Petitioners Reply Brief — Pisano v. Benny Skou
Supreme Court brief1965
Ask Donna
What actually matters in this document.
Text
INDEX
Table of Cases Cited
Alaska v. Petterson, 347 U. 8. 396 ................ 4
Aldridge v. States, 265 F. 2d 554 .................. 3
Ballwanz v. Isthmian, 319 F. 2d 457 ................ 5
Beard v. Ellerman, 289° F. 2d 201, sub nom. Atlantic
Ws FN BH Wc Te OD ob rev cccccctccoccesces
Brabazon v. Belships, 202 F. 2d 904 ...............
Calmar v. Nacirema, 266 F. 2d 79 ................
Caputo v. United, 311 F. 2d 413 ..............00-
Connolly v. Weyerhaeuser, 236 F. 2d 848, sub nom.
Weyerhaeuser v. Nacirema, 355 U.S. 563 ........ 3,
Crumady v. Fisser, 358 U.S. 423 ............0000e-
DeGioia v. United, 304 F. 2d 421 ..................
Ferrante v. Swedish, 331 F. 2d 571 .............. 3,
Gutierrez v. Waterman, 373 U.S. 206 ..............
Italia v. Oregon, 376 U. S. 315 ..................
SEE GT. CEN GOO Fe BE OOO cccccccsctccercccece
PGE UV; DA Ge is SEE 6 oo eo ecb i dbicccndeees
Palazzolo v. Pan-Atlantic, 211 F. 2d 277, sub nom.
Ryan v. Pan-Atlantic, 350 U. 8.124 ..............
Santomarco v. United States, 277 F. 2d 255........
Skovgaard v. Tungus, 252 F’. 2d 14, 358 U. 8.588 ....
Smith v. Jugoslavenska, 278 F. 24 176 ............
YY Oo FF OO SF SF CO ~ - CO WH
YY Oo _
Supreme Court of the United States
October Term, 1965
No. 542
ra
Ww
BENJAMIN Pisano,
Petitioner,
against
S. S. Benny Sxovu, her engines, boiler, tackle, etc., in rem,
and Ove Sxou, D/S Ove Sxovu, A/S and D/S af 1937 A/S,
Respondent,
against
Joun T. Crank & Son,
Respondent-Impleaded.
r, =
Vw
PETITIONER’S REPLY BRIEF
While the findings of the District Court were challenged
in the Court below, following the settled rule of this Court
that affirmed findings cannot be reviewed, petitioner has
not taken issue with said findings and admits, without
reservation, that petitioner improperly rigged the preventer
wire which created an unseaworthy condition and which,
some six working hours later, resulted in the accident and
petitioner’s injuries.
The District Court, in its opinion, did not take up the
question of primary duty of the shipowner and of the
stevedores to inspect, detect, and @orrect an open defect
of which it knew or should have known. Its decision of
some eight pages (pp. 9-16) did not have a single word
as to whether the shipowner used reasonable care to carry
out its obligation and whether the stevedore performed in
a workmanlike manner, retaining control over the opera-
1 Pages of Appendix.
tion by reasonable normal observation of the activity
aboard its ship m order to carry out the continuing duty
to provide the petitioner and his fellow workers with a
seaworthy vessel and with a safe place to work.
The District Court, in exquisite detail, outlined the past
history of the vessel and followed the activities of the peti-
tioner and of the stevedore operation step by step from
the time the vessel docked and work began at 1:00 P.M. on
July 21st until the collapse of the boom at 10:00 A.M. on
July 22nd. Throughout all of the opinion not a word was
written about the duties, responsibilities or activities of
any one other than the work gang, including petitioner,
yet the Court of Appeals concluded that the entire issue
of whether the shipowner, through its officers and crew
members, or the stevedore, through its boss, carried out
their duties toward the petitioner, was fully determined.
The sentence: ‘‘The unseaworthiness, resulting from the
manner in which the preventer wire was rigged, was the
sole proximate cause of the injuries to libellant’’ (p. 16),
was in fact held to be a full decision of the issue.
And so—with the use of one word upon which to base
its decision and with total silence even to the presentation
of the issue, the Court below ruled that it had been fully
discussed -and determined by the District Court.? Cer-
tainly the sentence was open to the interpretation that the
petitioner was_solely liable for creating the condition—as
it is admitted he was for the purpose of argument.
2 If “sole” was a determination that the shipowner and stevedore.
carried out their responsibilities toward the petitioner, what was
the District Court’s basis for such finding? Where was the dis-
cussion of that responsibility and how that duty was fulfilled?
Where was the discussion of the law applicable to the issue of such
importance as to be the basis for the decision of the Court below?
Employment of the word out of all context has lead to the de-
struction of the petitioner’s case—and not on the basis of findings
but on the basis of absence of any findings at all.
3
The cases cited by petitioner all deal: «ith the question
of shipowner and stevedore duty toward business invitees.
The different fact patterns cannot change the applicability
of the rule of law whether the shipowner ‘‘knew’’ rather
than ‘‘should have known”’ of the danger as in Skovgaard
v. Tungus, 252 F. 2d 14 (3C), 358 U. 8. 588 and Connolly v.
Weyerhaeuser, 236 F'. 2d 848 (2C), sub nom. Weyerhaeuser
v. Nacirema, 355 U. S. 563, or whether non-liability was
predicated upon lack of reasonable time to correct as in
Knoz v. United, 294 F. 2d 354 (3C). The other cases cited
by petitioner, Crumady v. Fisser, 358 U. S. 423; Beard v.
Ellerman, 289 F. 2d 201 (3C), sub nom. Atlantic v. Ellerman,
369 U.S. 355; Gutierrez v. Waterman, 373 U. S. 206; Fer-
rante v. Swedish, 331 F. 2d 571 (3C) ; Brabazon v. Belships,
202 F. 2d 904 (3C) and Aldridge v. States, 265 F. 2d 554
(9C), discussed the duty to inspect, detect and correct an
open and obvious danger and predicated liability upon the
failure to do so. Such is the case herein.
While the Court below did not take up the subject of
whether the condition was visible to inspection and super-
vision, the District Court’s decision clearly pointed out
that the improper rig was ‘‘on the deck’’ from bolt to turn-
buckle (p. 10), all in accordance with the uncontradicted
proof that the preventer was rigged on the open deck of
the vessel (21-24, 88).
The Court of Appeals did not deny that the knotless
rigging was on the deck but stated (although the District
Court had been absolutely silent in the matter) that a~~
‘‘minute, continuous supervision of every detail’’ would
have been necessary to detect the condition, a condition
that was on the open deck during six hours of actual work
operation and a fundamental part of the overall operation
affecting the safety of the entire ship to such extent that
the failure to properly rig caused the collapse of the ship’s
boom with its consequent injuries and damages.
8 Pages of the trial transcript.
4
Further, no mention at all was made of the duty of the
stevedore to properly inspect and supervise the operation
when once again the uncontroverted evidence was that he
was to inspect this most important rigging routine to assure
its safety during the cargo operation (9, 13, 41-42, 45, 322).
Such lack of proper inspection of the rigging by the
stevedore- boss so as to detect the lack of the knot was
a failure to perform in a workmanlike manner, Palageo v.
Pan-Atlantic, 211 F. 2d 277 (2C), sub nom. Ryan v. Pam-
Atlantic, 350 U. S. 124; Italia v. Oregon, 376 U. S. 315;
Calmar v. Nacirema, 266 F. 2d 79 (4C); Smith v. Jugosal-
venska, 278 F. 2d 176 (4C); Ferrante v. Swedish, 331 F. 2d
571 (3C); Néicrolt v. Den, 332 F. 2d°651 (2C); DeGtota v.
United, 304 F. 2d 421 (2C); Caputo v. United, 311 F. 2d
413 (2C) ; Santomarco v. United States, 277 F. 2d 255 (2C),
giving raise to Hability of the shipowner, with indemnifi-
cation over from the stevedore.
We are now faced with the situation of failure of a
District Court to make any determination on this most
important of issues, and an affirmance by the Court below,
not on any factual basis (since there was none) but on the
use of one word taken out of context in the discussion of
another issue.
This issue of shipowner and stevedore duty to inspect,
etc., has more and more frequently come before various
Courts of Appeals in recent years, arising out of the concept
that the shipowner cannot surrender control over its ship
to evade its duty to provide business invitees with a sea-
worthy vessel, Alaska v. Petterson, 347 U. S. 396. While
in this matter petitioner created the unseaworthy condition,
shipowner’s liability was predicated, inter alia, upon the
intervening failure of the shipowner and stevedore to fulfill
their duties to inspect, detect and correct that condition,
as laid down by this Court in Weyerhaeuser v. Nictrema,
supra. This Court must now decide whether an open, dan-
gerous condition for a period of six working hours and
twenty-one hours in all, remaining dangerous through
periods when there was or should have been an inspection
by either or both the shipowner and stevedore, can be laid
only at the feet of its creator, for if that is so the effect of
the Petterson decision concerning shipowner’s primary duty
has been utterly destroyed. Not only did the shipowner
herein improperly surrender control over its vessel ‘but it
did so to one longshoreman, the petitioner. It is truly
amazing how the petitioner’s mistake, made so long before
the accident, through work periods when inspection was
required, through periods of changes in the boom position
requiring inspection, through changes in cargo requiring
inspection, was still considered the sole cause of all that
befell him, while those in command stood aside, did noth-
ing—and now innocently cluck their tongues.®
For the destruction of this Court’s decisions, in negating
the shipowner’s and stevedore’s primary duty to watch over
4 The cases cited by respondent-impleaded on page 4 of its brief
in opposition concern matters in which there was no time element
between plaintiff's wrongful act and the accident. As such they are
not material herein.
5 A similar situation arose in Ballwanz v. Isthmian, 319 F. 2d 457
(4C), in which the Fourth Circuit rejected the concept of plaintiff-
longshoreman’s contributory negligence for injuries sustained during
the loading of cargo, in operation for three hours.
“The plaintiff longshoreman was at the bottom of the hier-
archy of command and we fail to see how we can be held
responsible for the manner of operations of the stevedore
company. The defendant ship owner has a general responsi-
bility for the manner in which the loading operations on his
vessel were carried out. If it was negligent and dangerous
to ‘sling’ the spreaders up instead of passing them up, then this
manner of operation had been going on under the general super-
vision of the ship owner and the particular supervision of the
stevedore company for nearly three hours before the injury
occurred” (p. 460).
= eee BIN RO
the vessel, petitioner submits that this Court should con-
sider, at this time, what responsibility is demanded of the
shipowner and of the stevedore so as to provide a known
basis of safety to the working gangs, all in accordance with
decisions of this Court and various Courts of Appeals,
cited above.
CONCLUSION
A writ of certiorari should be granted in accordance
with the prayer of the petition.
Dated: October 11, 1965.
Respectfully submitted,
GotpsteIn & STERENFELD,
Counsel for Petitioner,
50 Broadway,
New York, New York 10004.
Atvin P. ApFELBERG,
of Counsel.
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.