Petition for Writ of Certiorari — Utah Shared Access Alliance v. Carpenter (No. 06-1144)
Supreme Court brief2006
Ask Donna
What actually matters in this document.
Text
Suprane Cou:t. U.S.
FILE O
061144FEB16 2007
No.
. OFFICE OF THE CLERK
IN THE
Supreme Court of the United States
UTAH SHARED ACCESS ALLIANCE, PETITIONER
GLENN CARPENTER, IN HIS CAPACITY AS MANAGER OF
THE SALT LAKE FIELD OFFICE OF THE BUREAU OF LAND
MANAGEMENT, ET AL., AND SOUTHERN UTAH
WILDERNESS ALLIANCE, ET AL.
PETITION FOR A WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE TENTH CIRCUIT
PETITION FOR WRIT OF CERTIORARI
PAUL W. MORTENSEN
Counsel of Record
Hanks & Mortensen, I.C.
8 Fast Broadway, #740
Salt Lake City, Utah 84111
(SOL) 363-0940
Attorneys for Petitioner
CURRY & TAYLOR ®@ WASH O.C. @1202! 393 414 @uwsscinfFo.cam
1
QUESTION PRESENTED
The Tenth Circuit affirmed the Utah district court’s -
ruling upholding the Bureau of Land Management’s non-
emergency restrictions of mountain biking, off-highway
vehicle and dispersed camping uses, even though such
uses were authorized by BLM’s governing land use plans
and BLM’s restrictions were implemented without first
amending such land use plans according to section 202, 43
U.S.C. § 1712, of the Federal Land Policy and
Management Act (FLPMA), 43 U.S.C. § 1701 et seq.
FLPMA section 302(a), 48 U.S.C. § 1782(a),
requires that agency management actions conform to land
use plans unless and until the plans are amended in
accordance with FLPMA section 202. Norton v. Southern
Utah Wilderness Alliance, 542 U.S. 55, 69 (2004).
FLPMA section 202 mandates that land use plans shall be
amended utilizing public participation and comment in a
systematic interdisciplinary process. 43 U.S.C. §§ 1712(a),
1712(c)(2)&(9), 1712(f); 43 C.F.R. §§ 1610.5-3(c), 1610.5-5.
BLM’s non-emergency management actions herein
clearly failed to conform to governing land use plan
standards. Petitioner sued contending that BLM’s
actions violated section 302(a)’s management conformity
mandate and that BLM’s de facto amendment of the land
use plans denied Petitioner of its right to participate and
comment in the section 202 public, systematic
interdisciplinary, amendment process mandated by
Congress.
The Tenth Circuit upheld BLM’s management
restrictions, ruling that FLPMA section 302(b)’s “prevent
unnecessary or undue degradation” provision, 43 U.S.C. §
1732(b), provides an exemption to FLPMA section 202’s
public participation planning mandate and to FLPMA
section 302(a)’s management conformity mandate. The
u
Tenth Circuit opinion, thus, eviscerates Congress’ public
participation and management conformity mandates, and
directly violates Norton, presenting an important
question of federal law that has not been, but should be
settled by this Court.
One question is presented:
Whether, in the absence of an emergency, BLM
may apply FLPMA section 302(b)’s “prevent unnecessary
or undue degradation” provision to eviscerate FLPMA
section 202’s public participation mandate and FLPMA
section 302(a)’s management conformance mandate.
it
PARTIES TO THE PROCEEDING
Petitioner: Utah Shared Access Alliance, a nonprofit
advocacy group
Respondents: Glenn Carpenter, in his capacity as
manager of the Salt Lake Field Office of the Bureau of
Land management; Maggie Wyatt, in her capacity as
manager of the Moab Field Office of the Bureau of Land
Management; Sherwin Sandberg, in his capacity as the
manager of the Monticello Field Office of the Bureau of
Land Management; Sally Wisely, in her capacity as Utah
State Director of the Bureau of Land Management; Gale
A. Norton, in her capacity as Secretary of the Interior;
Kathleen Clarke, in her capacity as Director of the
Bureau of Land Management*
Intervenor-Respondents: Southern Utah Wilderness
Alliance, a nonprofit advocacy group; The Wilderness
Society, a nonprofit advocacy group; Great Old Broads for
Wilderness, a nonprofit advocacy group; Wildlands, CPR,
a nonprofit advocacy group
Rule 29.6
Utah Shared Access Alliance is a 501(c)(3) public
advocacy group, does not issue stock, and does not have
shareholders. Utah Shared Access Alliance has no
parent, subsidiaries or affiliates.
*Since this case began: Sandra Meyers has replaced Sherwin
Sandberg as the current manager of the Monticello Field Office.
Selma Sierra has replaced Sally Wisely as Utah State _—_ Director of
the Bureau of Land Management; Dirk Kempthorne has replaced
Gale A. Norton as Secretary of Interior
Ww
TABLE OF CONTENTS
QUESTION PRESENTED
TABLE OF AUTHORITIES
OPINIONS BELOW
CONCLUSION
APPENDIX
Circuit Court Opinion
District Court Memorandum Opinion & Order Re:
Supplemental Complaint Challenging the April
24, 2003 Box Elder County Order
District Court Memorandum Opinion & Order .........00-+- 38a
CG Ce iiiicinbincisetipsteseianctbicicianacaniacation . aia 64a
CI TC TIE a iiiitecsittaichctetaicenininsnacsigiinnsineisieii 66a
Relevant Provistons [Nvolved..........cseccceccesscsssscesssssecsescceees 68a
1999 BLM Box Elder County Order
2000 BLM Bow Elder County Order ........ccccccssecceeseseeeereeeees 90a
Vv
2001 BLM Grand County Camping Order .....sccecereeeeeee: 94a
2001 BLM Grand County Travel Restriction
2003 BLM Box Elder County Order
1999 BLM San Juan County Order
BLM National Policy Handbook 10/25/88, ch. 1.b.2.......
BLM Instruction Memorandum No. UT 2004-061
v1
TABLE OF AUTHORITIES
CASES
CHEVRON V. NATURAL RESOURCES DEFENSE
COUNCIL, INC., 467 U.S. 837, 842 (1984)
CRAWFORD FITTING Co. V. J.T. GIBBONS, INC., 482
U.S. 437, 445 (1987)
GOOD SAMARITAN HOsp. V. SHALALA, 508 U.S. 402,
409 (1993)
GUIDRY V. SHEET METAL WORKERS NAT'L PENSION
FUND, 493 U.S. 365, 375 (1990)
HOUSE V. U.S. FOREST SERV., 974 F. SUPP. 1022,
1035 (E.D. KY. 1997)
HUMBOLDT COUNTY V. UNITED STATES, 684 F.2D
1276, 1283 (9TH CIR. 1982)
HYNES V. GRIMES PACKING CO., 337 U.S. 86, 116-23
CI cccnincevsctsavibsninksonssssnhinniitestbeiliansiainaniingtaseabmaes AAAS AS ia 7
INTERNATIONAL PAPER Co. V. QUELLETTE, 479 U.S.
I 13
MORALES V. TRANS WORLD AIRLINES, 504 U.S. 374,
384-85 (1992)
NATIONAL WILDLIFE FEDERATION V. BURFORD,
835 F.2D 305, 323 (D.C. CIR. 1987)
OR. NATURAL RES. COUNCIL FUND V. FORSGREN,
252 F. SUPP. 2D 1088, 1099 (D. OR. 2008) ....................-eceeeeee 15
SOUTH DAKOTA V. YANKTON SIOUX TRIBE, 522 U.S.
529, 346 (1998)
STATE OF UTAH V. BABBITT, 137 F.3D 1193, 1215-1216
(10TH CIR. 1998)
UNITED STATES V. GRANDERSON, 511 U.S. 39, 56
(1994)
UTAH SHARED ACCESS ALLIANCE V. CARPENTER,
463 F.3D 1125 (LOTH CIR. 2006)
WHITMAN V. AMERICAN TRUCKING ASSOCIATIONS,
INC., 531 U.S. 457, 485 (2001)
STATUTES
42 U.S.C.
SE ia Maks FD winssinseitescsihdinciccininicibibisictiidiiniiianciaiichatiigeuigi 13
43 U.S.C. § 1701
43 U.S.C. § 1701(a)(7)
43 U.S.C. § 1702(d)
43 U.S.C. §
43 U.S.C.
er Eris BAe NIUE D itcsoniiatignicitininctiiniiteainnoeliadiinemcsapammiiaiiadapietadas 2
43 U.S.C. § 1712(e)(2)
43 U.S.C. § 2. °. f)
43 U.S.C. § 1732(a)
43 U.S.C. § 1732(b)
43 U.S.C. § 1739(e)
5 U.S.C. § 701
5 U.S.C. App. 2 § 1
H. R. Conf. Rep. No. 94-1724
REGULATIONS
DOC AR, BT :cssnicninsniscinibcsssiueiisaieiicciaiiiasaniiiidianlbadinaal 19
40 C.F.R. § 1506.11
40 C.F.R. § 1508.9(a)
40 C.F.R. § 1508.9(b)
43 C.F.R. § 1610.2(a)
43 C.F.R. § 1610.1(c)
CPR: DMT. i eurcicca eae, 1
43 C.F.R. § 1610.5-3(a)
43 C.F.R. § 1610.5-3(¢)
43 C.F.R. § 1610.5-5
GBT Be. FD catisntisnsessincteinivaetscacemmmedianags 3
1x
Ee ae eee 5, 6
EE ee 5, 6, 7
SI TE STII vicshecivnsetstenisubodsessensessesenenssovessoveretsesensestnece 9
43 C.F.R. §§ 1610.2(f)
43 C.F.R. $8 1610.5-3(¢)
43 C.F.R. $8 1610.5-5
43 C.F.R. §§ 8341.2, passim
alld cchesdcsncenunsicciinitbeadeaesdesienoosennvens 18
EEE eee 19
51 Fed. Reg. 15618 (Apr. 25, 1986)
63 Fed. Reg. 110
8364.1 / 40 C.F.R. § 1506.11
]
OPINIONS BELOW
The opinion of the Tenth Circuit Court is
reported at Utah Shared Access Alliance v. Carpenter,
463 F.3d 1125 (10° Cir. 2006). The district court’s
August 28, 2003 opinion is not reported. The district
court’s December 9, 2004 opinion is reported at 348 F.
Supp. 2d 1265.
JURISDICTION
The Tenth Circuit filed its decision on
September 19, 2006, and entered an order denying
Petitioner’s Petition for Rehearing with Suggestion for
Hearing En Banc on November 21, 2006. This Court
has jurisdiction under 28 U.S.C. § 1831, which
authorizes the Court to hear actions arising under the
Constitution, laws and treaties of the United States (in
this case the Federal Land Management and Policy
Act, 43 U.S.C. § 1701 et seq.), and, the Administrative
Procedures Act, 5 U.S.C. § 701 et seqg., which provides
jurisdiction to review final agency actions.
RELEVANT PROVISIONS INVOLVED
The following FLPMA sections are set out
verbatim in the appendix: FLPMA section 103(d) [43
U.S.C. § 1702(d)], FLPMA section 202 [43 U.S.C. §
1712], FLPMA section 302(a) [48 U.S.C. § 1732(a)],
FLPMA section 309(e) [48 U.S.C. § 1739(e)]. All of
these sections concern FLPMA’s public participation
mandate. Additionally, FLPMA section 302(a) contains
FLPMA’s management conformity mandate. Also set
out verbatim in the appendix is FLPMA section 302(b)
2
[43 U.S.C. § 1732(b)], which contains the “prevent
unnecessary or undue degradation” clause.
STATEMENT
1, FLPMA repealed numerous public land
laws considered obsolete and modified thousands more,!
providing the Secretary of Interior, and, thereby, the
Bureau of Land Management (BLM), with a single
comprehensive management directive. FLPMA
mandates that BLM lands be managed for multiple use
and sustained yield and FLPMA requires BLM to
provide a balance of uses. 43 U.S.C. § 1701(a)(7),(8), &
(12).
To assist BLM in fulfilling this balancing
obligation, FLPMA requires BLM to prepare and
maintain an “inventory of all public lands and their
resource and other values,” 43 U.S.C. § 1712(a), and to
prepare land use plans, 43 U.S.C. § 1712, which BLM
calls resource management plans (RMPs). In
developing or amending RMPs, BLM must observe the
principles of multiple use and sustained yield, 43 U.S.C.
§ 1712(c)1), use a “systematic interdisciplinary
approach,” 438 U.S.C. § 1712(c)(2), and consider
environmental impacts, 43 C.F.R.§ 1610.2(a).
Importantly, Congress mandated that BLM
must “give Federal, State, and local governments and
the public adequate notice and opportunity to comment
upon and participate in the formulation of plans and
programs relating to the management of the public
lands.” FLPMA section 202(f), 43 U.S.C. § 1712(. To
emphasize its insistence upon public participation,
‘ H.Rep. No. 94-1163, at 1 (1976); Reprinted in 1976 U.S.C. 6175.
3
Congress reiterated its mandate numerous times
throughout FLPMA.’
Congress further mandated that BLM’s
management of the public lands must conform to the
standards set forth in its RMPs. FLPMA section 302(a),
43 U.S.C. § 1732(a), mandates that BLM, “shall manage
the public lands under principles of multiple use and
sustained yield, in accordance with the land use plans
developed ... under section 202 of this Act ...” emphasis
added.
2. BLM has adopted numerous RMPs for its
Utah lands. These land use plans have designated
extensive lands as “open” to mountain bike, off-
highway vehicle (OHV), and motor-assisted dispersed
camping uses.’ Such are the cases with the Box Elder
RMP, adopted April 1986, which governs BLM lands in
Box Elder County, and the Grand RMP, adopted June
1985, which governs BLM lands in Grand County and a
portion of San Juan County. T0839, T1471.°
Soon after the Grand RMP was adopted in 1986 a
significant increase in mountain biking, camping and
OHV recreation occurred in the Grand RMP area. This
increase continued into the 1990’s presenting BLM with
legitimate management challenges. However, BLM
regularly responded to _ these challenges’ by
* These sections are quoted at page 10-12.
‘“Open area means an area where all types of |off road] vehicle use
is permitted at all times, anywhere in the area ...” 43 C.F.R. §
8340.0-5(f).
‘ Dispersed camping is camping unrestricted to designated sites or
campgrounds.
Appendix to the Petition references as _a. Tenth Circuit appendix
references as T_.
" Record numbers of visitors were expected in the 1998 tourism
season. T1513.
4
implementing RMP-authorized actions’ and by plan
amendments/environmental assessments (EAs)* under
FLPMA section 202. By 1996 the increase in recreation
was stabilizing. BLM’s 2001 amendment/EA to the
Colorado Riverway Recreation Plan amendment
stated, "Overall visitor use iv the Moab area has been
relatively stable for the past five years, but appears to
be shifting somewhat from non-motorized to motorized
use.” T1656.
BLM’s Box Elder County lands, located chiefly
on the extremely lonely desert west of the Great Salt
Lake, have never been subject to a recreational boom
like that in the Grand RMP area, which surrounds
Moab, Utah. There are no cities or towns west of the
Great Salt Lake. However, as in Grand County, BLM
has restricted huge areas of lands from OHV use
contrary to RMP “open” standards.
3. In 1999 BLM adopted a statewide policy
goal to change RMP categories from "open" to "limited
to designated roads and trails" for all public lands in
Utah except specifically designated "open" areas, such
as sand dune areas. T1245, T1722. BLM determined to
fast-track changes to mountain biking, camping and
OHV management standards, thereby evading
FLPMA’s public participation, “systematic
interdisciplinary approach,” and environmental analysis
requirements. To evade FLPMA sections 202 and
302(a), BLM construed its authority under FLPMA
* 1987 “Off-Road Vehicle Implementation Plan.” T1446.
* Utah's Coiorado Riverway Recreation Area Management Plan
(1992), itself amended by Amendment | in May, 2001. T1581. Mill
Creek Canyon Management Plan (Feb. 2001)(T1551), incorporating
four EAs from 1996, 1999 and 2000 resulting in findings of no
significant impact and also a Document of NEPA Adequacy.
T1556-57, T1568.
-
oO
section 302(b)’s “prevent unnecessary and undue
degradation” clause to override FLPMA sections 202
and 302(a). T0374.
4, This petition concerns summary
restrictions issued by BLM to implement its statewide
goal. In 1999 and 2000 BLM issued orders (88a, 90a)
restricting 550,000 “open" acres in Box Elder County to
“limited to existing routes” and “limited to designated
routes” standards recommended by an ad hoc advisory
group. T0811. 90a. In 2001 BLM restricted a quarter
million "open" acres in Grand County by issuing two
orders (94a, 98a) eliminating mountain bike and OHV
uses, except on existing routes, and eliminating related
dispersed camping.
The 1999 and 2000 Box Elder County orders and
the two 2001 Grand County orders each cited as
authority 43 C.F.R. § 8341.2 and/or 43 C.F.R. § 8364.1.
88a(90a), 90a(93a), 94a(98a), 98a(104a). 48 C.F.R. §
8341.2 provides:
Notwithstanding the consultative provisions in
Sec. 8342.2(a), where the authorized officer
determines that off-road vehicles are causing or
will cause considerable adverse effects upon soil,
vegetation, wildlife, wildlife habitat, cultural
resources, historical resources, threatened or
endangered species, wilderness suitability, other
authorized uses, or other resources, the
authorized officer shall immediately close the
areas affected to the type(s) of vehicle causing
the adverse effect until the adverse effects are
eliminated and measures implemented to
prevent recurrence.
6
43 C.F.R. § 8341.2 applies only to OHVs. In
contrast, BLM relied on 43 C.F.R. § 8364.1 to restrict
mountain bike and camping uses, as well as OHV uses.
43 C.F.R. § 8864.1 authorizes administrators to “close
or restrict use of designated public lands” in order to
“protect persons, property, and public lands and
resources.” Subpart (b)(3) of this regulation requires
that each order shall “[s]pecify the period of time
during which the closure or restriction shall apply.”
5. Petitioner filed this action on October 21,
2001, challenging, inter alia, the two 2001 Grand
County orders and the 1999 and 2000 Box Elder County
orders. The Grand County orders made no claim of
emergency. Though announced as emergency actions,
the two Box Elder County orders were obviously not
emergency in nature since they were issued to
implement OHV restrictions recommended by an ad
hoc advisory group, never chartered under the Federal
Advisory Committee Act, 5 U.S.C. App. 2 § 1 et seq.
9la.
After Petitioner filed its initial opening brief
with the district court, BLM on April 24, 2003 revoked
its 1999 and 2000 Box Elder County orders, and
simultaneously issued a new order (104a) that
restricted 189,000 acres of “open” lands in Box Elder
County to “limited to designated routes” and closed
over a hundred miles of non-designated existing roads.
T0588-603. In the new order (2003 Box Elder Order),
BLM relied solely on 43 C.F.R. § 8341.2 and did not
assert emergency authority as it had in the 1999 and
2000 restrictions. To support the 2003 Box Elder Order
BLM documented increasing non-emergency OHV
impacts within the 189,000 acre areas. Petitioner,
granted leave to file a supplemental complaint (64a),
la
(any footnotes trail end of each document)
No. 05-4009
UNITED STATES COURT OF APPEALS FOR THE
TENTH CIRCUIT
UTAH SHARED ACCESS ALLIANCE, a Utah non-
profit corporation,
Plaintiff-Appellant,
V.
GLENN CARPENTER, in his capacity as manager of
the Salt Lake Field Office of the Bureau of Land
Management; MAGGIE WYATT, in her capacity as
manager of the Moab Field Office of the Bureau of Land
Management; SHERWIN SANDBERG, in his capacity
as manager of the Monticello Field Office of the Bureau
of Land Management; JERRY MEREDITH, in his
capacity as manager of the Richfield Field Office of the
Bureau of Land Management; SALLY WISELY, in her
capacity as Utah State Director of the Bureau of Land
Management; GALE A. NORTON, in her capacity as
Secretary of the Department of Interior; BUREAU OF
LAND MANAGEMENT; KATHLEEN CLARKE, in
her capacity as director of the Bureau of Land
Management, Defendants-Appellees,
SOUTHERN UTAH WILDERNESS ALLIANCE, a
Utah non-profit corporation; THE WILDERNESS
SOCIETY; WILDLANDS CPR, a non-profit
corporation; GREAT OLD BROADS FOR
WILDERNESS, a non-profit corporation; REDROCK
FORESTS, a Utah non-profit corporation,
Defendants-Intervenors-Appellees.
2a
September 19, 2006, Filed
COUNSEL: Paul W. Mortensen, Hanks & Mortensen,
P.C., Salt Lake City, Utah, appearing for the Plaintiff-
Appellant.
Jeffrey E. Nelson, Assistant United States Attorney
(Paul M. Warner, United States Attorney, with him on
the brief), Office of the United States Attorney for the
District of Utah, Salt Lake City, Utah, appearing for
Defendants-Appellees.
Eric G. Biber, Earthjustice, Denver, Colorado (James
S. Angell, Earthjustice, Denver, Colorado; Stephen
H.M. Bloch, and Heidi J. McIntosh, Southern Utah
Wilderness Alliance, Salt Lake City, Utah, with him on
the brief), appearing for the Defendants-Intervenors-
Appellees.
JUDGES: Before TACHA, Chief Circuit Judge,
McWILLIAMS, Senior Circuit Judge, and O'BRIEN,
Circuit Judge.
OPINION BY: TACHA
OPINION: TACHA, Chief Circuit Judge.
Plaintiff-Appellant Utah Shared Access Alliance
("USA-ALL") is Utah's largest motorized access
advocacy organization. Its members use motorized
vehicles, including off-highway or off-road vehicles
("ORVs"), to access lands throughout Utah that are
managed by the Bureau of Land Management ("BI.M").
After the BLM imposed several restrictions on ORV
use in certain parts of the state, USA-ALL filed this
3a
lawsuit in the District of Utah under the
Administrative Procedure Act ("APA"), alleging
violations of the Federal Land Policy and Management
Act ("FLPMA"), the National Environmental Policy
Act ("NEPA"), the Federal Advisory Committee Act
("KFACA"), and the National Defense Authorization Act
("NDAA"), as well as regulations promulgated pursuant
to those statutes. The District Court concluded that the
BLM had not violated FLPMA, NEPA, or FACA, and
that USA-ALL did not have standing to bring its claim
under the NDAA. The court therefore entered
judgment in favor of the BLM and dismissed the action
under the NDAA. USA-ALL now timely appeals the
District Court's ruling with respect to FLPMA, NEPA,
the NDAA, and certain regulations. We _ take
jurisdiction under 28 U.S.C. § 1291 and AFFIRM.
I. STATUTORY FRAMEWORK
A. Federal Land Policy and Management Act
Nearly one-half of Utah is federal land managed by the
BLM, which is an agency within the Department of
Interior. Norton v. S. Utah Wilderness Alliance, 542
U.S. 55, 58, 124 S. Ct. 2378, 159 L. Ed. 2d 187 (2004)
("SUWA"). FLPMA, codified at 48 U.S.C. § 1701 et seq.,
creates a "versatile framework" for governing the
BLM's management of these lands. Rocky Mountain
Oil & Gas Ass'n v. Watt, 696 F.2d 734, 737-38 (10th Cir.
1982). The statute directs the BLM to manage public
lands "under principles of multiple use and sustained
yield." 483 U.S.C. § 1782(a); see also 48 U.S.C. §
1701(a)(8) (listing purposes and values that should be
considered in the management of public lands).
"Multiple use management’ is a deceptively simple
4a
term that describes the enormously complicated task of
striking a balance among the many competing uses to
which land can be put... ." SUWA, 542 USS. at 58
(citing 48 U.S.C. § 1702(c)). These uses include, but are
not limited to, "recreation range, timber, minerals,
watershed, wildlife and fish, and [uses serving] natural
scenic, scientific and historical values." Jd. The phrase
"sustained yield" refers to the BLM's duty "to control
depleting uses over time, so as to ensure a high level of
valuable uses in the future." Jd. (citing 48 U.S.C. §
1702(h)).
To assist in the management of public lands, FLPMA
requires that the BLM “develop, maintain, and, when
appropriate, revise land use plans.” 43 U.S.C. § 1712(a).
These land use plans, which the BLM regulations
denote "resource management plans" ("RMPs"), see 43
C.F.R. § 1601.0-5(n) (2005), project both the present
and future use of the land. 43 U.S.C. § 1701(a)(2).
Proposed RMPs are subject to a mandatory period of
public notice and comment, see 43 C.F.R. § 1610.2, and,
once adopted, will "guide and control future
management actions and the development of
subsequent, more detailed and limited scope plans for
resources and uses." 43 C.F.R. § 1601.0-2.
FLPMA prohibits the BLM from taking actions
inconsistent with the provisions of RMPs. See SUWA,
542 U.S. at 69; 43 U.S.C. § 1732(a) ("The Secretary shall
manage the public lands . . . in accordance with the land -
use plans developed by him... ."); 43 C.F.R. § 1610.5-3
("All future resource management authorizations and
actions ... shall conform to the approved plan."). When
needed, however, these plans may be amended. 45
C.F.R. § 1610.5-5. To do so, the BLM must prepare an
da
environmental assessment or an environmental impact
statement, see id., and submit the proposed amendment
to public notice and comment in the same way as when
the plan was originally being prepared. 43 C.F.R. §
1610.2.
In any event, RMPs must further the purpose of
FLPMA, which is to ensure that:
the public lands be managed in a manner that
will protect the quality of scientific, scenic,
historical, ecological, environmental, air and
atmospheric, water resource, and archeological
values; that, where appropriate, will preserve
and protect certain public lands in their natural
condition; that will provide food and habitat for
fish and wildlife and domestic animals; and that
will provide for outdoor recreation and human
occupancy and use.
43 U.S.C. § 1701(a)(8). Further underscoring the BLM's
duty to protect the environment is the statutory
requirement that “[iJn managing the public lands the
Secretary shall, by regulation or otherwise, take any
action necessary to prevent unnecessary or undue
degradation of the lands." 43 U.S.C. § 1732(b).
B. Executive Orders and Federal Regulations
Pertaining to ORV Use
ORV use represents one of the multiple uses that the
BLM provides for and must balance in managing the
public lands. In response to increased ORV use on
these lands, in 1972 President Nixon issued an
executive order for the purpose of “establishling]
6a
policies and provid[{ing] procedures that will ensure
that the use of off-road vehicles on public lands will be
controlled and directed so as to protect the resources of
those lands, to promote the safety of all users of those
lands, and to minimize conflicts among the various uses
of those lands." Exec. Order No. 11644, 37 Fed. Reg.
2877 (Feb. 8, 1972). The stated reason for the order was
to further the purpose and policy of NEPA; it
established criteria by which federal agencies were to
develop regulations and administrative instructions for
the designation of areas and trails on which ORVs
would be permitted. /d. § 3. It also required agencies to
"monitor the effects" of ORV use on the public lands
and "[ojn the basis of the information gathered, they
shall from time to time amend or rescind designations
of areas or other actions taken pursuant to this order as
necessary to further the [NEPA]." Jd. § 8.
President Carter, in 1977, issued Executive Order No.
11989, which amended Executive Order 11644 and
strengthened it considerably. See Exec. Order 11989, 42
Fed. Reg. 26959 (May 24, 1977). The amended order
provides that notwithstanding the BLM's designations
of public land use under the applicable RMP, the BLM
"shall... immediately close" any area or route to ORVs
whenever it determines that ORV use "will cause or is
causing considerable adverse effects" to wildlife,
wildlife habitat, and other natural resources. See id. § 2
(amending Exec. Order 11644, § 9(a)). Under the order,
the closure must remain in place until the adverse
effects have been eliminated. /d.
The Department of Interior has adopted regulations to
implement the Nixon and Carte: Executive Orders,
FLPMA, and other federal statutes. See 43 C.F.R. §
7a
8340.0-1 et seq. Under 43 C.F.R. § 8342.1, all public
lands must be designated as open, limited, or closed to
off-road vehicles. See 48 C.F.R. § 8342.1. The
designations must be made to minimize conflicts among
the different users of the lands (i.e., hikers, ORV users,
and birdwatchers). Jd. In addition, care must be taken
to avoid damage to natural resources and to prevent
impairment of wilderness suitability. Jd. The initial
designation of areas as open, limited, or closed to ORVs
is accomplished’ through the resource management
planning process, and it must involve public
participation and consideration of all viewpoints. 43
C.F.R. § 8342.2(a).
Short of promulgating or amending an RMP, the
resource management planning process does not speak
to the manner in which an ORV designation may be
changed. As such, and in order to address Executive
Order 11989, the BLM promulgated a regulation that
requires the agency to close areas to ORV use, without
resort to the route-designation process undertaken
when promulgating or amending an RMP, when the
BLM determines that ORVs "are causing or will cause
considerable adverse effects" to "soil, vegetation,
wildlife, wildlife habitat, cultural resources, historical
resources, threatened or endangered _ species,
wilderness suitability, other authorized uses, or other
resources." 43 C.F.R. § 8341.2(a). Notably, such closures
are nondiscretionary: the BLM "shall immediately
close the areas affected to the type(s) of vehicle causing
the adverse effect until the adverse effects are
eliminated and measures implemented to prevent
recurrence." Jd. (emphasis added). "This provision
creates a separate duty to close without regard to the
designation process; it does not automatically become
8a
inoperative once the Secretary exercises his discretion
to designate the land." Sierra Club v. Clark, 756 F.2d
686, 690 (9th Cir. 1985).
The BLM's authority to close or restrict the use of
public lands notwithstanding the provisions of the
governing RMP is not limited to 43 C.F.R. § 8341.2(a).
It is also permitted to do so in order "to protectpersons,
property, and public lands and resources." 43 C.F.R. §
8364.1. An order closing or restricting the use of public
lands under this authority must identify the lands that
are closed to entry or restricted as to use; specify the
uses that are restricted; specify the period of time
during which the closure or restriction applies; identify
any persons exempt from the closure or restriction;
include a statement of the reasons for the closure; and
be posted and published as provided in the regulation.
43 C.F.R. § 8364.1(b), (c).
C. National Environmental Protection Act
NEPA, 42 U.S.C. § 4321 et seq., was enacted in
recognition of "the profound impact of man's activity on
the interrelations of all components of the natural
environment, [and] . . . the critical importance of
restoring and maintaining environmental quality to the
overall welfare ... of man." 42 U.S.C. § 4331. NEPA
"prescribes the necessary process by which federal
agencies must take a hard look at the environmental!
consequences of the proposed courses of action."
Pennaco Energy, Inc. v. U.S. Dept. of Interior, 377 F.3d
1147, 1150 (10th Cir. 2004) (internal quotations
omitted). At bottom, NEPA "insure|s| a fully informed
and well-considered decision," see Vermont Yankee
Nuclear Power Corp. v. Natural Res. Def. Council, 435
9a
U.S. 519, 558, 98 S. Ct. 1197, 55 L. Ed. 2d 460 (1978),
especially when proposed activity may "significantly
affect|] the quality of the human environment." 42
U.S.C. § 4332(2)(C).
Accordingly, NEPA requires all agencies that propose
a “major federal action" that significantly affects the
quality of the environment to prepare an environmental
impact statement ("EIS") that describes the
"environmental impact of the action; unavoidable
adverse environmental effects; alternatives to the
action; relationship between the short-term uses and
long-term productivity of the affected environment; and
irretrievable and _ irreversible commitments of
resources should the action be implemented." Catron
County Bd. of Comm'rs, N.M. v. U.S. Fish & Wildlife
Serv., 75 F.3d 1429, 1434 (10th Cir. 1996) (citing 42
U.S.C. § 4832(2)(C)(i)-(v)). If the impact of the major
federal action on the environment is uncertain, the
agency must prepare an environmental assessment
("EA") to determine whether the impact will be
significant such that an EIS is required. Jd. (citing 42
U.S.C. § 4332(2)(E)). An EA and/or an EIS is also
required when an RMP is to be amended. See 48 C.F.R.
§ 1610.5-5. Notwithstanding these mandates,
regulations provide for "emergency" exceptions:
Where emergency circumstances make it
necessary to take an action with significant
environmental impact without observing the
provisions of these regulations, the Federal
agency taking the action should consult with the
Council about alternative arrangements.
Agencies and the Council will limit such
arrangements to actions necessary to control the
10a
immediate impacts of the emergency. Other
actions remain subject to NEPA review.
40 C.F.R. § 1506.11. In this way, agencies must comply
with NEPA's requirements "to the fullest extent
possible." 42 U.S.C. § 4332.
D. National Defense Authorization Act
The NDAA is enacted each fiscal year to specify the
budget needs for the Department of Defense. See
National Defense Authorization Act for Fiscal Year
2000, Pub. L. No. 106-65, 118 Stat. 512 (1999). The
NDAA authorizes appropriations for Department of
Defense military activities, including military
construction and defense activities for the Department
of Energy. /d.
On October 5, 1999, Congress enacted § 2815 of the
NDAA, which affected Utah's public lands "adjacent or
near to the Utah Test and Training Range and Dugway
Proving Grounds or beneath Military Operating Areas,
Restricted Areas, and airspace that make up the Utah
Test and Training Range." NDAA § 2815(a), 113 Stat.
512, 852 (1999). The NDAA provided in § 2815(d) that
"the Secretary of Interior may not proceed with any
amendment of any individual resource management
plan" until the Secretary of Defense submits a study to
Congress evaluating the impact of any proposed
changes to land management plans upon military
training, testing, and operational readiness. NDAA §
2815(d), 113 Stat. 512, 852 (1999).
Il. BACKGROUND
lla
At issue is whether the BLM acted within its authority
when it imposed restrictions on ORV use in Box Elder
County and Grand County, Utah, from 1999 through
2003.
A. Box Elder County
Pursuant to FLPMA, the BLM has adopted RMPs for
its Utah lands. The Box Elder RMP was adopted in
1986 and designates the vast majority of land as open to
ORV use. In 1999, however, the BLM published a
Notice of Closure of Public Lands ("1999 Box Elder
Order"), which closed land that had been previously
designated as open. The closure was ordered
seasonally, from January through April, and the
authority for the closure was listed as 43 C.F.R. §§
8341.2 and 8364.1. See 64 Fed. Reg. 22639-02. The order
reads as follows:
Notice is hereby’ given’ that’ effective
immediately, the public lands within Broad
Hollow Unit, Kilgore Basin Unit, Meadows Unit .
. . are seasonally closed from January 1 to April
30 to all motorized vehicle use. The purpose of
this closure is to protect wildlife, including
critical deer and sage grouse habitat.
Exemptions to this closure will apply to
administrative personnel of the Bureau of Land
Management, BLM authorized permittees and
Law Enforcement Personnel. Other exemptions
to this closure order may be made on a case by
case basis by the authorized officer. This
seasonal closure will remain in effect until
further notice.
12a
The authority for this closure is 43 C.F.R. §
8341.2 and 43 C.F.R. § 8364.1.
Id.
In 2000, the BLM published another closure order
("2000 Box Elder Order"), which temporarily closed
selected lands to ORV use regardless of the season. See
65 Fed. Reg. 16410-01. Specifically, the order stated:
Notice is hereby given that’ effective
immediately, selected public lands administered
by the Bureau of Land Management (BLM), Salt
Lake Field Office, within western Box Elder
County are closed to off road vehicle (ORV) (also
commonly referred to as off highway vehicle--
OHV) use on an interim emergency basis. This
action will allow BLM to address concerns
related to unrestricted cross country travel in
the specific places where we now have resource
damage. The purpose of this closure is to protect
wildlife, wildlife habitat, rangeland resources,
soil, vegetation, cultural resources, historical
resources, and other resources from ongoing and
imminent adverse impacts from ORV use... .
This emergency closure will remain in effect
until BLM completes a land use plan amendment
for OHV management.
Id. Like the 1999 Box Elder Order, the 2000 Box Elder
Order cited 43 C.F.R. §§ 8341.2 and &364.1 as
authorizing the closure.
In 2003, after USA-ALL filed this action, the BLM
revoked both the 1999 and 2000 Box Elder Orders and
13a
simultaneously issued a new order. That order ("2003
Box Elder Order") stated that in five areas of the
county ORVs may only be used on designated routes.
The remaining public lands were to be managed
according to the 1986 Box Elder RMP. The 2003 Box
Elder Order provided:
Notice is hereby given that effective
immediately, the Bureau of Land Management
(BLM), Salt Lake Field Office, revokes the
seasonal Notice of C'osure of Public Lands
published on April 27, 1999 (64 FR 22639 (1999))
and the Notice of Closure of Public Lands
published on March 28, 2000 (65 FR 16410
(2000)). Notice is hereby given that effective
immediately, ORV use in the following five areas
of Box Elder County is limited to designated
routes: Devils Playground (9838 acres), Grouse
Creek Mountains (52493 acres), Hogup
Mountains (51698 acres), Pilot Mountains (62654
acres), and Wildcat Hillis (12640 acres). The
remaining public lands in Box Elder County will
be managed according to the Box Elder
Resource Management Plan.
68 Fed. Reg. 20167-02.
Citing only 48 C.F.R. § 8341.2 as the authority for the
closure order, the 2003 Box Elder Order further
provided that "[t]his limitation will remain in effect
until the considerable adverse effects giving rise to this
limitation are eliminated and measures are
implemented to prevent recurrence of these adverse
effects." [d.
B. Grand County
As with Box Elder County, land use in Grand County is
also managed by an RMP adopted in the mid-1980s. In
January 2001, the BLM published two notices related to
ORV use. In the first notice ("Grand County ORV
Restrictions"), ORV use in five areas was to be limited
to existing roads and trails only. The notice cited
FLPMA, Executive Orders 11644 and 11989, and 43
C.F.R. §§ 8341.2 and 8364.1 as its authority, and stated:
This notice places restrictions on travel by off-
road vehicles (ORVs) and mountain bikes on
specific public land administered by the BLM
Moab Field Office.’ These actions are necessary
to halt ongoing impacts and prevent future
degradation of resource values. They are being
implemented on an interim basis to protect
resource values and public safety, pending
revision of the Resource Management Plan
(RMP) for the area administered by the BLM
Moab Field Office.
66 Fed. Reg. 6659-01. The second notice ("Grand
County Camping Restrictions"), which was published in
order to support implementation of the Grand County
ORV Restrictions, provided that camping involving
vehicles would be limited to developed campgrounds
and designated campsites. 66 Fed. Reg. 6658-01. Again,
the BLM cited 48 C.F.R. § 8364.1 as its authority for
the notice.
C. Procedural History
On October 17, 2001, USA-ALL filed this suit in the
15a
District of Utah, contesting implementation of the 1999
and 2000 Box Elder Orders and the two Grand County
restrictions under FLPMA, NEPA, FACA? and the
NDAA. USA-ALL asked the District Court to set aside
the orders and restrictions under the APA. See 5 U.S.C.
§ 706(2). Southern Utah Wilderness Alliance, The
Wilderness Society, Great Old Broads for Wilderness,
and Wildlands CPR were permitted to intervene and
defend the BLM's action. Thereafter, the BLM revoked
the two Box Elder Orders and supplanted them with
the 2003 Box Elder Order. Accordingly, the BLM
argued in its answer to USA-ALL's complaint that the
2003 Box Elder Order mooted any argument related to
the 1999 and 2000 Box Elder Orders. The BLM also
sought to have the complaint dismissed for failure to
state a claim as to the remaining orders. After
extensive briefing and oral argument, the District
Court agreed with the BLM on both issues, and in two
memorandum dispositions dismissed with prejudice all
of USA-ALL's causes of action. This appeal followed.
III. DISCUSSION
A. Standard of Review
Because none of the statutory or regulatory provisions
in question provide for a private cause of action, the
judicial review provisions of the APA govern this suit.
See 5 U.S.C. § 702; Colo. Envtl. Coal. v. Walker, 353
F.3d 1221, 1234-35 (10th Cir. 2004). Under the APA, a
reviewing court may set aside final agency action that
is "arbitrary, capricious, an abuse of discretion, or
otherwise not in accordance with law." 5 U.S.C. §
706(2)(A); Silverton Snowmobile Club v. U.S. Forest
Serv., 433 F.3d 772, 779-80 (10th Cir. 2006). "(T]he
16a
essential function of judicial review [of agency action] is
a determination of (1) whether the agency acted within
the scope of its authority, (2) whether the agency
complied with prescribed procedures, and (3) whether
the action is otherwise arbitrary, capricious or an abuse
of discretion." Olenhouse v. Commodity Credit Corp.,
42 F.3d 1560, 1574 (10th Cir. 1994). Only the second and
third inquiries will be undertaken in this appeal.’
To determine whether the agency complied with
prescribed procedures, we must review. the
administrative record and applicable law. Id. To
determine whether the agency's decision was arbitrary
or capricious, we must "ascertain whether the agency
examined the relevant data and articulated a rational
connection between the facts found and the decision
made." Jd. (footnote omitted). This standard also means
that there must be a reasoned basis for the agency's
action, and it must be supported by "substantial
evidence." Jd. "Evidence is substantial in the APA
sense if it is enough to justify, if the trial were to a jury,
a refusal to direct a verdict when the conclusion to be
drawn is one of fact." Jd. (internal quotation marks
omitted). Finally, action will be deemed “arbitrary or
capricious" if the explanation for the action “is so
implausible that it could not be ascribed to a difference
in view or the product of agency expertise." /d.
B. The 1999 and 2000 Box Elder Orders are Moot.
Reviewing de novo, see Disability Law Ctr. v. Millcreek
Health Ctr., 428 F.3d 992, 996 (10th Cir. 2005), we agree
with the District Court that USA-ALL's arguments
relating to the 1999 and 2000 Box Elder Orders are
moot. “Mootness is a threshold issue because the
17a
existence of. a live case or controversy is a
constitutional prerequisite to federal court jurisdiction."
McClendon v. City of Albuquerque, 100 F.3d 863, 867
(10th Cir. 1996). Federal courts may adjudicate only
actual controversies; as such a claim or appeal should be
dismissed as moot when the controversy ceases to
exist. United States v. Seminole Nation of Okla., 321
F.3d 939, 943 (10th Cir. 2002). Because the BLM
revoked the 1999 and 2000 orders, any controversy
associated with these orders has been nullified.
Nevertheless, USA-ALL argues that its appeal falls
within an exception to the mootness doctrine because
the BLM's actions are “capable of repetition, yet
evading review." Murphy v. Hunt, 455 U.S. 478, 482,
102 S. Ct. 1181, 71 L. Ed. 2d 353 (1982). This exception
applies "when: (1) the duration of the challenged action
is too short to be fully litigated prior to its cessation or
expiration, and (2) there is a reasonable expectation
that the same complaining party will be subjected to
the same action again." Disability Law Ctr., 428 F.3d at
996 (quotations and alterations omitted). There is no
reasonable expectation that the BLM will re-issue the
1999 and 2000 Box Elder Orders because they have
been superceded by the 2003 Box Elder Order. See Am.
Rivers v. Nat'l Marine Fisheries Serv., 126 F.3d 1118,
1124 (9th Cir. 1997) (superceding agency opinion moots
original opinion). Moreover, the 1999 and 2000 Box
Elder Orders will not evade review because USA-ALL
makes the same arguments with respect to those orders
as it does with respect to the 2003 Box Elder Order,
which this Court reviews in Part ITI.C-E. See id. (when
superceding agency opinion is capable of review,
exception to the mootness doctrine does not apply).
18a
Accordingly, the portion of this appeal relating to the
1999 and 2000 Box Elder Orders is dismissed as moot.
C. The BLM Complied with Procedures Mandated by
FLPMA and its Action is Supported by Substantial
Evidence.
1. The Restrictions Are Not "De Facto Amendments."
USA-ALL contends that the 2003 Box Elder Order and
the two Grand County restrictions must be nullified
because they are "de facto amendments" to the Box
Elder and Grand County RMPs that were issued
without public notice and participation and without the
BLM having first conducted an EA as required by
FLPMA. We disagree.
Although there is some support outside this jurisdiction
for an argument relating to "de facto amendments," the
cases of which this Court is aware have little--if any--
bearing on the facts presented by this appeal. See, e.g.,
House v. U.S. Forest Serv., 974 F. Supp. 1022 (E.D. Ky.
1997) (proposed timber sale approved on the basis of
three policies that constituted "significant" changes to
land use plan requires same public comment as land use
plan itself); Or. Natural Res. Council Fund v.
Forsgren, 252 F. Supp. 2d 1088 (D. Ore. 2003) (narrower
definition of lynx habitat which led to reduction in such
habitat is "significant" change to land use plan and
requires public comment and preparation of EIS). This
Court is not aware of any authority indicating that a
closure order promulgated pursuant to 43 C.F.R. §§
8341.2 and 8364.1 constitutes a "de facto" amendment to
an RMP, thus triggering compliance with FLPMA's
public participation and EA requirements. To the
19a
contrary, the Ninth Circuit has specifically held that
"[njothing in [§ 8364.1] or the authorizing statutory
sections requires public hearings for temporary
closures" to vehicular use--thereby foreclosing any
argument that temporary ORV closures are essentially
RMP amendments. Humboldt County v. United States,
684 F.2d 1276, 1283 (9th Cir. 1982).
Indeed, courts have consistently emphasized the
distinction between the initial ORV-route-designation
process reflected in an RMP--which is subject to public
comment and requires the promulgation of an EA--and
closures of those designated routes authorized under
regulations promulgated pursuant to FLPMA, NEPA,
and other statutes. For example, the Central District of
California noted that:
The regulations took into account the
amendments to E.O. 11,684 effected E.O. 11,9839,
3 C.F.R. 120 (1978). See 43 C.F.R. s 8341.2. E.0.
11,989, among other things, amended E.O. 11,644
so as to require closure of ORV areas and trails
whenever an agency finds that ORV use will
cause or is causing "considerable adverse
effects." This closure standard is to be
distinguished from the initial designation
criteria set forth in E.O. 11,644 and mirrored in
43 C.F.R. § 8342.1.
Am. Motorcyclist Ass'n v. Watt, 543 F. Supp. 789, 796
n.14 (C.D. Cal. 1982) (emphasis added); see also Sierra
Club, 756 F.2d at 690 (stating that 43 C.F.R. § 8341.2
"creates a separate duty to close without regard to the
designation process; it does not automatically become
inoperative once the Secretary exercises his discretion
20a
to designate the land."); Am. Sand Ass'n v. U.S. Dept.
of Interior, 268 F. Supp. 2d 1250, 1255 (S.D. Cal. 2003)
(closure order under 43 C.F.R. §§ 8341.2 and 8364.1
done in accordance with FLPMA).
Moreover, this exemption of OHV travel restrictions
from the resource management planning process
reflects the realities of public land management and
allows the BLM to timely comply with its statutory
mandate to "take any action necessary to prevent
unnecessary or undue degradation of the lands." 43
U.S.C. § 1782(b). Because the RMP revision process is
much more time-consuming than enacting a temporary
closure order, the BLM could not effectively respond to
resource degradation only through the formal planning
process. In this way, the BLM's exercise of its
authority to address resource degradation--whether
done pursuant to 43 C.F.R. § 8342.1(a) or 43 C.F.R. §
8364.1--is not "de facto" planning. Rather, it is a lawful
discharge of the BLM's duty, independent of the
planning process, to prevent undue degradation of
resources.
2. An Emergency Is Not Required Before the BLM May
Close Lands to ORV Use, and Its Decision is Supported
by Substantial Evidence.
USA-ALL also argues that there was no substantial
evidence supporting a finding of an emergency, which it
contends is necessary before the BLM may place ORV
restrictions on the public lands. This contention is
completely without merit. The regulation authorizing
the challenged orders does not use the word
“emergency, nor does it contain any language from
which a requirement of an emergency could be inferred.
2la
See 43 C.F.R. § 8341.2; see also Am. Sand Dune Ass'n,
268 F'. Supp. 2d at 1254 (holding that no emergency is
necessary under FLPMA for the BLM to issue ORV
closure orders). Rather, the BLM's authority under 43
C.F.R. § 8341.2 is tied to the existence of considerable
adverse effects that are being caused by or will be
caused by ORV use, and our review of the record
convinces us that substantial evidence supports such a
finding in this case. For this reason, we also disagree
with USA-ALL's contention that the BLM's
explanation as to why it issued the closure orders is
implausible.
D. NEPA
Next, USA-ALL appears to argue that because NEPA
requires preparation of an EA prior to the
promulgation of an RMP, see State of Utah v. Babbitt,
137 F.3d 1193, 1214 (10th Cir. 1998), NEPA similarly
requires preparation of an EA prior to the amendment
of an RMP. We have just held, however, that the
closure orders at issue are not amendments.
Accordingly, we reject this argument.*
In addition, for the first time before this Court, USA-
ALL maintains that NEPA compliance is necessary for
the closure of public transportation routes, which it
apparently understands Utah's wilderness areas to be.
This issue, however, was not presented to the District
Court; therefore, we do not consider it further. See
Cummings, 393 F.3d at 1190.
E. NDAA
The District Court properly dismissed USA-ALL's
22a
claims under the NDAA for lack of standing. A party
must first have standing before its claim may be
adjudicated on the merits. "The standing inquiry
requires us to consider both constitutional limits on
federal court jurisdiction and prudential limitations on
its exercise." Bd. of County Comm'rs of Sweetwater
County v. Geringer, 297 F.3d 1108, 1111 (10th Cir.
2002). There is no dispute that USA-ALL meets the
requirements of constitutional standing.
With respect to prudential standing, federal courts
have long recognized that a plaintiff must satisfy the
following prudential principles: "(1) the plaintiff
generally must assert his or her own legal rights; (2)
the court must refrain from adjudicating generalized
grievances most appropriately addressed by one of the
other branches of government; and (3) the plaintiff's
complaint must fall within the zone of interests to be
protected or regulated by the statute . . . in question."
Mount Evans Co. v. Madigan, 14 F.3d 1444, 1450-51
(10th Cir. 1994) (internal quotation omitted). "The zone
of interests test is a guide for deciding whether, in view
of Congress' evident intent to make agency action
presumptively reviewable, a particular plaintiff should
be heard to complain of a particular agency decision."
Id. at 1452. The burden to establish prudential standing
is on the plaintiff bringing the action. See id. at 1450.
In our view, USA-ALL has not demonstrated that its
interest in using the public lands for ORV and other
recreational activities fall within the zone of interests
protected by the NDAA. Therefore, USA-ALL may
not challenge the BLM's action as violating the NDAA.
F. Factory Butte
23a
Finally, we conclude that the District Court properly
concluded that USA-ALL lacked standing to challenge
BLM-issued signs encouraging, but not requiring, ORV
users to stay on particular routes on land designated as
"open." According to USA-ALL, its members have
refrained from traveling away from those particular
routes because they fear that the BLM will retaliate by
closing those areas if those members fail to comply with
the BLM's request. The possibility of a mandatory
closure, however, is far from imminent, and therefore
USA-ALL has failed to allege an "injury in fact" for
purposes of standing. See Bear Lodge Multiple Use
Ass'n v. Babbitt, 175 F.3d 814, 821-22 (10th Cir. 1999).
IV. CONCLUSION
The BLM complied with required procedures under
FLPMA and NEPA when it enacted the 2003 Box
Elder Order and the Grand County ORV and Camping
Restrictions, the BLM's decision close various public
lands to ORV use was supported by substantial
evidence, and the BLM's reasoning in doing so was not
implausible. Further, USA-ALL does not have
standing to challenge the Orders and Restrictions
under the NDAA, and it also lacks standing to
challenge the posting of signs encouraging ORV use
only on particular trails. We therefore AFFIRM.
nl The Moab Field Office oversees the management of
public lands in Grand County.
n2 5 US.C. App. 2 § 1 et seg. USA-ALL later
voluntarily dismissed its FACA claim.
2Aa
n3 USA-ALL does ask this Court to "overturn" E.O.
11989, 48 C.F.R. § 8841.2, and 43 C.F.R. § 8364.1
because they are inconsistent with FLPMA and NEPA;
if we were to do so, USA-ALL argues, the BLM would
have had no authority for its actions. Because, however,
this argument was raised for the first time on appeal,
we do not entertain it. See Cummings v. Norton, 393
F.3d 1186, 1190 (10th Cir. 2005). Accordingly, our
review is limited to whether the BLM acted in
accordance with required procedures and whether its
actions were arbitrary or capricious.
n4 USA-ALL's argument on this point is not entirely
clear. Referencing 42 U.S.C. § 4332(2)(E), which states
that "all agencies of the Federal Government shall. . .
study, develop, and describe appropriate alternatives to
recommended courses of action in any proposal which
involves unresolved conflicts concerning alternative
uses of available resources," USA-ALL contends that
the BLM was required to prepare an EA. Although an
agency must comply with § 4332(2)(E) in preparing an
EA, see 40 C.F.R. § 1508.9(b), this subsection is not
what triggers the need to prepare an EA. Rather, an
agency may choose to prepare an EA "[wlhen it is
unclear whether a proposed action requires an EIS."
Greater Yellowstone Coalition v. Flowers, 359 F.3d
1257, 1274 (10th Cir. 2004). An agency is required to
prepare an EJS only for "major Federal actions
significantly affecting the quality of the human
environment.” 42 U.S.C. § 4332(2)(C). Further
muddying the water, USA-ALL makes no attempt to
argue how an ORV closure order or camping restriction
constitutes either a "proposal" within the meaning of
subsection (E) or a "major federal action" under
subsection (C). Finally, we note that some courts have
25a
concluded that actions taken to protect the
environment need not be predicated by an EA or an
EIS. See Am. Sand Ass'n, 268 F. Supp. 2d at 1253 ("An
environmental assessment or an environmental impact
statement is not necessary for federal actions that
conserve the environment.") (citing Douglas County v.
Babbitt, 48 F.3d 1495, 1505 (9th Cir. 1995)); Nat'l Assoc.
of Property Owners v. United States, 499 F. Supp. 1223,
1265 (D. Minn. 1980) ("In essence, plaintiffs' claim is
that the Department of Agriculture must prepare an
EIS in order to leave nature alone. The Court is not
moved by this argument."). Therefore, to the extent
USA-ALL contends that the issuance of a closure order
pursuant to 43 C.F.R. § 8341.2(a) constitutes either a
"proposal" or a "major Federal action," we decline to
address the issue. See Craven v. Univ. of Colo. Hosp.
Auth., 260 F.3d 1218, 1226 (10th Cir. 2001) ("We will not
manufacture arguments for an appellant, and a bare
assertion does not preserve a claim, particularly when,
as here, a host of other issues are presented for
review.’).
26a
Civil No. 2:01-C V-00804J
UNITED STATES DISTRICT COURT FOR THE
DISTRICT OF UTAH, CENTRAL DIVISION
UTAH SHARED ACCESS ALLIANCE,
Plaintiff
V.
GLENN CARPENTER, in his capacity as manager of
the Salt Lake Field Office of the Bureau of Land
Management, MAGGIE WYATT, in her capacity as
manager of the Moab Field office of the Bureau of Land
Management, SHERWIN SANDBERG, in his capacity
as manager of the Monticello Field Office of the Bureau
of Land Management; JERRY MEREDITH, in his
capacity manager of the Richfield Field Office; SALLY
WISELY, in her capacity a Utah State Director of the
Bureau of Land Management, GALE A. NORTON, in
her capacity as Secretary of the Department of Interior,
KATHLEEN CLARKE, in her capacity as director of
the Bureau of Land Management, and BUREAU OF
LAND MANAGEMENT,
Defendants;
SOUTHERN UTAH WILDERNESS ALIJANCE,
THE WILDERNESS SOCIETY, GREAT OLD
BROADS FOR WILDERNESS, AND WILDLANDS
CPR.,
Defendants- Intervenors
December 8, 2004, Decided
December 9, 2004, Filed
27a
COUNSEL: For UTAH SHARED ACCESS
ALLIANCE, a Utah non-profit corporation, plaintiff:
Paul W. Mortensen, EMAIL, HANKS ROOKER &
DENNING, SALT LAKE CITY, UT
For GLENN CARPENTER, in his capacity as
manager of the Salt Lake Field Office of the Bureau of
Land Management, MAGGIE WYATT, in her capacity
as manager of the Moab Field Office of the Bureau of
Land Management, SHERWIN SANDBERG, in his
capacity as manager of the Monticello Field Office of
the Bureau of Land Management, JERRY
MEREDITH, in his capacity as manager of the
Richfield Field Office of the Bureau of Land
Management, SALLY WISELY, in her capacity as
Utah State Director of the Bureau of Land
Management, GALE A. NORTON, in her capacity as
Secretary of the Department of Interior, NINA ROSE
HATFIELD, in her capacity as acting director of the
Bureau of Land Management, BUREAU OF LAND
MANAGEMENT, KATHLEEN CLARKE, In her,
capacity as director of the Bureau of Land
Management, defendant: Carlie Christensen, Ms.,
EMALL, Jeffrey E Nelson, Mr., EMALL, US
ATTORNEY'S OFFICE
For SOUTHERN UTAH WILDERNESS
ALLIANCE, A Utah non-profit corporation, THE
WILDERNESS SOCIETY, WILDLANDS CPR, A
non-profit corporation, GREAT OLD BROADS FOR
WILDERNESS, A non-profit corporation, REDROCK
FORESTS, A Utah non ~- profit corporation,
intervenor-defendant: James S. Angell, EMALL, Keith
G. Bauerle, EMALL, Eric Biber, EARTHJUSTICE,
DENVER, CO; Heidi J. McIntosh, EMALL, Stephen
28a
H. Bloch, EMALL, SOUTHERN UTAH
WILDERNESS, ALLINANCE, SALT LAKE CITY,
UT
JUDGES: BRUCE 8S. JENKINS, United States Senior
District Judge
OPINION BY: BRUCE 8S. JENKINS
OPINION:
MEMORANDUM OPINION & ORDER RE:
SUPPLEMENTAL COMPLAINT
CHALLENGING THE APRIL 24, 2003 BOX
ELDER COUNTY ORDER
In a Memorandum Opinion and Order ("Order")
dated August 28, 2003, the Court dismissed all of the
causes of action of Plaintiff. Utah Shared Access
Alliance ("USA-AlIl")'s First Amended Complaint
against defendants Glenn Carpenter, et al. (collectively
"Defendants"). (See Order, dated August-28, 2003 (dkt.
no. 118).) The case remained open pending the Court's
ruling on the claims set forth in USA-All's
Supplemental Complaint Regarding New Box Elder
County Restrictions, for which USA-All seeks
declaratory and injunctive relief requiring Defendants
to acknowledge and to adhere to controlling law and
BLM's governing land management plan_ while
managing motorized access to public lands in Box Elder
County, Utah. Specifically, USA-All challenges
Defendants’ April 24, 2003 action restricting land in
Box Elder County: USA-AIl alleges that Defendants
have arbitrarily and capriciously abused their
emergency authority; violated the directions of their
governing land management plan; unlawfully amended
29a
its land use plan to close access roads without utilizing
legally - required procedures, public participation and
environmental analysis; and _ violated specific
congressional restrictions in the Nationa: Defense
Authorization Act for fiscal year 2000.
This action arises under the Federal Land Policy
and Management Act, 43. U.S.C. § 1701, et. seq. (2000)
("FLPMA"); the National Environmental Policy Act, 42
U.S.C. § 4331, et. seq. (2000) ("NEPA"); the National
Defense Authorization Act for Fiscal Year 2000, Pub.
L. No. 106-65 [*1268] ("NDAA"); and, where
applicable, implementing regulations, all made
reviewable through the Administrative Procedure Act,
5 U.S.C. § 701 et. seq. (2000) (the "APA"). 5 U.S.C. § §
702, 704, 706(2).
Having fully considered the arguments of counsel,
the submissions of counsel, and the applicable legal
authority, the court now enters the following
memorandum opinion and order.
FACTUAL HISTORY
The Box Elder Resource Management Plan ("RMP")
was completed in 1986. Under the RMP, 999,634 acres
were designated as open to off-highway vehicle
("OHV") travel; 11,180 acres were limited to existing
routes; and 980 acres were limited to designated routes.
On January 14, 1998, BLM completed a plan
amendment that addressed the management of certain
lands that BLM acquired after the RMP was
completed. On April 27, 1999, BLM published a "Notice
of Closure of Public Lands" closing selected public lands
in Box Elder County to OHV travel from January 1 to
April 30 of each year. On March 28, 2000, BLM
published a "Notice of Closure of Public Lands" closing
30a
certain lands in western Box Elder County to address
concerns related to unrestricted cross - country OHV
travel in places where resource damage had occurred.
On April 24, 2003, BLM issued a "Notice of Limitations
of Off Road Vehicles (ORV) Use on Public Lands" with
respect to certain defined lands in Box Elder County.
68 Fed. Reg. 20,167 (2003) ("New Order"). The New
Order which revoked the two prior notices described
above restricted OHV use to designated routes in five
described areas in Box Elder County.
USA-All claims that by the New Order, Defendants
have restricted use of over 180,000 acres of BLM land
in the Pilot Mountains, Grouse Creek Mountains, Devils
Playground, Hogup Mountains and Wildcat Hills; that
Defendants’ restrictions have eliminated open travel in
these areas. BLM has closed more than half of the
existing roads in these areas. USA-AIl asserts that
their members have in the past traveled in or on areas
and roads now so restricted; that USA-All members are
restricted in pulling off the road to establish camping
sites; and that USA-All members have immediate
intentions to travel on existing roads and trails, as well
as off-road in restricted areas, but they are afraid of
incurring criminal sanctions, being stigmatized, and/or
suffering additional access restrictions if they violate
the restrictions. USA-All and its members assert that
they have been denied the opportunity to participate in
motorized access management planning.
Defendants argue that the BLM properly exercised
its authority in issuing the New Order; that the New
Order is supported by. ample evidence in the
administrative record; and that the BLM's issuance of
the New Order does not create a "de facto amendment"
of the RMP. Specifically, the BLM's Salt Lake Field
dla
Office documented evidence of proliferation of new
OHV routes, damage and destruction of vegetation,
increased soil erosion, and a likelihood of damage to
cultural resources; for these reasons, BLM was
required by applicable regulations to close the affected
areas until the adverse affects of OHV travel are
eliminated. They also contend that USA - All lacks
standing to complain of alleged violations of the NDAA,
but in any event the BLM's issuance of the New Order
did not violate the NDAA.
ISSUES ON APPEAL
1. Does USA-All have standing to challenge any alleged
violations by the BLM of the National Defense
Authorization Act of 2000? If so, does the New Order
violate the National Defense Authorization Act of 2000?
2. Is the New Order unsupported by substantial
evidence or otherwise arbitrary and capricious?
3. Does the New Order violate the planning
requirements of the Federal Land Policy and
Management Act?
4. Does the New Order violate the National
Environmental Policy Act.
STANDARD OF REVIEW
USA-All alleges that the New Order violates
FLPMA's land use planning requirements, the
environmental analysis requirements of the NEPA and
the NDAA. Because none of these statutes includes a
citizen's suit provision, judicial review is governed by
the APA, 5 U.S.C. § § 701 et seq. Judicial review under
32a
the APA is limited to the administrative record and is
narrow in scope. The APA provides that, "the
reviewing court shall ... hold unlawful and set aside
agency action, findings, and conclusions found to be ...
arbitrary, capricious, an abuse of discretion, or
otherwise not in accordance with law." 5 U.S.C. §
706(2)(A); see also Olenhouse v. Commodity Credit
Corp., 42 F.3d 1560, 1574 (10th Cir. 1994), that is,
"whether [BLM] examined the relevant data and
articulated a rational connection between the facts
found and the decision made." Jd. Agency action is
arbitrary and capricious if the decision runs counter to
the evidence before the agency or if it is not supported
by substantial evidence in the record. See Motor
Vehicle Mfrs. Ass'n v. State Farm Mut. Ins. Co., 463
U.S. 29, 48, 77 L. Ed. 2d 443, 103 S. Ct. 2856 (1983).
DISCUSSION
I. USA-All Lacks Standing to Challenge the New
Order Under the National Defense Authorization
Act of 2000.
Defendants and defendant-intervenors dispute that
USA - Ali has standing to challenge the New Order
under NDAA. USA-AIl claims that there has been a
violation of Section 2815 of the NDAA, which prevents
BLM from amending its RMPs for some of the areas
covered by the New Order until the Secretary of
Defense studies the impacts that those amendments
would have on military readiness. NDAA § 2815,
Specifically, USA-All argues that the New Order
stripped out interior roads in at least 2 or 3 areas
resulting in immense areas that now qualify as 5,000-
acre de facto wilderness areas condemned by the
33a
NDAA. (See Transcript of Hearing, dated July 16, 2004
("Tr."), at.16.)
For an APA claim such as this, standing includes
the "prudential" requirement that "the plaintiff's
complaint must fall within the zone of interest to be
protected or regulated by the statute or constitutional
guarantee in question." Mount Evans Co. v Madigan,
14 F.3d 1444, 1451 (10th Cir. 1994). A plaintiff must
establish that its injury "falls within the ‘zone of
interests' sought to be protected by the statutory
provision whose violation forms the legal basis of the
complaint." Id. at 1452 (citations omitted); see also
Lujan v. Nat'l Wildlife Fed'n, 497 U.S. 871, 883, 111 L.
Ed. 2d 695, 110 S. Ct. 3177 (1990). As to § 2815, the
NDAA's purpose is to ensure that BLM land-use
planning does not vitiate military readiness. NDAA §
2815(a). USA-AIl's purported injury - the imposition of
limits on the ability of its members to ride their
machines across the public lands - hardly falls into this
zone of interest. USA-AlIl lacks prudential standing to
pursue a NDAA claim. Accordingly USA-All's ADA
claim based on the NDAA claim must be dismissed.
II. The New Order does not violate either the
Federal Land Policy and Management Act or the
National Environmental Policy Act.
BLM regulations provide that if the BLM
determines that ORVs “are causing or will cause
considerable adverse effects" to natural resources,
other authorized uses, or other resources, the BLM
"shall close the area affected to the type(s) of vehicle
causing the adverse effect." 43 C.F.R. § 8341.2(a)
(2003) (emphasis added). Thus, the regulations do not
require evidence of existing adverse effects before use
34a
restrictions can be imposed. Under § 8341.2(a), the
BLM's role in minimizing user conflicts and damage to
natural resources is not strictly reactive. Northwest
Motorcycle Ass'n v. United States Dep't of Agric., 18
F.3d 1468, 1476-77 (9th Cir. 1994).
In addition, NEPA sets forth a set of action - forcing
procedures that require that agencies take a "hard look"
at environmental consequences. See Friends of the Bow
v. Thompson, 124 F.8d 1210,1213 (10th Cir. 1997).
Under NEPA, a federal court must determine whether
the agency took the required “hard look" at potential
environmental consequences of its decision.
USA - All argues that the New Order is inconsistent
with the RMP and that it violates NEPA and the
FLPMA requirements. for public participation and
environmental analysis, as well as the FLPMA
standards for consistency. USA - All argues that the
court must either reject BLM's interpretation or strike
the federal regulations down.' (See Tr.17.)
USA - All is mistaken in asserting that the OHV
regulation violates the NEPA and FLPMA public
participation, environmental analysis and consistency
requirements. As this Court stated in its previous
Order, the amendment of an RMP is a different process
from the issue of a closure order under the OHV
regulations. The amendment or revision of an RMP is a
lengthy process that requires a number of steps,
including scoping, publication of an environmental
impact statement, and public comment. See generally
43 C.F.R. Part 1600. BLM's authority to close areas to
OHV use, is separate from the plan amendment process
and does not require compliance with the amendment
procedures. (Order, at 19.)
3dDa
The plain meaning of the, provision supports this
distinction:
Notwithstanding the consultation
provisions of §$ 8342.2(a), where the
authorized officer determines that off-road
vehicles are causing or will cause
considerable adverse effects... the
authorized officer shall immediately close
the areas or trails affected... Such closures
will not prevent designation. . ., but these
shall not be opened to the type(s) of off-road
vehicle to which it was closed unless the
authorized officer determines that the
adverse effects have been eliminated and
measures implemented to prevent
recurrence.
43 CFR. § 8341.2(a) (emphasis added). The BLM's
authority to restrict land uses under these regulations
is independent of its authority to amend or revise
RMPs under FLPMA and 43 C.F.R. Part 1600. These
regulations simply enforce FLPMA's mandate. that the
BLM "shall by regulation or otherwise, take any action
necessary to prevent unnecessary or undue
degradation of the lands." 4.3 U.S.C. § 1732(b).
Furthermore, the Administrative Record ("AR") is
replete with evidence of various real and potential
adverse effects supporting the BLM's issuance of the
New Order: ORV use has already caused or will cause
(1) harm to livestock grazing through the cutting of
fences, the opening of gates, and the harassment of
livestock; * (2) increased risk to soils susceptible to
erosion if exposed by ORV use and trail creation;* (3)
destroyed vegetation in western Box Elder County,
36a
increased bare areas that are vulnerable to colonization
by, noxious and invasive weeds, as well as trail
proliferation that removes vegetation and increasing
soil erosion;' (4) considerable adverse effects on
wildlife;> and (5) diminished visual appeal of the desert
landscape.°
The court is satisfied that the defendants took the
required “hard look" at potential environmental
consequences of its decision under NEPA and that the
New Order was not arbitrary or capricious under the
regulations.
For the reasons discussed above,
IT IS ORDERED that all of the causes of action of
USA-All's Supplemental Amended Complaint are
DISMISSED with prejudice.
Let judgment be entered accordingly.
DATED this 8th December, 2004.
BY THE COURT
BRUCE 8. JENKINS
United States Senior District Judge
JUDGMENT IN A CIVIL CASE
The action came to trial or hearing before the Court.
The issues have been tried or heard and a decision has
been rendered.
IT ISORDERED AND ADJUDGED
that judgment be entered in favor of the defendants
and plaintiffs cause of action is dismissed with
prejudice.
37a
December 13, 2004
Footnotes
nl USA-All states that although it is reluctant to
challenge a regulation that on its face if used properly
by the agency can help everyone, there is conflict
within the governing statutes and the court may be
compelled to strike the regulation. Tr.12, In 3-10.
n2 AR 00839-00859.
n3 3AR 00840-00885.
n4 AR 00830-00860, 00918-22.
n5 AR 00841-00861.
n6 AR 00840-00845.
38a
8/28/03
Civil No. 2:01-CV-00804J
UNITED STATES DISTRICT COURT FOR THE
DISTRICT OF UTAH, CENTRAL DIVISION
UTAH SHARED ACCESS ALLIANCE,
Plaintiff
V.
GLENN CARPENTER, in his capacity as manager of
the Salt Lake Field Office of the Bureau of Land
Management, MAGGIE WYATT, in her capacity as
manager of the Moab Field office of the Bureau of Land
Management, SHERWIN SANDBERG, in his capacity
as manager of the Monticello Field Office of the Bureau
of Land Management; JERRY MEREDITH, in his
capacity manager of the Richfield Field Office; SALLY
WISELY, in her capacity a Utah State Director of the
Bureau of Land Management, GALE A. NORTON, in
her capacity as Secretary of the Department of Interior,
KATHLEEN CLARKE, in her capacity as director of
the Bureau of Land Management, and BUREAU OF
LAND MANAGEMENT,
Defendants;
SOUTHERN UTAH WILDERNESS ALIANCE,
THE WILDERNESS SOCIETY, GREAT OLD
BROADS FOR WILDERNESS, AND WILDLANDS
CPR.,
Defendants- Intervenors
39a
I.
INTRODUCTION
Plaintiff Utah Shared Access Alliance ("USA-AII")
challenges a number of actions and alleged failures to
act on the part of defendants Glenn Carpenter, et al.
(collectively "BLM"). Specifically, USA-All's First
Amended Complaint alleges that BLM failed to follow
applicable law when BLM issued orders restricting the
operation of off-highway vehicles ("OHVS"), mountain
bikes, camping, and woodcutting on various tracts of
BLM-managed land in Box Elder County, Grand
County, San Juan County, and Wayne County, Utah. In
addition, USA-All alleges that BLM violated applicable
law by posting signs inconsistent with land-use plan
designations and by publishing incorrect information
with respect to the use of OHVS and mountain bikes on
BLM-managed land. USA-All claims that the
challenged actions violate provisions of the Federal
Land Policy and Management Act ("FLPMA"), 43
U.S.C. §§ 1701, et_seg.; the National Environmental
Policy Act ("NEPA"), 43 U.S.C. §$§ 4321, et seq; certain
regulations of the Department of the Interior; and land-
use plans adopted by BLM.
USA-AII also alleges that BLM violated the Federal
Advisory Committee Act ("FACA"), 5 U.S.C. App. 2 §§
1, et seq., by participating in meetings of groups formed
for the purpose of discussing land-use issues in Box
Elder and Grand Counties.
USA-AIl's First Amended Complaint requests the
following relief: (1) a declaration that BLM's alleged
actions and inactions violate applicable law, (2) an order
setting aside BLM's orders and actions that allegedly
violate applicable law, and (3) an oréer compelling BLM
40a
to engage in land-use planning with respect to the lands
affected by BLM'’s orders and actions described above.
For the reasons discussed below, the Court dismisses
each of USA-All's causes of action with prejudice.
Il. LEGAL FRAMEWORK
A. Federal Land Policy and Management Act
Under FLPMA, the BLM is directed to manage the
public lands “under principles of multiple use and
sustained yield" and "in a manner that will protect the
quality of scientific, scenic, historical, ecological,
environmental, air and atmospheric, water resource,
and archeological values." 43 U.S.C. §§ 1701(a)(8),
1732(a). "Multiple use" requires management of the
public lands and their numerous natural resources so
that they can be used for economic, recreational, and
scientific purposes, and so as to prevent unnecessary
and undue degradation. Id. at § 1702(c); Public Lands
Council v. Babbitt,167 F.3d 1287,1290-91(10" Cir.1999),
aff'd, 529 U.S. 728 (2000). "Sustained yield" is defined
as "the achievement and maintenance in perpetuity of a
high-level annual or regular periodic output of the
various renewable resources of the public lands
consistent with multiple use. "43 U.S.C. § 1702(h).
B. Land-Use Plans
To assist in the management of public lands, FLPMA
requires that the BLM “develop, maintain, and, when
appropriate, revise land use plans ... which provide .. .
for the use of the public lands." 43 U.S.C. § 1712(a). In
the development and revision of land use plans, the
A4la
BLM is required to “use and observe the principles of
multiple use and sustained yield." Id. at § 1712(¢)(1).
The land-use plans developed by the BLM are
generally known as resource management plans
("RMPs"). 43 C.F.R. § 1601.0-5k. Once an RMP is
adopted, the BLM is required to "manage the public
lands. . . in accordance with the land use plans" 43
U.S.C. § 1732(a); Southern Utah wilderness Alliance v.
Norton, 301 F.3d 1217,1233-34 (10° Cir. 2002). RMPs
must "establish intervals and standards, as appropriate,
for monitoring and evaluation of the plan." 43 C.F.R. §§
1610.4-9, 1601.0-5(k) (emphasis added). In addition,
RMPs shall be revised "as necessary, based on
monitoring and evaluation findings Sec. 1610.4-9), new
data, new or revised policy and changes in
circumstances affecting the entire plan or major
portions of the plan." Id. at § 1610.5-6.
C. ORV Executive Orders and Regulations.
Off-road vehicle ("ORV") or off-highway vehicle
("OHV") use represents one of many land uses that the
BLM provides for in the management of public lands.
In 1972, President Nixon issued an executive order for
the purpose of "establish{ing] policies and provid[ing]
procedures that will ensure that the use of ORVs on
public lands will be controlled and directed so as to
protect the resources of those lands, promote the safety
of all users of those lands, and minimize conflicts among
the various users of those lands." Executive Order No.
11644, 37 Fed. Reg. 2877 (Feb. 8, 1972). This executive
order established criteria by which federal agencies
were to develop regulations and administrative
instructions for the designation of specific areas and
42a
trails in which ORVs may and may not be permitted,
E.0.11644, § 3. The order also required that agencies
"monitor the effects" of ORV use on their public lands
and, "[o|n the basis of the information gathered, they
shall from time to time amend or rescind designations
of areas for ORV use as necessary to further its policy."
E.0. 11644, § 8.
In 1977, President Carter amended Executive Order
No.11644 "to clarify agency authority" to define zones of
use by ORVs on public lands. The order provides that
notwithstanding the administrative designation of
public lands, federal land management agencies have
the authority to close areas and trails to ORVs
whenever the agency determines that ORV use "will
cause or is causing considerable adverse effects "to
particular resources. The order also authorizes agencies
to adopt policies that particular lands can be considered
closed to ORVs except for areas or trails that are
specifically designated as open to such use. Executive
Order No. 11989, 42 Fed. Reg. 26959 (May 25, 1977)
(both executive orders are referred to as the "ORV
Executive Orders").
The Department of the Interior has promulgated
regulations implementing the OR Executive Orders
and establishing criteria for designating lands as open,
limited, or closed to the use of ORVs. 43 C.F.R. Part
8340 (the "ORV Regulations"). The regulations require
BLM officials to locate ORV trails and areas so as to
minimize user conflicts and damage to natural
resources, including wildlife and wildlife habitat, and to
prevent impairment of wilderness suitability. Id. at §
8342.1 (a)-(c), Designation of ORV = areas is
accomplished through the resource management
43a
planning process, and must involve the public and
consider the views of interested parties. Id. at §
8342.2(a). After designation is completed, the field
manager must take measures to identify designated
areas and trails so the public will be aware of the
locations and limitations applicable to ORV use. Id. at §
8342.2(b). The field manager shall notify the public by
marking areas and trails and by providing informational
material such as maps to the public. Id. at § 8342.2(c).
In accordance with the ORV Executive Orders,
however, the BLM regulations also provide that if the
BLM determines that ORVs “are causing or will cause
considerable adverse effects" to natural resources,
other authorized uses, or other resources, the BLM
"shall close the area affected to the type(s) of vehicle
causing the adverse effect." Id. at § 8341.2(a). The BLM
is authorized to impose closures under these
circumstances without engaging in the public
participation requirements of the RMP planning
process. Id. (BLM _ shall close such _ areas
[Njotwithstanding the consultation provisions in §
8342.2(a).") Such closure may remain in effect "until the
adverse effects are eliminated and measures
implemented to prevent recurrence," Id.
Under the ORV Executive Orders and _ their
implementing regulations, discretion rests with the
agencies to determine whether and to what extent
specific areas should be closed to ORV use. Sierra Club
v. Clark, 756 F.2d 686, 690 (9th Cir. 1984); see also Ohio
Valley Trail Riders v. Worthington, 111 F. Supp. 2d
878, 885 (E.D. Ky. 2000) (holding that the Forest
Service has broad discretion to prohibit or restrict
OHV use where necessary to protect forest resources).
44a
The Council on Environmental Quality, the agency
charged with a continuing review of the implementation
of the ORV Executive Orders (E.0.11644, § 8(b)), has
interpreted the ORV Executive Orders as conferring
the responsibility for closing particular areas on
"responsible federal officials in the field" "[b}liased on
their practical experience in the management of the
public lands, and their first-hand knowledge of
conditions ‘on the ground." Sierra Club, 756 F.2d at
690.
The BLM's role in minimizing user conflicts and
damage to natural resources is not strictly reactive.
Northwest Motorcycle Ass'n. v. United States Dep't. of
Agric., 18 F.3d 1468, 1476-77 (9th Cir. 1994). Under 43
C.F.R. § 8341.2 when the authorized officer determines
that ORVs “are causing or will cause considerable
adverse effects," the authorized officer "shall
immediately close the areas affected to the types) of
vehicle causing the adverse effects" (Emphasis added).
Thus, the regulations do not require evidence of
existing adverse effects before use restrictions can be
imposed. See Northwest Motorcycle Ass'n, 18 F. 3d at
1476-77 (holding that the Forest Service's charge to
minimize “user conflict" when developing ORV use
plans does not require that actual conflicts exist before
restrictions on ORV use can be imposed).
D. Closure and Restriction Orders
The BLM also has the authority, independent of its
regulation of ORV use, to close or restrict the use of
public lands under its management and supervision.
O'Neal v. United States, 814 F.2d 1285, 1287 (9th Cir.
1987). Under the governing regulation, the BLM may
45a
close or restrict the use of designated public lands "to
protect persons, property, and public lands and
resources.” 43 C.F.R. § 8364.1(a).
An order that closes or restricts the use of public lands
must identify the public lands that are closed to entry
or restricted as to use; specify the uses that are
restricted; specify the period of time during which the
closure or restriction applies; identify those persons
exempt from the closure or restriction; and include a
statement of the reasons for the closure. Id. at §
8364.1(b). The order must be posted in designated
locations and must be published in the Federal
Register. Id. at § 8364.1(c).
III. BLM MANAGEMENT ACTIONS
A. Box Elder County
On April 27, 1999, BLM published a "Notice of Closure
of Public Lands" closing selected public lands in Box
Elder County to OHV travel from January 1 to April 30
of each year. (ARSLFO 00768-9.) On March 28, 2000,
BLM published a "Notice of Closure of Public Lands"
under which certain lands in western Box Elder County
were closed in order to address concern related to
unrestricted cross-county OHV travel in places where
resource damage had occurred. (AR SLF000792.) USA-
All has challenged these orders on the grounds that
they violate FLPMA, NEPA, and _= applicable
regulations.
BLM moved to stay the briefing of these issues on the
ground that it intended to revoke the above-described
closure orders in Box Elder County and issue a new
46a
closure order affecting a smaller geographic area. On
April 24, 2003, BLM issued a "Notice of Limitations of
Off Road Vehicles (ORV) Use on Public Lands" with
respect to certain defined lands in Box Elder County.
68 Fed. Reg. 20,167 (2003). This order revokes the prior
closure orders described above and restricts OHV use
to designated routes in five described areas in Box
Elder County.
On May 8, 2008, the Court issued an order granting
BLM's motion to stay the briefing with respect to the
revoked Box Elder County closure orders. The Court
also granted USA-All 30 days from the date of the
order to file any claims USA-AIl might choose to file
with respect to the new closure order in Box Elder
County. On June 6, 2003, USA-All filed a Supplemental
Complaint addressing issues relating to the new closure
order in Box Elder County. For these reasons, USA-
All's challenge to BLM's 1999 and 2000 closure orders is
moot, and the Court will not address the merits of those
claims in this Memorandum Opinion and Order. See
Citizens for Responsible Gov't State Political Action
Comm. v. Davidson, 236 F.3d 1174, 1182 (10th Cir. 2000)
("A case is moot when the issues are no longer "“live’ or
the parties lack a legally cognizable interest its the
outcome.")
B. Grand County
BLM's Moab Field Office manages over 1.8 million
acres of public land in Grand County and part of San
Juan County. In 1985, BLM completed a resource
management plan (the Grand RMP") governing the
management and use of those lands. (AR MOAB00001.)
Under the Grand RMP, 1,183,660 acres were designated
47a
as "open" to OHV use; 596,234 acres were designated as
limited to existing roads and trails; 15,206 acres were
limited to designated roads and trails; and 24,454 acres
were closed to OHV use. (AR MOABO00115.)
Since the adoption of the Grand RMP in 1985,
recreation and tourism in the Moab area have increased
substantially, resulting in a parallel increase in the use
of BLM-managed lands. (AR MOAB00002.) By 2000,
the Moab Field Office had begun to document various
types of adverse effects resulting from increased OHV
and mountain bike use on the lands managed by the
Moab Field Office. The documented adverse effects
included OHV and mountain bike tracks off of main
routes and past barriers, tracks through cryptobiotic
soils, extensive denuded areas, trail proliferation, user
conflicts, soil erosion, and trampling of plants. (AR
MOAB00011-12, 00048-64, 00150-154, 00779, 00878.)
In an effort to eliminate these adverse effects, BLM
imposed restrictions on OHV travel and other uses of
BLM lands managed by the Moab Field Office. On
January 22, 2001, BLM published a "Notice of Travel
Restrictions" (the "Moab Travel Notice") under which
OHV and mountain bike travel in five areas designated
as "Moab Travel Management Areas" was limited to
existing roads and trails. 66 Fed. Reg. 6659 (2001). (AR
MOAB000011-15.) This order affected a total of 245,046
acres, representing 13% of the land managed by the
Moab Field Office and 256 of the land that had
previously been designated as "open" to OHV travel.
(ARMOABO00012.)
Also on January 22, 2001, BLM published a "Notice of
Camping and Wood Cutting and Gathering
48a
Restrictions" (the "Moab Camping Notice"). 66 Fed.
Reg. 6658 (2001). (AR MOAB00007-10.) Under the
Moab Camping Notice, camping with vehicles is limited
to developed campgrounds and designated sites in
certain described areas and within one-half mile of
several designated highways and roads. (AR
MOAB00008.) The notice also includes requirements for
disposal of solid human waste, restrictions on
woodcutting and gathering, and certain restrictions on
backpack-type camping in the designated areas. (AR
MOAB00008-9.) The Moab Travel and Camping Notices
were implemented "on an interim basis . . . pending
revision of the Resource Management Plan (RMP)...."
(AR MOAB00007, 00011.) BLM has begun the revision
of the Grand RMP and expects to complete the process
in March 2006. The revised Grand RMP will include
specific travel-related planning, including identification
of areas where OHV travel is open, limited, or closed;
designation of routes where appropriate; and camping
and wood-cutting restrictions to the extent they may be
deemed necessary. (Declaration of Katherine P.
Mitchell., Par 3.)
The Moab Field Office's monitoring of the areas
affected by the Moab Travel and Camping Notices has
produced evidence of continuing adverse effects in
these areas. This monitoring has revealed evidence of
OHV and mountain bike use, off-road tracking, and off-
road damage in these areas (AR MOABO1846, 01847,
01848, 01850, 01852, and 01855.)
C. San Juan County
The resource management plan for the San Juan
Resource Area (the "San Juan RMP"), which includes
49a
land currently managed by the Monticello Field Office,
was adopted on March 18, 1991 (AR MONT90OO0001.)
Under the San Juan RMP, lands in the Indian Creek
Canyon Corridor ("ICCC") were generally designated
as "open" to OHV travel.
After the adoption of the San Juan RMP, use of OHVs
in the ICCC increased. (AR MONT 00181.) This
resulted in a proliferation of trails in the ICCC, along
with damage to riparian areas, vegetation, soil, and
visual and cultural resources. (AR MONT00132.)
Because of these adverse effects on resources, the
Monticello Field Office published a "Notice of
Recreation Use Restrictions for Indian Creek Canyon
Corridor" (the "Monticello Recreation Notice") on
January 2, 1998. (AR MONT00132.) The Monticello
Recreation Notice restricted the use of OHVs and
mountain bikes to existing roads and trails; restricted
camping to improved recreation sites with facilities for
overnight use or designated undeveloped campsites;
prohibited woodgathering within one-half mile of
motorized routes; and required that campfires within
onehalf mile of motorized routes be built only in BLM-
constructed fire rings, designated fire rings, or fire
pans. (AR MONT900132.)
The Monticello Recreation Notice states that it "shall
remain in effect pending the completion of the Indian
Creek Canyon Corridor Recreation Plan" or until
updated by the authorized office," (AR MONT00132.)
BLM has begun the revision of the San Juan RMP and
expects to complete that process by March 2006,
(Mitchell Deel., 4 13.)
The administrative record includes evidence that
50a
adverse effects continue to exist in the ICCC area.
Monitoring reports have revealed instances of hill-
climbing activity, travel off of existing routes, off-trail
damage, and undeveloped campsites in the ICCC. (AR
MONT001 81, 00328, 00333, 00335, 00337, 00338, 00339,
00340, 00799, 00850, 00851, 00997.)
USA-AIl contends that BLM has placed signs in the
ICCC area and prepared maps and visitor information
that are inconsistent with the San Juan RMP and the
Monticello Recreation Notice. (First Amended
Complaint, 44 130-132.) Katherine P. Mitchell, BLM's
Deputy State Director, represented that she met with
USA-AIl's representative, Brian Hawthorns, to discuss
these issues, and that BLM has taken steps to remedy
any inconsistencies between the Monticello Recreation
Notice and the signs and other visitor information in
the ICCC area. (Kitchell Decl. Par. 11). Mr. Hawthorne
responded that BLM had corrected at least some of the
allegedly incorrect signs and information. (Second
Declaration of Brian Hawthorne, Par. 2.) Counsel for
the BLM represented that BLM intends to remedy any
remaining inconsistencies between the Monticello
Recreation Notice and the signs and other visitor
information in the ICCC area.
D. Factory Butte Area
The land-use plan for the Henry Mountain Field Station
was adopted in 1982, and a_ specific OHV
implementation plan, which includes the Factory Butte
area, was adapted in 1988. Under the 1988 OHV plan,
the majority of the lands near Factory Butte were
designated as "open" to OHV travel. In addition, the
plan identified a 640-acre “play area" where OHV use
5la
was encouraged. (AR RICH00003.)
USA-AIl contends that BLM's signs and media violate
FLPMA's consistency mandate, 43 U.S.C. § 1732(a) and
43 C.F.R. § 1610.5-3(a), because they are inconsistent
with requirements set forth in BLM's governing land-
use plan. (Plaintiff's First Amended Complaint 4 148-
153; Plaintiff's Opening Brief at 87-90; Plaintiff's Reply
Brief at 16-19.) USA-All also alleges that BLM has
violated FLPMA and NEPA by requesting, through
signs, handouts, and personal contacts, that OHV users
- voluntarily use the "OHV play area" while staying on
existing roads and trails elsewhere in the - Factory
Butte area. (First Amended Complaint, Ninth and
Tenth Causes of Action; USA-All's Opening Brief at 81-
95.) USA-All alleges that some of its members have
refrained from traveling in open areas in the Factory
Butte area because they fear that BLM will _ retaliate
by closing these areas if USA-All's members fail to
voluntarily comply with BLM’'s requests. (First
Hawthorne Decl., ¥ 15.)
BLM's Deputy State Director represented that she met
with USA-All's representative, Brian Hawthorne, to
discuss this issue, and that BLM has modified language
on signs and other information provided to the public in
the Factory Butte area. (Kitchen Decl., 4 11.) Mr.
Hawthorne does not dispute that BLM has addressed
USA-AIll's concerns. (Second Hawthorne Decl., 413.)
IV. DISCUSSION
A. Standard of Review
JSA-All challenges BLM's actions and _ alleged
52a
inactions under the Administrative Procedure Act
("APA"), 5 U.S.C. §§ 701-706. USA-All challenges
BLM's actions under U.S.C. § 706(2) on the ground that
USA-All's actions are arbitrary, capricious, in excess of
statutory authority, without observance of procedure
required by law, or otherwise not in accordance with
law. "The duty of a reviewing court under the ‘arbitrary
and capricious’ standard is to ascertain whether the
agency examined the relevant data and articulated a
rationale connection between the facts found and
decision made." Olenhouse v. Commodity Credit ., 42
F.3d 1560, 1574 (10th Cir. 1994) (citing Motor Vehicle
Mfrs. Ass'n v. State Farm Mut. Ins. Co., 463 U.S. 29, 4
(1983)).
USA-All also challenges BLM"'s alleged failure to
undertake FLPMA planning and NEPA analysis under
5 U.S.C. § 706(1), which authorizes courts to "compel
agency action unlawfully withheld or unreasonably
delayed." Courts may grant relief under Section 706(1)
only in the case of mandatory, nondiscretionary duties.
"{I}f a duty is not mandated, or if an agency possesses
discretion over whether to act in the first instance, a
court may not grant relief under § 706(1)" Southern
Utah Wilderness Alliance v. Norton, 301 F.3d 1217,
1226 (10th Cir. 2002).
B. BLM's Issuance of Closure Orders
i. Moab Travel and Camping Notices
USA-AIl contends that BLM's orders restricting OHV
travel, camping, and woodcutting in Grand County are
not supported by substantial evidence in the record.
The Court disagrees.
53a
When reviewing agency action under Section 706(2) of
the APA, the Court's role is limited to determining
whether the agency relied on appropriate factors in
making its decision and whether there is substantial
evidence in the record that supports the decision,
Olenhouse, 42 F.3d at 1574. The Court may not
substitute its judgment far that of the agency, even if
the Court might have made a different choice. Custer
County Action Ass'n v. Garvey, 256 F.3d 1024, 1030
(10th Cir. 2001), cert. denied, 534 U.S. 1127 (2002). In
reviewing agency action, the Tenth Circuit has held
that "if Congress has not directly addressed the issue,
the agency possesses broad discretion in administering
the law so long as its actions are based on a permissible
construction of its enabling statute ..., This discretion
is even greater where, as here, the agency's actions are
based on the interpretation of its own regulations."
Valley Camp of Utah v. Babbitt, 24 F.3d 1263, 1267 (10h
Cir.1994) (citations omitted). "|T|he scope of review of
an agency's factual findings is very narrow where the
[agency] has been vested with substantial discretion, as
in the administration of public land." Sierra Club v.
Clark, 756 F.2d at 691 (citation omitted).
The regulations relevant to this case that authorize
BLM to restrict permissible uses of public land are 43
C.F.R. §§ 8341.2 and 8364.1. Under Section 8341.2(a),
BLM is required to immediately close any area to OHV
travel where “off-road vehicles are causing or will cause
considerable adverse effects ... ." (Emphasis added.)
Under this regulation, it is not necessary that BLM
demonstrate that adverse effects have already occurred
in each area where OHV use will be limited. Instead,
BLM may restrict OHV use in areas where it has
documented the existence of adverse effects or where it
54a
has determined in the exercise of its judgment that
adverse effects are likely to occur. See Northwest
Motorcycle Ass'n v. U.S. Dep't of Agriculture, 18 F.3d
at 1466-67 (holding that the Forest Service need not
prove existing considerable adverse effects in order to
justify restriction of OHV use under a Forest Service
regulation, 36 C.F.R. § 295.5, mandating restriction
where OHV use "will" cause or is "likely" to cause
considerable adverse effects).
In addition, under 43 C.F.R. § 8864.1(a), BLM is
authorized to restrict uses of federal land in order "to
protect persons, property, and public lands and
resources.)" This regulation authorizes BLM to restrict
uses other than OHV travel, including mountain biking,
camping, and woodcutting.
As set forth above, the administrative record contains
substantial evidence of various adverse effects
supporting BLM's issuance of the Moab Travel and
Camping Notices, including evidence of tracks off of
main routes and beyond barriers, tracks through
cryptobiotic soils, litter and other waste products on
trails, trail proliferation, and damage to soil and
vegetation. Moreover, the camping and woodcutting
restrictions are adequately supported by substantial
evidence in the record that BLM' action was required in
order “to protect persons, property, and public lands
and resources" under 43 C.F.R. § 8364.1(a).
The administrative record also contains substantial
evidence supporting BLM's determination to maintain
the Moab Travel and Camping Notices in effect. Under
43 C.F.R. § 8341.2(a), areas where OHV travel is
restricted due to the actual or potential presence of
55a
considerable adverse effects "shall not be opened to the
type(s) of off-road vehicle to which it was closed unless
the authorized officer determines that the adverse
effects have been eliminated and measures
implemented to prevent recurrence." Id. at § 8341.2(a)
(emphasis added). The administrative record contains
substantial evidence that the adverse effects in the
areas covered by the Moab Travel and Camping
Notices have not been eliminated. BLM monitoring
reports contain evidence of continuing instances of
damage and adverse effects resulting from OHV travel
in the areas covered by these notices. Since the adverse
effects that gave rise to the notices have not been
eliminated, BLM is justified in maintaining these
restrictions in effect.
2. Monticello Recreation Notice
USA-AIl does not allege that the Monticello Recreation
Notice was unjustified or unsupported by substantial
evidence. (USA-AII's Opening Brief at 70 n.126.) USA-
All alleges, however, that BLM is not justified in
maintaining the Monticello Recreation Notice in effect.
(First Amended Complaint, Seventh and Eighth
Causes of Action.)
As set forth above, the administrative record contains
substantial evidence that resource damage and adverse
effects continue to exist in the ICCC since the
Monticello Recreation Notice was issued in 1998. The
record contains evidence of hill-climbing activity, travel
off existing roads, numerous off-road tracks, and other
instances of resource damage in the ICCC area. Since
the adverse effects that gave rise to the Monticello
Recreation Notice have not been eliminated, BLM has
56a
lawfully maintained those restrictions in place. 43
C.F.R. § 8341.2(a).
C. Time Limit of Closure Orders
USA-AIl contends that orders restricting the use of
federal lands under 43 C.F.R. § 8341.2 and 8364.1 must
either contain specific expiration dates or be deemed to
have expired after a period of no more than three years.
(First Amended Complaint, 480, 89, 128; USA-All's
Opening Brief at 60-61, 75-76.) Under 43 C.F.R. §
8341.2, areas that are closed to OHV travel due to the
existence of considerable adverse effects "shall not be
opened" until the adverse effects are eliminated. The
regulation contains no provision for expiration within a
particular period of time. To the contrary, the
expiration of closure orders issued under 43 C.F.R. §
8341.2 is governed by the existence or elimination of
the adverse effects that gave rise to the closure orders.
Until those adverse effects have been eliminated, BLM
is required to maintain the closure orders in effect.
BLM must, on an ongoing periodic basis, review
conditions relied upon to issue the closure orders
challenged herein. 43 C.F.R. § 8341.2(a).
Under 438 C.F.R. § 8364.1, BLM is required to "specify
the period of time during which the closure or
restriction shall apply." 43 C. F. R, § 8364.1 (b)(3). This
language, however, does not require that BLM specify
an expiration date.
The Moab Travel and Camping Notices state that they
"shall remain in effect until modified or the RMP is
amended." (AR MOAB0007, -11.) Similarly, the
Monticello Recreation Notice states that it "shall
7a
remain in effect pending the completion of the Indian
Creek Canyon Corridor Recreation Plan or until
updated by the authorized officer." (AR MONT000132.)
BLM has begun the revision of the Grand and San Juan
RMPs and intends to complete those projects by March
2006. Therefore, BLM has complied with the
requirement of 43 C.F.R. § 8364.1 that it "specify the
period of time during which the closure order
restriction shall apply" by linking the expiration of
those closure orders to the completion of the revisions
of the Grand and San Juan RMPs.
D. Land-Use Planning
1. "De Facto Amendment" Claim
USA-AlIl contends that BLM's issuance of closure
orders and other use restrictions has created "de facto"
amendments of the applicable resource management
plans. (First Amended Complaint, ¥4 81, 86, 91, 107,
129, 156.) The amendment and revision of land-use
plans is accomplished as part of the planning process
set forth in 4 C.F.R. Part 1600. The amendment or
revision of a land use plan is a lengthy process that
requires that 1.M engage in a scoping process to
identify relewant issues; evaluate the effects of
alternative eourses of action; prepare a_ draft
environmental impact statement; analyze public
comments; publish a final environmental impact
statement with a proposed revised RMP; and resolve
any protests to the proposed RMP. (Kitchell Decl., Par.
3.)
BLM is also authorized, independent of the formal
planning process, to take action in response to resource
58a
damage by closing areas and otherwise restricting uses
of federal lands pursuant to 43 C.F.R. §§ 8341.2 and
8364.1. These regulations implement FLPMA's
mandate that BLM "shall, by regulation or otherwise,
take any action necessary to prevent unnecessary or
undue degradation of the lands." 43 U.S.C; § 1732(b).
BLM's authority to restrict land uses under these
regulations is independent of its authority to amend or
revise RMPs under FLPMA and 48 C.F.R. Subpart
1600. See 48 C.F.R., § 8341.2(a) (BLM is required to
close areas that are suffering or will suffer considerable
adverse effects “[njotwithstanding the consultation
provisions in § 8342.2(a)"); see also Sierra Club v. Clark,
756 F.2d at 690 ("[T}his provision [43 C.F.R. § 8341.2(a)]
creates a separate duty to close without regard to the
designation process; it does not automatically become
inoperative once the Secretary exercises its discretion
to designate land"); American Motorcyclist Ass'n v.
Watt, 543 F. Supp. 789, 796 n.14 (C.D. Cal. 1982) ("This
closure standard [under 43 C.F. R. § 8341.2] is to be
distinguished from the initial designation criteria set
forth in E.O. 11, 644 and mirrored in 48 C.F.R. §
8342.1.").
Although BLM's issuance of the challenged orders
modifies the permissible uses of BLM-managed land
outside the framework of the land-use planning process,
the orders are consistent with BLM's authority under
43 C.F.R. §§ 8341.2 and 8364.1. BLM's issuance of these
orders and closures does not constitute "de facto" plan
amendments.
2. Section 706(1) claims
59a
USA-AII alleges that BLM has unlawfully withheld or
unreasonably delayed the amendment of the Grand and
San Juan RMPs and the Henry Mountains Management
Framework Plan, and that BLM should be compelled to
engage in the plan amendment process. (First
Amended Complaint, Fourth, Sixth, Seventh, and
Kighth Causes of Action.) Under FLPMA, the
Secretary of the Interior "shall ... develop, maintain,
and, when appropriate, revise land-use plans... ." 43 U.
S.C. § 1712(a). BLM is required by regulation to
monitor and evaluate landuse plans and "as appropriate
to determine whether there is sufficient cause to
warrant amendment or revision of the plan." 43 C.F.R.
§ 1610.4-9. These provisions leave the determination of
the timing of land-use plan amendment and revision
largely to the discretion of the BLM. Since there is no
specified interval or date-certain deadline for the
initiation and completion of land-use plan amendments
and revisions, there is no basis for a claim that BLM has
"unlawfully withheld" that action. Forest Guardians v.
Babbitt,174 F.3d 1178, 1190-91 (10th Cir. 1999).
The facts before the Court also fail to support a claim
that BLM has "unreasonably delayed" land-use
planning in these areas. BLM has initiated revisions of
the R MPs governing the areas managed by the Moab,
Monticello, and Richfield Field Offices BLM _ shall,
pursuant to 43 C.F.R. Part 1600, provide USA-All and
its members full opportunity to participate in the
planning process. BLM estimates that the plan
revisions will be completed by March 2006. Therefore,
BLM has not “unreasonably delayed" the process of
revising these land-use plans.
EB. Management Actions in the ICCC and Factory
Butte Areas
USA-All alleges that BLM has placed inaccurate
informational signs and disseminated misleading
information to public land users in the ICCC area in
San Juan County. USA-All also alleges that BLM has
improperly requested public land users in the Factory
Butte area to voluntarily restrict their OHV use to an
"OHV play area" and otherwise to remain on existing
trails in the Factory Butte area. (First Amended
Complaint, Seventh, Eighth, and Ninth Causes of
Action.)
BLM's efforts to manage the use of public lands and the
effects of OHV use are not at odds with BLM's
obligation to engage in land-use planning as
appropriate. FLPMA requires BLM to "take any action
necessary to prevent unnecessary or undue
degradation of the [public] lands." 43 U.S.C. § 1732(b).
In addition, Congress directed BLM to manage the
public lands “for outdoor recreation" as well as "to
preserve and protect certain public lands in their
natural condition." Id. at § 1701(a)(8). BLM is therefore
authorized to take steps short of formal planning - -
such as placing signs on the ground and disseminating
information to the public - - in an effort to prevent
unnecessary and undue degradation of the lands under
BLM's control. Even if such efforts in the Factory
Butte and ICCC areas may have been in error, the
record demonstrates that BLM has taken steps to
correct such errors.
Furthermore, USA-All lacks standing to object to
BLM's request that OHV users in the Factory Butte
area remain on existing trails outside the designated
6la
"OHV play area." BLM has requested that OHV users
in the Factory Butte area voluntarily restrict their
activities. BLM has not imposed a mandatory closure or
restriction. In fact, the language in the current sign and
hand-out in use at the OHV play area states in bold
print that the "Factory Butte area outside the
designated Play Area is also open to off-road use and
such use is permissible." (AR RICH00408, 00414)
BLM's request for voluntary compliance does not
constitute an “injury in fact" sufficient to confer
standing on USA-All and its members. Bear Lodge
Multiple Use Ass'n v. Babbitt, 175 F. 3d 814, 821 (10°
Cir. 1999, cert denied, 629 U.S. 1037(2000).
Finally, the declarations submitted by both USA-AIl
and BLM indicate that the parties have discussed these
issues and have agreed on the steps needed to resolve
them. (Kitchell Decl., { 11; Second Hawthorne Decl., 4
2-3) Thus, these issues are moot, and the Court need
not address them further. See Southern Utah
wilderness Alliance v. Smith, 110 F.3d 724, 727 (10th
Cir. 2000) (issues are moct where’ changed
circumstances since the beginning of litigation "forestall
any occasion for meaningful relief’).
Federal Advisory Committee Act
USA-All alleged that BLM violated FACA by
participating with local groups that were formed to
address OHV issues in Box Elder and Grand Counties.
In Box Elder County, BLM participated with the west
Box Elder Access Management Team ("Box Elder
Team"), USA-All requested, among other things,
judgment voiding the closure orders issued with
respect to BLM lands in Box Elder County. (USA-AII's
62a
Opening Brief at 104-5.) This issue is moot, however,
because BLM has revoked those closure orders and
issued a new closure order. USA-All has filed a
Supplemental Complaint with respect to the new
closure order in Box Elder County, and USA-AIll's
claims with respect to BLM's actions in Box Elder
County will be addressed in connection with the
Supplemental Complaint.
In Grand County, BLM participated with the Grand
County Access Committee ("GCAC"). USA-AIl
requested injunctive relief with respect to BLM's
participation with the GCAC. (USA-AIl's Opening Brief
at 104.) However, USA-AIl lacks standing to sue for
any alleged violation of FACA in connection with the
GCAC. The GCAC was organized on March 29, 2001,
over two months after BLM issued the Moab Travel
and Camping Notices that USAAII challenges in the
present case. (AR MOABO00942.) The Grand County
Council terminated the GCAC effective August 8, 2002,
and the GCAC produced no recommendations or other
completed work product. (von Koch Decl. Par. 8.) Thus,
USA-All cannot show the "injury in fact" required to
establish standing to seek relief under FACA.
Fertilizer Institute v. U.S. Envtl. Protection Agency.,
938 F. Supp 52, 55 (D. D. C.1996).
V. CONCLUSION
lor the reasons discussed above,
IT IS ORDERED that all of the causes of action of
USA-All's First Amended Complaint are dismissed
with prejudice.
63a
IT I FURTHER ORDERED that this case shall
remain open pending the Court's ruling on the claims
set forth in USA-AIll's Supplemental Complaint
Regarding New Box Elder County Restrictions.
Dated this 28 day of May, 2003.
64a
Civil No. 2:01 CV 804J
IN THE UNITED STATES DISTRICT COURT
DISTRICT OF UTAH, CENTRAL DIVISION
UTAH SHARED ACCESS ALLIANCE Utah non-
profit corporation,
Plaintiffs,
VS.
GLENN CARPENTER, et al., Defendants,
SOUTHERN UTAH WILDERNESS ALLIANCE, et
al.
Defendants -Intervenors.
ORDER
The Federal Defendants’ Motion to Stay was heard by
the Court on April 23, 2003. Jeffrey E. Nelson
represented the Federal Defendants; Paul W.
Mortensen represented the Plaintiffs; and Stephen
H.M. Bloch represented the Defendants-Intervenors.
Based on the memoranda submitted by the parties and
the arguments of counsel,
IT 1S HEREBY ORDERED as follows:
The oral argument will proceed as scheduled at 9:30
a.m. on Wednesday, May 21, 2003, on the issues briefed
by Plaintiff that are not resolved by BLM's revocation
of the two closure orders affecting certain BLM-
managed lands in Box Elder County.
2. If Plaintiff decides to assert any claim with
respect to the new order published by BLM with
65a
respect to certain BLM-managed lands in Box Elder
County, Plaintiff shall allege any such claim by filing an
appropriate amended pleading within 30 days from the
date of this Order. In the event Plaintiff files such a
claim with respect to the new order in Box Elder
County, the issues arising from Plaintiff's new claim or
claims shall be briefed and argued separately from the
argument to be held on May 21, 2003.
Dated this 8th day of May, 2003.
66a
No. 05-4009
UNITED STATES COURT OF APPEALS FOR THE
TENTH CIRCUIT
UTAH SHARED ACCESS ALLIANCE, a Utah non-
profit corporation,
Plaintiff-Appellant,
V.
GLENN CARPENTER, in his capacity as manager of
the Salt Lake Field Office of the Bureau of Land
Management; MAGGIE WYATT, in her capacity as
manager of the Moab Field Office of the Bureau of Land
Management; SHERWIN SANDBERG, in his capacity
as manager of the Monticello Field Office of the Bureau
of Land Management; JERRY MEREDITH, in his
capacity as manager of the Richfield Field Office of the
Bureau of Land Management; SALLY WISELY, in her
capacity as Utah State Director of the Bureau of Land
Management; GALE A. NORTON, in her capacity as
Secretary of the Department of Interior; BUREAU OF
LAND MANAGEMENT; KATHLEEN CLARKE, in
her capacity as director of the Bureau of Land
Management, Defendants-Appellees,
SOUTHERN UTAH WILDERNESS ALLIANCE, a
Utah non-profit corporation; THE WILDERNESS
SOCIETY; WILDLANDS CPR, a non-profit
corporation; GREAT OLD BROADS FOR
WILDERNESS, a non-profit corporation; REDROCK
FORESTS, a Utah non-profit corporation,
Defendants-Intervenors-Appellees.
67a
ORDER
Filed November 21, 2006
JUDGES: Before TACHA, Chief Circuit Judge,
McWILLIAMS, Senior Circuit Judge, and O'BRIEN,
Circuit Judge.
Appellant's petition for rehearing is denied.
The petition for rehearing en banc was transmitted to
all of the judges of the court who are in regular active
service. As no member of the panel and no judge in
regular active service on the court requested that the
court be polled, that petition is also denied. Entered for
the Court
68a
FLPMA Sec. 103(d) 43 U.S.C. § 1702(d)
(d) The term “public involvement” means_ the
opportunity for participation by affected citizens in
rulemaking, decisionmaking, and planning with respect
to the public lands, including public meetings or
hearings held at locations near the affected lands, or
advisory mechanisms, or such other procedures as may
be necessary to provide public comment in a particular
instance.
FLPMA Sec. 202 43 U.S.C. § 1712. Land use plans
(a) Development, maintenance, and revision by
Secretary
The Secretary shall, with public involvement and
consistent with the terms and conditions of this Act,
develop, maintain, and, when appropriate, revise land
use plans which provide by tracts or areas for the use of
the public lands. Land use plans shall be deveioped for
the public lands regardless of whether such lands
previously have been classified, withdrawn, set aside,
or otherwise designated for one or more uses.
(b) Coordination of plans for National Forest System
lands with Indian land use planning and management
programs for purposes of development and revision
In the development and revision of land use plans, the
Secretary of Agriculture shall coordinate land use plans
for lands in the National Forest System with the land
use planning and management programs of and for
Indian tribes by, among other things, considering the
policies of approved tribal land resource management
programs.
(ce) Criteria for development and revision
In the development and revision of land use plans, the
69a
Secretary shall—
(1) use and observe the principles of multiple use and
sustained yield set forth in this and other applicable
law;
(2) use a systematic interdisciplinary approach to
achieve integrated consideration of physical, biological,
economic, and other sciences;
(3) give priority to the designation and protection of
areas of critical environmental concern;
(4) rely, to the extent it is available, on the inventory of
the public lands, their resources, and other values;
(5) consider present and potential uses of the public
lands;
(6) consider the relative scarcity of the values involved
and the availability of alternative means (including
recycling) and sites for realization of those values;
(7) weigh long-term benefits to the public against short-
term benefits;
(8) provide for compliance with applicable pollution
control laws, including State and Federal air, water,
noise, or other pollution standards or implementation
plans; and
(9) to the extent consistent with the laws governing the
administration of the public lands, coordinate the land
use inventory, planning, and management activities of
or for such lands with the land use planning and
management programs of other Federal departments
and agencies and of the States and local governments
within which the lands are located, including, but not
limited to, the statewide outdoor recreation plans
developed under the Act of September 3, 1964 (78 Stat.
897), as amended [16 U.S.C. 4601-4 et seq.], and of or for
Indian tribes by, among other things, considering the
policies of approved State and tribal land resource
management programs. In implementing this directive,
70a
the Secretary shall, to the extent he finds practical,
keep apprised of State, local, and tribal land use plans;
assure that consideration is given to those State, local,
and tribal plans that are germane in the development of
land use plans for public lands; assist in resolving, to
the extent practical, inconsistencies between Federal
and non-Federal Government plans, and shall provide
for meaningful public involvement of State and local
government officials, both elected and appointed, in the
development of land use programs, land use
regulations, and land use decisions for public lands,
including early public notice of proposed decisions
which may have a significant impact on non-Federal
lands. Such officials in each State are authorized to
furnish advice to the Secretary with respect to the
development and revision of land use plans, land use
guidelines, land use rules, and land use regulations for
the public lands within such State and with respect to
such other land use matters as may be referred to them
by him. Land use plans of the Secretary under this
section shall be consistent with State and local plans to
the maximum extent he finds consistent with Federal
law and the purposes of this Act.
(d) Review and inclusion of classified public lands;
review of existing land use plans; modification and
termination of classifications
Any classification of public lands or any land use plan in
effect on October 21, 1976, is subject to review in the
land use planning process conducted under this section,
and all public lands, regardless of classification, are
subject to inclusion in any land use plan developed
pursuant to this section. The Secretary may modify or
terminate any such classification consistent with such
land use plans.
(e) Management decisions for implementation of
Tila
developed or revised plans
The Secretary may issue management decisions to
implement land use plans developed or revised under
this section in accordance with the following:
(1) Such decisions, including but not limited to
exclusions (that is, total elimination) of one or more of
the principal or major uses made by a management
decision shall remain subject to reconsideration,
modification, and termination through revision by the
Secretary or his delegate, under the provisions of this
section, of the land use plan involved.
(2) Any management decision or action pursuant to a
management decision that excludes (that is, totally
eliminates) one or more of the principal or major uses
for two or more years with respect to a tract of land of
one hundred thousand acres or more shall be reported
by the Secretary to the House of Representatives and
the Senate. If within ninety days from the giving of
such notice (exclusive of days on which either House
has adjourned for more than three consecutive days),
the Congress adopts a concurrent resolution of
nonapproval of the management decision or action, then
the management decision or action shall be promptly
terminated by the Secretary. If the committee to which
a resolution has been referred during the said ninety
day period, has not reported it at the end of thirty
calendar days after its referral, it shall be in order to
either discharge the committee from further
consideration of such resolution or to discharge the
committee from consideration of any other resolution
with respect to the management decision or action. A
motion to discharge may be made only by an individual
favoring the resolution, shall be highly privileged
(except that it may not be made after the committee
has reported such a resolution), and debate thereon
72a
shall be limited to not more than one hour, to be divided
equally between those favoring and those opposing the
resolution. An amendment to the motion shall not be in
order, and it shall not be in order to move to reconsider
the vote by which the motion was agreed to or
disagreed to. If the motion to discharge is agreed to or
disagreed to, the motion may not be made with respect
to any other resolution with respect to the same
management decision or action. When the committee
has reprinted, or has been discharged from further
consideration of a resolution, it shall at any time
thereafter be in order (even though a previous motion
to the same effect has been disagreed to) to move to
proceed to the consideration of the resolution. The
motion shall be highly privileged and shall not be
debatable. An amendment to the motion shall not be in
order, and it shall not be in order to move to reconsider
the vote by which the motion was agreed to or
disagreed to.
(3) Withdrawals made pursuant to section 1714 of this
title may be used in carrying out management
decisions, but public lands shall be removed from or
restored to the operation of the Mining Law of 1872, as
amended (R.S. 2318-2352; 30 U.S.C. 21 et seq.) or
transferred to another department, bureau, or agency
only by withdrawal! action pursuant to section 1714 of
this title or other action pursuant to applicable law:
Provided, That nothing in this section shall prevent a
wholly owned Government corporation from acquiring
and hoiding rights as a citizen under the Mining Law of
1872.
(f) Procedures applicable to formulation of plans and
programs for public land management
The Secretary shall allow an opportunity for public
involvement and by regulation shall _ establish
73a
procedures, including public hearings where
appropriate, to give Federal, State, and _ local
governments and the public, adequate notice and
opportunity to comment upon and participate in the
formulation of plans and programs relating to the
management of the public lands.
FLPMA See. 302(a) 43 U.S.C. § 1732(a).
The Secretary shall manage the public lands under
principles of multiple use and sustained yield, in
accordance with the land use plans developed by him
under section 1712 of this title when they are available,
except that where a tract of such public land has been
dedicated to specific uses according to any other
provisions of law it shall be managed in accordance with
such law.
FLPMA Sec. 302(b) 43 U.S.C. § 1732(b).
(b)In managing the public lands, the Secretary shall,
subject to this Act and other applicable law and under
such terms and conditions as are consistent with such
law, regulate, through easements, permits, leases,
licenses, published rules, or other instruments as the
Secretary deems appropriate, the use, occupancy, and
development of the public lands, including, but not
limited to, long-term leases to permit individuals to
utilize public lands for habitation, cultivation, and the
development of small trade or manufacturing concerns:
Provided, That uniess otherwise provided for by law,
the Secretary may permit Federal departments and
agencies to use, occupy, and develop public lands only
through rights-of-way under section 1767 of this title,
withdrawals under section 1714 of this title, and, where
74a
the proposed use and development are similar or
closely related to the programs of the Secretary for the
public lands involved, cooperative agreements under
section 1737 (b) of this title: Provided further, That
nothing in this Act shall be construed as authorizing the
Secretary concerned to require Federal permits to hunt
and fish on public lands or on lands in the National
Forest System and adjacent waters or as enlarging or
diminishing the responsibility and authority of the
States for management of fish and resident wildlife.
However, the Secretary concerned may designate areas
of public land and of lands in the National Forest
System where, and establish periods when, no hunting
or fishing will be permitted for reasons of public safety,
administration, or compliance with provisions of
applicable law. Except in emergencies, any regulations
of the Secretary concerned relating to hunting and
fishing pursuant to this section shall be put into effect
only after consultation with the appropriate State fish
and game department. Nothing in this Act shall modify
or change any provision of Federal law relating to
migratory birds or to endangered or threatened
species. Except as provided in section 1744, section
1782, and subsection (f) of section 1781 of this title and
in the last sentence of this paragraph, no provision of
this section or any other section of this Act shall in any
way amend the Mining Law of 1872 or impair the rights
of any locators or claims under that Act, including, but
not limited to, rights of ingress and egress. In managing
the public lands the Secretary shall, by regulation or
otherwise, take any action necessary to prevent
unnecessary or undue degradation of the lands.
75a
FLPMA Sec. 309(e) 43 U.S.C. § 1739(e).
In exercising his authorities under this Act, the
Secretary, by regulation, shall establish procedures,
including public hearings where appropriate, to give
the Federal, State, and local governments and the
public adequate notice and an opportunity to comment
upon the formulation of standards and criteria for, and
to participate in, the preparation and execution of plans
and programs for, and the management of, the public
lands.
76a
2005 CFR 43 § 1601.0-2
The objective of resource management planning by the
Bureau of Land Management is to maximize resource
values for the public through a rational, consistently
applied set of regulations and procedures which
promote the concept of multiple use management and
ensure participation by the public, state and local
governments, Indian tribes and appropriate Federal
agencies. Resource management plans are designed to
guide and control future management actions and the
development of subsequent, more detailed and limited
scope plans for resources and uses.
2005 CFR 43 § 1601.0-5(k).
(k) Public means affected or interested individuals,
including consumer organizations. public land resource
users, corporations and other business entities,
environmental organizations and other special interest
groups and officials of State, local, and Indian tribal
governments.
2005 CFR 43 §1610.1
(c) An interdisciplinary approach shall be used in the
preparation, amendment and revision of resource
management plans as provided in 40 CFR 1502.6. The
disciplines of the preparers shall be appropriate to the
values involved and the issues identified during the
issue identification and environmental impact
statement scoping stage of the planning process. The
Field Manager may use any necessary combination of
Bureau of Land Management staff, consultants,
contractors, other governmental personnel, and
77a
advisors to achieve an interdisciplinary approach.
2005 CFR 43 § 1610.2 Public participation.
(a) The public shall be provided opportunities to
meaningfully participate in and comment on the
preparation of plans, amendments and related guidance
and be given early notice of planning activities. Public
involvement in the resource management planning
process shall conform to the requirements of the
National Environmental Policy Act and associated
implementing regulations.
(b) The Director shall, early in each fiscal year, publish
a planning schedule advising the public of the status of
each plan in process of preparation or to be started
during that fiscal year, the major action on each plan
during that fiscal year and projected new planning
starts for the 3 succeeding fiscal years. The notice shall
call for public comments on projected new planning
starts so that such comments can be considered in
refining priorities for those years.
(c) When BLM starts to prepare, amend, or revise
resource management plans we will begin the process
by publishing a notice in the Federal Register and
appropriate local media, including newspapers of
general circulation in the state and field office area. The
Field Manager may also decide if it is appropriate to
publish a notice in media in adjoining States. This
notice may also constitute the scoping notice required
by regulation for the National Environmental Policy
Act (40 CFR 1501.7). This notice shall include the
following:
(1) Description of the proposed planning action;
(2) Identification of the geographic area for which the
plan is to be prepared;
78a
(3) The general types of issues anticipated;
(4) The disciplines to be represented and used to
prepare the plan;
(5) The kind and extent of public participation
opportunities to be provided;
(6) The times, dates and locations scheduled or
anticipated for any public meetings, hearings,
conferences or other gatherings, as known at the time;
(7) The name, title, address and telephone number of
the Bureau of Land Management official who may be
contacted for further information; and
(8) The location and availability of documents relevant
to the planning process.
(d) A list of individuals and groups known to be
interested in or affected by a resource management
plan shall be maintained by the Field Manager and
those on the list shall be notified of public participation
activities. Individuals or groups may ask to be placed
on this list. Public participation activities conducted by
the Bureau of Land Management shall be documented
by a record or summary of the principal issues
discussed and comments made.
The documentation together with a list of attendees
shall be available to the public and open for 30 days to
any participant who wishes to clarify the views he/she
expressed.
(e) At least 15 days’ public notice shall be given for
public participation activities where the public is
invited to attend. Any notice requesting written
comments shall provide for at least 30 calendar days for
response. Ninety days shall be provided for review of
the draft plan and draft environmental impact
statement. The 90-day period shail begin when the
Environmental Protection Agency publishes a notice of
the filing of the draft environmental impact statement
79a
in the Federal Register.
(f) Public notice and opportunity for participation in
resource mangement plan preparation shall be
appropriate to the areas and people involved and shall
be provided at the following specific points in the
planning process:
(1) General notice at the outset of the process inviting
participation in the identification of issues (See
$§1610.2(c) and 1610.4—1);
(2) Review of the proposed planning criteria (See
§1610.4-2);
(3) Publication of the draft resource management plan
and draft environmental impact statement (See
§1610.4—7);
(4) Publication of the proposed resource management
plan and final environmental impact statement which
triggers the opportunity for protest (See §§1610.4-8
and 1610.5—1(b)); and
(5) Public notice and comment on any significant change
made to the plan as a result of action on a protest (See
§1610.5-1(b)).
(g) BLM will make copies of an approved resource
management plan and amendments reasonably
available for public review. Upon request, we will make
single copies available to the public during the public
participation process. After BLM approves a plan,
amendment, or revision we may charge a fee for
additional copies. We will also have copies available for
public review at the:
(1) State Office that has jurisdiction over the lands,
(2) Field Office that prepared the plan; and
(3) District Office, if any, having jurisdiction over the
Field Office that prepared the plan.
(h) Supporting documents to a resource management
plan shall be available for public review at the office
80a
where the plan was prepared.
(i) Fees for reproducing requested documents beyond
those used as part of the public participation activities
and other than single copies of the printed plan
amendment or revision may be charged according to
the Department of the Interior schedule for Freedom of
Information Act requests in 43 CFR part 2.
(j) When resource management plans involve areas of
potential mining for coal by means other than
underground mining, and the surface is privately
owned, the Bureau of Land Management shall consult
with all surface owners who meet the criteria in
§3400.0-5 of this title. Contact shall be made in
accordance with subpart 3427 of this title and shall
provide time to fully consider surface owner views. This
contact may be made by mail or in person by the Field
Manager or his/her appropriate representative. A
period of at least 30 days from the time of contact shall
be provided for surface owners to convey their
preference to the Field Manager.
(k) If the plan involves potential for coal leasing, a
public hearing shall be provided prior to the approval of
the plan, if requested by any person having an interest
which is, or may be, adversely affected by
implementation of such plan. The hearing shall be
conducted as prescribed in §3420.1-5 of this title and
may be combined with a regularly scheduled public
meeting. The authorized officer conducting the hearing
shall:
(1) Publish a notice of the hearing in a newspaper of
general circulation in the affected geographical area at
least once a week for 2 consecutive weeks;
(2) Provide an opportunity for testimony by anyone
who so desires; and
(3) Prepare a record of the proceedings of the hearing.
S8la
2005 CFR 43 §1610.5-3
(a) All future resource management authorizations and
actions, as well as budget or other action proposals to
higher levels in the Bureau of Land Management and
Department, and subsequent more detailed or specific
planning, shall conform to the approved plan.
(b) After a plan is approved or amended, and if
otherwise authorized by law, regulation, contract,
permit, cooperative agreement or other instrument of
occupancy and use, the Field Manager shall take
appropriate measures, subject to valid existing rights,
to make operations and activities under existing
permits, contracts, cooperative agreements or other
instruments for occupancy and use, conform to the
approved plan or amendment within a reasonable
period of time. Any person adversely affected by a
specific action being proposed to implement some
portion of a resource management plan or amendment
may appeal such action pursuant to 43 CFR 4.400 at the
time the action is proposed for implementation.
(c) If a proposed action is not in conformance, and
warrants further consideration before a plan revision is
scheduled, such consideration shall be through a plan
amendment in accordance with the provisions of
$1610.5-5 of this title.
(d) More detailed and site specific plans for coal, oil
shale and tar sand resources shall be prepared in
accordance with specific regulations for those
resources: Group 3400 of this title for coal; Group 3900
of this title for oil shale; and part 3140 of this title for
tar sand. These activity plans shall be in conformance
with land use plans prepared and approved under the
provisions of this part.
2005 CFR 43 §1610.5-5
A resource management plan may be changed through
amendment. An amendment shall be initiated by the
need to consider monitoring and evaluation findings,
new data, new or revised policy, a change in
circumstances or a proposed action that may result in a
change in the scope of resource uses or a change in the
terms, conditions and decisions of the approved plan.
An amendment shall be made through an
environmental assessment of the proposed change, or
an environmental impact statement, if necessary, public
involvement as prescribed in §1610.2 of this title,
interagency coordination and consistency
determination as prescribed in §1610.3 of this title and
any other data or analysis that may be appropriate. In
all cases, the effect of the amendment on the plan shall
be evaluated. If the amendment is being considered in
response to a specific proposal, the analysis required for
the proposal and for the amendment may occur
simultaneously. ’
(a) If the environmental assessment does not disclose
significant impact, a finding of no significant impact
may be made by the Field Manager. The Field Manager
shall then make a recommendation on the amendment
to the State Director for approval, and upon approval,
the Field Manager shall issue a public notice of the
action taken on the amendment. If the amendment is
approved, it may be implemented 30 days after such
notice.
(b) If a decision is made to prepare an environmental
impact statement, the amending process shall follow
the same procedure required for the preparation and
approval of the plan, but consideration shall be limited
to that portion of the plan being considered for
83a
amendment. If several plans are being amended
simultaneously, a single environmental impact
statement may be prepared to cover all amendments.
2005 CFR 43 §1610.5-6
A resource management plan shall be revised as
necessary, based on monitoring and evaluation findings
(§1610.4-9), new data, new or revised policy and
changes in circumstances affecting the entire plan or
major portions of the plan. Revisions shall comply with
all of the requirements of these regulations for
preparing and approving an original resource
management plan.
43 CFR § 8340.0-5 Definitions.
As used in this part:
(a) Off-road vehicle means any motorized vehicle
capable of, or designed for, travel on or immediately
over land, water, or other natural terrain, excluding:
(1) Any nonamphibious registered motorboat;
(2) Any military, fire, emergency, or law enforcement
vehicle while being used for emergency purposes;
(3)-Any-vehicle whose use is expressly authorized by
the authorized officer, or otherwise officially approved;
(4) Vehicles in official use; and
(5) Any combat or combat support vehicle when used in
times of national defense emergencies.
(b) Public lands means any lands the surface of which is
administered by the Bureau of Land Management.
(c) Bureau means the Bureau of Land Management.
(d) Official use means use by an employee, agent, or
designated representative of the Federal Government
or one of its contractors, in the course of his
84a
employment, agency, or representation.
(e) Planning system means the approach provided in
Bureau regulations, directives and manuals to
formulate multiple use plans for the public lands. This
approach provides for public participation within the
system.
(f) Open area means an area where all types of vehicle
use is permitted at all times, anywhere in the area
subject to the operating regulations and vehicle
standards set forth in subparts 8341 and 8342 of this
title.
(g) Limited area means an area restricted at certain
times, in certain areas, and/or to certain vehicular use.
These restrictions may be of any type, but can
generally be accommodated within the following type of
categories: Numbers of vehicles; types of vehicles; time
or season of vehicle use; permitted or licensed use only;
use on existing roads and trails; use on designated
roads and trails; and other restrictions.
(h) Closed area means an area where off-road vehicle
use is prohibited. Use of off-road vehicles in closed
areas may be allowed for certain reasons; however,
such use shall be made only with the approval of the
authorized officer.
(i) Spark arrester is any device which traps or destroys
80 percent or more of the exhaust particles to which it
is subjected.
43 CFR § 8341.2 Special rules.
(a) Notwithstanding the consultation provisions in
§8342.2(a), where the authorized officer determines that
off-road vehicles are causing or will cause considerable
adverse effects upon soil, vegetation, wildlife, wildlife
habitat, cultural resources, historical resources,
85a
threatened or endangered species, wilderness
suitability, other authorized uses, or other resources,
the authorized officer shall immediately close the areas
affected to the type(s) of vehicle causing the adverse
effect until the adverse effects are eliminated and
measures implemented to prevent recurrence. Such
closures will not prevent designation in accordance with
procedures in subpart 8342 of this part, but these lands
shall net be opened to the type(s) of off-road vehicle to
which it was closed unless the authorized officer
determines that the adverse effects have been
eliminated and measures implemented to prevent
recurrence.
(b) Each State director is authorized to close portions of
the public lands to use by off-road vehicles, except
those areas or trails which are suitable and specifically
designated as open to such use pursuant to subpart
8342 of this part.
43 CFR § 8364.1 Closure and restriction orders.
(a) To protect persons, property, and public lands and
resources, the authorized officer may issue an order to
close or restrict use of designated public lands.
(b) Each order shall:
(1) Identify the public lands, roads, trails or waterways
that are closed to entry or restricted as to use;
(2) Specify the uses that are restricted;
(3) Specify the period of time during which the closure
or restriction shall apply;
(4) Identify those persons who are exempt from the
closure or restrictions;
(5) Be posted in the local Bureau of Land Management
_ Office having jurisdiction over the lands to which the
order applies;
86a
(6) Be posted at places near and/or within the area to
_ which the closure or restriction applies, in such manner
and location as is reasonable to bring prohibitions to the
attention of users;
(7) Include a statement on the reasons for the closure;
and
(c) In issuing orders pursuant to this section, the
authorized officer shall publish them in the Federal
Register.
(d) Any person who fails to comply with a closure or
restriction order issued under this subpart may be
subject to the penalties provided in §8360.0-7 of this
title.
40 CFR § 1502.7 Page limits.
The text of final environmental impact statements (e.g.,
paragraphs (d) through (g) of §1502.10) shall normally
be less than 150 pages and for proposals of unusual
scope or complexity shall normally be less than 300
pages.
40 CFR § 1506.11 Emergencies.
Where emergency circumstances make it necessary to
take an action with significant environmental impact
without observing the provisions of these regulations,
the Federal agency taking the action should consult
with the Council about alternative arrangeinents.
Agencies and the Council will limit such arrangements
to actions necessary to control the immediate impacts of
the emergency. Other actions remain subject to NEPA
review.
87a
§ 1508.9 Environmental assessment.
Environmental assessment:
(a) Means a concise public document for which a
Federal agency is responsible that serves to:
(1) Briefly provide sufficient evidence and analysis for
determining whether to prepare an environmental
impact statement or a finding of no significant impact.
(2) Aid an agency's compliance with the Act when no
environmental impact statement is necessary.
(3) Facilitate preparation of a statement when one is
necessary.
(b) Shall include brief discussions of the need for the
proposal, of alternatives as required by section
102(2)(E), of the environmental impacts of the proposed
action and alternatives, and a listing of agencies and
persons consulted.
88a
BLM Information Clearance Officer.
[FR Doc. 99-10544 Filed 4-26-99; 8:45 am]
BILLING CODE 4310-84-M
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[UT-020-09-1220-00]
Notice of Closure of Public Lands
AGENCY: Bureau of Land Management, Interior.
ACTION: Notice of closure of public lands.
SUMMARY: Notice is hereby given that effective
immediately, the public lands within Broad Hollow
Unit, Kilgore Basin Unit, Meadows Unit, as legally
described below, are seasonally closed from January 1
to April 30 to all motorized vehicle use. The purpose of
this closure is to protect wildlife, including critical deer
and sage grouse habitat. Exemptions to this closure will
apply to administrative personnel of the Bureau of
Land Management, BLM authorized permittees and
Law Enforcement Personnel. Other exemptions to this
closure order may be made on a case by case basis by
the authorized officer. This seasonal closure will remain
in effect until further notice.
LEGAL DESCRIPTION: This closure order applies
to the following lands administered by the Bureau of
Land Management, Salt Lake Field Office, within Box
Elder County, Utah.
Broad Hollow Unit
T.14 N., R.16 W., SLBM
All public lands located in:
Sec. 8 and 9 south of the Upper Narrows
Road,
Sec. 10 SW1A, SL2S12SE14,
Sec. 14 W12,
Sec. 17 east of the Upper Narrows Road,
and
Sec. 20 E12, SY2SW1/4.
Kilgore Basin Unit
T.9 N., R.18 W., SLBM
All public lands located in:
Sec. 6 south of Toms Cabin Road,
Sec. 8 west of the Old Grouse Creek Road,
See. 18,
Sec. 20 west of the Old Grouse Creek Road,
and
Sec. 30 north of Cabin Springs Road.
T.10 N., R.18 W., SLBM
All public lands in
Sec. 30 located south of Toms Cabin Road.
T.9 N., R.19 W., SLBM
All public lands located in:
Sec. 4, 10, 12, 14, 24, 26,
Sec. 22 E12, EV2NWI1A, SW1A, and
all of See. 28 and 34 north of Cabin Springs Road.
T.10 N., R.19 W., SLBM
The following public lands west of Toms Cabin Road:
Sec. 28 E12, Lots 14, SEIANW14,
E128SW14,
Sec. 34 E12, E12W12, NWIANWIA,
WI12SWIA.
Meadows Unit
T.11 N., R.16 W., SLBM
All of See. 22, 23, 26, 27, 28, 34, and
All of the public lands in Sec. 33 located north of the
Ingham Pass County Road.
‘FOR FURTHER INFORMATION CONTACT: The
Bureau of Land Management, Salt Lake Field Office,
2370 S. 2300 W., SLC, UT 84119, telephone (801)977-
4300.
90a
SUPPLEM?L../TARY INFORMATION: The
authority for this closure is 43 CFR 8341.2 and 43 CFR
8364.1. Violations of this closure are punishable by a
fine not to exceed $1,000 and/or imprisonment not to
exceed 12 months as provided in 43 CFR 8360.0-7.
Glenn A. Carpenter,
Salt Lake Field Manager.
[FR Doc. 99-10531 Filed 4-26-99; 8:45 am]
BILLING CODE 4310-DQ-P
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[UT-020-00-1220-00]
Notice of Closure of Public Lands
AGENCY: Bureau of Land Management, Interior.
ACTION: Notice of Closure of Certain Public Lands in
Box Elder County, Utah to Off Road Vehicle Use.
SUMMARY: Notice is hereby given that effective
immediately, selected public lands administered by the
Bureau of Land Management (BLM), Salt Lake Field
Office, within western Box Elder County are closed to
off road vehicle (ORV) (also commonly referred to as off
highway vehicle—OHV) use on an interim emergency
basis. This action will allow BLM to address concerns
related to unrestricted cross country travel in the
specific places where we now have resource damage.
The purpose of this closure is to protect wildlife,
wildlife habitat, rangeland resources, soil, vegetation,
cultural resources, historical resources, and other
resources from ongoing and imminent adverse impacts
from ORV use. Exemptions to this closure will apply
for administrative and management purposes for the
Bureau of Land Management, BLM authorized
permittees, and law enforcement personnel. Other
9la
exemptions to this closure order may be made on a case
by case basis by the authorized officer. This emergency
closure will remain in effect until BLM completes a land
use plan amendment for OHV management.
FOR FURTHER INFORMATION CONTACT:
Alice Stephenson, Environmental Coordinator, Bureau
of Land Management, Salt Lake Field Office, 2370 S.
2300 W., Salt Lake City, UT 84119, telephone (801) 977-—
4300.
SUPPLEMENTARY INFORMATION: As _ an
interim measure, BLM is joining Box Elder County, the
U.S. Forest Service and the State of Utah Sovereign
Lands in imposing restrictions for OHV use on public
lands in western Box Elder County. The BLM is
temporarily closing selected public lands to off highway
vehicle use consistent with the County’s access road
management plan and related map. The new
restrictions for public lands, which are identified on the
map, include full closure of very limited lands, seasonal
closures of specific lands and closures to cross country
travel for certain lands. This plan was adopted on July
7, 1998, by the Box Elder County Commission as
Ordinance No. 222 which applies to western Box Elder
County. This ordinance is the product of
recommendations made by the West Box Elder Access
Management Team with extensive public involvement
and support from BLM, State Sovereign Lands, and the
U.S. Forest Service (USFS). With this interim
emergency action, BLM joins the County, USFS and
State Sovereign Lands in providing consistent OHV
management in western Box Elder County regardless
of land ownership. Without this action, and because all
other lands in western Box Elder County have OHV
restrictions, BLM public lands, which are currently
open to OHV use without restriction, would be subject
92a
to increasing impacts from OHV use. These closures
are a temporary action to protect public lands highway
vehicle—OHV) use on an interim emergency basis. This
action will allow BLM to address concerns related to
unrestricted cross country travel in the specific places
where we now have resource damage. The purpose of
this closure is to protect wildlife, wildlife habitat,
rangeland resources, soil, vegetation, cultural
resources, historical resources, and other resources
from ongoing and imminent adverse impacts from ORV
use. Exemptions to this closure will apply for
administrative and management purposes for the
Bureau of Land Management, BLM authorized
permittees, and law enforcement personnel. Other
exemptions to this closure order may be made on a case
by case basis by the authorized officer. This emergency
closure will remain in effect until BLM completes a land
use plan amendment for OHV management.
FOR FURTHER INFORMATION CONTACT:
Alice Stephenson, Environmental Coordinator, Bureau
of Land Management, Salt Lake Field Office, 2370 S.
2300 W., Salt Lake City, UT 84119, telephone (801) 977-
4300.
SUPPLEMENTARY INFORMATION: As _ an
interim measure, BLM is joining Box Elder County, the
U.S. Forest Service and the State of Utah Sovereign
Lands in imposing restrictions for OHV use on public
lands in western Box Elder County. The BLM is
temporarily closing selected public lands to off highway
vehicle use consistent with the County’s access road
management plan and related map. The new
restrictions for public lands, which are identified on the
map, include full closure of very limited lands, seasonal
closures of specific lands and closures to cross country
.travel for certain lands. This plan was adopted on July
93a
7, 1998, by the Box Elder County Commission as
Ordinance No. 222 which applies to western Box Elder
County. This ordinance is the product of
recommendations made by the West Box Elder Access
Management Team with extensive public involvement
and support from BLM, State Sovereign Lands, and the
U.S. Forest Service (USFS). With this interim
emergency action, BLM joins the County, USFS and
State Sovereign Lands in providing consistent OHV
management in western Box Elder County regardless
of land ownership. Without this action, and because all
other lands in western Box Elder County have OHV
restrictions, BLM public lands, which are currently
open to OHV use without restriction, would be subject
to increasing impacts from OHV use. These closures
are a temporary action to protect public lands and
resources until BLM completes the proposed plan
amendment for offhighway vehicle designations for
public lands in Box Elder County, Notice of Intent
published April 15, 1997.
Imposing the OHV use restrictions will protect wildlife,
wildlife habitat, soil, vegetation, cultural resources,
historical resources, and other resources from damage
by off-highway vehicles (OHVs).
This closure shall not be construed as a limitation on
BLM’s future planning and off-highway vehicle route
designations.
The referenced map and ordinance is available for
review at the above address and at the Box Elder
County Mapping Department.
The authority for this closure is 43 CFR 8341.2 and 43
CFR 8364.1.
Violations of this closure are punishable by a fine not to
exceed $1,000 and/or imprisonment not to exceed 12
months as provided in 43 CFR 8360.0-7.
94a
Sally Wisely,
State Director.
[FR Doc. 00-7551 Filed 3-27-00; 8:45 am]
BILLING CODE 4310-DQ-P
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[UT-062-01-1220-AA]
Notice of Camping and Wood Cutting and Gathering
Restrictions, Moab Field Office
AGENCY: Bureau of Land Management
(BLM), DOI.
ACTION: Notice of camping and wood cutting and
gathering restrictions—
Moab Field Office, Utah.
SUMMARY: This notice, applicable to specified public
lands administered by the BLM Moab Field Office,
limits camping to developed campgrounds and
designated sites, allows BLM to limit the size of
designated camping areas, and requires the use of
portable toilets at these designated sites where toilets
are not provided. The notice also prohibits wood cutting
and gathering, including Christmas tree cutting, for
these intensively used areas and the Sand Flats
Recreation Area. These actions are implemented on an
interim basis to protect natural resources pending
revision of the Resource Management Plan (RMP) for
the area administered by the Moab Field Office.
DATES: This notice is effective January
22, 2001, and shall remain in effect until modified or the
RMP is amended.
FOR FURTHER INFORMATION CONTACT:
Russell von Koch, Resource Advisor, BLM Moab Field
Office, 82 East Dogwood Avenue, Moab, Utah 84532 or
telephone 435-259--2100.
95a
SUPPLEMENTARY INFORMATION: Frequent
use of public lands near Moab, Utah for camping at
undeveloped sites and associated wood cutting and
gathering is damaging soils, vegetation, and scenic
values at local destination areas and along popular
trails and roads. The following actions are necessary to
limit impacts to natural resource values and maintain
the quality of recreation opportunities.
Camping Restrictions Along Highway and Road
Corridors
Camping with vehicles on BLM administered public
land within one-half mile of the following highways and
roads is limited to developed campgrounds and
designated sites on a year-round basis to protect scenic
values, reduce damage to soils and vegetation, and
provide for public safety:
(1) Utah Highway 313;
(2) The Island in the Sky entrance road between Utah
Highway 313 and Canyonlands National Park;
(3) The Gemini Bridges route (primarily Grand Co. No.
118) and the spur route from it into “The Bride
Canyon;”
(4) The Kane Creek Canyon Rim route from U.S.
Highway 191 to where it crosses the eastern boundary
of section 20, T. 27 S., R. 22 E. exclusive of the state and
private land west of BKiue Hill; and (5) Lands within
Long Canyon north of the Colorado Riverway
Recreation Area and south of the State land at the head
of the canyon within one-half mile of the Long Canyon
Road (Grand Co. No. 135).
Other Camping Restrictions
Camping with vehicles on BLM administered public
lands is also limited for the above reasons to developed
96a
campgrounds and designated sites on a year-round
basis in the following areas:
(1) The lands along both sides of U.S. 191 bounded by
Arches National Park on the east, private lands in
Moab Valley on the south, the Potash Rail Spur on the
west, and private and State lar 1 near the lower Gemini
Bridges Trailhead on the north;
(2) Lands located between the road to Nefertiti Rapid
(Grand Co. No. 154) and the shoreline of the Green
River along the east side of the river from the public
land boundary near Swaseys Take-out upstream to the
upper end of the Nefertiti Rapid parking area;
(3) Lands including the Pace Hill, Castle Rock, Ida
Gulch, Professor Valley, Mary Jane Canyon, and the
upper Onion Creek areas that are south of the Colorado
Riverway Recreation Area as established in 1992,
below the rims of Adobe and Fisher Mesas, and west of
the private land in Fisher Valley;
(4) Lands along the Potash Trail (Grand Co. No. 134,
the road between the western end of Utah Highway
279 and Canyonlands National Park) that are east of
Canyonlands National Park; south of Dead Horse Point
State Park, and other state and private lands, north of
the Colorado River, and west of the Colorado Riverway
Recreation Area as established in 1992, excluding
riverside campsites accessible by water craft from the
Colorado River; and
(5) Lands within the Mill Creek Canyon Planning Area.
Backpack type camping within the Mill Creek Planning
Area is allowed at sites one-quarter mile or farther
from designated roads and greater than 100 feet from
Mill Creek and from archaeological sites. All camping
continues to be prohibited in the Powerdam and Flat
Pass areas under a previously published notice.
97a
For all of the above locations, at developed
campground
This text is long and has been trimmed here. Open the source document for the complete record.
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.