Appendix — Environmental Protection Agency v. New York, 127 S. Ct. 2127 (2007) (No. 06-736)
Supreme Court brief2007
Ask Donna
What actually matters in this document.
Text
Supreme Co
8 Fi as U.S.
06-736 Nov 27 2098
No. OFFICE OF THE cy BRK
In the Supreme Court of the Gnited States
UNITED STATES ENVIRONMENT PROTECTION
AGENCY, PETITIONER.
i Vv.
STATE OF NEW YORK, ET AL.
ON PETITION FOR A WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE DISTRICT OF COLUMBIA CIRCUIT
APPENDIX TO THE
PETITION FOR WRIT OF CERTIORARI
PAUL D. CLEMENT
Solicitor General
Counsel of Record
SUE ELLEN WOOLDRIDGE
Rocse ap rsesaide yom ; Assistant Attorney General
cting General Counse THOMAS G. HUNGER
Counsel of Record UD
ELLIOTT B. ZENICK Deputy Solicitor General
Assistant General Counsel JAMESA. FELDMAN _
j CA eh Assistant to the Solicitor
ctu C. Avannacs Geneval
United States Environmental THOMAS A. LORENZEN
Protection Agency ANGELINE PURDY
Washington, D.C. 20460 Attorneys
Department of Justice
Washington, D.C. 20530-0001
(202) 514-2217
TABLE OF CONTENTS
Page
Appendix A (court of appeals opinion, dated Mar. 17,
UTTER TUEUNEG ida svawesceeetcecrpsccces la
Appendix B (court of appeals’ denial of rehearing,
EE, abc vieecescrrecccevsccers 18a
Appendix C (rules and regulations (40 C.F .R. Pts. 51,
UPC EET asa dedcdodccecvccccecceescces 20a
(I)
APPENDIX A
UNITED STATES COURT OF APPEALS
DISTRICT OF COLUMBIA CIRCUIT
Nos. 03-1380, 03-1381, 03-1383, 03-1390,
03-1402, 03-1453, 03-1454, 04-1029,04-1035, 04-1064,
05-1234, 05-1287
STATE OF NEW YORK, ET AL., PETITIONERS
V.
ENVIRONMENTAL PROTECTION AGENCY, RESPONDENT
CLEAN AIR IMPLEMENTATION PROJECT, ET AL.,
INTERVENORS
Argued Feb. 8, 2006.
Decided March 17, 2006.
Rehearing en Bane Denied June 30, 2006
Before: ROGERS, TATEL and BROWN, Circuit Judges.
Opinion for the Court filed by Circuit Judge ROGERS
’ ROGERS, Circuit Judge.
(la)
2a
In New York v. EPA, 413 F.3d 3 (D.C. Cir. 2005)
(“New York I”), the court addressed the first of two
rules promulgated by the Environmental Protection
Agency providing ways for stationary sources of air pol-
lution toe avoid triggering New Source Review (“NSR”).
The court upheld in part and vacated in part the first
rule. /d. at 10-11. We now address the second rule, the
Equipment Replacement Provision (“ERP”), which
amends the Routine Maintenance, Repair, and Replace-
ment Exclusion (““RMRR”) from NSR requirements.
Under section 111(a)(4) of the Clean Air Act, 42 U.S.C.
§ 7411(a)(4), sources that undergo “any physical change”
that increases emissions are required to undergo the
NSR permitting process. See also id. §§ 7501(4),
7479(2)(C)(cross-referencing id. § 7411(a)(4)). The ex-
clusion has historically provided that routine mainte-
nance, repair, and replacement do not constitute
changes triggering NSR. The ERP both defined and
expanded that exclusion. EPA explained:
[The] rule states categorically that the replacement
of components with identical or functionally equiva-
lent components that do not exceed 20% of the re-
placement value of the process unit and does not
change its basic design parameters is not a change
and is within the RMRR exclusion.
Equipment Replacement Provision of the Routine Main-
tenance, Repair and Replacement Exclusion, 68 Fed.
Reg. 61,248, 61,270 (Oct. 27, 2003) (“Final Rule”); see
also 70 Fed. Reg. 33,838 (June 10, 2005) (“Reconsidera-
tion”). Hence, the ERP would allow sources to avoid
NSR when replacing equipment under the twenty-per-
cent cap notwithstanding a resulting increase in emis-
sions. The court stayed the effective date of the ERP on
3a
December 24, 2003. We now vacate the ERP because it
is contrary to the plain language of section 111(a)(4) of
the Act.
The Clean Air Act requires new and modified sources
of pollution to undergo NSR, a permitting process that
imposes specific pollution control requirements depend-
ing upon the geographic location of the source.' Section
111(a)(4) of the Act describes when a source is to be con-
sidered “modified”:
The term “modification” means any physical change
in, or change in the method of operation of, a station-
ary source which increases the amount of any air pol-
lutant emitted by such source or which results in the
emission of any air pollutant not previous emitted.
42 U.S.C. § 7411(a)(4) (emphasis added). Since the in-
ception of NSR, RMRR has been excluded from the de-
finition of “modification.” See 39 Fed. Reg. 42,510,
42,514 (Dec. 5, 1974); 43 Fed. Reg. 26,388, 26,403-04
(June 19, 1978). Heretofore, EPA applied the RMRR
exclusion through “a case-by-case determination by
' NSR consists of two programs: prevention of significant deteriora-
tion (“PSD”) and nonattainment NSR. See New York I, 413 F.3d at 11-
14. New and modified sources in attainment areas, i.e., where air
quality standards have been met, and in unclassifiable areas are
required to follow PSD rules, which means they must obtain a precon-
struction permit, prove that the construction will not cause violations of
certain air quality standards, and show that their operations are in
compliance with the Best Available Control Technology (“BACT”) re-
quirements. See 42 U.S.C. § 7475. In nonattainment areas, i.e., where
air quality standards have not been met, new and modified sources are
required to obtain preconstruction permits, to offset emissions
increases with emissions reductions from other sources in the area, and
to install “lowest achievable emissions rate” technology (“LAER”). See
id. § 7503.
4a
weighing the nature, extent, purpose, frequency, and
cost of the work as well as other factors to arrive at a
common sense finding.” 67 Fed. Reg. 80,290, 80,292-93
(Dec. 31, 2002). Consistent with Alabama Power Co. v.
Costle, 636 F.2d 323 (D.C. Cir. 1979), which recognized
EPA’s discretion to exempt from NSR “some emission
increases on grounds of de minimis or administrative
necessity,” id. at 400, EPA has for over two decades de-
fined the RMRR exclusion as limited to “de manims
circumstances.” 68 Fed. Reg. at 61,272. The ERP pro-
vides a bright-line rule and expands the traditional
scope of the RMRR by exempting certain equipment
replacements from NSR. See, e.g., 40 C.F.R.
§ 52.21(ce)(2005)."
> The ERP provides:
Without regard to other considerations, routine maintenance,
repair and replacement includes, but is not limited to, the replace-
ment of any component of a process unit with an identical or
functionally equivalent component(s), and maintenance and repair
activities that are part of the replacement activity, provided that all
of the requirements in paragraphs (cce)(1) through (cc)(3)of this
section are met.
40 C.F.R. § 52.21(ece). Paragraph (ec)(1) establishes that the fixed
capital cost of the replacement component cannot exceed twenty
percent of the replacement value of the process unit. Paragraph (ce)(2)
states that the replacement cannot change the basic design parameters
of the process unit. Paragraph (ec)(3) requires that the replacement
activity not cause the process unit to exceed any independent, legally
enforceable emission limitation. The ERP also amends 40 C.F.R. §§
51.165, 51.166, and 52.24, but given the similarity of the sections, the
court will follow the practice of the parties in citing only section 52.21.
5a
The government and environmental petitioners con-
tend that the ERP is contrary to the plain text of the Act
because the statutory definition of “modification” ap-
plies unambiguously to any physical change that in-
creases emissions, necessarily including the emission-
increasing equipment replacements excused from NSR
by the rule. They maintain that the word “any,” when
given its natural meaning, requires that the phrase
“physical change” be read broadly, such that EPA’s at-
tempt to read “physical change” narrowly would rele-
gate the word “any” to an insignificant role.
In evaluating the petitioners’ contention, we proceed
under the familiar two-part test of Chevron, U.S.A., Inc.
v. Natural Resources Defense Council, Inc., 467 U.S.
837, 104 S. Ct. 2778, 81 L.Ed.2d 694 (1984). If “Con-
gress has directly spoken to the precise question at issue
. . . that is the end of the matter; for the court, as well
as the agency, must give effect to the unambiguously
expressed intent of Congress.” /d. at 842-43, 104 S. Ct.
2778. Only if the statute is silent or ambiguous do we
defer to the agency’s interpretation, asking “whether [it]
is based on a permissible construction of the statute.”
Id. at 843, 104 S. Ct. 2778. “Ifa court, employing tradi-
tional tools of statutory construction, ascertains that
Congress had an intention on the precise question at
issue, that intention is the law and must be given effect.”
Id. at 843 n. 9, 104 S. Ct. 2778.
The petitioners and EPA agree that the phrase
“physical change” is susceptible to multiple meanings,
each citing dictionary definitions. However, “the sort of
ambiguity giving rise to Chevron deference ‘is a creature
not of definitional possibilities, but of statutory context.’
“American Bar Ass’n v. FTC, 430 F.3d 457, 469 (D.C.
6a
Cir. 2005) (quoting Brown v. Gardner, 513 U.S. 115, 118,
115 S. Ct. 552, 1380 L.Ed.2d 462 (1994)); see California
Indep. Sys. Operator Corp. v. FERC, 372 F.3d 395, 400
(D.C. Cir. 2004); Cincinnati Ins. Co. v. Flanders Elec.
Motor Serv., Inc., 40 F.3d 146, 152 (7th Cir. 1994). As
the parties point out, the ordinary meaning of “physical
change” includes activities that “make different in some
particular,” “make over to a radically different form,” or
“replace with another or others of the same kind or
class.” WEBSTER’S THIRD NEW INTERNA-
TIONAL DICTIONARY 373 (1981). To say that it is
“physical,” in this context, indicates that the change
must be “natural or material,” rather than “mental,
moral, spiritual, or imaginary.” /d. 1706. The parties
agree that in “[rJeal-world, common-sense usage,” 68
Fed. Reg. at 61,271, “physical change” includes equip-
ment replacements. They further agree that the ERP
would excuse from NSR requirements certain emission-
increasing activities that EPA has historically consid-
ered to be “physical changes.” See id. at 61,270.
The parties’ essential disagreement, then, centers on
the effect of Congress’s decision in defining “modifica-
tion” to insert the word “any” before “physical change.”
According to the petitioners, the word “any” means that
the phrase “physical change” covers any activity at a
source that could be considered a physical change that
increases emissions. According to EPA, “any” does
nothing to resolve ambiguity in the phrase it modifies.
EPA maintains that because “physical change” is “sus-
ceptible to multiple meanings,” 7d. at 61,271, “identify-
ing activities that are ‘changes’ for NSR purposes .. .
requires an exercise of Agency expertise,” “the classic
situation in which an agency is accorded deference un-
der Chevron,” id. at 61,272. Under this approach, once
7a
EPA has identified an activity as a “physical change,”
the word “any” requires that the activity be subject to
NSR. We conclude that the differences between the par-
ties’ interpretations of the role of the word “any” are
resolved by recognizing that “[rJead naturally, the word
‘any’ has an expansive meaning, that is, ‘one or some
indiscriminately of whatever kind,’” United States v.
Gonzales, 520 U.S. 1, 5, 117 S. Ct. 1032, 137 L.Ed.2d 132
(1997), and that courts must give effect to each word of
a statute, see, e.g., TRW, Inc. v. Andrews, 534 U.S. 19,
31, 122 S. Ct. 441, 151 L.Ed.2d 339 (2001). Because Con-
gress used the word “any,” EPA must apply NSR when-
ever a source conducts an emission-increasing activity
that fits within one of the ordinary meanings of “physi-
cal change.”
In a series of cases, the Supreme Court has drawn
upon the word “any” to give the word it modifies an “ex-
pansive meaning” when there is “no reason to contra-
vene the clause’s obvious meaning.” Norfolk S. Rwy. Co.
v. Kirby, 543 U.S. 14, 31-32, 125 S. Ct. 385, 160 L.Ed.2d
283 (2004); see also Dep’t of Hous. and Urban Dev. v.
Rucker, 535 U.S. 125, 180-31, 122 S. Ct. 1230, 152
L.Ed.2d 258 (2002); Gonzales, 520 U.S. at 5, 1175S. Ct.
1032. Indeed, the Court has read the word “any”
to signal expansive reach when construing the
Clean Air Act. In Harrison v. PPG Industries, Inc., 446
U.S. 578, 100 S. Ct. 1889, 64 L.Ed.2d 525 (1980), the
Court resolved a jurisdictional dispute under section
307(b)(1) by interpreting the phrase “any other final
action,” which the Court “discern[ed to have] no uncer-
tainty.” Jd. at 588, 100 S. Ct. 1889. The Court never
suggested that the term “final action” was itself devoid
of multiple meanings depending on the context, but
rather stated that when Congress amended the Act in
8a
1977, “it expanded its ambit to include not simply “other
final action,’ but rather “any other final action.’” /d. at
589, 100 S. Ct. 1889. “[I]n the absence of legislative his-
tory to the contrary;” the Court held that the statutory
phrase “must be construed to mean exactly what it says,
namely, any other final action.” /d.
Although EPA is correct that the meaning of “any”
can differ depending upon the statutory setting, see
Niwxon v. Missouri Mun. League, 541 U.S. 125, 182, 124
S. Ct. 1555, 158 L.Ed.2d 291 (2004), the context of the
Clean Air Act warrants no departure from the word’s
customary effect. Unlike Nixon, the question of statu-
tory interpretation here does not arise in a setting in
which the Supreme Court has required heightened stan-
dards of clarity to avoid upsetting fundamental policies.
See id. at 132-33, 140-41, 124 S. Ct. 1555 (citing Gregory
v. Ashcroft, 501 U.S. 452, 111 S. Ct. 2395, 115 L.Ed.2d
410 (1991)). EPA points to no “strange and indetermi-
nate results,” id. at 133, 124 S. Ct. 1555 that would
emerge from adopting the natural meaning of “any” in
section 111(a)(4) of the Act. Given Congress’s goal in
adopting the 1977 amendments of establishing a balance
between economic and environmental interests, see Wis-
consin Elec. Power Co. v. Reilly, 893 F.2d 901, 909-10
(7th Cir. 1990) (““WEPCo”), it is hardly “farfetched,”
Nixon, 541 U.S. at 138, 1248S. Ct. 1555, for Congress to
have intended NSR to apply to any type of physical
change that increases emissions. In this context, there
is no reason the usual tools of statutory construction
should not apply and hence no reason why “any” should
not mean “any.” Indeed, EPA’s interpretation would
produce a “strange,” if not an “indeterminate,” result: a
law intended to limit increases in air pollution would
allow sources operating below applicable emission limits
9a
to increase significantly the pollution they emit without
government review.
Even without specific reliance on the effect of “any,”
this court has construed the definition of “modification”
broadly. In Alabama Power, the court explained that
“the term ‘modification’ [in section 111(a)(4) ]is nowhere
limited to physical changes exceeding a certain magni-
tude.” 636 F.2d at 400. Although the legislative history
indicated that one Senator intenced the term to apply
only to “major expansion program[s],” id. at 400 n.47,
the court observed that “the language of the statute
clearly did not enact such limit into law,” zd. at 400. The
court further observed that “[iJmplementation of the
statute’s definition of ‘modification’ will undoubtedly
prove inconvenient and costly to affected iridustries; but
the clear language of the statute unavoidably imposes
these costs except for de minimis increases.” Id. More
recently, in New York J, the court looked to the plain
meaning of section 111(a)(4) and the absence of contrary
legislative history in holding that even pollution control
projects constituted “physical changes.” New York J,
413 F.3d at 40-42. Likewise, the Seventh Circuit con-
cluded in WE PCo that the purposes of the 1977 amend-
ments to the Act required an expansive reading of the
plain language of section 111(a)(4). See WEPCo, 893
F.2d at 908-10.
EPA’s attempt to avoid the persuasive force of these
decisions and to find ambiguity in the phrase “any physi-
cal change” fails for a variety of reasons. Even assum-
ing that the decisions construing section 111(a)(4) are
not “judicial precedent holding that the statute unam-
biguously forecloses the agency’s interpretation,” Nat’
Cable & Telecomms. Ass’n v. Brand X Internet Servs.,
10a .
--- U.S. ----, ----, 125 S. Ct. 2688, 2700, 162 L.Ed.2d 820
(2005), Brand X, on which EPA principally relies, does
not drain those decisions of all precedential value. The
fact that previous judicial interpretations of section
111(a)(4) have all reached the conclusion that the text
must be read broadly supports the petitioner’s argument
at Chevron step one, particularly because those
decisions--both before and after Chevron--used language
indicating the text was “clear” and “plain.” See New
York J], 413 F.3d at 40; WEPCo, 893 F.2d at 907; Ala-
bama Power, 636 F.2d at 400.
Even in the absence of such precedent, EPA’s ap-
proach to interpreting “physical change,” as well as a
similar approach by industry intervenors that focuses on
the thirty-nine words following “any,” contravenes sev-
eral rules of statutory interpretation. EPA’s position is
that the word “any” does not affect the expansiveness of
the phrase “physical change”; it only means thax, once
the agency defines “change” as broadly or as narrowly
as it deems appropriate, everything in the agency-de-
fined category is subject to NSR. To begin, that reading,
contrary to “a cardinal principle of statutory construc-
tion,” would make Congress’s use of the word “any” “in-
significant” if not “superfluous.” TRW, 534 U.S. at 31,
122 S. Ct. 441 (quoting Duncan v. Walker, 533 U.S. 167,
174, 121 S. Ct. 2120, 150 L.Ed.2d 251 (2001)). Reading
the definition in this way makes the definition function
as if the word “any” had been excised from section
111(a)(4); there is virtually no role for “any” to play.
Additionally, the approaches of EPA and industry would
require Congress to spell out all the applications cov-
ered by a definition before a court could conclude that
Congress had directly spoken regarding a particular
application, ignoring the fact that a definition, like a
lla
general rule, need not list everything it covers. See Na-
tional Public Radio, Inc. v. FCC, 254 F.3d 226, 229
(D.C. Cir. 2001); see also Shays v. FEC, 414 F.3d 76,
108 (D.C. Cir. 2005). EPA’s approach would ostensibly
require that the definition of “modification” include a
phrase such as “regardless of size, cost, frequency, ef-
fect,” or other distinguishing characteristic. Only in a
Humpty Dumpty world’ would Congress be required to
use superfluous words while an agency could ignore an
expansive word that Congress did use. We decline to
adopt such a world-view.
In contrast, the petitioners’ approach, by adopting an
expansive reading of the phrase “any physical change,”
gives natural effect to all the words used by Congress
and reflects both their common meanings and Con-
gress’s purpose in enacting the 1970 and 1977 amend-
ments. See New York I, 413 F.3d at 11-13; WEPCo, 893
F.2d at 909. To improve pollution control programs in
a manner consistent with the balance struck by Con-
gress in 1977 between “the economic interest in permit-
ting capital improvements to continue and the environ-
mental interest in improving air quality,” Chevron, 467
U.S. at 851, 104 S. Ct. 2778, Congress defined the phrase
“physical change” in terms of increases in emissions.
After using the word “any” to indicate that “physical
change” covered all such activities, and was not left to
agency interpretation, Congress limited the scope of
“any physical change” to changes that “increase [ ] the
amount of any air pollutant emitted by such source or
which result [ ] in the emission of any air pollutant not
* See TVA v. Hill, 437 U.S. 153, 173 n.18, 98 S. Ct. 2279, 57 L.Ed.2d
117 (1978) (quoting Through the Looking Glass, in THE COMPLETE
WORKS OF LEWIS CARROLL 196 (1939)).
12a
previously emitted.” 42 U.S.C. § 7411(a)(4). Thus, only
physical changes that do not result in emission increases
are excused from NSR. Because Congress expressly
included one limitation, the court must presume that
Congress acted “intentionally and purposely,” Barnhart
v. Sigmon Coal Co., 584 U.S. 438, 452, 122 S. Ct. 941, 151
L.Ed.2d 908 (2002) (quoting Russello v. United States,
464 U.S. 16, 23, 104 S. Ct. 296, 78 L.Ed.2d 17 (1983)),
when it did not include others. Cf. New York 1, 413 F.3d
at 39. So construed, each word in the phrase “any physi-
cal change” has a meaning consonant with congressional
intent and the scope of the definitional phrase is limited
only by Congress’s determination that such changes be
linked to emission increases.
The expansiveness of the petitioners’ approach does
not leave the definition of “any physical change” without
limits. The modifier “any” cannot bring an activity that
is never considered a “physical change” in ordinary us-
age within the ambit of NSR. But when Congress places
the word “any” before a phrase with several common
meanings, the statutory phrase encompasses each of
those meanings; the agency may not pick and choose
among them. EPA, through its historical practice and
its words, has acknowledged that the equipment replace-
ments covered by the ERP are “physical changes” under
one of the ordinary meanings of the phrase. See 68
Fed.Reg. at 61,271-72. EPA may not choose to exclude
that “[rJeal-world, common-sense usage of the word
‘change.’” /d. at 61,271. Moreover, a physical change is
not the sole criterion for triggering NSR under the defi-
nition of “modification.” The expansive meaning of “any
physical change” is strictly limited by the requirement
13a
that the change increase emissions. See 42 U.S.C.
§ 7411(a)(4)."
The fact that EPA, through, the RMRR exclusion,
has historically interpreted “any physical change” to
exclude changes of trivial regulatory concern on a de
minimis rationale, see Alabama Power, 636 F.2d at 360-
61, does not demonstrate that the meaning of “physical
change” is ambiguous. Rather, it reflects an agency’s
inherent power to overlook “trifling matters,” id. at 360,
a “principle [that] is a cousin of the doctrine that, not-
withstanding the ‘plain meaning’ of a statute, a court
must look beyond the words to the purpose of the act
where its literal terms lead to ‘absurd or futile results,”
id. at 360 n.89 (citations omitted). As the Supreme
Court has instructed, “the venerable maxim de minimis
non curat lex (‘the law cares not for trifles’) is part of
the established background of legal principles against
which all enactments are adopted, and which all enact-
ments (absent contrary indication) are deemed to ac-
cept.” Wisconsin Dep't of Revenue v. William Wrigley,
Jr., Co., 505 U.S. 214, 231, 112 S. Ct. 2447, 120 L.Ed.2d
174 (1992). Reliance on the de minimis doctrine invokes
congressional intent that agencies diverge from the
plain meaning of a statute only so far as is necessary to
avoid its futile application. Thus, the court in Alabama
Power acknowledged that “EPA does have discretion, in
administering the statute’s ‘modification’ provision, to
exempt from PSD review some emission increases on
grounds of de minimis or administrative necessity.” 636
* The court has no occasion to decide whether part replacements or
repairs necessarily constitute a “modification” under the definition
taken as a whole.
14a
F.2d at 400. As applied, the court explained that de
minimis standards served to alleviate “severe” adminis-
trative and economic burdens by lifting requirements on
“minuscule” emission increases. See id. at 405. While
the court today expresses no opinion regarding EPA’s
application of the de minimis exception, given the limits
on the scope of the de minimis doctrine, see Shays, 414
F.3d at 113-14, EPA appropriately has not attempted to
justify the ERP as an exercise of de minimis discretion.
As EPA has disclaimed the assertion that its prior ex-
pansive interpretations of “any physical change” were
“absurd or futile,” 70 Fed. Reg. at 33,842, it is in no posi-
tion to claim that the ERP is necessary to avoid absur-
dity.
EPA’s remaining arguments also fail to demonstrate
that the phrase “any physical change” is ambiguous.
The fact that the court concluded that the word “in-
creases” in section 111(a)(4) is ambiguous, see New York
1, 413 F.3d at 23, does not suggest that the phrase
“any physical change” is also ambiguous; unlike the
latter, the former is unaccompanied by a qualifier sig-
naling Congress’s intent. Congress’s use of the word
“increases” necessitated further definition regarding
rate and measurement for the term to have any contex-
tual meaning. No such further definition of “physical
change” is required because Congress’s use of the word
“any” indicates the intent to cover all of the ordinary
meanings of the phrase, as evidenced by EPA’s decades-
long understanding and practice. Also, because the
court in New York J rejected industry’s contention that
Congress ratified the New Source Performance Stan-
dards (“NSPS”) regulations on “modification” in the
1977 amendments, see id. at 19-20, EPA’s reliance on its
NSPS regulations to demonstrate the ambiguity of “any
15a
physical change” is unavailing. As discussed, the early
emergence of a RMRR exclusion based on a de minimis
rationale does not blur the clarity of the phrase “any
physical change.” To the extent industry intervenors
rely on the NSPS regime to reargue their position that
“modifications” require an increase in maximum emis-
sion rates, that issue was resolved in New York I, 413
F.3d at 19-20, 40; see also New York v. EPA, 431 F.3d
801, 802-03 (D.C. Cir. 2005) (Williams, J., concurring in
denial of rehearing), and is irrelevant because it does
not address what constitutes a “physical change.”
“Therefore, for EPA to avoid a literal interpretation
at Chevron step one, it must show either that, as a mat-
ter of historical fact, Congress did not mean what it ap-
pears to have said, or that, as a matter of logic and stat-
utory structure, it almost surely could not have
meant it.” Hngine Mfrs. Ass’n v. EPA, 88 F.3d 1075,
1089 (D.C. Cir. 1996). The discussion in New York I, 413
F.3d at 12-13, and WEPCo, 893 F.2d at 909 (quoting
H.R. REP. No. 95-294, at 211, (1977), as reprinted in
1977 U.S.C.C.A.N: 1077, 1290), of Congress’s basic goals
in enacting the 1977 amendments—to intensify the war
against air pollution, to establish a permit program that
struck a balance between economic and environmental
interests, and to stimulate technology to control pollu-
tion—demonstrate the futility of EPA’s endeavor. EPA
cannot show that historical fact prevents a broad read-
ing of “any physical change” inasmuch as EPA for de-
cades has interpreted that phrase to mean “virtually all
changes, even trivial ones, . . . generally interpret[ing]
the [RMRR] exclusion as being limited to de minimis
circumstances.” 68 Fed.Reg. at 61,272.
16a
As for logic, EPA cannot show any incoherence in
Congress requiring NSR for equipment replacements
that increase emissions while allowing replacements that
do not increase emissions to avoid NSR. EPA acknowl-
edges the reasonableness of its past expansive interpre-
tation of “any physical change.” See id.; 70 Fed Reg. at
33,842; Respondent’s Br. at 29. To the extent that EPA
relies on the argument that allowing ERP projects has
the potential to lower overall emissions through in-
creased efficiency even if emissions increase at a source,
the court in New York I rejected EPA’s similar argu-
ment in support of an exemption from NSR for pollution
- control projects. The court stated that “Congress could
reasonably conclude, for example, that tradeoffs be-
tween pollutants are difficult to measure, and thus any
significant increase in emissions of any pollutant should
be subject to NSR.” New York J, 413 F.3d at 41. Absent
a showing that the policy demanded by the text borders
on the irrational, EPA may not “avoid the Congressional
intent clearly expressed in the text simply by asserting
that its preferred approach would be better policy.”
Engine Mfrs., 88 F.3d at 1089.
Likewise, EPA offers no reason to conclude that the
structure of the Act supports the conclusion that “any
physical change” does not mean what it says. EPA does
not address the Act’s structure except in defending the
reasonableness of the ERP as a policy choice. In that
context, EPA points to the Act’s “many other systematic
air programs,” particularly “model market-based pro-
grams,” as support for its view that economic and envi-
ronmental interests can be effectively balanced while
limiting the application of NSR to existing sources. See
70 Fed. Reg. at 33,844. Although EPA might prefer
17a
_market-based methods of controlling pollution, Con-
gress has chosen a different course with NSR.
Accordingly, we hold that the ERP violates section
111(a)(4) of the Clean Air Act in two respects. First,
Congress’s use of the word “any” in defining a “modifi-
cation” means that all types of “physical changes” are
covered. Although the phrase “physical change” is sus-
ceptible to multiple meanings, the word “any” makes
clear that activities within each of the common meanings
of the phrase are subject to NSR when the activity re-
sults in an emission increase. As Congress limited the
broad meaning of “any physical change,” directing that
only changes that increase emissions will trigger NSR,
no other limitation (other than to avoid absurd results)
can be implied. The definition of “modification,” there-
fore, does not include only physical changes that are
costly or major. Second, Congress defined “modifica-
tion” in terms of emission increases, but the ERP would
allow equipment replacements resulting in non-de
minimis emission increases to avoid NSR. Therefore,
because it violates the Act, we vacate the ERP.
18a
APPENDIX B
UNITED STATES COURT OF APPEALS
FOR THE DISTRICT OF COLUMBIA CIRCUIT
No. 03-1380
CONSOLIDATED WITH 03-1381, 03-1383, 03-1390,
03-1402, 03-1453, 03-1454, 04-1029, 04-1035,
04-1064, 05-1234, 05-1287
September Term, 2005
STATE OF NEW YORK, ET AL.,
PETITIONERS
V.
ENVIRONMENTAL PROTECTION AGENCY,
RESPONDENT
CLEAN AIR IMPLEMENTATION PROJECT, ET AL.,
INTERVENORS
[Filed On: June 30, 2006]
Before: ROGERS, TATEL, and BROWN, Circuit Judges.
19a
ORDER
Upon consideration of respondent’s petition for re-
hearing filed May 1, 2006, it is
ORDERED that the petition be denied.
PER CURIAM
FOR THE COURT:
MARK J. LANGER, clerk
BY:
MICHAEL C. McGRAIL
Deputy clerk
* Circuit Judge Kavanaugh did not participate in this
matter.
20a
APPENDIX C
RULES AND REGULATIONS
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Parts 51 and 52
[F RL-7575-9; RIN 2060-AK28; Electronic Docket
OAR-2002-0068; Legacy Docket A-2002-04 |
Prevention of Significant Deterioration (PSD) and
Non-Attainment New Source
Review (NSR): Equipment Replacement Provision
of the Routine Maintenance,
Repair and Replacement Exclusion
[Monday, October 27, 2003]
AGENCY: Environmental Protection Agency
(EPA).
ACTION: Final rule.
SUMMARY: The EPA is finalizing revisions to the
regulations governing the NSR programs mandated by
parts C and D of title I of the Clean Air Act (CAA). To-
day’s changes reflect EPA’s incorporation of comments
from the proposed rule for “Prevention of Significant
Deterioration (PSD) and Non-attainment New Source
2la
Review (NSR): Routine Maintenance, Repair and
Replacement.” These changes provide a category of
equipment replacement activities that are not subject to
Major NSR requirements under the routine mainte-
nance, repair and replacement (RMRR) exclusion. The
changes are intended to provide greater regulatory cer-
tainty without sacrificing the current level of environ-
mental protection and benefit derived from the NSR
program. We believe that these changes will facilitate
the safe, efficient, and reliable operation of affected fa-
cilities.
EFFECTIVE DATE: This final rule is effective on
December 26, 2003.
ADDRESSES: Docket. Docket No. A-2002-04 (Elec-
tronic docket OAR-2002-0068), containing supporting
information used to develop the proposed rule and to-
day’s final rule, is available for public inspection and
copying between 8:00-a.m. and 4:30 p.m., Monday
through Friday (except government holidays) at the Air
and Radiation Docket and Information Center (6102T),
Room B-108, EPA West Building, 1301 Constitution Av-
enue, NW, Washington, D.C. 20460; telephone (202) 566-
1742, fax (202) 566-1741. A reasonable fee may be
charged for copying docket materials.
Worldwide Web (WWW). In addition to being avail-
able in the docket, an electronic copy of this final rule
will also be available on the WWW through the Technol-
ogy Transfer Network (TTN). Following signature, a
copy of the rule will be posted on the TTN’s policy and
guidance page for newly proposed or promulgated rules:
http://www.epa.gov/ttn/oarpg.
FOR FURTHER INFORMATION CONTACT: Mr. Dave
Svendsgaard, Information Transfer and Program Inte-
gration Division (C339-03), U.S. EPA Office of Air Qual-
ity Planning and Standards, Research Triangle Park,
North Carolina 27711, telephone 919-541- 2380, or elec-
tronic mail at svendsgaard.dave@epa.gov, for questions
on this rule.
SUPPLEMENTARY INFORMATION:
Regulated Entities
Entities potentially affected by this final action in-
clude sources in all industry groups. The majority of
sources potentially affected are expected,to be in the
following groups:
Industry group SIC* NAICS"
Electric Servi-
“SPI Ns Senet 491 221111, 221112,221113, 2211119,
221122, 2211121,
Petroleum es
OPS Saws ewes as ce 291 324110
Industrial
Inorganic
ee 281 325181, 325120, 325131, 325182,
211112, 325998, 331311, 25188
Industria]
Organic
Chemicals ........... 286 325110,325132, 325192, 325188,
325193, 325120, 325199
23a
Miscellaneous
Chemical
POGUES oo cc cccccvse 289 325520,325920, 325910, 325182,
325510
Natural Gas
SOE ie eas knees 132 211112
Natural Gas
ey ee 492 486210, 221210 -
Pulp and
Paper Mills ......... 261 322110,322121, 322122, 322130
Paper Mills . ......... 262 322121, 322122
Automobile
Manu-
| re 371 336111, 336112, 336211, 336992,
336322, 336312, 336330 336340,
336350, 336399, 336212 336213
Pharm-
SS a ee 283 325411, 325412, 325418, 325414
FNa Standard Industrial Classification.
FNb North American Industry Classification System.
Entities potentially affected by this final action also
include State, local, and tribal governments that are
delegated authority to implement these regulations.
Outline
The information presented in this preamble is orga-
nized as follows:
I. General Information
A.
24a
How can I get copies of this document and
other related information?
C.
D.
Docket
Electronic Access
. Where can I obtain additional information?
. Background
What is the RMRR exclusion?
. Issues surrounding the RMRR exclusion
Process used to develop this rule
What we proposed
Ill. Equipment Replacement Provision
A.
action
B.
Overview and justification for today’s final
What is an identical or functionally equivalent
replacement and why should such an activity be consid-
ered RMRR?
C.
What cost limit has been placed on the equip-
ment replacement approach?
D.
What will be the basis of applying the 20-per-
cent threshold?
E.
What basic design parameters are being estab-
lished to qualify for the equipment replacement provi-
sion?
25a
F. What collection of equipment should be consid-
ered in applying the equipment replacement provision
and how should it be defined?
G. Consideration of non-emitting units as part of
the process unit
H. What is the accounting basis for the process
unit?
I. Enforcement
1. Compliance assurance
2. General issues
J. Quantitative Analysis
K. Consideration of other options
1. Annual Maintenance, repair and replacement
allowance
2. Capacity-based option
3. Age-based option
L. Specific list of excluded activities
M. Stand-alone exclusion for energy efficiency
projects
N. Legal Basis
1. How does the NSR program address existing
sources and why is today’s rule consistent with this ap-
proach?
26a
2. Why today’s rule appropriately implements the
Clean Air Act’s definition of modification
IV. Administrative Requirements for This Rule
A. Executive Order 12866—Regulatory Planning
and Review
B. Executive Order 13132—Federalism
C. Executive Order 13175—Consultation and Co-
ordination with Indian Tribal Governments
D. Executive Order 13045—Protection of Chil-
dren from Environmental Health Risks and Safety
Risks
E. Paperwork Reduction Act
F. Regulatory Flexibility Analysis
G. Unfunded Mandates Reform Act of 1995
H. National Technology Transfer and Advance-
ment Act of 1995
I. Executive Order 13211—Actions Concerning
Regulations That Significantly Affect Energy Supply,
Distribution, or Use
J. Executive Order 12988—Civil Justice Reform
V. Effective Date for Today’s Requirements
VI. Statutory Authority
1. General Information
27a
A. How Can I Get Copies of This Document and
Other Related Information?
1. Docket. The EPA has established an official public
docket for this action under Docket ID No. A-2002-04.
The official public docket consists of the documents spe-
cifically referenced in this action, any public comments
received, and other information related to this action.
Although a part of the official docket, the public docket
does not include Confidential Business Information
(CBI) or other information whose disclosure is re-
stricted by statute. The official public docket is the col-
lection of materials that is available for public viewing at
the EPA Docket Center, (Air Docket), U.S. Environ-
mental Protection Agency, 1301 Constitution Ave., NW.,
Room: B108, Mail Code: 6102T, Washington, DC, 20004.
The EPA Docket Center Public Reading Room is open
from 8:30 a.m. to 4:30 p.m., Monday through Friday,
excluding legal holidays. The telephone number for the
Reading Room is (202) 566-1742. A reasonable fee may
be charged for copying. |
2. Electronic Access. You may access this Federal
Register document electronically through the EPA
Internet under the “Federal Register” listings at
http://www.epa.gov/fedrgstr/.
An electronic version of the public docket is available
through EPA’s electronic public docket and comment
system, EPA Dockets. You may use EPA Dockets at
http://www.epa.gov/edocket/ to submit or view public
comments, access the index listing of the contents of the
official public docket, and to access those documents in
the public docket that are available electronically. Once
28a
in the system, select “search,” then key in the appropri-
ate docket identification number.
Certain types of information will not be placed in the
EPA Dockets. Information claimed as CBI and other
information whose disclosure is restricted by statute,
which is not included in the official public docket, will
not be available for public viewing in EPA’s electronic
public docket. EPA’s policy is that copyrighted material
will not be placed in EPA’s electronic public docket but
will be available only in printed, paper form in the offi-
cial public docket. To the extent feasible, publicly avail-
able docket materials will be made available in EPA’s
electronic public docket. When a document is selected
from the index list in EPA Dockets, the system will
identify whether the document is available for viewing
in EPA’s electronic public docket. Although not all
docket materials may be available electronically, you
may still access any of the publicly available docket ma-
terials through the docket facility identified in section
1.A.1. of this preamble. The EPA intends to work to-
wards providing electronic access to all of the publicly
available docket materials through EPA’s electronic
public docket.
For additionai infermation about EPA’s electronic
public docket visit EPA Dockets online or see 67 FR
38102, May 31, 2002.
29a =“
B. Where Can I Obtain Additional Information?
In addition to being available in the docket, an elec-
tronic copy of today’s final rule is also available on the
WWW through the Technology Transfer Network
(TTN). Following signature by the EPA Administrator,
a copy of this rule will be posted on the T7'N’s policy and
guidance page for newly proposed or promulgated rules
at http://www.epa.gov/ttn/oarpg. The TTN provides in-
formation and technology exchange in various areas of
air pollution control. If more information regarding the
TTN is needed, call the TTN HELP line at (919) 541-
5384.
Il. Background
A. What Is the RMRR Exclusion?
Title I of the Clean Air Act (CAA) established the
New Source Review program’ to help control airborne
emissions from major new stationary sources of pollu-
tion. Under the program, anyone who seeks to construct
a new stationary source that will be a major source of
regulated pollutants must obtain a permit from State
authorities (or, where a State has not established its own
program, from EPA directly) before beginning construc-
tion of the source. In order to obtain the permit, the
owner or operator must, among other things, demon-
strate that the new source will have state-of-the-art pol-
lution control devices.
' We broadly use the term “New Source Review,” or NSR, to
encompass both the PSD and the Non-attainment New Source Review
program.
30a
The NSR program does not generally affect existing
sources, but it does apply if they undergo a “modifica-
tion.” The NSR provisions of the CAA do not create
their own definition of “modification,” instead borrowing
the definition of the term established by section 111 of
the CAA, which defined the term for purposes of the
New Source Performance Standards (NSPS) program.
That definition states that “{t]he term “modification”
means any physical change in, or change in the method
of operation of, a stationary source which increases the
amount of any air pollutant emitted by such source or
which results in the emission of any air pollutant not
previously emitted.” Under 40 CFR parts 51 and 52, the
rules we have promulgated to carry out the NSR pro-
gram, “major modification” is similarly defined as any
physical change in or change in the method of operation
of a major stationary source that would result in: (1) A
significant emissions increase of a regulated NSR pollut-
ant; and (2) a significant net emissions increase of that
pollutant from the major stationary source.” The regula-
tions further provide that certain activities do not con-
stitute a “physical change or change in the method of
operation” under the definition of “major modification.”
One category of such activities is routine maintenance,
repair and replacement (RMRR). The regulatory provi-
sions excluding RMRR from the definition of change
constitute the RMRR exclusion.
* Once a modification is determined to be major, NSR requirements
apply only to those specific pollutants for which there would be a
significant net emissions increase.
3la
B. Issues Surrounding the RMRR Exclusion
Until today, the NSR regulations have not further
specified what types of activities are encompassed by
the term RMRR. Heretofore, we have applied the
RMRR exclusion exclusively on a case-by-case basis
using a multi-factor test for determining whether a par-
ticular activity falls within or outside the exclusion. We
have made these case-by-case determinations both in
the context of applicability determinations, where a
source or permitting authority has requested EPA’s
guidance concerning whether a particular activity falls
within the exclusion or requires a permit, and in the con-
text of enforcement actions, where we have challenged
an activity undertaken by a source after the fact and the
source has asserted that the activity was permissible
under the exclusion. S
This case-by-case approach has been praised for its
flexibility, but criticized for hampering activities impor-
tant to assuring the safe, reliable and efficient operation
of existing plants. Specifically, some of the case-by-case
determinations we have made, particularly over the past
decade, and particularly in a series of enforcement ac-
tions, have been criticized for giving the exclusion a nar-
row scope that disallows replacement of significant plant
components with identical or functionally equivalent
components. Critics argue that the effect is to discour-
age plant owners or operators from engaging in replace-
ments that are important to restoring, maintaining and
improving plant safety, reliability, and efficiency. They
further argue that this effect is exacerbated by what
they assert are the uncertainties inherent in the case-
by-case approach.
32a
To elaborate on the uncertainty issues: Unless an
owner or operator seeks an applicability determination
from his or her reviewing authority, it can be difficult
for the owner or operator to know with reasonable cer-
tainty whether a particular activity constitutes RMRR.
This gives the owner or operator five choices, two of
which the owner or operator is not likely to select, and
the other three of which have significant drawbacks for
the productivity of the plant.
First, the owner or operator may simply seek an
NSR permit. That course, however, is likely to be time-
consuming and expensive, since it will likely result in a
requirement to retrofit an existing plant with state-of-
the-art pollution controls which often is very costly and
can present significant technical challenges. Therefore,
an owner or operator is not likely to select this option if
it can be avoided.
Second, the owner or operator may proceed at risk
without a reviewing authority determination. That op-
tion, however, is also not likely to be attractive where a
significant replacement activity is involved, because if
the owner or operator proceeds without a reviewing au-
thority determination and if we later find that he or she
made an incorrect determination on its own, the owner
or operator faces potentially serious enforcement conse-
quences. Those consequences could well include sub-
stantial fines (along with the further consequences of
having been determined to be in violation of the CAA)
and penalties and a requirement to install the state-of-
the-art pollution controls, even though those controls
present technical issues or represent a significant
enough expenditure that they likely would have deterred
SE eT ASS TAREE EEE
33a
the owner or operator from seeking a permit in the first
place. The owner or operator is not likely to take this
risk if he or she believes there is a high probability of
these kinds of consequences and if he or she has other
options.
Third, the owner or operator may seek an applicabil-
ity determination. That process, too, is time-consuming
and expensive, albeit typically less so than seeking a
permit. This path presents a potentially significant bar-
rier to today’s global, quick-to-market industries, such
as computer chips, pharmaceuticals, and autos. This
approach also is likely to result in substantial foregone
activities that would enhance the safety, reliability and
efficiency of the plant while awaiting the applicability
determination.
Fourth, the owner or operator may forego or curtail
replacements that would enhance the safe, reliable, or
efficient operation of its plant, instead opting to repair
existing components even though they are inferior to
current day replacements because they likely have dete-
riorated with use and probably are less advanced and
less efficient than current technology. Foregoing the
replacement activities altogether will reduce plant
safety, reliability and efficiency; curtailing or postponing
them does as well, differing only in the degree of these
effects.
Finally, the owner or operator may curtail the plant’s
productive capacity by replacing components with less
than the best technology in order to be more certain that
the replacement is within the RMRR regulatory bounds,
or he or she may agree to limit the source’s hours of op-
eration or capacity or install less than state-of-the-art
34a
air pollution controls to ensure no increase in emissions.
Either of those courses, however, will also result in loss
of plant productivity.
The uncertainties are also problematic for State and
local reviewing authorities. They require those author-
ities to devote scarce resources to make complex deter-
minations, including applicability determinations, and
consult with other agencies to ensure that any determi-
nations are consistent with determinations made for
similar circumstances in other jurisdictions and/or that
other reviewing authorities would concur with the con-
clusion.
Industry commenters strongly echoed these con-
cerns, asserting that the expense and delay associated
with NSR scrutiny, whether or not the activity is ulti-
mately judged to be subject to major NSR, have caused
a number of facilities to forego needed and beneficial
maintenance, repair, and replacement activities, includ-
ing ones that would likely have reduced emissions. In
our June 2002 report to the President, we similarly con-
cluded that the NSR program has impeded or resulted
in the cancellation of projects that would have main-
tained and improved the reliability, efficiency, or safety
of existing energy capacity.
We are persuaded that we should change the ap-
proach to the RMRR exclusion that we have been follow-
ing for equipment replacements. The approach we have
been taking often has not encompassed the replacement
of existing components with identical or similar new
components that serve the same function, that represent
a small fraction of the value of the process unit of which
35a
they are a part, that do not change the process unit’s
basic design parameters, and that do not cause the pro-
cess unit to exceed any emission limitations. For the
reasons noted above, this approach tends to have the
effect of leading sources to refrain from replacing com-
ponents, to replace them with inferior components, or to
artificially constrain production in other ways. We are
persuaded that none of these outcomes advanced the
central policy of the major NSR program as applied to
existing sources, which is not to cut back on emissions
from existing major stationary sources through limita-
tions on their productive capacity, but rather to ensure
that they will install state-of-the-art pollution controls
at a juncture where it otherwise makes sense to do so.
We also do not believe the outcomes produced by the
approach we have been taking have significant environ-
mental benefits compared with the approach we are
adopting today and, indeed, we believe our new ap-
proach may well produce environmental improvements
as compared to the old one.
We are also persuaded that uncertainties surround-
ing the scope of the exclusion that are associated with
the case-by-case approach tend to exacerbate the prob-
lem outlined above. These uncertainties can discourage
replacements that would promote safety, reliability and
efficiency even in instances where, if the matter were
brought to EPA, we would determine that the replace-
ment in question was RMRR. Such discouragement re-
sults in lost capacity and lost opportunities to improve
energy efficiency and reduce air pollution.
We believe that these problems will be significantly
reduced by the rule we are adopting today. This rule
36a
specifies that the replacement of components of a pro-
cess unit with identical components or their functional
equivalents will come within the scope of the exclusion,
provided the cost of replacing the component falls below
20 percent of the replacement value of the process unit
of which the component is a part, the replacement does
not change the unit’s basic design parameters, and the
unit continues to meet enforceable emission and opera-
tional limitations.
Our new equipment replacement approach will allow
owners or operators to replace components under a
wider variety of circumstances than they have been able
to do under our prior RMRR approach. It also provides
more certainty both to source owners or operators who
will be able better to plan activities at their facilities,
and to reviewing authorities who will be able better to
focus resources on other areas of their environmental
programs rather than on time-consuming RMRR deter-
minations. The effect should be to remove disincentives
to undertaking RMRR activities falling within the rule,
thereby enhancing key operational elements such as
efficiency, safety, reliability, and environmental perfor-
mance. For example, we anticipate that improved safety
and reliability will result in more stable process opera-
tions and reduce periods of startup, shutdown, and mal-
function and the increased emissions usually associated
with them. Accordingly, we believe the rule will pro-
mote the central purpose of Title I of the CAA, “to pro-
tect and enhance the quality of the Nation’s air re-
sources so as to promote the public health and welfare
and the productive capacity of its population.” CAA sec-
tion 101.
TORE EAN TEEN EO
37a
We note that we continue to believe that our prior
narrower and entirely case-by-case approach to the
RMRR exclusion was consistent with the relevant lan-
guage of the CAA and a reasonable effort to effectuate
its policies. At the same time, we also believe that the
final rule’s categorical exclusion of certain replacement
activities and the broader definition of RMRR on which
that exclusion is premised are likewise consistent with
the statute’s language and represent a better accommo-
dation of the statute’s twofold ends. We therefore have
decided to »dopt the final rule.
C. Process Used To Develop This Rule
In the 1992 “WEPCO Rule” preamble, we declared
our intent to issue guidance on the subject of RMRR. In
1994, as an outgrowth of meetings with the Clean Air
Act Advisory Committee, we developed, for discussion
purposes only, a preliminary draft that presented pos-
sible ways of how RMRR could be defined. We received
a substantial volume of comments on this document. We
subsequently decided not to include this preliminary
draft approach in our 1996 NSR proposed rulemaking.
In 2001, the President’s National Energy Policy
directed EPA in consultation with the Department of
Energy (DOE) and other Federal agencies to review the
impact of NSR on investment in new utility and refinery
generation capacity, energy efficiency and environmen-
tal protection. Our Report to the President illustrated
the problems associated with our prior case-by-case ap-
proach to identifying RMRR activities and underscored
the advantages of establishing an objective bright-line
approach fev edministering the RMRR provision.
38a
We held conference calls with various stake-
holders during October 2001 (including representatives
from industry, State and local governments, and
environmental groups) to discuss new ideas that were
raised as to how the RMRR provision might be im-
proved. The proposed RMRR rule reflected many of the
ideas discussed in those meetings. Today’s final rule on
the equipment replacement provision is based on careful
consideration of comments received on the proposed
RMRR rule (67 FR 80920, December 31, 2002), where
we sought comment on all aspects of our proposed ap-
proaches. Today’s rule represents final action on only
one part of what we proposed in December 2002—the
equipment replacement provision. We have decided, for
now, not to take final action on the proposed annual
maintenance, repair and replacement allowance ap-
proach.
D. What We Proposed
The RMRR proposal offered for comment two
cost-based approaches for determining what constitutes
routine maintenance, repair, and replacement. Under
the proposal, facilities could have relied on a facility-
wide annual maintenance, repair and replacement allow-
ance and/or an equipment replacement cost threshold to
determine whether major NSR requirements were trig-
gered by performing plant maintenance, repair and re-
placement activities. The proposal additionally outlined
two options based on the capacity and age of a facility.
We solicited comment on all aspects of the proposed ap-
proaches as well as any other viable option for clarifying
the term “routine maintenance, repair, and replace-
ment.” We took public comment on the proposed rule
39a
until May 2, 2003—-120 days following publication in the
Federal Register.
Under the “annual maintenance, repe‘r and
replacement allowance,” an annual maintenance cost
allowance would be established for each industrial facil-
ity based on an industry-specific percentage. For the
percentage, we considered using the Internal Revenue
Service “Annual Asset Guideline Repair Allowance Per-
centages” (AAGRAP), which for years has been used as
an integral part of an exclusion under the New Source
Performance Standard (NSPS) program. A multi-year
allowance approach, in addition to the annual approach,
was also offered for consideration in the proposal.
Safeguards were proposed to ensure that the
types of activities undertaken under the annual allow-
ance are not activities that should be subject to greater
scrutiny. These safeguards include: (1) No new unit
may be installed; (2) no unit may be replaced in its en-
tirety; and (3) changes may not cause an increase in the
short-term emission rate of any regulated NSR pollut-
ant.
Under the “equipment replacement provision,” or
ERP, we proposed to streamline the process for deter-
mining if major NSR permitting requirements apply to
replacement of existing equipment with identical new
equipment or with functionally equivalent equipment.
Per-replacement-of-component(s) thresholds, poten-
tially up to 50 percent of the cost of replacing the pro-
cess unit, were suggested by the proposal. As long as
the threshold was not exceeded and the basic design
40a
parameters remained unchanged, the activity would be
considered RMRR under this approach.
Under the proposal, all activities that fell within
the annual maintenance, repair and replacement allow-
ance or the equipment replacement threshold and that
met all the other criteria for these provisions would be
considered RMRR without further review. Activities
that were unable to be accommodated under the annual
maintenance, repair and replacement allowance or the
equipment replacement threshold could still qualify for
the RMRR exclusion after a case-by-case review in ac-
cordance with current rules.
We solicited comments on all aspects of our
RMRR proposal.
lil. Equipment Replacement Provision
A. Overview and Justification for Today’s Final
Action
Today, we are revising certain provisions of the ma-
jor NSR program by finalizing the equipment replace-
ment provision (ERP) to specify activities that will auto-
matically qualify for the RMRR exclusion. This rule is
effective on December 26, 2003. At this time, we are not
taking action on our proposed annual maintenance, re-
pair and replacement allowance approach.
Although many commenters requested that we fur-
ther clarify the case-by-case approach for determining
whether an activity is RMRR, we are not taking action
on this suggestion at this time. We are still considering
what, if any, changes should be made to that policy. In
4la
the meantime, the case-by-case approach will remain
available for the owner or operator of a source to use as
an alternative and/or supplement to today’s ERP.
Under today’s rule, an activity (or aggregations of
activities) can qualify for the ERP if: (1) It involves re-
placement of any existing component(s)* of a process
unit with component(s) that are identical or that serve
the same purpose as the replaced component(s); (2) the
fixed capital cost of the replaced component(s), plus
costs of any activities that are part of the replacement
activity (e.g., labor, contract services, major equipment
rental, and associated repair and maintenance activi-
ties),’ does not exceed 20 percent of the current replace-
ment value of the process unit; and (3) the replace-
ment(s) does not alter the basic design parameters of
the process unit or cause the process unit to exceed any
emission limitation or operational limitation (that has
the effect of constraining emissions) that applies to any
component of the process unit and that is legally en-
forceable.
Today’s final rule specifies the procedures by which
the owner or operator of a source selects the basic de-
sign parameters for steam electric generating facilities
* For the sake of clarity, we want to be clear that the term “compo-
nent” is meant to be applied broadly and read broadly to include
replacements of both large components, such as economizers, re-
heaters, etc. at a boiler, as well as small items, such as screws, washers,
gaskets, etc.
* We note that certain ancillary costs incurred during a given
replacement activity should not be part of the replacement activity,
such as replacement power that must be purchased during the main-
tenance shutdown of an electric utility.
42a
and for other types of process units. Specifically, for
steam electric generating facilities, we have clarified our
proposed approach by specifying maximum hourly heat
input and fuel consumption rate’ as basic design param-
eters. We are also allowing owners or operators of
steam electric generating facilities the option to select
a pair of parameters based on the process unit’s out-
put—more specifically, maximum hourly electric output
rate or maximum steam flow rate—as an alternative to
the previously proposed input-based parameters. Like-
wise, we are retaining our proposed approach of specify-
ing maximum rate of fuel or material! input for other
types of process units, but we also allow you to use maxi-
mum rate of heat input, or maximum rate of product
output if you prefer an output-based basic design pa-
rameter. In addition, we allow you to propose an alter-
native basic design parameter(s), if the above options
are inappropriate for your process unit.
We are not specifically defining the basis for deter-
mining the replacement value of a new process unit.
Instead, the final rule provides you with the flexibility of
using any of the following: (1) Replacement cost;° (2)
invested cost, adjusted for inflation; (3) the insurance
value, where the insurance value covers complete re-
placement of the process unit (rather than, for example,
lost revenue replacement); or (4) another accounting
procedure to establish a replacement value of the pro-
cess unit if such accounting procedure is based on Gen-
* Actually proposed as “fue! consumption specifications.”
y proj
“ Replacement cost can be either an estimate of the fixed capital cost
of constructing a new process unit or the current appraised value of the
process unit.
43a
erally Accepted Accounting Principles (GAAP). The
GAAP are the conventions, rules and precedures that
define accepted accounting practice for recording and
reporting financial information, including broad guide-
lines as well as detailed procedures. The basic doctrine
was set forth by the Accounting Principles Board of the
American Institute of Certified Public Accountants,
which was superseded in 1973 by the Financial Account-
ing Standards Board.
If you choose to use options 3 or 4 to determine the
replacement value for a particular process unit, you
must send a notice reflecting your decision to your re-
viewing authority. The first time that an owner or oper-
ator submits such a notice for a particular procéss unit,
the notice may be submitted at any time, but any subse-
quent notice for that process unit may be submitted only
at the beginning of the process unit’s fiscal year. You
must continue to use the same basis to evaluate any ad-
ditional activities that you undertake on that process
unit within that same fiscal year. If you have provided
notice of using either option 3 or 4, then the reviewing
authority will assume that the same method will be used
for subsequent fiscal years unless you send a notice to
them declaring your intent to use another method. In
the absence of providing any notification to your review-
ing authority, you must use option 1 or 2.
The final ruies also set forth a defin.tion of process
unit, specifically delineate the boundary of the process
unit for certain specified industries, and define a func-
tionally equivalent replacement. A more detailed dis-
cussion of these requirements and our rationale for this
BEST AVAILABLE COPY
44a
action is contained in other parts of this preamble sec-
tion.
Today’s final rules are designed to allow you to
engage in activities that facilitate the safe, reliable and
efficient operation of your source. We believe that to-
day’s final action broadens the major NSR program ex-
clusion for equipment replacements and provides you
with additional certainty as to what equipment replace-
ment activities qualify for the RMRR exclusion. By add-
ing certainty to the process, we are removing the disin-
centives te undertaking routine equipment replacements
and promoting proper operational planning to facilitate
safe, reliable and efficient operations. When an activity
qualifies for the ERP, it will be considered RMRR and
excluded from major NSR without regard to other con-
siderations. In many cases, we believe that maintaining
safe, reliable and efficient operations will have the cor-
responding environmental benefit of reducing the
amount of pollution generated per product produced.
The final rules also will reduce the resource burden on
reviewing authorities resulting from implementation of
the existing, case-by-case process for determining
RMRR. In these respects, the final rules are consistent
with the central purpose of the CAA, “to protect and
enhance the quality of the Nation’s air resources so as to
promote the public health and welfare and the produc-
tive capacity of its population.” CAA section 101.
4Sa
B. What /s an Identical or Functionally Equiva-
lent Replacement and Why Should Such an
Activity Be Considered RMRR?
We proposed to exclude the replacement of existing
equipment with identical or functionally equivalent com-
ponents. As we observed at the time of our RMRR pro-
posal, we believe that most identical and functionally
equivalent replacements are necessary for the safe, effi-
cient and reliable operations of virtually all industrial
operations; are not of regulatory concern; will improve
air quality (e.g., by decreasing startup, shutdown, and
malfunctions); and thus should qualify for the ERP un-
der the RMRR exclusion. We believe industrial facili-
ties are constructed with the understanding that certain
equipment failures are common and ongoing mainte-
nance programs that include replacing components in
order to maintain, restore, or enhance the reliability,
safety, and efficiency of a plant are routine. Conversely,
delaying or foregoing maintenance could lead to failure
of the production unit and may create or add to safety
concerns. ,
When such equipment replacement occurs, the re-
placed component is inherent to both the design and
purpose of the process unit, and there is no reason to
believe that such activity will cause the unit to emit
above its original design capacity. Moreover, most of
these replacements are conducted at industrial facilities
to maintain proper operations and to implement good
engineering practices. For example, if a pump associ-
ated with a distillation column fails and is replaced with
an identical new pump, we believe that such a common
activity is and should be considered an excluded replace-
46a
ment. It is not a “change” to the plant, since it merely
maintains the plant as designed. Instead, it is the type
of activity expected to occur to maintain the plant.
Therefore, we think replacements like this properly fall
within the exclusion for “routine maintenance, repair
and replacement.” We also believe treating them in this
fashion is consistent with the basic policies of the CAA:
that existing plants are subject to major NSR permit-
ting requirements only when they engage in an activity
that constitutes an opportune time to install state-of-
the-art pollution control equipment.
We also believe that this principle extends beyond
the replacement of equipment with identical equipment.
When equipment is wearing out or breaks down, it often
is replaced with equipment that serves the same purpose
or function but is different in some respects or improved
in some ways in comparison with the equipment that is
removed. To continue with the example used above, if,
instead of replacing the worn out distillation column
pump with an identical one, the owner or operator re-
placed it with a new and improved model, it does not
seem to us that this changes the fundamental reasons
for treating that replacement as likewise within the
scope of “routine maintenance, repair and replacement.”
This is particularly true since technology is con-
stantly changing and evolving. When equipment of this
sort needs to be replaced, it often is simply not possible
to find the old-style technology. Owners or operators
may have no choice but to purchase and install equip-
ment reflecting current design innovations. Even if it is
possible to find old-style equipment, it seems unneces-
sary and undesirable to generally construe NSR permit-
47a
ting requirements in a manner that is bound to deter
owners or operators from using the best equipment that
suits the given need when replacements must be in-
stalled.
The limiting principle here is that the replacement
equipment must be identical or functionally equivalent
and must not change the basic design parameters of the
affected process unit (e.g., for electric utility steam gen-
erating units, this might mean heat input and fuel con-
sumption specifications). We also believe, however, that
we need not and should not treat efficiency as a basic
design parameter as we do not believe NSR was in-
tended to impede industry in making energy and process
efficiency improvements. We believe such improve-
ments, on balance, will be beneficial both economically
and environmentally. This treatment of efficiency
should address the concern and perception that the NSR
program serves as a barrier to activities undertaken to
facilitate, restore, or improve efficiency, reliability,
availability, or safety of a facility.
Today’s rule does not distinguish between the re-
placement of components that are expected to be re-
placed frequently or periodically and the replacement of
components that may occur on a less frequent or one-
time basis. It likewise does not distinguish between the
replacement of larger and smaller components, instead
requiring greater scrutiny if the replacement in question
is part of an activity that exceeds 20 percent of the re-
placement value of the process unit.
Our decisions on these points are derived from re-
flection on the function of the exclusion in the context of
48a
the CAA. As explained above, and as described more
fully in our legal analysis set forth below, we do not be-
lieve that application of the major NSR program to
“modified” plants is designed to require existing plants
that are continuing to operate in a manner consistent
with their original design to curtail their rate of produc-
tion or hours of operation beyond limitations set forth in
their existing permits. We likewise do not believe that
the program is designed to discourage plants from re-
placing parts or components so as to preserve their abil-
ity to produce at that rate. Rather, we believe Title | of
the Clean Air largely leaves to State and local permit-
ting authorities whether to require adjustments in the
operations of those plants in order to reduce emissions
to the degree needed to attain or maintain national] air
quality standards, and how to weigh the trade-offs such
adjustments may produce in terms of potential economic
impacts and loss of productivity. Instead, we believe the
central function of the application of major NSR. permit-
ting requirements to “modifications” is to assure that
plants install state-oi-the-art pollution controls.
We recognize that on these points, the approach
taken by our final rule thereby differs in some respects
from the multi-factor, case-by-case approach we have
been using in identifying RMRR, and particularly from
some of our applications of that test to certain equip-
ment replacements. We believe, however, that this ad-
justment in our approach is fully warranted for the rea-
sons outlined above, and described more fully in our !e-
gal analysis below.
49a
The following examples of functionally equivalent
replacements under today’s rule include:'
¢ Replacing worn out pipes in a chemical process
plant with pipes that are constructed of different metal-
lurgy (e.g., to help reduce corrosion, erosion, or chemical
compatibility problems).
* Replacing an analog controller with a digital con-
troller, even though a similar analog controller can still
be purchased and even though the new controller would
allow for more precise control. A good example was pre-
sented to us by the forest products industry during our
review of the NSR program’s impacts on the energy
sector. A company in that sector needed to replace out-
dated anaiog controllers at a series of six batch
digesters. In this case, the original controllers were no
longer manufactured. The new digital controllers, cost-
ing approximately $50,000, are capable of receiving in-
puts from the digester vessel temperature, pressure,
and chemical/steam flow. The new controllers would
have more precisely filled and pressurized digesters
with chips, chemicals, and steam, thus bringing a batch
digester on line faster.
’ As discussed in more detail below, although such activities would
be functionally equivalent, they would still need to meet other criteria
to qualify for the ERP. For example, a functionally equivalent re-
placement does not qualify for the ERP if it results in a change to a
basic design parameter of the affected unit. If an activity does not
qualify for RMRR under the ERP, the case-by-case RMRR approach
would still be available to the owner or operator under those cireum-
stances. And, of course, even if the activity does not qualify for the
RMRR exclusion, the activity will not be a modification and, hence, will
not trigger NSR unless it results in a significant emissions increase.
50a
¢ Replacing an existing mill or pulverizer (e.g.,
grinding clinker in a cement factory or coal for a boiler)
with a new one of a different type because both new and
old equipment serve the same purpose (even if the char-
acteristics of the ground material would be different
before and after the replacement).
* Replacing existing spray paint nozzles with new
ones that might atomize the spray better or have a
higher transfer efficiency because the “before” and “af-
ter” nozzles serve the same function.
At the same time, there are numerous activities
that occur at facilities that may fall within the bounds of
the cost threshold percentage, basic design parameters,
and other backstop features of today’s rule, but never-
theless cannot qualify for the RMRR exclusion on the
grounds that the equipment is neither identical nor func-
tionally equivalent. An example of this would be a chem-
ical processing facility where the owner or operator
makes a physical change that allows the production of a
new end product that physically could not have been
manufactured with the previous equipment using the
same raw materials as used before in the same amounts
as before. This would not be a functionally equivalent
replacement activity because the facility is able to pro-
duce an end product after making the change that the
facility was not capable of making before the change.
Consequently, this activity would not qualify as RMRR
under today’s ERP.
Several commenters said the equipment replace-
ment provision will streamline the major NSR applica-
bility analysis. A number of commenters believed the
S5la
ERP would be easier to implement than the proposed
annual maintenance, repair and replacement allowance
approach. One commenter said that allowing identical
replacements to be excluded from major NSR will codify
existing industrial practices, where replacement has no
impact on emissions and would clearly represent
RMRR. |
Many commenters expressed support for the ERP,
but recommended certain changes that they felt needed
to be made to improve the proposal. One commenter
supported the ERP in combination with a capacity-based
option, on the assumption that repair and maintenance
is to be excluded as well as equipment replacement.
One commenter attempted to collect data from tur-
bine customers and found that achieving a level of data
collection necessary for the ERP was far from simple,
because the cost of maintenance activities is affected by
such things as variability in engine model, package tech-
nology, and type of maintenance contract. Another
commenter gave an example of the benefit that the ERP
may provide. Without the ERP, the commenter said the
source is limited to some fraction of boiler tubes allowed
to be replaced at a given time, whereas with the ERP,
replacement of all boiler tubes would, in the com-
menter’s opinion, rightfully be considered routine. An-
other commenter said the ERP will remove regulatory
burdens for types of equipment replacements that are in
their view “routine,” such as, replacement of tubes in
industrial boilers. They addéd that, without a clearer
understanding of which activities are RMRR, they may
be inclined to delay conducting such replacements.
52a
Many other commenters generally opposed any
change to the RMRR exclusion, including one based on
equipment replacement. Some of these commenters
believed the ERP was problematic because it would al-
low a sonrce to replace an entire process unit over time.
Two of the commenters opposed the ERP because they
felt it would create disincentives for the implementation
of Plantwide Applicability Limits (PAL) and Clean Unit
provisions from the recently finalized rule.
One commenter said that from an engineering
standpoint, for a power plant, the difference between
routine maintenance and a major plant refurbishing pro-
ject is clear. To further clarify, the commenter made
the following points. According to the commenter, rou-
tine maintenance is frequent and follows a predictable
pattern. The commenter characterized routine mainte-
nance at power plants as: repair of leaking pipes, pumps,
valves, and fans; cleaning and lubrication of components;
and inspections. The commenter added that permanent
staff do this work either while the plant is operating or
during only brief periods of downtime. The commenter
further expressed that activities that are not routine
require long plant or process unit shutdowns, are done
infrequently, and are major capital projects for which
special funding is set aside as a result of years of plan-
ning and design work.
One commenter said the proposal will allow emis-
sions increases that will be difficult to offset through
other regulations. One commenter objected to the ERP
for a number of reasons: (1) The provision does not pre-
vent replacement with different equipment; (2) it does
not promote efficiency improvements or application of
53a
good air pollution controls; and (3) it would allow re-
placements that would significantly increase emissions.
This commenter said replacement of air pollution con-
trols should trigger best available control technology
(BACT) or lowest achievable emission rate (LAER) re-
quirements. Two local air pollution control agencies in
California noted that they currently already exclude all
replacements with identical equipment from major NSR
wher certain conditions are met.
Commenters generally had similar viewpoints on
allowing both identical and functionally equivalent
equipment replacements to qualify as RMRR. However,
some commenters expressed greater concern related to
excluding the replacement of equipment with function-
ally equivalent equipment. Primarily their concerns
were rooted in the fact that a functionally equivalent
replacement component could lead to increases in opera-
‘tional efficiency or productivity, and these commenters
asserted that these sorts of process enhancements
should not be excluded as RMRR.
We agree with the commenters who felt identical
and functionally equivalent replacement activities gen-
erally should be excluded as RMRR. We also agree with
the commenters who believe that this provision wil!
streamline the major NSR applicability process and will
bring clarity. The provision we are finalizing will allow
a source to make a simple determination as to whether
a replacement piece of equipment qualifies as identical
or functionally equivalent. This type of determination
will be straightforward and easier for the source to im-
plement than the current case-by-case analysis required
to determine a replacement falls within the RMRR ex-
eat wis eae a . @e * ney a ie ; Ya ee a
S4a
clusion. We support the air pollution agencies that have
already excluded these types of changes from NSR.
We disagree with those commenters who believe
that this provision will create disincentives for sources
to accept a PAL or have emission units designated as
Clean Units. A PAL offers a source to bring on entirely
new emissions units with no Federal preconstruction
permit, as long as emissions caps are not exceeded. A
_PAL or a Clean Unit designation allows a source to
make modifications without performing a major NSR
applicability test. These advantages will still be the
driving force for sources to elect to use the PAL or
Clean Unit provisions, and we do not believe this final
rule will significantly detract from their appeal.
We also believe that there is substantial value in
facilitating equipment replacements to a greater degree
than our current approach permits and draws a cleaner
and more easily administered line between equipment
replacements that categorically do not require a permit
and major plant refurbishing which will result in in-
creased emissions. For pieces of equipment used at in-
dustrial facilities, most manufacturers have well-estab-
lished procedures for the inspection and replacement
that are part of the regular maintenance necessary to
provide for the equipment’s safe, efficient and reliable
operation. Some of these replacements are large in
terms of cost and infrequent, but all are necessary to
maintain the safe, efficient and reliable use of the pro-
cess unit. We believe it is important to allow for these
replacements provided that certain safeguards are in
place, as discussed below.
' 55a
We disagree with suggestions from commenters
that the time period between activities, standing alone,
provides an appropriate or clear distinction between
activities that should be permissible under the RMRR
exclusion and those that should not. In fact, some com-
ponents wear out every year, while others wear out ev-
ery 20 years. Nevertheless, both types of changes
should fall within the ERP of the RMRR exclusion be-
cause both allow the facility to operate as designed. By
not imposing a time limitation, the ERP allows replace-
ment activities to be driven by consideration of economic
efficiency rather than artificial regulatory constraints.
We disagree with commenters who expressed parti-
cular concern about functionally equivalent replace-
ments. We continue to believe such activities should be
encouraged and should qualify as RMRR. Even though
a functionally equivalent component varies in some re-
spects from the replaced component, we feel the most
important factor to consider is whether the replacement
will serve the same purpose as the replaced component.
We acknowledge that a functionally equivalent replace-
ment can result in an increase in efficiency and; conse-
quently, productivity. In fact, one of our goals is to pro-
mote such outcomes. However, we believe that the basic
design parameter safeguard is appropriate to assure
that the ERP only automatically excludes from major
NSR functionally equivalent replacements that do not
result in a significant change to the fundamental charac-
teristics of the process unit.
We note that the two local programs in California
that exclude the replacement of equipment with iden-
tical equipment also allow the replacement of equipment
S6a
with functionally equivalent equipment without consid-
ering such action to be a modification. Due to local air
quality considerations, the local programs establish min-
imum pollution control requirements that are imposed
in some circumstances when functionally equivalent
equipment replacements occur. Nothing in today’s rule
would prevent a State or local program from imposing
additional requirements necessary to meet Federal,
State or local air quality goals.
After reviewing the comments on our proposal, we
have decided to promulgate what we proposed in De-
cember 2002 for the RMRR equipment replacement pro-
vision with relatively minor changes. We decided to in-
clude another safeguard in addition to those we pro-
posed in order to appropriately constrain the meaning of
the term “functionally equivalent.” The additional safe-
guard is that an excluded replacement activity cannot
cause the process unit to exceed any emission limitation
or operational limitation (that has the effect of con-
straining emissions) that applies to the process unit and
that is legally enforceable.
Thus, today’s final rule allows you to categorize
identical and functionally equivalent equipment replace-
ments as RMRR if the fixed capital cost of such replace-
ment plus the cost of repair and maintenance activities
that are part of the replacement activity does not exceed
20 percent of the replacement value of the process unit,
and if the replacement does not alter a basic design pa-
rameter of the process unit or cause the process unit to
exceed any emission limitation or operational limitation
(that has the effect of constraining emissions) that ap-
plies to the process unit.
a Se De eee ea see eee ee
S7a
C. What Cost Limit Has Been Placed on the
’ Kquipment Replacement Approach?
The next concept presented in the proposal is the
cost-based limitation on the scope of the ERP. The pur-
pose of this threshold is to distinguish between those
equipment replacement activities that should automati-
cally qualify as RMRR without furt..er consideration
and those activities that should undergo case-specific
consideration. This concept is akin to the long-estab-
lished reconstruction provision under the NSPS pro-
gram. For the reasons explained below, we have de-
cided to establish a 20-percent cost threshold under the
ERP. ,
We believe a similar bright-line rule that would
obviate the need for case-by-case review under our
multi-factor test of appropriate categories of equipment
replacements would be extremely useful in addressing
many of the problems that we have identified with the
current operation of the NSR program. Such a rule
would be particularly useful in avoiding the uncertainty
and delay, and consequent postponed or foregone equip-
ment replacements, that our multi-factor case-by-case
review induces. For example, our RIA indicates that it
takes a year, on average, to obtain a determination
whether a proposed replacement is routine. That kind
of delay obviously creates perverse disincentives to re-
frain from equipment replacements and instead repair
existing equipment or find some other solution. |
This is the kind of problem that classically leads
agencies to fashion bright-line tests to provide greater
regulatory certainty and efficiency. Moreover, because
2
58a
the kind of disincentives that give rise to this concern
operate largely by economic means, prompting sources
to take one course of action (cut back on productive
equipment replacement) rather than another (replace
the equipment and incur the costs of delay, as well as
potentially the costs of installing state-of-the-art con-
trols), we think a cost-based threshold is a reasonable
basis on which to create such a bright-line rule.
In the proposal, we observed that it may sometimes
be difficult to determine where to draw the line between
an activity that should be treated as an excluded re-
placement activity and one that should be viewed as a
physical change that might constitute a major modifi-
cation, when the replacement of equipment with iden-
tical or functionally equivalent equipment involves a
large portion of an existing process unit. We solicited
comment on a range of equipment replacement cost
thresholds such as one based on the NSPS program.
Under the NSPS program, when the cost of a project at
an existing affected facility exceeds 50 percent of the
fixed capital cost that would be required to construct a
comparable entirely new unit (that is, the current capital
replacement value of the existing affected source), then
the source must notify and provide information to the
permitting authority. After considering a range of fac-
tors, including the cost of the activity, the estimated life
of the facility after the replacements, the extent to
which the replaced equipment causes or contributes to
the emissions from the source, and any economic or
technical limitations on compliance with the NSPS, the
59a
reviewing authority determines whether the proposed
project is a reconstruction.®
We observed that, in some respects, an equipment
replacement cost threshold set at the NSPS reconstruc-
tion test could be an appropriate approach for distin-
guishing between routine and nonroutine identical and
functionally equivalent replacements under the major
NSR program. As under the NSPS program, we do not
believe it is reasonable to exclude from major NSR
those activities that involve the total replacement of an
existing entire process unit.
We also noted, however, that there are other con-
siderations pointing in favor of a threshold lower than
the 50-percent reconstruction threshold that might be
appropriate to bound the ERP. Under NSPS, when a
source undertakes a replacement activity at an existing
affected facility that constitutes half or more of the facil-
ity’s capital replacement value, our rules require a case-
by-case determination as to whether such replacements
constitute construction. We noted that a percentage
threshold lower than 50 percent might be more appro-
priate for determining where we would require case-by-
case consideration of the question whether equipment
replacements constitute a modification of an existing
process unit under major NSR. We solicited comments
on the appropriate level of any percentage.
* In the proposal, it was incorrectly stated that applicability of the
NSPS was triggered if a project exceeded 50 percent of the cost of
replacing the affected facility. As stated in this notice, if an activity
exceeds this cost threshold, that only triggers further evaluation, not
the automatic application of the NSPS to the source.
60a
Many commenters supported the threshold of 50
percent of replacement value as the upper limit on
equipment replacement. They felt this number is con-
sistent with existing regulatory requirements.and would
accord the flexibility originally intended under the CAA
for RMRR activities, while at the same time assuring
that major, nonroutine projects remain subject to major
NSR applicability review, and they felt this number is
consistent with a common-sense interpretation of the
regulations.
They also believed a 50-percent cutoff to be consis-
tent with reconstruction definitions used in many NSPS
and National Emission Standards for Hazardous Air
Pollutants regulations. Some commenters stated that a
50-percent cutoff for the ERP would be valid for the
same reason as for the NSPS reconstruction test; signif-
icant changes to a process unit are necessary before ret-
rofit controls should be considered, provided there is no
increase in emissions.
Many other commenters opposed the 50-percent
replacement value threshold. They believed the capital
replacement percentage should be much less than 50
percent. One commenter suggested as an appropriate
threshold that the sum of equipment replacement costs
for a single process unit over any period of 5 consecutive
years should not exceed 50 percent of the replacement
value of the process unit. Another commenter said the
replacement percentage should not be higher than 25
percent. Another commenter suggested a replacement
percentage of 5 to 10 percent to reduce the risk of re-
placement of an entire process unit over time without
installation of BACT. One commenter said a more ap-
6la
propriate perc . .ge for electricity producers is 0.1 to
1.0 percent. +....ther commenter said the threshold
should be 5 percent, 1 percent, or even less, as shown by
an NSR enforcement case against the Tennessee Valley
Authority (TVA).
Another commenter believed the 50-percent num-
ber has no practical effect in protecting public health
and the environment, and the commenter was not aware
of any projects that have exceeded 50 percent in cost.
While opposed to the ERP in general, one com-
menter said the cost threshold should be as high a per-
centage as possible, so as not to promote premature re-
placement of equipment that is repairable. Another
commenter said the 50- percent number from the NSPS
is archaic and not environmentally protective. This
commenter suggested that the threshold instead be 24
percent. The commenter believed this lower percentage
is appropriate because the lifetime of high-cost materi-
als will considerably exceed 5 years.
We agree with those commenters who see a rela-
tionship between establishing a threshold for equipment
replacements that we will treat as RMRR under the ma-
jor NSR program and the threshold the NSPS program
established for reconstruction. However, we disagree
that these two thresholds should be the same. The
NSPS threshold was intended to identify those activities
that, even though they did not qualify as a modification
under NSPS, nevertheless are of such magnitude that
further consideration should be given as to whether they
are projects tantamount to new construction. The 50-
percent NSPS threshold is not a bright line in the sense
62a
that all projects that exceed 50 percent are automati-
cally considered as reconstruction. Rather, as discussed
above, it is a threshold intended to alert permitting au-
thorities to significant projects and allow case-by-case
decisions based on a series of regulatory factors.
The ERP replicates the NSPS concept in some
ways. It identifies a threshold below which there is no
need for further inquiry into whether an activity quali-
fies for the ERP and above which there is a need for a
case-by-case determination. The major difference be-
tween the ERP and the NSPS reconstruction test is that
the ERP deals with modifications, not reconstructions.
This difference weighs in favor of establishing the equip-
ment replacement threshold at something less than the
reconstruction threshold. It is logical and practical to
conclude, as some of the commenters do, that by using
the word “modification” the CAA intended to capture
activities on a smaller scale than reconstructions. As
noted above, we have set the ERP cost threshold at 20
percent. This value is less than one-half of the 50-per-
cent reconstruction threshold and, therefore, fits well
within this conceptual framework.
A 20-percent cost threshold would be consistent
with the decision of the U.S. Court of Appeals for the
Seventh Circuit in the Wisconsin Electric Power Com-
pany v. Reilly (“WEPCO”) case, to the extent that it
would not automatically allow the activities performed
there to constitute RMRR. See 893 F.2d 901 (7th Cir.
1990). This court decision directly addressed the ques-
tion of what level of “like kind” replacement activities
qualify as changes under the major NSR program.
63a
In the WEPCO case, the Court considered an activ-
ity involving 5 coal-fired units at WEPCOQ’s Port Wash-
ington plant. Each unit was rated at 80 megawatts of
electrical output capacity. The activity involved the re-
placement of numerous major components. The infor-
mation submitted by WEPCO showed that the company
intended to replace several components that are essen-
tial to the operation of the Port Washington plant. In
particular, WEPCO sought to replace the rear steam
drums on the boilers at units 2, 3, 4, and 5. According to
WEPCO, these steam drums were a type of “header” for
the collection and distribution of steam and/or water
within the boilers. WEPCO viewed their replacement as
necessary to continue operation of the units in a safe
condition. In addition, at each of the emissions units,
WEPCO planned to repair or replace severai other inte-
gral components, including replacement of the air heat-
ers at units 1, 2,3, and 4. WEPCO also planned to reno-
vate major mechanical and electrical auxiliary systems
and common plant support facilities. WE PCO intended
to perform the work over a 4-year period, utilizing suc-
cessive 9-month outages at each unit. The cost of the
activity was estimated in 1988 to be $87.5 million. The
Court noted that EPA concluded at the time this activity
was unprecedented in that EPA did not find a single
instance of renovation work at any electric utility gener-
ating station that approached this activity in nature,
scope and extent. The Court determined, at our urging,
that the changes did constitute a “physical change” un-
der the NSR rules. .
In the case of a steam electric generating facility,
the process unit definition provided in today’s rule is
nearly identical to the make-up of the “comparable new
64a
facility” that was used in the NSPS evaluation of the
WEPCO renovation project. However, under our rule
we would not include the cost of pollution control equip-
ment in determining the replacement cost of the
WEPCO process units. WEPCO had electrostatic pre-
cipitators on each of its 5 process units, which our rule
would subtract from the replacement cost. In addition,
the WEPCO evaluation dealt with 5 boilers, each with its
own turbine-generator set; to be consistent with today’s
definition of steam electric generating facility, we would
likely treat each boiler unit as belonging to a different
process unit. However, since all of the boilers under-
went similar renovations, for simplicity we can assume
that all of the process unit-specific activity costs are
equivalent.
Using 1991 dollars, consistent with the timeframe
of the Seventh Circuit Court’s decision, it appears that
the value of the 5 process units at the 400-megawatt
WEPCO Port Washington facility would be approxi-
mately $321 million based on 1991 model plant values
provided by the International Energy Agency. The 1988
project cost of $87.5 million scaled up to 1991 dollars
would have had an adjusted project cost of $92.3 mil-
lion.” Thus, the capital cost percentage for the replace-
ment activities at WE PCO, averaged over its 5 process
units, amounted to 29 percent. Alternatively, using the
project cost of “at least $70.5 million” cited in the 1991
" Using the Chemical Engineering magazine’s Annual Plant Cost
Index (composite), $87.5 million in 1988 dollars is equal in real terms
to (361.3/342.5) multiplied by 87.5 million, or $92.3 million in 1991
dollars.
65a
decision by the Seventh Circuit, and using the same
value for process unit cost, we compute at least 22 per-
cent. The 20-percent threshold is, therefore, beneath the
scope of the activities at issue in the WEPCO case and
hence not inconsistent with that decision.
The 20-percent threshold also is supported by
available data for the electric utility sector. We havea
robust and detailed set of information available on main-
tenance, repair and replacement activities for the elec-
tric utility sector. Information about the electric utility
sector persuades us that we have established the right
ERP threshold for this sector.
Information on other industrial sectors beyond
electric utilities (as well as general economic theory)
further supports our 20 percent bright line test. Case
studies performed by an EPA contractor and included in
Appendix C of our final regulatory impacts analysis
(RIA) estimate the overall impact of the rule on six dif-
ferent industrial sectors (pulp and paper mills, automo-
bile manufacturing, natural gas transmission, carbon
black manufacturing, pharmaceutical manufacturing,
and petroleum refining). The case studies find that rou-
tine equipment replacement activities generally do not
cause emissions increases. The case studies also find
that equipment replacement activities vary widely
within these industries. Likewise, the cost of these ac-
tivities as a percent of the process unit replacement
value varies widely. We recognize that the study ad-
dresses specific case examples from only a part of regu-
lated industry and that the project cost information is
derived from a limited inquiry of industry representa-
tives. We believe, however, that the study provides a
66a
useful scoping assessment that tends to support the
proposition that the 20 percent threshold derived for the
utility industry (which is based on robust industry data)
should be applied to industry as a whole. In short, the
study supports our view that it is reasonable to assume
that equipment replacement activities in the utility in-
dustry are similar enough to replacement practices in
other industry that the 20 percent value determined for
utilities, is appropriate for industry as a whole. This
data indicates that most typical replacement activities
will fall within the 20-percent threshold. At the same
time, the data indicates that some major replacement
activities likely will cross the 20-percent threshold and
will require a case-by-case evaluation under the multi-
factor RMRR test.
Two comment letters (from the Utility Air Regula-
tory Group (UARG) and from the American Lung Asso-
ciation (ALA), et al.) were particularly helpful in under-
standing the issues associated with the electric utility
sector. The UARG provided as an attachment to its
comment letter a document describing major repair and
replacement activities that its members believe must be
undertaken at utility generating stations in order to
keep those facilities operational. The UARG noted that
capital costs incurred for repair and replacement activi-
ties at an individual process unit additionally include
activities more minor than those addressed in the docu-
ment. The UARG grouped repair and replacement ac-
tivities into project families; within each project family
were per-component costs ($/kW) for numerous equip-
ment replacement activities. We have reviewed the list
of projects supplied by UARG and have concluded that
these types of replacement activities are important to
67a
maintaining, facilitating, restoring or improving the
safety, reliability, availability, or efficiency of process
units. Therefore, generally speaking, these types of
individual activities and groups of activities should qual-
ify for the ERP and be excluded from major NSR with-
out case-specific review. We also believe that it is rea-
sonably expected in the electric utility industry for
groups of these activities to be implemented at the same
time. Such groupings should also be excluded without
case-specific review. When we compare the 20-percent
ERP cost percentage to the UARG data, we find that
individual replacement activities would, in fact, qualify
for the ERP and that limited groupings of these activi-
ties would qualify. However, larger groupings of these
activities—groupings that are not usually seen in the
industry—would not qualify for the ERP. This shows
that the 20-percent threshold will be effective in distin-
guishing between activities (and aggregations of activi-
ties) that should not require case-specific review to be
excluded from major NSR and those that do.
The ALA commenters provided with their com-
ments the results of their analysis of projects at issue in
an NSR enforcement case against Tennessee Valley Au-
thority (TVA). As shown in the ALA comment letter,
the Clean Air Task Force and the Natural Resources
Defense Council looked at costs for 14 projects on a pro-
cess unit basis, in year 2001 dollars, from the publicly
available record for the case. For all but one of the chal-
lenged projects, the ALA commenters calculated a cost
of less than 4 percent of process unit replacement cost.
The ALA commenters submitted results of this analysis
with their opposition to a source-wide, 5-percent mainte-
nance allowance. As noted above, we concluded in our
68a
2002 report to the President that the NSR pro-
gram—and the RMRR provision in particular— has in
fact resulted in delay or cancellation of activities that
would have maintained and improved the reliability,
efficiency, and safety of existing energy capacity. The
primary purpose of today’s rule is to rectify this prob-
lem. Thus, to the extent the activities addressed by
ALA qualify for the ERP, we now believe that such ac-
tivities, if conducted in the future, should be*excluded
from major NSR.
A final factor that we believe supports our selection
of a 20 percent threshold is the cost of installing state-
of-the-art controls on existing units. There is obviously
no single answer to the question of at what point that
cost becomes the deciding factor in an owner’s decision
whether to replace a piece of equipment and incur that
cost, since much will depend on the rate of return on the
investment. Nevertheless, we think it is reasonable to
assume that if the cost of the controls is greater than the
cost of the replaced equipment, it is likely to operate as
a substantial deterrent to replacing the equipment at
issue. That is likely to be the case with respect to elec-
trie utilities if we set the threshold below 20 percent,
which represents the approximate cost of retrofitting
existing plants with state-of-the-art controls. The equa-
tion is similar for industrial boilers. Notably, those sec-
tors represent a substantial fraction of the emissions
potentially subject to the NSR program. While the rela-
tive costs of air pollution controls in other industries
vary more widely than the costs for utility and industrial]
boilers, we nevertheless believe that the costs and tech-
nical issues associated with retrofitting air pollution con-
69a
trols factor significantly into equipment replacement
decisions.
D. What Will Be the Basis of Applying the 20-
Percent Threshold?
In the proposal, we solicited comment on whether
implementing the ERP on a per-activity basis or on
some other reasoned basis, such as applying the per-
centage to components that are replaced collectively
over a fixed period of time, may be more workable.
Many commenters stated that the ERP should be
implemented on a per-activity (or aggregation of activi-
ties) basis. Two of the commenters cited longstanding
NSR precedent as the basis of their comments, while
two other commenters relied on NSPS precedent. An-
other commenter thought the per-activity approach
would be less confusing than summing activities over a
fixed period of time. Other commenters believed the
equipment replacement threshold should in fact be ap-
plied on a 5-year rolling average.
We have decided to apply the percentage threshold
on a per-activity (or aggregation of activities) basis.
This is consistent with how major NSR has been.applied
in the past and will continue to apply in the future, with
the exception of those sources which establish a PAL.
The major NSR program is a preconstruction program
that requires applicability to be determined for a given
activity at a facility and, as necessary, permitting to oc-
cur prior to the time activities are commenced. The ma-
jor NSR program also requires applicability to be deter-
mined, in the first instance, based on an assessment only
of the parts of a facility involved in the activity. A per-
70a
activity basis works well with this approach. We are not
going final with a “component-by-component” approach
that we solicited comment on through our RMRR pro-
posal.
There would be obvious problems if we chose any
of the other approaches suggested in the proposal or
suggested by commenters (for example, annual basis or
5-year rolling average). One of the primary concerns
with applying the percentage to activities performed
over a span of time is that we would be restructuring the
major NSR program to operate based on after-the-fact
determinations. This raises the difficult question of
what happens under this type of approach if you learn
after commencement of an activity that it does not qual-
ify under the ERP. This situation is largely avoided by
the per-activity approach that we are establishing in to-
day’s rule. .
It should be noted that activities that are related
must be aggregated under the ERP, in the same way as
they would have to be aggregated for other NSR appli-
cability purposes. Under our current policy of aggrega-
tion, two or more replacement activities that occur at the
same time are not automatically considered a single ac-
tivity solely because they happen at the same time. For
example, a steam turbine rotor replacement project and
a boiler tube replacement project would not be aggre-
gated simply because they occur during the same main-
tenance outage and on the same process unit. Further
inquiry into the nature of the activities and their rela-
tionship to each other is needed before deciding whether
the activities must be aggregated under NSR. Also,
non-replacement activities that are part of a larger re-
Tla
placement activity should be included when calculating
costs for a replacement activity against the capital cost
threshold. .
E. What Basic Design Parameters Are Being
Established To Qualify for the Equipment
Replacement Provision?
In the proposal, equipment replacements were only
eligible for the ERP if they did not change the basic de-
sign parameters of the process unit. We proposed that
maximum heat input and fuel consumption specifications
for EUSGUs and maximum material/fuel input specifica-
tions for other types of process units are basic design
parameters. We solicited comments on limiting the eli-
gibility of the ERP this way and on the basic design pa-
rameters we proposed.
Several commenters expressed concerns with ei-
ther the use of these specific parameters, or the restric-
tion of the regulated community to only this set of de-
sign parameters. Other comments centered around an
inconsistency in how EPA has accounted for efficiency
in the basic design parameter safeguard. The com-
menters stated that, while EPA stated in the proposed
preamble that efficiency is not a basic design parameter,
the basic design parameter safeguard, as proposed, has
the potential to bar equipment replacements that
achieve significant gains in efficiency.
Commenters from all sides supported EPA’s ap-
proach to handling activities intended to improve an af-
fected process unit’s performance beyond its basic de-
sign parameters. Commenters asserted that these ac-
tions would not fall within the RMRR exclusion.
72a
Commenters from the gas transmission industry con-
curred and amplified this concept, stating that an engine
that is “uprated” at the time of overhaul should not be
excluded from major NSR under the RMRR exclusion.
We recognize that the proposed basic design para-
meters are inconsistent with some industry conventions,
and that we should allow for industry-specifie flexibility
or specify additional source category-specific parame-
ters. For example, for natural gas transmission com-
pressor stations, commenters explained that brake
horsepower is the conventional design capacity parame-
ter. We received similar comments from other indus-
tries, including cement and surface coaters, who ob-
jected to limiting their facilities to the proposed basic
design parameters. Accordingly, we have decided to
provide flexibility by providing a menu of choices from
which the owners or operators may select and also by
allowing for owners or operators to propose alternative
basic design parameters to their reviewing authority
which would then be made legally enforceable.
In addition to this flexibility, there may be a need
for additional flexibility in using the basic design param-
eters that are spelled out in today’s rule. For instance
with boilers, maximum steam production rate is often
used by the industry, and it may make sense in some
cases to set the design parameters based on those values
rather than on maximum heat input. Likewise, a crude
oil distillation tower may have several capacities that
are a function of the type of crude that is to be pro-
cessed, and so a refiner may need to have a set of basic
design parameters for its crude towers. These situa-
tions can be addressed by the source proposing alterna-
73a
tive parameters or sets of parameters to their reviewing
authority.
Also, there should be flexibility in how the basic
design parameters are demonstrated when the owner or
operator chooses not to rely on the design information
for its process unit. For example, in order to establish
the heat input value that the process unit has demon-
strated it is capable of achieving, an electric generating
unit should have the flexibility to reference available
credible information, such as results of historic maxi-
mum capability tests or engineering calculations. Re-
sults from tests performed by electric utilities in the
context of providing assurances to generation dispatch
systems and regional or national power pools may be
used to establish the process unit’s maximum heat input.
A review of such data or other available operational data
or design information can reveal the heat input that the
process unit is capable of achieving in its “pre-activity”
configuration, and this can be compared to a “post-activ-
ity” heat input value. Plant operators, where the speci-
fied basic design parameters are inappropriate for the
process, can propose what the measure of performance
will be for these process units, including the use of per-
mit limits on amount of production, to their reviewing
authority. For process units having multiple end prod-
ucts and raw materials, the owner or operator should
consider the primary product or primary raw material
when selecting a basic design parameter. |
Many pieces of equipment are purchased based on
their capacity or output. Consequently, for both utilities
and non-utilities, we have modified the proposed basic
design parameters to include output-based alternatives
74a
in today’s final rule. For utilities, the owner or operator
can select maximum hourly electric output rate and
maximum steam flow rate as its basic design parame-
ters, as an alternative to using input-based measures of
maximum hourly fuel consumption rate and maximum
hourly heat input. (We are clarifying from the proposal
that the correct parameter is maximum hourly heat in-
put, not maximum heat input.) Owners or operators may
set different design parameters for different fuel types
(such as coal or oil) or a combustion device that can ac-
commodate multiple fuel types: for coal-fired units, own-
ers or operators should consider that the fuel consump-
tion rate will vary depending on the quality of the coal
for a given heat input. When establishing fuel consump-
tion specifications in terms of weight or volume, the min-
imum fuel quality based on BTU content should be used
for coal-fired units.
Regardless of whether the source selects a basic
design parameter(s) specified for non-utilities in today’s
rule or gets approval from their reviewing authority to
use an alternative parameter(s) for any type of source,
we have not specified a fixed averaging time period for
the circumstance because we want the owner or opera-
tor to have the flexibility to select an averaging time
that best accommodates their operation. In most cases,
we believe that long term averaging periods (e.g., a 12-
month fixed period) will not be appropriate.
Thus, an equipment replacement that improves a
process unit’s efficiency and thereby enables the unit to
return to its design parameters can qualify as RMRR
even if current actual emissions increase as a result.
For example, if boiler tubes or refractories are replaced
75a
on a boiler process unit, and these activities are beneath
the capital cost threshold and are within the unit’s basic
design parameters, then they would qualify as RMRR
under the ERP even if this improves the unit’s effi-
ciency.
The manufacturer’s design parameters of a process
unit are always acceptable if an owner or operator
chooses to rely on them. In the rare cases where a facil-
ity does not have established design parameters, we be-
lieve that a reasonable look back period should be used
for establishing the pre-activity values for basic design
parameters, rather than taking the condition of the pro-
cess unit immediately before the activity. We have
therefore established a 5-year look back period, consis-
tent with that for the NSPS hourly emissions increase
test, for these situations. 2 7
We were urged by some commenters to incorporate
a de minimis increase level in the basic design parame-
ters that would allow activities to qualify for the ERP
even though the activities would result in a minor
change to the relevant basic design parameters. They
argued that some effects resulting from the replacement
may not be apparent before the equipment has been re-
placed. They argued that allowing for small changes in
basic design parameters would add greater certainty to
the ERP because unforeseen small changes would not
cause an activity to lose the exclusion after the fact.
While we sympathize with the commenter’s concern, we
do not see a ready solution to this problem under the
RMRR exclusion. In fact, we are not persuaded that
those types of changes can be readily justified under the
ERP because it is hard to see how an activity that
76a
causes basic design parameters to change is not “a
change” under NSR.
In sum, we continue to believe that an identical or
functionally equivalent replacement should not qualify
for the ERP if the activity causes the process unit to
exceed its specified basic design parametérs. Without
such a requirement, significant alteration of a process
unit’s fundamental design could be accomplished under
the guise of the ERP. Such an outcome obviously does
not square with the idea that identical or functionally
equivalent replacements are not “changes” under the
major NSR program. Our final rule is different from
the proposal, however, in that it provides greater flexi-
bility in defining basic design parameters for process
units. We were persuaded by commenters who ex-
pressed concerns that the proposed approaches did not
adequately encompass all affected operations and indus-
try sectors.
77a
F. What Collection of Equipment Should Be Con-
sidered in Applying the Equipment Replace-
ment Provision and How Should It Be De-
fined?
In the proposal, we raised the issue of what
collection of equipment should be considered in applying
the threshold under the ERP. We proposed the term
“process unit” as the appropriate collection to accommo-
date the intended coverage of activities under the ERP.
The purpose of this term is, to the extent possible, to
align implementation of the ERP with generally ac-
cepted and practical understandings of what constitutes
a discrete production process. The general definition
that we proposed was based closely on the definition of
process unit contained in 40 CFR 63.41 and read as fol-
lows:
Process unit means any collection of structures
and/or equipment that processes, assembles, applies,
blends, or otherwise uses material inputs to produce or
store a completed product. A single facility may contain
more than one process unit.
To help illustrate these concepts, we further pro-
posed five industry-specific examples of how this defini-
tion of process unit might be applied.
Some commenters compared the proposal’s defini-
tion of “process unit” (“ * * * producing or storing a
completed product * * * ”) to the definition that is
used by section 112(g) and that appears in 40 CFR 63.41
(“ * * * producing or storing an intermediate or final
product * * * ”). One of the commenters supported
the proposed definition. Two commenters said the rule’s
78a
definition should be consistent with that used by section
112(g¢), which they believe is broad enough to encompass
interrelated operations. While supporting the RMRR
proposal’s definition, two commenters recommended
that EPA provide regulatory flexibility by allowing a
facility the option to choose which definition it will use.
One commenter generally supported the proposed
definition of “process unit,” but this commenter believed
that “the delineation of a process unit should be made by
regulated entity rather than explicitly defined in a rule.”
Three commenters asserted that pollution control
equipment should be included in the process unit defini-
tion. One industry commenter said pollution control
equipment is often integral to the process and may pro-
duce an intermediate product. One environmental
commenter believed the proposed rule was unclear as to
whether pollution control equipment is part of the pro-
cess unit.
Several commenters said the proposed definition is
too vague or broad. Another commenter urged EPA to
change the definition of process unit to limit the scope of
what is allowed in the ERP, so that the source of emis-
sions (for example, an entire coal boiler) would not be
allowed to be replaced without major NSR. The
commenter asserted that the replacement unit’s scope
should be limited to an emission unit.
Most commenters agreed that the general process
unit definition is sufficient. However, a number
of commenters suggested that we revise or eliminate
some of the process unit examples (that is, the industry
category-specific definitions), and others were con-
79a
cerned that the proposed definitions do not support the
detailed process unit definition for a specific industry
because the definitions will never capture all possible
elements and configurations.
We received comments from several industry rep-
resentatives suggesting changes to our proposed
industry-specific definitions, and also to request that we
delineate other process unit types explicitly in the rule.
Definitions were submitted for sugar mills, chemical
manufacturing plants, surface coating operations, flat
glass manufacturing, fiberglass i aealalliaalit ad and gas
compressor stations.
One industry commenter agreed with our proposed
approach to proportionately allocate, based on capacity,
the cost of those components shared by two or more pro-
cess units. Another commenter suggested that, for elec-
tric utilities, we allocate the cost of shared equipment
based on a pro rata share of megawatts produced.
We agree with the commenters who favor using a
process unit as the basis for administering the ERP and
including a definition of process unit in the final rule.
We also agree with the commenters who suggested that
the definition of process unit should be consistent with
the definition in 40 CFR 63.41, and we have altered the
final rule definition to include those processes that pro-
duce “intermediates.” We acknowledge that, without
further explanation, the term “intermediates” is suscep-
tible to misinterpretation, which can cause confusion and
lead to less regulatory certainty. Thus, we provide the
following explanation as to how we intend to interpret
today’s rule.
80a
By “intermediates,” we mean the intended product
of an integrated facility operation. For example, for an
automotive manufacturing plant, while the completed
product would be the driveable vehicle ready for ship-
ping to the showroom, an intermediate product could be
the engine or the painted body shell. In this case, we
would not consider smaller production operations, such
as the e-coat, primer surface, or top coat operation, to be
intermediates in the context of our final rule definition
for process unit. Our primary goal in defining this term
“process unit” is to encompass integrated manufacturing
operations that produce a completed product, and those
operations that produce an intermediate as the product
of the process unit. In the case of the automotive paint
shop, series of coating steps together comprise the care-
fully designed and interrelated set of operations, all of
which are needed to provide a coating system that meets
design specifications. The individual operations almost
never are implemented individually and, as a practical
matter, simply would serve no meaningful purpose in the
absence of the others.
We disagree with the commenters who wish to in-
clude all pollution control equipment in the definition of
process unit. We feel that periodic replacement of com-
ponents of emissions control equipment should be en-
couraged and would rarely lead to actual emissions in-
creases. In instances where identical or functionally
equivalent replacement of pollution control equipment
occurs, it is likely you will qualify for a Pollution Control
Project exclusion. We do agree, however, that where
the control equipment is an integral component of the
process it should be included. Therefore, we are exclud-
8la
ing associated pollution control equipment from the defi-
nition of the “process unit,” except for contro] equip-
ment that serves a dual purpose in the process. We
know there are industries where pollution control equip-
ment performs a dual purpose; for example, condensers
- often serve to control emissions of organic air pollutants
while serving as an integral component of the operation
of a fractionation column. A low-NQ, burner is another
example of a dual-purpose component. In such cases, to
provide clarity and simplify administration of the ERP,
our rule provides that dual purpose equipment should be
considered part of the process. We are also clarifying in
today’s rule that administrative buildings (including
warehousing) are not to be included in the process unit,
but other types of non-emitting units that are integral to
the processing equipment should be included.
We also have included in our final rule industry-
specific examples of how this definition might' be ap-
plied. The examples are drawn from three selected in-
dustrial processing categories—electric utilities, refin-
eries, and incinerators. We proposed each of these de-
tailed definitions and received mostly support from
commenters on their accuracy. While we also proposed
detailed definitions for two other industries—pulp and
paper and cement producers—we have decided not to
finalize those definitions after receiving comments from
the relevant industry trade association asserting that
the definitions did not, and could not, capture all of their
industry’s configurations and they believed the generic
process unit definition was sufficient for their industry.
Because of the centrality of the “process unit” concept
to the usefulness of the ERP, it is our desire to include
specific definitions for steam electric generating facili-
2a
ties, petroleum refineries, and incinerators in the final
rule to provide as much certainty as possible for facili-
ties in these industries. As noted above, these defini-
tions also should be useful for those in other industries
who will apply our general definition because the indus-
try specific definitions provide clear examples of how we
intend the general definition to be interpreted and ap-
plied. During the public comment period on the pro-
posal, several commenters submitted additional industry
specific definitions and asked us to put them in the final
rule. We are not finalizing these suggested definitions
at this time, because we did not include them in the pro-
posed rule. However, provided below are the process
unit definitions that commenters submitted to us and
that we think comport well with the general definition of
process unit promulgated today.
¢ For a natural gas compressor station, each com-
pressor system, together with its proportionate share of
common support equipment is a separate process unit.
This would generally consist of the air inlet system, ac-
cessory drive system, gas producer, fuel delivery sys-
tem, cooling system, lube system, power turbine, power
shaft, control system, starting system, exhaust system,
and support facilities (e.g., auxiliary power generating
equipment, heating/cooling equipment, station and yard
pipe, valves, etc.).
* For a flat glass manufacturing plant, each pro-
duction line within a facility should be a separate pro-
cess unit. Flat glass production is completed on a con-
tinuous line where raw materials are added at one end,
a continuous ribbon of glass is formed, and finished
glass is packaged at the other end. The flat glass pro-
duction line consists of: the batch house, where raw ma-
83a
terials are stored and weighed; the furnace and refiner,
where the raw materials are melted; the bath, where the
glass ribbon is formed; the lehr, where the ribbon is an-
nealed; and the cutting and packaging equipment, where
the glass is removed from the line for sale to customers
or for additional processing later.
¢ For a fiberglass production facility, each produc-
tion line is a separate process unit. Fiberglass is manu-
factured on a continuous line where raw materials are
melted at one end to form a continuous strand of fiber-
glass that is packaged at the other end. The fiberglass
production line begins with the batch house, where raw
materials are stored and weighed. In the melter,
forehearth, and refiner, the raw materials are melted
and refined. From the refiner, glass fibers are formed
through controlled bushings. From the bushings, the
continuous strand fibers are either directly cut or pack-
aged or wound onto spools for packaging for sale to cus-
tomers or for additional later processing.
¢ For the production of precipitated amorphous
silica, the process unit includes, but is not limited to: raw
material storage and handling equipment used for mix-
ing sand and other raw materials prior to addition to the
furnace; the furnace itself; the raw material storage and
handling equipment for the cullet dissolving and silica
precipitation process; all dissolving, precipitation, and
filtration tanks and equipment; and drying equipment.
Further, the process unit includes all the product pack-
aging, storage, handling, and transfer equipment.
¢ For a chemical manufacturing plant, the process
unit would include all the equipment assembled and con-
nected by pipes or ducts to process raw materials and to
BEST AVAILABLE COPY
84a
manufacture an intended primary product and associ-
ated byproducts or intermediates. The process unit can
consist of more than one unit operation. Chemical manu-
facturing process units may include, but are not limited
to: raw material storage, and air oxidation reactors and
their associated product separators and recovery de-
vices; reactors and their associated product separators
and recovery devices; distillation units and their associ-
ated distillate receivers and recovery devices; associated
unit operations; associated recovery devices; and any
feed, intermediate and product storage vessels, product
transfer racks, and connected ducts and piping. A chem-
ica] manufacturing process unit includes pumps, com-
pressors, agitators, pressure relief devices, sampling
connection systems, open-ended valves or lines, valves,
connectors, instrumentation systems, and process con-
trol or dual purpose air pollution control devices or sys-
tems. For a chemical manufacturing facility, there are
several types of process units: those that separate and
distill raw material feedstocks; those that change molec-
ular structures through reactions or polymerization;
those that “finish” the reacted or polymerized product,
through compounding, blending, or similar operations;
auxiliary facilities, such as boilers and by-product fuel
production; and those that load, unload, blend, or store
products. Process equipment that acts to control emis-
sions, such as condensers, recovery devices, and oxidiz-
ers, is considered part of the process unit.
We note that we were unable to include some other
process unit definitions submitted by commenters.
While we do not believe that these other proposed de-
finitions were necessarily inconsistent with our general
definition of process unit, we had concerns and questions
85a
with some of these proposed definitions. We believe that
now that this rule is issued, we can more fully evaluate
those other definitions, including communicating with
the leading industry officials, and determine whether we
would approve of their use.
Finally, we have made some slight corrections to
the process unit definitions that we proposed based on
comments we received on the proposed definitions.
There are numerous industries that have industrial
boilers at their facility to provide electricity and steam
to their operations. As a general rule, we would expect
these boilers to be tredted as a separate process unit
from the other unit operations occurring at the facility. _
We would expect the boundaries of the process units for
such boilers to be consistent with the boundaries estab-
lished under the definition for a steam electric generat-
ing facility in today’s rule, which encompasses all equip-
ment from coal handling to the emission stacks.
We also decided to continue to require that owners
or operators who have components shared by two or
more process units to proportionately allocate, based on
capacity, the cost of those components. And we agree
with the commenter that an equitable approach for elec-
tric utilities having components shared by two or more
process units is to allocate the cost of shared equipment
based on the pro rata share of megawatts produced by
eacn process unit.
$6a
G. Consideration of Non-Emitting Units as Part
of the Process Unit
Many commenters supported excluding non-emit-
ting equipment from the ERP. One commenter stated
that triggering the major NSR review process for main-
tenance activities is an impediment to continuous im-
provement projects for certain products and processes,
even if actual emissions decrease or only non-emitting
units on the process line are affected. Delays or post-
ponements of project maintenance work adversely affect
the reliability, safety and productivity of operations and
cost control efforts. Another commenter recommended
that work at clearly non-emitting units, specifically in-
cluding foundation regrouting and repair and frametop
replacement, should be excluded from this rule. Three
commenters believed that non-emitting units cannot
result in an increase of emissions and thus do not need
to be evaluated under major NSR.
A bianket exclusion for non-emitting units could
create problems of interpretation because the term
“non-emitting components” is ambiguous when consider-
ing certain components. Commenters asserted that
identifying and separating out non-emitting components
can be a complex undertaking, and may be contrary to
the goal of a clear and straightforward option. One
commenter provided the following examples: (1) Piping
systems (although pipe connectors are a source of fugi-
tive emissions, the pipe normally is not); and (2) struc-
tural supports for a process unit (separating out the cost
of supports from an investment basis throughout a facil-
ity will be difficult).
87a
Another commenter believed it would be difficult to
separate the costs of emitting and non-emitting equip-
ment when determining the cost of the process unit.
The commenter also believed it would be difficult to de-
termine allocation of shared equipment in the cost anal-
ysis.
We are concerned that, if owners or operators were
allowed to strip away all of the non-emitting components
from a process unit definition, it would create significant
ambiguity in the rule and could result in significant vari-
ation in how the rule is applied to similar sources in dif-
ferent jurisdictions. In addition, we simply do not think
it is practical or logical to separate “non-emitting” com-
ponents of a process unit from “emitting” components.
We believe that integrated manufacturing operations
(that is, process units) typically include both types of
equipment. Separating emitting from non-emitting
equipment would create an artificial divide that con-
trasts sharply with physical and operational reality.
As noted above, however, we do believe that a dis-
tinction should be made between non-emitting equip-
ment that is part of a process unit and non-emitting
equipment that is functionally distinct from the process
unit. For example, most production facilities have build-
ings or space to house administrative offices, such as
offices for the plant accounting staff. Such non-emitting
facilities should not be considered part of any process
unit under today’s rule.
88a
H. What Is the Accounting Basis for the Process
Unit?
In the proposal, the accounting basis for the ERP
discussed was the same as for the NSPS reconstruction
provision, which is the fixed capital cost that would be
required to construct an entirely new unit. We also dis-
cussed for the annual maintenance, repair and replace-
ment allowance using the invested cost of a unit as the
accounting basis. We proposed that it would be appro-
priate to require that costs be calculated using an ap-
proach along the lines set out in the EPA Air Pollution
Control Cost Manual (http://www.epa.gov/
ttn/cate/dir1/c__allchs.pdf). Finally, we solicited com-
ment on whether the costs associated with the unantici-
pated shutdown of equipment, due to component failure
or catastrophic failures such as explosions or fires,
should be included in evaluating costs under the ERP.
In reviewing comments, we recognized that some
commenters appeared to direct their comments on the
accounting methods at the annual maintenance, repair
and replacement allowance, and not necessarily the
ERP. Often, we came to this conclusion simply by the
way the commenters organized their comments, and not
by any specific statements in the comment letter. How-
ever, since we asked for comment on the accounting ap-
proaches as they would be applied to both the annual
maintenance, repair and replacement allowance and the
ERP, we believe that comments that appeared te be
dedicated to the annual maintenance, repair and re-
placement allowance should also apply to our evaluation
of the accounting for the ERP, except in the case where
the commenter specified that their comments on the
89a
proposed accounting methods applied only to the annual
maintenance, repair and replacement allowance or the
ERP. Likewise, for considering whether costs associ-
ated with unanticipated shutdown of equipment, we con-
sidered the comments to apply to both the ERP and the
annual maintenance, repair and replacement allowance
unless the commenter specifically noted that the com-
ment should not be applied to both of the peapenee rule
provisions.
Most commenters asked for flexibility on whether
a facility should use replacement value, invested cost or
insurance valuation as the basis for the calculations.
They felt that all were of equal merit and different ones
would be available at different facilities so EPA should
not prescribe only one type.
Most commenters did not support the sole use of
the EPA Air Pollution Control Cost Manual (APCCM)
to standardize calculations for replacement and repair
costs for RMRR in general. Most commenters felt that
the APCCM is a worthy reference for costing but also
that sources should not be limited to only one manual,
because a single manual is likely to have shortcomings
and not be able to represent every situation.
Many commenters supported an exclusion of costs
for unanticipated shutdowns and failures. They noted
that strong incentives exist to avoid fires, explosions and
other unanticipated equipment failures because of the
risk of human injury and production interruptions and
because of the expense involved in restoring lost capac-
ity. As a result, they contend that a catastrophic event
already penalizes the facility dramatically, but then to
90a
impose the case-by-case analysis would only exacerbate
their troubles. They explained that failures take place
occasionally and can result in a sudden, unplanned par-
tial or total loss of equipment. When such a failure oe-
curs at a natural gas compressor station, the turbine or
engine concerned must be replaced immediately to avoid
a disruption in gas supply. Other facilities may have
similar pressures to maintain their product around the
clock. Such replacement fits easily within most ele-
ments of the equipment replacement test. Commenters
asserted that replacing a catastrophically failed turbine
or engine is clearly “routine,” since companies will al-
ways replace such failures.
Other commenters, however, opposed an exclusion
for unanticipated shutdowns and failures on the grounds
that maintenance activities performed during forced
outages are simply maintenance and should be consid-
ered as such, particularly given that the proposed
RMRR rule approaches and the December 2002 final
rules already have given the industry a number of ex-
clusion options.
We are allowing sources to determine the applica-
bility of today’s rule on the basis of replacement value,
with an option for sources to notify their reviewing au-
thority in writing if they desire to use another option
(for example, invested cost or insurance value where the
insurance value covers only the complete replacement of
the process unit). The equipment replacement cost
should be based on the current replacement value of the
entire process unit at the time of conducting the activity.
9la
Typically, replacement value is more easily ob-
tained than invested cost. Most manufacturers will have
information concerning the replacement value of a pro-
cess unit, because such costs are commonly used when
evaluating various business scenarios relating to manu-
facturing costs. Also, use of replacement value is consis-
tent with the NSPS provisions.
In addition to determining the replacement value
of a process unit, in our final rule we allow for the use of
several other accepted methods in different industries
for estimating such values. Replacement values:are the
estimated value of replacing a unit and can be based on
a current appraisal. In lieu of replacement cost, you can
also use inflation-adjusted original investment, insur-
ance limits if insured for full replacement of the unit, or
other cost estimation techniques currently employed by
the company, as long as the company follows GAAP and
if approved by the reviewing authority.
A dollar-per-kilowatt rate for calculating costs may
be appropriate for utilities. This model is specific to
source and fuel type and is updated periodically. We
allow sources to use insurance valuation methods such
as the Handy-Whitman Index to determine replacement
costs for electric utilities. Other sources to compute
costs include the Nelson Refinery Construction Index
Factors, Solomon Refinery Study, and licensors of the
respective process unit (e.g., Kellogg, UOP).
In order for a cost-based approach to be equitable,
all owners or operators must include the same catego-
ries of expenses in both the process unit replacement
value and the replacement activities sought to be ex-
92a
cluded. Therefore, although the final rule does not man-
date any particular approach, we believe it is generally
appropriate to calculate costs using an approach similar
to the elements of Total Capital Investment as defined
in the APCCM. While the manual contains basic con-
cepts that could be used to estimate total capital invest-
ment at a process unit, it is geared toward cost calcula-
tions for add-on control equipment. On the other hand,
the underlying concepts are taken from work done by
the American Association of Cost Engineers to define
the components of cost calculations for all types of pro-
cesses, not just emission control equipment. In certain
cases, other manuals might make more sense depending
on their circumstances.
Under the APCCM, total capital investment in-
cludes the costs required to purchase equipment, the
costs of labor and materials for installing the equipment
(direct installation costs), costs for site preparation and
buildings, and certain other indirect installation costs.
However, any costs that are part of the installation and
maintenance of pollution control equipment should be
excluded from the cost calculation, per our discussion in
the previous section of this preamble. We believe equip-
ment that serves a dual purpose of process equipment
and control equipment (combustion equipment used to
produce steam and to control hazardous air pollutant
emissions, exhaust conditioning in the semiconductor
industry, etc. should be considered process equipment.
Direct installation costs include costs for founda-
tions and supports, erecting and handling the equip-
ment, electrical work, piping, insulation, and painting.
Indirect installation costs include such costs as: engi-
93a
neering costs; construction and field expenses (costs for
construction supervisory personnel, office personnel,
rental of temporary offices, etc.); contractor fees (for
construction and engineering firms involved in the activ-
ity); startup and performance test costs; and contingen-
cies.
We believe there may be merit to the comments we
received advocating a categorical exclusion for unantici-
pated shutdowns and failures of some kind. When such
an outage occurs, there may be a real urgency to restore
the plant to operation without forcing it to await the re-
sults of a permitting action or applicability determina-
tion. In the past, we have handled these situations with
case-by-case consent orders; however, even that ap-
proach may lead to unnecessary delays. It may specifi-
cally be sensible to relaxing the 20 percent cost thresh-
old limitation for such events because it is unlikely that
sources would incur an outage to avoid controls. We did
not propose such a stand-alone exclusion and hence we
believe we should not act upon it at this time.
I. Enforcement
1. Compliance Assurance
We believe that the records developed and main-
tained in the ordinary course of business will provide the
primary means of assuring compliance with today’s rule.
We know that, as a general rule, companies necessarily
generate and keep records related to the types of pro-
jects covered by today’s rule. For example, companies
generally have comprehensive procedures by which
funds are allocated to both capital and maintenance ex-
pense projects. Many of the records generated by these
94a
_ procedures are needed for tax accounting purposes and,
by law, must be maintained for at least 6 years. More-
over, additional records must be maintained in indus-
tries regulated for other purposes, such as the energy
sector (over 90 percent of which, by capacity, is subject
to FERC regulation). Public utilities, licensees and nat-
ural gas companies that are subject to FERC jurisdic-
tion must, unless they receive a waiver from the Com-
mission, comply with extensive accounting and record
retention requirements. They must keep financial infor-
mation according to uniform systems of accounts that
are set out in 18 CFR part 101 for public utilities and
licensees, and 18 CFR part 201 for natural gas compa-
nies. These uniform systems of accounts include hun-
dreds of specific accounts, including individual accounts
for boiler plant equipment, engines and engine-driven
generators, turbogenerator units, and hundreds of other
asset, liability, cost and property items.
These companies also must retain records accord-
ing to the schedules set forth in 18 CFR part 125 (for
public utilities and licensees) and 18 CFR part 225 (for
natural gas companies). The types of records that com-
panies must keep include, for public utilities and licens-
ees, for example, generation and output logs (records
must be kept for 3 years), load records (3 years), gauge-
reading reports (2 years), maintenance work orders and
job orders showing entries for labor, materials and other
charges in connection with maintenance and other work
pertaining to utility operations (5 years), work order
sheets for construction work in progress (5 years), ap-
praisals and valuations made of utility property or in-
vestments (3 years), engineering records, drawings, and
other supporting data for proposed or as-constructed
9Sa
utility facilities, including detail drawings and records of
engineering studies (must be kept until facilities are
retired), contracts or other agreements relating to ser-
vices performed in connection with construction of util-
ity plant (6 years after the plant is retired or sold), gen-
eral and subsidiary ledgers (10 years), paid and canceled
vouchers, and original bills and invoices for materials,
services, etc. (5 years).
Altogether, these various sources of information
provide more than reasonabie assurance of compliance
with today’s rule. This is particularly true given EPA’s
broad authority to inspect affected facilities and require
submission of compliance related data. Accordingly, we
are not imposing any recordkeeping requirements in
today’s rule.
2. General Issues
Today’s rule provides revisions to the major NSR
program to specify categories of equipment replacement
activities that we will consider RMRR in the future. As
recognized by the U.S. Supreme Court, an agency may
not promulgate retroactive rules absent express con-
gressional authority. See Bowen v. Georgetown Univ.
Hosp., 488 U.S. 204, 208, 102 L. Ed. 2d 493, 109 S. Ct.
468 (1988). The CAA contains no such expressed grant
of authority, and we do not intend by our actions today
to create retroactive applicability for today’s rule. 42
U.S.C. 7401 et seg. Today’s rule applies only to conduct
that occurs after the rule’s effective date.
None of today’s rule revisions apply to any changes
that are the subject of existing enforcement actions that
the Agency has brought and none constitute a defense
96a
thereto. Furthermore, prior applicability determina-
tions on major modifications that result in control re-
quirements in an NSR permit that currently applies to
a source remain valid and enforceable as to that source.
As noted above, today we are changing the scope of
the RMRR exclusion from the major NSR program by
taking final action on the ERP. If you subsequently un-
dertake an activity that does not meet the applicable
provisions of these new alternatives and do not obtain a
preconstruction permit if you are required to do so, you
will be subject to any applicable enforcement provisions
(including the possibility of citizens’ suits) under the
applicable sections of the CAA. Sanctions for violations
of these provisions may include monetary penalties of up
to $27,500 per day of violation, as well as the possibility
of injunctive relief, which may include the requirement
to install air pollution controls.
J. Quantitative Analysis
At proposal, we presented a quantitative analysis
of the possible emissions consequences of the range of
different approaches to the RMRR exclusion to evaluate
if our policy conclusions are correct. Our analysis was
conducted using the Integrated Planning Model (IPM).
This analysis was done for electric utilities because we
have a powerful model to perform such an analysis that
we do not have for other industries. We stated that the
results for electric utilities accurately reflect the trends
we would see in other industries.
The IPM analyses of different scenarios showed
that the breadth of the RMRR exclusion would have no
practical impact on, let alone be the controlling factor in
97a
determining, the emissions reductions that will be
achieved in the future under the major NSR program.
The analyses showed that emissions of SO, are essen-
tially the same under all scenarios, but that under to-
day’s rule these emission levels will be met in a more
economically efficient manner than the base case. This
stands to reason because nationwide emissions of SO,
from the power sector are capped by the title IV Acid
Rain Program. For NQ,, these analyses showed modest
relative decreases in some cases and modest relative
increases in other cases. These predicted changes rep-
resent only a fraction of nationwide NO, emissions from
the power sector, which hover around 4.3 million tons
per year (tpy). At this time, we do not have adequate
information to predict with confidence which modeled
scenario is most likely to occur. What these analyses
indicate, however, is that regardless of which scenario is
closest to what comes to pass, today’s rule will not have
a significant impact, up or down, on emissions from the
power sector. However, we expect the rule to result in
significant improvements in safety, reliability, and other
relevant operational parameters.
The DOE also presented further analysis of the
possible emissions consequences of the range of differ-
ent approaches to the RMRR exclusion. Using the Na-
tional Energy Modeling System (NEMS), a variety of
changes in energy efficiency and availability were evalu-
ated, as well as the effect on emissions resulting from
these regulatory revisions. This analysis concluded that
efficiency improvements resulting from increased main-
tenance, repair and replacement are expected to de-
crease emissions, whereas availability improvements are
expected to increase emissions. In the cases repre-
98a
sented in this analysis, the emissions reductions from
assumed reductions in heat rates tended to dominate the
corresponding effects of the assumed availability in-
creases.
A number of commenters said that the underlying
assumptions EPA used in the IPM analysis were flawed
and resulted in erroneous conclusions regarding the
emission reduction potential of the proposed RMRR
rules. Several commenters stated that EPA’s IPM anal-
ysis incorrectly assumes that no major modifications at
any older units would ever trigger the requirement to
add new pollution controls. In addition, according to
commenters, EPA also erroneously assumed that this
lack of major maintenance, repair and replacement will
have very little impact on the performance of those
power plants, when in reality their emissions would in-
crease significantly. The commenters cited a Clean Air
Task Force analysis for power plants, which estimates
that EPA’s rule revisions will result in at least 7 million
more tons of SO, and 2.4 million more tons of NO, annu-
ally. Some commenters also questioned the appropriate-
ness of using EPA’s analysis for the electric generating
sector to draw conclusions about non-utilities.
One commenter said the IPM and DOE NEMS
analyses correctly demonstrate that EPA’s RMRR pro-
posal will have no appreciable impact on emissions from
the power sector. According to the commenter, this con-
clusion is consistent with EPA’s findings in a 1989 re-
port, “1989 EPA Base Case Forecasts,” which demon-
strated that continuing to allow utilities to undertake
activities including ongoing annual operating and main-
tenance activities and a major refurbishment when the
99a
unit reached 30 years of operating life would have no
appreciable impact on emissions from the power sector,
just as EPA’s and DOEF’s recent analysis confirmed.
One commenter said the proposal lacks any refer-
ence to the gains accomplished by major NSR, the ongo-
ing enforcement actions, settlements reached as a result
of those actions, or the potential gains from the investi-
gations now pending. The commenter argued that EPA’s
reliance on improvements in productive capacity as the
measure of success fails to consider that productive ca-
pacity must be balanced with the interests of health and
welfare. The commenter also noted that a critical part
of EPA’s burden is to consider all the relevant factors
leading to its conclusion that the exclusions are neces-
sary and appropriate and that at the very least this in-
cludes an assessment of the expected effects on emis-
sions, which in turn will determine the public health ben-
efits and costs of the proposed rule. Although data on
emission reductions achieved under the existing pro-
gram are available, we have stated that we cannot pre-
cisely quantify the effects the proposed rule will have on
emissions. Some commenters stated that before promul-
gating a final rule, EPA should provide such a quantita-
tive assessment of the rule.
We disagree with the commenters who believe that
emissions would be significantly higher for electric utili-
ties than are estimated under the IPM model runs.
These commenters’ arguments rely on the assumption
that EPA’s base case is invalid because, if major NSR
rules were left unchanged, eventually all coal-fired utili-
ties would either apply BACT or deteriorate so badly
that they would