Brief for the Respondent in Opposition — Federal Power Commission v. Greene County Planning Board

Supreme Court brief1972

Ask Donna

What actually matters in this document.

Text

f certiorari 7 FEDERAL POWER COMMISSION,

below re.

ted | GREENE COUNTY PLANNING BOARD, TOWN OF DURHAM,

NEW YORK, ASSOCIATION FOR THE PRESERVATION

OF DURHAM VALLEY, POWER AUTHORITY OF THE

STATE OF NEW YORK and THE SIERRA CLUB,

Respondents.

BRIEF OF RESPONDENT POWER AUTHORITY OF THE

STATE OF NEW YORK IN OPPOSITION TO PETITION FOR A

WRIT OF CERTIORARI

THOMAS F. MOORE, JR.

10 Columbus Circle

Suite 1800

New York, New York 10019

Attorney for Respondent

Power AUTHORITY OF THE

State or New Yorx

Scorr B. Litty

New York, N. Y.

i

of Counsel.

Angust 8, 1972

Sy eS

;

2 aie

iets ki

Le

INDEX

PAGE

rents in the proceeding .........sseeccvcccescons 3

Jurisdiction of the Commission ...............0005 11

Status of Commission proceeding .............005. 12

Status of project construction ............ee eee eee 15

Other pending cases involving interpretation of

Sa Aas ah eae cau ASERRERER ERA SRI EA 15

The urgent need for the line ..............eceeeee 19

The Authority’s position with respect to the opinion

IIE ep SA IOAN APR EE RS Segre rene a ae ee er 21

AEE IEE STOEL ETT SUT OEE TTE PTO 22

APPENDIX:

OPC order of Marek (, 1072 2... ccecesceccccncees la

og Be Be oy ae 6a

re SE EE Oy BO na ys Snes eravecececes ens 9a

Bru eter OF AUSUSE 4, TOTS occ i ercdecscccss 12a

Presiding Examiner’s notice of certification, Project

eb en ae eran eee l5a

Court of Appeals order modifying opinion ......... 18a

ii

CITATIONS

CAsEs: PAGE

Calvert Cliffs’ Coordinating Committee, Inc. y.

Atomic Energy Commission, 449 F.2d 1109... 17

Citizens for Cleon Air v. Froehlke No. 72 Civ. 2259,

Ge IG Ay Oe ML EE bn ve wc ancnawisacecancus 17

Kalur v. Resor, 335 F. Supp. 1 .................... 16-17

Scenic Hudson Preservation Conference v. Federal

Power Commission, 354 F. 2d 608, cert. denied sub

nom., Consolidated Edison Co. of New York vy.

Scenic Hudson Preservation Conference, 384 U. §.

Se anes ceksdeccuneebkeskk 4k ie dee ceenuan 13

Scenic Hudson Preservation Conference v. Federal

Power Commission, 453 F. 2d 463, cert. denied 32 L.

Rs EE sh ndu dada Wanddeonce bens eusauwss . BB

Sierra Club v. Hardin, 325 F. Supp. 99 ............ 7

Sierra Club v. Sargent, Civil No. 249-71C2, (W. D.

WU: OA SU EEE od icaNasmadeues vacen cove se 17

Students Challenging Regulatory Agency Procedures

v. United States, No. 971-72, (D. D. C. Jul. 10,1972) 17

Upper Pecos Association vy. Stans, 328 F. Supp. 332,

aff’d 452 F. 2d 1233, cert. granted, 40 L. W. 3556 .. 15,16

FepErRAL Power CoMMISSION PROCEEDINGS:

Arkansas Louisiana Gas Co., Docket No. CP70-267 .. 6

Columbia LNG Corp., et. al., Docket No. CP71-289,

OU sccndessncdudanetescseesouciistssesae .6, 17-19

Distrigas Corporation, Docket Nos. CP70-196, et.al. . 6

El Paso Natural Gas Company, Docket No. RP72-6 .. ; 6

Florida Gas Transmission Company, Docket No. |

gS eee seeVeteneessvaeedenunsranuens 6

Tecon Gasification Co., et. al., Docket Nos. CP72-100, ;

Cy sbcckawsaconecsessineseseseeuses

United Gas Pipeline Co., Docket Nos. RP71-29, et. al.

Utah Power & Light Co., Project No. 1744 ......... 6

iil

SraTUTES:

Federal Power Act PAGE

6012), 36-G. &. C. § FORCED) 2. ec cnccccccccs 11

Cite), BS WU. B.C. § TOT Ce) ... 5 cccccccncesscs 11

§10(a), 16 U.S. C. § 803(a) ....... 2.0... 13

National Environmental Policy Act of 1969 (42

U.S. C. § 4321 et seq.) ...... 2, 3, 5, 6, 13, 15-17, 19, 21, 22

Rivers and Harbors Act of 1899

Se Gee We BOOED enn vdeecéccewecwceacece 16

New York Public Authorities Law § 1005 .......... 12

REGULATIONS:

Federal Power Commission Rules of Practice and

Procedure, 18 C.F.R. § 2.81(b) (Order No. 415 as

SEE Keehn s LeU ae ewe nbadeved cone cawrecks 4,5,7,8

\[ISCELLANEOUS:

Guidelines of the Council on Environmental Quality 5)

Federal Power Commission Orders, Project No. 2685

Order of March 7, 1972 ....................... 8-10

Ce Ss ee 10, 12, 15

Order of July 5, 1972 . 0... ccc ccc ccc cc cccccce 11

Order of August 1, 1972 ..................... 11

Presiding Examiner’s Notice of Certification, Project

2685, dated February 9, 1972 ................... 8

IN THE

Supreme Court of the United States

OCTOBER TERM, 1971

No. 71-1597

FepERAL Powrer CoMMISSION,

Petitioner,

vs.

Greexe County PLannine Boarp, Town or Durnam, New

York, AssoclATION FOR THE PREsERVATION oF DuRHAM

Vattey, Power AUTHORITY OF THE StaTe oF NEw York

and THE Sierka CLus,

Respondents.

BRIEF OF RESPONDENT POWER AUTHORITY OF THE

STATE OF NEW YORK IN OPPOSITION TO PETITION FOR

FOR A WRIT OF CERTIORARI

This case involves a strictly procedural dispute between

the Federal Power Commission (Commission) and some

intervenors in a Commission proceeding who oppose con-

structon of a transmission line. Respondent, Power Au-

thority of the State of New York (Authority) and con-

sumers in New York State are unfortunately caught in

the cross fire.

The Authority opposes the granting of the petition for

a writ of certioravi on the grounds that:

1. A resolution of the issue which the petition asks

this Court to resolve under ‘‘QuEsTIon PRESENTED’’ was

not included in the judgment of the court below. By way

of dictum the court expressed the opinion that prior to

the start of hearings, which were in progress at the time

of the court decision, on a transmission line with respect

to which there is a contest, the Commission should have

2

circulated a draft environmental statement Prepared by

its staff with respect to the line.* However the court

allowed the proceeding for approval of the line ty continue,

directing that a draft environmental statement be pre-

pared and circulated and that intervenors be given ap

opportunity to cross-examine with respect to it prior ty

the Examiner's initial decision. Thus the dictum which

is the subject of the “QUESTION PRESENTED’? does not re-

flect the holding which was the foundation of the judgment,

(Pet. App. pp. 10a, 18a.) **

2. The case should be considered moot because the

Commission largely complied with the judgment of the

court below before countermanding an order it had given

its staff to comply. (The recission order Was made after

the Solicitor General agreed to petition for a writ of cor.

tiorari.)

3. This ease is not a proper vehicle for this Court’s

resolution of the several complicated questions which are

currently being considered throughout the United States

with respect to interpretation of the National Environ.

menta! Policy Act (NEPA) (42 U. S. C. $4321 ef seq.)

since: (a) this case at most involves only one of such ques-

tions and a narrow one at that; (b) other pending cases

involve additional questions as well; (c¢) the Commission’s

compliance with the order of the court below would require

virtually no additional functions to be performed by its

staff except circulation of a draft statement which has

already been prepared or virtually prepared and thus

*The Court also expressed the opinion that # draft environ-

mental statement should have been prepared and circulated by the

Commission prior to its making a determination With respect to two

transmission lines concerning which there Was no contest and no

hearing. It denied the relief sought with respect to those lines,

** References to the Solicitor General’s Appendix are to ‘Pet.

App.”’ References to the Authority’s Appendix annexed hereto

are to ‘‘A. App.”’

3

would impose no burden on the Commission; (d) granting

ihe petition would inevitably result in extremely serious

delay in the availability of transmission facilities urgently

needed to carry electric power, particularly to the New

York City area, and hence would be very much against the

public interest whereas review will undoubtedly be sought

in other cases where similar consequences would not result;

and (e) the merits of the case before the Commission are

not involved.

Events in the Proceeding

On August 15, 1968 the Authority applied to the Commis-

sion for a license to build a one million kilowatt pumped

storage hydroelectric project in the Catskill Mountains

southwest of Albany. (The project is known as the Blen-

heim-Gilboa Project.)

On June 6, 1969 the Commission issued a license for the

plant and three transmission lines connected with the proj-

ect switchyard but required that construction of the lines

be deferred until the Commission specifically approved

plans for design and location including ‘‘plans for pres-

ervation and enhancement of the environment as it may

be affected by the transmission lines[’] design and loca-

tion’.

Un June 16, 1969 the Authority accepted the license, im-

mediately started construction and proceeded to borrow in

stages approximately $200,000,000 to pay the cost.

On November 24, 1969 the Authority filed for approval

plans for the three transmission lines together with an

Appendix describing environmental considerations,

On January 1, 1970 the President signed NEPA and it

became effective on that date. (It had been passed by both

Houses of Congress in December, 1969.)

On April 10, 1970 the Commission after study by its

staff approved plans for two of the lines, there being no

opposition to them.

AAD RRD Sipe

4

There being opposition to the third line, largely by resi.

dents of Durham, one of the towns in Greene County through

which it would pass on its way to Leeds near the Hudson

River south of Albany, the Commission deferred action with

respect to it and granted petitions for intervention by re.

spondents herein (other than the Authority) and several

landowners in the Durham area.

On December 4, 1970 the Authority filed an amended

application for approval of the Leeds line containing a modi.

fication of the route first proposed and also an alternate

route avoiding most of Durham but traversing a good part

of the Town of Greenville in Greene County.

Also on December 4, 1970 the Commission issued its

Order No. 415 for the first time establishing regulations

implementing NEPA. (36 F. R. 18958, 18 (. F. R. §§ 2.80-

2.82.)

On March 15, 1971 the Town of Greenville which ob-

jected to removal of the proposed line location from Dur-.

ham into its territory filed objections to the alternate route

and moved to intervene. (Intervention was granted on May

4, 1971.)

On March 26, 1971 the Authority filed its Environmental

Statement with respect to the Leeds line in compliance

with the Commission’s Order No. 415. The Authority

circulated the Statement as required by Commission

regulations and gave it additional circulation and pub-

licity beyond that required by the regulations. In the

Environmental Statement the Authority described three

additional alternate routes for the line which were ad-

vanced by people objecting to the two alternates set forth

in the Authority’s amended application for approval. The

Statement made clear that the Authority did not consider

any of the three added alternates feasible.

The Commission staff reviewed the Authority’s En-

vironmental Statement as to form, found it not to be

deficient, circulated it among federal and state agencies,

5)

sought their advice with respect to it and made it public

as required by Commission regulations. (The court below

held the consultation requirements of NEPA were thereby

net. Pet. App. pp. 17a-18a.)

On June 22, 1971, following a Commission order direct-

ing that hearings be held, a Commission Examiner con-

ducted a pre-hearing conference and set up a procedural

schedule for filing and serving prepared written testimony

by the Authority, the staff and the intervenors and for

the actual holding of hearings.

In November and December, 1971 and January, 1972

hearings were held but not completed.

In the meantime on October 22, 1971 some of the inter-

yenors petitioned the United States Court of Appeals for

the Second Cireuit for review of the Commission’s as-

sumed denial by silence of many motions made by the

intervenors including motions to stop construction of the

project proper and the two transmission lines, construction

of all of which was then about 80% complete, and a motion

to stay the proceeding on the Leeds line pending the Com-

mission’s distributing a draft environmental statement

which intervenors contended should have been done before

the hearings started.* The court denied a motion to siay

the proceeding and on January 17, 1972 entered the

* On November 19, 1971 while the court proceeding was pending

ike Commission issued its Order No. 415-B amending Regulation

§281(b) to provide that the applicant’s draft statement after

being approved as to form by the staff and after being modified if

found to be deficient in form ‘‘shall be deemed to be information

comparable to an agency draft statement pursuant to Section 7

of the Guidelines of the Council on Environmental Quality’’.

(Pet. App. pp. 33a, 44a.)

Before argument in the court below Authority Counsel pointed

out to Commission Counsel the urgent need for the Leeds line

and the importance of keeping the proceeding before the Examiner

going. Authority Counsel requested that the Commission file and

distribute a draft environmental statement and thus avoid a

court decision.

(Footnote continued on next page)

seietiellcigindl eiayacin ty

6

judgment here sought to be reviewed. The Only relief

granted by the judgment was a direction to the Commis.

sion to have its staff, prior to the Examiner’s initial

decision, prepare and circulate a draft environmental

statement and obtain comments on it and that the Fx.

aminer allow the intervenors to examine Authority and

staff witnesses with respect to it before the hearings are

closed. (Pet. App. p. 18a.) (The court expressed the

opinion that NEPA requires that a draft Statement he

circulated before hearings in all eases except where there

are two hearing the first “‘solely to gather information to

aid the Commission in formulating its Statements, the

(Footnote continued from preceding page)

After the Court of Appeals’ decision Commission Counsel made

it clear to Authority Counsel that in eases other than the instant

case the Commission would go ahead with administrative proceed.

ings upon applications under the Federal Power Act and the Natn.

ral Gas Act where significant environmental considerations are

involved without complying with what the opinion of the court

below said the law to be. The fact that it is doing so is illustrated

by a gas certificate case involving a $139 million gasification plant

and related pipeline facilities for which application to the Commis.

sion was filed in October 1971 and in which hearings were ordered

by the Commission on February 24, 1972 five weeks after the Court

of Appeals’ decision in the instant ease without requiring staff to

file a draft environmental Statement. The hearing was completed

May 24, 1972. The staff did not file a draft statement before, dur.

ing or after the hearing. Tecon Gasification Co. et al., FPC Docket

Nos. CP72-100, et al. (See also Utah Power and Light Co., Project

No. 1744; Arkansas Louisiana Gas Co., Doeket No. CP70-267, Opin-

ion No. 612, issued February 18, 1972; Distrigas Corporation,

Docket Nos. CP70-196, e¢ al. Opinion No. 613, issued Mareh 9,

1972; El Paso Natural Gas Company, Docket No. RP72-6. Order

issued March 6, 1972; United Gas Pipeline Co., Docket Nos,

RP71-29, et al., Opinion No. 606, issued December 3, 1971, Presid-

ing Examiner’s Order issued February 17, 1972, and Order issued

March 31, 1972, staying Presiding Examiner’s ruling; and Florida

Gas Transmission Company, Docket No. CP70-104, Order issued

February 17, 1972.) See, however Columbia LNG Corporation,

et al. (infra pp. 17-19) where the Commission staff circulated its

own draft statement in a brief to the Examiner at the close of hear-

ings and asked for reopening of hearings to consider matters re-

flected in it.

7

second to consider the merits of the license application’’

‘Pet, App. p- 16a, emphasis added). This statement of

the court was not necessary to the judgment.)

The court again refused to stop the proceeding before

the Examiner pending circulation of, and receiving com-

ments on, a draft environmental statement and left it to the

Commission to determine the most efficient procedure for

meeting the court’s mandate, (Pet. App. p. 18a.)

Basically what the court did in its judgment was to

hold that before the close of hearings on an application

to a federal agency for a license or other approval in a

situation significantly affecting the environment, the agency

through its staff must prepare, circulate and receive com-

ments on an agency draft environmental statement and

the Examiner must g've intervenors an opportunity to

utilize that statement in the course of hearings. In doing

so the court held invalid tne provision in Section 2.81(b)

of the Commission’s regulations that an applicant’s draft

environmental statement as modified by applicant if re-

quired by initial review by the staff as to form is ‘‘informa-

tion comparable to an agency draft statement’’. The court

held that an agency’s circulation of an applicant’s state-

ment after any required modification as to form does not

satisfy the requirement that the agency’s staff circulate

and receive comments on a draft statement of its own com-

position. (Pet. App. pp. 9a-18a.)

On January 28, 1972, the Commission Examiner held a

formal conference to discuss the judgment of the court

and to establish procedures for going ahead. Intervenors

refused to attend but sent the Examiner a letter stating

their position. At the conference Commission Staff Coun-

sel stated that the staff would prepare and file a draft

environmental statement and asked a specific time in which

to do so. Staff Counsel also asked that the Authority

furnish the staff with a great deal of information which they

listed on the record including prognoses as to the need for

Sie LEE sic BGS pik RT ~

8

power in New York State in the 1970’s and 1980’s and plans

of the Authority and other power entities for Providing

generating and transmission facilities to supply such needs

Covered by the request was the report of the results of g

feasibility study of proposed additional generation facilities

on the Schoharie Creek which the Authority had announced

was being made at the prehearing conference tho preceding

June and which it then had agreed to make available to all

parties and the public during the hearings as soon as com-

pleted. (The report was nearly complete at the time of the

January 28 request and was filed shortly thereafter.) [py

addition Staff Counsel asked that the intervenors be re.

quired to file prepared testimony which they had been qj.

rected to file and had agreed to file by January 18, and had

prepared but had not filed. Staff Counsel stated that all

this material was needed for the preparation of the draft

statement.

The Examiner made an order setting a time for circula.

tion of a draft statement and refused to delay the resump.

tion of hearings as requested by intervenors in their letter

until the draft statement had been circulated for 45 days."

The Examiner stated however that intervenors could move

to fix time and place of hearings to conform with their con-

venience.

After the Examiner at the intervenors’ request certified

procedural questions to the Commission, the Commission on

March 7, 1972 issued an order affirming the Examiner's

direction that the staff file and circulate a draft environ-

mental statement by the time prescribed but modified his

procedural schedule by providing that hearings resume

after the statement had been distributed for 45 days and

comments received from interested agencies rather than

while it was being prepared and distributed. (A, App.

pp. la, 15a.)

* Section 2.81(b) of the Commission’s regulations provides that

agencies to which an environmental statement is circulated shall be

afforded 45 days in which to respond,

9

In its March 7 order the Commission directed:

‘‘(C) The Examiner shall reopen the record to

receive, as soon as practicable after the completion of

such circulation period, additional direct testimony

from PASNY and the Commission staff, and to allow

additional cross-examination promptly thereafter;

and he shall open the record to receive, as soon as

practicable after the completion of such cross-exami-

nation, direct testimony from Intervenors, and to

allow cross-examination promptly thereafter.’’? (A.

App. p. 5a.)*

In its March 7 order the Commission said that it was

secking a rehearing of the Court of Appeals’ judgment but

that

“* * * the public interest requires that this pro-

cecding progress rather than remain dormant pend-

ing judicial review * * *.’? (A. App. p. 4a.)

The Court of Appeals denied the Commission’s petition

for rehearing on March 10, 1972. (Pet. App. pp. 31a-32a.)

The Commission asked the court to stay its mandate but

the court refused on April 5, 1972.

On February 28, 1972 the Court of Appeals granted a

motion by the Authority to clarify its opinion by correcting

minor errors and by amending a statement in the opinion

about the Authority whieh had been taken from the brief

of petitioner Greene County Planning Board. (The cor-

rections and amendment are not reflected in the opinion

as printed in Appendix A to the petition for a writ of cer-

tiorari. The court’s order is printed in the annexed ap-

pendix at p. 18a.)

The intervenors filed and served some written testimony,

they had already prepared, as directed by the Examiner and

the Authority filed and served a great mass of material re-

quested by the Commission’s staff, The last day upon which

the staff could possibly have filed a draft environmental

*The record was never closed.

ae

ase

Cit dace Ean BE. re Sg

tans RS

10

statement in timely compliance with the March 7, 1972 order

of the Commission was May 15, 1972.*

On June 1, 1972 the Commission unilaterally and without

notice to any of the parties other than its Staff issued an

order countermanding its March 7 direction to the staff to

prepare and circulate an environmental statement. The

order also stayed the administrative proceeding before the

Examiner. The stated reason for the order was that the

Solicitor General had agreed to apply for a writ of certiorar

and there was concern that if the staff were not forhidden to

circulate the draft statement the case might become moot

and further concern that continuance of the proceeding ab-

sent obedience to the Court of Appeals’ judgment directing

circulation of the draft statement might conflict with that

court’s mandate. (A. App. pp. 6a-8a.)

In efforts to persuade the Commission to rescind or mod-

ify its June 1 order so that the proceedings could continue

the Authority took many steps including: a telegraphed re.

quest by the then Acting Chairman of the Authority for

rescission which the Commission treated as a motion for

reconsideration; a motion to the Court of Appeals for clari-

fication of its judgment to make clear whether or not it

would consider continuance of the proceedings absent the

Commission’s compliance with the court’s direction with re-

spect to the draft environmental statement a violation of the

mandate; an application to this Court which was referred

first to Mr. Justice Marshall and later to Mr. Justice Rehn-

quist for a full or partial stay of the Court of Appeals’ judg-

ment to the end that proceedings continue pending decision

on the petition for a writ of certiorari; and a formal appli-

cation for rehearing by the Commission of its June 1 order,

*The draft statement was required to be filed within 45 days

after receipt by the Commission staff of material requested on the

record at the January 28 conference from Authority and inter-

venors. The staff requested further material informally from the

Authority, the last of which the Authority submitted on Mareh 29,

1972, 45 days before May 15.

11

The telegraphed request which was treated by the Commis-

sion as a motion for reconsideration was denied July 5, 1972.

(A. App. p. 9a.) The motion to the Court of Appeals for

clarification was denied June 14, 1972. The application to

this Court for a full or partial stay was denied by Mr. Jus-

tice Rehnquist on July 27, 1972. The application to the Com-

mission for rehearing was denied on August 1, 1972. (A.

App. p. 12a.)

Jurisdiction of the Commission

Section 4(e) of the Federal Power Act (16 U. S. C.

(797(e)) authorizes the Commission to issue licenses for

project works ‘‘necessary or convenient’’ for power devel-

opments on waterways over which Congress has jurisdic-

tion, Section 3(11) in defining ‘‘project’’ includes ‘‘pri-

mary line or lines transmitting power therefrom [the

project] to the point of junction with the distribution sys-

tem or with the interconnected primary transmission sys-

tem’. (16 U.S.C. § 796(11)). The Leeds line does not con-

nect with a distribution system. Neither does either of the

other two lines included in the project. The other two lines

are already part of the State’s interconnected primary

transmission system. If the Leeds line is compieted it will be

also. It will be a very important part of it.

The Commission licensed the three lines as primary

lines hut in the Leeds proceeding the matter with respect

to that line has been reopened.

Some intervenors took the position that the Leeds line

if constructed will not be a primary line but will be part

of the interconnected grid. At the initial hearing in

Albany the Examiner refused to require the intervenors

unequivocally to state on the record at that time whether

or not such was their position.* In contesting the need for

*The discussion before the Examiner appears at pp. 178-181

of the transcript of the hearing in the proceeding held on November

9, 1971 at Albany, N. Y.

12

the line at the hearings intervenors restricted their Cross.

examination to the need for the line to carry project power

and to insure stability of the power plant. Thus they con.

fined their treatment of need to need as a primary line,

If the line were held not to be a primary line the Com.

mission would not have jurisdiction and the line could

legally be built by the Authority under state law (New York

Public Authorities Law, § 1005). Thus, whether or not jt

is a primary line is a threshold issue in the Comission

proceeding. A resolution of the issue has been put off by

the Commission's June 1, 1972 order staying the proceeding

**pending final review by the United States Supreme Court

of the Court of Appeals decision * * *.”’ (A, App. p. 8a.)

Status of Commission Proceeding

Many issues have been raised in the Leeds line pro-

ceeding, some by the intervenors’ cross-examination of

witnesses presented by the Authority and the Commission

staff, some in direct testimony of Commission staff wit.

nesses, some in New York State Public Service Commission

comments on the Authority’s Environmental Statement

and some as a result of events which have occurred since

the amended application for approval of the line was filed

in December, 1970. Included among the latter are changes

in route which the Authority has suggested aad which re-

sulted from recent developments in the area involved such

as subdividing and the building of structures.

While the original application sought approval of a

single circuit 345 kv line, the Commission because of the

prospect of additional generating facilities being con-

structed in the area and elsewhere must consider whether

the towers should be capable of carrying two 345 kv cir-

cuits as suggested by the State Public Service Commission

and whether they should be capable of being converted to

765 kv as suggested by a Federal Power Commission

13

expert witness. Both suggestions were made in anticipa-

tion of further transmission capacity being needed in the

future because of construction of additional generating

facilities by the Authority and other power en.ities. Testi-

mony showed that additional facilities will be necessary as

part of the interconnected grid whether more generating

facilities are constructed on the Schoharie or not.

The Commission must consider the additional issues,

not only because of NEPA but also because of the require-

ments of Section 10(a) of the Federal Power Act which

provides :

(a) That the project adopted, including the

mays, plans, and specifications, shall be such as in

the judgment of the Commission will be best adapted

to a comprehensive plan for improving or develop-

ing a Waterway or waterways for the use or benefit

of interestate or foreign commerce, for the improve-

ment and utilization of waterpower development,

and for other beneficial public uses, ineluding ree-

reational purposes * * *.’* (16 U.S. C. © 803(a); see

Scenic Hudson Preservation Conference v. Federal

Power Commission, 354 F. 2d 608 (2d Cir. 1965),

cert. denied sub nom., Consolidated Edison Co. of

New York v. Scenic Hudson Preservation Conference,

384 U. S. 941 (1966); Scenic Hudson Preservation

Conference Vv. Federal Power Commission, 453 F.

2d 463 (2d Cir. 1971), cert. denied, 32 L. Ed. 2d 813

(1972).)

Long before the hearings commenced, the locations of

the alternate routes of the line for which approval had been

sought as well as information with respect to voltage and

design of structures shown in the application for approval

were advertised in newspapers and given wide circulation.

Notice was given as to where and when the application,

plans and drawings including sketches of alternate types

of structures could be examined.

Some of the additional issues, further consideration of

which must be given in the proceedings, are so substantial

Ane

Mele

—s

hee

eh eel th Atti om ae

14

that additional advertising and other forms of notice must

be carried out in order to comply with the Federal] Power

Act, the Commission's regulations thereunder and related

statutes.

A great amount of prepared testimony and exhibts must

be submitted by the Authority and by others who Wish to

do so.

For example, intervenors cross-examined Authority and

staff witnesses at length on the issue of undergrounding

but have submitted no affirmative testimony on the issue

and no exhibits. Likewise they cross-examined at length

on the need for the line as a primary line and did some

cross-examination on route selection but have submitted no

testimony of their own on either and no exhibits except an

essay on the history of the Susquehanna Turnpike concern.

ing which some of the prepared testimony they submitted

relates.

The Authority, as required by the Commission, sub-

mitted exhibits showing precise locations and elevations

of tower sites on the two alternate line routes one or the

other of which the Commission has been asked to approve.

It must submit similar exhibits with respect to suggested

revised route locations not only for single cireuit 345 ky

towers but for higher towers capable of carrying two 345

kv cireuits and for still higher towers capable of carrying

two 345 kv cirenits and being converted to a single 765 ky

circuit. It also must present exhibits showing locations of

the higher towers on the routes already subject to the hear-

ings. The Authority will of course also have to submit

direct testimony explaining the exhibits. Higher towers

require a wider right-of-way and the effect of widening

must be shown.

The Authority intends to produce additional evidence

on the need of the Leeds line to carry power to the New

York City area and on the need of the line to insure stability

of the power plant and of power systems to which the power

will he delivered when one of the other lines from the plant

15

is out of service because of faults or maintenance require-

ments.

The Authority will be prepared to supply the additional

material soon after an order is given for the proceeding

to be resumed. However, everything has been stayed by

the Commission’s June 1 order. (A. App. p. 6a.)

Siatus of Project Construction

The project proper consisting of a lower reservoir in

Schoharie Creek with a dam designed to handle 155,000

cubic feet of water per second, an upper reservior 1,000

feet higher, a powerhouse, penstocks, motor generators,

pump turbines, dikes, roads, and other features is 92%

complete. The transmission lines to Fraser (Delhi) and

to New Seotland (Albany) are complete. They were en-

ergized on July 27, 1972 and are being used to bring power

from the west, largely Pennsylvania, to the Albany area.

Other Pending Cases Involving Interpretation of NEPA

(m May 22, 1972 this Court granted a writ of certiorari

to the Court of Appeals for the Tenth Cirenit in Upper

Pecos Association v. Stans, 452 F. 2d 1233 (1971 ), 40 L. W.

3356. The ease involves a two to one decision affirming a

jndgment of the District Court for the District of New

Mexico on a challenge to the legality of a grant made by

‘he Economie Development Administration of the Depart-

ment of Commerce (EDA) to a county in New Mexico of

% of the cost of building a road in the Elk Mountain

area. A declaratory judgment was sougitt to the effect that

the grant was invalid because of violation of NEPA (328

PF. Supp. 332). EDA issued no environmental statement

before or after making a decision to make the grant of

money but the Forest Service which was charged with

approving the location of the road and which the court

found to be the ‘‘lead ageney”’ did cireulate an environ-

mental impact statement after the decision on the grant had

Dt inet RAT wheelie see A

aE deci

ents AR

16 ei

been made by EDA. The opinion of the majority of the

Court of Appeals said that there was presented a question

of the point in time at which an environmental statement

must be available. The majority of the court held that

the circulation of the environmental statement after the

EDA decision on the grant was timely. The dissenting

judge took the position that NEPA required that EDA

consider the environmental consequences of making the

grant and that it had failed to comply with NEPA. (452 F,

2d at 1234-37.)

In the instant case this Court is asked for an advisory

opinion. The subject of the requested opinion is actually

in issue in the Upper Pecos ease. This Court can, therefore,

answer the ‘‘Question Presentep’’ in the instant case in

the Upper Pecos case which is already before the Court.

It can do so without the unfortunate delay to an important

public project which will come about if a writ is granted

in the instant case.

Kalur v. Resor, 335 F. Supp. 1 (D. D. ¢. 1971), is an

action for a declaratory judgment and injunction. The

court set aside regulations promulgated by the Secretary

of the Army under NEPA and Section 13 of the Rivers

and Harbors Act of 1899 (33 U.S. ¢. §407). The regula-

tions were concerned with applications for permits to make

discharges into navigable streams or non-navigable tribu-

taries. The court held, contrary to the contentions of the

Government, that NEPA applies to all applications for per-

mits to discharge material into navigable streams including

those where water quality is involved and held invalid

Corps’ regulations exempting the Corps from issuing en-

vironmental statements in permit eases where water quality

is solely involved.* The case is on review before the Court of

* It also held that Section 13 of the Rivers and Harbors Act

forbids discharges into non-navigable tributaries of navigable

Streams and that the Corps of Engineers does not have authority

to permit such discharges although it does have such power as to

navigable streams.

2 17

Appeals for the District of Columbia Circuit and is expected

to be argued early in the fall. It involves issues in addition

to the narrow issue sought to be presented in the instant

case and is deemed to be of great importance by the Depart-

ment of the Army. A writ of certiorari will almost in-

evitably be requested. The proceeding is a_ general

attack on regulations under which no action was ever taken.

No specifie project is involved so the question here sought

to be resolved along with other NEPA questions could be

resolved by this Court in that case without delaying a

vital public project.

For other cases involving preparation and circulation

of agency environmental impact statements, the scope of

review under NEPA and the question of what constitutes

major federal actions subject to NEPA see Sierra Club v.

Sargent, Civil No. 249-71C2, (W. D. Wash. March 16, 1972) ;

Students Challenging Regulatory Agency Procedures v.

United States, No. 971-72, (D. D. C. July 10, 1972) involv-

ing an Interstate Commerce Commission freight rate de-

cision; Citizens for Clean Air v. Froehlke, No. 72 Civ. 2259,

(S. D. N. Y. August 1, 1972). See also Sierra Club v.

Hardin, 325 F. Supp. 99 (D. Alaska, 1971). That case which

involves the need, adequacy and timeliness of an environ-

mental statement is scheduled to be argued in the Court of

Appeals for the Ninth Circuit on September 7, 1972.

The Commission staff did largely what the court below

directed be done in the instant case, in Columbia LNG Cor-

poration, et al. (F.P.C. Docket No. CP71-289 et al.) The case

involves an application for approval of a liquid natural gas

facility on Chesapeake Bay in the area of Calvert Cliffs

Park which was described in Calvert Cliff’s Coordinating

Committee, Inc. v. Atomic Energy Commission, 449 F. 2d

1109 (D. C. Cir. 1971). Approval was sought for various

project features including a pier extending 6,000 feet from

the shore of Cove Point to accommodate tremendous

tankers. The application was filed on June 4, 1971. Hear-

rere .

eo ha a LOMA Racal s Decal debe Ralaelatinneds

Pe Sib thelltang dia eral) Madiae A

kicokyeleng oad’.

18

ings before an Examiner were completed on J uly 8, 197],

The Commission staff filed a brief with the Examiner on

August 16,1971. Attached was an appendix labeled “Draft

Environmental Statement’. The statement Was cirep.

lated for 45 days. On August 18, 1971 the staff made a

motion requesting that state and federal agencies be

allowed until September 30, 1971 to file comments in con.

nection with the staff draft environmental statement.

Thereafter and before the Examiner handed down a

decision the Commission staff joined in a successful appli-

cation to reopen the hearings and urged that witnesses on

environment previously examined be subject to cross-ex.

amination. Additional hearings were held and environ-

mental testimony received. The hearings were concluded

on January 24, 1972, seven days after the decision of the

court below in the instant case. On February 29, 1972,

the staff filed a brief attached to which was an appendix

modifying and updating its draft environmental statement

based upon evidence at the second hearing . This was one

month and 12 days after the decision of the Court of Ap-

peals in the instant case. On May 15, 1972 the Commission

issued an order expediting proceedings and cutting down

on the time prescribed in the regulations for the parties to

file exceptions to the Examiner’s decision. His decision

was filed on May 22 and included a draft ‘‘Environmental

Statement’’. On June 28, 1972, thirty-seven days after the

Examiner’s decision the Commission adopted his decision

with some modifications. The Commission decision con-

tained a final environmental statement.

The action of the Commission Staff in the Columbia

ease did not conform to the judgment of the court below

in that its draft statement was not filed prior to the close

of the hearings before the Examiner. However, it cured

the lack of conformance by circulating the statement and

joining in the successful application to the Examiner to

reopen the hearings in which environmental evidence was

received.

19

On motion of parties including the Sierra Club and the

Maryland Conservation Council, the Commission issued

an order granting rehearing. The grounds upon which

rehearing was sought included allegations of violation

of the Commission’s own environmental regulations with

respect to notice and violation of NEPA including alleged

violations of requirements with respect to the draft environ-

mental statement.

Court review will undoubtedly be sought in the case which

involves many issues and a writ of certiorari will almost

certainly be asked.

Many other cases involving NEPA are pending through-

out the country.

The Urgent Need for the Line

The line as planned is only about 33 miles long and if

built without further extensive delay will replace only

four or five houses. It is of vital importance to carry

power to the New York City area and to insure the stability

of the project power plant and of at least one power sys-

tem to which power will be directly delivered. It is needed

both as a project primary line and as a necessary link in

the interconnected grid. It is by far the most important

of the three project lines. Although need for the line is

one of the issues raised by intervenors all evidence pre-

sented has shown the need and none has shown a lack of

need. More evidence based on additional recently com-

pleted computer tests will be presented when the hearing

resumes,

Leeds is on the way to New York City from the Blen-

heim-Gilboa Project. To increase substantially the amount

of power which can be carried from the project and the

west to New York the Leeds line must be completed and

the capacity of some connections between Leeds and New

York increased. This inerease in capacity is being delayed

pending decision on whether or not the Leeds line in fact

20

will be built because the power entities involved need to

have assurance that it will be built before commiting the

necessary funds.

When the Leeds line is built and the capacity of those

connections increased and a 345 kv interconnection from

Fraser south (the missing links in which have recently

been approved by the State Public Service Commission) jg

built the amount of power which can be carried from upstate

New York to New York City will be increased by an amount

almost equal to the amount which can be carried to New

York now over existing facilities.* The Leeds line is essen.

tial to this result.

While the City’s peak loads are in the summer, upstate’s

peak loads are in the winter. Thus, the Blenheim-Gilboa

plant will be of the most value upstate in the winter and

in the City in the summer.

The power situation in New York City and Westchester

County in the summer is desperate and getting worse. The

1,000,000 kilowatt Blenheim-Gilboa plant represents almost

one-eighth of the peak power load which New York City ex.

periences in the hot summer months. The Leeds line js

essential for carrying power to the New York City area.**

Because of delay already experienced it is not now

possible to have the Leeds line and the improved intercon-

nections on the east side of the Hudson ready for service to

*There.are two 345 kv lines between Albany and Leeds,

When the Authority’s Leeds line is complete it together with its

New Scotland line will constitute a third 345 kv line to Leeds.

** Leeds is a key point. A very important new switchyard is

located there. Two 345 kv lines and some lower voltage lines from it

go across the Hudson and down the east side to New York City.

Additional 345 kv lines will be substituted for the lower voltage

lines. It is this work which is being impeded by delay in the Leeds

line. Recently a 345 kv line was completed from Leeds on the

west side of the river south to Roseton about half way to New York

City. A 345 kv interconnection is planned from Roseton south for

future construction.

21

Yew York for the summer of 1973. It is important that

further delay be avoided in order to have them ready for the

summer of 1974.

The Authority’s Position With Respect to the

Opinion Below

The Authority sympathizes with the problems of the

Commission and other agencies in carrying out traditional

duties and in addition the many added duties imposed by

NEPA. The Authority is in the position of other public

and private organizations which have an obligation to

supply goods or services vitally needed by the public. It

believes that there must be an accommodation between en-

vironmental considerations which are of course extremely

important and the needs of human beings for the essentials

of life such as electricity. It recognizes that ultimately

this Court must resolve differences between extreme posi-

tions taken by some as to interpretation of statutes designed

to safeguard the environment and the positions of entities

charged with the responsibility to construct needed facili-

ties which have an effect on the environment.

We believe that the opinion of the court below to the

effect that agency draft environmental statements must be

submitted prior to the start of administrative hearings in all

eases except where an administrative hearing is conducted

“solely”’ for the purpose of obtaining information on which

to hase the statement is unsound. There is no statutory or

practical basis for it. An agency stati can formulate a much

more useful and adequate statement after a hearing is

commenced and issues joined than before.

However we believe that the actual judgment of the

court below requiring a staff draft statement prior to the

close of the hearing is reasonable and legally justifiable.

It is consistent with the position the Authority took in the

court below. (Pet. App. p. 10a.)

22

Conclusion

It was not necessary for the court below to answer the

‘‘Question PreseNTED”? in order to reach its judgment, The

opinion expressed by the court that an agency draft ep.

vironmental statement must be circulated prior to con.

mencement of administrative hearings is dictum. The judg.

ment of the court was that such an impact statement must

be circulated before hearings are closed and must be made

a subject of the hearings if requested by intervenors, Henee,

there is not presented to this Court a controverted issye

necessarily passed upon and since the judgment does not

match the ‘‘Question PresenteD’’ it is not properly

reviewable.

The Commission substantially complied with the man-

date of the court below by having its staff either complete

or almost complete a draft environmental statement after

receiving from the Authority a mass of technica] informa-

tion and computations which it prepared at great expense

and in good faith on the basis of the staff’s formal state-

ment in the course of Commission proceedings that it was

necessary for the preparation of a draft statement which

the staff stated it would circulate and which the Commis-

sion later formally ordered it to prepare and circulate,

Under these circumstances the Commission’s abrupt change

of course did not keep the case from being moot.

Other cases now in litigation, one of which is already

before this Court and several of which will almost surely

be brought to the door of this Court, involve the question

here sought to be resolved as well as other questions

with respect to interpretation of NEPA. The ease in whicha

writ of certiorari has already been granted or one of the

others now in litigation would form a much better vehicle

for this Court’s interpretation of NEPA than the instant

case.

Requiring the Commission to comply with the judgment

of the court below by denying the petition would require

no substantial work on the part of its staff or place any

23

burden on the Commission because of the extent to which

the judgment has already been obeyed. On the other hand

the Authority would be put to great hardship and expense

by the granting of the petition and power consumers would

be put at a great disadvantage because of the delay in the~.

construction of essential power facilities. :

For these reasons the petition for a writ of certiorari

should be denied.

However, it is respectfully requested that in the event

the petition is granted the Court direct that the proceedings

before the Commission be resumed and carried forward

during pendency of the case in this Court. This would

be highly proper because (i) the court below held that the

Commission had carried on adequate consultation with other

agencies by circulation of the Authority’s Environmental

Statement, (ii) all issues which could conceivably be raised

in the proceeding before the Commission have already

been raised so the availability of a staff environmental

statement is not essential for notice purposes, (iii) the

merits of the case before the Commission are in no way

involved, and (iv) regardless of what decision this Court

might finally make on the merits a Commission environ-

mental statement could be circulated before the hearings are

fnally closed and made available as provided in the order

of the court below.

Respectfully submitted,

Tuomas F, Moorg, Jr.

10 Columbus Circle

Scort B, Litiy oe

ee ee a ia New York, New York 10019

New York, N. Y. Attorney for Respondent

Jouxn C, Mason Power AUTHORITY OF THE

Washington, D. C. StaTe or New York

of Counsel.

August 5, 1972.

ee

APPENDIX.

FPC Order of March 7, 1972

UNITED STATES OF AMERICA

FEDERAL Power CoMMISSION

Before Commissioners: John N. Nassikas, Chairman;

John A. Carver, Jr., Albert B. Brooke, Jr.,

Pinkney Walker, and Rush Moody, Jr.

owER AUTHORITY OF THE : eres

hae . ee Project No, 2685

Srate oF NEW YorK j

ORDER ADOPTING PROCEDURE FOR HEARING

(Issued March 7, 1972)

On June 6, 1969, the Commission granted a license to

the Power Authority of the State of New York (PASNY)

to construct and operate the Blenheim-Gilboa Pumped Stor-

age Project No, 2685 including, as part of the project works,

three 845 Kv transmission lines (41 FPC 712). The princi-

pal project works and two of the lines are currently nearing

completion, This proceeding involves PASNY’s application

to construct the third line, which it proposes to route from

the Town of Gilboa, in Schoharie County, New York, to the

Leeds substation in the Town of Athens, in Greene County,

New York,

As of the conelusion of the cross-examination of

PASNY’s and the Commission staff’s direct witnesses on

January 7, 1972, the schedule for the hearing provided that

Intervenors would file the prepared testimony of their direct

witnesses on or before January 18, 1972, and that cross-

examination of such witnesses would commence on Febru-

ary lo, 1972. On January 17, 1972, however, the United

States Court of Appeals for the Second Circuit issued an

opinion' holding that the Commission staff is required by

'Greene County Planning Board v. Federal Power Commission,

Docket Nos. 71-1991 and 71-1996.

2a

the National Environmental Policy Act of 1969 (NEPA) to

prepare and circulate a draft environmental impact stat.

ment and should have done so prior to the hearing.

Intervenors did not file the prepared testimony of their

direct witnesses when due and, by Notice issued January 21,

1972, Presiding Examiner William C. Levy called a gop.

ference for January 28, 1972, ‘‘for the purpose of consider.

ing the impact of the Court of Appeal’s [sic.] opinion op

the future course of this proceeding and adopting such pro-

cedures and schedules as may be required by the courts

[sic.] opinion and remand.”’

The Commission staff indicated at the conference that it

would prepare and circulate an environmental impact state.

ment solely for the purpose of expediting the proceeding

and not as an interpretation of the Court of Appeals’ opin.

ion. The staff requested that the environmental information

accumulated by both PASNY and Intervenors be made

available for the preparation of such statement, and it asked

specifically that PASNY furnish certain data and that

Intervenors furnish the prepared testimony which should

have been filed on or before January 18, 1972. The Exam.

iner directed that PASNY furnish the requested material as

soon as possible and that ‘‘the staff will have 45 days from

the receipt of that material to file the detailed environmental

statement required by the court’s mandate.”’

Intervenors did not appear at the conference. Instead,

they expressed their positions in a letter dated January 25,

1972, in which they challenged the Examiner’s continuing

jurisdiction in the proceeding through the Court of Appeals’

statement,

‘*We leave to the Commission to determine the most

efficient procedure for meeting this mandate [Em-

phasis added].”’

They also indicated that the character and scope of their

witnesses’ testimony would be substantially affected by the

Commission staff’s environmental impact statement, and

3a

that it would be financially burdensome and wasteful of time

to file what they had prepared and submit their witnesses

to cross-examination prior to their receipt of such impact

statement. Nonetheless, the Examiner ruled that he had

continuing jurisdiction and directed ‘‘them to file this over-

due direct testimony forthwith’’, granting leave for Inter-

yenors to move that ‘‘such witnesses be cross-examined at

atime and place convenient’’,

By letter dated February 4, 1972, Intervenors asked the

Examiner to reconsider such rulings and, in any event, to

reduce all of his conference rulings to writing and refer

them to the Commission pursuant to § 1.28 of the Commis-

sion’s Rules of Practice and Procedure. As a result, the

Examiner issued a Notice dated February 9, 1972, in which

he set forth, reconsidered and reaffirmed his conference rul-

ings* and certified them to the Commission.

Intervenors state in their request that ‘‘we had testi-

mony in a prepared form on January 17, 1972 and obviously

it would be a small burden, financially speaking, for us to

hile this material at this time.’’ They assert, however, that

they should not have to file the testimony because to do so

would further violate NEPA by continuing the hearing

prior to the preparation by the Commission staff of a draft

environmental impact statement, and they state that such

‘*... testimony contains statements of position, rec-

ommended compromises and admissions which we

may not wish to make after we have had the oppor-

tunity to review both the staff impact statement and

any comments thereon which are submitted within

the 45 day circulation period. We cannot say, due

to the changed cireumstai.ces, whether any, all or a

part of this testimony will be part of our direct ease.’?

Nonetheless, Intervenors offered to make available ‘all

backup material used by our witnesses in preparing the tes-

* Although the Notice states that the Examiner denied Inter-

venors’ request for reconsideration, its context indicates that he

reconsidered but declined to change his rulings.

4a

timony which was ready on January 17, 1972, the files of

the Greene County Planning Board, and the employees of

the Planning Board for consultation’,

On February 14, 1972, we petitioned the Court of Appeals

for a rehearing of its opinion issued January 17, 1972, and,

consequently, we do not consider it appropriate to

to interpret it at this time. On the other hand, the public

interest requires that this proceeding progress rather than

remain dormant pending judicial review; and for this rea-

son the Commission staff offered to prepare a draft envi-

ronmental impact statement and requested that the envirop.

mental information accumulated by all participants be made

available for such purpose. Accordingly, any environmen-

tal information which is in the form of prepared testimony

of Intervenors’ direct witnesses should be made available

to the Commission staff and other participants together

with the other environmental material to be furnished by

the participants.

The Commission finds:

In the present posture of this proceeding, the best adopt-

ed procedure for assuring compliance with the Federal

Power Act and the National Environmental Poliey Act of

1969 is set forth in principle below, subject to the continu.

ing authority of the Presiding Examiner to issue further

rulings to implement this Order.

The Commission orders:

(A) As soon as practicable, all participants to this pro-

ceeding shal! make available to the Commission staff and

other participants all environmental information requested

from them during the course of the conference on January

28, 1972, including any environmental information which is

in the form of prepared testimony of Intervenors’ direct

witnesses which was due for filing on January 18, 1972; bat

“‘statements of position, recommended compromises and

admissions’? may be deleted.

da “

(B) The Commission staff shall prepare a draft envi-

ronmental impact statement, and shall file it and commence

greulation within 45 days after receipt by it of the fore-

ing environmental information. Participants and agen-

cies shall have 45 days from the date of such filing in which

to comment on such statement.

(C) The Examiner shall reopen the record to receive,

as soon as practicable after the completion of such circula-

tion period, additional direct testimony from PASNY and

the Commission staff, and to allow additional cross-exami-

nation promptly thereafter; and he shall open the record

to receive, aS soon as practicable after the completion of

such cross-examination, direct testimony from Intervenors,

and to allow cross-examination promptly thereafter.

(D) The Examiner’s conference rulings set forth in his

Notice dated February 9, 1972, are affirmed to the extent

that they are consistent with this Order and reversed to the

extent that they are inconsistent herewith.

By the Commission,

(SEAL)

Kenwnetu F. Pius,

Secretary.

1 td ALA AA ORAS eae A

6a

FPC Order of June 1, 1972

UNITED STATES OF AMERICA

FEepERAL Power CoMMISSION

Before Commissioners: John N. Nassikas, Chairman;

Albert B. Brooke, Jr., Pinkney Walker, and

Rush Moody, Jr.

Power AuTHorRIty oF THE) ,,_. —

Stare or New York Project No. 2685

ORDER PARTIALLY RESCINDING ORDER OF

MARCH 7, 1972 AND STAYING

FURTHER PROCEEDINGS

(Issued June 1, 1972)

On June 6, 1969, the Commission granted a license to

the Power Authority of the State of New York (PASNY)

to construct and operate the Blenheim-Gilboa Pumped

Storage Project No. 2685 including, as part of the project

works, three 345 Kv transmission lines (41 FPC 712). The

principal project works and two of the lines are currently

nearing completion. This proceeding involves PASNY’s

application to construct the third line, which it proposes to

route from the Town of Gilboa, in Schoharie County, New

York, to the Leeds substation in the Town of Athens, in

Greene County, New York.

On January 17, 1972, the United States Court of Appeals

for the Second Circuit issued an opinion holding that the

Commission staff is required by the National Environmental

Policy Act of 1969 (NEPA) to prepare and circulate a draft

environmental statement and should have done so prior to

hearing.' We filed a petition for rehearing which was denied

on March 10, 1972.

On March 7, 1972, prior to the Court of Appeals’ denial

of rehearing, we issued an order setting forth the procedure

to be followed in this proceeding pending judicial review

* Greene County Planning Board vy. Federal Power Commission,

455 F. 2d 412 (CA 2, 1972).

7a

of the Greene County decision. Among other things, we

soneluded that this proceeding should progress rather than

remain dormant pending review, and that Commission staff,

in compliance with the mandate of the Second Circuit,

should proceed with the preparation of a draft environ-

mental statement to be filed within 45 days following the

receipt of certain environmental information from the

participants.

Since the issuance of our order of March 7, 1972, and

the denial of rehearing by the Court of Appeals, the Solici-

tor General of the United States has agreed to file, on behalf

of the Federal Power Commission, a petition with the

United States Supreme Court for a writ of certiorari to

review the judgment of the Court of Appeals. In view of

this fact, and pursuant to our authority under Section 309

of the Federal Power Act, we have decided to rescind our

order of March 7, 1972, to the extent that it: (1) requires

the Commission staff to prepare and circulate a draft envir-

onmental impact statement, (2) direets the Examiner to

reopen the record for the receipt and cross-examination of

additional evidence, and (3) affirms certain rulings of the

Examiner, as set forth in his notice dated February 9, 1972,

which are inconsistent with our action today. Such action,

we believe, is required in order to preclude the possibility

that the issue for which review is sought might become moot.

An early resolution of this issue by the Supreme Court will

serve to eliminate uncertainty in this proceeding as well as

inmany other cases before the Commission in which NEPA

issues have been raised.

In order to avoid a conflict with the mandate of the

Second Cireuit, we deem it appropriate to stay these pro-

ceedings pending final review by the United States Supreme

Court of the validity of the judgment of the Court of

Appeals.

The Commission finds:

The proper disposition of the present proceeding will be

best served through the partial rescission, as set forth be-

ith Metab Pr SEERA hes.

8a

low, of our order of March 7, 1972, and the cessation by

Commission staff of any further action toward the prepa.

ration of a draft environmental statement pending further

order of this Commission. Moreover, these proceedings

should be stayed pending final review by the United State;

Supreme Court of the validity of the judgment of the Court

of Appeals in Greene County Planning Board vy. Federq|

Power Commission, 455 F.2d 415 (CA2, 1972).

The Commission orders:

(A) Pursuant to our authority under Section 309 of the

- Federal Power Act, ordering paragraphs (B), (C), and

(D), of our order of March 7, 1972, in this proceeding are

rescinded and the Commission staff is directed to take no

further action toward the preparation of a draft environ-

mental impact statement, pending further order of this

Commission.

(B) The proceedings in this matter are stayed pending

final review by the United States Supreme Court of the

Court of Appeals decision in Greene County Planning Board

v. Federal Power Commission, 455 F.2d 415 (CA2, 1972),

(C) The Examiner’s conference rulings set forth in his

Notice dated February 9, 1972, are affirmed to the extent

that they are consistent with this order and reversed to the

extent they are inconsistent herewith.

bv the Commission.

(SEAL)

Kenneth F, Pins,

Secretary.

9a

FPC Order of July 5, 1972

UNITED STATES OF AMERICA

FrepErRAL Power Commission

Before Commissioners: John N. Nassikas, Chairman;

Albert B. Brooke, Jr., and Rush Moody, Jr.

y 'THORITY OF THE , :

— a cies Project No. 2685

Srate oF New York j

ORDER DENYING MOTION FOR

RECONSIDERATION

(Issued July 5, 1972)

On June 6, 1969, the Commission granted a license to

the Power Authority of the State of New York (PASNY)

to construct and operate the Blenheim-Gilboa Pumped

Storage Project No. 2685 including, as part of the project

works, three 345 Kv transmission lines (41 FPC 712). The

principal project works and two of the lines are currently

nearing completion. This proceeding involves PASNY’s

application to construct the third i‘ne, which it proposes to

route from the project switchyard in the Town of Gilboa,

Schoharie County, New York, to the Leeds substation in

the Town of Athens, Greene County, New York.

On January 17, 1972, the United States Court of Ap-

peals for the Second Circuit held in Greene County Plan-

ung Board v. Federal Power Commission, 455 F. 2d 412,

that the Commission staff is required by the National En-

vironmental Policy Act of 1969 (NEPA) to prepare and

circulate a draft environmental impact statement and

should have done so prior to the hearing. On February

14,1972, we petitioned the Court of Appeals for a rehearing.

On March 7, 1972, considering at that time that ‘the

public interest requires that this proceeding progress

< San ad: bbe vents ct Ano

wee

a.

10a

rather than remain dormant pending judicial review”, we

issued an order adopting a procedure for assuring compli.

ance with the Federal Power Act and the Nationa] Environ.

mental Policy Act of 1969 pursuant to the Second Cireuit’s

mandate that the ‘‘staff should prepare a detailed State.

ment before the Presiding Examiner issues his initial do.

cision.’?” On March 10, 1972, the Second Circuit denied

our petition for rehearing, and subsequently the Solicitor

General of the United States agreed to file in the Supreme

Court of the United States a petition for a writ of certioray;

to review the judgment of the Second Circuit. In order

to preclude the possibility that the issue for review might

become moot, we issued an order on June 1, 1972, partially

rescinding our order issued March 7, 1972, and staying

further proceedings.

On June 6, 1972, we received from PASNY a telegram,

which we are treating as a motion for reconsideration, pro-

testing our Order issued June 1, 1972, and asking that it be

rescinded. Asserting that the Gilboa-Leeds line is the most

important of the three transmission lines to serve the pro}-

ect and is the key to reliable delivery of power to the New

York area, PASNY urged that this proceeding should not

be stayed to test a legal issue in the Supreme Court while

other licensing proceedings are allowed to continue without

the staff having prepared environmental impact statements

prior to hearing. PASNY also asserted that the delay

is very much against the public intergst and that the longer

it continues, the greater the transmission line changes,

additional costs and environmental problems to be en-

countered.

Although PASNY also asked that we withdraw our re-

quest to the Solicitor General, the petition for a writ of

certiorari was filed in the Supreme Court of the United

States on June 8, 1972; and, among other matters, it ad-

vised the Court of our Orders issued March 7 and June 1,

lla

1972. While we regret the consequences of the delay re-

sulting from our stay, we consider our action to have been

necessary and appropriate to carry out the provisions of

the Federal Power Act and the policies and goals of the

National Environmental Policy Act of 1969.

On June 21, 1972, two days after the last date for filing

answers, we received for filing an unsigned original and

two copies of the answer and cross-motion of Intervenor

Greene County Planning Board, which we are also con-

sidering. While the answer generally supports our Order

issued June 1, 1972, and questions PASNY’s assertions

with respect to the importance of the Gilboa-Leeds line,

the eross-motion (1) asserts that PASNY’s telegram was

considered to be a valid filing of a motion although it did

not comply with our Rules of Practice and Procedure and

(2) requests ‘‘that all future filings in this proceeding be

deemed proper if an original and two copies are sent to

the Commission, and each party of record served with one

copy.’’ We believe, however, that in acting upon PASNY’s

telegram the Secretary of the Commission properly dis-

charged his duties by construing it as a motion for recon-

sideration, serving it upon the other participants, and

thereby affording them an opportunity to respond.

The Commission orders:

PASNY’s motion for reconsideration of our Order

issued in this proceeding on June 1, 1972, and Greene

County’s cross-motion for relaxed filing procedures, are

denied.

By the Commission.

(SEAL)

Kennetu F. Pius,

Secretary.

Lg Pt ante Kaa Scie ae ee oe Oe

ot

12a

FPC Order of August 1, 1972

UNITED STATES OF AMERICA

FreperaL Power ComMISssION

Before Commissioners: John N. Nassikas, Chairman;

Albert B. Brooke, Jr., Pinkney Walker,

and Rush Moody, Jr.

Power AUTHORITY OF THE

STATE oF New York Project No. 2685

ORDER DENYING APPLICATION

(Issued August 1, 1972)

Power Authority of the State of New York ( (PASNY)

filed a telegram June 6, 1972, which the Commission by

letter of June 8, 1972, advised all parties would be treated

as a motion for reconsideration of its Order of June 1, 1972,

which stayed the proceeding on PASNY’s application for

authorization to construct a third transmission line for the

Blenheim-Gilboa Pumped Storage-Project No. 2685.

In our order of July 5, 1972 we denied the motion for

reconsideration after considering PASNY’s assertions that

staying the proceedings was against the public interest and

stated:

Although PASNY also asked that we withdraw

our request to the Solicitor General, the petition for

a writ of certiorari was filed in the Supreme Court of

the United States on June 8, 1972; and, among other

matters, it advised the Court of our Orders issued

March 7 and June 1, 1972. While we regret the con-

sequences of the delay resulting from our stay, we

consider our action to have been necessary and ap-

propriate to carry out the provisions of the Federal

13a

Power Act and the policies and goals of the National

Environmental Policy Act of 1969.

On July 3, 1972, PASNY filed an application pursuant

to Section 313 of the Federal Power Act and Section 1.34 of

the Commission’s Rules of Practice and Procedure for re-

joaring of the Commission’s order of June 1, 1972, by which

tie proceedings were stayed.

In addition elaborating on its reasons why it believed

the stay of proceedings to be against public interest,

PASNY also asserted without elaboration that ‘‘. .. The

June 1 Order, having been issued without notice in violation

of relevant statutes and the Commission’s own regulations,

was void.’” PASNY does not refer to any particular statu-

jory or regulatory provisions, and we are not aware of any

requiring Notice before the Commission could temporarily

stay its own proceedings. On the contrary, in view of the

breadth of our discretion under Section 309 of the Federal

Power Act (16 U.S.C. Section 825(h)), established in Niag-

ara Mohawk Power Corporation v. Federal Power Commis-

sion, 879 F.2d 153 (1967), we are confident as to the validity

of our Order issued June 1, 1972.

Inasmuch as the June 1 Order complained of is proce-

dural in nature, the Commission may modify it at any time

and continue the proceedings, when to do so will not conflict

with the mandate of the Second Circuit in Green County

Planning Board v. Federal Power Commission, 455 F.2d 415

(A2, (1972), and will not render moot a serious legal ques-

tion now pending for review by the Supreme Court of the

United States in this same ease.

Since PASNY’s application of July 3, 1972, reiterates

with elaboration contentions similar to those set forth in

the telegram of June 6, 1972, and which were considered

inour denial of July 5, 1972, the application should likewise

be denied.

l4a

The Commission orders:

The Application of the Power Authority of the Stats

of New York filed July 3, 1972 asking for further recon.

sideration of our order of June 1, 1972 is denied.

By the Commission.

(SEAL)

Mary B. Kipp,

Acting Secretary.

lida

Presiding Examiner’s Notice of Certification

UNITED STATES OF AMERICA

FEDERAL Power ComMMISSION

’ Z » Stave )

Power AUTHORITY OF THE § Project No. 268%

or New York (PASNY) — 57 Todeet No. 2685

PRESIDING EXAMINER’S DENIAL OF REQUEST

TO RECONSIDER RULING MADE AT CONFERENCE

ON JANUARY 28, 1972 AND

NOTICE OF CERTIFICATION

To THE COMMISSION :

Cross-examination of applicants and staff’s direct case

was concluded on January 7, 1972, and the hearing was

recessed to resume February 15, 1972, for the cross-exami-

nation of Intervenors prepared testimony due on or before

January 18, 1972. On January 17, 1972, the Court of

Appeals issued an opinion in Greene County Planning

Board v. Federal Power Commission et al. Docket Nos.

71-1991, 1996 holding inter alia that the Commission failed

to comply with the National Environment Policy Act and

remanding for further proceedings in accordance with its

opinion. Accordingly, a conference was called for Friday,

January 28, 1972 at 10 A.M., at the Office of the Commission

for the purpose of considering the impact of the Court of

Appeal’s opinion on the future course of the proceeding

aid adopting such proceedures and schedules as may be

required by the courts opinion and remand.

By letter dated January 18, 1972, the Presiding Exam-

ner was advised that Intervenors, in view of ‘‘yesterdays

opinion of the United States Court of Appeals ... are not

submitting any direct testimony at this time.’? ... and

“await guidance from the Commission concerning the most

dicient procedure for meeting the mandate of the Court.’

l6a

On January 25, 1972, Intervenors wrote ady sing tha:

they would not be at the conference, that the conference ya;

not properly called, and requesting that the letter be Copied

into the transcript of the conference as a statement of their

position (See TR. 1864-1867).

The conference was held on Friday, January 28, 1972

(See attached transcript Vol. No. 12) at which time the

Presiding Examiner considered the position and requests

of all the parties, including Intervenors, and made the fol.

lowing rulings:

1. The Presiding Examiner’s continuing juris.

diction to proceed with the hearing, and to determine

the most efficient procedure for meeting the court's

opinion, has not been terminated or revoked by the

Commission or by the Courts.

2. The Staff was directed to file a detailed .

vironmental statement within 45 days from the

receipt of certain requested data from Applicants

and to serve copies of such statement on all the par.

ties and Agencies to whom the Applicants Environ.

mental Statement was distributed.

3. All parties and agencies will have 45 days

thereafter to file their comments along with any an-

swering testimony or requests for a further oppor-

tunity to examine PASNY and Staff witnesses in the

light of Staff environmental statement.

4. Intervenors were directed to file forthwith

their direct testimony, due January 18, 1972, and to

make any motions they deemed necessary concerning

a convenient time and place for cross-examination of

their witnesses.

x

5. The February 15th hearing date was recessed

pending the filing of Intervenors direct testimony. A

new hearing date will be fixed when such testimony is

filed.

17a

On February 4, 1972, Intervenors wrote requesting, inter

glia, that 1 reconsider the above rulings, correct the record,

and in any event, refer them to the Commission. (A copy

of their letter is attached.)

The Presiding Examiner has carefully reconsidered his

rulings in the light of Intervenors letter of February 4, 1972,

and sees no good reason for Intervenors continuing default

in the filing and cross-examination of its prepared direct

testimony concedely available for filing when due on Janu-

ary 18,1972. The cross-examination of PASNY and Staff’s

direct case was concluded on January 7, 1972. Progress in

completing the direct phase of this proceeding is the most

dicient procedure for mecting the Court’s mandate pending

the filing of the Staff’s detailed environmental statement

now in preparation. Intervenors will, of course, have full

opportunity to respond to such statement, to file answering

testimony, and to cross-examine PASNY and Staff wit-

nesses in the light of the statement. Not to proceed with

Intervenors prepared direct testimony is conducive to the

very delay which Intervenors take such pains to discuss in

the Appendix to their letter of February 4, 1972.

Accordingly, their request for reconsideration is denied

and the conference rulings reaffirmed. However, in view of

the status of this proceeding in the Court of Appeals, the

Presiding Examiner’s Rulings are certified to the Commis-

sion for its consideration, as requested, under § 1.28 of the

Commissions Rules of Practice and Procedure.

Respectfully submitted this 9th day of February, 1972.

/sf/ Wrasam C. Levy

William C. Levy

Presiding Examiner

Attachments

Cory To aLL Parties

en eee re ee ae |

~ oe

18a

Court of Appeals Order Modifying Opinion

UNITED STATES COURT OF APPEALS

Seconp Circurr

At a Stated Term of the United States Court of Appeals,

in and for the Second Cireuit, held at the United State

Court House, in the City of New York, on the 28th day of

February, one thousand nine hundred and seventy-two,

Greene County PLansineo Boar,

Petitioner,

v.

Fevers, Power Commission,

Respondent.

Town or Dvurnam, New York and Assoctatioy ror tar

Preservation or Dunnam Vatiey, Power Avruoriy OF

THE State or New York, Tue Sierra Civs,

Intervenors.

Upon the motion made herein by intervenor, Power

Authority of the State of New York, by notice dated Feb-

ruary 14, 1972, to modify and clarify portions of this

Court’s opinion dated January 17, 1972, it is hereby ordered

that the sentence ‘‘PASNY has admitted that the Gilboa-

Leeds line is part of a plan which may include three mas-

sive pumped storage hydroelectric projects, six 345 kilo-

volt transmission lines and three 765 kilovolt transmission

lines*’, beginning on page 13, line 18 of the opinion, be de-

leted and the following sentence substituted: ‘“PASNY

has indicated that this line is part of a plan which may

include an additional massive pumped storage hydroelee-

tric project with attendant transmission lines.”’

It is further ordered that the date March 21, 1971, on

page 5, line 15, of the opinion be deleted and the following

date substituted: ‘‘ March 26, 1971’’.

19a

It is further ordered that the appearances for the Power

suthority of the State of New York be changed to read:

“Seott B. Lilly, New York, N. Y. (Thomas F. Moore,

Jr., New York, N. Y., John R. Davison, New York,

N. Y., John C. Mason, Washington, D. C., of counsel),

for Intervenor Power Authority of the State of New

York.’”’

J. Josern Smiru

Irvine R. Kavrman

WriuiuM H. Meiuiean

Circuit Judges

Dated: February 28, 1972

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.