Appendix — Dalehite v. United States

Supreme Court brief1952

Ask Donna

What actually matters in this document.

Text

~~

| WAR DEPARTMENT DO BOT RECORD

OFFICE OF THE CHIEF OF ORDNANCE

WASHINGTON, D. C. EDSeynelds/jrn/331i

22 August 1947

“”

SUBJECT: Tests of Fertiliser Gade Ammonium Bitrate

\ .

10s Commanding General \

_ Aberdeen Proving Ground

Maryland

y

%

*

Fo

1. Forwarded for your informtion and guidance are copices

of 24, atid 34 indorsement to letter from Ficatimny Arsenal] te

thie office dated 7 July 1947, file 0.0. 64/150, subjects

"Investiration of Fertilizer Grade Ammonium Bitrate,” and letter

to FPPAP dated <2 August 19.7, subject: “Intermediate Scale Tests

2. Im accordance with paregraph 5 of 2nd indorsensat,

Pioatiany Areenal will prepare the test program request.

BY COMMAND OF MAJOR GENERAL HUGHES;

? ,

MERLE H. DAVIS

: Col, Ord Dept

3 Incle aseistant

1. Cy 26 Ind dtd 13 Aug 47 ,

to 0CcO

@. Cy 34 Ind dtd 22 aug 7

M te P.A.

%. Cy ltr dtd 22 ang 1,7

to FRAP

4)

a

P.A.

ee eens

ALO nO EE SEPM Dal iit OM AL Ce waive wii til,

100

Ompas 171.86¢/198-29 2nd Ind

Attus ORDBB-T

_ Grd Dept, Picatinny Arsenal, Dover, H. J., Aug. 13, 1917

Os Chalet of Ordnance, Washington 25, D. C., Arty: ORD IM

‘i Consideration has been given to the type of intermediate scale teste |

| Which could be made at Aberdeen Proving Ground from which edditiona) |

| information could be obtained regarding the sensitiveness of fertiliter |

&. To attempt to initiate detonation of « large mase of begged,

dry, cramuler fertiliser grede amaonium nitrate (FGAN) by the detonation

of @ ome]l masse of molten PGAN. for this test, there will be used a

12,000 pound bomb, T-10, filled with both bagged and loose PGAN. Attached

te and Inading through the bese plate ani into the bomb will be a stee]

cylinder, 2.5" 1.4. x 36", leaded with FOAE and externally wrapped with

resistance wire for heating. As shown in Technica) Report Bo. 165d, Table

EVITI, PGAN in sealed cylinders of this sise can be caused to detonate

merely by the applicetion of externa) heat. In this teet, sucn a tube

could ect as an initiator for the mase of material in the body of the

bomb. The eatire system is to be closed before starting the test.

b. Same as & above, except that the whole system is evscuated

before hosting the initiating tune. -

6. To try to initiate detonation of a large, fined mass of

PGAN by fTire. Te thie test it is planned to lead « 12, pound bomb,

™10 with bagged FPGAS, but a quantity of iuflemmable material such as

wood and excelsior will be pleced ia the aiddle of the charge. The

bomb will be vented and the inflammable material ignited by means of

electrie equibs.

¢. Same as co above, except that the boabd will be sealed and

evacuated before igniting tho inflammable material.

Bote: Bach of the above four teste would involve @pprozimately

3,000 ~ 4,000 pounds of Faas.

inereased heat over thet seeded to-melt the PGAN. Im this test, there

Setadl ished at this Arsene] us ® similar aesenbdly oo eying an

imert graauler filler. - ee .

- 101

Attn: ORDBS-T

0.0. 464/150

Note: In each of the five tests, determinations wil] be made of

the interne] temporature and the blast pressure produced.

OPDBB 471.869/198-29 @nd Ind (Contd) ~ 13 1947

2. Each of tests a, b, co, and a above coal) for the use of « 1z,000

pound bomb. At the present tims there ere nine (9), 7-10, 12,000 pound

bombs in storage at this Arsenal. It is understooco that these were sent

here for experimentel work but were never used. authorisation is ‘re-

quested to requisition four (4) of these bcabs, since they are readily

available and would require little modification for the proposed purposes.

Likewise, authorisation is requested to use one (1) 4,000 pound, 1-8,

bomb, 27 of which ere in storage here. All modifications necessary to .

theese bombs will be made in the Arsenal shops before —— the empty

bombe to Aberdeen.

3. It. ie estimated that approximtely $2000 wil) ‘ve required for

shop work in ecanection with mouifying the bombs, preliminary test work

and transportation of the empty bombe to the Proving Grouad. It is ree -

quested that this amount be allocated for work on this project at thie

arsenal, >

L. It is requested that your Office order 20,000 pounds of PGAN

to be seat to Aberdeen and that this arsenal be notified of ite arrival

at the Proving Ground.

5. When ell the bemd moaifications have been nade and prelininery

experimental work at this Arsenal completed, the eajity bcmos will te

sent to Aberdeen Proving Ground. A Test Program Request will be prepared

outlining detaile for conducting each test. It is understocd thet

Aberdeea Proving, Ground will conduct theee tests with the cooperetion

of technical personne] from this Arsenal.

>» 6 The comments of your Office om the test program outlined in

the above peragrephs are requested. Assuming these tests are ta be

completed before the White Sands Tecete, a1] work at thie Areenal is

counection with this project will be expedited.

/e/ W. 8. LARNED

| ff WW. B, WARMED

Colonel, Ord Dept

Comman diag ‘

- 28623 i

asi

ANG RARE hewn

en) Oe

OLAS AE MEN HB Sot

AS A tN NEI ATI thi Tiles shen itr il Se ee ee Lee oe

102

Subjects Investigation of Fertilizer Grade Ammonium Nitrate

0.0. 46/150 : 3rd Ind HDReynolds/jrh/3414,

ATTH:; O8DIM

ORnDBB 4,71.869/198-29

WD, Ord 0, Washington <5, CD. C., 22 August 19);7

TO: co, Picatinny Arsenal, Dover, Mew vereey

1. This office concure with the inal tests as outlined in

paragraph 1 of 2nd indorsement.

2. Authorisation ie granted for the use of four (L,) 7-10, 12,000

pound bombs and one (1) T-8, 4,000 pound bomb for the tests.

3. Autiorisation te further granted for the use of $5,000 from

Allotment 20 17 P 430 funds, $2,000 for the proposed tests and

$1,000 for other expenditures which have been mede in other experimental

work in sonnection with the test program on PGAN.

_ &. This office will make the necessary arrangements for. ten (10)

tons of fertilizer crede ammonium nitrate to be shipped to Aberdeen and

you will be advised when shipment is made.

- BY COMMAND OF MAJOR GENERAL HUGHES;

j Va

7 MERLE H. DAVIS

Col, Ord Dept .-

cc ‘ 7 Kesistant .

FDAP . -

Inspection Brench

Aberdeen, Prov Ground ai

ORD

CON CU RRENCE s

Ins;ection Bresch

: ; wv eae

47

23624

a0 er Nat HBC

103

\

WAR CEPARMENT _ DO HOT RECORD

OFFICE OF THE CHIEF OF ORDNANCE aa

WASHINOTON, D. C. BD Re ynolds/jrh/33 1,

3 22 Auguet 1947

SUBJECT: Intermediate Scale Tests on PGAN

TO: Pield Cirector of Ammunition Plante

Joliet Arsenal

Joliet, Illinois ;

1. Reference is made to inclosure copy of end and jrd

indoresments to letter from Picetinny Areenal to this office

dated 7 duly 1947, file 0.0. 464/150, subjects “Investigation

of Pertiliser Grade Ammonius Nitrate."

2. It te requested that 10 tons of FGAN be shipped to

Aberdeen Proving Ground, marked "For Picatinny Arsenal Test

Program” and that ~icetinny Arsenal be advised when shipment

is ‘made.

BY COMMAND OF MAJOR CEMBRAL WUGHES;

MERLE H. DAVIS

Col, Grd Dept

2 Incle . Assistant

1. Cy 2d Ind até 13 Aug 47

te occ (00 *),

2. Cy 34 Ind dtd 22 Aug 47

to P.a.(00 464/150)

ce

P.A.

Aberdeen Proving Ground

§

a

23625

tl eR el ee ee aed at ewnmenroreete iat

eS a

104

ORDNANCE DEPARTMENT

PICATINNY ARSENAL * RECORD

DOVER, HEN JERSEY LMBr ikeen/rr /222),

ORnteB-f 4.71.866/198-5SL,

APG ,71.86/10

SUBJECT: Tweets om Pertiliser Grade Ammoaium Nitrate

TOs. The Director

Proving Center

Aberdeen Proving Ground

Aberdeen, Maryland

1. There are inclosed (a) Test Request Ho. <730 to be

used for identification purposes only, (b) one cojy each ef Drawings

Pi-7-550-560, inclusive, and (¢) two .meumiticn Data Cards as follows:

pre Ammunition Lot

Data Card Be. Be., Pa-E- Ites

Tost e . : on

46398 ie 1065 12,000 to. bomb, T-10, (4)

2. This material should de forwarded to the Proving Center

by Areens] truck somstias within the next 2-3 weeks.

4. Personnel from this Arsenal are availabie tc visit the

Proving Center for aay discussion which may be deemed advisable

before the tests are started.

FOR THE (OMMANDING OPPICBR:

C. R. DUTTON

, Col, Ord Dept

8 Incle i Assistant

1 = Test Program Request No.. 2750

2 - 6:© Drawings FE-7

7 - em. Data Card Bo.

A e a 2 & a

23626 A

>

LiRriksen/rr/2224

Test Program “equest No. 2730

Picatinny Arsenal, Dover, §. J.

6 October 1947 ;

le Material for Test

a. Tan (10) tons of fertilizer grade ammonium nitrate (FGAN).

This material has already been received at Aterdeen Province Ground

fron Ravenna Arsenal.

be One (1) 4,000 pound T-8 and four (4) 12,000 pound 7-19

bambe have been modified and are identified as follows:

Ammunition

Lot No. Date Card No. Item

Pi-E-I0ez ae oo : :

PA-€-1085 £6398 12,000 lb. bomB (2)

* These and the following equipment for use in these tests will be

sent to the Proving Ground frap thie Arsenal by truck:

(1) ‘Thermocouples

(2) Thermocouple lead wire

3) Potentioneter for use with therroce:ples

. 4) Résistance wire

(S) Asbestos

(6) Pellets of FCAN and paper

Ce Asserbly and loading of the bombs to be done st the Froving

Ground as outlined below under "Recommended Test Program” with the

cooperation of personnel from Picatinny. .

2. Procurement Authority

&- Allotaent advice (for work at Hicatinny Arsenal only)

roe aie dian Shits (000. 464/150, ORDSB £71.-869/198-29, 34

be Project Klos = None

C+ RAD No. = None

3+ Arsenal Expenditure No.

XeO. 321 (95/228)

105 ge!

"A

ject of meson or Experiment

To investigate the sensitivity of fertiliser grede amacaiuz

nitrate to explosion.

5. Lecal Tests | ee

It has been shown that PGAN can be caused to detonate under

certain conditions of temperature, confinement, etc. These tests

are outlined in Tables 17 and 16 of PA Technical heport Bo. 1656.

Each of these tests invclved approximately 5-10 pounds of FGAR.

,

Oo ject of Tests

To determine whether moderetely large quantities of FPGAN

(1500-3000 pounds) cans be caused to detonate under eny of the five

(5) ditferent test conditions outlined below in detail under

* Rs commended Test Procedure”.

7. ped tts ticn in Detail of laprovements mace Since Last Frov ing

Gr

Zo previous tests mace at Froving Ground.

»

6. Precautions in Handling and Testing

@. 6 smoking shbuld be permitted by any personnel engaged

in any of the handling operations of PUAN, es;ecially dvring and

efter loading the test bombs.

bd. Each test, requires some degree of control. Asseyming

detomtion of the FOAN will occur ia each test, the distance

from the test bomb to a suitable barricade which wil] house

personnel and control] equipment, is left to the diseretioa of the

Proving Ground.

CG. Small scele tests at this Arsenal indiceted the possibili-

ty that bombs containing heated FGAN aay rupture and behave lixe

® rocket. Therefcre, precautions gust be taxen against euch «

hasard. The 4,000 1b. bomb should be partially buried nose-dem

im the ground. Por test purposes each 12,000 lo. bomb mst be

tested with the bese lower than the nose at an angle of about *

20 to 70 degrees with the horisontal. As a precaution it is

suggested that each 12,000 1b. bemb be partially buried sese-

first in the side of a hill or trench, or be laid in a sloping

lauacher-trench and pointed to sea.

23528

.

J/

9. History Sketch

The Texas City disaster of 16 and 17 April 1947 occasioned

considerable investigation st this Arsenal into the characteris-

tics of the FGAs involved to try to determine the possible cause

for the explosion. ‘the laboratory teste indicated that both the

nitrate and bags were of satisfactory quality and no deficiency

in this respect was resporsible for the fire which preceded

explosion .

However, during the course of this investigation, « number

of tests were made which showed that, when under controlled con-

ditions, a 5-10 pound quantity of PGAF could be made to detonate.

These tests, together with supplementary laboratory data, indicated that

the detonation of the POAN at ‘exas City may*have been initiated

by an explosion of gaseous products formed during the combustion of

nitrate and paper. This work is all reported in Technical Repdrt No.

1658.

It was considered desireable, therefore, to extend these

information already gained, try to simulate conditions which may

have existed on the ships "Orandcamp* and "High Flyer” before

detonation of the whole mass occurred.

10. ~ Recounended Test Progren

For each of the proposed five tests, there i

duplicate, « workin: sketch which shows the set-up to be used

(Drawing Nos. PI-7-556-560 inclusive). ‘The onjy changes sade

:

ait

He

z

ie

: 1

re

i

ii

i

:

.

i

Ei

Ee

i

i

5

tT

A

5

i

i

i

:

ef

:

bat

i

il

efit

ti

its

3

at

rE

<E

~

*~_-w*e

$2

Shen heating of the ene tube begins, the area should be

cleared.

vd ide io ks Same as Test Mo. 1, except that the whole

system is to be evacuated before heating the initiating tube. An

ordinary Hi-Vac pump should be suitable for this purpose.

Ce Test No. 2A ~- To try to initiate detonation of a large,

confined mass of FOAM by fire. ‘The 12,000 pound bomb should be

loaded as shown on the accompanying sketch. The inflammable

material should form a layer at least one foot in thickness.

After loading the bomb should be laid in a trench. As shown on

the sketch, the inflammable aaterial should be ignited ty means

*of several] electric squibs.

Gd. Teast No. 2B = Same as Test No. 2, except that the bomb

will be sealed and evacuated before igniting the inflammable

material.

@. -Test No. 3 - To melt @ large quantity of dry, granular

FOAN in ac container and attempt to cause detonation of same

by application of increased heat over that needed to melt the FGAN.

In this test, there will be used a 4,000 pound bomb, filled with a

mixture of FOAN and bagging paper (99/1). Heat is to be applied

externally by means of resistance wire wrapped around the bomb.

A preliminary test has beerr made at this Arsenal on 6

4,000 pound bomb filled with common salt to indicate the. necessary

conditions. The bomb wae placed in a vertical position with its

nose down, wrapped with one layer of asbestos paper, over which

approximately 1,000 feet of resistance wire was wound. ‘The

resistance wire wes cut into six (6) approximately equal sections

(150-160 feet) and these connected in parellel to the power

supply. ‘the whole bomb was then covered with a 3-4 inch layer

of fibrous asbestos. A 220 volt power source fused for 60

amperes was connected to a voltage regulator and the current

gredually fed through the resistance wire circuits. The follow-.

25638

3

Ji

199

“s

7

ing dat» was collected:

Current fed into each Period cf Boab Te:.perature, °C.

of the six circuits Heat i Taternal

eT Ce aan Pig ee

100 Te5 22-6 300 150

lov 11.0 ct-40 350 10

Continued heatin, woula undoubtedly have increased th« temperatures.

: In the test at tic froving Ground, tie currens shcvl. be

fed predually trough the resistence wire until the te.perature

at tre wide of the bomb wall reaches approxzimtely 150-c00°..

The power ingut into the resistance wire shovld then oe ac Jjusted

or cut back to allow tie center cf <1: bemd te come vu; to 175-1".

As shown in the sketch, thermoco.jles are to be ; laced in the bcmb

an: these shoul:i indicete the internal temperatures. hen the

whole interior of tne bimd has reached a minizus of 175-100°C.,

the power input into the resistance wire shovli be increasec su as

tc reise the interna) tenperature of tie Dcad us razidly as possible.

In tests 2h, 2B and 5, thermocoujles «re to waployed to

measure the interne] temperatures us the <est progresses.

_ It ds requested thet blest pressure measurements be muse

in each of the five tests.

Picatinny will cocgerate fully on this ;roject by having

technical representatives-present wren the tests arc ceiling mace in

order to firxrish information and advice on the basis of tests mace

at this Arsenel. és

ll. References

@. 0.0. hab/l50, ORDBS 72 .B65/198-<43 cnc va: sre Invorsenents.

b. Fieatinny arsenal Tecnnicas ke;ort Ne. 103¢.

~

~

le. Coordination ~

None.

Cc. re il TTOn

Col, Ord wept |

Assietent

Jy

MESSAGE IC BM

PROM, QUINTON, C. G., AKG, iid.

ACTION 10s COMMAN.INC OFFICER

FICATIONY ARSENAL

DOVER, NEW JERSEY

ATTENTION: TECH. DIV. CHEM. Bh.

ME TEST OF PCAN, FICATINNY TPR 273°, WST u CONDUCTED BY HEATING SHALL AMOUNT

GAR In CONTACT WITH 900 LBS. LOOSE PGAN uD 2300 L358. BAGGED PGAN I” 12,000 Us,

BCMB T1O. BOMR DETOMATED HIT: CRATE2, FRAGMENTATICH, NCISE, BIC., CEFINITELY

CHARACTERISTIC OF HIGH ORDER UBTONATION. ‘TEST aA COADUCTED WIT! 1600 Las, Se 68D

POAN AND SEVERAL FEET THICKNESS OF COWAUSTIBLE MATERIAL 18 12,000 LB. BOuB Tio

wT 4-5/4 New VENT. LARGE EMISSION OF DARK BROAN SwOKE FO. TO HOURS BUT BO

- CRTOMATION. AFTER PLOOLING WITH RATER Bows OBSERVED TO HAVE AFPROXIMATELY TKO

FEET OF ASR, PCAN, AND TAPER AT NOSE. RECOMMEND TESTS 18 AND 5 MOT BE CONDUCTED

AS ORIGINALLY REQUESTED aND NEXT TEST BE 2B WITHOUT EVACUATING AIR. BWD CITE

ORDBG-DPD BROCKMEYER

cc

- NATIONAL BUREAU CF STANDARDS, ATTN: wR. J. A. DICK INSOM

OCO, ORDIM, ATTW: MR. a. D. REYNOLDS

OCO, ORD™, ATTN: COLONEL TIBIETDS

23622 a

111

ET26

EUBO39 ¥

EqBSs PP UETAO

FM VEGX 3/ DOVRR NJ 540 PICATINNY ARS DOVER NJ 2917502

TO CG AF ATPN ARMS AND AM DIV ABERDEEN MD

BD GRNC

RE BOMB TESTS W AVYONTUM NITRATE PA TEST PROGRAM RE.UEST NO 2730

DESIRED TO PEAT TEST NO 1 MADE 16 D3C EXCEPT USING VACUUM AND A

RY'PTURE DISC IN ONE OF THE BOOSTER HILES PD RUPTURE DISC VILL BE

| SUPPLIED PD ALSO REPEAT TEST NO 2 MADE 18 DEC USINO A COMPLETELY

C’.ASED BOYB PD UNLESS INFO TO CONTRARY RECEIVED MERE IT IS UNDERSTOOD

TESTS WILL COMMENCE 5 JAN PD MR ERIKSEN SILL ARRIVE ON THAT DAY PD

PLEASE CONFIRM BY RETURN TT END CITE ORDBB L H ERIKSEN TTS43

CPN Pa NO 27301162185 TM43 |

29/17552 Ss

23633 4

112

BECORD

MESSAGE FC PM

QUINTON, C.G., APG, MD.

COMMANDING OFFICER

PICATINNY ARSERAL

DOVER, NEW JERSEY

ATTN; TECH. DIV., CHEM. BR®

REURTT 543 29 DECEMBER 1947 AND TPR 2730. TEST 1 REPEATED BY HEATING SKALL AMOUNT

OF FGAN IN CCNTACT 41TH 900 LB. LOOSE PGAM AND 21,00 18S. BAGGED FGAN IN 12000 LB.

BOMB 10. BOMB PITTED WIT: 500 PSI RLFTUFE, DISc AND EVAGLATKD 0 105mm EB. DISC

BLOWN OFF AFTER 1-}/2 HOURS HEATING BUT NO DE AMA TION OCCURRED. GRADUALLY D&- |

CREASING AMOUNT OF DARK BROWN SUOKE GIVEN ce FoR THREE HOURS. SST 2 REPEATED

BY IGNITING SEVERAL CUaIC PEET CC'BUSTIBLE MATERIAL IN SEALED 12000 LB. BOMB TlO

LOADED WITH 2000 LB. BAGGED FGAN. BOMB METONATZED HIGH ORDER APPROXIMATELY L5

SECONDS AFTER START OF FIRE. MUWRE TESTING SUSFENDED PENDING INSTRUCTIONS FROM

OCO. ALL REMAINING COMrOWENTS WILL Be HELD AT FRCV!:G GRCLWD UNTIL FURTHER

NOTICE. 7500 LBS. FGAN ON HAND. END CITE ORDBG-DPD BRUCKMEYER

cc

OCO - ATTN: CRDIM - MR. REYNOLDS

BUREAU OF STANDARDS - ATTN; MR. J. DICKINSON

UNCLASSIFIED -

ORDBG-DPD/OBBrockmeyer/vit/ 15 Jan 48 C. BLPORD SMITH, Col, Ord Dept _ 1 21

2285 Director, Dev. &@ Proof Services

23634 Jj] 4

23635

113

vy

an JA 4 4¢ y \ , ~~ z

ag oe t*4bse e gx

FLOR Le MEE a

i” ae Bes His BY FAME BEV

ie 2 BM OLD CALA MATERA. 4 6 ’

"Cw fem > O97 0—0g © SU OTEM S70

AM irow eFIO AMO

CAC AIFAX

s~

‘oe pe AME BGA Selene oN Be lange

, ’ ; > BG AISE HLA BT AC SAME VA Od

, i. ; sy 3 SOLFELI LN CL A¢ VOCE CO. ot: shite i

2 O- STALL BUNS, OOF W/ONX 96.7

LEMOS, VROMPEC O hi JH A? SE SFIS

© MMO RL S15 TAPCO WME FOR SATO

MULMD VIO 8 IGLOFYMIE

WMLS FO Oe RCE LUCENE

r LOS TV OL, WAL.

Oe Te A PID ee

Cale oer ee wer ‘vee Sidi: > Seton

3 Be oy

4 _- — - ~ - Pe mE TOA. the Spec

(AestOe =

ROIS oo

_ 2olg0 OAT Wait faa

LEE 2--. bed Sak

, ee

vf ¥ o>:

1 25675) FOOL

2 FI8/ Me. ae ha Be

ar

PROPOSED ABO MEL FE 7ST

bE MME A] ABE LEN PROVE CROUND

70 DETERMINE 1 ME SENSITWIT YF FER

UMER CRE Hi MONON MHTRATE 7D

EXPLOSION. (72°57 WO

2); i

fa-74-¥7 4

Pare bsg FS

PP Z6P EF ERP

‘fi

Fo

“X, : a im ‘

vwee td a pen nig dt

amt

eS aie

2

Te,

Sd, SMOVYALIO OL

MOAE SHO? PID 14

Ts,

ON LOML NOISC

a {

Oe hee

eh A

PF

i ae SE

~ +,

are; a

WVA SATEA? PR-7-565C

Tas - tt 72 VACUUM PLNAe

A Bo AES MO A yb FE A-

= nae —_—

{

P| '

NK

CUP ep

‘

Sy,

by Ss Wt

7 2

: . J f]

es , . :

as m, meee Me Le. a ;

4 . 4 é . 5. ; CU wr

¥ ay = :

a

,

A +" .

ae * | ~ ; :

OND Lil THOA TA (FAN,

OLLS ~ BAL OED

‘ew

—™ me, y

- ~ “ oe

‘ P a

‘ \ <

_ : + 2

. " P

| Rae eC 7ES7-5 Ze

(a AOL MN {2 :

LEV LKVIINE fr EF. © bhi pth tid: ee

0 AMPLE AMI WA AVI FO LA". Ap.

«! TEST NC EBS * iF, - | :

we

Ly

eo

‘ e

‘—“— =

i © MNF fo 7S. a

ee some T. wh . | ‘ by : ? . .

TN PA \ | DLE AE COVINA so

oO es ANC : SO. VES. AWE ANE LAE

MIN Sr

A #,

=

if ea W202

BE BA vd MII NM Ot”

Go TAM OMI COC LS

FHC OSED AS SL. !

ATE LIL AFT A, ea eos b.

TO LEEPELOLTE ae ‘

ALOT EE GO? a ay!

Ve LAE ES =e

_

ae we . & Z

BIS 7 1c) 2 5 SEW rh ge 7 pee 236039

_2 =e qeoe <pesntip ose «

4 1

vd

m ; ae

a i

ct.

Re

: é

?

a — )

a & (=

i wo

| ® “ .

e| » ioe

a} 63 eee

< &

e

119

AS50402 -RegBREepeD § ABERDEEN PROVING GROUND § 15 December 1947

Profect No. EP-FG-l. Bomb, GP, T10, 120G0 1d, Loaded witn#G200 1b. of

FGAN, initiator tube attached, Rear view, before detonatten Test lA.

- a

23641

a

~

ta

BERDEEN

’

PROVING GROUND §

,0aded

LA.

21

a

464 $ ABERDEEN PROVING GROUND & ta Nasenuen 100

- ’ , SD . i a raae ‘np? ' a -racmants :

a Py a ”

2384

\

> ABLE CrtwN Po “Ai ic ? > .

‘ ~

469 B ABERDEEN PROVING GROUND § uetead

ra a ‘ow

. ‘ ( “AH rest

&

-

os eo ins x aa oF 62 ae " 5 Se had ; “3 " ~~ aie Fee me x

ag Cy ws 7 VOR, = $k nc? P.. ¥ , 4 ‘3g Vaan

>

61 § ABERDEEN PROVING GROUND § 8 January 1948

ject No. EP-FG-1. Bomb, 12000-1b, T10, Loaded with $300 lbs. of FPOAR

fore Heating; Test 1C, Evacuated. Reer view showing blow out diec.

———

a ae OCLs Sle Vee ‘5 ABERDEEN PROVING GROUND » 8 January ix48

. > | , " 15 \ ’ o 4 . 4+ "7 ?

‘ be No. I i romo, AcUVNVeid., lO, Loadec with 2 J id8.

4 ’ F . | , 4

“ « ee ; ast \ . 7a ate wice view.

& ABERDEEN PROVING GROUND § 18 December 1947

“ 498

rojfect } EP-FG-1l 12000 1b. Bomb T10 loeded eith wooden dunnage and

300 lb. of PGAN before ignition, Test 2a, Left Rear Viee.

28645

@ 150499 pesemsotza_ 8 ABERDEEN PROVING GROUND 8 18 December 1247

Profect No. EP-PG-1. 12000 lb. Bomb T10 loaded with wooden dunnage 3

1600 1b. of PGAN before ifnition, Test 2A, left side view.

a @

23698) f

Per.

iter 18

a)

, rid

ASO7LO B ABERDEEN PROVING GROUND § 15 January 1948

Project No. EP-PG-l. Repre entative Pragments of 12000 lb. Bomb T10

After Detonation with 2000 lb. of PGAN.

Es ; © >

Ff 2: 65]

Ron & ABERDEEN PROVING GROUND 8 15 January 1948

Project No. EP-FG-l. Crater after Detonation of 2000 lb. of PGAN in

12000 1b. Bomb T10. Test 2.

23652

Arr€uD1Ik D

Physical Test Laboratory resort

2365.5

131

f U

with we (2) irce-constaatan therme- References Bone

ef iron-constaaten; exe elesed bond iastrumented with two (2) ehresel-

alumel thermocouples and two (2) 300 ft. leadwires ef chresel-alusel.

- @ A Vented dom? was set w@ with two (2) iren-constentan theres-

couples installed and measuring circuits were effected between ench

thermocouple and a designated recording pyrometer. The closed bead was

instrumented in a like manner except that the thermocouples and leadwires

were of chrone)]-al wel.

3. Continuous temperature recordings were made throughout each test

end the chart speed of each recomier was governed to a rate of travel of

12Z* per heur.

%, All noted odeervations during the teste were mete ey the Aberdcen

Preving Ground project engineer.

Yor thermocouple locations and charts see Appendix A.

1 Incl .

Appendix &

Approved: A Z Z Z Pe Signed: * 4 farkey

R. P. Witt, “Ss. W. Parker,

Chief, Materiales Testing

Physical Test Laboratory. Section.

23654

i

'v ‘8 'N NI YOWW

: eee ae demenaon

Asepnnepted by

ee a : rer Rares

ati |

| 1400)|) 1500

| ir Lieethd i: |

' j hit tidy

bi tt +t

' | -?

2 int

| 5

4-4

i }

i] i -

is RSE OSE SRS

an

& ee nae NSD

a

ms i

me

a _- ;

a

* aa ieee

+ -- ‘

:

1— }

= 1 ;

|

'

; j ’ '

an di ee ee ©

*1 I

a

eee

a | a

—_

—

ene

= i |

od ee . =

eg | | |

2213 = OR] == E |

a aes

9 9E= {

= ao = q

; - , ra oe er = t a

>} —————— Missense) Pesan.

t oe etal ~ ana: —_ = oy — —_

———

—

. ——

‘ —

‘4 ——

een

~ -_— ee eee af * ~ —-

—> — —_—— ~~ — —_—

——— — ee _— —s — 4

- — a ———— =

Tee — = — 7 -

—

ee ee

— a» | Cae ae a

—— ee ee a _—————— ;

— Se a ee

ee

—_ r prot pecaira —— ee ne

- — —o

ee ——a

ace ——— — ~~ 7

a ~ ~-— + — —

— <— — — 7

— a —— - =

— -_ — —

oe =< _— —_

- > ee a ae ae a _— —

—— ————

1—!

\n

~“

yo

f

AFFSNDIX E

Calowutions 5

<

“¢

23664 ”/

CALCULATIONS

Thia Cylinder ;

5° “Wr «where. K ° criside diameter

Pe a {hn speht 60,000 © ,0707 x 80,00U'* 5050 psi

PRP leaF inside diameter “3% © .y:h

Maximum Strain ~

cae 1 - RE i « teks

= 1 = 072 elcbd

5" 1.25 + U.75R « et * 0f9 (.49L)© TYrebe om TOD 0672

P* -67e x &C,000 * 5500 fal

doximum Strain Energy

P 2(1- @), ell - .ove) Fon hs 0 ie © .0070

S*Tioe om) (leon 70) > Ub)? -%

F © 60,000 x .0070 © 5560 péi

Pressure required to olow cif vese ;late of bomp

Force on inside ot comb bese ;late * Fressure x area

s ls.7) é Dre

Fp = © <76 F lb

Inside face voi ;late bes aiumeter of 16.75 in.

Stress jn bese belts without uny initial stress cue to ti,hten-ng

Roo. diemter ct lel/gelcNPe~ stid * 1.5% in.

Tots] ~hread roct area ci stids * «<v x Gar x1 2 40640 in.©

27o P lb aS

St in st as ° 9.1

ress in stucs ro Ee 3 9.10 P pei

23658

ee i ct ee

ll ~ ~~ _="_y a ww} A a a ee

a

a

Ne

a

oa

;

i

139

“Initial stress in studs carsed by tiphtening nuts estigated as 16,000 ; ounds per inch

“ot etud diameter

Area one thread roct * Qpe)" 5.14 © 1.518 in.@

Strese © 1.50 x 16,000 = 15,800 pai

| T.518

Total stress in studs = ¢.10 1 * 15,000 psi

,

=

Aesuse ultimate strength cf 1020-1055 steel studs as 55,000 pei

“Internal bomb pressure required tc rujture studs

9.10 P * 15,800 © 55,000

- 55 000 - 15,800 e 3% ,200 e

ssn “e*yo~ © 4510

~*~

si .

. Ate $ yes teow ee ee tims % arts i we

pppoe ee ve gp isos BM DONE 9S aaa we EMU TSS ai a

PABA IES RR RARER ae OR ea SR

Wk x

¥3

tt

ee

lo ! ——_ ' : Gre? |

we CF wrtsen % @ ivesl +e ot”

i ’ }

| . ,

~~ . 1--- - ; oe en? Se

i | | . 1

\

| : | ~~ |

; ' | ' ' ' .

' seetue Yppewesleg | ;

) exous expsel 4q9, PUw os y4 SenOMe [[eEE

: | } j

a a a ai ij at aa

a

F

jo

\ MMV 4 -

| NS Se, GREE Sas RRS Bee iat | ~~

| aan

‘ - + ' | i :

nia | ae ewer eke |

i vers Fro foal Oe ee

| . iat *ee i

| ae | ea i tere Ge fh 7 i } etd Tae RB 5 the ft

sty rd bee 7 TM ie Fc a

SE FRM LEVON Vu) 1 ate a a

a8 Reeth ¢ ' MaDETLIF } | ty ) !

wt \ il | | Hl eNTALUE F Von: BOREL FRSTONUOGD TOOEDICEOYLOQHUTT TTVAURRe HDA HEU HCL

outrage

ot a? site o “%

f ve

aneey eRe PRs Aes ye)

23660

Oo -;

—{— vial

ry a + ie) i 7a | an i 2 | i (2

i

° wwe

ett Sue "at

GOLSsie@e Bus IBUCD

SR0ws GACIG Ast. Ades 4ONOUW | [Pus

PORT Sake RIA biel! AY oe

Up ee Eee up suesoeg

exOWS UALIG Pes guNUeR UN} ped

be a List

oan _—-—— “eo ewes =< @ -- - -* -—- -—— «2°78 = 2

estt als b0€ ne € ue 21 13+ | 2n5 99r 77 ane YS 1 ine

UCpeelt Be yu@yeucs

@x4OTe UACIQ Pes {YyroEeB [> auc

“2. ee -~—-e- --~—°-* -—- “ere ~—--—- -*<- “7. -*- “ere —_- to cere

¢y ior VIgt

PTE cca scheint AN een RE catitettininte

ag

r

et ias |

‘980% jo woyyerag

°o

St

bl

rene

BUF OR} Se BawgeuLD

PxXOWS BACIG AUMcuEG | wES

a ae

ULB jee Jupeewscul

Sg0Ge oF, U4 4UTOMe Llleusg

“«- “or f 77+. oe

UUTSe lee suBgeULD

@4OSS O37 UR UNCER «ss07

__

Opes tee FUL ewes ag

whOMe LACLQ 344.) VNC esiej

Uvpsupee Up suesoeg

exOWs UALIG Ped guNvEe® EN} Ded

Se ees 3

£eq 30 owt]

est

ect

GOyes tee Pujeessleg

@n088 GASLQ TUFLL PUP O2yH* JaNoew [Lem

~rnre ae

“ontt lot 666 nee. oes 2, $69 819 ee «6g TRC eT

cntt e2lot 666

P ast

»

|

me De

oet

, |

oe ; Ly6t ed pt

| V2 39°, I-D4- 90 fos4

e EVD4 “AIA pepeoy qmog peyme’-"hT COO'ZT BI e414 Pom

‘ : @ {dmosomsr BALOG

} | : ewig “#4 & @uex

CoN GE OTHER Mg OT ABE

> - TRA? Bee a he ae

Grgt

Be Maite NE RS Ee SS.

, aaa ‘

salt

23661

ark

—~- ©. oe

LOFeByze 4a 4eULD

@40ms UAcCsQ xsep 4404 ZUNOEE 1] BUS

Oat

sne eat

—. . ly

“té

- ¢— oe “22 -<-«+

~er

any

one «<

éll

GOlSsl ee Ful eee250¢

@NOWS GALZQ pes JUMOSW BNT pen

~~ Cu aw uM AR

Uvjee tse 22038UC5

@40@8 UACIQ Pes BMOSw | WES

Neal 7-- --- oe — ro2e

nee

Cn

ae

igst bat

O1at

(oe os RESCH IR A A

5S elena wom © 6682) 14 C80 .~emmeese ZY

AE i AIR RIE Ra

a | Th

; ill i

| | : l ! | H i! tr HI! 4 i ' | |

>? ‘ an ee i. mae rrTrr . ear - -s - ’ TT? 4 nk |

it iy : AVE | ; if YS ia I hit ' it | LT 4 bi if

| | Hil) BT Jo Pere A | "y I! iD m4,

5 | ' , | ;

4 ee eee te # ee el '

, | |

SES 1 . = —— aqua ———F - - . — <-> <= t — oe natitaddis

| o | | 1 | 7 | amet

| | . :

| } ' '

| | SOlGC Tee Ietieucg

, ‘onome Berg YENGHS 1 [eEg

- i cis ~* > + —— — = —

® 2161

Goyeqwe Fujlewesoey

‘@Rows 8F;4A FEnGre {Teng |

mm ,

eed had Ae} ete + tee ey eee lnediad wen ot ee te ey we ~~ u

' t ’ ) ! i

| ; | , i eTst

|

GOles|ae uwieuesd |

@XOWS ©254UA QunGwe eFs0] : |

Sexe ve t

|

St —- | £261 |

Bypee fas Puy egesoeg

@nowse BAO1g BEF Gumeew e#4e7

61 Lest

GOlSSTSe Ful ewe250e¢

®xyOUs GALLQ pes PUWMOTW ENE pen

——- oe

OPERATING PRACTICE

AMMONIUM NITRATE PROGRAM

NEBRASKA ORDNANCE PLANT

23662

| otifieation to Evetsls (erator for

] res — ae TO E°™ -&s

fignel Used by Kce{tic Operator

£ teaming Out Dray Off Line Pricr io '

}.i-Pan,

E teaming Out Goorense: ind Drar Of

Eignal Ved by Ecttie OQecrator fo- F

l:sttlo Charge

tees

6633

-Pan

opping

lve

st

142

Jun 2 37

Faragraph

12, 208.5

12,208 .6

12,209.2.

12,209.2.

12,209.2.7

12,200 .2.8.

12,20°.2.9

12,209.2.10

212,209.2.11

12,209.2.12

12,209.2.1

12,209.2.23

12,209.2.15

12,209A

12,20°A.1

12,209A.2

12,209A.°

i2,cO9A.

32 ,209A.5

12,20SA.

12,216

12,230.1

12,210.2

rs

12,210.

12, 210.

12,210.

12,211

12,211.21

12,211.

12,211.

Title

ig 4-

jx

Signal used by Kettle Operator for Condition of

First Charzo

Signal Used by Kett'.e Operator for Second Kettle

Gharge

Signel Used by Xettle Operator for Vompletion of

Second Cherge

Signal to Steam Out Let Down Valve

Signal to Close Lot Down Valve

How to Operate Liquor Valve

Housekeeping and Inepection Duties of Ai-Pon

Operator

GRAIXING KETTLE OPERATION

Xettle Preparation

Clenning Kettle

Seal Kettle Door

Preheat Kettle

Release Steam Pressure

Charging Kettles

Sigzal for Kettle Operator to Hi-Pan Operator

for Draw Off line 3

Signal for Kettle Operator to Hi-Pan Operetor

tioa

Signel for Kettle Operator to Hi-Pan Operator

for

Upon Comlotion of Charge

Starting of Plows

Charging Second Fettle

Signel Uoon Completion o7 Charge

Signal to Shut Off Steas

Housekeeping for Spillazu

Aa@aition of Yax to Kettlo

Introducing ater to xettle Jac

When to Drop Kettle

How to Drop Kettle

Housekeeping of Kettles and Flo

Responsibility of Lead OQverctor

ket

or Area

Charging

Signel for Kettle Crerater te Hi-Pan Operator

GRAINING KUIVLE OPERATION DURING POWER FAIANZ

Poeition of Start~Stop Switch

Use of Stean end Elimination of

Kettle Prenrration Yhen Power R

Use of Bar in Starting Xettle

Disvositicn of Material if Kett

Forcing Kettle

CONVEYIIG GPAINED AL?'O" LUN }ITR

Operation Belt Conveyo>-

Truck Position «t Grainiag Duil

Pilling Truck

Trusk Operators Responsibility

Truck Operation

Water

estored

le Does °*

ATE

diag

o~

Truck Position at Central Bagging Building

OPERATION OF CEHTRAL BAGCING

Operation of Equipsent

Capacity of Truck Unloading Hopver

Check for Foreign Material

Shutting Down Equipment

23664

g

Aq

ore

te

|

ae

#

+

2

4

oe

J

12

12

12

12

12

12

12

12

12

le,

12

12

12

12

12

12

12

12

12

RL ee NY

Dee Sea ere

iS

Vv eere

°°

NY

~*~ ae

e

RRRRRBP

.

wi

rb

on

a +

BRE

ne ne

Wann fue Sure

B

Title

Housekeeping

CPERATIOZ CLAY FOPP¥R

Charging Clay Hopper

Disposition of Empty Bags , '

Use of Fork Truck

Operators "Pesvonsibdility

PACKAGI''G OF AMMONIUM NITRATE IFO PAP R BAGS

Beg Supply

Position of “ag or

Operaticn of Sca/

Reading o: Scale

Correct Weisht ?

Sampling <nd Insnecsion

Processing fas for Sowing

SEYTiG FAPCR BACSED AMCrIM’ NITRATES

Position cf Jag

Closing of Beg

Inspection

Sewing Machine Operators Responsibility

Bag Condition

PREPARATIC? OF RAILROAD CAR FOR LOADING

Inspection

Prenaration

Cer Lining Ferer

Dunnage

ping Urechire

IOADING OF BOX CARS FOR SHIFHE™ T

Box Car Spotting

Tally Sheot

Position of Conveyor

Resvonsibility of Car Loader

Dannage in Doorway

Responsibility of Chief Car Loxder

Responsibility of Ast. Saift Supervisor

Eanty age

Closing of Car Doors

Switeh Crew

Prescribed Loading

SEJING MACHIIG AiTD SCALZ MAINTENANCE

Suwing Machine Maintenance

Scale Maintenance

Frequency of Scale Inspection

Greasing of Equipment

14k

145

WS RR es Pet

3 ni iy

bit 4! i

UE

hy 7 5

i Ht

3 p i? i

; Hot

; sai3

f Aaal

. all

in,

——

slaty H Hult

Gy kl dau

41448 hy tafe

i ia bh be

Getty dj edit

off ee th tit ii ii

3 qu 3 23 el |

| ei i HE gully

Tee lal ay

Hi

tecau aucune os Geen hc a

bag when it reaches the user.

Hs

223666

146

fugit ae tag HEL |

ci tel tie ad

iF i wide vin by td

; i ii TE a3 3 ath I: i

i Ha iE

oe io¢ S 3

file a i ert

aitisl “td ant 1

. . . pecking cipcmawn ye

i mene ereiemen mmeaaaaae ae eae aa ee ee

—— 2

| 99887

a allowed i: “10 steam ceils in the bie

—— a

10-40-87

K.

4 9

10.

11.

12.

wae 12,555

Prem the standnoint of quality control, the aisimes fudge

coint at which a hivan my be drommed is JOR? PF, This ig”

determined by actually taking fudre voint with thermometer,

Maxigus steas vreseurp allewed in the grainias ket tle jacket

shall not exceed 60 psig. ? :

Grained material in the kettles dial] sot be waxed at tescers-

tures $e exceed 200 F, even thoush the vlysioal annenrance of

* eager dryness * occurs at temeratures to exteed 290° PF.

The finished oroduct will not be barged at temeraturss to

exceed the maxigus temperature as estxbdlished at each indi-

vidual graining nlant.. (P.D.A.P. Maximum 190° PF.)

The tage mst be kept free from all contamination ouch as water,

oil, nitrate duct, sitrate solution, etc.

The maxiaus steasz oressure allowed in the unloading of wax cars

shall sot exceed 27 psig.

The maxigum texmverature of the aaterial in the wax care ehall

mot exceed 200° F. Texmnerature of waxy io stora7e tanks orefer-

avily should be kept below 200° F.

Periodically, a rénresentative of the Technical Dev-rtment will

insvect ecch olant to see thet the stnadard nroceiures is

written and aonroved are being followed. Any wajor change in

the operating wroceture will be actei unon ty the Technical

Departament before bein: incorocorated into the nlant's Standard

Procedure.

23665

——— SS ST ew ee ee eee ee eee —

Sa rk oo ok 0 OO BEG

Neb b7

——- eee mee EEE ——o

naan

—:12,202.1

2,202.2

12,202.3

GECTIA C - STAICARD SPEAATINO PROCEDURES

Tal) fA La!

--Shen the tatk cars of neutral *iquor

err:ve at 6l'¢. ‘+5, Lies: sotify tho supervisor on

ahi.t.

iN --To spot the nitrate tank cars,

o * U

(1) Lead Tunk Bouse Operator will notify switch orev

where to spot cars.

(2) Se% band brake on eacd car.

(3) Place tlue flag on cuteide of building in center ©

of each track

(4) When cer is spotted, tank car infcrwation card

is filled cut with car nusber ani date ar-ived.

(5) Date topped ani by whos.

(6) Date and tine that beat is turned on and by whos.

(7) Date and time car was emptied ani by wice.

(8) Date and time the car was pulled out and by whos.

to Precere Bitrate Core for Unlosding.

(1) Check car for ammonia nitrate cards end remove

shipping documente.

(2) Lower ramp to car very carefully.

(3) Gpen air valve and relesse pressure or vacuum in

car and emell cutlet for ammonia fumes.

(4) Remove seal and pin. Open dome.

(5) Use stean lance to steam out stand pipe. Steam

cut only enough to open stand pipe.

(6) Commect liquor unloading lins to car

(7) Steem out liquor line to car (when finished

eteeming, close liqucr valve to car.)

(8) Commect uir supply line to tank oar air line |

(9) Open air valve to car and build up air pressure

in car to 25 psig.

(10) Wotify Shift Supervisor if contents appear

atnorgei ; arya” aes ne Sanee Se Seoerunery Xe

quor conteaingnte

23669

148

149

12, 907

SaPcti

(2) Top the car dry, that is, to the crystal bed.

(3) If stoppage cocurs by evidence of line surging, —

elose liquor valve immediately,

>|

(4) Veut pressure from tank car.

(5) Diseonnect air hose on car.

(6) Steam out header and hose.

(7) Insert 2 owing tee

(8) Commect steam to 2 tee

Vent pressure slowly.

(11) Open car ant check ear for crystals.

(12) Replace done cover,

(13) Wash outside of car free froe crystals.

(14) Raise remp and fasten securely.

(15} Rewove blue flag when ewiteh is reedy to be made.

23671)

7-847

12,203

TRLQAD TO TANK CAR OF BAL

12 Pe —+— <a the waz car at unloading station.

es 1g Sasa

12,203.2 Rane Renapad — Rewors dos cover ant visually inepest

be certain that it is waz.

12,203.3 dpanagtian -- Chesk inside valve, Meke certain it is

12,203 4 -- Instell micad{ng nipple and ® valve in .

(2)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

cap. Remove bottom cap if necessary.

Hook up steam lines to heating ecils ani turn oa

esteem. Maxie steam pressure allowed 27 lbs.

Heat from 6 to & hours or ustil solids are melted

out of bottom cf oar.

Install air lances and turn on air es socom as

possible.

Take teaperetures at intervals, temperatures are

not to exced 200° F. Probe to see if solids are

all diseclved.

Secure semple for laboratory analysis.

Open inside tenk cer valve.

Se ee

wax will rum cut

wnleading line. ’

Open tank sar wuloeding valve and al) other valves

leading to storage tank.

(10) Pump car until it is coupletely expty.

(11) When car is eapty close tank car valve.

(12) Close 2 unloading valve and stop pump.

(19) Bresk wnicn iztveen car end war unloading ins.

23671

Fah i ®

@, 3.6

2204.5

12, 204.4

12, 204.8

2°) 151

(44) P ware @ re lances.

(15) Glese dome sovur. . csyrics

(16) Remove steas comectiays, ae

(17} Cheek te see that all tarc sar conse tices

mere Deon remve:.

(18) Raise eet walk and reacve tls £04. : Hake sure ell counse-

Cox Removal -- Remove ear frow oniléing, aS hoses and pumps are

jatetr Prmantion -- At or ine is stan to be intr- ee %

of unloading +i. Very Lapa tact

BEATE OF MEUPRAL LI Ovo:

pa o- The bot wa%e circulsting pazps

weekly,

Gheck ine ftapdet Rane oe’ ~~ Tie stean turbiae pump

ehall eech ehitt e> Jat it te in stand-by

condition.

Piaadie Ted Lb size fon Er spe «> If itquar core are to

. » eobify the boile> rowie so timt they can

have tbeir staerni-by boiler in readiness.

idaner_Atcreae Bnaca---Ti aicrete storage teaaks should

checked to determine thas an adequate spece is

available to receive lignor:.

Eeeniog lines of Grates -- Steam out beater.

- Etart al> compressors, »

precautions recocaended by the manufacturer.

Check the lubrinaticn en4 35 Ghar cisqutts cagyly of

water is flowing tirough the in‘ srcoolers.

oe mPa Sat ae

5 exce « When unloading from tank

car. Temperatcre of liquor shold be cooled to 120

by air and toppings an som as possible.

‘fabing HUbee Ae abate -- A revresentetive six le of

quer sent to the laboretory for ana-

2Rb7 2

=e

12, 204.9

_ 12,204.10

12,204.11

¢:

,205.1

12,205.2

@ 2s

12,208.1 -

12,206,2

'12,206.3

12,2064

, 12,206.5

2 12, 206.6

Circulating Line Texperatare Control.-Cieck Circ?

lating line to sec that texperatire does noi expeed

129° ¥. Normal operating tenpereture ic to be 212°8. °

fospechipe-Cirenlaviag_bise ~- Cheek liquor circe-

twice each shift. If leaks are found,

sien Gaaalieas ck ina,

Jnereching Storage Tank — Che: botton of storage ;

tanks ce co If a leak is foun, t

th hot water. Blow water tive that pressure

th :

wo If circulation is

¢ a oot of line with air.

the line. For short periods of time, water

may be circulated from water s-orage tank.

_ Before charging, sare

gure there are no

_ foreign objects in

_ bi-pan, eeprcial ly

Gare cf Air lances -- Steam ont air lences for from

20.to 30 seconds. This is also to be done twutween

each charge. :

Gare of ietdomn Yahya -- Check autlet valve of hiepan

aes valve is closed. :

jutaainaiion of ats —~ Open air walwy slightly on

licuor to Hi-Pan -- silks satan teen nein hee | | Be eure ccreen is on

’ édrewoff line and clean.

~ — 7411 pan to gxige appram

imately when couble charcs is used; 45009 when Steam on hi-pan coils

single charge is used. . ie not to emeed 1009

- preseure

L 2k

SAFETY

2,207

B12, 207.1

-~ When tauperature

increase air slightly so mate-

When tempera’

saree egitation.

*

See that air agitation is

wniform over surface.

.

reaches F.,

rial stays in

12,207.2

{iF ut rine all “abt

t Hoon $2eg,g 3035,

He irae bi pied

$358 Heetiiiie dibasai ait

Ld

mi af

a9” i:

foots

a i

a3 5 3

982 9 dss

43 i

AR

or 8 86

ae a Shs

1 @e 3.

out drew off line

until kettle operator turns off blue light.

23674

~

*

"> |

Re

aS

es

he

~,

rs

ee!

> 22,209.1

. ? a

12,209.1.1

12,209.1.2

12,209.1.3

L 12,209.24

»

12% 158 |

SaFETY

PREG ADT] Oi

fern steam on gently to

avoid splashing over

edge of hi-pan, Make

gare plug valve is closed

before steaming goose neck.

Be sure you understand

signals. When in doult,

beth operators will come in

contact end decide how to

‘proceed,

Signal to Close let Down Valve -- When red and blue

lights are turned off close valve.

Henle Seagate higuer-lalre — Liquor valve should

never t except hand. Do not use wrench.

-- Bi-Pan Operator will keep hi-pan roc

clean at all times, and will report anything unusual

or equipment cut of order to his lead operator.

Esttic Preperation Plows must be sbut off

during cleaning operetion.

Cleaning Kettle -- Kettles and plows must ie Keep hands and foet out of

cleaned before charging. kettles while plows are

running.

Seal Kettle Door -- Close door snd seal with nitrate.

Preheat Kettle -~ Kettle should be preheated for

5 minutes 4f kettle js rot already hot.

Rslenee_Sisea“-comure — Shit off steam and re- Operators should wear

pressure if steam has been used. gloves.

23675

12,205

2 Charging Eetties

2.1 Sjgnal for Kettle Opsrator to Fi-Pan Operator

or Draw Off Ling Steening.--Steaz out draw off

ling for approxiastely 2 sinntes.

2.2 88 for Kettle

amen Compietion.--Signal Hi-Pan

® step has been completed (rea light).

203 Signal for Kettle Operator 30 Hi-Pan Sperater

for Soe EK lace draw o

pipe kettie.

Signal Hi-Pan Operator to discharge liquer.

(Both

2.4

Signal for Kettle Operat

°

n Completion of Charge.

mately 7500 pounds/(dry weight) of liquer before

mately 7500 pounder (807 v

lighte off.)

or to Hi-Paa

Operater

Draw off spproxi-

Signalling Hi-Pan (Operator to stop the flow ef

liquor (red light).

2.5

proces

Starting of

Ovs.--Start plows during charging

2.6 char Second Kettle.--When draw off line bas

eae 1e

drained, place draw off line over waste line and

signal Hi-Pan Orerator (doth lighte on) te steae

reined, place draw off pipe ever second

kettle and proceed as of first kettle. *

rh S28 ene 3 of Charge

kettle hee

.~-Whea second

rgeé and draw off line

out drav off line apprezipately two aisctes.

2.9

Shut off Steas.--Signal Hi-Pan Opereter

Cc 2:38 wifes te

ignts o te

Rousekeeping for 3pillage.--Waeh down any nitrate

spillage from kettle or grates.

ata

8 off stean.

Kettle.-—Whea asterial is

2.10 Addition of to

suger and teeperature is 290° FP. or belew,

eo known qtantity ef was added.

656 of waz. Wax dDuckets to be calibrated

23676

156

Sars

PRECAU 7) OMS

Maximum steas : res. 3re

allowed ia kettle ..ckst

40 pounde.

Be eure draw off pi:e

ie over drain, and

eafety device locked is

place.

Operator gust weer face

ehield. Stand clerr o%

draw off line when stear-

ing ous on drawing liguer

into kettles.

Do not clind into

kettles. Keep firm hold .

on draw off pipe.

Watch out for seplacihing

of hot liquor.

When moving draw off

pipe froa one rettle to

the aext, place scoop

‘shovel under draw off

pine to avoid svilliag

of liqaid aitrete on

fleors, grates, and

kettles.

+

Be eure draw off lise i

over Grain and eafety

devices ie locked is

place.

Keep hands, *eet ani

tools oud of rettls

door.

Wez is net te de aided

whee material ezree2e

200° P. . ;

a “~

ae oe

ws Se 2 , Me tle.

- 32,209.2.42 eee waz ie thescoughiy

@ ie ready to arep. :

12,209.2.85 a Opes kettle end break hole

r ettiag hal flew inte hopper

12,209. '.L8

12,209. 2.45 Aagspenerbin ber of [eek Cpereter et Operaters

responsibie for reporte and will

bring sas fiato office at ead ef his shift.

CONVEY] BO GRATED AIORIUM BIT SAR

ae

r mas vanen kettles are emptied.

A maxioum of 2 kettles are.emptied. A maxima

ef 2 kettles will te allewed is hopper at one

and dewn oa beld.

(12,80

“. 12,210.2

4

} time.

ater wi cading hopper

ia Daildings.

12,210.3 i --~freck Opsrater will start sagar

‘ empty: ag ead filliag truck anf will step

& flew when trusk ie full.

: , ee e's asibility.--In case of

inclement vee ° ver will close 114 ea

| track, thus protecting grained material.

"* 12,220.5 Sense Leeration.—Prenspers trusk load to Central

Bg.

12,210.6 Pe t ai ga

sition 8 erer

| & uniceading hopper at Central Bagriag.

&

236 77

De aot exceed grea

epeed limit. Yateh

fer other vebicles

aad personnel.

Yer

9-23-47 | ety 12,2ih4

SAFITY

: , * REGAUTIONS. 5

12,200 GRAINING KRITIS OF RATION UFDiG FO HR FALL) ;

12,205A.1 Position of Start-Ston Switch-~Checke all lrettier

tq see thet Start-Stop cwitcher are on Stop

Pesition, ie

12,20°A.2 Use of Steam and Lliminction of Water—If water Do not exco ri 60 }

is being used in kettle jecxets for cooling turn vounds,

off water and turn stear into jackets. Jeave

astern on settle jackets rntil power is restored.

Use by ness steem at this time aad bring prescure

un to 20 lbs. on cuage.

12,20°A.3.. Kettle Prenaration tIhen Power Restored—When nower

; s resto sides and bottom o ttle with

screper to see if crust is looses. If crust is

loose screve away in from. of vlow blades. If

moterial is hard use a small amount ef water ve

tween meterial and kettle.

12,20GA.4 Use of Bar in Starting Kettle-—when kettle is

' Yeady use a crow bar cerase through upricht arms '

of plow blades to start kettle.

12,209A.5 Dienosition of Material.if Kettle Does Not Start--Do not shovel

does not start easily shovel anmonium onto floor or initio

nitrate into an empty kettle and save as much of paper bage,.

it as i: possible.

12,2090.6 Forcing Ret tie—pe not attempt to etart a

ettle t 8 not apnperr as though it would

start ecsily.

236705

1-8-47

l2,c1l

1c, 211.3

12,211.2

12,211.3

12,211.4

1z.211.5

12,712

12, 712.1

1c 222.2

17,212. 3

GPRAAS}ON CERYRAL BASOIEG.

2 .—-Mart each piece of

prent ia ollewing sequsned.

(1) Start ehaker screens

(2) Start bucket elewnter te shaker ecreaag

(3) Ptard corey sonreyor;

(%) Start rotary cccler;

(2 Start —— egal a ere LB;

Start t hopper cerew

(7) Stert clay feeder screy ) *tstancousiy

of Gal Eo

ene t at co tise. 6

to tep of baffel Before dumping another load.

fer Mat

aats is r; be gure there is

no foreign cbjeets dumped in hopper. If there

iq immediately cat off all motors.

Saving Down Beuipaens.——then chatting dow

equipment, use sane ayetes as starting up, caly

im reverse. Bzazple:

a. Tarn off ecrey cenveyor ia trusk unloading

| hopper;

b. Ghat off elevator to rotary eoeler, ete.,

umtil last piece of equipmest is emat off.

Eousegeeping.—-Keep hooper roem ané floor area

switches clean at all tines.

CP i 4

Charging Clay Fopper.--Fill clay heppor with elay.

Disposition of Reply Bage,--Pisce capty tage in

paper tote % . :

Use of Fork -~-Use fork truek to plaes

saitete of ne On working platforms and ferk

truek to remove eapty pallets.

23079

.--Bever Gump

mast be dows

-~-Cheok all treeite as

Alwaye Oe eure everyone

ie im the clear. ;

Meshises and equipnest

will 208 be placed ia

operation wumtil al)

gaarads have been

replaced.

Hopper attemdant will

notify track driver

whem ready to J imp.

‘Hepper room and floor

area arcuad switches

wust be kept c) san at

all times.

Free passage vey mei

de maintained at all

times to switchs.

Eo@p working platfors

and floor clear at all

times.

Drive fork lift

camticously and blow

hora at all bling

cornere and doorways.

Be careful of trucks

backing tats hopper

rooms,

12,212.4 peers asid -~°18 fe alee tbe Clay

per Operator's to Bring pallets of bags

to bagging loomtion. These is never to be sere

than two paliete of tage at this location at aay

one tine.

12,23 PACKAGING OF AMMOBIUN NITRATR LTO PAPER 2a0g

@e.23.1 Beg SPELT ~~ Keep @ geod eupply of Mage on hand = Work area must be cisan

et all times. Pick ep paper beg free pile at at @ll times. Cleanii-

side of seales. : neee prevents socidvots

& Z

12,°13.2 Position of on ---Open south (*

c positioa f op on packaging

machine. Position clamps over mouth of beg. }

pm

12,213} Operation of Soale.—Grasp lever on side of Wateh ont for handle on

hopper that contrels flow of nitrate free soals,

hopper.

12,213.44 Reading of Soale.--Pull lever to open hopper,

thes filling dag. Obdseerve marker on seals

and slow flow as pointer appreaches the full

mark. Whes gointer reaches mark, have hopper

clesed.

12,223.5 Correct Weight.--It is ispertant that tags be

weighed accurately. Any overage aust be dipped

out. Call Shift Foreman ary time you find the

scales not weighing accurately.

12,713 6 Samping and Inepeotion.—Samples to be taken ae | |

outlined in sampling procedure. Bage are te be 5

eS check weighed as outlined in Inspection Preee-

Gure. Tesperesare of materis. in tage is to be

Getermined and bage are not te be filled with

materiel exseeding 190° PF.

. ne

12,213 Tf Pro for Se -+-Break all tags dow Keep convayer and sur

0 that tep o @ etraight. Curved top Bage rounding floor area

make poer sewing. Assist dagger in keeping bag glean at all tines.

conveyor and floor clesa.

12,214 SEWING PAPER BAGGED AMMOBIUN BITRATE

12,Q4.1 Position ef Bag.--Ae bag gored from bagging con-

t veyor to sewlag machine coaveyor, position bag

for sewing. (Straightes wrinkled tope of bere

when secessary. )

Z3680

1-637

12,25.2

12,24.3

@. as

aad repeat eperations, .1 te .3, inelucive. If

bag iv Gamaged, retag material. Setify your

eapervicsr if tage are net being broken dow

properly. .

1?, 214.5 Conéition.-—Bages aust be kept free frea ell Keep fleer area clean

oon fea gush ae cil, aitrate Gust, nitrate and neat all tines.

pelution, water, ete. Be contaminaeted tags will

& be leaded inte box cars.

12,215 ARA oF CAR FOR

12,215.21 nepection.—-Oper oar door and inspect car for Important that car is

fia roof and geneTal condition. Glean sar free from content saats

ef all dedris and dirt. ee Jf ome each as calfur, lize

— ecal éast, om.

12,215.2 Ereperetice.—» gare @1) loose boards and nails Watch step, there my be

are ven down ané all deat nails Fenoved. wpright asilse on fleor.

G2. «Car Liaiag Peper.--Piace car lining paper on

oor ef car, and any drmaged places on wali of

12,215.4 Dunnege.—Duanage will be placed om tack side of

car. if lum*er is used, the dunnege will be

flush with inside of car and to the height ef sa

the leaded car. When thie is done, proceed to

‘leading doermy, then duanage cppesite side in

eame manner after car is loaded.

2365 |

a

12,26

LS |

12,216.1

\2,216.2

12, 216.3

12,216.%

$°

12,216.6

12,216.7

“~~

If ctoel strapping ie eeod, etrap villi be

fastene4 to eash side ef ear co that thie will

Ait the ceater of every other row of the bags,

starting at the Yotten sow. (See attached die

_ gras.) Then nee streteher and draw bands very

ight, Clamp together and Gack wp ceribearé

over strupping, de eure sade of strappiag are

covered with cardboard go that ends of stvupping

will aot pamsture bags.

Place etrepping oa eppeaite side of car

menner. When car ie sompletely leaded

cardboard aside, inside tetweea strapping and

bags. Tack carddoard tato place.

LOaDINO OF BOX OARS FOR SUTPMERT

Box Car $ing.--Spcet oar at leading platfers

at Cen Building.

tally Shees Tally chest vill be placed insite

of car. o telly chest ie used for marking

the mumber of bage per fow as placed in car.

Position of Canveyor.-——-Place extension conveyor

in ear or flezoveyer in car if available.

Start flemveyor.

Responsibility Car vests stare bag free oon-

wayor and carry to end cf car and preceed to

Lead car in preecribded gananer. (See attached

sa ee

peanege an Doormny.--As loading in doorway of

Gat ie completed, secure proper dunnsge in door

way of car.

Responsibility Chief Caz Leeaet.—-Chtef Car

Loader will remove. 5 7 + which will de

| given to the dest. Supervisor at the end of shift.

4

Reevoneidility Aset. Suift See cae and

& Supervisor will verify count in car and *

sign shipping documents which he in tura will

place in car.

Beno Bags, Fen eapty bage will be placed in

Oar. ;

Closing of Car Doors.~-Doors will Be clesed aad

sealed. Seale must corterposd with shipping :

accuments.

23682

~—“e--~-~ --~

i)

Se

12,218

SAPETT

PRECAUTIONS °

Be very careful while

estretahing steel strap-

ping es 1% may break oF

est leces. Vear gloves

while perforaiag this

ope ration.

Keep fingers and hantis |

wat of flexzoveyors.

Watch fiagers and hends,

while slesing bez car

doors.

a a i i i i

3-4]

12,216.10

12,216.11

217

12,2723

vor

loaded car and spot empties ané pro

2

Switch Crew.--Call switeh crew to pall est

ord we

abdove. ; rm

Presoribded Leading.--All care aust be leaded as

prescribed em shipping documents. Material macé

mot Be loaded that dese not apet specsifienticns

and car gust act leave the eres until the cen

tents are approved by the laberstery. SBrekes

begs or bage that ere net sewe properly will be

returned to bailding for retagging or reeeviag,

SEVING MACHINE ABD SCALE MA [ET RRARCR

Seving Meer he Raintesnnce .~~Raeb soving wachisa

is to out of operation evary eight

houre apf theroughly cleaned and ciled.

Scale Maintensnceg.--Use a pres@are of] can and

thoreughly clean scale pivets with ksrosene

twice a shift.

Tre

at least three tines 6

are ecourate. Methed: Plaee two (2) 30 lb.

weights inside of an empty nitrate bag and sue-

pead from bag holder. Adjust seale eo that

garker on scale centers en line.

of Scale [a

Greasing of %.--Grease ail éentrai

bagging equipment once per shift and eheck al)

Dearings twice per shift.

23683

ALL ei] mst be wiped up

aad eily rage ker% in

mete] coatainer vith.114.

Do mot edjust sachinery

while in gaotien. All

guards mast be replaced —

before mashinery is

again operated.

@.. INITIAL AND NO. —

CAR CAPACITY

DATS

/

SAMPLE

CAR SIZE

TALLY CARO 2h 4O'g”

BRAKE END

ow

@ x4

ARE

rey

| aOR EIS

§ket

@:_.

10. xe

ies

12 wba

TE

,

||, a ae

| We certify that the avove count ly correct.

OPPOSITE

ow Ne.

9 . eee

2,5 4

» er

eee 2

—

220.

SHIFT START

SHE T Fimigsn

DOCRWAY -

sw

| . <aecemmanaaals

i >

\ Sea ee

+ “2_

Pelitgr, 96

laa.

Trtal

im car

Time started

Loadsng

Time Finished

Loading

ay js preperly leaded and dunnaged

Tpe

isad Cor Leader

Asst The Gepervecr

1633

;

SamPVe CAR $i7f

Lengthy 4p 4

CAR INITIAL AND NO. .

CAR CAPACITY ————-4 222

~

Ds TE

SHIFT START ____

SMIFT FinisH

“4 1. oe

1€2. 2 24s :

oe Eee ; eee’

4,22. «22. +2G. |

en el er oe

5.22 622 \g. 5" :

) RoE SAN 4. |

+70 3.22 er ad

ead

10.22 10.260 Nessie 4

WSscaainies cei Bolster. uy

12.72 _ w7eQ L326

eo. t wewllle

Mice Nici eas 8

hal ie peers a

Tre £LO r0.WlQ ——

Time Firsres

Loading

ele

We certity thet the above ceunf is correct.

car properly loaded and gunnraged.

e3@ Car toad’

23654

| CAR Sicé

ae SAMPLE Lenglh 36’

TALLY CAKD

- INITIAL AND NO

CAR CAPACITY... 22

SHIFT START

DATE

SMmIFT FINISH

ts E e we eee aes way

Pees Racca SENET,

oT ee

ge , Ss eee

. Pad a

4 ee a) 428

pa De ccceattiaiataas

ak 3 @

- (SNES 7

a Rea

“Reon lat 9.

10,444 ~ Scion:

Te a OR

12 HQ

1 LOD

}

14 14.

Time started

15. me «Lana

Tot Lae 8

Time Finnned

Lésding

&

;

W reity thet the above ouat is Correct. The

tar > Properly leaded and Junnaged

.

4

Lead Cor 4 eeder

a

o-* Saat Svperviter

168

C#IKS:4e

SAMPLE * erat ©:

TALLY CARD

CAR iatTiAL AND NO a

E22.

CAR CAPACITY

DATE SHIFT TAT B

SMIFT FitsSh

BFAKE END OPPOSITE .DCORWA

teow No. Row No. Row N-

' * cama ices

dete 2h ye

S caiccne Societies D eaiiasiiinn

‘jarae ee. 5 Pee ihr

6 veers irate

ee i 2 6. 6

7. cenmeanatinis 7 ,_ Pe ad Rid

Se s, 2 Se aN

Biscssiontebiiiiee © casonicain Reet et

19,24. 10 2 Cio

Lee pees Beles 24

LGd.

a car lle

DD aniecsiatiaiadn

|

Time siante@ °

FW: cntrenane 000. <tinsiinane jnaiat s

Tirsc Fonisn.

Loagsng

We cert. inst the abowe Count ws .orrect.

cor we Dy ysity foaded and dunnaged.

mead Cer Leader

Asst, “>? Soperriser

23685

CAR Si2h

” eee mpagtt fo 6”

@ae wiTiat AND No.

CAR CApAciTY LL 22 és

DaTe SmiFT START.

SHIFT FimwiS1 Ss

es , /

. LF >. 9. 4A

Pa i 2. 3

r 6 4. PY +4e@

§. cme a

6 hfe. <a. 6 AY

pense , WEDEAeS 7.

$i @ 9. Ge “eae

& ) goes Beales eee

Sty ha

4G 12, 42 [FF |

yolk Ppa an ro eae

14 48 14 AB

1 AA ib 4 Be bigger ES

Ow rey PU :

Tire Fincher

Ld

we Cavts ty That Ti@ steve Count rs Corr ecr. The

Cored preper'y jugd@d ard duped

tag Jee lead’ r-

ASS? GHT Top ervr or

ee

CAR INITIAL AND WO

CAR CAPACITY

[a Tk

165

SAMPLE CARS,’

Cergy 4 -

TALLY CARO

LLOQ

SHH rT START

00 ccaticis

'S

rr 47k

SWiFT FiNisw

OF eos, TE Orcoawa

Faw hee ow We

is aden pe =

2 26 4 LQ

J ens 3.

a #2 4Go

$ A ety 5 eee mec

oe i é GO

Ti ennai , Se

ye + Bie 25

Ds dain 6 cama

0. Bo 2 ae se

Buster

OS ie TPT

2 272 /fo

TeToy

3 a or. Car g

4. * ee

Tirme started

JS Sere een bead: 4 a

Tor VF¥¢Z

St

_ Tome F inss red

Losang

we pape AT he Beeye Cowrt 1% Corr’ 7

"

Corey prep

23656

loaded Bd dimagsad.

beas Car buade

ABr Saifl S+ per orse

\O

\O

“4

2365 4

B-hster

Ben &

aad

f* ” A~ Gheas

Sic TloWs ACROSS CAR VEC Tion ~ WER OS: CAE

ENO

Door pay

167

CAAAASAANRANS NVSRAARANASARSRSASSARY :

Gan Bitotor kiw Ka Bhar tw SDovb). Rows

gG sa bedlsh-r Re »/

é Bay « Mes 45 | 7 Sey. Ai fow _A Bag 4 A Fass -

Me , ' J bay s be Sg

LAbhpthhddhtdkdhdttitddkitititttiti¢péliditiikieiiiioliaillhadbbitanr ZZZZ

“=~ «© iitene

i ' rs t MgaeUOh MS Oe Ie eS.” SRR PM Seat pie ele Bis

‘ Ae woe i ' eee [ U

i .

| ee ee eee ee ee aie sod ; |

! : Po ee pe ee me ee me

ie et 1] :

ce o , ¥

-— —

|

t Ly _—- << a <n =“ — <a by —- ooh ae — y rs —

m- 7 9 a re ct i as “43 — ¥ — «A re: . i |

‘ | ‘ { ' | '

Litt h! Cithihihhdshtlh dh lik

Kev Loy “itey IY « “Ver Cag Anas

(hd Lh Adbhdet

Kvy Bi; ber h Ir. “” “corny

Stcrvion Twku GAR-

AENGCTN WISE.

Notes

LA fh ae wi) have

on)y Y Devble FPows

2.A50'b car we |

7 Doi hie Pins

ae =. a ~

etm

yA Lilele)

Perr rer eee era

Oe Laelia

eee ei

Pee aed

BR

DARA:

}

4 MAES a cAMP aASRR AACS OA BIE A ait OR eR OY Glas Wy

(jr r p y > VA. 3 Sats

: /) (% py i + i

~~ aitin Wine MDB , ai of Ch ‘

3 | ram 1 pth a

Office Memorandum ¢ UNITED STA1i8 GOVERNMENT

: GC Tibbitts Atew (71146

to. : Field Director of Ammniticn Plant, Joliett, T11QATE: 6 May 1947

from : Chief, Safety & Security Division, 0cO ere We

SUBJECT: Safety Survey Report = Iowa Ordnance Plant

1, There is forwerded herewith copy of Safety Survey Ncport of Iowa Ordnance

Plant, Burlingten, Iowa, covering results of survey made on 14 thru 25 April 1947. .

2. This report is submitted for your information and for action relative to

such items as come under the jurisdiction of your service,

"

1 Inel CARROLL H. DEI TRICK

Safety Survey Report (in dup) Colonel, Od Lept .

ces; Chief, Field Sv

Chief, Int Sv

DO NOT RECORD

ist Ind | FRTaylor /pr /5204

OFDAP, Chief, ORDLY-S, 27 May 1947

TOs oo,’ Chief, CPDGU

1. A copy of subject report was submitted to Iowa Ordnance Flant for correc-

tive action as recommended in paragraph 5. lows has advised that such corrective

acthon is as followe:

a. Excessive amoumts of Ammonium Nitrate dust in Building 3-12 have been

cleaned up. The two bagging hoppers from which the dust originated have been covered,

thereby eliminating large accumulations in the future. Also a standard wash-down

procedure has been set up to eliminate any further small accwmilations in the future.

5's Operators of graining houses ‘are being cautioned and instructed to keep

exits cleared at all times. This condition will be cleared up upon receipt of addi-

tional vehicles which have been approved for, issue.

? *

Ce At the present time the contractor is sonducting a Job Instruction Fro-

Ee which shall be finished within the next two or three weeks. Upon sompletion of

¢ Job Instruction Program, the Job Safety Training Program will be started.

/ 1 Inod

T. Le GAINES

w/a ;

‘e"p

23689

”

(a et em aera mee on

mms : / 6

KE0 & : iQ) tH" FCO F

= : PCy a

Chief, afew 4 Seourity iv, 0CO 6 my 1947

ro dunegh J. mora, fafery Knginesr, hafety 4 Leeuwriy liv, OCo |

Samely Swreay nepert ~ Iam Ordrenes Plant | 4

the flering is a regert of :afety furvey of Teme Ordmene Plant CR at

yn Ee Si mag J. Mare, iatety Engineer of thir | ivieion of 14 = thry ° 3

.

6

x

‘>

¢

>» Wa

. ]

+

ee

set

“a

wy

a

‘ +

4

eS

179) B

cutiecsts ‘afety 'urvey pert - Towa Ori Pl G my 1947

Te: Chisf, safety . eourity itv, WO

(2) (0 vtorere, Vageninver ar! J yluoe)

7

fucve ave 275 sandar! tylem an! 14 slove round mapas U6.

‘Thase are 24,%%,991 lin oy MT, 16,660,770 Lbs of rnokeless

pownles’, 4,271,2°)) inn af Vompos‘*tan 't, 483,150 re of

touyl, FFD ,629 lve a° bole pomdar, $4,249 ahe of olac~

pomler, 7,445 lim of Leud amide, 2,514 l'a 0° fulseine ve

of morcury, 1,'X%) lbs of MW an! emouniy ion a) >omhe

ntored in the above wen cioned mi,aginne, . ack iv ‘e done

to permit’ surve tllanod. tyre are no conn. le Saulldinys

oovainity, aii’ ion ar oxclon tives, \e,e74.iun oon rol

is fool, Ther te no -runh ur debris 4 dw arnen, re

breake ars well minained. he overeallea ey o¢ Ve

areas ‘# ond,

(3) ( torqe, ine utilities)

these uf nw acara,e of #x lonives or @ ois ton in tine ©.

bulld vice a7 tils eo abliatca nce

(4) ( urve Lianos)

| ‘hore 6 & Gurve Llaice proram in apern*.on ani 1 wak 4

| is: «41 don Balelye <

; (5) ( emiifcarisa sion)

j

| here ore no denilivarocas on opera:iont a> “uF Fe & Liste

"B') Ss

f&) ¢ enevn -on)

tere ate no Pena LO operu t. OT Bo Wiis |v AWA 1% 1%

(J) © owrie om ds” Crap a ejes on axial)

Siere: £3 "Oo chest Yruc..o": CM Bi “eS BCT HLA

Dt te bg. # B HOLES ls Ve

: rh \é. 6's ad > a it "ro. ynrt )

: Yep concom PL PH SO PITMAN IF ATA FAL oat SOP ene: — .

: S ‘was? OO. . Me Be (ee ite ie | Ver le

; cornlen. wil Fe eran ' Oe iv ‘ae Reg Re She es

: are Jtrns OTOLODOF e las i: 2s Sey ULiaer & ar ee

3 ts otkimeIrme Lie Teruo ‘ oe Les ee ee a Se

3 wr Cale og ed gy itn Goh es aD TO 2 tse

:

& ,

3 -

23691 2,

, ;

‘

i

<r seen Se NR a ey Ve a See ween Wee “er | peer eee yee

wa

age

Dar gS

The }

Line 3 and Wwe Amoniua Nitwete Area ware

of the follmming conditions. Rusescive amount o° Amenim

Nitwe.e due: on ledyes, equipmen:, fixtures an! Slows. ~

Poor central o” greases, oils, clean rags, are Slare

Ge Jrvtyn terial 9 ery ,

(1) ‘he acoiden. frequency rate for iis ef “abi isimens 2or

he wonth oF April i 7.93 for 126,05. maiourn. te

exisiin. sale; 8 axards of th plant am. «. ‘here

is anple pro active equijwent. hy ical 6a warding

of equigsen* is , od. hese ic a well equipped hospital

with a con*xuct sureon an! nurre in a.-endance,

de rerepor a ijon an: ret ‘fo _o: 50}

(2) ‘he radbron:: am: higtmay, factlitien of Sie on #1 Ginn’

are fOuUle Ww te Ube meducwion in he omyvl oper saan’

hore is a weondens, for som of who uiverr a.) e ices

4 ‘9 apesds The su:jec’..o° speed my 2 «my: brow ho *o

the atcen’.ton of alli employeos by ‘neu rup visors in

‘azety ‘@- Ulm ele

@. (oIw tuo ’.ion a::' "ac li* las

: JS

(1) ‘he scacS houses and prec: laally all rimp. of ° ine %A ore

o* ‘Srume comoric.ane (there are 7? imil’in:. an! 7

barns wi tae s°a-7 vetidence and plan G-ea)e f1l explosive

proce: sa!’ stomice Pulicinga bew Lis taim procs -Uie

Se 24, Nu proto t.an bye ae imve Cwm ok ct a 59 and

‘Oo sali fac arse hae Ceo a Hore CRU we el Te

eo ye ihe 47 Wek BO ime One elec ric porr, PF ean

On TR th, Gi HWA OH ry! Ar Bre A OYE’ Be

f

Ve

23692 4

7 2 * J i Pye, “ta Aus " *

i Se os Se oy ett eh ees SRG ae epee eae aS Ot 7

PR ANGE AE TOTP ORE eS ROD, ey

Wada iT re

‘Shae

eh mie Ne a VP a NES SA

“ PEATE SESS IH eS RRS a ee a

AOE ERS a

cusjeci: ately ousey epor’ = Lowa sed 2

"og chic !, «“*ey ecari‘y “iv, ‘(ye

\ C. . Pista. Pro ec -.M

\ yl)

of we Callas sy op. or,

r ste ta 4, . ers

ve isan wr olan

. ds

(els, Foo

sol

me See” Ue

© Bay ogee OO Bee La was revise $3 oe cuar Lua7e 1’ was B’ ated

Pe Sis Sra hepa © 6) COVER re eR Shel Lome & CoH bet

POO Set 2.83 em eewly avinio: Tor emrovele

\ ot

We . 8 Ocuertin: 25 wry lores, om

(Ll) ‘dlitary Invomwe.ion 2: ivan Led ec at ‘3 Py © WAS {owBe

1, & kepy in w& locked sete an Ae .deiouetsaion vildiace

‘. .xploc ives (Job) acer yuinby :

(1) i .|@fe-g Suluin: Vo Tan 5 Lee Simin bo ae 8 Se

n inees ani he upery surr Of Ce”. "aH Lis': wn oO TRaALs

have been megaentied ano ormter Che cll supervwisore’o! he “vite

MIneCD VeEparcaen. & Am ois rcencty - XpOr. . OFLor, . .of ww;

ve @ohe to trac. o« ewloyaok be uxplobive one. Course as

approved by afry ant eeunty ivis one

eg be ; -

Be he aleey Cecanica lon Gpomee oo -@ Bore. al nur VSO, Site

we'Llesec so saves Saas. lon: @ dma to he clear ew. ws. osu,r vl, ened’ ae od,

i 24° Aes ew 'y AVE, dws Ci UMN € coral Lome acx! Pree. cor poe voller.

a TC es oie) we) ae eee bh On a, ee ee | he "O° Om Gorriiberte

-¢ Yo os alte © of wesusicton i: ecoveyrouns wi iis ties tur bee ar an. ed

so va. soured wor a waiwr hos wen alivwsa ade

Ge Me ores Shure area all croenen r.iliin « wes wh trad

on an avera eo OneR exch Aye wonterences wer elds di plan cena even.

unl ob rece): east caent wid ache ules of elininavct: Cie unre le & mol iow»

noiAle A

de He “smh ‘olloweup duspec’. on reveals a mrved Siprove ent

“n tie wwuse Cheats. > hiawekeopin ° orl man, eoroee lve Vrecg tyros? Us -a@l; doo

preven’ Wie reoccurrence 9 ‘he &oove wise le

2 - eae t aearree renee |

Be he exeosni on e'wunyp of Ft

equipaen., iixuuares am: floor: oF

taken °o preven aocusula ion of d wt

he

23693

aout iions & 1: prac’ 1008.

‘ae Peary:

het

the Guard ani Fire ‘epar‘aen‘s are comp lned and cons ist

onium Arn a dies oO “ne leis,

bulletin, 3—12 shoul |

+ AN: Mako ues

>

ubject, (nie ourve, eport |e Lae 4 me Cay U4”

fog shir, ‘afes -eurhy tr, UC

%e | wtiins Siioul: ow tale am sowetures fe “> vw preven.

vlockin J Osi &. Sm omen tnglh ice US “eet Aco e TA: & NPte

Se Te oxploe mm 6m.) ae Y Yetrst PO, mus & walk Ue & ares

an Boon sw DONRiblee

:

F

:

;

~

4 sd

Le Noah dale 2

O) tet oie 6 od bi teh it:

fr

™

rea

;

. ~

OC0 Y bSeuerumpare

“ds JOH DRAPE -

me 28 April 1947

IOWA ORDNANCE PIANT

Burlington, Iowa

TO: Chief, Safety & Security Division, 0CO

From: Mr. Joseph J. Moore, Séfety Engineer, Safety & Security Division, OO

3 Subject: Safety Survey Report - Iowa Ordnance Plant oes

:. The following is a report of Safety Survey of Iowa Ordnance Plant,

q Burlington, Iowa, made by ur. Joseph J. Yoore, Safety Engineer of this Division

4 on 14 thru 25 April 1947. ; : “8

x 1. PERSONNEL AT THE ESTABLISIMENT 4efoe

a. Lt. Col. J. 5. Jefferds is the Commanding Officer.

. be. Mr. Je Re Long~is the Safety Officer.

- c. Mr. Je Re Long is the Safety Director

3 dad. Mr. John Bush is the Safety Engineer, there are no Inspectors. :

. @. Total number of Employees. Male Femele. Total »

Ordnance af 338 21 359

: Fifth Army 114 5 119

Signal 4 3 7

Emergency Export Corporation 264 i 266

TOL 751

There are 6 Commissioned Officcrs

2. MISSION OF THE ESTABLISHMENT

@. Storage of high explosives, smokeless powder, ARYO and finished

> ammunition and inert component parts comprise the mission of the plant in addi-

ee tion to maintenance of 100% standby ccndition. Ammonium Nitrate fertilizer project

e Started production & Janvary 1947.

Z 3. SATETY SURVEY FINDINGS

s a. Fire Prevention and Protection

Pe (1) There is one stetion equipped with 1 = 1000 gallon per mimite

—— esas a as eee ehlhlC KhCw CLT rT OC lO ll rl hc lll TN rr rm we ei we ne ,h—Uc hc! hUC hUCU ShlUr lh;

Lee See * i ; ee fo , seo hag

et #4

paper, 1 = 750 gym purper, 1 = brash truck, and 2 - 1500 ,

gallen tank Weteretler trucx. ‘there is first aid fire-

fighting equipment in buildings and areas of the plant. It

was otated there is ample supply of water for fire Sighting ‘

purposes. Auxiliary firemen are appointed on each working

shift.

be Bxuhosives aid Ammnition Safety | | ;

(1) (Storage, Outdoor)

There is no storage of explosives or ammmition outdoors

at this establishzent.

(2) (Stormge, Magazines and Igloos) |

There are 275 standard igloos and 34 aboveground magazines.

there are 24,904,391 lbs. of INT, 16,686,770 1bs of smokeless

powder, 4,271,200 lbe of Composition B, 483,150 lbe of tetryl, |

273,620 Ube of B.C. powder, 54,240 bc of black powder, 7,48

lbs of lead aside, 2,519 lbs of fulminate of mercury, 1,79

be of PEIN and ammunition and bombs stored in the above mentike:|

magazines. Stacking is done *o ee # surveillance. There are |

no combustible buildings containing ammunition or explosives.

Vegetation control is good. There is no cone pie debris in th

areas. Firebreaks are well maintained. ‘the over-all safety °!

the areas is good.

(3) (Storage, Line Buildings) |

There is no storage of explosives or ammunition in line builé |

ings of this establishment.

(4) (Surveillance)

There is a surveillance program and the work ‘is being done '

safely. -

25696 :

186

Subject:

To:

(5) (Demilitarization) af

There are no demilitarization operations at this cs*ablish-

ment. |

(6) (Renovation)

There are nc renovation operations at this establichnent.

(7) (Destruction of Serap and Peject ‘faterial )

there are no deatmiction of scrap and reject materisls at

ni this establishment.

(8) (Ammonium Nitrate Program)

— Aumoniun Nitrate Progran is being handked by the Emergency

[Export Corneration. Mr. H. Y. Wood ts the Plant Superin—

tendent and mF. Aaron Cox is the vafety Ensineer. There

are 266 employees. Production of the fertilizer started

8 January 1947. Present rate of production is 261 tons

per day. Only 3 of the 4 graininr houses are in operation.

Temperatures of the Ammonium Witrate from high pan to grain-

ing kettle 320° (Ammonium "Nitrate will fudge at 310°); grain

kettle to nitrate bugry 215°; nitrate buggy to bag 160° to

, 200°, All loaded bacs with a cpasaenct of 190° * 200°

are set aside and cooled to a tempere tare of 170° cr less

x before they are loaded ‘nto the box cars for shipnen*.

Temperature of anodic after they hens been loaded

into larges ch the Mississippi River are 105° to 115°.

The housekeeping and house-—cleaning in the buildinss of

Line 3 and the Amionium Nitrate Area were poor because of

the following conditions,

23697

Subjects .

Tos

Excessive amount of Ammonium Nitrate dust on ledges,

equipment, fixtures and floorg. Poor control of greases, 2

oils, clean rags, arc flare of electric welder, welding a

operations near ammonium nitrate, shop work being done ee

near operations, temporary wiring near ammonium nitrate, yi

“tk oe-6VER : os

men stepping on moving conveyor to GreesGewer, door ways a

- and oxigts blocked rith nitrate bugries, and no fire symbols 3

on buildings. a

»

+3

3 “3

“2

188

“Tt

’ .

4

Subjects 3 ‘

Tor

c. Industrial Safe

accident rate

(1) ‘he/frequency/for this establishment for the month of April

is 7.93 for 126,055 manhours. The existing safety standards

of the plant are good. There is ample protective equipment.-

Physical safeguarding of equipment is cood. There is well

eqaippéd hospital with a contract surgeon and nurse in attendance

d. Transporta*ion and traffic Control

(1) ‘The railroud and higtway facilities of the establishment are

good. Tue to the reduction in the guerd department there is

e tendency for some of the drivers of vehicles to speed. The

_ subject of speeding is being brought to the attention of all

employees by their supervisors in Safety Meetings.

e. Construction and Facilities

(1) ‘the ctaff houses and practically all remps of Line 3A are of

frame construction, (There are 7? buildings and 7 barns in

the staff residence and plant area). All explosive process

and storage buildings hav* lightning protection. The lightning

protection systens have been tested and found to be satisfactory.

These tests were conducted within the past year. It was states

that the electric power, staan generating, and sewavye System

are adequate.

f. Plant Protcction

(1) ‘he Guard and Fire Departments are combined and consist of

the following personnels

1 Chief, 4 Crew Chiefs, and 22 Fire Fighter-Ouards

g. Disaster Plan

The Disaster Plan was revised 1 February 1947. It was stated

- 23699 \

Subjects

that it is adequate to cover present conditions. & copy

has been sent to Safety & Security Division for approval.

3

“re Safeguarding Military Information

(1) Military information ishandled sapieneiues to Army Regulations.

It is kept in a locked safe in the Administration Building.

i. Explosives (Job) Safety Training.

(1) The Explosives Safety Training program is being conducted

by the Safety Engineer and the Supervisors of the Establishment.

Manuals have been requested feom-eur-office in order that all

supervisors of tho Ordnance Department and the Emergency Export

Corporation may be able to teach the employees the Explos ive

Safety Course as approved by Safety and.Sacurity Division.

b. ‘the storage of ammmition in aboveground magazines has been arranged

so that the need. for a waiver has been eliminated. r

c. ‘the Ammonium Nitrate area and process buildings were wees on an

average of once each day, due to the mumerous wisafe sete and comlitions noted.

Conferenses were held with plant management and their safety departmen* with the

idea of od imina ting the above sete and condi tions, also suggesting ways of pre=-

vent ing the above te happen again. Owing -to thie condition it is suggested thet-

this plant-bs inspected about 10 daly 1947.

_d. If Safety end Security Division is of the opinion tit Ammonium Nitra

operations should be treated as Class 9, Xt is recommended that Building No. 3-12

. ee ‘

23700 |

=e

a sae

. : “ ’ :

' age 7 , te

. oe . tal -

¥ ~ my

5 . ,/

. ,

: a

, 5 =< e 8

. 3 oe % ,

ar Te ta ek we Aik

i?

® i f r 1}

- fe (AI NAAN wv ; Tage VY Finke

sop

| 23701

23702

ay.) TR OORT mE EY oR AS flee ae nese .

LEN AAR WOR LEO NIA LN GS REED ly

SUN Ga Sep hbas aoe qReeahe ad tet ene ‘a:

Gee

“e |

i]

“3

|

ee)

;

os

z

3

4

000 G/F

Subjects : Pattee. 3

Tos

be made and-all-requirements-of the Safety Marual necessary for safe operetions

of _the linebe- instituted.

- @e—Jurther recommendation is that an Explosive (Job) Safety Training

Program-be e@tarted immediately to eliminete the vints tions cf procedures prevalent

in-thegreining end Line) Aree.

\A4e The final edlenup inspection revealed a marked improvement in the

hovse--cleaning, housekeeping and many corrective measures installed to prevent

\A‘’ 9 4-

the reoccurrence of the above conditions ard rata teeta

56 RECOMMENDA TIONS

- The excess ive amounts of Ammoniven Nitrate dust on the ledges, equip-)

s and f1

ment, rt off ennaing 3-12 ehould be removed and measures taken

i=

Wiake shoal Go ets enn. procures nei tn-Beaened © bn! :

fwem block ing the exits at. the graining building in the —— Nitrate Aree. re

&

oo 1

6. me

hesahut-down-and cleaned up. Before operations begin,« thorough safety inspection

we

% :

"Tle. Gly ak Gore oe au

/- ld pon Plow :

rf

| J 3 25 april vA

TO: Chief, Safety & Security Division, 000. ; |

FROM: Joseph J. Moore, Safety Engineer, Safety & Security Div., 000.

SUBJECT: Safety Survey Report, owa Ordnance Plant. /-

/

The following is a report of Safety Survey of Iowa Oxdnepos Pleat,

Burlington, Iowa, made by Mr. Joseph J. Moore, Safety Enginser of tis.

Division en 1, thru 25 April 19),7. | ¢ J |

l. Personnel at the Establishment

a. Lt. Colonel J. & Jefferds is the Commanding Officer.

e. Total Number of Baployees Male Female Total

ng yf 3 ay!’

Fifth arny- Corps of Emgrs. 5

Fite asey we aa” y

Signal re 7

Emergency Expert Corp. 264 2 266

TOTAL ¢ 75I

’

There are 6 seay Officers.

2. Mission of the Establishrent

Storage of high explosives, smokeless powder, ARFO, and finished

ammunition and inert” component parts comprise the mission of the plant in

addition to maintenance of 100% standby condition. Ammonium Nitrate fertiliser

project started production 8 January 1917.

3. Safety Survey—Findi ngs

‘a. Fire Prevention and Protection.

(1) There is one station equipped with 1 - 1000 galion per

minute pumper, 1 - 750 gpm pumper, 1 - Brush truck, and 1 - 1500 gallon tank sg

Motorailer truck. There is first aid fire-fighting equipment in buildings i) See

and areas of the plant. It was stated there is ample supply of water for

pre Hie cect purposes. Auxiliary firemen are appointed on each working :

8 ° 5

NID}

b. Explosives and Ammnition Safety.

{1) (Storage, Outdoor)

There is no storage of explosives or ammunition outdoors

at this establishment.

23705 | ‘

vey

ahh

25 Apr 7

(2) (Storage, Magasines and Igloos)

There are 275 standard iglooe and 3), above ground

magezines. There are 2,904,391 lbs. of THT, 16,686,770 lbs. of smokeless

powder, k,271,200 lbe. of Composition B, 483,150 lbs. of tetryl, 273,620 lbs.

of B.C. powder, 54,20 lbe. of black powder, 7,8 lbs. of lead aside,

2,539 Ibe. of fulwinate of mercury, 1,797 lbe. of PETN and emmunition and

bombs stored in the above mentioned magazines. Stacking is done to pernit

eurveillance. There are no cambustible buildings containing ammunition cor

explosives. Vegetation control is good. There is no trash or debris in the

areas, Firebreaks are well maintained. The overall safety of the areas is

good. >

(3) (Storage, Line Buildings)

There is no storage of explosives or ammnition in lins

buildings of this establishment. «

(4) (Surveillance)

There is a surveillance program and the work is being

done safely.

(S) (Demilitarisation)

There are no demilitarisation operations at this estab-

lishment.

(6) (Renovation) ;

There are no renovation operations at this establishment.

(7) Destruction of Scrap-and Reject Material

There are no destruction of scrap and reject materiels

at this establishment.

(8) Ammonium Nitrate Program

Ammonium Nitrate Program is being handled by the

Emergency Export Corporation. Mr. H. V. Wood is the Plant Superintendent

and.Aaron Cox is the Safety Engineer. There are 266 employees. Production

“Of the fertiliser startod 8 January 1917. Present rate of preduction is

261 tone per day. (Qnly 3 of the 4 graining houses are in operation. Tem-

peratures of the Ammonium Nitrate from high pan to graining kettle 320°

(Ammonium Nitrate will fudge at 310°); Grain kettle to nitrate buggy 215°;

nitrate buggy to bag 160° to 200°. All loaded bags with a temperature of

190° to 200° are set aside and cooled to a temperature of 170° or less before

they are loaded into the box cars for shipment. Temperature of the fertilizer

after they have been loaded into barges on the Mississippi River are 105° to

Wie Sandra tnn of alte Led hat.

Sc. Industrial Safety; fn

(1) The, frequency.for this establishment for che month of

April is 7.93 for 126,055 manhours. The existing safety standards of the

plant are good. There is ample protective equipment. Physical safsguarding

of equipment is good. There is a well equipped hospital with a contract

surgeon and nurse in attendance.

25 apr 7

“qd. Transportation and Traffic Control

(1) The railroad and highway facilities of the establishment

are good. Due to the reduction in the guard department there is a tendency

for some of the drivers of vehicles to speed. The subject of speeding is

being brought to the attention of all employees by their supervisors in

Safety Meetings.

e. Construction and Facilities

(1) The staff houses and practically all ramps of Line 3A

are of frame constrictions (There are 77 buildings and 7 barns in the staff

residence and plant anga). All explosive process and storage buildings have

lightning protection. The lightning protection systems have been tested and

found to be satisfactory. These tests were conducted within the past year.

It was stated that the electric power, steam generating, and sewage systems

are adequate.

f. Plant Protection ’

(1) Thequard and Fire Departments are combined and consist

of the following personnel: 1 Chief, 4 Crew Chiefs and 22 fire-fighter guards.

ge Disaster Plan >

(1) The Disaster Plan was revised 1 February 194,7., It was

stated that it is adequate to cover present conditions. A copy has been sent

to our-gffice for approval.

h. Safeguarding Military Information

(1) Military information is kept- according to Army Receistions.

It is kept in a locked safe in the Administration Building.

i. Explosives (Job) Safety Training

(1) The Explosives Safety Training program is being conducted

by the Safety Engineer and the Supervisors of the Establishment. Manuals have

been requested from our office in order that all supervisors of the Ordnance

Department and the Emergency Export Corporation may.be able to teach the

employees the Explosive Safety Course as approved by our office.

?

4. “Remarks : Fy.

a. The Safety Organization is sound and function, satisfac-

torily as set up. All personmel exhibit an active kntwledge and interest in

safety. Supervisory, surveillance and safety functions are clear cut and are

properly coordinated. :

23707

25 apr 47

aa

The storage of ammunition in above ground magazines has been

arranged so that the need for a waiver from-our-oefftee has been eliminated.

- The Ammonium Nitrate area and process buildings were visited

on an average of once each day due to the numercus unsafe acts and conditions

noted. Conferences were held with plant management and their safety depart-

ment with the idea of eliminating the above acts and conditions, also sug-

gesting ways of preventing the above to happen again.

bins Owing to the-above conditions it is suggested that this plant

be inspected about 10 July 19:7. m , :

“tf cz affies is of the opinion that Ammonium Nitrate operations

should be treated as Class 9, I recommend that Building #3-12 be shut down

and cleaned up. Before operations begin a thorough safety inspection be made

and all requirements of the Safety Marmal necessary for safe operations of

the line be instituted.

~-’ Purther recommendation is that an Explosives (Job) Safety Training

program be started immediately to eliminate the violations of procedures

prevalent in the graining and Line 3 areas.

A

A) tay — re He clin, | if

Recommerdiati ons

Fe

j s ; : { a,

a vf wa eats <.. e Lid Lo § i OE 7 -¢ opie! ee LAV 60 be?

a ; ;

a ve actacaite

4

: — ae be ond. pee os - r / $F we - ee Sa 224. a —

, a y

a. Ww oe [ PO ge eavd wt Oo 4 <

——<t we - tte ae ae ea

~

ee: rE See oe ore pe ie Ae” Wee

Ani... 3 fee

‘ _— y ae

et Bee § Ay. ‘an # -Lif fc

~<

{\ “

s 4

hy

eae,

Sh ‘

£

«

|

i Cree mr aaawinte mney AH

}

{

i

]

'

|

b -

i

-

5

— portent — — a Sapam ee ae, : actin sar kos healt

«

= omen ae —— —- -— — - _——/ — — ~ —- —— ee a

—

i

-

=

i RE Ae RR

dtg#5-O

72:

im VA OSL7:

7

a a S

ulJVEecl.

Vf. a.

V4 A ,

——_ -4 , ie /

f p-

e” 3a/ bem of

ad

ty

if:

s

A

Fae? View A

are oA a, he

it Py

holawf

oC

O. O. Porm 5734 B90

210

y Sane” |

| AM LAL yl,

Jrcecgaintey ob ef

i |

- ~ Ff 4 r . - shatioubedt winitinenee dinate

if l y ) | i

| Ve A

Cee ag 2 pod pate oer lt ee SET

“ ; : y,

tad the ys a we es, saea Pe , ak PEs : af :

eee 4}

LAY -¥g Zz has _ =)

0 Porm S74 oa

or verre @rwe ras y, ry

23712 = r

SPT, FOR ty REIN NORE ght MISA AE ONS RY REET! | wy Pera aes Penns Oe

ORIEN AH Pte ieee tS ptioc Ak WONG Ss:

‘~@ a.

a pred

7

< Cs *s

Ao A ra” ar"

aaa i i a Be

i i

: a 2 te,

Ohta hell le co eat ‘a a ee

£94)

: : Ef. .£

(r.* “ Ce ed &

a eee of ae a wo f

Ss oF Me ee

Balled soll ate? ae vA MP a ‘ii “4 ae .

- ~-

eit, a } Ly oe: rea a

aa713 ¢°

as LOO 4 oe Fy en 2 SL: ad oa

plIe 2 60° ZAP | ee ej

eg wes

nik dtd 7

fs sae e

f

BCo Y/N 214

;

eel

oa

a -

« 2? ~*

Ps, ° ‘ i

‘ . . ‘

“

a ANS Pe

; Sore eee - | . aN P |

4 a?

Pg 4 ;

a : care me. —— Li Zs

i? it 7:

= 4 = “Oar te af?

“i f Z

Pd “} a at. de dow A Be OUT, <2 —_ _-

e ada. sll Pla A ee 2 we A —— 2 > aa pe oe ae —- cial

vA = , "af rs .

pita Fn ee - Soom, Sets , 2. yA 2

—— . ae —~ .®, —_ a a Yo--- SE Se

é

Se ee — — a De

Sa 7 ; /

S ee /f aaa PA

ent : oS a a A — me

pigs pe - --— — lla td — >» = — ee

0. Oo. oTe4 B 9519 |

.

29 23716 ~~

.

ve can 2s ; eae, a. Arte F Ae ,

wg ra a4 | }

/ f | es ‘\ sf ona ‘ | ;

Ff Lk od. : ica: y/ LI ae Peete ac? Saleem ae L : a

Lewin Eel Bi Ses = /

CY 4. C2214: i5-O 2x. hihi Pag © od = Se A : 2. £:.

Sai ee it , js ea

LAL? Ei ¢ ‘

wk CA-~ Rai I. : r ¢ mR a"

€ parasite PAA gee we eh te Cr et

ig

BN

. ALGL- = AWD Leg ey tr OA.

ee © Be oer os

ap wd ver pee

Ag

ee ed es

2 As

tet he

Ie, , , ee

Biree ar Be ae. I te rh (ori iat es tae fit- Eo

Avs

S

OCo S/W 217 :

Sive

ee ae

ree (bf)

ae ag 6

S-6519 os 6 sevenewarr remem: avne ven

23718

a

=

’

.

/ o?

3 ~ae~

al P

-- f

fN\)>

mates Ee aay ee

Geb

219

Yrplo bs:

SQEQN SA

os

eo om |

™ Arenas | ee ox 2 _ : | ‘ .

i % vy 7 4g font ee LA Ay Y. iy ~ < omen > x z

mer = at tes a Fae pe LS

‘ ,

Sh

is

h

a i ft

; Me

: O. ©. Form 5794 are

| 95 Te AAU eH weNR OFC e Lem

4

See rT

— .

pm AT RE a ; =

,

: “ \

a >.

* od

‘A

‘1 indie ° ‘

q fF 5

, .

id i fe, 38 o£.

.

222

OWA

—_ '

EI ES 5 ,

co Ci /iL Gi: — hfe tne : O -

/ ca

) e ee car

©.0O Form 5704

35 9. eee

a

4

ey,

~

; r WAR DEPARTMENT

& OFFICE OF THE CHIEF OF ORDNAY CE

FIELD DIRECTOR OF AMYUNITION PLANTS RECORD

JOLIET, ILLINOIS

TlHaines /ojr/S222

ORDLY=S 333/12616 Iowa

9 April 1917

ORDCW 333/L8

SUBJECT: Inspection of Decontaminated Areas

TO: Commanding Officer

Iowa Ordnance Plant

S Burlington, Iowa o

1. During the past few weeks there have been several instances of

the finding of explosives and hazardous items in installations which

have been reported as decontaminated. The continued discovery of these

dangerous items makes it necessary that immediate and ade

ial is discovered and removed from the premises. 41) buildings should

be thoroughly inspected. This includes boiler houses, change houses,

3. In areas previously reported as decontaminated, it has been

reported, for example, that one igloo has been found fl]

of miscel-

lanecus items of ammunition, carboys of acid have been found in aban-

doned buildings, a can of black powier was found in a boiler roan,

and that rounds of small arms ammunition were found in a store

house.

/s/ Joel G. Holmes

JOEL G. HOLMES

Colonel, Ord Dept

Assistant

vi; 23723

INGTON ik... AC cw, 70

r0: ir, WA, Johnston Apri. 19/1447

- \

SUBJECT: lag Teuporatures AS 900, 18

Ba

( pte.

1, On Thureday April 17, 1%7, the following individuals “cade

an inspection of the Federal Setgad Ling facilities at the

+o

2. The method of handling the bags was inspected and checked

from the time they opened the x Car until they were actually

loaded-into the barge. Aji ) edures were in order,

3. Fith the a Fessen didi thermometer, tenpsratures were

taken bags that had been leaded into the barge.

These as to temperature, were made by actually

climming fertiliser and determining ty sense

of to to be warm. Several readings vere’

to 105 degrees. One reading ms obtained

ef 115 This was the highest temperature recorded,

Saved on this information it was the opinion of this greup

that the loading precedure mas satisfactory from a safety

standpoint.

y, v. Beod %

RV sath Superint endent

oo: Messrs, Jchn BR, Long

Joe Moore :

J, O, Chapman

7" ww VF Ve aS SS ww wwe

WAR DEPARTMENT Me

OF AMMUNITION PLARTS

SUBJECT: September Performance Analysis . ~

TO: Commanding Officer

Iowa Ordnance Plant

Burlington, Iowa

i. Analysis of the Control Reports received by this office,

covering the Renovation and Demilitarization Program for the month of

September shows the following performance:

Your | Industry

Installation Averere

1 ~ Percent of September Schedule Completed ; 70.2% 53S

2- Dollar Performance (Earned Dollars/Dollars Spent) 133.2 43.

3—Man Hour Performance (Earned MH/Actual MH Used) 92.3% 77.0%

Y- Cost per Direct Labor Man Hour $2.08 $5.25

2. The completion of 70.2% of the September Schedule is under-

+

ya

Standable since this amount was the balance to be dore on the schedule.

In other words, it is the equivalent of the 100% performance.

-__The Dollar Performance of 133.3% indicates an appreciable

Savinzn was made and your inetaliation [s to be commendec Tor thts ~

seneenernmmnnltl aetnmmnsnemeat ween amore desecrea. Fe er ne ss” ie

* fine work, ee oe

° the Man Hour Performance of 92. also is ve

dicates good p anning b the Operations Department.

ood and in-

- the Cost ver Direct Labor Man Hour of $2.08 also indicates

ood planning and a welt balance overhead. Yr SORPartYor—es—ere—te -

— Tae Goa for the month of Wenten Your Teeter! retorts enown

teeta

Rap tiers 9) 40 Wemyss oe oe, . «og “ee La ®*

7 er

6. It is noted that your instaliation did not use the new "S-hedcule

2", Porm 00-1113, on your reports for the month of October. The request

from this office for the use of his form was made in the letter dated

<7 September 1946. It is to the acvantace of your installation as wel]

as to this office that the report be prepared as requestec.

PY _

4

ORDEY-L

SUBJECT: September Performance Analysis 1 13 Kovember 1916

7. The Ordnance Department Order No. 57-6, ated ly October 1916,

requests that the monthly report be incorporated with the first quarter

“report of the next month. This change supersedes the instructions given

in the 27 September 1916 letter from this office.

8. In accordance with instructions contained in the Ordnance Depart-

ment Order Ho. 57-l6, dated LU, October 196, responsibility for the com-

pletion of the demilitarization and renovation program is delegated to

this office. Since Schedule 9 report is the only means by which this

office oan follow the progress of your operations, it is requested that

explanatory remarks regarding conditions that have affected the performance

of your installaticn be stated on the monthly report of Schedule 9 (Form

00-1113). Such remarks will be personally reviewed by the Commanding °

Officer and sufficient notation added to indicate action taken to correct

discrepancies, “

BY ORDER OF THE CHIEF OF ORDNANCE:

Peer:

> "ay JOEL G. ROLMES

Colonel, Ord Dept

Assistant

28426

_ i

iii, | Caer,

JOM COMIC Pat D E

BRITON, JOM O00 ¥ /S a

. {Dp

fe MEBTIZG ELD APRIL p |

gz. Y, gg ace ee te oer

Ca & 2 Pierce p Dept ca a oeear

ag teed Safety & Security Granch ¥. R, Canpbel)

J. 3. Ghapmen Aaron Cox

H, H, Gevb ‘A. Jd. Marta

A, &, Mausner R, Jd. Im

a, ©, Meurer

ag

A chais ccs Ke ci oe r

been making a safety cuiit of the plant ani will take pert in the mesting.

Mr, Cox reported that the Frequency for Merch wus 25.00, Severity,

based on the 900 days on the toe injury of Carl Melson, eas 22.50, The

Frequency here to date is 21,10 and Severity to dete, dased on the same

900 days, 1.26,

Causes of injuries during March were as follows; :

1s& Striking against

55% Struck by “

18% Caught in between Es

64 Falls, different levels a

3% Slipping, strains, etc,

Part of body affected: \ |

m = neck injuries

208 Arme

3% Feet and [foes

Agency: Machines and Eqiiipment :

7% Graining wettles or hi-pans

7% Conveyor, industrial trailers

7% Steam hose or pipe

164 Other /

~~

%,

255

F i

Pd ae:

33 qs

5.

\

Friday.

vets Howat

noe Department

request but explained that their dspartment

recently a Mr. McCauley had been

on

in

of their operation,

brought to

held

brought

to

. outline and adopt it to Job defety Training

Progen

JoTeke.

lead opere

from the

y, Lh HS

lend some assistance

our

that

phase

Yegriun 4 dy HE

_— cat vali

4d 1

know firsthand what he thinks of our operation hers.

are his comments ami suggestions:

i. raga An ee Shae Oe Sees Se Oe Sree on

ary

They

the

Plante

die tod

and

speeding

has more

Ordnance, Department.

id to the Ordmance Department personnel —/

equipment and wonderful

ioned that be saw a bus speeding the other day.

O00 ,000 miles were traveled

dapartment of the War Departaent with no

some of the best

of Mowember 4

the jurisdiction of the

m applied

pointed out that the Ordnance Departaent

stic

eent

other

have

morth

under

endl

E23

Mr, Moore's office makes this recosment ‘Sion.

where the paper bags have been found charre fram

greece

cases

He

PS

to ammonium nitrate

It is quite resistive

that it will detonate,

that there would probably be directive,

respect be paid

done in the past.

stated

ting thet more

beer

is known

it

ile

Je

4.

36

6.

76

9

ll,

ad 3 =

Housekeeping, House Cleaning =~ Building 3-12

In going through Building 3-12 last Tuesday, Mr. Moore said he didn't

think it looked a bit good, the next day he thought it looked fins,

and the day following it didn’t look so good again although it wasn't

as bad as the firet day he saw it. He stated that the quickest

way to climinate accidents is through housekeeping, Housekeeping is

first, house clesening second, ‘

Unsafe conditions - these can always be traced beek to poor house-

keeping.

Unsafe acta ~ the third ites,

Control of greases and oils = These are foreign substances and should

not be too close to ammonium nitrate,

Control of clean rags ~ A lot of nice clean rags were seen in @ paper

sack. This is not so good, |

Poor control of arc flare of electric welder « People having to work

near electric welderc, even though they are not welders are subject

to "kleg” eyes. Mr. Moore stated he had seen very serious cases

resulting from just having to work near the arc, He has discussed

thie with Mr. Long in regard to members of the Fire Departaent who

are sent out to observe welding operations, wearing dark glasses,

Any man using an oir hose for cleaning purposes should wear goggles,

Poor control of welding operations near amponium nitrate fertiliser -

Some jobs of work could be done in other locations, If it hes to

be done near operations it should be isolated as much as possible.

The removal of hinges on TN? buggies should be expedited < Hr, Moore

stated that he umferstood we had had one lost time accident fron this

Cause «

The practice of men stepping on the conveyor when they want to get

on the other side is hasardous, ss

Any personnel requested to walk around on the top of tank should

weer a life line or a piece of rope around their waist (both ends

* have to be tied).

Mr, Moore has discussed the subject of Safety Shoes with both

Mr, Johnston and Mr. Wood, He mentioned that he could see where ons

accident might have been Prevented by the Wearing of safety shoes,

~,

34

»>

8.93 with 112.908 man hours worked, For February it was 9.04 with

hems worked, When thay see this report they ask

master with a high frequency for the number of

wan houre worked, They don't pay any attention to the severity, but

it is a good thing to heve. The insurance company watches the

severity more than frequency when thay see the severity rate

going tp tiny start putting a safety enginser on the jod orertine

out dome. = :

cts. He would suggest

a

laying the foreman off, If the foreman doesn't go along you can't have

to lay a foreman off so

@ at all = you get another

+.

17. Mr. Moore said he thought the housekeeping and housecleaning was good

in the graining houses when he was there.

that he mentioned these items to call the attention of

fact that he had seen them ~ many things he had not

& they would be straightened out, 4s said that if corrective

re not taken he would have to mention that he had talked things

with this person and that person in his report, He said he would

ck again and inspected and found then corrected,

*, Weod advised the

for @ couple of weeks

“3

j

:

8

E

F

7

d

:

E

g

g

1

_The following camments and suggestions were made by Mr. Long:

2, Mr. Long stated that he could see an improvement in our operations —

right along,

2. Que probles that his department is much concerned with is the dissipation »

of heat in the loaded cars, He Suggested, as a measure of aiding in

dissipating this heat, leaving the car doors Ope: until the car is

ready to be pulled cut. What ¢ ¥ are striving for is ventilation

23730)

>

36

; ednesday

and Mr, Moore from FDAP, and others in making &

inspection of your operation at Burlington. Since Mr. Moore

was making a safety audit for the Field Director, I am =

sure that he was reasonably well inxpressed with the type

af housekeeping that he observed on that cocasion,.*

There wee a noticeable improvement cover the confitions of the

Plant in

sometime ago with Mr, Thomas, It looks like the organised

plan

complimented on the improvement. I can't help but observe,

however, that it has been sy experience at these Amsoaiu

Mitrate Plants, that it takes everyons keeping everlastingly

at it twenty-four hours a day to keep one of these plants in

shipehare comiition so that the housekeeping looks tiptop at

ail times."

PRODUCT ION

Our main housekeeping problem is also a production problem - the regrinis

in Building 3-10. Saturday a bulletin was put out on the

operation. The grinders from Cornhusker are in transit and will be

installed, one in each house, when they arrive, —

This preblem etarts in the manufacture of scrap, We ere running about as

of predustion or About 20 ton per day. In runming a brief time study on

the grinding operation, Mr, Food found they were

minutes, At this rate, they can in four hours grinding time on anyone

shift, 12 ton or 24,000 peunds. it is reasona ble to assume thet ons

truck can make five trips allowing. one hour and 24 minutes for one

One truck with 50 cans requires 58 minutes to one hour to make the ‘

\

:

8

:

5

y

23431

™m

a

]

-6-« .

+

rr

ef

ty

FE

i:

g

iy

5

g

8

&

3

:

bgt ecey

f

He

4H

ih

HEE

gilts

eit

Hf

“a

ssf

:

e

f

¢

8

i, Inme reported that during the past week wax has averaged .713, The week

of April 4th to 10th the average was .903, This doesn’t seem like much of a

drop, but figuring it in dollars and cents, it is $49.34 per day.

Temperatures are running nicely at Building 3-12, dropping down during the

week fram 200 to 190 withcut any trouble. Usually average about 10 bags

fer every two lots that were too hot, Quality seems to be coming up good

all the way around, Sag weight averaged 101.54 or .04 of a per cent higher,

Grein sise is slipping down again. Our average for the month to date is

about 42.6, and will probably be about 42 for the month, Mr. Ihne is of the

opinion that “dusters” are still the cause. He thought the two lead operators

we had brought from Cornhusker were contributing to these “dusters” due to

their methods of cooling the kettles. o

Any request for samples in connection with our product shipped to Texas City

must heave the onal approval of Mr. Wood, and in of his absence,

Br, Chapman. is to safeguard ourselves up to the point where we are

retaining 200 grems of these samples for our own protection. Mr. Ihne has

placed these samples under lock an key. ,

TANK FARM

Mr, Codd undo a study of heating time of tank cars and between April let

and Sth heated tiem in an hour and a half, At this rate the cost of hoating

® ear would be £124.80. Heating time on other cars have run from 2,67 hours

to 3.07 hours. He feels that it is the tendency to leave the heat on cars

when it is close to shift change tims for the oncoming shift to finish. He

g

SF

te

:

that he has taken temperatures where the cars were from 220 to 230°.

Mr, Cobb the tank car unloading procedure and an

this operation uniform on all cars.

23732

~~

Water consumption was discussed, Phe water Gepartment have advised thet

our asege is very inconsistent and will jump from 3,000 gallon per minute ”

up Lr)

6,000 gallon, In Jammry 2,700, February 4,900 and

siroh 87300. We have increased fron 1f in : ) te 22 to Petrunry

to 308 in March, en

°° a. Chapman

Shift Supervisors ~ C, H, My W

R. Le Foster aM

237933

238

di

OC & Y ra

REPORT OF TRAVEL

TO .

AMMONIUM NITRATE INSTALLATIONS

4-9 DECEMBER 1946

SECTION I. PURPOSE OF VISIT

i. Visits were made by the following persons to the following Plants

and Works engaged in the production of either Anhydrou~ Amaonia, Amsonius

Nitrate Solution or Grained Ammonium Nitrate;

Persons

Mr. Le G. Porter Department of Agriculture, Washington, D. C.

Mr. He. Tf. Bennett bed

Mr. K. D. Jacobs : ° %

Captain C. D. Lyons OPFDAP, Joliet, Illinois

Plant or Forks

Missouri Ordnance Works Louisiana, Missouri

Cactus Ordnance Forks Dumas, - Texas

Jayhawk Ordnance Yorks Pitteburg, Kaneas

Milen Arsenal Milen, Tennessee

Holston Ordnance Forks Kingsport, Tennessee

Radford Arsenal Radford, Virginia

3. The following two Anhydrous Ammonia plants were Visited on 8 @ 4

Desember 1946 by the above personnel from the Department of Agriculture;

4. Visite were made to the various ingtallations at the requsst of the

Department of Agriculture. If “ppears that the primary purpose of visit uae

}

>

=~

286

REPORT OF PRAVEL (Oontd) :

for the purpose of allowing the Department of Agriculture to obtain first-

hand information as to tne progress of the fertiliser program and to allow

them to evaluate Plants and Works being used in the program; i.e., cvst of

product, eondition of buildings and equipment, and possible life of plant.

SECTION II. OBSERVATIONS

1. Miseourt Ordnance Works

a. Necessary informaticn required was furnished by ur. George

Ripley, Plant Manager and Lt Col Bassett, Cosmanding Officer.

be Information desired pertained to: (1) Coste, (2) Process, (3)

Labor Supply, (4) Condition of Equipment, and (5) Plant Preduction.

Ge Rehabilitation work is progressing at a satisfactory rate at

this plant with the first four units to be inte produstion by 31 Deocesber

1948. At capacity this will give approximately 160 tons of Anhydrous Ammonia

per day. The fifth wit will probably be put inte production in March 1946.

Delay is due to reesipt of Compresscr Cylinder fram Ingersoll-Rand Company.

The Commanding Officer has obtained necessary priority assistance and’is ex-

pediting in every possible way delivery of Cylinder.

4. Plant was operating at reduced rate due to lack of tank oars and

to impending freight embargo.

2. Cactus Crdnance Works

. a. Party was accompanied on inspection trip by Captain J. R.

Schecter, Executive Officer and Mr. C. R. Griffin, Plant Manager.

be Information requested was general in nature and essentially thet

requested at Missouri Ordnance Works. Quite a bit of interest was shown in

the equipment ani material necessary to complete another ammonia unit at the

plant. The Plant Manager furnished a breakdown of costs on the completion of

this unit to representatives of the Department of Agriculture. It was esti-

mted that for approximately 4@ million deliars, this unit could be operating

in six months.

¢. Production was curtailed due to freight embargo. It is esti-

wa ted that all units will be in production by 31 December 1946.

3. Jayhawk Ordnanee Works

a. At the invitation of Mr. C. Y. Thomas, Vioe President of Spencer

Chemical Company, an inspection trip was made to Jayhawk Ordnance Yorks,

a a ee et i v

/

REPORT OF TRAVEL (Contd)

Pitteburg, Kansas. The plant is at the present tims being operated by Spenser

Cyemical Company om a lease basis.

b. Uf interest to the group -was the produetion of Anhydrous Ammonia

end the production of neutral liquor at the one plant.- Production of eamacia

“ds adequate to make approximately 600 tons of neutral liquor. This escumt ef

‘liquor is not being produced at the plant due to the limiting factors cf their

Hitrto Acid plant.

©: Information was also furnished to the effect that facilities te

produce dry ico from waste carbon dioxide and sethazol were to be oomstructed

in the near future.

d. All data requested relative to all phases of the plant was fur-

nished with the exeeption ef costs data.

4. Wilem Arsenal

a. Inspection ef the graining facilities at thie plant was made in

the company of Mr. Bolten, Shift Supervisor for Silas Mason Company, and

Captain George Constan.

b. Preduction data, labor supply and the various phases of operations

were discussed.

Ge Plant was operating at time of inspection at better than

acheduled rate. Departaent of agriculture representatives were very moh in-

terested sinos it was the only graining plant visited and since one of the

members had not before seen a graining plant in operatica.

5. Holatom Ordnenes Yorks

a. Plant inspection was aade in the company of Major Beatty, Xm

manding Officer, and other representatives of Ordnance and Liberty Powder Ce.

bd. Boilers which were transferred from New York Ordmance "orks ere

expected to be geporating steam by 20 December 1946. This will enable plant

to meet production as sohs@iled in January 1947.

6. Data relative to habor, sosts, production, and operations way

furnished as requested.

«

6. Radford Areenal

nore

rn 8 a. Group wae accompanied on tour by Captain Farmer and the Hercules

Powder Company day supervisor.

Pe]

23736

rer Pw yy Ow 9 & gery wv =a ws o eA. ae

288

REPORT OF TRAVEL (Contd)

3 &

be. Plant was operating eat a limited rate with a majority of the

work ou the Acid Area complete. There wae etill a omal) amount of work to

be dane on the neutralisers,

SECTION IIIT. CONCLUSIONS AND RECON‘ DATI OMS

1. It appears that the purpose of the visit by representatives of the

Department of Agriculture was to: (1) Study progress being made by the Ord-

nance Department in completing necessary rehabilitation work to place plants

into operation and (2) make recommendations relative to sontinuing operation

of plants in the Tar Department Program ofer a long period of time und the

bringing int» preduction of additional units to inorease the overal) program.

2. Ae has previously been brought out, information requested was:

ae Operating Procedures

b. Production

Ce Labor Supply |

de Costs

S. All data requested was readily furnished and the Department of

Agriculture mubers expressed their great appreciation for the courtesies

show during their visits te the various Plants end Works.

SSCTIOM IV. CORRECTIVE ACTION TAKEX

Scns.

at A yd,

C. BD.

Dan Captain, Ord Dept

oe

23737

di

i

vi

r. itl i

cbs 3

yon

i wl

iH i

cl

i

i

ae Ht

chat (a

fa i

Alp

irl

iu

HHT i

HTH

fie

ik

bit

H

it

ie

i

4.

cil

al i

ay all

:

a J

i

ual

¥

t

Ath it it am Hl

OE /kva,

234034

pate —

Memora ¢ UNITE _GOVERNMENT

O~~r ”, 3 J 9. F ILIA DCSadth/vh

osha 5206

DATE: 1} October 2946

Bipy—tty— —epretee yon , eee

FROM : Chief, ORDLY-L i re a ee nee ae oe

SUBJECT: Report om Substitution of hea B for PRP in Coating famoniua Nitrate

Inclesed is a copy of Report No. 6, on the investigation by the Midwest

Research Institute, on the substitution of Wax B for PRP in coating fertiliser

_grede ammonium nitrate. scliea ita, OD

1 Inel {- J. NM. PRARRE

Cy Rpt Wo. 6

ORDLY 319,1/37765 Gen'l lst Ind ° “HDReynolds/$ch/3314

Chief, Ammunition Div, I. S., 28 Uctober 1946

6... Chief, ORDLY-L

1. Subject report has been discussed with Safety and Security Division.

2. Safety and Security requests that flash points of both PRP and Yiax B

be determined and, in addition, determinations be made of the flash points

of NHq4 NOz coated with PRP and with Wax B.

5S. It is requested that the above information be forwarded to Safety and

Security Division thru this office,

eo Incl O. reo

ae

w/a Col, Ord Dept

se

23740

G.

_ ORDLY-L 319.1/37755 Gen'l 2d Ind a

Chief, ORDLY-L, 20 November 1946

Wie tt x Oe

Ft —ehtet; te Div; 1-97

TO: Chief, Safety & Security Div

i, Attached hereto is copy cf letter dated 13 November 1946 from the

Spencer Chemical Company in reply to inquiry from this office for the data call-

ed for in lst Inaorsement. It is believed tiat the data contained in this iett=

er from Spencer Chemical Company gives sufficient information to establish the

suitability, from a safety standpoint, of tiax B product for “ccatine ammonium ni~

td

trate fertilizer, é

2. It is the opinion of this office that determination of flash point of

ammonium nitrate coated with PRP and Wax B would be a hazardous operation and it

is therefore recommended that no further attempts be made to obtain this data.

No further action will be taken by this office unless specifically directed to

order this work done,

1 Ined jo J. Ne PRARRE

Incl 2 - Cy ltr fm Spen

cc

Chief, ORDIM

23741

000 #26 .

SPENCER CHEMICAL COMPANY

P.O. Box 604

Pittsburg, Kansas

Development Department November 13, 1946

File: 906D,.2.7

; } |

Office, Chief ef Ordnance

Field Director of Ammunition Plants

Joliet, Illinois «

Attention: Mr, J. Ne Pearre

Dear Mr, Pearre:

Your letter of inquiry in regard to flash pointe of PRP arid Wax B, and of +

ammonium nitrate coated with these compounds, was apparently misdirected to

Wahoo, Nebraska and, although issued under date of November 1, 1946, reached

my desk only yesterday. \

Tuen *noz4/9a*° TLY LIdHO

I have received recent informatien from the Mid-Continent Petroleum Corporatien

at Tulsa that the flash point on thejr Wax B product is 460 F plus or minus 5°F

and fire point 505°F plus or minus 5 F by the Cleveland Open-Cup Method of test.

I am sorry to advise that we have no informatien en the flash point of PRP and. ‘

do notghave the necessary ‘aboratory equipment to determines the flash point i

- accurately, From past exparience in the petroleum testing business, I should j

expect the flash point of any PRP wixture to be at, or near, the fiash point ©

of the paraffinewax component and considerably under the flash point of WAX B

since the latter is a higher aeeeceter weight compound than is the paraffin

type Wax.

SIGTHO

TO:

As to the flash point of ammonium nitrate coated with either of the subject

coating a,ents, it appears to me that this would be a dif*icult, if not in-

- pessible, test to make, since ammonium nitrate begins decomposition or dis

sociation at about 340 F and may decompose violently at temperatures approach- = ({

ing the flash points ofthe waxes used for coating. I should say, therefore, \

that we would not care to undertake the latter test,

You have been kind enough to ask my opinion as to whether or not it would be

advisavle to have the work involwed in testing done by an outside laborateory,

and I do believe that this wo.ld be the desirable procedure. For determinatien

of the flash points of PRP ami Wax B, I would recommend that a laboratory

engaged in testing of petroleum products be contdcted, such as the C, J. Tagiia-

due Company or the Cross Laboratory in Kansas City, Missouri. Fees for such

tests vary but should not exceed $15.00 per deterudantion, by A.S.T.M. method,

and I cannot stress too strongly the necessity of insisting on this standard

of procedure,

7 c.

. ‘ ’ ' ' - ' , , 9

L~ Y ’ ial, . . ‘>-yY~ --~

eS ———————— Le lle

208

Mr. J. N. Pearre

Joliet, Dllinois

November 13, 1946

I hope that the for egoing informati

on satisfies vour

sorry that the inquiry was delayed in reaching thie Bois ig ee

Yours very truly,

WHY: ve W. We Yeandle

‘ ‘ Director, Development Dept.

a

C

. 0

p

ae

?

- ‘ef

~ ° Low -

¢

©

23743

EEE EEE EEE NSIS NOUPG EG OEY MC TCEVTT OPEB eye

O00E &

REPORT NO 23 ,

DATE 5 December 1946

AMMONIUM NITRATE PROGRESS REPORT

° ,

Reference is made to Report No. 14 dated 19 September 1946 in which

certain basic data was furnished‘and which remains the same for each Plant

and Works except in those instances ane changes are shown below or were pe

reflected in Reports No. 15 thru 22 inclusive. |

I. ANHYDROUS AMMONIA

PLANT OR WORKS: CACTUS ORDNANCE WORKS

PER CENT OF REHABILITATION COMPLETED:.- 75 (10% increase)

NUMBER OF CONTRACTOR PERSONNEL ON SITE ENGAGED IN REHABILITATION

OR CONSTRUCTION: increase)

OPERATIONS AND PRODUCTION: Two (2) trains in operation; startup

dates for No. 3 & No. @ trains are estimated to be 5 & 20 December

respectively.

BRIEF SUMMARY OF PROGRESS BEING MADE AT THIS WORKS: Shortage of tank

cars has necessitated a cut-back in opsrations at this installation.

November production - 2,332 tons. |

O

~ e:

PLANT OR WORKS: MISSOURI ORDWANCE WORKS 3

PER CENT OF REHABILITATION COMPLrTED: 93.2 (9.4% increage)

EQUIPMENT carat $3

PeR CENT INSTALLED: 93.2 (9.4% increasgo)

OPERATIONS AND PRODUCTION: It is estimated tnat No. 3 unit will start

up approximately 5 December and No. 2 unit approximately 15 December.

Startup date for No. 1 unit has been serious:y retarded due to the ea

fact that a casting to be supplied by Ingersoll-Rand was defective, :

Startup date is estimated to be 1 March 1947.

PERS UT TE Spy ewe YET ey r+ § £9 © € 6 Vee lg

301

AMMONIUM NITRATE PROGRESS REPORT 5 December 1946

Bil ER’ SUMMARY OF PRQGRESS BEING MADE AT THIS WORKS: November pro-

duction - 1,164 ton Unless ammonia ig not affected by the embargo,

production at this installation will be greatly curtailed.

Startup of No. 3 & No. 2 units will be made but No. 5 & No. 4

units will be shut down provided ammonia is embargoed. This procedure

is oeing adopted in order to break in the No. 3 & No. 2 units.

f

Construction at this installation has progressed to such an ex-

tent that the Corps of Engineers have been notified to terminate the

construction contract as of 13 December 1946. The Operating Con-

tractor, Hercules Powder Company, has agreed to complete any necea-

sary rehabilitation work. '

v :

PLANT OR WORKS: MORGANTOWN ORDNANCE WORKS —

BRIEF SUMMARY OF PROGRESS BEING MADE AT THIS WORKS: 5,583 tonsa of

ammonia were produced during November. 4y production has now been

reduced to less than 100 tons per day periding a decision with respect

to embargo. At the present rate, Morgaritown can operate for approxi-

mately fourteen days.

*

PLANT OR WORKS: ORIO RIVER ORDNANCE WORKS

PER CENT OF REHABILITATION COMPLETED: 95 (3% increase)

“dIEF SUMMARY OF PROGRESS BEING MADE aT THIS WORKS: November pro~ z

duction - 2,551 tons. Coa str made necessary to cut back pro-

duction at this installation.

-II. AQUEOUS AMMONIUM NITRATES

PLANT OR WORKS: HOLSTON ORDNANCE WORKS

PER CENT OF REHABILITATION COMPLETED: 79 (4% increase)

PER CENT OF CONSTRUCTION COMPLETED: Process Work - 88 (8% inorwase)

Boiler Plant - 56 (34% increase)

2

Fr

ais | 23745

YS rage te ee ee ee al Ee wey ‘aeeaee- — Oe eee ee

—_— — = — - — ee —_— —_ — — a, al

Y/

PM WATE 40CReSS REPORT 5 December i934".

— mm — men

toe SBNY 2 'oTALLED:. 95 (8% increase)

~~ oo

Athy GUMMAS > GF PROGRESS BEING MADE AT THIS WORKS: 546 tons <«/

neutrsl liquor were produced in Novémber. Shutdowns resulting f:--

failures cf temporary boiler caused reduction in November produ.:(:.

Ability to meet January schedule depends upon instaliation of or

new boiler: by 1 January 1947.

—-— + - “-—~. ‘_—_ ————- -«

PLAL™ <b “ANS 2 INDIANA ARSENAL

—— ——-—-_< —-—

PER SCENE OF PEMABILITATION COMPLETED: 85 (5% increase)

PER CENT OF CONSTRUCTION COMPLETED; 65 (10% increase)

WUMBER OF CONTRACTOR PERSONNEL ON SITE ENGAGED IN REHABILITATION

* AND7CR Ci NSTRICTIQYs 305 (17 decrease)

EQUIPMENT .

PER Ce\iT INSTALLED: 62 (7% increase)

OPERATIONS AND PRODUCTION: Ten AOP units and six neutralizers »+.-

In full operation. 6,506 tons of neutral liquor were produced i:

November. Amount to be producs4 in December depends upon decisi «:

with respect to status of ammonia and neutral liquor in connection

with the embargo. x

_——~——s— — rere

PLANT OX WORKS: JOLIET ARSENAL

PER CENT OF REHABILITATRON COMPLETED; 60 x increase)

PER CENT GF CONSTRUCTION COMPLETED: 54 (5% increase)

NUMBZR GF CONTRACTOR PERSONNBL ON SITE ENGAGED IN RSHABILITAT ‘ii

AND/OR CONSTRUCTION: ZIS (41 decrease)

BRIG! SUMMARY OF PROGRESS BEING MADE AT THIS ARSENAL: 4,403 tor.

neutral liquor were produced in November.

r3d45

‘

302 §

SR PRS eee

Se et ee, et

EA RE ee A

303

AMMONIUM NITRATE PROGRESS REPORT 5 December 1946

—

‘

PLANT OR WORKS: RADFORD ARSENAL

PER CENT OF REHABILITATION COMPLETED: 97 (4% increase)

PER CENT OF CONSTRUCTION COMPLETED: 97 (4% inorease)

NUMBER OF CONTRACTOR PERSONNEL ON SITE ENGAGED IN at AA

ON 3 crease

EQUIPMENT

PER CENT INSTALLED: 97 (4% increase)

‘ BRIEF SUMMARY OF PROGRESS BEING MADS AT THIS ARSENAL: November pro-

duction - 606 tons.

\

PLANT OR WORKS: SUNFLOWER ORDNANCE WORKS

PcR CENT OF REHABILITATION COMPLETSD: Porth Acid Area - 100

Scuth Acid Area - 60 (17% in-

crease )

NUMBER OF CONTRACTOR PERSONNEL ON SITE ENGAGED IN REHABILITATION

3 ecrease

—e

BRIEF SUMMARY OF PROGRESS BEING MADE AT THIS WORKS: November pro-

duction = Tal tons. |

PLANT OR WORKS: WABASH RIVER ORDNANCZ WORKS

PER CENT OF REHABILITATION COMPLETED: 65 (35% increase)

PER CENT OF CONSTRUCTION COMPLETED: 19 (9% increase)

¥

NUMBER OF CONTRACTOR PERSONNEL ON SITE ENGAGED IN REHABILITATION

A : Increase)

BRIEF SUMMARY OF PROGRESS BEING MADE AT THIS WORKS: Report from

ontractor outiining necessity for overtime has not been received

to date.

/yVyr

23044

/

AMMONIUM NITRATE PROGRESS REPORT 5 December 1946

III. GRAINED AMMONIUM NITRATE

PLANT OR WORKS: CORNHUSKER ORDWANCE PLANT

PER CENT OF CONSTRUCTION COMPLETED; 70 (10% increase )

NUMBER OF CONTRACTOR PERSONNEL ON SITE ENGAGED 1M REHABILITATIOK

BRIEF SUMMARY OF PROGRESS BEING MADE AT THIS PLANT: 2,518 tons of

um nitra e ter ¢ were produced during November.

Failure to meet November schedule was caused by receipt of con-

taminated liquor. The majority of this liquor that was contami-

nated with paint has been grained.

Cornhusker has storage space for 375,000 tons of fertilizer.

PLANT OR WORKS; ILLINOIS ORDNANCE PLANT

EQUIPMENT

PER CENT INSTALLED: 79 (24% increase)

BRIEF SUMMARY OF PROGRESS BEING MAD® AT THIS PLANT; November pro-

duction - 599 tons.

Illinois hae storage space for 100,000 tons of fertilizer.

PLANT OR WORKS: IOWA ORDNANCE PLANT

PER CENT OF REHABILITATION COMPLETED: 38

: . —— ee Pie eT SRENEK,

TO OT! POPE LY Meat ME Lg ose CPs 2 pao + Re

V3

EQUIPMENT

PER CENT RECEIVED: 75

FER CENT INSTALLED: 75

BRIEF SUMMARY GF PROGRESS BEING MADE AT THIS PLANT: It is estimated

at the production schedule meat.

5

23748

L¢L

AMMONIUM NiTRATE PROGRESS REPCRT

‘

oy

>

PLANT OR WORKS: MILAN ARSENAL

BRIEF SUMMARY OF PROGRESS BEING MADE AT THIS ARSENAL; November pro

duction ~ 6,071 tons. This figure represents 571 tons over and abov:

schedule.

Milan has storage space for &,000 tons of fertilizer.

EF : :

?

5 December 1946

305

dn

a

PLANT OR WORKS: NEBRASKA ORDNANCE PLANT

PER CENT OF REHABILITATION COMPLETED: 85 (10% increage)

PER CENT OF CONSTRUCTION COMPLETED: 62 (12% increase)

NUMBER OF CONTRACTOR PERSONNEL ON SITE ENGAGED IN REHABILITATION

C : increase)

EQUI PMENT

PER CENT RECEIVED: 94 (4% increase)

PER CENT INSTALLED: 70 (15% increase)

‘

BRIEF SUMMARY OF PROGRESS BEING MADE AT THIS PLANT: ‘This instal-

Iation is to commence Operations week of © December 1946.

PLANT OR WORKS: RAVENNA ARSENAL

PER CENT OF REHABILITATION COMPLETED: 80 (5% increase)

PER CENT OF CONSTRUCTION COMPLETED: 70 (7% increase)

NUMBER OF CONTRACTOR PERSONNEL ON SITE ENGAGED IN REHABILITATION

’ decrease)

EQUIPMENT ae

a

PER CENT INSTALLED: 75 (9 increase)

BRIEF SUMMARY OF Ook s® BEING MADE AT THIS ARSENAL: 458 tons of

e ser ¢ ammonium rate were p on ring November.

Ravenna has storage capacity for 10,000 tons of ammonium nitrate

‘(fertilizer grade).

—y

23749

~@ @

306

AMMONIUM NITRATE PROGRESS REPORT , & December 1946

iV. GENERAL

ee the enbarce and the drastic effect that it may have

upon operation of fertilizer installations, the following teletypé

was sent 5 December 1946 to subject installations:

"IN VIEW OF CRITICAL SITUATION CAUSED BY EMBARGO, THE

FOLLOWING INSTRUCTIONS ARE ISSUED: BRING NO NEW UNITS

INTO PRODUCTION UNLESS PRESENT OPERATING UNITS HAVING

EQUIVALENT CAPACITY ARE SHUT DOWN. CONTINUE REHABILI-

TATION INCLUDING IDLE TANK CARS. OPERATE AT MINIMUM

RATE TO UTILIZE RAW MATERIALS AND/OR STORAGE TO FULLEST

EXTENT. RETENTION OF OPERATING PERSONNEL TO BE ON

BASIS OF CONTRACTOR'S RECOMMENDATION WITH LEAST DELAY

FOR STARTUP. KEEP SEPARATE COST ON EXPENSES INCURRED

AS RESULT OF EMBARGO AND REPORT TOTAL AMOUNT TO THIS

OFFICE IN LUMP SUM AS SOON AS POSSIBLE AFTER LIFTING OF

EMBARGO." ©

3. WW. SMILEY /

Mejor, Ord

Assistant

; , \f7'' 308

e t ‘ © : :

- ae , = 5 °

| ae

» é ~ , 3

Chief of ladustrial Service

Chief of Ammmition Div, I. 8.

Bffect ef Freight Babargo on Fertiliser Program

1. This office has been advised by the Transportation Corps that the enberge

on freight, which becomes effective midmight Thursday, 5 Desembe>, will prohibit

the shipment of fertiliser end the rew materiale therefor (ammonia and amoniua

_ mitrate eclution). In view of this situation, the Ordnance Department has tue

Jehcices with respect to the fertilizer progrem: Ape oe Rg

a. Aek the Transportation Corps to request permits for the shipment of .

anhydrous smmonia and asmonium mitrate solution, (approximately 80 carleade per day).

The Transportation Corps has unofficially advised this office that thay believe that

such permits might be obtained. Since the urgent request of the Departecat of ante

Agriculture for permits to ship ccmmercial fertiliser was refused, it is not

believed that jsormits for the shipment of War Department fertiliser would be granted,

However, the graining plants could store the finished produet in warious lead line

buildings for a period of at least 1 - 2 monthe at the present rates of production.

Thies office has checked with Safety and Security and they have no cbjection to the

storage of this mterial in this type of storage. |

3 b. Shut down the ammonia, ammonium nitrate solution, and graining plants

as scon as the storage at the amzonia plants has been filled, imeluding tank care

now on the tracks, and the solution plants have provessed all of their ammonia

steoks. ‘This, of course, would necessitate laying off thousands of workers and

the re-recruitment of these wirkers or replacements for them, in the evext the

progrem is renewed, would present a very difficult prebdlem. in view of the knom

short-term mature of this program.

Tae ETS Toy Cote ine Siete op peer ome aie pens ees ae ihe a SNP Boats Bl

“3 Pa ee) Brey Wea SSAA RE Al tye ab geb ls whine ee he AMR TET aS

Scie, ARICA,

5

4

HRC A ah S Tyitm oS Mat ope Gs et ese 4S 4 € $5 “i e wg? ee esnis AY are NOC ASE tsi f we , wey Sek S78 Rey ey ‘ pean Ae ii. r eS Ft jie he

PROM Mien Pitt en Mor APR EN MERE Saree COTES Oe oT CEU Nant y Ther eee menwer EM rn ae Nese eee eee,

“a 4

4 Sans ma Pee LSS oe

SEA AK ERNE Qa

ARIE IE AOS MLNS FF AIRING 5 PO RRL INN EN IO EGE

OP agent tery

SS Bi, ORIEL Uy

2. In view of the fact that the request of the Departaent of Agricul ture

to permit the whipment of commercial fertiliser was denied, this office recommends

that mo effort be made to obtain permits for the shipment of either the finished

fertiliser or the components; such as, anhydrous ammonia and ammonium nitrate

solution. However, in view of the following excerpt from Mr. Snyder's letter of

28 May 1946 to the Under Secretary; "Accordingly, I request the Yar Departasnt to

undertake such a program without delay and to take whatever actica is

to expedite the attainment of maximum production”, it is suggested that this matter

be referred to the Office of the Under Secretary for final decision. tid

r

|

5 fg

. . b 2

AID SEM IANS

0. K. JAK

Col, Ord Dept

23751

ea

Gy. 24 Ind ata 30 Rov 46

winch

¢

CROLY-L 471[00/80866 Gon’) 6th Ind

om

“WOhief, Amumition Div, I. 8., 28 Novenber 1946

TO: Chief, Safety end Security Div

For your inforantion and ccameate.

” ey

td

1 Inc ees O. M. JAK

n/e te Col, Ord Dept

3

For | | 23752

J. H. PRARRE

é>4} hi Shea sate ,

ee Cae ta ie a BBY et

BA indie

x ise bp

PDE uel Ve Se

Pid >

Dadiotind hitters

hie as

Pgs KM

ROME LSTA Pn tae Nee

Rigo i “4G SS eT ha VeRO fae Mahe i Pee? he

‘ ae PU os Apis Wg re Id | Dicks bee a

ER te ee ea rk ate: ren eed vor des ogee are

win Dit Leer ® | : Yoo

Cer gh RO hae ae ead

PRS oo NA ag OCS SON Big

vg aPar KS Ed Sono d binkl | Le

muy 1@ Novenber 1046

MEISEL NA LEBEL LE LE OCG ELLE I ERS EF DIDI i

\

\

‘

ve OR

2235 23733. < o

x PG!

3 , v3

be : f i

2 i

1 3 i MU

is a aa i

aul Hi

| nye naa ay

ii aE i §

’ @ &

cet

re

@rcur/a, states of w 1. + Program, 15 Bev bo, vent'a.

(23755 —

CRDLY=i. 471.86/36866 Geni. tnd Ind Moyne! és/ jrb/3314

Chief, Aumumities Diz, 1. 8., BD Getebor 19466

TO. Ghief, Safety and Security Div =

Pereuréod for your iaferaation and comments. ee

(

Chief, Aummnition Div, i. 3., 8 econ: ides

Tr 0.F.D.A.P., Joliet Arsenal, Joliet, illineis '

Forwarded for reply to questions in Ird indorsemafit..

Oo. BH. dAuE

Col, Ord Dept

>°OO1k

0C0 ¥ £3

7 Voveanier 194°

-* . - q . + . ” a *,". meses Os

STaubard) OMfPATIIC PROCES Poe PT UL.

-—* «=e

*

sunctions of the *-vwnition Jsivision, Industrial Sacvier, sydnance Soparcment.

——_——— er oe

Responsibie for complote planning of tie wirufacturing crogram and

mainteinin; liaison with other Governri atal ¢comcics, such as Office of

war fobili:ation and kesonversion, Civiidian irocuction .dainistration, °

: and the Ofice of Vefonse “Transportation, with onriicalar eomphesis on

a the supply «i coke and tan cars for the program. ‘ho foctunition D: vision

* maintains close contact with the Transportation (orps ca the tani: cnr

x supply program. re

Ammunition ‘:ivision Porsonnel to contact revarding rrovran:

Colonol w, if, Jank - Chief, ArmunStion bivision, 27-443, 'Lxt. 6769

% ir. HM. 4. Roynolds ~ Technical assistait, 28-448, ixt, 3314

% Dr. it. U, Bongis - Chief, Facilities trench, Amminition Div, 2i-430

| Uxt. <C24

Functions of the Field Diroctor of Amaunition Plant3;, Jolie? arsenal, Jo.iet, Ill.

ay Responsible for the production and plauniny of shipping schedules

of all rev »mterialo and-release of end product to (CQ.

Production forecasts will be forwrerded to CQiG (thru CO) by the 10th

day of each month covering prodiction for the fellowing month,

Rovisiongs in sehedules arc to be Sorwarded to GoiG (thru oCcu) as changes

occur (increases or decroeses in prsduction of 1,000 tons or less to be

reported in regular weekly reports = chanzes smountin; to more than 1,000

tous to bo reported by teletype at time of oce uwrence).

; Urdnance plants, on receipt of chippin;, orcers from UG, will order

= daily requirements of cars from carriers and prepare bills of lading for

a shipment. It is cxtremely important that Shipoing orjers be prepared in 3

a full showing all information necessary for completion of bills of lading,

BS i.o., Consignee, routing, port designation und overgeas code in order to

3 avoid delny in shipment as no storage facilitions exist at Ordnance plants

. and finished fertilizer must, of necoscity, bo loaded in care as produced.

2 Delay would rosult in heavy demurrage charz.s us well as sevore criticism

4 because of the delay to critical reilway equipiwnt.

s OFPDAP personnel to contact in Ammonium iitrate Fertiliser Program:

3 Colonel J. G, Hlolmes - Phone - Joliet 2-6661

Za : Joliet, Illinois

= Mr. H. T. Groen

* Trafrio Lanayer - OFDAP Phone - Joliet 2-6661

S 4 Joliet, Illinots

23757;

TS RE LEAR AE CRE A Ee ee

ONIai

ow Sine

BROT tena | Co

iss

Sy) ERE

al. fies -

BVOC

STAIDARi) OP.RATING PROCEDURES FOR TIM: “AR DEPARTLNT

+ “i , rw ‘ 4

Functions of the Treneportel= <or ee , Procedure for Keloase and l'ovement

° r sor an te. :

1. Planning, Intelligence and hovaments Division is responsible

for the assembly and coordination of information and planning date

sooured from Service, Supply and Proourement Division, "DGS, Office

ef the Chief of urdnance, and uffice of the Quartermaster Generel.

Disseminates this information to Commercial Traffic Service and “ater

fran@port Service, Office of the Chief of Transportation.

2, Technical Service (uartermaster Purchasing Office) requests

raleases from Freight Traffic #ranch, Commercial Traffic Service, advising:

oF

badd

a, Name of shipper, point of crigin, and carriers sorving

>. Commodity >

e, Guantity (number of earloads), woight and cube

d. Date available and daily shipping capacity

@. Overseas destination or marks

~

3, Transportation Corpse arranges port and shipping progran.

a. Freight Traffic Branch advises Ocean Traffio Branch, Water

Transport Service as to the commodity, overseas destination, quantity,

when and at what rate avail.l)s» and the preferred port, together with

auch details of the ob.igation as are known, and requests that a ship be

bertned on a specified date consistent with these factors.

b. Ocean Traffic Branch indicates whether the proposed port

is acosptable and when vessel will be on berth. Also whether arrival at

port as scheduled will provide efficiert ship loading or whether stook

piling is essential (stock piling or storage will be avoided when feasible

to minimise cost; if oasential, storage will be arranged by Freight Traffic

Branch, Commercial Traffic Service, in collaboration with Osean Traffic

Branch, Water Transport Service).

vs

4. Preicht Traffic Branch issued TCR releases to Teohnical Service,

specifying port and dates ship will load, with required forwardine, schedule.

5. Froight Traffic Branch nseumes responsibility for rail movement

from origin to port, taxes steps to assure proper car supply and advises

Ueean Traffic Eranoh irmediately of any change in actual cargo availability.

Freight Traffic Branch maintains record of movement to the extent néo-

essary to protect vessel requirements.

a. Freight Traffic Branch advises AAR as to everall car require-

ments ia accordance with monthly projection and of each release furnished

ané talss corrective action with the AAR arid individual carriers in the

event of a deficiency in oar supply.

23758

‘ STANDARD OPFRATING PROCIDURUS FOR THis GAR DEPARTEIT

F’RTILIzrR GRAIL A.LONAU NITRATE PROGRA. (CONT'D)

6. Ocean Traffic branch ie responsible for berthing the vessel

as acroed and immediately advises Freicht Traffic Dranch of any change

in vessel datos, Cceon Traffic branch arranges for loading of ship

from cars o.- port storage and for the sailing of tho vessel.

a Corps rersonne] involved in Super vicion of Fertiliser

uC?

Colonel Kenneth |., saa sxxeoutive to AC of T Ext. 72626

Planning, Intelli;ence and Hovemonts Division

sotoasl J. kt. Uessersmith, chier Ext, 2482

tir. &. RR. Tasxer : Ext. 71368

>

Commercial Traific Service

Colonel 2. C. R. Lasher, Chief Lxt. 2872

Lajor D. L. Smith, Executive — Ext. 6605

Majo> L. Db. Lally, Chief, Freight Traffic Branch Ext. 2719

Mnjor J. i, Higgins, Deputy Chie/, Freight Traffic kxt. 2946

Branch

ir. 11, FP. Dowell, Chief, Port Control Unit (kcleases),

Freight Traffic Branch Ext. 5630

Viater Transport Lervice

colonel W. 5. Eliiott, Chter Ext, 5175

Lt. Col. T. S. Lowry, Executive Ext. 51765

Mir. ric ‘J, Jones, Chief, Ocean Traffic Branch Ext. 2675

Mr. &. L. Marshall Ext. 4617

ir. . J, Kilroy axt. 4590

Punctions of the Office of the Quartermaster Geroral.

1. Mission

a. by directive of the Secretary of War procurement has been

directed and contracts have been made with various commercial producers

of nitrogenwma fertiliser with the following coutrect stipulation:

"On and after 1 January 1947, the War Department will deliver

on request to the contractor or a third party (Including

covernmental agencies) designated by the contractor a quantity

of emmonium nitrate fertilizer produced in War Depertaent

fecilities equal in terme of nitregsn content to the nitro-

genous fertilizer purchased from the contractor under this

directive. Not more than 50 percent of the quantity so to be

delivered will be made available @uring the period

March 1947 and not more than 60 percent will be made available

during the month of April 147. Any undelivered quantity will

be made available during the period May-June 1947".

jo 9759 /

f

STANDARD OPTRATING FROCRDURKS FOR Tie ‘iAR DEPART UT

GRADE AMMONTUM NITRAT.. ROGRAL. (CONT'D)

b. The Secretary of Nar has also directed The Quartermaster

General to act as the agent for the “ar Department in effecting any

delivery of fertilizer, the return of which is requested by a contractor

under the terms of paragraph 1 a. cited above. ote

o. It ‘has been turther directed ‘that the Quartermaster Corps will

undertake the distribution of ali urdnanco produced fertiliser grade armoniun

nitrate whether for shipment to « port of embarkation for ovorsess shipment

- or for redistribution and replacement to commercial producors currently under

contract with the wusrtermaster Corps.

2. STAFF RESPORS IPILITIES:

?

In the furtherance of this mission the following staff sections

of the Supply Division, Office of the Quartermaster General will be

reaponsible for the following actions: /

‘ t f

a. Procurement Policy Branshs

(1) Will establish policies and procedures by which all -

activities of the staff and operating agencies of the

Quartermaster.Corps will be governed when such activities

pertain to the distribution of Urdnance produced fer-

tiliser crade amncnium nitrate. , ,

(2) Will be the central point of contact with the other

technical services concerned in this program; namely,

the Ordmance Depertment and the Transportation Corps.

(3) Will receive copies of production forecasts and produoctica

echedales from the Urdnance Department end notification

of any drastic changes in schedules or published programs

that may affect the operation.

(4) Will receive and distribute instructions and ordere of

the Quartermaster Goneral pertaining to the program and s

transmit the same to the appropriate agency. .

bd. Gencral Supplies Branch:

(1) W411 iseue all procurement directives indicating operating

<7 procedure for the (uartermaster Purchasing Office, Bow

York, and will issue-all changes and amendeenta thereto. .

(2) W4ll distribute information copies of procurement directives

and changes to all interested agencies.

Diy ly nia aaciredlgmhanrery Office, New York, will be the operating

aowary Quartermaster Generel in this program and will be respensib)

po for the following actions. ’ : ,

Ph ee Ge pom” ee.

Sle 8S

SBP Be acts Sa abenk Bee Bese ela hey

OE SESS on ge ea Sea dl Bio ae a a Ste

AN DES GRR MONDE Pai tabi Se eas

as

me ng a aaae rare oF Sk Se eed

AE te nate ae WA ULa CE Nay Sil

Ay a)

an 8 ar AS eR Ep a Pca ie a ee EAS RE EPO SaL Oe MET ERY pet as a nee Cyne Seo),

Galata EGBA TN Icy FLORA va SC ed ia Ail ni cate ee Ashita 1%

—

= . .

g PSOE Me ne 9

%

- r~. . at

STAMIAIG) UTURATING rROCLUURLS EL TU. Ta DO PARTIMGE Z7

FURTICYZOR Chauk AMON: RIMAGE SUT er (Sunt).

a. Will be respopidible for Quartesry cicr Optrativas per-

taining to the distribution of Ur inane) produced asmonium nitrite

whether for oxport or return to “omuersiul procuc+re, *.

b. “i412 maintain clos® liaizon witn

the Fisld Sirector of

Ammuunition I'lantc in the precrao. x

—

_ @. Will upon the basis of Ordnance production) schoci.les and

procuremont directives roceived, s

Service, Transportation Corps for shipment of fortilizor grade

niun

nitrate from the Ordnance plants to ports, comercial’ contractors, . r

desipnated third parties. eS

d. 7411 issue shipping instructions to Ordnance plants.

Office of the :.uarternaster General Personuel involved in the /cmioniun \

A eee easSestsnesasste-steeetiegestenanee

itrate ‘rocram. - *

j

Colonel S. W, Smithers, Ch, Proc. Pol.’Br. 2051A lint. 3406

(In the event that Colonel Smithe:s cannot be~reached, the

following branch representatives cary ke called).

/ : eS ,

Kajor J. J. Mann,/Jr. i..q. Br., Mil. Plan Dfyvy 2426. txt. 2130

Captain A. J. Vowmey, Proc. Fol. br. 2605A F#xt. 72952

Wr. T. T. Co » Gen Sup. Br., Sup. Div. f-1044A ixt. 4461

Quartermaster Purchasing Uffice, lll Lcet 16th Jt., dow York, %, J. Y.

: . Gramercy 7-4700

Colonel Il, A. Gardner, Officer in Charge

Kr. J. S. MacIntosh, Proourénent Specialist

tr. U. P, Kurth, Transportation Uficer

**

23761

ecur? TUR's fror: the Commercial Traff.-

ee Ce ee Ee

the purpose of this trip was to inspect fecilities aveiiahle for production

of grained emoniua nitrete. .

aleo nate s trip through the production area with Mr. Beatty anc ir. Fouler.

Production facilities consist of two graining bouses, each containing thres

high-pana and six kettice. Adjacent to each graining house are four storage

then te @ loading hepper. Present plane esll fer dumping kettles at Fr.

by means of reguistion of the speed of the two above conveyors, have tive

hed material eodled to 200° F, before packini. at peosent, hand scales

be used for weighing and wire to tie the packed bugs. Automatics scales

In

tAazas

pre

w

and bag sewing machines wil) be installed later.

event this house-is not ready when solution arrives, the othe’ .cuse

will be started, Here no additional ceeling equipment has been installed. It

ie ready to operate on asthod used befure YJ Day. Recexssary convayors are Gf

hand, however, te install, and will be erected as soon as thu first house is cam

pleted and ia seperation.

Cantractor's reprecenvatives feel that there will be no difficulties in

the way to prevent aceting eeheiule of 3000 tens for November, and 4500 tons

for December.

They woul.) like to have their weeks supply ef liquor arrive on plant, dar-

ing firet five days «> they will have no means of epotting care over & weekend.

Shipping inctruetions have arrived trem .uartermaster Corpe for first two

woeke' produetien. Contractor, however, neode reutings.

A diseuseienm on production reports gava, in detail, to Comumnding Officer

end contractor, information desired by FDAP. Teletype report will be suusitted

daily until further notice in ccecrdanse with code requested by FIMP.

itilan will wash ous approximately 400,000 te $00,000 pounds of THY en their

I

| hoe

aif . 23762

225

Ropers ef Travel to Milen Arsenal eae 6 November 1946

a

present progran. Wash house is not adaptable without alterations for drying

and flaking this asterial to prepere for sale. They are now burning reclained

- THT. A y Tom :

Good housekeeping was in evidence all throwh the plant. nor

A discussion on inspection developed possibility of a bottieneck in

shipments of fimished product. Contractor desires to ship cars without waiting

for acceptance. Ordnance plans to analyse each car and contractor gays he will

have to do the same to conform with terms of contract,

aS

Productien is «xsected to get under way some tine Monday. There may be

two bot tlenecka at this installatios:

a. Waiting for completion of snalyses of finiched material before shipment.

b, Inability of Ordnance personnel to spot al) the solution scars nmecded

for a weeks’ production during a five-day peried, in which Ordnance will operate.

*

It is recommended that 100 percent analysis of finished iota of ennonivun

nitrate be performed by either tle contractor or Urdnance and that spot checks

be made by the party not making 100 percent analyses.

It is recommended that arrangements be made to provide, if nevessary, ever-

time for the Diesel engine crew in order that the @Olution cers can be spotted

on Saturdays and Sundays and movement of empty liquor solution care and full

grained ammonium nitrate cars from the plant during these two days.

OE mone COME a nt

The two above reccamendations have been referred to the ndmdiietreation

and Inspection Sections ef this office,

. DUNCAN C. SMITH

Q Technical Adviser

*

$F 23763

ag

S

®

9

%

S

aguy saavics rences

GCRRAANCE DEPASTHERT © See

—~ “ @2r i

sy ‘is

418g OO!

Sevee, Kee

4

| /

’

a

¢

>

,

Se

4

NF

ost

ry

ant

POA

%

Bes

i.

ey

wae

Be

AEse

ke

\y

oh

‘

Shipment of Ammonium Nitrate

-

ry

Te

‘

‘

a?

k i,

.

yi ae: . apne DP a ne eI Ree tits Gk Ee LS LON sige eee Se ais Ue

flail ih ik pte gaa citi th ceae Wiad Tn A te tvthet ware. Gx as Tig ote ot) ORS hr oF ft Se

pei ea. ae Cs” UR ase CP YE Cs Tae Bale ate : SS Ae

ieee eS era a Bis Se Tite WR 6 ae 20 Pai culate iY 2 SCARS MIT CRAIN StS SP ite bey OT TRAE ep agus (ia

Ee ne Ree Eee ad “ aa ChaNS pepe ee Ss SRS Sh pete ER RHE RE ets tay bs Ee Wines sal bit a PERRIS : 23 at ai as nat

Ds? av Was Ske pee ee RS Le aoe ae hi NaS Bien es Bi oe aioe grate Seok 2

~~

>

i é

-«

~

> a

phates 6 TR nt

Ld

-

-

—

theguant of nents Bitte it 1

: — 3 duns 19h?

| She. OD mh tes OB ni

fe Dea tes te

2 iy 2967).

+o vecmenenads then eomicinet os gercgvegit Sy 65h Sema ee Ads

eed

ote ea eb we nonetery Br sengTiaked ky pour af Yaa, Cee Tieting some eam

of cermapratsnee far sigartars of the Unter Searetesy = ver : So

ay

“st |

V5

stroked eapy of vopart free Of Tlee G@itef <i Tempe

*

[LHDD

?

&

(

Y

39 May 1947

i H

Gafety end Security Bivisiea, Ord.

Gelenel 6. EH. Deitriek

Reena 18-430, Phe

Subject: Storage of Amueaiwn Bitrate at Revemne

“

Pe:

it

pT

ef

hav

inept Reen 3038, eo 2 Bldg., 1901 D M., H.W.

EIB Ny s Pe aS SP Ete, hl MehesARS : PRR RYE R ea et

RO ent Pee ed Eee SA GRE are Mees ee PA et ae he yy ee ae ty oi PR ee Ye * Rie ebay

(RAS i eee rot ¢ SEs TENE 4 He! 7y MKS ; ac a ES

* pens a 3 teases Le Ty mel yee *, sit PA ea ae Niky COL ate aie eee

Severna ne em Een one re promo me pete ere Na ro

ta oe ye A * Cte ate aie peat aint . d

ua oe.) poe j si

23767

eee

|

:

:

Fingh Point Msigtare . Biber Soluble

iii

o eer ® 5D yas PML AS + _ © PRR NER DE Pee Be es -

but ih

a aeq at) a ‘Wae fe ah,

i il Hae

453 2) tube! +e HH

aE HALT at Uieas

aa nadie ele ites

fa li : wie, fiieef

ai ad i Te i aa

be 7 oe He i ii by HE

i if 1 ls

hil the # ia

23769

ORDLY <I

Toy 060, Attys Mire de Adelman

gam as ;

A {2p {wu Fé f 4

— ~* ia

oe,

aoe

e

38 may ls

a PA Sar oce

a) ae "rane et

RES Sic Ree ehe rt ee ee a Pe OE Ie Oe)

ae 2 bats ise"

: Dane te UE Ue meee Pee RET EE a ee 2

Mee ee Penge Se Ree See vA oa GP, ee

ef te shen

with warm ameonius nitrate fertiliser, Thay have alse reported a

that bags exposed te relative humidities abeve 50% will abserd :

enough meistire te exseod the 7X moisture centent that they ccn-

sider eritieal for ammonium nitrate bageing, Rewenna Arsenal 3

has made moisture touts om represurtative bags in storage and 3

found, is

Bagpok bags 5.33 meisture 4

Uaien bag 5.87% 0 i* 4

@eorge 4 Sherrard 5.49% . 4

Raveuna's bag storage is a triek building, werein the bags are d

exposed to atmospheric lumidity thet is normally in the renge ef fe

60%. Presumably this diserepanay is due te the shipping packages :

retarding the dampening offeet of high relative humidity, |

weisture from the air to beeome damp, will eause serious damage

te the paper, This damage insludes diseoleration, loss of a

strength, and embrittlement. Speeial tests eenducted at Iowa eo:

Ordnenes Plagt shew that the inner ply ef mlti-~qall bags suffers S

}

degradation after twenty feur (24) hours heating in am even min

tained at 100° 6 (212° F) under eonditions wherein the paper is

imbedded in a dish ef ammonium nitrate fertiliser, At hi gher

‘emperatures the degradation preseeds mere rapidly and at 140° 6

e 23770

*

ER SET rahe ctr ca Acca t path the gon cee

§

al

Hi

ith

CEL CG, BOL

z

;

}

fi

ee:

060, Zafety & Security

Aree)

PIE NE LEY Sih SS AREAS CNP RAEN SARI My hl OA NT R R e s 1 NMY Ball WU oae: NL OT) gee ate a I CIR AOG LEC ese PT WETS aby His KANE EB paha tea yl Ure seh IRAN AS role Ce tN lr Snel ot atte

, “e

* ° . ‘ ‘

7 2 ,e« ? — « . . o*

Pe ~ ze.

‘

. 2 . *’ . al »

3 ‘ - * ‘

> ¢,

. .

. ¢ , °

4.»

*

e ® t 7 ye

, ~ e s

’

‘ ¢ .

.

-

a ° -

.

. .

‘ a. s

: » . oy

‘ ® : eo - : ° “ " ~ ‘S

s . - - _ ko

. ° : ‘

. . 7 :

;* . ‘ e

° . + ‘ . -

- anid . a

. . *

. . {*

.

‘ ”

. ‘

*

- 4.

.

= #

\

‘ 3 bs

-

+ ° x

3

e =

Sad * r

e-

.* - *

° .

‘ e .

S

‘ e +9

. i

. =

é 24

’ -

,

.

4b Bs

SP ihe bb oy

oH ges.

LE Pe Be

*

7

.

se Legge

Cee re

A th

‘

$

Sig

e

50) eas

Of a

’

\

¢

’

ogen

ee

at Pees

[AY Ptuw ae

5 tak Ys

y

Verne

ne

peers

én

fe

A

‘

>

.

.

.

*

r: “«

Ae *

eh Fels fee

Vt Meh oe

Tree oP bikie Pia

Eat oe fart

| WD, Ord ©, Machington 26, 3. 60, 29 my 1807

: ' Raver aromal has tern yequested te cubalict te eveenn2

| Maan sLlotmant 706-1898 P 180 A 117ER0D to cover tote ef homuniom Fitwets

ORDNANCE SEPARTBENT

ARSENAL

PIC

— eaune / 7/ g69/199-19

23773

Yo

* CR AD ASA NR AERC RI Sn pSliia ONC I INGRED E ak es

as

OCD WU) “539 :

SR AOS

ORDNANCE DEPARTMENT ~ - reaopn

PICATINNY ARSENAL WRTomlinson/PFuacy/rr

Dover. New Jeansay ioc 2223

| MAY sed

Gn EbY 19 et.

weg |

SUBJECT: Investigation of Ammonium Nitrate Fertilizer ~f-

7 —>

TO: * Chief of Ordnance _\~—=

* Washington 25, D. C. | Bee Eh Bi

| | | Si

' APTENTION: ORDIM Vy o~

1. In accordance with the Pat ae reached at a conference in the

Office of Chief of the Industrial Division, 16 May 1947 a swmary re-

port of the work done on the subject investigation during the week

ending 23 May 197 is inclosed. There is also inclosed a summry of

the work to 15 May 1947, not previously reported to _— Office.

2 In the first mentioned report conditions neseabart for the

spontaneous ignition of Ammonium Nitrate (A.N.) fertiliser are in- |

disated. Further work is being ame to establish the minimm conditions.

The first report also shows the progress of analyses to determine the .

presence of impurities in the bags used for packing, and the conditions

which cause charring of the bags with and without fertilizer present.

Preliminary experiments made in an effort to cause detonation by heat

ang on rate of detonation of A.N. fertilizer are also recorded. It is

indicated that the fertiliser can be detonated in a 1$ inch file when

confined in Shelby steel tubing at a density of about-1.0 gm./cc. and

beostered with 50 gm. of RDX Composition A-3. An attempt is being made

to determine the rate of detonation. .

FOR THE COMMANDING OFFICER: .

7 ee

ae * , 15 Maya’

; Ce. R. DUTTON

1. Summary Rept, 23 May 4 be trip) Col, Ord Dept

in trip) Assistant

1 " .

'y?

23774 a ays

‘BaSNI

. {"

*, Z '

' @ se

~ a f

he dak eg i,

\

SECURITY CL2 CATION t1/ eng!

WAR DEPARTMENT

DISPOSITION FORM | - 307°

OCOISE Zam

toChief of Ordnance - fromDirector of Service, ae

on Supply & Procurement, WDGS 1 may 1ga7 Co

1. Attention is invited to attached copies of correspondence from this office to

the Ghief of Transportation and The Quartermaster General in connection with the

ject matter. In this connection it will be noted that special effcrt has been reque

to effect timely and expeditious shipments of ammonium nitrate manufactured in plants

operated under°the supervision of the Ordnance Departmet. It is desired that the

production of ammonium nitrate in such plants be continued to the highest possible

degree and that all deterring factors be eliminated.

2. Itis accordingly requested that conbelenaa Ordnance activities continue their

efforts to achieve this objective and that continuing difficulties preventing such

accomplishment b. reported to this office. |

"BY ORDER OF THE*SECrETARY OF WAR

posP/2) 22085 — Shipment of pana we Nitrate at

y

~

NS

I

- Aes

| } ee

& we i ” ; % a

rn aaa Fg seat ‘ab

} 2 Incis LeR. LUTES, Lieutenant General, GSC is es

l-Cy DF to C/Transportation Director of Service, Supply and Procurement @ © mS

2-Cy DF to The GG (gt Rated

Copies furnished:

Under Secretary of War ae

Chief, Civil Affairs Div., /SS , . »

A

=4

(ite Vials Rade /

; seek iy i 2 12D ’

WD AGO Foam 897 ioe é 4°) Lt GOVERSMART PROSTING OFFICE 19486 ~D9580

MAY ‘946

it

at

i i

ni i

i ih

ath Fr i.

3 task

a

Lae fy Grd dept, 1h ey WT

‘Seo Mane fer Keceré on Case T12h7

23778

oo <— = i i i i al

~ ——s ~

Ate

60o I (7¥

fit

7"

dy

Ran p

it

A

izy

SERTABLE TA

i ete

al Se

AL

HT

as ee rh ere err

ee ee

en

ae

Dre (; 2

4

237977

CL oN Neh SOS hoe. pple daa as etch ie tae eRe Bie

<

z=

tal

+

a<

7

e >

» z

3z

<= =

o<

ou

a.

»

oe

hia

WAY 25%)

many

earga To

$F. -f

“

GO?

m Bitrete

emme-e 7!

URINE:

ss

an

Be Si,

io

sf

a

23778

SOT: iemeonian Zitrate

(Vertiliser Grade)

eomsnina aitrete, the ralstive ef feotivences of the ceating agente

themselves against asisture trensaiizcion and the aneunt of ponotretion

ef the coating agente inte the anmeniun uitrete grains.

ea

: gy TS Roper? Be 120419 (in dup) Gea ane teat

P ae aes itn ie Asal stant

:

ie

eon e 2 93779

i at i a de i en ee

HEADQUARTERS

ARMY CHEMICAL CUNTER 7G

SOCEWOSO ARSENAL, MARTLAND rv

5a VIER GF OFFICZ OF THE POST PIKE MArSHAL

Pru #71.86/1 : ; \ : wan /ef

| “\ 7 May 1947

\

\

SUBJECT: Fire end Explosive Hazards of Ammonium le and Processed

Mixtures

ee 000 18-22) o®

i

TO 4 Chief of Ordrvance, Washington, Ds Ce \

4

\ | ~

le Enclosed herewith is a copy of @ report from tine Bureau of Hines Cy

on the impact, fricticnal impact, and static spark. sensitivities of mix-

tures now being processed at Edgewood Arsenel, \

2. This report indicates that the mixture is non~explosive and pre<-

sents no danzerous fire hazarde This report is not in ecoordance with

the provisions of Paragraph 70 b (4) 0.0. Form Noe 7224, Oranance Safety

Manual, dated 3 May 1945. Special instructions are requested for the

- olassification (explosive content) and for the storage and handling of

these mixtures under the following conditions:

Se Quantity distance tables for « maximun of twenty four thousand

(24,000) pounds in processed fuel blocks weighing twelve (12) pounds eache

be Quantity distance tables for a maximum of eighteen theusand

(18,000) pounde of processed blocks (weighing twelve (12) pounds each),

each block sealed in a metal container, i.e. top compartment of floating

smoke pot E23. The bottom compartment of the floating smoke pot holds

approximately two (2) gallons of fez oile The E23 smoke pot is fuzed

with a Cal Corps M15 or M16 igniter.

(1) Specifications for fog cil used in E23 floating smoke

pot are shown on chart on Page 2.

23780) Vie

7O

“}

>

PFN 471.86/1

‘type Sor-l 3 , Type SGFr-2

Requirement 8 moiXe e t are Mire

ry 2 a % ‘

Flash Point ; *-= ¢ °-- Pitekateall ry S20°F ,

Viscosity, Saybolt Universel, lOOOF. 4 --<- 3 ooo 3 110 : 100 _~—C

Viscosity, Saybdoit Universal, 2100F, 2 60e 3; *-= 2° | : =

Conradsogz carbon residue 3 Ol 3 <= s Gel. 54 em

Neutralication number : Oel ~ oe : Oel 3°

Pour Point . 1 OF, 2 om= minus 40°F, ---

Distillations Vapor tempercture, at ; : 2 é

10 mme avsolute pressure, at * ea : ; 2

10 percent evaporation ¢ sn : S9OCF, 2 === 3°

50 percent evaporation : = : 4900P, ;: oa g oon

90 percent evaporation : 610°F, ; o-- a ¢ «co

*A viscosity of 65, at 210°F,, will be the maximum permissible for oils

having a Viscosity Index of 50 or more. |

Se Paragraph 70 o (6) 0.0. Form No. 7224, Ordnance Safety Manual is

snot in accord with laragraph 165 a (2) Ti 9-1900. xeouest instructions

as to the procedure tc he followed in fichting fires of this typee

FOR THE COMMANDING OFFICER: |

1 Inolosure 3

Bureau of Mines Report

| chek %-Srdow.

RICHARD 0. GORDON -

Lt .Colonel, Cal...

Aset.Executive Officer.

Y

LEGION gn

\)

‘o Calor ¥*)

ompapt ¢7/. og Sel ) ery

suaJact: /sanseiun Bitrate (Pertilissr Grete)

TO: Uaief ef Ordmme 7

Hashingtes 25, OC ,

ATTRETIGN: Col C. B. Beitriex

Safety end Security Oivisien

lL. ‘There is inslesed in duplicate Chemienl Laberatory Report Be.

specification tests and misressopic

qiamination of twenty-four (24) samples of aamenian aitrete fertiliser

wbieh were received fron the lows Ordnance Plast, Durliagten, lous.

FOR THE COMMANDINO OFFICER:

Cc. &. WTTta

1 Incl Ceol, Grd Vept

1. Chem Lab Heport No 1203% (ir dup, Assistant

-_

~*~ 5

Lay

2. The results of epecification tests shew that all of the

eanples comply «ith the reqeiremsate. Tee alercecepia summon ti

ef

eotathap L senplovely pated with wax ont thet o unjerity of She

vee nien partisiee have enly © amall portion of their surface coated

with wax.

POR THE COMMANDING OFFICER:

23785

Lr

Q.06 47086 USP let Inf

COED 47.869 /190=3 A

i. The teste outlined in the beaie letter

eharnetar (at ee

ef dehemzming oertaia

conbinetions are very setisfactery. It is

af saseaceiara

toe pina

SES,

tests be contusted a8 vee as prestisable ani espies ef the test results

ZOtS 4

mae

at

7

a ;

if

bf

ail

23785

be BONS ia a ain al Net Ee ree

0Cco 15(28)|

ch Be |

WwW TRPTT)

re "

iP ‘2

~ ;

od

A

oe

(

ar

eae

dS }

i ait

me, k

Pt

of

ond

s

+E

wt

} Sale *

<|\" g

, & 4

2 >

/ = z A |

) 2 = ral

ts/ c-

2 i g

. $0

= f

3 }

| B F

i 7 '

-4

= Sti.

ere

_* a*

on

i —_ = yo

\ © AS

fi ly

it

j

it

ii At yi

i!

i

Wa

iat

Ht 1

i

iy

a

.

if |

i

a Lil

i

CO 45( 50)

i

el

vl

Hit

Ne

lit

i

it

igh

Lil

Ht

t it

il i i

We Wt :

ee Pe

ree RICO

23789

.

“See

Pid. COtn .OCKTONE OAD BE AOBGREPOIEED UY CAREOM GOry A... AGGSURGED TS

x

“SS

REO CED nw

TO WEDURE PROSEPT ATTENTION WAR DEPARTMENT ranaynsite/ 36/PO

REVI SGPER TO

OF¥YICK OF THE CHIEF OF ORDNANCE >

| WASHIMGTOM, BD. SG.

ATTErom OF : $

a | Dy 13 Marek 1967

Re

‘ © ,

SUBJECT: Shipping Orders on Pertiliger Urade Ammonium Hitrate :

TOs The .uartermaster Generai

—- ~ ~

ATTSTIOM: Major Mellhaney, Temp A, 2603

1. ‘nelosed is a copy of & memorandua’ from the Field Director of

Ammunition Plante to this cffies dated 4 Marah 1847, subject: Shipping

orders on Pertiliser Oreds Ammonium Nitrate, file 0.0. 471.86/441,

with inclosures,.

2. It is requested that your office consider the recommendations

meds in inclosure memorandum and advise this office of your coments e

or recommendations or action taken.

POR THE CHIEF OF ORDMANC®:

\

1 Inol O. Me JAMK

Cy ¥Yamo dtd 4 karoh Col, Ord Dept |

_ w/8 inols Assistant

\ fA.

\ é

} ‘

|

: eee: .

: ay vi

i WA ?, \ ‘

; oes :

me 7

ee ay

Yiag. Gro. CY *

c “

23796

y - es Tas

Saree ; 4 p Sts bees

RSCORD

Mice Memorandum * UNITED STATES GQYERNMENT

=? f £6~ 11 War CDLyons/ok/5205

TO ; OCO, ATTN; ORDIM “~~ DATR: 4 Merch 1947

From : Field Director of Ammunition Plants,

ATTN; ORDLY-E

suBjEcT: Shipping Orders on Fertilizer Grade Pe a Nitrate

1. Reference is made to the attached copies of shipping orders covering ship

ment of fertilizer grade Ammonium Nitrate for the month of March 1947,

9B 1H OD

2, Attention ie invited to the fact that shipping instructions attached were ~\

all issued, with the exception of one, on the 28th day of February 1947 by the aN

Quartermaster Purchasing Office, New York, N. Y. It was the underetanding of this —_

_ office that all graining plants would be advised of shipmente in sufficient time

~ “4n order to sllow them to plan ahead and to eliminate the necessity of storing

nished material. The late date of issuance has also been generally true in past

.. months,

a 3. It is to be noted that shipping ordere require that 25 empty bags are to

be included in e&@ch car to cover’ breakage, On the basis of the present sohedule -

65,000 tans, and at the present market price of bage - 13 cents each, the value of

empty bags placed in cars, over & l2-month period, totals approximately $53,000.00.

4. Shipping orders also require thet repships be made on e@ch shipment from

the graining plants in general to the foilowing;

®. Quartermaster Purchtsing Office, New York, N. Y.

b. Consignee or Consigne:s

7

5S. The above, information is brought to your attention for such action as your

office may feel is necessary; however, it is suggested that the following reccamen-

dations of this office be soted upon;

&, Quartermaster Corps be again requested to issue shipping instructions

by the 20th of each month for the following month in order to ellow for proper

pleaning at plant level ss regards handling, storage and ordering required box oars.

| db, That Quartermaster Corps be requested to replenish Ordnance operating

‘ funds being expended in sending empty bags with eash shipment, since it is felt that

the range of expenditure of production funds should not be extended beyond the

shipping of the loaded oars, in the absence of the adaptation of this recommends-

tion, it is suggested that the Quartermaster Corps be requested to contact all

ocneignees and &sk that 811 empty begs received and not used be returned to plent

of origin,

ee sc. All repships sent from plents on finished meteriel be on & collect

= basis, °

6. Action on the above recommendations, or comments relative to sans wy ySar

fice, will be @ppreciated,

of .

/ : ; i YW fs

6 Inole

5:0. 30-2806168-47 30-280-10908-47 JOEL G. HOLaES wae te ey

| 30+280+156=-47 3042801 55-47 Colonel, Ord Dept / Qn

4-30-280-124-47 30=280+157-47 99791 . Wile hin 2%

-f ar ‘

eae

we eee

Clo iv 6

ad

RECORD

es 471.86/2023 lst Ind AJClear/he/221,

Ord Dept, Picatinny Arsenal, Dover, NJ oa yga/

TO: Chief of Ordnance, Washington 25, 1, ATTN: ORDGU

l. As requested in paragraph 4 of this letter vests have been con-

ducted to determine the ignitability of the submittec ammonium nitrate

fertilizer bags. These results are given in Chemical Laboratory hKeport

No 120235 which is inclosed in duplicate.

2. On the basis of the data given in this report it appears un-

likely that the reported fires were due to contact between the hot

ammonium nitrate fertilizer and the Duplex paper bag stock since the

data show that the bags must attain a temperature of approximately 700°F

before ignition, accompanied by flame, takes place. The fact, however,

that the bag stock treated with ammonium nitrate charrea moderately when

heated for two houre at 300° ¢ 5°F does not permit this possipiJity to

be completely eliminated particularly since it was reported in paragraph

3 of this letter "that the fertilizer is bagged at temperatures of

approximately 190°F to 2,0°F in Duplex paper bags" and "plac

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Appendix — Dalehite v. United States · 346 U.S. 15 | Frix