Petition for Writ of Certiorari — Applied Companies Companies v. Geren (No. 06-817)
Supreme Court brief2006
Ask Donna
What actually matters in this document.
Text
Supreme Court, U.S.
FILEO
06-81 70cC 08 2006
No. OFFICE OF THE CLERK
In the
Supreme Court of the United States
APPLIED COMPANIES,
Petitioner,
V.
FRANCIS J. HARVEY,
Secretary of the Army,
Respondent.
On Petition for a Writ of Certiorari to the United
States Court of Appeals for the Federal Circuit
PETITION FOR WRIT OF CERTIORARI
PeTerR B. JONES
(Counsel of Record)
JONES & DONOVAN
3636 Bircu STREET
SurrE 210
Newport BEAcH, CA 92660
(949) 833-8893
Counsel for Petitioner
Applied Companies
Becker Gallagher + Cincinnan, OH - Washington. DC. ° 8U0. Sey) SiN
pf pes | tf
i
QUESTION PRESENTED
At issue is the vitality of the Supreme Court’s rule limiting
issues absent a cross-appeal; specifically:
May a court of appeals entertain an appellee’s affirmative
defense to liability, rejected at trial level, where the appellee
has not cross-appealed?
ee.
PARTIES TO THE PROCEEDING
(and Corporate Disclosure Statement) -
Petitioner
Applied Companies is a California corporation, which has
not issued shares to the public. No publicly held corporation
owns any of Applied Companies’ stock.
Respondent
Respondent is the United States of America acting by and
through the Department of the Army, Francis J. Harvey,
~ Secretary.
iil
TABLE OF CONTENTS |
Page
CUSSION PMMRINEED coccccse ere venseewas i
PARTIES TO THE PROCEEDING ......ccccccess 1
py 2 gt Be se manera iii
TA GF RTE 5 oe ee eo ob eae Vv
PORN ks hb vee ee Ree ]
BASIS FOR JURISDICTION .... 0... ee cee eee J
RECFULA TRI IN VOIVED «cece ea cen wees 2
STATEMENT OF THE CASE .. 2... ccc eevee 2
ARGUMENT FOR GRANTING THE WRIT ....... 6
A. THE FEDERAL CIRCUIT’S DECISION
FLOUTS AN “INVETERATE AND CERTAIN”
RULE THAT LIMITS ISSUES ABSENT A
CROSS-APPEAL
B. THE - FEDERAL CIRCUIT’S DECISION
FLOUTS THE CROSS-APPEAL RULE IN
ORDER TO CONTINUE THAT COURT'S
PATH OF DISCARDING COMMERCIAL
CONTRACT LAW, CONTRARY TO SUPREME
COURT INSTRUCTIONS TO APPLY THAT
CONCLUSION
APPENDIX
Appendix A - Federal Circuit Order Denying
I IE I eo. Vio no wv soe la
Appendix B - Federal Circuit Errata Sheets of 8/23/06
and 7/14/06 and Federal Circuit Opinion
UU oo ais he ee eae 8 ee 2a
Appendix C - Federal Circuit Judgment
PE 6 6 ek ksi a od ree ew ae 14a
Appendix D - Armed Services Board of Contract
Appeals Opinion of 11/2/04 ............... 15a
Appendix E - Armed Services Board of Contract
Appeals Opinion on Appellant’s Motion for
mecomenberation OF GITSIGS 2. ce ees 85a
Vv
TABLE OF AUTHORITIES
: Page
Cases
B.F. Goodrich Co. v. United States,
Se ae ee CER, BD. co Oe eo eck Caw 12
Brownlee v. Dyncorp,
349 F.3d 1343 (Fed.Cir. 2003)
El Paso Natural Gas Co. v. Neztsosie,
526 U.S. 473, 119 S.Ct. 1430,
SAS 5 ae Ce vcs cs ew ha eS 6,7
Lynch v. United States,
292 U.S. 571, 54 S.Ct. 840,
78 L.Ed. 1434 (1934)
Mobil Oil Exploration and Producing, Southeast, Inc.
v. United States,
530 U.S. 604, 120 S.Ct. 2423,
54F 5 Oe CR onc ba oo we ee oe 12
Morley Constr. Co. v. Maryland Casualty Co.,
300 U.S. 185, 57 S.Ct. 325,
81 L.Ed. 593 (1937)
Perry v. United States,
294 U.S. 330, 55 S.Ct. 432,
79 L.Ed. 912 (1935)
TEG-Paradigm Environmental, Inc. v. United States,
Federal Circuit No. 06-5007 (September 29, 2006) . 13
2
vi
United States v. ITT Continental Baking Co..,
420 U.S. 223, 95 S.Ct. 926,
TP Eee SP CIRIOE 6 vo vec ca ccd tetewe 4,7,8
United States v. National Exchange Bank of
Baltimore, Md..,
270 U.S. 527, 46 S.Ct. 388,
Se. Pe CO on oc ao ok eee eae 12
United States v. Winstar Corp.,
518 U.S. 839, 116 S.Ct. 2432,
Par cee Oe CE 9 x ve 6 mk a wk iin wb eles 12
Statutes
ee es Oe ee i ere 8 bk ks ere eevee !
UI MS a NOs ar rr sh pias she mais a
Rules
NII oh eg a aah ee eee 3
Ni a Sle Gra ta ata taie and l
Regulations
Lak, bo og Ee aaa en rene pare sane ne 1]
ee te ee RE ke ke eee ee ees 2,9
Other Authorities
Graham, “Departing From Hadley: Recovering Lost
Profits on Collateral Undertakings in Suits Against
The Government,”
35 Pub. Cont. L..J. 43 (2005)
Vil
Johnson, “Interpreting Government Contracts: Plain
Meaning Precludes Extrinsic Evidence and Controls
at the Federal Circuit,”
oe ree. Cee. 1. 5. GS Ge sec ce eears 13
Restatement of Contracts (2d)
I
PETITION FOR WRIT OF CERTIORARI
OPINIONS BELOW
Armed Services Board of Contract Appeals:
Applied Companies, ASBCA Nos. 50593, 52102, 99-2
BCA 4 30,554 (on cross-motions for summary
judgment).
Applied Companies, ASBCA No. 50593, 04-2 BCA
q 32,786 (on the merits).
Applied Companies, ASBCA No. 50593, 05-2 BCA
¢ 32,986 (on motion for reconsideration).
Federal Circuit Court of Appeals:
Applied Companies v. Harvey, 456 F.3d 1380 (2006)
BASIS FOR JURISDICTION
The judgment and opinion of the United States Court of
- Appeals for the Federal Circuit were entered and issued on
July 14, 2006. Applied Companies filed a timely petition for
panel rehearing on August 17, 2006, within the 45 days
allowed by FRAP 40(a)(1). Substantive changes to the
Federal Circuit’s opinion were made by “errata” dated
August 23, 2006. The petition for panel rehearing was denied
by order dated September 12, 2006. This petition for
certiorari is filed within 90 days of that order. The Supreme
Court’s jurisdiction is invoked pursuant to 28 U.S.C.
§§ 1254(1) and 2106.
2
REGULATION INVOLVED
Federal Acquisition Regulation (FAR) 48 CFR Part 48 -
“Value Engineering” and 48 CFR § 52.248-1, contract clause
entitled “Value Engineering”, pertinent portions of which are
set out in the Appendix pp. 17a-20a.
STATEMENT OF THE CASE
Military-specification air conditioners come in five sizes.
Applied Companies contracted with the United States Army
to supply air conditioners in the 36,000 BTU size. The
contract included the standard “Value Engineering” (VE)
clause, 48 CFR (FAR) § 52.248-1. Applied submitted and
the government accepted a value engineering change proposal
(VECP). The VE change reduced the costs of air
conditioners by $2,979 apiece. Appendix pp. 40a-45a
(Finding 18).
The VE clause provides that a contractor is to receive a
50% share of three years’ savings on future contracts for
“essentially the same item.” Applied claimed a 50% share of
savings on military-specification air conditioners in five sizes
on grounds that all five were “essentially the same.” The
government asserted a defense of accord and satisfaction and
denied liability for any future contract savings. That defense
was based on the wording of bilateral contract modification
P9, which conditionally accepted the VECP (subject to
testing).
Applied’s claim was decided by the Armed Services Board
of Contract Appeals (ASBCA) pursuant to the Contract
Disputes Act, 41 U.S.C. § 607. The ASBCA’s decision,
3
under the heading “Entitlement,”' denied the Government’s
accord-and-satisfaction defense, and decided that the
contractor was entitled to share in future contract savings.
Appendix pp. 48a-55a. Under the heading “Quantum,” the
ASBCA awarded the contractor $1,000,947, as its share of
savings on future contracts for 36,000 BTU air conditioners.
The ASBCA plurality declined to award a share in future
contract savings for military-specification air conditioners in
the other four sizes on grounds that the contractor had failed
to carry a burden to prove the dollar quantum of savings on
each of those other “configurations” of air conditioners.
Appendix pp. 63a and 84a.
Pursuant to 41 U.S.C. § 607(g)(1)(A), Applied appealed
the ASBCA’s decision to the Federal Circuit Court of
Appeals. Applied’s brief presented and argued the issues
whether the ASBCA applied the correct law in determination
of quantum.
The government did not appeal pursuant to 41 U.S.C.
§ 607(g)(1)(B)’ or file a cross-appeal pursuant to FRAP
4(a)(3). But in appellee’s brief the government argued that in
modification P9 “Applied Companies Abandoned Any Claim
' It is the ASBCA’s long-standing practice to bifurcate its cases into
phases of “entitlement,” meaning liability, and “quantum,”
meaning dollar amount of the claimant’s recovery. See e.g.
Brownlee v. Dyncorp, 349 F.3d 1343, 1347-1349 (Fed.Cir. 2003).
’ The Contract Disputes Act, 41 U.S.C. § 607(g)(1), gives both the
contractor and the government 120 days to appeal to the Federal
Circuit. Applied’s notice of appeal was filed 58 days after the date
of the ASBCA’s order denying reconsideration. Therefore the
government had plenty of time after notice of Applied’s appeal to
file its own appeal.
4
For Compensation Based On Other Contracts” and that, “the
board erred in refusing to enforce the plain meaning of ...
modification [P9].”* Applied’s reply brief argued that, absent
a cross-appeal, the government’s argument of error in the
ASBCA’s adjudication of entitlement, rejecting the
government’s affirmative defense, was not cognizable by the
court of appeals.
Without acknowledging the cross-appeal rule, the Federal
Circuit entertained the appellee’s argument that the ASBCA’s
adjudication of the affirmative defense to liability was error,
held that the appellant was not entitled to any recovery, and
“affirmed” an award of $1 million on grounds that the correct
award was zero. The Federal Circuit’s decision is based on
that court’s interpretation of mod P9, in disagreement with the
ASBCA:
* The government’s appellee’s brief conceded that the ASBCA’s
quantum decision was “flawed” and resorted to the argument that
Applied “abandoned” its right to share in any future contract
savings as an “alternative basis for affirming the board.” Brief for
Appellee dated January 27, 2006, pp.26-27. Compare with
respondent's arguments in United States v. ITT Continental Baking
5
“... we hold that mod P9 and mod P15,* read
together harmoniously, clearly provide that Applied is
not entitled to a share in future savings.
“Because the agreement between Applied and the
Army provided unambiguously that Applied was not
entitled to share in any future savings, the Board
correctly declined to award Applied a share of future
savings for additional AC models. Accordingly, the
decision of the Board is AFFIRMED.” Emphasis
added. Appendix pp. 11a and 13a.
* Contract modification P15 was a- unilateral modification not
signed by the contractor. The government did not argue that
modification P15 was part of the parties’ agreement. The Federal
Circuit’s “reading” of modification P15 into the parties’ agreement
was done sua sponte. The Federal Circuit’s original opinion stated
that the parties’ agreement consisted of mod P9 and “... mod P15,
which unconditionally accepted the VECP.” After Applied filed a
petition for panel rehearing on August 17, 2006, noting the
inaccuracy of the court’s characterization of PI5, the Federal
Circuit issued an “errata” dated August 23, 2006 which made
substantive changes to the original decision including replacement
of the court’s characterization of mod PI5 with “... mod P15,
which definitized mutually agreed upon cost savings data in
accordance with Applied Companies’ fax of December 20, 1991.”
Appendix p. 2a.
6
ARGUMENT FOR GRANTING THE WRIT
A. THE FEDERAL CIRCUIT’S DECISION FLOUTS AN
“INVETERATE AND CERTAIN” RULE THAT
LIMITS ISSUES ABSENT A CROSS-APPEAL. _
__ By entertaining an appellee’s argument attacking the trial
tribunal’s ruling against an affirmative defense, without a
cross-appeal, and by allowing that defense as the basis for
decision, the Federal Circuit has so far departed from the
accepted and usual course of judicial proceedings as to call
for an exercise of the Supreme Court’s supervisory power.
Repeated Supreme Court decisions establish the principle
that “[a]bsent a cross-appeal, an appellee may ‘urge in
support of a decree any matter appearing in the record,
although his argument may involve an attack upon the
reasoning of the lower court,’ but may not ‘attack the [lower
court’s] decree with a view either to enlarging his own rights
thereunder or of lessening the rights of his adversary.’
[Citations omitted.]” El Paso Natural Gas Co. v. Neztsosie.
526 U.S. 473, 119 S.Ct. 1430, 1434-1435, 143 L.Ed.2d 635
(1999). In its last statement of the cross-appeal rule, the
Supreme Court took the trouble to state that it had “repeatedly
affirmed” the rule, that it was recognized “as early as 1796,”
and that “more than 60 years ago we spoke of it as ‘inveterate
and certain.’” Ibid, 526 U.S. at 479-480, 119 S.Ct. at 1434-
1435.
In this case, without a cross-appeal, the Federal Circuit
entertained and adopted an argument that revived an
affirmative defense to any liability which the appellee had lost
below. The Federal Circuit thereby flouted the Supreme |
Court's rule without even acknowledging its existence (even
though the rule was invoked in the appellant's reply brief).
7
It is no answer to the cross-appeal rule to assert that the
appellee accepted the judgment below and therefore did not
seek to lessen the rights won by his adversary. That is no
answer because the rule operates to limit issues; it “is meant
to protect institutional interests in orderly functioning of the
judicial system, by putting opposing parties and appellate
courts on notice of the issues to be litigated and encouraging
repose of those that are not.” El Paso Natural Gas Co. v.
Neztsosie, supra, 526 U.S. at 481-482, 119 S.Ct. at 1436.
The issue-specific nature of the rule is illustrated in Morley
Constr. Co. v. Maryland Casualty Co., 300 U.S. 185, 191,
57 S.Ct. 325, 81 L.Ed. 593 (1937) (which is cited in El Paso
Natural Gas, supra), in which the plaintiff-appellee had sought
alternative forms of relief, lost one and won the other, and did
not cross-appeal. The Supreme Court reversed a court of
appeals’ reinstatement of the relief that was lost because
“where only one party appeals the other is bound by the
decree in the court below and he cannot assign error in the
appellate court ...”. 300 U.S. at 191, 57 S.Ct. at 328. In
Applied’s case, the appellee government succeeded with the
assignment that “the board erred by refusing to enforce the
plain meaning of the relevant paragraphs of modification
PO00009” (by which paragraphs, the government argued,
“Applied Companies abandoned any claim for compensation
based on other contracts”). Brief for appellee dated January
27,2006, pp.42-43. The reasoning that an appellee, without
a cross-appeal, can re-argue a lost defense if he is willing to
accept the end result has been attempted and specifically
rejected by the Supreme Court. In United States v. ITT
Continental Baking Co., 420 U.S. 223, 95 S.Ct. 926, 43
L.Ed.2d 148 (1975), ITT had been held liable for a single
violation penalty. The Government appealed arguing for a
continuing violation and daily penalties. At the Supreme
Court, ITT did not cross-petition for certiorari but argued that
——
8
there had been no violation. The Court would .ot hear that,
stating:
“Respondent [ITT] recognizes that, not having
cross-petitioned, it cannot attack the judgment insofar
as it sustained the findings of violations and imposed
penalties for violations. [Citations, including Morley
Constr. Co., supra, omitted.] Respondent argues that
it may nevertheless seek to sustain the Court of
Appeals’ limitation on the penalties on the theory that
no penalty should have been awarded at all.
Ordinarily however ... we do not entertain a
challenge to a decision on the merits where the only
petition for certiorari presents solely a question of the
remedy granted for a liability found to exist, even if
the respondent is willing to accept whatever judgment
has already been entered against him.” 420 U.S. at
225 n.2., 95 S.Ct. at 929 n.2.
The Federal Circuit’s decision rides over the Supreme
Court’s “inveterate and certain” rule of limitation of issues on
appeal, without even acknowledging that rule. The Federal
Circuit’s decision usurps the authority to substitute that
court’s own determination of liability and of an affirmative
defense in a case in which a trial tribunal’s determination of
those matters was not appealed. The Supreme Court should
exercise its supervisory power to reverse that usurpation and
confirm the vitality of the cross-appeal rule.
9
B. THE FEDERAL CIRCUIT’S DECISION FLOUTS
THE CROSS-APPEAL RULE IN ORDER TO
CONTINUE THAT COURT’S PATH OF
DISCARDING COMMERCIAL CONTRACT LAW,
CONTRARY TO SUPREME COURT
INSTRUCTIONS TO APPLY THAT LAW.
The gravamen of the Federal Circuit’s decision is that
court’s interpretation of the parties’ written agreement
conditionally accepting Applied’s VECP. That agreement,
modification P9, included:
“It is mutually agreed that there will be no future
contract sharing provisions.”
and
“This price adjustment is an estimate ... the savings
are subject to negotiation and final adjustment ..
Further, it is mutually agreed that the negotiated
settlement method shall be the ‘Lump-Sum Settlement
Method.’” Appendix p. 29a.
The VE clause’s provision for a “lump sum” applies only to
future contract savings and is an alternative to “a series of
payments over time as future contracts are awarded”. 48
CFR § 52.248-1, “Value Engineering,” 4 (i)(4).2 The
ASBCA interpreted mod P9 to mean that there was no need
to provide for future contract sharing provisions because the
parties agreed to discharge the future savings in a single lump
sum. Appendix p. 52a. Rejecting (and mischaracterizing)
> “When the Government wishes and the Contractor agrees, the
Contractor's share of future contract savings may be paid in single
lump sum rather than in a series of payments over time as future
contracts are awarded.”
- 10
that interpretation, the Federal Circuit held that the “lump
sum” language adopted by the parties in their agreement was
“irrelevant” and meaningless:
“The Board also found mod P9's language that
‘the negotiated settlement method shall be the Lump-
Sum Settlement Method’ to contradict® language
indicating that Applied would not be entitled to future
savings, because the VE clause only mentions a lump-
sum settlement method as an option with future
contract savings. [Emphasis in original.
The inclusion in mod P9 of language referring to
the lump-sum payment method was, at most,
irrelevant. ... Accordingly, we hold that mod P9 and
mod P15, read together harmoniously clearly provide
that Applied is not entitled to a share in future
savings.” Appendix pp. 10a-l1la. Emphasis added.
° The Board made no such “finding” or conclusion of contradiction.
To the contrary, the Board interpreted mod P9 harmoniously and
coherently:
‘... a lump sum adjustment was the agreed procedure.
Therefore there would be no provision for future savings
by way of royalties as future AC units were procured.
Accordingly there was no need for ‘future contract sharing
provisions’ in the modification.” Appendix p. 52a.
11
The Federal Circuit’s interpretation’ offends a basic canon
of contract interpretation as set forth in Restatement of
Contracts (2d):
“§ 203. Standards of Preference in Interpretation
“(a) an interpretation which gives a reasonable,
lawful, and effective meaning to all the terms is
preferred to an interpretation which leaves a part
unreasonable, unlawful, or of no effect;”
It is hard to imagine an interpretation that would more offend
that rule than the Federal Circuit’s procrustean expedient of
simply lopping off a perfectly comprehensible sentence -
which bears precisely on the subject of a signed agreement —
as “irrelevant.”
The Federal Circuit’s decision offends another
fundamental rule of contract law: interpretation against the
draftsman. Ina finding of fact that is final, the ASBCA found
that mod P9 was “drafted by the government.” Appendix
pp. 26a-27a, Finding 11. The Restatement of Contracts (2d)
provides:
” No Government representative testified that the government held
or relied on an interpretation like the Federal Circuit’s. No
government representative testified to an intention that the
contractor would waive, release or exchange its VE clause right to
a share in future contract savings. Since 48 CFR (FAR) § 48.102
directs that “Agencies shall ... provide contractors a fair share of
the savings on accepted VECPs” it is questionable whether agency
contracting officials would have had authority to extract a waiver
of the contractor’s share.
12
“§ 206. Interpretation Against the Draftsman
In choosing among the reasonable meanings of a
promise or agreement or a term thereof, that meaning
is generally preferred which operates against the party
who supplies the words or from whom a writing
otherwise proceeds” .
That rule was held, by the Federal Circuit’s predecessor
court, to apply specifically to the VE clause. B.F. Goodrich
Co. v. United States, 398 F.2d 843, 847 (Ct.Cl. 1968)
(“Since this [VE] clause was drafted by the Government, it
should be read against the defendant.”) But the Federal
Circuit’s decision “interprets” the parties’ agreement in a
manner exceedingly adverse to the party who did not draft the
agreement — as a complete forfeiture of that party’s VE clause
right to share in millions of dollars of future contract savings.
Those actions of the Federal Circuit in this case are further
steps on the path taken by that court to discard established
commercial contract law, especially as set out in the
Restatement.
It is a principle, often restated by the Supreme Court, that
contracts of the United States are subject to the same law that
governs the contracts of private parties. United States v.
National Exchange Bank of Baltimore, Md., 270 U.S. 527,
534, 46 S.Ct. 388, 389, 70 L.Ed. 717 (1926) (“The United
States does business on business terms”); Lynch v. United
States, 292 U.S. 571, 579, 54 S.Ct. 840, 843, 78 L.Ed. 1434
(1934); Perry v. United States, 294 U.S. 330, 352, 55 S.Ct.
432, 435, 79 L.Ed. 912 (1935); United States v. Winstar
Corp., 518 U.S. 839, 895, 116 S.Ct. 2432, 2464-65, 135
L.Ed.2d 964 (1996). In Mobil Oil Exploration and
Producing, Southeast, Inc. v. United States, 530 U.S. 604,
607, 120 S.Ct. 2423, 2429, 147 L.Ed.2d 528 (2000), the
Supreme Court again reaffirmed the principle and noted “The
13
Restatement of Contracts reflects many of the principles of
contract law that are applicable to this case.”
In Applied’s case the Federal Circuit gave not even a nod
to the Restatement’s principles of “effective meaning to all
terms” and “interpretation against the draftsman,” §§ 203(a)
and 206, above. That is all of a piece with the Federal
Circuit’s path away from established contract law, as noted in
commentary: Johnson, “Interpreting Government Contracts:
Plain Meaning Precludes Extrinsic Evidence® and Controls at
the Federal Circuit,” 34 Pub. Cont. L. J. 635 (2005). (The
Circuit has not explained its reasons for rejecting the
Restatement _(Second)’s_ rules of contract interpretation.
Notwithstanding the Supreme Court’s insistence that the
general law of contracts governs federal contracts, the Circuit
* The Federal Circuit has recently restated its “ plain meaning” and
“extrinsic evidence” rules in TEG-Paradigm Environmental, Inc.
v. United States, No. 06-5007 (September 29, 2006), Slip Op. pp.
14-16, which asserts that “extrinsic evidence may not be used to
interpret an unambiguous contract provision.” Slip Op. at 15.
That rule is directly contra Restatement § 212, Comment b, “Plain
meaning and extrinsic evidence” which includes: “Any
determination of meaning or ambiguity should only be made in light
of the relevant evidence of the situation and relations of the parties
... preliminary negotiations and statements made therein ...” and
Comment c: “The rule of [§ 212] Subsection (1) permits reference
to the negotiations of the parties, including statements of intention
... $0 long as they are used to show the meaning of the writing.”
Emphasis added. In Applied’s case, the Federal Circuit
characterized the testimony of a government official (and Army
procuring activity Deputy Commander) to the Army’s intention as
“parol.” Appendix p. Ila. (Compare with Restatement § 213
“(Parol Evidence Rule)” (“A _ binding integrated agreement
discharges prior agreements to the extent that it is inconsistent with
them.” Emphasis added. ))
14
may see no need to explain ...”) Emphasis added. 34 Pub.
Cont. L.J. at 636 and 672.°
CONCLUSION
Certiorari should be granted and the Federal Circuit’s
decision should be reviewed and summarily reversed because
that decision deviates from established law limiting issues
cognizable by a court of appeals. The Federal Circuit’s
arrogation of power to decide issues excluded by the long-
standing cross-appeal rule calls for use of the Supreme
Court’s supervisory power. The Federal Circuit’s decision
unmistakably signals that, if not reined in, that court will
honor no such constraint on its power to entertain any issues
at all.
In addition, the Federal Circuit’s decision in this case
signals that that court will continue on its path of ignoring
established contract law, especially the Restatement of
Contracts 2d, and of fashioning wholly new law for contracts
of the government. It would be appropriate for the Supreme
Court also to rein in the Federal Circuit’s deviation from
established contract law.
® See also Graham, “Departing From Hadley: Recovering Lost
Profits on Collateral Undertakings in Suits Against The
Government,” 35 Pub. Cont. L.J. 43 (2005). (“In suits against the
Government Hadley [v. Baxendale, 156 Eng. Rep. 154 (1854)] is
subject to an important qualification. ... the Federal Circuit
generally holds that lost profits must flow from the contract with
the Government ... This rule ... constitutes a stark departure from
Hadley and the common law of contracts.” pp.59-60.)
15
Respectfully submitted,
Peter B. Jones
Counsel of Record
JONES & DONOVAN
3636 Birch Street, Suite 210
Newport Beach, CA 92660
PH: (949) 833-8893
Attorney for Petitioner
APPLIED COMPANIES