Appendix — Alyeska Pipeline Service Co. v. Wilderness Society
Supreme Court brief1975
Ask Donna
What actually matters in this document.
Text
INDEX
P
Docket entries of the United States Court of Appeals
POI ie AMRUrIE Or CONIDIA: 2 22 tien 93% )0's.ehac
Docket entries of the United States District Court for
He District OF COMMMDIN occa cod 66550 ekd oaeees
Letter from Kenneth P. Fountain to Russell FE. Train,
Oar veer AMOR 6 5.0 SIN ae Oe ee
United States Department of the Interior, Trans
Alaska Pipeline: System Stipulations, September
cyte eee he ci cI At hy a pied! le gia tere Zp wea Peck
Federal Task Foree on Alaskan Oil Development, A
Preliminery Report to the President, September
Dei aM pate ete Phe Sie ce GS cd Fie SB a law OSS
Application for Pipeline Figntor Way, December 22,
1969
cd Cured Pat foe pit de tok ag Dee Soe beat Dea ak wa YA Niet Ra rN Voge We Yaa Te Ye Oe Tr lake Sele Set Ju be Seek” ge Ser
Federal Task Force on Alaskan Oil Development,
Chronology, April 1869 through February 1970. .
Rogers C. B. Morton, Statement of Reasons for Ap-
proval, Application for Pipeline Right-of-Way
and Ancillary Land Uses—Prudhoe B: iv to Val-
dez, Alaska: Appleation by State of Alaska for
Right-of-Way for Highway, May 11, 1972........
Motion of Plaintiffs for Partial Summary Judgment,
fu get (ANG) Le SOC ee
Defendant’s Motion to Place Plaintiffs’ Motion for
Partin] Summary Judgment in Abe ‘yance and Sup-
porting Memorandum, M: ny 17,1972
Defendants* Motion to Withhold Consideration of Mo-
tion for Partial Summary Judgment by Plaintiff,
Wilderness Society, et al: and Supporting Mem-
orandum, May 19, 1972
Plaintiffs Respouse to Defendant's Motion to Defer
Consideration of Plaintiffs’ Motion for Partial
Summary Judgment Under the Mineral Leasing
BCs ape) as 6 Et ae
Di ROS! /O xO: 0 (616) :0) 0.6.7.6 16) 61-8. 16, 10 <8 “e161 8.610
age
to
41
49
cg
S9
sa,
140
ll Index Continued *
Page
Brief of Appellee Alveska Pipeline Service Company
Covering Mineral Leasing Net and Terminal Fa-
etlity Issues, July 17, 1902, pp. 85-50 2000.02.00... 162
Brief of Appellee Alyeska Pipeline Service Company
Covering National Environmentat Policy Act Ts-
Ses tly ol, 192, PAA occa ee sevsc cede s ones 17s
Bill of Costs of Appellants. The Wilderness Society,
Mnvironmental Defense Fund, Inc. and Friends of
the Earth, February 25, 1973 0.000 00........000. 209
Notation: The Opinion and Judgment of
the United States Court of Appeals are
included in the Petition fora Writ of Cer-
tiorari, App. la-40a, and are reported at
495 F.2d at 1026 (1974).
IN THE
Suprenw Court of the United States
Ocroser Term, 1974
-No. 73-1977
ALYESKA PIPELINE SERVICE CoMPaANy,
Petitioner,
vs.
Tike WILpeRNEss Society, ENVIRONMENTAL DEFENSE
Funp, Ixc., AND FRIENps oF THE Eartu,
Respondents.
On Writ of Certiorari To The United States Court of Appeals
For The District of Columbia Circuit
—__——_—_
APPENDIX
9
DOCKET ENTRIES
UNITED STATES COURT OF APPEALS
FOR THE -
DISTRICT OF COLUMBIA CIRCUIT
No. 7 i2- 1796
ALYESKA PIPELINE Service Company, Petitioner
v.
The Winperness Society, EXviroNMENTAL DEFENSE Funn,
Inc. aND FrieNbDS oF THE Kartu, Respondents
DATE FILINGS
PROCEEDINGS
8-22-72 Certified Original Preliminary Reeord (2. vols.
cael (n-5)
8-23-72. 4—Appellant’s motion for eonsilers ation on briefs
filed ee and for expedited hearing (p-23)
8-25-72 Certified Oviginal Record (volumes 1-12) (8 vol-
umes of transeripts, 38 boxes containing depositions,
briefs and exhibits) (n-3
8-29-72 4—Response of Federal appellees to appellants’
motion for consideration on briefs filed below, and for
expedited hearing. and suggestion that such hearing be
held en bane (m-29) : .
8-29-72 4—Response of State of Alaska to motion to ex-
pedite hearing and for consideration of briefs below
(m-29)
8-29-72 4—R sponse of Alyeska Pipeline Serviee Com-
pany to motion to expedite appeal and for eonsidera-
tien of briefs below, and to the government’s sugges-
tion for hearing en bane (m-29)
9-1-72. Per Curiam order sua sponte, consolidating with
Nos. 72-1797 and 72-1798, for all purposes; granting
appellants’ motions for consideration on briefs filed
below and expedited hearing, and counsel for the par-
ties shall pronrptly file with this Court 20 copies of the
briefs filed in the District Court; suggestions for hear-
i
oo
Ing em\bane are submitted and a ruling thereon will be
made premptiv; Leventhal and Wilkey, CJ
9.6-72 4- Motion of United Distribution Companies for
leave to file brief for amicus curiae (m-6)
912-72 20--Brief for Appellants David Anderson and the
Canadian Wildlife Federation (i-i2)
9-12-72) 20—Reply brief for Appellants David Anderson
and the Canadiaw Wildlife Federacion (im-12)
9-12-72 20-—Brief for appellee State of Alaska (m-12)
913-72. 20—Brief for appellee Morton (m-15)
*9.12-72 20—Distriet Court Brief for State of Alaska (Na-
tional Environmental Policy Aet issues in) District
Court filed pursuant to order 9-1-72) (m-12)
9.13-72. 20—Appellees’ Morton memorandum of points
and authorities in response to issues raised in District
Court motion for partial summary judgment filed May
12, 1972 (filed in brief form pursuant to order 9-1-72)
(m-13)
9-14-72 20—Appellee’s Alyeska Pipeline Service Co., brief
filed in the District Court (filed in Brief form pursuant
to order 9-1-72) (National Environmental Policy Act
Tssues) (m-14) :
9-14-72 20—Appellee’s Alyeska Pipeline Service Co., brief
filed in the District Court (Mineral Leasing Act and
Terminal Facility issues) (filed in Brief form pursuant
to order 9-1-72) (m-14)
9-14-72 10—Volumes of supporting documents to appellee
Alyeska Pipeline Service Co., brief (covering Mineral
Leasing Act and Terminal Facility Issues)
9-14-72 10—Volumes of supporting documents to appellee
Alyeska Pipeline Service Co., brief (covering National
Environmental Policy Act Issues)
9-15-72 Per Curiam order en bane granting suggestion
that eases be considered by the Court sitting en bane
and eases are hereby scheduled for argument beforé the
Court sitting en bane at 10:00 a.m. on Friday, October
6, 1972: CJ Bazelon, Wright, MeGowan, Tamm, Lev-
H
‘
“4t
+
enthal, Robinson, MacKinnon, Robb and Wilkey, CJ;
CJ MeGowan did not participate in order
9-18-72 10—Joint Appendix
9-21-72. Per Curiam order granting motion of United Dis-
tribution Companies for leave to participate amicus
curiae and to proceed on the memyrandum and motion.
by Cordova, District Fisheries Union to correct mis-
nomer of appellant’s brief. CJ Bazelon, Wright, Me- .
Gowan, Leventhal, Robinson, MaeKinnon, Robb and
’. Wilkey: Judge McGowan did not participate
DATE » FILINGS— PROCEEDINGS
9-21-72 Per Curiam order granting petition of United Dis-
tribution Companies for leave to participate amicus
curiae and to proceed on the memorandum amicus
curiae filed below, also motion by the Cordova District
Fisheries Union to correct Misnomer of appellant’s
brief. CJ Bazelon, Wright, McGowan, Tamm, Leven-
thal, Robinson, MacKinnon, Robb and Wilkey, CJ,
Judge McGowan did not participate in order “
9-21-72 20—briefs amicus curiae of United Distribution
- Companies (m-6)
9-21-72 11— Joint motion of-all parties to extend time for
oral argument and for more than two counsel to be
~ heard for each side
9-25-72, 4—Motion of United Distribution Companies for
leavé to withdraw the name of one of the companies
listed as a member of the United Distribution Com-
panies (m-25) a
10-2-72 Per Curiam order granting motion of Uniced Dis-
tribution Companies for leave to withdraw the name
of Illinois Light Company as a member of United Dis-
tribution Companies. CJ Bazelon, Wright, McGowan,
Tamm, Leventhal, Robinson, MacKinnon, Robb, and
Wilkey, CJ, Cireuit Judge McGowan did not partici-
pate in order ‘ :
10-2-72 Per Curiam order granting joint motion for addi-
tional time and for more than two counsel to be heard
X
D \
for each side: amending order of September 15, 1972
to reflect the time of oral argument ta be 9:30 a.m. in-
’ stead of 10:00 aun, Cd Bazelon, Wright, MeGowan,
Tamm, Leventhal. Robinson, MacKinnon, Robb and
Wilkey, CJ; Circuit Judge MeGowan did not partici-
pate in order
10-3-72 4—Motion of ‘Alyeska Pipeline Service Co., for
Jeave to file supplemental joint, appendix (m-35)
10-6-72 Argued before CI Bazelon, Wright, Tamni, Lev-
enthal, Robinson, MacKinnon and Wilkey, CJ, the
court announced that Circuit Judge Robb is a member
of the .en bane court but is unable to be present, the
case will be submitted to him on the briefs and tape
recording: on motion by Mr. Thomas F. Hogan, Mr.
Warren W. Matthews. Jr. a member of the bar of the
Supreme Court of Alaska was allowed to argue pro
hae vice for appellant, Cordova District Fisheries
Union: on motion by Mr.,William TT. Allen, Mr. John
E. Havelock a member of ilie Supreme Court of Alaska
was allowed to argue for appellee State of Alaska;
counsel for the parties were granted leave to file the
transcript of the argume.:t in the Distriet Court:
10-18-72 Order per CJ oe en bane, granting joint
motion for permissiotto file a supplement joint ap-
pendix and Clerk is directed. to file the supplemental
joint appendix lodged herein on October 3rd; CJ Baze-
lon. and Wright, Leventhal, Robinson, Mae Kinnon,
Robb and Wilkey, CJ . ;
10-18-72 10—Joint supplemental appendix (
10-20-72 Per Curiam order directing Clerk to file in these
consolidated eases the letter of October 4, 197° from
counsel for United Distribution Co., requesting that .
the name of Consolidated Natural Gas System, and
affiliates, together with the name of their attorney, Mr.
H. P. Sullivan, be expunged from the memorandim
amicus curiae of United Distribution Companies filed
on July 31, 1972; the request is granted; CJ Bazelon
6
and Wright. Leventhal, Robinson, Robb and Wilkey,
CJ
10-80-72 Letter dated October 4, 1972, from United Dis-
tribution Co.—granted
11-15-72 4-—joint motion for consolidation of numbers and
captions in opinion
11-80-72. +—appellees’ motion for leave to file supplemen-
‘tal information (m-30)
12-4-72 4—Response of the Wildemess Society, Environ-
mental Defense Fund, Ine., and Friends of the Earth
to seeretary’s motion for leave to file supplemental in-
formation (m-?7)
12-11-72) Per Curiam order by the Clerk for the Court
grouting motion of the Seereteary of the Interior for
leave to file supplemental information and Clerk is
directed to file Supplemental information
12-11-72) +-Supplemental information for the Secretary
of Interior (m-20)
DATE FILINGS—PROCEEDINGS
1-5-7838) Order per CJ Bazelon granting joint motion for
consolidation of numbers and eaptions and the caption
in the consolidated eases is hereby amended to read as
follows; Nos. 72-1796, 72-1797 and 72-1798 The Wilder-
ness Society, Environmental Defense Fund, Ine.,
Friends of the Barth, and David Anderson, Canadian
Wild Life Federation and The Cordova District Fish-
eries Union, Appellants v. Rogers C. B. Morton, Seere-
tarv of the Interior, Earl L. Butz, Secretary of Agri-
eulture and Alyeska Pipeline Service Company, and
State of Alaska
2-9-7383 Opinion for tie Court by Cireuit Judge Wright.
2-9-73 Opinion by Cireuit Judge MacKinnon, Coneurring
in part and dissenting in part.
2-9-7383 Opinion by Cireuit Judge Robb, coneurring in part
and dissenting in part. .
2-9-73 Opinion by Cireuit Judge ‘Wilkey, coneurring in
part and dissenting in part.
ya
9.9.73 Judement vacating judgment of the District Court
ar smanding case for further consideration (n)
2-21-38 Receipt dated February 21, 1973 from the Clerk,
District Court for the twelve volumes of original rec-
ord with reporter's transcripts (8 vols.) and three
boxes of depositions, briefs and exhibits also prelim-
inary record with reporter’s transcript (2 vols.)
9.92.73 1—Bill of Costs of the Wilderness Society, En-
vironmental Defense Fund, Inc.. and The Friends of
the Earth (p-25)
3-1-7383 4—Appellee’s motion for stay of Mandate Pending
application for a writ of Certiorari (p-1)
3-2-78 4 -Appellee’s Alyeska Pipeline Service Co. mo-
tion to defer action on Appellant’ bill of costs (p-2)
3-6-72 4—Appellants’ opposition to motion of Alyeska
Pipeline Service Company for stay of Mandate and
Deferal of Action Costs (p-6)
3-7-7383 4 Motion of Federal Appellee to file response to
the appellants’ bill of costs time having expired (m-7)
3-19-73 Notice of filing certiorari in Supreme Court on
Mareh 9, 1973, in S.C. = 72-1227, 72-1228, and 72-1°29
8.97.73 Per Curiam order en bane granting motions of
appellee Alyeska Pipeline Service Co. for stay of man-
date pending application to the Supreme Court for a
writ of certiorari motion of appellee Alyeska Pipeline
Service Co. for deferral action on appellants’ bill of
costs: motion for permission to file a response by the
Federal Appellees to appellants’ bill of costs out of
time: Clerk is difected to stay the issuance of the
mandate for a period of 30 days, the stay granted
herein shall be subject to the provisions of Rule 41 (b)
of the FRAP: CJ Bazelon:; and Wright. Leventhal,
Robinson, MacKinnon, Robb and Wilkey, CJ
3-27-78 4-—-Response by the Federal appellees to the ap-
pellanit’s s hill of costs (m-7)
4-5-78 Certified Copy of Sie Court denying certiorari
on April 2, 1973 in S.C. #72-1227, 72-1228 and 72-1229
8
4-9-73 4—Appellee’s Alyesk« Pipe Line Service Co. mo-
tion to set time to file reply to Bill of Costs to April
20th (p-9)
4-19-73) Per Curiam order en bane granting appellee’s:
(Alyeska Pipeline Service Co.) motion to set the time
for filing responses to appellants’ bill of costs and the
time for filing responses to the bills of eosts filed en
behalf of appellants’ is extend to Apvil 20, 1973; CF
Bazelon; Wright, Leventhal, Robinson, MaeKinnon,
Robb and Wilkey, CJ
4-20-73 10—Federal Appellees’ supplemental response to
the bills of costs filed by appellants (p-20)
DATE & FILINCS-—-PROCEEDINGS
4-20-73 10—Alyeska Pipeline Service Co., response to ap-
pellants’ bill of costs (m-20)
4-20-73 10—State of Alaska’s response to appellants’ bill
of costs (p-20)
4-25-73 10—Motion of Wilderness Society Environmental
Defense Fund, Inc. and The Friends of the Earth to
extend time to file response to appellees’ bill of costs
(p-25)
(B)4-80-783 Clerk’s order granting motion of appellants
The Wilderness Society, Environmental Defense Fund,
Ine., and Friends of the Earth to extend time to file
responses to Bill of Costs to May 2nd
_ (1)5-2-78) 4-—Response of The Wilderness Society, EDF,
Inc., and Friends of the Earth to the bill of costs (p-2)
(S)5-4-78 4-—Response by Appellant, Cordova District
Fisheries Union, to Appellees’ oppositions to Cordova
District Fisheries Union Bill of Costs (m-2) (OK THK)
(M)5-9-78 Per Curiam order en bane that Clerk is di-
reeted to issue the opinion and certified copy of this
Court’s judgment to the District Court forthwith; CJ
Bazelon, and Wright, Leventhal, Robinson, MaeKin-
non, Robb and Wilkey, CJ
5-9-78 Copy of opinion and certified copy of judgment
issued to the District Court.
9
(S)5-23-73 10—Appellants*’ motion for leave to file sup-
plemental information (Wildernes. Society, Environ-
mental Defense Fund, Inc., and Friends of the Earth)
()»-23)
(M)6-6-73 Order Per CJ) Bazelon eranting appellants’
motion for leave to file supplemental information; and
the Clerk is directed to file the opinion of the U.S.
Supreme Court, in Hall, et al v. Cole, No. 72-630
(M)6-6-73 10—Supreme Court opinion (m-23)
(S)6-11-73 10—Appellants’ motion for leave to file sup-
plemental information (Wilderness Society, Environ-
mental Defense Fund, and Friends of the Earth) (m-
11)
(M)6-13-78 Per Curiam order en bane, sua sponte, that
the pending motions with respect to appellants’ bill of
costs shall be argued before the Court sitting en banc
at 11:00 A.M. on Wednesday, July 11, 1978; each side
be allotted 15 minutes for oral argument; the total time
allotted for argument is 30 minutes; CJ Bazelon, and
Wright, Leventhal, Robinson, MaeKinnon, Robb ‘and
Wilkey, CJ
(M)6-26-73 Per Curiam order en bane granting appel-
lant’s motion for leave to file supplemental informa-
tion: CJ Bazelon:; and Wright. Leventhal, Robinson,
MacKinnon, Robb and Wilkey, CJ
(M)7-10-78 10—Appellanis’ motion for leave to file sup-
plemental information (p-10)
(B)7-11-73 Per Curiam order en bane granting appellants’
motion for leave to file supplemental information;
Bazelon, CJ: Wright, Leventhal, Robinson, MaeKin-
non, Robb and Wilkey, CJ
(B)7-11-78 1—Supplemental information
(M)7-11-73 Reargued before CF Bazelon, Wright, Lev-
enthal, Robinson, MaeKinnon, Robb and Wilkey. CJ:
the ease was called for hearing on-motions for bill of
costs filed by Friends of the Earth and The Cordova
Distriet Fisheries Union
10
(S)7-18-73 10—Appellants’ motion for leave to file sup-
plemental information (m-13) !
(B)7-26-73 Order per CJ Bazelon granting appellants’
motion for leave to file copy of order entered in the
United States District Court for the District of Co-
lumbia in Pyramid Lake Paiute Tribe of Indians v.
Morton, Civil Action 2506-70, D:D.C. June 22, 1978
(B)7-26-78 4—Supplemental information (order of Pyra-
nid Lake Paiute Tribe of Indians v. Morton)
(S)10-15-73 Letter from Appellants advising of additional
authorities pursuant to loeal Rule 8(¢)
(S)11-19-73 11—Letter from Appellants’ advising of ad-
ditional authorities pursuant to local Rule 8(¢)
(G)1-25-74 Letter from Dennis M. Flannery advising of
additional authorities pursuant to local Rule 8(g)
DATE FILINGS—PROCEEDINGS
(M)38-21-74 Per Curiam order en bane, sua sponte, that
the Clerk of the District Court is directed to certify
and transmit Item Nos. 61 thru 80 to this Court as a
supplemental record on appeal as promptly as the busi-
ness of his office permits: CJ Bazelon; Wright, Lev-
enthal, Robinson, MacKinnon, Robb and Wilkey, CJ
(G)3-21-74 Certified Original Supplemental Record (ne
transcript) (n)
4-4-74 Opinion for the Court filed by Cireuit Judge
Wright.
4-4-74 Dissenting opinion filed by Cirenit Judge MacKin-
non.
4-4-74 Dissenting opinion in which Cirenit Judges Mac-
Kinnon and Robb join, filed by Cireuit Judge Wilkey.
4-4-74 Per Curiam order by the Clerk approving all ex-
penses requested by appellants. Costs therefore are
taxed in the amount of $11,051.65 against Alyeska Pipe-
line Service, State of Alaska and USA. Bill of costs is
remanded to District Ce ivt for setting of Attorneys
fees in accordance with the opinion of this Court filed
this date.
Oo
11
4-11-74 Receipt dated April 9, 1974 from the Clerk, Dis-
trict for the supplemental record containing exhibits
(P)4-29-74 Certified copies of orders and opinion issued
‘to District Ceurt.
(P)4-29-74 Certified bill of costs for appellants Wilder-
ness Society, Environmental Defense Fund, Ine., and
Friends of the Earth issued to District Court.
6-12-74. Order per Circuit Judge Wright amending opin-
ion of 4-4-74.
(1.)7-8-74 Notice from Supreme Court in filing petition
for certiorari in S.C. #73-1977 on July 3, 1974
(1.)10-23-74 Certified copy of order from Supreme Court.
granting petition for certiorari in S.C. #73-1977 on
October 15, 1974
(G)11-21-74 Letter from Clerk of Supreme Court request-
ing original record and pleadings before this court
(M)12-9-74 Preliminary Record—(2 vol. of transcript)
Original Reeord (vols. I-V) (8 vols. of transeript with
the original record and supplemental Record (Exhibits
—2 boxes) returned by the Clerk of the U.S. District
Court
(M)12-2-74 Order per CJ Bazelon the Clerk of the District
Court for the District of Columbia shall return the
record to this Court as promptly as the business of
his office permits; and the Clerk of this Court shall for-
ward the record to the Supreme Court as promptly
as the business of his office permits .
(M)12-2-74 Certified copy’ of the above order sent to
Clerk, U.S. District Court
(M)12-2-74. Order per CJ Bazelon that the Clerk is di-
rected to prepare a certified record, consisting of the
following; 1. a copy of the appendices filed September
13, 1974; 2. a copy of the Joint appendix filed Septem-
ber 18, 1972: 3. a copy of the supplemental appendix
filed October 18, 1972: 4. a copy of the opinion and
judgment filed February 9, 1973;5. a copy of the opin-
ions and order filed April 4. 1974; 6. a copy of this
12
order; the Clerk is directed to transmit the certified
record to the Cierk of the Supreme Court
(M)12-10-74 Certified copy of the above order and the
Preliminary Reeord (2 vol. of trans.) Original Reeord
vols. I-V (8S vol. of trans.) and Supplemental record
(2 boxes of exhibits) sent to Clerk, Supreme Court
(M)12-10-74 Receipt returned from Clerk, Supreme Court
for all of the above records, ete.
DOCKET ENTRIES
UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA
WILDERNESS SOCIETY V. HICKEL
(CA: No. 928-70)
DATE PROCEEDINGS
1970 Deposit for cost by
Mar. 26—Complaint, appearance; Appendix A, B, Cy D;
‘ filed. :
Mar. 26—Summons, copies (3) and copies (3) of Complaint
issued Deft 3-27; DA 3-51; AG 3-27-70.
Mar. 26—Motion of pltff-. for Preliminary Injunction;
Memorandum of Law; Exhibit. M.C.; filed.
Mar. 26—Motion of pltffs. to consolidate; P & A’s. M.C.;
filed.
Mar. 26—Certifieate of Service, Mareh 26, 1970; filed.
Mar. 30—Affidavits (8); p/’s 3 30/70; filed.
Mar. 31—Affidavits (4) by pltf.; p’s 3.31/70; filed.
Mar. 31—Notice by pltfs. of hearing; p/s 5/31/70; filed.
Apr. 1—Affidavits (5) by pltfs.; p/s 4/1/70; filed.
Apr. 1—Affidavit of John W. Thomson; ¢’s 3/31/70; filed.
Apr. 1—Motion of pltfs. for temporary restraining order;
exhibit; affidavit; P& A; with exhibit; p/’s 4/1/70; filed.
Apr. 1—Affidavit of Gary W. Crosby; p/s 4/1/70; filed.
Apr. 2—Stipulation extending time for deft. to respond to
~
motion for preliminary injunction to 4/7/70; filed.
18
Apr. 83—Affidavit of Sigurd F. Olson; e/m 4/3/70; filed.
Apr. 3—Motion of pltfs. for temporary restraining order,
endorsed: ‘‘Balancing the Equities as it must ‘and as-
suming standing to sue, the application is denied. Hear-
ing on preliminary injunction sct for 4- 3-70’" (fiat)
(N) MeGuire, J.
Apr. 6—Notiece of appeal by pltfs. from order of 4-3-70;
copy mailed to Herbert Pittle; deposit $5.00 by Moor-
man; filed.
Apr. 6—Copy of corrected page 18 of memorandum of law
in support of motion for preliminary injunction by
pltf.; e/m 4-2-70; filed.
Apr. 6—Amended complaint; appendix A, B, C, D, & E;
p/s $6-70; filed.
Apr. 7—Transeript of proceeding 4-3-70; Reporter Joan
E. Warren (Court’s Copy); filed,
Apr. 7—Brief by deft. in opposition to motion for prelim-
inary injunction; p/s 4/7/70; affidavits of Jack O.
Horton with exhibits 1 thru 28; affidavit of Jack O.
Horton = 2: affidavit of Robert S. Burd, Spencer H.
Smith. William T. Pecola, Keith Hl. Miller, Robert L.
Beardsley, W. G. Stroecker, R. W. Groff, Edgar M.
Clausen, M. B. Ringstad, C. W. Baer, E. S. Albright,
James A. Thompson, Jr. and Thomas J. Moore and
William I. Waugaman; filed.
1970
Apr. 9—Reply of pltfs. and rehearing memorandum; Ex-
hibit A, B, C; attachmen‘s (2) to affidavit; ¢/m 4 9/70;
filed.
Apr. 16—Objections of defendant to plaintiff’s proposed
form of preliminary injunction; ¢/m 4-16-70; M.C.;
filed.
Apr. 15—Stipulation of voluntary dismissal of appeal from
denial of motion for temporary restraining order. (N)
N/371; McGuire, J. .
Apr. 22—Objections of deft. to proposed findings>of fact
a
and conclusions of law; ¢/m 4/22; M.C.; filed.
14
Apr. 24—Injunction undertaking of pltf. in sum of $100.00
with National Surety Corp. approved; filed.
Apr. 23—Proposed Findings of Fact and Conclusions of
Law of pltf.; filed.
Apr. 23—Findings of Fact and Conclusions of Law. (N);
Hart, J.
Apr. 23—Preliminary injunction $100.00 bond; U.S. Mar-
shall to serve a copy of this Order forthwith. (N)
Serv. 4-29-70. Hart, J.
May 20—Interrogatories of pltfs. to deft; ¢/m 5-19-70;
filed.
May 26—Answer of deft. to amended complaint; em 5/20;
appearance of Herbert Pittle; filed.
May 26—Calendared (AC/N)
May 28—Motion of deft. for enlargement of time to re-
spond to interrogatories; P&A;e@ m5 28; M.C.; filed.
June 2—Opposition of deft. to motion for enlargement of
time to respond to interrogatories; p/s 6/2/70; filed.
June 5—Motion of deft. for enlargement of time to answer
interrogatories of time to answer interrogatories to
June 30, 1970. granted. (fiat) (N) Hart, J.
June 12—Interrogatories of pltf. to deft.; ¢ m 6 11,70;
filed.
June 22—Motion of deft. for enlargement of time to object
or answer second set of interrogatories; P&.\: e/m
~ 6/19/70; M.C.; filed. — .
June 30—Objections of deft. to interrogatories; em 6°30/
70; M.C.; filed.
June 30—Answer of deft. to interrogatories; e/m 6.30 70;
filed.
Jul. 13—St'pulation as to corrections to transeript of pro-
eeedings on pltfs. motion for preliminary injunction.
Jul. 20—Request of pltf. for deft. to produce for inspection
certain docvraents; ¢/m 7/17/70; filed.
Jul. 24—Motior of plitfs. to compel answers to interroga-
tories; P&.4; ¢/m 7/22; M.C.; filed.
g
15
DATE PROCEEDINGS
1970
Jul. 27—Motion of deft. for enlargement of time to object
to or answer second sect of interrogatories; P&.A; ¢/m
7-27-70; M.C.; filed.
Jul. 31—Stipulation extending time for deft. to oypose mo-
tion to compcl answers to first set of interrogatories
to August 10, 1970; filed.
Aug. 10—Opposition of deft. to motion to compel answers
to interrogatories; ¢,’m 8/10 70; filed.
Aug. 12—Supplemental answers of deft. to interrogatories ;
e/m 8/11/70; filed.
Aug. 20—Answer of deft. to request to produce; ¢/m 8/17;
filed.
Aug. 20—Request of pltfs. to admit, pursuant to Rule 36,
that the letter appearing in the Fairbanks Daily News
Miner on July 20, 1970 is a true copy of a letter from
deft. to William Randolph Hearst, Jr.; exhibit; ¢/m
8/19; filed.
Sep. 1—Motion of deft. for enlargement of time to object
or answer second set of interrogatories; P&A; ¢/m
8/28; M.C.; filed.
Sep. 10—Transcript of proceedings—pages 1-50; FE. Alfred
Kaufman, Reporter (Court’s Copy): filed.
Sep. 30—Request of pltfs. for_production of documents ;
appendix 1; ¢ m 9/25/70; filed.
Oct. 6—Appearance of Victor TH. Kramer as counsel for
pltfs. ¢/m 10-1-70; filed.
Oct. 26—Answer of deft. to plifs. request to produce; ¢/m
_ 10-23-70; filed.
Oct. 28—Motion of deft. for enlargement of time to re-
spond, to interrogatories; P&A; ¢/m 10-27-70; M.C.;
filed.
Oct. 28—Answer of deft. to interrogatories (II) (Partial) ;
Appendix A, B, C. and D; ¢’m 10-27-70; filed.
Oct. 28—Objections of deft. to interrogatories ; P&A; ¢/m
10-27-70; filed.
o
VA
16
Nov. 10—Motion of pltfs. to compel answers to interroga-
tories and inspection of documents; P&A; affidavits
(3); ¢’m 11-10-70; filed.
Nov. 24—Response of deft. to pltf’s. motion to compel an-
swers to interrogatories and inspection of documents;
exhibits (2); e¢/m 11-23-70; filed.
Nov. 30—Answers of deft. to interrogatories; ¢/m 11-27-
70; filed.
Dee. 1—Memorandum of pltfs. in reply to defts. response
to pltfs. motion to compel answers to interrogatories
and inspection of documents; affidavit; exhibits (2);
e/m 11-30-70; filed. "
Dee. 8—Supplemental memorandum of pltfs. in support of
their motion to compel answers to interrogatories and
inspection of documents; e/m 12-8-70; filed.
DATE PROCEEDINGS
1970
Dee. 15—Supplemental motion of pltfs. to compel answers
to pltfs. interrogatories; P&A; ¢/m 12-15-70; M.C.;
filed.
Dec. 15—Request of pltfs. to supplement responses to in-
terrogatories and requests to produce; e/m 12-15-70;
filed.
Dee. 30—Opposition of deft. to pltfs. supplemental motion
to compel answers to interrogatories and inspection of
documents; ¢/m 12-24-70; filed.
1971
Jan. 8—<Al]]l discovery motions continued to 2-26-71 at 1:30
p.m.; filed.
Feb. 22—Interrogatories of pltf. to deft. as amended; ¢/m
2-19-71; filed.
Feb, 25—Consent order directing deft. answer plaintiffs
interrogatories (II) not later than 4-22-71; plaintiffs
may file motion to compel production of documents as
to which a claim of privilege has been asserted. (N)
Hart, J. .
Apr. 23—<Answer of deft. to interrogatories (ITI) as
amended; ¢/m 4-22-71; filed.
17
oY A
May 4—Consent order extending time for pltfs. to request
production of documents to and including 5-13-71. (N)
Hart, J.
May 13—Request of pltfs. to produce documents for in-
spection and copying; p/s 5-13-71; filed.
May 27—Response of deft. to pltfs. request to produce ;
filed.
*May 27—Consent order enlarging time for deft. to pro-
duce all documents identified in pltfs. request to pro-
duce to and including the times specified in said re-
sponse for each document. (N) Hart, J.
June 29—Certificate of service of exhibits and motion to
change venue mailed 6-29-71; exhibits A, B, C and
exhibit 1; filed.
*June 28—Motion of deft. to change venue; P&A; ¢/m 6-28-
71; M.C.; filed.
July 2—Motion of pltfs. for enlargement of time to re-
spond to motion for change of venue; P&A; p/s 7-2-71;
M.C.; filed.
July 6—Motion of pltfs. for enlargement of time to re-
spond to defts. motion to change venue to 7-19-71,
granted. (Fiat) (N) Hart, J.
July 19—Memorandum of P & A of Pltfs. in opposition to
motion for change of venue; attachments a, b, ¢, d, e, f,
& g; affidavits (5) ; P/S 7-19-71; filed.
DATE PROCEEDINGS
1971
July 27—Response of deft. to pltfs. memorandum of P&A
in opposition to motion to change venue; attachment
1; ¢/m 7-27-71; filed.
July 30—Supplemental memorandum of pltf. in opposition
to motion for change of venue; p/s 7-30-71; filed.
July 30—Affidavit of Peter LaBate; filed.
July 30—Motion of deft. to change venue argued and de-
nied. (OTBP) (R»porter G. Nevitt) Hart, J.
Aug. 5—Appearance of Dennis M. Flannery as counsel for
pltfs. and also Saunders Cook Hillyer; filed.
13 ™
Aug. 9—Order eine defts. motion for change of venue.
™) Hart, J ‘ \
legtiieate of mailing; copy of praccipe filed
8-5: 71 on 8-10-71; filed.
Aug. 20—Motion of Alyeska Pipeline Service Company to
intervene as a defte; attachment 1; P & A; appendix
A & B; Exhibit; P/S 8-20-71; M.&.; filed.
Aug. 24—Appearance of John F. Dretelt counse] for pitfs.;
¢ m 8-24-71; filed. ;
Aug. 27—Memorandum by pitfs: in response to motion of
Alveska Pipeline Service Company to intervene as a
deft.; Exhibit A & B; ¢ m 8-27-71; filed.
Aug. 30—Motion of the State of Alaska for leave to Inter-
vene; P & A’s; Exhibit; Affidavit; e/m 8-20-71; M.C.;
appearance of Mr. Kenneth Frank, Asst. Atty. Gen.;
(State Capitol, Pouch, IK Juneau, Alaska.) filed.
Sep. 7—Memorandum of pltf. in response to motion of
State of Alaska to interven Exhibit A; e/m 9-7-71;
filed. —S
Sep. S—Appearance of William If. Allen and Richard D.
Copaken as attorneys for the State of Alaska, inter-
venor; filed.
Sep. 10—Order motion of State of Alaska to intervene as’ ca
deft. on condition that Alaska file pleading no later
than 9-30-71. (N) Hart, J.
Sep. 20—Order granting Alvyeska Pipeline Service Co.’s
motion to intervene; for production of documents, (N)
Aug.
Jones, J.
Sep. 830—Answer of intervenor, State of Alaska, to
amended complaint; cross-claim vs. deft. C. B. Morton;
em 9-30-71; filed.
Oct. 14—Request of pltf. for produetion of documents;
e/m 10-14-71; filed.
Oct. 14——Request of pltf. for admissions; ¢ ‘m, 10-14-71;
filed. =,
\
19
DATE PROCEEDINGS
1971
Nov. 11—Notice of pltfs. to take deposition of Dr. Fred-
erick J. Sanger; ¢ m 11-11-71; filed.
Nov. 15—Motion of David Andetsen and the Canadian
Wildlife Federation for leave to intervene; P& A; @ mM
11-15-71; M.C. Deposit $5.00 by Berlin; appearance of
Borlin, Roisman and Kessler; filed.
Nov. 15-—Motion of deft. for order determining that action
be maintained as a class action; P&A; ¢ m 11-15-71;
M.C.; filed.
Nov. 16—Motion of pltf. to clarify preliminary injunction;
P&A: table of content; memorandum, exhibits A-G;
p/s 11-16-71; draft environmental statement; M.C.;
filed. ;
Nov. 17—Motion of pltfs. for protective order; P&A; affi-
davit; @/m 11-17-71; M.C.; filed.
Nov. 17—Answer of defts. to pltfs. request for production
of docuinents; ¢/m 11-16-71; filed.
Nov. 17—Answer of defts. to request for admissions: ¢/m
“16-71; filed.
NW. 18—Response of pitfs. to defts. motion for protective
order: attachment; affidavit: ¢ m 11-18-71: filed. |
Nov. 18—Transeript of proceedings 11-18-71, pages 1-8. Re-
porter E, Kaufman. (Clerk's copy): filed.
Nov. 19—Order directing that deposition of Dr. Sanger
not be taken°on 11-19-71 and not until after he has
completed his work on NEPA impact statement; coun-
se] for deft. shall then notify plifs. for said deposition.
(N) Hart, J. BR. Ww
Xov. 22—Motion of deft. #1 for extétton of time to re-
spond to motion to clarify preliminary injunetion: ¢ m
11-19-71; M.C.; filed.
Nov. 22—Motion of deft. #1 for extension of time to re-
spond to motion to intervene: ¢ m 11-19-71; M.C.; filed.
Nov. 22—Motion of intervenor, State of Alaska for exten-—
sion of time to respond to pltfs. m¢tion for preliminary
injunction; ¢/m 11-22-71: M.C.; ‘led. .
20
Nov. 22—Motion of intervenor, State of Alaska to extend
time to respond to motion by David Anderson and
Canadian Wildlife Federation to intervene; ¢/m 11-
22-71; M.C.; filed.
DATE PROCEEDINGS
1971
Noy. 22—Motion of deft. Alyeska Pipeline for extension of
time to respond to motion by David Anderson, et al
to intervene; ¢’m 11-22-71; M.C.; filed.
Nov. 22—Motion of deft. Alyeska Pipeline for extension of
time to respond to pltfs. motion to clarify preliminary
injunction; ¢/m 11-22-71; M.C.; filed.
Nov. 28—Motion of pltfs. for extension of time to respond
to motion by David Anderson and Canadian Wildlife
to intervene; ¢/m 11-23-71; M.C.; filed.
Nov. 23—Motion of pltfs. for extension of time to respond
to defts. motion for order determining that action shall
be maintained as a class action; e/m 11-23-71; M.C.;
filed.
Nov. £3—Memorandum of intervenor, State of Alaska, in
response to defts. motion for order determining that
action shail be maintained as a class action; ¢/m 11-
23-71; filed.
Nov. 283—Memorandum of Points and Authorities sub-
mitted by deft. Alyeska Pipeline Service Co. in support
of defts. motion to have this action maintained as a
class action; appendix 1; ¢/m 11-23-71; filed.
Nov..23—Motion of intervenor, State of Alaska, for exten-
sion of time to 11-23-71 to respond to motion of David
Anderson and Canadian Wildlife Federation to inter-
vene granted. (Fiat)(N) Hart, J.
Nov. 23—Motion of deft. Rogers C. B. Morton for exten-
sion to 12-10-71 of time to respond to pltfs. motion to
clarify preliminary injunction granted. (Fiat) (N)
Hart, J. .
Noy. 23—Motion of deft. Alyeska Pipeline Service for ex-
tension of time to 11-30-71 to respond to motion of
21
David Anderson and The Canadian Wildlife Federa-
tion to intervene. (Fiat) CN) Hart, J.
Nov. 23—Motion of deft. Rogers C. B. Morton for exten-
sion of time to 11-80-71 to respond to motion of David
Anderson and the Canadian Wildlife Federation. to in-
tervene. (Fiat)(N) Hart, J.
Nov. 23—Motion of intervenor, State of Alaska, to extend
to 12-10-71 time to respond to plitfs. motion to clarify
preliminary injunction. (Fiat) () Hart, J.
DATE PROCEEDINGS
1971
Nov. 23—Motion of deft. Alyeska Pipeline Service to ex-
tend to 12-1-71 time to respond to pltfs. motion to
clarify preliminary injunction (Fiat) (N); filed.
Nov. 29—Transcript of proceedings 7-80-71, vol. 1, pages
1-41. Gerald Nevitt, Reporter (Court’s copy); filed.
Nov. 30—Memorandum of pltfs. in response to motion by
David Anderson and the Canadian Wildlife Federation
to intervene as plts.; ¢°m 11-30-71; filed.
Nov. 30—Memorandum of pltfs. oa opposition to motion
for order determining that this action shall be main-
tained as a class action; ¢/m 11-30-71; filed.
Nov. 30—Memo of intervenor State of Alaska in opposi-
tion to motion of David Anderson and Canadian Wild-
life to intervene; ¢/m 11-30-71; filed.
Nov. 30—Memo of Alyeska Pipeline Service Co. in oppo-
sition to motion by David Anderson and Canadian
Wildlife to intervene; ¢/m 11-30-71; filed.
Nov. 30—-Memo of deft. in opposition to motion of David
Anderson and Canadian Wildlife to intervene; filed.
Dee. 1—Attachment to memorandum of Alyeska Pipeline
Service Co. in opposition to motion by David Anderson
and the Canadian Wildlife Federation to intervene;
filed.
Dee, 1—Memorandum of points and authorities of Alyeska
Pipeline Service Co. in opposition to plitfs. motion to
Ji
29
.
clarify preliminary injunction; appendix 1; ¢/m 12-1-
71; filed.
Dee. 2—Motion of David Anderson and the Canadian Wild-
life Federation to intervene, denied. (Fiat)(N) Hart, J.
Dec. 3—Answer of deft. Morton to cross-claim of inter-
venor State of Alaska; ¢/m 12-2-71; filed.
Dee. 6—Metion of David Anderson and the Canadian Wild-
life Federation for rehearing and reconsideration of
the denial of their motion for leave to intervene; P&A;
exhibit; e/m 12-3-71; M.C.; filed. °
Dec. 7—Notice of pltfs. to take depositidn of Russell E.
Train; ¢/s 12-7-71; filed.
DATE PROCEEDINGS
1971
Dec. 7—Notice- of pltfs. to take deposition of Burton W.
Sileoek; ¢/s 12-7-71; filed.
Dec. 7—Notice of pltfs. to take depositions of individuals
designated by Dept. of Interior; e/s 12-7-71; filed.
Dec. 7—Notice of pltfs. to take deposition of William T.
Pecora; ¢/s 12-7-71; filed.
Dec. 7—Notice of pltfs. to take deposition of Jack O. Hor-
ton; c/s 12-7-71; filed.
Dec. 8—Motion of pltfs. for extension of time in which to
file reply memorandum; P&A’s; e/m 12-7-71; M.C.;
filed”.
Dec. 9—Memorandum of P&A’s by defts. in opposition to
motion to clarify preliminary injunction; e/m 12-9-71;
filed.
Dec. 9—Motion of pltfs. for extension of time to file reply
Memorandum, granted. (Fiat)(N) Hart, J.
Dec. 10—Memorandum of intervenor State of Alaska in
opposition to pltfs. motion to clarify injunction; ¢/s
12-10-71; filed. ,
Dec. 13—Motion of deft. for protective order quashing
notices for taking of depositions; P&A; affidavit; ¢/m
12-10-71; M.C.; filed.
5
23
Dec. 13—Opposition of pltfs. to motion for protective or-
der quashing notices for taking of depositions; ex-
hibits (2); ¢/m 12-13-71; filed. .
Dee. 13—Response of Alyeska Pipeline Service Co. to mo-
tion for protective order; appendix I; ¢/m 12-13-11;
filed.
Dee. 15—-Reply of pltfs. to defts. opposition to motion to
clarify preliminary injunction; exhibits A&B; ¢/m 12-
15-71; filed.
Dec. 15—Order granting motion of deft. for a protective
order; depositions not be noticed or taken until after
filing of final section 102. (N) Hart, 4
Dee, 23—Transeript of proceedings 12-14-71. E. A. Kauf-
man, Reporter. (Court's copy) ; filed.
Dee. 29—Appearance of James N. Barnes as attorney for
pltfs; ¢/m 12-29-71; filed.
Jan. 10—Supplemental exhibits (2) to pitfs. motion to
clarify preliminary injunction; ¢ m 1-10-R; filed.
DATE PROCEEDINGS
1972
Jan. 10—Copy of a letter 1-10-72 to case attorneys from
Judge Hart; exhibits A&B and C; filed.
Jan. 18—Order denying Mo. of David Anderson and the
Canadian Wildlife Federation for reconsideration of
their mo. for leave to intervene. (N) Hart, J.
Jan. 18—Order denying mo. of pltfs. to clarity preliminary
injunction. (N) Hart. J.
Jan. 31—Notice of appeal by Intervenors David Anderson
and the Canadian Wildlife Federation from order of
January 18, 1971, Deposit $5.00 by Berlin copies mailed
to Herbert Pittle, Dennis Flannery, John Dienelt, Paul
F. Mickey, Quinn O’Connell, John Krodell, John Have-
lock, and William Allen; filed.
Jan. 31—Preliminary Ree. on appeal delivered to USCA;
Deposit by Mr. Berlin $1.00; Receipt from USCA for
Prel. ree.; filed.
24
Feb. 2—Motion of pltfs. to compel production of docu-
ments; P & A; Table of cases; memorandum; With
exhibits A through F; P S 2-2-72; M.C.; filed.
Feb. 8—Motion of deft. Alyeska Pipeline Service Co. for
extension of time to respond to pltfs. motion to compel
production of documents; ¢/m 2/8; M.C.; filed.
Feb. 16—Motion of pltfs. to compel production of docu-
ments; P & A; table of cases; memorandum; ¢/m. 2-16-
72; M.C.; filed. -
Feb. 16—Motion of deft., Alyeska Pipeline for extension of
time until Feb. 18, 1972 to respond to motion to compel
production of documents, granted. (Fiat)(N) Hart, J.
Feb. 18—Memorandum of Points & Authorities of Alyeska
Pipeline Service Co. in opposition to pltfs. motion to
compel production of documents; ¢/m 2-18; filed.
Feb. 283—Answer of deft to plaintiff’s motion to compel
production of documents; e,/m 2-18-72; filed.
Feb. 24—Order denying pltfs. motion to compel produc-
tion of documents, filed 2-2-62. (N) Hart, J.
Feb. 25—Opposition of deft’s to eles motion for produe-
tion of a document; ¢/m 2-24-72; filed.
Mar. 1—Order denying pltfs’ motion to compel production
of-certain documents filed 2-2-72. (N) Hart, J.
Mar. 8—Request of pltfs. for admissions; ¢/m) 3/8; filed.
Mar. 80—Appearance of Thomas B. Stoel Jr.'ag counsel
for plaintiffs; ¢/m 3-30; filed. |
DATE PROCEEDINGS
1972
Apr. 7—Answer of defts. to request for admissions ; C/S;
4/7; filed.
Apr. 10—Answer of deft. to pltffs. request for admissions ;
e/m 3-872; filed.
Apr. 26—First amended complaint by intervenors ¢/m 5-
25; filed.
May 11—Order granting motion of Alyeska Pipeline Ser-
vice Company to consolidate C..A. 861-71 and C.A. 928-
70. (N) (Original filed in C.A. 861-71) Hart, J.
2:)
May 12—Notice by defts. of intention to issue permit > c/s
5-11. 3
May 12—Motion of pltfs. for partial summary judgment ;
statement ; : & A with exhibits Thru E; Exhibit A
thru E, 1, 2, 3, F, G, H, 1, 2, 3, 4, 5, 6, I, J, K; C/S
5-12. M.C.
May 16—Response of intervenors to motion for partial
summary judgment; ¢/m 9-16.
May 17—Motion of pltffs. for leave to file amended and
supplemental complaint for injunction and Declaratory
Judgment; P & A’s; Table of Contents; exhibit; ¢/m
5-16. M.C.
May 17—Motion of defts. Alyeska Pipe Line to place
plaintiffs motion for partial summary judgment in
obeyanee; Table of Authorities; P & A; ¢/m 5-17. M.C.
May 17—Motion of deft. Alyeska Pasiine Service Com-
pany for scheduling of pretrial conference and related
procedure; P & A; ¢/m 5-17.
May 19—Order eranting motion of plaintiffs to’‘file an
amended_and supplemental complaint. (N) Hart, J.
May 19—Motion of defts. to withhold consideration of mo-
tion for partial summary judgment by plaintiffs; ¢/s
5-19. M.C.
May 19—Memorandum of intervenor State of Alaska in
response to motion of Alyeska Pipeline Service Com-
pany to place plaintiffs motion for partial summary
judgment in obeyance; ¢’s. 5-19.
May 19—Memorandum of intervenor State of Alaska in
response to motion of Alyeska Pipeline for scheduling
of pretrial conference & related procedures; ¢/s 9-19.
May 19—Motion of defendants for scheduling of pretrial
conference & related procedures; P & A; ¢/s 5-19.
May 19—Motion of plaintiffs to hold in oheyance motion for
scheduling of pretrial conference; exhibit; ¢/m 5-19.
M.C.
May 19—Response of plaintiffs to motion to defer con-
sideration of plaintiffs motion for partial summary
judgment; ¢/m 5-19.
26
DATE PROCEEDINGS
1972
May 19—Response of deft. Cordova District Fisheries
Union to motion for partial summary Judgment; ¢/m —
5-17.
May 23—Trawsceript of proceedings 5-19-72; E. A. Kauf-
man Reporter (Court’s copy).
May 26—Interrogatories of deft. to plaintiff.
May 30—Answer cf intervenor State of Alaska to amended
& supplemental complaint; e/m 5-30.
May 30—Answer to amended and supplemental complaint
by deft. Alyeska Pipeline Service Co.; ¢/m 5-30.
June 2—Certified Copy of judgment of USCA reversing
judgment opinion attached.
June 5—Deposition of Frederick Sanger for plaintiffs on
May 31, 1972.
June 5—Deposition of Knute Johnson on May 24, 1972.
(Map attached.)
June 5—Deposition of Ross Mullens on May 24, 1972
June 5—Deposition of James KE. King for plaintiffs on
May 24, 1972
June 5—Deposition of Malcolm S. Isleid for plaintiffs on
May 24, 1972.
June 5—Deposition of Edwin L. Chet Chaser for plaintiffs
on May 24, 1972.
June 5—Deposition of Steven R. Smith for plaintiffs on
May 24, 1972
June 5—Answer of deft. to first amended complaint of
intervenors; ¢/m 6-5.
June 5—Answer of deft. to amended & Supplemental com-
_plaint; e/m 6-5.
June 7—Motion of defendants for protective order; P & A;
e/m 6-7.
June 7—Petition of United Distribution Companies for
leave to intervene; p/s 6-7. Appearance of Tilford <A.
Jones as counsel for intervenors, Suite 301, 7316 Wis-
econsin Ave., Bethesda, Md. 20014. $5.00 deposit by
Jones.
27
June 9—Answer of Alyeska Pipeline to first amended com-
plaint.
June 9—Interrogatories of defendant Alyeska Pipeline to
intervenor plaintiffs; C/S 6-9.
June 9—Transcript of proceedings 6-7-71, Reporter Joan
C. Blair (Court’s Copy).
June 13—Petition of United Distribution Company for
leave to participate Amicus Curiae; ¢/m 6-13. M.C.
DATE PROCEEDINGS
1972
June 14—Order directing all parties serve any additional
requests for production on or before 6-16-72; on or
before 6-19-72 government make available to all parties
certain documents; discovery be completed on or be-
fore 6-23-72: on or before 7-17-72 Wilderness Society
i brief; all defendants file briefs on or before 7-31-
; hearing set 8-14-72 and 8-15-72 if neec ioeghe pro-
cathe findings to be filed on or before 8-21-72. (N)
Hart, J.
June 15—Interrogatories and request of pltfs. for produc-
tion of documents; attachment; ¢/m 6-15-72; filed.
June 19—Request of plaintiff to defendants motion for
production under Rule 34; ¢ m 6-16.
June 19—Request of plaintiff to defendant Alyeska Pipe-
line for production under Rule 34; affidavit ; e/m 6-16.
June 19—Transmittal sheet from USCA returning prelim-
inary record.
June 21—Request of Alyeska Pipeline Service Co., for
production of documents; ¢/m 6-21-72
June 23—Order on Stipulation for protective order. (N)
Hart, J.
* *
June 20—Affidavit of Harold A. Berends; filed. Hart, J.
June 20—Affidavit of Theodore G. Bingham; filed. Hart, J.
June 20—Affidavit of Maleolm L. Johnson; filed. Hart, J.
June 20—Affidavit of pier W. Gearhart. ¢e/m 6-16-72.
Hart, J.
28 a
June 26—Answer of plaintiff Environmental Defense fund
to interrogatories; affidavit; ¢/m 6-26.
June 26—Answer of plaintiffs to HI ETECRAIONESS Exhibits
A,B, C & D; e/m 6-26.
- June 29—Response of plaintiff to request of Cordova Dis-
trict Fisheries Unions for production; ¢/m 6-29-72.
June 29—Answer of intervenor State of Alaska to first
amended complaint; ¢:m 6-29-72
Jul. 3—Response of Alyeska Pipeline Service Company to
interrogatories & request for production of documents ;
e/m 7-3.
Jul. 10—Answer of intervenor plaintiffs David Anderson &
Canadian Wildlife Federation to interrogatories by de-
fendant Alyeska Pipeline Company; Exhibit A, B, C
& D; ¢/m 7-10-72.
DATE PROCEEDINGS
1972
Jul. 13—Answer of intervenor plaintiffs Goffrey Warden
to interrogatories by defendant Alyeska Pipeline Com-
pany; affidavit; ¢/m 7-15-72.
Jul. 17—Motion of David Anderson and the Canadian
Wildlife Federation for a final jadgment permanently
enjoining the approval by tue Secretary of Interior of
permits implementing the trans Alaska Pipeline Sys-
tem; P & A’s; e/m 7-17. M.C.
Jul. 17—Brief of Intervenor State of Alaska on the Mineral
Leasing Act Issues and related issues; e/m 7-17.
Jul. 17—Copy of statement of intervenor State of Alaska
on the Cordova District Fisheries Union Motion for
partial summary judgment; exhibits 1, 2, 5, 4,5 & 6;
e/m 7-17.
Jul. 17—Memorandum of P & A’s by defendants in re-
sponse to issues raised in plaintiffs motion for partial
summary judgment filed May 12, 1972; appendix A &
B, ¢/m 5-12.
. 29
Jul. 17—Brief of Alyeska Pipeline Service Company cov-
ering Mineral leasing act and terminal facility issues;
P/S 7-17.
Jul. 17—Brief on National Environmental Policy Act is-
sues by Sinintitt: e/m 7-17.
Jul. 17—Appendix by plaintiff, supplemental docume nts;
- Vol. I, 11 & TIT.
Jul. 17—Alyeska Supporting Documents; Vol. ‘I, IT; at-
tachment; A, B, C, D, E, F; Vol. WI & IV.
Jul. 19—Memorandun: of Cordova District Fisheries
Union, appendix.
Jul. 19—Motion of State of Rissa ‘for = e to file amend-
ment of & supplement to its answer; P & A’s; exhibit.
Jul. 19—Motion of Alyeska Pipeline Semies Goinpany for’
clarification of Preliminary injunction; P & A’s; affi-
davit (2) with attachment.
Jul. 21 avit of service.
Jul. 25—Brief of Alyeska Pipeline Service Company.
Jul. 26—Opposition of plaintiff to motion to clarify prelim-
inary injunction; e/m 7-26.
Jul. 28—Motion of defendant Alyeska Pipeline Service
Company for clarification. of preliminary injunction
heard & granted. Hart, J.
Jul. 28—Order granting motion of defendant Alyeska
Pipeline Service Company for clarification of prelim-
inary injunction of 4-28-70. (N) (See order for details)
ener! filed in C.A. 928-70) Hart, J.
DATE . PROCEEDINGS
"1972
Jul. 28—Letter dated 7-28-72 to Judge Hart changing word-
ing of paragraph 2 of brief relating to the State High-
way adding page 2 to replace corresponding pages of
the agreement as per defendants.
Jul. 31—Deposition of Jack Horton, exhibit a plaintiffs
. exhibits A thru E.
-
<
A AIRA NN
Jul.
Jul.
Jul.
Jul.
Jul
Jul.
Jul.
Jul.
Jul.
Jul.
Jul.
Jul.
Jul.
Jul.
Jul.
Jul.
30
31—Letter dated 6-16-72 from deponent authorizing
corrections to deposition; copies of corrections at-
tached.
31—Letter dated 5-23-72 from Mr. Porter to Alderson
Reporting Company re: corrections.
31—Deposition of David A. Breu; exhibits by plain-
tiffs 1-6. .
31—Deposition of Frederick Sancer; exhibits 1, 2, 3,
5,6 &7 by plaintiff; defendants exhibit #2.
. 31—Deposition of William Vogely; plaintiffs exhibit
1&2.
31—Deposition of Jared Carter; exhibits by plaintiff.
1,2 & 3; attachments A thru I.
31—Deposition of Richard Nehring; exhibits 1 thru
7 by plaintiff.
31—Deposition of Rogers C. B. Morton; exhibits by
plaintiff 1 thru 5; exhibits:by defendant A, B, C & D.
31—Letter dated June 28, 1972, to Alderson Report-
ing Company; re: corrections.
31—-Letter dated July 26, 1972 to Alderson Reporting
Company with affidavit.
31—Letter dated July 28, 1972 to Alderson Reporting
Company with attachments.
31—Brief of defendants in response to all plaintiffs
issues on N.E.P.A. issues; appendix A, B, C, D, EK, F,
G, H, 1 & J; e/m 7-31.
31—Brief of Alyeska Pipeline Service Company; vol-
umes 1, 2, 3, 4, 5, 6, 7; 7-31.
31—Memorandum amicus curiae of United Distribu-
tion Companies; appendix A; ¢/m 7-31.
31—Brief of intervenor State of Alaska; exhibit A;
c/s 7-31.
31—Stipulation that the 42 page document entitled
‘alternatives to the Trans-Alaska Pipeline System,
effects on Fish & Wildlife of four possible routes dated
10-29-71, was submitted on 11-1-71 to Kenneth Roberts ;
e/m 7-28.
es
31
DATE PROCEEDINGS,
1972
Aug. 7—Brief of National Environmental Policy Act is-
sues to replace the typewritten briefs filed earlier ; ¢/m
8-7.
_ Aug. 7—Reply brief of anne appendices A thru I; ¢/s
8-7.
Aug. 7—Reply brief for Dav id Anderson & The Wildlife
Federation; ¢/m 8-7,
Aug. 8—Transcript of proceedings 7-28-72; E. A. Kauf-
man Reporter (Court’s copy).
Aug. 10—Reply brief of Cordova Distributor Fisheries
Union; ¢/m 8-8.
Aug. 10—Hearing begun, environmental aspect; respited
to August 15, 1972. (Reporter: E. A. Kaufman) Hart,
J.
Aug. 15—Hearing resumed, mineral aspect, and cor luded,
Denying plaintiffs motion for partial summary judg-
ment; denying plaintiffs and intervenors prayers for
preliminary and permanent injunction dissolving the
injunction and dismissing the complaint. (Reporter:
E. A, Kaufman) Hart, J. :
Aug. 16—Order denying plaintiffs motion for partial sum-
mary judgment; denying plaintiffs and intervenors
prayers for preliminary and permanent injunction;
dissolving injunction; dismissing the complaint. (N)
Hart, J.
Aug. 17—Transcript of proceedings 8-14-72; E. A. Kauf-
man Reporter (Court’s copy).
Aug. 17—Transcript of proceedings 8-15-72 , EO A. Kauf-
man Reporter (Court’s copy).
Aug. 22—Notice of appeal by David Anderson & The Wild-
life Federation intervenor plaintiffs from order of 8-
16-72. Copies mailed to Herbert Pettle, Robert E. Jor-
dan, William E. Allen; deposit $5.00 by Berlin.
Aug. 22—Notice of appeal by The Wildlife Society, En-
vironmental Defense- Fund, Ine. & Friends plaintiffs
from order of 8-16-72. Copies mailed to Herbert Pettle,
Robert EK. Ponants William Allen. Deposit of $5.00 by
Wlannerv.
_—
eS
ate =
2 Sy “f
SP Os
32
Aug. 22—Preliminary Record on Appeal delivered to
USCA; deposit of $1.25 by Dennis M. Flannery; re-
ceipt from USCA for preliminary record.
Aug. 23—Certificate of John J. McHale administrative ree-
ord of Trans-Alaska Pipeline decision with 9 volumes
and Box No. A, 10 & 18. (Filed in C. A. 861-71).
DOCKET ENTRIES
UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA
C.A. No. 861-71
Tue Corpova District Fisuertes UNIon
v.
MorToN, ET AL
DATE PROCEEDINGS
1971
Apr. 28—Complaint, appearance Exhibit A; filed.
Apr. 28—Summons, copies (4) and copies (4) of Complaint
issued D.A. ser 4-30; #1 ser 5-7; #2 ser 5-10; A.G. ser
5-3.
June 28—Motion of defts. to change venue; memorandum ;
e/m 6-28-71; M.C.; appearance of Herbert Pittle; filed.
June 29—Answer of defts. to complaint; ¢/m 6-29-71; ap-
pearance of Herbert Pittle; filed. ,
June 29—Certificate of service of defts. as to exhibits A, B
& C on 6-29-71; filed.
June 29—Calendared (N) CD/N.
Jul. 6—Motion of pltf. for enlargement of time to file op-
position; P&A; e/m 6-30-71; M.C.; filed.
Jul. 7—Notice of, pltf. to take deposition of Bernard Cos-
ter; ¢/m 7-2-71; filed.
Jul. 9—Amended notice of pltf. to take deposition of Ber-
nard Coster; ¢/m 7-5-71; exhibit A; filed.
"33
Jul. 9—Stipulation extending time to file opposition to mo-
tion for change of venue to and including July 19,
‘1971. (fiat) (N) Hart, J.
Jul. 19—Opposition of pltf. to motion to change venue;
exhibits 1 thru 4; ¢/m 7-15; filed.
Jul. 27—Request of pltf. for production under Rule 34;
e/m 7-27-71; filed.
Jul. 27—Response of defts. to pltf.’s opposition to motion
to change venue; attachment; ¢/m 7-27; filed.
Aug. 3—Withdrawal of motion to change venue by Defts. ;
filed.
Aug. 16—Motion of pltf. for partial summary judgment;
memorandum; exhibits A & B; ¢/m 8-16-71; M.C.; filed.
Aug. 20—Motion of Alyeska Pipeline Service Company to
intervene as a deft.; attachment 1; P&A; Appendix
A&B; exhibit; ¢/m April 20, 1971; appearance of Rob-
ert E. Jordan III; deposif $5.00 by Jordan; filed.
Aug. 23—Notice by pltf. of taking of deposition of William
= R. Hudson; exhibit A; ¢/m 8-19; filed.
Aug. 27—Memorandum of pltf. in opposition to motion of
~ Alyeska Pipeline Service Co. to intervene as deft; ¢/m
~ 8-27; filed.
Aug. 27—Response of defts. to pltf’s request for produc-
tion; ¢/m 8-27-71; filed?
Aug. 27—Motion of defts. to place pltf’s motion for partial
summary judgment in abeyance; memorandum, attach-
ment 1; ¢/m 8-27-71; M.C.; filed.
DATE . PROCEEDINGS
1971
Aug> 30—Motion of the State of Alaska to intervene as’
deft.; P&A; affidavit; ¢/m 8-30-71; M.C.; appearance
of John E. Havelock (State Capitol Pouch K, Juneau,
Alaska) ; filed.
Sep. 7—Memorandum of pltf. in response to motion by
State of Alaska to intervene; ¢/m 9-7; filed.
~
34
Sep. 8—Appearance of William H. Allen and Richard D.
Copaken as counsel for State of Alaska, intervenor;
CD/N;; filed.
Sep. 10—Opposition of pltff. to motion to place pltffs. mo-
tion for partial summary judgment in obeyance; ¢/m
9-10-71; filed.
Sep. 10—Order granting motion of State of Alaska to in-
tervene as a deft. on condition that Alaska file plead-
ing no later than 9-80-71. (N) Hart, J.
Sep. 20—Order granting Alyeska Pipeline Service Co.’s
motion to intervene; for production of documents. (N)
Jones, J.
Sep. 23—Re-notice by pltf. of taking deposition of William
R. Hudson; e/m 9-21-71; filed.
Sep. 27—Affidavit of service on re-notice of deposition;
filed. ‘
Sep. 28—Interrogatories of pltf. to deft. #1; filed.
Sep. 28—Affidavit of service by Kathleen M. Peterson of
interrogatories to Rogers C. B. Morton; filed.
Sep./30—Deposition of Bernard Coster for the pltf.; filed.
Sep. 30—Deposition of Bernard Coster for the pltf.; Deft’s
exhibits A, B, C, D, F, G, I; filed.
Sep. 30—Affidavit of Rosemary Rice in re to disposition «f
Bernard Coster; filed.
Sep. 30—Answer of intervenor State of Alaska to the com-
plaint ; ¢/m 9-30; filed.
Oct. 14—Points & Authorities by pltf. in support of oppo-
sition to motion to hold pltf’s motion for summary
judgment in abeyance; exhibit A; ¢/m 10-13; filed.
Oct. 14—Memorandum of Alyeska Pipeline in support of
_ deft?s motion to place pltf’s motion in abeyance; ¢/m
~——— 10-14-71; filed.
Oct. 154—Statement of intervenor State of Alaska on deft’s
motion that pltf’s motion for partial summary judg-
ment be placed in abeyance; ¢/m 10-15; filed.
39
DATE PROCEEDINGS
1971
Oct. 15—Motion of defts’ to place pltf’s motion for partial
summary judgment ‘in abeyance argued and granted.
(Order to be presented) (Rep: KE. A. Kaufman) Hart,
J. °
Oct. 19—Transcript of proceedings, October 19, 1971, pages
1-9; reporter: KE. Alfred Kaufman, Court ’s copy; filed.
Oct. 19—Answer of defts. to pltf’s interrogatories; ¢/m
10-19-71; filed.
Oct. 19—Order granting defts’ motion to hold pltf’s mo-
tion for partial summary judgment in abeyance until
further order. (N) Hart, J.
Oct. 29—Exhibits from R.&R. court reporters; filed.
Nov. 4—Deposition of Commander William it. Hudson for
the pltf.; filed.
Nov. 11—Notice by pltf. to take deposition of Frederick
J. Sanger; ¢/s 11-11; filed.
Nov. 17—Motion of defts. for protective order enlarging
time for taking deposition; P&A; exhibit; e¥m 11-17-
71; M.C.; filed.
Nov. 19—Order directing that deposition of Dr. Sanger
not be taken on 11-19-71 and not until after he has
completed his work on NEPA impact statement, coun-
sel for deft. shall then notify pltfs. for said deposition.
(N) Hart, J.
Nov. 26—Request by pltf. for production ; ¢/m 11-23; filed.
Dec. 14—Request of pltf. for production under Rule 34;
e/m 12-14-71; filed.
1979
Jan. 5—Response of defts. to request for production ; ¢/m
1-5; filed.
Jan. 18—Response of defts. to request for production of
documents * ¢/m 1-17-72; filed.
Feb. 29—Interrogatories of pltf. to Alveska Pipeline Serv-
ice Co.;e/m 2-28-72; filed.
36
Feb. 29—Request of pltf. for production; ¢/m 2-28-72; filed.
Mar. 30—Response by defts. to pltf’s request for produc-
tion; c/m 3-28; filed.
Apr. 21—Request by pltf. for production; e/m 4-12; filed.
Apr. 25—-Response of Alyeska Pipeline Service to inter-
rogatories; attachments; I & IT; ¢/m 4-25-72; filed.
Apr. 28—Motion of Alyeska Pipeline Service to Consoli-
date with 928-70; p&a; ¢/m 4-28-72; M.C.
May 12—Notice of pltf. to take depositions of Knute John-
son, Ross Mullins, Chet Cheshier, Pete Lovseth, Pete
Isleib, Ed King, Bah Blake and Charlie Simpler; ¢/m
5-12-72.
DATE PROCEEDINGS
1972
May 12—Request of pltf. for production under Rule 34 to
State of Alaska; ¢/m 5-12-72. |
May 12—Notice of defts. of intention to issue permits;
e/m 5-11-72; filed.
May 11—Order granting motion of Alyeska Pipeline Serv-
ice Company to consolidate C.A. 861-71 and C.A. 928-
70. (N) Hart, J.
May 17—Copy of motions of deft. Alyeska Pipeline Service
Company to place pltf’s motion for partial summary
judgment in abeyance; table of authorities; memo and
for scheduling of pretrial conferences and related pro-
cedures; P&A; table of contents; e/m 5-17-72; M.C.
(original filed in CA 928-70.)
May 19-—-Motion of deft. to withhold consideration of mo-
tion for partial summary judgment by Wilderness
Society; ¢/s 5-19; M.C. (filed in CA 928-70)
May 19—Motion of defts. for scheduling of pretrial con-
ferences; P&A; ¢/s 5-19; M.C. (filed in CA 928-70)
May 19—Copy of memo. of intervenor, State of Alaska,
in response to motion of Alyeska Pipeline to pltf’s
motion for partial summary judgment in abeyance;
e/m 5-19 (original filed in CA 928-71).
37
May 19—Copy of memo. of intervenor, State of Alaska,
in response to motion of Alyeska Pipeline for sched-
uling of pretrial conference; e/m 5-19.
May 23—Transcript of proceedings, May 19, 1972, pages
1-9; rep: KE. A. Kaufman (filed in CA 928-70).
May 26—Interrogatories by Alyeska Pipeline Service to
Wilderness Society; ¢/s 5-26 (filed in CA 928-70).
June 6—Notiee by pltf. of taking deposition of witnesses;
e/m 6-6.
June 6—Notice by pltf. of taking deposition of persons
conducting water tests; ¢/m 6-6.
June 6—Notice by pltf. of taking deposition of James
Hemming; ¢/m 6-6.
June 6—Notice by pltf. of taking deposition of Gordon
Watson and Leroy Saw]; ¢/m 6-6.
June 5—Deposition of Steven R. Smith for the pltfs.
June 5—Deposition of Edwin L. ‘‘Chet”’ Chaser for the
pltfs.
June 5—Deposition of Malcolm S. Isleid for the pltfs.
June 5—Deposition of James KE. King for the pltfs.
DATE PROCEEDINGS
,1972
June 5—Deposition of Ross Mullens for the pltfs.; Exhs.
1 & 2. :
June 5—Deposition of Knute Johnson for the pitfs. with
attached map. .
June 7—Motion of defts. for protective order; P&A; ¢/m
6-7 (original filed in CA 928-71).
June 9—Transcript of proceedings June 7, 1972 pages 1
thru 50; Reporter; Joan Curtis Blair (filed in CA 928-
70).
June 9—Interrogatories by deft. Alyeska Pipeline to in-
tervenor pltfs.; ¢/s 6-9-72; filed in CA 928-70).
June 13—Petition of United Distribution Companies for
leave to participate amicus curiae and withdrawal of
petition to intervene; ¢/s 6-13; M.C. (filed in CA 928-
70).
38
June 14—Order directing all parties serve any additional
requests for production on or before 6-16-72; on or
before 6-19-72 Government make available to all par-
ties certain documents; discovery be completed on or
before 6-23-72; on or before 7-17-72 Wilderness Society
file brief; all defts. file briefs on or before 7-31-72;
hearing set 8-14-72 and 8-15-72 if necessary; proposed
finds ta be filed on or before 8-21-72. (N) Hart, J.
June 19—Request by pltfs. for production to deft. Rogers
C. B. Morton; ¢/m 6-16 (filed in CA 928-70).
June 19—Request by pltfs. for production of Alyeska Pipe-
line Service; ¢/m 6-16 (filed in CA 928-70).
June 20—Affidavit of Harold A. Berends.
June 20—Affidavit of Theodore G. Bingham.
June 20—Affidavit of Maleolm L. Johnson. .
June 20—Affidavit of Stuart W. Gearhart; ¢/m 6-16-72.
June 21—Request of intervenor deft. for request for pro-
duction; ¢/m 6/21/72.
June 23—Order on stipulation for protective order. (N)
Hart, J.
June 29—Response of deft. to request for production of
documents (filed in CA 928-70).
June 29—Answer of intervenor, State of Alaska, to first
amended complt.; ¢/m 6-29.
Jul. 3—Response of. Alyeska Pipeline Service Co. to inter-
rogatories and request for production of documents
(dated 6-14-72) ; ¢/m 7/3/72.
Jul. 6—Deposition of Wallace H. Noerenberg w/pltf’s
exhs. 1 & 2, published.
DATE PROCEEDINGS
Jul. 6—Deposition of Ben L. Hilliker with pltf’s Exhs. #
1 & 2, published.
Jul. 6—Deposition of Joseph R. Blum with pltf’s exhs. 1,
2, 3, 4, 5, 6 & 7, and State’s exh. #1, published.
Jul. 10—Copy of answer of intervenor-pltfs. David Ander-
son and Canadian Wildlife Federation to interrogator-
ies by deft.; c/m 6-10; original filed in CA 928-70.
Jul.
Jul.
Jul.
Jul.
Jul.
Jul.
Jul.
Jul.
Jul.
Jul.
Jul.
Jul.
39
\
13—Copy of answer of intervenor-pltf. Warden to in-
terrogatories of Alyeska Pipeline Co.; aff.; ¢/m 7-13;
original filed in CA 928-70.
17—Response of defts. to issues raised in pltf’s motion
for partial summary judgment; appendix A & B; ¢/m
7-17.
17—Copy of brief for intervenor State of Alaska on
Mineral Leasing Act issues and statement on Cordova
motion for partial summary judgment; ¢/s 7-17.
19—Memorandum of Cordova District Fisheries Un-
ion; appendix filed in C.A 928-70.
19—Motion of intervenor State of Alaska for leave
to file amendment to its answer to complt.; P&A; M.C.
19—Copy of motion to Alyeska Pipeline Service for
clarification of preliminary injunction; P&A; affs. (2);
e/m 7-19 (original filed in CA 928-70)
21— Affidavit of service filed in CA 928-71.
25—Brief of Alyeska Pipeline Service Co. covering
Mineral Leasing Act; ¢/s 7-17; filed in CA 928-70.
28—Letter dated 7/28/72 to Judge Hart changing
wording of paragraph 2 of brief relating to the State
Highway adding page 2 to replace corresponding page
of the agreement as per defts.
28—Motion of deft. Alyeska Pipeline Reyes Co. for
clarification of preliminary injunction heard and grant-
ed. (Rep: Al Kaufman) Hart, J.
28—Order granting motion of deft. Alyeska Pipeline
Service Co. for clarification of. preliminary injunction
of 4-23-70. (N) (Seegordér for details) (original filed
in CA 928-70). Hart, J.
31—Stipulation in re 42 page document entitled alter-
native to the trans-Alaska Pipeline System dated Oc-
tober 29, 1971 was submitted November 1, 1971; ¢/m
7-28.
40
DATE PROCEEDINGS
1972
Jul. 31—Brief of deft. in response to pltfs’ briefs on Nepa
issues (filed in C.A. 928-70).
Jul. 31—Brief of Intervenor State of Alaska; ¢/m 7-31.
Aug. 7—Brief of National Environmental Policy Act. is-
sued to replace the briefs filed earlier. (filed in CA
928-60) ; ¢/m 8-7.
Aug. 8—Transcript of proceedings, pages 1-12; July 28,
1972; repz E. Alfred Kanfman. (filed in CA 928-70)
Aug. 10—Reply brief of Cordova District Fisheries Union;
c/m 8-8 (filed in CA 928-70).
Aug. 14—Hearing begun; environmental aspect; respited
to Aug. 15, 1972. (Rep: E. A. Kaufman) Hart, J.
Aug. 15—Hearing resumed, mineral aspect, and concluded ;
denying pltfs’ motion for partial summary judgment;
denying pltfs’ and intervenors prayers for preliminary
and permanent injunction dissolving the injunction and
dismissing the complts. (Rep: E. A. Kaufman) Hart, J.
Aug. 16—Order denying pltfs’ motion for partial sum-
mary judgment; denying pltfs’ and intervenors pray-
ers for preliminary and permanent injunction; dismiss-
ing the complts. (N) Hart, J.
Aug. 22—Notice of appeal by pltf. from order of 8-16-72;
copies to Herbert Pittle, Robert E. Jordan and Wil-
liam Allen; $5.00 by Hogan.
Aug. 22—Preliminary record on Appeal delivered to
USCA; deposit by Thomas F. Hogan $1.25.
Aug. 22—Receipt from USCA for preliminary record.
Aug. 23—Certifieate of John J. MeHale, Administrative
record of Trans-Alaska Pipeline decision with 9 vol-
umes and Box No. A, 10 and 18. 4
41
Letter from Kenneth P. Fountain to Russell E. Train, June 10, 1969
Trans ALaska PIPELINE System,
Houston, Ter., June 10, 1969.
Re right-of-way application and sale of eravel.
HIon. Russett EB. Tray,
Under Secretary, Department of the Interior,
Interior Building,
Washington, D.C...
Dear Mr. Secretary: The attached application for Pipe-
line Right-of-Way has been delivered to the Office of the
State Director, BLM, in Anchorage, Alaska. We have re-
quested guidance from that office on the proper procedure
for the processing of the application. The application de-
viates from requirements of the regulations with respect
to 2254.1-2(d)(1) Maps and 2284.5-1(e) Pumping plant
site.
In each case, detailed survey data is not yet available
to facilitate mapping within the accuracy and with the
requisite bearings, distances, and ties as set out in the
cited sections. As stated in the application, a survey which
will produce the mapping and station plats in exact compli-
ance with the regulations has been contracted for and work
ix currently under way. We expect to produce an alignment
map and station plats duly certifieated by November, 1969,
We plan to furnish-the proper station plats and alignment
map sheets as they are produced. The first of these align-
ment sheets sheuld be available in late July or August.
It is planned to furnish prints only of these sheets since
some minor changes would be expected when the route is
actually staked on the ground. When each, of the sheets
has been on the ground verified we will furnish repro-
ducibles as required. Linen can be furnished, as specified
in the regulations, however, film, if acceptable, will provide
a better document since the base map will be aerial pho-
tography.
42
The interim alignment map furnished is completely plot-
ted to a 1 inch = 1 mile scale. It contains, in addition to
the pipeline plot, gravel and rock locations, soil test bore
hole locations, a center-line plot of theeconstruction road
right-of-way requested and notations where above ground
construction is expected. Recognizing that soils data and
drilling logs are not ordinarily part of a right-of-way
application, this data is included both for your information
and use and ‘to demonstrate the depth of research em-
ployed in selection of the route sought.
The aditional right-of-way, both for the construetion
road and the additional 46’ which are necessary for ingress
and egress to the primary right-of-way have been applied
for under the provisions of 48 CEFR 2234.1-3(a) (3). In
reviewing 43 CER, this provision appeared to be the most
appropriate,
There is one additional right-of-way matter. We will be
constructing communication facilities along the general
route of the pipeline. These will most probably be micro-
wave installations and will require sites for reporter sta-
tion towers. Location of these sites will be aeeomplished
in the near future and applications will be forthcoming.
There are, of course, large requirements for gravel inci-
dent to the construction. Sources of gravel have been tenta-
tively located along the pipeline route and estimates of
quantities required have been prepared. (See attached
schedule of gravel sources and locations). As you ean ap-
preciate we have not proved each of these sources to in-
sure that it is readily useable. We have defined/with some
degree of accuracy what our quantity requirements are.
We would prefer to purchase the total amount of gravel
without being held to the amounts specified from each spe-
cific source, i.e., so long as the total was not exceeded the
amount from any single source could be more or less than
that set out in the attached schedule. It would also be pre-
ferred if the time allowed to dig and take the gravel could
extend up to say five or six years. .
it
43
Time is of the essence in obtaining right-of-way for this
pipeline. The unique environment of Alaska combined with
the remoteness of the route make necessary a concurrence
of processes that would otherwise be sequential, To give
you an appreciation of our time requirements, I am en-
closing:
1. Road Construction Schedule.—The first three spreads
are scheduled to begin work this summer, spread one in
August and spreads two and three in September. Gravel
and right-of-way must be firmed up by July.
2. Pipeline Construction Schedule-—Although — actual
work is not scheduled to begin until-early 1970, approxi-
mately six months mobilization time is required and we
must have right-of-way data even before we request bids.
Thus it is imperative that we obtain right-of-way permits
with conditions and stipulations by July.
Also enclosed is a short summary of our method of route
selection and a brief description of the construction road
together with a tabulation of soil data, Valdez to Fair-
banks.
It should be- noted that the portions of above eround
construction on the requested route are quite limited (ap-
proximately 40 miles or 5% of the total mileage) and more
importantly in relatively short segments. This should re-
lieve many of the fears expressedabout the adverse effects
of substantial surface construction.
If you have any questions or need any additional data,
pleast let us know.
Very truly yours,
Kennetu P. Fountatx
44
GRAVEL REQUIREMENTS FOR Roaps AND STATIONS
Location of borrow pit Alinement
: sheet
Range Township reference Cubic yards
R-14+-E T-8-N 1 420,000
R-14-E _ _. T-7-N 1 230,000
| T-6-N 1-2 440,000
-14-E _. T-5-N ___. 2 200,000
-14-E _ T-4-N . 2 426,000
R-14-E __ _. T-3-N 2 240,000
R-15-E _ _. T-2-N 2 - 429,000
R-15-E _. _ T-1-N 2 200,000
R-14-E | T-1-N 3 214,000
R-14-E __ _ T-1-8 - 3 220,000
R-14-E _ . T-2-8 : 3 423,000
R-14-E _ T-3-S 3 210,000
R-14-E _ T-4-S _ 3 300,000
R-14-E 20. T-5-S _ 3-4 508,000
R-14-E © _ T-6-8 - 4 409,000
R-14-E _ T-7-S 4 205,000
*R-14-E _ T-8-S 4 403,000
R-14-E S 4 198,000
R-13-E - 9-8 _ 4-5 210,000
R-13-E - Bs) _ 344,000
R-13-E _. 5 ~~ § 290,000
R-12-K _ D ~ 444,000
R-12-E _ dD 296,000
R-12-E _ 6 160,000
R-12-E 6 268,000
R-11-E 6 300,000
R-10-W 6 148,000
R-10-W 6 148,000
R-10-W 3-7 296,000
R-10-W _ 7 — 162,000
R-10-W | 7 308,000
R-10-W 7 298,000
R-10-W - 7 © — 150,000
R-11-W 7 140,000
R-11-W 8 148,000
R-12-W _ 8 368,000
R-12-W - 8 363,000
R-12-W - 8 125,000
45
R-13-W T-26-N 8 120,000
R-13-W _ T-26-N 9 150,000
R-13-W . T-25-N 9 148,000
R-13-W T-24-N 9 128,000
R-14-W __... TT -24-N _ 9 162,000
_R-14-W _.. T-23-N 9 * 527,000
R-15-W __......_...... T-20-N ; 10 333,000
R-15-W _ T-20-N _ 10 120,000
Total yardage for roads ss —s—sé~CSSs«d2,329,000
STATIONS
R-14-E _ _ T-1-N 3 250,000
R-14-E _. T-7-S 4 250,000
R-12-E _. u T-12-8 _... 02: 5) 250,000
R-15-W __......_..__. T-22-W 9 250,000
Grand total oo. = 18,829,000
I. Preevine Route
The preliminary pipeline route selection was done by
a task foree of 27 men during the months of August and
September 1968. There were five helicopter transported
field parties involved in gathering data on several possi-
ble routes. From the evaluation of this data, a tentative
route, with alternates, was chosen. ,
During the months of March and April of 1969, five
more field parties were engaged in gathering soil data and
samples along the tentative routes. These parties were
comprised of a Party Chief, ‘a Geologist, a three-man drill-
ing crew and the necessary cat train personnel. The par-
ties were supported by fixed wing aireraft and helieop-
ters. The data collected included ground and air tempera-
tures, geological observations, and drill hole logs and sam-
ples.
A ditching testing program was conducted in the Fair-
banks area. This program was to determine the most fea-
sible method and type of equipment to excavate different
types of frozen soils. These test results will be made avail-
we
eee |
3
CARAS NT
Beene SYM MEMUETA e sog
‘ . , 3 o ‘
+
‘a
. |
able to enable contractors to use optimum ditching meth-
ods with minimum damage to ground surface.
With the assistance of R&M Ener.-Geological Consul-
tants, Arctic Engineering Consultants, and the University
of Alaska, we have evaluated the data acquired from soil
borings, from soil temperature readings, and from aerial
photo interpretations. In addition, the entire route will be
photographed using conventional color film and infrared
film. Results of ‘these new photos will be studied in detail
to confirm the route being applied for.
The route as now proposed is a result of all of these
studies in addition to the normal pipeline stndies éf hy-
draulie gradients, ete. This route is now thought to be the
most economical and the most secure from: damage to the
pipeline and to the terrain. The route will of course be
subject to minor alterations as we continue our studies
with low altitude aerial photos and ground surveys.
II. Rient-or-Way Wintn
The 54 R.O.W. width which is allowed by statute is not
. adequate for the construction of a 48” pipeline. The R.O.W.
should be 100’ width to accommodate the extremely large
equipment that is necessary to handle the 48” pipe, and the
large spoil pile of exeavated soil. Attached are sketches
of the required 100’ wide pipeline R.O.W., and the 100’
wide road R.O.W., for different methods of construction.
III. Roap Construction
It will be necessary to ecastruet approximately 390 miles
of roadways to furnish access to the pipeline during con-
struction. This road will begin at the Manley Hot Springs-
Livengood Road at a point approximately 10 miles west
of Livengood, and will continue generally north along the
pipeline R.O.W. to Prudhoe. This road would be considered
to be at least a semi-permanent, all weather road. The total
traffic on this road will exceed 240,000 tons of freight dur-
ing the construction of the pipeline.
47
The route for the road has been selected to follow the
pipeline as nearly as possible. The road deviates from the
pipeline R.O.W. in some areas, due primarily to the fact
that a_ pipeline can negotiate mach steeper grades than are
practical for a road. Other faciors taken into account were
locations of stable soils, gravel borrow areas, rock quarry
areas, and drainage features.
The road R.O.W. width should be 100 ft. to allow room
for normal road construction methods for this type of ter-
rain. The road would utilize normally, accepted types ci
drainage strictures, including culverts, bridges and fords.
There are numerous special studies in progress to deter-
mine the best methods of handling the “ological, Archae-
ological and Conservation problems that will be eneoun-
tered during and after the construction of the pipeline and
road. Results of these studies will establish procedures to
be used to meet all requirements of minimum changes to
the terrain.
VaLpez To Farreanks Initia, Summary Sor Types
_[{In miles]
Oceasionall y Not
Soil classifications } Frozen Frozen frozen Total
Sand 0 > Sy 2.1
Silt—-sand | en. t |
Cola i silt - wees BW scsticvecnienedssenin. ee
Colluvium —_ . 39 0.5 4.4
‘Moraine valine 8.1 6.9 15.0
Alluvial fan 10.7 = 10.7
Glacial till =. Ge aideckeneomee 3.5 6.1 9.6
Silt—clay 7 15.3 15.3
Silt—clay and granular soil - 42.3 _ 42.3
Gravel a: . ee 0.7 53.3
Sand—gravel and cobbles 9 9
Terrace gravel - . 6 6
Silt over gravel. 112 7.0 18.2
Silt—sand over es 7 31.9 4.53 36.2
Silt—clay over gravel = 8 8
“*
La |
SS ve aR
-
DIM Wet 4?
sha tat
48
Oceasionally Not
Soil classifications Frozen Frozen frozen ‘Total
Silt over sand ‘gravel 8.5 . 8.5
Colluvium over glacial till 7.6 7.6
Silt over bedrock 8 19.35 20.3
Silt—sand and cobbles
ever bedrock 3.4 3.4
Silt—sand over bedrock ; fs 115 115
Glacial till over bedrock . Ze 12.3
Moraine and tile over bedrock — 7.0 7.0
Silt—sand ‘gravel over bedrock — - 1.8, 1.8
Bedrock 16.4 16.4
Bedrock (greenstone) —. saaathastucls 29 9
Talus 2.8 2.8
Tailings cates eae tere aie tea duel | |
Snowslide zone . oa yay f
No coverage Ge (P-
Total miles —.. .. 107.8) 70.8) 171.0 349.1
49
STIPULATIONS FOR THE
TRANS ALASKA PIPELINE SYSTEM
Environmental Stipulations to be used in conjunction with
existing laws and regulations for construction of the 48”
oil Pipeline and related facilities from Prudhoe Bay to
Valdez, Alaska.
Prepared by:
DEPARTMENT OF THE INTERIOR
and the
FEDERAL TASK FORCE ON ALASKAN OIL
DEVELOPMENT
(Seal)
September 1969
' UNITED STATES
DEPARTMENT OF THE INTERIOR
Office of the Secretary
Washington, D.C. 20240
Letter of Acknowledgement
This volume of stipulations represents the concerted ef-
forts of the Department of the Interior and the Federal
Task Force on Alaskan Oil Development, with the partici-
pation of State of Alaska agencies, to draw up guidelines
that will provide exacting environmental protection during
the construction and operation of the Trans Alaska Pipe-
line.
In this endeavor, we have asked our bureaus and repre-
sentatives to judge both the conceptual framework and in-
dividual stipulations by a yardstick that was both fair and
firm, one that stressed equally the importance of environ-
. mental protection and resource development.
The participation in this project has been notably broader
than the cooperative effort’ of the Government agencies
formally involved. We have received substantial counsel
50 ~~
from conservation and industry representatives, as well
as from the interested public.
This wide participation and interest, as well as the depth
of many contributions, underscore what is becoming a na-
tional commitment toward the proper use and protection
of our natural resources.
It is a pleasure to acknowledge and thank those who
have participated directly in this project, and particularly
those not professionally involved who have contributed their
sincerity and advice toward the responsible development of
arctic Alaska. :
/s/ Waturer J. Hicken
Walter J. Hickel
Secretary of the Interior:
A. Definitions
As used herein, the foHowing terms have the following
meanings: '
‘* Authorized Officer’? means the Alaska State Director,
Bureau of Land Management, or the person designated or
delegated to act in his stead with respect to the subject
matter of this permit. As used herein, it is synonymous
with ‘Superintendent in Charge,’’ as that terms is used
in 43 CFR, Subpart 2234.
’
‘*Pipeline’’ means the Pipeline right-of-way; all or any
part of the Pipeline system constructed thereon; and all
structures, facilities, and appurtenances related thereto or
used in connection therewith, whether located on or off
the Pipelihe right-of-way.
‘*Permittee’? means each and every individual, person or
company, including partnerships, corporations, joint ven-
tures, associations, or any other business firms engaged in,
or which shall become engaged in, the construction, opera-
tion or maintenance of the Pipeline, together with their
employees, agents, contractors_and subcontractors and the
‘employees of each of them.
ol
B. General
1. Acknowledgments of Permittee
Permittee, by accepting this permit and commencing
activities pursuant thereto, acknowledges each of the fol-
lowing:
a. That, except where the approval of the Authorized
Officer is required before Permittee may commence a par-
ticular operation, neither the United States nor any of its
agents or employees agrees to or is in any way obligated
to examine or review any plan, design, specification, or
other document which may be filed by Permittee with the
Authorized Officer pursuant hereto;
b. That the absence of any comment by the Authorized
Oficer or any other employee of the United States with
respect to any plan, design, specification, or other document
which may be filed by Permittee with the Authorized Officer
does not represent in any way whatever any assent to,
approval of, or concurrence in such plan, design, specifi-
‘ation, or other document or of any action proposed therein;
e. That this permit, and the rights and privileges granted
thereby, is subject to all valid existing rights in and to
the land which is the subject of this permit, and that the
United States makes no representations or warranties what-
ever, cither express or.implied, as to the existence, number,
or nature of such valid existing rights.
2. Authorized Officer
The Authorized Officer, and su¢h representatives of in-
terested Federal agencies as he may designate, may inspect
the exploration, construction, operation, or any other ae-
tivities of Permittee at any time.
For purposes of information and review, the Authorized
Officer at any time may eall upon Permittee to furnish any
or all data related to pre-construction, construction. or
operation activities undertaken in connection with the Pipe-
Sere 6
02
line and its related facilties, including roads. Permittee
shall furnish the requested data as promptly as possible,
or as otherwise required under the terms of this permit or
other applicable permits. Such data specifically include,
but are not limited to, records of all geological data, soil
core drillings and terrain temperature measurements made
during pre-construction investigations; and engineering
standards, basie data and technical criteria relating to the
design, construction and operation of the Pipeline, pump-
ing stations, safety devices and monitoring programs.
The Authorized Officer may require Permittee to make
such modification of the alignment and installation of the
Pipeline as he may deem necessary to protect stability of
geologic materials, integrity of the Pipeline, fish and wild-
life habitats, and the environment. He may also require
Permittee to make adjustments of the above-ground heights
and/or methods of installation of the Pipeline to prevent
obstruction of access.
The Authorized Officer shall be afforded reasonable use
of Permittee’s communications systems.
In the event the Authorized Officer determines in his
absolute discretion that Permittee has failed or refused to
comply with the provisions of this permit, or any other
permit issued in connection with the Pipeline, the Author-
ized Officer, by written-order, may suspend or terminate any
or all of Permittee’s activities. Permittee shall not resume
such suspended or terminated activities until given written
authorization to do so by the Authorized Officer.
All decisions, orders and determinations of the Author-
ized Officer, unless otherwise indicated by him in writing,
shall be appealable only to the Secretary of the Interior.
During the pendency of any such appeal, the Authorized
Officer’s decision, order, or determination shall not be sus-
pended, but shall remain in full force and effect until the
Secretary of the Interior finally disposes of the appeal.
3. Changes in Conditions
Unforeseen conditions arising during construction and
operation of the Pipeline may make it necessary to revise
or amend these stipulations. In that event, Permittee and
the Authorized Officer shall agree as to what revisions or
amendments shall be made. If they are unable to agree, the
Seeretary of the Interior shall have final authority to
determine the matter.
4. Equal Opportunity
By aceepting this permit, Permittee agrees that, during
the period of construction of the Pipeline and its related
facilities and roads, and for so long as the Pipeline, or any
portion thereof, shall be in operation, or for so long as
this permit shall be in effect, whichever is the longest;
_a. Permittee will not discriminate against any employee
or applicant for employment because of race, color, religion,
sex, or national origin. Permittee will take affirmative action
to ensure that applicants are employed, and that employees
are treated during employment, without regard to their
race, color, religion, sex, or national origin. Such action
shall include, but not be limited to thé following: employ-
ment, upgrading, demotion, or transfer; recruitment or
recruitment advertising; lavoff or termination; rates of
pay or other forms of compensation; and selection for
‘training, including apprenticeship. Permittee agrees to post
in conspicuous places, available to employees and applicants
for employment, notices to be provided by the Authorized
Officer setting forth the provisions of this equal opportunity
clause.
b. Permittee will, in all solicitations or advertisements
for employees placed by or on behalf of Permittee, state
that all qualified applicants will receive consideration for
employment without regard to race, religion, sex, color,
or national origin.
54
e. Permittee will send to each labor union or representa-
tive of workers with which Permittee has a collective bar-
gaining agreement or other contract or understanding, a
notice, to be provided by the Authorized Officer, advising
the labor union or workers’ representative of Permittee’s
commitmeiits under this equal opportunity clause and shall
post copies of the notice in conspicuous places available to
employees and applicants for employment. —
d. Permittee will comply with all provisions of Executive
Order No. 11246 of September 24, 1965, as amended, and
the rules, regulations, and relevant orders of the Secretary
of Labor.
e. Permittee will furnish all information and reports
required by Executive Order No. 11246 of September 24,
1965, as amended, and by the rules, regulations, and orders
of the Secretary of Labor, issued pursuant thereto, and
will permit access to Permittee’s books, records, and ac-
counts by the Authorized Officer and the Secretary of Labor
for purposes of investigation to ascertain compliance with
such rules, regulations, and orders.
f. In the event of Permittee’s noncompliance with the
equal opportunity clause of this permit or with any of such
rules, regulations, or orders, this permit may be cancelled,
terminated or suspended in whole or in part and Permittee
may be declared ineligible for further Federal Government
contracts or permits in accordance with procedures author-
ized in Executive Order No. 11246 of September 24, 1965,
as amended, and such other sanctions may be imposed and
remedies involved as provided in Executive Order No.
11246 of September 24, 1965, as amended, or by rule, regu-
lation, or order of the Seeretary of Labor, or as otherwise
provided by law.
g. Permittee will include the proyisions of paragraph a.
through g. of this equal opportunity clause in every con-
tract, subcontract or purchase order unless exempted by
rules, regulations, or orders of the Secretary of Labor
JVd
issued pursuant to Section 204 of Executive Order No.
11246 of September 24, 1965, as amended, so that such
provisions will be binding upon cach contractor, subcon-
tractor or vendor. Permittee will take such action with
respect to any contract, subcontract or purchase order as
the Authorized Officer may direct as a means of enforcing
such provisions including sanctions for noncompliance : pro-
vided, however, that in the event Permittee becomes in-
volved in, or is threatened with, litigation with a contractor,
subcontractor or vendor as a result of such direction by
the Authorized Officer, Permittee may request the United
States to enter into such litigation to protect the interests
of the United. States.
5. Liabilities and Responsibilities of Fermittec
a. Any structure, property or land harmed or damaged
by or during the construction, operation or maintenance of
the Pipeline shall be reconstructed, repaired, rehabilitated
and restored, as may be necessary, by Permittee as soon
as practicable, so that the condition thereof, in the judgment
of the Authorized Officer, is at least equal to the conditions
thereof immediately prior to such damage or destruction.
Permittee further shall abate as soon as practicable any
condition existing with respect to the Pipeline or its related
facilities or roads, or with respect to the construction, opera-
tion or maintenance thereof, which may be causing. harm
or damage to any person, structure, property, land, stream
or wildlife.
hb. Permittee shall be liable to the United States for any
damage suffered or cost or expense incurred by the United
States in any way arising from or connected with any oper-
ation under this permit whenever such damage, cost or ex-
penses results from any breach of the permit or from any
wrongful or negligent act of Permittee. Immediately upon
written notice by the Authorized Officer of the nature and
amount of such damage to or cost or expense of the United
States, Permittee shall reimburse the United States there-
for.
e ee
56
e. Permittee further shall indemnify and hold harmmless
the United States against and from any and all demands,
claims or liabilities of every nature whatsoever, arising. di-
rectly or indirectly from or in any way connected with any
or all of the following: 1) The construction, operation or
maintenance of the Pipeline or of any facility, structure or
road used in connection therewith, whether or not located
on Federally-owned land; and 2) The use or oeeupaney,
whether authorized or not, by any person whomsoever of
any land owned by the United States which is the subject
of any permit or right granted to Permittee; provided,
however, that the provisions of this paragraph e. shall not
be deemed to apply to injuries or damages to the extent
caused by employees of the United States acting within
the scope of their authority.
6. Bonding Requirements
Permittee shall furnish a bond or other security (herein-
after called ‘*Bond’’) of such type and on such terms and
conditions as are aeceptable to the authorized Officer, in.
the principal amount of five million dollars ($5,000,000), -
within thirty (30) days after issuance to Permittee of a
-permit for a right-of-way for oil pipeline purposes. —
Said Bond shall have the purpose of: 1) ensuring the
performance by Permittee of each and every obligation of
Permittee under the terms and conditions of any permit
issued to Permittee by the United States in connection with
the Pipeline; and 2) providing for immediate payment to
the United States of any cost or obligation ineurred by
the United States in performing any said obligation of
Permittee which, in the absolute judgment of the Author-
ized Officer, Permittee has not performed satisfactorily.
Said Bond shall be maintained in force and effect during
construction of the Pipeline, as for so long as the Pipeline
is operated, and for so long thereafter as may be necessary.
a7
7. Housing and Quarters
Permittee shall furnish, on a reimbursable basis, such
representatives of the United States as may be designated
by the Authorized Officer with meals, living quarters and
office space during the periods of construction and opera-
tional activities. Permittee shall be notified in writing by
the Authorized Officer at a reasonable time before need
exists, regarding the number of individuals for whom such
services and facilities will be required.
8. Public Improvements
Eixisting telephone, telegraph, and transmission lines,
fences, ditches, roads, trails, and other improvements shall
be protected in all phases of Permittee’s construction oper-
ations under this permit. Damage to utilities and improve-
ments shall be promptly repaired to a condition w. ieh is
at least as good as the condition just prior to such damage.
All roads and trails needed for fire protection shall be
kept free of logs, slash, and debris.
Construction activities will not be allowed within one-
half (%) mile of all designated reereation sites (camp-
grounds, waysides, parks) unless authorized in writing by
the Authorized Officer.
9 Federal, State and Local Laws and Regulations
Permittee shall comply with all applicable federal, state
and Joeal laws and regulations thereunder, existing or here-
after enacted or promulgated, affecting in any manner con-
struction, operation, or maintenance of the Pip-siine or any
road constructed in connection therewith.
10. Pipeline Standards, Design and Compliance
All design, materials, and construction practices em-
ployed in the installation of the Pipeline shall be in accord-
ance with safe and proven engineering practice for the
arctic environment and in accordance with the following
pipeline standards:
as
a. U.S.A. Standard Code for Pressure Piping, Liquid Pe-
troleum Transportation Piping Systems (USAS_ B31.4-
1966).
b. The Department of Transportation’s proposed regu-
lations on ‘‘Transportation of Hazardous Materials by
Pipeline.”’
If either of said pipeline standards contains a provision
which is inconsistent with a provision in the other standard,
whichever provision is the more stringent shall be observed
by Permittee. The plan and profile for the Pipeline shall be
submitted for review and approval of the Authorized Offi-
cer prior to commencement of construction for any section
of the Pipeline. The plan shall show the locations of pump-
ing plant sites, block valves, stream crossings and other
facilities; it shall also show those parts of the Pipeline to
be constructed above ground, the dimensions of above-
ground structures, and the general specifications and loca-
tions of all crossings across the Pipeline.
The design shall provide for automatic shut-off valves at
each pumping station and additional valves using the best
“engineering judgment with due regard for the following:
terrain traversed, including associated drainage;
population centers;
wildfowl habitat and fishery habitat ;
public water supplies and signinfiecant water bodies in-
eluding the Yukon River and other major rivers; and
hazardous geologic areas;
All practical means will be utilized to avoid breaking or
otherwise injuring the tundra or other organic layers in
permafrost areas outside the Pipeline ditch area.
X-ray testing of weld quality and pressure testing of the
completed Pipeline shall be conducted by Permittee prior
to placing the system in operation.
59
During the construction of the Pipeline, Permittee shall
protect the environment, stability of geologic materials, and
integrity of the Pipeline and shall prevent undue interfer-
ence with access over or across the Pipeline.
Permittee shall provide for continuous and suitable in-
spection of the Pipeline and related facilities by qualified
inspectors to assure compliance with design and construc-
iion specifications.
11. Survey Monuments
In surveyed areas, Permittee shall mark and protect all
survey monument. within or near the Pipeline right-of-way
against destruction, obliteration or damage during the life
of this permit. If any monuments corners or accessories are
destroyed, obliterated or damaged, Permittee shall hire a
registered land surveyor to reestablish or restore at the
same location the monuments, corners or accessories using
surveying procedures in accordance with the ‘‘Manual of
Instructions for the Survey of Publie Lands of the United
States, 1947 Ed.,’’ and shall record such survey in the ap«
propriate records. Additional requirements for the protec-
tion of monuments, corners, and bearing trees may be pre-,
scribed by the Authorized Officer.
12. Environmental Briefing
Prior to and during construction activities, Permittee
shall provide for environmental and other pertinent brief-
ings of construction and other personnel by such Federal
employees as may be designated by the Authorized Officer.
Such briefings shall include fire prevention and suppression
training for all construction personnel. Permittee shall
arrange the time, place and attendance for such briefings
upon request by the Authorized Officer. Permittece shall
bear all costs of such briefings other than salary, per diem,
subsistence, and travel costs of Federal employees.
In addition, Permittee shall separately arrange with the
State of Alaska for such similar briefings as the State may
desire.
SEK ATARI ENT
Burrs SERAANAE
60
13. Construction Schedule
Prior to commencement of construction, Permittee shall
submit a schedule of its construction activities. This sched-
ule shall be in such detail as may be required by the Au-
thorized Officer. During the course of construction this
schedule shall be updated and resubmitted at 30-day inter-
vals.
14. Surveillance and Maintenance
Permittee shall, during the life of the Pipeline permit and
for so long as the Pipeline is in operation, conduct a sur-
veillance and maintenance program applicable to the aretic
environment in a timely manner and designed to provide -
for public safety, prevent damage to any resources adjacent
to the Pipeline right-of-way, prevent erosion from the Pipe-
line right-of-way and maintain pipeline integrity. The sur-
veillance and maintenance program shall include an effee-
tive communications system.
_ Reeords on construction, operation and maintenance ae-
tivities shall be maintained by Permittee and regularly sub-
mitted as required to appropriate State and Federal agen-
cies. Such records will include surveillance data, leak and
break records, and necessary operational data. .
Roads or air strips shall be maintained by Permittee to
give maintenance crews access to valves, pumping stations,
and other facilities.
15. Electronically Operated Devices
Permittee ‘shall sereen, filter, or otherwise suppress any
electronically operated devices, that are installed as part
-of the Pipeline which are capable of producing electromag-
netic interference radiations, to the extent necessary so
that such devices will not adversely affect the functioning of
existing communications systems or navigational aids. In
the event that physical obstructions such as towers or build-
ings are to be ereeted as part of, or fm association with,
,
4 “
61
the Pipeline, their positioning should be such that they will
not obstruct radia.ion patterns of line-of-sight communica-
tions systems, navigational aids, or :similar systems.
16. Oil Spills
Permittee recognizes its prime responsibility for the pro-
tection of the publie and environment from the contingency
of oil spillage. 7
a. Reporting of Oil Leaks
All spills or leakage of oil or waste materials shall be
recorded and reported by Permittee in accordance with 49
CFR, Part 180. Reports shall be filed with the Central
Reporting Network as may be required by any joint Fed-
eral-State contingency plan which may be adopted and
which pertains to the minimization of the effects df a Py
oil or other hazardous substances in Alaska or adjacer
waters.
_b. Containment of Oil Spills at Storage Tanks and Tank
Farms :
Permittee shall jrovide oil spill containment dikes or
other structures, around storage tanks at pumping stations
and at the Valdez tank farm. The volume of the contain-
ment structures shall be at least: 1) one-hundred ten (110)
pereent of the total storage volume of the storage tanks
in the relevant area, plus 2) a volume sufficient for maxi-
mum trapped precipitation and runoff which might be
impounded at the time of the spill. Such structures shall be
impervious so as to provide seepage free storage over rea-
sonable periods of time.
e. Cleanup of Oil Spills
Permittee shall submit +a contingeney plan in conform-
ance with the recommendations of the National Interageney
Committee at least sixty (60), days prior to scheduled com-
mencement of pumping. The plan shall: include oil spill
control, disposal and cleanup; specify that the Interior
agencies responsible for contingency plans in Alaska shall
cou
62
be among the first to be notified in the event of a Pipeline
failure resultmg in oil spill; provide for immediate cor-
rective actions, including control and cleanup of oil spills
and restoration of the affected resource; and spell out that
the Authorized Officer shall approve any materials or de-
vice used to control or clean up oil spills and shall approve
any disposal sités or techniques selected to handle oily mat-
ter. Detailed information must»be included for major river
crossings, lakes, populated areas, pumping stations and
terminals. The contingency plan shall include separate end
specific oil spill cleanup techniques for 1) terrestrial, 2)
lake, 3) river and stream, +) marine, and 5) estuarine spills.
The plan must be approved by the Authorized Officer prior
to pumping oil through the Pipeline.
If at any time, including without limitation during any
phase of the construction, operation or maintenance of the
Pipeline, any oil or other pollutant should spill or escape
from the Pipeline, the coutrol and total removal, disposal
and cleaning up of such oil or other pollutant, wheresoever
found, shall be at the expense of Permittee. Upon failure
of Permittee to control, dispose of, or clean up an oil spill,
or to repair all damages resulting therefrom, the Author-
ized Officer shall take such measures as he deems necessary
to control the spill, clean up the spillage and restore the
area to as near its-original condition as possible at the full
expense of the Permittee.
17. Exeavations
In excavation operations, Permittee shall use construc-
tion methods that will provide maximum protection to ani-
mals and human beings.
18. Termination of Use
Upon revocation or termination of the Pipeline permit
or abandonment of any section of the Pipeline, Permittee
shall remove all above-ground Pipeline sections, and re-
store_the land to the satisfaction of the Authorized Officer.
+
Prior to capping the open ends of underground pipe sec-
tions, all oil and residues shall be removed from the pipe.
19. Pipeline Corrosion
Permittee shall provide detailed plans for corrosion re-
sistant design and methods for early detection of corrosion.
These will include: pipe material and welding techniques
to be used and information on their particular suitability
for the environment involved; details ‘on the external pipe
protection to be provided (coating, wrapping, sete), in-
cluding information on variation of the coating processes to
cope with variations in environmental factors along the
Pipeline route; plans for cathodic protection including de-
tails of impressed ground sources and controls to jnsure
continuous maintenance of adequate protection over the
entire external surface of the pipe; details of plans for
monitoring cathodic protection current including spacing
of current monitors; provision for periodic intensive sur-
veys of trouble spots and regular preventive maintenance
surveys and special provisions for abnormal potential pat-
terns “resulting from crossing of the right-of-way by other
pipelines or cables; information on precautions to be taken
in removing corrosive substances (e.g., saline water) from
the crude prior to moving it to the pipeline. Permittee will
also provide comments on the need for plansafor periodic
internal pitting surveys by electromagnetic or other means.
20. Seismie Monitoring
Permittee shall file with the Authorized Officer for ap-
proval a detailed plan for the monitoring of crustal strain
and microseismic activity in the vicinity of the proposed
Pipeline route.
Said monitoring network shall be constructed and in
operation prior to use of the Pipeline.
The monitoring network shall include establishing of
reference points on stable ground, placed at satisfactory
intervals so as to form closed figures. Trilateration meas-
PS ORO I NB ORI 5
64 »
urements shall be madeat time intervals not to exceed six
months and to a probableverror not to exceed two parts per
million. As data on creep locations and rates are accumu-
lated, Permittee shall install recording or telemetering
creep meters where movement is rapid. The monitoring net-
work shall also provide for klusters of seismonitors, with
outputs telemeter to a centrak facility, where the Pipeline
crosses major fault zones.
Data obtained from the netwerk shall be provided to the
Authorized Officer at regular Dore vals throughout the op-
erational life of the Pipeline. Strain, creep, and microseis-
mic data shall be used by Permittee to aid in the initiation
of corrective measures to protect the Pipeline from break-
ing from tectonic strain.
C. Native Training
Permittee shall enter into an agreement with the Secre-
tary of the Interior regarding recruitment, testing, train-
ing, placement, employment and job Dinsdling of Alaska
Natives. : \
Continuously during Pipeline construction, Permittee
shall conduct a pre-employment and on-the-job training
program for Alaska Natives, adequate to quaiity them for
initial emplovment and for advancement to higher paying
positions thereafter.
Permittee shall do everything within its power to secure
the employment of those Alaska Natives who successfully
complete Permittee’s training program.
Permittee shall inform the Authorized Officer of its dis-
charge of any Alaska Natives, and of the reasons therefor,
in advance of such discharge wherever possible or, if ad-
vance notice is impossible, as soon thereafter as is prac-
ticable.
Permittee shall furnish the Authorized Officer sueh in-
formation and reports concerning Alaska Native employ-
65
ment as the Authorized Officer shall require from time to
-
time.
D. Regulation of Public Access
After construction is completed, Permittee shall permit
free and unrestricted public access to and upon the Pipe-
line and access road rights-of-way for all lawful and pfoper
purposes except areas designated as restricted by Per-
mittee with the consent of the Authorized Officer.
During construction Permittee may regulate public ac-
cess and vehicular traffie as required to facilitate operations
and to protect the public and wildlife from hazards asso-
ciated with the Project. For this purpose, Permittee shall
provide warnings, flagmen, barricades and other safety
measures as necessary. :
‘Provisions must be made for suitable permanent cross-
ings where Permittee’s Pipeline right-of-way and related
access roads cross existing roads, foot-trails, winter sled
trails, or other rights-of-way.
During construction, Permittee shall provide alternate
routes for existing roads and trails as determined by the
Authorized Officer, whether or not these roads or trails are
recorded.
K. Pollution Abatement
1. Pesticides and Herbicides
The use of pesticides and herbicides is limited to non-
persistent and immobile types. An approved list of pesti-
cides and herbicides, together with application constraints
shall be obtained from the Authorized Officer.
2. Water Pollution
Permittee shall conduct its activities in a manner to
prevent pollution of land and water, thereby protecting
acquatie and terrestial life.
Toxic material or sediments shall not be released in any
lake or water drainage in such concentrations as would
es ear a) SAUTE ERIE ear, 4
een ca keara se en
SAS reerenese sr,
Bice:
i
66
exceed acceptable water standards. Every effort shall be
made to protect water bodies from damage by erosion and
unnatural drainage cond#tions. In the design, construction
and operation of the Pipeline, protection of water quality
shall be of prime importance. Criteria for compliance will
be the ‘‘Alaska State Plan-Water Quality Standards for
Interstate Waters within the State of Alaska’’ as revised.
Unless waived by the Authorized Officer, dikes or coffer-
dams shall -be installed to separate conerete work areas
from lakes or streams during construction.
Mobile ground equipment shall be kept out of the waters
of lakes, streams or rivers except for crossings within the
right-of-way limits.
3. River and Stream Crossings
The Pipeline shall cross all rivers and streams com-
pletely underground unless a different means of crossing is
approved in writing by the Authorized Officer.
4. Thermal Pollution
At all underground water crossings the Pipeline shall be
placed at such depth and be so insulated that it will not
degrade the water beyond standards set for thermal pollu-
tion in the State of Alaska. oe
If changes in the overburden take place so as to expose
the pipe to natural water, the Pipeline will be additionally
‘insulated from the water to the satisfaction of the Au-
thorized Officer.
A standard stream crossing profile shall be filed in ad-.
vance of Pipeline installation for review by the Authorized
Officer.
F. Erosion Control
1. General .
The design of the Pipeline, roads, and associated strue-
tures shall include specifications for the construction of
67
erosion control and drainage features that will minimize
the concentration of water and thereby reduce erosive
effects.
The erosion control measures such as water. bars, con-
tour furrows, water spreaders, diversion ditches, plugs, or
other control measures shall be constructed to avoid in-
duced and accelerated erosion and to lessen the possibility
of forming new drainage channels resulting from construe-
tion activity on all Pipeline rights-of-way areas. All control
measures must be designed with proper regard to minimize
disturbance to the thermal equilibrium, thus minimizing
the adverse effects of permafrost degradation.
The Authorized Officer shall be informed of all proposed
erosion control measures.
2. Stream Banks :
KExeavated cuts through stream banks shall have side
slopes that will not erode or slide.
. Where practicable, unless otherwise approved by the
Authorized Officer, temporary access over stream banks
shall be niade through use of fill ramps rather than by ex-
avating through stream banks. Permittee shall remove
such ramps upon termination of seasonal use or abandon-
ment.
3. Water Crossings
At water crossings, the Pipe trench excavation shall stop
an adequate distance from the water crossing to leave a
_ protective plug (unexcavated material) at each bank. These
plugs shall be left in place until the crossing grade is com-
plete behind the plug and the pipe laying operation is be-
gun. The plugs shall not be completely removed until abso-
lutely necessary. The plugs shall be replaced with stable
material en each bank as soon as the pipe is laid.
R ePrenie
8 rapes
68
4. Disturbed Areas
Permittee shall conduct all construction, operation, and
maintenance activities with minimum disturbance to vege-
tation.
Disturbed areas shall be restored by Permittee as nearly
as practicable to their original condition as follows:
a. All disturbed areas shall be left in a stabilized eondi-
tion. Stabilization practices shall include, as determined
by the needs of specifie sites: seeding; planting; mulching;
and the placement of mat binders, soil binders, rock or
gravel blankets, or structures.
b. Special attention shall be given to stream and river
crossings so as to prevent erosion. Such measures shall not
interfere with fish passage.
ce. Material from the trench exeavation in excess of that
required to backfill around the pipe shall be disposed of in
a manner approved by the Authorized Officer.
d. Seeding and planting shall be conducted during the
first growing season and shall be repeated if unsuccessful
on the first attempt. All other restoration shall be com-
pleted as soon as possible.
e. Unless other acceptable methods such as controlled
burning or burial are approved by the Authorized Officer,
all trees, snags, stumps or ether woody material, not hav-
ing commercial or construction value, shall be mechanically
chipped and spread in a manner that will aid seeding estab-
lishment, soil stabilization and the minimization of perma-
frost degradation.
5. Disturbance of Natural Waters
All construction activities of Permittee which may create
new lakes, drain existing lakes, significantly divert natural
drainages, permanently alter stream hydraulics, disturb
significant areas of streambedsp or appreciably degrade
69
water quality, shall be prcehibited unless approved in ad-
vance by the Authorized Officer,
6. Areas of Unstable Soils
Areas having soils that are susceptible to slides and
slumps, excessive settlement, severe erosion and soil creep
shall be avoided wherever possible. However, if these areas
cannot be avoided, or are encountered unexpectdly, Per-
mittee shall design its construction to insure maximum
stability. Permittee will continue soil investigations in con-
junction with construction activities. Such data shall be
made available to the Authorized Officer upon his request.
The Authorized Officer may require spe*ial construction
methods, and/or rerouting, where unstable conditions are
encountered.
7. Permafrost Degradation
Permittee shall conduct studies to determine: (1) the
most feasible route and best construction design through
permafrost areas so as to prevent permafrost degradation
that could result in progressive geomurphie degredation
and (2) whether the Pipe should be buried or above ground.
The potential effects of installing the pipe beneath the
surface in moisture laden permafrost will be determined
with regard to each segment of the Pipeline, and reports
thereon shall be filed with the Authorized Officer prior to
construction of each segment of the Pipeline. Construction
methods shall be designed to prevent degradation of the
permafrost in areas where such degradation would result
in detrimental erosion or subsidence.
8. Off Right-of-Way Traffic
Permittee’s vehicles shall not be operated outside the
boundaries of the Pipeline, access or other roads, or other
permitted areas, except with the consent of the Authorized
Officer or when necessary to protect life, limb, or publie
property. ;
70
G. Sanitation and Waste Disposal
All waste generated in road or Pipeline construction and
operation shall be removed or otherwise disposed of in a
manner acceptable to the Authorized Officer. All applicable
standards and guidelines of the Alaska State Department
of Health and Weltaré, the United States Public Health
Service and the Federal Water Pollution Control. Adminis-
‘tration shall be adhered to by Permittee. All incinerators
shall meet the requirements of all applicable State and
Federal laws and regulations and shall be used with maxi-
mum precautions to prevent forest and tundra fires. After
incineration, material not consumed in the incinerator shall
be disposed of in a manner approved in advance by the
Authorized Officer. :
Emissions from incinerators, pumps, motors, equipment
and installations and other burning material, must meet
the air quality standards of the United States Public
Health Service and the State of Alaska.
The term ‘‘waste’’ as used stipulation means all
discarded matter, including but not limited to human waste,
trash, garbage, refuse, oil drums, petroleum products, |
ashes and equipment. The best practicable portable or
permanent waste disposal systems shall be used and shall
be approved inradvance by the Authorized Officer.
H. Small Craft Passages
?
The creation of any permanent obstruction on any waters
to the passage of canoes, boats, or other craft under forty
feet in length, is prohibited.
I. Aesthetics
Permittee shall consider aesthetic values in planning, -
construction, and operation of the Pipeline and its asso- .
ciated facilities and roads. All permanent structures shall °
be painted a color or colors that harmonizes with their
natural setting. The Authorized Officer may require such
plans as he deems necessary to protect aesthetic values.
by
:
71 4
J. Timber 5
1. Commercial Timber é
Prior to clearing operations, Permittee will enter into a f
contract with the United States for the purchase by Per-
mittee of all merchantable timber situated within the Pipe-
line right-of-way. 5; B.
2. Noncommercial Timber.
Clearing and grubbing limits shall be approximately 10
feet outside of the edge of any cut or fill. Unless other.
methods, such as controlled burning or lopping and burial,
are agreed upon between Permittee and the Authorized
Officer in the clearing plan as acceptable for a given seg-
ment, all trees, snags, stumps or other woody material not
having value to Permittee shall be mechanically chipped
and spread in a manner that will aid seeding establishment,
soil stabilization and the minimization of permafrost de-
gradation. Permittee shall identify right-of-way clearing
boundaries on the ground for each construction segment
prior to clearing operations.
wee
All timber and other vegetative material outside the
right-of-way clearing boundaries and all blazed, painted
or posted trees which are on or mark the clearing bound-
aries are reserved from cutting and removal with the ex-
ception of danger trees or snags designated as such by the
Authorized Officer.
All trees, snags, or other woody material cut in connec-
tion with clearing operations shall be cut so that the re-
sulting stumps shall not be higher than six (6) inches
measured from the ground on the uphill side.
All trees, snags, and other woody material cut in con-
nection with clearing operations: shall be felled into the
right-of-way and away from live water courses. ’
In areas where heavy equipment would be detrimental
under the existing conditions, standard hand clearing op-
erations will be used.
te Tee
Logs shall not be skidded or yarded across any stream
without prior approval of the Authorized Officer.
All debris, such as logs, chunks, and tops resulting from
clearing operations and construction Which may _ block
stream flow, delay fish migration, contribute to flood
damage, or result in streambed scour or erosion shall be
removed.
No log landing shall be located within two hundred (200)
feet of any live stream course.
Logs having a value to Permittee shall be neatly piled
adjacent to the right-of-way clearing boundary if further
use is contemplated by Permittee.
K. Wildlife
1. Hunting, Fishing, and Trapping
Permittee shall inform its employees, agents, contractors,
subcontractors, and their employees, of applicable laws and
regulations relating to hunting, fishing, and trapping.
2. Use of Explosives
At least thirty (30) days in advance of any underwater
blasting Permittee shall submit to the Authorized Officer
a plan for such blasting. The plan shall set forth blasting
locations, types and amounts of explosives, date or dates
_ of blasting, and the reason for the blasting.
No blasting shall be permitted underwater, or within one
quarter (14) mile of streams or lakes, without a permit
from the Alaska Department of Fish and Game.
3. Buffer Strips
Except at approved crossings, the Pipeline shall be lo-
cated so as to provide three hundred (300) minimum buffer
strip of undisturbed land along all streams. Requests for
exceptions to this provision shall be submitted in writing
-to the Authorized Officer at least thirty (30). days in ad-
73
vance of approval. The request shall include a description
of the design criteria and time necessary to restore or
enhance the stream habitat.
4. Fish Spawning Beds
‘Fish spawning beds’? means the areas, usually gravel,
where anadromous and resident fish deposit their eggs.
Where channel changes cannot be avoided in designated
anadromous fish spawning beds, new channels shall be con-
structed according to standards supplied by the Authorized
Officer. Spawning beds shall be protected from sedinient
from all sources of construction activity. Where soil ma-
terial is expected to be suspended in water as a result of
construction activities, sediment settling basins shall be
constructed to permit the removal of silt before it reaches
the stream or lake. Special requirements may be made by
the Authorized Officer for each stream system to protect
spawning beds. Permittee shall repair all damage to fish
spawning beds caused by construction, operation, or main-
tenance of the Pipeline.
d. Migration of Fish
Permittee shall provide for uninterrupted and safe up-
stream or downstream passage of fish. Any artificial strue-
ture or any stream channel ¢éhange that causes a perma-
nent blockage to migration of fish shall be provided with a
permanent fish passage structure that meets all Féderal
and State requirements. The proposed design shall be
submitted to the Authorized Officer at least.thirty (30)
days in advance of construction. &,.
Unless otherwise provided for by appropriate State or
Federal authority, culvert construction in water crossings
shall meet the following minimum standards:
a. Water. velocities at iedium discharge will not exeeed
four (4) feet per second in any part of the culvert.
74
b. Installation shall be at zero gradient with the bottom
_ of the outlet six (6) inches below the natural streambed to
prevent erosion at the downstream end of. the culvert.
¢. Where necessary because of outfall erosion, a stilling
basin shall be constructed at the outflow end of the culvert
that is at least three (3) feet deep and twelve (12) feet long.
Thé pool sides shall be stabilized with riprap or other
appropriate methodto prevent erosion.
d. Water shall be diverted around the work area in the
streambed’ during installation of the culvert to reduce
siltation.
e. Water diversion ditches or pumps shall be sereened
with a device approved by the Authorized Officer to pre-
vent harm to migrating fish.
~~
Abandoned water diversion structures shall be plugged
and stabilized to prevent trapping or stranding of fish.
6. Seasonal Concentrations of Fish and Game
Key fish and wildlife areas may be closed to construction
activities during periods of wildfowl nesting, migration,
and spawning. The Authorized Officer shall provide Per-
“mittee written notice of closure,
From time to time, the Authorized Officer shall furnish
Permittee a list of areas where closure may be required,
i at with anticipated dates of closure. A
7. Big Game Movements
Permittee shall construct the Pipeline, both buried and
above ground sections, so as to assure unrestricted passage
and movement of big game animals.
i
L. Antiquities and Historical Sites
Permittee shall engage an archeologist approved by the
Authorized Officer to provide surveillance and inspection
of the Pipeline for archeological values.
75 ,
If in connection with any operation under this permit
Permittee exeavates known 6r previously unknown archeo-
logical, paleontological, or historieal sites, Permittee shall
notify immediately said archeologist who shall investigate
and provide an on-the-ground opinion regarding the pro-
tection measures to be undertaken by Permittee. The Au-
thorized Officer may suspend that portion of Permittee's
operations necessary to preserve evidence pending investi-
gation of the site by said archeologist or his representative.
Two copies of all survey and excavation reports shall be
filed with the Authorized Officer.
f
‘ M. Fire Prevention
» Permittee shall take all measures necessary or appropri-
ate for the prevention and suppression of fires on the
. permit area and on other Federal lands, Permittee shall
comply with all applicable laws and regulations, and with
the instructions and*directions of the Authorized Officer
concerning the prevention and suppression of fires.
N. Campsites
Permittee or its contractors shall obtain special land use
permits for each campsite from the Authorized Officer.
-Upon abandonment or relocation of each campsite, the
area shall be cleaned up and restored to a condition satis-
factory to the Authorized Officer.
O. Material Sites = :
1. Purchase of Materials -
Permittee shall make application in accordance with ap-*
plicible regulations, to purchase construction materials.
consuinmate a materials sale contract with advanee pay-
ment, and submit a mining plan that must be approved
before any materials are removed from the publie lands.
Permittee shall utilize upland materials and existing ma-
terial sites in plaee of clearwater stream materials when
Pe ete}
76
reasonably available. Gravel and other construction ma-
terials shall not be taken from stream or river beds or
shores or outlets of lakes that are or could be considered *
as spawning areas. unless approved by the Authorized
_ Officer.
2. Vegetative Sereen_
Permittee shall not cut or remove any vegetative cover
within a minjmum of five hundred (500) foot strip between
roads and material sites unless authorized to do so in
writing by the Authorized Officer. Permittee shall remove
any debris created by its construction activities.
Where primary roads intersect the Pipeline right-of-
way, a screen of vegetation native to the specific setting
shall be established unless waived by the Authorized Officer
in writing.
3. Layout of Material Sites
Material site boundaries should be shaped in such a
manner as to blend with surrounding natural land patterns.
Regardless of the lavout of material sites, primary empha-
sis shall be placed on prevention of damage to vegetation
and soil erosion.
4. Fish Protection
If material sites are approved adjacent to or in certain
lakes, rivers or streams, the Authorized Officer may further
require the construction of levees or berms to protect fish
and prevent siltation or streams or lakes.
5. Restoration
All slopes shall be left in a ‘stable condition.
Haul ramps, berms, dikes and other earthern structures
shall be leveled and other struetures removed unless other-
wise directed by the Authorized Officer.
Material pits in stream and river bottoms and channels
shall be connected to the stream by channels constructed to
allow flow of water through the pit at median stream stage.
S
>
77
Vegetation, overburden and other materials removed
-from surfaces of material sites shall be-disposed of by
Permittee at termination of use-of the site inva manner
approved by the Authorized Officer. Vegetative ‘debris
which has been put through a chipper shall be spread evenly
over material site slopes, together with other organic ma-
terials and topsoil. Permittee, during the first growing
season following termination of use of the site, shall re-
vegetate material site slopes through seeding and planting
with suitable plant materials unless otherwise directed by
the Authorized Officer.
Upon completion of material site restoration, Permittee
shall immediately remove all equipment, materials and
supplies from the sites.
* PARTICIPATING AGENCIES
ALASKA
Federal
Department of the Interior
Regional Coordinator
Bureau of Land Management
Bureau of Spert Fisheries and Wildlife
Bureau of Commercial Fisheries ‘
Federal Water Pollution Control Administration
Bureau of Mines
U.S. Geological Survey
oe Bureau of Indian Affairs
National Park Service
Department of Defense
Corps of Engineers, sAlaskas District
Alaskan Command a
Federal Field Committee for Development Planning
State
Department of Fish and Game
Department. of Natural Resources, Division of Lands
Department of Highways
78
WASHINGTON
Federal Task Foree on Alaskan Oi! Development
Department of the Interior
Department of Defense
Department of Transportation
Department of Commerce
Department of Health, Education and Welfare
Department of Housing and Urban Development
THE SECRETARY OF THE INTERIOR
WASHINGTON
September 15, 1969 |
MEMORANDUM TO THE PRESIDENT
Subject: Preliminary Report of the Federal Task Force
on Alaskan Oil Development
Attached is the Preliminary Report of the Federal Task
Force on Alaskan Oil Development as requested in your
Memorandum of May 9, 1969.
Since its inception, the activities of the Task Force have
concentrated primarily on ,the application by the Trans
Alaska Pipeline System for an 800-mile right-of-way from
Alaska’s North Slope to the Port of Valdez on the Pacific
Ocean.
This report concisely examines the background and the
‘ organization of the Task Force, and the scope of inter-
related problems—environmental, technological, — social,
and legal, —involved with a project of this magnitude over
arctic, remote, and wilderness terrain. The report also
discusses the major problems still outstanding, and our
intentions for future activity.
The Task Force has been guided by your charge that oil
be explored and developed ‘‘without destruction and with
‘
b
79
minimum . disturbance’? to the environment of arctic
Alaska,
/s/ Wauter J. Hicken
Walter J. Hickel
Attachment
ae
FEDERAL TASK FORCE ON ALASKAN OIL DEVELOPMENT
A Preliminary Report to the President
September 15, 1969
Background
The petroleum discovery on Alaska’s North Slope, an-
nounced in August 1968, by Atlantic-Richfield and Humble
Oil and Refining Companies represents a reservoir of
major importance to the energy and defense posture of
the Nation. nh
In anticipation of the array of problems—environmental.
technological, social, and legal—involved with the extent
and rapidity of North Slope oil development the Seeretary
of the Interior established the North Slope Task Force on
April 18, 1969. Chaired by the Under Secretary of the
Interior it was composed of. eight departmental bureau
and office heads, and charged with the responsibility of
insuring environmental and orderly development of Fed-
eral lands on Alaska’s North Slope.
On May 9, 1969, during the Under Seeretary’s 5-day
inspection of the North Slope, the President suggested by
memorandum to Secretary Hickel that the North Slope
Task Foree be enlarged into a Gevernment-wide group
(Enclosure 1).
In addition to the other departm®ts for whom the
President recommended membership, Nhe Secretary of
Housing and Urban Development was invited to designate
a representative (Enelosure 2). This group is composed
of’ departments having direct. program involvement. in
Alaska. Three other offices were invited to » participate as
so aa
tt
{
ttt,
80
observers or liaison members: the Office of Science and
Technology, the National Science Foundation, and the
Bureau of the Budget.
Additionally, several select groups were identified as
members for communication and coordination. These in-
clude the State of Alaska, the Federal Field Committee
for Development Planning in Alaska, the Department of
the Interior Field’ Committee in Alaska, and the Conser-
ration /Industry ‘‘ Ad Hoe’? Committee.
Since its inception on June 5, 1969, this Government-
wide group has met five times, considering in succession
(1) the extent of present Federal involvement in Alaska
and a general review of environmental, transportation,
and social problems attending oil development (June 5);
(2) the application by the Trans Alaska Pipeline System
for an 800-mile right-of-way from the North Slope to
Valdez (June 17); (8) a presentation by industry regard-
ing the extent of their planning and preparation (July 1);
an application by the State of Alaska to select a portion
of the route (Livengood to the Yukon River) for a seeon-
dary highway (August 12); and (5) the two-volume set
of proposed environmental stipulations applying to the
overall pipeline right-of-way (September 11).
Accomplishments
The attention of the Task Force has foensed primarily
on the application by the Trans Alaska Pipelinté*System
(TAPS), a joint venture of Atlantic Pipeline Company,
BP Pipeline Corporation and Humble Pipeline Company,
which was received on June 9, 1969 by the Anchorage
office of the Bureau of Land Management. A copy of the
application and an accompanying letter to Under Seeretary
of the Interior Train were hand-delivered to the Task
Force on June 10, 1969.
Simultaneously with the receipt of the application, the
Task Force submitted to the Trans Alaska Pipeline a set
of 79 questions reflecting the concerns of Department of
the Interior agencies. The TAPS’ answers to these ques-
tions were received on June 20. Following an examination
Fy
81
of the answers and two meetings with industry, Interior
bureaus submitted to the Under Secretary individual as-
sessments upon TAPS’ ‘‘state of technological readiness.’
The unanimous judgment by Interior bureaus was that
TAPS had not adequately finalized their own plans on a
technological level for the construction of the pipeline or
ancillary projects. Each bureau raised serious questions
regarding the impending time frame and expressed con-
cern over the industry’s ability to use data from their
own ongoing studies.
The application requested affirmative action “by J uly.”’
An interim response was made by Secretary Hickel on
June 27, which gave assurance that the application would
be granted when several conditions, reflecting environ-
mental, legal, procedural and native interest. eoncerns
were met (Enclosure 3).
In early July, an extensive team of Interior, other Fed-
eral, and State officials prepared an initial draft of stipu-
lations to accompany and condition the granting of the
right-of-way. This set arrived in Washington on July 22;
was examined, revised, edited, rebound and distributed to
the State of Alaska, industry, outside members of the Task
Forev, and the interested public on August 8. Their review
and comment were solicited by September 15.
On July 22, the State of Alaska requested a modification
of the Alaskan land, freeze for the purpose of building a
secondary highway from Livengood to the Yukon River
which, by agreement,’ TAPS would build and the State
accept following completion of adjacent pipeline construe-
tion. On July 29, the Secretary indicated to the Senate
and House Committees cn Interior and Insular Affairs
his intention of lifting the freeze for this purpose. The
Chairmen of the respective committees did not indicate
disapproval, and the freeze order was modified for this
93-mile highway section on August 13.
On August 29-30 public hearings on the pipeline appli-
cation were held at the University of Alaska at Fairbanks.
The hearing was presided over by the Under. Secretary
PORES FS
82
and an Interior panel composed of the Assistant Secretary.
for Fish and Wildlife, Parks, and Marine Resources, the
Director of the Geological Survey, the Department of the
Interior Regional Coordinator, the State Director, Bureau
of Land Management, and a Special Assistant to the—
Secretary.
Outstanding Problems—The Scope of Concern
The application for an 800-mile pipeline right-of-way
aeross Alaska has brought together a complex and inter-
related scope of environmental, technological, social, and
legal problems, the solution to some of which are still out-
standing. This section outlines and summarizes the param-
eters of these concerns.
Permafrost
Permafrost is perpetually frozen ground, of rock, soil,
and ice that has remained below freezing for two or more
years. It underlies a significant percent of the State of
Alaska. Tundra may be considered the topmost layer of
soil and vegetation that insulates the permafrost, alter-
nately thawing in summer and freezing in winter. It exists
in a state of quasi- (or what is commonly termed delicate)
equilibrium. A disturbance to the insulating mat of vege-
tation disturbs the entire thermal regime, causing it to
thaw ma manner that it otherwise would not. This thawing
ean cause differential subsidence, erosion, and related frost
action of severe and major extent. A Geological Survey
Professional Paper, published in July, examines the geo-
logic/environmental factors unique to the Aretie which
present acute engineering problems for design, building,
and maintenance of construction projects.
The problems attendant on pipeline construction are
made more severe by the temperature of the oil which is
anticipated to arrive at wellhead at 160° F, A recent Geo-
logical Survey computer analysis on permafrost degrada-
tion adjacent to a hot pipeline calculates that a melt zone
-of at least 25 feet deep in the first year could be expected.
N 83
Other calculations including those of industry have esti-
mated this melt zone in excess of 300 feet with time.
A working group of Federal, State of Alaska and in-
dustry specialists is presently examining possible solutions
fo this problem. Alternative solutions include routing the
pipeline around, or elevating it above, soil areas of high
moisture content. TAPS is conducting a further core
drilling investigation of soil conditions in high moisture
areas.
Gravel
Gravel is used as an insulating layer to maintain the
thermal equilibrium. of permafrost underlying construe-
tion activities. The total requirement for gravel is esti-
mated by TAPS to total 13, 329,000 eubie yards. An accept-
able source of gravel must be found.
Seismic activity
Large segments of the pipeline route cross areas of
known seismic activity. The historie frequency and mag-
nitude of major earthquakes are most severe near Valdez.
Some faults, crossing other portions of the route, may be
subject to slow, earth adjustments or ‘‘creeping.’? The
design, engineering, and location of the pipeline must take
into consideration both types of seismic movement.
Solid and Human Waste
The rates of biological degradation of wastes. both solid
and liquid, are extremely slow in the Arctic, and waste
treatment presents unique and difficult problems. The pro-
posed stipulations specify that all disposal systems .shall
meet the standards of the Alaska State Department of
Health and Welfare, U.S. Publie Health Service, and the
Federal Water Pollution Control Administration.
Water Pollution .
The most eritieal danger for water pollution is that re-
sultant from an oil spill) TAPS has indieated that the
‘apacity of the pipeline is 500,000 gallons per mile. Spillage
} ' 84
of one-mile capacity of this pipeline would equal nearly
twice the total amount of oil lost at Santa Barbara.
The operation of tankers, in either the Beaufort Sea or
Prince William Sound, produces a related problem. In-
ee _.._ bound, the tankers will be loaded with ballast, sea water
mixed with oil dredge, that must be discharged prior to
loading of crude. It is necessary for the Task Force to
receive firm assurance that pipeline technology, construe-
7$ tion and operation have been perfected to give maximum
standards against fresh and salt water pollution.
Fish and Wildlife
The Brooks Range and North Slope of Alaska are accu-
4 ‘rately regarded as the last and, until recently, most un-
‘ touched wilderness areas in North America. It is certain
that human and industrial activity will have effects on the
presence and migration of some species. The Department
of the Interior is continuing to work closely with the State
of Alaska and private interests to minifize disturbances
to the fish and wildlife along the right-6f-way.
ALASKAN NATIVES
The low income, substandard living conditions, and
absence of opportunity for Alaska natives have been well
documented. These considerations and the potential oppor-
ee tunities that oil developments might provide, have been
given important consideration bw the Task: Force. The pro-
posed stipulations inelude strong prévisions to insure
against discrimination; to insure full and equal oppor-
-tunity; to insure equal job advertising in Alaska; to insure
preemployment and on-the-job training; and to allow for
suspension or cancellation of the permit in the event of
noncompliance.
- of.
LEGAL AND PROCEDURAL MATTERS e
The legal and procedural problems inherent in the TAPS
application are summarized below: 6.
~- °The Land Freeze: Public Land Order 4582, signed on
January 17, 1969, withdraws all public and otherwise un-
~
all
85
reserved lands in Alaska from appropriation or disposition
for the determination and protection of the rights of Alas-
kan natives. During his confirmation hearings, the Secre-
tary of the Interior stated that he would not revoke or
modify the order except (1) in case of public necessity and
in order to serve important purposes; and (2) that in such
cases he would first seek the concurrence of the Interior
Committee of the Congress.
As a step precedent to granting the application, there-
fore, the Seeretary must inform the respective committees
of his intention to lift the freeze for this S00-mile right-
of-way.
Responses by Alaskan Natives: The Sceretary’s agree-
ment with the Senate Committee does not mention obtain-
ing native village comments on nearby projects. Chairman
Aspinall, however, under certain circumstances in the past,
has recommended that notice ofthe project be given to
native villages loeated within one mile of the project; and
that their comments be obtained and evaluated prior to
approval.
The Secretary of the Interior, by telegram, on June 23,
has informed six native associations of the TAPS’ appli-
cation and requested their comments. Two preliminary and
no final responses have been received.
Mapping Requirements: The authority under which the
pipeline right-of-way has been requested (45 CFR 2230)
requires that the application be accompanied by a map
showing the survey of the right-of-way properly located
with respect to public land surveys, and showing courses
and distances of the center line. Similar requirements exist
for material sites (such as gravel) and for special use
perinits.
These requirements did not accompany the application,
and are still outstanding. By regulation it is necessary to
know where a right-of-way is going before an application
can be approved. TAPS indicates that it expects to comply
with this requirement by a date in November.
‘
86
Likewise, the sites for pumping plants must be described
and located, with the amount of land indicated and all
structures in it depicted that are necessary for proper use
of the right-of-way. This requirement has not been satisfied.
Width of the right-of-way: The application requests a
54-foot wide pipeline right-of-way together with an addi-
tional parallel and adjacent 46-foot right-of-way. Further,
for all sections between Livengood and the North Slope,
the applicants request another 100-foot right-of-way for a
construction road, making a total requirement of 200 feet
in width for that distance.
The authorizing statute (30 U.S.C. 185) limits pipeline
rights-of-way to 25 feet on either side of center line, er to
a total of 54 feet. Diseussions are continuing between the
Department and TAPS to determine the exact method by
which TAPS will acquire the additional 46 feet for the
pipeline right-of-way and the further addition of a 100-foot
right-of-way for a construction road.
Previously Withdrawn Areas: In addition to the public
domain, the proposed right-of-way crosses land under the
jurisdiction of the Federal Power Commission (Ramparts),
the Department of the Air Force (Kielson Air Force Base),
the Department of the Army (Fort Greely), the U.S. Forest
Service (Chugach National Forest), and the State of
Alaska (State selected lands). Both coneurrence and con-
ditioning stipulations from these agencies will be required
before rights-of-way can be approved across lands under
their jurisdiction. The Task Force is working closely with
these agencies on this matter. ;
Material and Borrow Needs: In addition to the mapping
requirements previously discussed, permission for the ex-
ecavation of borrow material is dependent upon a sale made
either through negotiated procedures, or by advertising
through competitive bidding. In either case, an appraisal
of fair market value is required.
Federal regulations (48 CFR 23) additionally require a
mining and relrabilitation plan for each and every material
87
site be submitted, and approved, prior to removal or dis-
turbance of the surface.
Disputed Lands: The’ State of Alaska has applied for
blanket selection of lands in the area of Valdez. These
lands are subject to the freeze imposed by Publie Land
Order 4582 on January 17, 1969, and have not been ap-
proved for State selection. On July 22, 1969, a private
protest was filed against State selection with the Anchorage
Bureau of Land. Management Office. The protest claims
title to certain tracts in the Valdez area, which have been
selected by the State, arid over which the pipeline corridor
has been planned.
The State of Alaska, as the adverse party in interest,
has advised the Bureau of Land Management that it will
take no action on this protest. Consequently, the Anchorage
office of the Bureau of Land Management will reject the
protest, allowing the protestant to appeal his ease to the
Director, then possibly. the Secretary of the Interjor, and
ultimately the District courts.
In addition to this protest, a suit was filed on July 14,
1969 to quiet title to other lands adjacent to those under
protest, and involved with the development of the pipeline
terminus areas.
Current Status
An outline of the major concerns regarding the pipeline
application is contained in Secretary Hickel’s letter to
TAPS of June 27 (Enclosure 3). This letter provides a
cheek list of the category of requirements, as yet outstand-
ing, that must be satisfied:
1. Law and regulation: The standard requirements
for mapping and power plant descriptions must be
met. TAPS estimates this will be provided by a
date in November. ‘
. Environmental concerns: Engineering design and
bo
pipeline location must be such that thermal de-
gradation in permafrost areas is avoided.
88
3. Native interests: Substantial safeguards for Alas-
kan natives, as well as for environmental values,
are provided for in the proposed stipulations. It is
expected that the Task Force will finalize these
stipulations by the first of October. Stipulations for
lands under military jurisdiction arg also in the
final stages of preparation.
4. Committees of Congress: The Interior and Insular
Affairs Committees must be informed of the Secre-
tary’s intention to lift the freeze for the pipeline
right-of-way. This is 2 necessary step precedent to
granting the application and could be accomplished
by the first of November, perhaps sooner. A satis-
factory response from each committee must be
obtained.
dD. id se of Alaska: Governor Miller has been
provided with a set of the August edition of the
stipulations and his.review and comments requested.
The poliey of the Department continues to be to give
priority attention to the application and to process it as
rapidly As the public interest permits.
Future Developments
Foliowingthe finalizing of the stipulations for the Trans
Alaska Pipeline, the immediate focus of the Task Force
will turn to the considerably broaded problems weighing
upon the proper administration of the public domain in
Alaska—particularly those on the North Slope—involved
with mineral and seismie exploration, drilling, and oil and
related natural resource develdpment. This effort will be a
atural outgrowth and expansion of. the present concen-
tretion on the pipeline right-of-way, and a great number of
the stipulations currently under development for the pipe-
line can be appropriately extended to the larger problems
arising from future natural resource development.
In our progress we have been guided by the view that
oil development and environmental protection are not in-
consistent. We have attempted in our proceedings to reach
an equitable balance between the just congerns . ... and
<p
S9
timetables. .. of industry, and the just concerns ... and
i,
timetables .s. . of the publie.
We have developed within the Task Force a close spirit
of understanding and cooperation between government,
conservation, and industry representatives. This under-
: standing and cooperation is developing into a new percep-
tion of the course of public responsibility and with it a
ease history in environmental management.
/s/ Russe EB. Tras
Russell FE. ‘Train
Chairman -
TRANS ALASKA PIPELINE SYSTEM
2100 Travis Street ”
llouston, Texas 77002
Telephone (713) 222-7294
Telex 762 330
APPLICATION FOR PIPELINE RIGHT-OF-WAY
December 22, 1969
Director
Bureau of Land Management -
Department of Interior
Interior Building
Washington, D.C. 20240
Dear Sir: rc
Atlantic Pipe Line Company, BP Pipe Line Corporation,
Humble Pipe Line Company, Mobi! Pipe Line Company,
Home Pipe Line Company, Piijllips Petroleum Company,
Union Oil Company of California and Amerada Hess Cor-
poration submit this application for an oil pipeline right-
of-way, for the construction ef an oil pipeline system ex-
_ tending from a point in the north line of Township 8 North,
Range 14 Kast, Umiat Meridian, to a point in Section 13,
Township 9 South, Range 7 West, Copper River Meridian.
This application-is made pursuant to the regulations
contdined in Title 43, CFR, Subpart 2234, and in support
.
> >
5 GARR EES
90
of such application, the following is submitted. This appli-
cation supplements and amends a prior filing-of June 10,
1969, and is submitted in such a form to replace the prior
a and is complete within itself.
. Applicants agree that the right-of-way, if approved,
an be subjeet te’ the terms and®onditions of the applie-
able regulations contained in Title 48, CER, Subpart 2254,
except that applicants respectfully request that the require-
ment that EP application be filed in accordance with Title
43, CFR, § 1821.2 be waived to permit the filing of this
uel direetly with the Director of the Bureau of
Land Management, Washington, D.C. This waiver is being
requested beeause of the corplexities of the permit being
sought and the faet that the requested right-of-way will
traverse more than one land distri¢t jurisdiction.
2. This application is made pursuant to Section 28 of
the Mineral Leasing Act of February 25, 1920 (41 Stat.
449) as amended by the Acts of August 21, 1935, and August
12, 1953 (49 Stat. 678; 67 Stat. SOT, 30 USC 185) and
regulations promulgated thereunder.
3. The primary purpose for whieh said right-of-way will
b@&used is the construction, maintenance and operation of
a 48” diameter pipeline system and related appurtenances
for the transportation of liquid crude petroleum from the
North Slope of Alaska to a marine terminal at Port Valdez.
4. As required by Title 48, CFR, § 2234.1-2 (b) the fol-
lowing listed documents are being submitted, or have been
submitted as noted below, for the respective applicants:
Atlantic Pipe Line Company
(a) Certitied copy of corporate charter (previously sub-
mitted and on file in BLM Qualification File No. AA 5722,
State Office, Anchorage, Alaska).
(b) Certificate of qualification to do business in Alaska
(on file in aforesaid BLM File No. AA 5722).
(ec) Resolution of Board of Directors wherein officers of.
said corporation are given sufficient authority to make this
91
application (on file in aforesaid BLM File No. AA 5722
and to execute the Power of Atterney listed as (e) below:
(dq) A common carrier stipulation (on file in aforesaid
BLM File No. AA 5722).
(ce) Power-of Attorney authorizing the undersigned to
execute this application.
(4) Corporate By-Laws (previously filed BLM No. AA
5722).
BP Pipe: Line Corporation
(a) Certified-copy of corporate charter (previously sub-
anttted and on file in BLM Qualification File Ne. AA 5722,
State Oflice, Anchorage, Alaska).
(b) Certificate of qualification to do business in Alaska
(on file in aforesaid BLM File No. AA 5722).
(ec) Resolution of Board of Directors wherein officers of
said corporation are given sufficient authority to make this
application (on file in aforesaid BLM File No. AA 5722).
(qd) A common carrier stipulation (on file in aforesaid
BLM File No, AA 5722).
(e) Power of Attorney authorizing the undersigned to
execute this application.
(f) Corporate By-Laws (previously filed BLM No. AA
5722),
Humble Pipe Line Company
(a) Certified copy of corporate charter (previously sub-
mitted and ou file in BLM Qualitieation File No. AA 5722,
State Olfice, Anchorage, Alaska).
(b) Certificate of qualification to do business in Alaska
(on file in aforesaid BLM File No. AA 5722).
(c) Resolution of Board of Directors wherein officers of
said corporation are given sufficient authority to make this
application (on file in aforesaid BLM File No. AA 5722).
(d) A common carrier stipulation (on file in aforesaid
BLM File No. AA 5722).
wt
. 92
(e) Power of Attorney authorizing the undersigned to
execute this application.
(tf) Corpprate By-Laws (previously filed BLM No, AA
5722).
Note: Copies or duplicate originals of the instruments
referred to above as having been previously filed in BLM
File No. AA 5722, are attached herewith for your ready
reference.
Mobil Pipe Line C&npany
(a) Certified copy of corporate charter.
(b) Certificate of qualification to do business in Alaska.
(c) Resolution of Board of Directors wherein officers of
said corporation are given sufficient authority to make this
application.
(d) A common earrier stipulation.
(e) Power of Attorney authorizing the undersigned to
execute this application.
(f) Corporate By-Laws.
Home Pipe Line Company
(a) Certified copy of corporate charter.
(b) Certificate of qualification to do business in Alaska.
(ec) Resolution of Board of Directors wherein officers of
said corporation are given sufficient authority to make this
application.
(d) A common carrier stipulation.
(e) Power of Attorney authorizing the undersigned to
execute this application.
(f) Corporate By-Laws.
Phillips Petroleum Company
(a) Certified copy of corporate charter.
(b) Certificate of qualification to do business in Alaska.
(c) Resolution of Board of Directors wherein officers of
said corporation are given sufficient authority to make this
application.
93
(d) A common earricr stipulation.
(e) Power of Attorney authorizing the undersigned to
exeeute this application,
(tf) Corporate By-Laws.
Union Ol Company of California
i
(a) Certified copy of corporate charter.
(b) Cerfificate of qualification to do business in Alaska.
(¢) Resolution of Board of Directors wherein officers of
said corporation are given sufficient authority to make this
application.
(d) A common carrier stipulation,
(e) Power of Attorne¥ authorizing the undersigned to
execute this application.
(f) Corporate By-Laws.
Amerada Hess Corporation
(a) Certified copy of corporate charter.
(b) Certificate of qualification to do business in Alaska.
(c) Resolution of Board of Directors wherein officers of
said corporation are given sufficient authority to make this
application.
(d) A common carrier stipulation.
(e) Power of Attorney authorizing the undersigned to
exeeute this application.
(f) Corporate By-Laws.
9. Applicants are submitting herewith maps showing a
survey of the requested ‘right-of-way as follows:
(a) Alignment map AL-00-G2, dated August, 1969, re-
Vision £1 dated October 31, 1969, sheets 1 through 77.
(b) Alignment map AL-00-G2, dated September 25, 1969,
sheets 77A through 77F.
< 94
Sheets 777A through 77h of the Aligument map will be
replaced by aerial photo based maps currently being pre-
pared. ,
6. Your applicants request that they be granted promptly
the right-of-way permit in accordance with the terms and
conditions set out in 43 CER § 2254.1-3 (@) and such other
specified conditions as may be found to be necessary in
order to render its use compatible with the public interest.
A cheek in the amount of Ten Dollars ($10.00) is enclosed’
with this application.
Coneurrently with this application, applicants are sub-
mitting separately applications for special land use permits,
o
This text is long and has been trimmed here. Open the source document for the complete record.