Transcript of Record — William Cramp & Sons Ship & Engine Building Co. v. United States

Supreme Court brief1910

Ask Donna

What actually matters in this document.

Text

/#

TRANSCRIPT OF RECORD.

SUPREME COURT OF THE UNITED STATES.

OCTOBER TERM, 190€)

No. @8.99,

THE WILLIAM CRAMP AND SONS SHIP AND ENGINE

BUILDING COMPANY, APPELLANT,

us. |

THE UNITED STATES.

APPEAL FROM THE COURT OF CLAIMS.

FILED MARCH 3, 1908.

(21,054. )

(21.054.)

SUPREME COURT OF THE UNITED STATES,

CCTOBER TERM, 1908.

No. 306

THE WILLIAM CRAMP AND SONS SHIP AND ENGIN

BUILDING COMPANY, APPELLANT

THE UNITED STATES

APPEAL FROM TITE COURT OF CLAIMS

INDEN

Original Pris

Caption

Stiterment of fiitie petition, &e

Vinended petition

Exhibit \o Contraet for tl t ! boat Ni

Septerbn ', |

i idl cot pocur 1h pon

( Bill ot puurt i 1} 1 wh

Traverse (

{reument snd sulmiss

Order for re-argunient '

Re-wreumient aid submission

Findings of fact y

Conclusion of law is

Opinion {s

Judginen vi

Application for appert

Order allowing sppernt

Clerk's certitiont ‘

jivonp & Prerweiien Nt Prixtrens, Wasutsarosx, D.C... May 11, 1900

WM. CRAMP & SONS SITIP AND ENGINE BLDG. CO Vide (Ue Ge

| H Petition lied Aaeeniled Pet (rid

In the Court of Claims

ae Winniam Cramp & Soxs Suie vxp Exeixe 2 ILDING Com-

VARY

Vs

THe Usirep Srares

Phe claimant filed its original petition April 24. 1401. and subse

quently, to wit, on Mareh PS. 1908. by leave of Co moaned in leu of

sted ortetial petition, t filed its sare nde petition hich is as feod-

lows

THe Wintiam Cramp & Sons Site & Exaine Borppixe CoMPANY,

Chratresint.

Tue Ustrep Srares

Lanended Petition tpiad kahit fs | i. (

}Iiled Mareh PS. p9a3

To the Tlonorsibole Chief istics sid J iWdoes of the Court

of Claims of

the United States

The claimant. The Willian Cramp W Sens Ship & Engine Build-

the Company. a corporation Inearporated wider the hows of the State

of Pennsvivanias respectfully shows

1. On or about September 24. PSO. che the United

States, represent | by thr NA tine secretal it ihe N entered into

a contract, a copy of which is hereunto annexed. marked Exhibit: A.

and hiade prart hie reat. whereby HL Wats. cthnen

Hooother things, agreed

"_ pes ' .

Phat the elatiians Wotld. da aecoredsmes with ce ream taws, planes

and specilications, construct for the Unite) States i eertatn vessel

destamated as “Battleship No. S27 with her Ititigs ~pecitied and

certain af her equtpmient: saved vessel to bi constricted with her ma.

chiners enedies and boilers conmplete a their parts and

’ TUPLE abies pie! Col vered 1 thie Naw Vord Leaoue [x]-

and. Penueviversia. to sued perso Secretary of the

Navy meeht designate. within three vears trem: iy date of the con-

tract. to with on oor before Si plember 24. W899, Phat the claimant

Would. in accordance with the said spec iientions ane Prisatis, furnish

all of the material to be used in the comstruetion of the hull and

machinery of the said vessel That the clainant las rapidly

ils possible, furnish all workine drawihhe@s and: tey Plates necessary to

1—306

2 THE WILLIAM CRAMP & SONS SHIP AND

‘

show the dinieistens atid shape o. eawehi and every arinor plate re-

quired ior the construction of the said) vessel, Including those to be

provided for hier side and diagonal armor, turrets, barbettes, cise

lates, Coming towers. animunition tubes and. the protections for

her gaos and lomdling positions, such drawings and templates to shov

ithe Positions and sizes of the bolt holes therein. ‘That the Clatineant

would furnish all of the armor and its accessories which night bs

required for the construction of the protective deek of said yesse!

That the clatwant would care for and preserve from injury the said

vessel and all of the waterial: provided for or used in her construs

tion during the progress of the contract work, and would keep lie

and all of the said raaterials. including these to be furnished by thi

clatinant and those to be furnished by the United States, duly in

sured against fire ond marine risks. breakage of wives, and risks of

laubching, uintil her Prelipe tary or conditional UECOD LATICO? Hy thre

United States. the loss. if any, te be pavable to the Secretary of the

Navy.

Irn eonsideration the reof the United States verecd 1) to pay the

Clalit Certain sts of tenev: (2) to furnish the Clatmant all

armor pactes to be teed tn the com=trietion of certain parts of the said

vessel, rretudiig her <tde sed dingonal armor, turrets, bar

casenrifes, conmitns towers. anmmoimition tubes. and

Protections tor her guns and loading positions, and all bolt

for such armor plates: ¢3) to tring: the lates to the drawing or ten

plate “170s phaed <he pes Within resase niable rind bactiurinye litits as sy

jorth wn the speeileations and to dred) ane fii) all bolt hates therein

as shewn by the dr wines and femiplates, and by te deliver the said

arnior plates mt ihe shipvard of the claimant “within the times and

th. onde Popecguey i Orpy Whe ane nr) pra er /

2 Thereati "HN aeeordares ith the terns of the snid comirae

the elotmant procuved materials to be used in the bull and maehiners

of the said vessel and the protective deck thereof, and as rapidly

po sph ole burnin! hans, dra ines, ini templates ROCESS ‘

shew the dimen) bel shape of each and every armor plate rv

quired for tie eon-irieiion of the scid vessel. and proceeded with th

work of construction. andl at all times kept the said vessel and mate.

riils ctily 8 es 2 ae bias t }tt=s hy fire and THUD risks, breakaee ot

wavs and | i miehine. all of whieh thines were duly an

proved 1. ie Seeretary of ti \; Vy and the Clatmient, Prony tivee t

tine, did and powrlormied al other thines which. tivder the terms o

the satd coutract, it was required to do and perform, exeept in se far

te the ely Wits Chted from: so deine by the sets and failure-

of the cptied States hereinafter set forth, and the elaimant eompl

the sai | delivered her to the person thereunto desien

b : ERE

veel Hse oof the con-trnetion of the sido voesse!

nm or al February T, 1S98. sad at divers times ther ifter, th

af i Cat ui moorder to earee on the work prone

vial yy yf) i with the terrgs of the site contraet. certatn «o |

ror ylote > which the Uriited States diod Aaa a a !

< li ct thee ( THN YT thre elaine, when the He shrouded ay

required, Dirt the ( nited States COMETATS lo its suid Wereenpent,

ENGINE BUILDING CO. VS. THE UNITED STATES. 3

mt not then furnish and ch i 1 { Wier plates, although

! a ae ae ape

thereunto requested, and foiled to doe sa for lone nertods of time

hereafter, And whereas the claimant eentd have completed the said

vessel in aecordn ce with the terme of the soid contract, and delivered

by

a r to the United States On oy hve fore Sone miher ue TPNO9tp- hy reason

of the s; id failures of the United Stites to perborrs he sj i contract

on its part. the said vessel's completion and delivery to the United

States was delaved until on or about Oetober 16. L900. and the elaim-

ent was thereby erventiy Tindered in the eon truce! i of the said vessel.

1] was put to creat a lditional expense in canines i with the same

t her ear Momreservation ome thar of the 1 ih outsed or pro

el toy her corstriceti red Foor th thre a

( } ry ay! real ‘ Et thy 1 cor ; } AE oF :

count of the fathiure of the United Stites te 4 ain

a} unted to the sim: of = ! ae

hh need Ie hivefour dolls che) rt Siac |

mrope full PrPeag ys frome two dell of pa “P ' . ’

hee! Madiliit. B ond €, respee tively. ri ’ ot i

1 Phe el rant de the only pes On awryen aa Pat Le

‘ iD forty erie - eS | ti~f ( ’

iV part tere rinterest therein hiss be Y

ri-tly tt it! fir POCOTYVE rel recover tray tt) y , & for s |

WE ee a id daaisge the sen ef t t! id jive

hina Ye } ariel ( hiv ar Tove sityed ‘ ‘ | 4

The elainnant das made due ° : , ict: Mideea

h for the payment of the said sum. but the Seereiary of the

Navy. ais thre nvent of thre United State n the mre Mises. has

}

|

( to consider the said demand. and the said <a as not

been paid, nor anv part thereof. The claimant has alwave borne

true ollegianee to the Governiment of the United States. aad has not

In any wav waded, abetted. or ociven encauravement + WS Ree

loninst it

Wherefore the clotinaat pravs for ince 1 ist the United

States in the stim of seventyv-ctelt thousand five Hundred and ciehty

four dollins and fourteen cents (Sia. pe4 FA). apd fer such further

rehefas this lionorable court 1 av vrant. both at | tid try ecndity.

othe preniises

THE WILLEAM CRAMP & SONS STITP

\ND ENGINE BUILDING COMPANY

By CHARLES Ho CRAMP. President

HAYDEN,

‘

\

tttorneus for Claimant

McC AMAMON «

; P Se

Croha coppel Cetin at Pi ladel ph "1

(hark ~ 1] Coren Dp. bere cluly “Worl deposes and ~VVs thysyt hye

thie porentede f of Th \\ titan Cramp & Sons Shay ie} vpoyye

Pathdine Compr. thie eluting rire Ith anal which subseribed

lies Poors eon eo petition: that he has re; cl the

irre inial knows the eor

7

4 THE WELLEAM CRAMP &4SONS SITIP AND

tents thereof. aid that the frets therein stated are true te the best

of his knowledge anid belied,

Subscribed aud sworn to before me this 12th dav of Mareh, 1908,

ISAAC ARROTT,

Notary Public

Exuipir A,

~

Contract for the Construction ofa Seaqoog Coastline Battle Ship

of Ahout 110000 Tons Displace ment,

“Battle Ship No a

Contract, of two parts. made and concluded this twenty-fourth

day of September, AOD) TS96, by and between the William Cramp

and Sons Ship aud Prueine Building Company. a corporation created

under the laws of the State of Pennsylvania, and deine business at

Philadelphia. its said) State. represented by the president of said) cor:

poration, party of the first part. and the United States, represented

by the Secretary of the Navy. party ot the sceone part.

Whereas, The vet entitled “An net raking appropriations for the

naval service for the fiscal vear ending June thirtieth. eighteen hun

dred and ninety-secenu. and for other purposes” approved June LO,

1896, authorized the construction of three servoing coust-line batth

ships. te be constructed) in vecordanee with certain Provisions Col

tained in the oet entitled “An aet to dnerease the naval establish

ment.” approved \neust ISS6] and te he in all their parts of

domestic miantfaeture: an

Whereas, \fter din cide risenrent, the propesal of the said party

of the first part for the construction of one of said vessels. including

hull, machinery. eneines, boilers, and Uppurtenanees, equipment,

,

’

}

tl

except amehors said chaits, the Installation of the ordnance and

ordnance outfit, aod the tittine. fixing. placing and securing of all

her armor complete in all respects, Which vessel is. for the pur-

pores of this contract, designated and known as “Battle Ship

S No. 82° Tas heen dirty BECO LE « hay the Seeretary of the Navy,

and

Whereas The drawines, plans sinned ~pectiioations~ required hiv the

said aet have heen « Wi provided, adopted, and approved Th ecard

ance with the provisions of said aet of June 10. TS96-

Now. therefore. this contract witnesseth: That. in consideration. ot

the preniises. abel for aird tee consideration of the pavinvents to hi

made as hereinafter provided. the party of the first part, for itself

and its ~tecessars sited HSSTQMS, and its legal representatives, does

hereby covenant and agree te and with the United States as follows,

that is to say

First. The party of the first part wilh at its own risk and EXpenise,

construct. In aceordanece with the provisions of the nets of Coneress

relating thereto. sid in eouformitw with the aforesaid) drawings.

plans. and ~pectiieds ons. one battle ship Of slieuit eleven thortsired

tons displacement, with fittines ils ~pectfied, shied equipment, except

ENGINE BUILDING CO, VS. THE UNITED STATES h

anehors anid Chains: sich vesse] to be construeted of steel of domestic

manufacture. and to be provided and fitted with machinery, engines,

and botlers. also of domestic manufacture, complete in all their

parts, apPpurberanees, anid spare parts. and in all respects as described

In the annexed drawings. plans, and specifications. and in the acts

of Congress above referred to. and will deliver the same at the Navy

Yard, League Island. Pennevivania, to such person as the Secretary

of the Nav may desieniate: if heme, however, expressly understood

and agreed that af ana article or thing. included im. or covered

the drawings. plans. and specifications aforesaid) shall be found

during the prosecution of the work under this contract. toe be met

produced or manufactured in the United States. and i. atte:

9 reasonable effort, it shall be found impractieable to obtarn

the sare as an article of domestic mamufactire, then. and 3

sell Cue, Pravision shall he niade, hy or with the appreval of the

Secretary of the Navy. for such alteration tn the drawings. plans

and specitications. or for the adoption of seh new or different devices

or pelauts is thay be feorrriel HeCessa PN in order to Carry oll aid Corl

plete this contract, ~ubpect, as to tnerensed or dititiished compen

sation by reason oof stich change. to the conditions applicable te

chanees as expressed in the second ehuise of this contract

Secoud. The eoustruetion of said) vessel. the word vessel as used

here and hereafter througheut this contract heme titended to an

clide evervihing covered hay the drawthes, polaunis. anid ~peettientions

above referred to, lial] conform ta all respect- te cited wath sada

drawings, plans. and speetheations. whieh are hereto ammexed said

shall be deemed and taken as forming a prart of this contract with

the like operation and effect as Tf the same were tmeorperated heren

No omission tn the drawttes. plans or specifications of ain detail

object, or provi- Odi necessary to Carrs this contract inte full arid

complete effect. th accordance with the object ane intent of the aet-

of Congress above referred to, ~hall operate to the disadvantage of the

Vrited States, but the same shall be sati-factortly supplied. per

formed. ane observed liv the PRUTEN of the first part, amd all clams for

eXtra compensation by reason of. or for. or on account of. such extra

perfornnmes, are dre reby and tn consideration of the prenitses x

presslv waived. and di is hereby further provided. and this contraci

Is pon the eXpress condition that the drawihes, platin. and ~pectiion

tots aforesaid shall bool be changed Wh unas respect, When thie Cost of

such change shall, ih the execution of the work, ‘ xeood five hauindred

dollars. except pron the written order of the Se retary oo

1) \eting Secretary of the Navy: that if changes ave thie raed

the actual cost thereof. and the damage. tf anv, eansed there by

shall be aseertatnied. estiimited. and sr as nc hy oa board of rave

officers. appeotnted ie the Seeretaryv of the Nawyv. and that the in

the first part <hadl dhe heotard be the oo of said board,

Or a peetOritn ee as te the c1miount of nereased or diminished

On pen sation whieh the sate print of the first part shall be entitled

to recerve. Tf any. PD corse quence of -ueh chatige or chars

There The prrrtn of thre fir~t puart will, ths rapidly ue possthle frit

| Wt ooyorkpne drawdigs ane teniplate. necessary ote shaw the

4

5 THE WILLIAM CRAMP & SONS SHIP AND

"yanerisis ced shape of each and covery armor plate required for use

ty the eoostruetion of the vessel, including those to be used in the

coustuetion of the side and diagonal belts, turrets, barbettes. case-

ces connine towers. ammunition tubes, and protection for the

suns aud loading positions, and the position and sizes of the bolt

holes thorein--the spacing and dimensions of said bolt holes to Tx

in accordenee with the specifications and subject to the approval of

ihe Secretary of the Navy: it being expressly understood and agreed

that the party of the first part shall furnish all the armor, armor

bolls. aud their aecessories required in the construction of the pro-

tective deck: that the party of the second part shall furnish all other

spror. aud the armnor belts. te be used im the construction of thi

vessel including such as mreNv Ie required in the construction ef @

1 ooral belts. turrets. barbettes, casemiates, conniig to

ers, anitaiiion tubes, and protection for the guns and loadiag posi

{to fins sech ormor plates to the drawing or template =ize= and

chepos, within reasonable manufacturing limits, as set forth im the

-pecifications, and drill and tap all armor-holt holes there:

1] shown by said approved drawings and templates, and de-

liver said armor. and armor bolts. at the ship vard af the

pariv of the first part. and within the times and in the order required

to e:nrey oor the warl pre perks ond thet the party of the first part

|

shall at its own risk amd expense. furnish all rivets and other fasten-

ines. apd deill. tan. ane fit all holes for rivets and other fastenimes

used to couneel any part of the hull framing to the armor for con-

-trietive prrposes. except as hereinbefore mentioned, and properly

ft oH. mace wv J secure to the vesse] all the Arnon, including the

side and Giacenal belts. turrets. barbettes, easemates, conning towers,

aymnnition tubes, and protection for the guns and loading positions.

is required by the aforesaid drawines. plans. and speeifieations ; and

Hodes expressly niderstood. covenanted, and agreed that if, upon the

jon of the vessel. except the fitting. fixing. placing. and se-

eurine of the armor for her side and diagonal belts. turrets. bar

Wettes. eoseruates. aid conning towers, the party of the second part

sh not deve commenced the delivery of such armor to the PAUTty

fhe fie port. then and tn sueh case the vessel shall he subjected

to the teiat provided for in the tenth elause of this contract, and if

toandoeon suelo triak all the conditions and requirements relating

thereto, exeent a= to the fitting. fixing. placing, and sceuring of th

armor for the ide and Jinegonal helt<. turrets, harhettes, cnseniuites,

and cor nine fowers, Nal] ha fulfilled the vesse] shall he aeeepted Hh

pros idea! for in the eleventh eliose of this contract: and if the party

of the scecnd vert shall not have commenced the deliverv of the

apmior fer the <tde and digeonnl belts. turrets. barhettes. easemates,

or eonnine towers when the vessel is readv for her final trial ot

within five reenths after either a preliminary or a conditional ac

coptince of the vessel. said vessel shall he finally accepted, sub

}? foet to the eondittons ane requirements of this contract. a

the eost of fitting. fivine. placing. and securing the arnier

the side and dineonsl belt<. turrets, harhettes. caseriates. gay

eonnine teawers <halb be asec rintned. estimated. and determined

ENGINE BUILDING CO, VS. THE UNITED STATES. 7

i board ot haval othicer- tppel tod by thie Secretary Ol thie aN i\ .

the party of the first part shall be bound by the detertuination ot

suid board, and such cost: shall be deducted fromr th price oO} this

vessel in the final settlement under this contract: but if cl

the second part shall commence aud eoutinue with reason

vence the delivery of the armor fer the side or diagonal Petts, tu

rets, barbettes, casemites, or comming towers of the vessel prior to der

final trial or within five months after either 2 pre Inyo}

conditional accep hance of the vessel, the party of the firsi part <h

fit. fix, place, and secure all the armor toe the vessel in aceardanes

with the requirements of this contract and the drawings,

specications hereto annexed,

Fourth. The materials and workiiishin used cid police

the construction of the vessel herein contracted. fer

finish, shall he first-class anid of the very bent CUUbi dy :

from the beginnine to the end of the work. be sul

tion of the Secretary of the Navy: it being hereby uid

enanted. and aereed that the sid Secretary

ch

Inspectors, to whem the party of the first part ~hiel riint

is

suuples of said materials, and such informiition as to

thereof. and the hianner of using the same. as 1 iN ber ye

also any assistance such inspectors may require in di li

weight and quality of steel and other metals. said of 4 dott

materials, either used or intended for use In the eensteruy of thr

vessel, and that the inspectors may. with the appre

Secretary. peremptorily rejeet any unfit rote) orl

1s the use thereof. The Inspectors shall. at all trv hie

progress of the work. have full aeeess therete.

of the first part shall furnish them with full facilities for

ton and superintendence of the sane

hifth. The steel to be used in the construction of thre

contracted for shail conform to the “Speciications for

steel for use in the construction of the hulls and miachirn '

ships Nos. 7, 8, and 9, for the United States Na as

the Secretary of the Navy under date of Jaty Bo S06

cations are annexed to and fornia pruart of this contrnes

Sith. The party of the first part will, at its own ex:

such plans or drawings as mav be necessary duri

the work, and will submit the sme to the Nowy Derr

proval | etore the toatertal is order door the work ea ‘

Nevepth, The paren of the first preart, db conpsre ' i}

pretmises, hereby covenants and agrees to held

States harmless from and against all and every deneand. os !

anv nature or kine for. or on mecount of. thy

in. model, design, or sueeestion. or for or

fany patented invention, article. or anplianes which |

he adopted or nsed in or ahont the const)

iV port thereof. under thi- CoOmtraek, ane te per ‘

Government from all habilitw on aeeount thes

the nse thereof. by proper releases fron) 4 iMenters. oO 1}

to the sati-t chron of thre Secretary of the N

4

ro) Pik WILLIAM CRAMP & SONS SHIP AND

Lighth. Vhe vessel herein coutracted for, and all materials

appliances provided for and used, or to be used. in the constructs:

thereof, shall be kept duly insured against fire and marin

14 risks, breakage of ways and risks of launching, which insu

ance shall be renewed and inereased, from time to time, by

and at the expense of the party of the first part, until the prelinal

nary or the conditional acceptance of the vessel. the loss, if any, to

be stated in the polieles as pavable to the Secretary of the Navy: thi

insurance to be effected in such manner and in sueh COULPAUNTOS as

shall be approved by him. and in an amount to be fixed. fron: tiny

to time. by him, not exceeding the amount of the pavinents tide

under this coutract

Vinth. The vessel herein contracted for shall be completed i

aecordanes with the drawittes, platis, and speetfications alibbeNed

hereto and resid for delivers to the party of the second pert. On oy

before the eXpiration of three Vvears from the date hereof: buat th

len of the Party of the -econd pRUrPh Upon idl vessel, and the materials

on hand for use in the construction thereof, respective] ned cotter

lively, for all TOTES, pute on account thereof, shall conmnenee with

the first payment. and shall thereupon attach to the work done and

Inaterials furnished. and shall, in like manner. attach from tiniest

titne, as the work progresses, and as further pavinents are mide. and

shall continue until it shall have been properly discharged. Tn ease

the completion of the vessel as aforesaid: shall be delaved bewond the

said period of three vears, deductions shall be made fron the pricy

sUpulated in this contract for each and every day (excepting Sry

days) during the continuance of sueh delay. and Until the vesse

shall be completed as atoresard and ready for delivery tor othe

party of the second party, as follows, viz) During the three month

nent sueceeding the eOXpIration of sia perro, seventy-tive dol]

(870.00) a day. during the fortieth, forty-first and forty-seea

tnonths from the date of this contract, one hundred and tite

1 dollars (8150.00) a dav: and for each and ever daw Cex

cepling Suridiaves ) during Which stich cCormiplet ion shill |

delaved beyond the period of three vears and “IN months from: the

date of this contract three hmdred dollars (8200000) Sond all sueh

deductions fron the price of the Vessel to be nade. fron titiie

tine. fron UV pPavinent or pavimients fallin dive Hinder this cay

TNC: provided, however, thisit such delay <hall niet have been crnpsy

In the aet of the PRUTEN of the ~ecornad part.oor by fire on Waiter, op tiny

anv strike or stand-out of workmen emploved in the consteaeri

of the vessel, or by other CIPCT Ts tatiees, bevornd the control of t}

party of the first part: lat such cirenmistanees shall not de deen

to Ineluide delays My obtamine tatertals When sueh delay. iVtse fro

causes other than those herern =peettiod sand provided. further Wh

Incase of any such alleged delav. the party oof the first mart «hall

Hitnedtate notice thereof iw riting to the Seeoretary of the News

In Cise Guy questions shall arise, under this CODEPANOCH. Compe

deductions from the price of the vessel hereny contracted fey

question. with all the facts relatinve therete shill die Sub itted

ENGINE BUILDING Co. V8, THE UNITED STATES. 9

Secretary of the Navy for consideration. and his decision thereon

shall be conelusive and binditig (ipront the puttiies to this contract,

All delavs whieh the S ereiiy of the Navy shall find to be properly

attributable to the party of the second part, or to its authorized offi-

cers, or agents, or any or either of then. and to have been delays

operiting upon the completion of the vessel within the tive ~pecrtied

therefor in this contract. <lhall entithe tbe party al the first part toa

corresponding extension of the period preseribed for the conmpletion

of the Vessel : provided, howerer, that te delay nor the alleged Callse

or catises thereof attributed by the party of the first Paart. to

lth the party of the second part. its officers or agents. shall be eon-

stdered by thie Secretary of the Nay tithes thy party of the

fitst part shall. aut the tie of Lhe oeerrrernies of suehe delsay notify

idm an Writhig of the faet< armed ere Mtrtitihiees ti enehy couse, and of

the extent to whieh the said purty cot the first part elatus that the

completion od the vessel ds thereto deliaved

Fenth, The party of the tivst part hereby further covenants and

agrees that the vessel to be eomstrueted ay der this contraet shall be

sullieneriths strony te earrmy bier ar Pe to this Mbriitient, equip

ment, coal, stores, and raeditrpers prescribed by the Seeretarv. of

the Navy uted Prretterttoen| ty thie ititie Neal dren tis relsites, and spect

eobiatis threat thie beotsr! Woes hi | sitet ft why w! eluding engines,

hotlers. sted HPP eras i TINTHAMO™ OPEP bperene itied fire TOOTS,

soke Pipes clistilltrye sippy ts, stores “pare parts heating itp)

parattls, tools ty Workshop, mud water tn beaplers condensers, PUTS,

pipes, itiel stegry turbves but tet ineludtne Parrer misehine My eapstan,

Hot eXceed eleven han

dred and thirty tons (LEO tons) Hits wetahit ter be detertitned from

the certified records of the itetital werodit oof thy parts of the ma

chinery v= they are sent om board the vo-se!

withdliss steering gear. oor Witieties } hall

tor doe cothected Hp aN

cept the wetelt of the contained Water, whiredy <dradl dn caletlated

from the actual volumes tn steaming condita hown oon the

certified drawings of the completed iieliners the veocht to be

caloribited for <alf water exeepy fat thine poaet v bier fresh) Witter

only is used: that if said tote werobit bn Seoedted. a dednetion of

five hindred dollars (S500) a tor <b heeotrdte from the eontraet

price af thr Vossel for ouve hi hot af Nees.

mel that if satel total Werohit ba

rothat <thpulated,

execodled ty epereent.a further

dednetion of ten thousand dollar oSPoae, dath hy toade from the

contract pries of the vos« Why deduetrons te be made

li Prot ANN Paver on Davent. eoutdey this eon

tract: ane that wher the vesse Plefted. os required) by

the drawings. plow. Po specrientians Had ete for delivery te

the party ff thee eco rt his { he Hateetend) tog trial trip,

the Aeon a nulor 4 ried or approved by the See

retary of the Navy. te tet tl | chinery, inelud

Ing engives. batters, and appurtenanees, the canipmernt, the installa

ten wt the cbdianie or fit dothe <poed of the yvesse]

inne threat ~bie ~h 1} bie ceverpileay ¢ J moy mtoaf rey ibeet i

’

10 THE WILLIAM CRAMP & SONS SIIIP AND

(1.) Thot the working of the nh cehinery in all it< parts shal! be

to the satisfaction of the Se relay ob the Navy

2.) The party of the first part hereby guarantees that the <pe

deve lope Hrs the vessel, Upon sid trial meder coredition Preseritved

Or approved bry the Secret iy of the Navy, shall be tet lees than

average of sixteen (16) knots an hour, maittained successfully for

four (4) consecutive hours, during which period the air pressure in

the fire room: shall not exceed an average of one ineh of water, ¢]

vessel to be weighted te a tea draft of twenty-three feet six inch

(26 feet 6 tnehes)

(3.) That stick vew-e hill be found to be <tronge and well built

and iu sire Colby % th the contract drawtnes, plans, ied

specications, ittiet «4 he ip vovedd Tvs the Secretary of the Navy

provided, That if, at and ipeerny scered 00 Hh. there <hall be any farlure

ii the vessel to meet fully the rr puirenient- of this eontraet, ile

party of the first port stall be entitled to make further trial, sutli-

cient in mituber to reasonably demonstrate her capabilities; a

provided ulso, Viiat the toner of trials -hall be determined and

Litttedd | thie Scere { the Navy. and that all the ex

1s penises of ll trials prior to the preliminary or the conditional

’

aceeplance of the vessel shall be borne by the party of the

first part

Kleventh, We at anne tpn the trial before mentioned. the fore

VOINe reqiireniené | conditions relating to the vessel herein eon-

tracted for =teal firititled. and af the “peed C16) krots) cuarantecs

as aboresiid si hn developed nid maintained as aforesatd. thet

ateel dan <thelp eu bie Vesserd <br dl be predinuit ily accepted, and pay.

ment of the | throe tuetallaent: of the priee stipnlated tn this eer

tract. ard el a: te ! tertis, <brall be rade. <tbteet. however, to

special reserve of lye piel chodiags (SOLOW) Pree ard out ¢

the reservations. Ju tter provided for: Dnt if the <peed develop

and miotitauine --<el on der trial <hell fall below the spe

(dts teiyet ~aforesetd, but mot below 14 knete an beur

she shall be « coepted, sabypeet te de ctiretion from the

price Of tlie verse] woot of ber fathire te reaeb the <peed 16

knots) etiarartecd aforesaid. at the rate of twenty-five thom-nnd

dollars (325.000) a quarter knot for speed between 16) knots

lots, and (itive thermeaned dobhare C850 O00) ) a oegiiart r knot for sy

between o's us Sheets. proached however, that all the other re

querer ed ( if of this contract shall lave heen fu

ariel, 1h ‘ ar S75 tical ecerhiniee threat the levst) thryyres

stallmrette of th wool the ve nd the reservatterns on pers

The lis wit ‘ reserve Fuel whepedy <Peall be

plicable tae he satisfaction of <ueh deductions. and <!

be reteti 1] ‘ ‘% 1) “14 rerrt fer th Tae

provide! fy tf thie vessel ~ teoonhithit an avers

of at lena Vo bape ty brane tt <beadl dee optional with the Sere

of the Nave to f her ot weept ber at reelueed prnee aimed

conditions te be aereed unen between the <atd Seeretare and the

party of the first part

EXGINE BUILDING CO, V8, THE UNITED STATES. 11

" In cose of a prelionin a#eceptance of said vessel. the said

special reserve of sixty theasand dollars (860,000), or. in

ise of a conditional aceeptianece of the vessel, the said reserve fund,

or so ttieh there tay. ite the fndement of the Secretary of the

Navy. be noeessare. «ball be held anti! the vessel has been finally

trie! after bad f en et eet ee ried, i werohted correspond-

ingly. and in all respects conmplete and ready for sen. under conde

fiom preserthed or approved by the Secretary of the Navy: provided,

that «teh fins! trial <hall take pleee within five months from and

fter the date of the peelingivesy the conditional aceontanee of the

es<el ct othrat thes retises thereef <hall he borne lw the party of

Vf. cat sanyo tee seby Cty tr eratanv troe within five months

ifter ¢] relty ry oor th " fromal aceentanee of sat vessel,

ts fisivitee Pe plrce. anv weal - or defeet in

4 ‘ 4 ' Paeechiee mn oop detepioy i a her than

thet eltpe ts ‘ It, ' partor parts of ite po Winery

f pepe nte ] ) F Vyeal] dig

: Rasaas a fn Ae ry of the

y ; | 4 ‘ 4 } ‘ ‘ ‘ i hyysf Posye ! } rity at

, a | 3 1 1iare t why <cocloee.

‘ings trenannd in 41 rn i i ovessel ot anv fi or times

durine suri! fice wbeec fl I fell onnartiny v to al rve end

nerert ti evkine of the wnehinery in oll ites Withont,

me Urectine or controlling power over the <ame in ease such

neer «hall | liege, fy ensation shall he paid by the

rtwoof the fips f

Tf ssid veces ty Pereties. for sneh final trial within five

rrverethin fs the date of her preliminary or eandit nal ae-

Pa eeptaner. threnugh ne fault or delav on the port of the party

f the first pert. ond if there hall her red po wenk-

Ver fave rt, ‘ ! eroaney failure. hreakine down or de-

fier ther ql thet af fe four wear snd tear. of any part

nart< of tf chinery, enets botlers or appurtenances, then

he vessel eferl] bee firesl tte mil the said <) reserve, or

hie « | 7 of tlye ! rye fumed yy red, <apboye however, to

loduetiopy et perorunt pret mew peelepettens thet nav | } de oan the

fice of the vessel under the procteios of thie cnntpact

In ease of the reieetion of the vessel for ane of tl eontises provided

win this contract. the party of the first part hell refund to the

party of the ~ecotned prert «or letratid. op witht ity sve thre reatter,

IE posnwernveeret theretefeere ¢ lee tos thy id party of the first par for

ri ent of the construetion of <id rosce

Porelith Pe tive fel ecome! part hovine approved. as foun-

Theore four 9] tf Plans. and specifications of a ves

v! rt fore 'Ehaf properly carried out. result

by rewlrietin woul orf fT lees then SIxfeen le nyot- ae) h war,

12 rik WILLIAM CRAMP & SONS SHEP AND

changes, so loug as the size, strength. and character of the vessel shall

remain substantially the same: changes in plans or speeitieations i

volving Ihereased or deeroased eNpeiise to be dealt with as provided

for in the second clause of this contraet

Thirteenth, Wois further mstitiialls uiiderstood, covenanted ana

avreed that. tn ease of the failure or onisston of the party of the

{inst partoat anv staye of the work prior to its completion,

21 from GY Calise OP Cates other than those speciiiod ity the

ninth clause of this contract, to eo forward with the work and

make satisfactory progress towards it+ completion within the pry

seribed period, it maar] Tee optional with the Secretary of the Navy te

declare this contract forferted, The purty of the first part shall

thereupon. and oon notice thereof. ta writing, be. and the sat parts

of the first pearl does hereby. ti consideration of the prenibses, bet

itself ane its seeessors aud assigns. and its legal representatives, ca

knowledge tteelf te be justly tidebted to the party of the sec

part, as for liquidated and aseertamed damages. tna stm equal to

the ageregale amount of al! Paavinenits there tofore minde to at for. or

on aecount of work doue under this contract, and does further cove

nant and agree, as aforesaid, to refund the same on demand, or within

sINtY days thervedatt route that the pears of ihe ~ecored pret shiall sini

mav hold. as collateral security. for sueh refined. said) vessel. or se

much thereof as shall them diave been constructed. ane all qratertal

furnished or on hand for the purposes of construction. "Phe Seer

tary of the Navy shall thereupon eanse te be taken and filed a full

and complete efatement and iaventory of all work done Or con

meneed He Upon. or sbeouit “atd vesse, anid of all hoetertals ont hand

applicable thereto. the property of the party of the first part. and

shall catise the <anie to be duly valaed bw oa board. conu-t-tine of yet

less than five persons. qualitio

discharge of their duties. to be appotnted by the Seeretary of the

Navy, which board shall proceed without unnecessary delay to ex

amine such work and qeatertals and aseertatn amd deehiure the fair

market value thereof. tneludine a reasonable and eustommary mare

of profit litbotiosn motel of the work is “hall have bee moot the tune

such forfeiture t. declured. satisfactorily performed: and ape

22 seh exsiiuation the party of the first puerl daVv athenad

hy its represcntative or. if it <0 desires, by cotnsel aed sul

mit such evidence is thie board tar deen proper

Fourteenth Upon receipt of the report and finding of said) board

and upon his approval thereof, the Seeretary of the Nawy mary

his discretion rroceced a COniy lets wife Ves ol, an Hecoredanee with

the contract. drawines. pl

pose all siritabl nootertals ony brand and ire lipeded Nh thre ryyveryytay

aforesaid: and the tithe to said vessel. or so much thereof as shal

have been completed, ined ter sd] ~uely omiaiterials shall forthwit}

vest in the party of the second part: sited thee party of the first part

does hereby, for iteclf ined tts sees seers. and Hss}Ons med tts lew

representatives, covert and aeree to and with the party of th

econd part that. on receiving moties of the tntention af the Seen

tary of the Navy to proceed to thre competitor of the work t wil

11 loniow ledoe and experienee Cor thi

|

itis aid species tion Wisin for threvt pry

—-

ENGINE BUILDING CO. Vs. THE UNITED STATES. 13

surrender said vessel and all nictertals on hand, together with the

use of the vard or plant. and all machinery. tools. and appliances

appertaining thereto and theretofore used or tecessartiv to be used

inoand about the completion of che work,

Kiftecnth, Un ease the Secretary of the Navy shall proceed. under

ihe foregotne chinse. to complete the work. such procedure <hall be

without trmecessary delay. and shall be at the risk and expense of

the party of the first part. which party shall be chargeable with any

roerense dh the cost of matertals or labor incurred by reason of its

fathure te performs this contract, Upon the final settlement of the

ability of the party of the first part an account shall be stated stub

stantially as follows

The party of the first part shall be charged

1 With all pavinent. made

2. With the extra cost. if anv. of matertals and labor ane

oe all other extra eCNpenses, if anv. tnenmrred in the cormpletion

of the work.

The party of the first part shall then be eredited with the value

of the work done yp) le the time of SHSPeriston, ana of the rater!

on hand. as ascertained Dw the board. under the provisions of the

thirteenth elanse of this contract and approved by the Sceretary ot

the Navws and with sueh pavinents, tf anv. as tay have been re

funded. Tfoa balance shall thereupon appear in faver of the ports

of the first part. the same shall be paid te and accepted by the said

party oof the first part in full discharge of all claims under this

contraet: but oa balanee shall appear in faver of the party of the

second pret, thr PRUrty of the first poart hereby coveratts sid recs,

vs aforesatd. to pay and discharge the sare on demand

Nirtoonth It js rititually tnderstood, eovernmnted, ated avrecd hy

Hid between the respective parties hereto that it shall mot. under ars

eretmistinces, be obligatory upon the party of the second part to

weeptoor pay fer the vessel. or anv part thereof. to be constructed

Hider this contract, unless she shall have been completed: in. strict

conformity with this contract, and in accordance with the provision-

of the aete of Coneress. relating thereto. and that this qualifieatton

Shall he deemed and teken as applicable and applying te each and

every cliatise, covenant, and condition, express or tripelted, it) thits

contract contamed

Nerentecnth Wo ts rvtitunadds nnderstood, covenunted md serreed

byoand between the respective parties hereto that this contre shall

net, nor shall any titerest herein. be transferred by the party of the

fir-t part tonne other Persan Or persons

Riahteonth Wis hereby mutially and expressly covensnted and

agreed, and this contraet 1 Wiper the express condition that

a | no omeniber of or delegate to Coneopress. offices roof the Navy

HO GEE preter holdine any offiee or oppor tree nt under the

Navy Department. t< or shall be admitted: te anv share or part of

this eontraet., or to pny ha Ne fit fe arise therefrarnn leit t} I~ «1 poke

Hon. se farias it reliates tes mienibers of or delegates tr Congress, <hall

the eonstried to extend to this eontract. of hein trode with an

Heorporited Company

14 PHE WILLIAM CRAMP « SONS SHIP AND

Ninclecvth. The party of the sec ned part. in constderation of the

pretiises, lees hereby contract, promise and engage to and wiih

the party of the first part, as follows

1. The price to be paid for the vessel to be constructed and fur-

nished. in accordance with this contract. shall be two million <i

bundred aye fifty theusend dollar ¢82.650,000 )

2. Payments shall be made by the party of the second part in

thirty equal inetallnents, as the work progresses, with a reservation

of ten per cent. from each installment

3. No payment shall be made except upon bills in quadruplicate,

certified by the spectors of dial) and machinery of the vessel. in

such tianner a shall be directed bes the Sccretary of the Navy, Whose

firiat] approval of all lil. thu certified shall be Mecessary before pray-

ment thereof,

4. MI warrants for payioents ander this contract shall be iiide

payable to the party of the first part or its order

®. Payment of the last three tn-tallments shall not be made ex-

cept as provided for in the eleventh clause hereof,

6. When a payment i te be made under this contract, A a con-

dition preeedont thereto. the Seeretury of the Navy may, in his dis.

cretion require, for the protection of the party of the second peart,

evicle nee ~atisfactory ter Daten ior be furnished hy the prarty of

2 the first prart. that ne liens or rights jn rem of any kind

against said vessel. or her machinery, fittings, or equipment,

or the taaterial on hand for tise tn the COnSEPUCtIOn thereof, have

heen or Cal be cequirred, for eren account of any work done Or any

machinery, fitting, equilprent, or toatertal already Incorporated “ls

a part of said vessel, or on Picannel fer that purpose. or that such liens

or rielit~ hiaive either bree ti releus¢ | absolutely ors subordinated le

the rights of the Government as te make its lien for all paviments

Parent, <0 as not to eneumber or hinder in anv wav the rights

of the Government to accept or reject said vessel. and so as to become

ib-olutely extinguished in case of the acceptance of the vessel,

7. When all the Con tions. cone tants. and provisions of this con-

tract =hall have been performed and fulfilled by and on the part of

the party of the first port. said party of the first part shall be entitled.

within ten davs after the filine and aeeeptance of tts claim, to. pe-

Cove the mite ~pectal reserve, or the surplus, if anv, of sud TESeryvc

frre. Or <0 4 neh of either as the mitted party of the first part may ha

entitled to. on the execution of a final release to the party of the

second peuirt it “neh lorry iis shall! bn approved by the Seeretary of thre

Nay ve of all clatty- Of gen kind or deseription under or hy virtue

of this coutraet

Te whith, Ty ony doubt~ or disputes ATISe as to the meanlhig of

anvihing in the drawines, ‘

’ °n é ae

pricttin, or -peetieations, or rt any diserey

anev appear between satd driawines. plans or <pecifications. and th:

ey traet. the misnttes Pid] Vee at enee referred to the Secretary of the

Navy. for determination. and the party of the first part hereby binds

ht ,

If ated its steecessors and assicns. amd its legal representatives to

\s t.: oh. -

‘ by f by fils eet feoda vty the prre tey}=ar-

ENGINE BUILDING Co. VS. THE UNITED STATES. 15

. Tn Withies Whereni th res pechive parties hereto tive hore

unto set their hands and seals the day and vear first above

written,

THE WILLEAM CRAMP & SONS SHIP \ND

ENGINE BUILDING COMPANY

Lskan.] By CHAS. WH. CRAMP. President

Signed and sealed in the presence of

Attest:

JNO. DOUGHERTY. Seercta

THE UNITED STATES,

[SEAL.| By W. McADOO.

jx cle tiny Nee re tary oft the Vann

SAM. C. LEMLY.

Audie ld rocat, freneveal

\s te \W Ne \doo.

\eting Secretary of thre Navy

Exuinir B

PHiLaDeELpHta, December 6. LaO0

United States Government, Departinent of the Navy. Bureau ot

Construction and Repair,

lo

The William Cramp & Sons Ship and Engine Building Company,

Ir

lor charges for care ana Preservaliolh of the US B.S Aluhanin

exciusive of tiachinery) in con-equenice of delay in completion of

the vessel, cattsed hy the fatlure of the CGovernnie

a her armor at the tities arch in the

the work properly, from: September 24 T8900 doa, of oxnir

Hon of Contract, lo October EG. Ta

it to deliver

’ ?

oraer required to !

rey on

M”). both dates inclusive,

as follows

Whartave. OAS days ub ome cent per ton

per dav on 6,802.12 eross tons (tonnage

bared on Report of Bureau of Constrie

lion aire Repair, ISU pp. 7]

Watchine

man for the above period, at SH for 24

One niolit and one dav wate)

hours a : Pog oo

Electric Lielting. Pilatistisitine vessel 248

dave during the shove period, at S46. .2 16.049. 76

Paintine.— Touching pound repatting

waiter bottoms, trraninie tunk, coffer

dams, boiler-roonys Avinrwne-rooms. er

fine-roomis, woodwork. oniilitary mast

ontarede Of - Hutt. tel cork pruntiy u

throuehout shin. and turpentine deeks

0 hours painting. at Le

ey Ih

S200 00

red-lead oil, at 1 889 AQ

'y PHE WILLIAM CRAMP & SONS SIIIP AND

1.200 The, eolor, at We... .. 2... e, 21000

6 gals. hard oil, $4.50... . 27.00

10 eals, varnish, at 83.75... .. a7 Ov

1.120 [bs. turpentine, at 66.00.0000... 247.20

1 bags sawdust, at 25e. 0000, 1.00)

—— 2,908 . 25

Keeping ship clean from snow and ice, re

moving debris, and general attendance

and sealing

25.8295) hrs. laborers, at 22'oe.. DST] 64

25 Covers. —Canvas over hateles, ven-

Ulators, and turrets

1.250 Ibs... at 15e SITS4 30

Running heaters to heat ship

5420 hrs. machinists, at 350... 1.89700

Turning over dynamio, steering, boat erane,

ice tiachine, and windlass engines, gal-

ley, ranges and bottom and other rma-

chinery in hull specifications

9800 hours machinists, at 35 .. $2,049.25

9850 hours helpers, at 226. ius end <oo

eicrncectinonnetant 53.366 63

Running air machines at night in order to

obtain pressure to cut armor bolt holes:

extra time which would not have been

necessary had the armor arrived in time

to carry on the work properly

S20) hours machinists, at 35e S287 00

2100 hours helpers, at 22!s¢ a4 O00

aoe 311.00

Tearing out scupper pipes and putting in

place again to allow armor to goon. Tad

the seuppers not been in place the ship

would have been damaged by water: it

Was necessary, therefore, to install the

~cuppers before the armor arrived. . .

1000 hours machinists, at 356... S1.400.00

STO hours helpers, at 22toe.. 198.75

oY WHO hours pattern-makers, at

ot Ye, ... “en ra S560 .00

SOO ft Inmber at 106.0... S000

ans 6. GOR or

Turning ship to avert magnetic polariza

ton

Tow-boat service oo... . $7500

ISO hours riggers, at 80e.. 000... 54.00

6 hours locomotive eranes, at 82.00 IS 00

ENGINE BUILDING CO, VS, THE UNITED STATES. 17

174 men were working on the ship

whose time was lost, but who were

paid, through vir and electric light

connections bemg disconnected for

two hours, each averaging 20c, per

SL . OP le eae epee Orn ee a eae ee 6960

- _ 216.60

Tow-boats breaking ice around ship... ... 15.00

Insurance. —Cancellation value of policies

tts Temes. OOK, FG, FOU «oo as sie lee eo BATH T6

lusuranee whieh would not have been re-

quired had the ship been delivered

Date of begumiag. Cost.

B24.75

September 29 1S99

‘ a IS7 250

30,

October | | Deen as Pea aati tartare Ue ort i a Ti

DOCHINDOT Os dh cs one ; LTO LAT

» Be es See was B20 086

re Rat soak Hig a aie 16.5]

January § 11,1900....... ; O27 2S

¢ ta ig 177 6S

30

February 20, 1900.........4.4.. 8323.00

ae ong eRe SAE Mery oP IST. 26

March Re een tt ae on 202.07

April ee Net Rt IF are ah care St 202.91

de Bee ee ae hanes ered B2O 8D

os at ii ot Pee eel Saar an ... 699.78

A RS ie in 629 36

July Ree es ee ee aie Sot. 23

i SAS ary ne eae eT en 143.75

August ES ee SEGA RPA Cee 1LAOT 90

si re rete i ees, BLA 090

y+ | Nae big tepanseth ae sae 1.20617

«ena Rene SE LN ALN Ee 715.08

eons S1TPSS52 034

Return preniiuins allowed on) cancellation

October 16, 1900, Maoh tts 2,027.04

KO SOS 30

POuil pore. : 2... $70,996.66

J3—5Ub

18 THE WILLIAM CRAMP & SONS SHIP AND

Exuipir ©

PrinapeLVHla, December 6, 1900

United States Gov rhinent, Wepartraent of the Navy. Bureau

Stem Miigineering,

to)

The William Cramip & Sons Ship and Engine Build

iene Comm

Dy

Por charges - POy aesrye rheg pore rvertiorm « thie propeddine@ tre

APi\

of the tS bb. Ss Lethe Mh Conmseaqienee ob dela 1) ¢

oO] pletion of {! Vaessett, Lint L din itn fst] } t the fravep

to deliver ber armor at the times and in the order required

to carry on the work property, ft Sent ber 24, TS99, date

expiration of contract, to Noweryhber 16 }ove j ile rredusive

as follows

September, LStith Overhaun Hre-roory blowers, ele

ine boilers, PUne ten porary steam nines, cleanis

feed-tanks and rin ee optiTpede =e An S256 O65

October, IS9% Examining and dabrieatine evlinder-

and piston, runnine tenmorary bilo heLLONE | peypoe

lubricating ane greasing cirendating pumps, overhaul

Ing fire-room, blowers, and tlehtenine up fire main

cc on ia ee aaa ey ar Fe Caer Poe Age Pe ale toa gs

Novennrby Pr. Psa (le; ryt ! coneenss r’ tube overhaul

Ing engine-roon: lower, rejoimting fire ranin pipe.

adjusting main beariies. clenning beilers. running

water boat suction. overhouling drains from fire-roe

blowers, ranuing punaps. and esunining water service

pipe and valy

December, 1889. Overhauling eross head brasses. fit

ting up temporary boilers for heating, raving suetion

pipe from temporary tank. running temporary heater

pipe, overhouting piston rod paeking. runnin

oe tet

porary steam: pipe. lubriesting alr and. feed pumps.

and cleaning hotles 2G

January, [9000 Connecting temporary steam pipe te

stern tubes. getline hellers rendy for stean arensines

pups. exami 1) nisfton prods and valve sten

82 packing, bracketing extension levers on te

porary y ret ' dlonkevinen oy} PEM orary

boiler, hleedin mNtlisy eed orp red ruattl

eovers on temporary bearer ; OT

February, 1200 Willing for amd running water beat

; : ‘

suetioan. «te my ' } wap?

’

.

pu ApS, €K ! i~t} > hb ?

ie :

and stacks. fish i ( ' }

any ’ . ; s : ! igi

Jott and cleanniie | Cx COonneetiopm gn boplers 1o7

ENGINE BUILDING CO. VS. TILE UNITED STATES,

March, 1900.—Overhanling ere-< head ouides and slip-

temipornry steain pre. putting fish oil in

pers, running

boiler tubes. ramming purips, everhan

: ) am

line CraNN shaft,

donkeyman, watchman, overhauling crank pins,

running water boat snetion. firing temporary boiler,

Cleanine ane reodslhiye ! 1] | l re} ‘ ! \ ea

hre-room. assembling and adjusting euid 625.68

April, 1900.—Overhauline ms ne oT psto

DONS, GIscon ect Tevrppocteyy Peoria] rm ng

pumps. overhauls ited Onne temnorart

tend pipes. cle: ! { ! oOve;l

hauhine blower are SHonsiol

links. overh ' ‘ DbO..2e

May. 1900 i

bhatt re}

boilers. dis ecting and

pipe, eXmmining feed a

tharv feed pumps. overbeidine

6 putinps overhauling 4 ut ’ |

Inine MeCorib steaine Nuts

Pulp, Cleenineg and ore rristed

bilge suction plage. overbear|i thir

service, rejoiit! hotter dy HIDE. OVE

hrieator Verbatiling safety y \ ! YH1 66

June, 900 \djustine tin rrryit

purups, donkevian. overhiaantine @ enya

cocks, rejointing auxiliary feed drains verhaniing

drains fron dyn mno-rootus. over] ' iy eoid

fo crane reqorntiine suundiiage stent ind exhaust

Pipes 184 3]

fuly. 1900 Donkeviian. rpuonnine 2 , averhanlin

ane reqotntiiya <4 larg] ge} . H

chinery 200 58

\ueust, 1900 Ponmkewrnear ‘ o}} at Tei tan litho iN

} a t nn? ly , a! , }

Piveal steatn cibaittis, @lenminp tUTheh OPPO sist ! bie?

NOT tenatm ame avxtiiary st it ]

,

blowers ane pruldaipos vern rie tery %

i

. 1 5 ’

reroprnty " ary. 9 ‘

ee, rehtent ' qetred t) ‘ ? boesttevny i = my ry

pistons, tichtenine hole covers. tightening jeints

ys: ‘ ’ 3 :

On CVIINGePS, ENG Piste eit MB CN

° . 1 ’

NTTRELEE ool { ) ' THE TET rf] 39

Sprites } Perey { ; asf

bheee'y ( '

i985

| ‘ (y ) { 1

yore Ors

| , H40 14

ony } ~ ~ 1 an) wi

} ty Teiey xe)

20 THE WILLIAM CRAMP & SONS SHIP AND

156 gals. lubricating oil, at 60e.. 20... 93.60

. fs oo. eh ee eee 12.00

—$ 1.3546 40

BOE or 8 eee aN IE. oa a a ae ee $7,587 . 48

35 I1.——Traverse. Filed December 12, 1905.

In the Court of Claims of the United States, December Tern,

i ee,

No. 22,535.

THE WILLIAM Cramer & Sons Suite & Exatxe Buinpinc Compasy

vs,

Tne Unirep Srares.

And now comes the Attorney General, on behalf of the United

States, and answering the petition of the claimant herein, demic

each and every allegation therein contained: and asks judement that

the petition be dismissed.

L. A. PRADT.

Assistant Attorney General

36 Il1.—A rgument and Submission.

On the 12th and 13th days of December, 1905, this cause wos

argued by Mr. James TH. Hayden, for the claimant, and by Mr. fF. W

Collins, for the defendants, and submitted.

Subsequently, to wit, on December 28, 1907, the case was on

manded to the Trial Calendar for oral argument by the following

order :

It is ordered that this case be remanded to the Trial Calendar for

the reasons stated in memorandum,

Memorandum.

Argument is desired solely upon the question of the effeet of. the

final receipt and wherein the execution thereof takes it out of th:

recent decision of the Supreme Court in the ease of The Willian

Cramp and Sons Ship and Engine Building Company respecting thy

battle ship Indiana.

By roe COURT

Accordingly on December 4. 1907, Mr. James Th Hayden was

heard for the claimant and Mr. F. W. Collins for the defendants and

the case was resubmitted.

ENGINE BELLDING CO. VS. THE UNITED STATES, 21

OF LV Findings of Fact and Conclusion of Law and Opinion

of the Court. Filed February 4. T9OS.

Tue Wintiam Cramp & Sons Sup axp Exaixe Bt thpine

Company

v.

Tur Uxrrep Srares

This case having been heard by the Court of Claims. the court,

upon the evidence, makes the following

Findings of Fact

I.

The claimant is a corporation Incorporated and existing under the

laws of the State of Pennsylvania

1]

On September 24. 1S96. the Claimant and the Uriited States en

tered tite the contract, annexed to the petition herein, providing for

the construction and delivery of a battle ship designated as “Battle

ship No. 8,” abil row known as ine. & = * \labaria.” sud con

tract being designated as “Exhibit A.”

ITT.

Upon the execution of the said) contract the clarmant made all

preparations necessary for the commencement of work upon the

construction of the said battle ship. December 2. 1896. her keel

Was laid. and thereafter the work progressed with due dispatch, and

the battle ship would have been completed) and ready for delivery

within the contract period if the Government had delivered to the

Catmant the arnuor and armor bolts within the times and in the

order required to carry on the work properly. as obligated <o ta do

by Clause 3 of the contraet

Vv.

Ih due course the chiammant furnished to the Uriited States working

drawings and tommplates, showing the dimensions and shape of enely

ind everv armor plate required for use in the construction of thre

satd battle ship

38 V

On or about February 15, TSO. work tipon the vessel tard pre

eressedl tan port where the delivers of her Internal arhner heeamie

necessary, dn order that her comstruetion nitohit proceed within the

Contract period The first tristalliavent of plates for tie ro interna!

rer was not received by claimant until December 22. TSO. and

the last istallments Were tet delivered hy le ferdants unite Moreh

I. 1899. and notwithstanding these hindrances the chumeant prose

Cited the work Wyn the vessel, in “Oy fur and im Tinpor In its it could ay

done.

22 THE WILLIAM CRAMP & SONS SHIP AND

VI

On May TS. PS9S, the said battle ship was launehed. She had

then progressed toward completion to the extent of about oo per

cent.

Vil.

On or about June 350, ESOS, the supermtending constructor, aetin.

as the representative of the United States at the claimant's shipyard

made a report to the Chief of the Bureau of Construction and Repen

no which he stated

“Tt is estimated that on June 30. 1S98. the vessel (“A /labaimna’

Was 60 per cent completed. The contractor's trial, tinal couipletio

and delivery of the vessel to the government will depend entire!

Wpron the delivery of the armor and armament, and the shin -houwld

he ready for final delivery to the government within two months

after the receipt of the armor and armiunent at the shipbuilding

vard.’

at “tated further threat the probable date of the vesse]'s final Coty

pletion was September 28 T8900) that estimate being based upon th

SMP positron threat all rmrbror worttle hy delivered without undue dle fits,

Vill

On dre & TSOS. the United States entered inte a contraet with

the Bethleli Nia [ron CCoriipeans which provided for the PEVPPDUD Pree eye

and delivers by the latter of the armor required for thr said: batt!

ship.

IN

\fter the liunehing of the sad battle ship.oain order that wor!

prot her mieht proceed in proper rder to complet her within the

contract period. the claimant required for use certain parts of her

external armen namely, the plates for her side arnror or rain be!

~1de casemiates, Upper and lower: ban the United States did) not

Mav TS. SOS. deliver the same Plates for the external armor of th:

satd battle <hin were delivered to the elatmant from time te

between May 27. TS99. and June 7, 1900. as follows

Armor, Date of delivers

Side or main belt Mav 27 to Nov 10, }soo

Lower side casenates Noy 28, 1899, to Jan. 3, 1900

Upper stde Casenuites Jan. 3 to Feb PTB. 1000

uy Upper side casemate

wings Jan. 12 to Feb, 12, 1900

Signal tower June 15. PS99

Turret——aft Vor Ste Apr 2b psoe

Turret. forward Mav 9 to June 7. 1900

Hineh Qua protections Sept, 28 to Oet. 1. 1S99

\

On oor choot Tine DO) TOO) the <apertntending eonmstruetor, aett

as the POP POSO HE ALEV of the United States at the clitmant’s shiny vard

ENGINE BUILDING CO, VS. THE UNITED STATES Z

Hade a report to the Chiei of the Bureau of Constructi

which he stated

"The vesse] is at present estimated to he 7 per cent. comy leted,

L estimate that the date of the offical trial earn de bout Nugust 15,

100. and that the ship will be ready for commuissioni by the 50th

of September, 1900"

\1

Onoor about July DPS. TS99. a strike cecurred none the workme

Cr

n the Claimant’. vir, which involved tran id 4 SOOO rien I

ditlerernt tines between sted dent tid the oarts mriy ‘ 1enyey It i.

how) threat sid strike isatevialts bitriede oy i rk

} the laheoiwa Vhe ond workine ) hie | | it

the strike were about 160 riveters. but the reuse

lle tine thier Hter installed a ey { of oyaebpinne t | hii ~

Which the elutmant was enabled te iy re she ‘ ;

work, and by std tears expedited the work bevornd wheat would

nave dor basic “ited riveters pot porred ty thre <tr)

NII

rom June 7, 100, wher thr

last shipment of rior piste for the

— beat lt stipe Wiis deliv read to the

Claimant the wor chine

Sb tiioan, loin elvis order aid with al

J tr- bile oe ] ted

Hew otlieral tris ct ~peed test Wie hie 7 on AW st (702) 1H)

October r 16, P00, she was delivered to the United s "

ent inte: Commndisstem as Vessel af thie United sstiite Navy

XII

Ihy Pocsony cof the fehure of thr ly tee Steite te fare by thy } yt

m thy rad bottle ~hip is oat Was required tooenrry oo | ‘ of dies

iietion properly, her completion was delayed for period of

“ days

NI\

Ny orenson oof delavs on the part oof the armor contraetors. the

Or Wits lief delivered it) thie char thite caupyyT is get {

Houlel drave been. ane the vesse Wits not fe ered to the endant

| Odetortney lt. }Ona

Upon thr request of thie elityrisitt Cony Coty } ‘ !

eat Hearth uate eptember 28. TSO the Sacer, the

() Navy. on October 9, IS9O by letter. not ed the ¢

pany that the “prow of the ninth ise the eorntract

he Constrnetion Posand vessel, pelatiy for «le 1 the

CL price for ad will be suspended for a4 ree

! thy | ite ‘ ' ’ ' thre eNXtoOn

wel Cde-tarbiet ] wy P erpedat he BR w

Steamy Enis ern | ¢ rine nd WR bie

e for the completion of the Alabama was duls | Si

} i] ! ! cone ‘ () ay) , Pa

| nseauence af tis exis ;

2+ THE WILLIAM CRAMP & SONS SHIP AND

Was nade from the contract price of the vessel, which wae pated (i

the claimant company in full,

XV.

On February 9, 1901, the claimant directed a letter to the Seere-

tary of the Navy in which it made claim for the damage which it

had sustained in consequence of the said failures and delays of th

United States.

On February 13, 1901, the Secretary of the Naws directed the fel-

lowing letter to the claimant:

Navy DePaki MENT,

Wiasnminaron, Fe hruary 13. 1907

GENTLEMEN Referring lo vour letter of the Oth instant, enelosing

statement of geeount and claiming retriburserent. in the sam of

SG6.973.28. of expenses incurred in caring for the A/abaned ane her

machinery during the delay in her completion, for whieh it is alleged

the Government d+ responsible. TP have te state that while. from

casual consideration of the matter. it might seem: proper that the

papers should be referred to the bureans concerned for eX bat ion

and report. it appears. after a careful consideration of the subject,

that the claim. being for unliquidated damages. is of a kind the

Department has ne authority under the baw te entertann

Very respectfully,

JOIN PD LONG Neeretary

The Willian Cramp & Sons. Ship and Engine Building Conpany

Philadelphia. Penna

On April 15, 1901, the claimant, by it< counsel, directed the fo!

lowing letter to the Seeretary of the Navy

WasHiIneton, DOC). Apr bo, 190}

In the Matter of the Final Release on the U.S. 8. blrhame

Sin in behalf of the William Cramp & Sens Ship and Engine

Building Company we beg to say

The company is in receipt of these papers whieh von sent te rt for

execution: (1) A form for the final release to be given on deen

of the construction of the UL S28. Aahwme. and (LTD) a ter

4] of the contract whereby the company will agree toe imderunf

the United States against all miatner of deriands rade foro:

on aecount of the use of the patented inventions employed in thy

construction of the vessel.

We enclose to vou herewith the contract of tdemmnity: duly es

ecuted by the company,

We also enclose a final release duly exeeuted. We invite vou

attention to a proviso, inserted by the company. which does tet o

pear in the forms of release presented by vou. This proevice i

follows (p>. se

ENGINE BUILDING CO. V8. THE UNITED STATES, 25

Provided That nothing hereon <bal] Operate as a waiver of this

COMMPRINY s riehit tr athe for sped recover Judoinert Hh the Court of

Clatt~ for daniages ineurred or losses sustained by the company In

the prosecution of the contract werk which were occasioned by de-

lave or defaults on the peat of the | tiited States.”

On February 9. 1901, the conpany presented to vou a claim for

lamiices to the amount of se 7i vs. Which it had sustained by

resmson ane as a result of the fathure ef the United Stites to furnish

immer, te be tised in the construction of the vessel, at the times and

ti the Peesstiteet prescribed bay thre contraet for the construetion of the

vesse]

In vour letter directed te the eompary on Bi bruary 13, 1901, you

=! ited that thi elaine, he eeey fe whignidated nage x, US of a hind

the Depart cent teas we athe “i sree the law to entertain.”

It hiss freepentiy beer beld byw the Supreme Court of the United

States and by the Court of Clater that the head of an Executive

Department is net vested with juri<dietion te hear and determine

ati for unliquidated dames, even though they may grow out of

contract. tiade ly bits depeurtierndt

Ly the net of Maireh 7, ISN? kevewn as thre ‘Tucker Act,” the

Court of Claims ix vested with turtedietion to hear and determine

stich elaits

The release subnoitted by vou. witheut qualification, such as the

TOV ise inserted hy thie compan werraled undoubtedly be held to

nelude net onty all claims whieh vou have passed upon and over

hich veu might have jurisdietion. but also claims which vou had

of entertamed and over whieh won pessess no jurisdiction. By ex-

enting the release without the qualification the company would be

leprivecl of the rohit te seek and obtain its remedy in the only forum

pessessitise purtselietions in the prPetritses Tha provisn inserted does

ot affect the etlietenes or comtietetress of thre relense so far as it

deals with mittters coming within wour jurisdiction We diet that

OU WHT] approve the release as arene, appreeniting that it merely

preserves the corey, ! ulit ter thie die Wing anid adpidieation of its

eatin. as preserthed by the ° Tue tp”

Wi re ~peetfully Peaqtiest Vang te oreder Peavenert to thre COMMpPany for

the stan of S10.000. the amgunt of the consideration named in the

release

Very respectfulls MeCA\MMON & HAYDEN,

The Hheory Jobin |) Loony Seeretiat if thre Nav

WN Oh April 17. 1900. the Seeretary of the Navy directed to

the elatmant’. counsel the following letter

Navy DervrrM en,

Wiastincros, Lpril 17, 1904

spas hatersachad efor Hige ts eur letter of the loth instant. imelos

ng 2 final release exeenterd by the W Wn Cramp & Sons Ship and

Engine Building Conmmany. under the contract for th Re SL Ny

Dread I have te state that the proviso inserted in the last

+ —— 30M

26 THE WILLLAM CRAMP & SONS SHIP AND

=

paragraph of sata reine, (oot vac thereta contaiied shall oper.

ale us a Watver or the cotapany’s right to sue in the Court of Claims

for alleged damiaeos arising from delays and defaults on the part of

the Government curing the con-truction of said vessel, t= mot Huecepl

able to the Dey ritnenk.

After cons iderniion oo the matters set forth in vour letter, and the

discussion of the sclicet between Mr. Phavden. of your firma, and the

Judee-Ndveocate-Cienersl the Denartment will aecept a release tr

seid COMPLE awn in secordanee with the form forwarded to the

contractors tn its hi ON Yoon. of the 9th Instant, with the follow-

Ing provicion. whitely excepting the substitution of “elaims’ for

rpohe” is sui tintds hint was suecested by Mr. Tlavden

namie] Provided. That this release shall not be taken to inelids

Claims avisti: a tba i contract other than those whieh the

Seer LAT O1 the Nav listed Hiriselietion fooentiort Wn fs

Upon receipt of release property executed tn form as mdieated

herein, vouchers in favor of the Willjam Cramp Sons Ship ani

Engine Buildine Company wilh be approved for payment of the

balances due under the eontract less the 820.069 contemplated In

said relen-e

The veleas ‘ favith vour letter i herewith returned

Very respectfully,

. JOUN DD. LONG. Seeretary

eal eB

Messrs, MeCammon & THavden, No. 1420 F Street No W., Wash-

ington, D.C.

XV1

On April PY 1901. the chiiniant. by it. counsel, directed the fol-

lowing letter to the Sceretary of the Naw

Wastinetox, DOC April 20, 190)

Sir We ~enal vou herewith a finial relosuse execuled hy the W il-

liam Cramp & Sone ship and Eneine Building Company, aoder the

contract for the con-trnetion of the A/lebawe. This eontains a

¢lanse which excepts Tro the operation of the release claims arising

under the contraet why ‘yh vou. as Seeret iTV of the Navy, had not

jurisdiction to entertain, the chunse being the one set out im vou

letter of the U7th instant

Verv respectfilly, WeCAMMON & TEAYDEN

To the Honorable the Secretary of thre Navy

13 The tollowing release was transmitted with the foregone

letter:

ENGINE BUILDING CO, VS. THE UNITED STATES, 27

RELEASE.

Unde r Contract Dated Nepile mboy 2A, IS. noth the W iam Cramp

and Sons Nh ip cated Menge Baal Ming hh, Oi Py for the ¢ ‘onstrue-

hion of Batth Nh p Va oF, thy fi {li hary tye Gols

Whereas by the cleventh clause of the contract dated September

24. T8986. Dy and between the William Cr amp and Sons Ship and

Engine Building Cotman, parts af ihe first part, and the United

States, party of the seeond pert. for the CODSEMTETION of battle ship

No. 8, the b/odiia, it is; roreed: that a spectl reserve of s “INV thou-

sand (SG0.0000) dollars shall be held until the vessel -hall have been

finally tied, provided threat stich lintel trial shall take place within

five mouths fromr and after the tlate of the prelitninary aeceptance

of the vessel: anid

Whereas by the seventh paragraph of the ninerconth clause of

«tid contract it is further provided that when all the eonditions.

coveriants, ane provistoms of <aid ontract <liall have been ! vlormied

and fultilled by andoon the part of the party of the fet part said

party of the first paat shall be entitled. within ten day after the

filinver steed aecephinee of its elit. bo receive the snid “pred ial reserve,

or the Surry tus, if wy, of the ssid reserve fund, Or so ried) of ¢ tther

as the sata prarty of the (rst pecurt ryraa be entitled ta, on the execu-

tion of a final release to the party of the second part, m auch form

us shall hn opproved lw the Secretary of the Navy. of all « aims of

any kind or deseription under or by virthe of said contraet: ‘and

Sebi “tide vosse] Wil preltsinaurdds aeceptod on the 22nd day

of October, 1900, gid her tinal trial conmplered March 11, 1901: and

Whi revs al] the conditions, COVeT EES. and prov hans at eatd con-

tract have been performed and fabltitled bye sad the mart of the

party of the fir-t part. excepting certal i! vote. Tedieieneies,

and items of Hiiconipletod work, to cover wht i noob iwenty

thousand dollars is, according to oan undorstuidine between the re-

“pective parties to sate contract, and as stated in the letter dated

April 9 1901 (No. YOTO-OT). of the Secretary of the Navy to the

parties of the fir-t part. to be withheld by dhe party of the second

part mati the completion of the vessel im said ress na

Whereas owing to the ti ypedtenesy at this thine of Loeping the

Alahejue ata Wavy vile leony ’ enonoh for thie loine of the work in

question, the party of the second prart has consented ta rav fo the

parties of the first part all balinees due aiider HH eontroct, except.

Ine th Hel special reservation of twonty the lolly

Now, therefore. tn onsideration of the prey Hy my of forty

thousand dallars (8 10.000 1] srriemanit oof thy Overssi peetal

erve Joes. thy above-nremd oned reservatian of : thousand dol-

rs (ZOO). heqiic to me dn dand nad ly a | the Sisntes,

represen tod Try thre Secretary oof the Nay the receipt 4 hereof is

hereby selknowledged. the Willian: Cran Hd Say Shin and

Kicvine Buildine Company. represented by te. Chas th Crarmn

reste nif ssrd commaay, dees he reby, form pfx offs Steees-ors

2S THE WILLIAM CRAMP & SONS SHIIIP AND

and assign- and it- legal representatives, remise. release, and for-

ever discharge the United States of and from all and all manner of

debts, dues. st and stuns of money, accounts. reckonings. clatnis,

and demands whatsoever in law and in equity, for or by rea-

44 son of or on account of the construction of said) vessel under

the contract aforesated, excepting the sum of twenty thousand

dollars. withheld by the Seeretary of the Navy as above set forth

Provided, Vlhiat this release shall net be taken to include claims

arising under the <aid contract other than those which the Secretary

of the Navy had jurisdiction to entertain,

In witness whereof the Willtan Cramp and Sons Ship and Eneime

Building Company has caused its corporate mame to be hereunte

subseribed aid it- corporate seal te be affixed this nineteenth day

of April, 1901, by Charles Th. Cranup. its president.

[Seal of the Willian: Cramp and Sons Ship and Engine

Durtleding Co. |

THE WILLEAM CRAMP AND SONS SHTP

AND ENGINE BUILDING COMPANY,

By CHAS. TE CRAMP. President,

Attest:

CILAS. T. TAYLOR, Seeretary

On April 20. 1901. the Judge-Ndvecate-CGeneral. by direction of

the Secretary of the Navy. directed the following letter to claimant's

counsel

Navy DEPARTMENT,

Orrick of THE Jt par ADVOCATE-GENERAL,

WiastixGron, Apri] 20, 190]

GENTLEMEN The final release by Messrs. Cramp & Sons under

the contract for the A/eheme, received with vour letter of this date,

and the patent guaranty by the sate company previously received,

have been approved lw the Department,

By direction of the Secretary

Very respectfully. SAM. C. LEMLY

Judge -ldrocate-General

Messrs. MeCanition & Haveen, Nev, 1420 F Street N. W... Wash

meton, DO.

XVII

The leust pauvinenyt om seeount of battle ship Las a * Plahaa

was made on or about \ueust 26. 1902) as set forth in the follow

ing voucher

ENGINE BULLDING CO, VS. THE UNITED STATES au

Quadruplicate. Noo 895s Bo 6

The (oS Navy Department to Win. Crampoand Sons Ship and

Mngine Building Company, Dr

Appropriation, Terease of the Navy, “Construction and Machinery

Battleship: Now S.** Alabama.’ Date of contract

September 24. 2806

Ane Se. Pel } Por amount withheld on vouchers of April 20. boa]

the vessel lia lige been finally aecepted STO OOO OO)

Loess

Destactions faa uncompleted work on huidlanad mevetin

| ery (as per statement of items attached) as follows

|

{

On tial S832 55

| Onomachimers 70S

| 1. IT Sthol

Viniount paver IS,S}0050

1 Navy DerarTMEN’T.

WASHINGTON, [). CUA ugust POH. TOO]

We hereby certify that this bill is correct,

DARIUS GREEN,

Lehing Chief of Bureau of Construction and Repar,

4: B.S.

GEO. W. MELVILLE

Linger m Chie. USN

Chief of Bureau of Nteam Linge rong

Navy DrepartMent, Wasningrox, D.C

\pproved for the sti of eighteen thousand eight hundred and

en and 39° 100 dollars. pavable by purchasing pay officer at Phila

delphia. Pa

rE. W: RACK ETT.

Aeting Neeretary of the Navy

Jat ‘ dollars in full of

Recerved, a

the above bill

Nt the vine yl tit ED Es Chargeable tis Countracto ‘SN Onn Aer stigil / lH ”) Do it

and Materials Furnished at the Navy Yard. Neu York. to he Deducted

m Vouchers for Final Parijanent

On Plu]

Lissboon Miter: Por

Replace Cust t t? trap H i Viilte

eneines With ¢ ry t i ostrapos ~ SOF + . St

Ke en POPtv secs bolts for side lights and

pina ! Zen ents ’ #4) i }

helitting and stitl ~pons shutters of forward

t ch guns ridin deek S440) ; | {

350 THE WILLIAM CRAMP & SONS SHIP AND

On Machinery

i ining up starboard Hl. P. engine S47.80 31 G7 S40 47

Repairing auxiliary starboard dise har: ue pipe i in eae h

ene PAO Wy a or kel sds ate a eee ad BL i! 15.4%

Placing stop vale in dee machine system, : LUS.o4 YON le

Making stop valve at upper end of steam: pipe ‘to

auxiliary feed puinps accessible from fireroom

TOOE ne act eis Die Chines cae ase P66 11.60 38

Fitting salin meter pots for ey pore itors nou 4? Ny Jn.

Covering steate pipes 24.52 1.20 ws

PAS, 2 Os Tt Ti]

Hull BSS. 20}

Machinery... D7 0S

Total Lise

46 XVI.

By rearoti of the idl -everal failures and delays of the Unite

of the armor for the said batt

ship, ania the de af t\ Wn hier « and dithe ities CNT rreneed ]

her cons: truetion cot equent thereon, the clatraant wae put to ext’

exXpehee in the perforniinice of the contract iu suit. anvdd stistanine

damage to the amount of S40. 792.66. ‘The items of the said exti

expense and damage were is follows

Wharfage: September 24. 1899. to October LO. [900

BS7 dave at S500 per month, including watehing. 0. See t0.0

Electric Hghting—Hluminating SAS days during

the above pertod, at #46.12..

furnishing

comapletions

States with Reapers to the

vesse|

16,049 .7

Painting-——Touching up and repamting

water bottoms, trimming tank. coffer-

dams. boiler rooms, dynamo rooms, en-

gine rooms, woodwork, military masts,

outside oof hull. and cork painting

throughout ship. and turpentining decks

5.000 hours painting, at ssf e. S1.520 00

8.825 lbs. red-lead oil, at 10.6. 382 50

1.750 Ibs. color, at 12 « 10.00

6 e@als. hard oil, at 88.75. 29 50

10 @als. varnish, at $3.02. . BO PO

4.120 Ibe. turpentine, at 6¢ 247 .20

16 bags sawdust, at 256. 4.00

j cleat from ~The and Ce,

attendance and sealing

Keepme -hy

and Col ral

PU S298) hrs. laborers. at | ad i ee ae

Covers —Canvas over hatches, ventilators. and turre

£2306 ths... ab tore. Wie

(Pp. 92 -93. )

Teron ine debris,

i

POOR COPY

ENGINE BUILDING CO. VS. THE UNITED STATES.

Hhunning heaters to heat ship

o. 420 brs.. machinists. at 2S e@..

Turning over dynamo, steering, boat crane. iee machine

}

ryal

and windlass engines, galley. ranges, and blower. a

ether machinery in hull ~pecifications

O50 hrs. machinists, at 2S e.. S1.639 40

5.599 lirs., helpers, at 16.16 D412 66

Running air machines at night in order to Obstertny pore

ure to cut armor bolt holes: extra time whieh wonld

not have been necessary had the artior arrived im tines

to carry on the work properly

S20 hre.. machinists. at 2S ¢ SPIO BL

240 hrs. helpers, at 16.1 ¢ IS 64

Tearing out scupper pipes and putting mm place again te

low armor to goon. Tad the <Cuppers not heen tr

place thi hip would have been damaged Tw water

Was necessary, therefore, to install the scuppers before

the armor arrived

1,000 hrs. machinists, at 2S ¢ S1.P20 000

STO hirs.. helpers, at 16.1 ¢ 110 07

960 hrs. pattern makers, at 80.6 ¢ 2G 16

SOO ft. lumber, at 106 S000)

Turning ship to avert magnetic polarization

Towhoat service eters S75 00

ISO his., riggers, at 18.5 33.30

6 hrs.. locomotive eranes. at S32. IS 00

Ivf men were working on the ships

Whore time was lost. but who were

pad. through air and electrice-lght

connections being disconnected — for

two hours, each averaging 20 ¢ per

hour. or HO 60

Towboats’ service. breaking ice around ~hip

17

Insurance

Cancellation value of polreres hh force

Septeniber 25, PSa9 S5.7H4 16

Renewals Of Tusuranee evidenced hy

sid policies puld between Septernber

24. 1S99) and October 16. 1900 H.058 20

YSLe 26

Deduet cancellation Value of said pot

CIES 1 turned to Claimant October 14)

1g00 2,027.04

17 F

> 580

ESN

1.633

195

1

32 YHE WILLIAM CRAMP & SONS SHIP AND

Maintenance and upekeep of propelling machinery :

Septeniber, Iso Overhauling fire-reom blowers.

cleanite boilers, running temporary steane pipes.

cleaning feed-tanks and running pumps subse-

quent to 24th... 6. eect eee ences L11..

October, ISO9—-Examining and lubricating cylin-

ders and pistons, rHnniig temporary bilge suction

pipe. lubricating and greasing circulating puraps,

overhauling fire-room blowers, and tightening up

Cee COAG SOT os is ses hae eee 6s ee LUSZ

November, IS99— Cleaning condenser tubes, over:

hauling engine-room blower, rejointing fire-main

pipe. adjusting main bearings, cleaning boilers.

raining water-hoat suetion, overhauling drains

from fire-room: blowers. running pumps and ex

amining water service pipe and valves... 0...

December, 1890 Overhauling eress-head bras-e-.

fitting up temporary boilers for heating, running

suction pipe from temporary tank, running tem:

porary heater pipe, overhauling piston red pack

ine. running temporary steam: pipe. lubricating

air and feed pumps. and cleaning boilers... ... 2A7

January, 19000 Condueting temporary -team pipe

to stern tubes, getting boilers ready for steam,

ereasing pumps, examining piston reds and valve

stem packing, bracketing extension levers on tem

porary suction, donkey-mnan on temporary boiler,

bleeding auxiliary feed pipes, and putting covers

on temporary LO EN ae oO eer gene os

February, 1900-—Drilling for and running water

hont suetion, donkey-man on temporary boiler,

running pumps. cleaning feed tanks, putting fish

oil in boilers and stacks, fish oiling tubes, renew

ine auxiliary steam joints, and cleaning back

connection in boilers... 0.000.000... tM Sere a

March, 1900— Overhauling eross-head) guides and

slippers. runing temporary steam pipe, putting

fish oil in boiler tubes. running pumps, overhaul:

ing erank shaft. donkey-man. watchman, over:

hauling erank pins. running water boat suction,

firing temporary boiler, cleaning and greasing

machinery, repacking valves in fire-room, assem

bline and adjusting enides.. 00.0.2... a

April, 1990 Overhanling packing in piston stuffing

hoxes, disconnecting temporary boiler, running

pumps, overhauling guides, connecting temporary

steam) pipes. cleaning and greasing machinery,

overhauling blowers, examining and adjusting

suspension links, overhauling stop valve gear,

donkev-man 348

BO]

ENGINE BUILDING CO, VS. THE UNITED STATES,

May, 1900—-Running purnps, pumping bilge, don-

kev-man, rejoining auxiliary steam valves, clean-

ing boilers, disconmectiirg and removing Ler po-

rary steani pipe, examiing feed putuip pistons,

overhauling auxiliary feed puraps. overhauling

fire and bilge putops. overhauling main feed

pumps, examining MeConib strainers, examining

sanitary: opurmps. cleaning and greasing mia-

chinery, examining bilge suction plugs, overhaul

Ine thrust bear Walter ser 1ee, rerori tie howler

drain pipe. overhaul

safety valve gear ;

June, 1900-— Adjusting turning engine. running

Pultips. donkev-miat, overhauling biloe suetion

© lnbricators. overhauling

plug COM ke. it Jointing TLUEEN TEDL feed drains, over-

hauling drains from dyname-roome. overhauling

joints, steam) to crane. rejornting auxiliary steam

and exhaust pipes. : a

July. 1900—Donkev-rian. rutting putaps. over

hauling and rejotnting stecm to deek machiners

getting boilers ready for steam. overhauling

boilers, turning miachiners

4s

August. 19000—Donkev-man. enuimeer. rejornting

wuNiliary steam drains. cleaning and greasing

machinery, examining math and auxthiary steam

joints. running blowers and purips. overhauling

=

steam Gari S¥St@M). rejqornting heoiler nanhole

plates. overhauling off serviee. tightening joints

}

in Water bottom. orf stowine pistons. tightening

manhole covers. theahtemmmye joints on evlinders

eXumiining pistons. cleaning berlers. examining

valve chests. exatiiniing putups

rt

plenrber, 100 Cleaning botlers. donkev-man,

enorme er, ele | hie mn | ore mane rope bina ry; tioht

ening main auxiliary stesa and exhaust joint

October, LQOQ 2 Clenrntne

meer, VUE putipyes. clennine tiny! GTCUSING Mr,

chinery te Oet. 16. L900) ine a

B50 tons biturineus conl. at S3 S1.050 00

424 eals. fish oil at Dre 140 SO

:

, $

horlers donkey Prieith, EMO

56 gals. lubricating otf at GO. q

200 Tbs. waste. at He 1? 00

Total

Less overcharges On) bar Ol miaehinists inh miaintersanes

and upkeep of propelling machinery, 13.575 hours,

tl 7 cents per how

Making i tots! aut

h—300

—"

—

33

248 .98

V4 ool

200.48

A41 40

Qs Sf

329 S4

46 40

N90 25

799 66

34 THE WILLIAM CRAMP & SONS SHIP AND

Conclusion of Law.

Upon the foregotng findings of facet the court decides as a con

clusion of law that the petition be distuissed and judgrient ordered

for the defendants under the authority of the case of United Stat,

vy. Woe. Cramp & Sons, ete. (206 UL S.. 118).

Opinion.

Per Curiam:

The contract tn this case. respecting the language of the tinal re

lease upon the completion of the vessel and the payient of the ve

serve therein mentioned, is the same as in the ease of Cited States v.

Cramp and Sous (206 US. LIS). wherein the court said

“The sixth Clause of this paragraph Hiatkes ~pectal provision fo

the last payment. to be tiade ‘when all the conditions, covenants, and

provisions of said contract shall have been performed and fultilled

by and on the part of the party of the first parts and ton the execu

tion of a final release to the United States im such forme as shall be

approved by the Secretary of the Navy, of all claims of any kind or

description under or by virtue of said contract. Evidently the

parties contemplated and specially provided by this stipulation that

the whole matter of the contract should be ended at the time of thi

final release and the last payinent. That which was to be releawesd

was ‘all clattas of any kind or description under or by virtue of said

contract. Manifestly. ineluded within this was every claim: arising

not merely from a change in the specifications, but alse @rowing ov

of delay caused by the Government. The language is not alon

‘claims under’ but ‘clatmie by virtue’ of the contract — chains of

any kind or description. ATL the claims for whieh allowances wer

made in the judginent of the Court of Claims come within one or thi

other of these causes. Tt imay be that, strictly speaking. they were

not claims under the contract, but they were clearly claims by virtua

of the contract. Without it ne sueh elatuis could diave arisen

49 Now, it having heen providod in oaedveunee thie the contrac

should he closed by the execution of a release of this scope |

can not be that the company, when it signed the release. underston

that some other or lesser release was conteniplited. Tt riust hav

understood that it was the release required by the contraet—a re

lease intended to be of all elaims of any kind or deseription under or

by virtue of the contract. and that the form of words which thi

Secretary had approved was used to express that purpose. * * *

It is only by reason of the performance of the contract in the ear

struction of the vessel that these elaine arise. Bit for the contract

and the construction of the vessel ander it, there would be ne sted

claims. * * * Tf parties intend to leave some things open and

unsettled their intent so to do should be rinde minifest”

That language evidently has reference to the contract and its nm

quirements and therefore when the contract tn ternis mroavides that

the reserve or final payment will be made “when all the condition.

1

i

1

{

ENGINE BULLDING CO. VS. THE UNITED STATES oO

covenmts, and provisions of said contract shall have been performed

and fulfilled by and on the partof the party of the fist part,” the

clan wats, pon such pravrnent, obligated to sten the release pro-

vided by the terms of the contract releasing the Government from

“all claims of any kind or deseription under or by virtue of said

contract And. strive eel Court dy the cast cited holds that the re

ease of all clans growing out of the construction of the vessel

without whieh such elaine would wot have

of the contract and settled. as the court save. all

the partios iis : melding unliquidated

clatms——the Seeretury of the Nave in respect thereto mot only had

thre rioht fo weeept stich release in the Interest of the Crovernmient,

brit ttieler thi contract it was bias duty toda so

Therefore it rrntast bo hele threat. when the vessel was complet d

he reserve patd. the rights of the parties were determined by the

contract self and) ried thre lerroviaee of the releuse It follows th

arisen Was a recognition

disputes hetween

to chums sted Upon

ind

oni the auithrorit of ths, or! cited the petition Tritist ay dismissed,

whieh fs necorea nol lorie thiel bdorient i~ ordered to by entered for

the defendant

mo) y Judame ntoof the Court

No Aopen)

Mik Wittiam Crawe anp Soxs Sup asp Exaise Borpixe

COMPANY

Pie UNirep Srares

Ata Court of Clatms held tr the (atv of Washington on the 8d

lav of February, T9OS. judgment was ordered to be entered as fol

premises tire

ty fi] Onistele Viatteo aot the {

do order, adjudee and deeree that the petition thi

fendanits, and

latmcant. Phe Wallin tu & Sons Ship and Eneoine Iuildine

Conmipeaniy bi supvel thie cltpie ~ hereby Manni

By rie COUR’

tilrance of. Appeal

Poe Wiettaw Crawe wwe Sox, Sump any Exarse Br ILDING

(iu ~~ S } 1 phil

Tite ( BD: STATES

Ire hie rie rit 1! ley 114 thre tu ‘ } eel ‘ ol thie

he fol ) 1 4aays " { on oe .¢0 lef’ ‘ this elay

t. bn t Thorens ) Ieediy hil | Po) | poly {

ob WM. CRAMIE & SONS SHIIIP AND ENGINE BLDG. CO. VS, U. 8.

wid gives notice of an appeal to the Supreme Court of the United

States,

MeCAMMON & HAYDEN,

Attorneys for Claimant

Filed February 4, 1908

FEBRUARY 5, 1908

Ordered that the above application for appeal be allowed as

praved for

By rue COURT

_te

VII Certificate,

In the Court of Claims

No. 22535

Tue Witniam Cramer axp Sons Suip anxp ExGixne Burtping

COMPANY

vs,

The Unitvep States

I, John Randolph, Assistant Clerk Court of Claims, hereby certify

that the foregoing are true transeripts of the pleadings in the above-

entitled cause: of the findings of fuet and conelusion of law: of the

Opinton of the Court: of the Hhiedorrenst of the Court distiissing the

petition: of the application for, and allowanee of, appeal to the

Supreme Court of the United States

Thy testin Oni\ whereof | have hereunto set mis hand and affixed

the seal of said Court of Claims this 2ilat dav of Mebruary, 1908

[Seal Court of Claims. |

JOIN RANDOLPH,

Asst Clerk, Court of Claims

Mridorsed on cover) File No 2b.054. Court of Claims. Term No

8060 The William Cramp & Sons Ship and Engine Building Com-

pany. appellant, ox. The United States. Filed March 3d, 1908, File

No. 21.054.

1)

Ty Me iy :

Jak,

ek ihrdge toon te §

4 ‘ \. ¥

oe hoo

IN THE SUPREME COURT OF THE UNITED STATES

Ocrorer Team, 1909.

No. 92.

THE WILLIAM CRAMP AND SONS SHTIP AND

ENGINE BUILDING COMPANY. Apperrtanr.

THE UNITED STATES.

BRIEF FOR THE APPELLANT.

STATEMENT OF TITE CASE.

This ts an appeal by the Cramp Company, claimant below,

from the judgment of the Court of Claims, dismissing its

petition (pp. 33-36). The claim in suit is for breach of

contract. The contract was entere] into by the claimant

and the United States, represented by the Secretary of the

Navy, on September 24. 1896. It related to the construe-

tion of a battleship, now known as the U.S. S. “Alabama.”

The claimant undertook : to provide all material, to be used

in the construction of the vessel, except certain armor plate ;

to construct her in conformity with certain laws, specifica-

tions and plans: that she should meet certain re-

quirements: and to deliver her to the United States. com-

plete in all respects, within three vears from the date of the

contract; also to keep the vessel and all materials provided

for use in her construction, insured for the benefit of the

Secretary of the Navy, against loss or damage by fire and

other risks. up to the time of her delivery to the United

2

States. In consideration of this the United States assumed

two independent obligations: (1) To furnish part of the

armor to be used in the construction of the vessel, more

particularly described as all “such as may be required in the

construction of the side and diagonal belts, turrets, barbettes,

casemates, conning towers, ammunition tubes, and protec-

tion for the guns and loading positions.” and to “deliver

said armor and armor bolts at the ship vard of the party of

the first part (Cramp Company ) within the times and in the

order required to carry on the work properly.” (2)

To pay the Cramp Company the sum of $2,650,000;

this being made pavable in’ thirty instalinents, some

of which were to be paid as the work progressed, some upon

the delivery and preliminary acceptance of the vessel, and

the balance. including a special reserve of $60,000,

upon the vessel's final acceptance and the execution

by the builders of a release to the United States “in such

form as shall be approved by the Secretary of the Navy, of

all claims of any kind or description under or by virtue of

this contract” (p. 14). Final acceptance was not to occur

until the vessel should have been in the actual service of

the Government not exceeding five months. It was stipu-

lated: (1) Tf the delivery of the vessel should be delayed.

bevond the expiration of the building period of three years,

the builder would become liable for liquidated damages to

be deducted from its compensation, unless such delay were

caused by act of the United States, or by certain other cir-

cumstances beyond the builder's control. (2) The builder

was required to submit all questions with regard to delays

to the Secretary of the Navy and his decision as to their

cause and extent was made binding upon both parties; (3)

In case the Secretary should find that. the builder's work

was being delayed by acts of the United States or its offi-

cers or agents, the builder was to be allowed “‘a correspond.

ing extension of the building period” (pp. 4-15. 21, Find

ing IT).

7”

aa

3

Upon the execution of the contract thy claimant made

all preparations necessary for the commencement of the

work, undertaken. On December 2, 1896, the vessel's keel

was laid and thereafter her construction progressed with

due dispatch, and she would have been completed and ready

for delivery within the contract period if the United States

had delivered her armor as and in the manner undertaken Ds

it (p. 21). By the middle of February, 1898, the construe

tion of the vessel had progressed to a point where it became

necessary for the builders to have her internal armor, in or-

der that work upon her might proceed properly. ‘This

was a portion of the armor that the Government had agreed

to furnish. It was to constitute part of her strueture in

the same sense as her keel and frames. The first instalment

of it was not delivered to the builders until December 22,

1898, and the last instalment was rot delivered unti! Mareh

11, 1899, Notwithstanding the hindranee and combat

rassment caused by the lack of the internal armor. the

builders proceeded with their work as rapidly as possible

in so far as it could be done at all (p. 21). On May 18,

1898, the vessel was launched. \ccording to the official

estimate, the contractor's work was then about Hiftv-live per

centum completed (p. 22). On June 9, 1898, over ty enty

months after the execution of the contract in suit and nearly

four months after the lack of internal armor began to de-

lay the builder’s work on the vessel, the United States en

tered into a contract with the Bethlehem [ron Company by

which the latter agreed to manufacture and deliver certain

armor, including that which the Government had under

taken to provide for the “Alabama,” deliveries of. the

armor to begin in December, 1908. The Cramp Company

had nothing to do with that contract. nor was it apprised by

the contract in suit of the manner in which the Government

would procure the armor which it undertook to contribute

The Government had given no order for that armor, nor

Daehn oral eh ao el

4

taken steps to procure it, before June 9, 1898. In his re-

port, dated June 30, 1898, the Navy Department's represen-

tative at the Cramp Company's ship-yard, said:

“It is estimated that on June 30, 1898, the vessel

(Alabama) was 6O per cent completed. The con-

tractor’s trial, final completion and delivery of the ves-

sel to the Government will depend entirely upon the

delivery of the armor and armament, and the ship

should be ready for final delivery to the Government

within two months after the receipt of the armor and

armament at the shipbuilding yard.”

He stated further that the probable date of the vessel's

completion was September 24, 1899, provided that all of

her armor were delivered cithout undue delay (p. 22)

After launching. in order that work upon the vessel

might procecd in due course, it became necessary for the

contractor to have certain parts of her external armor.

This was not delivered until much later, nor were

the deliveries of armor of the several classes made

in the order necessary to carry on the work properly. The

first instalment of external armor was delivered on April 5,

1899, and the last of them, as late as June 7, 1900—<ight

and a half months after the date fixed by the contract for the

completion of the vessel and her delivery to the Government.

Armor for the turret, aft, was delivered in April, 1899,

while that for the forward turret was not delivered until

over a year later. Again the last of the armor for the side

or main belts was not delivered until November 10, 1899,

or six weeks after the expiration of the building period.

This latter delay had the most detrimental effect upon the

progress of the work, for the armor being heavy and de-

signed to be submerged in part, a great amount of material

intended for the internal fittings of the vessel could not be

installed at all, since its weight would have sunk her too deep

vt

to admit of the subsequent installation of the main belts (p.

22). Inhis report of June 30, 1900, the Navy Department's

representative at the Cramp’s shipyard said of the ‘Ala-

bama”’:

“The vessel is at present estimated to be 97 per cent

completed. | estimate that the date of the official trial

ean be about August 15, 1900, and that the ship will

be ready for commissioning by the 30th of September.

1900.”

From June 7, 1900, when the last instalment of armor

plate was delivered, the work of fintshing and testing the

vessel was prosecuted with all possible dispatch. Her off-

cial trial was held on August 20, 1900, and she was deliv

ered to the Government and placed in commission on Octo-

ber 16, 1900. On October 31. the Secretary of the Navy

issued an order to the effect that the vessel's preliminary ac-

ceptance should date from October 22, and that the build-

ing period should be extended until that date (p. 23, Finding

NIV). In July of 1899 @ strike occurred among the work-

men of the Cramp Company's yard, but it had no effect upon

the progress of work upon the “Alabama” (p. 23, Finding

XT). The whole delay of more than a year (387 days) was

attributable to the United States, and the inevitable con-

sequence of its failure to) provide armor plate for the

vessel, as agreed. Such was the finding of the Sccre-

tarv of the Navy, by whom the cause and extent of the

delay was inquired into and determined in the manner pro-

vided by the contract (Paragraph 9th) which made his

decision of such matters conclusive upon the parties

(pp. 23-24. Vinding NIV). While this finding of the

Secretary is not now open to dispute it is noteworthy

that the Government's delay of over twenty months in

placing an order for the armor accounts for the

delay, in the deliveries of the armor, and the hindrance

8

of work and damage of which the ship-builder complains.

By reason of the Government's breach of contract in failing

to provide armor plate for the vessel in due season, the

Cramp Company was put to extra expense in the perform-

ance of the contract on its part, and suffered damage, which

the Court of Claims has assessed at $49,792.66. This was

made up of items covering (1) the wharfage, maintenance

and upkeep of the vessel, and insurance carried upon her as

required, during the delay period; (2) the cost of extra

work made necessary by the delay: and (3) the increased

cost of doing certain of the work specified by the contract

because of the lack of armor, when needed (pp. 30-33).

On February 9, 1901, after the delivery of the vessel to

the United States and her preliminary acceptance, but be-

fore final acceptance, the Cramp Company wrote to the Sec-

retary of the Navy, presenting its claim for the damage suf-

fered by it, in consequence of the Government's default,

estimating this at $66,973.23. On February 13, 1901, the

Secretary replied :

“ek * * while from a casual consideration of the

matter it might seem proper that the papers (particu-

lars of demand) should be referred to the bureaus con-

cerned for examination and report, if appears after

careful consideration of the subject, that the cLaim, be-

ing for UNLIQUIDATED DAMAGES, JIS OF A KIND THAT

THE DEPARTMENT HAS NO AUTITORITY IN LAW TO EN-

TERTAIN.”

On March 11, 1901, the Department, having completed

the final trial of the vessel, the Secretary notified the Cramp

Company of her final acceptance. Along with this notice he

sent the company a form of final release and said that a

part of the special reserve. amounting to $40,000, would be

rs

paid to the company upon the return of that release duly

executed. This draft release read:

“Whereas, by the eleventh clause of the contract,

dated September 24, 1896, by and between the William

Cramp and Sons Ship and Engine Building Company.

party of the first part,and the United States. party of the

second part, for the construction of battleship No. &, the

“Adlabama,” it is agreed that a special reserve of sixty

thousand (60,000) dollars shall be held until the ves-

sel shall have been finally tried, provided that such final

trial shall take place within five months from and after

the date of the preliminary acceptance of the vessel:

and

“Whereas, by the seventh paragraph of the nineteenth

clause of said contract it is further provided that when

all of the conditions, covenants, and provisions of said

contract shall have been performed and fulfilled by and

on the part of the party of the first part said party of

the first part shall be entitled, within ten days after the

fling and acceptance of its claim, to receive the said

special reserve, or the surplus, if any, of the said re-

serve fund, or so much of either as the said party of

the first part may be entitled to, on the execution of a

final release to the party of the second part, in such form

as shall be approved by the Seeretary of the Navy, of

all claims of any kind or deseription under or by virtue

of said contract: and

“Whereas, the said vessel was preliminarily accepted

on the 22d of October, 1900, and her final trial com-

pleted March 11, 1901: and

“Whereas all the conditions, covenants. and provi-

sions of said contract have been performed and fulfilled

by and on the part of the party of the first part, except-

ing certain minor defects, deficiencies and items of un-

completed work, to cover which the sum of twenty

thousand dollars js according to an understanding of

the parties to said contract, and as stated in the letter

dated April 9, 1901 (No. 2919-01) of the Secretary

of the Navy to the parties of the first part, to be with-

held by the party of the second part until the completion

of the vessel in said respects; and

Whereas, owing to the inexpediency at this time of

keeping the “.\labama”™ at a navy vard long enough for

the doing of the work in question, the party of the sec-

ond part has consented to pay to the parties of the first

part all balances due under said contract, excepting the

suid special reservation of twenty thousand dollars;

“Now, therefore, in consideration of the premises, the

sum of forty-thousand dollars (S40,000), the amount

of the aforesaid special reserve, less the above-men-

tioned reservation of twenty thousand dollars (S20,-

COO) being to me in hand paid by the United States,

represented by the Secretary of the Navy, the receipt

whereof is hereby acknowledged, the William Cramp

and Sons Ship and Engine Building Company repre-

sented by me. Charles HI. Cramp, president of said com-

pany, does hereby for itself and its successors and as-

signs, and its legal representatives, remise, release, and

forever discharge the United States of and from all and

all manner of debts, dues, sum and sums of money, ac-

counts, reckonings, claim and demands whatsoever in

law and in equity for or by reason of or on account of

the construction of said vessel under the contract afere-

said, excepting the sum of twenty thousand dollars,

withheld by the Secretary of the Navy as above set

forth.”

The Cramp Company being advised that such an instru-

ment would bar its right to assert and collect its claim for

damages. declined to execute a release in that form, but, on

April 15, 1901, tendered to the Secretary one in all respects

like his draft, except that it contained this additional pro-

viso, designed to save the company’s right of action on the

claim in suit (p. 25):

“Provided, that nothing herem shall operate as a

waiver of the company’s right to sue for and recover

judgment in the Court of Clotms for damages incurred

or losses sustained by the company in the prosecution of

the contract work, which were occasioned by delays

or defaults on the part of the United States.”

9

This was tendered by counsel for the Cramp Company

along with a letter in which they showed that the company

wished to preserve its right to collect. the claim) in

suit, and was not willing to relinquish it in’ the man-

ner contemplated by the Secretary's draft of the release.

They suggested further that inasmuch as the Sceretary had

declined to entertain the claim on the ground that he lacked

authority to do so, and was sustained in that position by

numerous decisions of the Court of Claims, holding that

the head of an executive department is not vested with

jurisdiction to hear and determine claims for unliquidated

damages, the company was constrained to seek — its

remedy by suit in the Court of Claims, as provided by the

act of Congress, approved March 3, 1887, and known as

the “Tucker Act.” On April 17, 1901, the release thus ten-

dered was returned to counsel by the Secretary with a letter

in which he said that the proviso, added by the company. was

not acceptable to the Department. but that the Department

would accept a release containing a proviso, “which, er-

cepting the substitution ef “crars:s’ for ‘rieuts,’ is substan-

tially what was suggested by Mr. Hayden, namely + Pro-

vided, that this release shall xov be talen to include CLAIMS

arising under the said contract, OTOFR THAN THOSE WHICH

THE SECRETARY OF THE NAVY HAD TURISDICTION TO EN-

TERTAIN. *

On that representation, the Cramp Company executed a

release containing this proviso, sugeested by the Secretary,

and it was tendered to the Department by counsel, on April

20, 1901, with a letter in which they said:

“This (release) contains a clause which excepts from

the operation of the release claims arising under the

contract, which you, as Sceretary of the Navy, had not

jurisdiction to entertain.”

x

¢

Sep ver 4

10

In that form the release was accepted (p. 28) and the sum

of $40,000 was thereupon paid to the Cramp Company.

Phis suit was brought on April 29, 1901 (p. 1). On August

26, 1901, the Department accounted to the company for the

sum of $20,000, withheld, pending the completion by the

Goverument of a few minor items of work. The cost of

these came to S1189.61,, and the balance of the contract

price-—S18,810.39-—was paid toe the company and receipted

for as follows:

“lor amount withheld on voucher April 20, 1901,

the vessel having been finally accepted, less deductions

for uncompleted work on hull and machinery (as per

statement attached) as follows :”

No further release or voucher was called for by the De-

partment or given by the Company (pp. 28-30). After

hearing. the Court of Claims dismissed the petition and en

tered judgment for the defendant (p. 34), holding: (1) that

under the contract the Government became entitled to a

release of all claims that might have accrued to the Cramp

Company for the Government's breach of contract on pay-

ment of the special reserve, and that the contract itself had

the effect of a release: (2) that the acceptance of the special

reserve barred the company’s right of action, although it

vas paid with the understanding. expressed in the release.

that it should not operate agaimst claims that the Seeretary

had not authority to entertain. The court said that this

decision was “under the authority of the case of Umited

States us. Wim. Cramp & Sons, etc. (206 U. S.. 118)"

SPECIFICATION OF F-RRORS.

The errors of the Court of Claims, relied upon and in-

tended to be urged are these:

1. The said court erred in dismissing the petition and in

‘ntering judgment for the defendant.

11

2. The said court erred in holding that the claimant was

debarred, by the contract in suit, or by the release from

asserting and collecting the claim in suit.

3. The said court erred in holding that by acceptance of

the last payment made on account of the contract price of

ihe vessel the claimant became debarred from asserting and

collecting the claim im suit.

4. ‘Vhe said court erred in failing and refusing to hold

that under the terms of the contract the claimant had a right

of action for the damages suffered by it in consequence of

the defendant’s failure to deliver armor for the vessel as

covenanted, and that the claim in suit remained open and

unsettled, the claimant saving its right) of action upon

the same.

5. The said court erred in failing and refusine to vive

judgment for claimant in a sum equal to the damage suf

fered by it, caused by the defendant's failure to deliver the

vessel's armor. as covenanted.

ARGUMENT.

In the court below the defendant raised several issues of

law, denying the Government's liability. ‘These were

founded upon the terms of the contract and those of the

release, and upon the acceptance by the claimant of the

payments made after final acceptancs \s stated above,

the court confined its consideration of the case to the sup-

posed bar, created by the contract itself, and the acceptance

of the last payment. That question will be taken up first

Afterwards, the other questions, ratsed below, but not men-

tioned in the opinion of the court, will be considered

12

I.

The contract did not obligate the claimant to re-

linguish the claim in suit, or any other claims that

might accrue to it for breach of the contract by the

United States. The contract itself was not a release

of such claims. The acceptance by the claimant of the

last payment did not create a bar to the claimant's

right of action for the breach comimitted by the United

States.

The interpretation of the contract by the court below

comes down to this: (1) While the United States, as a

consideration on its part to be performed, covenanted to

deliver armor plate to the builder for use in the construc-

tion of the vessel. when and as the builder should need it,

and, independent of and in addition to that, covenanted to

pay the builder a certain sim of money; there was another

provision of the contract (Paragraph 19, Sec. 7), which

made the Government's covenant to furnish armor nugatory,

by requiring the builder to relinquish any and all claims that

might accrue to it for breach of contract by the Govern-

ment on receipt of the sum stipulated to be paid. In short.

it was held that the Government was relieved of both of its

obligations by performing one, and, from the moment when

the contract was signed. the chumant was powerless to

compel the Government to perform both obligations, al-

though the two were independent, and together made up

the consideration to the builder for the construction of

the vessel. (2) Thoueh the Government broke its cove-

nant to deliver armor, it) did perform its other and in

dependent covenant to pay a certain sum of money, and

the condition as to payment was such that acceptance of

the money had the same effect as an unconditional release

and precluded the builders from claiming damages for breach

of the first covenant, although they gave notice of their claim

18

before payment of the money, and by the release which was

given before payment, the parties left the claim in suit open

and unsettled.

Let us see whether there is any justification for placing

such an interpretation upon the contract or the conduct of the

parties.

The contract, drawn by the Navy Department, was of

great length and divided into nineteen paragraphs. Sixteen

of these related exclusively to obligations assumed by the

builders, including: (1) the provision of materials: (2) the

prosecution of work upon the vessel: (3) the time of her

completion and delivery: (4) the tests to which she should

be subjected and requirements that she would have to meet :

and (3) numerous penalties and forfeitures to he posed

upon the builder in the event of failure on its part

Three of the paragraphs—the third, eleventh, and nine-

teenth—relate, among other things, to th considerations

moving from the Government.

Paragraph “Third” deals with the furnishing of the

vessel's armor. Certain contingeneics provided against in

the latter part of this paragraph, and whieh, had they arisen,

might have modified the obligations of both parties, did aot

arise, so we can ignore them and contine our attention. to

the following: The builder undertook to prepare plans and

templates for all of the armor, to supply the plates required

for the protective deck, and to install all of the armor Upon

the vessel. The Government on its part undertook to pro-

vide all armor plate other than that requived for the protec-

tive deck, and to deliver it to the builder “at the times and wt

the order required to caryy on the work properly.” These

undertakings. were not subject to any condition as to the

manner in which either party should produce or procure the

part of the armor to be contributed by it. The Govern-

ment’s obligation was not made dependent upon or an alter-

native for any other consideration to be performed by it.

14

Paragraph “Nineteenth” (p. 14) relates to the money

consideration: “The price to be paid for the vessel to be

constructed and furnished in accordance with this contract.”

was fixed at $2,650,000—to be paid by the Government to

the builder in thirty equal instalments with a reservation of

ten per centum from each instalment. Twenty-seven in-

stalments were to be paid as the work progressed. The last

three were to be paid as provided by Paragraph Eleventh.

and not otherwise (pp. 10-11), that is to say: they were to

be retained by the Government until preliminary acceptance

of the vessel, when they were to be paid over to the con-

tractor, subject, however, to a special reserve of $60,000.

as to which it was provided :

“In case of a preliminary acceptance of said vessel,

the said special reserve of $60,000 * * * shall be

held until the vessel has been finally tried, after being

fully equipped, armored, or weighted correspondingly,

and in all respects complete and ready for sea, under

conditions prescribed or approved by the Secretary of

the Navy; provided, that such final trial shall take place

-cithin five months from and after the date of the pre-

liminary «acceptance of the vesse 7

Paragraph “Nineteenth” also contained this :

“7 When all the conditions, covenants and provr

sions of this contract shall have been pe rformed and

fulfilled, by and on the part of the party of the first

part (Cramp Company ). said party of the first part shall

be entitled within ten days after the filing and accept-

ance of its claim, to receive the said special reserve or

the surplus if any of said reserve fund or so much of

either as the party of the second part may be entitled

to, on the execution of a release Ih sit ir form as shall

be approved by the Secretary of the Navy, of all claims

of any kind or description under or by virtie of this

contract.” ;

15

These surely do not justify the interpretation that. the

court below placed upon the contract.

(1) The price stipulated to be paid was “for the vessel,

to be constructed and furnished in accordance zith this con-

tract.” i. ¢., the Government supplying all armor other than

that for the protective deck and delivering it to the builders

“at the times and in the order required to carry on the work

properly.”

(2) The contract (Par. 11th, p. 11: Par. 19th, See. 5,

p. 14) did not sanction the withholding of the special re-

serve by the Secretary after final acceptance of the vessel,

or more than five months after her preliminary acceptance.

(3) Section 7 of paragraph nineteenth (spray) was not a

present release, but, at the utmost, an agreement to release,

conditioned upon the performance by the Government of

the considerations specified. Verformance by the Govern-

ment of its covenant to supply armor failing, the builder's

agreement to release went with it. “Jf part of the consid-

cvation agreed on be not performed, the whole accord fails.”

(City of Memphis vs. Brozar, 20° Wall. 289: Bank vs.

Leech, 94 Fed. R., 3102.1 Smith's Leading Cases, 3th Am.

d., 445-H6.) In the case of Bank vs. Leech (supra),

Caldwell, J... said:

“It is a well settled rule of law that accord with-

out satisfaction is net a good answer. An agree-

ment or accord which is to operate as a. satisfaction

of an existing liability must. before it can have that

effect, be fully executed. It is not enough that there

be a clear agreement or aceord and a sufficient consid-

eration: but the agreement or accord must be executed

before it can he pleaded as an accord and satisfaction.

If part of the consideration agreed on be not performed,

the whole accord fails.”

(4) Section 7 of paragraph nineteenth (supra) contem-

plated the presentation of a claim by the Cramp Company for

16

the part of the money remaining unpaid at the time of the

final acceptance of the vessel, an adjustment of the matter

with the Secretary, and thereafter a release and pay-

ment. based on such adjustment. — These things did

not occur for obvious reasons. The Cramp Com-

pany had presented — the claim in suit, over two

months before final acceptance of the vessel. The Secre-

tary, without disputing the amount of the claim or the right

of the company to recover It, advised the company that “fe

claim being for unliquidated damages, is of a kind the De-

partment has no authority in law to entertain” (p. 24). It

was the Secretary who, two months Tater, after final accept-

ance of the vessel, and without a request from the Cramp

Company, tendered to it a part of the special reserve, saying

that it would be paid on the execution of a release which

svould have discharged the United States from all “debts,

dues, sum and sums of money, accounts, reckonings, claims

and demands whatsoever in law or in equity for or by rea-

son of or on account of the construction of said vessel under

the contract aforesaid, excepting the sum of $20,000, with-

held by the Secretary of the Navy" subject to a further ad-

justment. The company declined to execute that release, be-

cause it wished to preserve its right of action on the claim in

suit. and so advised the Secretary. It agreed with him

in his conclusion that “the claim, being one for unliquidated

damages, was of a kind that he had no authority in law to

entertain.” Tt told him that it proposed to submit the claim

to the Court of Claims, which had authority in law to enter-

tain it. It tendered to the Secretary, in lieu of the release

proposed by him, one by which its “right” of action on the

claim in suit was excepted and left open, as well as its claim

for a further adjustment of the $20.000 matter. The Sec-

retary objected to the use of the word “right” as applied to

the claim in suit. Doubtless he considered that the accept-

ance of such a release might be taken as his assent to the

17

proposition that the company had a right of action. Tle

had no authority to concede even that much, and to do so

would have been an encroachment upon the jurisdiction,

committed by Congress, to the Court of ( ‘laims. So he of-

fered to approve a release, which in speaking of the matter

anal ee from its operation, should deseribe the compariy’s

bill of damages as a “elaine” rather than a “right.” We said

in effect that such a change of terms would not impair the

efficiency of the proviso as a saving clause (p. 20). The

company acceded to this proposition and the release executed

by it and delivered to the Sc retary before payment of any

part of the special reserve, in terms, ¢ Seepted from its opera

tion “claiinis arising wader the said contract other | an those

which the Secretary of the Na: V had jurisdiction to ente

‘aiw’—the very words that had been cmploved by the Rates

tary to describe the claim in suit,

The elaborate and tautologiea! expressions contained in

the fifth paragraph of the release (pp. 27-28) do not over-

come the particular sents of limitation, contained in the

proviso (p. 28), which limited the operation of the release

to claims which the Secretary of the Navy had jurisdiction

to entertain,

Texas, efc.. R. Co. vs. Dashiell (48 U. 3. Osh, Fes

case turned upon a release which read:

“Ww hereas, on and prior to the 24th day of December,

19C0, 1, G. HL. Dashiell, was employed by the ‘Texas &

Pacific R: ahead Co. as brakeman and extra freight con-

— at or near Eastland, Texas, on the said 24th day

t December, 1900, about 3.15 o'clock ALM. 1 sus-

a certain personal injuries in the manner and of

the character described, to the best of my knowledge

and ability, to-wit: Extra east eng. 189 struck caboose

of extra east eng. 255, 2'4 miles cast of Fastlan}

carte my body, right lee, right arm, and giving me

t scalp wound. And whereas, it s by said railway

company and myself mutually Pui wre to maintain

18

amicable pleasant relations and avoid all controversy in

respect to said matter: Now, therefore, to that end, and

in consideration of thirty and no/100 dollars, to me

now here paid in cash by said Texas & Pacific Railway

Company, | hereby release and acquit, and by these

presents bind myself to indemnify and forever hold

harmless, said Texas & Pacific Railway Company from

and against all claims, demands, damages, and _liabili-

ties, Of any and every kind or character whatsoever,

for or account of the injuries and damages sustained

by me in the manner or upon the occasion aforesaid.

and arising or accruing, or hereafter arising or accru-

ing, in any way therefrom. * * * And it is also

expressly understood, that all premises and agreements

respecting or in any wise relating to the subject hereof

are fully expressed herein and no others are made to

exist.”

\fter executing this Dashiell brought an action against

ithe railroad for his personal injuries, enumerating injuries

to his head, eves, back, sides, arms, shoulders, and in the

organs and functions of his brain and his mental and nerv-

ous systems. The railroad set up the release contending

that it was intended “to be a final settlement of all claims

erowing out of the aceident.” The defendant contended

that it was a settlement only for the particular injuries

there enumerated. The court adopted the plaintiff's view

of the instrument and gave judgment in his favor. This

was afiirmed by the Circuit Court of Appeals and thereafter

by this court, where Mr. Justice McKenna. delivering the

opinion, said :

“The words ‘in the manner and upon the occasion

are a mere tautological identification of the collision

and cause of the injuries. They add nothing else

whatever to the meaning of the release. This construc-

tion gives purpose to the enumeration of the injuries

and to all of the provisions of the release. Ind the

rule of construction should not be overlooked that*ijen

eral words in.a release are to be limited and restrained

to the particular words tn the recital.”

EAPC DRA CRIA LAB ESL AS HARE DEED

19

(3) The Seeretary of the Navy and the Cramp Com-

pany were © rreet in the opinion expressed by the former and

acquiesced in by the latter that ‘the clatu being one for

unliquidated damages is of a kind the Department has no

audiority under the law to entertain” (p. 24). By the

saving clause which was finally included in the release «

“Provided, That this release shail not be taken io

include claims arising under the said contract other thai

those which the Secretary of ihe Navy had jurisdiction

fo entertam.”

they adopted apt words to carry out their purpose to leave

the claim in suit open and unsettled. It is and always has

heen the law that executive officers of the Government

cannot entertain such claims, and it has been held over anil

over again that the head of an executive department is not

authorized to entertain and settle claims for unliquidate.

damages, even when they grow out of contracts made by

him. Such has been and is the rule followed by all execu-

tive departments. In an opinion given in 1832 (Opinions,

ed. 1841, p. 882). Mr. Attorney-General Tawney said:

“If the Navy Commissioners have refused to take

the bread from Mr. Stiles. according to contract, when

he had prepared it of the quality called for by the

agreement, if is not in the power of the executive branch

of the Government to liquidate and pay the damages he

may have sustained. Vf he has been damnified by the

oficers of the Government, Congress* alone can re

dress the injury.”

*Since that opinion was written Congress by the act of March 3.

1887, known as the “Tucker Act,” has conferred upon the Court of

Claims jurisdiction “to hear and determine * * * all claims * *

for damages liquidated or unliquidated. in cases not sounding in tort

e

x

we

* ‘

&

a

Pd

ix

McKee vs. U. S., 12 C. Cls., 5

Power vs. U. S., 18 Id., 263, 2

McClure vs. U. S., 19 Id., 18, 28-29;

Brannen vs. U. S., 20 1d., 219, 223-224:

Pneumatic Gun Carriage e o. vs. U. S., 36 1d., 71:

J Opin. Attys.-Genl., 327-328 ; Id., 627, 630.

14, 555-558:

7

bs Tes

In Power vs. U.S. (supra), Davis, J.. delivering the

opinion, said (p. 275):

“Claims for unliquidated damages require for their

settlement the application of the qualities of judgment

and discretion. “They are frequently, perhaps generally,

sustained by extraneous proof, having no relation to

the subjects of the contract, which are common to both

parties: as, for instance, proof concerning the number

of horses and the number of wagons, and the length

of time that would have been required in performing a

given amount of transportation. The results to be

reached in such cases can in no just sense be called an

account, and are not committed by law to the control

and decision of Treasury accounting officers.”

(6) Apart from the plain and explicit language of the

release, it was clearly nnderstood by the parties that the

claim in suit was left open and unscttled, to be adjudicated

by the tribunal having exclusive jurisdiction of claims for

unliquidated damages. That was the situation of affairs,

when the first payment of S10.COO0 was made from the spe-

cial reserve. When the 820,000 matter was adjusted, some

months later, this suit had been brourht and no release

whatever, bevond a voucher for the payment, was asked for

or given. To give the release or the claimant's acceptance of

the last payments the effect claimed for them by the Gov-

ernment and given them by the court below, would be to

use them in a way not justified by the terms of the release,

a

21

or intended by the parties, and would allow the Government

to commit a fraud. (Parmelee vs. Lawrence. 44 Ill... 405-

409; Fire Ins. Assn. vs. Wickham, 141 U. S., 564, 576-

S82). If the terms of the release were obscure, which they

are nol, it would have to be interpreted in such a Way as to

carry out the intent of the parties, to be ascertained from

the correspondence which passed between them. (Fire Jus.

Assn. vs. Wickham, 141 U.S., 564, 576-582. CS. 7s. Peck.

102 U. S., 64: Merriam vs. U. §..107 U. S.. $37, 441-442:

U.S. vs. Gibbons, 109 U.S... 200, 3-204: Chicago, ete.

R. Co. vs. Denver, ctc., R. Co.. 143 U. S.. 596, 609-610:

Nash vs. Towne, 5 Wall. 689, 699.) No one can read that

correspondence and] say that either party intended the release

to bar the claimant's remedy on the claim in suit. but on

the contrary that both parties intended that it should be pre-

served.

(7) The Seer tary was not precluded from paving the

spectal reserve without requiring the claimant to exeeute an

unconditional release. ‘Take Section 7. Paragraph Nine-

teenth (supra) literally and by itself, without: regard to

the rest of the contract. or the situation of the parties: or

the fact that the Secretary, whe made the contract. had au-

thority to modify it, and it would have precluded him: from

ordering final acceptance of the vessel or from) paying any

part of the special reserve until “all the conditions, cove-

nants, and provisions of this contract. shall have been

performed and fulfilled by the perty of the first part

(Cramp Company). This the company had not done,

here remained. as shown by the release itself, “certain

defects, deficiencies and items of mncompleted work.” to

cover the cost of which the Secretary withheld $20,000

pending the completion of these things by the Govern

ment at the builder's cost (p. 27). Tf he had authority to

make that exception of a matter which he was authorized to

settle, he had, also. authority to make the other exception

Hy

19)

with respect to claims that he could not entertain and was

obliged by law to leave unsettled, if the contractor refused to

relinquish them. The Secretary had legislative authority to

make a contract for the construction of the vessel in ques-

tion, and while this was limited in some particulars it was

broad. There was no limitation with respect to the manner

of paying the money consideration, or the taking of a

release. These things were left to his discretion. Tle was

as free to exercise his judgment in the modification of the

contract ‘in these particulars as he was to make the contract

in the beginning. (U.S. vs. Barlow, 184 U.S. 123:

Salomon vs. U.S. 19 Wall, 17:0. S.. ex rel. Redteld, vs.

Windom, 137 U. S.. 636.) Mr. Justice MeKenna, deliv-

ering the opinion of this court, in (urifec States vs. Barlow,

said (p. 135):

“It is contended by the United States that the direc-

tion of the Secretary of the Navy was a change or

modification of the contract within the meaning of the

7th subdivision of the contract, and that the Secretary

had no power to direct or consent to such change more

than the ‘humblest laborer employed upon the work.

and besides, that no such change could be made except

by an agreement in writing.

“We have no doubt of the power of the Secretary of

the Navy. His power is manifest from the contract,

and is given by law.”

The acceptance by the claimant of the payments made

after final acceptance of the vessel with the understanding

acquiesced in by the Secretary, that the payments should not

bar the claim in suit, certainly did not create such a_ bar.

Weeks vs. Rector et al of Trinity Church (56 Appellate

Division, N. Y., 195). The contract drawn in question in

that case provided for the construction of masonry work in

a building to be erected by Trinity Church. It was stipu-

23

lated that this work should be completed by a certain date,

or in default of that, penalty should be imposed upon the

contractor. While not expressly provided in the instru-

ment, the implication was that the church would secure the

necessary building permit and file the necessary plans, with-

ina reasonable time and so enable the contractor to proceed

with his work. ‘Vhis the church negleetcd to deo promptly,

and in consequence of the delay the contractor was obliged

to suspend on two occasions. Tle finished the work, how-

ever, and was paid the sum named in the contract. Later

he brought his action for damages caused by the delay. The

lower court dismissed the complaint and gave judgment for

the defendant. On appeal that was reversed. the court in

general term saying:

“But it is said that the plaintiff having gone on and

finished the work after he had been permitted to do so

on the 18th of September, and having received his com-

pensation therefor, waived his right to bring any action

for damages because of the failure of the defendant

to perform the contract on his part. It appears in

the case that it was agreed between the parties that

the payment of the contract price should not prejudice

the right of the plaintiff to bring this action, but even

if that agreement had not been made, the receipt by

the plaintiff of the stipulated contract price for the per-

formance of the contract would not operate as a waiver

of Ins right to proceed against the defendant for a

violation of its agreement. When the plaintiff was

compelled by the act of the defendant to cease work

on this building he was not called upon to rescind the

contract or to refuse to proceed further with it at the

pert] of waiving any damages which he might have suf-

fered, but he was at liberty to go on with the work,

considering the contract still in force, and when he had

finished maintain his action to compel the defendant

to pay the increased expense to which he had been put

by its act.”

24

(8) The court below erred ta saving that this case is gov-

erned by the decision of this court in Uatled States vs. 1 nt,

Cramp & Sons, cic. (206 U.LS.. 118), which will be referred

to as the “Indiana” case. The two are not comparable

for several reasons. (a) In the “Jiadiana™’ case the builder

dil not give notice of its claim for damages until long after

an unconditional release had been given and the special re-

serve paid. In the preset cause such notice was duly given

before release and payment. €b) In the “/ndtana™ case the

release was vucondiiional and given cuhout protest. Tn the

present case the relcase was unon the condition therem ex

pressed, that i should wof extinguish elaims of the class te

which the one in suit belongs. nor wes the conditional release

given, nor was pavment of the special reserve made, until

the parties had reached an understanding that the claimant

should be left free to pursue its remedy on the claim in suit.

(c) Inthe “/ndiana’ case suit was not brought until fiftcen

months after the release was given and the contract closed.

In the present case suit was brought on the ninth day after

the execution of the conditional release and payment of part

of the special reserve and four months before payment of

the balance (pp. 1. 28). (d@) The points on which the de-

cision of the “/adiana” case turned are clearly set out in the

opinion of this court:

“This case turns on the re/case executed by the build-

ing company. * * * No payment of moneys not due

is necessary to sustain this release. It is under seal and

the contract is itself full consideration. * * * In-

deed, the general language of the release itself and the

number of words of description in it show that it was

the intent of the Secretary of the Navy to have a final

closing of all matters arising under or by virtue of the

contract. * * * Jf partics intend to leave some

things open and unsetiled their intent to do so sho vdd

be made nianifest. Here was a contract, involving thre

25

millions of dollars, and after the cork scas d me, the

vessel delivered and accepted, and this release entered.

claims are presented amounting to over $500,000. Sure-

ly the parties never intended to leave such a bull: of

unsettled matters.”

In the present case none of these things occurred. The

release was limtied to claims that the Secretary was au-

thorized to pass upon. He said that the claim in suit Was

not one of that class and the claimant agreed with him in

that conclusion. He was advised of the nature and amount

of the builders claim and knew just what he was obliged to

leave unsettled. It is certain that he paid over the special

reserve with his eves open and without any expectation that

the conditional release and payment of the special reserve

would close the transaction, but on the contr: ary, with the

claimant's assurance that it would bri Ing suit upon the claim.

It is to be presumed that the Secretary acted in good faith,

Probably the court below in m: king its decision seized upon

an expression contained in the opinion of this court in the

“Indiana” case, i. e.:

“No payment of moneys not due is necessary fo sis-

tain this release. Vt is under seal and the contract itself

is full consideration.”

That does not mean that the contract which necessarily

was made in advance of its breach by the Government and

of course before the claim in suit could have accrued, was

equivalent to a release of that claim. Tf an unconditional

release had been given in the pre sent case, the contract itself

ie, reid hase heen se aye ” copoderrady We a ’ ft: Iyoey } oH,

release was qiven and ne is nothing to sustain, but the

tnstrument which left the claim in suit “open and unsettled

26

Il.

The Government broke the contract, and in conse-

quence of that the clamant suffered damage, and ts

entitled to recover an amount equal to that damage.

Phe Government's failure to deliver armor plate as agreed

was but a partial failure of the consideration moving from

it. When the breach occurred the builder had no means of

knowing how long it would continue. When the delay be

gan the vessel was abont half completed, and over $1,

YOO,000 must have been paid by the Government on account

of the contract price of the vessel. The unfinished vessel

was lable to rapid) deterioration. It was the builder's

right, and obviously 1 was for the best interest of the United

States, as well as its own, to proceed with the work as best

wt could, complete it, and sue for damages caused by the

breach. (2 Parsons on Contracts, 679; Clark vs. UL S.,

() \\ oe 343 : ( eee ey A Speed, S Wall : “rie Pie YP vat Behan,

110 U. S., 338, 344; Figh vs, UL S28 C. Cls., 319; Myeric

eo U: SL SEC Ce 8.)

In Cornwall vs. Henson (2 Ch 298—1900), Collins, L.

J.. said (p. 303):

oP)

“The law is clear that the breach ot one stipulation

does not necessarily carry with it even an inplication

of an intention to repudiate the whole contract. * *

lhe farther the parties have proceeded with the per-

formance of the contract, the less likely is it that, by

breach of one stipulation by one party, he should im

tend to declare his incapacity to perform the contract

or his intention not to carry it out.”

Hudson on Bialding Contracts (1, p. 303—1907 ) :

“[f the prevention does not go to the root of the

whole contract, but merely delays the performance, the

contractor does not waive his right to recover damage

merely by proceeding with the work.”

MLR oe OOS Do Diidth PO tal ore Cr ote Wwe

pees te OEM, LI RM a ES "ete

27

A.

In the court below the Government contended that,

when the Secretary determined that the delay in the comple-

tion of the vessel was due to the failure of the Government

to furnish armor plate as agreed, and extended the building

period, named in the contract, by an interval equal to the de-

lay enforced by the Government, he modified the contract so

that it called for the completion of the vessol in something

over four vears, instead of three vears. From: that, they

argued that the vessel being completed within the time set by

the contract, and the armor plate having been delivered to

the ship builders soon enough to enable them to complete the

vessel within the time required, there was, in contemplation

of law, no delay in the delivery of armor, no breach of con

tract, and, of course, no injury to the builder. That is pure

sophistry. On that theory, the Government might have de-

ferred ordering the armor for vears, or forever, and if the

Secretary kept on extending the Cr unp Company's building

period, the Government could have left the — vessel

on claimant's hands indefinitely and still remained

blameless. = The effort to evade the indisputable fact

that the Government failed to perform its undertaking

is lke the reasoning of the divine who sought — to

soothe his congregation by saving that. when properh

interpreted, the parable of the rich man does not

mean necessarily that Dives was confined ina place designed

for torment, but might, equally well, be taken to mean that

he was ma celestial sanitarium, whither he had been taken

to be cured of an attack of gout, and being in pain, he spoke

of that as a place of torment. The Secretary found that

the delay in the completion of the “d/abama” was attributa-

ble to the Government, and catsed Dw its failure to furnish

armor plate as agreed. Accordingly acting under the con-

ract (Par. 9th) he ordered preliminary acceptance of the

vessel, after the expiration of the building period. and

extended the building period up to the time of deliv-

ery. No amount of juggling with terms and phrases can

convert this simple admission of responsibility for the delay

and recognition of the builder's right to deliver the vessel

into a modification of the contract itself. The fact

being undisputed that the Government did not de-

liver armor plate “at the times and in the order

required to carry on the work properly” it is no defense to

sav that the contract was not broken because the armor was

delivered in time to enable the builder to complete the vessel

within the building period, as extended by the Secretary.

That is a non sequitur. The contract allowed the builder to

constime the period of three vears in constructing the ves-

sel but did not require the builder to do so. If she had

been finished in a shorter time the Government would

have been obliged to accept her. It would have had no

right to require the builder to maintain her after comple-

tion, simply because the full building period had not elapsed.

The Government's obligation to deliver armor would not

have been fulfilled ipso facto if the deliveries had been made

early enough to enable the builder to complete the vessel in

three years. If her construction had progressed without tn-

usual dispatch, but more rapidly than the contract required,

and the builder, in order “to carry on the work properly”

had needed the armor plate sooner than he got it. the

Government would have been guilty of a breach of its

covenant.

B.

The Government further contended that by forbearing

to take advantage of its own wrong, that is to say, by the

omission to impose penalty for its own delay and the exten-

sion of the building period, it rendered full satisfaction to

the builder for the damage suffered on account of the

Government's failure to deliver armor plate as stipulated

in paragraph “Third.” Counsel for the Government

based this upon paragraph “Ninth” of the contract

and invoked the maxim: “[.rpressio unius est exclusio alte-

rius.” The argument was that, inasmuch as the contract pro-

vided for the deduction of liquidated damages from the build-

ers compensation in the event of delay caused by the build-

er, but, said that if delay were caused by the United States.

no such deductions should be made. and that the builder

would be entitled to an extension of the building period, it

must be presumed that the builder was to have no remedy

for breach by the Government except immunity from pen-

alty and continuance of the Government's obligation to re-

ceive and pay for the vessel. If such were the law or such

the meaning of paragraph ninth, of what use was it to put

in the contract, as part of the consideration moving from the

Government, the covenant that it should) furnish armor

when needed by the builder? What value has an obligation,

if the obligor can tenere it without hability ?

There is nothing in paragraph “Ninth” which deprives

the claimant of its right to pecuntary damages. This whole

subject is well treated of im a recent work (/ludson on

Building Contracts, YO07) where it is said (Vol. 1. pp.

524-525) :

“Building and engineering contracts, as has already

been stated, usually contain provisions for the payment

by the builder to the owner of liquidated damages in

case of the work's not bemg completed by a stipulated

time. Liquidated damages, stipulated for at a rate for

each day or week of delay in completing the works,

must begin to run from some definite date. It follows.

therefore, that if there ts no date in the contract, or if

the date in the contract has for some reason ceased to

be the proper date for the completion of the works,

there is no date from which hqudated damages can

run. and, therefore, all right to recover liquidated dam-

30

ages has gone. In order to meet this contingency, a

provision is generally inserted that the architect may

erant an extension of time for the completion of the

works in case of delay from various causes, such as

strikes, lockouts, alterations and additions, ete., and

that in case of such extension of time being granted,

the builder shall complete within the extended time.

This clause, if duly acted upon, fixes another date for

completion and the obligation of the builder may then

be to complete by that other date: but that other date

may for some reason not be the proper date, or, being

a proper date, may have ceased to be so, in which case

again there is no date from which liquidated damages

can run, and, therefore, the right to recover liquidated

damages may have gone. For example, the architect

may only have power to extend the time for (1)

strikes, (2) lockouts, or (3) alterations. If delays take

place, for example from the failure of the building

owner to give the builder possession of the site on

which he has to build, then, in that case, the time for

completion in the contract having ceased to be ap-

plicable, and there being no power in anvone to fix an-

other date. there is no date from which liquidated dam-

ages can run and then again no liquidated damages are

recoverable.”

,p. S31:

“Where there is power to extend time for delays

which in fact have taken place, but the power has not

been exercised, either within the time expressly or im-

nliedly limited by the contract, or not at all, it follows

that the building owner has lost. the benefit of the

clause. and, if the contract time has ceased to be ap

plicable owing to delays caused by the building own

there is no date from which penalties can run, and

therefore, it would seem, no penalties can he recoy

ered.”

oe se SL OTM Oe Bh A LP ELI OR RGAE PG

31

Id., pp. 542-543:

“In the event of the employer having hindered the

performance of the contract so as to prevent the agreed

liquidated damage clause applying, it is doubtful

whether he can recover unliquidated damages against

the builder. It is concluded by authority that when

the parties have agreed upon a Heuidated sum as dam-

ages the amount of the damages cannot be left to the

jury, but the question appears to be undecided whether

if the emplover cannot recover Hanidated damages

from any default of his own, he can recover unliqui

dated damages, and if so how such damaves may be

assessed. [Tf the employer, in such a case, were per

mitted to recover unliquidated damaves, without ans

limit to the amount. it might be said that he would be

able by his own act to defeat and take advantage of

the breach, which he himself had conmiitted. if the un

liquidated damages were greater than the liquidated

damages. It 1s submitted that the agreement as to

liquidated damages is as much a part of the bareain as

any other part of the contract, and that it does not rest

with the building owner to change the contract which

he has entered into by substituting another term, viz:

that if the clause as te liquidated damages should by

his own act or default cease to be applicable, then he

should be permitted to recover whatever unliquidated

damages he could prove. Of course, if the contract has

heen entirely put an-end to by the default of the

employer, then the builder can recover on a quantum

meruit for work done at reasonable prices and ina rea-

sonable time and the emmplover can claim damages rf the

work ts not done ina reasonable time.”

Id... p. 546:

“Fextension of tinte does not release the employer

from damaaces for delay unless the bilder covenants

to accept the extension in satisfaction of his claim for

damades.-

aad

32

In the present case the parties by their contract liquidated

the damage recoverable by the Government for delay at-

tributable to the builder. There was no attempt to lqui-

date the builder’s damage for the Government's failure to

supply armor as agreed. The contract made the Secretary

the final arbiter to determine two facts: the cause and the

extent of delay. Those facts being determined the con-

tract provided under what circumstances the builder

should or should not pay liquidated damages and

whether the building period should or should — not

he extended. It was competent to provide, as the contract

did, that no damages should be imposed for delay, oc-

casioned without fault of the builder and beyond its control,

whether the Government or some other agency were respon-

sible. It was reasonable to discriminate, as the contract did,

between delays due to the Government's default and delays

arising without fault of the Government or builder. That

is: in case delay were caused by the Government. it

should not benefit by its own wrong. and its obligation to

take and pay for the vessel should be continued by a suitable

extension of the building period: but if delay were caused

without fault of the Government by other agencies beyond

the builder's control, such a continuance of the Govern-

ment’s undertaking should not be obligatory—for both par-

ties being innocent of causing the delay it might well be as

great a hardship to compel the Government to accept an

obsolete type of vessel as to leave her upon the build-

er’s hands. But here we have the cause and extent of

the delay determined by the Secretary and aside from

that, they are admitted by other agents of the Gov-

ernment and established by uncontrovertible proof. The

default was the Government's own and no one else was

to blame for it. The builder's immunity from liquidated

damages followed as a matter of law, as well as by virtue of

the contract. The obligations of both the Government and

33

the builder were continued by the extension of the build-

ing period. The Government argued in the court below that

in the absence of a covenant giving the builder a right to

recover damages, it did not possess that right. That is pre-

posterous. The right existed not because the contract said

. but because the Government failed to perform the con-

tract on its part and because the contract did not say that

the builder should not have damages for the Government's

breach if an extension were granted,

Stubbings Co. vs. Exposition Co. (110 TM. App.. 210).

This action grew out of a contract for glazing and other

work upon buildings to be erected for the World's Pair at

Chicago. Tt was stipulated that the contractor would com-

plete it by a certain date. It contained this clanse:

“The sum of $50 per day shall be deducted from

the contract price for each day the work is delayed in

completion after the specified date. If, however . prog-

ress of the work shall be del: wed by any cause beyond

the control of the contractor, an extension of time m: Ly

be made by the Chief, but claims for such extension

must be made in writing at the time of such delay,

and the decision of the Chief thereon shall be final and

binding upon both parties.”

Three of the items in plaintiff's bill of particulars were

for “damages for extra time on account of advance in

wages, caused hy work not being ready for us to complete

as per terms of our contract.” The court said:

‘The propriety of an allowance of claims for dam-

ages for such delay, when supported by the evidence,

has been recognized. Tobev vs. Price, 75 Tl. 645:

Church vs. Hearson, 41 Ill. App., 89. And the con-

tractor was not obliged to abandon the work and sue

for damages, but had the right to proceed to complete

it and then claim damages. * * * Tt is contended.

however, by appellee, that the stipulation in the con-

tracts that if delays are occasioned by other contrac:

34

iors additional time will be allowed within which to

complete the work, by implication means that there is

to be no pecuniary compensation on account of dam-

ages suffered by such delays. It is conceded that there

was delay, and it does not seem to be denied that wages

rose in the meantime and that it cost the appellant con-

siderably more on that account to perform its contracts.

The provisions of the contract referred to do not pur-

port to authorize the chief to determine what, if any,

damages the contractor might suffer from such de-

lav. The question is not as to the amount of extra

time to be allowed the contractor. There might be no

contention as to such allowance, and yet the contractor

might be seriously damaged by a rise in the cost of

material and labor, possibly to such an exter t as to

cause him absolute loss. We are of opinion that the

language used in the contract did not submit this ques-

tion of damages to the decision of the architect or

chief.”

In the present case we ha. > seen that the law precluded

the Secretary of the Navy from entertaining the question of

the claimant's damage, and that he refused to entertain the

claim in suit on the ground that he had no authority in law

ty do so.

Velson vs. Pickwick Co. (30 Il. Apps., 333). This was

an action for breach of a contract by which Nelson, the

appellant. had undertaken to do certain painting and glaz-

ing on a building which was being erected by the Pickwick

Company, appellee. The specifications provided that the

work should be completed by a certain date, and that if

Nelson failed to do so, penalty at the rate of $25.00 per

iy should he deducted from his compensation; also, that

Nelson should co-operate with the other contractors

and arrange to avoid delay. The specifications were in

print and the court assumed that all the contractors were

bound by like provisions. The contract required the work

to be done under the supervision of architects. It reiter-

Bd

ated the provision for the deduction of $25.00 per day for

each day’s delay, but provided:

“Should delay be caused by other contractors, to

the positive hindrance of the contractor hereto, a just

and proper amount of extra time shall be allowed by

the architects, * * * and in case the said parties

shall fail to agree as to the * = * amount of

extra time, the decision of the architects shall be final

and binding.”

Judge Gary delivering the opinion of the court said (pp

335 et seqg.):

“The principal question in the case is. whether this

provision for the allowance of extra time by the ar:

chitects is the only remedy of the appellant when de-

laved by other contractors. He was so delaved until.

by the rise in wages, it cost him $473.20 more than it

otherwise would have done to perform his contract.

The matter in controversy is, whether he shall recove!

that sum. There is parol testimony of a promise by

the general agent of the appellees, having authoriiy.

made to appellant when but a small part of the work

was done, and he claimed extra pay as condition of

going on with it, that the company would pay the ad-

ditional cost caused by such delay. But if the rights

of appellant were fixed by the contract. any promise

to pay him extra for doing what the contract bound

him to do would lack a consideration, unless special

circumstances would take the case out of the general

rule, as in Bishop vs. Busse, 69 IW, 403. and Cooke

ws. Murphy, 70 Ill, 96. There is a preponderance

of the testimony that such a promise was made.

and the probability that there was, as well as

the justice of the claim, are strongly supported

by the concurrent circumstances. Without — re.

citing that testimony and those circumsiances, hov- 3

ever, the case may safely be put upon the ground thai

‘the contract necessarily presupposes and implies, on

the part of the appellees, an obligation to supply’ that

36

upon which the appellant was to do his work. Broom's

Legal Maxims, 667. It was the legal duty of the ap-

pellecs to keep the work in such a state of forwardness

as to enable the appellant to perform his contract with-

in the limited time. See vs. Partridge, 2 Duer., 403.

The provision for the extra time was for the avoid-

ance of the penalty the appellant would incur tf he did

not complete his contract on time. In its language it

purports to be a benefit to him; an allowance, not a

deprivation, of his right to require the work to be in

readiness for him. Under a provision in the spectfica-

tions with other contractors, whose work preceded that

of the appellant, like that in the specifications for his

work, the appellees had in their hands indemnity for

the increase to the price of the appellant's work. If

they did not have such a provision it was their own

omission, the consequence of which is not chargeable

to appellant. If the appellees desired exemption from

their obligations under the contract, they should have

put such exemptions in clear language that would

have put appellant on his guard, and left no doubt as

to what was intended. * * * Itis only by the ap-

plication of the maxim, “EXPRESSIO UNIUS EST EXCLUSIO

\LTERIUS,’ that the claim of the appellant can be cut off;

that, as there is one consequence of delay caused by

other contractors declared, all others are, by that dec-

laration, exclided. But this maxim ‘is not of uni-

versal application, but depends on the intention of the

parties as discoverable upon the face of the instrument,

or of the transaction.” Broont’s Legal Maxims, 633.

The claim made by the appellant is not within the

clause quoted from the contract as to questions the ar-

chitects should decide. There is no question of the value

of extra work, nor is there any disagreement between

the parties relating to performance of the contract.

The amount which the appellant should recover 1f he ts

entitled to recover at all, being undisputed, the decree

is reversed and the cause remanded with directions to

allow to appellant $478.20 for his damages for delay.

as well as the amount due him upon the contract.”

See also: Frost vs. Rand, McNally & Co. (51 Ul.

App., 276).

ee

Del Genovese vs. Third Ave. R. Co. (13. N. Y. App. 412,

1897). The contract drawn in question related to an exca-

vation for the foundation of a power house. The com-

plaint set out two causes of action: one for an unpaid

balance of the contract price; the other for damages sus-

tained by plaintiff in consequence of numerous hindrances

and delays caused by agents of the defendant company.

The case went to a referee who found for the plaintiff, re-

porting that, in consequence of directions given by the ar-

chitect, defendant's agent, which the plaintiff was required

to obey, he had on certain occasions been obliged to suspend

work altogether and at other times had been greatly ob-

structed in his operations by the presence of material and

apparatus of other contractors engaged in doing

This text is long and has been trimmed here. Open the source document for the complete record.