Amicus Curiae Brief — Train v. Natural Resources Defense Council, Inc.
Supreme Court brief1975
Ask Donna
What actually matters in this document.
Text
FILE
Sumem: Cor. 1 €
DEC 27 157%
ICHAEL ROBAK JP_ceesy
Te
In the Supreme Court of the United States
OCTOBER TERM, 1974
No. 73-1742
RUSSELL E. TRAIN, ADMINISTRATOR, UNITED
STATES ENVIRONMENTAL PROTECTION AGENCY,
Petitioner,
VS.
NATURAL RESOURCES DEFENSE COUNCIL, INC.,
Respondent.
AMICUS CURIAE BRIEF OF STATE OF MISSOURI
JOHN C. DANFORTH
Attorney Genera:
WALTER W. Noworny, JR.
Assistant Attorney General
Dan SUMMERS
Assistant Attorney General
Supreme Court Building
Jefferson City, Missouri 65101
(314/751-3321)
Attorneys for Amicus Curiae
F. L. Menpennate, Ivc., 926 Cherry Street, Kansas City. Mo. 64108, 421-3020
INDEX
Interest of Amicus Curiae ..................0.ccccsseseceeeeseeneeeeres
Argument—
Congress did not intend to foreclose the states from
granting variances from their respective imple-
mentation plans where such variances would not
interfere with the attainment and maintenance of
national ambient air quality standards
Conclusion
Citations
CASES
Getty Oil Co. v. Ruckelshaus, 467 F.2d 349 (3d Cir.
DED cece pnnranceiies cane saeeeadiesmecsoicpsapeerexeaeexnnienseuaonneeenieceeacs
Natural Resources Defense Council, Inc. v. Environ-
mental Protection Agency, 478 F.2d 875 (1st Cir.
1973)
Natural Resources Defense Council, Inc. v. Environ-
mental Protection Agency, 483 F.2d 690 (8th Cir.
1973) F
Natural Resources Defense Council, Inc. v. Environ-
mental Protection Agency, 494 F.2d 519 (2d Cir.
Be tcasainlepn seo Mianlchted esting ltnigancsicietpcede Bate ates
Natural Resources Defense Council, Inc. v. Environ-
mental Protection Agency, No. 72-2145 (9th Cir.,
Nov. 11, 1974)
Union Electric Company v. Environmental Protection
Agency, No. 74-1614 (8th Cir., petition filed August
19, 1974)
11
Il
STATUTES AND REGULATIONS
42 U.S.C. $18570-4(D) cocccceccccsssseevsseevessseesevesevevessseveseesssesseeeses 1,7
42 U.S.C. $1857c-5(a) (2) (A) eeecieceeeeeeseee ee 1,4, 11
42 U.S.C. $1857¢-5(£) occ. cece ee 5, 6, 8,9, 11
70 ORK ORNS E10) (: Os 9, 10
Section 203.110, RSMo 1969 .........c..c.ccccsscsscsesssssssesesssesneeees 2
rT G8 2; a) A. ee ace eae ene 4,11
40 CAFLR. $50.11 (gg) 2 ccccsccccssssececsssssesesssssesevsseessssseesseseees — 4
40 C.F.R. $51.15(d) 4
40 C.F.R. $51.32(f) 4
40 C.FLR. Part 52. occ coco ccececcece cca ceeeeeeeeveeeeceseeeseeeess 7
MISCELLANEOUS
Comment, Variance Procedures Under The Clean Air
Act: The Need For Flexibility, 15 Wm. and M. L.
Rev. SZ4 C1GTS) oncccciccccenciceeiccssnseioscouccnnciseneccoenonasestecaeucnenses 9
EPA, National Strategy For Control of Sulfur Oxides ,
From Electric Power Plants, (Washington, D.C.,
Aa CC | ce rer |)
In the Supreme Court of the United States
OCTOBER TERM, 1974
No. 73-1742
RUSSELL E. TRAIN, ADMINISTRATOR, UNITED
STATES ENVIRONMENTAL PROTECTION AGENCY,
Petitioner,
vs.
NATURAL RESOURCES DEFENSE COUNCIL, INC..
Respondent.
AMICUS CURIAE BRIEF OF STATE OF MISSOURI
INTEREST OF amncut CURIAE
This case presents the question whether under the
Clean Air Act, 42 U.S.C. $1857, et seqg., variances from par-
ticular requirements of the state implementation plans are
allowed, or whether Section 110(f) of the Act, 42 U.S.C.
$1857c-5(f), is the only vehicle for deferring the applica-
tion of a standard, limitation, time schedule or other re-
quirement of a state implementation plan.’ The State of
1. 42 U.S.C. §1857c-5(f) authorizes the Governor to apply
for, and EPA to approve, a postponement of any requirement of
an applicable implementation plan for a. period of one year
upon certain conditions. This postponement can be requested
only up to the date on which a source or class of sources is re-
quired to meet the applicable requirement.
Section 110(e) of the Act, 42 U.S.C. §1857cei(e), provides for
an exteusion of the date for attaining a national primary ambient
air quality standard for a period of up to two years beyond the
three-year date specified by 42 U.S.C. §1857c-5(a) (2) (A) (i).
However, 42 U.S.C. §1857c-5(e) is not at issue in this cuse, as an
application for such extension can be made only at the time a
state implementation plan is submitted. The deadline for sub-
mission of such plans was May 31, 1972.
Missouri, through the Missouri A‘r Conservation Com-
mission, is responsible for formulating and enforcing its
implementation plan. The state’s Air Pollution Control
Law, Sections 203.010 to 203.195, RSMo 1969, as amended,
contains a variance procedure similar to that of the State
of Georgia, and almost identical to iad of amicus curiae,
State of Texas.”
2. §203.110:
“1. The commission may grant individual. variances be-
yond the limitations prescribed in this chapter whenever it is
found, upon presentation of adequate proof, that compliance with
any provision of this chapter or any rule or regulation, standard,
requirement, or order of the commission or executive secretary
will result in an arbitrary and unreasonable taking of property
or inthe practical closing and elimination of any lawful business,
occupation or activity, in either case without sufficient corres-
pending benefit or advantage to the people; except, that no vari-
ance shall be granted where the effect of the variance will permit
the continuance of a health hazard; and except, also, that any
variance so granted shall not be so construed as to relieve the
person who receives the variance from any liability imposed by
other law for the commission or maintenance of a nuisance.
2. In determining under what conditions and to what extent
a variance may be granted, the commission shall exercise a wide
discretion in weighing the equities involved and the advantages
and disadvantages to the applicant and to those affected by air
contaminants emitted by the applicant.
3. Variances shall be granted for such period of time and.
under such terms and conditions as shall be specified by the com-
mission in its order. The variance may be extended by affirma-
tive action of the commission.
4. Any person seeking a variance shall do so by filing a
petition for variance with the executive secretary. The executive
secretary shall promptly investigate the petition and make a rec-
ommendation to the commission as to the disposition thereof.
Upon receiving the recommendation of the executive secretary,
if the recommendation is against the granting of a variance, a
hearing shall be held if requested as provided in section 203.100.
If the recommendation of the executive secretary is for the grant-
ing of a variance, the commission may do so without a hearing;
except, that upon the petition of any person aggrieved by thé
granting of the variance, a hearing shall be held as provided in
section 203.100. In any hearing under this section, however, the
burden of proot shail be on the person petitioning for a variance.
5. Upon failure to comply with the terms and conditions of
any variance as specified by the commission, the variance may
(Continued on following page)
In addition to the general concern of the State of
Missouri that variance procedures be upheld under the
Clean Air Act, and that those persons who hold variances
from the Missouri Air .Conservation Commission not be
faced with enforcement action because they shave in good
faith relied on the variances granted them, Missouri has
another interest in the instant case. There is presently
pending in the United States Court of Appeals for the
Eighth Circuit a petition by the Union Electric Company.
the major supplier of electric power for the St. Louis area»
for review of the sulfur dioxide regulations of the Missouri :
implementation plan.* The State of Missouri has inter-
vened in the Union Electric case, and has presented the
Court of Appeals with the suggestion that since the Mis-
souri Air Conservation Commission has not passed on
Union Electric’s applications for variances from the sulfur
dioxide regulations, the petition should be dismissed. or
held in abeyance, until the state has the opportunity to do
so.' If this Court were to affirm the decision of the Court
of Appeals below, Missouri would of course be foreclosed
from making this contention.
Footnote Continued—
be revoked or modified by the commission after a hearing held
upon not less than thirty days’ written notice. The notice shall
be served upon all persons who will be subjected to greater re-
strictions if the variance is revoked or modified, or who have
filed with the executive secretary a written request for notifi-
cation.”
3. Union Electric Co. vy. Ervironmental Protection Agency.
No. 74-1614, 8th Cir., petition fied August 19, 1974. Ora! argu-
ment on the question of jurisdiction will be heard on January
10, 1975.
4. This position is bused on language in Getty Oil Co. v.
Ruckelshaus, 467 F.2d 349 (3d Cir. 1972), which indicates that
the Courts of Appeals may not review a state regulation if the
state has not yet passed on a variance request.
ARGUMENT
Congress Did Not Intend to Foreclose the States
from Granting Variances from Their Respective Im-
plementation Plans Where Such Variances-Would Not
Interfere with the Attainment and apnea "a of Na-
tional Ambient Air Quality Standards.
The basic question before this Court is whether the
Clean Air Act leaves room for the states to grant certain
types of variances from their respective implementation
plans. Counsel for the State of Missouri trusts that the
parties to this case will present the relevant case law and
statutory citations, and, therefore, Missouri has no need
to present a lengthy brief on the subject. However, Mis-
souri is concerned that the opinion of the Court of Appeals
for the Ninth Circuit be presented to the Court as the
correct construction of the Clean Air Act.
That opinion, Natural Resources Defense Council, Inc.
v. Environmental Protection Agency, No. 72-2145 (9th Cir.,
Nov. 11, 1974), held that minor variances (those variances
which will not interfere with the attainment and mainte-
nance of national ambient air quality standards) could be
granted even beyond the date specified by 42 U.S.C.
$1857c-5(a} (2) (A) (i). This opinion goes beyond the posi-
tions taken by the First, Second and Eighth Circuits,’ and
beyond the postition now taken by EPA.* Missouri sub-
5. Natural Resources Defense Council, Inc. v. Environmental
Protection Agency, 478 F.2d 875 (1st Cir. 1973); Natural Re-
sources Defense Council, Inc. v. Environmental Protection Agency,
483 F.2d 690 (8th Cir. 1973); Natural Resources Defense Council,
Inc. v. Environmental Protection Agency, 494 F.2d 519 (2d Cir.
1974).
6. 40 C.F.R. §§51.11(g), 51.15(d), 51.32(f). Prior to the 1st
Cir. Opinion, EPA had taken the position that variances which
did not interfere with the attainment and maintenance of na-
tional standards would be permitted as revisions of the imple-
mentation plan during both the pre-attainment and post-attain-
ment periods. 40 C.F.R. §§51.6, 51.32(f).
5
mits that the proper construction of the Clean Air Act
would allow minor variances (those variances not inter- —
fering with attainment and maintenance of national stan- ©
dards) both before and after the mandatory attainment —
date, and that the decision whether to grant such variances ©
is left by the Act to the respective states.
It is the position of the State of Missouri that 42 U.S.C. —
$1857c-5(f) was not intended by Congress to be the exclu-
sive means of granting relief from a particular requirement ~
of an implementation plan, where a source of emissions |
cannot comply with the plan because of technological in-
feasibility. This position is based on the proposition that
the attainment and maintenance of national ambient air
quality standards, and not emission limitation, is the basic
goal of the ,Act, and that under the Clean Air Act, as
amended, the primary responsibility for attainment and
maintenance of the national standards still resides in the
states. These propositions are adequately supported by a
reading of the Clean Air Act as a whole, rather than nar-
rowing the inquiry to an analysis of the specific language
of 42 U.S.C. §1857ce5(f) alone. The United States has
thoroughly covered these points in its brief, and Mi:souri
will not burden the Court with a repetition of these argu-
ments. Instead, Missouri will argue that the rationale of
the Ninth Circuit should be adopted by this Court.
As discussed above, the Ninth Circuit has held that
the Clean Air Act does not prohibit the states trom grant-
ing variances from particular requirements of implementa-
tion plans, where such variances will not interfere with the
attainment and maintenance of ambient air quality stan-
dards. The State of Missouri believes that the Ninth Cir-
cuit position is the only logical one to take. when the practi-
cal effects of the other positions are considered.
J
The effects of the other positions before the Court can
readily be seen from the following situation. A large elec-
tric utility, supplying 99 percent of the electric power to a
metropolitan area of 1.8 million people, is in violation of
specific emission limitations (set by state regulations) at
the mandatory attainment date. However, the national
ambient air quality standards for that pollutant are not
being exceeded for the metropolitan area. The utility
finds that it is unable to apply those emission control tech-
niques required to bring its emissions of the particular
pollutant within state regulation limitations, because the
technology for such controls has not been developed, or
because shortages of fuels and/or control equipment make
compliance with the state emission limitation impossible
at the present time.’
- Faced with this situation, the utility has a choice. Un-
der the positions taken by the United States and Natural
Resources Defense Council, Inc., it can either continue to
operate in violation of the emission limitation and face
large fines for such violations, or it can shut down its oper-
ations, thereby causing a substantial, even massive dis-
ruption of the regional economy and a threat to the public
welfare. We submit that Congress did not intend such a
result and that the Clean Air Act cannot be read to man-
date such a result.
Accepting the proposition that the regulatory scheme
of the Act is designed to force the development of new air
7. Although at the moment hypothetical, we believe that
this set of facts could exist in Missouri on June 1, 1975, with re-
spect to sulfur dioxide emission limitations. The hypothetical
assumes that the one-year postponement provided in 42 U.S.C.
§1857c-5(f) was not taken advantage of. The same situation
could well exist on June 1, 1976, after the one-year postponement
had — even if the postponement were applied for and
granted. ;
~
pollution control technology, Congress could not have in-
tended that substantia] economic disruption should occur.
where the national ambient air quality standards are being
met and maintained, simply to achieve an emission limita-
tion which was ambitiously set at a level more stringent
than necessary. The national ambient air quality stan-
dards, by definition, are set at a level which will protect
the public health and welfare.~ If the public health and
welfare are being adequately protected in an air control
region, then it is illogical to enforce a more stringent
emission limitation against a source which cannot comply
with it,” especialiy when economic disruption detrimental
to the public welfare will result.
Under the construction of the Clean Air Act, advanced
by the parties to the case at bar, there is almost no flexi-
bility in the Act to meet the exigencies of a situation Where
technology has not advanced as rapidiy as anticipated in
1970. -With the mandatory attainment date fast approach-
ing,'” there are still technological hurdles to be crossed in
order to effectively contro! certain pollutants such as the
a
8. 42 U.S.C. §1857c-4(b).
9. To some extent we are also talking about a situation
where compliance, with an emission limitation more stringent
than necessary to meet national standards is technologically feasi-
ble, but economically infeasible. In some situations the cost of
compliance could reach a point where it would have an economie
impact outweighing the benefit to the public from extra incre-
r.ents of emission reduction. In such cases. we submit that the
states should have the authority and responsibility to strike the
balance between costs and benefits.
10. The mandatory attainment date for national primary
ambient air quality standards in most states is May 31, 1975.
40 C.F.R. Part 52. In addition, a number of states must also meet
secondary standards by that date. 40 C.F.R. Part 52
photochemical oxidants.'' And clean fuels are in shorter
supply than anticipated in 1970. There seems to be little
chance that some of the technological and resource supply
problems will be resolved by mid-1975, or even mid-1976.
Yet the: positions of the First, Second and Eighth Circuits
are that no later than mid-1976 (for most states) all
sources must comply with emission limitations, even if na-
tional standards have been met and are being maintained.
The position of the Fifth Circuit is, of course, even more
restrictive. .
.Missouri submits that with regard to the issue before
the court, the only logical construction of the Clean Air
Act is that plaged on it by the Ninth Circuit. That is, that
42 USC. $1857c-5(f) is’ not the exclusive means of
achieving flexibility in enforcement of state implementa-
tion plans. Instead, a state may grant a minor variance
(one which does not interfere with the attainment and
maintenance of, national] standards) even after the manda-
tory attainment date. Any other construction of the Act
will result in absurd consequences,'- and Congress cannot
be presumed to have intended such absurdities.”
11. In addition, there is a great dispute between the EPA
and the electric power industry as to whether the technology for
controlling sulfur dioxide emissions is presently available. Fur-
thermore, assuming EPA’s position is correct that the technology
for controlling sulfur dioxide emissions is now presently avail-
able, common sense dictates that all power plants in the United
States cannot be brought into compliance by mid-1976, simply
because it is physically impossible to complete such a massive
construction program by mid-1976. Therefore, no matter what
it is called, variances will have to be granted from such manda-
tory dates.
12. Major industrial and utility facilities closing down or
paying large fines, even though the public health and welfare is
being protected (because national ambient air quality standards
are being met) and compliance within an emission limitation is
impossible or economically ruinous, is, we subniit, absurd.
Admittedly, all sources must comply with the national
ambient air quality standards on the mandatory attainment
date (unless a one-year postponement is granted pursuant
to 42 U.S.C. §1857c-5(f)). Yet there is no statutory lan-
guage which would suggest that minor variances be
treated any differently after the attainment date than be-
fore such date. In fact the Act. in implicitly encouraging
the states to adopt implementation plans more stringent
than necessary to achieve and maintain the national stan-
dards,’* would seem to require post-attainment flexibility.
“Ss
and it has been postulated that 42 U.S.C. §1857c-5(f)
itself requires a uniform approach to pre-attainment and
post-attainment variances.'' We see no basis in the Act
for a differ-nt treatment of pre-attainment and post-attain-
ment variances.
An alternative to the granting of minor variances in
cases of technological or economic infeasikjlity is, of
course, a relaxation (lowering) of emission limitations to
the bare minimum.'* The difficulty with this approach is
that it lowers air pollution control for all sources to the
lowest common denominator. This approach flies in the
face of reason and the provisions of 42 U.S.C. $1857d-1.'°
13. 42 U.S.C. §1857d-1: Comment, Variance Procedures Un-
der The Clean Air Act: The Need For Flexibility, 15 Wm. and
M. L. Rev. 324, 336-337 (1973).
14. Id.; see also Natural Resources. Defense Council, Inc. v.
Environmental Protection Agency, supra, Slip Opinion pp. 7-8" <"*
15. EPA has suggested (at least implicitly) this approach
in certain informal publications.
16. Footnote 13, supra; 42 1/.S.C. §1857d-1 provides:
“Except as otherwise provided in sections 1857f-6a, 1857f-
6c(c)(4), and 1857f-11 of this title (preempting certain
State regulation of moving sources) nothing in this chapter
(Continued on following page)
=
ae
10
Does it not make more sense to set emission limitations at
levels which make an effort to improve ambient air quality,
and make judicious use of minor variances to accomodate
cases where the stringent limitations cannot be met for a
period of time, than to require all sources to meet only the
minimum levels of emission reduction necessary to protect
the public health and welfare?
We submit that 42 U.S.C. §1857d-1 provides, at the
least, that the respective states have the option to enact
such a scheme of regulation. Otherwise, Congress would
have had no reason to specifically provide in that section
for state regulation and enforcement of emission limita-
tions in the terms there provided. Congress could not have
intended to enact a regulatory scheme encouraging innova-
tion and progressive regulation, yet prohibit any flexibility
after the scheme takes final effect.
It might also be suggested that the flexibility required
to meet technological and economic reality could be pro-
vided by a judicious delay of enforcement, or the use of
schedules of compliance in enforcement orders, by EPA."
+
Footnote Continued—
shall preclude or deny the right of any State or political sub-
division thereof to adopt or enforce (1) any standard or limi-
tation respecting emissions of air pollutants or (2) any re-
quirement respecting control or abatement of air pollution:
except that if emission standard or limitation is in effect
under an applicable implementation plan or under section
1857c-6 or section 1857c-7 of title, such State or political
~ subdivision may not adopt or enforce any emission standard
or limitation which is less stringent than. the standard or
limitation under such plan or section.”
17. EPA has suggested the use of such a scheme in its
publication “National Strategy For Control of Sulfur Oxides Froin
Electric Power Plants”, pp. 16-17, 23-24 (Washington, D.C., July
1974).
11
This would amount, in effect, to EPA’s granting of vari-
ances to individual sources. We feel, however, that this
scheme is less desirable than state variance procedures,
because state variances are granted after public hearing.
EPA, on the other hand, need not hold a hearing, or other-
wise subject a proposed enforcement order to public
scrutiny. In addition, state variances can be granted only
for certain specified reasons,'’* while EPA’s standards of
granting compliance delays are known only to them. We
the variance by EPA," is a more equitable procedure, less
susceptible to abuse, and is a procedure contemplated by
Congress when it enacted the Clean Air Act.
CONCLUSION
Amicus Curiae, the State of Missouri, submits that 42
U.S.C. §1857c-5(f) is not the exclusive method whereby
compliance with particular requirements of a state imple-
mentation plan may be deferred if national ambient air
quality standards are being met and maintained. Rather.
the Clean Air Act allows the states to grant minor vari-
ances, subject to EPA approval, both before and after the
mandatory attainment dates provided in 42 U.S.C. §1857c-
5(a)(2)(A). Any other reading of the Clean Air Act
would plainly defeat the intent of Congress to encourage
the states to set emission limitations and compliance dates
more stringent than required to meet national ambient air
18. See Appendix p. 1.
19. Variances are presently treated as revisions of the state
implementation plan, 40 C.F.R. $51.6.
12
quality standards, and would result in inequitable, absurd
and economically disastrous consequences.
Respectfully submitted,
t JOHN C. DANFORTH
Attorney General
WALTER W. Nowortny, JR.
Assistant Attorney General
Dan SUMMERS
Assistant Attorney General
Supreme Court Building
Jefferson City, Missouri 65101
(314/751-3321)
Attorneys for Amicus Curiae
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.