Appendix — Dalehite v. United States
Supreme Court brief1952
Ask Donna
What actually matters in this document.
Text
~~
| WAR DEPARTMENT DO BOT RECORD
OFFICE OF THE CHIEF OF ORDNANCE
WASHINGTON, D. C. EDSeynelds/jrn/331i
22 August 1947
“”
SUBJECT: Tests of Fertiliser Gade Ammonium Bitrate
\ .
10s Commanding General \
_ Aberdeen Proving Ground
Maryland
y
%
*
Fo
1. Forwarded for your informtion and guidance are copices
of 24, atid 34 indorsement to letter from Ficatimny Arsenal] te
thie office dated 7 July 1947, file 0.0. 64/150, subjects
"Investiration of Fertilizer Grade Ammonium Bitrate,” and letter
to FPPAP dated <2 August 19.7, subject: “Intermediate Scale Tests
2. Im accordance with paregraph 5 of 2nd indorsensat,
Pioatiany Areenal will prepare the test program request.
BY COMMAND OF MAJOR GENERAL HUGHES;
? ,
MERLE H. DAVIS
: Col, Ord Dept
3 Incle aseistant
1. Cy 26 Ind dtd 13 Aug 47 ,
to 0CcO
@. Cy 34 Ind dtd 22 aug 7
M te P.A.
%. Cy ltr dtd 22 ang 1,7
to FRAP
4)
a
P.A.
ee eens
ALO nO EE SEPM Dal iit OM AL Ce waive wii til,
100
Ompas 171.86¢/198-29 2nd Ind
Attus ORDBB-T
_ Grd Dept, Picatinny Arsenal, Dover, H. J., Aug. 13, 1917
Os Chalet of Ordnance, Washington 25, D. C., Arty: ORD IM
‘i Consideration has been given to the type of intermediate scale teste |
| Which could be made at Aberdeen Proving Ground from which edditiona) |
| information could be obtained regarding the sensitiveness of fertiliter |
&. To attempt to initiate detonation of « large mase of begged,
dry, cramuler fertiliser grede amaonium nitrate (FGAN) by the detonation
of @ ome]l masse of molten PGAN. for this test, there will be used a
12,000 pound bomb, T-10, filled with both bagged and loose PGAN. Attached
te and Inading through the bese plate ani into the bomb will be a stee]
cylinder, 2.5" 1.4. x 36", leaded with FOAE and externally wrapped with
resistance wire for heating. As shown in Technica) Report Bo. 165d, Table
EVITI, PGAN in sealed cylinders of this sise can be caused to detonate
merely by the applicetion of externa) heat. In this teet, sucn a tube
could ect as an initiator for the mase of material in the body of the
bomb. The eatire system is to be closed before starting the test.
b. Same as & above, except that the whole system is evscuated
before hosting the initiating tune. -
6. To try to initiate detonation of a large, fined mass of
PGAN by fTire. Te thie test it is planned to lead « 12, pound bomb,
™10 with bagged FPGAS, but a quantity of iuflemmable material such as
wood and excelsior will be pleced ia the aiddle of the charge. The
bomb will be vented and the inflammable material ignited by means of
electrie equibs.
¢. Same as co above, except that the boabd will be sealed and
evacuated before igniting tho inflammable material.
Bote: Bach of the above four teste would involve @pprozimately
3,000 ~ 4,000 pounds of Faas.
inereased heat over thet seeded to-melt the PGAN. Im this test, there
Setadl ished at this Arsene] us ® similar aesenbdly oo eying an
imert graauler filler. - ee .
- 101
Attn: ORDBS-T
0.0. 464/150
Note: In each of the five tests, determinations wil] be made of
the interne] temporature and the blast pressure produced.
OPDBB 471.869/198-29 @nd Ind (Contd) ~ 13 1947
2. Each of tests a, b, co, and a above coal) for the use of « 1z,000
pound bomb. At the present tims there ere nine (9), 7-10, 12,000 pound
bombs in storage at this Arsenal. It is understooco that these were sent
here for experimentel work but were never used. authorisation is ‘re-
quested to requisition four (4) of these bcabs, since they are readily
available and would require little modification for the proposed purposes.
Likewise, authorisation is requested to use one (1) 4,000 pound, 1-8,
bomb, 27 of which ere in storage here. All modifications necessary to .
theese bombs will be made in the Arsenal shops before —— the empty
bombe to Aberdeen.
3. It. ie estimated that approximtely $2000 wil) ‘ve required for
shop work in ecanection with mouifying the bombs, preliminary test work
and transportation of the empty bombe to the Proving Grouad. It is ree -
quested that this amount be allocated for work on this project at thie
arsenal, >
L. It is requested that your Office order 20,000 pounds of PGAN
to be seat to Aberdeen and that this arsenal be notified of ite arrival
at the Proving Ground.
5. When ell the bemd moaifications have been nade and prelininery
experimental work at this Arsenal completed, the eajity bcmos will te
sent to Aberdeen Proving Ground. A Test Program Request will be prepared
outlining detaile for conducting each test. It is understocd thet
Aberdeea Proving, Ground will conduct theee tests with the cooperetion
of technical personne] from this Arsenal.
>» 6 The comments of your Office om the test program outlined in
the above peragrephs are requested. Assuming these tests are ta be
completed before the White Sands Tecete, a1] work at thie Areenal is
counection with this project will be expedited.
/e/ W. 8. LARNED
| ff WW. B, WARMED
Colonel, Ord Dept
Comman diag ‘
- 28623 i
asi
ANG RARE hewn
en) Oe
OLAS AE MEN HB Sot
AS A tN NEI ATI thi Tiles shen itr il Se ee ee Lee oe
102
Subjects Investigation of Fertilizer Grade Ammonium Nitrate
0.0. 46/150 : 3rd Ind HDReynolds/jrh/3414,
ATTH:; O8DIM
ORnDBB 4,71.869/198-29
WD, Ord 0, Washington <5, CD. C., 22 August 19);7
TO: co, Picatinny Arsenal, Dover, Mew vereey
1. This office concure with the inal tests as outlined in
paragraph 1 of 2nd indorsement.
2. Authorisation ie granted for the use of four (L,) 7-10, 12,000
pound bombs and one (1) T-8, 4,000 pound bomb for the tests.
3. Autiorisation te further granted for the use of $5,000 from
Allotment 20 17 P 430 funds, $2,000 for the proposed tests and
$1,000 for other expenditures which have been mede in other experimental
work in sonnection with the test program on PGAN.
_ &. This office will make the necessary arrangements for. ten (10)
tons of fertilizer crede ammonium nitrate to be shipped to Aberdeen and
you will be advised when shipment is made.
- BY COMMAND OF MAJOR GENERAL HUGHES;
j Va
7 MERLE H. DAVIS
Col, Ord Dept .-
cc ‘ 7 Kesistant .
FDAP . -
Inspection Brench
Aberdeen, Prov Ground ai
ORD
CON CU RRENCE s
Ins;ection Bresch
: ; wv eae
47
23624
a0 er Nat HBC
103
\
WAR CEPARMENT _ DO HOT RECORD
OFFICE OF THE CHIEF OF ORDNANCE aa
WASHINOTON, D. C. BD Re ynolds/jrh/33 1,
3 22 Auguet 1947
SUBJECT: Intermediate Scale Tests on PGAN
TO: Pield Cirector of Ammunition Plante
Joliet Arsenal
Joliet, Illinois ;
1. Reference is made to inclosure copy of end and jrd
indoresments to letter from Picetinny Areenal to this office
dated 7 duly 1947, file 0.0. 464/150, subjects “Investigation
of Pertiliser Grade Ammonius Nitrate."
2. It te requested that 10 tons of FGAN be shipped to
Aberdeen Proving Ground, marked "For Picatinny Arsenal Test
Program” and that ~icetinny Arsenal be advised when shipment
is ‘made.
BY COMMAND OF MAJOR CEMBRAL WUGHES;
MERLE H. DAVIS
Col, Grd Dept
2 Incle . Assistant
1. Cy 2d Ind até 13 Aug 47
te occ (00 *),
2. Cy 34 Ind dtd 22 Aug 47
to P.a.(00 464/150)
ce
P.A.
Aberdeen Proving Ground
§
a
23625
tl eR el ee ee aed at ewnmenroreete iat
eS a
104
ORDNANCE DEPARTMENT
PICATINNY ARSENAL * RECORD
DOVER, HEN JERSEY LMBr ikeen/rr /222),
ORnteB-f 4.71.866/198-5SL,
APG ,71.86/10
SUBJECT: Tweets om Pertiliser Grade Ammoaium Nitrate
TOs. The Director
Proving Center
Aberdeen Proving Ground
Aberdeen, Maryland
1. There are inclosed (a) Test Request Ho. <730 to be
used for identification purposes only, (b) one cojy each ef Drawings
Pi-7-550-560, inclusive, and (¢) two .meumiticn Data Cards as follows:
pre Ammunition Lot
Data Card Be. Be., Pa-E- Ites
Tost e . : on
46398 ie 1065 12,000 to. bomb, T-10, (4)
2. This material should de forwarded to the Proving Center
by Areens] truck somstias within the next 2-3 weeks.
4. Personnel from this Arsenal are availabie tc visit the
Proving Center for aay discussion which may be deemed advisable
before the tests are started.
FOR THE (OMMANDING OPPICBR:
C. R. DUTTON
, Col, Ord Dept
8 Incle i Assistant
1 = Test Program Request No.. 2750
2 - 6:© Drawings FE-7
7 - em. Data Card Bo.
A e a 2 & a
23626 A
>
LiRriksen/rr/2224
Test Program “equest No. 2730
Picatinny Arsenal, Dover, §. J.
6 October 1947 ;
le Material for Test
a. Tan (10) tons of fertilizer grade ammonium nitrate (FGAN).
This material has already been received at Aterdeen Province Ground
fron Ravenna Arsenal.
be One (1) 4,000 pound T-8 and four (4) 12,000 pound 7-19
bambe have been modified and are identified as follows:
Ammunition
Lot No. Date Card No. Item
Pi-E-I0ez ae oo : :
PA-€-1085 £6398 12,000 lb. bomB (2)
* These and the following equipment for use in these tests will be
sent to the Proving Ground frap thie Arsenal by truck:
(1) ‘Thermocouples
(2) Thermocouple lead wire
3) Potentioneter for use with therroce:ples
. 4) Résistance wire
(S) Asbestos
(6) Pellets of FCAN and paper
Ce Asserbly and loading of the bombs to be done st the Froving
Ground as outlined below under "Recommended Test Program” with the
cooperation of personnel from Picatinny. .
2. Procurement Authority
&- Allotaent advice (for work at Hicatinny Arsenal only)
roe aie dian Shits (000. 464/150, ORDSB £71.-869/198-29, 34
be Project Klos = None
C+ RAD No. = None
3+ Arsenal Expenditure No.
XeO. 321 (95/228)
105 ge!
"A
ject of meson or Experiment
To investigate the sensitivity of fertiliser grede amacaiuz
nitrate to explosion.
5. Lecal Tests | ee
It has been shown that PGAN can be caused to detonate under
certain conditions of temperature, confinement, etc. These tests
are outlined in Tables 17 and 16 of PA Technical heport Bo. 1656.
Each of these tests invclved approximately 5-10 pounds of FGAR.
,
Oo ject of Tests
To determine whether moderetely large quantities of FPGAN
(1500-3000 pounds) cans be caused to detonate under eny of the five
(5) ditferent test conditions outlined below in detail under
* Rs commended Test Procedure”.
7. ped tts ticn in Detail of laprovements mace Since Last Frov ing
Gr
Zo previous tests mace at Froving Ground.
»
6. Precautions in Handling and Testing
@. 6 smoking shbuld be permitted by any personnel engaged
in any of the handling operations of PUAN, es;ecially dvring and
efter loading the test bombs.
bd. Each test, requires some degree of control. Asseyming
detomtion of the FOAN will occur ia each test, the distance
from the test bomb to a suitable barricade which wil] house
personnel and control] equipment, is left to the diseretioa of the
Proving Ground.
CG. Small scele tests at this Arsenal indiceted the possibili-
ty that bombs containing heated FGAN aay rupture and behave lixe
® rocket. Therefcre, precautions gust be taxen against euch «
hasard. The 4,000 1b. bomb should be partially buried nose-dem
im the ground. Por test purposes each 12,000 lo. bomb mst be
tested with the bese lower than the nose at an angle of about *
20 to 70 degrees with the horisontal. As a precaution it is
suggested that each 12,000 1b. bemb be partially buried sese-
first in the side of a hill or trench, or be laid in a sloping
lauacher-trench and pointed to sea.
23528
.
J/
9. History Sketch
The Texas City disaster of 16 and 17 April 1947 occasioned
considerable investigation st this Arsenal into the characteris-
tics of the FGAs involved to try to determine the possible cause
for the explosion. ‘the laboratory teste indicated that both the
nitrate and bags were of satisfactory quality and no deficiency
in this respect was resporsible for the fire which preceded
explosion .
However, during the course of this investigation, « number
of tests were made which showed that, when under controlled con-
ditions, a 5-10 pound quantity of PGAF could be made to detonate.
These tests, together with supplementary laboratory data, indicated that
the detonation of the POAN at ‘exas City may*have been initiated
by an explosion of gaseous products formed during the combustion of
nitrate and paper. This work is all reported in Technical Repdrt No.
1658.
It was considered desireable, therefore, to extend these
information already gained, try to simulate conditions which may
have existed on the ships "Orandcamp* and "High Flyer” before
detonation of the whole mass occurred.
10. ~ Recounended Test Progren
For each of the proposed five tests, there i
duplicate, « workin: sketch which shows the set-up to be used
(Drawing Nos. PI-7-556-560 inclusive). ‘The onjy changes sade
:
ait
He
z
ie
: 1
re
i
ii
i
:
.
i
Ei
Ee
i
i
5
tT
A
5
i
i
i
:
ef
:
bat
i
il
efit
ti
its
3
at
rE
<E
~
*~_-w*e
$2
Shen heating of the ene tube begins, the area should be
cleared.
vd ide io ks Same as Test Mo. 1, except that the whole
system is to be evacuated before heating the initiating tube. An
ordinary Hi-Vac pump should be suitable for this purpose.
Ce Test No. 2A ~- To try to initiate detonation of a large,
confined mass of FOAM by fire. ‘The 12,000 pound bomb should be
loaded as shown on the accompanying sketch. The inflammable
material should form a layer at least one foot in thickness.
After loading the bomb should be laid in a trench. As shown on
the sketch, the inflammable aaterial should be ignited ty means
*of several] electric squibs.
Gd. Teast No. 2B = Same as Test No. 2, except that the bomb
will be sealed and evacuated before igniting the inflammable
material.
@. -Test No. 3 - To melt @ large quantity of dry, granular
FOAN in ac container and attempt to cause detonation of same
by application of increased heat over that needed to melt the FGAN.
In this test, there will be used a 4,000 pound bomb, filled with a
mixture of FOAN and bagging paper (99/1). Heat is to be applied
externally by means of resistance wire wrapped around the bomb.
A preliminary test has beerr made at this Arsenal on 6
4,000 pound bomb filled with common salt to indicate the. necessary
conditions. The bomb wae placed in a vertical position with its
nose down, wrapped with one layer of asbestos paper, over which
approximately 1,000 feet of resistance wire was wound. ‘The
resistance wire wes cut into six (6) approximately equal sections
(150-160 feet) and these connected in parellel to the power
supply. ‘the whole bomb was then covered with a 3-4 inch layer
of fibrous asbestos. A 220 volt power source fused for 60
amperes was connected to a voltage regulator and the current
gredually fed through the resistance wire circuits. The follow-.
25638
3
Ji
199
“s
7
ing dat» was collected:
Current fed into each Period cf Boab Te:.perature, °C.
of the six circuits Heat i Taternal
eT Ce aan Pig ee
100 Te5 22-6 300 150
lov 11.0 ct-40 350 10
Continued heatin, woula undoubtedly have increased th« temperatures.
: In the test at tic froving Ground, tie currens shcvl. be
fed predually trough the resistence wire until the te.perature
at tre wide of the bomb wall reaches approxzimtely 150-c00°..
The power ingut into the resistance wire shovld then oe ac Jjusted
or cut back to allow tie center cf <1: bemd te come vu; to 175-1".
As shown in the sketch, thermoco.jles are to be ; laced in the bcmb
an: these shoul:i indicete the internal temperatures. hen the
whole interior of tne bimd has reached a minizus of 175-100°C.,
the power input into the resistance wire shovli be increasec su as
tc reise the interna) tenperature of tie Dcad us razidly as possible.
In tests 2h, 2B and 5, thermocoujles «re to waployed to
measure the interne] temperatures us the <est progresses.
_ It ds requested thet blest pressure measurements be muse
in each of the five tests.
Picatinny will cocgerate fully on this ;roject by having
technical representatives-present wren the tests arc ceiling mace in
order to firxrish information and advice on the basis of tests mace
at this Arsenel. és
ll. References
@. 0.0. hab/l50, ORDBS 72 .B65/198-<43 cnc va: sre Invorsenents.
b. Fieatinny arsenal Tecnnicas ke;ort Ne. 103¢.
~
~
le. Coordination ~
None.
Cc. re il TTOn
Col, Ord wept |
Assietent
Jy
MESSAGE IC BM
PROM, QUINTON, C. G., AKG, iid.
ACTION 10s COMMAN.INC OFFICER
FICATIONY ARSENAL
DOVER, NEW JERSEY
ATTENTION: TECH. DIV. CHEM. Bh.
ME TEST OF PCAN, FICATINNY TPR 273°, WST u CONDUCTED BY HEATING SHALL AMOUNT
GAR In CONTACT WITH 900 LBS. LOOSE PGAN uD 2300 L358. BAGGED PGAN I” 12,000 Us,
BCMB T1O. BOMR DETOMATED HIT: CRATE2, FRAGMENTATICH, NCISE, BIC., CEFINITELY
CHARACTERISTIC OF HIGH ORDER UBTONATION. ‘TEST aA COADUCTED WIT! 1600 Las, Se 68D
POAN AND SEVERAL FEET THICKNESS OF COWAUSTIBLE MATERIAL 18 12,000 LB. BOuB Tio
wT 4-5/4 New VENT. LARGE EMISSION OF DARK BROAN SwOKE FO. TO HOURS BUT BO
- CRTOMATION. AFTER PLOOLING WITH RATER Bows OBSERVED TO HAVE AFPROXIMATELY TKO
FEET OF ASR, PCAN, AND TAPER AT NOSE. RECOMMEND TESTS 18 AND 5 MOT BE CONDUCTED
AS ORIGINALLY REQUESTED aND NEXT TEST BE 2B WITHOUT EVACUATING AIR. BWD CITE
ORDBG-DPD BROCKMEYER
cc
- NATIONAL BUREAU CF STANDARDS, ATTN: wR. J. A. DICK INSOM
OCO, ORDIM, ATTW: MR. a. D. REYNOLDS
OCO, ORD™, ATTN: COLONEL TIBIETDS
23622 a
111
ET26
EUBO39 ¥
EqBSs PP UETAO
FM VEGX 3/ DOVRR NJ 540 PICATINNY ARS DOVER NJ 2917502
TO CG AF ATPN ARMS AND AM DIV ABERDEEN MD
BD GRNC
RE BOMB TESTS W AVYONTUM NITRATE PA TEST PROGRAM RE.UEST NO 2730
DESIRED TO PEAT TEST NO 1 MADE 16 D3C EXCEPT USING VACUUM AND A
RY'PTURE DISC IN ONE OF THE BOOSTER HILES PD RUPTURE DISC VILL BE
| SUPPLIED PD ALSO REPEAT TEST NO 2 MADE 18 DEC USINO A COMPLETELY
C’.ASED BOYB PD UNLESS INFO TO CONTRARY RECEIVED MERE IT IS UNDERSTOOD
TESTS WILL COMMENCE 5 JAN PD MR ERIKSEN SILL ARRIVE ON THAT DAY PD
PLEASE CONFIRM BY RETURN TT END CITE ORDBB L H ERIKSEN TTS43
CPN Pa NO 27301162185 TM43 |
29/17552 Ss
23633 4
112
BECORD
MESSAGE FC PM
QUINTON, C.G., APG, MD.
COMMANDING OFFICER
PICATINNY ARSERAL
DOVER, NEW JERSEY
ATTN; TECH. DIV., CHEM. BR®
REURTT 543 29 DECEMBER 1947 AND TPR 2730. TEST 1 REPEATED BY HEATING SKALL AMOUNT
OF FGAN IN CCNTACT 41TH 900 LB. LOOSE PGAM AND 21,00 18S. BAGGED FGAN IN 12000 LB.
BOMB 10. BOMB PITTED WIT: 500 PSI RLFTUFE, DISc AND EVAGLATKD 0 105mm EB. DISC
BLOWN OFF AFTER 1-}/2 HOURS HEATING BUT NO DE AMA TION OCCURRED. GRADUALLY D&- |
CREASING AMOUNT OF DARK BROWN SUOKE GIVEN ce FoR THREE HOURS. SST 2 REPEATED
BY IGNITING SEVERAL CUaIC PEET CC'BUSTIBLE MATERIAL IN SEALED 12000 LB. BOMB TlO
LOADED WITH 2000 LB. BAGGED FGAN. BOMB METONATZED HIGH ORDER APPROXIMATELY L5
SECONDS AFTER START OF FIRE. MUWRE TESTING SUSFENDED PENDING INSTRUCTIONS FROM
OCO. ALL REMAINING COMrOWENTS WILL Be HELD AT FRCV!:G GRCLWD UNTIL FURTHER
NOTICE. 7500 LBS. FGAN ON HAND. END CITE ORDBG-DPD BRUCKMEYER
cc
OCO - ATTN: CRDIM - MR. REYNOLDS
BUREAU OF STANDARDS - ATTN; MR. J. DICKINSON
UNCLASSIFIED -
ORDBG-DPD/OBBrockmeyer/vit/ 15 Jan 48 C. BLPORD SMITH, Col, Ord Dept _ 1 21
2285 Director, Dev. &@ Proof Services
23634 Jj] 4
23635
113
vy
an JA 4 4¢ y \ , ~~ z
ag oe t*4bse e gx
FLOR Le MEE a
i” ae Bes His BY FAME BEV
ie 2 BM OLD CALA MATERA. 4 6 ’
"Cw fem > O97 0—0g © SU OTEM S70
AM irow eFIO AMO
CAC AIFAX
s~
‘oe pe AME BGA Selene oN Be lange
, ’ ; > BG AISE HLA BT AC SAME VA Od
, i. ; sy 3 SOLFELI LN CL A¢ VOCE CO. ot: shite i
2 O- STALL BUNS, OOF W/ONX 96.7
LEMOS, VROMPEC O hi JH A? SE SFIS
© MMO RL S15 TAPCO WME FOR SATO
MULMD VIO 8 IGLOFYMIE
WMLS FO Oe RCE LUCENE
r LOS TV OL, WAL.
Oe Te A PID ee
Cale oer ee wer ‘vee Sidi: > Seton
3 Be oy
4 _- — - ~ - Pe mE TOA. the Spec
(AestOe =
ROIS oo
_ 2olg0 OAT Wait faa
LEE 2--. bed Sak
, ee
vf ¥ o>:
1 25675) FOOL
2 FI8/ Me. ae ha Be
ar
PROPOSED ABO MEL FE 7ST
bE MME A] ABE LEN PROVE CROUND
70 DETERMINE 1 ME SENSITWIT YF FER
UMER CRE Hi MONON MHTRATE 7D
EXPLOSION. (72°57 WO
2); i
fa-74-¥7 4
Pare bsg FS
PP Z6P EF ERP
‘fi
Fo
“X, : a im ‘
vwee td a pen nig dt
amt
eS aie
2
Te,
Sd, SMOVYALIO OL
MOAE SHO? PID 14
Ts,
ON LOML NOISC
a {
Oe hee
eh A
PF
i ae SE
~ +,
are; a
WVA SATEA? PR-7-565C
Tas - tt 72 VACUUM PLNAe
A Bo AES MO A yb FE A-
= nae —_—
{
P| '
NK
CUP ep
‘
Sy,
by Ss Wt
7 2
: . J f]
es , . :
as m, meee Me Le. a ;
4 . 4 é . 5. ; CU wr
¥ ay = :
a
,
A +" .
ae * | ~ ; :
OND Lil THOA TA (FAN,
OLLS ~ BAL OED
‘ew
—™ me, y
- ~ “ oe
‘ P a
‘ \ <
_ : + 2
. " P
| Rae eC 7ES7-5 Ze
(a AOL MN {2 :
LEV LKVIINE fr EF. © bhi pth tid: ee
0 AMPLE AMI WA AVI FO LA". Ap.
«! TEST NC EBS * iF, - | :
we
Ly
eo
‘ e
‘—“— =
i © MNF fo 7S. a
ee some T. wh . | ‘ by : ? . .
TN PA \ | DLE AE COVINA so
oO es ANC : SO. VES. AWE ANE LAE
MIN Sr
A #,
=
if ea W202
BE BA vd MII NM Ot”
Go TAM OMI COC LS
FHC OSED AS SL. !
ATE LIL AFT A, ea eos b.
TO LEEPELOLTE ae ‘
ALOT EE GO? a ay!
Ve LAE ES =e
_
ae we . & Z
BIS 7 1c) 2 5 SEW rh ge 7 pee 236039
_2 =e qeoe <pesntip ose «
4 1
vd
m ; ae
a i
ct.
Re
: é
?
a — )
a & (=
i wo
| ® “ .
e| » ioe
a} 63 eee
< &
e
119
AS50402 -RegBREepeD § ABERDEEN PROVING GROUND § 15 December 1947
Profect No. EP-FG-l. Bomb, GP, T10, 120G0 1d, Loaded witn#G200 1b. of
FGAN, initiator tube attached, Rear view, before detonatten Test lA.
- a
23641
a
~
ta
BERDEEN
’
PROVING GROUND §
,0aded
LA.
21
a
464 $ ABERDEEN PROVING GROUND & ta Nasenuen 100
- ’ , SD . i a raae ‘np? ' a -racmants :
a Py a ”
2384
\
> ABLE CrtwN Po “Ai ic ? > .
‘ ~
469 B ABERDEEN PROVING GROUND § uetead
ra a ‘ow
. ‘ ( “AH rest
&
-
os eo ins x aa oF 62 ae " 5 Se had ; “3 " ~~ aie Fee me x
ag Cy ws 7 VOR, = $k nc? P.. ¥ , 4 ‘3g Vaan
>
61 § ABERDEEN PROVING GROUND § 8 January 1948
ject No. EP-FG-1. Bomb, 12000-1b, T10, Loaded with $300 lbs. of FPOAR
fore Heating; Test 1C, Evacuated. Reer view showing blow out diec.
———
a ae OCLs Sle Vee ‘5 ABERDEEN PROVING GROUND » 8 January ix48
. > | , " 15 \ ’ o 4 . 4+ "7 ?
‘ be No. I i romo, AcUVNVeid., lO, Loadec with 2 J id8.
4 ’ F . | , 4
“ « ee ; ast \ . 7a ate wice view.
& ABERDEEN PROVING GROUND § 18 December 1947
“ 498
rojfect } EP-FG-1l 12000 1b. Bomb T10 loeded eith wooden dunnage and
300 lb. of PGAN before ignition, Test 2a, Left Rear Viee.
28645
@ 150499 pesemsotza_ 8 ABERDEEN PROVING GROUND 8 18 December 1247
Profect No. EP-PG-1. 12000 lb. Bomb T10 loaded with wooden dunnage 3
1600 1b. of PGAN before ifnition, Test 2A, left side view.
a @
23698) f
Per.
iter 18
a)
, rid
ASO7LO B ABERDEEN PROVING GROUND § 15 January 1948
Project No. EP-PG-l. Repre entative Pragments of 12000 lb. Bomb T10
After Detonation with 2000 lb. of PGAN.
Es ; © >
Ff 2: 65]
Ron & ABERDEEN PROVING GROUND 8 15 January 1948
Project No. EP-FG-l. Crater after Detonation of 2000 lb. of PGAN in
12000 1b. Bomb T10. Test 2.
23652
Arr€uD1Ik D
Physical Test Laboratory resort
2365.5
131
f U
with we (2) irce-constaatan therme- References Bone
ef iron-constaaten; exe elesed bond iastrumented with two (2) ehresel-
alumel thermocouples and two (2) 300 ft. leadwires ef chresel-alusel.
- @ A Vented dom? was set w@ with two (2) iren-constentan theres-
couples installed and measuring circuits were effected between ench
thermocouple and a designated recording pyrometer. The closed bead was
instrumented in a like manner except that the thermocouples and leadwires
were of chrone)]-al wel.
3. Continuous temperature recordings were made throughout each test
end the chart speed of each recomier was governed to a rate of travel of
12Z* per heur.
%, All noted odeervations during the teste were mete ey the Aberdcen
Preving Ground project engineer.
Yor thermocouple locations and charts see Appendix A.
1 Incl .
Appendix &
Approved: A Z Z Z Pe Signed: * 4 farkey
R. P. Witt, “Ss. W. Parker,
Chief, Materiales Testing
Physical Test Laboratory. Section.
23654
i
'v ‘8 'N NI YOWW
: eee ae demenaon
Asepnnepted by
ee a : rer Rares
ati |
| 1400)|) 1500
| ir Lieethd i: |
' j hit tidy
bi tt +t
' | -?
2 int
| 5
4-4
i }
i] i -
is RSE OSE SRS
an
& ee nae NSD
a
ms i
me
a _- ;
a
* aa ieee
+ -- ‘
:
1— }
= 1 ;
|
'
; j ’ '
an di ee ee ©
*1 I
a
eee
a | a
—_
—
ene
= i |
od ee . =
eg | | |
2213 = OR] == E |
a aes
9 9E= {
= ao = q
; - , ra oe er = t a
>} —————— Missense) Pesan.
t oe etal ~ ana: —_ = oy — —_
———
—
. ——
‘ —
‘4 ——
een
~ -_— ee eee af * ~ —-
—> — —_—— ~~ — —_—
——— — ee _— —s — 4
- — a ———— =
Tee — = — 7 -
—
ee ee
— a» | Cae ae a
—— ee ee a _—————— ;
— Se a ee
ee
—_ r prot pecaira —— ee ne
- — —o
ee ——a
ace ——— — ~~ 7
a ~ ~-— + — —
— <— — — 7
— a —— - =
— -_ — —
oe =< _— —_
- > ee a ae ae a _— —
—— ————
1—!
\n
~“
yo
f
AFFSNDIX E
Calowutions 5
<
“¢
23664 ”/
CALCULATIONS
Thia Cylinder ;
5° “Wr «where. K ° criside diameter
Pe a {hn speht 60,000 © ,0707 x 80,00U'* 5050 psi
PRP leaF inside diameter “3% © .y:h
Maximum Strain ~
cae 1 - RE i « teks
= 1 = 072 elcbd
5" 1.25 + U.75R « et * 0f9 (.49L)© TYrebe om TOD 0672
P* -67e x &C,000 * 5500 fal
doximum Strain Energy
P 2(1- @), ell - .ove) Fon hs 0 ie © .0070
S*Tioe om) (leon 70) > Ub)? -%
F © 60,000 x .0070 © 5560 péi
Pressure required to olow cif vese ;late of bomp
Force on inside ot comb bese ;late * Fressure x area
s ls.7) é Dre
Fp = © <76 F lb
Inside face voi ;late bes aiumeter of 16.75 in.
Stress jn bese belts without uny initial stress cue to ti,hten-ng
Roo. diemter ct lel/gelcNPe~ stid * 1.5% in.
Tots] ~hread roct area ci stids * «<v x Gar x1 2 40640 in.©
27o P lb aS
St in st as ° 9.1
ress in stucs ro Ee 3 9.10 P pei
23658
ee i ct ee
ll ~ ~~ _="_y a ww} A a a ee
a
a
Ne
a
oa
;
i
139
“Initial stress in studs carsed by tiphtening nuts estigated as 16,000 ; ounds per inch
“ot etud diameter
Area one thread roct * Qpe)" 5.14 © 1.518 in.@
Strese © 1.50 x 16,000 = 15,800 pai
| T.518
Total stress in studs = ¢.10 1 * 15,000 psi
,
=
Aesuse ultimate strength cf 1020-1055 steel studs as 55,000 pei
“Internal bomb pressure required tc rujture studs
9.10 P * 15,800 © 55,000
- 55 000 - 15,800 e 3% ,200 e
ssn “e*yo~ © 4510
~*~
si .
. Ate $ yes teow ee ee tims % arts i we
pppoe ee ve gp isos BM DONE 9S aaa we EMU TSS ai a
PABA IES RR RARER ae OR ea SR
Wk x
¥3
tt
ee
lo ! ——_ ' : Gre? |
we CF wrtsen % @ ivesl +e ot”
i ’ }
| . ,
~~ . 1--- - ; oe en? Se
i | | . 1
\
| : | ~~ |
; ' | ' ' ' .
' seetue Yppewesleg | ;
) exous expsel 4q9, PUw os y4 SenOMe [[eEE
: | } j
a a a ai ij at aa
a
F
jo
\ MMV 4 -
| NS Se, GREE Sas RRS Bee iat | ~~
| aan
‘ - + ' | i :
nia | ae ewer eke |
i vers Fro foal Oe ee
| . iat *ee i
| ae | ea i tere Ge fh 7 i } etd Tae RB 5 the ft
sty rd bee 7 TM ie Fc a
SE FRM LEVON Vu) 1 ate a a
a8 Reeth ¢ ' MaDETLIF } | ty ) !
wt \ il | | Hl eNTALUE F Von: BOREL FRSTONUOGD TOOEDICEOYLOQHUTT TTVAURRe HDA HEU HCL
outrage
ot a? site o “%
f ve
aneey eRe PRs Aes ye)
23660
Oo -;
—{— vial
ry a + ie) i 7a | an i 2 | i (2
i
° wwe
ett Sue "at
GOLSsie@e Bus IBUCD
SR0ws GACIG Ast. Ades 4ONOUW | [Pus
PORT Sake RIA biel! AY oe
Up ee Eee up suesoeg
exOWS UALIG Pes guNUeR UN} ped
be a List
oan _—-—— “eo ewes =< @ -- - -* -—- -—— «2°78 = 2
estt als b0€ ne € ue 21 13+ | 2n5 99r 77 ane YS 1 ine
UCpeelt Be yu@yeucs
@x4OTe UACIQ Pes {YyroEeB [> auc
“2. ee -~—-e- --~—°-* -—- “ere ~—--—- -*<- “7. -*- “ere —_- to cere
¢y ior VIgt
PTE cca scheint AN een RE catitettininte
ag
r
et ias |
‘980% jo woyyerag
°o
St
bl
rene
BUF OR} Se BawgeuLD
PxXOWS BACIG AUMcuEG | wES
a ae
ULB jee Jupeewscul
Sg0Ge oF, U4 4UTOMe Llleusg
“«- “or f 77+. oe
UUTSe lee suBgeULD
@4OSS O37 UR UNCER «ss07
__
Opes tee FUL ewes ag
whOMe LACLQ 344.) VNC esiej
Uvpsupee Up suesoeg
exOWs UALIG Ped guNvEe® EN} Ded
Se ees 3
£eq 30 owt]
est
ect
GOyes tee Pujeessleg
@n088 GASLQ TUFLL PUP O2yH* JaNoew [Lem
~rnre ae
“ontt lot 666 nee. oes 2, $69 819 ee «6g TRC eT
cntt e2lot 666
P ast
»
|
me De
oet
, |
oe ; Ly6t ed pt
| V2 39°, I-D4- 90 fos4
e EVD4 “AIA pepeoy qmog peyme’-"hT COO'ZT BI e414 Pom
‘ : @ {dmosomsr BALOG
} | : ewig “#4 & @uex
CoN GE OTHER Mg OT ABE
> - TRA? Bee a he ae
Grgt
Be Maite NE RS Ee SS.
, aaa ‘
salt
23661
ark
—~- ©. oe
LOFeByze 4a 4eULD
@40ms UAcCsQ xsep 4404 ZUNOEE 1] BUS
Oat
sne eat
—. . ly
“té
- ¢— oe “22 -<-«+
~er
any
one «<
éll
GOlSsl ee Ful eee250¢
@NOWS GALZQ pes JUMOSW BNT pen
~~ Cu aw uM AR
Uvjee tse 22038UC5
@40@8 UACIQ Pes BMOSw | WES
Neal 7-- --- oe — ro2e
nee
Cn
ae
igst bat
O1at
(oe os RESCH IR A A
5S elena wom © 6682) 14 C80 .~emmeese ZY
AE i AIR RIE Ra
a | Th
; ill i
| | : l ! | H i! tr HI! 4 i ' | |
>? ‘ an ee i. mae rrTrr . ear - -s - ’ TT? 4 nk |
it iy : AVE | ; if YS ia I hit ' it | LT 4 bi if
| | Hil) BT Jo Pere A | "y I! iD m4,
5 | ' , | ;
4 ee eee te # ee el '
, | |
SES 1 . = —— aqua ———F - - . — <-> <= t — oe natitaddis
| o | | 1 | 7 | amet
| | . :
| } ' '
| | SOlGC Tee Ietieucg
, ‘onome Berg YENGHS 1 [eEg
- i cis ~* > + —— — = —
® 2161
Goyeqwe Fujlewesoey
‘@Rows 8F;4A FEnGre {Teng |
mm ,
eed had Ae} ete + tee ey eee lnediad wen ot ee te ey we ~~ u
' t ’ ) ! i
| ; | , i eTst
|
GOles|ae uwieuesd |
@XOWS ©254UA QunGwe eFs0] : |
Sexe ve t
|
St —- | £261 |
Bypee fas Puy egesoeg
@nowse BAO1g BEF Gumeew e#4e7
61 Lest
GOlSSTSe Ful ewe250e¢
®xyOUs GALLQ pes PUWMOTW ENE pen
——- oe
OPERATING PRACTICE
AMMONIUM NITRATE PROGRAM
NEBRASKA ORDNANCE PLANT
23662
| otifieation to Evetsls (erator for
] res — ae TO E°™ -&s
fignel Used by Kce{tic Operator
£ teaming Out Dray Off Line Pricr io '
}.i-Pan,
E teaming Out Goorense: ind Drar Of
Eignal Ved by Ecttie OQecrator fo- F
l:sttlo Charge
tees
6633
-Pan
opping
lve
st
142
Jun 2 37
Faragraph
12, 208.5
12,208 .6
12,209.2.
12,209.2.
12,209.2.7
12,200 .2.8.
12,20°.2.9
12,209.2.10
212,209.2.11
12,209.2.12
12,209.2.1
12,209.2.23
12,209.2.15
12,209A
12,20°A.1
12,209A.2
12,209A.°
i2,cO9A.
32 ,209A.5
12,20SA.
12,216
12,230.1
12,210.2
rs
12,210.
12, 210.
12,210.
12,211
12,211.21
12,211.
12,211.
Title
ig 4-
jx
Signal used by Kettle Operator for Condition of
First Charzo
Signal Used by Kett'.e Operator for Second Kettle
Gharge
Signel Used by Xettle Operator for Vompletion of
Second Cherge
Signal to Steam Out Let Down Valve
Signal to Close Lot Down Valve
How to Operate Liquor Valve
Housekeeping and Inepection Duties of Ai-Pon
Operator
GRAIXING KETTLE OPERATION
Xettle Preparation
Clenning Kettle
Seal Kettle Door
Preheat Kettle
Release Steam Pressure
Charging Kettles
Sigzal for Kettle Operator to Hi-Pan Operator
for Draw Off line 3
Signal for Kettle Operator to Hi-Pan Operetor
tioa
Signel for Kettle Operator to Hi-Pan Operator
for
Upon Comlotion of Charge
Starting of Plows
Charging Second Fettle
Signel Uoon Completion o7 Charge
Signal to Shut Off Steas
Housekeeping for Spillazu
Aa@aition of Yax to Kettlo
Introducing ater to xettle Jac
When to Drop Kettle
How to Drop Kettle
Housekeeping of Kettles and Flo
Responsibility of Lead OQverctor
ket
or Area
Charging
Signel for Kettle Crerater te Hi-Pan Operator
GRAINING KUIVLE OPERATION DURING POWER FAIANZ
Poeition of Start~Stop Switch
Use of Stean end Elimination of
Kettle Prenrration Yhen Power R
Use of Bar in Starting Xettle
Disvositicn of Material if Kett
Forcing Kettle
CONVEYIIG GPAINED AL?'O" LUN }ITR
Operation Belt Conveyo>-
Truck Position «t Grainiag Duil
Pilling Truck
Trusk Operators Responsibility
Truck Operation
Water
estored
le Does °*
ATE
diag
o~
Truck Position at Central Bagging Building
OPERATION OF CEHTRAL BAGCING
Operation of Equipsent
Capacity of Truck Unloading Hopver
Check for Foreign Material
Shutting Down Equipment
23664
g
Aq
ore
te
|
ae
#
+
2
4
oe
J
12
12
12
12
12
12
12
12
12
le,
12
12
12
12
12
12
12
12
12
RL ee NY
Dee Sea ere
iS
Vv eere
°°
NY
~*~ ae
e
RRRRRBP
.
wi
rb
on
a +
BRE
ne ne
Wann fue Sure
B
Title
Housekeeping
CPERATIOZ CLAY FOPP¥R
Charging Clay Hopper
Disposition of Empty Bags , '
Use of Fork Truck
Operators "Pesvonsibdility
PACKAGI''G OF AMMONIUM NITRATE IFO PAP R BAGS
Beg Supply
Position of “ag or
Operaticn of Sca/
Reading o: Scale
Correct Weisht ?
Sampling <nd Insnecsion
Processing fas for Sowing
SEYTiG FAPCR BACSED AMCrIM’ NITRATES
Position cf Jag
Closing of Beg
Inspection
Sewing Machine Operators Responsibility
Bag Condition
PREPARATIC? OF RAILROAD CAR FOR LOADING
Inspection
Prenaration
Cer Lining Ferer
Dunnage
ping Urechire
IOADING OF BOX CARS FOR SHIFHE™ T
Box Car Spotting
Tally Sheot
Position of Conveyor
Resvonsibility of Car Loader
Dannage in Doorway
Responsibility of Chief Car Loxder
Responsibility of Ast. Saift Supervisor
Eanty age
Closing of Car Doors
Switeh Crew
Prescribed Loading
SEJING MACHIIG AiTD SCALZ MAINTENANCE
Suwing Machine Maintenance
Scale Maintenance
Frequency of Scale Inspection
Greasing of Equipment
14k
145
WS RR es Pet
3 ni iy
bit 4! i
UE
hy 7 5
i Ht
3 p i? i
; Hot
; sai3
f Aaal
. all
in,
——
slaty H Hult
Gy kl dau
41448 hy tafe
i ia bh be
Getty dj edit
off ee th tit ii ii
3 qu 3 23 el |
| ei i HE gully
Tee lal ay
Hi
tecau aucune os Geen hc a
bag when it reaches the user.
Hs
223666
146
fugit ae tag HEL |
ci tel tie ad
iF i wide vin by td
; i ii TE a3 3 ath I: i
i Ha iE
oe io¢ S 3
file a i ert
aitisl “td ant 1
. . . pecking cipcmawn ye
i mene ereiemen mmeaaaaae ae eae aa ee ee
—— 2
| 99887
a allowed i: “10 steam ceils in the bie
—— a
10-40-87
K.
4 9
10.
11.
12.
wae 12,555
Prem the standnoint of quality control, the aisimes fudge
coint at which a hivan my be drommed is JOR? PF, This ig”
determined by actually taking fudre voint with thermometer,
Maxigus steas vreseurp allewed in the grainias ket tle jacket
shall not exceed 60 psig. ? :
Grained material in the kettles dial] sot be waxed at tescers-
tures $e exceed 200 F, even thoush the vlysioal annenrance of
* eager dryness * occurs at temeratures to exteed 290° PF.
The finished oroduct will not be barged at temeraturss to
exceed the maxigus temperature as estxbdlished at each indi-
vidual graining nlant.. (P.D.A.P. Maximum 190° PF.)
The tage mst be kept free from all contamination ouch as water,
oil, nitrate duct, sitrate solution, etc.
The maxiaus steasz oressure allowed in the unloading of wax cars
shall sot exceed 27 psig.
The maxigum texmverature of the aaterial in the wax care ehall
mot exceed 200° F. Texmnerature of waxy io stora7e tanks orefer-
avily should be kept below 200° F.
Periodically, a rénresentative of the Technical Dev-rtment will
insvect ecch olant to see thet the stnadard nroceiures is
written and aonroved are being followed. Any wajor change in
the operating wroceture will be actei unon ty the Technical
Departament before bein: incorocorated into the nlant's Standard
Procedure.
23665
——— SS ST ew ee ee eee ee eee —
Sa rk oo ok 0 OO BEG
Neb b7
——- eee mee EEE ——o
naan
—:12,202.1
2,202.2
12,202.3
GECTIA C - STAICARD SPEAATINO PROCEDURES
Tal) fA La!
--Shen the tatk cars of neutral *iquor
err:ve at 6l'¢. ‘+5, Lies: sotify tho supervisor on
ahi.t.
iN --To spot the nitrate tank cars,
o * U
(1) Lead Tunk Bouse Operator will notify switch orev
where to spot cars.
(2) Se% band brake on eacd car.
(3) Place tlue flag on cuteide of building in center ©
of each track
(4) When cer is spotted, tank car infcrwation card
is filled cut with car nusber ani date ar-ived.
(5) Date topped ani by whos.
(6) Date and tine that beat is turned on and by whos.
(7) Date and time car was emptied ani by wice.
(8) Date and time the car was pulled out and by whos.
to Precere Bitrate Core for Unlosding.
(1) Check car for ammonia nitrate cards end remove
shipping documente.
(2) Lower ramp to car very carefully.
(3) Gpen air valve and relesse pressure or vacuum in
car and emell cutlet for ammonia fumes.
(4) Remove seal and pin. Open dome.
(5) Use stean lance to steam out stand pipe. Steam
cut only enough to open stand pipe.
(6) Commect liquor unloading lins to car
(7) Steem out liquor line to car (when finished
eteeming, close liqucr valve to car.)
(8) Commect uir supply line to tank oar air line |
(9) Open air valve to car and build up air pressure
in car to 25 psig.
(10) Wotify Shift Supervisor if contents appear
atnorgei ; arya” aes ne Sanee Se Seoerunery Xe
quor conteaingnte
23669
148
149
12, 907
SaPcti
(2) Top the car dry, that is, to the crystal bed.
(3) If stoppage cocurs by evidence of line surging, —
elose liquor valve immediately,
>|
(4) Veut pressure from tank car.
(5) Diseonnect air hose on car.
(6) Steam out header and hose.
(7) Insert 2 owing tee
(8) Commect steam to 2 tee
Vent pressure slowly.
(11) Open car ant check ear for crystals.
(12) Replace done cover,
(13) Wash outside of car free froe crystals.
(14) Raise remp and fasten securely.
(15} Rewove blue flag when ewiteh is reedy to be made.
23671)
7-847
12,203
TRLQAD TO TANK CAR OF BAL
12 Pe —+— <a the waz car at unloading station.
es 1g Sasa
12,203.2 Rane Renapad — Rewors dos cover ant visually inepest
be certain that it is waz.
12,203.3 dpanagtian -- Chesk inside valve, Meke certain it is
12,203 4 -- Instell micad{ng nipple and ® valve in .
(2)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
cap. Remove bottom cap if necessary.
Hook up steam lines to heating ecils ani turn oa
esteem. Maxie steam pressure allowed 27 lbs.
Heat from 6 to & hours or ustil solids are melted
out of bottom cf oar.
Install air lances and turn on air es socom as
possible.
Take teaperetures at intervals, temperatures are
not to exced 200° F. Probe to see if solids are
all diseclved.
Secure semple for laboratory analysis.
Open inside tenk cer valve.
Se ee
wax will rum cut
wnleading line. ’
Open tank sar wuloeding valve and al) other valves
leading to storage tank.
(10) Pump car until it is coupletely expty.
(11) When car is eapty close tank car valve.
(12) Close 2 unloading valve and stop pump.
(19) Bresk wnicn iztveen car end war unloading ins.
23671
Fah i ®
@, 3.6
2204.5
12, 204.4
12, 204.8
2°) 151
(44) P ware @ re lances.
(15) Glese dome sovur. . csyrics
(16) Remove steas comectiays, ae
(17} Cheek te see that all tarc sar conse tices
mere Deon remve:.
(18) Raise eet walk and reacve tls £04. : Hake sure ell counse-
Cox Removal -- Remove ear frow oniléing, aS hoses and pumps are
jatetr Prmantion -- At or ine is stan to be intr- ee %
of unloading +i. Very Lapa tact
BEATE OF MEUPRAL LI Ovo:
pa o- The bot wa%e circulsting pazps
weekly,
Gheck ine ftapdet Rane oe’ ~~ Tie stean turbiae pump
ehall eech ehitt e> Jat it te in stand-by
condition.
Piaadie Ted Lb size fon Er spe «> If itquar core are to
. » eobify the boile> rowie so timt they can
have tbeir staerni-by boiler in readiness.
idaner_Atcreae Bnaca---Ti aicrete storage teaaks should
checked to determine thas an adequate spece is
available to receive lignor:.
Eeeniog lines of Grates -- Steam out beater.
- Etart al> compressors, »
precautions recocaended by the manufacturer.
Check the lubrinaticn en4 35 Ghar cisqutts cagyly of
water is flowing tirough the in‘ srcoolers.
oe mPa Sat ae
5 exce « When unloading from tank
car. Temperatcre of liquor shold be cooled to 120
by air and toppings an som as possible.
‘fabing HUbee Ae abate -- A revresentetive six le of
quer sent to the laboretory for ana-
2Rb7 2
=e
12, 204.9
_ 12,204.10
12,204.11
¢:
,205.1
12,205.2
@ 2s
12,208.1 -
12,206,2
'12,206.3
12,2064
, 12,206.5
2 12, 206.6
Circulating Line Texperatare Control.-Cieck Circ?
lating line to sec that texperatire does noi expeed
129° ¥. Normal operating tenpereture ic to be 212°8. °
fospechipe-Cirenlaviag_bise ~- Cheek liquor circe-
twice each shift. If leaks are found,
sien Gaaalieas ck ina,
Jnereching Storage Tank — Che: botton of storage ;
tanks ce co If a leak is foun, t
th hot water. Blow water tive that pressure
th :
wo If circulation is
¢ a oot of line with air.
the line. For short periods of time, water
may be circulated from water s-orage tank.
_ Before charging, sare
gure there are no
_ foreign objects in
_ bi-pan, eeprcial ly
Gare cf Air lances -- Steam ont air lences for from
20.to 30 seconds. This is also to be done twutween
each charge. :
Gare of ietdomn Yahya -- Check autlet valve of hiepan
aes valve is closed. :
jutaainaiion of ats —~ Open air walwy slightly on
licuor to Hi-Pan -- silks satan teen nein hee | | Be eure ccreen is on
’ édrewoff line and clean.
~ — 7411 pan to gxige appram
imately when couble charcs is used; 45009 when Steam on hi-pan coils
single charge is used. . ie not to emeed 1009
- preseure
L 2k
SAFETY
2,207
B12, 207.1
-~ When tauperature
increase air slightly so mate-
When tempera’
saree egitation.
*
See that air agitation is
wniform over surface.
.
reaches F.,
rial stays in
12,207.2
{iF ut rine all “abt
t Hoon $2eg,g 3035,
He irae bi pied
$358 Heetiiiie dibasai ait
Ld
mi af
a9” i:
foots
a i
a3 5 3
982 9 dss
43 i
AR
or 8 86
ae a Shs
1 @e 3.
out drew off line
until kettle operator turns off blue light.
23674
~
*
"> |
Re
aS
es
he
~,
rs
ee!
> 22,209.1
. ? a
12,209.1.1
12,209.1.2
12,209.1.3
L 12,209.24
»
12% 158 |
SaFETY
PREG ADT] Oi
fern steam on gently to
avoid splashing over
edge of hi-pan, Make
gare plug valve is closed
before steaming goose neck.
Be sure you understand
signals. When in doult,
beth operators will come in
contact end decide how to
‘proceed,
Signal to Close let Down Valve -- When red and blue
lights are turned off close valve.
Henle Seagate higuer-lalre — Liquor valve should
never t except hand. Do not use wrench.
-- Bi-Pan Operator will keep hi-pan roc
clean at all times, and will report anything unusual
or equipment cut of order to his lead operator.
Esttic Preperation Plows must be sbut off
during cleaning operetion.
Cleaning Kettle -- Kettles and plows must ie Keep hands and foet out of
cleaned before charging. kettles while plows are
running.
Seal Kettle Door -- Close door snd seal with nitrate.
Preheat Kettle -~ Kettle should be preheated for
5 minutes 4f kettle js rot already hot.
Rslenee_Sisea“-comure — Shit off steam and re- Operators should wear
pressure if steam has been used. gloves.
23675
12,205
2 Charging Eetties
2.1 Sjgnal for Kettle Opsrator to Fi-Pan Operator
or Draw Off Ling Steening.--Steaz out draw off
ling for approxiastely 2 sinntes.
2.2 88 for Kettle
amen Compietion.--Signal Hi-Pan
® step has been completed (rea light).
203 Signal for Kettle Operator 30 Hi-Pan Sperater
for Soe EK lace draw o
pipe kettie.
Signal Hi-Pan Operator to discharge liquer.
(Both
2.4
Signal for Kettle Operat
°
n Completion of Charge.
mately 7500 pounds/(dry weight) of liquer before
mately 7500 pounder (807 v
lighte off.)
or to Hi-Paa
Operater
Draw off spproxi-
Signalling Hi-Pan (Operator to stop the flow ef
liquor (red light).
2.5
proces
Starting of
Ovs.--Start plows during charging
2.6 char Second Kettle.--When draw off line bas
eae 1e
drained, place draw off line over waste line and
signal Hi-Pan Orerator (doth lighte on) te steae
reined, place draw off pipe ever second
kettle and proceed as of first kettle. *
rh S28 ene 3 of Charge
kettle hee
.~-Whea second
rgeé and draw off line
out drav off line apprezipately two aisctes.
2.9
Shut off Steas.--Signal Hi-Pan Opereter
Cc 2:38 wifes te
ignts o te
Rousekeeping for 3pillage.--Waeh down any nitrate
spillage from kettle or grates.
ata
8 off stean.
Kettle.-—Whea asterial is
2.10 Addition of to
suger and teeperature is 290° FP. or belew,
eo known qtantity ef was added.
656 of waz. Wax dDuckets to be calibrated
23676
156
Sars
PRECAU 7) OMS
Maximum steas : res. 3re
allowed ia kettle ..ckst
40 pounde.
Be eure draw off pi:e
ie over drain, and
eafety device locked is
place.
Operator gust weer face
ehield. Stand clerr o%
draw off line when stear-
ing ous on drawing liguer
into kettles.
Do not clind into
kettles. Keep firm hold .
on draw off pipe.
Watch out for seplacihing
of hot liquor.
When moving draw off
pipe froa one rettle to
the aext, place scoop
‘shovel under draw off
pine to avoid svilliag
of liqaid aitrete on
fleors, grates, and
kettles.
+
Be eure draw off lise i
over Grain and eafety
devices ie locked is
place.
Keep hands, *eet ani
tools oud of rettls
door.
Wez is net te de aided
whee material ezree2e
200° P. . ;
a “~
ae oe
ws Se 2 , Me tle.
- 32,209.2.42 eee waz ie thescoughiy
@ ie ready to arep. :
12,209.2.85 a Opes kettle end break hole
r ettiag hal flew inte hopper
12,209. '.L8
12,209. 2.45 Aagspenerbin ber of [eek Cpereter et Operaters
responsibie for reporte and will
bring sas fiato office at ead ef his shift.
CONVEY] BO GRATED AIORIUM BIT SAR
ae
r mas vanen kettles are emptied.
A maxioum of 2 kettles are.emptied. A maxima
ef 2 kettles will te allewed is hopper at one
and dewn oa beld.
(12,80
“. 12,210.2
4
} time.
ater wi cading hopper
ia Daildings.
12,210.3 i --~freck Opsrater will start sagar
‘ empty: ag ead filliag truck anf will step
& flew when trusk ie full.
: , ee e's asibility.--In case of
inclement vee ° ver will close 114 ea
| track, thus protecting grained material.
"* 12,220.5 Sense Leeration.—Prenspers trusk load to Central
Bg.
12,210.6 Pe t ai ga
sition 8 erer
| & uniceading hopper at Central Bagriag.
&
236 77
De aot exceed grea
epeed limit. Yateh
fer other vebicles
aad personnel.
Yer
9-23-47 | ety 12,2ih4
SAFITY
: , * REGAUTIONS. 5
12,200 GRAINING KRITIS OF RATION UFDiG FO HR FALL) ;
12,205A.1 Position of Start-Ston Switch-~Checke all lrettier
tq see thet Start-Stop cwitcher are on Stop
Pesition, ie
12,20°A.2 Use of Steam and Lliminction of Water—If water Do not exco ri 60 }
is being used in kettle jecxets for cooling turn vounds,
off water and turn stear into jackets. Jeave
astern on settle jackets rntil power is restored.
Use by ness steem at this time aad bring prescure
un to 20 lbs. on cuage.
12,20°A.3.. Kettle Prenaration tIhen Power Restored—When nower
; s resto sides and bottom o ttle with
screper to see if crust is looses. If crust is
loose screve away in from. of vlow blades. If
moterial is hard use a small amount ef water ve
tween meterial and kettle.
12,20GA.4 Use of Bar in Starting Kettle-—when kettle is
' Yeady use a crow bar cerase through upricht arms '
of plow blades to start kettle.
12,209A.5 Dienosition of Material.if Kettle Does Not Start--Do not shovel
does not start easily shovel anmonium onto floor or initio
nitrate into an empty kettle and save as much of paper bage,.
it as i: possible.
12,2090.6 Forcing Ret tie—pe not attempt to etart a
ettle t 8 not apnperr as though it would
start ecsily.
236705
1-8-47
l2,c1l
1c, 211.3
12,211.2
12,211.3
12,211.4
1z.211.5
12,712
12, 712.1
1c 222.2
17,212. 3
GPRAAS}ON CERYRAL BASOIEG.
2 .—-Mart each piece of
prent ia ollewing sequsned.
(1) Start ehaker screens
(2) Start bucket elewnter te shaker ecreaag
(3) Ptard corey sonreyor;
(%) Start rotary cccler;
(2 Start —— egal a ere LB;
Start t hopper cerew
(7) Stert clay feeder screy ) *tstancousiy
of Gal Eo
ene t at co tise. 6
to tep of baffel Before dumping another load.
fer Mat
aats is r; be gure there is
no foreign cbjeets dumped in hopper. If there
iq immediately cat off all motors.
Saving Down Beuipaens.——then chatting dow
equipment, use sane ayetes as starting up, caly
im reverse. Bzazple:
a. Tarn off ecrey cenveyor ia trusk unloading
| hopper;
b. Ghat off elevator to rotary eoeler, ete.,
umtil last piece of equipmest is emat off.
Eousegeeping.—-Keep hooper roem ané floor area
switches clean at all tines.
CP i 4
Charging Clay Fopper.--Fill clay heppor with elay.
Disposition of Reply Bage,--Pisce capty tage in
paper tote % . :
Use of Fork -~-Use fork truek to plaes
saitete of ne On working platforms and ferk
truek to remove eapty pallets.
23079
.--Bever Gump
mast be dows
-~-Cheok all treeite as
Alwaye Oe eure everyone
ie im the clear. ;
Meshises and equipnest
will 208 be placed ia
operation wumtil al)
gaarads have been
replaced.
Hopper attemdant will
notify track driver
whem ready to J imp.
‘Hepper room and floor
area arcuad switches
wust be kept c) san at
all times.
Free passage vey mei
de maintained at all
times to switchs.
Eo@p working platfors
and floor clear at all
times.
Drive fork lift
camticously and blow
hora at all bling
cornere and doorways.
Be careful of trucks
backing tats hopper
rooms,
12,212.4 peers asid -~°18 fe alee tbe Clay
per Operator's to Bring pallets of bags
to bagging loomtion. These is never to be sere
than two paliete of tage at this location at aay
one tine.
12,23 PACKAGING OF AMMOBIUN NITRATR LTO PAPER 2a0g
@e.23.1 Beg SPELT ~~ Keep @ geod eupply of Mage on hand = Work area must be cisan
et all times. Pick ep paper beg free pile at at @ll times. Cleanii-
side of seales. : neee prevents socidvots
& Z
12,°13.2 Position of on ---Open south (*
c positioa f op on packaging
machine. Position clamps over mouth of beg. }
pm
12,213} Operation of Soale.—Grasp lever on side of Wateh ont for handle on
hopper that contrels flow of nitrate free soals,
hopper.
12,213.44 Reading of Soale.--Pull lever to open hopper,
thes filling dag. Obdseerve marker on seals
and slow flow as pointer appreaches the full
mark. Whes gointer reaches mark, have hopper
clesed.
12,223.5 Correct Weight.--It is ispertant that tags be
weighed accurately. Any overage aust be dipped
out. Call Shift Foreman ary time you find the
scales not weighing accurately.
12,713 6 Samping and Inepeotion.—Samples to be taken ae | |
outlined in sampling procedure. Bage are te be 5
eS check weighed as outlined in Inspection Preee-
Gure. Tesperesare of materis. in tage is to be
Getermined and bage are not te be filled with
materiel exseeding 190° PF.
. ne
12,213 Tf Pro for Se -+-Break all tags dow Keep convayer and sur
0 that tep o @ etraight. Curved top Bage rounding floor area
make poer sewing. Assist dagger in keeping bag glean at all tines.
conveyor and floor clesa.
12,214 SEWING PAPER BAGGED AMMOBIUN BITRATE
12,Q4.1 Position ef Bag.--Ae bag gored from bagging con-
t veyor to sewlag machine coaveyor, position bag
for sewing. (Straightes wrinkled tope of bere
when secessary. )
Z3680
1-637
12,25.2
12,24.3
@. as
aad repeat eperations, .1 te .3, inelucive. If
bag iv Gamaged, retag material. Setify your
eapervicsr if tage are net being broken dow
properly. .
1?, 214.5 Conéition.-—Bages aust be kept free frea ell Keep fleer area clean
oon fea gush ae cil, aitrate Gust, nitrate and neat all tines.
pelution, water, ete. Be contaminaeted tags will
& be leaded inte box cars.
12,215 ARA oF CAR FOR
12,215.21 nepection.—-Oper oar door and inspect car for Important that car is
fia roof and geneTal condition. Glean sar free from content saats
ef all dedris and dirt. ee Jf ome each as calfur, lize
— ecal éast, om.
12,215.2 Ereperetice.—» gare @1) loose boards and nails Watch step, there my be
are ven down ané all deat nails Fenoved. wpright asilse on fleor.
G2. «Car Liaiag Peper.--Piace car lining paper on
oor ef car, and any drmaged places on wali of
12,215.4 Dunnege.—Duanage will be placed om tack side of
car. if lum*er is used, the dunnege will be
flush with inside of car and to the height ef sa
the leaded car. When thie is done, proceed to
‘leading doermy, then duanage cppesite side in
eame manner after car is loaded.
2365 |
a
12,26
LS |
12,216.1
\2,216.2
12, 216.3
12,216.%
$°
12,216.6
12,216.7
“~~
If ctoel strapping ie eeod, etrap villi be
fastene4 to eash side ef ear co that thie will
Ait the ceater of every other row of the bags,
starting at the Yotten sow. (See attached die
_ gras.) Then nee streteher and draw bands very
ight, Clamp together and Gack wp ceribearé
over strupping, de eure sade of strappiag are
covered with cardboard go that ends of stvupping
will aot pamsture bags.
Place etrepping oa eppeaite side of car
menner. When car ie sompletely leaded
cardboard aside, inside tetweea strapping and
bags. Tack carddoard tato place.
LOaDINO OF BOX OARS FOR SUTPMERT
Box Car $ing.--Spcet oar at leading platfers
at Cen Building.
tally Shees Tally chest vill be placed insite
of car. o telly chest ie used for marking
the mumber of bage per fow as placed in car.
Position of Canveyor.-——-Place extension conveyor
in ear or flezoveyer in car if available.
Start flemveyor.
Responsibility Car vests stare bag free oon-
wayor and carry to end cf car and preceed to
Lead car in preecribded gananer. (See attached
sa ee
peanege an Doormny.--As loading in doorway of
Gat ie completed, secure proper dunnsge in door
way of car.
Responsibility Chief Caz Leeaet.—-Chtef Car
Loader will remove. 5 7 + which will de
| given to the dest. Supervisor at the end of shift.
4
Reevoneidility Aset. Suift See cae and
& Supervisor will verify count in car and *
sign shipping documents which he in tura will
place in car.
Beno Bags, Fen eapty bage will be placed in
Oar. ;
Closing of Car Doors.~-Doors will Be clesed aad
sealed. Seale must corterposd with shipping :
accuments.
23682
~—“e--~-~ --~
i)
Se
12,218
SAPETT
PRECAUTIONS °
Be very careful while
estretahing steel strap-
ping es 1% may break oF
est leces. Vear gloves
while perforaiag this
ope ration.
Keep fingers and hantis |
wat of flexzoveyors.
Watch fiagers and hends,
while slesing bez car
doors.
a a i i i i
3-4]
12,216.10
12,216.11
217
12,2723
vor
loaded car and spot empties ané pro
2
Switch Crew.--Call switeh crew to pall est
ord we
abdove. ; rm
Presoribded Leading.--All care aust be leaded as
prescribed em shipping documents. Material macé
mot Be loaded that dese not apet specsifienticns
and car gust act leave the eres until the cen
tents are approved by the laberstery. SBrekes
begs or bage that ere net sewe properly will be
returned to bailding for retagging or reeeviag,
SEVING MACHINE ABD SCALE MA [ET RRARCR
Seving Meer he Raintesnnce .~~Raeb soving wachisa
is to out of operation evary eight
houre apf theroughly cleaned and ciled.
Scale Maintensnceg.--Use a pres@are of] can and
thoreughly clean scale pivets with ksrosene
twice a shift.
Tre
at least three tines 6
are ecourate. Methed: Plaee two (2) 30 lb.
weights inside of an empty nitrate bag and sue-
pead from bag holder. Adjust seale eo that
garker on scale centers en line.
of Scale [a
Greasing of %.--Grease ail éentrai
bagging equipment once per shift and eheck al)
Dearings twice per shift.
23683
ALL ei] mst be wiped up
aad eily rage ker% in
mete] coatainer vith.114.
Do mot edjust sachinery
while in gaotien. All
guards mast be replaced —
before mashinery is
again operated.
@.. INITIAL AND NO. —
CAR CAPACITY
DATS
/
SAMPLE
CAR SIZE
TALLY CARO 2h 4O'g”
BRAKE END
ow
@ x4
ARE
rey
| aOR EIS
§ket
@:_.
10. xe
ies
12 wba
TE
,
||, a ae
| We certify that the avove count ly correct.
OPPOSITE
ow Ne.
9 . eee
2,5 4
» er
eee 2
—
220.
SHIFT START
SHE T Fimigsn
DOCRWAY -
sw
| . <aecemmanaaals
i >
\ Sea ee
+ “2_
Pelitgr, 96
laa.
Trtal
im car
Time started
Loadsng
Time Finished
Loading
ay js preperly leaded and dunnaged
Tpe
isad Cor Leader
Asst The Gepervecr
1633
;
SamPVe CAR $i7f
Lengthy 4p 4
CAR INITIAL AND NO. .
CAR CAPACITY ————-4 222
~
Ds TE
SHIFT START ____
SMIFT FinisH
“4 1. oe
1€2. 2 24s :
oe Eee ; eee’
4,22. «22. +2G. |
en el er oe
5.22 622 \g. 5" :
) RoE SAN 4. |
+70 3.22 er ad
ead
10.22 10.260 Nessie 4
WSscaainies cei Bolster. uy
12.72 _ w7eQ L326
eo. t wewllle
Mice Nici eas 8
hal ie peers a
Tre £LO r0.WlQ ——
Time Firsres
Loading
ele
We certity thet the above ceunf is correct.
car properly loaded and gunnraged.
e3@ Car toad’
23654
| CAR Sicé
ae SAMPLE Lenglh 36’
TALLY CAKD
- INITIAL AND NO
CAR CAPACITY... 22
SHIFT START
DATE
SMmIFT FINISH
ts E e we eee aes way
Pees Racca SENET,
oT ee
ge , Ss eee
. Pad a
4 ee a) 428
pa De ccceattiaiataas
ak 3 @
- (SNES 7
a Rea
“Reon lat 9.
10,444 ~ Scion:
Te a OR
12 HQ
1 LOD
}
14 14.
Time started
15. me «Lana
Tot Lae 8
Time Finnned
Lésding
&
;
W reity thet the above ouat is Correct. The
tar > Properly leaded and Junnaged
.
4
Lead Cor 4 eeder
a
o-* Saat Svperviter
168
C#IKS:4e
SAMPLE * erat ©:
TALLY CARD
CAR iatTiAL AND NO a
E22.
CAR CAPACITY
DATE SHIFT TAT B
SMIFT FitsSh
BFAKE END OPPOSITE .DCORWA
teow No. Row No. Row N-
' * cama ices
dete 2h ye
S caiccne Societies D eaiiasiiinn
‘jarae ee. 5 Pee ihr
6 veers irate
ee i 2 6. 6
7. cenmeanatinis 7 ,_ Pe ad Rid
Se s, 2 Se aN
Biscssiontebiiiiee © casonicain Reet et
19,24. 10 2 Cio
Lee pees Beles 24
LGd.
a car lle
DD aniecsiatiaiadn
|
Time siante@ °
FW: cntrenane 000. <tinsiinane jnaiat s
Tirsc Fonisn.
Loagsng
We cert. inst the abowe Count ws .orrect.
cor we Dy ysity foaded and dunnaged.
mead Cer Leader
Asst, “>? Soperriser
23685
CAR Si2h
” eee mpagtt fo 6”
@ae wiTiat AND No.
CAR CApAciTY LL 22 és
DaTe SmiFT START.
SHIFT FimwiS1 Ss
es , /
. LF >. 9. 4A
Pa i 2. 3
r 6 4. PY +4e@
§. cme a
6 hfe. <a. 6 AY
pense , WEDEAeS 7.
$i @ 9. Ge “eae
& ) goes Beales eee
Sty ha
4G 12, 42 [FF |
yolk Ppa an ro eae
14 48 14 AB
1 AA ib 4 Be bigger ES
Ow rey PU :
Tire Fincher
Ld
we Cavts ty That Ti@ steve Count rs Corr ecr. The
Cored preper'y jugd@d ard duped
tag Jee lead’ r-
ASS? GHT Top ervr or
ee
CAR INITIAL AND WO
CAR CAPACITY
[a Tk
165
SAMPLE CARS,’
Cergy 4 -
TALLY CARO
LLOQ
SHH rT START
00 ccaticis
'S
rr 47k
SWiFT FiNisw
OF eos, TE Orcoawa
Faw hee ow We
is aden pe =
2 26 4 LQ
J ens 3.
a #2 4Go
$ A ety 5 eee mec
oe i é GO
Ti ennai , Se
ye + Bie 25
Ds dain 6 cama
0. Bo 2 ae se
Buster
OS ie TPT
2 272 /fo
TeToy
3 a or. Car g
4. * ee
Tirme started
JS Sere een bead: 4 a
Tor VF¥¢Z
St
_ Tome F inss red
Losang
we pape AT he Beeye Cowrt 1% Corr’ 7
"
Corey prep
23656
loaded Bd dimagsad.
beas Car buade
ABr Saifl S+ per orse
\O
\O
“4
2365 4
B-hster
Ben &
aad
f* ” A~ Gheas
Sic TloWs ACROSS CAR VEC Tion ~ WER OS: CAE
ENO
Door pay
167
CAAAASAANRANS NVSRAARANASARSRSASSARY :
Gan Bitotor kiw Ka Bhar tw SDovb). Rows
gG sa bedlsh-r Re »/
é Bay « Mes 45 | 7 Sey. Ai fow _A Bag 4 A Fass -
Me , ' J bay s be Sg
LAbhpthhddhtdkdhdttitddkitititttiti¢péliditiikieiiiioliaillhadbbitanr ZZZZ
“=~ «© iitene
i ' rs t MgaeUOh MS Oe Ie eS.” SRR PM Seat pie ele Bis
‘ Ae woe i ' eee [ U
i .
| ee ee eee ee ee aie sod ; |
! : Po ee pe ee me ee me
ie et 1] :
ce o , ¥
-— —
|
t Ly _—- << a <n =“ — <a by —- ooh ae — y rs —
m- 7 9 a re ct i as “43 — ¥ — «A re: . i |
‘ | ‘ { ' | '
Litt h! Cithihihhdshtlh dh lik
Kev Loy “itey IY « “Ver Cag Anas
(hd Lh Adbhdet
Kvy Bi; ber h Ir. “” “corny
Stcrvion Twku GAR-
AENGCTN WISE.
Notes
LA fh ae wi) have
on)y Y Devble FPows
2.A50'b car we |
7 Doi hie Pins
ae =. a ~
etm
yA Lilele)
Perr rer eee era
Oe Laelia
eee ei
Pee aed
BR
DARA:
}
4 MAES a cAMP aASRR AACS OA BIE A ait OR eR OY Glas Wy
(jr r p y > VA. 3 Sats
: /) (% py i + i
~~ aitin Wine MDB , ai of Ch ‘
3 | ram 1 pth a
Office Memorandum ¢ UNITED STA1i8 GOVERNMENT
: GC Tibbitts Atew (71146
to. : Field Director of Ammniticn Plant, Joliett, T11QATE: 6 May 1947
from : Chief, Safety & Security Division, 0cO ere We
SUBJECT: Safety Survey Report = Iowa Ordnance Plant
1, There is forwerded herewith copy of Safety Survey Ncport of Iowa Ordnance
Plant, Burlingten, Iowa, covering results of survey made on 14 thru 25 April 1947. .
2. This report is submitted for your information and for action relative to
such items as come under the jurisdiction of your service,
"
1 Inel CARROLL H. DEI TRICK
Safety Survey Report (in dup) Colonel, Od Lept .
ces; Chief, Field Sv
Chief, Int Sv
DO NOT RECORD
ist Ind | FRTaylor /pr /5204
OFDAP, Chief, ORDLY-S, 27 May 1947
TOs oo,’ Chief, CPDGU
1. A copy of subject report was submitted to Iowa Ordnance Flant for correc-
tive action as recommended in paragraph 5. lows has advised that such corrective
acthon is as followe:
a. Excessive amoumts of Ammonium Nitrate dust in Building 3-12 have been
cleaned up. The two bagging hoppers from which the dust originated have been covered,
thereby eliminating large accumulations in the future. Also a standard wash-down
procedure has been set up to eliminate any further small accwmilations in the future.
5's Operators of graining houses ‘are being cautioned and instructed to keep
exits cleared at all times. This condition will be cleared up upon receipt of addi-
tional vehicles which have been approved for, issue.
? *
Ce At the present time the contractor is sonducting a Job Instruction Fro-
Ee which shall be finished within the next two or three weeks. Upon sompletion of
¢ Job Instruction Program, the Job Safety Training Program will be started.
/ 1 Inod
T. Le GAINES
w/a ;
‘e"p
23689
”
(a et em aera mee on
mms : / 6
KE0 & : iQ) tH" FCO F
= : PCy a
Chief, afew 4 Seourity iv, 0CO 6 my 1947
ro dunegh J. mora, fafery Knginesr, hafety 4 Leeuwriy liv, OCo |
Samely Swreay nepert ~ Iam Ordrenes Plant | 4
the flering is a regert of :afety furvey of Teme Ordmene Plant CR at
yn Ee Si mag J. Mare, iatety Engineer of thir | ivieion of 14 = thry ° 3
.
6
x
‘>
¢
>» Wa
. ]
+
ee
set
“a
wy
a
‘ +
4
eS
179) B
cutiecsts ‘afety 'urvey pert - Towa Ori Pl G my 1947
Te: Chisf, safety . eourity itv, WO
(2) (0 vtorere, Vageninver ar! J yluoe)
7
fucve ave 275 sandar! tylem an! 14 slove round mapas U6.
‘Thase are 24,%%,991 lin oy MT, 16,660,770 Lbs of rnokeless
pownles’, 4,271,2°)) inn af Vompos‘*tan 't, 483,150 re of
touyl, FFD ,629 lve a° bole pomdar, $4,249 ahe of olac~
pomler, 7,445 lim of Leud amide, 2,514 l'a 0° fulseine ve
of morcury, 1,'X%) lbs of MW an! emouniy ion a) >omhe
ntored in the above wen cioned mi,aginne, . ack iv ‘e done
to permit’ surve tllanod. tyre are no conn. le Saulldinys
oovainity, aii’ ion ar oxclon tives, \e,e74.iun oon rol
is fool, Ther te no -runh ur debris 4 dw arnen, re
breake ars well minained. he overeallea ey o¢ Ve
areas ‘# ond,
(3) ( torqe, ine utilities)
these uf nw acara,e of #x lonives or @ ois ton in tine ©.
bulld vice a7 tils eo abliatca nce
(4) ( urve Lianos)
| ‘hore 6 & Gurve Llaice proram in apern*.on ani 1 wak 4
| is: «41 don Balelye <
; (5) ( emiifcarisa sion)
j
| here ore no denilivarocas on opera:iont a> “uF Fe & Liste
"B') Ss
f&) ¢ enevn -on)
tere ate no Pena LO operu t. OT Bo Wiis |v AWA 1% 1%
(J) © owrie om ds” Crap a ejes on axial)
Siere: £3 "Oo chest Yruc..o": CM Bi “eS BCT HLA
Dt te bg. # B HOLES ls Ve
: rh \é. 6's ad > a it "ro. ynrt )
: Yep concom PL PH SO PITMAN IF ATA FAL oat SOP ene: — .
: S ‘was? OO. . Me Be (ee ite ie | Ver le
; cornlen. wil Fe eran ' Oe iv ‘ae Reg Re She es
: are Jtrns OTOLODOF e las i: 2s Sey ULiaer & ar ee
3 ts otkimeIrme Lie Teruo ‘ oe Les ee ee a Se
3 wr Cale og ed gy itn Goh es aD TO 2 tse
:
& ,
3 -
23691 2,
, ;
‘
i
<r seen Se NR a ey Ve a See ween Wee “er | peer eee yee
wa
age
Dar gS
The }
Line 3 and Wwe Amoniua Nitwete Area ware
of the follmming conditions. Rusescive amount o° Amenim
Nitwe.e due: on ledyes, equipmen:, fixtures an! Slows. ~
Poor central o” greases, oils, clean rags, are Slare
Ge Jrvtyn terial 9 ery ,
(1) ‘he acoiden. frequency rate for iis ef “abi isimens 2or
he wonth oF April i 7.93 for 126,05. maiourn. te
exisiin. sale; 8 axards of th plant am. «. ‘here
is anple pro active equijwent. hy ical 6a warding
of equigsen* is , od. hese ic a well equipped hospital
with a con*xuct sureon an! nurre in a.-endance,
de rerepor a ijon an: ret ‘fo _o: 50}
(2) ‘he radbron:: am: higtmay, factlitien of Sie on #1 Ginn’
are fOuUle Ww te Ube meducwion in he omyvl oper saan’
hore is a weondens, for som of who uiverr a.) e ices
4 ‘9 apesds The su:jec’..o° speed my 2 «my: brow ho *o
the atcen’.ton of alli employeos by ‘neu rup visors in
‘azety ‘@- Ulm ele
@. (oIw tuo ’.ion a::' "ac li* las
: JS
(1) ‘he scacS houses and prec: laally all rimp. of ° ine %A ore
o* ‘Srume comoric.ane (there are 7? imil’in:. an! 7
barns wi tae s°a-7 vetidence and plan G-ea)e f1l explosive
proce: sa!’ stomice Pulicinga bew Lis taim procs -Uie
Se 24, Nu proto t.an bye ae imve Cwm ok ct a 59 and
‘Oo sali fac arse hae Ceo a Hore CRU we el Te
eo ye ihe 47 Wek BO ime One elec ric porr, PF ean
On TR th, Gi HWA OH ry! Ar Bre A OYE’ Be
f
Ve
23692 4
7 2 * J i Pye, “ta Aus " *
i Se os Se oy ett eh ees SRG ae epee eae aS Ot 7
PR ANGE AE TOTP ORE eS ROD, ey
Wada iT re
‘Shae
eh mie Ne a VP a NES SA
“ PEATE SESS IH eS RRS a ee a
AOE ERS a
cusjeci: ately ousey epor’ = Lowa sed 2
"og chic !, «“*ey ecari‘y “iv, ‘(ye
\ C. . Pista. Pro ec -.M
\ yl)
of we Callas sy op. or,
r ste ta 4, . ers
ve isan wr olan
. ds
(els, Foo
sol
me See” Ue
© Bay ogee OO Bee La was revise $3 oe cuar Lua7e 1’ was B’ ated
Pe Sis Sra hepa © 6) COVER re eR Shel Lome & CoH bet
POO Set 2.83 em eewly avinio: Tor emrovele
\ ot
We . 8 Ocuertin: 25 wry lores, om
(Ll) ‘dlitary Invomwe.ion 2: ivan Led ec at ‘3 Py © WAS {owBe
1, & kepy in w& locked sete an Ae .deiouetsaion vildiace
‘. .xploc ives (Job) acer yuinby :
(1) i .|@fe-g Suluin: Vo Tan 5 Lee Simin bo ae 8 Se
n inees ani he upery surr Of Ce”. "aH Lis': wn oO TRaALs
have been megaentied ano ormter Che cll supervwisore’o! he “vite
MIneCD VeEparcaen. & Am ois rcencty - XpOr. . OFLor, . .of ww;
ve @ohe to trac. o« ewloyaok be uxplobive one. Course as
approved by afry ant eeunty ivis one
eg be ; -
Be he aleey Cecanica lon Gpomee oo -@ Bore. al nur VSO, Site
we'Llesec so saves Saas. lon: @ dma to he clear ew. ws. osu,r vl, ened’ ae od,
i 24° Aes ew 'y AVE, dws Ci UMN € coral Lome acx! Pree. cor poe voller.
a TC es oie) we) ae eee bh On a, ee ee | he "O° Om Gorriiberte
-¢ Yo os alte © of wesusicton i: ecoveyrouns wi iis ties tur bee ar an. ed
so va. soured wor a waiwr hos wen alivwsa ade
Ge Me ores Shure area all croenen r.iliin « wes wh trad
on an avera eo OneR exch Aye wonterences wer elds di plan cena even.
unl ob rece): east caent wid ache ules of elininavct: Cie unre le & mol iow»
noiAle A
de He “smh ‘olloweup duspec’. on reveals a mrved Siprove ent
“n tie wwuse Cheats. > hiawekeopin ° orl man, eoroee lve Vrecg tyros? Us -a@l; doo
preven’ Wie reoccurrence 9 ‘he &oove wise le
2 - eae t aearree renee |
Be he exeosni on e'wunyp of Ft
equipaen., iixuuares am: floor: oF
taken °o preven aocusula ion of d wt
he
23693
aout iions & 1: prac’ 1008.
‘ae Peary:
het
the Guard ani Fire ‘epar‘aen‘s are comp lned and cons ist
onium Arn a dies oO “ne leis,
bulletin, 3—12 shoul |
+ AN: Mako ues
>
ubject, (nie ourve, eport |e Lae 4 me Cay U4”
fog shir, ‘afes -eurhy tr, UC
%e | wtiins Siioul: ow tale am sowetures fe “> vw preven.
vlockin J Osi &. Sm omen tnglh ice US “eet Aco e TA: & NPte
Se Te oxploe mm 6m.) ae Y Yetrst PO, mus & walk Ue & ares
an Boon sw DONRiblee
:
F
:
;
~
4 sd
Le Noah dale 2
O) tet oie 6 od bi teh it:
fr
™
rea
;
. ~
OC0 Y bSeuerumpare
“ds JOH DRAPE -
me 28 April 1947
IOWA ORDNANCE PIANT
Burlington, Iowa
TO: Chief, Safety & Security Division, 0CO
From: Mr. Joseph J. Moore, Séfety Engineer, Safety & Security Division, OO
3 Subject: Safety Survey Report - Iowa Ordnance Plant oes
:. The following is a report of Safety Survey of Iowa Ordnance Plant,
q Burlington, Iowa, made by ur. Joseph J. Yoore, Safety Engineer of this Division
4 on 14 thru 25 April 1947. ; : “8
x 1. PERSONNEL AT THE ESTABLISIMENT 4efoe
a. Lt. Col. J. 5. Jefferds is the Commanding Officer.
. be. Mr. Je Re Long~is the Safety Officer.
- c. Mr. Je Re Long is the Safety Director
3 dad. Mr. John Bush is the Safety Engineer, there are no Inspectors. :
. @. Total number of Employees. Male Femele. Total »
Ordnance af 338 21 359
: Fifth Army 114 5 119
Signal 4 3 7
Emergency Export Corporation 264 i 266
TOL 751
There are 6 Commissioned Officcrs
2. MISSION OF THE ESTABLISHMENT
@. Storage of high explosives, smokeless powder, ARYO and finished
> ammunition and inert component parts comprise the mission of the plant in addi-
ee tion to maintenance of 100% standby ccndition. Ammonium Nitrate fertilizer project
e Started production & Janvary 1947.
Z 3. SATETY SURVEY FINDINGS
s a. Fire Prevention and Protection
Pe (1) There is one stetion equipped with 1 = 1000 gallon per mimite
—— esas a as eee ehlhlC KhCw CLT rT OC lO ll rl hc lll TN rr rm we ei we ne ,h—Uc hc! hUC hUCU ShlUr lh;
Lee See * i ; ee fo , seo hag
et #4
paper, 1 = 750 gym purper, 1 = brash truck, and 2 - 1500 ,
gallen tank Weteretler trucx. ‘there is first aid fire-
fighting equipment in buildings and areas of the plant. It
was otated there is ample supply of water for fire Sighting ‘
purposes. Auxiliary firemen are appointed on each working
shift.
be Bxuhosives aid Ammnition Safety | | ;
(1) (Storage, Outdoor)
There is no storage of explosives or ammmition outdoors
at this establishzent.
(2) (Stormge, Magazines and Igloos) |
There are 275 standard igloos and 34 aboveground magazines.
there are 24,904,391 lbs. of INT, 16,686,770 1bs of smokeless
powder, 4,271,200 lbe of Composition B, 483,150 lbe of tetryl, |
273,620 Ube of B.C. powder, 54,240 bc of black powder, 7,48
lbs of lead aside, 2,519 lbs of fulminate of mercury, 1,79
be of PEIN and ammunition and bombs stored in the above mentike:|
magazines. Stacking is done *o ee # surveillance. There are |
no combustible buildings containing ammunition or explosives.
Vegetation control is good. There is no cone pie debris in th
areas. Firebreaks are well maintained. ‘the over-all safety °!
the areas is good.
(3) (Storage, Line Buildings) |
There is no storage of explosives or ammunition in line builé |
ings of this establishment.
(4) (Surveillance)
There is a surveillance program and the work ‘is being done '
safely. -
25696 :
186
Subject:
To:
(5) (Demilitarization) af
There are no demilitarization operations at this cs*ablish-
ment. |
(6) (Renovation)
There are nc renovation operations at this establichnent.
(7) (Destruction of Serap and Peject ‘faterial )
there are no deatmiction of scrap and reject materisls at
ni this establishment.
(8) (Ammonium Nitrate Program)
— Aumoniun Nitrate Progran is being handked by the Emergency
[Export Corneration. Mr. H. Y. Wood ts the Plant Superin—
tendent and mF. Aaron Cox is the vafety Ensineer. There
are 266 employees. Production of the fertilizer started
8 January 1947. Present rate of production is 261 tons
per day. Only 3 of the 4 graininr houses are in operation.
Temperatures of the Ammonium Witrate from high pan to grain-
ing kettle 320° (Ammonium "Nitrate will fudge at 310°); grain
kettle to nitrate bugry 215°; nitrate buggy to bag 160° to
, 200°, All loaded bacs with a cpasaenct of 190° * 200°
are set aside and cooled to a tempere tare of 170° cr less
x before they are loaded ‘nto the box cars for shipnen*.
Temperature of anodic after they hens been loaded
into larges ch the Mississippi River are 105° to 115°.
The housekeeping and house-—cleaning in the buildinss of
Line 3 and the Amionium Nitrate Area were poor because of
the following conditions,
23697
Subjects .
Tos
Excessive amount of Ammonium Nitrate dust on ledges,
equipment, fixtures and floorg. Poor control of greases, 2
oils, clean rags, arc flare of electric welder, welding a
operations near ammonium nitrate, shop work being done ee
near operations, temporary wiring near ammonium nitrate, yi
“tk oe-6VER : os
men stepping on moving conveyor to GreesGewer, door ways a
- and oxigts blocked rith nitrate bugries, and no fire symbols 3
on buildings. a
»
+3
3 “3
“2
188
“Tt
’ .
4
Subjects 3 ‘
Tor
c. Industrial Safe
accident rate
(1) ‘he/frequency/for this establishment for the month of April
is 7.93 for 126,055 manhours. The existing safety standards
of the plant are good. There is ample protective equipment.-
Physical safeguarding of equipment is cood. There is well
eqaippéd hospital with a contract surgeon and nurse in attendance
d. Transporta*ion and traffic Control
(1) ‘The railroud and higtway facilities of the establishment are
good. Tue to the reduction in the guerd department there is
e tendency for some of the drivers of vehicles to speed. The
_ subject of speeding is being brought to the attention of all
employees by their supervisors in Safety Meetings.
e. Construction and Facilities
(1) ‘the ctaff houses and practically all remps of Line 3A are of
frame construction, (There are 7? buildings and 7 barns in
the staff residence and plant area). All explosive process
and storage buildings hav* lightning protection. The lightning
protection systens have been tested and found to be satisfactory.
These tests were conducted within the past year. It was states
that the electric power, staan generating, and sewavye System
are adequate.
f. Plant Protcction
(1) ‘he Guard and Fire Departments are combined and consist of
the following personnels
1 Chief, 4 Crew Chiefs, and 22 Fire Fighter-Ouards
g. Disaster Plan
The Disaster Plan was revised 1 February 1947. It was stated
- 23699 \
Subjects
that it is adequate to cover present conditions. & copy
has been sent to Safety & Security Division for approval.
3
“re Safeguarding Military Information
(1) Military information ishandled sapieneiues to Army Regulations.
It is kept in a locked safe in the Administration Building.
i. Explosives (Job) Safety Training.
(1) The Explosives Safety Training program is being conducted
by the Safety Engineer and the Supervisors of the Establishment.
Manuals have been requested feom-eur-office in order that all
supervisors of tho Ordnance Department and the Emergency Export
Corporation may be able to teach the employees the Explos ive
Safety Course as approved by Safety and.Sacurity Division.
b. ‘the storage of ammmition in aboveground magazines has been arranged
so that the need. for a waiver has been eliminated. r
c. ‘the Ammonium Nitrate area and process buildings were wees on an
average of once each day, due to the mumerous wisafe sete and comlitions noted.
Conferenses were held with plant management and their safety departmen* with the
idea of od imina ting the above sete and condi tions, also suggesting ways of pre=-
vent ing the above te happen again. Owing -to thie condition it is suggested thet-
this plant-bs inspected about 10 daly 1947.
_d. If Safety end Security Division is of the opinion tit Ammonium Nitra
operations should be treated as Class 9, Xt is recommended that Building No. 3-12
. ee ‘
23700 |
=e
a sae
. : “ ’ :
' age 7 , te
. oe . tal -
¥ ~ my
5 . ,/
. ,
: a
, 5 =< e 8
. 3 oe % ,
ar Te ta ek we Aik
i?
® i f r 1}
- fe (AI NAAN wv ; Tage VY Finke
sop
| 23701
23702
ay.) TR OORT mE EY oR AS flee ae nese .
LEN AAR WOR LEO NIA LN GS REED ly
SUN Ga Sep hbas aoe qReeahe ad tet ene ‘a:
Gee
“e |
i]
“3
|
ee)
;
os
z
3
4
000 G/F
Subjects : Pattee. 3
Tos
be made and-all-requirements-of the Safety Marual necessary for safe operetions
of _the linebe- instituted.
- @e—Jurther recommendation is that an Explosive (Job) Safety Training
Program-be e@tarted immediately to eliminete the vints tions cf procedures prevalent
in-thegreining end Line) Aree.
\A4e The final edlenup inspection revealed a marked improvement in the
hovse--cleaning, housekeeping and many corrective measures installed to prevent
\A‘’ 9 4-
the reoccurrence of the above conditions ard rata teeta
56 RECOMMENDA TIONS
- The excess ive amounts of Ammoniven Nitrate dust on the ledges, equip-)
s and f1
ment, rt off ennaing 3-12 ehould be removed and measures taken
i=
Wiake shoal Go ets enn. procures nei tn-Beaened © bn! :
fwem block ing the exits at. the graining building in the —— Nitrate Aree. re
&
oo 1
6. me
hesahut-down-and cleaned up. Before operations begin,« thorough safety inspection
we
% :
"Tle. Gly ak Gore oe au
/- ld pon Plow :
rf
| J 3 25 april vA
TO: Chief, Safety & Security Division, 000. ; |
FROM: Joseph J. Moore, Safety Engineer, Safety & Security Div., 000.
SUBJECT: Safety Survey Report, owa Ordnance Plant. /-
/
The following is a report of Safety Survey of Iowa Oxdnepos Pleat,
Burlington, Iowa, made by Mr. Joseph J. Moore, Safety Enginser of tis.
Division en 1, thru 25 April 19),7. | ¢ J |
l. Personnel at the Establishment
a. Lt. Colonel J. & Jefferds is the Commanding Officer.
e. Total Number of Baployees Male Female Total
ng yf 3 ay!’
Fifth arny- Corps of Emgrs. 5
Fite asey we aa” y
Signal re 7
Emergency Expert Corp. 264 2 266
TOTAL ¢ 75I
’
There are 6 seay Officers.
2. Mission of the Establishrent
Storage of high explosives, smokeless powder, ARFO, and finished
ammunition and inert” component parts comprise the mission of the plant in
addition to maintenance of 100% standby condition. Ammonium Nitrate fertiliser
project started production 8 January 1917.
3. Safety Survey—Findi ngs
‘a. Fire Prevention and Protection.
(1) There is one station equipped with 1 - 1000 galion per
minute pumper, 1 - 750 gpm pumper, 1 - Brush truck, and 1 - 1500 gallon tank sg
Motorailer truck. There is first aid fire-fighting equipment in buildings i) See
and areas of the plant. It was stated there is ample supply of water for
pre Hie cect purposes. Auxiliary firemen are appointed on each working :
8 ° 5
NID}
b. Explosives and Ammnition Safety.
{1) (Storage, Outdoor)
There is no storage of explosives or ammunition outdoors
at this establishment.
23705 | ‘
vey
ahh
25 Apr 7
(2) (Storage, Magasines and Igloos)
There are 275 standard iglooe and 3), above ground
magezines. There are 2,904,391 lbs. of THT, 16,686,770 lbs. of smokeless
powder, k,271,200 lbe. of Composition B, 483,150 lbs. of tetryl, 273,620 lbs.
of B.C. powder, 54,20 lbe. of black powder, 7,8 lbs. of lead aside,
2,539 Ibe. of fulwinate of mercury, 1,797 lbe. of PETN and emmunition and
bombs stored in the above mentioned magazines. Stacking is done to pernit
eurveillance. There are no cambustible buildings containing ammunition cor
explosives. Vegetation control is good. There is no trash or debris in the
areas, Firebreaks are well maintained. The overall safety of the areas is
good. >
(3) (Storage, Line Buildings)
There is no storage of explosives or ammnition in lins
buildings of this establishment. «
(4) (Surveillance)
There is a surveillance program and the work is being
done safely.
(S) (Demilitarisation)
There are no demilitarisation operations at this estab-
lishment.
(6) (Renovation) ;
There are no renovation operations at this establishment.
(7) Destruction of Scrap-and Reject Material
There are no destruction of scrap and reject materiels
at this establishment.
(8) Ammonium Nitrate Program
Ammonium Nitrate Program is being handled by the
Emergency Export Corporation. Mr. H. V. Wood is the Plant Superintendent
and.Aaron Cox is the Safety Engineer. There are 266 employees. Production
“Of the fertiliser startod 8 January 1917. Present rate of preduction is
261 tone per day. (Qnly 3 of the 4 graining houses are in operation. Tem-
peratures of the Ammonium Nitrate from high pan to graining kettle 320°
(Ammonium Nitrate will fudge at 310°); Grain kettle to nitrate buggy 215°;
nitrate buggy to bag 160° to 200°. All loaded bags with a temperature of
190° to 200° are set aside and cooled to a temperature of 170° or less before
they are loaded into the box cars for shipment. Temperature of the fertilizer
after they have been loaded into barges on the Mississippi River are 105° to
Wie Sandra tnn of alte Led hat.
Sc. Industrial Safety; fn
(1) The, frequency.for this establishment for che month of
April is 7.93 for 126,055 manhours. The existing safety standards of the
plant are good. There is ample protective equipment. Physical safsguarding
of equipment is good. There is a well equipped hospital with a contract
surgeon and nurse in attendance.
25 apr 7
“qd. Transportation and Traffic Control
(1) The railroad and highway facilities of the establishment
are good. Due to the reduction in the guard department there is a tendency
for some of the drivers of vehicles to speed. The subject of speeding is
being brought to the attention of all employees by their supervisors in
Safety Meetings.
e. Construction and Facilities
(1) The staff houses and practically all ramps of Line 3A
are of frame constrictions (There are 77 buildings and 7 barns in the staff
residence and plant anga). All explosive process and storage buildings have
lightning protection. The lightning protection systems have been tested and
found to be satisfactory. These tests were conducted within the past year.
It was stated that the electric power, steam generating, and sewage systems
are adequate.
f. Plant Protection ’
(1) Thequard and Fire Departments are combined and consist
of the following personnel: 1 Chief, 4 Crew Chiefs and 22 fire-fighter guards.
ge Disaster Plan >
(1) The Disaster Plan was revised 1 February 194,7., It was
stated that it is adequate to cover present conditions. A copy has been sent
to our-gffice for approval.
h. Safeguarding Military Information
(1) Military information is kept- according to Army Receistions.
It is kept in a locked safe in the Administration Building.
i. Explosives (Job) Safety Training
(1) The Explosives Safety Training program is being conducted
by the Safety Engineer and the Supervisors of the Establishment. Manuals have
been requested from our office in order that all supervisors of the Ordnance
Department and the Emergency Export Corporation may.be able to teach the
employees the Explosive Safety Course as approved by our office.
?
4. “Remarks : Fy.
a. The Safety Organization is sound and function, satisfac-
torily as set up. All personmel exhibit an active kntwledge and interest in
safety. Supervisory, surveillance and safety functions are clear cut and are
properly coordinated. :
23707
25 apr 47
aa
The storage of ammunition in above ground magazines has been
arranged so that the need for a waiver from-our-oefftee has been eliminated.
- The Ammonium Nitrate area and process buildings were visited
on an average of once each day due to the numercus unsafe acts and conditions
noted. Conferences were held with plant management and their safety depart-
ment with the idea of eliminating the above acts and conditions, also sug-
gesting ways of preventing the above to happen again.
bins Owing to the-above conditions it is suggested that this plant
be inspected about 10 July 19:7. m , :
“tf cz affies is of the opinion that Ammonium Nitrate operations
should be treated as Class 9, I recommend that Building #3-12 be shut down
and cleaned up. Before operations begin a thorough safety inspection be made
and all requirements of the Safety Marmal necessary for safe operations of
the line be instituted.
~-’ Purther recommendation is that an Explosives (Job) Safety Training
program be started immediately to eliminate the violations of procedures
prevalent in the graining and Line 3 areas.
A
A) tay — re He clin, | if
Recommerdiati ons
Fe
j s ; : { a,
a vf wa eats <.. e Lid Lo § i OE 7 -¢ opie! ee LAV 60 be?
a ; ;
a ve actacaite
4
: — ae be ond. pee os - r / $F we - ee Sa 224. a —
, a y
a. Ww oe [ PO ge eavd wt Oo 4 <
——<t we - tte ae ae ea
~
ee: rE See oe ore pe ie Ae” Wee
Ani... 3 fee
‘ _— y ae
et Bee § Ay. ‘an # -Lif fc
~<
{\ “
s 4
hy
eae,
Sh ‘
£
«
|
i Cree mr aaawinte mney AH
}
{
i
]
'
|
b -
i
-
5
— portent — — a Sapam ee ae, : actin sar kos healt
«
= omen ae —— —- -— — - _——/ — — ~ —- —— ee a
—
i
-
=
i RE Ae RR
dtg#5-O
72:
im VA OSL7:
7
a a S
ulJVEecl.
Vf. a.
V4 A ,
——_ -4 , ie /
f p-
e” 3a/ bem of
ad
ty
if:
s
A
Fae? View A
are oA a, he
it Py
holawf
oC
O. O. Porm 5734 B90
210
y Sane” |
| AM LAL yl,
Jrcecgaintey ob ef
i |
- ~ Ff 4 r . - shatioubedt winitinenee dinate
if l y ) | i
| Ve A
Cee ag 2 pod pate oer lt ee SET
“ ; : y,
tad the ys a we es, saea Pe , ak PEs : af :
eee 4}
LAY -¥g Zz has _ =)
0 Porm S74 oa
or verre @rwe ras y, ry
23712 = r
SPT, FOR ty REIN NORE ght MISA AE ONS RY REET! | wy Pera aes Penns Oe
ORIEN AH Pte ieee tS ptioc Ak WONG Ss:
‘~@ a.
a pred
7
< Cs *s
Ao A ra” ar"
aaa i i a Be
i i
: a 2 te,
Ohta hell le co eat ‘a a ee
£94)
: : Ef. .£
(r.* “ Ce ed &
a eee of ae a wo f
Ss oF Me ee
Balled soll ate? ae vA MP a ‘ii “4 ae .
- ~-
eit, a } Ly oe: rea a
aa713 ¢°
as LOO 4 oe Fy en 2 SL: ad oa
plIe 2 60° ZAP | ee ej
eg wes
nik dtd 7
fs sae e
f
BCo Y/N 214
;
eel
oa
a -
« 2? ~*
Ps, ° ‘ i
‘ . . ‘
“
a ANS Pe
; Sore eee - | . aN P |
4 a?
Pg 4 ;
a : care me. —— Li Zs
i? it 7:
= 4 = “Oar te af?
“i f Z
Pd “} a at. de dow A Be OUT, <2 —_ _-
e ada. sll Pla A ee 2 we A —— 2 > aa pe oe ae —- cial
vA = , "af rs .
pita Fn ee - Soom, Sets , 2. yA 2
—— . ae —~ .®, —_ a a Yo--- SE Se
é
Se ee — — a De
Sa 7 ; /
S ee /f aaa PA
ent : oS a a A — me
pigs pe - --— — lla td — >» = — ee
0. Oo. oTe4 B 9519 |
.
29 23716 ~~
.
ve can 2s ; eae, a. Arte F Ae ,
wg ra a4 | }
/ f | es ‘\ sf ona ‘ | ;
Ff Lk od. : ica: y/ LI ae Peete ac? Saleem ae L : a
Lewin Eel Bi Ses = /
CY 4. C2214: i5-O 2x. hihi Pag © od = Se A : 2. £:.
Sai ee it , js ea
LAL? Ei ¢ ‘
wk CA-~ Rai I. : r ¢ mR a"
€ parasite PAA gee we eh te Cr et
ig
BN
. ALGL- = AWD Leg ey tr OA.
ee © Be oer os
ap wd ver pee
Ag
ee ed es
2 As
tet he
Ie, , , ee
Biree ar Be ae. I te rh (ori iat es tae fit- Eo
Avs
S
OCo S/W 217 :
Sive
ee ae
ree (bf)
ae ag 6
S-6519 os 6 sevenewarr remem: avne ven
23718
a
=
’
.
/ o?
3 ~ae~
al P
-- f
fN\)>
mates Ee aay ee
Geb
219
Yrplo bs:
SQEQN SA
os
eo om |
™ Arenas | ee ox 2 _ : | ‘ .
i % vy 7 4g font ee LA Ay Y. iy ~ < omen > x z
mer = at tes a Fae pe LS
‘ ,
Sh
is
h
a i ft
; Me
: O. ©. Form 5794 are
| 95 Te AAU eH weNR OFC e Lem
4
See rT
— .
pm AT RE a ; =
,
: “ \
a >.
* od
‘A
‘1 indie ° ‘
q fF 5
, .
id i fe, 38 o£.
.
222
OWA
—_ '
EI ES 5 ,
co Ci /iL Gi: — hfe tne : O -
/ ca
) e ee car
©.0O Form 5704
35 9. eee
a
4
ey,
~
; r WAR DEPARTMENT
& OFFICE OF THE CHIEF OF ORDNAY CE
FIELD DIRECTOR OF AMYUNITION PLANTS RECORD
JOLIET, ILLINOIS
TlHaines /ojr/S222
ORDLY=S 333/12616 Iowa
9 April 1917
ORDCW 333/L8
SUBJECT: Inspection of Decontaminated Areas
TO: Commanding Officer
Iowa Ordnance Plant
S Burlington, Iowa o
1. During the past few weeks there have been several instances of
the finding of explosives and hazardous items in installations which
have been reported as decontaminated. The continued discovery of these
dangerous items makes it necessary that immediate and ade
ial is discovered and removed from the premises. 41) buildings should
be thoroughly inspected. This includes boiler houses, change houses,
3. In areas previously reported as decontaminated, it has been
reported, for example, that one igloo has been found fl]
of miscel-
lanecus items of ammunition, carboys of acid have been found in aban-
doned buildings, a can of black powier was found in a boiler roan,
and that rounds of small arms ammunition were found in a store
house.
/s/ Joel G. Holmes
JOEL G. HOLMES
Colonel, Ord Dept
Assistant
vi; 23723
INGTON ik... AC cw, 70
r0: ir, WA, Johnston Apri. 19/1447
- \
SUBJECT: lag Teuporatures AS 900, 18
Ba
( pte.
1, On Thureday April 17, 1%7, the following individuals “cade
an inspection of the Federal Setgad Ling facilities at the
+o
2. The method of handling the bags was inspected and checked
from the time they opened the x Car until they were actually
loaded-into the barge. Aji ) edures were in order,
3. Fith the a Fessen didi thermometer, tenpsratures were
taken bags that had been leaded into the barge.
These as to temperature, were made by actually
climming fertiliser and determining ty sense
of to to be warm. Several readings vere’
to 105 degrees. One reading ms obtained
ef 115 This was the highest temperature recorded,
Saved on this information it was the opinion of this greup
that the loading precedure mas satisfactory from a safety
standpoint.
y, v. Beod %
RV sath Superint endent
oo: Messrs, Jchn BR, Long
Joe Moore :
J, O, Chapman
7" ww VF Ve aS SS ww wwe
WAR DEPARTMENT Me
OF AMMUNITION PLARTS
SUBJECT: September Performance Analysis . ~
TO: Commanding Officer
Iowa Ordnance Plant
Burlington, Iowa
i. Analysis of the Control Reports received by this office,
covering the Renovation and Demilitarization Program for the month of
September shows the following performance:
Your | Industry
Installation Averere
1 ~ Percent of September Schedule Completed ; 70.2% 53S
2- Dollar Performance (Earned Dollars/Dollars Spent) 133.2 43.
3—Man Hour Performance (Earned MH/Actual MH Used) 92.3% 77.0%
Y- Cost per Direct Labor Man Hour $2.08 $5.25
2. The completion of 70.2% of the September Schedule is under-
+
ya
Standable since this amount was the balance to be dore on the schedule.
In other words, it is the equivalent of the 100% performance.
-__The Dollar Performance of 133.3% indicates an appreciable
Savinzn was made and your inetaliation [s to be commendec Tor thts ~
seneenernmmnnltl aetnmmnsnemeat ween amore desecrea. Fe er ne ss” ie
* fine work, ee oe
° the Man Hour Performance of 92. also is ve
dicates good p anning b the Operations Department.
ood and in-
- the Cost ver Direct Labor Man Hour of $2.08 also indicates
ood planning and a welt balance overhead. Yr SORPartYor—es—ere—te -
— Tae Goa for the month of Wenten Your Teeter! retorts enown
teeta
Rap tiers 9) 40 Wemyss oe oe, . «og “ee La ®*
7 er
6. It is noted that your instaliation did not use the new "S-hedcule
2", Porm 00-1113, on your reports for the month of October. The request
from this office for the use of his form was made in the letter dated
<7 September 1946. It is to the acvantace of your installation as wel]
as to this office that the report be prepared as requestec.
PY _
4
ORDEY-L
SUBJECT: September Performance Analysis 1 13 Kovember 1916
7. The Ordnance Department Order No. 57-6, ated ly October 1916,
requests that the monthly report be incorporated with the first quarter
“report of the next month. This change supersedes the instructions given
in the 27 September 1916 letter from this office.
8. In accordance with instructions contained in the Ordnance Depart-
ment Order Ho. 57-l6, dated LU, October 196, responsibility for the com-
pletion of the demilitarization and renovation program is delegated to
this office. Since Schedule 9 report is the only means by which this
office oan follow the progress of your operations, it is requested that
explanatory remarks regarding conditions that have affected the performance
of your installaticn be stated on the monthly report of Schedule 9 (Form
00-1113). Such remarks will be personally reviewed by the Commanding °
Officer and sufficient notation added to indicate action taken to correct
discrepancies, “
BY ORDER OF THE CHIEF OF ORDNANCE:
Peer:
> "ay JOEL G. ROLMES
Colonel, Ord Dept
Assistant
28426
_ i
iii, | Caer,
JOM COMIC Pat D E
BRITON, JOM O00 ¥ /S a
. {Dp
fe MEBTIZG ELD APRIL p |
gz. Y, gg ace ee te oer
Ca & 2 Pierce p Dept ca a oeear
ag teed Safety & Security Granch ¥. R, Canpbel)
J. 3. Ghapmen Aaron Cox
H, H, Gevb ‘A. Jd. Marta
A, &, Mausner R, Jd. Im
a, ©, Meurer
ag
A chais ccs Ke ci oe r
been making a safety cuiit of the plant ani will take pert in the mesting.
Mr, Cox reported that the Frequency for Merch wus 25.00, Severity,
based on the 900 days on the toe injury of Carl Melson, eas 22.50, The
Frequency here to date is 21,10 and Severity to dete, dased on the same
900 days, 1.26,
Causes of injuries during March were as follows; :
1s& Striking against
55% Struck by “
18% Caught in between Es
64 Falls, different levels a
3% Slipping, strains, etc,
Part of body affected: \ |
m = neck injuries
208 Arme
3% Feet and [foes
Agency: Machines and Eqiiipment :
7% Graining wettles or hi-pans
7% Conveyor, industrial trailers
7% Steam hose or pipe
164 Other /
~~
%,
255
F i
Pd ae:
33 qs
5.
\
Friday.
vets Howat
noe Department
request but explained that their dspartment
recently a Mr. McCauley had been
on
in
of their operation,
brought to
held
brought
to
. outline and adopt it to Job defety Training
Progen
JoTeke.
lead opere
from the
y, Lh HS
lend some assistance
our
that
phase
Yegriun 4 dy HE
_— cat vali
4d 1
know firsthand what he thinks of our operation hers.
are his comments ami suggestions:
i. raga An ee Shae Oe Sees Se Oe Sree on
ary
They
the
Plante
die tod
and
speeding
has more
Ordnance, Department.
id to the Ordmance Department personnel —/
equipment and wonderful
ioned that be saw a bus speeding the other day.
O00 ,000 miles were traveled
dapartment of the War Departaent with no
some of the best
of Mowember 4
the jurisdiction of the
m applied
pointed out that the Ordnance Departaent
stic
eent
other
have
morth
under
endl
E23
Mr, Moore's office makes this recosment ‘Sion.
where the paper bags have been found charre fram
greece
cases
He
PS
to ammonium nitrate
It is quite resistive
that it will detonate,
that there would probably be directive,
respect be paid
done in the past.
stated
ting thet more
beer
is known
it
ile
Je
4.
36
6.
76
9
ll,
ad 3 =
Housekeeping, House Cleaning =~ Building 3-12
In going through Building 3-12 last Tuesday, Mr. Moore said he didn't
think it looked a bit good, the next day he thought it looked fins,
and the day following it didn’t look so good again although it wasn't
as bad as the firet day he saw it. He stated that the quickest
way to climinate accidents is through housekeeping, Housekeeping is
first, house clesening second, ‘
Unsafe conditions - these can always be traced beek to poor house-
keeping.
Unsafe acta ~ the third ites,
Control of greases and oils = These are foreign substances and should
not be too close to ammonium nitrate,
Control of clean rags ~ A lot of nice clean rags were seen in @ paper
sack. This is not so good, |
Poor control of arc flare of electric welder « People having to work
near electric welderc, even though they are not welders are subject
to "kleg” eyes. Mr. Moore stated he had seen very serious cases
resulting from just having to work near the arc, He has discussed
thie with Mr. Long in regard to members of the Fire Departaent who
are sent out to observe welding operations, wearing dark glasses,
Any man using an oir hose for cleaning purposes should wear goggles,
Poor control of welding operations near amponium nitrate fertiliser -
Some jobs of work could be done in other locations, If it hes to
be done near operations it should be isolated as much as possible.
The removal of hinges on TN? buggies should be expedited < Hr, Moore
stated that he umferstood we had had one lost time accident fron this
Cause «
The practice of men stepping on the conveyor when they want to get
on the other side is hasardous, ss
Any personnel requested to walk around on the top of tank should
weer a life line or a piece of rope around their waist (both ends
* have to be tied).
Mr, Moore has discussed the subject of Safety Shoes with both
Mr, Johnston and Mr. Wood, He mentioned that he could see where ons
accident might have been Prevented by the Wearing of safety shoes,
~,
34
»>
8.93 with 112.908 man hours worked, For February it was 9.04 with
hems worked, When thay see this report they ask
master with a high frequency for the number of
wan houre worked, They don't pay any attention to the severity, but
it is a good thing to heve. The insurance company watches the
severity more than frequency when thay see the severity rate
going tp tiny start putting a safety enginser on the jod orertine
out dome. = :
cts. He would suggest
a
laying the foreman off, If the foreman doesn't go along you can't have
to lay a foreman off so
@ at all = you get another
+.
17. Mr. Moore said he thought the housekeeping and housecleaning was good
in the graining houses when he was there.
that he mentioned these items to call the attention of
fact that he had seen them ~ many things he had not
& they would be straightened out, 4s said that if corrective
re not taken he would have to mention that he had talked things
with this person and that person in his report, He said he would
ck again and inspected and found then corrected,
*, Weod advised the
for @ couple of weeks
“3
j
:
8
E
F
7
d
:
E
g
g
1
_The following camments and suggestions were made by Mr. Long:
2, Mr. Long stated that he could see an improvement in our operations —
right along,
2. Que probles that his department is much concerned with is the dissipation »
of heat in the loaded cars, He Suggested, as a measure of aiding in
dissipating this heat, leaving the car doors Ope: until the car is
ready to be pulled cut. What ¢ ¥ are striving for is ventilation
23730)
>
36
; ednesday
and Mr, Moore from FDAP, and others in making &
inspection of your operation at Burlington. Since Mr. Moore
was making a safety audit for the Field Director, I am =
sure that he was reasonably well inxpressed with the type
af housekeeping that he observed on that cocasion,.*
There wee a noticeable improvement cover the confitions of the
Plant in
sometime ago with Mr, Thomas, It looks like the organised
plan
complimented on the improvement. I can't help but observe,
however, that it has been sy experience at these Amsoaiu
Mitrate Plants, that it takes everyons keeping everlastingly
at it twenty-four hours a day to keep one of these plants in
shipehare comiition so that the housekeeping looks tiptop at
ail times."
PRODUCT ION
Our main housekeeping problem is also a production problem - the regrinis
in Building 3-10. Saturday a bulletin was put out on the
operation. The grinders from Cornhusker are in transit and will be
installed, one in each house, when they arrive, —
This preblem etarts in the manufacture of scrap, We ere running about as
of predustion or About 20 ton per day. In runming a brief time study on
the grinding operation, Mr, Food found they were
minutes, At this rate, they can in four hours grinding time on anyone
shift, 12 ton or 24,000 peunds. it is reasona ble to assume thet ons
truck can make five trips allowing. one hour and 24 minutes for one
One truck with 50 cans requires 58 minutes to one hour to make the ‘
\
:
8
:
5
y
23431
™m
a
]
-6-« .
+
rr
ef
ty
FE
i:
g
iy
5
g
8
&
3
:
bgt ecey
f
He
4H
ih
HEE
gilts
eit
Hf
“a
ssf
:
e
f
¢
8
i, Inme reported that during the past week wax has averaged .713, The week
of April 4th to 10th the average was .903, This doesn’t seem like much of a
drop, but figuring it in dollars and cents, it is $49.34 per day.
Temperatures are running nicely at Building 3-12, dropping down during the
week fram 200 to 190 withcut any trouble. Usually average about 10 bags
fer every two lots that were too hot, Quality seems to be coming up good
all the way around, Sag weight averaged 101.54 or .04 of a per cent higher,
Grein sise is slipping down again. Our average for the month to date is
about 42.6, and will probably be about 42 for the month, Mr. Ihne is of the
opinion that “dusters” are still the cause. He thought the two lead operators
we had brought from Cornhusker were contributing to these “dusters” due to
their methods of cooling the kettles. o
Any request for samples in connection with our product shipped to Texas City
must heave the onal approval of Mr. Wood, and in of his absence,
Br, Chapman. is to safeguard ourselves up to the point where we are
retaining 200 grems of these samples for our own protection. Mr. Ihne has
placed these samples under lock an key. ,
TANK FARM
Mr, Codd undo a study of heating time of tank cars and between April let
and Sth heated tiem in an hour and a half, At this rate the cost of hoating
® ear would be £124.80. Heating time on other cars have run from 2,67 hours
to 3.07 hours. He feels that it is the tendency to leave the heat on cars
when it is close to shift change tims for the oncoming shift to finish. He
g
SF
te
:
that he has taken temperatures where the cars were from 220 to 230°.
Mr, Cobb the tank car unloading procedure and an
this operation uniform on all cars.
23732
~~
Water consumption was discussed, Phe water Gepartment have advised thet
our asege is very inconsistent and will jump from 3,000 gallon per minute ”
up Lr)
6,000 gallon, In Jammry 2,700, February 4,900 and
siroh 87300. We have increased fron 1f in : ) te 22 to Petrunry
to 308 in March, en
°° a. Chapman
Shift Supervisors ~ C, H, My W
R. Le Foster aM
237933
238
di
OC & Y ra
REPORT OF TRAVEL
TO .
AMMONIUM NITRATE INSTALLATIONS
4-9 DECEMBER 1946
SECTION I. PURPOSE OF VISIT
i. Visits were made by the following persons to the following Plants
and Works engaged in the production of either Anhydrou~ Amaonia, Amsonius
Nitrate Solution or Grained Ammonium Nitrate;
Persons
Mr. Le G. Porter Department of Agriculture, Washington, D. C.
Mr. He. Tf. Bennett bed
Mr. K. D. Jacobs : ° %
Captain C. D. Lyons OPFDAP, Joliet, Illinois
Plant or Forks
Missouri Ordnance Works Louisiana, Missouri
Cactus Ordnance Forks Dumas, - Texas
Jayhawk Ordnance Yorks Pitteburg, Kaneas
Milen Arsenal Milen, Tennessee
Holston Ordnance Forks Kingsport, Tennessee
Radford Arsenal Radford, Virginia
3. The following two Anhydrous Ammonia plants were Visited on 8 @ 4
Desember 1946 by the above personnel from the Department of Agriculture;
4. Visite were made to the various ingtallations at the requsst of the
Department of Agriculture. If “ppears that the primary purpose of visit uae
}
>
=~
286
REPORT OF PRAVEL (Oontd) :
for the purpose of allowing the Department of Agriculture to obtain first-
hand information as to tne progress of the fertiliser program and to allow
them to evaluate Plants and Works being used in the program; i.e., cvst of
product, eondition of buildings and equipment, and possible life of plant.
SECTION II. OBSERVATIONS
1. Miseourt Ordnance Works
a. Necessary informaticn required was furnished by ur. George
Ripley, Plant Manager and Lt Col Bassett, Cosmanding Officer.
be Information desired pertained to: (1) Coste, (2) Process, (3)
Labor Supply, (4) Condition of Equipment, and (5) Plant Preduction.
Ge Rehabilitation work is progressing at a satisfactory rate at
this plant with the first four units to be inte produstion by 31 Deocesber
1948. At capacity this will give approximately 160 tons of Anhydrous Ammonia
per day. The fifth wit will probably be put inte production in March 1946.
Delay is due to reesipt of Compresscr Cylinder fram Ingersoll-Rand Company.
The Commanding Officer has obtained necessary priority assistance and’is ex-
pediting in every possible way delivery of Cylinder.
4. Plant was operating at reduced rate due to lack of tank oars and
to impending freight embargo.
2. Cactus Crdnance Works
. a. Party was accompanied on inspection trip by Captain J. R.
Schecter, Executive Officer and Mr. C. R. Griffin, Plant Manager.
be Information requested was general in nature and essentially thet
requested at Missouri Ordnance Works. Quite a bit of interest was shown in
the equipment ani material necessary to complete another ammonia unit at the
plant. The Plant Manager furnished a breakdown of costs on the completion of
this unit to representatives of the Department of Agriculture. It was esti-
mted that for approximately 4@ million deliars, this unit could be operating
in six months.
¢. Production was curtailed due to freight embargo. It is esti-
wa ted that all units will be in production by 31 December 1946.
3. Jayhawk Ordnanee Works
a. At the invitation of Mr. C. Y. Thomas, Vioe President of Spencer
Chemical Company, an inspection trip was made to Jayhawk Ordnance Yorks,
a a ee et i v
/
REPORT OF TRAVEL (Contd)
Pitteburg, Kansas. The plant is at the present tims being operated by Spenser
Cyemical Company om a lease basis.
b. Uf interest to the group -was the produetion of Anhydrous Ammonia
end the production of neutral liquor at the one plant.- Production of eamacia
“ds adequate to make approximately 600 tons of neutral liquor. This escumt ef
‘liquor is not being produced at the plant due to the limiting factors cf their
Hitrto Acid plant.
©: Information was also furnished to the effect that facilities te
produce dry ico from waste carbon dioxide and sethazol were to be oomstructed
in the near future.
d. All data requested relative to all phases of the plant was fur-
nished with the exeeption ef costs data.
4. Wilem Arsenal
a. Inspection ef the graining facilities at thie plant was made in
the company of Mr. Bolten, Shift Supervisor for Silas Mason Company, and
Captain George Constan.
b. Preduction data, labor supply and the various phases of operations
were discussed.
Ge Plant was operating at time of inspection at better than
acheduled rate. Departaent of agriculture representatives were very moh in-
terested sinos it was the only graining plant visited and since one of the
members had not before seen a graining plant in operatica.
5. Holatom Ordnenes Yorks
a. Plant inspection was aade in the company of Major Beatty, Xm
manding Officer, and other representatives of Ordnance and Liberty Powder Ce.
bd. Boilers which were transferred from New York Ordmance "orks ere
expected to be geporating steam by 20 December 1946. This will enable plant
to meet production as sohs@iled in January 1947.
6. Data relative to habor, sosts, production, and operations way
furnished as requested.
«
6. Radford Areenal
nore
rn 8 a. Group wae accompanied on tour by Captain Farmer and the Hercules
Powder Company day supervisor.
Pe]
23736
rer Pw yy Ow 9 & gery wv =a ws o eA. ae
288
REPORT OF TRAVEL (Contd)
3 &
be. Plant was operating eat a limited rate with a majority of the
work ou the Acid Area complete. There wae etill a omal) amount of work to
be dane on the neutralisers,
SECTION IIIT. CONCLUSIONS AND RECON‘ DATI OMS
1. It appears that the purpose of the visit by representatives of the
Department of Agriculture was to: (1) Study progress being made by the Ord-
nance Department in completing necessary rehabilitation work to place plants
into operation and (2) make recommendations relative to sontinuing operation
of plants in the Tar Department Program ofer a long period of time und the
bringing int» preduction of additional units to inorease the overal) program.
2. Ae has previously been brought out, information requested was:
ae Operating Procedures
b. Production
Ce Labor Supply |
de Costs
S. All data requested was readily furnished and the Department of
Agriculture mubers expressed their great appreciation for the courtesies
show during their visits te the various Plants end Works.
SSCTIOM IV. CORRECTIVE ACTION TAKEX
Scns.
at A yd,
C. BD.
Dan Captain, Ord Dept
oe
23737
di
i
vi
r. itl i
cbs 3
yon
i wl
iH i
cl
i
i
ae Ht
chat (a
fa i
Alp
irl
iu
HHT i
HTH
fie
ik
bit
H
it
ie
i
4.
cil
al i
ay all
:
a J
i
ual
¥
t
Ath it it am Hl
OE /kva,
234034
pate —
Memora ¢ UNITE _GOVERNMENT
O~~r ”, 3 J 9. F ILIA DCSadth/vh
osha 5206
DATE: 1} October 2946
Bipy—tty— —epretee yon , eee
FROM : Chief, ORDLY-L i re a ee nee ae oe
SUBJECT: Report om Substitution of hea B for PRP in Coating famoniua Nitrate
Inclesed is a copy of Report No. 6, on the investigation by the Midwest
Research Institute, on the substitution of Wax B for PRP in coating fertiliser
_grede ammonium nitrate. scliea ita, OD
1 Inel {- J. NM. PRARRE
Cy Rpt Wo. 6
ORDLY 319,1/37765 Gen'l lst Ind ° “HDReynolds/$ch/3314
Chief, Ammunition Div, I. S., 28 Uctober 1946
6... Chief, ORDLY-L
1. Subject report has been discussed with Safety and Security Division.
2. Safety and Security requests that flash points of both PRP and Yiax B
be determined and, in addition, determinations be made of the flash points
of NHq4 NOz coated with PRP and with Wax B.
5S. It is requested that the above information be forwarded to Safety and
Security Division thru this office,
eo Incl O. reo
ae
w/a Col, Ord Dept
se
23740
G.
_ ORDLY-L 319.1/37755 Gen'l 2d Ind a
Chief, ORDLY-L, 20 November 1946
Wie tt x Oe
Ft —ehtet; te Div; 1-97
TO: Chief, Safety & Security Div
i, Attached hereto is copy cf letter dated 13 November 1946 from the
Spencer Chemical Company in reply to inquiry from this office for the data call-
ed for in lst Inaorsement. It is believed tiat the data contained in this iett=
er from Spencer Chemical Company gives sufficient information to establish the
suitability, from a safety standpoint, of tiax B product for “ccatine ammonium ni~
td
trate fertilizer, é
2. It is the opinion of this office that determination of flash point of
ammonium nitrate coated with PRP and Wax B would be a hazardous operation and it
is therefore recommended that no further attempts be made to obtain this data.
No further action will be taken by this office unless specifically directed to
order this work done,
1 Ined jo J. Ne PRARRE
Incl 2 - Cy ltr fm Spen
cc
Chief, ORDIM
23741
000 #26 .
SPENCER CHEMICAL COMPANY
P.O. Box 604
Pittsburg, Kansas
Development Department November 13, 1946
File: 906D,.2.7
; } |
Office, Chief ef Ordnance
Field Director of Ammunition Plants
Joliet, Illinois «
Attention: Mr, J. Ne Pearre
Dear Mr, Pearre:
Your letter of inquiry in regard to flash pointe of PRP arid Wax B, and of +
ammonium nitrate coated with these compounds, was apparently misdirected to
Wahoo, Nebraska and, although issued under date of November 1, 1946, reached
my desk only yesterday. \
Tuen *noz4/9a*° TLY LIdHO
I have received recent informatien from the Mid-Continent Petroleum Corporatien
at Tulsa that the flash point on thejr Wax B product is 460 F plus or minus 5°F
and fire point 505°F plus or minus 5 F by the Cleveland Open-Cup Method of test.
I am sorry to advise that we have no informatien en the flash point of PRP and. ‘
do notghave the necessary ‘aboratory equipment to determines the flash point i
- accurately, From past exparience in the petroleum testing business, I should j
expect the flash point of any PRP wixture to be at, or near, the fiash point ©
of the paraffinewax component and considerably under the flash point of WAX B
since the latter is a higher aeeeceter weight compound than is the paraffin
type Wax.
SIGTHO
TO:
As to the flash point of ammonium nitrate coated with either of the subject
coating a,ents, it appears to me that this would be a dif*icult, if not in-
- pessible, test to make, since ammonium nitrate begins decomposition or dis
sociation at about 340 F and may decompose violently at temperatures approach- = ({
ing the flash points ofthe waxes used for coating. I should say, therefore, \
that we would not care to undertake the latter test,
You have been kind enough to ask my opinion as to whether or not it would be
advisavle to have the work involwed in testing done by an outside laborateory,
and I do believe that this wo.ld be the desirable procedure. For determinatien
of the flash points of PRP ami Wax B, I would recommend that a laboratory
engaged in testing of petroleum products be contdcted, such as the C, J. Tagiia-
due Company or the Cross Laboratory in Kansas City, Missouri. Fees for such
tests vary but should not exceed $15.00 per deterudantion, by A.S.T.M. method,
and I cannot stress too strongly the necessity of insisting on this standard
of procedure,
7 c.
. ‘ ’ ' ' - ' , , 9
L~ Y ’ ial, . . ‘>-yY~ --~
eS ———————— Le lle
208
Mr. J. N. Pearre
Joliet, Dllinois
November 13, 1946
I hope that the for egoing informati
on satisfies vour
sorry that the inquiry was delayed in reaching thie Bois ig ee
Yours very truly,
WHY: ve W. We Yeandle
‘ ‘ Director, Development Dept.
a
C
. 0
p
ae
?
- ‘ef
~ ° Low -
¢
©
23743
EEE EEE EEE NSIS NOUPG EG OEY MC TCEVTT OPEB eye
O00E &
REPORT NO 23 ,
DATE 5 December 1946
AMMONIUM NITRATE PROGRESS REPORT
° ,
Reference is made to Report No. 14 dated 19 September 1946 in which
certain basic data was furnished‘and which remains the same for each Plant
and Works except in those instances ane changes are shown below or were pe
reflected in Reports No. 15 thru 22 inclusive. |
I. ANHYDROUS AMMONIA
PLANT OR WORKS: CACTUS ORDNANCE WORKS
PER CENT OF REHABILITATION COMPLETED:.- 75 (10% increase)
NUMBER OF CONTRACTOR PERSONNEL ON SITE ENGAGED IN REHABILITATION
OR CONSTRUCTION: increase)
OPERATIONS AND PRODUCTION: Two (2) trains in operation; startup
dates for No. 3 & No. @ trains are estimated to be 5 & 20 December
respectively.
BRIEF SUMMARY OF PROGRESS BEING MADE AT THIS WORKS: Shortage of tank
cars has necessitated a cut-back in opsrations at this installation.
November production - 2,332 tons. |
O
~ e:
PLANT OR WORKS: MISSOURI ORDWANCE WORKS 3
PER CENT OF REHABILITATION COMPLrTED: 93.2 (9.4% increage)
EQUIPMENT carat $3
PeR CENT INSTALLED: 93.2 (9.4% increasgo)
OPERATIONS AND PRODUCTION: It is estimated tnat No. 3 unit will start
up approximately 5 December and No. 2 unit approximately 15 December.
Startup date for No. 1 unit has been serious:y retarded due to the ea
fact that a casting to be supplied by Ingersoll-Rand was defective, :
Startup date is estimated to be 1 March 1947.
PERS UT TE Spy ewe YET ey r+ § £9 © € 6 Vee lg
301
AMMONIUM NITRATE PROGRESS REPORT 5 December 1946
Bil ER’ SUMMARY OF PRQGRESS BEING MADE AT THIS WORKS: November pro-
duction - 1,164 ton Unless ammonia ig not affected by the embargo,
production at this installation will be greatly curtailed.
Startup of No. 3 & No. 2 units will be made but No. 5 & No. 4
units will be shut down provided ammonia is embargoed. This procedure
is oeing adopted in order to break in the No. 3 & No. 2 units.
f
Construction at this installation has progressed to such an ex-
tent that the Corps of Engineers have been notified to terminate the
construction contract as of 13 December 1946. The Operating Con-
tractor, Hercules Powder Company, has agreed to complete any necea-
sary rehabilitation work. '
v :
PLANT OR WORKS: MORGANTOWN ORDNANCE WORKS —
BRIEF SUMMARY OF PROGRESS BEING MADE AT THIS WORKS: 5,583 tonsa of
ammonia were produced during November. 4y production has now been
reduced to less than 100 tons per day periding a decision with respect
to embargo. At the present rate, Morgaritown can operate for approxi-
mately fourteen days.
*
PLANT OR WORKS: ORIO RIVER ORDNANCE WORKS
PER CENT OF REHABILITATION COMPLETED: 95 (3% increase)
“dIEF SUMMARY OF PROGRESS BEING MADE aT THIS WORKS: November pro~ z
duction - 2,551 tons. Coa str made necessary to cut back pro-
duction at this installation.
-II. AQUEOUS AMMONIUM NITRATES
PLANT OR WORKS: HOLSTON ORDNANCE WORKS
PER CENT OF REHABILITATION COMPLETED: 79 (4% increase)
PER CENT OF CONSTRUCTION COMPLETED: Process Work - 88 (8% inorwase)
Boiler Plant - 56 (34% increase)
2
Fr
ais | 23745
YS rage te ee ee ee al Ee wey ‘aeeaee- — Oe eee ee
—_— — = — - — ee —_— —_ — — a, al
Y/
PM WATE 40CReSS REPORT 5 December i934".
— mm — men
toe SBNY 2 'oTALLED:. 95 (8% increase)
~~ oo
Athy GUMMAS > GF PROGRESS BEING MADE AT THIS WORKS: 546 tons <«/
neutrsl liquor were produced in Novémber. Shutdowns resulting f:--
failures cf temporary boiler caused reduction in November produ.:(:.
Ability to meet January schedule depends upon instaliation of or
new boiler: by 1 January 1947.
—-— + - “-—~. ‘_—_ ————- -«
PLAL™ <b “ANS 2 INDIANA ARSENAL
—— ——-—-_< —-—
PER SCENE OF PEMABILITATION COMPLETED: 85 (5% increase)
PER CENT OF CONSTRUCTION COMPLETED; 65 (10% increase)
WUMBER OF CONTRACTOR PERSONNEL ON SITE ENGAGED IN REHABILITATION
* AND7CR Ci NSTRICTIQYs 305 (17 decrease)
EQUIPMENT .
PER Ce\iT INSTALLED: 62 (7% increase)
OPERATIONS AND PRODUCTION: Ten AOP units and six neutralizers »+.-
In full operation. 6,506 tons of neutral liquor were produced i:
November. Amount to be producs4 in December depends upon decisi «:
with respect to status of ammonia and neutral liquor in connection
with the embargo. x
_——~——s— — rere
PLANT OX WORKS: JOLIET ARSENAL
PER CENT OF REHABILITATRON COMPLETED; 60 x increase)
PER CENT GF CONSTRUCTION COMPLETED: 54 (5% increase)
NUMBZR GF CONTRACTOR PERSONNBL ON SITE ENGAGED IN RSHABILITAT ‘ii
AND/OR CONSTRUCTION: ZIS (41 decrease)
BRIG! SUMMARY OF PROGRESS BEING MADE AT THIS ARSENAL: 4,403 tor.
neutral liquor were produced in November.
r3d45
‘
302 §
SR PRS eee
Se et ee, et
EA RE ee A
303
AMMONIUM NITRATE PROGRESS REPORT 5 December 1946
—
‘
PLANT OR WORKS: RADFORD ARSENAL
PER CENT OF REHABILITATION COMPLETED: 97 (4% increase)
PER CENT OF CONSTRUCTION COMPLETED: 97 (4% inorease)
NUMBER OF CONTRACTOR PERSONNEL ON SITE ENGAGED IN at AA
ON 3 crease
EQUIPMENT
PER CENT INSTALLED: 97 (4% increase)
‘ BRIEF SUMMARY OF PROGRESS BEING MADS AT THIS ARSENAL: November pro-
duction - 606 tons.
\
PLANT OR WORKS: SUNFLOWER ORDNANCE WORKS
PcR CENT OF REHABILITATION COMPLETSD: Porth Acid Area - 100
Scuth Acid Area - 60 (17% in-
crease )
NUMBER OF CONTRACTOR PERSONNEL ON SITE ENGAGED IN REHABILITATION
3 ecrease
—e
BRIEF SUMMARY OF PROGRESS BEING MADE AT THIS WORKS: November pro-
duction = Tal tons. |
PLANT OR WORKS: WABASH RIVER ORDNANCZ WORKS
PER CENT OF REHABILITATION COMPLETED: 65 (35% increase)
PER CENT OF CONSTRUCTION COMPLETED: 19 (9% increase)
¥
NUMBER OF CONTRACTOR PERSONNEL ON SITE ENGAGED IN REHABILITATION
A : Increase)
BRIEF SUMMARY OF PROGRESS BEING MADE AT THIS WORKS: Report from
ontractor outiining necessity for overtime has not been received
to date.
/yVyr
23044
/
AMMONIUM NITRATE PROGRESS REPORT 5 December 1946
III. GRAINED AMMONIUM NITRATE
PLANT OR WORKS: CORNHUSKER ORDWANCE PLANT
PER CENT OF CONSTRUCTION COMPLETED; 70 (10% increase )
NUMBER OF CONTRACTOR PERSONNEL ON SITE ENGAGED 1M REHABILITATIOK
BRIEF SUMMARY OF PROGRESS BEING MADE AT THIS PLANT: 2,518 tons of
um nitra e ter ¢ were produced during November.
Failure to meet November schedule was caused by receipt of con-
taminated liquor. The majority of this liquor that was contami-
nated with paint has been grained.
Cornhusker has storage space for 375,000 tons of fertilizer.
PLANT OR WORKS; ILLINOIS ORDNANCE PLANT
EQUIPMENT
PER CENT INSTALLED: 79 (24% increase)
BRIEF SUMMARY OF PROGRESS BEING MAD® AT THIS PLANT; November pro-
duction - 599 tons.
Illinois hae storage space for 100,000 tons of fertilizer.
PLANT OR WORKS: IOWA ORDNANCE PLANT
PER CENT OF REHABILITATION COMPLETED: 38
: . —— ee Pie eT SRENEK,
TO OT! POPE LY Meat ME Lg ose CPs 2 pao + Re
V3
EQUIPMENT
PER CENT RECEIVED: 75
FER CENT INSTALLED: 75
BRIEF SUMMARY GF PROGRESS BEING MADE AT THIS PLANT: It is estimated
at the production schedule meat.
5
23748
L¢L
AMMONIUM NiTRATE PROGRESS REPCRT
‘
oy
>
PLANT OR WORKS: MILAN ARSENAL
BRIEF SUMMARY OF PROGRESS BEING MADE AT THIS ARSENAL; November pro
duction ~ 6,071 tons. This figure represents 571 tons over and abov:
schedule.
Milan has storage space for &,000 tons of fertilizer.
EF : :
?
5 December 1946
305
dn
a
PLANT OR WORKS: NEBRASKA ORDNANCE PLANT
PER CENT OF REHABILITATION COMPLETED: 85 (10% increage)
PER CENT OF CONSTRUCTION COMPLETED: 62 (12% increase)
NUMBER OF CONTRACTOR PERSONNEL ON SITE ENGAGED IN REHABILITATION
C : increase)
EQUI PMENT
PER CENT RECEIVED: 94 (4% increase)
PER CENT INSTALLED: 70 (15% increase)
‘
BRIEF SUMMARY OF PROGRESS BEING MADE AT THIS PLANT: ‘This instal-
Iation is to commence Operations week of © December 1946.
PLANT OR WORKS: RAVENNA ARSENAL
PER CENT OF REHABILITATION COMPLETED: 80 (5% increase)
PER CENT OF CONSTRUCTION COMPLETED: 70 (7% increase)
NUMBER OF CONTRACTOR PERSONNEL ON SITE ENGAGED IN REHABILITATION
’ decrease)
EQUIPMENT ae
a
PER CENT INSTALLED: 75 (9 increase)
BRIEF SUMMARY OF Ook s® BEING MADE AT THIS ARSENAL: 458 tons of
e ser ¢ ammonium rate were p on ring November.
Ravenna has storage capacity for 10,000 tons of ammonium nitrate
‘(fertilizer grade).
—y
23749
~@ @
306
AMMONIUM NITRATE PROGRESS REPORT , & December 1946
iV. GENERAL
ee the enbarce and the drastic effect that it may have
upon operation of fertilizer installations, the following teletypé
was sent 5 December 1946 to subject installations:
"IN VIEW OF CRITICAL SITUATION CAUSED BY EMBARGO, THE
FOLLOWING INSTRUCTIONS ARE ISSUED: BRING NO NEW UNITS
INTO PRODUCTION UNLESS PRESENT OPERATING UNITS HAVING
EQUIVALENT CAPACITY ARE SHUT DOWN. CONTINUE REHABILI-
TATION INCLUDING IDLE TANK CARS. OPERATE AT MINIMUM
RATE TO UTILIZE RAW MATERIALS AND/OR STORAGE TO FULLEST
EXTENT. RETENTION OF OPERATING PERSONNEL TO BE ON
BASIS OF CONTRACTOR'S RECOMMENDATION WITH LEAST DELAY
FOR STARTUP. KEEP SEPARATE COST ON EXPENSES INCURRED
AS RESULT OF EMBARGO AND REPORT TOTAL AMOUNT TO THIS
OFFICE IN LUMP SUM AS SOON AS POSSIBLE AFTER LIFTING OF
EMBARGO." ©
3. WW. SMILEY /
Mejor, Ord
Assistant
; , \f7'' 308
e t ‘ © : :
- ae , = 5 °
| ae
» é ~ , 3
Chief of ladustrial Service
Chief of Ammmition Div, I. 8.
Bffect ef Freight Babargo on Fertiliser Program
1. This office has been advised by the Transportation Corps that the enberge
on freight, which becomes effective midmight Thursday, 5 Desembe>, will prohibit
the shipment of fertiliser end the rew materiale therefor (ammonia and amoniua
_ mitrate eclution). In view of this situation, the Ordnance Department has tue
Jehcices with respect to the fertilizer progrem: Ape oe Rg
a. Aek the Transportation Corps to request permits for the shipment of .
anhydrous smmonia and asmonium mitrate solution, (approximately 80 carleade per day).
The Transportation Corps has unofficially advised this office that thay believe that
such permits might be obtained. Since the urgent request of the Departecat of ante
Agriculture for permits to ship ccmmercial fertiliser was refused, it is not
believed that jsormits for the shipment of War Department fertiliser would be granted,
However, the graining plants could store the finished produet in warious lead line
buildings for a period of at least 1 - 2 monthe at the present rates of production.
Thies office has checked with Safety and Security and they have no cbjection to the
storage of this mterial in this type of storage. |
3 b. Shut down the ammonia, ammonium nitrate solution, and graining plants
as scon as the storage at the amzonia plants has been filled, imeluding tank care
now on the tracks, and the solution plants have provessed all of their ammonia
steoks. ‘This, of course, would necessitate laying off thousands of workers and
the re-recruitment of these wirkers or replacements for them, in the evext the
progrem is renewed, would present a very difficult prebdlem. in view of the knom
short-term mature of this program.
Tae ETS Toy Cote ine Siete op peer ome aie pens ees ae ihe a SNP Boats Bl
“3 Pa ee) Brey Wea SSAA RE Al tye ab geb ls whine ee he AMR TET aS
Scie, ARICA,
5
4
HRC A ah S Tyitm oS Mat ope Gs et ese 4S 4 € $5 “i e wg? ee esnis AY are NOC ASE tsi f we , wey Sek S78 Rey ey ‘ pean Ae ii. r eS Ft jie he
PROM Mien Pitt en Mor APR EN MERE Saree COTES Oe oT CEU Nant y Ther eee menwer EM rn ae Nese eee eee,
“a 4
4 Sans ma Pee LSS oe
SEA AK ERNE Qa
ARIE IE AOS MLNS FF AIRING 5 PO RRL INN EN IO EGE
OP agent tery
SS Bi, ORIEL Uy
2. In view of the fact that the request of the Departaent of Agricul ture
to permit the whipment of commercial fertiliser was denied, this office recommends
that mo effort be made to obtain permits for the shipment of either the finished
fertiliser or the components; such as, anhydrous ammonia and ammonium nitrate
solution. However, in view of the following excerpt from Mr. Snyder's letter of
28 May 1946 to the Under Secretary; "Accordingly, I request the Yar Departasnt to
undertake such a program without delay and to take whatever actica is
to expedite the attainment of maximum production”, it is suggested that this matter
be referred to the Office of the Under Secretary for final decision. tid
r
|
5 fg
. . b 2
AID SEM IANS
0. K. JAK
Col, Ord Dept
23751
ea
Gy. 24 Ind ata 30 Rov 46
winch
¢
CROLY-L 471[00/80866 Gon’) 6th Ind
om
“WOhief, Amumition Div, I. 8., 28 Novenber 1946
TO: Chief, Safety end Security Div
For your inforantion and ccameate.
” ey
td
1 Inc ees O. M. JAK
n/e te Col, Ord Dept
3
For | | 23752
J. H. PRARRE
é>4} hi Shea sate ,
ee Cae ta ie a BBY et
BA indie
x ise bp
PDE uel Ve Se
Pid >
Dadiotind hitters
hie as
Pgs KM
ROME LSTA Pn tae Nee
Rigo i “4G SS eT ha VeRO fae Mahe i Pee? he
‘ ae PU os Apis Wg re Id | Dicks bee a
ER te ee ea rk ate: ren eed vor des ogee are
win Dit Leer ® | : Yoo
Cer gh RO hae ae ead
PRS oo NA ag OCS SON Big
vg aPar KS Ed Sono d binkl | Le
muy 1@ Novenber 1046
MEISEL NA LEBEL LE LE OCG ELLE I ERS EF DIDI i
\
\
‘
ve OR
2235 23733. < o
x PG!
3 , v3
be : f i
2 i
1 3 i MU
is a aa i
aul Hi
| nye naa ay
ii aE i §
’ @ &
cet
re
@rcur/a, states of w 1. + Program, 15 Bev bo, vent'a.
(23755 —
CRDLY=i. 471.86/36866 Geni. tnd Ind Moyne! és/ jrb/3314
Chief, Aumumities Diz, 1. 8., BD Getebor 19466
TO. Ghief, Safety and Security Div =
Pereuréod for your iaferaation and comments. ee
(
Chief, Aummnition Div, i. 3., 8 econ: ides
Tr 0.F.D.A.P., Joliet Arsenal, Joliet, illineis '
Forwarded for reply to questions in Ird indorsemafit..
Oo. BH. dAuE
Col, Ord Dept
>°OO1k
0C0 ¥ £3
7 Voveanier 194°
-* . - q . + . ” a *,". meses Os
STaubard) OMfPATIIC PROCES Poe PT UL.
-—* «=e
*
sunctions of the *-vwnition Jsivision, Industrial Sacvier, sydnance Soparcment.
——_——— er oe
Responsibie for complote planning of tie wirufacturing crogram and
mainteinin; liaison with other Governri atal ¢comcics, such as Office of
war fobili:ation and kesonversion, Civiidian irocuction .dainistration, °
: and the Ofice of Vefonse “Transportation, with onriicalar eomphesis on
a the supply «i coke and tan cars for the program. ‘ho foctunition D: vision
* maintains close contact with the Transportation (orps ca the tani: cnr
x supply program. re
Ammunition ‘:ivision Porsonnel to contact revarding rrovran:
Colonol w, if, Jank - Chief, ArmunStion bivision, 27-443, 'Lxt. 6769
% ir. HM. 4. Roynolds ~ Technical assistait, 28-448, ixt, 3314
% Dr. it. U, Bongis - Chief, Facilities trench, Amminition Div, 2i-430
| Uxt. <C24
Functions of the Field Diroctor of Amaunition Plant3;, Jolie? arsenal, Jo.iet, Ill.
ay Responsible for the production and plauniny of shipping schedules
of all rev »mterialo and-release of end product to (CQ.
Production forecasts will be forwrerded to CQiG (thru CO) by the 10th
day of each month covering prodiction for the fellowing month,
Rovisiongs in sehedules arc to be Sorwarded to GoiG (thru oCcu) as changes
occur (increases or decroeses in prsduction of 1,000 tons or less to be
reported in regular weekly reports = chanzes smountin; to more than 1,000
tous to bo reported by teletype at time of oce uwrence).
; Urdnance plants, on receipt of chippin;, orcers from UG, will order
= daily requirements of cars from carriers and prepare bills of lading for
a shipment. It is cxtremely important that Shipoing orjers be prepared in 3
a full showing all information necessary for completion of bills of lading,
BS i.o., Consignee, routing, port designation und overgeas code in order to
3 avoid delny in shipment as no storage facilitions exist at Ordnance plants
. and finished fertilizer must, of necoscity, bo loaded in care as produced.
2 Delay would rosult in heavy demurrage charz.s us well as sevore criticism
4 because of the delay to critical reilway equipiwnt.
s OFPDAP personnel to contact in Ammonium iitrate Fertiliser Program:
3 Colonel J. G, Hlolmes - Phone - Joliet 2-6661
Za : Joliet, Illinois
= Mr. H. T. Groen
* Trafrio Lanayer - OFDAP Phone - Joliet 2-6661
S 4 Joliet, Illinots
23757;
TS RE LEAR AE CRE A Ee ee
ONIai
ow Sine
BROT tena | Co
iss
Sy) ERE
al. fies -
BVOC
STAIDARi) OP.RATING PROCEDURES FOR TIM: “AR DEPARTLNT
+ “i , rw ‘ 4
Functions of the Treneportel= <or ee , Procedure for Keloase and l'ovement
° r sor an te. :
1. Planning, Intelligence and hovaments Division is responsible
for the assembly and coordination of information and planning date
sooured from Service, Supply and Proourement Division, "DGS, Office
ef the Chief of urdnance, and uffice of the Quartermaster Generel.
Disseminates this information to Commercial Traffic Service and “ater
fran@port Service, Office of the Chief of Transportation.
2, Technical Service (uartermaster Purchasing Office) requests
raleases from Freight Traffic #ranch, Commercial Traffic Service, advising:
oF
badd
a, Name of shipper, point of crigin, and carriers sorving
>. Commodity >
e, Guantity (number of earloads), woight and cube
d. Date available and daily shipping capacity
@. Overseas destination or marks
~
3, Transportation Corpse arranges port and shipping progran.
a. Freight Traffic Branch advises Ocean Traffio Branch, Water
Transport Service as to the commodity, overseas destination, quantity,
when and at what rate avail.l)s» and the preferred port, together with
auch details of the ob.igation as are known, and requests that a ship be
bertned on a specified date consistent with these factors.
b. Ocean Traffic Branch indicates whether the proposed port
is acosptable and when vessel will be on berth. Also whether arrival at
port as scheduled will provide efficiert ship loading or whether stook
piling is essential (stock piling or storage will be avoided when feasible
to minimise cost; if oasential, storage will be arranged by Freight Traffic
Branch, Commercial Traffic Service, in collaboration with Osean Traffic
Branch, Water Transport Service).
vs
4. Preicht Traffic Branch issued TCR releases to Teohnical Service,
specifying port and dates ship will load, with required forwardine, schedule.
5. Froight Traffic Branch nseumes responsibility for rail movement
from origin to port, taxes steps to assure proper car supply and advises
Ueean Traffic Eranoh irmediately of any change in actual cargo availability.
Freight Traffic Branch maintains record of movement to the extent néo-
essary to protect vessel requirements.
a. Freight Traffic Branch advises AAR as to everall car require-
ments ia accordance with monthly projection and of each release furnished
ané talss corrective action with the AAR arid individual carriers in the
event of a deficiency in oar supply.
23758
‘ STANDARD OPFRATING PROCIDURUS FOR THis GAR DEPARTEIT
F’RTILIzrR GRAIL A.LONAU NITRATE PROGRA. (CONT'D)
6. Ocean Traffic branch ie responsible for berthing the vessel
as acroed and immediately advises Freicht Traffic Dranch of any change
in vessel datos, Cceon Traffic branch arranges for loading of ship
from cars o.- port storage and for the sailing of tho vessel.
a Corps rersonne] involved in Super vicion of Fertiliser
uC?
Colonel Kenneth |., saa sxxeoutive to AC of T Ext. 72626
Planning, Intelli;ence and Hovemonts Division
sotoasl J. kt. Uessersmith, chier Ext, 2482
tir. &. RR. Tasxer : Ext. 71368
>
Commercial Traific Service
Colonel 2. C. R. Lasher, Chief Lxt. 2872
Lajor D. L. Smith, Executive — Ext. 6605
Majo> L. Db. Lally, Chief, Freight Traffic Branch Ext. 2719
Mnjor J. i, Higgins, Deputy Chie/, Freight Traffic kxt. 2946
Branch
ir. 11, FP. Dowell, Chief, Port Control Unit (kcleases),
Freight Traffic Branch Ext. 5630
Viater Transport Lervice
colonel W. 5. Eliiott, Chter Ext, 5175
Lt. Col. T. S. Lowry, Executive Ext. 51765
Mir. ric ‘J, Jones, Chief, Ocean Traffic Branch Ext. 2675
Mr. &. L. Marshall Ext. 4617
ir. . J, Kilroy axt. 4590
Punctions of the Office of the Quartermaster Geroral.
1. Mission
a. by directive of the Secretary of War procurement has been
directed and contracts have been made with various commercial producers
of nitrogenwma fertiliser with the following coutrect stipulation:
"On and after 1 January 1947, the War Department will deliver
on request to the contractor or a third party (Including
covernmental agencies) designated by the contractor a quantity
of emmonium nitrate fertilizer produced in War Depertaent
fecilities equal in terme of nitregsn content to the nitro-
genous fertilizer purchased from the contractor under this
directive. Not more than 50 percent of the quantity so to be
delivered will be made available @uring the period
March 1947 and not more than 60 percent will be made available
during the month of April 147. Any undelivered quantity will
be made available during the period May-June 1947".
jo 9759 /
f
STANDARD OPTRATING FROCRDURKS FOR Tie ‘iAR DEPART UT
GRADE AMMONTUM NITRAT.. ROGRAL. (CONT'D)
b. The Secretary of Nar has also directed The Quartermaster
General to act as the agent for the “ar Department in effecting any
delivery of fertilizer, the return of which is requested by a contractor
under the terms of paragraph 1 a. cited above. ote
o. It ‘has been turther directed ‘that the Quartermaster Corps will
undertake the distribution of ali urdnanco produced fertiliser grade armoniun
nitrate whether for shipment to « port of embarkation for ovorsess shipment
- or for redistribution and replacement to commercial producors currently under
contract with the wusrtermaster Corps.
2. STAFF RESPORS IPILITIES:
?
In the furtherance of this mission the following staff sections
of the Supply Division, Office of the Quartermaster General will be
reaponsible for the following actions: /
‘ t f
a. Procurement Policy Branshs
(1) Will establish policies and procedures by which all -
activities of the staff and operating agencies of the
Quartermaster.Corps will be governed when such activities
pertain to the distribution of Urdnance produced fer-
tiliser crade amncnium nitrate. , ,
(2) Will be the central point of contact with the other
technical services concerned in this program; namely,
the Ordmance Depertment and the Transportation Corps.
(3) Will receive copies of production forecasts and produoctica
echedales from the Urdnance Department end notification
of any drastic changes in schedules or published programs
that may affect the operation.
(4) Will receive and distribute instructions and ordere of
the Quartermaster Goneral pertaining to the program and s
transmit the same to the appropriate agency. .
bd. Gencral Supplies Branch:
(1) W411 iseue all procurement directives indicating operating
<7 procedure for the (uartermaster Purchasing Office, Bow
York, and will issue-all changes and amendeenta thereto. .
(2) W4ll distribute information copies of procurement directives
and changes to all interested agencies.
Diy ly nia aaciredlgmhanrery Office, New York, will be the operating
aowary Quartermaster Generel in this program and will be respensib)
po for the following actions. ’ : ,
Ph ee Ge pom” ee.
Sle 8S
SBP Be acts Sa abenk Bee Bese ela hey
OE SESS on ge ea Sea dl Bio ae a a Ste
AN DES GRR MONDE Pai tabi Se eas
as
me ng a aaae rare oF Sk Se eed
AE te nate ae WA ULa CE Nay Sil
Ay a)
an 8 ar AS eR Ep a Pca ie a ee EAS RE EPO SaL Oe MET ERY pet as a nee Cyne Seo),
Galata EGBA TN Icy FLORA va SC ed ia Ail ni cate ee Ashita 1%
—
= . .
g PSOE Me ne 9
%
- r~. . at
STAMIAIG) UTURATING rROCLUURLS EL TU. Ta DO PARTIMGE Z7
FURTICYZOR Chauk AMON: RIMAGE SUT er (Sunt).
a. Will be respopidible for Quartesry cicr Optrativas per-
taining to the distribution of Ur inane) produced asmonium nitrite
whether for oxport or return to “omuersiul procuc+re, *.
b. “i412 maintain clos® liaizon witn
the Fisld Sirector of
Ammuunition I'lantc in the precrao. x
—
_ @. Will upon the basis of Ordnance production) schoci.les and
procuremont directives roceived, s
Service, Transportation Corps for shipment of fortilizor grade
niun
nitrate from the Ordnance plants to ports, comercial’ contractors, . r
desipnated third parties. eS
d. 7411 issue shipping instructions to Ordnance plants.
Office of the :.uarternaster General Personuel involved in the /cmioniun \
A eee easSestsnesasste-steeetiegestenanee
itrate ‘rocram. - *
j
Colonel S. W, Smithers, Ch, Proc. Pol.’Br. 2051A lint. 3406
(In the event that Colonel Smithe:s cannot be~reached, the
following branch representatives cary ke called).
/ : eS ,
Kajor J. J. Mann,/Jr. i..q. Br., Mil. Plan Dfyvy 2426. txt. 2130
Captain A. J. Vowmey, Proc. Fol. br. 2605A F#xt. 72952
Wr. T. T. Co » Gen Sup. Br., Sup. Div. f-1044A ixt. 4461
Quartermaster Purchasing Uffice, lll Lcet 16th Jt., dow York, %, J. Y.
: . Gramercy 7-4700
Colonel Il, A. Gardner, Officer in Charge
Kr. J. S. MacIntosh, Proourénent Specialist
tr. U. P, Kurth, Transportation Uficer
**
23761
ecur? TUR's fror: the Commercial Traff.-
ee Ce ee Ee
the purpose of this trip was to inspect fecilities aveiiahle for production
of grained emoniua nitrete. .
aleo nate s trip through the production area with Mr. Beatty anc ir. Fouler.
Production facilities consist of two graining bouses, each containing thres
high-pana and six kettice. Adjacent to each graining house are four storage
then te @ loading hepper. Present plane esll fer dumping kettles at Fr.
by means of reguistion of the speed of the two above conveyors, have tive
hed material eodled to 200° F, before packini. at peosent, hand scales
be used for weighing and wire to tie the packed bugs. Automatics scales
In
tAazas
pre
w
and bag sewing machines wil) be installed later.
event this house-is not ready when solution arrives, the othe’ .cuse
will be started, Here no additional ceeling equipment has been installed. It
ie ready to operate on asthod used befure YJ Day. Recexssary convayors are Gf
hand, however, te install, and will be erected as soon as thu first house is cam
pleted and ia seperation.
Cantractor's reprecenvatives feel that there will be no difficulties in
the way to prevent aceting eeheiule of 3000 tens for November, and 4500 tons
for December.
They woul.) like to have their weeks supply ef liquor arrive on plant, dar-
ing firet five days «> they will have no means of epotting care over & weekend.
Shipping inctruetions have arrived trem .uartermaster Corpe for first two
woeke' produetien. Contractor, however, neode reutings.
A diseuseienm on production reports gava, in detail, to Comumnding Officer
end contractor, information desired by FDAP. Teletype report will be suusitted
daily until further notice in ccecrdanse with code requested by FIMP.
itilan will wash ous approximately 400,000 te $00,000 pounds of THY en their
I
| hoe
aif . 23762
225
Ropers ef Travel to Milen Arsenal eae 6 November 1946
a
present progran. Wash house is not adaptable without alterations for drying
and flaking this asterial to prepere for sale. They are now burning reclained
- THT. A y Tom :
Good housekeeping was in evidence all throwh the plant. nor
A discussion on inspection developed possibility of a bottieneck in
shipments of fimished product. Contractor desires to ship cars without waiting
for acceptance. Ordnance plans to analyse each car and contractor gays he will
have to do the same to conform with terms of contract,
aS
Productien is «xsected to get under way some tine Monday. There may be
two bot tlenecka at this installatios:
a. Waiting for completion of snalyses of finiched material before shipment.
b, Inability of Ordnance personnel to spot al) the solution scars nmecded
for a weeks’ production during a five-day peried, in which Ordnance will operate.
*
It is recommended that 100 percent analysis of finished iota of ennonivun
nitrate be performed by either tle contractor or Urdnance and that spot checks
be made by the party not making 100 percent analyses.
It is recommended that arrangements be made to provide, if nevessary, ever-
time for the Diesel engine crew in order that the @Olution cers can be spotted
on Saturdays and Sundays and movement of empty liquor solution care and full
grained ammonium nitrate cars from the plant during these two days.
OE mone COME a nt
The two above reccamendations have been referred to the ndmdiietreation
and Inspection Sections ef this office,
. DUNCAN C. SMITH
Q Technical Adviser
*
$F 23763
ag
S
®
9
%
S
aguy saavics rences
GCRRAANCE DEPASTHERT © See
—~ “ @2r i
sy ‘is
418g OO!
Sevee, Kee
4
| /
’
a
¢
>
,
Se
4
NF
ost
ry
ant
POA
%
Bes
i.
ey
wae
Be
AEse
ke
\y
oh
‘
Shipment of Ammonium Nitrate
-
ry
Te
‘
‘
a?
k i,
.
yi ae: . apne DP a ne eI Ree tits Gk Ee LS LON sige eee Se ais Ue
flail ih ik pte gaa citi th ceae Wiad Tn A te tvthet ware. Gx as Tig ote ot) ORS hr oF ft Se
pei ea. ae Cs” UR ase CP YE Cs Tae Bale ate : SS Ae
ieee eS era a Bis Se Tite WR 6 ae 20 Pai culate iY 2 SCARS MIT CRAIN StS SP ite bey OT TRAE ep agus (ia
Ee ne Ree Eee ad “ aa ChaNS pepe ee Ss SRS Sh pete ER RHE RE ets tay bs Ee Wines sal bit a PERRIS : 23 at ai as nat
Ds? av Was Ske pee ee RS Le aoe ae hi NaS Bien es Bi oe aioe grate Seok 2
~~
>
i é
-«
~
> a
phates 6 TR nt
Ld
-
-
—
theguant of nents Bitte it 1
: — 3 duns 19h?
| She. OD mh tes OB ni
fe Dea tes te
2 iy 2967).
+o vecmenenads then eomicinet os gercgvegit Sy 65h Sema ee Ads
eed
ote ea eb we nonetery Br sengTiaked ky pour af Yaa, Cee Tieting some eam
of cermapratsnee far sigartars of the Unter Searetesy = ver : So
ay
“st |
V5
stroked eapy of vopart free Of Tlee G@itef <i Tempe
*
[LHDD
?
&
(
Y
39 May 1947
i H
Gafety end Security Bivisiea, Ord.
Gelenel 6. EH. Deitriek
Reena 18-430, Phe
Subject: Storage of Amueaiwn Bitrate at Revemne
“
Pe:
it
pT
ef
hav
inept Reen 3038, eo 2 Bldg., 1901 D M., H.W.
EIB Ny s Pe aS SP Ete, hl MehesARS : PRR RYE R ea et
RO ent Pee ed Eee SA GRE are Mees ee PA et ae he yy ee ae ty oi PR ee Ye * Rie ebay
(RAS i eee rot ¢ SEs TENE 4 He! 7y MKS ; ac a ES
* pens a 3 teases Le Ty mel yee *, sit PA ea ae Niky COL ate aie eee
Severna ne em Een one re promo me pete ere Na ro
ta oe ye A * Cte ate aie peat aint . d
ua oe.) poe j si
23767
eee
|
:
:
Fingh Point Msigtare . Biber Soluble
iii
o eer ® 5D yas PML AS + _ © PRR NER DE Pee Be es -
but ih
a aeq at) a ‘Wae fe ah,
i il Hae
453 2) tube! +e HH
aE HALT at Uieas
aa nadie ele ites
fa li : wie, fiieef
ai ad i Te i aa
be 7 oe He i ii by HE
i if 1 ls
hil the # ia
23769
ORDLY <I
Toy 060, Attys Mire de Adelman
gam as ;
A {2p {wu Fé f 4
— ~* ia
oe,
aoe
e
38 may ls
a PA Sar oce
a) ae "rane et
RES Sic Ree ehe rt ee ee a Pe OE Ie Oe)
ae 2 bats ise"
: Dane te UE Ue meee Pee RET EE a ee 2
Mee ee Penge Se Ree See vA oa GP, ee
ef te shen
with warm ameonius nitrate fertiliser, Thay have alse reported a
that bags exposed te relative humidities abeve 50% will abserd :
enough meistire te exseod the 7X moisture centent that they ccn-
sider eritieal for ammonium nitrate bageing, Rewenna Arsenal 3
has made moisture touts om represurtative bags in storage and 3
found, is
Bagpok bags 5.33 meisture 4
Uaien bag 5.87% 0 i* 4
@eorge 4 Sherrard 5.49% . 4
Raveuna's bag storage is a triek building, werein the bags are d
exposed to atmospheric lumidity thet is normally in the renge ef fe
60%. Presumably this diserepanay is due te the shipping packages :
retarding the dampening offeet of high relative humidity, |
weisture from the air to beeome damp, will eause serious damage
te the paper, This damage insludes diseoleration, loss of a
strength, and embrittlement. Speeial tests eenducted at Iowa eo:
Ordnenes Plagt shew that the inner ply ef mlti-~qall bags suffers S
}
degradation after twenty feur (24) hours heating in am even min
tained at 100° 6 (212° F) under eonditions wherein the paper is
imbedded in a dish ef ammonium nitrate fertiliser, At hi gher
‘emperatures the degradation preseeds mere rapidly and at 140° 6
e 23770
*
ER SET rahe ctr ca Acca t path the gon cee
§
al
Hi
ith
CEL CG, BOL
z
;
}
fi
ee:
060, Zafety & Security
Aree)
PIE NE LEY Sih SS AREAS CNP RAEN SARI My hl OA NT R R e s 1 NMY Ball WU oae: NL OT) gee ate a I CIR AOG LEC ese PT WETS aby His KANE EB paha tea yl Ure seh IRAN AS role Ce tN lr Snel ot atte
, “e
* ° . ‘ ‘
7 2 ,e« ? — « . . o*
Pe ~ ze.
‘
. 2 . *’ . al »
3 ‘ - * ‘
> ¢,
. .
. ¢ , °
4.»
*
e ® t 7 ye
, ~ e s
’
‘ ¢ .
.
-
a ° -
.
. .
‘ a. s
: » . oy
‘ ® : eo - : ° “ " ~ ‘S
s . - - _ ko
. ° : ‘
. . 7 :
;* . ‘ e
° . + ‘ . -
- anid . a
. . *
. . {*
.
‘ ”
. ‘
*
- 4.
.
= #
\
‘ 3 bs
-
+ ° x
3
e =
Sad * r
e-
.* - *
° .
‘ e .
S
‘ e +9
. i
. =
é 24
’ -
,
.
4b Bs
SP ihe bb oy
oH ges.
LE Pe Be
*
7
.
se Legge
Cee re
A th
‘
$
Sig
e
50) eas
Of a
’
\
¢
’
ogen
ee
at Pees
[AY Ptuw ae
5 tak Ys
y
Verne
ne
peers
én
fe
A
‘
>
.
.
.
*
r: “«
Ae *
eh Fels fee
Vt Meh oe
Tree oP bikie Pia
Eat oe fart
| WD, Ord ©, Machington 26, 3. 60, 29 my 1807
: ' Raver aromal has tern yequested te cubalict te eveenn2
| Maan sLlotmant 706-1898 P 180 A 117ER0D to cover tote ef homuniom Fitwets
ORDNANCE SEPARTBENT
ARSENAL
PIC
— eaune / 7/ g69/199-19
23773
Yo
* CR AD ASA NR AERC RI Sn pSliia ONC I INGRED E ak es
as
OCD WU) “539 :
SR AOS
ORDNANCE DEPARTMENT ~ - reaopn
PICATINNY ARSENAL WRTomlinson/PFuacy/rr
Dover. New Jeansay ioc 2223
| MAY sed
Gn EbY 19 et.
weg |
SUBJECT: Investigation of Ammonium Nitrate Fertilizer ~f-
7 —>
TO: * Chief of Ordnance _\~—=
* Washington 25, D. C. | Bee Eh Bi
| | | Si
' APTENTION: ORDIM Vy o~
1. In accordance with the Pat ae reached at a conference in the
Office of Chief of the Industrial Division, 16 May 1947 a swmary re-
port of the work done on the subject investigation during the week
ending 23 May 197 is inclosed. There is also inclosed a summry of
the work to 15 May 1947, not previously reported to _— Office.
2 In the first mentioned report conditions neseabart for the
spontaneous ignition of Ammonium Nitrate (A.N.) fertiliser are in- |
disated. Further work is being ame to establish the minimm conditions.
The first report also shows the progress of analyses to determine the .
presence of impurities in the bags used for packing, and the conditions
which cause charring of the bags with and without fertilizer present.
Preliminary experiments made in an effort to cause detonation by heat
ang on rate of detonation of A.N. fertilizer are also recorded. It is
indicated that the fertiliser can be detonated in a 1$ inch file when
confined in Shelby steel tubing at a density of about-1.0 gm./cc. and
beostered with 50 gm. of RDX Composition A-3. An attempt is being made
to determine the rate of detonation. .
FOR THE COMMANDING OFFICER: .
7 ee
ae * , 15 Maya’
; Ce. R. DUTTON
1. Summary Rept, 23 May 4 be trip) Col, Ord Dept
in trip) Assistant
1 " .
'y?
23774 a ays
‘BaSNI
. {"
*, Z '
' @ se
~ a f
he dak eg i,
\
SECURITY CL2 CATION t1/ eng!
WAR DEPARTMENT
DISPOSITION FORM | - 307°
OCOISE Zam
toChief of Ordnance - fromDirector of Service, ae
on Supply & Procurement, WDGS 1 may 1ga7 Co
1. Attention is invited to attached copies of correspondence from this office to
the Ghief of Transportation and The Quartermaster General in connection with the
ject matter. In this connection it will be noted that special effcrt has been reque
to effect timely and expeditious shipments of ammonium nitrate manufactured in plants
operated under°the supervision of the Ordnance Departmet. It is desired that the
production of ammonium nitrate in such plants be continued to the highest possible
degree and that all deterring factors be eliminated.
2. Itis accordingly requested that conbelenaa Ordnance activities continue their
efforts to achieve this objective and that continuing difficulties preventing such
accomplishment b. reported to this office. |
"BY ORDER OF THE*SECrETARY OF WAR
posP/2) 22085 — Shipment of pana we Nitrate at
y
~
NS
I
- Aes
| } ee
& we i ” ; % a
rn aaa Fg seat ‘ab
} 2 Incis LeR. LUTES, Lieutenant General, GSC is es
l-Cy DF to C/Transportation Director of Service, Supply and Procurement @ © mS
2-Cy DF to The GG (gt Rated
Copies furnished:
Under Secretary of War ae
Chief, Civil Affairs Div., /SS , . »
A
=4
(ite Vials Rade /
; seek iy i 2 12D ’
WD AGO Foam 897 ioe é 4°) Lt GOVERSMART PROSTING OFFICE 19486 ~D9580
MAY ‘946
it
at
i i
ni i
i ih
ath Fr i.
3 task
a
Lae fy Grd dept, 1h ey WT
‘Seo Mane fer Keceré on Case T12h7
23778
oo <— = i i i i al
~ ——s ~
Ate
60o I (7¥
fit
7"
dy
Ran p
it
A
izy
SERTABLE TA
i ete
al Se
AL
HT
as ee rh ere err
ee ee
en
ae
Dre (; 2
4
237977
CL oN Neh SOS hoe. pple daa as etch ie tae eRe Bie
<
z=
tal
+
a<
7
e >
» z
3z
<= =
o<
ou
a.
»
oe
hia
WAY 25%)
many
earga To
$F. -f
“
GO?
m Bitrete
emme-e 7!
URINE:
ss
an
Be Si,
io
sf
a
23778
SOT: iemeonian Zitrate
(Vertiliser Grade)
eomsnina aitrete, the ralstive ef feotivences of the ceating agente
themselves against asisture trensaiizcion and the aneunt of ponotretion
ef the coating agente inte the anmeniun uitrete grains.
ea
: gy TS Roper? Be 120419 (in dup) Gea ane teat
P ae aes itn ie Asal stant
:
ie
eon e 2 93779
i at i a de i en ee
HEADQUARTERS
ARMY CHEMICAL CUNTER 7G
SOCEWOSO ARSENAL, MARTLAND rv
5a VIER GF OFFICZ OF THE POST PIKE MArSHAL
Pru #71.86/1 : ; \ : wan /ef
| “\ 7 May 1947
\
\
SUBJECT: Fire end Explosive Hazards of Ammonium le and Processed
Mixtures
ee 000 18-22) o®
i
TO 4 Chief of Ordrvance, Washington, Ds Ce \
4
\ | ~
le Enclosed herewith is a copy of @ report from tine Bureau of Hines Cy
on the impact, fricticnal impact, and static spark. sensitivities of mix-
tures now being processed at Edgewood Arsenel, \
2. This report indicates that the mixture is non~explosive and pre<-
sents no danzerous fire hazarde This report is not in ecoordance with
the provisions of Paragraph 70 b (4) 0.0. Form Noe 7224, Oranance Safety
Manual, dated 3 May 1945. Special instructions are requested for the
- olassification (explosive content) and for the storage and handling of
these mixtures under the following conditions:
Se Quantity distance tables for « maximun of twenty four thousand
(24,000) pounds in processed fuel blocks weighing twelve (12) pounds eache
be Quantity distance tables for a maximum of eighteen theusand
(18,000) pounde of processed blocks (weighing twelve (12) pounds each),
each block sealed in a metal container, i.e. top compartment of floating
smoke pot E23. The bottom compartment of the floating smoke pot holds
approximately two (2) gallons of fez oile The E23 smoke pot is fuzed
with a Cal Corps M15 or M16 igniter.
(1) Specifications for fog cil used in E23 floating smoke
pot are shown on chart on Page 2.
23780) Vie
7O
“}
>
PFN 471.86/1
‘type Sor-l 3 , Type SGFr-2
Requirement 8 moiXe e t are Mire
ry 2 a % ‘
Flash Point ; *-= ¢ °-- Pitekateall ry S20°F ,
Viscosity, Saybolt Universel, lOOOF. 4 --<- 3 ooo 3 110 : 100 _~—C
Viscosity, Saybdoit Universal, 2100F, 2 60e 3; *-= 2° | : =
Conradsogz carbon residue 3 Ol 3 <= s Gel. 54 em
Neutralication number : Oel ~ oe : Oel 3°
Pour Point . 1 OF, 2 om= minus 40°F, ---
Distillations Vapor tempercture, at ; : 2 é
10 mme avsolute pressure, at * ea : ; 2
10 percent evaporation ¢ sn : S9OCF, 2 === 3°
50 percent evaporation : = : 4900P, ;: oa g oon
90 percent evaporation : 610°F, ; o-- a ¢ «co
*A viscosity of 65, at 210°F,, will be the maximum permissible for oils
having a Viscosity Index of 50 or more. |
Se Paragraph 70 o (6) 0.0. Form No. 7224, Ordnance Safety Manual is
snot in accord with laragraph 165 a (2) Ti 9-1900. xeouest instructions
as to the procedure tc he followed in fichting fires of this typee
FOR THE COMMANDING OFFICER: |
1 Inolosure 3
Bureau of Mines Report
| chek %-Srdow.
RICHARD 0. GORDON -
Lt .Colonel, Cal...
Aset.Executive Officer.
Y
LEGION gn
\)
‘o Calor ¥*)
ompapt ¢7/. og Sel ) ery
suaJact: /sanseiun Bitrate (Pertilissr Grete)
TO: Uaief ef Ordmme 7
Hashingtes 25, OC ,
ATTRETIGN: Col C. B. Beitriex
Safety end Security Oivisien
lL. ‘There is inslesed in duplicate Chemienl Laberatory Report Be.
specification tests and misressopic
qiamination of twenty-four (24) samples of aamenian aitrete fertiliser
wbieh were received fron the lows Ordnance Plast, Durliagten, lous.
FOR THE COMMANDINO OFFICER:
Cc. &. WTTta
1 Incl Ceol, Grd Vept
1. Chem Lab Heport No 1203% (ir dup, Assistant
-_
~*~ 5
Lay
2. The results of epecification tests shew that all of the
eanples comply «ith the reqeiremsate. Tee alercecepia summon ti
ef
eotathap L senplovely pated with wax ont thet o unjerity of She
vee nien partisiee have enly © amall portion of their surface coated
with wax.
POR THE COMMANDING OFFICER:
23785
Lr
Q.06 47086 USP let Inf
COED 47.869 /190=3 A
i. The teste outlined in the beaie letter
eharnetar (at ee
ef dehemzming oertaia
conbinetions are very setisfactery. It is
af saseaceiara
toe pina
SES,
tests be contusted a8 vee as prestisable ani espies ef the test results
ZOtS 4
mae
at
7
a ;
if
bf
ail
23785
be BONS ia a ain al Net Ee ree
0Cco 15(28)|
ch Be |
WwW TRPTT)
re "
iP ‘2
~ ;
od
A
oe
(
ar
eae
dS }
i ait
me, k
Pt
of
ond
s
+E
wt
} Sale *
<|\" g
, & 4
2 >
/ = z A |
) 2 = ral
ts/ c-
2 i g
. $0
= f
3 }
| B F
i 7 '
-4
= Sti.
ere
_* a*
on
i —_ = yo
\ © AS
fi ly
it
j
it
ii At yi
i!
i
Wa
iat
Ht 1
i
iy
a
.
if |
i
a Lil
i
CO 45( 50)
i
el
vl
Hit
Ne
lit
i
it
igh
Lil
Ht
t it
il i i
We Wt :
ee Pe
ree RICO
23789
.
“See
Pid. COtn .OCKTONE OAD BE AOBGREPOIEED UY CAREOM GOry A... AGGSURGED TS
x
“SS
REO CED nw
TO WEDURE PROSEPT ATTENTION WAR DEPARTMENT ranaynsite/ 36/PO
REVI SGPER TO
OF¥YICK OF THE CHIEF OF ORDNANCE >
| WASHIMGTOM, BD. SG.
ATTErom OF : $
a | Dy 13 Marek 1967
Re
‘ © ,
SUBJECT: Shipping Orders on Pertiliger Urade Ammonium Hitrate :
TOs The .uartermaster Generai
—- ~ ~
ATTSTIOM: Major Mellhaney, Temp A, 2603
1. ‘nelosed is a copy of & memorandua’ from the Field Director of
Ammunition Plante to this cffies dated 4 Marah 1847, subject: Shipping
orders on Pertiliser Oreds Ammonium Nitrate, file 0.0. 471.86/441,
with inclosures,.
2. It is requested that your office consider the recommendations
meds in inclosure memorandum and advise this office of your coments e
or recommendations or action taken.
POR THE CHIEF OF ORDMANC®:
\
1 Inol O. Me JAMK
Cy ¥Yamo dtd 4 karoh Col, Ord Dept |
_ w/8 inols Assistant
\ fA.
\ é
} ‘
|
: eee: .
: ay vi
i WA ?, \ ‘
; oes :
me 7
ee ay
Yiag. Gro. CY *
c “
23796
y - es Tas
Saree ; 4 p Sts bees
RSCORD
Mice Memorandum * UNITED STATES GQYERNMENT
=? f £6~ 11 War CDLyons/ok/5205
TO ; OCO, ATTN; ORDIM “~~ DATR: 4 Merch 1947
From : Field Director of Ammunition Plants,
ATTN; ORDLY-E
suBjEcT: Shipping Orders on Fertilizer Grade Pe a Nitrate
1. Reference is made to the attached copies of shipping orders covering ship
ment of fertilizer grade Ammonium Nitrate for the month of March 1947,
9B 1H OD
2, Attention ie invited to the fact that shipping instructions attached were ~\
all issued, with the exception of one, on the 28th day of February 1947 by the aN
Quartermaster Purchasing Office, New York, N. Y. It was the underetanding of this —_
_ office that all graining plants would be advised of shipmente in sufficient time
~ “4n order to sllow them to plan ahead and to eliminate the necessity of storing
nished material. The late date of issuance has also been generally true in past
.. months,
a 3. It is to be noted that shipping ordere require that 25 empty bags are to
be included in e&@ch car to cover’ breakage, On the basis of the present sohedule -
65,000 tans, and at the present market price of bage - 13 cents each, the value of
empty bags placed in cars, over & l2-month period, totals approximately $53,000.00.
4. Shipping orders also require thet repships be made on e@ch shipment from
the graining plants in general to the foilowing;
®. Quartermaster Purchtsing Office, New York, N. Y.
b. Consignee or Consigne:s
7
5S. The above, information is brought to your attention for such action as your
office may feel is necessary; however, it is suggested that the following reccamen-
dations of this office be soted upon;
&, Quartermaster Corps be again requested to issue shipping instructions
by the 20th of each month for the following month in order to ellow for proper
pleaning at plant level ss regards handling, storage and ordering required box oars.
| db, That Quartermaster Corps be requested to replenish Ordnance operating
‘ funds being expended in sending empty bags with eash shipment, since it is felt that
the range of expenditure of production funds should not be extended beyond the
shipping of the loaded oars, in the absence of the adaptation of this recommends-
tion, it is suggested that the Quartermaster Corps be requested to contact all
ocneignees and &sk that 811 empty begs received and not used be returned to plent
of origin,
ee sc. All repships sent from plents on finished meteriel be on & collect
= basis, °
6. Action on the above recommendations, or comments relative to sans wy ySar
fice, will be @ppreciated,
of .
/ : ; i YW fs
6 Inole
5:0. 30-2806168-47 30-280-10908-47 JOEL G. HOLaES wae te ey
| 30+280+156=-47 3042801 55-47 Colonel, Ord Dept / Qn
4-30-280-124-47 30=280+157-47 99791 . Wile hin 2%
-f ar ‘
eae
we eee
Clo iv 6
ad
RECORD
es 471.86/2023 lst Ind AJClear/he/221,
Ord Dept, Picatinny Arsenal, Dover, NJ oa yga/
TO: Chief of Ordnance, Washington 25, 1, ATTN: ORDGU
l. As requested in paragraph 4 of this letter vests have been con-
ducted to determine the ignitability of the submittec ammonium nitrate
fertilizer bags. These results are given in Chemical Laboratory hKeport
No 120235 which is inclosed in duplicate.
2. On the basis of the data given in this report it appears un-
likely that the reported fires were due to contact between the hot
ammonium nitrate fertilizer and the Duplex paper bag stock since the
data show that the bags must attain a temperature of approximately 700°F
before ignition, accompanied by flame, takes place. The fact, however,
that the bag stock treated with ammonium nitrate charrea moderately when
heated for two houre at 300° ¢ 5°F does not permit this possipiJity to
be completely eliminated particularly since it was reported in paragraph
3 of this letter "that the fertilizer is bagged at temperatures of
approximately 190°F to 2,0°F in Duplex paper bags" and "plac