Petition for Writ of Certiorari — Heart of the Black Hills Stations v. Federal Communications Commission

Supreme Court brief1973

Ask Donna

What actually matters in this document.

Text

LIBRARY : fs

SUPREME Court, u.§.3~ 269 }

IN THE

SUPREME COURT OF THE UNITED STATES

OCTOBER TERM, 1973

No. A-1272

HEART OF THE BLACK HILLS STATIONS,

Petitioner,

FEDERAL COMMUNICATIONS COMMISSION,

Respondent.

PETITION FOR WRIT OF CERTIORARI

TO THE UNITED STATES COURT OF APPEALS

FOR THE DISTRICT OF COLUMBIA CIRCUIT

DONALD R. SHULTZ

Whiting, Lynn, Jackson,

Shultz, Ireland & Lebrun

P.O. Box 2003

Rapid City, South Dakota 57701

Attorney for Petitioners

Wastengton. OC + @ CLE PUBLISHERS INC. e (202) 393 0625

5

&

oe |

atm ete |

we rrr ne,

" (i)

TABLE OF CONTENTS

CITATION TO OPINIONS BELOW ...............-..

anes bbe bebe eee Oboe ba ae oe

Soa ie i ae 9a ik 1k a

RE ee eer ea

ge rare

REASONS FOR GRANTING THE WRIT:

I. The Commission Ignored the Public Interest

Requirement of the Communications Act, 47

ee ay wa RASS eae me 6

lI. The Commission’s Failure To Act Upon

Petitioners’ Applications for Construction Per-

mits and Other Improvements, To Construct a

New Antenna and Transmission Lines Pre-

vented Petitioners From Remedying the Very

Technical Violations Upon Which the Commis-

sion Based Its Denial for Renewal. of Peti-

RE ETS RE ne 8

II]. The Commission’s Reliance on the 1966 Waiver

of the CATV Protection Requirements Was an

Insufficient Basis for Its Findings and Decision

and Constitutes a Denial of Due Process to the

re a eee a near eke es 9

IV. The Commission’s Finding That Petitioners Had

a Decade of Serious Technical Violations and

That Said Violations Were Continuing Is

| Without Substantial Support inthe Record ....... 11

a ee a ia aah eek a 12

re en ak is waite tia el as Ak WSO la

se re Lh a oe wwe oe Oe ee we Oe 1b

| ET ee So ae ah Osa eal a 8 oa ie Ic

| ee te ak aa Wale acne wins Ww wae oe oe Id

cence ne natn

a

Be 07 Na

deere

the... PLEIN INET, : — . . .

, SSE EN TD LIE ENDL ECL E ERLE NDE SER IU LESS TE ERENT TEES NID EEN NE A Reon Mian

(ii)

TABLE OF AUTHORITIES

Cases:

Carroll Broadcasting Co. v. F.C.C. (CA-DC), 258 F.2d

Citizens Communication Center v. F.C.C. (CA-DC),

ERE 6 oF nsw d bee ned eee ee ss

City of New York Municipal Broadcasting System v.

ge Be) err

Federal Communications Commission v. Sanders

Bros. Radio Station, 309 U.S. 470, 84 L.Ed. 869,

SID ooh ao Oe ade Aa 40400 bee ee

Joseph v. F.C.C. (CA-DC), 404 F.2d 207 .........

National Labor Relations Board v. Pittsburgh S.S.

Co., 340 U.S. 498, 479, 71 S.Ct.453. ... 2.2...

U.S. v. Storer Broadcasting Co., 76 S.Ct. 763, 351

Fe & oe § eee eee ee

Universal Camera Corp. v. National Labor Relations

Board, 340 U.S. 474, 456, 71 S.Ct.456 ........

Statute:

Federal Communications Act, 47 U.S.C. §151 et

eg a ear er aera arr

Other:

82 Yale Law Journal 1575 (July 1973) ...........

“eee

“eee

eee

IN THE

SUPREME COURT OF THE UNITED STATES

OCTOBER TERM, 1973

No. A-1272

HEART OF THE BLACK HILLS STATIONS,

Petitioner,

FEDERAL COMMUNICATIONS COMMISSION, |

Respondent.

PETITION FOR WRIT OF CERTIORARI

TO THE UNITED STATES COURT OF APPEALS

FOR THE DISTRICT OF COLUMBIA CIRCUIT

Petitioner prays for Writ of Certiorari to be issued to

review the judgment of the Court of Appeals for the

District of Columbia entered February 26, 1973,

affirming the order of the Federal Communications

Commission entered on November 1, 1971, and reported

at 32 FCC 2d 169 (1971) and the order of the Federal

Communications Commission dated August 1, 1972,

denying Petitioner’s petition for a reconsideration.

2

OPINIONS BELOW

An initial decision of the Hearing Examiner, Thomas

Donahue, of the Federal Communications Commission,

dated July 17, 1970, 32 FCC 2d 201 (1971) (Appendix

A).

A decision and order of the Federal Communications

Commission was filed on November 1, 1971, denying

applications of the Petitioner for renewal of licenses of

the television broadcast stations KRSD-TV, Rapid City,

and KDSJ-TV, Lead, South Dakota, reported at 32

FCC 2d 169 (Appendix B).

An opinion denying Petitioner’s Petition for Recon-

sideration was denied by the Commission on August 1,

1972, and reported at 36 FCC 2d 568 (1972) (Appendix

C).

A judgment of the United States Court of Appeals,

District of Columbia, dated February 26, 1973, affirming

the orders of the Federal Communications Commission

(Appendix D).

PA at ONT a Oe A

vee

JURISDICTION

The Judgment of the Circuit Court of Appeals was

entered on February 26, 1973, a timely Petition for

Rehearing was denied by the court on May 11, 1973. The

jurisdiction of this court is invoked under the provisions

of 28 U.S.C. §1254(1).

Sol E ICL Bi Sipe BAS ad Soh fo Ri a

KA RL OE. oral

{ QUESTIONS PRESENTED

1. Did the Commission fail to abide by the public

- interest requirement of the Communications Act, 47

© U.S.C. §309(a)?

i 2. Did the Commission’s failure to act upon

Petitioners’ applications for construction permits to

‘

r 4

4

b

Meee comer eres as

3

construct a new antenna, transmission lines and other

improvements prevent Petitioners from remedying the

very technical violations upon which the Commission

based its denial for renewal of Petitioners’ license?

3. Was the Commission’s reliance on the 1966 waiver

of the CATV protection requirements an insufficient

basis for its findings and decision and constitute a denial

of due process to the Petitioners?

4. Was the Commission’s finding that Petitioners had a

decade of serious technical violations and that said

violations were continuing without substantial support in

the record?

STATUTE INVOLVED

The Federal Communications Act, 47 U.S.C. §151 et

seq.; 47 U.S.C. §155(e); 47 U.S.C. §309(a).

STATEMENT OF THE CASE

This case involves the denial of application for the

renewal of licenses for the Petitioners’ broadcasting

stations, KRSD-TV at Rapid City and KDSJ-TV at Lead,

South Dakota.

The Petitioners, Eli and Harry Daniels, are brother-

partners and owner-operators of the licensed stations

since 1957 (KRSD-TV) and 1959 (KDSJ-TV).

They were pioneers in bringing television to western

South Dakota where the market is admittedly small,

competitive and located in a sparsely populated area.

They have been beset with usual problems confronting a

pioneer; including, costly updating of equipment made

obsolete with the rapid advance of technology,

insufficient trained manpower, a fallible source of

NEN AE IG MNES SELES TN NN oN

f

f

xy

8

3

:

Ei

i

.

3

Ed

4

B

4

i

3

#

*

ee 2

wna

iS anes

4

network signal, manpower shortage, and an _ unco-

operative weatherman. (Appendix A—p. 3a, 27a)

A renewal hearing before the Hearing Examiner in

1968 found technical violations, mainly an inferior

broadcast picture and spurious emissions. In 1967 a

tornado had seriously damaged the antenna structure of

KRSD-TV and in January 1968, Petitioners filed with the

Commission an application for construction permit for a

new antenna and transmission line to replace the

equipment damaged during the tornado. No action has

ever been taken by the Commission on this application.

(JA-32-35, 148-153, 296)

The failure of the Commission to follow the statutes

and its rules and to take any action on the application,

left the Petitioners operating with a temporary antenna

and without an opportunity for a more complete

replacement of equipment until the Commission acted

upon their application. Thereafter, the television stations

received citations from the Commission for technical

violations. Such violations were again, for a large part,

related to the deficiencies in the transmission line and

antenna, improvement in which the Commission, by its

refusal to act, had effectively prevented.

In 1966 a citation for technical violations was made by

a Commission engineer complaining that the broadcast

picture was of inferior quality and viewers were

dissatisfied. The violations cited by the F.C.C. Engineer

in 1961 and 1966 were satisfactorily answered or

corrected by the Petitioners to the Engineer (JA-SO, 51).

The technical violations consisted of temporary micro-

wave problems which were corrected (JA-51).

The Commission’s rules gave existing television

stations, such as KRSD-TV, certain protection on CATV

systems, primarily carriage and non-duplication. Carriage

5

rules required that CATV system must carry the local

television station on one of its channels. Non-duplication

required that the CATV could not carry another station

which broadcasted the same program as the local station

to avoid broadcasting of the same network program on

separate channels. The CATV Company operating in

Rapid City asked for a waiver of both carriage and

non-duplication requirements for the reason that KRSD

signal was temporarily not viewable. The Petitioners did

not respond immediately and the Commission; in 1966,

did grant a requested waiver of the carriage and

duplication requirements as to KRSD. In September

1966 Petitioners applied to the Commission to vacate the

waiver and restore the carriage and non-duplication

protections for the reason that it was then transmitting

an acceptable signal, on which the Commission never

acted. Shortly thereafter the CATV and Petitioners

voluntarily agreed to a non-duplication agreement and

CATV requested rescindment of its waiver request, which

was never acted upon by the F.C.C. (Appendix C—p. 17c)

The Hearing Examiner, after hearing, released his

initial decision July, 1970, finding that upon balancing

various technical deficiencies at various times against the

improving performance of the Petitioners and evidence of

improvements of the technical performance by the

Petitioners and taking into consideration in his opinion,

factors which were beyond the control of the Petitioners,

granted a one year short term renewal. (Appendix

A—p. 27a)

Exceptions and a brief in support thereof were filed by

the Commission’s Broadcast Bureau. The Commission

reversed the Examiner by decision and order of

November |, 1971, and denied renewal of the Petitioners’

licenses. (Appendix B)

“OVER RL EGE Re Et Reet ap aanEg Rae

POAT:

ya LEIS RITE BLE OPEL LAS LOM BRT ELE -

ss AWE Re LRG RPS LE BREN TEE) GROG IOS DE. TETRIS Rta OE Mote oere Pg eB ee i

¥ PIES ae az bare SNES

6

The Petitioners petitioned for reconsideration which

was denied by the Commission on August |, 1972

(Appendix C). The orders of the Federal Communica-

tions Commission were affirmed on appeal to the Court

of Appeals for the District of Columbia on February 26,

1973. (Appendix D)

REASONS FOR GRANTING WRIT

L.

THE COMMISSION IGNORED THE PUBLIC INTEREST

REQUIREMENT OF THE COMMUNICATIONS ACT,

47 US.C. §309%a).

The Hearing Examiner conciuded that it would be in

the public interest to grant a renewal of the license to the

Petitioners and stated:

“(3) The Examiner is by no means unaware of the

ease with which the public interest baby can be

emptied out in a tears-of-sympathy bath. On the

other hand he is convinced that the sweep of the

public interest standard is not so narrow as to

preclude thoughtful consideration of extenuating

circumstances that may accompany conduct that

otherwise would call for preemptory termination of

stewardship. Here the licensees are sore beset. They

pioneered their field. They work hard for small

remuneration. Their market is small. Their competi-

tion is great. Their purse is thin. They suffer

manpower shortage. Some of their basic equipment

is inefficient. Their source of network signals is

fallible. The weather is their enemy. And, it should

be noted that called to account they have not been

cavalier but, rather, cooperative. Moreover, their

eitorts at reform have met with some success.

(4) The question of whether or not to renew is a

hard one. On the one hand is the need to protect the

ae ee,

DA SEN AE RT

7

public from incursions on its interest by the

incompetent and inept. On the other hand, it is no

easy matter to take the bread and butter out of

men’s mouths. In the order clause below the

Examiner has attempted to reconcile these con-

flicting considerations.” (Appendix A—p. 26a)

The conclusion was sound and practical in view of the

circumstances. Public interest for western South Dakota

is far different than public interest for large metropolitan

areas. The public interest in western South Dakota will be

best served by the operation of a technically inferior

television station, offering a variety of access to network

programming rather than a deprivation to the public of

such technically inferior broadcasting without a perfect

replacement. A perfect replacement does not seem in the

realm of possibility as set forth by the evidentiary

conclusions of the examiner; i.e. small market, manpower

shortage and insufficient capitalization. Rapid City and

Lead, South Dakota, are rural areas. There is no

substantial reason to believe that any new applicant or

replacement licensee could profitably furnish better

service to the public based on these market conditions,

with the result that the public interest will be overcome

with a monopoly by the strong competitor. The general

policy of the Communications Act, evidenced by

congressional history as it relates to broadcasting, is the

promotion of competition. Federal Communications

Commission v. Sanders Bros. Radio Station, 309 U.S.

470, 84 L.Ed. 869, 60 S.Ct. 693; Joseph v. F.C.C.

(CA-DC), 404 F.2d 207; Carroll Broadcasting Co. v.

F.C.C. (CA-DC), 258 F.2d 440.

¥

a

t

7

:

&

aT creeper rere torte nog emnctmcnapeancm tne

AE RES 3H

8

DENIAL OF DUE PROCESS

THE COMMISSION’S FAILURE TO ACT UPON PETI-

TIONERS’ APPLICATIONS FOR CONSTRUCTION PER-

MITS AND OTHER IMPROVEMENTS, TO CONSTRUCT A

NEW ANTENNA AND TRANSMISSION LINES PRE-

VENTED PETITIONERS FROM REMEDYING THE VERY

TECHNICAL VIOLATIONS UPON WHICH THE COM-

MISSION BASED ITS DENIAL FOR RENEWAL OF

PETITIONERS’ LICENSE.

In January of 1968, the Petitioners filed with the

Commission its application (BPCT-4077) for construction

permits for construction of a new antenna and

transmission line to replace the equipment damaged in

the tornado of 1967. (JA-32-34, 148-153, 296)

(TR-321-323). 47 U.S.C. §155(e) requires the Com-

mission to promptly and orderly conduct its business

with the objective of rendering a final decision within

three months from the date of the filing of all

applications which are not designated for hearing. No

action has ever been had on the Petitioners’ applications

and the Commission has indicated, in its decision, that no

action was ever contemplated. In its decision the

Commission refers to its “policy” of not acting on major

facility changes during the pendancy of a renewal

hearing. (Appendix C—12c)

The applications for construction permits were filed in

January 1968, some nine months before the renewal

hearings. This “policy” is directly in violation of the

statutory mandate and has effectively denied the

Petitioners the opportunity to construct facilities which

would largely remove the technical violations and

deficiencies upon which the Commission relied. (JA-129-

131, 134-136) Congress obviously had in mind a concept

, A 202 PFs Sess ee ———

9

of due process to parties petitioning for construction

permits before the Commission, and the Commission, by

its failure to follow the congressional mandate, has

effectively denied the Petitioners due process of law in its

relations with the Commission.

Citizens Communication Center v. Federal Communi-

cations Commission (CA-DC), 447 F.2d 1201. The City

of New York Municipal Broadcasting System v. Federal

Communications Commission (CA-DC). 223 F.2d 637;

U.S. v. Storer Broadcasting Co., 76 S.Ct. 763, 351 U.S.

192, 100 L.Ed. 1081.

Hil.

THE COMMISSION’S RELIANCE ON THE 1966

WAIVER OF THE CATV PROTECTION REQUIRE-

MENTS WAS AN INSUFFICIENT BASIS FOR ITS

FINDINGS AND DECISION AND CONSTITUTES A

DENIAL OF DUE PROCESS TO THE PETITIONERS.

The Commission, in its decision and order, relied

heavily on the inference that KRSD had, in 1966 and

continuously thereafter, an inferior signal based upon the

Commission’s order in 1966 granting to the local CATV a

waiver of CATV rules. (Appendix B—3b) The Commis-

sion’s rules governing the operation of CATV systems

require that said system must carry the signal of any local

television station and an additional requirement of

non-duplication of any program of a local station of

another CATV channel.

The requirement of non-duplication is designed to

prevent the audience of a local TV station from being

diverted to another originating station foreign to the

community. The local CATV, in its request, was granted

a waiver of the carriage and non-duplication rules on the

basis that the Petitioners broadcast signal was too poor to

be usuable by the CATV system.

ES

E

10

The temporary waiver of the rules granted by the

Commission was made before the Petitioners had an

opportunity to object and a permanent stay was issued in

February of 1966. Based on the foregoing, the

Commission, in its opinion, inferred unfavorable to the

Petitioners, that the Petitioners’ poor signal had

continued since January of 1966.

“In this regard, we find it to be particularly relevant

that we were compelled in 1966 to grant an unusual

waiver of our CATV carriage and non-duplication

rules (Section 74.1103) to the Rapid City CATV

system, because KRSD-TV was providing a signal of

$ such poor quality that it was not usable by the cable

i system. Black Hills Video Corporation, 2 FCC 2d

243 and 465 (1966). Accordingly, we relieved the

cable system of the rules requirements ‘until such

time as it appears that KRSD is providing a signal of

acceptable quality. ...” 2 FCC 2d at 466. It is now

more than five years later, and the waiver is still in

effect.

“This fact, in conjunction with the continuity waiver

(CATV), raises the fundamental issue of whether

this licensee is technically qualified to remain a

licensee of these stations.” (Appendix B)

In doing so the Commission ignored the Petitioners’

efforts which resulted in the alleviation of this difficulty,

and as a result thereof, a request by CATV to withdraw

its earlier request for a waiver of the rules and CATV’s

voluntary non-duplication agreement. (JA-269, 274-278)

Further, in 1966, Petitioners requested non-

duplication protection because of an improved picture

quality. This petition was never acted on by the

Commission. (Appendix C—Sc)

Due process requirements dictate that the decisions of

the Commission must be sustained on_ substantial

Pies neces ris > EERO ETE IES TN EO a MATE So

1]

evidence when viewed in the light that the record in its

entirety furnishes. Universal Camera Corp. v. National

Labor Relations Board, 340 U.S. 474, 456, 71 S.Ct. 456;

National Labor Relations Board v. Pittsburgh S.S. Co.,

340 U.S. 498, 479, 71 S.Ct. 453.

IV.

THE COMMISSION’S FINDING THAT PETI-

TIONERS HAD A_ DECADE OF SERIOUS

TECHNICAL VIOLATIONS AND THAT SAID VIO-

LATIONS WERE CONTINUING IS WITHOUT

SUBSTANTIAL SUPPORT IN THE RECORD.

There was no finding by the hearing examiner of the

existence of any violations by Petitioners prior to 1966.

(Appendix A) The technical violations cited by the

F.C.C. Engineer since 1966 were either corrected or

satisfactorily explained by the Petitioners to the F.C.C.

Engineer (JA-50, 51). There was no evidence to base a

finding that the broadcast picture was continuously

defective. The mistaken inference drawn by _ the

Commission on the CATV waiver is without support and,

therefore, the finding of the Commission, that the

violations were continuous, is without any basis in the

record. The technical violation of the spurious signal was

not continuous and was properly rebutted by an

independent service company, RCA Co., which con-

ducted tests and found no spurious signals (JA-71, BH

Exhibit 6) and which was confirmed by the F.C.C.

Engineers’ inspection at KDSJ-TV in 1971. (JA-138, 139;

144, 146) The reliance on “continuous technical

violations” is further evidenced by the Commission’s

failure to act upon and approve the Petitioners’

applications for the construction permits of the new

antenna and transmission line previously discussed.

12

There being no substantial evidence to support the

Commission’s decision that the technical violations had

existed over a decade or in fact were continuous, renders

the Commission’s decision emasculated and without

substantial evidence in support thereof, thus violating the

Petitioners’ rights without due process of law. Universal

Camera Corp. v. National Labor Relations Board, supra,

National Labor Relations Board v. Pittsburgh S.S. Co.,

supra.

CONCLUSION

A present FCC Commissioner, Nickolas Johnson, in

this month’s Yale Law Journal, Volume 82, pages 1575

et seq. “A Day in the Life: The Federal Communications

Commission”’ observes that:

“There is reason enough to assert that everything the

FCC does is wrong.” p.. 1575

and reviews a typical weekly meeting to show the

arbitrary and capricious manner in which the FCC

conducts its decision-making process. He concludes his

treatise with the statement the article will afford:

‘“*, . the judicial branch some idea of how bad things

really are, of how tenuous is the basis for the idea

that judges should defer to the FCC’s ‘rational and

orderly process.’ Long-range reforms aside, if there

is to be any immediate hope for the FCC, it lies with

the courts.” p. 1634

The Petitioners do not assert that everything that the

Commission does is wrong; but they do assert that the

Commission clearly was arbitrary and capricious in

denying Petitioners a renewal of their licenses.

As Commissioner Johnson observes in his article, the

Staff daily manipulates the Commission (page 1633) and

this occurred in our case. The Commission repeatedly

halted ieiaiiaiari aia eee ae ad ait ah iaccn reat ayias:

SR a

Da eee ae . .

Se ee TT Le ETE NI Ne tate nee

IL BBE II AG SPRY

POA LET IM, Ne

»* Pie Paen proces

13

relied on “violations” by petitioners claimed by the Staff

Engineers and repeatedly refused to recognize petitioners’

responses to those claimed violations.

The Court of Appeals erred when, in its traditional

reluctance to overturn the decision of the FCC, it

summarily affirmed the Commission’s decision. Commis-

sioner Johnson observes that the FCC tends to punish

hardest the small broadcaster for violations of its rules.

(p. 1625) The Commissioner’s decisions involving these

Petitioners is too harsh and is thereby arbitrary and

capricious and should be reversed and a fair hearing given

to the Petitioners’ answers to the claimed violations.

Because this case presents questions of substantial and

unique importance, and because the decisions of the

Court of Appeals and the Commission deprive the

Petitioners of rights without due process, and are in

conflict with the decisions of this Court, it is submitted

that this Petition should be granted and the record

reviewed to reveal no substantial evidence that the

Petitioners were inept, careless or unwilling to abide by

the rules and regulations of the Federal Communications

Commission.

:

&

;

Respectfully submitted,

DONALD R. SHULTZ

Whiting, Lynn, Jackson, ;

Shultz, Ireland & Lebrun |

P.O. Box 2003

Rapid City, South Dakota 57701

Attorney for Petitioners

Dated this 8th day of August, 1973.

Peele hae eee

POA EER ereeoamE Ta amoer —

. iis wEnIEeT: ’ FEL RIT IS TEN SOLE NR LEP RENLT NE S ELIE SES ore |

cone eee

la

APPENDIX A

Hcart of the Black Hille Stations, The, et al. 201

BEFORE THE

¥F.C.C. 7019-28

FEDERAL COMMUNICATIONS COMMISSION

Wasuincron, D.C. 20584

In Re Applications of

Eu ano ILarny Danirrs, d..a. THE HEART or

THE Biack Hints Srations

For Renewal of License of Station

KRSD-TYV, Rapid City, S. Dak.

Ent ann Harry DAnters, D.b.A. THE HEART OF

THE Biack Hrs STATIONS

For Renewal of License of Station

KDSJ-TV, Lead, S. Dak.

APPFARANCES

Docket No. 18358

File No. BRCT-410

Docket No. 18359

File No. BRCT-364

Stephen A. Gold, Mark E. Fields, and Samuel Miller, for The

Heart of the Black Hills Stations; chard MM.

Rieht and Vergil W.

Zacy, for Chief, Broadcast Bureau, Federal Communications

Commission.

Inim1au Decision or Hearne Examiner Tuomas H. Donanvur

(Issued July 14, 1970; Released July 17, 1970)

PRELIMINARY STATEMENT

1, By Memorandum Opinion and Order released October 21, 1968,

the Commission designated the captioned applications for hearing.

These were the issues specified :

(1) To determine the nature and extent of the violations of the Com-

mission Ruies and Regulations by the licensees of Station KRSD-TYV.

Rapid City. South Dakota, as disclosed by Official Notices of Violation

issued against that station on September 27, 1966 and October 24,

1967. by the station's responses thereto, and by related documeits;

(2) To determine the nature and extent of the violation of Commis-

sion Rules and Regulations by the licensees of Station KDSJ-TV.

Lead, South Dakota, as disclosed by Official Notices of Violation

issued against that station on September 27, 1966 (corrected No-

vember -f. 1966) and October 24, 1967, by the station’s responses thereto

and by related documents;

(3) To determine whether the licensees’ management and operation

of Stations KRSD-TV and KDSJ-TV was so negligent, careless. or

inept. ov evidences such disregard for the Commission's Mules and

Regulation-, that they cannot. be relied upon to fulfill the responsibili-

ties na posed upon them; and

a. ee. 3d

ba ace al Ral ca, f tf aM

le aia = TARBR IY

a

.

‘

e

ne et ee a a

SAI, ASB

Sabb i ae

Fp esas Oh et

Eee

ATS OE LE ON

Tee PRA Pe SS aes

RAO Peewee eae

"he AROS eS thie aay,

eta eRe

2a

202 Federal Communications Commission ‘Reports

(4) To determine, in light of the evidence adduced under the tore

foing issues, whether the licensees of Stations KRSD-TV and KDS.-

Y'V ave qualified to receive renewals of these licenses and whether re-

newal of these licenses would serve the public interest.

The order directed the Broadcast Bureau to serve on tho licensees a

Bill of Particulars setting forth the facts upon which the issues were

based. On Octuber 28, 1968, this document was furvished.

2. A prehearing conference was held on November 27. 1965, in

Washington. The matter was heard in Rapid City, South Dakota, on

March 10-13, 1969, and in Washington, D.C.. on April 17, 1968. On

the latter date the record was closed. The record was reopened three

times in Washington, on May 27. 1969, on November 25, L960, and on

January 15, 1970. Proposed findings were filed by the licensees aad by

the Broadcast Bureau on February 10, 1970. Reply findings were filed.

by both parties on March 3, 1970.

FINDINGS OF FACT

Some Background Data

3. Eli and Harry Daniels are equal partners in the captioned li-

censees. They have been operators of the licensed stations since 1957

(KRSD-TYV) and 1959 (KDSJ-TV).

4. Eli Daniels oversees the day-to-day operations of both stations.

including engineering. Engineering work normally performed by a

consultant is performed by him. Born in 1911 in Wyoming he attended

a radio and ciectronics school for one year. In 1932 he took a coarse in

college algebra by correspondence from the University of Wyomiig.

While in the Army he took a course in engineering mathematics hy

correspondence from the University of Washington. In 1956 he at-

tended the Capitol Radio Institute in Washington, D.C.

5. For a munber of vears Eli Daniels held an amateur license. In

1933 he received a first-class radiotelephone license and has held it

ever since. In 1984 he built KW YO in Sheridan, Wyoming, sind served

there until 1939 as Chief Engineer. From 1939 to 1940 he owned and

operated a radio repair shop. In 1940 he enlisted in the Army and

served as a radio technician with the Alaska Communications Com-

mission. He was discharged from the Army in 1945. Shortly there-

after, he, his brother, and his father obtained a construction permit

for a radio station in Deadwood, South Dakota. They built the sta-

tion themselves and it went on the air as KDSJ (AM) in 1947.

In 1953 the same group built KRSD (AM), Rapid City. In 1957 they

built KRSD-TV in Rapid City and in 1959 KDSJ-TV in Lead.’ In

1958 they received a construction permit for an inter-city private relay

link, thereby bringing live television network programming to the

Black Hills for the first time. Since 1960 Eli and Harry Daniels have

been the licensees and have operated the two television stations. They

have received a nwnber of public service commendations for their sta-

tions’ services to such organizations as the Rapid City Chamber of

Commerce, United States Army, United States lic Force, Rapid City

Jaycees, Salvation Army, and the United States Post Oflice.

1 Lead and Deadwood are adjoining towns.

32 F.C.C. 2d

3a

Heart of the Blavk slilis Stations, Tae, et al... 903

Harry Daniels handles the finsucial atlairs of the stations, Those

affairs are not very good, The market in which the stittions operate is

listed by the American Researel Bureau as ISkrd in the nation, In

Rapid City there are another commercial television station and a nen-

commercial educational station, In both Lead and Rapid City cable

systems furnish subservihers with imported television service, The

wives of both partners ave employed outside the stations, Exeluding

allowance for depreciation, boun stations lose money, At the tine of

the hearing the two partners were eae h taking out of the two stations”

operations ‘about $3000 month in sale ‘.

KRSD-1V—Noticrs of Violations and Responses 1960-1967

7. In September 1966 KRSD-TV was inspected by two Commission

engineers, John MeKinney, Engincer ia Charge, Central TV Monitor-

ing Bureau at Grand |: dand, Nebra: ka, and Donald E,W vate of the

Denver Field Office, Following the inspection, on September 2 27, 16,

each engineer sent the station an Otlicial Notice of Violation (FCC

Form 793-. \). Speeifice violations cited in the MeKinney notice read

as follows:

Non-compliance with F.C.C. Rules and Regulations as follows:

1. Section 73.668(b). Visual te aural frequency separation unsteady and

measured as 4501.110 in one instance.

2. Section T3.682(0) (15) & (17). Reference white level and set-up level

not maintained within prescribed limits.

3. Section 73.6s2(a) (15). Aural radiated power as measured by the mobile

monitoring unit was approximately equal to the visnal radiated power.

4. Section TACST O02). With full sweep applied to the KRSD-TV visnal

transmitter variations us great as T db in amplitude were observed between the

2.1 and 4.1 Me/s portions of the radiated siguual.

&. Section T5.08T(a) 03). Visual carrier minus the colot sabeasvier frequency

(—3.58S) measured —35 dh

6. Section 73.600, Fig. 6. Color burst amplitude measured at not more than

20% of syne.

Those cited in the Wyattumotice read:

Non-compliance with the Commission's Rules Governing Radio Broadcast

Services as follows:

1. Section 73.639(b) (G6) in that authority to operate with the substitute aural

exciter in the aural transmitter was not available Telegraphic authority to

operate with the substitute aural exciter expired August 6, 1906.

2. Section 73.68(b) (4) in that the station has operated with visual output

power less than SO percent of the suthorized power in excess of 10 days without

prior Comunission authority. The station has operated with visual output power

less than $0 percent of the authorized power since August 6, 1/

3. Section 73.669(2) in that a maintenance log as required by Section 73.672

has not been maintained.

4. Section 73.672(a)(5) in that there was no record available showing that

the tower lights and tower light controls lave been inspected pursuant to Section

17.488(d) with the results entered in the maintenance log.

5. Section 73.672(4a)(6) in that there was no record available showing that

the calibration of the visual and aural power meters has been accomplisied

in accordance with Section 74.680 The results of this calibration are to be

entered in the maintenance log,

6G. Section 73.672(09(13) Gi) in that there was no record available showing

that the monthly frequency measurement has beer accomplished in accordance

With Section 73.690, The results of this measurement to be made in the maine

tenance log.

$3 F.C.C. 2d

E

SURO

ae

4 me

n

N82 REA ANTN HIMES BIE ALPE OPTI RPM INE TIT VINES RAP VEHN IIY MY PNA APREAN I ARUSHA R POM ORRIN AE. TREN V IN ERO GR

ROT IS IY He a Wa Da Re AG

4a

204 Federal Communications Commission Reports

7. Section 73.661 in that the original operator license (or FCC Form 759) of

the operator, Frank T, Etherington (on duty from 7:00 AM through 3:00 PM

on September 14, 1966) was not posted. (Only a photocopy of the license was

tel. )

" Rection 73.680(b) (2) In that the aura) tranamitter output power has been

in excess of 110 percent of the authorized power as specified by Section

73.682 (a) (19) since March 1, 1060,

8. On October 15, 1966, Eli Daniels responded to both notices.

His response to the McKinney notice reads: .

Reference: Violation notice by John McKinney, Engineer In Charge, dated

Sept. 27, 1960. Notice received on Sept. 30, 1066, FOC office in Denver

(Mr. George) was called for an extension of time in which to answer.

‘ Violation #1; We were operating with a substitute aural exciter because repairs

were being made on the regular one. Authority was obtained from the

Commission to use a substitute. The regular unit has since been installed,

“ however we are getting some drifting with temperature changes.

q Violation #2: This is a condition that whenever we are using the network we

cannot control the set-up. We can control the white level and we are watching

this more closely. We are looking into the possibility of using a local sync

generator locked to the net to correct the set-up portion of this violation.

Violation #3: Our aural transmitter was being operated according to Section

ih oS

i 73.682(a) (15) as amended eff. 5-11-64; III (64)-1; which calls for a range

8 of power between 10 & 70 percent of the visual transmitter power. Our

% visual was operating at reduced power, due to weak tubes (4X500's) in

4 the IPA stage. This violation has been corrected in that we have reduced

& our aural power to operate in the range between 10 & 20 percent of our

i visual transmitter power as advised by the inspector.

Y Note: Transmittal sheets to.up-date my copy of the FCC rules have not

% been received. I have written the GPO several times during the last yea:

4 and t. half to correct this situation and it appears that I'm finally getting

i results.

4 Violation #4: This condition was caused by a faulty transmission line which

hae heen causing the station trouble for several months. The condition was

% caused by a faulty center-conductor-connector in the transmission line. It

i was intermittent and varied with the wind. This in turn caused standing

8 waves as shown by the sweep response. After many hours of tower work

; the bad connector was located and repaired. It was located at the 350 foot

4 level. Please refer to the May 11, 66 Transmitter & Maintenance log sheet ;

% (see reverse side for maintenance details). The condition has been corrected.

Violation #5: Inspection of the minus 3.58 notch filter showed it to be tuned

rs properly. No doubt this discrepancy was caused by reflection on the trans-

a mission lines as explained above.

a Violation #6: Color burst amplitude will vary from program to program which

: we receive from our network feed; (we have no local color). This condition

cannot be corrected for the time being because we are receiving our signal

off-the-air from KFYR-TV, Bismarck, N.D. which in turn is off-the-alr

from WDAY-TV, Fargo, N.D. and which in turn is off-the-air from KSPT-

TV, Minneapolis, Minn.

) His response to the Wyatt notice included as attachments 12 pages of

copies of transmitter operating and maintenance logs. The response,

{ itself, reads:

i Reference Violation notice by Donald EB. Wyatt, Issuing Officer, dated Septcm-

ber 27, 1966, received September 30, 1966.

; Violation #1: Authority to operate with a substitute aural exciter was attached

to the unit in the transmitter, This telegraphic authority from the FCC in

* Washington, D.C. was handed to the inspector by my operator, Mr. Tom

\ Hoffman, Jt was the only instrument of nuthority received from the FCC.

It had expired and through a mistake of identity, I had had another tele-

graphic authority which was dated to expire on September 16, 1966, which I

82 F.C.C. 2d

{

¢

Bee meme vemen OPER WePNeenenare

OLN TEE

5a

Heart of the Black Hiils Stations, The, et al. 205

mistootefor the more recent authority mentioned above. Lhe repaired regular

unit bas been fnstulicd.

Vivlation #2; ‘Lhe output meter oo the transmitter is a peak reading device and

when everything is working normally it is set-np to read 507 volta for 5 kw

peak power. The low readings as noted by the inspector (around 350) did

not indicate true output power because of the condition of the transminsiou

lines, (je, faulty lines through no fault of our own), Since the reilections on

the lines were causing standing waves the peak readipg device will read

differently depending ou Where iis instilled in the me. Under the above

conditions, the most accurate method of measuring power was by the indirect

method. For turther information on the condition of the line please refer

to the May 11, 66 maintenance eutries on the reverse side of the sheet;

attached. When the transmitter was operating into a dummy load and/or

into normal transmission conditlofs, the transmitter delivered 3kw average

power with a plate voltage of S.oOkv and 1.0 umperes of plate curreut the

eiliciency factor is 459 (the manufacturer rated the transmitter at near

5050). Whereas we were operating with ap input of 3.05 kilovolts and 1.6

amperes current into the tinal amplifier. This is 6.475 input power and at

“ 45% etficiency this is 2.46 kw or 82% of 3kw average.

Violution #4: 1 believe that we kept u pretty good account of our maintenance us

required by 73.669(a). Our maintenance log is incorporated witb our trann-

mitter log since the latter is maintained daily and whenever any main-

tenance information is logged it is added to the transmitter operating sbeet.,

Please refer to the attached Xerox copies of our logs dated May 11, May 15,

May 16, June 27, June 28, July 21 and August 25, all 1966, for maintenance

entries.

Violation #4: Section 73.672(a)(5) does not appear in my copy of the rules.

_ . Page 212. (EU.1/64) of my rule book has 73.672(e) which states a record

must be made of tower Light inspection. Please refer to Transwitter & Main-

tenance log sheet dated August 25/66. We alse did tower work which included

lighting inspection on June 27 and 28th as noted on the logs.

Violation #5: 73.672(a)(6) does not appear in my copy of the rules. However

please refer to T & M log sheet dated May 16, 1966, reverse side. Calibration

was performed and noted, however it does not state results, other than

normal. The procedure is to set-up the output meter to read numerally the

peak power output. : :

Violation #6: Section 73.672(a) (S) (ii) does not appear in my rule book. Section

. 73.690(b) (3) when operating without a frequencr monitor ete. and (c) of

‘same section refers to logging results. Since we have been working with a

recently repaired monitor, we have not had the occasion to check frequencies

as often as once a month. Therefore logging was not done. | ;

Violation #7: This has been corrected.

Violation #8: Section 73.689(b) (2) states that power is to be 80 to 110% of

authorized power. And Section 73.682(a) (15) does not appear in my rule

hook, however the inspector informed me that the authorized power tis

between 10 and 20 percent of the visual power. This condition has been

complied with.

‘Please note: An extensive effort has been made during the last year and

one half to obtain transmittal sheets to up-date my copy of the rules.

Finally this last week, I seem to be getting results from the C.S.S. subscrip-

tion Unit, P.O. 1533 Wash. D.C.

On tthe same date, October 15, 1966, Daniels sent notices to both the

FCC Denver and Washington offices that: (1) KRSD-TV had rein-

stalled its regular aural exciter; (2) the station would operate tempo-

rarilv with reduced power so that transinission lines could be repaired,

9. On October 3, 1967, McKinney again inspected KRSD-TYV. Fol-

lowing this inspection. on October 24, 1967, a Notice of Violation was

sent the station. Specitic violations cited read as follows :

Non-compliance with F.C.C, Rules and Regulations as follows :

1. Section 17.56. Tower lighting has not been repaired as soon as practicable.

October 2, 1967—Entry in operating log shows that "Top (beacon) light and two

32 F.C.C. 2d

104-015—71-—-3

OAT PATENT PORN POHATAIRIEIED RFORS Frepy Parner a ognencnatr ann nna .

. pie iets kat ee a Ll aU an AOR ee -_

wow ee rw any |

ates 1.

Pee en Leataon a sv s alad al Santndal ta ei alle cumini

ear

6a

206 Federal Communications Commission Reports

lower light« out™ Signed, “Hoeffwan™. Thix some entry appears hack to Septem-

ber 8, 1807. On September §. 1067, an entry by Eli Danielx (watehstander> indi-

cates “OK” for all lights On September 7. 157. an entry says “2 lower lights and

top light eut—notitied control tower”. signed Jerry Villone. Entries from 6. 2767

to 9/6/17 indicate two lower light« out. Eutries from 5, 2/67 te 6/26/67 indicate

one lower light out. Ne entriex in log ~how that any lightx were replaced during

this period of time.

2. Section 73.060.a). Maintenance logx are not maintained. Licensee represeni<

that maintenance logs are made a part of eperating lugs by Jeczing necessary

information in Remarks Columm of operating log, however. suflicient: entrie<

could not be found to substantiate thix claim.

3. Section 73.672(a) (3). Monthly frequency meaxurements not logged.

4. Section 73.672(a)(5). Quarterly inxpection of tower lighting apparatus not

3. Section 73.672(a) (6). There are practically no entries indicating that trans-

mitter maintenance ix performed.

6. Section 73.688(b)¢1). Visual pewer not maintained within the range of

NO% to 110% of authorized power. ‘utput meter for visual amplitier hax full

xcule reading of 750 K.P. Voits. If 500 voltx on meter equalied 5000 watt output

autborized licensee and meter was linear, then 400 on meter would represent Us

of authorized power. During inxpection meter read 368 volts. Inspection of Gperat—

ing logs showed the following representative readings: 7 19/67--41°0 volts

(highest reading found); 7/20/67—375 volts; 8/1/67—310 volts; 8/6/67---250

volta ; 8/22/67—215 volix ; 8/26/67—2A0 Felts.

(Above rendings are average readings-for days shown ; other readings on same

dass might vary 10 or 15 volts from reading shown.)

Section 73.688(b)11). Evidence that the output meter(s) has been calibrated

at six months intervals was not rendily available. A pencilled notation in the

Remarks Column of the station's operating log for October 2. 1967 reads: “Output

calibrated thix date. E.D." Xo explanation of the method employed te calibrate

the output nor the voltmeter readings obtained was supplied, furthermore. the

entry did not «tate whetber the viser! or aural (zansmitier was se calibrated.

Inspection of thexe same logs back through a six-months peried failed to shov-

that the output had been calibrated at the navesxart six morths intervals

7. Section 73.689(b) (2). Aural power not maintained within range of 0% to

100% of authorized power. Output meter for aural amplifier sume as that of

visual amplitier and hax full scale reading of 750 R.F. volts. Meter read 159 volts

at time of inspection but inspection of operating logs shewed the following repre-

sentative readings : 8/19/G7—230 volts ; &/20/G7—200 volts ; 8/21/67—100 volts;

8/22/67— 230 voltx.

After date of &/22/67 the logs show a gradual decline in aura! output readings

to the prexent reading of 150 volts.

& Section 73.687(e). Wiring and shielding not in accordance with accepted

standards of good engineering practice.

9. Section 73.682(a) (13) & 117). Reference white level and set-up level not

maintained within prescribed limits.

10. Section 73.687 in) (2). Visual transmitter response does not mect the require-

ments of this part.

11. Section 73.699, Fig. 6(5). Color burst amplitude measured at only 8%

of syne level.

10. On October 24. 1967, McKinney also sent KRSD-TV an Advi-

sory Notice (FCC Form 790). That notice warned the station that

unless action was immediately taken to correct unsatisfactory condi-

tions a Notice of Violation would issue. The unsatisfactory conditions

noted by McKinney were as follows :

Authority for reduced aural power stating present sural operating power of

transmitter not posted

Color moniter inoperative

Blanking level measured SO percent

Noise prevent on network video feed ofttimes accompanied hy ~ound bars.

32 F.C. 2a

j 0 EO

— - —— SS re

ao eae

Ta

Heart of the Black Hills Stations, The, ct al. 207

11. Response to the October 24. 1967 McKinney Notice of Violation

was made by Eli Daniels on November 6, 1967. Attached to the letter

are three pictures of response curves of the KRSD-TV transmitter

taken on November 5, 197. ‘The body of Daniels’ letter reads:

Repty to Violations : :

1. Reference tower lighting discrepancies; please be informed that the top

light was installed as soon as practical. The tower maintenance man happened

to be out of town fighting fire in Idaho. He installed the top tower as soon as

he get back. FAA was notified of the outage. The fact that Hoffman read the

top light out on one day, and I noted it on the next day, is correct. My asstunption

ix that we had a broken loose filament. Furthermore, the fact that 2 lewer tower

lights out as indicated is correct. this condition may have existed for quite sowe

time, however, please be informed thatthe tower lizhting still meets the require-

ments as stated on the station license. since we have three lights installed at

each lower level. and therefore when one is out at each lower level, we are still

within the requirements, of two lights at each of the lower levels.

2. Maintenance logy were maintained. The log book is kept in a compartment

slot shelf behind the transmitter. The operator on duty at the time of inspection

had only been working for about five days and ajparentiy he was not familiar

with the maiptenance log. Routing maintenarce. such as tube replacements and

terminal equipment repair ete.: avd loge’..g required by Sec. 73.069¢a) is kept in

the remarks margin of the daily operating log. The separate maintenance lox is

instituted in. Noy. 1966 per instructions of a mailing from the FCC. Docket No.

16005 in the matter of amendment of part 73 which explains the requirements

relating to logs.

3. Monthly frequency measurements logged in avove mentioned maintenance

log book.

4. Quarterly iuspection logging entries in above mentioned maintenance log

a. Transmitter maintenance records are kept in the first section of the main-

tenance log if the maintenance is of majur importance such as tune-up. mejor

break downs and minor repairs are noted in the operators logs.

6. Visual power not maintained within the range of 80% to 110% of authorized

power, This has been a battle with this bumont transmitter. Usually. 5 k.w. ix not

available from this transmitter even with new tubes, if the conditions required

for color bandwidth is met. The best I've been able to do is 4.25 kw te 45 kw

into the dummy lead. Our calibration was set so that we got below 250 on our

Output meter we were below power and efferts were instituted to bring it back

up within ten days. The weakness of the tran=mitter seems to be in the 4 x 500

IPA stage which drives the finulx. We have been working on a new drive stage

to replace it. in order to get up te full pewer.

Sec ihe, TAs bs 1) complied with and logged in section D of our maintenance

log book.

7. Aural power output controlled by varying the drive into the finals. The finals

were designed for maximum eiciencr at an output of 2.5 KW. We have reduced

drive to the final to meet the requirements of 73.6890(b)(2). The output was set

te an output of S00 watts into the dummy lead. with the output meter reading

approximately 210. The aural transmitter easily meets the present requirewents,.

however. by reducing drive to the final. the efficiency sometimes goes as low as

15%. It is intended to apply for permission to eliminate the finals (3 x 2500 A 3's)

and supply power into the antenna from a lower power IPA stage.

8. Wiring and shielding. This discrepancy. is not very explicit. I don't know

whether it's in reference to the transmitter or the terminal equipment. However.

TI would like to mention that all the video circuits in the terminal equipment are

well shicided and run with co-axial cable throughout. We have taken great pains

to do this because we have had a cround potential difference between the studio

and the transmitter site «which is interconnected by co-axial cable) which has

caused an ac hum induction into our local video circuits.

Wiring of the trap<mitter, hax not been changed materially from that of the

manufacturer.

32 F-C.C. 20

f

A ene ttt tae

8a

20S Federal Communications Commission Reports

& Reference white level and set-up level not malutained within presetived

limits. This vielation is a human element type. Switchers and operators have been

instructed to watch this closely, The network incoming signal often t.me< has 2

low black level set-up whieh we cannot do anything with at the present time.

10. Visnal transmitter response docs nut meet the requirements of Seviion

TAGST inp (2).

Ficures 1,2 & 2. attached shows the response curve of the transmitter as taken

ou Nevember 5, 1967. Peak power was 4150 watts.

The response is ruined when the transmirter is connected to the transmission

lines. Reflections are caused by a faulty antenna. Preparations are underw.ys

to replace the antenna. since it was damaged during a severe wind storm sote-

time _ = :

11. burst amplitude comes into onr control terminal at varying levei-.

however generally it is within prescribed limits.

12. On November 8, 1967, McKinney sent KRSD-TY a “Warning”

(FCC Form 794). ‘The document repeated the specification of viola-

tions covered by the Notice of Violation sent on October 24, 1967 and

pointed out penalties assessable for failure to make response to notices

of violation. . |

KDSJ-TV—N otices of Violations and Responses 1966-1967

.13. On September 16, 1966, KDSJ-TV was inspected by John

McKinney and Donald Wyatt. Following the inspection each sent

KDSJ- Notices of Violations. Specific violations cited in the

McKinney notice read as follows:

Non-compliance with F.C.C. Rules aud Regulations as follows:

satapenaen 73.6S7(n) (2); 73.GS7(a)(3); 73.6G87(a)(6); 73.699 Fig. 5 and

687 (1) (1).

Measurements br the Central TV mobile monitoring unit indicased that

KDSJ-TV was transmitting both.an upper and lower sidvband with spurious

mixtures present 9 Mc/s either side of the visual carrier frequency. For example:

Aural+4.5 Mc/s= —25 db (as referred to the visua! currier)

Visual --4.5 Mc/s —20 db (as referred te the visnal carrier?

Visual —3.58 Mc/s=—25 db (as referred to the visual carrier)

Visual—9 Mc/s=—25 db (as referred to the visual carrier)

Numerous other spurious products wefe noted throughout this region all less

than 40 db suppressed.

2 Section 73.66S(a).._ KDSJ-TV was operating with a visual carricr frequency

berond tolerance as indicated above.

3. Section 73.682(a) (13) & (17). Reference white level and set-up level not

maintained.

4. Section 73.082(a) (16). Peak to peak variation exceeded 59.

5. Section 73.699, Figure 6. Horizontal synchronizing pulses so badly distorted

as to be unmeasurable. Front porch non-existent, back porch degraded.

6. Section 73.699. Figure 6. Color burst measured as less than 20 percent of sync.

In addition to the abore. the video noise present in the transmitted signal from

KDSJ-TV was extremely high. 2.

14: On September 16. 1966, KDS.J-TV was also inspected by Donald

Wratt. Specific violations cited in Wyatt’s Notice of Violation (which

was mailed to KDSJ-TV on September 27, 1966) read as follows:

Non-compliance with the Commission’s Rules Gorerning Radio Broadcast

Services as follows: . ’

1. Section 73.689(h) (2) in that the aural transmitter output power has been

in excess of 110 percent of the authorized power as specified by Section 73.682

(a) (13) since March 1, 1966. ,

2. Section 73.669(a) in that a maintenance log as required by Section 73 672

has not been maintained.

32 F.C.C. 24

initiated rt net em

oo Ee se:

9a

Heart of the Black Hills Stations, The. et al. 209

3. Section 73.671(a)(3) in that entries required by this section have gor

always been made in the operating log. ‘The station w us entened at L320 e¢M MST

on September 14. 1966, and ft was observed that ne entries had been mace in

the operating log since 12 0 PM- VST on this date.

4. Section 73.67212)¢G) in that there was pe record available showing thot

the calibration of the visunl and aura! power meters has been accomplished in

accordance with Section T2680 The rm sults of this calibration are ta be entered

in the maintenance log,

5. Section 73.6721a)(5) im that there wox he tecord available showins that

the tower lights and tower lizht controls have been inspected pursuant to Section

17.38(d) with the results entered In the maintenance log

G. Section 73.6726) (3) (if) in that there was ne record available showing

that the monthly frequency measurement bas been accomplished in accordance

With Section 73.690. The results of these we @suretuents Are te be entered in the

maintenance logs.

7. Section 73.101 (2) in that the Peak indicating flasher on the aural modulation

monitor was inoperative.

15. On October 17, 1966. the Aetmg Engineer in Charee of the

Denver Field Office sent KDSJ-TV a “Warning”. This ducument fol-

lowed standard form and substance of such documents, see ¢.g. para-

graph 12, above.

16. On October 19, 1966. Eli Danicls responded to both notices of

violations. His response to the McKinney notice reads:

Reference to official NOTICR OF VIOLATION dated September 16, 1966 and

WARNING NOTICE of September 27, 1966. please be informed that delsy in

response was beyond my control. We have had technical difticulties on trau~mis-

sion lines at our station in Rapid City and check-up at KDSJ-TY rezarding

VIOLATION NOTICES have not been completed. This letter will serve a, a

reply to some of the violations, and additional information will be forth-con:ing.

VIOLATION #1—Sectiuns (ete.)

I BELIEVE THAT MUCH OF THE INTERFERENCE MEASURED AbOVE

AND BELOW OUR CHANNEL® FIVE BRAND IS INTFRFERENCE FROM

THE MULTITUDE OF TWO-WAY RADIO INSTALLED ON NEAK-RY

TERRY PEAK.

Please refer to my correspondence to your office on the problem of in:erter-

ence on Channel 7 at Terry Peak (which we in turn relay by micro-wave ts our

channel 5 transmitter site.) Channel 5 also has interference from these two-way

radios.

On September 18. 1966 I made a preliminary check on the KIPSJ-TY traus-

mitter. The upper side band was down about 2 db at 4 mes. from that sbewn un

the exhibit below.

“SET FORTH IS 4 PICTURF OF AN

OSCILLOSCOPE READING

The above presentation is the results of the side band response after a slizht

touch up of the transmitter. Time did not permit a more extensive check on this

date.

VIOLATION #2

“On October 18. 1966 the frequency was meaxured with a Gertch T 1020 A

FREQUENCY METER and found to be 1105 erelex above our assigned frequency

of 77.240 mes. It was adjusted to zero, hence violation #2 is corrected and section

73.668(a) complied with.

Please note: Your discrepancy report indicates that the frequency was meas-

ured at 72.241.501 mes as acainst the assigued frequency of 72.240 mes. I belicve

the second digit is a misprint.

VIOLATION #3—73.682(a) (13) and (17)

Keference white level and biack level (set-up) is a provlem which varies

mostly on our network feed, although we do have this problem on heal pro-

gramming. We are working to improre this situation.

32 F.C.C. 2a

TT eT TT NST RI mT ae ey ere ene aman

al

Prerwaren ti PORE

wht

ta)

Seg sO ee

Aci ad AGE. N ined last pales

send

eat

Wipenchisuenncs apiiisetsintont Noga utaess . 4

r NPS Ran le eS Wile, eth aly A Rabat Nae alter we LDN Co Ma Ria aN Bh eile eee ee ee eT

210

10a

Fedevol Communications Commission [Reports

VIOLATION #$4-—-73.682(0)(16)

TEAK TO PEAK VARIATION exceeded 5/c because, the operator informs

me, the transmitter video clamping circuits were In-operative. We are working

te restore the clamp circuits to nermal. ;

VIOLATION #5--See. 70M), fic. 6

FAULTY SY¥NC-PULSES due to Jack of clamping in tran<mitter as men-

tieved above in $4. This will be corrected as soon as the clamp circuit is repaired.

Trouble shooting on this cirenit is being done now. Frent-pereh ix always bad

from our network feed. Project is under-way tu correct this. Clamping restoration

should cure the back porch problem.

VIOLATION #t6—73.699, fig. &

Coler burst comes tn low in amplitude from the network feed. ‘This problem

will be with us until we change our network feed pick-up.

A high level of noise and man made interference in our video signal is due to

interference from the local two-way radio. This fact has been confirmed bys

tests made with Electro-Craft, a local two-way radio service company. I had

them key their two-way radies and interference came in simultaneously with

their transmissions. They have three transmitters which they key on simuliane-

ously: one frequency is very near the lower edge of Channel 7, our pick up

chaunel

His response to the Wyatt notice reads:

Reference OFFICIAL NOTICE, dated September 16. 1966 by issuing officer,

Donald E. Wyatt:

VIOLATION #1—Section 75.689(b) (2) and 73.682(a) (15)

These sections complied with. The power of the aural transmitter was reduced

To (4) watts output.

VIOLATION #$2—Section 73.669(a)

It is 2 practice here to incorporate our maintenance logging with our trans-

mitter lez. For instance, whenever the transmitter goes off the air for mainte-

nance. or unpredicted outages. the on and off times are recorded on the trans-

mitier log along with the maintenance requiremeuts. After all, a transmitter

log ix primarily for the purpose of providing proper maintenance.

VIOLATION $3—Section 73.671 (a) (3)

Mr. Roy Hicks, operator on duty. reported that his log was up to date and

that the station was entered at 12:30 PM his time. He said that subsequent read-

ings were not kept up only during the time the inspectors were there, because

ther had the lag in their nossession. Our operators are instructed to keep up

with the log.

VIOLATION #4—Section 73.672(a) (6)

Complied with.

VIOLATION #5—Section 73.672(a) (5)

TOWFR LIGHTS INSPECTED AND LOGGED ACCORDING TO THIS

SECTION.

VIOLATION #6—Section 73.672(a) (3) (ii)

Monthly frequency measurement made and logged according to this section.

VIOLATION #7—Section 73.691 (a)

PEAK INDICATOR BEING REPAIRED. This section will be complied with

shortir.

17. On November 4, 1966, the Engineer in Charge of the Denver

Field Office wrote Daniels a letter covering enclosure of cor rected

copies of the Wyatt notice of violations and a corrected “warning”.

32 F.C.C. 2d

=e arabes Lao

lla

Heart of the Black Hills Stations, The, et al. 91)

On the corrected notice. change was made in a date specified in one

of the items. Request also was made in the covering letter that the

ollice be promptly advised if corrected response to the corrected notice

was contemplated, Request was further made that the oflice he notified

if the peak indicating flasher on the aural modulation monitor was

functioning properly.

IS. On Octeber 5. 1967, KDST-TV was again inspected by Me-

Kinney. Following the inspection, on October 24, 1967, two Oflictal

Notices of Violation were sent KDSJ-TV. Specific violations cited in

one included the following:

Non-complinznce with FCC. Rules and Regulations as follows :

1. Section WAT(addd). Cold Section W7.38¢bo5. Daily visual inspection of

tower lighting net entered in station recerds August 4 aud August So, 107.

2%. Section 17.50. Tower painting is badly deteriorated impairing visibility.

3. Section 17.56. Accordins te operating log entries the obstruction lights en

the tower have been inoperative sinee April 300 147.

4. Section T2.668(b). Aural to visual frequency savparation was measured

4498. 950 at 5:20 PM MDT.

>. Section T2.66000). Maintenance logs were not maintained. Licensee repre-

sents that tiaaiutenwnce jogs are made a part of operating logs by logging mainte-

nance Information in Remarks Column of operating tog. Sufficient entries could

not be found to substantiate this claim.

G& Section T3109 (b). Operating loz does pot indicate time zone used at station.

ZT. Section TACT 6a 62). Numerous periods of station outage appear in eper-

ating leg without proper explanation fur same. For example. on August 30. 1967, &

operator sizned on duty at G:45 AM but there are no jog entries from 7:00 AM

through 10:30 AM. Additionally, on August 11, 12. and 24, similar blank spaces KG

appear in operating legs without cause fui interruption shown. Many of these 3

are in middle of program day and last for two to three hours.

S. Section 72.672(a) 63). Monthiy frequency measurements not logged. Checked Es

logs back through February 1967. 4

, a. _ T3.672(b). Entry for quarterly tuwer lighting check not signed or ;

dated. :

10. Section 73.682(a) (17). No set-up present on network programming. 3

11. Sections 73.687 (a) (2), T3.68ST (a) (3), T3.6S7¢(a) (6), 73.687 (i) (1) and 73.699

Fig 5. Measurements indicated that KDSJ-TV was transmitting a double side-

band siznal with spurious signals above and below the visual carrier. for example:

‘

Ta ake 4 ak Sees

Visual minus 4.5 Me/s=—20 db: Visnal minus 3.58=—30 db: Visual minus 9.0

Me/s=—35 db: Aural plus 4.5 Me/s=—20 db (all as referred to visual carrier).

Numerous spurious products less than 40 dh suppressed were noted in the

region hetween minus 9 Me/s and plus 9 Mc/s of the visual carrier. &

12. Section 73.GS7(b) (7). Aural modulation was measured with peaks not D

Zreater than 50 percent for a continnous period of one half hour. (One third of a

thix modulation level could be attributed to ambient noise and hiss rather than :

prezram content). ;

12. Section 73.687 (ce) (4) and (d)(3a. Transmitter was being operated with t

portions of front panelling removed exposing high voltage power supply to touch &

by operating personnel. This was obviously done to provide additional cooling for 4

the transmitter as an external fan was placed before this opening and directed *

into the transmitter. E

14. Section 72.687 (e). Wiring and shielding not in accordance with accepted &

standards of good engineering practice. Ps

15. Section 73.689ib). Station records checked back through February and

no record of output power meter calibration found.

16. Section 73.691(a). The visual waveform monitor (Teathkit scope) was

net triggering properly and a suitable wave form presentation could net be ob-

tained for proper adjustment of video levels. Color receiver/monitor was not

operative.

17. Section 73.699 Fiz 6(5). Color burst amplitude measured approximatels

5 percent of srnc. Chrominance modulation on waveform practically non-existent.

18. Section 73.933(a). Emergeney Broadcast Receiver would not trigger alarm

device.

PERI I IR MLR Ee TY

a eeoroente

32 F.C.C. 2d

patpimt

CN PN eg TY aoe ay Y

Rh lalate ain aabiniztiht ss Tablas Ma MEN thon

|

sey ee. a

12a

2r2 Federal Communications Commission Reports

Specific violations cited in the other Notice of Violation read as

follows: -

1. Section 73.609(a) Operator Harold W. Codner (21-15-5733) bad not

log when atarting daty at 8:00 PM MDT. a

2. Scction 78.671(a) (3). Operator Harvld W. Codner had not made required

half hourly entrice from 3:00 PM until 4:30 PM (time of entry by inspector).

19. On November 8, 1967, 2 Warning was sent KDSJ-TYV in respect

to the violations cited in the second October 24, 1967 Notice of

Violations. ?

20. Separate + ~~ were made to the first and second Notices

of Violations by Eli Daniels on November 10, 1967. Response to the

first notice reads as follows:

Non Compliance with FCC Rules and Regulations:

Violation 1 Thru 18

1. Mr. Roy Hicks, Supervisor, has informed the operator of this violation

and was assured that effort will be made to prevent repetition.

2. Agreement has been made with a painter to paint the tower as soon as

3. Complete tower lighting, inspection and repaired us of 10-9-67. Manaze-

ment at KDSJ-TV was uot inforined that the lights were in-operative since

April 30, 1967.

4. Aural to Visual frequency separation has been adjusted by frequency

measurement.

5. Mr. Roy Hicks Maintenance Supervisor informs me that as of June of

this year the mainteranve log was kept in a note book which was kept in the

files at the transmitter station. ;

6. Supervisor has been informed and correct measures have been instituted.

7. The first log in qnestion was August 22°. 1967... . not Aucust 29. Th:

or had signed on duty then was informed by KRSD-TV in Rapid City,

Mm source, that transmission ‘vould be late in starting. The operator

remained on duty. When transmission resumed, logging was coninued.

The other log entries mentioned were for similar reasons and/or hitSD-TV

not on the air, or outage of microwave between KRSD and KDSJ. When trans-

mission was resumed, logging was resumed.

8 Monthly frequency measurements were made, however, logging w2s not

kept up. This situation will be corrected.

9. [Ilegible on record copr.]

10. Efforts are being made to correct this discrepancy.

11. Measurements were made on KDSJ-TV trausmitter on November §, 1967.

phs were taken of the tektronic trpe 524 AD scope. The attached

figures 1, 2 and 3 are the results of pictures taken. Figure 1 shows an overall

curve with 20 DB down at —1.25 MCS. Figure 2 shows response above the

— out to 10 MCS. Figure 3 shows the response below the carrier out to

Complete measurements were made to check the requirements of the sections

mentioned in violation 11, however in the developing process the negatives

were ruined. .

It is my contention that most of the spurious products adjacent to Channel 5

at Lead are caused by the two way installations at Terry Peak. Whenever we

have had too much lower side band, we have been informed of interferring with

the two way communications by the operators thereof. This bas happened in-

frequently ; perhaps about 2 or 3 times during the last four years. Furthermore,

the C.A.T.V. System at Lead is another source of spurious emissions which we

have noted as causing interference adjacent to Channel 5.

Further measurements and corrective adjustments and repairs will be made

within two weeks. The results will be recorded and forwarded for further reply

to this violation.

$2 F.C.C. 2d

:

Pc

13a

Heart of the Block Hills Stations, The, et al. 213

1Z. Supervisor, Mr. Hicks informs that the aural modulation indicator Masher

had been flusiring quite cften ax the operator turned level down to decrense

number of flashes per minute and apparently it was turned too low. Corrective

measures have been instituted.

13. The portions of the front paneling which were removed were ibe color

filter and its power supply fer maintenance. These units have been replaced.

The fan is to cvol the modulator power supply tubes mounted on the front panel

of the cabinets.

14. Wiring and shielding as far as I'm concerned are according to standards

and practices which I have observed ut other stations. If any wiring and shield-

ing was noted by the a asx not according to accepted standards of good

engineering practices then | think it’s proper to request a more detailed and

specific explanation on this matter so that | will be able to evaluate the situa-

tion better.

15. Out put power meter calibrations are usually perforined by maintenance

men from KRSD TV iu Rapid City. Notation in the stations maintenance log

were not always made due to the fact that notes weren't made available to

Roy Hicks, the Maintenance Supervisor, at Deadwood. Corrective meaxures

to avoid violations of this sort have been taken.

16. Measures have been taken to correct this discrepancy.

17. Color burst amplitudes will vary on the network signals. There are many

variables that causes loss of color burst. Generally the incoming micro ware

is fairly decent, however due to a large amount of interference, at Terry Peck,

in the reception of Channel 7 (the program source for KDSJ-TV) we have

had to install filters, above and below the Channel 7 band. Also the receiver

has to be tuned to eliminate two way hetrodrne. This all causes degradation

of the signal. This interference to the reception of Chaunel 7 at Terry Peak

wag noted in a letter dated March 2. 1966 to the kCC office in Denver, Colorado.

Tests were made to confirm some of these sources of interference.

1S. According to Roy Hicks, supervisor, the Emergency Broadcasting Receiver

is operating properly and was on the day of the inspection. The operator on

duty reported the alarm rang when KOTA. the monitored station, changed to

night time pattern on the day of the inspection. We found no fault with the

operation of the receiver.

Response to the second notice reads:

Violation of FCC Rules Section 73.669(a) and Section 73.671(a) (3).

Operator Harvld W. Codner has been informed of the violations by his super-

visor, Mr. Roy Hick< and he has assured Mr. licks that he will make every

effort to comply with the rules.

Testimony of Some Witnesses

21. In addition to the chief protagonists, Eli Daniels, licensees’

principal, and John McKinney, Engineer in Charge of the Commis-

sion’s monitoring station in Grand Island, Nebraska, a number of

witnesses took the stand at the hearing in Rapid City. In the main.

the facts testified to by these witnesses have only peripheral bearing

on the issues. Brief digests of their testimony are set forth below.

Donald EF ugene Wyatt

22. Wyatt is the Commission engineer referred to in Paragraph 7,

above. On direct examination he testified in amplification of the vari-

ous violations he found at KRSD-TV and KDSJ-TV during his

September 1966 inspection of those stations. Extensive cross-exami-

nation of the witness failed to impeach his account of the violations

he found at KRSD-TV and KDSJ-TV. Wyatt did testify that he

found Eli Daniels cooperative. He also testified that out of 40 stations

he had inspected KRRSD-TV and KDSJ-TV were the poorest he had

found in the entire district. On the basis of “good,” “fair,” “poor”

and “very poor” criteria, he rated the two stations “very poor”.

82 F.C.C. 2d

|

SERRE ter Teneo rete ERT : _— a _

ee TON TNE EE MPT TEN TE RL Ne HL LEE fT N RY REN NTS

14a

214 Federal Communications Commission Le parts

Charles 7. Undlin

23. He is president of the First. National Bank of the Blacl: Hills

and president of the Rapid City Chamber of Commerce, He has lived

in Rapid City nine years. Over the years he has sometinies had duli-

culty in trying to watch the picture on KRSD-TV. He has also heard

unfavorable comments from others conerning reception of some of

KRSD-TYV's programs, particularly sports programs. Although he

is not.a “major television watcher”, he has the impression that WRSD-

TV’s picture recently has been better than it was some years ago. Ile

does not employ a roof top antenna.

H. P. Divon

24. IIe is assistant vice president of the First National Bank of the

Black Hills and director of advertising. marketing and public rela-

tions. He has held the latter position for nine years. He is a member

of a number of civic organizations. The bank advertises over KRSD-

TV. Ile watches that. station some and finds its picture unstable. ITe

has heard the same complaint from other sol 1 Although not an

avid television viewer, he has noticed some slight improvement in

; the KRSD-TV picture recently. He places most of the bank's busi-

y ness with the other Rapid City television station because it furnishes

3

a better picture and better coverage. He has complained to KRSD-TV

salesmen over the difliculty he has had in viewing that station’s _

ture over the last six to eight years. He, too, does not employ an outdoor

antenna with his set.

B.A. Dait

F 25. Ile sells electronic equipment. including television sets. mm Rapid

% City. He has lived there 15 years. In his judgment from 1956 to the

: fall of 1968 the picture on KRSD-TV was very poor. diflicult to

: watch, sound entering picture, some “tearing” and intermittent inter-

ruptions of service. Since the fall of 1968 there has been improve-

ment. Sometime prior to August 1967 Dail placed a petition in a

conspicuous place in his store. The petition was addressed to the FCC

and to the National Broadcasting Company. It asked that steps be

taken to improve the quality of the signal over KRSD-TYV and

KDSJ-TYV. The petition asserted: (1) the quality of the signal trans-

mitted by the two stations made viewing them annoying and unsatis-

factory; (2) because of this problem the viewing public in the area

was being deprived of NBC programs. Dail acquired over 2.000 sig-

natures to the petition. The petition was sent to the Commission in

Washington.

26. Dail did not mention the petition to Daniels. Sometime after

the filing of the petition Daniels brought a successful suit in court

against Dail for nonpayment of an advertising account. Dail was

disappointed that Daniels didn't carry color broadcasting earlier than

his stations did. Dail has sold Daniels merchandise and has had diffi-

culty in making collection.

Donald William Holloway

27. He is a shipping clerk with a local concern. He has lived in

and around Rapid City for some 28 years. Generally he has had no

82 F.C.C. 2d

ee

a a

ies FOR LEED TT Re as — -_

NEARER A Phe SR,

15a

Heart of the Black Hilis Stations, The, ct al. 915

trouble with KRSD TV although he lias lived both in Rapid City

and some five miles outside the city. Jlowever, at the time he took

the stand he was getting a bad picture from both KRSD-TV and

the other Rapid City ‘T'V station. In his opivion KRSD-TV broad-

cast much better color than the other Rapid City television station.

The reason he believes he was getting bad television pictures was be-

cause an amateur operator was located next door. His set docs not

have an outside antenna.

Kenneth J. Nies

28, He isa life insurance ayent. He is on the Rapid City City Coun-

cil, acts as vice-mayor, belongs to the Chamber of Commerce and to .

the Lions Club. He has lived in Rapid City nearly 30 years. In com-

»arison to other stations he has had difficulty getting programs on

KRSD-TV. Reception is not good. Picture quality was inadequate

from the time the station went. on the air until late 1968. It has recently

improved.

William. Francis Duhamel

29. He is station manager of KOTA AM and TV in Rapid City and

Secretary of South Dakota Cable Co. In the fall of 1967 South Dakota

Cable was in the process of purchasing a CATV system from Western

Television Systems. ‘The system had been in operation since 1955 and

was in bad shape. It was lying on the ground in places and haphazardly

strung on telephone poles. An equipment company appraiser. after

inspecting the system, said it was basically junk. At the time South

Dakota Cable purchased the system it was not believed that the sys-

tem was physically capable of carrying a signal. Complaints were re-

ceived from those not on the cable that they received radiation from

the system. The system has since been entirely replaced. ‘Today ::9

one is able to get a picture that is not physically connected with the

system.

*30. On cross-examination Duhamel made clear that his testimony

related only tothe general state of the system when it was purchased,

and had nothing to do with the performance of the signal of KDSJ-

TV at Lead.

Duane Carsten

31. He operates a television retail and service store in Sturgis,

South Dakota. Sturgis is about 29 miles from Rapid City and § or

10 miles from Lead. He has been in business about 10 years. In con-

nection with his work he has viewed the pictures of KRSD-TV and

KDSJ-TV.

32. On the basis of TASO standards. he rated KRSD-TV and

KDSJ-TV as the picture of those stations appears in the area he

services. His ratings ran thus: KRSI-TV—black and white—in the

past—“fine” (picture has high quality providing enjoyable viewing.

interference perceptible. interference in picture is very small);

KRSD-TV—color—in the past—between “marginal” (picture poor

in quality and wish vou wala improve it. interference somewhat ob-

jectionable). and “inferior” (picture very poor. could watch it. defi-

nitely objectionable, interference is present) ; KRSD-TV—black and

$2 F.C.C. 2d

a ee PR 2 ‘ wT aN

Worm xed aa ee

CR eae

: ieee: ya Nes, ae

set eased eth SL Lah ee

l6a

216 Federal Communications Commission Reports

white—reeently “fine”; KRSD -TY—color—recently “fine”; KDS.1-

TV—Dblack and white—in the past—“passable” (picture acceptable,

ah aa op eee? ; — er = oe

riot 5 -UV—black and white—recent assuble”; DS

TV—color—recently “inferior”. ds shin

33. The witness on cross-examination admitted that he services

television in a mountainous area, that he personally feels that no high

band operation from the south is going to be very successful in the

area he services, and that at times the other television station at Lead

also presents an inferior picture,

Roy L. Hicks

34. Hicks is chief engineer at KDSJ-TV. He was employed there

when McKinney made an inspection of the station in 1967. He testi-

fied that he did keep a maintenance log, that it was at the station when

McKinney made his inspection. but that he was not there at the time,

and he had never informed the operator then on duty where the log

was kept.

Testimony of Daniels and McHinney,

Some Extenuating Circumstances,

Mehinney Outlines Areas of Technical Weakness.

5a, As previously noted, the chief protagonists at the hearing were

Eli Daniels and John McKinney. Based upon their testimony it

would be possible to bulge these findings with scores of pages of

arcane engineering facts. To do so ial ieee lend littie aid to

un understanding of the material facts. Daniels defended his opera-

tions through confession. avoidance and argumentation. Much tirne

was devoted on the record to pursuing a thesis by Daniels that Me-

Kinney’s finding of spurious signa] radiation at KDS.J-TV was evro-

neous and that his instrument readings must have been on signals of

a derelict CATV system. This contention, after exposure to cross-

examination and rebuttal, ended up in proposed conclusions from

licensees which read: “At the close of the hearings in Rapid City it

was impossible to determine from the record whether the spurious

emissions in question were actually attributable to KDSJ-TV. Events

subsequent to that time indicate that KDSJ-TV has. at. least inter-

mittently, been radiating spurious signals.” ‘To the extent that that

language conveys the meaning that McKinney was right, that when

he inspected the stations in 1966 and 1967 KDSJ-TV was emitting

spurious signals, the statement is accurate. Daniels defended the

charges of maintenance log dereliction by establishing such facts

as these. Prior to 1966 the two stations kept their maintenance lo,s in

the margins. and on the backs, of transmitter logs. After the 1966

inspection they reformed. Maintenance logs were kept. When McKin-

nev inspected the station in 1967, Daniels was not there and a neophyte

attendant was on duty who not only did not know where the mainte-

narice logs were kept. he did not know that they were kept. ‘That main-

tenance logs were kept in 1967 may be found. But it should be pointed

out that that fact helps the licensee’s position only a little. Unavail-

able logs are just as useless to an inspector as are non-existent logs.

32 F.C.C. 2d

ial a Set

17a

Heart of the Black 11:1's Stations, The, et al. 217

36. On the subject of problems orisinating with the somree of ies

network signal, Daniels cid better, ‘Phe subject stations for a lone

time obtained their network feed from Bismareis, North Dakota, via

microwave. Bisiiarck obtained its signal from Faro, North Dako.

Fargo, in turn, obtained its signed from Minneapolis, So many o:t-the-

air pickups did apparenth: degrade the signal Further, newer ood

equipment failures in the microwave system created additional prob.

lems, After much etlort and trustration Daniels finally etiecvod a

hook-up with a Rapid City CATY system. Under this arrangement the

stations’ network signals are brought direct from Denver. This arranae-

ment has substantially improved the quality of the stations’ techutvai

service, The arrangement is, hewever, temporary pending approval

by the Commission of xn application by the CATV system for a new

microwave system to serve the Black Hills avea, Daniels has applied

for this new service? Daniels also advanced a rather persuasive set

of extenuating facts concerning the quality of the KRSD-TV trans:

mitter. Both he and the Comimission engineer agreed that KRSD-! V's

transmitter is not much good, Bot, for oll practical purposes it is type.

approved, as to the licensee's oneracion, since the transmitter was

“grandfathered” in by the same Comission action that exclude! its

type for prospective acceptance, Transmitters are very expensive snd

it may he accepted as fact that Daniels does not have the money to

replace the one at KRSD- PV. Damels also made out a pretty solid

case for the proposition that an appreciable amount of his technical

trouble has stemmed from weather conditions ii the area, On niony

oceasions high winds have caused damage to KRSD-EV's anters:

tower. In June 1967 2 tornado nearly demolished the tower, In Jan-

uary 1968 Daniels tiled application for a new antenna system snd in

September 1968 received temporary authority to operate the new svs-

tem. He believes the new antenna has improved the quality of KRSD-

TV's service. The old antenna is to serve in standby status, Dauicls

further testified without refutation that although he has a subserip-

tion to receive all FCC rules changes, on at least one occasion, involy-

ing a change in requirements concerning maximum output power,

he did not receive his copy of the rule change. Daniels was also convine-

ing in testifying that technical staff was hard to come by to perform

maintenance work.

ov. The foregoing findings are not to suggest that Daniels sne-

ceeded in impeaching, to any substantial degree, the validity of the

violations charged to the licensee stations as a result of the 1966, 1967

inspections. During the hearing, however, it developed that, by then,

Daniels had taken some corrective action. On the basis of Daniels”

assurances, brief informal visits to the stations, and knowledge that

improved power sources had become available to the stations, McKin-

ney undertook to go through the list of violations and identify tho-e

where he believed effective corrective action had been taken or that

the problem causing the violation no longer existed. While a fair

number of violations were thus disposed of, there were many remain-

* Letters from E:i Daniels to managers of Mountain aiengwave Company, Denver, dated

September 9, 196%, and February 14, 1969, requesting the Company to apply to the Coin-

mission for a special operas fnuthority to provide a microwave link for service to

KRSD-TYV, are in evidence in this proceeding. ;

$2 F.C.C. 24

f

BEG ROIE IAA PERSO DI

. OS eae

oe Tae

aH

PEERS gS

SERIE Ea RTT

Ieee,

——

ee ee ee

3

4

ra

y

.

OOD AE a erica. 6,36 ee

MP DAA ey Aedes ns Sit

Pi EO

Pathe

BE ay ot Se Se

Saat ae aaa

18a

Federal Communications Commission Reports

218

ing that McKinney did not believe could be excised from considera-

tion either because he believed them to be still extant or because he

did not believe they could be disposed of without further inspection

of the stations, Moreover, McKinney undertook to outline in general

terms those areas where the technical side of the KRSD-TV—K bDs.J-

TV operations was fundamentally weak. These included spurious

emissions at KDSI-TYV, general construction practices including wir-

ing and shielding, « shortage of technical personnel and implementa-

tion of day-to-day maintenance. :

88. The hearing was recessed from March 13, 1969, in Rapid City.

The continuance was granted for the purpose of permitting the fi-

censees to make further showing. Prior to continuance, the Examiner

expressed hope that another inspection of the station might be made.

This wish was again expressed on the record on April 17, 1969, during

hearing in Washington.

Daniels’ Defense, Another Inspection, and Daniels’ Response to the

Notice of Violation.

_ 39. At the hearing on April 17, 69, in Washington, the licensees

introduced into evidence Daniels’ response to those arcas of weakness

generally outlined by McKinney. The Daniels’ statement was addresse:|

to those areas McKinney had outlined on the record. Daniels responded

seriatim and described the areas in this order: (1) sideband emissions ;

(2) faulty rey Sasa shielding; (3) Dumont transmitter; (4) per-

sonnel problems. Daniels’ statement reads as follows:

In order to alleviate or correct the above deficiencies, the following corrective

measurements will be undertaken.

1. RCA has been contacted for the purpose of having a consultant come down

and check the KDSJ-TV transmitter for possible spurious emissions. Negotia-

tions are presently being finalized on this matter. (See attached telegram.) (*)

2. It is the licensee's position that its general construction practices conform

to industry standards. However, station personnel have been ordered to keep

the transmitter buildings clean and free of debris. In addition, any exposed

wires will be placed in a cabinet wherever possible. With respect to the lower

supports on the old KRSD-TV antenna, these will be torn down and replaced

by \"" flexible steel cable enclosed in plastic tubing. The structure will employ

conventional hangers and clamps, and messenger cable will be used to support

the steel cable. It should be pointed out that this antenna tower is presently

not in use, since the Commission has granted temporary authority for use of

a new antenna.

3. The licensee does not have the financial resources to replace the Dumont

transmitter. However, a 3.58 mc color notch filter has been purchased which

can be easily adapted to a lower sideband filter. The installation of this filter

and the fact that KRSD-TV is presently operating with reduced power should

allow the station to better maintain power and more easily tune the transmitter

to its proper output response. In any event the licensee will take such corrective

action as is necessary to insure that the Dumont transmitter will be able in

the future to maintain authorized power.

4. There is no easy solution to this problem. As Mr. Daniels testified. recruiting

qualified personnel capable of maintenance work is an extremely difficult task.

However. in order to avoid going off the air at KDSJ-TV when a maintenance

problem occurs, the licensee intends to purchase a camera and film chain for

that station. If a microwave problem occurs, the operator will stay on duty,

while Mr. Hicks or Mr. Daniels makes the necessary repairs.

A telegram dated Apeit 8. 1969. from RCA to counsel for Dantele confirmed that at the

request of Daniels. RCA would make measurements on KRSD-TV and KD8J-TV for har-

monics and spurious emissions.

82 F.C.C. 24

akg ' ce

ve Oe AOE > ORD Lae NTI NEE ttm te IE tar

pol Uwe $3

SAIN ORDT A os: + =* :

a as ee

19a

Heart of the Black Hilla Stations, The, et al. 219

40. A memoranduf dated May 25, 1969, from Paul R. Bateman,

RCA Service Company, Chicago, Iiinoix, to KDSJ-LV and others

stated in pertinent part :

6-21: Traveled to Rapid Clits.

5-22: Picked up teat equipment, Borrowed a diode and a directional coupler,

Traveled to transmitter near Lead. A line section (154°) Was prepared and

fitted with the diode and the 3°’ directional coupler, Made ineasurements jn-

cluding spurious with both aural and visual operating into autenia, No spuriots

responses noted. A fuse blew once in aural transmitter, Some diiticulty experi-

enced In connecting aural transmitter to dummy load, Tried to check differen-

tial phase and gain, Very jittery display. Because of limited time, this meusure-

ment cancelled.

6-23: Departed station.

41. On July 30, 1969, KRSD-TV was again inspected by McKin-

ney. Following inspection an Ofticial Notice of Violation dated Au-

gust 15, 1969, was sent the station, Specific violations cited in the

notice read :

Non-compliance with F.C.C. Rules and Regulations as follows :

1. Section 73.682(a) (12). Trangnilssion Standards, The blanking level yA

be transmitte! at 75 plus/minus 2.5 percent of the peak carrier level; dxfring

the observed time the blunking level was ST percent which is above the specified

level.

@. Section 73.682(a) (13). Transmixsion Standurds. The reference shine level

of the luminance signal mensured 20 percent, which Is above the 12 ial plus/minus

2.5 percent of the penk carrier level.

8. Section 73.682(2) (17). Transmission Stanctards, The referdnce black level

shall be separated from the blanking level by the setup intervapof 7.5 plus/minus

2.5 percent; during the observed period the setup level w ag ‘measured as 3 per-

cent which is below the specified level.

4. Section 73. Figure 6 Color burst amplitude mensured 20¢¢ of sync in

leu of the specified HO% to 110¢% of syne.

6. 73.687(1) (1) and 74.608 Figure 5. Measurements: indicated spurious siguals

above the viaual carrier as follows: Aural plus 4.5/MHz= —30 db; Aural plus

9.0 MHz==—40 db.

All measurements were reepective to visual carrier.

6. Section 73.071(a) (1). Operating Log. On Jaily 27. 1969, operator Eli Daniels

failed to indicate the time power to the antenng stopped.

7. Section 73.6711a) (3). Operating Log. OA July 27. 1969, operator Eli Daniels

failed to make entries at half hour interv algAfter 7:30 PM.

8 Section 73.069(a). On July 27, 1069, operator Ell Daniels failed to sign the

“Operating Log" when going off duty. —°

9. Section 73.671(a) (5). On July 27,4969, operator Eli Daniels failed to make

an entry concerning daily observations of tower lights.

10. Sections 73.689(b) (1) (2) and 73.672(a) (7). The last power calibration

in the maintenance log indicated calibration at only the 100% level und failed

to show calibration over the range from 80% toa point over 100% of the author-

a — output.

2. On August 15, 1969, an Official Notice of Violation was sent

Nasniian covering inspection of KDSJ-TV. The date of the inspection

is not stated on the notice. However, as will be shown below the inspec-

tion was undoubtedly made by McKinney on July 29, 1969. The notice

reads as follows:

Non-compliance with F.C.C. Rules and Regulations as follows:

1. Section 73.687(b) (7). Modulation of the nurat transmitter was 50% on

peaks of frequent recurrence during the period 1:00-1:30 PM EST. July 29,

1969; during this period one-fourth of this modulation was in the form of noise

and distortion.

2. Section 73.699 Figure 6. Color burst amplitude measured 406% of sync in

lieu of between 90 to 110% of sync from 1:00-1:30 I’M EST, July 29, 1969.

2 F.C.C. 2

5

on

20a

220 Federal Communivations Commission Reports

3. Section T2.690(¢). The interval between successive measurements of the

visual carrier frequency and the difference between the visual carrer frequency

and aural frequency shall not exceed ene month. The last frequeacey measurement

Was May 16, 1:68), prior te July 28 Tt,

4. Section T3.G72Z(a) (2) cil). No entry was made in the Maintenance Log de-

acribing the methed used in determining the monthly frequency mensurement.

G& Section 72.601 (0). The visnal color moniter was tarned off at the time of

inspection or July 29, 1969, and operater, Mr. Rey Hicks, was unable to tune in

the coler procram

6. Section 72.689(b) (1). The Power Calibration of the Visas] Transmitter on

the dates of February 9, 1969, and May 18, 1969, indicated 5.0 KW which repre-

sented 1005 power, without the ealibration from 80% power, to a point over

100%. to the maximum of 110% power.

7. Sections 73.GS7(a)(2), 7T8.6sS7(2) (5), 73.68T(n) (6), TREST(ID (1) and

73.099 Figure 5. Measurements indicated spurious signals above and below the

visual carrier as follows: Visual minus 434 MHz=—15 db; Visual minus 9.0

MH2z=—2 db; Aural plus 4.5 Milz=—15 db.

All measurements were respective to visual carrier.

& Section 17.38ic)(<). Transn.itter log indicated antenna beacon iizght out

from June 27, 1969, through July 1, 1969, without any Federal Aviation Agency

notification.

9. Section 73.687(z) (2). Suitable facilities for the welfare and comfort of the

operator were not proviccd.

43. On August 27, 1969, Daniels made response to the August 15.

1969 Notico of Violations addressed to KRSD-TV. His response read :

Reference to your Official Netice of Violation, date mailed, August 15, 1909

and received this office on August 1S, 1969.

The following js my response to the notice of violations:

Violations numbered 1 throuch 4 pertaining to Transmission Standards;

(Le. blanking level, white level, bi2ck level and color burst).

‘These violations were all the cause of very poor network signal quality. Please

be iuformed that during tne month of July, and particulariy during the last

weck in July, the service on the NLC feed from the common carrier via the cabie

company has been very bad to fairly good, but wosuy iu the poor quality area.

Please refer to a letter irom Mr. Peter L. Karn, Manager of the ‘v<./ cable

company for confirmation. [*)}

It was noted by the undersicned that on July 30th (the day of the inspection)

the signal quality from the network feed was very bad during most of the fure-

noon and up until about 3:00 PM, when it suddenly becawe fairly decent. The

three o'clock when the —— quality, signal to noise and color became increas-

ingly better. At that time Mr. McKinney commented and said, “that looks like

a pretty —s picture. Where is that monitor getting its sicnal?” He was then

shown the — to the m-mitor as coming directly from the transmission line

» transmitter.

have been informed that the micro-ware system which feeds KRSD-TV and

the local cable system has been under extensive repairs and modifications. It is

also known that the common carrier. namely, Mountain Micro-wave, recently

received FCC approval to install new facilities (FCC news report No. 3737 dated

August 15, 1969) to serve the Black Hills area, KRSD-TV included. This then

should do much to reduce and eliminate the discrepancies of the above mentioned

nature.

Violation #5—Measurements indicated spurious signals above the visual car-

rier as follows: Aural plus 45 mcs.=—30db; Aural plus 9.0——40db.

Spurious signals above the channel seven band were noted & eliminated as

explained below :

The following is a transcript from our maintenance log, which outlines the

procedure followed to correct the discrepancy : -

~atiasined §o Go smapense seisa 0 Peter Crom the Baste Cixz Catto Co. stating that there

were duri yo, Tt, when

Bere gee Sorine te considerable occurred with the Cable

2la

Heart of the Black Hills Stations, The. et al. 99}

August 21, 196%—5 30 AM to G :20 AM.

Returned aural tronsmitter and checked for spurious siznals. Tneressedt

coupling to the 4x%ws intermediate smpliticr. This seemed to reduce spurt-

ous emixsion to nill. Further check will be made tomorrow.

Signed Eli Daniels,

August 22, 1968—12 :10 AM to 5:58 AM.

Further checks for spurious ewissions indicates spurious signals are still

present. Indicutions are that they originate in the FM driver urit. Checks

were pide with a field strength meter and a directional loop antenna. More

checking tomorrow.

Signed Eii Daniels.

August 23, 1969-—12 :10 AM tu 4:00 AM.

Undersigned and Jim Ostby worked on the aural FM driver unit. We dis-

covered a bad grid-leak resistor (Raj) and a badly charred tank coil ob)

in the 2nd doubler stage of the FM driver unit. The resister (R3) 100K

ohms measured approximately 225K ohms when it was cold. This resistor ne

doubt changed vaines under load! The coil was badly burnt and several

turns were shorted, hence this stage could have easily tuned to a hicher

frequency.

After replacing the above mentioned grid-lexk resistor with a 100K ohm

unit and rewinding the 15 coil, tests were made once again for spurious

emissions. None were detected as coming from the aural transmitter.

Sigued---Eli Daniels.

August 24, 1969—3 :30 AM to 4 :30 AM.

Checking for spurious signals using a Jerrold 704 and also a portable trpe

Amphenol #840 ficld strencth meters. No signals detected above or below the

channel seven band. The area checked was plus and minus 20 mes. from the

bands edges. The Jerrold 74 was instalkd about 30 feet from the channel 7

antenna and with a channe! 7 dipole directed to the antenna. Both transmit-

ters were in operation. The visual was operated with a sweep signal from tLe

RCA BW5B and the aural transmitter was unmodulated. No spurious signals

detected

Signed—Eli Dauiels.

August 24. 1969—S8 :00 AM to

Rechecking for spurious signals; nuthing detected with the 704 above a

minus 60 db. Antenna installed about 30 feet from the transmitting antenna.

A signal was detected about i:xtd down from our visual at a frequency of

approximately 195 mes. This signal still prevailed even after both channel 7

transmitters were shut off. This included a shut down of filament supplies

and all. The above was noted at between 8:30 AM and 9:50 AM.

Further measurements:

Swept channel 7 visual with the RCA BW5B sideband analyzer, with only

the visual transmitter un. No spurious signals noted on the scope above or

below the bands edges out to 10 mcs. A small pip was detected at 12.25 mes.

above the band.

Time 10:30 AM

Now checking with sweep into visual transmitter and also with tbe aurai

carrier on. No discernable difference noted from the above, except for the

aural pip at 4.5 mes. above the visual carrier.

Time 11:07 AM

MORE CIIECKING:

Both carriers ov. Visual swept as mentioned above; checking for spurious

signals with the Jerrold 704 field strength meter and using a channel 7

dipole directed to the transmitter antenna. No spurious signals noted from

the transmitting antenna. Meter set at maximum sensitivity. Detected signals

from Channel 31, Lead, So. Dak. on channel and also a signal at approxi-

mately 195 mes. as mentioned above. This signal was determined as not

cowing from KRSD-TY.

End of tests. Time 11:20 AM

Signed—Eli Daniels.

Violations numbered 6 through 9, on Operating Log, (i.e. logging times of power

shut down, off duty sign off. entries at half hour intervals and daily observation

of tower lights). The transmitter log bas been brought up to date. Logging was

32 F.C.C. 2d

104-015—71——-4

nl. lll + tt te

a

22a

222 Fedeval Communications Commission Le ports

left andene due te the fact that Thad a group of visitors at the station tbat

Sunday evening. Nornal observations were made during the evening and meter

readings were noted as nermdal Sicn-eff of all equipment at the transnitter was

done within 10 seconds ef program sicn-off, which was at 10:00 PM. ;

Vielation 10.—Section TLGNI Cb) CLE). .

Aevording to the above rule, whieh became effective March 17, 1969 F.R. Doe.

GO-1782: filed Feb. 11, 1960: this rule had been complied with, according to my

Interpretation. Specifically, the meter was calibrated with the transmitter operat-

ing at SO, 100 and 110 percent of authorized power. Also labels below cach of the

power meters (Aural and Visual transmitters) indicated the meter readings for

NOY power amd 110¢% power. These labels and markings were called to the at-

tention of the inxpector.

Violation 10.— Section T3.072(01 (7) : “Any other entries required by the instru-

ment of authorization or the provisions of this part.”

The maintenance log has been corrected to show that calibrations were made at

80% and 110% of authorized power.

44. On September 11, 1969. Daniels made reply to the August 15,

1969, Notice of Violation addressed to KDSJ-TYV. Lis response read .

Reference to your official Notice of Violation to KDSJ- TV, date mailed Au-

gust 15. 1969 and received in this office on August 18, 1909, the following is my

Nse :

Violations numbered 1 and 2. were the cause of poor network sicnals. Please

refer to my reply te violations 1 through 4 for KRSD-TYV, Violation Notice date

mailed August 15. 1969: my reply dated August 27, 1960.

Also, fading conditions during July and August further agzravated the bed

signal. Since KRSIXTV ix forced to operate with a temporary antenna instalied

on a 61 foot tower, pending action on our construction permit te install our new

antenna on top of our 400 foot tower: (see Application fer C.D. tiled. January 1.

1968/BPCT-1077. and according to x reply to my letter of inquiry dated April 9.

14 —attached*—this application has been pending sinee April 15, 1968) the

KRSD-TV signal at onr microwave relay point on Custer Mountain suffers the

consequences of the abeve mentioned fading and weaker signals emanating from

KRSD-TV due to the tow height of the antenna system now in use.

Efforts have been made during the past te tmprars our -enal inte Station

KDSJ-TY,. Channel 5. Lead. Se. Dakota. We have changed the location of our

relay station (KCX-93) from Terry I'eak to Custer Mountain. Refer to applica-

tion for C.P. filed April 20, 1968: C.P. granted May 31, 1968, BPTI -1226. Appli-

cation for license filed August 31, 196S: license granted December 9. 1968 tile

number BITI-1240. The change of location of KCX-98. our micro-wave station

was made necessary because we experienced so very much interference frum the

two-way radio installation on Terry Peak. This interference from the two-way

installation had been called to the attention of the FCC.

Last but not least. poor transmission quality which happened intermittenti:

is due to technical difficulties. Recent transmission observations and (ransinitter

tests and inspections hax revealed abnormal transmissions, More on this subject

will be dicussed in my reply to Violation #7 of this report.

VIOLATION #3

Frequency measurements were performed at the KRSD-TV transmitter site

and results recorded there in their log. Readings have since heen transterred to

the KDSJ-TV, transmitter log for June. July and August 1909. This brings our

frequency logging for KDSJ-TV up to date. Hence violation #3. complied with.

VIOLATION #4

This violation corrected. A copy of the method used to make measurements

from the KRSD-TV log-book (which is the method used) has been inserted into

da transmitter log book. This violation has been corrected and com-

th.

32 F.C.C. 2d

tat, Si

23a

Heart of the Black ills Stations, The, et al. 223

VIOLATION #5

The color monitor seemed to be working properly during my recent visits te the

station. If was working nermally during the last week ond up through Tnemlay,

September 9, 1960, On Wednesday, September 10, 14, the moniter wax net pro-

ducing o good picture from our tap-off to the transmitter. It was determined

then that transmitter operation was net normal, Problems existed in transmission

iustead of the monitor.

VIOLATION #6

The power calibrations of the Visual Transmitter on the dates mentioned were

made through the range 40°; and 110% power. The output meter on the trans-

mitter was marked as required by (he rules. It was determined during the

measurements that the output meter did read cae and curresponded to the

output power of the transmitter. Logging of thix has been inserted in the log book.

VIOLATION #7

Spurious signals as noted in this violation were confirmed by our tests and

measurements during the last two weeks. It was determinel that we have an

intermittent connection, or break down in our transmission diplexer and/or,

transmission line and antenna system. Thix deduction was made on the basis of

the fact that when either transmitter «visual or aural) was turned off, the

mentioned spurious signals disappeared.

We also detected other spurious signals as coming directly from our visual

oscillator exciter. These, we are fairly sure, are due to a bad crystal. A new

oue has been ordered.

It is going to take at least two weeks to correct the discrepancies noted in

Violation #7. A report in the forw of an amendment will be submitted upon com-

pletion of the work.

VIOLATION #8

The operator on duty at the time that the top beacon licht went out was Harold

Codner. He said. on questioning by the undersigned, that he called The Black

Hills Airport, which is the nearest airport to the station, an? rep-rted the outage

to them. He was informed by The Biack Hills Airport. that he should report the

tower light outage to the FAA in Rapid City. He then made repeated attempts to

contact the FAA in Rapid Citys, South Dakota without results. He then called and

notitied KDSJ-TV manacement a couple of days later about the outage, where

upon the lights were repaired immediately. The manager. Harry Daniels hap-

pened to be out of town for a couple of days, the time the top beacon light went

out. hence he was not notified nutil about two days later. Mr. Codner did not log

notification of the FAA since he was unable to make contact.

VIOLATION #9

Arrangements have been made to install a combustion type toilet at the

KDSJ-TV transmitter site. The unit has been ordered.

Two written statements of John McKinney were received into

Pe te They were dated August 6. 1969, and October 16, 1969. In

pertinent. these statements read :

At the request of the readcast Rurcau of the Federal Communications Com-

mission, J, Johu McKinney, Jr. in company with Mr. Samuel B. Stelk, present

Engineer-in-Charge of the Central FM-TV Enforcement Unit, travelled in the

mobile TV Enforcement van te Rapid Citr, Seuth Daketa on July Zsth, 1969,

and on July 20, 10 further travelled to Lead. South Dakota, and between the

hours of 10°30 aan. and 1:50 pom. MUS.T.. did make engineering monitoring

measurements on Television Broadcast Station KISI-TV to determine if, in

fact. said spurious emissions had been reduced or eliminated. As a result of these

observations and measurements on July 20. 1900, 1 have made the determination

that the spurious radio frequency emissions as reported in my testimony at the

Rapid City, South Dakota hearing March 10, 1960 to March 13, 1960 were still

3 FOL. BM

224 Federal Communications Commission Reports

presert and were beyond the tolerances allowed for spurious emissions by the

Rules aud Keeulations of the Federal Communications Commission. Using a

calibrated spectrum analyzer f, John McKinney, Jr. did measure the visual ruinus

4.5 MIs spurious at — 15 db and the visual minus 9.0 MITx spurious st — 2 db

as referenced to the visual carrier. Additionally the aural plus 4.5 Miz spuricas

was mensured at —15 db in reference to the visual carrier, (August 6. 109

McKinney Statement.)

1 have reviewed an engineering report prepared by RCA Service consultant,

Paul R. Bateman, dated May 22. 1969. and submitted to hearing examiner,

Thomas Donalw:. as Black Hills Exhibit 6 under eaver letter fram Stephen A.

Gold, attorney, dated July 8. 1969. Whereas the methods emploted by Mr. Bate-

man are conventional methods uf measurement employed by cnzineers as part of

a standard proof of transmitter performance, T find them totally inadequate as

proof that the antenna systein of KIDSJ-TV was not radiating the spurious emis-

sions which were the subject of a portion of the Official Notices of Violation

issued the licensce of this station.

Official Notices of Violation issued the licensee of KDSJ-TV dated Septein-

ver 16, 1066, and October 24, 1967. cited nen-compliance with Sections 73.687

(a) (2) ; 73.6ST(a) (3) ; 73.687 (a) (6) : 72.699 Pig. 5 and 73.6871) (1), exphtining

that the transmitter was transmitting spurious mixtures @ MIIz either side of

the visual carrier frequency and poimed out that the strongest of these at \ural

+45 MHz, Visual —4.5 Milz, Visual —3.5S MIlz and Visual —9 MiIz were

inadequately suppressed. It also noted that numerous other spuriotis preducis

were noted throughout this region, all less than 40 db suppressed. From an

analysis of the above measurements two factors were evident:

1. The sideband filter or that portion responsible for the suppression of the

color sub-carrier was improperly tuned or defective and

2. Some form of mixing was taking place between the aural and visual car-

riers producing the spurious siguals noted at 4.5 and 9 MlJz intervals.

1 accept the measurement made by RCA at —3.E8 MIIz and noted as —55 eb

which incidentally is beyond our tolerance of —42 db. Adjustments made by the

licensee could easily account for a difference of a few db between the time I

measured this signal in 1967 and when it was again measured by KCA in 1969.

My concern centers around the lack of showing on the part of RCA Service

that the 4.5 MHz and 9 MHz products were not being radiated from the aiutenna

system of KIDSJ-TV. When mixuures of this magnitude are observed they are

likely to be caused by one of three conditions :

1. Non-Linear rectification caused by corroded or loose connections in the

diplexer, transmission line, or the antenna itself.

2. Spurious products present in the incoming signal to the transmitter modu-

lator and improperly suppressed by the transmitter because of sideband filter

malfunction.

3. Spurious mixtures generated within the transmitter itself.

Mr. Bateman’s tests eliminated the possibility of the last of these premises

but did not prove to my satisfaction that the first and second possibilities lal

been explored, especially the first possibility which from my past experience is the

most likely cause of this problem.

The equipment layout shown in the RCA report shows the signal source during

these measurements as “Test Pattern Input.” It is not clear whether this input

is from a generator or monoscope furnished by RCA or whether this test pattern

was being supplied from the parent station KRSD-TV, Rapid City, throuzh the

microwave link and receiver demodulator equipment normally in use by KDSJ-

TV during programming. If the latter was the case then I wight possibly elim-

inate the second possibility as the cause.

This would leave the number one possibility as the most likely cause of these

spurious mixture products. Using the equipment set-up Mr. Bateman describes

in his report, there is no way of making a determination that the cause is not in

the antenna srstem.

My measurements were made using receivers and associated spectrum ana-

lyzers, and after vast experience in the field for over seven years, I have found

this method to be infallible.

After the above measurements were made by RCA Service Company, I trarecled

to Lead, South Dakota, and made a set of measurements on KDSJ-TV using the

32 F.C.C. 2d

25a

Heart of the Black Iills Stations, The, et al. 225

same equipment and techniques employed in 106 and 1967. Measurements were

made at a location clear of power line poles and other possible sourees of inter-

ference in a clearing about 1500 feet from the transmitting antenna. These

measurements confirmed the continued existence of the above-mentioned spurious

signals. They were performed on July 2D, 1960.

In addition to the foregoing statements, ] would like to point eut that I viewed

the pietnre from KRSD-TV. Rapid City. South Dakota, at the motel in which

we stayed on July 2sth, 28th. 80ch, and Stst, 1969. and compared it with the sig-

nal of KOTA-TY, also of Rapid City. and found it to be inferior to that of ROTA

in every respect. Programs represented as being in color on KRSD-TV frequently

are lacking sufficient color to discern that they are in color. The picture was

extremely noisy at times and in ny opinion unsuitable for broadeast. Comparing

my viewing of KRSD-TV over the several years I have bad ovcasion to view

this station, I might make the o' servation that the quality of the picture hax

somewhat improved during the : * year; but in view of the overall improve-

ment in the suite of the art sine — -rst viewed KRSD-TV about nine years ago,

there is a question 2s to Wheth 9: «uy small improvement noted is due to the

licensee's efforts or the better quatts of network feed. (October 16, 1960, MeKin-

ney Statement.)

46. On December 3. 1969, 2 Continuation of Official Notice was sent

the licensees by the Commission's Denver Field Office. This notice re-

lated to the inspection of KDSJ-TV on July 29, 1969, and Danicis’

September 25. 1969 response to that notice. ‘The notice asked for as-

surance that the station was in compliance with the Commission’s rules

in the following respects:

Item 7: Sections 73.687(a) (2), 73.G87(2) (3), 73.687(2) (6), 73.G87(i) (1) and

73.699 Figure 5. Measurements indicated spurious signals above and below the

visual carrier as follows: Visual minus !.% MHz=—15 db; Visual minus ¥.0

MHz=—20 db; Aural plus 4.5 MHz=—15 db.

All measurements were respective to visual carrier.

Please advise the corrective action obtained.

47. On December 17. 1969, Daniels responded to the continuation of

notice. His response read :

Since my last letter of September 25. 1969, we have Gone quite a bit of work on

our KDSJ-TV transmitter towards the objective of eliminating the noted spuri-

ous Signals. It is believed, at the time of this writing, that the objectionable

spurious signals have been eliminated.

First. 1] would like to give a condensed summiury of the procedure which we

undertook to climinate the spurious signals (details are available from our

maivtenance logs).

To begin with. we eliminated our antenna system from the output of the di-

plexer outward by substituting dummy loads at the output of our dipexer. Spuri

ous signals still prevailed. (Note: Our methods for determining the existence of

spurious signals is shown by Fig. 1 and 2 on separate sheets attached. )

Ry the process of elimination we detected that spurious signals were generated

in the FM Aural exciter. It was determined that the last three stages (which are

on frequency) had excessive gain and also not well neutralized. Thereby, the

stages acted as a receiver and picked up the visna! carrier and intermodulation

incurred. To eliminate the provlem. it was necessary to eliminate one stage and

redesign the other two stages tor proper neutralization.

Next, procedure was to go through and check neutralization of all other stages

in hoth transmitters. This completed. we again checked for radiation of spurious

siguals from our antenna system. We found that on measuring as per Fig. 1 and

2, we still detected spurious signals, however, much lower in amplitudes and

almost within tolerances. We then proceeded to check our antenna system once

again. lt was determined that we were feeding too strong a signal from our

off-the-air antenna into onr measuring equipment. By reducing the R-F. signal,

the readings of the respective spurious signals were reduced (i.e. reduced with

reference to the visual carrier).

32 F.C.C. 2d

26a

226 Federal Communications Coniunission Rv ports

Exainples of our ene results ore as fellows :

With one volt K.F. inte Side-band analyzer and with Tectrenioe scope set for

full gain, spurious sizuals just barely discernible db gain of scope set for Goeth

gun after vis. reference signal estabiished at appresimately 3 centimeters,

Therefor, spurious signals as measured hereby much lower thon Go dl ;

Using the method as per Fiz. 2 «Blonder Tongue Field Strencth Meter) > Ome

yolt R.F. in: Vis. set to read one volt.

Vis. minus 4.5 mbs, reading was TD imv 5S db down

Vis. minus 2.0 mbs, reading was about 70 ab down

Aur. plus 4.5 mbhs. reading was 1 mv 60 db down

0.7 volts RLF. signal inte 1.3. meter at Visual carrier

Vis. minus 4.5 mbhs. reads 0.7 mv/m 60 db down

Aur. plus 4.5 mhs. reads 0.3 miv/im 77 db down

Note: Also with 0.7 volts R.F. into Side band analyzer per Fig. 1, no discernible

spurious signals visible on scope.

Deduction was/is that when spurious signals are noted on the field strength

meter and/or sweep/scope method. the R.F. signal feed is too hich and thereupon

the instruments create spurious sienals of their own. As we reduced the KF.

signal input, the spurious readings reduced to greater leveis below the referenced

signal.

CONCLUSION:

As stated above, it is believed ibet spurious signais have been climinated from

the KDSJ-TV transmitter. We believe that the readings we do get with the tic'c-

strength method (Fig. 2). which are below 60 db, are created in the instrument.

We have on order a new field strength meter so that we may make further checks

on this issue.

CONCLUSIONS

= (1) There can be no doubt that in both 1966 and 1967 KRSD-TV

and KDSJ-TV were in substantial violation of Commission rules. So

bad were the stations’ operations that. during that period, hundreds

of viewers complained to the Commission over the poor quality of the

service they were receiving from the station.

(2) At the hearing. the fact of the existence of the violations was

driven home hard to the licensee. Moreover, the areas of needed cor-

rection were clearly outlined. By the end of the Rapid City sessicn of

the hearing the licensees were in possession of chapter and verse us to

recisely where the teclinical weaknesses of their stations lay. Follow-

ing recess but before close of record, the licensees had ample time in

which to take comprehensive corrective action. However, an inspection

of the stations, carried ove after licen-ves had had plenty of time within

which to put their technicai house in order, found the stations still in

substantial violation of the Commission rules. Further, response to

these latter charges of violations. while they do reflect considerable in

the way of good faith effort to reform, follow an all too familiar pat-

tern of being Jong on explanation and short on firm assurance that the

problems which gave rise to the violations have been eliminated to the

extent that elimination is within licensees’ power. With such: a back-

ground, it is not easy to find justification for renewal of the stations’

licenses.

(3) The Examiner is by no means unaware of the ease with which

the public interest baby can be emptied out in a tears-of-syimpathy

bath. On the other hand he is convinced that the sweep of the public

interest standard is not so narrow as to preclude thought ful considera-

tion of extenuating circumstances that may accompany conduct that

32 F.C.C. 28

27a

Heart of the Biach WWiils Stations, The, et al. 2°7

otherwise would call for preeimptory termination of stewardship. Here

the licensees are sore beset. ‘They piencered their field. They work hard

for small remuneration. Their market is small. ‘Their competition is

great. Their purse is thin. They suffer manpower shortage, Seme of

their basic equipment is ineflicient. Their source of network signals is

fallible. The weather is tieir enemy. And, it shoukl be noted that

ealled to account they have not been cavalier but, rather, cooperative.

Moreover, their ctiorts at. reform have met with some suecess.

(41) The question of whether or not. to renew is a hard one, On the

one hand is the need to protect the public from incursions on its interest

by the Incompetent. pe inept. On the other hand, it is no easy matter

to take the bread and butter outof men’s mouths. Jn the ordering

clause below the Examiner has attempted to reconcile these conflicting

considerations.

Accordingly, IT IS ORDERED that, unless an appeal is taken from

this Initial Decision to the Commission by a party or the Commission

reviews the Decision on its own motion in accordance with the provi-

sions of Section 1.276 of the Rules, the applications for renewal of the

licenses covering KRSD-TY., Rapid City, South Dakota, and KDSJ-

TV, Lead, South Dakota. are GRANTED FOR A PERIOD OF ONE

YEAR. In making the foregoing recommendation it is contemplated

that prior to the next renewal application a further inspection of the

two stations will be made.

Fevers, Communications Commisston,

Tuomas H. Doxanve, Wearing Examiner.

2 In this connection the Commission may wish to review its decision in Star Stations of

Indiana, Inc., 19 F.C.c. 2d 991, 17 RR 2d 491 (1969).

32 F.C.C. 2d

a as

ig a all

we nteeeed

Ib

APPENDIX B

196 Federal Communications Commission Reports

F.C.C. 71-1102

BEFORE THE

FEDERAL COMMUNICATIONS COMMISSION

Wasiurnaton, D.C. 20554

Tn the Matter of ‘

Ext ann Harry Danrers, v.p.a. Tue Heart or} Docket No. 18358

THE Buack iris Stations File No. BRC T-410

For Renewal of License of Station

KRSD-TYV, Rapid City. S. Dak.

Ext anp Harry Danxwris, »..a. ‘Tne Heart or| Docket. No. 18359

me Buack Hing Stanoxs File No. BRCT-a64

For Kenewal of License of Station

KDSJ-TYV, Lead, S. Dak.

APPEARANCES

Samuel Miller and Stephea A. Gold, on behalf of Eli end flarry

Daniels, d/b/as The ITeart. of The Black Hills Stations: and 22ichard

M. Riehl, on Behalf of the Chief, Broadcast Bureau, Federal Com

munications Commission.

DEcIsIon

(Adopted October 28, 1971; Released November 1, 1971)

Commissioner Bartiry For THE Commission : Comuussionens Rowrrt

KE. Ler anp Rew NOT PARTICIPATING.

1. This proceesling involves the applications for renewal of Heen.cs

of television Lroadeast stations KRSD-TYV, Rapid City and KDSJ-

TV. Lead. South Dakota, filed December 22. 1967. by Eli and Liarry

Daniels. db /as The Heart of The Black Hills Stations. Action on the

renewal applications was deferred on April 1, 1968. because of the

roblems and issues raised by Official Notices of Violation dated

September 27. 1966, and Octoher 24. 1967, concerning Station KNSD-

TY. and Official Notices of Violation dated September 27, 1966 (cor-

rected copy dated November 4, 1966) and October 24, 1967, concerning

Station KDSJ-TV.

2. By Memorandum Opinion and Order, FCC 68-1032, released

Ociober 21, 1968, we designated the above applications for hearing.

The following issues were specified :

(1) To determine the nature and extent of the violations of the

Commission Rules and Regulations by the licensees of Station KRSD-

TV, Rapid City. South Dakota, as disclosed by Official Notices of Vio-

lation issued against that station on September 27. 1966 and October 24,

1967, by the station’s responses thereto, and by related documents:

(2) To determine the nature and extent of the violations of Com-

mission Rules and Regulations by the licensces of Station KDS.J--TY.

Lead, South Dakota, as disclosed by Official Notices of Violation issued

82 F.CC. 2d

re

2b |

Heart of the islack Mills Stations, The, ct al. 197

against that. station on September 2... 1966 (corrected Nevember 4, |

1966) and October 24, 1967, by the station’s responses thereto and ivy

releated documents;

(3) To determine whether the licensees’ management and operation

of Stations KRSD-TV and KDSJ-TV was so negligent, careless. or

jnept. or evidenves such disregard for the Commission’s Rules and :

Regulations, that they cannot be relied upon to fulfill (he responsibili-

tics Imposed upon them; and . j

(4) To determine, in light of the evidence adduced under the fore-

going issues, whether the Jicensees of Stations KRSD-TV and KDs.1--

TV are qualified to received (sie) renewals of these licenses and :

whether renewal of these licenses would serve the public interest.

3. Subsequent to the Designation Order, but before the record was

closed, the stations were reinspected. Oficial Notices of Violation were

issued for KRSD-TV and WK DSJ-TV on August 15,1969. Jn an Tnitial

‘Decision, FCC TOD-28, released July 17, 1970, Wearing Examiner j

Thomas II. Donahue concluded that the public interest weighed in ;

favor of granting the licensee a short-term, one-year renewal even

though the stations were in substantial violation of the rules in 1966 :

and 1967 and that the licensee had failed “in impeaching, to any sub- ;

stantial degree, the validity of the violations charged” as a result of :

the inspections. (/nitial Decision at 28). The renewal recommenda-

tion was made in contemplation that the stations would be reinspected

before the next renewal period. exceptions to the Initial Decision and i

a brief in support thereof were filed by the Chief, Broadcast Kur cau 4

on August 17. 1970. ‘The Heart of the Black Hills Stations filed an

opposition to the Bureau's exceptions and supporting brief on Septem- ;

ber 2, 1970. On October 1, 1971, the Lroadcast Bureau filed a petition 4

to update the record to reflect the results of the laicsi inspections of the 1

stations: Official Notices of Violation issued against KRSD-TV on

June 22, 1971 and Official Notices of Violation against KDSJ-TV on ;

June 8 and 24, 1971. é

4. Oral argument was held before the Commission cn bane on 4

October 7, 1971. The findings and conclusions of the Examiner have 4

been considered in light of the exceptions, opposition and brief filed, j

and of the oral argument and the petition to update the record. We

hold that the applications for renewal of licenses must, in the circum- ;

stances, be denied. While we disagree with the xaminer’s ultimate a

conclusion that the applications should be granted for a one year term 4

we adopt his findings and conclusions, except as modified in this deci- 4

sion and in our rulings on the exceptions as set forth in the Appendix.

5. The licensee admits that it has “been guilty of occasional mis-

management and negligent operation of the stations,” ? but it contests

the Bureau’s position that denial of renewal is the proper penalty.

Instead, the licensee argues that there are extenuating circumstances

and that the short-term renewal recommended by the Examiner is

reasonable in light of the facts of this case.

1 The petition bas been consicered and will be grauted.

* Opposition to Broadcast Kureau's Exceptions and Brief in Suppirt of Exceptions, filed

September 2, 1970, by The Heart of the Black Hills Station at 3.

82 F.C.C. 2d

BEE Noli SSE. AA it RECN Ee en,

Mtn eed

kai Perc ibieth wn dade wel Cee

sia da eae A LE aS A i Doll Rie

Sr ee,

Pee a

=

EZ ove

Le WEY PES

3b

198 ‘ederal Communications Commission Reports

6. We disagree, While no one of the multitude of rule violations *

found to exist in this proceeding would ordinarily form a basis for

denial of renewal, the record here demonstrates that. The Heart of the

Black ILills Stations’ operation of stations KRSD-CV and KDSJ--TV

was conducted in an exceedingly careless, inept, and negligent. manner,

and that the licensee is either ineapable of correcting or unwilling to

correct the operating deficiencies shown by this uncontroverted record.

Tn this light, we are compelled to the conclusion that. renewal of these

licenses is not warranted. We take oflicial notice in this regard of the

material contained in the Broadcast: Buress’s petition to update the

record, filed October 1, 1971. to reflect. the results of the most recent

inspections of the stations and the violations found at those inspections.

7. The record in this proceeding and the Examiner's detailed find-

ings show that these stations have had a long 10-year history of re-

peated and serious violations of the Commission's Rules and Regula-

tions governing the technical requirements for operation of broadeast

stations. These violations included, but were not limited to. such basic

matiers as faulty tower lighting deficiencies, operation below author-

ized power, spurious emission, maintenance Jogs, and such serious

deficiencies in the quality of picture transmission that they were virtu-

ally unviewable. The tower lighting violations present an obviously po-

_tential air safety hazard, and the spurious emissions are ona frequency

close to that of an air trafic control frequency. With respeet to the

quality of the video signal being transmitted to the public. the record

establishes that, because of its serious technical and operating defi-

ciencies. the licensee has not twen providing the Rapid City and Lead

communities with a picture of usable quality since at least 165,

Tn this regard. we find it to be particularly relevant that we were

compelled in 1966 to grant an unusual waiver of ow CATV carriage

and non-duplication rules (Section 74.1103) to the Rapid City CATV

systein. because KRSD-TV was providing a sienal of such poor

quality that it was not usable by the cable svstom. Black Ii), Video

Torporation, 2 FCC 2d 243 and 465 (1966). Accordingly. we re-

lieved the cable system of the rules requirements “until such time

as it appears that KRSD is providing a signal of acceptable quali-

ty... .7 2 FCC 2d at 466. It is now more than five years later. and

the waiver is still in etlect.

§. Further evidence amassed in the record of the licensee's failure

to provide even a minimally adequate technical service to its public

is atforded by: a petition signed in 1967 by 2.000 viewers in Repid

* The Examiner found that one or both of the stations were guilty of. »mong others, the

following violations: (1) emission of spurions signals; (2) operation below authorized

wer; (3) reference white level and set-up not properly maintained; (+) improper color

rst amplitude: (5) susintandard wiring and shielding; (G6) antenna tower lichtiug

violations; and (7) loce not properly maintained or unavailable to Inspector at time of

inspection. Initial Decixion, FCC 7OD-28. released July 17, 1970 at 2S ane 44-45. Sev ale

Initial Deciaion at 4-11, 12--15, 19-21, 27-29 and 21-23. The licensee committed 36 In-

fractions of 33 separate rule violations during the 1968 and 1967 inspec:ions alone. ‘Lhe

net effect of these teclinical violations was to deprive the public of a viewable picture.

*KDSJ-TV, Lead. S.D. operates asa satellite of KRSD). Rapid City, being fed tie latter's

Programs via their licensed private inter-city mierownte link, Thus. the degraded quality

of the originating signal at Rapid City is likewise transmitted to KDSJ-TY at Len.

22 F.C.C. 2d

4b

Heart of the Black Hills Stations, The, ct al. 199

City concerning the poor picture quality of the stations whieh re-

qnested the Commission and NBC to attempt to improve the servige ;

the testimony to this efect at the hearing by several public witnesses :

and the fact that the Comniission’s inspector found the KRSD TY

Picture unsuitable for broadeast. as late as the July 1969 inspections.

The Examiner found. moreover, that the hearing had clearly out-

lined those areas where technical corrections were needed and that,

by the time of the July 1969 jnspections following the end of the

‘Rapid City phase of the hearing, ample time had clapsed to enable

the licensee to take comprehensive corrective steps. Yet (he 1969 in-

spection found KRSD-TV and KDSJI-TV s#/7 in substantial viola-

tion of the same rules that the 1966 and 1967 inspections found, all

of which resulted in a serious adverse impact on the quality of the

picture being broadeast to the public. Since the licensee's stations

were the NBC afliliates in the markets, it is clear that the commuani-

ties were being effectively deprived of that network's programs _Ubis.

fact, in conjunction with the continuing waiver, avprv, raises the

undamental issue of whether this licensee is technically qualified to

“Temain 2 licensee of these stations, We believe that it is not, anc we

‘are of the opinion that the Examiner failed to give suflicient weight

to this serious and adverse impact which the licensce’s violations had

on its cbligations to render a satisfactory service to the public.

9. One of the underlying purposes of the Communications Act

of 1934, as amended. is ta provide an efficient and adequate broaceast

service to the people of the United States. The Commissien is direeted

by the Act. smong other things. to “regulate the kind of apparatus

to be used with respect to its external effects and the purity and siarp-

ness of the emissions from each station and from the apparatus there-

in.” (Section 503(¢)). The Courts have long recognized that vie

Commission's regulations governing teelinieal operation of breadeast

stations “are vitally essential to the maintenance of adequate radio

Veeption and service.” and have upheld the Commission's refusal to

“renew the license ‘of a broadcast station which had repeavcdly violated

the Commission’s technical regulations. Greater. Noi peska Radio

Corp. ve. F.C.C.. 108 ¥. 205.7 (D.C. Cir. 1939).

10, The Commission is normally reluctant to deny renewal of a

broadcast license solely for violations of its technical rules. Yet ir

must. be recognized, as we have done in the past, in carrying out our

statutory responsibilities that: eee

[OJne of the most essential duties incumbent upon the licensee of a bread-

¢ast station is that of insuring the continuous operation of the transmitting

equipment. In fact, this is an indispensable condition to the gond service of any

station. Failures of this equipment, due ‘to causes reasonably within human

control, whereby the public is deprived of service, denotes a state of carelessness

and mismanagement which this Commission, in the’exercise of its regulatory

authority, will not condone. gd

Brooklyn Browtcasting Corporation. et al, 4 FCC 521 at 531. (1937).

See also Charles C. Carlson (WIBW) et al; 12 FCC 902 (Us),

aff'd 172 F. 2d 766 (1).C. Cir. 1949), Cert. denied 337 U.S. 950 (19).

~ Therefore, when we are presented with a record, as las been es-

tablished in this hearing, of at least 10 years of violations of sub-

nan jeqetetion of Rapid City 1s 43,836. Lead has a pepelation of 5.420 (1970 Census).

net weekly circulation is 23,000 (Source: ARB Television Market Summary,

KR

Feb-March 1971). It can thus be seen that the 2,000 signatures on this petition represent a

significant portion of KRSD's audience. ° ” 4

82 F.C.C. 2d

DS igh 9p OB ATP AR i RE NA

ei

Sb

200 Federal Communications Commission Reporis

stantially the same rule requirements for satisfactory operation,

which violations have had the cumulative offect of depriving the

public of the very service for which the licenses were originally

granted, then we are virtually compelled to the conclusion that re-

newal is neither justified nor warranted, in the public interest. Wo

must, in the present circumstances, agree with the position taken

by the Broadcast Bureau that:

The vumber, vature and extent of the violations reficcted iu the record of

this proceeding represent pcrhajs the most flagrant dereliction of a licensee's

responsibility in the operation of its tclevision stations that bas yet tv come

before the Commission. ‘

(Broadcast Bureau's Exception No. 5 at 13).

11. We, therefore, conclude that the licensee cannot be relied upon

to operate these stations in the future in accordance with the require-

ments of its licenses and the Commission’s Rules; that it is either

technically incapable or unwilling to correct operating deficiencies

when brought to its attention; and that it is, therefore, not qualified

to remain a licensee of hese stations.®

12. Accordingly, IT 1S ORDERED, that the F soy to update the

record, filed October 1, 1971, by the Chief, Broadcast Bureau IS

GRANTED.

18. IT IS FURTHER ORDERED, That the above-captioned

applications of The Heart of the Black Hills Stations for renewal of

licenses of television broadcast stations KRSD-TV, Rapid City, and

KDSJ-TV, Tead, South Dakota, ARE DENIED.

14. IT IS FURTILER ORDERED, Thai in order to enable Tie

Heat of the Black Hills Staiions to wind up its affairs IT IS

AUTHORIZED to operate stations KRSD-TV ani KDSJ-TV until

12:01 a.m., December 31, 1971; PROVIDED, however, thai ii The

Heart of the Black Hills Stations seeks rehearing and/or judicial

review of our Decision. it is authorized to continue to operate stations

KRSD-TV and KDSJ-TV until thirty (30) days after the final dis-

position of such appeal.

Feperat Communications Commission,

Ben F. Wapte, Secretary.

pr tl ah nn ane We iin MO Ie eS A Penh re Nee 5d T

APPENDIX

Rulings on Exceptions of the Chief, Broadcast Bureau to the Initial Decisions.

Zeception No. Rulinge

Granted for the reasons stated in paragraphs 6-10 of our

Decision herein.

$9 GRE 4... ncccccaae — The requested rulings are not decisionally signifi-

can

5 Granted. The findings and conclusions of the Examiner

as supplemented herein require denial of the reuewal

applications in the public interest. See also paragraphs

6 and 10 of our Decision herein. :

© We note that the licensee has ed, in extenuation. that it has lacked a J

resources to remedy the deficiencies above described, including replacement of a KRSDeTV 4

transmitter. This contention may, in turn, raise questions as to the licensee's Gaancial é

qualifications to continue operation. However, resolution of that issue is not necessary to

our decision.

82 F.C.C. 2d

NE Is Pee ot Ae oe

ee eee rr ete ee eT |

Py she tA Baty ds be

en ee

Ic

APPENDIX C

Before the

FEDERAL COMMUNICATIONS COMMISSION

Washington, D.C. 20554

In the Matter of ) FCC 72-665

: ) 79946

Eli and Harry Daniels, d/b/as )

THE HEART OF THE BLACK ) DOCKET NO. 18358

HILLS STATIONS ) File No. BRCT-410

For Renewal of License of )

Station KRSD-TV )

Rapid City, South Dakota .

Eli and Harry Daniels, d/b/as )

THE HEART OF THE BLACK ) DOCKET NO. 18359

HILLS STATIONS ) File No. BRCT-564

For Renewal of License of

Station KDSJ-TV )

Lead, South Dakota )

MEMORANDUM OPINION AND ORDER

Adopted: July 26, 1972

Released: August 1, 1972

By the Commission: Chairman Burch absent; Commis-

sioners Reid and Wiley abstaining

from voting; Commissioner Hooks

not participating.

1. The Commission has before it for consideration: (a)

a petition for reconsideration of our Decision, FCC

71-1102, 32 FCC 2d 196, released November 1, 1971,

denying the above-captioned applications, filed December .

1, 1971, by Eli and Harry Daniels, d/b/as The Heart of

The Black Hills Stations (Black Hills); (b) a petition to

erates Dientncnmnasta teeta

reopen and update the record, filed December 1, 1971 by

Black Hills; (c) a supplement to petition to reopen and

update the record filed December 2, 1971 by Black Hills;

(d) an opposition to the petitions for reconsideration and

to reopen and update the record, filed December 13,

1971 by Chief, Broadcast Bureau; and (e) a reply to the

Broadcast Bureau’s opposition, filed January 6, 1972.

2. The history of this proceeding has been adequately

detailed in our order designating these applications for

hearing, FCC 68-1032, released October 21, 1968, and in

Hearing Examiner Donahue’s Initial Decision, FCC

70D-28, 32 FCC 2d 201, released July 17, 1970, granting

a one year renewal of the licenses of KRSD-TV, Rapid

City, and KDSJ-TV, Lead, South Dakota. By Decision,

FCC 71-1102, 32 FCC 2d 196, released November 1,

1971, we reversed the Initial Decision and denied renewal

of these licenses in light of the licensee’s long history of

technical rule violations which have had the cumulative

effect of depriving the public of the licensed service.

Black Hills has now filed petitions for reconsideration of

the Decision and to reopen and update the record, which

petitions are opposed by the Broadcast Bureau.

3. Black Hills’ petitions for reconsideration and to

reopen and update the record, urging reconsideration of

the Commission’s denial of renewal of the licenses of

KRSD-TV and KDSJ-TV, rely principally on the

following contentions:' (1) the Commission relied upon

a mistake of fact concerning continuation of the waiver

of the CATV rules? in denying the renewal applications;

1 Arguments made in the petitions which were previously raised

by Black Hills and disposed of by the Commission, will not be

dealt with herein.

? Black Hills Video Corporation, 2 FCC 2d 243 and 465 (1966).

In 1966, we granted a waiver of our CATV carriage and

non-duplication rules to the Rapid City CATV system because

EE

» Aaah eae the. ASC dp E se: On

3c

(2) the stations’ picture quality has improved; (3) many

of the causes of the rule violations were beyond human

control; (4) its explanations of the rule violations were

disregarded by the Commission; and (5) it lacks sufficient

funds to replace inefficient equipment. The opposition

filed by the Broadcast Bureau contradicts these

arguments and strongly urges denial of both petitions. In

the interest of a more comprehensive understanding of

the points raised by these pleadings, we will deal with the

various contentions. made by the licensee, and the

Bureau’s oppositions thereto, according to the subject

matter involved.

Withdrawal of CATV Waiver Request

4. Black Hills claims that the Commission was in error

when it stated in the Decision denying renewal of KRSD

and KDSJ, that the CATV system’s requested waiver of

the carriage and non-duplication rules, Section 74.1103

of the Rules, was still in effect.? Black Hills argues,

however, that the cable system withdrew its waiver

request by letter dated July 5, 1968, as part of an

agreement between KRSD and Multi-Pix of South

Dakota, the then owner of the cable system,‘ and it

KRSD-TV was providing a signal of such poor quality that it was

not usable by the cable system. Black Hills Video Corporation, 2

FCC 2d 243 and 465 (1966). In our Decision denying Black Hills’

renewal applications, we stated that this waiver was still in effect.

332 FCC 2d 196, at 198.

“The agreement was not implemented until August 25, 1969.

This delay in implementation resulted from a provision in the

agreement requiring that KRSD receive its network signal from a

common carrier, Mountain Microwave Corporation, whose

construction permit-renewal applications were not granted by the

Commission until August 13, 1969. Mountain Microwave

Corporation, 18 FCC 2d 1016 (1969).

attaches copies of the letter and agreement to its

petitions as “Exhibits 1 and 2.”* It therefore contends

that KRSD’s signal has been of “usable quality since late

1968.” (Black Hills’ Petition for Reconsideration at p. 3).

5. The Broadcast Bureau finds meaningless the

licensee’s reliance upon the CATV operator’s request for

withdrawal of the waiver of the carriage and non-

duplication rules. First, the condition precedent which

the Commission placed on lifting the waiver, i.e.,

KRSD-TV’s providing a picture of “acceptable quality” ,®

has not been met. Additionally, the CATV operator’s

July 5, 1968 letter? to the Commission asking

withdrawal did not affirmatively advise the Commission

that KRSD was providing a picture of acceptable quality.

The withdrawal was based solely upon an agreement

between Black Hills and the CATV operator.*® Secondly,

the Bureau argues that the above agreement dispels any

inference that by 1968, Black Hills was providing a

viewable picture because, by its terms, the agreement

permits the cable operator to duplicate all KRSD-TV

network programming except for the distant station’s

local commercials and station identifications,? thereby

Sit should be noted that the aforementioned letter and

agreement, attached to Black Hills’ Petition as “Exhibits”, are not

part of the record of the hearing to date, and have not heretofore

been offered or relied upon by the licensee.

© Black Hills Video Corp., 2 FCC 2d 465 at 466, adopted

February 2, 1966.

7 Black Hills’ Petition for Reconsideration, Exhibit 1.

® Jd., Exhibit 2.

9 Jd. Exhibit 2 at p. 2 paragraph 4, which provides as follows:

“4. KRSD-TV agrees to permit CABLE [Multi-Pix] to

receive all of its programs and to receive all duplicating

programs as provided by . . . (?) (sic) [copy not legible] from

5c

insuring an alternative and dependable programming

service.

6. In repiy, Black Hills dismisses the Bureau’s opposi-

tion, arguing that, because the waiver was granted only

on the basis of pleadings, the Commission never made its

own determination of KRSD’s picture quality.’° More-

over, it claims that, in 1966, KRSD requested non-

duplication protection because of improved picture

quality prior to the request for withdrawal of the

waiver.'? However, this request was not acted upon by

the Commission.

Picture Quality

7. Black Hills argues that the record does not support

the conclusion that it has not provided a picture of usable

more distant TV broadcast stations during the term of this

Agreement, and KRSD-TV hereby waives any rights with

which it might be conferred under FCC rules to demand

deletion of programming by CABLE.”

This argument may not be in keeping with the facts. The

Commission’s files indicate that the 1966 waiver was granted not

only upon the basis of the CATV system’s pleading (to which

KRSD never responded), but also on the basis of information

available to it, disclosing that the KRSD signal “was of such poor

quality that it was not usable by the cable system.” (See

Commission Memoranda Opinions and Orders, of January 5 and

February 2, 1966, 2 FCC 2d, 243, 244, and 465, 466,

respectively.)

"The licensee’s Reply to Broadcast Bureau’s Opposition also

has attached to it what is termed “Exhibit 1”, which consists

apparently of copies of letters from its counsel and Black Hills to

the Commission, dated September 6 and 7, 1966, respectively,

requesting reimposition of the non-duplication condition by the

CATV system. Here, again, as in the situation noted in footnote 5

supra, there is no indication that these letters were offered

heretofore by the licensee for the record of the hearing herein.

i

quality since 1965. In support of its argument (in

addition to the CATV waiver argument, supra), Black

Hills claims that, while a majority of the six public

witnesses who: testified at the hearing as to picture

quality said that the picture had been unsatisfactory prior

to the fall of 1968, there had been a marked improve-

ment subsequently. Black Hills also challenges the

importance and validity of the 1967 petition signed by

2,000 viewers protesting the picture quality of the

stations, which the Commission stressed in its Decision.

In contrast, the licensee points to its Petition to Reopen

and Update the Record, which includes a compilation of

copies of viewers’ letters solicited over KRSD-TV and

KDSJ-TV,'* which Black Hills claims attest to the

viewability of the stations’ signals. In addition, petitioner

states that it has a thousand more letters in its files

which, it contends, are evidence of its service to the

public. Black Hills notes that B.H. Dail, who circulated

the 1967 petition, sent KRSD a letter attesting to the

improved quality of the service from KRSD and KDSJ.

Moreover, it is argued, the FCC Inspector’s July 1969

finding that the picture was unsuitable for broadcast

should be limited to the short period of time when he

was in Rapid City.

8. The Bureau rejects Black Hills’ principal claim of

factual error (ie., the Decision’s finding that the stations

had failed to provide a viewable picture since 1965), and

quotes the licensee as saying that “the only time I failed

to provide the public with a viewable picture, was during

the three year period prior to the designation” order in

2The Petition to Reopen and Update the Record contains the

above letters from viewers, as well as an affidavit from Eli Daniels

explaining the reasons for the various rule violations.

Tc

1963. (Broadcast Bureau’s Opposition at p. 6).'* This

amounts to an argument by Black Hills, the Bureau

asse‘ts, that it only failed to provide a “viewable”’ picture

for 3 years. No decisional significance is found by the

Bureau in the asserted error because, they state, it is

irrelevant whether the licensee failed to provide a

viewable picture for 3 years instead of 5 years; what is

relevant is the failure for an extended period of time.

9. The Bureau points out that the licensee’s claim of

factual error is premised upon three contentions, each of

which the Bureau rejects, to wit: (1) the 1968 withdrawal

of the request for waiver of carriage and non-duplication

rules; (2) the contention that the record establishes that

the public was provided with a viewable picture from late

1968 through the hearing in March 1969; and (3) the

clain that the results of the 1969 inspection (i.e., that

KRSD was transmitting a picture unsuitable for broad-

cast) must be limited to the period when the FCC

inspector was actually in Rapid City.

1¢. The Bureau’s response to the first argument

(withdrawal of waiver request) has already been sum-

marized in para. 5, supra. As to the second argument

regaxding picture quality, the Bureau concedes that the

1%Jack Hills charges that the Bureau distorted the record and

the liensee’s contentions in “manufacturing” the quotation to the

effect that only during the three year period prior to designation

did i fail to provide a viewable picture (Reply to Broadcast

Bureat’s Opposition to Petitions for Reconsideration and to

Reopen and Update the Record at p. 2 quoting from the Broadcast

Burea’s Opposition at p. 6). Black Hills denied making such a

statenent or that such a statement could be inferred from the

recoré. It claims that the Bureau devised the word “unviewable”,

which never was used by the licensee. While Black Hills admits that

some public witnesses characterized its picture as “unsatisfactory”

or “unreliable”, it argues that such terms are not equivalent to

“unviwable”.

licensee provided to the public with a viewable picture

from late 1968 through March 1969;!* however, it does

not regard this as proof that such improved service has

continued, which it asserts is the real factor of decisional

significance. What the Bureau claims to be really signifi- .

cant is the fact that, despite the Examiner’s statement

during the hearing on April 17, 1969, that he “was

disposed to deal lightly with the licensee” if the

remaining problems were cleaned up within 90 days, the

service again reverted to its previous “unsuitable for

broadcast” level within that same 90 days after the staff

concluded the hearings in Rapid City in mid-March 1969.

The latter situation was established by the results of the

July 30, 1969, inspection. From this, the Bureau con-

cludes that apparently only the physical presence of the

Commission’s staff in Rapid City can insure that the

licensee will operate its stations satisfactorily and in

compliance with Commission Rules. As to the third

argument, the Bureau states that Black Hills misconstrues

its burden when it claims that the proof regarding picture

quality must be limited to that period in 1969 during

which the FCC inspector was in Rapid City. It points out

that the same lack of video components, which the

licensee admits made its picture unsuitable for broadcast,

was present during the inspections of 1961, 1966, 1967,

1969 and 1971; that the only proof offered by the

licensee that these deficiencies were due to causes other

than broadcast equipment were statements on those

occasions by the licensee’s principal to that effect; and

that the record establishes that such excuses had no basis

in fact. The Bureau therefore submits that Black Hills has

141t should be noted that this period coincides with and spans

the months from the designation for hearing (October 21, 1968)

through the Rapid City phase of the hearing (March 10-13, 1969).

9c

failed to show a basis in this regard for reversal of the

Commission’s Decision.

11. Turning to the viewers’ letters submitted by Black

Hills in support of its claims regarding picture quality, the

Bureau argues that they should be accorded little, if any,

weight in part because of the almost “deceptive’!’

broadcast announcements in the solicitation of the letters

by the licensee over KRSD and KDSJ. These broadcast

statements implied that the denial of the renewal

applications would permanently deprive viewers of CBS

programming and a second program source, whatever its

quality. The solicitation is characterized by the Bureau as

“deceptive” because it failed to state that the Commis-

sion has consistently taken all possible steps in other

similar cases to insure uninterrupted or promptly re-

established service. According to the Bureau, fear of a

lost program source was the primary motivation behind

F the letters and, therefore, greater weight should be

q

me Pee

accorded the reason the letters were written, rather than

the reasons advanced in the letters for renewal of these

; licenses. The Bureau contends further that even if the

3 letters were to be considered as indicating improved

; service since 1969, they could not affect this Decision

; because here the central question is whether this licensee

can be “relied upon to maintain this service in the

future.”” (Bureau’s Opposition at p. 17). The Bureau

answers this question in the negative and points out that

4 many of the letters confirm unsatisfactory service prior

$ to the designation order.

1S Broadcast Bureau's Opposition at p. 17.

10c

Rule Violations Caused by Factors

Beyond Human Control

12. Black Hills argues that the Commission’s reliance

on Brooklyn Broadcasting Corporation, 4 FCC 521

(1937), as authority for denying renewal, is misplaced.

That case, Black Hills argues, involved equipment failures

“due to causes reasonably within human control, where-

by the public is deprived of service, ...” and is net

applicable to the instant case, because here “in many

instances the violations were due to causes not within

human control.” (Black Hills Petition for Reconsidera-

tion at p. 4). In support of this argument, Black Hills

asserts: (1) that the 1967 tornado all but demolished its

antenna tower, (2) that “network service has been

poor”,’® (3) that KRSD’s Dumont transmitter, “though

type-approved at the time, is not much good” (/d.), (4)

that the picture at -the last inspection was impaired

because of water that entered the transmission line

through a crack, and (5) that VHF TV signals are subject

to fading during the summer months and that Black Hills

has had most trouble with its signal from the common

carrier from June through August, during which time the

stations were inspected.'’

13. The Bureau’s opposition takes issue with Black

Hills’ treatment of the technical violations attributed to

16In his affidavit, attached to Black Hills’ Petition to Reopen

and Update the Record, Eli Daniels states that he anticipated, at

the time of the hearing, receiving “a superior picture once service

from the common carrier,” Mountain Microwave, commenced.

However, he states that Black Hills has had picture problems with

this service. (Affidavit at p. 2).

171t should be noted, contrariwise, that the stations were in fact

inspected in September 1966, October 1967, July 1969 and May

1971. ;

Lathe Relieabhs seater’

ae Pt

ME Ok dae a BAS ES.

llc

its two television stations and its attempt to distinguish

Brooklyn Broadcasting Corporation, supra, from the

instant case. The Bureau argues that even if some of the

violations were the result of causes beyond human

control, Black Hills has failed to rebut its “long history of

failing to promptly re-establish the service when problems

did occur.” (Bureau’s Opposition at p. 10). In particular,

the Bureau notes that, for 8 years, the licensee failed to

correct transmission line support defects which permitted

the line to sway. Yet during this period, the Bureau

states, the licensee was not able to achieve and to

maintain authorized power because it claimed that wind

damage to the transmission line made it impossible to

achieve full power. Likewise, the Bureau’s opposition

points to a number of instances in the record, going back

several years, where known deficiencies were called to the

licensee’s attention and the latest inspections showed

they had not been corrected, despite the licensee’s

promises to do so. Referring to the 1967 tornado which

severely damaged KRSD’s antenna and tower causing a

multi-image picture, the Bureau notes that, in spite of

this serious damage, Black Hills did not file an application

for a new antenna to replace the damaged one until 7

months had passed. With this background, the Bureau

submits that the consequences of the wind damage were

not beyond human control. In response to the contention

that VHF signals are subject to summertime fading from

June through August, the Bureau notes that only one of

the last four inspections occurred in these months!® and,

therefore, it rejects this explanation of Black Hills’

deficient picture quality as found during the inspections.

In reply, Biack Hills seeks to clarify the VHF summer-

time fading argument by explaining that “summer”’, for

18].

|

Ban ahs Bares Nik

12c

the purposes of VHF-TV signal fading, includes the

months of May through September. Thus, the licensee

concludes that three of the four inspections were

conducted during “summer” months and that this, in

part, accounts .for its less than satisfactory picture

quality. The seven months’ delay in filing the antenna

application is defended by the licensee on two grounds:

first, that antenna problems are not quickly diagnosable,

especially absent a standby antenna; and, second, that

preparation of an antenna application is both compli-

cated and time consuming.

Lack of Funds

14. Black Hills refers to its application for a new

antenna system, filed in January 1968, to replace the one

damaged by the 1967 tornado.’® It argues that without

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.