Petition for Writ of Certiorari — Cris Realms, Inc. v. United States
Supreme Court brief2001
Ask Donna
What actually matters in this document.
Text
, ‘¢ Court, U.S,
Q) LED
90 704 ocr, 3 o.2n99
No. | QFEICE QE THE CLERK
In The
Supreme Court of the United States
e
LAND, ET AL.; CRIS REALMS INC.; RONALD J. ISAAC;
BETTY PERRIN ISAAC; and
CRISTINA INVESTMENT CORPORATION,
Petitioners,
UNITED STATES OF AMERICA,
Respondent.
*
On Petition For Writ Of Certiorari
To The United States Court Of Appeals
For The Fifth Circuit
+
PETITION FOR WRIT OF CERTIORARI
a
Davip C. Logs Mack E. BARHAM
MOoLAISON, LOEB, Rosert E. ARCENEAUX*
GREENBERG & ZELENKA, LLP Travis L. BourGEo!s
230 Huey P. Long Avenue BarHam & ArcENEAUX, PLC
Gretna, LA 70053 Poydras Center, Suite 2700
Tel: (504) 366-4336 650 Poydras Street
New Orleans, LA 70130-6101
Tel: (504) 525-4400
Attorneys for Petitioners
Cris Realms, Inc., Ronald J]. Isaac, et ux, and
Cristina Inv. Corp.
“Counsel of Record
Spr
—— ee a ne
1)
2)
3)
QUESTIONS PRESENTED
Must a landowner prove “bad faith” to recover just
‘compensation when the market value of his property
has been diminished as a result of the project for
which his property has been condemned?
Is a determination that the Court of Claim lacks juris-
diction to hear an inverse condemnation claim res
judicata on the jurisdiction of a district court to deter-
mine the actual date of taking of the property made
the subject of the direct condemnation claim by the
United States?
Does the appellate court have jurisdiction to make a
de novo determination of facts when the district court
has not ruled upon the issue?
1)
2)
3)
ii
CERTIFICATE OF INTERESTED PARTIES
Parties
(A) The United States of America
(B) Cris Realms, Inc.
(C) Cristina Investment Corp.
(D) Ronald J. Isaac, et ux.
Corporate Information
(A) Cris Realms, Inc.
(i) Cris Realms, Inc. has no parent corpora-
tion.
(ii) Cris Realms, Inc. has no publicly held
stock.
(B) Cristina Investment Corp.
(i) Cristina Investment Corp. has no parent
corporation.
(ii) Cristina Investment Corp. has no publicly
held stock.
Law firms
(A) The United States of America (represented
below by)
(i) Glenn K. Schreiber, Hale Boggs Federal
Building, 501 Magazine Street, Room 205,
New Orleans, Louisiana 70130;
Donald F. Rosendorf, P.O. Box 561, Ben
Franklin Station, Washington DC 20044;
CERTIFICATE OF INTERESTED PARTIES - Continued
(B)
(C)
(D)
(E)
John Smeltzer, U.S. Department of Justice,
P.O. Box 23795-L’Enfant Plaza, Washington,
D.C. 20026.
Cris Realms, Inc.
(i) Barham & Arceneaux, PLC
Cristina Investment Corp.
(i) Barham & Arceneaux, PLC
Ronald J. Isaac, et ux.
(i) Molaison Colvin Greenberg Zelenka Morris
& Loeb, LLP
Perrin Butler (Cris Realms, Inc.)
(i) Barbee & Stern
iv
TABLE OF CONTENTS
Page
QUESTIONS PRESENTED 2. ccccccccccessccccccaces i
CERTIFICATE OF INTERESTED PARTIES .......... ii
FARR GE GONG ab i oie cecsvedaescecdoccness iv
TABLE OF AUTIOORITIOS 20.0... cccccsscsccccsecce Vv
CITATION OF THE LOWER COURT OPINIONS... 1
STATEMENT OF JURISDICTION................++. 1
CONSTITUTIONAL PROVISIONS.................- 2
ee Cs inv inh abnd baste vesveibisiaas 2
STATERGENT OF THE CAGB soc. c ccc cccccesscceses 3
REASONS FOR GRANTING CERTIORARI ......... 14
I. The Court of Appeals’ interpretation of the
“scope of the project” rule is contrary to well-
established law applying the Just Compensation
CD sivnvccsecobsnccscsccsccettaaayesecbaren 14
II. The Court of Appeals’ decision is directly con-
trary to this Court’s ruling limiting appellate
PORNO 6 0.6.6.6 6.n050 50 i pstdnncandostekencwens 18
III. The Court of Appeals’ decision is in conflict
with numerous decisions which recognize that
the district court has concurrent jurisdiction to
determine the date of taking in a condemnation
MEINE oc cccdccvpecotventdadsssntscksgsabessens 21
CE AMIOG bodes odnininesdsanthemacaavadubitan 28
pS ROR re BaP MERTEN Re App. 1
Vv
TABLE OF AUTHORITIES
WN oy cous ceavivscassadin 26,
Stephenson v. United States, 33 Fed.Cl. 63 (Fed.Cl.,
1994), mandamus denied, 66 F.3d 345 (Fed. Cir.
Ws nc vce cdcacaddndencesthedvinkensekdanpeuseres
Page
Cases
Allen v. R & H Oil & Gas Co., 63 F.3d 1326 (5th Cir.
WOOD inns cbdicvceswdenensetenegaphusetaskevens 18, 19
Bayou des Familles v. United States, 130 F.3d 1034
COR, COC TOG s co ciacccctaciviscnevsusncedtesecenas 26
_ Block v. North Dakota, ex rel. Bd. of Univ. and School
Lands, 461 U.S. 273, 103 S.Ct. 1811, 75 L.Ed.2d
Et. . OPPOrisrT Per rorT err rT Cite re rere 24
Click v. Copeland, 970 F.2d 106 (5th Cir. 1992)........ 20
First Interstate Bank v. United States, 61 F.3d 876
Cat, Cie, TOT vctnacccdstceanapescceseeasnaianne 19
Georgia-Pacific Corp. v. United States, 568 F.2d 1316
(Ct. Cl. 1978), cert. denied, 439 U.S. 820, 99 S.Ct.
64, 5B L.Bd.2d 111 (1978) .......ccccccccsccccccoes 22
Hensley v. West, 212 F.3d 1255 (Fed. Cir. 2000)....... 19
Icicle Seafoods, Inc. v. Worthington, 475 U.S. 709, 106
S.Ct. 1527, 89 L.Ed.2d 739 (1986).............-.+5- 18
Martin v. Bedell, 955 F.2d 1029 (5th Cir. 1992), cert.
denied, 506 U.S. 915, 113 S.Ct. 323, 121 L.Ed.2d
DED COGN ss onda ccd uccdcncetcssdnd Pigg pentewe tun 19
Nilson v. City of Moss Point, 701 F.2d 556 (5th Cir.
OEP P Rn rrrerirrerc re ore Te rrr ee ere 26
vi
TABLE OF AUTHORITIES - Continued
Page
Sociano v. United States, 352 U.S. 270, 77 S.Ct. 269,
2 LBABe BOS (IGG). cc cccccccecccccccccssicscosas 25
United States v. 12.18 Acres of Land in Jefferson
County, Kansas, 623 F.2d 131 (10th Cir. 1980)...... 17
United States v. 49.01 Acres of Land, 669 F.2d 1364
(2th, Cie. 290G). cccccccccccccesscccscosccsoveccsa 17
United States v. 320 Acres of Land, 605 F.2d 762 (Sth
Cie, BOGDP c0ccncnndseusnccebansncntacheccnseseusan 16
United States v. 422,978 Square Feet of Land, 445
RDA BOSD COGa Gok TIVE s occ ccccecccsecsscnceness 23
United States v. Daim, 494 U.S. 569, 110 S.Ct. 1361
(IDDED . cncccccccocncovecocsshcnteceaseusuapouweess 24
United States v. Dow, 357 U.S. 17, 78 S.Ct. 1039, 2
RE Pee ee 22
United States v. Ledford, 202 F.3d 283 (10th Cir.
1999); 1999 WIL. 1DGGESS 2. cccccccccscccccccccccess 23
United States v. Meadow Brook Club, 259 F.2d 41 (2d
Che. BODED occcuccccdeccscvetéveceneveucueun 13, 14, 16
United States v. Miller, 317 U.S. 369, 63 S.Ct. 276, 87
ee Ff: PPO 15, 16, 17
United States v. Mottaz, 476 U.S. 834, 106 S.Ct.
2224, 90 L.Ed.2d 841 (1986)..............0eeeeeees 24
United States v. Reynolds, 397 U.S. 14, 90 S.Ct. 803,
ZS L.ED TB ROPE Po 0 ac ccccccesssccess 15, 16, 17, 19
vii
TABLE OF AUTHORITIES —- Continued
EOS 0 6e6ecsedcecesstcetnckakcneesaunsdébacbederen 20
West Jefferson Levee Dist. v. Coast Quality Const.
Corp., 640 So.2d 1258 (La. 1994), cert. denied, 513
U.S. 1083, 115 S.Ct. 736, 130 L.Ed.2d 639 (1995) ..... 9
Se eee SE oncutecsn dostidaadubabctbddeodses 16
a I eee 2
OTHER
1 Orgel, Valuation Under Eminent Domain, § 105, at
GF Ge GD o 0 beck cbc sve dericdctbsccskcticseesecss 17
1
TO THE HONORABLE CHIEF JUSTICE AND
THE ASSOCIATE JUSTICES OF THE SUPREME
COURT OF THE UNITED STATES:
MAY IT PLEASE THE COURT.
Petitioners, Cris Realms, Inc., Cristina Investment
Corp., and Ronald J. Isaac, et ux., respectfully pray that a
Writ of Certiorari issue to review the Opinion and Judg-
ment of the Untied States Court of Appeals for the Fifth
Circuit entered in this matter on May 31, 2000.
e
CITATION OF THE LOWER COURT OPINIONS
The United States District Court judgment in this
case, entered on October 28, 1998, in Docket No. 94-3327
CW/94-3519 & 94-3541, Eastern District of Louisiana, is
unreported. It is reproduced in the Appendix attached
hereto at App. 2. The district court’s written reasons for
ruling, entered on October 7, 1998, is reproduced as App.
3.
The decision rendered by the United States Court of
Appeals for the Fifth Circuit on May 31, 2000, in Docket
No. 99-30187, is reported at 213 F.3d 830. It is reproduced
as App. 1.
¢
STATEMENT OF JURISDICTION
This is an appeal from a judgment rendered by
United States District Court for the Eastern District of
Louisiana on October 28, 1998. Jurisdiction in the district
court was based on 28 U.S.C. § 1331 and 1345. Plaintiffs
Cris Realms, Inc., Cristina Investment Corp., and Ronald
J. Isaac, et ux., appealed that decision on December 28,
1998. The jurisdiction of the Court of Appeals was based
on 28 U.S.C. § 1291. The United’ States of America also
filed a notice of appeal on February 19, 1999.
The United States Court of Appeals for the Fifth
Circuit reversed the decision of the District Court on May
31, 2000. Appellants Cris Realms, Inc., Cristina Invest-
ment Corp., and Ronald J. Isaac, et ux., timely petitioned
for rehearing on June 14, 2000. The Court of Appeals
denied the petition for rehearing on June 31, 2000.
¢
CONSTITUTIONAL PROVISIONS
No person shall be . . . deprived of life, liberty,
or property, without due process of law; nor
shall private property be taken for public use,
without just compensation.
U. S. Const. amend. V.
RECORD CITATIONS
Citation to the Appendix attached hereto are demar-
cated as “App. __.” Citations to the record before the
lower courts are demarcated as “R. Vol.__, at __” refer-
ring to the record on appeal, at the specified volume and
specified page.
STATEMENT OF THE CASE
This is a condemnation proceeding involving certain
parcels of land in Jefferson Parish, Louisiana, which are
being acquired for inclusion in the Jean Lafitte National
Historical Park. The land at issue was originally pur-
chased by Bayou des Familles Development Corporation
(“BDF”) for the purpose of developing residential subdi-
visions on the West Bank of the Mississippi River in
Jefferson Parish. In 1972, BDF acquired 2182.62 acres of
land for $7,161,200, at an average of approximately $3,000
per acre. See, District Court’s Written Reasons for Judg-
ment, App. 3, at 28 (contained in R. Vol. 5. at 1079-1098).
Ultimately, defendant Cristina Investment Corp. acquired
97.02 acres from BDF of which 69.04 are the subject of this
suit. Id., at 27-28. Cris Realms, Inc. acquired an undivided
interest in 25 acres in BDF land, of which 2.61 are the
subject of this suit, id., and Mr. and Mrs. Isaac acquired
101 acres of the BDF property, of which 56.32 are subject
to this condemnation. Id. These parties are referred to
collectively as “defendants” or “the landowners.”
After preparing a master plan for the development of
the property and obtaining the necessary parish permits,
BDF built a pumping station, a sewerage treatment plant,
a potable water line, and began building a levee. See App.
3, at 28-29; Pre-Trial Order, Uncontested Facts, No. 9; R.
Vol. 4 at 843. BDF began its levee after obtaining permis-
sion from the Jefferson Parish authorities, although it did
not have a 404 permit from the U.S. Corps of Engineers.
App. 3, at 28-29. All this was done pursuant to contrac-
tual obligations it had with future purchasers, such as
Cristina and the Isaacs to construct a levee enclosing the
properties it had sold, as well as its remaining property,
and build a sewerage treatment facility, a potable water
line and drainage pump station to service the property.
See App. 3, at 28-29, Pre-Trial Order, Uncontested Facts,
No. 5; R. Vol. 4 at 843.
BDF was ready, willing and able to fulfill these obli-
gations, see R. Vol. 10, at 33 (Rosenblum test.); R. Vol. 11,
at 75-76 (Krebs test.), until it was stopped by the Army
Corps of Engineers. The levee BDF was building, which
was by now ninety percent complete, was along the then-
preferred alignment proposed by the Corps for part of a
larger levee project, the West Bank Hurricane Protection
Levee. Along that alignment, the levee would have pro-
tected the property from storm surges and allowed it to
be drained, thereby making it suitable for development.
See Pre-Trial Order, Uncontested Facts, No. 10; R. Vol. 4 at
844. In August of 1972, Congress appropriated funds to
study the feasibility of creating what was to become the
Jean Lafitte National Park. See Pre-Trial Order, Uncon-
tested Facts, No. 11; R. Vol. 4 at 844.
On October 9, 1973 the Permit Branch of the New
Orleans district of the Corps became aware that BDF was
conducting dredge and fill operations which might be
subject to the permitting requirements of the Rivers and
Harbors Act and the Clean Water Act (“CWA”). On Octo-
ber 10, 1973, the District Engineer wrote to BDF advising
that work on the levee should cease immediately pending
a determination as to whether a permit was required.
BDF, however, did not wait for that final determination
‘ut cr atinued with its operations, insisting that no permit
was necessary. See Pre-Trial Order, Uncontested Facts,
No. 12; R. Vol. 4 at 844. On January 15, 1974, when
construction of BDF’s levee was ninety percent complete,
the Corps issued a cease and desist order prohibiting
further development of the property without a permit
under § 404 of the CWA. See App. 3, at 29; Pre-Trial
Order, Uncontested Facts, No. 13; R. Vol. 4 at 845. In
February 1975, the United States obtained injunctive
relief against BDF, preventing further levee construction.
See United States v. Bayou des Familles Development Corp.,
No. 75-536 (E.D. La.). BDF sought an after-the-fact 404
permit in 1975. See App. 3, at 29-30; Pre-Trial Order,
Uncontested Facts, No. 15; R. Vol. 4 at 845. However, no
action on that permit occurred for many years, and what
happened in the interim forms the crux of the case.
On November 10, 1978, Congress authorized creation
of the Jean Lafitte National Historical Park (the “Park”),
comprising an 8,600-acre “core area” and an 11,400-acre
“park protection zone” (“PPZ”). The enabling statute
authorized the Department of the Interior (“DOI”) to
revise the boundaries of the PPZ with the consent of
Jefferson Parish. The statute also authorized DOI to
acquire property in the PPZ, but only if state and local
authorities fail to enact or enforce reguiations governing
the use of properties within the PPZ pursuant to guide-
lines to be developed by DOI. The PPZ encompassed
approximately 1,000 acres of the property purchased by
BDF in 1972. See Pre-Trial Order, Uncontested Facts, No.
16; R. Vol. 4 at 845-46.
The Park, through its director and other United
States government officials, mobilized the environmental
forces and successfully blocked action on the BDF permit.
Its objective was clear — if the hurricane protection levee
was ultimately located and built so as to leave the BDF
property unprotected, that property would be de facto
“reserved” for the Park, such that when the Park eventu-
ally wanted title to it, it could be acquired for little or no
money since the property would have no economic value.
This plan was outlined in a memorandum written by the
Park Superintendent. See Defendants’ Exhibit 6.15 (Isse-
nogle memorandum re use of 404 permitting process to
reserve land for the Park). Stili, the government would
not formally file an expropriation action until October 31,
1994.
The Army Corps of Engineers was fully aware of the
relevance of its decision on the levee alignment to the
future of the Park. Even though in the late 1970’s govern-
mental regulation of the environment was still in its
infancy and would not have customarily produced the
kind of scrupulous micro-managing of wetlands that
exists today, see Sands, R. Vol. 13, at 27-28, the Corps
delayed action on the BDF permit for many years. It
“studied” the issue, although it is clear that the “study”
did not involve the BDF levee or development per se, but
was more concerned with the broader question of locat-
ing the hurricane protection levee, which in turn was an
inquiry, formed in large part, if not exclusively, by the
Park. See Sands, R. Vol. 13, at 30-32, 48-49, 60-65; Defen-
dants’ Exhibit 5.10 (letter from Charles Decker re interde-
pendence of decisions as to Park and BDF permit
application).
Finally, on September 17, 1979, four years after its
filing, the Corps denied BDF’s after-the-fact permit appli-
cation. But, that denial was not a “final” determination as
to the fate of the BDF property. General Tom Sands, the
then commander of the Corps of Engineers who ulti-
mately made this decision, denied the permit because at
that time no decision had been made on the hurricane
protection levee alignment, because the Park itself was
uncertain. See Sands, R. Vol. 13, at 28; Gagliano, R. Vol.
10, 121. His decision was more properly viewed as a
deferral of action, reserving all options to the Corps to
facilitate future wetlands concerns; the main one being
the Park. Id., at 32. The district court (in the instant
action) would later find that “[t]he evidence clearly estab- -
lished a reasonable probability that the landowners
would have obtained the permits necessary for develop-
ment absent the park project,” App. 3, at 34 (citing to the
testimony of General Sands, Mr. Gagliano and Mr.
Krebbs), and that “the landowners have carried their
burden in establishing a ‘reasonable probability’ that as
of the date of trial they could have obtained the necessary
permits... .” App. 3. at 42.
Even the Parish of Jefferson entered the picture, and
attempted to convince the Corps to approve a hurricane
protection levee alignment along the alignment proposed
by BDF. On June 4, 1980, the Parish adopted a resolution
endorsing a levee alignment which followed the BDF
levee on those reaches affecting the property and urging
the Corps to proceed with the construction of that levee
as a purely local project as opposed to a private project
undertaken by BDF. See Defendants’ Exhibit 4.6. On Octo-
ber 7, 1980, after BDF indicated its willingness to donate
the right-of-way for a levee along their original align-
ment, the Parish applied to the Corps for its own § 404
permit to build the levee along that alignment. See Pre-
Trial Order, Uncontested Facts, No. 20; R. Vol. 4 at 847.
On November 20, 1980, the Corps acknowledged the
Parish’s concerns about right-of-way costs and advised
the Parish that its permit application “might receive
favorable consideration” if the levee incorporated certain
water control structures. The Parish amended its permit
application accordingly. See Pre-Trial Order, Uncontested
Facts, No. 21; R. Vol. 4 at 847.
In connection with the Parish’s permit application, in
February, 1984 the Corps prepared a Draft Environmental
Impact Statement (“Draft EIS”) in which seven alternate
levee alignments were considered in addition to the no-
build alternative, but in those reaches affecting the Prop-
erty, only two possible locations for the levee were con-
sidered: (1) the original Corps/BDF alignment, which the
Corps by then designated “Alignment D,” and (2) an
alternate alignment, designated “Alternate Alignment
Modified E” (“Alignment E”), which would place most of
the subject property on the unprotected side of the levee.
See Pre-Trial Order, Uncontested Facts, No. 22; R. Vol. 4 at
847-48. The Corps denied the Parish’s permit application
on June 18, 1984, and instead offered the Parish a permit
for construction of a levee along Alignment E (Pre-Trial
Order, Uncontested Facts, No. 23; R. Vol. 4 at 848), which
would preserve the BDF property for the Park.
A public outcry for action on the levee project caused
the Parish to yield to the Corps and accept the permit for
the levee along Alternative E. On September 11, 1985, the
Parish passed a resolution accepting a permit for the
construction of a levee along the Corps’ proposed align-
ment, Alignment E, notifying the Corps that the West
Jefferson Levee District (the “Levee District”) should be
the recipient of the permit. See Pre-Trial Order, Uncon-
tested Facts, No. 24; R. Vol. 4 at 848. On February 25,
1986, the Corps granted the Levee District a § 404 permit
for construction of a levee along Alignment E. See Pre-
Trial Order, Uncontested Facts, No- 25; R. Vol. 4 at 848.
Due to cost, the project was converted to a federal project
and the Assistant Secretary of the Army (Civil Works)
approved a feasibility report for construction of a levee
along Alignment E tentatively on October 11, 1988 and
finally on March 28, 1989. See Pre-Trial Order, Uncon-
tested Facts, No. 26; R. Vol. 4 at 848. The Levee was
subsequently constructed along Alignment E. See Pre-
Trial Order, Uncontested Facts, No. 27; R. Vol. 4 at 849.
The end result and impact of the final levee align-
ment, which did not occur until December 18, 1990, when
the Corps entered into a binding agreement with the West
Jefferson Levee District for levee construction, was that
the subject properties have been rendered undevelopable.
The district court found that the “extensive historical
documentation supplied as exhibits by the landowners
established that the Corps of Engineers’ decision to deny
both the BDF and the Parish’s permit was motivated
primarily by the influence of the park.” App. 3 at 38.
Indeed, “the park project was the primary motivating factor
in the denial of the section 10 and 404 permits, and in the
location of the hurricane protection levee,” App. 3, at 42
(citing to twelve documents and an earlier decision of the
Louisiana Supreme Court) (emphasis added), and that
* West Jefferson Levee Dist. v. Coast Quality Const. Corp., 640
So.2d 1258, 1281 (La. 1994), cert. denied, 513 U.S. 1083, 115 S.Ct.
736, 130 L.Ed.2d 639 (1995) (“it is absolutely clear from the
10
the landowners could have developed their property “but
for the Jean Lafitte National Park project.” Id. at 42.
This is because the Levee was always viewed by all
concerned, including the Corps of Engineers and the
Jefferson Parish government authorities, as the “growth/
no growth” demarcation. See Evans, R. Vol. 11, at 16;
Sands, R. Vol. 13, at 13; Krebbs, R. Vol. 11, at 87. The
district court found it “undisputed” that the levee config-
uration determined the line of development, “and there-
fore, the subject properties were undevelopable as of the
date of the final levee alignment on December 18, 1990.”
App. 3, at 33-34. As such, the court determined that the
landowners were entitled to have their land valued at the
highest and best use which was for commercial and resi-
dential development. Id. at 42.
But, it was not until October 31, 1994 that the govern-
ment filed the instant expropriation proceeding, identify-
ing three tracts of land that it intended to condemn for
inclusion in the park.2 The defendant landowners
answered the complaint, arguing that the United States’
conduct regarding the manipulation of the Hurricane
record .. . that BDF’s application for Sec. 404 and 10 permits was
denied by the Corps in 1979 because of the ramifications
resulting from the inclusion of landowners’ land in the Jean
Lafitte park protection zone”).
2 Tract 107-22 (also known as Parcels K-3 and K-4) is owned
by defendant Cristina Investment Corporation, and measures
69.04 acres. Tract No. 107-24 (also known as Parcel 1-C), is
owned by the Isaacs, and measures 56.32 acres. Tract No. 107-37
(also known as Parcel O), is owned by Cris Realms, Inc., and
measures 2.61 acres. See Pre-Trial Order, Uncontested Facts, No.
1, 2, 4; R. Vol. 4 at 842-43.
eae
11
Protection Levee for Park purposes over the years consti-
tuted a taking of their property such as to require a
judgment of liability against the United States in the
amount of the market value the property would enjoy but
for the improper influence of the Park. It was stipulated
by the parties that any judgment as to fair market value
would be as of April 15, 1996, subject to a 6% annual
increase through date of trial. In addition, and due to the
government's interference and delay, the landowners
requested reimbursement for taxes paid prior to the con-
demnation and for an award of pre-judgment interest.
Trial took place on March 17-26, 1998. On October 7,
1998, the district court entered Written Reasons for its
Judgment, App. 3, and signed a Judgment reflecting these
findings on October 28, 1998. App. 2 (R. Vol. 5. at
1071-73). As noted above, the district court found that the
the park project was “the primary motivating factor” in
the denial of the BDF section 10 and 404 permits, and in
the location of the hurricane protection levee, and that
the landowners could have developed their property “but
for the Jean Lafitte National Park project.” App. 3, at
38-42. Applying the “scope of the project rule” the district
court discounted the negative effect of the park and levee
on the property at issue and awarded the landowners the
market value of their land taken, pursuant to a Pre-Trial
stipulation as to the value of the property, if it were
“developable,” in the amount of $16,079 per-acre. The
court also awarded severance damages based on the stip-
ulated post-taking value of $300 per acre, if the land was
unpermitable and undevelopable. The district court
denied the landowners’ request for reimbursement of
taxes paid, for pre-judgment interest and for severance
12
damages for their land taken, located under the West
Jefferson Hurricane and Flood Protection Levee -
On December 28, 1999, the landowners filed their
notice of appeal. R. Vol. 7 at 17223-24. The landowners
appealed the three latter rulings, namely, the court failure
to award a reimbursement of taxes, the court's failure to
award pre-judgment interest, and the denial of severance
damages for the land in “the levee right of way.” The
Government subsequently filed its own Notice of Appeal
and was designated “Cross-Appellant.”
The Fifth Circuit Court of Appeals rendered its opin-
ion on May 31, 2000, reversing the decision of the district
court. See Court of Appeal Opinion, attached as App. 1.
Employing both the clearly erroneous and de novo stan-
dards of review, and adopting the government's argu-
ment, the Court of Appeals held that the district court
erred in employing the scope of the project rule to the
case at issue. That is, the government’s condemnation
action did not “breathe new life” into the landowners’
otherwise untimely Tucker Act inverse condemnation
claim against the government; that the court of federal
claims’ dismissal of the landowners’ earlier Tucker Act
claim (as untimely) was res judicata on the instant action;
and accordingly, the landowners were only entitled to
just compensation equal to the market value of their land
3 The Government filed a motion to amend the judgment
under Fed. Rule Proc. 52(b), wherein it requested a total
reconsideration of the judgment. That motion was denied on
December 23, 1998. R. Vol. 7 at 1727. Also, the landowners
moved for an award of attorney fees, which motion was denied,
without prejudice, as premature given the instant appeal.
13
as of the date of the condemnation action, not at the time
of the denial of the BDF permits. Id.
The Court of Appeals’ finding that the scope of the
Project rule could not apply was based solely upon its
conclusion that at the time the Corps’s denied the BDF
permit application in 1979 it could not have anticipated
that its actions would drive down the price of the Land-
owner's land in connection with the Park project:
... [t}he government's action that reduced the
value of the Landowners’ property (the denial
of the permit application) pre-dated any con-
crete plans to purchase that property; and as in
[United States v. Meadow Brook Club, 259 F.2d 41
(2d Cir. 1958)] there is no evidence that the
Government's motive in denying the permit
application was to drive down the value of the
Landowners’ property.
App. 1, at 13. The Court of Appeals reached its decision
by extending Meadow Brook to the instant action, saddling
the landowners with a specific burden to establish “bad
faith” in the government's motives. Id., and n. 1. The
district court never expressly considered whether or not
the government was in “bad faith,” since that issue was
not preserved by the Government in the Pre-Trial Order
for trial, though the Government clearly had notice of the
landowner’s intention to assert the scope of the project
rule in seeking increased compensation. However, the
Court of Appeals refused to remand the case to the dis-
trict court on this issue, finding that such a remand was
not “warranted.” “If any evidence of bad faith existed,
the plaintiffs had every incentive to present it at trial.”
Id., at 13, n. 1.
<a
The Court of Appeals also refused to accept the land-
owners’ argument that the Government had waived its
sovereign immunity as to “just compensation” by filing
the instant condemnation action and requesting the court
to determine the true value of compensation that should
be paid to the landowners. Id., at 13-20. The Court of
Appeals did so because iit could not “square [the land-
owners’ argument] with any temporal limiting principle,”
referring to the Tucker Act’s six year statute of limita-
tions, and secondly, because of its determination that the
Government had not waived sovereign immunity. Id.
The landowners applied for a rehearing in the Court
of Appeals, which application was denied on July 31,
2000. See App. 4. The Court of Appeals’ mandate issued
on August 30, 2000.
¢
REASONS FOR GRANTING CERTIORARI
I. The Court of Appeals’ interpretation of the “scope
of the project” rule is contrary to well-established
law applying the Just Compensation Clause.
Relying on United States v. Meadow Brook Club, 259
F.2d 41 (2d Cir. 1958), the Court of Appeals below held
that the “scope of the project” rule could not apply unless ~
there was a showing of “bad faith” - that the Corps
denial of the BDF levee permit application was intended
to “drive down the price of Landowners’s property
and .. . [thus] facilitate the National Park Service’s even-
tual acquisition of the land.” App. 1, at 13. The panel then
applied this legal standard, and concluded that “there is
no evidence that the Government's motive in denying the
15
permit application was to drive down the value of the
Landowner’s property,” and consequently found as a fact
that there was no “bad faith” because “the primary pur-
pose in denying the permit was to protect the Park’s
ecosystem.” id.4 That decision is in error, and must be
reversed.
Until the decision below, “bad faith” had never been
considered an indispensable element of the “scope of the
project” rule. The rule was first announced in the land-
mark case of United States v. Miller, 317 U.S. 369, 377, 63
S.Ct. 276, 281, 87 L.Ed. 336 (1943). In that decision the
rule was confined to instances in which the United States
was asked to pay for enhanced value caused by the pro-
ject. It was not until 1970, in United States v. Reynolds, 397
U.S. 14, 21, 90 S.Ct. 803, 807, 25 L.Ed.2d 12 (1970), that
this Court recognized that the rule applied not only to
* The Court of Appeals also premised its reversal upon the
finding that at the time of the permit denial, the U.S. had no
definite plans to acquire the property, since the congressional
statute only authorized purchase of land within the “core” zone,
and purchase of land within the Park Protection Zone (PPZ) if
state or local government allowed development. App. 1 at 12-13.
With all due respect to the lower court, this conclusion is utterly
impossible to reconcile with United States v. Reynolds, 397 U.S.
14, 90 S.Ct. 803, 25 L.Ed.2d 12 (1970), which specifically rejected
the notion that such definitive plans were a necessary
component of the scope of the project rule. The appropriate test
“does not require a showing that the land ultimately taken was
actually specified in the original plans for the project. It need
only be shown that during the planning or original construction
it became evident that land so situated would probably be
needed for the public use.” 397 U.S. at 21; 90 S.Ct. at 807. Here,
the land was included in the PPZ, as that area was designated
when the Park was formed.
16
enhanced values but diminished values resulting from the
project as well. Miller/Reynolds was codified by the Con-
gress in 42 U.S.C. § 4651(3):
Any decrease or increase in the fair market
value of real property prior to the date of valua-
tion caused by the public improvement for
which such property is acquired, or by the like-
lihood that the property would be acquired for
such improvement, other than that due to physi-
cal deterioration within the reasonable control
of the owner, will be disregarded in determining
the compensation for the property.
Meadow Brook was decided in 1958, after Miller’s rule
regarding “enhanced value,” but before this Court’s deci-
sion in Reynolds regarding “diminished value,” and cer-
tainly before 42 U.S.C. 4651(3), which now embodies the
applicable rule. Nothing in Reynolds, 42 U.S.C. 4651(3),
nor the Fifth Circuit’s decision in United States v. 320
Acres of Land, 605 F.2d 762 (5th Cir. 1979), adds a “bad
faith” requirement. There has never been a case which
allows the Government to reap the windfall of suppress-
ing the value of land as a result of its commencement of a
project, and then years later reap the benefit of that
decreased value when it actually takes the land, even if
the result is purely unintentional. Such would be utterly
inconsistent with the public policy behind the Miller/
Reynolds rule. “It would be manifestly unjust to permit a
public authority to depreciate property values by a
threat . . . (of the construction of a government project)
and then to take advantage of this depression in the price
which it must pay for the property” when eventually
17
condemned. 1 Orgel, Valuation Under Eminent Domain,
§ 105, at 447 (2d ed.).5
The decision of the Court of Appeals below adding
“bad faith” as a prerequisite to the application of the
scope of the project rule should be reviewed. The implica-
tions of the Court of Appeals’ decision are far-reaching,
and threaten to eviscerate the Just Compensation Clause
by allowing the government to manipulate land values
through the regulatory process so long as they do not do
so for the express and only purpose of avoiding the Just
Compensation Clause. As the district court found, the
evidence overwhelmingly established that the BDF levee
permit was denied to facilitate the Park, who now seeks
to acquire the property at the bargain value directly
caused by the permit denial. This blueprint can, and no
doubt will, be followed in future circumstances should
5 The error of the Court of Appeals’ opinion is magnified
by its rationale - a desire to impose a “temporary limiting
principal” upon the scope of the project rule. See App. 1, at
14-16. The purpose of the Miller/Reynolds rule is to delimit the
issue of compensation from purely “temporal” considerations.
Miller/Reynolds recognizes that governmental projects take
many years to accomplish (indeed _here, the Levee Alignment
took more than twenty years to resolve!). United States v. 49.01
Acres of Land, 669 F.2d 1364, 1367 (10th Cir. 1986). For this
reason, courts applying the Miller/Reynolds rule had resisted the
temptation to read a “temporal” litmus test until the rule.
Instead, the rule demands that its application focus solely upon
the relationship to the enhancement or diminution in value to
the project at issue, regardless of the time between the
commencement of that project and the ultimate condemnation.
See e.g., United States v. 12.18 Acres of Land in Jefferson County,
Kansas, 623 F.2d 131, 133 (10th Cir. 1980) (“The period of time
involved is long, but the method was apparent.”).
18
the opportunity arise. This Court has paid particular
attention to the Just Compensation Clause, as it should,
since the power of the government to wrest private prop-
erty from a private citizen is one of the most awesome
and intrusive of the governmental functions. Allowing
the decision below to stand rewards the clever and crafty
fashion in which that power was abused. “Bad faith” has
no place in a Just Compensation Clause analysis, as this
Court’s decisions have made plain.
II. The Court of Appeals’ decision is directly contrary
to this Court’s ruling limiting appellate jurisdic-
tion.
In Icicle Seafoods, Inc. v. Worthington, 475 U.S. 709, 106
S.Ct. 1527, 89 L.Ed.2d 739 (1986). This Court reversed the
Ninth Circuit’s decision to supply a missing but crucial
finding that the appellate court had felt comfortable
entering because it viewed the matter as one of law. The
Court held that where the district court “failed to make
findings of fact essential or proper resolution of the legal
question,” the appellate court “should have remanded to
the District Court to make those findings. “[I]t should not
have simply made factual findings on its own.” 475 U.S.
at 714, 106 S.Ct. at 1530. This was so even though, accord-
ing to Justice Stevens in dissent, in that case the appellate
record contained “sufficient undisputed facts.” 475 U.S.
at 716, 106 S.Ct. at 1530-31 (Stevens, J. dissenting).
In Allen v. R & H Oil & Gas Co., 63 F.3d 1326, 1336 n.
15 (5th Cir. 1995), the lower court correctly summarized
the Icicle holding as follows: “appellate court fact-finding
is not allowed even for determination of de novo question
19
of law; proper procedure is to remand for correct fact
finding.”® See also Martin v. Bedell, 955 F.2d 1029, 1035 (5th
Cir. 1992), cert. denied, 506 U.S. 915, 113 S.Ct. 323, 121
L.Ed.2d 243 (1992), citing Icicle as holding that the appel-
late court’s review of a district court’s determination of
an issue is “limited to its findings of fact... .”
The Supreme Court has held that when a court
of appeals reviews a district court decision, it
may remand if it believes the district court
failed to make findings of fact essential to the
decision; it may set aside findings of fact it
, determines to be clearly erroneous; or it may
reverse incorrect judgments of law based on
proper factual findings; “[b]ut it should not sim-
ply [make] factual findings on its own”
Hensley v. West, 212 F.3d 1255, 1263 (Fed. Cir. 2000),
quoting Icicle, and citing First Interstate Bank v. United
States, 61 F.3d 876, 882 (Fed. Cir. 1995).
Regardless of whether the Court of Appeals viewed
the record of this case as wholly lacking of any evidence
of “bad faith,” remand was in order.” Lacking any consti-
tutional power to engage in fact finding, the Court of
© Allen reversed a pre-trial dismissal of a claim, and found
that its review was akin to that appropriate for consideration of
a 12(b)(6) or summary judgment motion. The suit was reinstated
without a remand on that issue, but the case was remanded for
further proceedings.
? While it is true that the question of whether a particular
project is within the scope of the project for which it is being
condemned is one of law and not fact, see Reynolds, supra, the
issue of whether or not the United States was in “bad faith” is
certainly properly addressed to the finder of fact.
“[D]eterminations regarding motivation and intent depend on
complicated inferences from the evidence and are therefore
20
Appeals was obliged to remand this case for the district
court to pronounce the facts. It is then up to the district
court, in the sound exercise of its discretion, to determine
whether the evidence should be reopened, or whether a
factual finding should be made on the basis of the record
as it was made under the erroneous legal assumption
held by all parties and the district court.®
Here, no “motivation” questions were asked of the
expert witnesses, who were also fact witnesses to the
extent that they were first hand participants in the Corps’
levee alignment, because “motivation” was not an issue
that was to be tried. The Pre-Trial Order did not list “bad
faith” as a contested issue, and the United States never
peculiarly within the province of the factfinder.” Walther v. Lone
Star Gas Co., 952 F.2d 119, 125 (Sth Cir. 1992). See e.g., Click v.
Copeland, 970 F.2d 106, 114 (Sth Cir. 1992) (“Sheriff Copeland’s
evidence of his motivation for transferring plaintiffs, along with
the plaintiffs’ evidence that supports a contrary inference, is
fodder for the jury.”).
8 This record contains ample evidence allowing any fact
finder to infer that the intention of the Corps, at the time of its
decisions as opposed to its post-hoc justification of ecosystem
protection, was to manipulate levee alignment to ensure that the
lands at issue were deprived of any development potential
precisely so that they might remain available for the park.
Utterly missing from the Court of Appeals’ contrary conclusion
is any recognition of the undisputed fact that at the time when
the decisions at issue by the Corps were made, an entirely
different regulatory environment existed, and the Corps did not
construe its mission, or its powers, as broadly as the witnesses
who offered after the fact explanations at trial. See Landowners
Reply Brief and Cross-Appellee Brief, at 20-22. Any attempt to
determine motivation cannot be divorced from consideration of
the regulatory environment in existence at the time.
21
asserted that it was the landowners’ duty to prove “bad
faith.” With all due respect, the Court of Appeals over-
stepped its permissible bounds by depriving the district
court of the right to adjudicate the “bad faith” issue
either on the basis of the record as it exists or on the basis
of additional evidence if the district court believes such is
appropriate. Of course, the Court of Appeals’ ultimate
plenary power is preserved by its subsequent review of
any such determinations. But, in the first instance, this
adjudication must be made by the district court, assum-
ing of course that “bad faith” is the determinative issue in
this case.
III. The Court of Appeals’ decision is in conflict with
numerous decisions which recognize that the dis-
trict court has concurrent jurisdiction to determine
the date of taking in a condemnation action.
In finding that res judicata applied, the lower court
confused a Tucker Act claim, which is subject to a time
limitation, to a claim for just compensation under the
Fourth Amendment, which is not subject to any time
limitation. The Tucker Act is not necessary for a land-
owner to obtain just compensation when the government
takes his property; it is only a necessary procedural stat-
ute when a taking occurs in the absence of a formal
condemnation of the property. When the Court of Claims
dismisses a Tucker Act claim on the basis of untimeliness,
it holds nothing more than it lacks the jurisdiction to hear
the claim, since the statute of limitations of the Tucker
Act is jurisdictional. That dismissal has no res judicata
effect on the merits of the dismissed claim, although in
22
most cases the dismissal is dispositive because no other
court has jurisdiction to hear the claim.
Thus, the proper inquiry in this case is not whether
the Court of Claims’ earlier dismissal is res judicata, but
instead whether the district court had the jurisdiction to
hear the claims that the United States contends are noth-
ing but Tucker Act inverse condemnation claims asserted
in a district court by reconventional demand. That ques-
tion has been definitively answered by the jurisprudence.
The date of taking in the defense of a condemnation
proceeding may predate the date of filing of the claim (or
the date the United States says that it took the property),
and district courts have the jurisdiction to make such a
determination, even if doing so affords the same relief
that might have been sought via the Tucker Act in the
Court of Claims. See United States v. Dow, 357 U.S. 17, 78
S.Ct. 1039, 2 L.Ed.2d 1109 (1958) (the date of taking may
pre-date the government's filing of a condemnation suit,
and the court hearing the condemnation suit was free to
fashion compensation accordingly); Stephenson v. United
States, 33 Fed.Cl. 63, 74 (Fed.Cl., 1994), mandamus denied,
66 F.3d 345 (Fed. Cir. 1995) (a “district court has the
authority to decide compensation as of the date of the
actual taking, even if the taking occurred prior to the
filing of the declaration [of taking], and to award the
value of the taken property to the owners at the time of
the taking”), and Georgia-Pacific Corp. v. United States, 568
F.2d 1316, 1319-21 (Ct. Cl. 1978), cert. denied, 439 U.S. 820,
99 S.Ct. 84, 58 L.Ed.2d 111 (1978) (court has the authority
in a condemnation suit filed by the government to deter-
mine the actual date of filing, which may pre-date the
filing-of the condemnation suit, and to value the property
23
as of the date of taking).? See also, United States v. Ledford,
202 F.3d 283 (10th Cir. 1999); 1999 WL 1244495.10
The Court of Appeals rejected this line of jurispru-
dence, and instead relied upon the Circuit Court decision
in United States v. 422,978 Square Feet of Land, 445 F.2d
1180 (9th Cir. 1971), to support its res judicata holding.
App. 1 at 17-21. But, that case is not applicable, and its
limited holding should not be expanded and applied to
the facts of this case because there is a critical difference.
In 422,978 Square Feet, the United States did not seek to
have the court determine the value of the land it sought
to condemn, as the United States actively did here.
Instead, the United States claimed that its condemnation
was pursuant to a bona fide navigational servitude, under
which servitude the United States did not have to pay
just compensation; the suit was only a method to confirm
ownership in the United States, and “only a method of
adjudicating the contention of the United States that the
State was not entitled to compensation.” 455 F.2d at 1188.
Since that case did not concern a true condemnation nor
° The Court of Appeals attempted to distinguish this line of
cases on the grounds that the landowners could have asserted a
timely Tucker Act claim, or that the federal district court
hearing the “counterclaim” had concurrent jurisdiction. This
attempt to distinguish hinges entirely upon the erroneous view
that a Court of Claims dismissal has some res judicata effect on
the Fourth Amendment right to just compensation, and ignores
the fact that a Court of Claims dismissal means nothing more
than the Court of Claims lacks jurisdiction to hear a Tucker Act
suit.
10 This case was not designated for publication, but is
directly relevant to the issue at bar; it was also cited to the Court
of Appeals, below, as pertinent and instructive.
24
did the government submit to the court's jurisdiction and
request it to determine just compensation, as it did here,"
the case is clearly distinguishable, and should not have
been applied.
On separate grounds, res judicata cannot apply here
since the Court of Claims (Tucker Act) action was dis-
missed for want of jurisdiction. The United States, as a
sovereign, is immune from suit. When it consents to be
sued, through some statutorily provided action such as a
Tucker Act claim, the terms of its consent to waive its
immunity define the court’s jurisdiction over the claim.
United States v. Daim, 494 U.S. 569, 608, 110 S.Ct. 1361,
1368 (1990). A “statute of limitations requiring that a suit
against the government be brought within a certain time
period is one of those terms.” Id. (citing to United States v.
Mottaz, 476 U.S. 834, 841, 106 S.Ct. 2224, 2229, 90 L.Ed.2d
841 (1986) and Block v. North Dakota, ex rel. Bd. of Univ. and
School Lands, 461 U.S. 273, 287, 103 S.Ct. 1811, 1819, 75
L.Ed.2d 840 (1983) (“When waiver legislation contains a
statute of limitations, the limitations provision constitutes
a condition on the waiver of sovereign immunity.”)).
The dismissal in the Court of Claims was granted
upon the government’s Summary Judgment Motion
11 See Complaint, at 1 (“This is an action . . . for the taking
of property under the power of eminent domain and for the
ascertainment and award of just compensation to the owners
and parties in interest.”), and 2 (“WHEREFORE, plaintiff
demands judgement that the property be condemned and that
just compensation for that taking be ascertained and awarded,
and for such other relief as may be lawful and proper.”).
25
under Fed. R. Civ. Pro. 56 on jurisdictional grounds,)2 the
Court of Claims treating the motion as a Motion to Dis-
miss under Fed. R. Civ. Pro. 12(b):
While the defendant has captioned its motion as
one for summary judgment . . . it will be treated
as a motion to dismiss. . . . The Defendant
argues that the claims are time barred, i.e., the
court lacks subject matter jurisdiction to enter-
tain the suit. Such jurisdictional challenges
are properly raised by a motion to dismiss-
- not a motion for summary judgment. . . .
Alternatively, defendant argues that [the] com-
plaint does not “state a takings claim against the
United States,” . . . but does not rely on evidence
outside the pleadings. This should also be
treated as a motion to dismiss.
12 The government argued in the instant appeal that the
Court of Claims suit was dismissed “on the merits by a court of
competent jurisdiction.” U.S. Brief, at 31. But this was not the
position it took in the Court of Claims. There, the U.S. sought to
have plaintiff’s suit dismissed by means of a Summary
Judgment Motion under Fed. R. Civ. Pro. 56 on jurisdictional
grounds: “The government now moves to dismiss based upon
jurisdictional grounds - state of limitations grounds - and
failure to state a claim.” U.S. Motion for Summary Judgment, at
3. Attached as Exhibit 1 to the Landowner’s Post-Argument
Brief, below. In the Court of Claims, the government recognized
that: “Timeliness under the six-year statute [of limitations
provided by the Tucker Act] is a jurisdictional prerequisite to
suit,” citing Sociano v. United States, 352 U.S. 270, 77 S.Ct. 269, 1
L.Ed.2d 306 (1957), and other cases. Id. at 15. They further
argued that: “The plaintiffs have the burden of establishing that
this Court has jurisdiction to adjudicate their claims. . . . In this
case, plaintiffs have not met this burden.” Id. at 16.
26
Court of Claims Opinion, February 23, 1996, at 1, n.1.
Attached as Exhibit 2 to the Landowner’s Post-Argument
Brief, below. The Court finally concluded that because
“plaintiffs filed suit beyond the jurisdictional limits set by
28 U.S.C. § 2501” their suit must be dismissed. Id. at 8, 10.
The Landowners appealed that decision, and the
Court of Federal Claims affirmed. Bayou des Familles v.
United States, 130 F.3d 1034, 1040, n.7 (Fed. Cir. 1997)
(“We conclude that the trial court could properly treat the
Government's motion as a motion to dismiss under RCFC
12(b) - whether viewed as a bar to the grant of a remedy
or as a bar to the court’s exercise of jurisdiction over the
cause, the result is the same.”). Since the Court of Claims
dismissed the suit on the grounds of untimeliness, which
was a jurisdictional ground, the jurisdiction of the Court
of Claims never attached, and thus its decision cannot be
res judicata on the instant suit. See Nilson v. City of Moss
Point, 701 F.2d 556, 562 (Sth Cir. 1983) (“dismissals for
want of jurisdiction are not decisions of the merits, while
those based on limitations are on the merits” for res
judicata purposes.”).'> For res judicata to apply, a deter-
mination on the merits must have been reached by a
court of competent jurisdiction. Id. at 559; Republic Supply
Co. v. Shoaf, 815 F.2d 1046, 1051 (5th Cir. 1987). Further-
more, for res judicata to apply, “the same cause of action
13 Likewise, the instant action is not one which the
landowners could have asserted at the time of their Tucker Act
claim (in considering all possible claims that the landowners
“could have been brought” at the time, or which are forever
barred by res judicata), since the instant suit is a direct
condemnation by the United States Government. See, ¢.g.,
Nilson, supra. 701 F.2d at 562-63.
27
must be involved in both cases,” Shoaf, 815 F.2d at 1051,
and here, the same claim is not asserted; this is the
government's voluntarily filed condemnation suit; not a
second attempt by the landowners to assert a cause of
action for appropriation.
The Court of Appeals voiced concerns regarding the
“temporal limiting principles” behind actions under the
Tucker Act. App. 1 at 14-16. Certainly, there are principles
of finality in litigation, which is why statutes of limitation
are created. But, allowing a landowner to defend a con-
demnation claim by challenging the date of taking does
not disturb any repose that the United States is legit-
imately entitled to receive. If the United States never
condemns the land, the Tucker Act's statute of limitation
gives it repose. But, when the United States actively
places value at issue, what right does it have to assert
that the Fourth Amendment right to just compensation to
the full extent of the loss is tempered by some time
limitation?
Finally, the landowners do not expand the “scope” of
the government's petition by claiming compensation for
more land than the government actually took. Instead,
they merely do what is permissible; to demand just com-
pensation for the taking. To allow the government to limit
the “scope” of its damages does nothing but obliterate the
Just Compensation Clause of the United States Constitu-
tion, for it allows the government to limit the amount of
compensation it will pay, which is exactly what the gov-
ernment is trying to do in this case.
.
28
ere
CONCLUSION
This Court should grant certiorari because of the
grave implication of the decision below on the correct
and proper application of the Due Process Clause.
Respectfully submitted,
Davip C. Logs Mack E. BARHAM
MOoLaIson COLVIN Rosert E. ARCENEAUX
GREENBERG ZELENKA Travis L. BourGEots
Morris & Logs, LLP BARHAM & ARCENEAUx, PLC
230 Huey P. Long Avenue Poydras Center, Suite 2700
Gretna, LA 70053 650 Poydras Street
Tel: (504) 366-4336 New Orleans, LA 70130-6101
Tel: (504) 525-4400
Attorneys for Petitioners
Cris Realms, Inc., Ronald J. Isaac, et ux, and
Cristina Inv. Corp.
APPENDIX
Opinion, United States Court of Appeals for
the Fifth Circuit, entered May 31, 2000..... App. 1
Judgment Determining Compensation, United
States District Court, Eastern District of Loui-
siana, entered October 28, 1998............. App. 24
District Court Reasons for Judgment, entered
et | a ee. Sree rerr re rrrer se App. 27
Denial of Petition for Rehearing, United States
Court of Appeals for the Fifth Circuit, entered
FOE Bag BE 6 ava eens ctesscsnsedescesanesss App. 46
App. 1
IN THE UNITED STATES COURT OF APPEALS
FOR THE FIFTH CIRCUIT
No. 99-30187
UNITED STATES OF AMERICA;
Plaintiff-Appellee-Cross-Appellant,
V.
LAND, ET AL.,
Defendants
CRIS REALMS, INC.,
Claimant-Appellant-Cross-Appellee,
UNITED STATES OF AMERICA;
Plaintiff-Appellee-Cross-Appellant,
V.
LAND; ET AL.,
Defendants,
RONALD J. ISAAC, ET UX: BETTY PERRIN ISAAC,
Defendants-Appellants-Cross-Appellees,
UNITED STATES OF AMERICA;
Plaintiff-Appellee-Cross-Appellant,
V.
LAND; ET AL.,
Defendants
CRISTINA INVESTMENT CORPORATION;
Defendant-Appellant-Cross-Appellee.
App. 2
Appeals from the United States District Court for the
Eastern District of Louisiana
Before DAVIS, CYNTHIA HOLCOMB HALL,’ and
SMITH, Circuit Judges. CYNTHIA HOLCOMB HALL,
Circuit Judge:
To resolve the instant case we must determine
whether a landowner’s damages in a condemnation suit
can be adjusted to reflect a prior regulatory taking by the
Government where the landowner’s efforts to be com-
pensated for that regulatory taking via a separate inverse
condemnation suit have already failed. We answer that
question in the negative, holding that a landowner who
has lost an inverse condemnation claim may not use the
compensation phase of subsequent condemnation pro-
ceedings to make an “end run” around res judicata and
the Tucker Act’s statute of limitations. We affirm in part,
reverse in part, and remand for further proceedings.
I.
The United States filed the instant condemnation suit
to acquire the land in question in 1994. But in order to
understand the unusual nature of this case it is necessary
to recount a sequence of events that began more than two
decades earlier. In August of that 1972, Congress appro-
priated funds to study the feasibility of creating a
national park in the Barataria Marsh, a wetlands area
* Senior Circuit Judge, U.S. Court of Appeals, Ninth
Circuit, sitting by designation.
EAA ORIE PNA CE OEP STR TE LC RN RE ET GT TUES Tee eee
Sia , ar Pere ne Vie 7 ‘ . ae e | o oc . oa
App. 3
located along the Mississippi River. That same month, the
Bayou Des Familles Development Corporation (“BDF”)
acquired 2,182.62 acres of land in the marsh. BDF planned
to develop residential communities on the land, so it
subdivided and sold the land to various parties. Among
those who presently own land formerly owned by BDF
are the three Appellants-Cross-Appellees in this case:
Cris Realms, Inc., Ronald J. and Betty Perrin Isaac, and
Cristina Investment Corporation (collectively “Land-
owners”).
In order to make the larger property suitable for
residential development, BDF planned to construct a
levee, which would allow for drainage of the wetlands
and protect the property from storm surges. BDF began
construction of the levee without obtaining construction
permits from the Army Corps of Engineers (“Corps”). In
October of 1973, the Corps advised BDF to cease work on
the levee pending a determination by the Corps of
whether the permits were required by 33 U.S.C. § 1344
and 33 U.S.C. § 403. BDF proceeded with the levee con-
struction anyway, prompting the Corps to issue a cease
and desist order in January of 1974, after 90 percent of the
levee had been completed. BDF was subsequently fined
$25,000 and required to obtain the requisite permits from
the Corps before continuing construction. BDF filed a
permit application in April of 1975 and a draft environ-
mental impact statement in June of 1975.
The Corps indicated an inclination to deny BDF’s
permit application in December of 1975, citing, inter alia,
strong opposition from the Environmental Protection
Agency, the National Marine Fisheries Service, the U.S.
Fish and Wildlife Service, the State Parks and Recreation
App. 4
Commission, and the State Planning Office. The Corps
noted concerns expressed in BDF’s environmental impact
statement that draining the land for development would
decimate the habitat of many species of wildlife, includ-
ing that of an endangered alligator. Over the next several
years, BDF’s permit application remained in a state of
limbo because of uncertainty concerning the construction
of a nearby hurricane-protection levee and the status of
the proposed national park in the Barataria Marsh.
Finally, in 1979, after Congress created Jean Lafitte Park
in the marsh area, the Corps denied BDF’s permit appli-
cation. In denying the permit, the Corps pointed to sev-
eral aforementioned general environmental concerns
along with fears that the levee would adversely impact
the new Park. The Corps also noted public and govern-
mental agency opposition to the construction of the levee.
The congressional legislation creating Jean Lafitte
Park established a 8,600-acre “core area,” which would
comprise the park itself, and a 11,400-acre “park protec-
tion zone.” The statute authorized the Department of the
Interior to acquire land within the park protection zone,
but only if state and local authorities failed to enact or
enforce protective regulations governing the use of land
within the zone. All three of the parcels subject to con-
demnation in this case fell within the park protection
zone.
On November 2, 1979, BDF filed suit in federal dis-
trict court to enjoin the Corps’ denial of the permit appli-
cation. See Bayou des Familles Dev. Corp. v. United States
Corps of Eng’rs, 541 F. Supp. 1025 (E.D. La. 1982). In this
App. 5
suit, BDF alleged, inter alia, that the permit denial consti-
tuted an uncompensated taking. The district court dis-
missed this claim for lack of jurisdiction, noting that the
Court of Claims would have exclusive jurisdiction over
such a claim under the Tucker Act, 28 U.S.C. § 1491. See
id. at 1042.
BDF filed an inverse condemnation suit in the United
States Claims Court on July 25, 1991.1 That suit was
joined by Landowners Ronald and Betty Isaacs. The court
dismissed the suit as time-barred by the Tucker Act's six-
year statute of limitations. See Bayou des Familles Dev.
Corp. v. United States, 130 F.3d 1034, 1037 (Fed. Cir. 1997).
The Federal Circuit affirmed on this basis, holding that
any takings claim had become ripe in 1979, and therefore
must have been filed by 1985. See id. at 1040. The other
Landowners in this case filed an inverse condemnation
suit on February 21, 1995, and that suit was similarly
dismissed as time-barred. See Cristina Inv. Corp. v. United
States, 40 Fed. Cl. 571, 579-80 (1998), appeal dismissed, 155
F.3d 570 (Fed. Cir. 1998).
Related litigation proceeded in the Louisiana state
courts as well. In 1986 Jefferson Parish sought and
obtained permission from the Corps to build a hurricane-
protection levee, proposing a location that differed from
that proposed by BDF. BDF and Landowners refused to
provide land for the Corps-approved levee, which would
have left most of Landowners’ land on the unprotected
1 In 1982 the United States Claims Court became the
successor to the United States Court of Claims’s original
jurisdiction. In 1992 the United States Claims Court became the
United States Court of Federal Claims.
App. 6
side of the levee (and hence, unsuitable for residential
development). Accordingly, the West Jefferson Levee Dis-
trict filed condemnation suits against Landowners, seek-
ing to acquire (for $500 per acre) 16.16 acres from
Landowner Cris Realms, Inc., 19.56 acres from Land-
owner Cristina Investment Corp., and 44.96 acres from
Landowners the Isaacs. Landowners sought much higher
compensation for their land, arguing that the District
should pay them what their land would be worth were it
suitable for development. The trial court agreed and a
court of appeals affirmed. The Louisiana Supreme Court
reversed, holding that Landowners were unable to
develop their property because of “the property’s loca-
tion inside of the park protection zone of Jean Lafitte
Park and because of the growing national policy toward
the more stringent preservation of wetlands.” West Jeffer-
son Levee Dist. v. Bayou Des Familles Dev. Corp., 640 So.2d
1258, 1284 (La. 1994). The court remanded for a recalcula-
tion of damages based on the undevelopable value of the
land.
Pursuant to 16 U.S.C. § 230a(c), the Federal Govern-
ment could only acquire land in the park protection zone
if the parish governments proved unwilling to enact
land-use regulations that would adequately protect the
ecosystem of the Park’s core. In 1994, after unsuccessfully
attempting to convince Jefferson Parish to enact such
land-use regulations, the National Park Service filed con-
demnation complaints seeking to acquire the “park pro-
tection zone” properties at issue in this case. The Park
Service valued the property at approximately $300 per
acre, based on the land being unsuitable for residential
development. Landowners insisted that they should be
Ce Wh NR AE NRL OE APT TE GHG
App. 7
compensated for the value of the land based on an
assumption that all the land would be suitable for such
development. This assumption yielded an appraisal of
approximately $16,000 per acre.
After a bench trial, the district court sided with Land-
owners on the valuation question, determining that Land-
owners were entitled to receive compensation based upon
the value-of the land if suitable for development. The
court determined that because the Government's actions
in denying the permit rendered the condemned property
unsuitable for development, the Government was liable
for what that land would have been worth had the levee
been built at the location proposed by BDF.
The district court also refused to award severance
damages for property that was in the right of way of the
(approved) hurricane-protection levee, and which had
been condemned by the state Levee District. But the
district court did award Landowners severance damages
to compensate them for the purportedly reduced value of
land on the protected side of the hurricane-protection
levee. The district court ordered such damages sua
sponte. The district court denied Landowners’ request for
prejudgment interest and reimbursement of taxes paid
between the alleged actual interference with their enjoy-
ment of the property and Landowners’ receipt of com-
pensation.
Landowners appealed the denial of prejudgment
interest and reimbursement for taxes paid. Landowners
also appealed the district court’s refusal to award sever-
ance damages for land in the hurricane-protection levee’s
right of way. The Government cross-appealed the district
App. 8
court’s decision to base compensation on the value of the
condemned land if suitable for development and the dis-
trict court’s award of severance damages for the ostens-
ible reduction in value of the land on the protected side
of the hurricane-protection levee.
I.
We review the district court’s factual findings for
clear error and its legal conclusions de novo. See United
States v. 50.822 Acres of Land, 950 F.2d 1165, 1168 (5th Cir.
1992). The district court’s valuation methodology “must
be based upon principles that reflect sound reasoning.”
Margate Shipping Co. v. M/V JA Oregon, 143 F.3d 976, 990
(5th Cir. 1998).
Ill.
We first address our attention to the primary issue
raised in the Government's cross-appeal. It is undisputed
that on the date the Government condemned their land,
the Landowners could no longer have prevailed in an
inverse condemnation suit to recover damages resulting
from the Corps’ refusal to allow BDF to construct a levee
at its desired location. Such a suit would have been
precluded by res judicata and time-barred under the
Tucker Act, 28 U.S.C. § 2501. See Bayou des Familles Dev.
Corp., 130 F.3d at 1040; Cristina Inv. Corp., 40 Fed. Cl. at
579-80; see also Mathis v. Laird, 457 F.2d 926, 927 (5th Cir.
1972) (holding a dismissal on statute of limitations
grounds to be a decision on the merits for the purposes of
res judicata). Nevertheless, the district court essentially
App. 9
concluded that the Government’s condemnation proceed-
ing breathed new life into the Landowners’ expired
inverse condemnation claims. Specifically, because one
federal instrumentality (the Corps) had denied the levee
construction permit, and another federal instrumentality
(the National Park Service) had condemned the land, the
condemnation suit provided the Landowners with a sec-
ond opportunity to obtain the aamages they sought in
their earlier Tucker Act suits. The district court’s neces-
sary calculation of damages due in the condemnation suit
would become the method by which the Landowners
would get what they were otherwise no longer entitled to
receive. We believe the district court erred in reaching
that conclusion.
The district court relied on the scope-of-the-project
rule in determining that the Government could be liable
for the earlier permit denial. In United States v. 320.0 Acres
of Land, 605 F.2d 762 (5th Cir. 1979), we succinctly articu-
lated the scope-of-the-project rule:
If the condemned land was probably within the
scope of the governmental project for which it is
being condemned at the time the Government
became committed to that project, then the
owner is not entitled to any increment in value
occasioned by the Government’s undertaking
the project.
Id. at 781-82. As we made clear at the time, the sc »pe-
of-the-project rule is also applicable to “depreciations in
value . . . attributable to the Government project for
which property is taken.” Id. at 787 n.32; see also 42 U.S.C.
§ 4651(3) (codifying the scope-of-the-project rule with
respect to any “decrease or increase in the fair market
—
:
;
3
4
§
:
3
|
:
3
:
:
App. 10
value of real property prior to the date of valuation
caused by the public improvement for which such prop-
erty is acquired”). Thus, in some instances where the
government initiates a project that drives down the value
of neighboring lands, if the government subsequently
condemns those lands, it will have to pay the landowners
the lands’ (higher) pre-project value. For example, sup-
pose the government fully intends to build a five square-
mile landfill in what is presently a residential neighbor-
hood. The government initially condemns one square
mile and re-zones it for landfill use. Presumably, such an
action would lower the value of adjoining lands. The
government could then pay less for the additional four
square miles than what it would have had to pay if it had
condemned the five square miles in one fell swoop. The
scope-of-the-project rule dictates that the compensation
due from such a piecemeal condemnation will be the
same as it would have been had the condemnation
occurred all at once. Where it applies, the scope-of-the-
project rule could theoretically allow a landowner to
recover at the compensation stage of a condemnation suit
what he would no longer be able to recover via a Tucker
Act inverse condemnation suit.
In 320 Acres we pointed to three factors relevant in
determining whether to apply the scope-of-the-project
rule: (1) Whether it was foreseeable that the project
would be enlarged to include the later-condemned prop-
erty; (2) The length of time between the initiation of the
project and the condemnation of the later-condemned
property; and (3) The nature of governmental representa-
tions about the final borders of the project at the time that
project was originally announced. See 320 Acres, 605 F.2d
App. 11
at 791-92. In applying those factors to that case, we indi-
cated that an 18-year lapse of time between the initiation
of the project and the condemnation of the land in ques-
tion might be so long as to render the scope-of-the-project
rule inapplicable to the later condemnations. See id. at
797. We further held that a mere government authoriza-
tion to purchase land, unaccompanied by an allocation of
funds for that purpose, “hardly evinces a firm commit-
ment [to subsequent condemnations], especially when the
Government has permitted certain lands within
numerous other National Parks to remain privately
owned.” Id.
In United States v. Meadow Brook Club, 259 F.2d 41 (2d
Cir. 1958), the Second Circuit articulated a further consid-
eration that is instructive in helping us determine
whether the scope-of-the-project rule applies to the
instant case. In Meadow Brook the United States filed a
complaint seeking to condemn certain parcels in order to
enlarge an airfield. The court confronted a valuation dis-
pute over whether compensation should be based on the
land in question being re-zoned for industrial use or its
present (lower-value) residential use. Meadow Brook had
applied for a re-zoning, but that application had been
opposed successfully by the Air Force on the ground that
industrial development on the land in question would
create flight hazards for planes landing at the airfield. Id.
at 46. The court held that absent a showing that “the
government's sole motive in resisting the change in zon-
ing was to depress the market value of the property
which it then intended to condemn,” it would not exclude
the Air Force’s opposition to the re-zoning as a factor
App. 12
suggesting that the land should be valued based on resi-
dential zoning. Id. at 45. Where the record contained no
allegation of bad faith by the government, it was inap-
propriate to allow the landowners to benefit from an
improbable prospective re-zoning, even if the govern-
ment’s action was the primary obstacle to the re-zoning.
Applying these considerations to the facts at issue
here, we hold that the scope-of-the-project rule is inappli-
cable. As a threshold matter, we must define the “project”
and its initiation date. For scope-of-the-project purposes,
the relevant project is the establishment of Jean Lafitte
National Park. Congress created that Park in 1978. Recall
that Congress did not initially authorize, the National
Park Service to buy Landowners’ property, or any other
property in the 11,400-acre park protection zone. Rather,
such purchases would only be authorized if the relevant
state and local government agencies failed to enact land-
use regulations that would adequately protect the Park’s
core.
In order for the scope-of-the-project rule to apply to
the instant case, the record would have to show that
when the Corps denied BDF’s permit application in 1979,
it anticipated that the denial would drive down the price
of Landowners’ property and that this would facilitate
the National Park Service’s eventual acquisition of the
land. We believe the record belies any such conclusion. To
the contrary, it is clear that at the time the Corps denied
the BDF’s permit application, there were no concrete
plans to purchase any land in the park protection zone.
Those plans to acquire lands did not begin until 1986, and
the Government did not file condemnation complaints
against Landowners’ property until 1994. Thus, there was
App. 13
a sixteen-year lapse between the initiation of the project
in question and the acquisition of Landowners’ property;
the Government action that reduced the value of Land-
owners’ property (the denial of the permit application)
pre-dated any concrete plans to purchase that property;
and, as in Meadow Brook, there is no evidence that the
Government’s motive in denying the permit application
was to drive down the value of Landowners’ property.!
Rather, the record clearly indicates that the Corps’ pri-
mary purpose in denying the permit was to protect the
Park’s ecosystem. On these facts, compensation should be
based on the value of the land at the time of the condem-
nation, regardless of prior Government actions that ren-
dered the land less valuable than it might have been in
the absence of prior Government activities. It was error
for the district court to value Landowners’ property as if
the proposed BDF levee kad been completed.
At oral argument and in supplemental briefing,
Landowners presented an additional theory supporting
the district court’s valuation determination. Landowners
assert that although their inverse condemnation suits to
recover compensation for the Corps’ denial of the levee
permit were dismissed by the Federal Circuit as time-
barred, these decisions do not preclude them from recov-
ering the same damages in the present condemnation
litigation. Landowners argue that a government condem-
nation action waives sovereign immunity as to all com-
pensation issues relating to property identified in the
* No remand on the bad-faith question is warranted. If any
evidence of bad faith existed, the plaintiffs had every incentive
to present it at trial.
ee srs
Vs eaten
App. 14
condemnation complaint. There are several reasons why
we reject Landowners’ effort to re-litigate an expired
inverse condemnation suit “via the back door.”
A fundamental reason for rejecting Landowners’
novel theory is our inability to square it with any tempo-
ral limiting principle. If the federal government were to
have built a dam in 1900, and this dam lowered property
values for nearby landowners, the landowners would be
able to recover damages for this alleged taking if the
federal government decided in the year 2000 that it ought
to condemn their land. Property law will not bear con-
tinuing governmental liability of that nature. The federal
government and federal courts need not revisit every
possible ancient inverse condemnation claim when they
decide to condemn a piece of property. The animating
principles behind the Tucker Act’s six-year statute of
limitations are consistent with venerable property rules
that stress the importance of finality, clarity of title, and
the extinguishment of claims by owners who sleep on
their rights. See generally Hohri v. United States, 586 F.
Supp. 769, 786 (D.D.C. 1984) (“The length of [the Tucker
Act’s] statute of limitations is a product of a legislative
weighing of competing claims of fairness - the need of
plaintiffs for a reasonable amount of time within which to
present their claims, and the right of defendants to be
free of stale claims. Statutes of limitations also protect
both the Court and the defendant from cases where the
loss of evidence - by death or disappearance of wit-
nesses, fading memories, or disappearance of documents
— may frustrate the search for truth.”), adopted after the
Supreme Court vacated and remanded on other grounds by
847 F.2d 779 (Fed. Cir. 1988); Thomas W. Merrill, Property
App. 15
Rules, Liability Rules, and Adverse Possession, 79 Nw. U.L.
Rev. 1122, 1128-33 (1984) (describing the necessity of
adjudicating claims before evidence has been lost, the
desirability of quieting titles, the interest in discouraging
owners from sleeping on their rights, and third party
reliance interests as the traditional justifications for trans-
ferring title to an adverse possessor after the statute of
limitations has run); Carol M. Rose, Canons of Property
Talk, or, Blackstone’s Anxiety, 108 Yale L.J. 601, 604-12
(1998) (discussing Blackstone’s consequentialist motiva-
tions for treating existing distributions of property as
beyond question despite his own doubts about whether
“current claimants really have any solid foundation for
the things they claim”). To grant property owners an
unlimited right to litigate (or re-litigate) any claims that
the government previously interfered with their property
rights would also run aground of the rule that a property
owners’ right to receive just compensation is not abso-
lute, but depends on his compliance with the law’s unam-
biguous procedures for obtaining such compensation. See
Bay View, Inc. v. Ahtna, Inc., 105 F.3d 1281, 1285 (9th Cir.
1997) (“The simple fact is that we have no jurisdiction to
address the merits of takings claims where Congress has
provided a means for paying compensation for any tak-
ing that might have occurred.”). As the Supreme Court
had noted, “taking claims against the Federal Govern-
ment are premature until the property owner has availed
itself of the process provided by the Tucker Act.” Wil-
liamson County Regional Planning Comm’n v. Hamilton
Bank, 473 U.S. 172, 195 (1985). After the property owner
has availed itself of that process and been denied com-
pensation, further litigation must allege that the process
App. 16
for receiving compensation, the Tucker Act in this case, is
not a “reasonable, certain and adequate provision” for
obtaining compensation or that the adequate procedures
were not followed. See City of Monterey v. Del Monte
Dunes, 526 U.S. 687, 710 (1999); Williamson County, 473
U.S. at 194. Quite sensibly, Landowners do not argue that
the Tucker Act is a constitutionally inadequate means for
obtaining compensation. The Federal Circuit’s dismissals
of Landowners’ Tucker Act claims are therefore res judi-
cata.
Second, Landowners’ argument that the federal gov-
ernment waives sovereign immunity as to all possible
inverse condemnation counterclaims involving the same
land when it files a condemnation suit is inconsistent
with the Supreme Court’s clearly-articulated decisions
holding that waivers of sovereign immunity must be
narrowly construed. See, e.g., Department of the Army v.
Blue Fox, Inc., 525 U.S. 255, 261 (1999) (“We have fre-
quently held, however, that a waiver of sovereign immu-
nity is to be strictly construed, in terms of its scope, in
favor of the sovereign. Such a waiver must also be
‘unequivocally expressed in the statutory text.’ ”) (cita-
tions omitted); see also Narramore v. United States, 960 F.2d
1048, 1051 (Fed. Cir. 1992) (“The condemnation statutes
do not waive sovereign immunity for property owners to
institute counterclaims or suits seeking damages for tak-
ings beyond the scope of the Government's filing.”).
Landowners do not point us to any text in the federal
condemnation statutes or rules that permit a landowner
to recover compensation for prior regulatory takings that
reduced the value of the property in question. The Gov-
ernment’s sovereign immunity therefore defeats a claim
App. 17
alleging that Landowners’ compensation in condemna-
tion should be adjusted upward to reflect what the land
would have been worth in the absence of a prior regula-
tory taking.
Confronting an analogous set of circumstances, the
Ninth Circuit reached a result consistent with the one we
reach today. In United States v. 422,978 Square Feet of Land,
445 F.2d 1180 (9th Cir. 1971), the court considered a case
in which the federal government took physical possession
of submerged lands owned by California in 1940. In 1955,
the federal government filed a condemnation suit to
obtain title to the land already in its possession. The
government then sought dismissal of its condemnation
complaint with prejudice to the state’s ability to recover
compensation in light of California’s failure to sue within
the Tucker Act’s six-year statute of limitations. California
argued that, notwithstanding the statute of limitations, it
was still entitled to receive compensation for the value of
the submerged land in light of the federal government's
condemnation suit. The Ninth Circuit rejected this argu-
ment, holding “that the running of the Tucker Act period
of limitations precluded the State from recovering in the
condemnation proceedings.” Id. at 1188. Thus, where a
landowner could have successfully sought compensation
under the Tucker Act but failed to do so, the initiation of
government condemnation proceedings to acquire that
same land did not create a second opportunity to recover
compensation for the government’s prior inverse con-
demnation via the compensation-determination process.
In arguing to the contrary, Landowners rely heavily
on a footnote in a recent decision by a judge on the Court
App. 18
of Federal Claims. Construing Narramore, that court
wrote:
The statement in Narramore v. United States, 960
F.2d 1048, 1050 (Fed. Cir. 1992) that condemna-
tion statutes do not waive the government's
immunity from property owners’ “counter-
claims” clearly does not prohibit a defendant
from alleging an earlier date of taking or a
greater compensation amount than deposited
with the court at the time of the declaration.
Stephenson v. United States, 33 Fed. Cl. 63, 75 n.21
(1994). Whatever the merits of this footnote, the Stephen-
son decision certainly does not contemplate the situation
at hand, where Landowners have already had their sepa-
rate inverse condemnation suits dismissed as time-
barred. See id. at 81 (“Indz2ed, the federal courts of
appeals uniformly have held that a district court lacks
jurisdiction to entertain a true counterclaim in a condem-
nation proceeding, that is, a separate freestanding claim
that otherwise could be asserted independently in
another proceeding [in the Court of Federal Claims].”).
Landowners provide us with no reason why the Court of
Federal Claims could not have considered their Tucker
Act claims had they been timely filed.
Landowners also cite Georgia-Pacific Corp. v. United
States, 568 F.2d 1316 (Ct. Cl. 1978), where the Court of
Claims confronted “what should be done when a claim-
ant brings suit in this court for an inverse condemnation
of land interests, and not long thereafter the Government
files a District Court condemnation action involving the
very same interests but asserting a later taking-date.” Id.
at 1318. The court held that the district court had the
App. 19
authority to determine which of the two parties’ pro-
posed date of taking was correct and to value the prop-
erty as of that date. See id. at 1319. The court also
suspended any further Tucker Act proceedings pending
the district court’s determination of the taking date.? In
Georgia-Pacific, unlike in the instant case, the property
owners’ inverse condemnation suit would have been
timely under the Tucker Act. Thus, in making a deter-
mination as to which of two competent courts should
adjudicate a common question at issue in two separate
lawsuits, the court deferred to the district court. Absent
the viability of both the inverse condemnation and con-
demnation suits, we do not read the Georgia-Pacific deci-
sion as allowing a district court to consider the equivalent
of a time-barred and jurisdictionally barred Tucker Act
counterclaim. The court implied as much in its extended
discussion of the unusual procedural posture of that dis-
pute:
The condemnation proceeding covers several
parties in addition to Georgia-Pacific. We thus
2 As the Georgia-Pacific court made clear, the Court of
Claims was not transferring the litigation to the district court,
only suspending “further proceedings in this litigation until the
District Court had decided when the date of taking occurred, or
has refused to inquire whether a time prior to March 5, 1976, is
the correct one.” 568 F.2d at 1319. After the district court made
its determination with respect to the common issue in the two
suits, the inverse condemnation aspects of the suit would have
been adjudicated by the Court of Claims alone. In the case at
bar, the Court of Federal Claims is similarly the only court with
jurisdiction to consider the inverse condemnation claim, but res
judicata and the Tucker Act’s statute of limitations now deprive
it of the authority to do so.
App. 20
have only part of the eminent domain litigation
in this court. . . . The nub of it is that only the
District Court is in a position to decide all
phases of the litigation in the event Georgia-
Pacific’s claim of an early taking should be
rejected.
Moreover, a single tribunal is better able
than two or more independent courts to direct
and handle variant and alternative claims all
bearing on the same situation. Sometimes such
unified treatment is precluded by jurisdictional
statutes, but where it is not — as we think is true
of this instance - it is ordinarily better to cen-
tralize the proceedings in the tribunal which has
the widest scope to handle all the parts of what
is in commonsense one unified piece of litiga-
tion.
Id. at 1321. These considerations simply are not
implicated where one tribunal has already dismissed a
claim as time-barred and the district court confronts an
effort to resuscitate a claim arising out of the very same
governmental action. The judicial efficiency consider-
ations that warranted a stay of Court of Claims proceed-
ings pending a district court determination in Georgia-
Pacific here warrant a district court’s refusal to revisit the
facts underlying Landowners’ already adjudicated
inverse condemnation claims.
In light of Landowners’ failure to pursue their Tucker
Act remedies in a timely manner, they may not argue in
the condemnation proceedings that they should be com-
pensated based on the value of their property as if
App. 21
suitable for residential development. On remand, the
district court should determine the value of Landowners’
property in its current, unsuitable for development, state.
IV.
The Government also argues that the district court
erred by awarding severance damages to Landowners
Cris Realms and Cristina Investment for damage to prop-
erty on the protected side of the hurricane-protection
levee. We agree.
Although Landowners did not request such sever-
ance damages below, the district court awarded damages
to compensate them for the partition of their land that
occurred as a result of the construction of the hurricane-
protection levee. The hurricane-protection levee ran
through Landowners’ property, presumably making it
more difficult to travel from one side of the property to
the other. The district court apparently concluded that
but for the Corps’ denial of the BDF levee permit applica-
tion, the hurricane-protection levee would nut have been
built, so Landowners’ property would not have been
partitioned.
3 For the same reasons, we affirm the district court’s
determinations that Landowners are entitled to neither
reimbursement of taxes paid on the properties since the date of
the alleged inverse condemnation nor prejudgment interest.
Landowners’ proper remedy for recovering such damages were
Tucker Act inverse condemnation suits. Because such suits have
already been dismissed as untimely by the Federal Circuit, res
judicata and a lack of jurisdiction bar us from revisiting those
claims for damages.
App. 22
Any severance damages resulting from the construc-
tion of the levee are not compensable in the present
proceedings because they were not caused by the Gov-
ernment’s condemnation of the properties in the instant
suit. Landowners’ opportunity to acquire severance dam-
ages as a result of the hurricane levee came and went in
the state court condemnation litigation that culminated in
West Jefferson Levee Dist. v. Bayou Des Familles Dev. Corp.,
640 So.2d 1258, 1284 (La. 1994). It was, after all, the state
government, not the federal government, that built the
hurricane-protection levee. Landowners’ argument that
severance damages are due because the Corps’ refusal to
permit the BDF levee resulted in the hurricane-protection
levee’s placement is unpersuasive for the reasons stated
above.
V.
Landowners also appeal one of the district court’s
rulings with respect to severance damages. The district
court denied Landowners’ request for severance damages
to lands underneath the hurricane levee. Although that
land has been condemned by the State of Louisiana, and
Landowners received payment from Louisiana for those
lands, Landowners sought severance damages for value
allegedly taken by the United States prior to Louisiana’s
expropriation. The district court held that because “the
land underlying the levee had been expropriated by the
West Jefferson Levee District before the condemnation
proceedings herein, landowners are not entitled to sever-
ance damages on that portion.” This reasoning was
sound. See United States v. Dow, 357 U.S. 17, 20-21 (1958)
(holding that only the owner on the date of the taking is
App. 23
entitled to receive just compensation.). For the aforemen-
tioned reasons, Landowners can only recover severance
damages resulting from the condemnation itself, not from
any prior Government action. Thus, if the condemnation
caused any severance damages to the land underneath
the levee, the State of Louisiana, which owned that land
at the time of the condemnation, would be the proper
recovering party.
VI.
For the foregoing reasons, we AFFIRM in part,
REVERSE in part, and remand for a recalculation of just
compensation consistent with this opinion.
App. 24
UNITED STATES DISTRICT COURT
EASTERN DISTRICT OF LOUISIANA
UNITED STATES OF * CIVIL ACTION
AMERICA * NO. 94-3327
v. * C/W 94-3519 & 94-3540
2.61 ACRES OF LAND, * SECTION: “S”
ETC. .
JUDGMENT DETERMINING COMPENSATION
(Filed Oct. 28, 1999)
For the reasons set forth in the Court’s Reasons for
Judgment relative to the amount of just compensation for
the takings in Tract Nos. 107-37 (“Cris Realms”), 107-22
(“Isaac”) and 107-24 (“Cristina”) in the captioned actions,
entered October 7, 1998.
IT IS ORDERED that there be judgment in favor of
defendants Cris Realms, Inc., et al., and against plaintiff,
the United States of America, in the full and true amount
of ONE HUNDRED SIXTY THREE THOUSAND SIX
HUNDRED SIXTY SIX DOLLARS AND TWENTY CENTS
($163,666.20) as just compensation for the taking of fee
simple title to the lands in Tract No. 107-37 (2.61 acres),
exclusive of minerals and subject to existing easements
for public roads and highways, public utilities, railroads
and pipelines, as well as for severance damages to the
remainder (6.32 acres).
IT Is FURTHER ORDERED that there be judgment in
favor of defendants Ronald J. Isaac, et al., and against
ee
App. 25
plaintiff, the United States of America, in the full and true
amount of ONE MILLION FORTY FOUR THOUSAND
ONE HUNDRED SEVENTY TWO DOLLARS AND
EIGHTY CENTS ($1,044,172.80) as just compensation for
the taking of fee simple title to the lands in Tract No.
107-22 (56.32 acres), exclusive of minerals and subject to
existing easements for public roads and highways, public
utilities, railroads and pipelines.
IT IS FURTHER ORDERED that there be judgment in
favor of defendant, Cristina Investment Corporation, and
against plaintiff, the United States of America, in the full
and true amount of ONE MILLION FOUR HUNDRED
THIRTY THREE THOUSAND FIVE HUNDRED EIGHTY
TWO DOLLARS AND FORTY CENTS ($1,433,582.40) as
just compensation for the taking of fee simple title to the
lands in Tract No. 107-24 (69.04 acres), exclusive of min-
erals and subject to existing easements for public roads
and highways, public utilities, railroads and pipelines, as
well as for severance damages to the remainder (8.42
acres).
IT IS FURTHER ORDERED that title to the estates
described in the Schedules B attached to the complaints
in the captioned proceedings will vest in the United
States upon payment of the foregoing amounts of just
compensation into the registry of the Court at which time
the Court will enter an order vesting such title.
IT IS FURTHER ORDERED that the defendants’
request for attorney fees shall be determined by further
proceedings to be conducted by the magistrate judge.
App. 26
New Orleans, Louisiana, this 28 day of October, 1998.
/s/ Mary Ann Vial Lemmon
ON
UNITED STATES DISTRICT
JUDGE
Approved as to form:
EDDIE J. JORDAN, JR.
UNITED STATES ATTORNEY
/s/ Glenn K. Schreiber
GLENN K. SCHREIBER
Assistant United States Attorney
COUNSEL FOR PLAINTIFF,
UNITED STATES OF AMERICA
/s/ David C. Loeb by REA
David C. Loeb (Bar No. 8660)
Molaison, Price & Loeb, LLP
COUNSEL FOR DEFENDANTS
RONALD J. ISAAC, ET AL.
/s/ Robert E. Arceneaux
Robert E. Arceneaux (Bar No. 1199)
Barham & Arceneaux
COUNSEL FOR DEFENDANTS
CRISTINA INVESTMENT CORP. and
CRIS-REALMS INC., ET AL.
/and/
/s/ Robert C. Stern by REA
Robert C. Stern (Bar No. 12454)
COUNSEL FOR DEFENDANT,
PERRIN CHARLES BUTLER
App. 27
UNITED STATES DISTRICT COURT
EASTERN DISTRICT OF LOUISIANA
UNITED STATES CIVIL ACTION
VERSUS NO. 94-3327
2.61 ACRES OF LAND SECTION “S”
REASONS FOR JUDGMENT
(Filed Oct. 6, 1998)
The United States, through the National Park Service,
filed a complaint on October 31, 1994, pursuant to Rule
71A of the Federal Rules of Civil Procedure, condemning
three separate tracts of land for inclusion in the Jean
Lafitte National Historic Park, Tract Numbers 107-22,
107-24, and 107-37, which measure 56.32 acres, 69.04
acres, and 2.61 acres, respectively. The condemned land is
located on the West Bank of the Mississippi River in the
Parish of Jefferson, approximately midway between New
Orleans and Barataria, Louisiana.
The owners of the condemned land do not object to
the condemnation itself, but dispute the amount of just
compensation to which they are entitled pursuant to the
Fifth Amendment of the United States Constitution.
Accordingly, the owners filed Notices of Appearance pur-
suant to Rule 71A(e) of the Federal Rules of Civil Pro-
cedure. The landowners moved for summary judgment,
this Court denied that motion, and the case proceeded to
trial before the Court without a jury.
Historically, in 1972, Bayou des Familles Develop-
ment Corporation (“BDF”), a real estate investment com-
pany formed by a group of landowners to develop
App. 28
residential subdivisions along the west bank of the Mis-
sissippi River in the Parish of Jefferson, acquired 2182.62
acres of land, including the land which is the subject of
this condemnation suit, for $7,161,200, an average of
about $3,000 per acre. Immediately thereafter, BDF sold
101 acres each to Charalex Lands, Incorporated, which
later became the Coast Quality Construction Company, to
Ronald J. Isaac and his wife Betty Jane Perrin, and to
Regent Development Corporation. Ultimately, Cristina
Investment Corporation acquired 97.02 acres, consisting
of parcel K-3 acquired on August 17, 1977, and parcel K-4,
acquired on March 7, 1978, 69.04 acres of which are
subject to this condemnation proceeding (Tract Number
107-24). Cris Realms, Inc. acquired parcel O, containing
25 acres on May 1, 1987, 2.61 acres of which are subject to
this condemnation proceeding (Tract Number 107-37). Mr.
and Mrs. Isaac acquired parcel 1-C, containing 101.26
acres on September 23, 1972, 56.32 acres of which are
subject to this condemnation proceeding (Tract Number
107-22). The present owners are referred to herein collec-
tively as “landowners.”
The residential development plans included the
building of a canal, a levee, a pumping station to drain
the land, and the blocking of waterways which ran
through the property.! Within one year of acquiring the
1 Specifically, BDF’s residential development plan called
for the blocking of Bayou Boeuf, a natural waterway connecting
the Bayou Segnette Waterway and the Gulf Intercoastal
Waterway, and the blocking of Kenta Canal, a man-made
waterway which extended through BDF’s property into Bayou
Barataria. Both Kenta Canal and Bayou Boeuf connect to the
Gulf of Mexico and therefore, are subject to tidal influence.
App. 29
land and receiving permission from the Parish of Jeffer-
son, but without any United States Corps of Engineers
(“Corps”) permit, BDF began construction of a levee and
canal system in order to make the property suitable for
residential construction.2 The levee BDF undertook to
construct followed the contours of one of several levee
lines proposed by the Corps for the construction of a
flood control and hurricane protection project.
In January 1974, after BDF’s levee was 90% complete,
the Corps issued a cease and desist order to BDF, based
on the Corps’ determination that BDF needed federal
permits for construction of the levee and canal projects,
pursuant to Section 404 of the Federal Water Pollution
Control Act Amendments, 33 U.S.C. §§ 1251 to 1387
(renamed the Clean Water Act in 1977). In February 1975,
the United States filed an enforcement action against BDF
in the United States District Court for the Eastern District
of Louisiana in which the government alleged that BIDF
had violated Section 10 of the Rivers and Harbors Appro-
priations Act of 1899 (“RHAA”), 33 U.S.C. § 403. The
court issued a final judgment in that case in favor of the
United States, requiring BDF to pay $25,000.00 in civil
penalties and to submit an “after-the-fact” application to
the Corps for the requisite federal permits. United States
v. Bayou Des Familles Dev. Corp., No. 75-536 (E.D. La.).
On April 7, 1975, BDF submitted its “after-the-fact”
application for federal permits to construct the levee. On
2 In July of 1973, BDF entered into a contract for
construction of a sewage treatment plant and a pumping
station. On August 16, 1973, BDF entered into a contract for the
construction of a levee.
App. 30
April 28, 1975, the Corps published a public notice of
BDF’s “proposed” project, announcing the Corps’ deter-
mination that an environmental impact statement was
required as part of the permit process. More than four
years later, on September 17, 1979, the Corps denied
BDF’s “after-the-fact” application.
On November 2, 1979, BDF filed suit in the United
States District Court for the Eastern District of Louisiana,
seeking to enjoin the Corps from denying the “after-the-
fact” permit and from recommending the building of a
flood control and hurricane protection levee in a location
which differed from that of BDF’s levee project. On April
20, 1982, the court declined to grant the injunctive relief
sought by BDF and determined the BDF’s claim that the
denial of the permit constituted an uncompensated taking
pursuant to the Fifth Amendment of the United States
constitution must be brought before the United States
Court of Claims, which had exclusive jurisdiction over
the matter under Section 1491(a) (1) of Title 28 of the
United States Code. Bayou Des Familles Dev. Corp. v.
United States, 541 F. Supp. 1025 (E.D. La. 1982). On
appeal, the United States Court of Appeals for the Fifth
Circuit affirmed the trial court in an unpublished opin-
ion, and the United States Supreme Court denied BDF’s
petition for a writ of certiorari. Bayou Des Familles Dev.
Corp. v. United States Corps of Engineers, 104 S.Ct. 1413
(1984).
In 1986, the Corps granted the West Jefferson Levee
District a permit to build a hurricane protection levee in a
location which substantially differed from that of BDF’s
original levee project. Although BDF and the landowners
were willing to donate land for the hurricane protection
App. 31
levee if it were built on BDF’s original levee location
(Alignment D), they were not willing to donate land for
the hurricane protection levee on the location approved
by the Corps (Alignment E). Therefore, the West Jefferson
Levee District filed an expropriation suit in state court in
order to expropriate the land necessary for building the
hurricane protection levee on Alignment E.
In the levee expropriation case, the trial court deter-
mined that the land condemned should be valued as if it
were developable at the time expropriated. The trial court
also awarded severance damages, finding that the land
left unprotected by the location of the hurricane protec-
tion levee was rendered undevelopable; delay damages
arising out of the extended duration of the levee align-
ment selection process; and attorney’s fees. The Louisiana
Court of Appeal for the Fifth Circuit amended the awards
for delay damages and attorney’s fees, but otherwise
affirmed the trial court. The Supreme Court of Louisiana
reversed the court of appeal’s decision, holding that the
owners failed to carry their burden of proving that their
inability to obtain the permits was caused by the hurri-
cane protection levee project itself and specifically found
the inability to obtain the permits was caused by the park
project. West Jefferson Levee District v. Bayou Des Familles
Dev. Corp., 640 So.2d 1258 (1994). This case was remanded
to the lower court for a determination of just compensa-
tion for the land underlying the levee as undevelopable
wetland.
During the pendency of the Louisiana litigation, on
July 25, 1991, BDF filed suit against the United States in
the Court of Federa! Claims, alleging that the Corps’
denial of BDF’s “after-the-fact” application for permits to
App. 32
build the ninety-percent complete levee constituted a tak-
ing of their property without compensation in violation
of the Fifth Amendment to the United States Constitu-
tion. The Court of Federal Claims dismissed BDF’s suit as
time-barred, and on appeal, the United States Court of
Appeals for the Federal Circuit affirmed that dismissal.
Bayou Des Familles Dev. Corp. v. United States, 130 F.3d
1034 (1997).
Landowners whose property is condemned for gov-
ernmental use are protected by the “Takings Clause” of
the Fifth Amendment to the United States Constitution,
which provides, “[NJor shall private property be taken
for public use, without just compensation.” A landowner
is entitled to receive the fair market value of land taken
by the government. United States v. 320 Acres of Land, 605
F.2d 762, 781 (5th Cir. 1979). The fair market value of the
land being taken is determined at the time the land ir
taken and in accordance with the “highest and best use”
for which the land is suitable. Id. at 781, 818-20. More-
over, the value of the land may be neither increased nor
decreased by the fact of the taking itself, pursuant to the
“scope of the project rule.” See Almota Farmers Elevator &
Warehouse Co. v. United States, 93 S.Ct. 791, 796 (1973).
Section 4651(3) of Title 42 of the United States Code,
which sets forth the guidelines to be used by the heads of
federal agencies in determining the value of acquired
property, codifies the “scope of the project rule,” provid-
ing in part:
Any decrease or increase in the fair market
value of real property prior to the date of valua-
tion caused by the public improvement for
App. 33
which such property is acquired, or by the like-
lihood that the property would be acquired for
such improvement, other than that due to physi-
cal deterioration within the reasonable control
of the owner, will be disregarded in determining
the compensation for the property.
Under the scope of the project rule, the government
may not use the impact of a proposed project to devalue
the property it seeks to acquire for the project. Nor may
the government keep the value of property that it seeks to
acquire artificially low by denying the owner of that
property peruuts needed to develop the property. How-
ever, a landowner must demonstrate a “reasonable possi-
bility” that, absent the regulatory restriction, permits
would be issued or that rezoning would occur which
would free the property for use otherwise precluded by
the regulatory restriction. United States v. 320 Acres of
Land, 505 F.2d 762, 819 (5th Cir. 1979).
In the present case, the parties entered into a stipula-
tion that the fair market value of the subject tracts as of
April 15, 1996, was approximately $16,000 per acre, sub-
ject to a ©% annual increase in value, assuming the high-
est and best use to be for commercial and residential
development, and that the fair market value of the subject
tracts as of April 15, 1996, was $300 per acre, assuming
their highest and best use to be unpermittable wetlands.3
It is undisputed that the configuration of the levee deter-
mined the growth/no growth line of development, and
therefore the subject properties were undevelopable as of
3 Pre-trial order, page 17.
App. 34
the date of the final levee alignment on December 18,
1990.
The landowners argue that, had their land been
included within the levee’s protection, the highest and
best use of the land would be for residential or commer-
cial development and, because the levee alignment was
substantially motivated by the park project, the devalu-
ing influence of the levee alignment must be excluded in
the valuation of the property for these condemnation
proceedings. Because the Park is a wetlands preserve,
landowners assert it is impossible to sever the issue of
wetlands preservation from the creation of the Park. On
the other hand, the government argues that because of
the significant adverse impact the proposed BDF project
would have had on the ecological balance of the Barataria
Basin and the Louisiana Gulf fisheries industry, and
because of the landowners’ inability to justify the adverse
impact on high quality wetlands affected by the BDF
project, it is unlikely, even absent the creation of the Jean
Lafitte Park, the permits could have been obtained.
The evidence clearly established a reasonable possi-
bility that the landowners would have obtained the per-
mits necessary for development absent the park project.
Particularly, General Thomas A. Sands, the District Engi-
neer for the Corps of Engineers in New Orleans District
from 1978-1981, who ultimately denied the BDF request
for an after-the-fact permit, testified:
Q: The factor which was controlling of the
location of the Bayou Des Familles levee as of
1975 was the Park?
se mew.
App. 35
A: The location of the park had a major impact
on where that levee would be aligned.
Q: If the BDF levee had been permitted, would
it have had an effect on the eventual location of
the Federal Westbank Hurricane Protection
Levee?
A: It certainly would have.
Q: It would have been determinative, would it
not?
A: Yes, I would say that it would.
Q: Of the factors [that lead to the BDF permit
denial], do you think that there was any factor
as important as the park?
A: Once again, the Park itself was sort of a
focal point for decision making processes in this
area at this particular point in time. So, if I were
listing the facts that are there, I would say that I
would list the location of the park because it
was there, as number 1.
Other experts reached the same conclusion on the
basis of the historical record development patterns, the
history in the surrounding area and the physical charac-
teristics of the subject tracts. Dr. Sherwood Gagliano, an
expert in the field of geography, geology and exviron-
mental permits, whose opinion this Court expressly
accepts, testified:
Q: If the park and its park protection zone did
not exist and had not been a factor in the BDF
404 permit process, in your opinion, would that
permit have been granted?
App. 36
A: The BDF permit?
Q: Yes.
A: Yes, it would have.
Q: Ifthe park and park protection zone did not
exist, had not been a factor in the Parish’s 404
permit process, for alignment D, would that per-
mit had been granted?
A: Yes, it would have.
Q: Was the park and its park protection zone
the major factor which required the rejection of
the BDF and the Parish 404 permits?
A: Yes, I think the record clearly reflects that.
Q: In your opinion, is there any factor other
than the park and the Park Protection Zone
which require the selection of Alignment E?
A: No.
Q: Was the denial of the BDF permit and the
parish 404 permit, essential to overcome the
eventual construction of Alignment E. By that I
mean, was it necessary to prevent construction
of the levee on the BDF alignment and the align-
ment D right-of-way?
A: Yes, it was.
Q: In order to preserve that opportunity to
place that levee in its current location, the Par-
ish and the BDF permits had to be denied?
App. 37
A: Yes.
Q: Do you consider the denial of the BDF 404
permit, the creation of the park and the park
protection zone and the selection of Alignment
E to be multiple phases of the same project?
A: Yes.
Q: Now that alignment E has been selected, is
there any possibility that a 404 permit would be
issued to BDF or the current property owners
for the unprotected remainder of the property?
A: No.
Mr. Joseph Krebbs, an expert civil engineer with
expertise in environmental permits for residential subdi-
visions, also testified to the impact of the Park on the BDF
permit application:
Q: Were you involved in the BDF permit appli-
cation?
A: Yes, I was.
Q: Do you have an opinion with regard to the
effect that the creation of the Park had on the
permit action on the BDF permit?
A: Yes, I do.
Q: What is that opinion, sir?
A: The opinion is that had it not been for the
park and the park protection zone, the permit
would have been granted.
Q: Do you think that this was also the case
with regard to the permit application for a levee
alignment shown as Alignment D that was filed
by the Parish of Jefferson?
A: Yes I think so.
App. 38
The extensive historical documentation supplied as
exhibits by the landowners established that the Corps of
Engineers decision to deny both the BDF and the Parish’s
permit was motivated primarily by the influence of the
park. That documentation includes:
1. A letter dated June 12, 1972 from the U.S. Com-
mittee on Environmental Development to Colonel Hunt,
District Engineer, outlining specific requests with refer-
ence to conditions and characteristics that pertain to the
Parish of Jefferson:
That the general area designated as the pro-
posed Jean Lafitte National Park (see map 1)
have no permits issued for petroleum and or
other mining operations. Also that no levee,
dikes, canals or other structures be permitted or
allowed . . . That no permits be granted that
would in any way engender the sites
. . . deemed significant in Jefferson Parish.
2. A Corps of Engineers latter dated 3/21/73, stat-
ing that at a July 24, 1972, public hearing, “[p]Jarticularly
at issue was the compatibility of the possible hurricane
protection plans and the proposed Jean Lafitte National
Cultural Park.”
3. A Corps of Engineers letter dated 6/28/73 to the
Jefferson Parish Clerk, stating in part, “we will attempt to
determine a levee alignment that would provide the
needed hurricane protection and yet be compatible with
the plan for the proposed park.”
4. A Corps of Engineers letter dated 5/13/74 to the
National Park Service, discussing coordination of Levee
and Park projects:
App. 39
{[a]t a public meeting held in connection with
these studies on 24 July 1972, we were made
aware that proposals under consideration for
the Jean Lafitte National Park presented poten-
tial conflicts with the proposals for hurricane
protection.
5. A Corps of Engineers letter dated 7/25/74 to
Senator J. Bennett Johnston, stating that because of the
park project, the “Chief of Engineers has neither the
authority nor the funds to construct the proposed hurri-
cane protection levees on the west bank of Jefferson Par-
ish.”
6. A Corps of Engineers letter dated 9/10/74 to
Representative Lindy Boggs stating:
[t]he location of the proposed park is an important con-
sideration in our study of hurricane protection measures
for the West Bank of the Mississippi River in the vicinity
of New Orleans. Moreover, depending on the type of
park recommended, it may be necessary to exclude the
park, except for the developed areas requiring protection,
from the planned protective works.
7. A letter dated 11/19/75 from the State Park Com-
mission, opposing the permit to BDF due to development
of the Park project.
8. A letter dated 4/11/79 from the National Park
Service to the Corps of Engineers, objecting to the grant-
ing of a § 404 permit to BDF:
Please note that the levee, canals and pumping
station lying between points L and M in the plan
accompanying the public notice are within the
“core” area of the authorized Jean LaFitte
App. 40
National Historical Park. Similarly, the southern
portion of the levee along the line L to K is in
the National Park. The length involved here is
from point L northeastward to approximately
the Ross Canal. With a few exceptions, none of
which suggest a permissive position toward the
destruction or alteration of wetlands, the “core”
area will be protected to the same degree all
National Parks enjoy. This has the effect of pre-
cluding the construction, or in this instance
reconstruction to make effective, any levees
within the “core” of the park. Most of the
remainder of the levee and canal system is
located in the “Park Protection Zone” which has
the purpose of protecting fresh water flows into
the “core” area . . . The project proposed in the
permit application would inevitably impact the
water resources of the “core” area of the Park,
and on that basis we object to the issuance of an
“after-the-fact” permit and lament the damage
already experienced.
9. A letter dated 4/19/79, from the Corps of Engi-
neers, informing the BDF that its permit would probably
be denied due to the impact on the park:
Reference is made to your application dated 4
April 1975 for an after-the-fact permit for a
levee system in Jefferson Parish . . . The impacts
of the levee project on the park . . . cause us to
believe that your request for a permit will be
denied.
10. A letter to James J. Donelon, Jefferson Parish
Council President, dated 9/17/79, from the Corps of
Engineers, stating that the BDF permit and future align-
ment of the levee is dependent on park boundaries.
App. 41
11. A letter dated 9/02/83 from Superintendent
James L. Isenogle to Colonel Lee, regarding the effect of
BDF levee alignment on the park stating:
Specifically we are concerned about the possible
future use of an alignment used previously by
the Bayou des Familles Corporation and located
in the Park Protection Zone of the Park. The
existing levee, although never completed or
closed, has interfered with surface water flow
from the Park Protection Zone into the Core
area. ... Certainly the construction of a new
and a permanent levee on the Bayou des Fami-
lles Corporation alignment would result in the
permanent loss of much of the natural surface
water flow in the Park unit.
For these reasons, we will oppose the construc-
tion of new levees on, or near the alignment of
the Bayou des Familles Corporation levees, and
plan to seek the dismantling of protion of the
existing levee at the appropriate time.
12. A resolution dated 5/09/84, by Jefferson Parish,
rejecting the Corp of Engineers’ Draft Land Protection
Pian for the Park and finding these guidelines “unduly
restrict{ed] and limit[ed] the rights of property owners on
the West Bank without compensation. .. . ”
In addition, the Supreme Court of Louisiana, in West
Jefferson Levee District v. Coast Quality Construction Corp.,
640 So.2d 1258, 1279 (1994), found that the park was the
determinative factor in the ultimate decision to deny the
BDF permit:
App. 42
[I]t is absolutely clear from the record, and
indeed the landowners’ own expert in the per-
mitting process, Dr. Sherwood Gagliano, so tes-
tified, that BDF’s application for § 404 and § 10
permits was denied by the Corps of Engineers in
1979 decause of the ramifications resulting from
the inclusion of landowners’ land in the Jean
Lafitte park protection zone, and that BDF
would have been unable to obtain such permits
at any time after 1979, for the same reason. The
record unequivocally shows BDF’s permit appli-
cation was denied by the Corps because of polit-
ical pressure on the Corps to preserve the
landowners’ wetlands property as undeveloped
and unpermitted wetlands because of its inclu-
sion in the park protection zone of Jean Lafitte.
The Court finds that the Park project was the primary
motivating factor in the denial of the Section 10 and 404
permits, and in the location of the hurricane protection
levee. Applying the scope of the project rule, this court
determines that the landowners have carried their burden
of establishing a “reasonable possibility” that as of the
date of trial they could have obtained the necessary per-
mits for commercial and residential development but for
the Jean Lafitte National Park project. The landowne:xs
are therefore entitled to have their land valued with the
highest and best use for commercial and residential
development.
The stipulation that the market value of the land is
$16,000, assuming the highest and best use is commercial
and residential development, implicitly decides that such
development is economically feasible. During the course
of the trial, the court allowed the government to present
App. 43
evidence with supported its position on the develop-
ment’s lack of economic feasibility. Likewise, landowners
presented evidence to show that development was eco-
nomically feasible. However, any evidence of feasibility
was unnecessary because the stipulated value of $16,000
per acre as commercial and residential development
could not be determined without an underlying analysis
of economic feasibility.
The validity of the stipulation is bolstered partic-
ularly by the expert testimony of landowner’s expert, Dr.
Wade R. Ragas, who determined the highest and best use
of the subject property is for commercial and residential
development, and reached a market value, as of April 15,
1996, of $16,079 per acre for the Realms and Cristina
tracts, and $15,700 per acre for the Isaac tract, almost
identical to the stipulated market value. Additionally,
Patrick J. Egan, an expert appraiser and executive vice-
president and partner in the real estate firm of Latter &
Blum, testified on behalf of the government as to the
suitability for development of the subject tracts. Mr. Egan
admitted, assuming that the subject properties were
leveed and drained, that he was in agreement with Dr.
Ragas’ estimation of value.
“As I think I stated, if you assume that this land
is ready for development and has been drained,
has been leveed and is at the required elevation
to support development, I would agree with
[the values established by Dr. Ragas].”
The government's stipulation to a market value of
$16,000 per acre, is conditioned only upon a finding that
the highest and best use was for residential and commer-
cial development. Although the government now
App. 44
attempts to renounce the stipulation, the evidence,
viewed as a whole and in light to the scope of the project
rule, supports the stipulated amount.
In addition to being entitled to receive market value
for land “when the government has physically acquired
through its eminent domain powers a portion of a distinct
tract of property, ‘the compensation to be awarded
includes not only the market value of that part of the
tract appropriated, but the damage to the remainder
resulting from the taking, embracing, of course, injury
due to the use to which the part appropriated is to be
developed.’ ” United States v. 14.38 Acres of Land, 80 F.3d
1074 (5th Cir. 1996), quoting, United States v. Grizzard, 31
S. Ct. 162, 163 (1911). The landowners also assert a claim
for severance damages for the difference between the
total acreage owned by them and the condemned prop-
erty. Because the land underlying the levee had been
expropriated by the West Jefferson Levee District before
the condemnation proceedings herein, landowners are
not entitled to severance damages on that portion. How-
ever, on the property not expropriated by West Jefferson
Levee District nor condemned in these proceedings, land-
owners have established they suffered severance dam-
ages resulting from the taking. “The proper measure of
damages in such a case is the difference between the
value of the parent tract before the taking and its value
after the taking.” Id. at 1077.
The landowners are therefore entitled to compensa-
tion for severance damage of $16,679 per acre before the
taking value, minus the $300 per acre after the taking
value. The Cristina owners are entitled to severance dam-
ages on 8.42 acres, and the Realms owners are entitled to
App. 45
severance damages on 6.32 acres. Because all of the Isaac
property was taken either by the levee expropriation or
by this condemnation for the park project, the Isaacs are
not entitled to severance damages.
Finally, the landowners’ request for reimbursement
of taxes paid between the alleged actual interference with
their enjoyment of the property and the time compensa-
tion is paid, and for prejudgment interest is denied.
Landowner’s request for attorneys’ fees is referred to
magistrate judge for a hearing.
The government is instructed to prepare judgments
consistent with this ruling.
New Orleans, Louisiana this 6th day of October, 1998.
/s/ Mary Ann Vial Lemmon
MARY ANN VIAL LEMMON
UNITED STATES DISTRICT
JUDGE
App. 46
IN THE UNITED STATES COURT OF APPEALS
FOR THE FIFTH CIRCUIT
No. 99-30187
UNITED STATES OF AMERICA
Plaintiff -— Appellee-Cross-Appellant
v.
LAND; ET AL
Defendants
CRIS REALMS INC
Claimant — Appellant-Cross-Appellee
UNITED STATES OF AMERICA
Plaintiff — Appellee-Cross-Appellant
v.
LAND; ET AL
Defendants
RONALD J ISAAC, Et Ux; BETTY PERRIN ISAAC
Defendants — Appellants-Cross-Appellees
UNITED STATES OF AMERICA
Plaintiff - Appellee-Cross-Appellant
v.
LAND; ET AL
Defendants
CRISTINA INVESTMENT CORPORATION
Defendant — Appellant-Cross-Appellee
App. 47
Appeals from the United States District Court
for the Eastern District of Louisiana, New Orleans
ON PETITION FOR REHEARING
(Filed Jul. 31, 2000)
Before DAVIS, CYNTHIA HOLCOMB HALL,’ and
SMITH, Circuit Judges. PER CURIAM:
IT IS ORDERED that the petition for rehearing is
Denied.
ENTERED FOR THE COURT:
/s/ W. Eugene Davis
United States Circuit Judge
*Senior Circuit Judge, U.S. Court of Appeals, Ninth Circuit,
sitting by designation.