Petition for Writ of Certiorari — Carr v. Pacific Maritime Ass'n
Supreme Court brief1991
Ask Donna
What actually matters in this document.
Text
@ FILED
Nc § 9-8 19— NOV 23 1990
— ee QOSEPH F. SPANIOL, JR.
IN THE , EK
SUPREME COURT
OF THE UNITED STATES
October Term, 1990
JOHN CARR, et al.,
Petitioners,
vs.
PACIFIC MARITIME ASS'N, et al.,
Respondents.
GREG BROOKS, JUDY CHECKERS, et al.,
Petitioners,
vs.
PACIFIC MARITIME ASS'N, et al.,
Respondents.
PETITION FOR A WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE NINTH CIRCUIT
GEORGE W. SHAEFFER, JR.
SILVER, GOLDWASSER & SHAEFFER
1201 Dove Street, Suite 600
Newport Beach, California 92660
(714) 955-197]
Counsel for Petitioners
\S
Lorraine Mitchel - Legal Briefs
732 E WASHINGTON BOULEVARD
LOS ANGELES. CALIFORNIA 90021
TELEPHONE (213) 747-5631
CONTENTS REPRODUCED FROM FURNISHED PRETYPED COPY.
QUESTIONS PRESENTED
1. Did the District Court err in
granting summary judgment on the ground
that Petitioners are barred from bringing
their actions due to their failure to
exhaust the collective bargaining grievance
procedure.
2. Are there genuine issues of
material fact showing Petitioners are
excused from exhausting the collective
bargaining grievance procedure.
3. Viewing the facts and the law
in the light most favorable to Petitioners,
are Petitioners excused from exhausting the
collective bargaining grievance procedure
for one or more of the following reasons:
a. The lack of neutrality in
the membership of the Port LRC renders the
i
exhaustion of the grievance procedure of
the non-§13 claims futile.
b. The lack of neutrality in
the membership of the Port LRC and the lack
of guaranteed arbitration of §13 claims
renders the exhaustion of the grievance
procedure of the §13 claims futile.
C. The grievance and
arbitration procedures are inadequate in
situations such as this which involve a
fundamental challenge to the registration
process.
d. The grievance procedure is
not speedy.
e. The unions' breach of
their duty of fair representation excuses
any Claim of exhaustion as a defense.
e. The repudiation of the
contract grievance and arbitration
procedures by Respondents permits judicial
ii
review of Petitioners' breach of contract
claims.
iii
Ieen 4 oe
goer
fae lcs
‘ eyarerd +i See
LIST OF PARTIES
The Petitioners before this Court are
too numerous to be conveniently listed.
Therefore, the identities of each of the
Petitioners are set forth in the appendix
hereto, p.la infra.
The Respondents before this Court are
the Pacific Maritime Association, the
International Longshoremen's and
Warehousemen's Union and two of its!
locals, Local 13 and Local 63.
iv
TABLE OF CONTENTS
QUESTION PRESENTED. . ...... +
LIST OF PARTIES ...+ + © © © @ «
TABLE OF AUTHORITIES ......2e-s
OPINIONS BELOW > . * > > >. 7 > > > .
JURISDICTION . . «. © © © © © «© «© «
STATUTE INVOLVED .... +. 2 © « « «
STATEMENT OF THE CASE. . ... +s «
A.
Nature of the Case and Course
of Proceedings. ......
Statement of Facts. .
l.
2.
TRO POFELES. « « 2 « «
Relevant contract
provisions
a. Non-§13 and §13
claims or jrievances.
b. Grievance procedure
The challenged
BOMABGEOCEOR « « 2 0 tc
The registration appeals
DEOCO@SB. « 2 2 2 © c ec
Petitioners' grievances.
Vv
20
20
nite
TABLE OF CONTENTS cont'd...
REASONS FOR GRANTING THE WRIT. ... .
I.
The Doctrinaire Approach of the
Ninth Circuit's Decision in this
Matter Conflicts with Decisions of
this Court, Decisions of Other
Circuits, and Defeats the Overall
Purpose of Federal Labor Relations
POLICY « sos wa Se we wc
A. The Lack of Neutrality in the
Membership of the Port LRC
Renders the Exhaustion of the
Grievance Procedure of the Non-
Bid Game Bweese. «© 2 3s 8k et
As Senn /< 2 6 ee
2. Exhaustion of non-§13
Claims was futile .....
3. Exhaustion of §13 claims
i ees ss eee ef
B. The Grievance and Arbitration
Procedures are Inadequate in
Situations such as this which
Involve a Fundamental Challenge
to the Registration Process. .
Cc. The Grievance Procedure is
mot Speedy . ...+.+«-+-e«-s+e -.
D. The Union's Breach of its'
Duty of Fair Representation
Excuses any Claim of Exhaustion
as a Defense .. «+ +2 «ce © «
vi
28
28
29
29
36
42
45
53
57
TABLE OF CONTENTS cont'd... PAGE
E. Repudiation of Contract
Grievance and Arbitration
Procedures by Defendants Permit
Judicial Review of Plaintiffs'
Breage @F COomtereact . . «2s e e 61
1. The Port LRC
Discouraged Appeals ... 62
CONCLUSION 65
vii
’
a
al .
¥
oo
= '
” , P
as
1s
Aa
a
-_
'
§ ,
*
o>.
= ’ :
ry
'
*
¥ ’
“a r .
Lhe s
'
.
'
: i
oe eae a ae ee SS a
TABLE OF AUTHORITIES
CASES PAGE
Vv
904 F.2d 1313 (9th Cir. 1990) 2
Cook Industries, Inc. v._
C.Itoh & Co., Inc,
449 F.2d 106, (2nd Cir. 1971) 34
Del Costello v. Internationa] —
Brotherhood of Teamsters
462 U.S. 151, 155, 103 S.Ct. 2281,
76 L.Ed.2a 476 (1983) 22
Early v. Eastern Transfer
699 F.2d 552, 558
(lst Cir. 1983) 34
393 U.S. 324, 89 S.Ct. 548,
21 L.Ed.2d 519 (1969) 29, 31-33
549 F.2d 1346 49
Repu a
379 U.S. 650, 85 S.Ct. 614,
13 L.Ed.2d 580 (1965) 28, 31-33
45
Sheet Metal Workers v. Kinney Air
Conditioni °
756 F.2d 742 (9th Cir. 1985) 32
viii
CASES PAGE
United Steelwor) e 2 ,
648 F.2d 905 (3d Cir. 1981) 34
Vaca v. Sipes
424 U.S. 554, 96 S.Ct. 1048,
47 L.Ed.2d 231 (1976) 29, 37, 38
61-62
Williams v. Pacific Maritime Assn,
617 F.2d 1321, 1330 n.15
(9th Cir. 1980) 45, 48
STATUTES
United States Code
28 USC §1254(1) 5
28 USC §1337 3
29 USC §185 3e3,6
_
a
3
a ry
‘=z
2
‘o
it
«
j
=
As
-,
a
4 S
;
=
“
”
) ,
ar
5
- +
2
al
a
’
>
,
*
ee
— if
_ e Z
~~ Pi ea SS eae
IN THE SUPREME COURT OF THE UNITED STATES
October Term, 1990
JOHN CARR, ET AL.,
Petiticners,
Vv.
PACIFIC MARITIME ASS'N, ET AL.,
Respondents.
GREG BROOKS, JUDY CHECKERS, ET AL.,
Petitioners,
Vv.
PACIFIC MARITIME ASS'N, ET AL.,
Respondents.
PETITION FOR A WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE NINTH CIRCUIT
The Petitioners respectfully pray that
a writ of certiorari issue to review the
judgment and opinion of the United States
Court of Appeals for the Ninth Circuit
entered in this action on May 21, 1990.
1
OPINIONS BELOW
The Opinion of the United States Court
of Appeals for the Ninth Circuit in this
matter is for publication. The Opinion is
reported at 904 F.2d 1313 (9th Cir. 1990).
The Opinion is reprinted in the Appendix
hereto, p.la, infra.
The District Court's Statement of
Uncontroverted Facts and Conclusions of
Law, and Summary Judgment (Fernandez, j.)
entered June 3, 1987 have not been
reported. They are reprinted in the
appendix hereto, p.6la and p.75a,
respectfully, infra.
The District Court's findings and
| judgment in the related actions of Brooks
/and Checkers are identical in all material
respects to Carr; therefore, they are not
reprinted in the appendix.
JURISDICTION
The jurisdiction of the District Court
was invoked pursuant to Section 301 of the
Labor Management Relations Act, 29 U.S.C.
§185(a) and (b), and 28 U.S.C. §1337.
On June 8, 1987, the District Court
entered summary judgment in favor of
Pacific Maritime Association (hereinafter
"PMA"), International Longshoremen and
Warehousemen's Union (hereinafter "ILWU"),
and International Longshoremen and
Warehousemen's Union, Locals 13 and 63
(hereinafter "Local 13" and “Local 63"),
and against the plaintiffs in the Carr
action.1 On July 6, 1987, the Carr
1 The individual plaintiffs in the
Carr, Brooks, and Checkers actions will be
hereinafter collectively referred to as
"Carr", "Brooks", and "Checkers" unless
otherwise indicated.
Plaintiffs filed a Notice of Appeal.
The Brooks and Checkers actions were
consolidated by the district court for all
purposes on September 21, 1987. On
September 29, 1987, the District Court
entered summary judgments in favor of PMA,
ILWU and Locals 13 and 63, and against the
plaintiffs in the Brooks and Checkers
actions. On October 16, 1987, the Brooks
and Checkers plaintiffs filed Notices of
Appeal.
On September 16, 1988, the case was
argued before a panel of the Ninth Circuit
Court of Appeals and submitted. On May
21, 1990, the Court's Opinion was filed
affirming the decisions of the District
Court. Judge Hall filed a lengthy dissent.
See, p.la, infra.
On June 6, 1990, a Petition for
Rehearing with Suggestion for Rehearing En
4
Banc was filed. On August 24, 1990, the
Ninth Circuit filed an order denying the
petition for rehearing, and rejecting the
suggestion for a rehearing en banc.
Petitioners have made no application
for an extension of time to file a Petition
for Writ of Certiorari.
The jurisdiction of this Court to
review the judgment in the Ninth Circuit is
invoked under 28 U.S.C. §1254(1).
STATUTES INVOLVED
29 U.S.C. §185. Suits by and against
labor organizations.
Venue, amount, and citizenship.
(a) Suits for violation of contracts
between an employee and a labor
organization representing employees in an
industry affecting commerce as defined in
this chapter, or between any such labor
5
a
organizations, may be brought in any
district court of the United States having
jurisdiction of the parties, without
respect to the amount of controversy or
without regard to the citizenship of the
parties.
STATEMENT OF THE CASE
A. Case _a
of Proceedings.
Petitioners' cases arise under Section
301 of the Labor-Management Relations Act
of 1947, 29 U.S.C. §185. The Carr action
was filed on November 5, 1985; the Brooks
action was filed on January 15, 1986; and
the Checkers action was filed on March 24,
1986. Petitioners filed actions against
Respondents alleging that their failure to
be registered as either longshoremen or
clerks was in violation of various terms of
6
the applicable collective bargaining
agreements. The actions seek the
registration of Petitioners as longshoremen
or clerks, the deregistration of
individuals who were improperly registered,
and the appointment of a special master to
control or monitor all future registrations
in the Los Angeles-Long Beach Harbors
(hereinafter "Harbors").
The underlyirg dispute arose when
Respondents registered additional Class "B"
longshoremen and Class "B" clerks for
Harbors. Employment as a longshoremen or
clerk is accomplished by a registration
process. The registration process being
challenged in this action occurred from
approximately September of 1984 through
early May of 1985. The Petitioners were
not selected for registration as either
longshoremen or clerks.
7
.
Pursuant to stipulation, the parties
agreed to limit their discovery and
thereafter engaged in extensive discovery
related to the issues of whether
Petitioners exhausted or were excused from
exhausting the collective bargaining
grievance procedure. Pursuant to the
stipulation, the parties engaged in no
formal discovery associated with the
specific contentions in the Complaints.
On June 11, 1986, the parties filed a
stipulation and the district court ordered
a stay of the proceedings in all three
actions until a scheduled arbitration
involving the timeliness of the
Petitioners' group grievances alleging
discrimination (§13 claims) could be heard
and decided by the coast arbitrator. The
district court's order specifically
permitted the completion of the outstanding
8
‘te Mi be 7 : ni 7 - 5
wee kr: Pe ae ee ee ee art eee ee Ae ee
a -
:
‘
!
“
|
.
é
wT -
; oem “ .
. ; 7 ay y “ he i. a
= * ‘ 4 ” ; i ‘ . ial 7 sy =r 2 a
discovery among the parties on the
exhaustion issues. The stipulation was
without prejudice to the parties’ claims
concerning the adequacy of the grievance
procedure. Petitioners intention to oppose
the Motions for Summary Judgment on any one
of the exceptions to the exhaustion rule
was Clearly stated in the stipulation.
The arbitrator issued his decision on
January 15, 1987 (discussed, infra.). The
arbitrator found Petitioners §13
discrimination claims were time barred, and
there had been no abuse of discretion in
failing to extend the ten day time period
for filing §13 discrimination claims. The
Petitioners' non-§13 claims were not the
subject of the arbitration award.
Summary judgments were entered in
favor of Respondents and against Carr on
June 8, 1987, and against Brooks and
= re i
ia idee
5
Sir
ua
}
<> - 7 | 3 RY ;
Pe eG the PPAR
Checkers on September 2S, 1987. The
District Court held that Petitioners were
barred from maintaining their actions by
their failure to exhaust the collective
bargaining grievance procedure. The Ninth
Circuit affirmed with Judge Hall
dissenting. The merits of Petitioners’
claims have never been addressed by the
Port LRC, the arbitrator, the district
court, or the Ninth Circuit.
B. Statement of Facts.
1. The parties.
PMA is an association of West
Coast stevadoring, shipping, and terminal
companies. The ILWU is the exclusive
bargaining representative of longshoremen
and clerks who work for PMA members. Locai
13 is an affiliated local union of ILWU.
Local 13 represents longshoremen employed
by PMA member companies in the Harbors.
10
Local 63 is also an affiliated local union
of ILWU. Local 63 represents clerks
employed by PMA member companies in
Harbors.
PMA and ILWU are parties to a
collective bargaining agreement known as
the Pacific Coast Longshore and Clerks
Agreement (hereinafter “PCLCA"), which is
comprised of two documents: the Pacific
Coast Longshore Contract Document
(hereinafter "PCLCD"), and the Pacific
Coast Clerks Contract Document (hereinafter
"PCCCD"). The PCLCD governs the terms and
conditions of employment for longshoremen
employed by PMA member companies. The
PCCCD governs the terms and conditions of
employment for marine clerks employed by
PMA members companies. The parties to the
PCLCA, PCLCD, and PCCCD are PMA, on behalf
of its member companies, and the ILWU on
11
behalf of itself and certain of its
affiliated local unions.
Petitioners are 127 casual
longshoremen and clerks whose applications
for registration is class "B" longshoremen
or clerks in the Los Angeles Harbor area
were rejected.
2. Relevant contract
provisions
(a) Non-§13 and §13
claims or grievances,
Petitioners allege, in
their complaints filed in district court
and in the group grievances filed with the
Port LRC violations of various sections of
the collective bargaining agreements; the
Claims are denominated non-§13 and §13
(discrimination) claims. Petitioners' non-
§13 (non-discrimination) claims involve the
following allegations: A violation of §8.31
12
——-
tet ae
.
“
‘
.
ee eee ee ee ae eee ee ae ar ee : >. Pay
of the PCLCD which requires the Joint Port
Labor Relations Committee and the Coast
Labor Relations Committee (hereinafter
"Port LRC"® and "Coast LRC") to control the
registration process.* Petitioners allege
a vioiation of §8.43 which prohibits
favoritism or discrimination in the hiring
of longshoremen.? Petitioners request the
deregistration and discharge of any
individual who violated §8.43 pursuant to
§8.44.4 Petitioners allege a violation of
§9.1 which recognizes the principle of
promotion from the ranks.° Petitioners
2 §8.31 is reprinted in the appendix
hereto, p.83a, infra.
3 §8.43 is reprinted in the appendix
hereto, p.83a, infra.
4 §8.44 is reprinted in the appendix
hereto, p.83a, infra.
5 §9.1 is reprinted in the appendix
hereto, p.83a, infra.
13
allege a violation of §9.2 which requires
some of the qualifications for promotion to
be length of service in the industry and
competency. ® Petitioners allege a
violation of the good faith guarantee, §18,
which requires the Respondents to observe
the agreements in good faith.’ Finally,
Petitioners allege a §13 (discrimination
claim) in violation of §13 on the basis of
membership or non-memberships in the
Union. 8
(b) Grievance procedure.
The relevant collective
bargaining grievance procedure is set forth
in §17 of the PCLCA and PCLCD. The details
6 §9.2 is reprinted in the appendix
hereto, p.83a, infra.
7 §18.1 is reprinted in the appendix
hereto, p.83a, infra.
8 §13 is reprinted in the appendix
hereto, p.83a, infra.
14
Se ee ee, ee eee ee Oe ee ee Oe eee ee ee ee oe See. |
of the various provisions of the grievance
procedure are discussed in Williams v.
Pa s & 617 F.2d.
1321, 1323-26, 1329 (Sth Cir. i960).
Generally, the grievance procedure provides
a process to resolve non-discrimination or
non-§13 grievances, and a procedure to
resolve discrimination or §13 grievances.
A §13 grievance is explicitly limited to
claims of discrimination based upon, inter
alia, membership or non-membership in the
Union. Williams v. Pacific Maritime
Association, supra, at 1329.
Non-§13 grievances are
processed pursuant to the provisions of
§17.23.2 Section 17.23 empowers the Port
LRC to investigate and adjudicate the
9 §17.23 is reprinted in the appendix
hereto, p.83a, infra.
15
;
grievance. Pursuant to 517.2419, a
decision of the Port LRC on the grievance
is final and binding except were there is a
disagreement between the employer and union
members of the Port LRC. Thus, an
individual grievant relying on provisions
of the PCLCA other than §13 has no right of
appeal beyond the Port LRC. (Id.)
If a grievant alleges a
Claim of discrimination in violation of §13
(a §13 claim or grievance), the grievance
is processed according to the terms of
g§17.4.11 The process is described in
§17.41 and is started by filing a grievance
with the Port LRC setting forth the facts
of the alleged discrimination. The
10 §17.24 is reprinted in the
appendix hereto, p.83a, infra.
11 §17.4 is reprinted in the appendix
hereto, p.83a, infra. :
16
ae
grievance is to be filed within ten days of
the date of the occurrence of the alleged
discrimination. The Port LRC is to
investigate the grievance and to allow the
grievant to appear, to state his case, and
to present oral and written evidence and
argument. 12 Section 17.411 permits the
Port LRC to extend the time for filing a
Claim of discrimination by up to six months
when it determines that an extension is
necessary to prevent inequity.13 Section
17.42 permits the grievant, the employer,
or the union to appeal a decision of the
Port LRC to the Coast LRC.14 pursuant to
§17.421, the Coast LRC is empowered to
12 §17.41 is reprinted in the
appendix hereto, p.83a, infra.
13° §17.411 is reprinted in the
appendix hereto, p.83a, infra.
14 §17.42 is reprinted in the
appendix hereto, p.83a, infra.
17
confirm, reverse or modify the decision of
the Port LRC with or without a further
hearing.1> Section 17.43 provides that:
"An appeal from the decision of the [Coast
LRC}] can be presented to the Coast
Arbitrator....by the individual involved,
the Employers, or the Union."16 Section
17.431 defines the arbitration procedure to
be "(tjhe procedures generally applicable
under this agreement..."17 Section 17.5
describes the powers of the arbitrators and
the finality of their decisions on the
parties.
3% The challenged
registration.
15 §17.421 is reprinted in the
appendix hereto, p.83a, infra.
16 §17.43 is reprinted in the
appendix hereto, p.83a, infra.
17 §17.431 is reprinted in the
appendix hereto, p.83a, infra.
18
The Coast LRC authorized the
registration of 350 additional Class "B"
longshoremen and clerks in Harbors in
August, 1984. Approximately 30,000
applications were handed out for
registration as a longshoremen or clerk.
Approximately 22,250 completed
applications were returned by September 26,
1984. The applications were scored by a
committee comprised of representatives of
PMA and Locals 13 and 63. The applications
were scored by the committee and those
individuals with the highest scores were
interviewed. In January of 1985, the
committee commenced registering successful
applicants in groups of 50. The initial
phase of the registration was completed on
May 4, 1985 resulting in the registration
of 300 Class "B" longshoremen, 50 marine
Clerks, and an additional 40 individuals
19
with tied scores. Ultimately, 410
individuals were registered as
longshoremen, and between 58 and 60
individuals were registered as clerks.
4. The registration appeals
process.
Pursuant to the direction of
the Coast LRC, a notice was posted on May
6, 1985 in the longshore, clerk, and casual
dispatch halls notifying individuals that
the initial phase of registration had been
completed, and appeals would be considered
timely if received on or before May 15,
1985.
5. Petitioners' grievances.
Approximately 318 appeals or
grievances were filed by unsuccessful
applicants for registration on or before
May 15, 1985. Among those filing
individual appeals or grievances were 28 of
20
the original Carr Petitioners. Carr
Petitioners Wasserman and Schreiner raised
nepotism and favori -* in the registration
process in their individual grievances.
The grievances of Schreiner and Wasserman
are still pending before the Port LRC.
(Ia.)18 All of the other’ individual
grievances by the Carr Petitioners were
denied.
All of the Brooks Petitioners
filed individual appeals with the Port LRC
on or before May 15, 1985. Brooks
Petitioners Booher, Carlisle, and
Juergensen received no notification from
the Port LRC regarding the status of their
18 schreiner and Wasserman are
permitted by the summary judgment to pursue
only the timely filed individual
grievances.
21
appeal.19 the individual grievances filed
by all other Brooks Appellant were denied
by the Port LRC.
All but four of the Checkers
Petitioners filed individual appeals with
the Port LRC. The individual appeals which
were filed were denied.
On October 16, 1985, a
statement of grievance was submitted to the
Port LRC on behalf of the Carr Petitioners.
The grievance was amended and mailed to the
Port LRC on October 23, 1985.29 The first
19 Booher, Carlisle, and Juergensen
are permitted by the summary judgment to
pursue only the timely filed individual
grievances.
20 The Carr complaint was filed in
district court on November 5, 1985. The
proximity of the complaint and the group
grievance filed on October 16, 1985 was due
to the six month statute of limitation
which applies to these types of actions.
Del_ Costello v. International Brotherhood
of Teamsters 462 U.S. 151, 155, 103 S.Ct.
2281, 2285, 76 L.Ed.2d 476 (1983). Carr
22
amended statement of grievance (hereinafter
"amended grievance") includes as an
attachment "B" the preliminary factual
basis for the claim of favoritism in the
selection process. Attachment "B" shows
the family connection between many of those
registered and union members, or PMA and
Union officials.
The basic grounds for the group
grievances filed by the Carr Petitioners
waS a contention that the individuals
listed in attachment "B" to the amended
grievance were registered in violation of
§8.43 of the contract documents which
prohibit favoritism or discrimination in
the hiring of longshoremen or clerks.
was concerned that if the six month
limitation period accrued on May 6, 1985,
the date the notice of the grievance period
was posted at the casual hall, the six
month limitation period would expire on
November 6, 1985.
23
i i i i i ee i ea ee a
Additional facts were alleged in the group
grievances showing a violation of §§8.3,
8.43, 8.44, 9.1, 9.2, 9.3, 13 and 18.1 of
the PCLCD.
On January 16, 1986, and March
25, 1986, the Brooks and Checkers
Petitioners, respectively, filed appeals
with the Coast LRC which incorporated as
the ground for appeal the amended grievance
of the Carr Petitioners.
The statement of grievance
filed by the Carr Petitioners with the Port
LRC on October 16, 1985 provides, inter
alia, that "[Ajll grievants raise common
Claims which are based upon. recently
discovered facts derived from the
collaborative efforts of grievants. fThus,
grievants believe the instant grievances
are properly before the committee for
resolution of their claims." The Port LRC
24
had the discretion to hear the group
grievance pursuant to the provisions of
§17.411. §17.411 permits a discretionary
six month time period within which to file
a §13 claim of discrimination to prevent
inequity. See note 14, supra.
Carr was advised on April 11,
1986 by the Port LRC that the group
grievance was denied on the grounds that it
was untimely. Carr was notified that
appeals were to be filed within ten days of
either the action giving rise to the
grievance or the occurrence of the alleged
discrimination. Since the Carr grievance
was filed more than five months after the
completion of the registration, the
grievance was denied as being untimely.
(Id.) Carr was further notified by the
Port LRC in the April 11, 1986 letter that
the decision was not appealable and final
25
with respect to all matters relating to the
application and registration process.
However, an appeal of bona fide claim of
discrimination in violation of §13 could be
filed with the Coast LRC.
An appeal was filed with the
Coast LRC. On May 1, 1986, the Carr
Petitioners were notified by the Coast LRC
that the grievance was denied as being
untimely for the reasons stated in the Port
LRC's decision of April 11, 1986. The Carr
Petitioners were advised that they could
appeal to the Coast Arbitrator the issue of
the timeliness of their §13 claims of
discrimination. On May 1, 1986, the Coast
LRC also notified the Brooks and Checkers
Petitioners that their group grievances
were denied, but they had the right to
appeal to the Coast Arbitrator claims which
asserted discrimination in violation of §13
26
i nfia ==> oe
of the PCLCA.
Appeals were filed to the Coast
Arbitrator. Ina letter from the Coast LRC
dated May 16, 1986, all Petitioners were
advised that: "Your appeal with respect to
this case shall be limited to the
timeliness of the filing of §13
discrimination claims by the above-named
individuals." The arbitration was to be
heard in San Francisco.
The Coast Arbitrator issued his
decision on January 15, 1987. The
Arbitrator found Petitioners' §13
discrimination claims were timed nerve.
and there had been no abuse of discretion
by the Port LRC in failing to extend the
ten day time period for filing §13
discrimination claims under §17.411.
The merits of Petitioners’
grievances were not presented or resolved
27
4
during the collective bargaining agreement
grievance procedure. 21
REASONS FOR GRANTING THE WRIT
As a general rule, employees must
attempt to exhaust the grievance and
arbitration procedures established in a
collective bargaining agreement prior to
bringing an enforcement action in district
court. Republic Steel Corp. v. Maddox 379
U.S. 650, 85 S.Ct. 614, 13 L.Ed.2da 580
21 petitioners also filed intra-union
appeals with the ILWU. The appeals were
identical to those filed with the Port LRC.
The ILWU decided not to hear these appeals.
28
—
(1965); Vaca v. Sipes 424 U.S. 554, 563, 96
S.Ct. 1048, 1056, 47 L.Ed.2d 231 (1976).
The exhaustion requirement is subject
to a number of exceptions under a variety
of situations when the _ doctrinaire
application of the exhaustion rule would
defeat the overall purposes of the federal
labor relations policy. Glover _v. St.
Louijis-S.F.Ry. 393 U.S. 324, 329-31, 89
S.Ct. 548, 551, 21 L.Ed.2d 519 (1969). The
Petition presents such situations.
A. The Lack of Neutrality in the
Membership of the Port LRC
Renders the Exhaustion of the
Griev e Non-
1. Introduction.
The Court is requested in this
Petition to settle the confusion
Surrounding the degree of attempt which
29
i
must be made to utilize the private
collective bargaining grievance procedure
when such attempt would be clearly futile.
As Judge Hall notes in her dissent, the
Ninth Circuit's majority opinion in this.
case “[(Cjompletely emasculates' the
bias/futility exception". (Slip Op.
Appendix p.46a).
The majority opinion requires
Petitioners to file grievances with a
biased committee an allege in the grievance
that the committee is biased. As Judge
Hall notes, the Petitioners in this action
implicitly raised their objection by
specifically alleging in the grievance
particular family connections between
successful registrants and PMA and union
officials, members and employees;
therefore, the Petitioners objection to the
Port LRC's lack of nuetrality on the
30
appeared on the face of the grievance.
(Slip Op. Appendix at p.43a). Judge Hall
states that the Petitioners should be
excused from exhausting the grievance
procedure “(Bjecause it would have been a
futile act to submit a nepotism grievance
to a biased Port LRC panel on which both
union and management representatives had
engaged in the cronyism of which the
appellants complained." (Slip Op. Appendix
at p.47a).
Judge Hall notes that Maddox
was decided by this Court prior to Glover.
It appears logical that an attempt to
exhaust the collective bargaining grievance
procedures is required prior to claiming
such procedures are inadequate. However,
such an attempt is useless if plaintiffs
fit within the bias/futility exception.
(Slip Op. Appendix p.46-47, 50 & nn.6 and
31
9a). Judge Hall correctly notes that in
Glover the only attempt to exhaust
contractual remedies consisted of a simple
informal complaint to the company regarding
discrimination; the Glover employees never
utilized the grievance procedure by filing
a formal complaint with the union or the
company. (Slip Op. Appendix p.46 n.6a).
Finally, the majority holds
that Petitioners waived their right to
claim bias on the part of the Port LRC by
failing to raise the objection when the
committee convened. The majority,
therefore, rejects Petitioners’ claim that
they are excused from exhausting the
collective bargaining grievance procedure
because the grievance procedure it futile.
The majority relies upon the Ninth Circuit
Cpinion of Sheet Meta] Workers
International Association, Local No. 420 v.
32
Kinney Air Conditioning Company 756 F.2d
742 (9th Cir. 1985).
The Ninth Circuit's application
of Kinney to the present matter effectively
overrules this Court's opinion in Glover as
stated by Judge Hall in dissent. (Slip Op.
Appendix p. 46-47a). Judge Hall readily
distinguishes Kinney from the present
matter. Petitioners were not signatories
to the collective bargaining agreement,
Petitioners had no direct say in the
establishment of the procedures for
selecting panelists to the committee, and
Petitioners have never obtained a
determination on the merits of their
contract claims. (Slip Op. Appendix p.42-
43a). Therefore, Petitioners stand on a
much different footing than the parties in
Kinney who claimed bias at the conclusion
of the dispute resolution process although
33
ae
_s _ —_ , 4 ™ oA ene dl
the bias was known in advance to the
parties prior to the arbitration. Kinney
clearly waived his objecticn when he failed
to object to the selection of the board
members at the time they were seated to
hear the grievance. Kinney, supra at 746.
The following three other cases
cited by the majority opinion conflict with
the facts in the instant matter: Early v.
Eastern Transfer, 699 F.2d 552, 558 (1st
Cir. 1983), cert denied, 464 U.S. 824
(1983); Cook Industries, Inc. v. C.Itoh &
Co., Inc., 449 F.2d 106, 107-08 (2d Cir.
1971), cert denied, 405 U.S. 921 (1972);
United Steelworkers of America Local 1913
v. Union Railroad Co., 648 F.2d 905, 913-14
(3d Cir. 1981). As Judge Hall notes, all
three cases involve situations where
individuals went through an arbitration
process without objecting until they
34
3
received an adverse ruling. The plaintiffs
then complained in federal court about bias
situations which they knew prior to
proceeding with the arbitration. (Slip Op.
Appendix p.40 n.4a).
Judge Hall notes in dissent
that the Petitioners in this action are
required under the majority opinion to
present their bias claim té6 the Port LRC
before proceeding to federal court.
Because Petitioners failed to specifically
state that the committee members of the
Port LRC were "biased", Petitioners waived
their right to object to the bias of the
board. This interpretation overrules
Glover. As we previously stated bias of
the committee is clearly established in the
group grievance and in the evidence
presented in opposition to the motion for
Summary judgment. The doctrinaire approach
35
of the majority in this case defeats the
overall purpose of federal labor relations
policy. The majority opinion makes it now
impossible to bring a §301 action.
2. Exhaustion of non-§13
Claims was futile.
Petitioners assert many non-§13
discrimination claims. For example,
individuals were encouraged to falsify
information and documentation on their
applications, individuals were coached,
applications were prescored, individuals
were registered with little or no prior
maritime employment experience, and
Respondents failed to give priority in
registration to those individuals working
out of the casual hall. As_ previously
stated, the parties agreed to limit their
discovery to the exhaustion issues, the
subject of the present appeal.
36,
| Nevertheless, Petitioners conducted thier
own informal investigation. Petitioners
have identifed 223 of the _ successful
registrants who have little) or no hours of
experience as casual longshoremen. Thus,
Petitioners have presented evidence
establishing the validity of their
contentions that sections of the PCLCD
other than §13 were violated by
Respondents.
The identical lack of
neutrality found to exist in Glover exists
in the present appeal. The Petitioners are
challenging the very decision of the Port
LRC in registering those individuals with
family connections to members of the Port
LRC. The Port LRC minutes of October 16,
1985 reflect the minutes of the meeting at
which time the Petitioners presented to the
Port LRC their group grievance. The
37
chairman of the committee was David Arian,
President of Local 13. Charles Young, an
employee of PMA, was present for the
employers.
Arian's sister was registered
as a clerk during the 84-85 registration.
Young's mother was registered as a clerk
during the recent registration, and Young's
girlfriend was registered as a
longshoremen.
Moreover, Arian and Young were
two of the individuals who participated in
reviewing the grievances filed by the 318
individuals who had filed appeals or
grievances from their unsuccessful
registration. The minutes of the Port LRC
identify those individuals who reviewed the
registration grievances or appeals on
behalf of PMA and the Locals. Young and
Arian considered a total of 109 grievances
38
icc cael
from May 20, 1985 through July 9, 1985.
Furthermore, additional
represent-atives of the Port LRC who
reviewed some or many of the 318 individual
grievances also had family members who were
registered. Judge Hall identifies 6 Port
LRC representatives who had from 1 to 7
family members’. registered. (Slip Op.
Appendix p.38 n.3a).
The futility of presenting the
Appellant's grievance during the ten day
time period, assuming arguendo that the
months of collation and investigation could
have been compiled and presented prior to
May 15, 1986, is also shown by the
experiences of three of the Petitioners.
Davis was an unsuccessful applicant for
registration. Davis timely filed a
grievance and alleges generally favoritism
in the selection process. Davis' grievance
39
provides in relevant part: "Of the 15
women who were first chosen for
registration they were all related or close
friends of such people as _ Local 63
president, Local 63 dispatch, Local 63
committee member, Local 13 committee
member, and PMA committee member."
In a letter of July 19, 1985,
Davis was notified that her appeal was
denied. Young was a member of the
registration’ committee which heard the
appeal of Davis on or about July 19, 1985.
Young testified in his deposition that the
committee "did not feel she had a §13
grievance." Young believed Davis was vague
as to her allegations and she wasn't very
specific to §13. Wasserman and Schreiner
presented §13 claims to the Port LRC in
which they alleged favoritism and nepotism
in the selection process. Both individual
40
appeals were pending before the Port LRC at
the time the case was submitted to the
Ninth Circuit.
Viewing the evidence in the
light most favorable to Petitioners, there
are genuine issues of material fact
concerning the futility or lack of
neutrality of the Port LRC who would have
heard Petitioners' non-§13 claims had they
been presented on or before May 15, 1986.
The proper focus of the
futility argument should be during the time
period May 5 through May 15, 1986, the
relevant time period to file appeals. The
details of the identities of those
registered was not known during the 10 day
appeal period; the identities of those
individuals who would hear appeals was not
known; and the specific family connections
between those who would hear appeals and
41
ed
a ae
those who were registered was not known.
The information regarding family
connections of those registered was not
easily obtained. The Port LRC has never
published or made available to anyone other
than union or PMA officials an entire or
partial list of those applicants who were
registered as either a longshoremen or a
clerk during the 1984-85 registration
process.
3. Exhaustion of §13 claims
was futile.
Appellees argued to the
district court that resort to the grievance
and arbitration process in the collective
bargaining agreement is not _ futile.
Appellees argued that an individual's right
to pursue §13 claims to the Coast
Arbitrator insulates Appellees from a claim
that the grievance and arbitration
42
procedures are futile. However, in the
present petition, this claim should be
rejected. Under the specific terms of the
collective bargaining agreement, the Port
LRC has original jurisdiction over §13 and
non-§13 claims. As such, the Port LRC's
neutrality is at issue irrespective of the
availability of further levels of appeal.
Secondly, the present petition
presents contract claims which are not §13
discrimination claims. The decision of the
Port LRC on Petitioners' contract claims or
non-§13 claims is final and binding.
Grievants can pursue only their §13 claims
to the Coast LRC and to the Coast
Arbitrator. However, the Coast LRC's
consent to an arbitration before the Coast
Arbitrator is required.
For example, Petitioner
Wasserman presented §13 claims to the Port
43
LRC. Wasserman's grievance alleged
favoritism and nepotism in the selection
process. The Port LRC rejected these
claims. Wasserman appealed to the Coast
LRC. The Coast LRC remanded the matter
back to the Port LRC to conduct a hearing
on Wasserman's claims. A §13 grievance
hearing was conducted by the Port LRC in
October of 1985. No decision had been
rendered. Therefore, the Wasserman
situation is instructive. There is no
guarantee in the collective bargaining
grievance procedure that grievant's §13
grievance will be heard by any entity other
than the Port LRC.
Davis also presents an
instructive example of situations showing
the futility of appealing a §13 grievance.
Davis received no notification of her
appeal rights from the denial of a §13
45
oP Ore eS LOE NY LEE LEE LET LN OLN AS RE NTRS! LF. UNUM MONE NR AE
irievance which was based upon favoritism
n the selection process. Davis was
‘equired by the Coast LRC to -eceive
iotification of her rights of appeal from
the denial of a §13 crievance.
B. The Grievance and Arbitration
Procedures are Inadequate in
to the Registration Process.
An additional exception to the
‘xhaustion rule is that the process and
remedies must be adequate. Republic Steel
orporation v. Maddox, supra at 653, 85
.Ct. at 616. Williams v. Pacific Maritime
issociation, supra at 1328 and n.13. In
‘he instant matter, neither the procedures
ior the remedies available in the grievance
nd arbitration process are adequate to
ddress the merits of the claims of the
45
Petitioners.
Discovery of the application and
supporting documents of the successful
applicants is critical to proving: the
merits of the contentions of the
Petitioners. Once the applications and
supporting documents are obtained, the
merits of the various contentions of the
Petitioners can be verified. The accuracy
of the information contained on the
successful applicants' applications and
Supporting documents can be verified
through employers and _ school records.
Family connections can be verified by the
addresses, and if necessary, drivers’
licenses. 22 Until the application and
Supporting documents are obtained through
22 An example of a completed
application and the information requested
On such an application is in the record.
46
Cire yee on ineeerenn irs Siac aaa
Ag SEO GE
-he discovery process, the merits of the
contentions cannot be conclusively proven.
The Petitioners' grievances allege a
yreach of various sections of the
collective bargaining agreement (non-§13
jrievances), and Plaintiffs' §13
jrievances. Both grievances are originally
considered by the Port LRC. The Port LRC
ioes not permit an employee to be
represented by an attorney. Additionally,
there is no pre-hearing discovery permitted
in §13 grievances, and by implication, non-
$13 grievances.
At the Port level, parties do not have
the power to compel by subpoena or
Stherwise the production of documents or
appearance of witnesses. The Coast
Arbitrator does not have the power to
subpoena witnesses or documents according
-O the deposition testimony of Inter-
47
national Vice President Rubio, and PMA Vice
President Holtgrave believe otherwise.
Pre-hearing discovery is essential in
this type of case. Even if the Coast
Arbitrator was able to subpoena records to
an arbitration, the Petitioners would be
limited to attacking the validity of the
documents on their face. Obviously, the
Petitioners would have insufficient time to
conduct the necessary investigation to
determine the validity of the statements
contained in the application and the
supporting documents from the successful
applicants.
Moreover, the arbitrator's powers are
limited strictly to the application and
interpretation of the agreement as written.
See PCLCD §17.52, and Williams v. Pacific
Maritime Association, supra at 1328 n.13.
The arbitrator has no power to award
48
successful grievants attorneys fees. The
Coast Arbitrator does not have the power to
appoint the special master as requested in
the Brooks and Checkers complaints to
control future registrations. Petitioners
contend that the favoritism and nepotism in
the selection process during the 84-85
registration process is ae revisit to
illegally disguised sponsorship. In
National Labor Relations Board v.
international Longshoremen's and
Warehousemen's Union, Local 13 549 F.2d
1346, 1351 (9th Cir. 1977), the Court
enforced the NLRB's findings that’ the
sponsorship program required in Harbors at
one time was a form of discrimination in
violation of §§8(b) (1) (A) & (2) of the
National Labor's Relation Act, 29 U.S.C.
§§158(b) (1) (A) & (2).
Finally, the Ninth Circuit's Opinion
49
we tse, = ec 2s !lC
_ = — sw ee ——
aCe a ee
contradicts this Court's decision in Maddox
and Hines. Both Maddox and Hines require
that some attempt be made to exhaust
contractual grievance procedures prior to
bringing an enforcement suit. This Court
has not described with any degree of
specificity the nature of the requisite
attempt. In this particular matter, Judge
Hall's dissent clearly describes the
efforts of Petitioners in attempting to
exhaust the collective bargaining grievance
procedure. (Slip Op. Appendix p.50a et
seq.) It was virtually impossible to
establish persuasive evidence of nepotism
and favoritism within the registration
process within the ten day filing period.
Moreover, the details of the
identities of those registered was not
known during the 10 day appeal period; the
identities of those individuals who would
50
ee ee ee ee a es ee ee ey Cm ee Ne
hear appeals was not known; and the
specific family connections between those
who would hear appeals and those who were
registered was not’ known. The record
describes the collaborative efforts of the
Petitioners in discovering the information
which is identified in attachment "B" to
the amended grievance, and the extensive
exhibits attached to the Frank Rodriguez
declaration.
The information regarding family
connections of those registered was not
easily obtained. The Port LRC has never
published or made available to anyone other
than union or PMA officials an entire or
partial list of those applicants who were
registered as either a longshoremen or a
Clerk during the 1984-85 registration
process.
The information contained in
51
‘weer eS ee ee ae ee ee ee ee eee oe a
attachment "B" to the amended grievance and
exhibits 1 through 4 to the Frank Rodriguez
declaration was obtained by the Petitioners
interviewing a substantial number of people
over a long period of time. The specific
information was simply not available by May
15, 1985, the purported deadline in which
to appeal one's non-registration.
The Petitioners submitted their claims
to the Port LRC; it refused to hear it.
The Port LRC had the discretion to hear the
grievances for up to six months; it
rejected them. As Judge Hall notes:
"Considering the difficulty in obtaining
evidence, Plaintiffs' good faith effort to
file their grievance should have been
allowed." (Slip Op. Appendix p.57a.) Judge
Hall states, "The majority treats
appellants' unsuccessful attempt as if it
were equal to no attempt!!! Thus barring
52
Petitioners' complaint. (Slip Op. Appendix
p.53a & 54a.)
Petitioners attempt to pursue the
contractual remedies was sufficient to
satisfy the Maddox requirements. Genuine
issues of material fact exist as to the
adequacy of the remedies and procedures in
the grievance procedure concerning the
issues presented in this appeal.
Cc. The Grievance Procedure jis not
Speedy.
In this action, the Petitioners' group
grievances were filed in October of 1985.
The attorney for Petitioners received a
response from the Port LRC on April 14,
1986, denying the grievances on the grounds
of timeliness. Pursuant to the notice from
the Port LRC, an appeal was filed to the
Coast LRC. On May 1, 1986, the Petitioners
were advised by the Coast LRC that their
a3
i te ee
ee ee
rrr
grievances were denied as being untimely.
Pursuant to the notice of the Coast LRC, an
appeal to the Coast Arbitrator was filed,
and the Coast LRC notified Petitioners on
May 16, 1986 that an arbitration before the
Coast Arbitrator was scheduled.
The parties agreed to submit to the
Coast Arbitrator, Sam Kagel, the evidence
supporting their respective contentions by
July 16, 1986. On or before August, 1986,
the parties agreed to mail their respective
legal briefs to the Coast Arbitrator. By
agreement of the parties, the deadline for
submitting briefs was extended to August 8,
1986. The arbitrator did not rule until
January 15, 1987. Thus, the timeliness of
Petitioners' §13 grievances was not
determined for a period of 15 months from
the initial submission of the grievances in
October, 1985.
54
“ye
Dy sags Seg RY
Moreover, the grievance procedure is
not designed to speedily resolve the types
of claims presented by Petitioners in this
action. Assuming that the Petitioners'
claims had been presented to the Port LRC
prior to May 15, 1985 with the degree of
specificity of the October, 1985
grievances, the Port LRC would have
original jurisdiction over the claims. The
Petitioners could only appeal the non-§13
claims. Their evidence concerning §13
claims would then be presented to the Coast
LRC should there be an appeal, and if
permitted by the Coast LRC, to the Coast
Arbitrator. Such a process would obviously
exhaust even the most intrepid, patient and
financially solvent grievant.
Finally, neither Petitioners Wasserman
nor Schreiner had received notice from the
Port LRC of the final disposition of their
55
POT LOS ROTI LOIS AILS TS 8 NAM EIT UM, PIE gE BE MOONY TOPS EUST YC TRAE A LAI OD
claims of favoritism and nepotism in the
selection process from the Port LRC at the
time the case was submitted to the Ninth
Circuit. Schreiner's individual grievance
has been pending since July of 1985, and
Wasserman's grievance has been pending
since October of 1985. Genuine issues of
material fact exist as to whether the
grievance procedure is speedy when the
claims presented in this appeal are
involved.
Judge Hall notes in dissent that the
unreasonable delays in the process both
"(Ijluminates the fundamental procedural
inadequacy of the grievants and arbitration
procedure to deal with a large class
related grievances arising out of an
allegedly discriminatory registration
process." (Slip Op. Appendix p.58a).
56
Defense.
The Opinion conflicts with this
Court's observation in Vaca v. Sipes, supra
at 186, 87 S.Ct. at 914 that Congress did
not intend "[T]jo shield employers from the
natural consequences of their breaches of
bargaining agreements by wrongful union
conduct in the enforcement of such
agreements." In this case, the Petitioners
have been left remediles.
The Unions herein owe a duty of fair
representation to the employees in the
bargaining units represented by the ILWU,
Locals 13 and 63. This statutory duty to
fairly represent all of the employees in
the bargaining unit applies to the
collective bargaining with the employer,
57
eel ke Seta A cee aioe
Net ae Ch He, Pads Ty PLD] ae eae, WEP ee EIS EE eee Lee Oe ee are
and in the Union's enforcement of the
resulting collective bargaining agreement.
Vaca v. Sipes, supra at 177, 87 S.Ct. 909-
910.
The Union owes a duty of fair
representation to all Petitioners, except
those 16 Petitioners who did not work as
casual longshoremen or clerks during the
relevant time period, and who were not
employed in Local 63's office clerical
division. 23
The exhibits attached to the Rodriguez
declaration show the blatant favoritism in
the selection process. The relationship
between the successful registrants and past
and present Union officials or members are
23 The Coast minutes of August 10,
1984 include the categories of casuals as
individuals who are included within the
definitions of longshoremen in {1.91 of the
PCLCD, and the definition of clerk in {1.71
of the PCCCD.
58
statistically extraordinary.
Attached to the Rodriguez declaration
are three exhibits. Exhibit 1 identifies
many of the successful registrants who have
a family connection with a Union or PMA
official. One hundred and nineteen (119)
names of successful registrants who are
related to Union or PMA officials are
listed.
Exhibit 2 identifies many of the
successful registrants who have a family
connection with a current member of the
Union. One hundred and ninety (190) names
of successful registrants who have a family
connection to a Union member are included.
‘Exhibit 3 identifies many of the
successful registrants who have little or
no hours of experience as casual
longshoremen. Two hundred twenty-three
(223) successful registrants are listed.
59
Finally, the statistical information
presented in the Frank Rodriguez
declaration is even more remarkable when
considered in the context of the
registration. Approximately 30,000
applications were handed out for
registration as a longshoreman or clerk.
Approximately 22,250 of the applications
were returned. Four hundred and ten (410)
individuals were originally registered as
longshoremen, and between fifty eight (58)
and sixty (60) individuals were registered
as clerks. As of April 20, 1987, one
hundred and nineteen (119) of the four
hundred and seventy (470) individuals who
are registered have a family connection to
PMA or Union officials. An additional one
hundred and ninety (190) successful
registrants have a family connection to
current Union members. Thus, approximately
60
twenty-five percent (25%) of those
registered had a family connection to PMA
or Union officials. Three hundred and nine
(309) of the four hundred and seventy (470)
successful applicants, or over sixty
percent (60%), have a family connection to
PMA or Union officials or members.
Genuine issues of material fact exist
as to whether the Unions’ served the
interests of affected Petitioners without
hostility or discrimination, with complete
good faith and honesty, and without
arbitrary conduct. Vaca v. Sipes, supra at
177, 87 S.Ct. 909-10.
E. Repudiation of Contract
Breach of Contract.
An employee can obtain judicial review
61
of his breach of contract claim despite his
failure to pursue contractual remedies
where the conduct of the employer amounts
to a repudiation of those procedures. Vaca
v. Sipes, supra at 185, 87 S.Ct. at 914.
In such a_ situation, an employer is
estopped by his own conduct in asserting
exhaustion as a defense. 7 For the
same reason, a Union is estopped from
raising exhaustion as a defense if it
repudiates the contractual remedy
procedures. In this action, Respondents
are estopped by their own conduct from
asserting exhaustion of the collective
bargaining grievance procedure as a
defense.
1. Cc j age
Appeals.
PMA area manager Lane testified
that the Port LRC did not wish to solicit
62
acho i si ae as es ea ati
FN. Pe te ee ed ae oP aed
OS tn
pee ee ee ONE Wee ee OP ee een
Pe eo Pt, eh ee) eT
Re yer, Pen) oe
Nee Pt be Ne SONS MOET,
.large numbers of appeals. The Committee
was concerned that should it begin handling
appeals in large numbers, the appeals would
stop registration process. Id. Thus, the
Port LRC gave no consideration to notifying
the unsuccessful applicants of their appeal
rights at the time the $5.00 application
fee was mailed to each of the applicants.
(CR35:215).
The Port LRC meetings wherein
the individual appeals from unsuccessful
registrants were considered and reflected
in their minutes of May 20 through May 30,
1985, and July 9, 1985. The minutes show
that registration appeals were summarily
reviewed and rejected by the Port LRC. PMA
and Young testified that individuals were
not requested to appear before the Port LRC
to discuss the substance of their appeals.
The Port LRC's discouragenent
63
of appeals is also reflected in individual
instances involving the Petitioners. Davis
was notified on July 19, 1985, that her
appeal was denied. The Davis grievance
specifically alleges favoritism in the
selection process and gives general
examples. The Port LRC denied Davis'
grievance on the grounds that it was not a
§13 grievance. Moreover, the Coast LRC
requires a §13 grievant to be notified in
writing of his or her appeal rights by the
Port LRC when the Port LRC denies a §13
grievance. The Port LRC failed to notifiy
Davis of further avenues of appeal in the
notice of denial.
The declarations of Petitioners
Wasserman and Schreiner show that nepotism
and favoritism in the registration process
were raised in their individual grievances.
To date, both grievances are pending before
64
the Port Committee.
Therefore, Respondents are
estopped from the action of the Port LRC
from asserting exhaustion as a defense.
The Port LRC or its members have actively
discouraged appeals, summarily rejected
appeals, failed to notify individuals of
further appeal rights, and ignored appeals.
CONCLUSION
For the foregoing reasons, it is
respectfully requested that the Petition
for Writ of Certiorari be granted.
DATED: November 20, 1990
Newport Beach, CA
Respectfully submitted,
SILVER, GOLDWASSER & SHAEFFER
A Professional Law Corporation
wy LU Shaiff-
GEORGE W. SHAEFFER, JR.
Attorneys for Petitioners
A0306.PET
65
IO Ly PAI nt ee RM ee ee
ee ee gee, A ME meee ey Ae ee ee a ee Lee ee ae
SES AON Ee
Pid
APPENDIX
. - in Ta ee eS ee eee ee
FOR PUBLICATION
UNITED STATES COURT OF APPEALS
FOR THE NINTH CIRCUIT
JOHN CARR, et al.,
Plaintiffs-Appellants, Nos. 87-6137
87-6497
Vv.
D.C. Nos.
PACIFIC MARITIME ASS'N, CV-85-7243 FFF
St Gi, CV-86-0345 FFF
CV-86-1859 FFF
Defendants~Appellees.
/ OPINION
GREG BROOKS, JURY CHECKERS,
et al.,
Plaintiffs-Appellants,
Vv.
PACIFIC MARITIME ASS'N,
et al.,
De fendants-Appellees.
as /
Appeal from the United States District
Court for the Central District of California
Ferdinand F. Fernandez, District
Judge, Presiding
Argued and Submitted
September 16, 1988-Pasadena, California
Filed May 21, 1990
Before Wm. A. Norris, Cynthia H. Hall
and Alex Kozinski, Circuit Judges.
Opinion by Judge Kozinski;
Dissent by Judge Hall
|
“|
|
KOZINSKI, Circuit Judge:
Applicants for registration as class
B longshoremen and clerks seek damages and
injunctive relief, claiming that the
registration process was tainted by
nepotism, favoritism and discrimination.
The district court found that the
applicants failed to exhaust contractual
grievance procedures and that their failure
was not excused. Plaintiffs appeal the
district court's grant of summary judgment
and dismissal of their action. We review
the district court's grant of summary
judgment de novo. DParring v. Kincheloe 783
F.2d 874, 876 (9th Cir. 1986).
I. FACTS
Plaintitfs are 128 casual
longshoremen and clerks whose applications
for registration as\class B longshoremen or
Clerks in the Los Angeles area were
2 a
ee
4
rejected. + Defendants are the Pacific
Maritime Association (PMA), an association
of West Coast stevedoring, shipping and
terminal companies; the International
Longshoremen's and Warehousemen's Union
(ILWU), the exclusive bargaining
representative of longshoremen and clerks
who work for PMA members; ILWU Local 13
(Local 13), the chartered, affiliated local
of the ILWU for longshoremen in the Los
Angeles area; and ILWU Local 63 (Local 63),
the chartered, affiliated local of the ILWU
for clerks in the Los Angeles area.
Defendants are parties to the Pacific Coast
1 Three groups brought suit: The Carr
Group (109 unsuccessful Class Bunion
registrants) filed suit on November 5,
1985; the Brooks Group (11 unsuccessful
Class B union registrants) filed suit on
January 15, 1986; and the Checkers Group (8
unsuccessful Class B union registrants)
filed suit on March 24, 1986. These three
actions have been consolidated on appeal.
; 6
Longshore Contract Document and the Pacific
Coast Clerk Con*.ct Document (the
Contract), which govern the terms and
conditions of employment for longshoremen
and clerks.
This controversy arises out of the
registration of approximately 387 class B
longshoremen and clerks by defendants in
late 1984. Approximately 22,250
applications were submitted for
registration by September 26,- 1984.
Appiications were scored by a Joint
Registration Committee, a tripartite
committee composed of representatives of
the PMA, Local 13 and Local 63.
The first phase of the registration
process was completed on May 4, 1985. The
Coast Labor Relations Committee (Coast
LRC), which issues rules governing the
registration and grievance process, had
4 a
established a ten-day grievance filing
period to commence upon completion of the
registration process. On May 6, 1985,
notices were posted in the longshore, clerk
and casual dispatch halls notifying
individuals that the initial phase of the
registration had been completed, and that
appeals would be considered timely if
received by the Joint Port Labor Relations
Committee (Port LRC) on or before May 15,
1985. The Port LRC received 318 timely
grievances.
On October 23, 1985, more than five
months after the close of the grievance
filing period, 109 unsuccessful registrants
(the Balsley Group) filed their First
‘Amended Statement of Grievance with the
Port LRC. They alleged favoritisn,
nepotism, arbitrary scoring and coaching of
applicants (non-section 13 Contract claims)
5 a
ee ee eA ee Se ee See a SS ee ee ee ee aay eee
Be Pe bt ot ie Ee be
and discrimination on the basis of non-
union membership (section 13 Contract
claims) by the Joint Registration
Committee. They also alleged violations of
Local 13's and Local 63's duty of fair
representation, and a breach of the
collective bargaining agreement by all
defendants.
Under the terms of the Contract, 2
the Port LRC resolves all non-section 13
Claims. Its decision is final and binding
2 section 11 of the Coastwise
Registration Rules, adopted by the Coast
LRC on August 10, 1984, provides that the
grievance procedures set forth in the
Contract "shall be the exclusive remedy
with respect to any disputes involving
registration or deregistration...[of]
persons working or seeking to work under
this Agreement....No other remedies shall
be utilized by any persons with respect to
any dispute involving registration or
deregistration until the grievance has been
exhausted." Coastwise Registration Rules,
§11 (August 10, 1984), quoted in David
Balsley, et al., Arbitrator's Decision at 7
(January 15, 1987) (Kagel, Arb.).
6 a
on all parties, unless there is
disagreement between the union and
managenent members of the Port LRC, in
which case an appeal to the Coast LRC is
allowed. See Contract §17.24.
Section 13 claims are _ processed
pursuant to section 17.4 of the Contract.
All section 13 claims must be filed within
ten days of the alleged discriminatory
incident. Contract §17.41. The Port LRC
has direction to extend the deadline for
filing section 13 claims up to six months
from the date of the alleged discriminatory
act "to prevent inequity." Contract
§17.411. The Port LRC's decision may be
appealed to the Coast LRC, provided the
request for review is made within seven
days of the Port LRC's decision. Contract
§17.42. The Coast LRC's decision is
further appealable to the Coast Arbitrator,
7, @
eee ee ee
again under the condition that the appeal
be made within seven days of the Coast
LRC's decision. Contract §17.43. Neither
the Port LRC, the Coast LRC nor the Coast
Arbitrator can extend the latter two
periods or the period for challenging non-
section 13 claims.
On April 11, 1986, the Port LRC
ruled that the Balsley Group's section 13
and non-section 13 claims were time-barred.
The Port LRC also rejected the grievants'
request that it extend the filing deadline
for the section 13 claims to six months.
The Balsley Group appealed its
section 13 claims to the Coast LRC on April
17, 1986.2 On May 1, 1986, the Coast LRC
3 Two other groups filed grievances
with the Coast LRC, incorporating by
reference the allegations made in the
Balsley Group grievance. The Checkers
Group filed on March 25, 1986; the Brooks
Group filed on January 16, 1986. Neither
8 a
held that the group's section 13
discrimination claim was time-barred. The
Coast LRC also ruled that the Port LRC did
not abuse its discretion by refusing to
extend the filing period for the section 13
claims.
The Balsley, Brooks and Checkers
Groups filed a consolidated appeal before
the Coast Arbitrator in May 1986. The
parties stipulated that the only issue
before the Coast Arbitrator was the
timeliness of their section 13 claims.
District court proceedings were stayed
pending the Coast Arbitrator's decision.
On January 15, 1987, the Coast
Arbitrator held that the grievants' section
group filed a group grievance with the Port
LRC before pursuing their remedies with the
Coast LkC. The grievances of both groups
were found to be time-barred by the Coast
LRC.
13 discrimination claims were time-barred.
He found that the grievants either knew or
should have been aware of allegations of
nepotism, favoritism and discrimination in
the registration process prior to the May
15, 1985, filing deadline. The Coast
Arbitrator concluded that the allegations
made in the October 23, 1985, amended
grievance could have been raised in a
timely manner. The Coast Arbitrator found
that the Port LRC did not abuse its
discretion in deciding not to extend the
filing deadline for section 13 claims.
The district court granted summary
judgment for defendants in all three
actions.4 The district court refused to
4 See Carr v. Pacific Maritime Ass'n,
No. CV 85-7243-FFF (C.D.Cal., filed June 3,
1987); Brooks v. Pacific Maritime Ass'n,
No. CV 86-345 FFF (C.D.Cal. Sept. 29,
1987); Checkers v. Pacific Maritime Ass'n,
No. CV 86-1859 FFF (C.D.Cal. Sept. 29,
10 a
excuse plaintiffs’ failure to exhaust their
contractual remedies and dismissed their
claims for breach of collective bargaining
agreements and for breach of the union's
duty of fair representation under section
301 of the Labor Management Relations Act
of 1947, 29 U.S.C. §185 (1982).°
II. DISCUSSION
{1} A. As a general rule, members
of a collective bargaining unit must first
exhaust contractu?l grievance procedures
before bringing an action for breach of the
collective bargaining agreement. See,
e.g., Clayton v. UAW 451 U.S. 679, 686
(1981). This requirement applies with
equal force to claims brought against a
1987).
5 The district court dismissed
without prejudice claims by plaintiffs
whose grievances were timely filed.
Ai ty ahve Sets alt £8
union for breach of the duty of fair
representation. See Vaca v. Sipes 386 U.S.
171, 184-85 (1967). Failure to utilize the
grievance procedures, or to invoke them in
a timely manner, bars’ grievants from
pursuing remedies in court. See Republic
Steel Corp. v. Maddox 379 U.S. 650, 652
(1965). At a minimum, therefore, members
of the bargaining unit must first turn to
the grievance procedures for a remedy. Id.
at 652-53.
(2) Plaintiffs argue that they are
excused from exhausting tneir contractual
remedies because the alleged lack of
neutrality of the Port LRC rendered resort
to grievance process futile. See Republic
Steel, 379 U.S. at 652 (quoting Steele v.
Louisv ashv » 833 BB. Ba,
206 (1944) ("employees should [not] be
required to submit their controversy to ‘a
12 a
group which is in large part chosen by the
{(defendants] against whom their real
complaint is made'")); see also Williams v.
Pacific Maritime Ass'n, 617 F.2d 1321, 1328
n.13 (9th Cir. 1980) (dicta), cert. denied,
449 U.S. 1101 (1981). We have held,
however, that a plaintiff waives his right
to claim bias on the part of the grievance
committee unless he raises the objection
when the committee convenes. Sheet Metal
Wo : Vv
Kinney Air Conditioning Co., 756 F.2d 742,
746 (9th Cir. 1985). This is the rule in
several other circuits as well. See e.g.,
Ea Vv 1 , 699 F.2d 552,
558 (lst Cir.), cert. denied, 464 U.S. 824
(1983); Cook Industries, Inc. v. ¢. Itoh &
Co., Inc., 449 F.2d 106, 107-08 (2d Cir.
1971), cert. denied, 405 U.S. 921 (1972);
United Steelworkers of America Local 1913
13 a
v. Union Railroad Co., 648 F.2d 905, 913-14
(3d Cir. 1981).
{3} In Kinney, plaintiffs attempted
to overturn an unfavorable arbitration
award on the theory that the grievance
process was. biased. We held that
plaintiffs had waived their bias claim
because they had not objected to the makeup
of the arbitration board at the time of the
grievance procedure. Kinney, 756 F.2d at
746. The rule of Kinney is easily extended
to this case.© Here, plaintiffs failed to
6 The dissent argues that this case
is distinguishable from Kinney because
"appellants are not signatories to the
applicable collective bargaining
agreement," and therefore "had no direct
say in the establishment of procedures for
selecting panelists who would hear and
impartially decide their grievances."
Dissent at 5125. This seems to us
irrelevant. It will almost always be true
that a grievant will not be a signatory to
the collective bargaining agreement; by
virtue of representation, individual union
members rarely have much of a direct say in
14 a
object in a timely manner to alleged bias
in the Port LRC. Moreover, they did not
attempt to use the grievance procedure
within the specified time limits. Yet they
come to court now claiming that such
the procedures set up to arbitrate
grievances. Surely the Kinney rule is not
limited to signatories to the collective
bargaining agreement; any grievant is
capable of objecting to the composition of
an arbitration panel. See e.g., United
Steelworkers 648 F.2d at 913-14 (applying
the rule to an individual union member);
Early 699 F.2d at 558 (same). Perhaps the
dissent is referring to the fact that
plaintiffs are not union members. se
cannot be, however, that non-members of the
union have greater rights to avoid
grievance procedures than union members.
The dissent also contends that
plaintiffs' statement of grievance to the
Port LRC may be read as an implied
objection to the neutrality of the Port LRC
itself. Dissent at 5125-26. This, too, is
irrelevant. Plaintiffs' filed their
grievance, over five months after the
deadline. If, at the time of the original
filing deadline, plaintiffs had reason to
Suspect the Port LRC was biased, plaintiffs
could have filed their "implied" objections
timely; if they did not suspect bias at
that time, they had no reason not to file.
15 a
failure should be excused because of bias
in the Port LRC. It would defy logic to
hold that plaintiffs, like those in Kinney,
who use a grievance procedure without
objection waive their right to claim bias,
while those, like the present plaintiffs,
who offer no objection to the procedure and
fail to use it are to be afforded the
protection of the courts. To allow these
plaintiffs to bring their bias claim would
create perverse incentives to avoid
grievance procedures that would undermine
our traditional deference to private
dispute resolution in labor relations.
Therefore, because plaintiffs did not
timely notify the Port LRC that’ they
believed the grievance procedure was
16 a
= ee eae ee Se eee es ee z Cie. On
: ‘
5 ‘
’
’ :
“ -
=
:
:
<
¥
a
a
ye!
3
.
‘ 4
ae. ")
mh 4
: ‘
+ ;
,; it
oa 4
:
= rr,
- .
“¥ r
i y |
:
=
3 v
wa
: ‘
:
a
AS ; .
7
| , aD
“= ‘
;
° %
A, , |
7 | ;
mo
. ao
tainted, they cannot claim bias now.’
Appellant Nancy Davis presents a
special case. She filed her grievance with
the Port LRC before the close of the filing
period. In her letter of April 24, 1985,
to the Port LRC, Davis alleged, inter alia,
nepotism, favoritism and coaching of
favored applicants. The Port LRC rejected
her claim without notifying her of her
right to appeal any section 13 claims she
might have presented. The Coast
Arbitrator, in interpreting the Contract,
apparently found that Davis had raised a
7 Contrary to the dissent's
assertions, we do not require that
plaintiffs have “exhausted the grievance
procedure," or that they "go through the[ ]}
entire" process. Dissent at 5126-27. To
preserve their bias/futility clain,
plaintiffs simply needed to notify the Port
LRC in a timely manner that they believed
the grievance procedure was biased so that
the Port LRC might have an opportunity to
act on that complaint.
17 a
~
section 13 claim, but that she had waived
her right to appeal it by failing to appeal
the Port LRC's decision to the Coast LRC
within several days. Although a Coast LRC
rule requires the Port LRC to inform all
grievants who allege section 13 claims of
their right to appeal to the Coast LRC, see
Letter from ILWU-PMA Joint Coast Labor
Relations Committee to ILWU Locals and PMA
Area Offices (July 18, 1979), we cannot
overturn the Coast Arbitrator's
interpretation of the contract or his
application of the rules issued pursuant to
it. "({A]s long as the arbitrator is even
arguably construing or applying the
contract and acting within the scope of his
authority, that a court is convinced he
committed serious error does not suffice to
overturn his decision." United Paperworkers
Int'l Union v. Misco, Inc., 484 U.S. 29, 38
18 a
(1987). We must therefore reject Davis'
claim as well.
(4) B. Plaintiff's next allege that
their failure to exhaust their contractual
remedies should be excused because of the
inadequacy of the grievance processes and
remedies. They argue that the grievance
mechanics are flawed because they do not
provide for pre-hearing discovery,
representation by counsel before the Port
LRC, appointment of a special master by the
Coast Arbitrator to control future
registrations, or the award of attorney's
fees to grievants who succeed before the
arbitrator. None of these alleged flaws,
however, prevented plaintiffs from at least
attempting to invoke the contractual
19 a
‘
remedies in a timely manner.® At a
minimum, grievants must present and
prosecute their grievances through
contractual procedures before complaining
8 The dissent argues that "(i]t was
highly unreasonable to expect individuals
to muster, in ten days and without any
discovery, proof of pervasive nepotism and
favoritism sufficient to prepare a
grievance stating a claim for violation of
the collective bargaining agreement."
Dissent at 5128-29. But, under the
collective bargaining agreement, grievants
aren't required to "muster proof"; the
initial filing need only set out "the facts
as to the alleged discrimination."
Contract §17.41. It is the job of the Port
LRC to "“investigate" all grievances.
Contract §17.124. Three hundred and
eighteen other grievants apparently had no
problem meeting the 10-day requirement.
This group included Carr appellant Nancy
Davis, whose timely filing alleged
favoritism and nepotisn.
Instead of filing timely, plaintiffs
conducted an independent five-month
investigation. As the dissent states, "the
collective bargaining agreement neither
required not forbade" plaintiffs'
investigation. Dissent at 5129 n.10. But
the agreement did require that plaintiffs
at least notify the Port LRC that they had
a complaint.
20 a
~
of the inadequacy of those processes. See
e.g., Hines _v. Anchor Motor Freight, 424
U.S. 554, 563 (1976) (grievant cannot
"sidestep the grievance machinery...unless
he attempted to utilize the contractual
procedures for settling his dispute with
his employer"); Beriault v. Local 40, Super
Cargoes & Checkers, Int'l Longshoremen's &
Warehousemen's Union 501 F.2d 258, 262 (9th
Cir. 1974). Thus, the assertion by
plaintiffs that the grievance and
arbitration procedures were inadequate is
entirely speculative, since plaintiffs
failed to avail themselves of those
remedies in a timely manner.
¢)} im We must also reject
Plaintiffs' claim that the Port LRC's
refusal to extend the filing deadline for
their section 13 discrimination claim and
its "discouragement of appeals" amounts to
>
Ee
a repudiation of the grievance procedure.
The plaintiffs' ability to have a neutral
arbitrator review the Port LRC's decision
cures whatever bias there may have been in
the Port LRC's decision making process.
See Ritza_v. Int'l Longshoremen's &
Warehous 's Union, 837 F.2d 365, 370
(9th Cir. 1988) ("any hostility that may
exist at the joint coast level is cured by
the availability of neutral arbitration").
As already noted, the Coast Arbitrator
determined that the Port LRC's decision not
to extend the deadline was not an abuse of
discretion. We must accord great deference
to such findings by arbitrators acting
pursuant to collective bargaining
procedures. See e.g., Misco, 484 U.S. at
36-38. As to the non-section 13 claims,
the Port LRC had no authority to extend the
filing deadline. Plaintiffs may therefore
22 a
not complain that the Port LRC abused its
discretion or acted with partiality in
failing to extend those filing deadlines.
The Port LRC's failure to notify
applicants of their right to appeal the
Joint Registration Committee's decision
when applicants' registration fees were
returned does not constitute repudiation of
any aspect of the contract. All
applications contained a notice to
applicants of their right to appeal the
Joint Registration Committee's decision; no
other notification was required.
Nor does plaintiffs' suggestion that
"registration appeals were summarily
reviewed and rejected by the Port LRC,"
Appellants' Brief at 47, establish that the
Port LRC discouraged appeals. Indeed, the
fact that numerous applicants successfully
appealed the Joint Registration Committee's
23 a
decision suggests that the Port LRC was
more than a rubber stamp.
D. Plaintiffs also claim the
union's alleged breach of its duty of fair
representation excuses their failure to
comply with the grievance procedures.
Although plaintiffs claim that the union
breached its obligation to "represent those
in a designated unit, to serve their
interest without hostility or
discrimination, and to exercise its
discretion with complete good faith,
honesty, and to avoid arbitrary conduct,"
Appellants' Brief at 40, in essence their
fair representation claim focuses not on
the union itself but on the actions of the
union members on the Joint Registration
Committee and the Port LRC.
There are two situations in which a
breach of the duty of fair representation
24 a
excuses the exhaustion requirement: First,
where “the union has sole power under the
contract to invoke the higher stages of the
grievance procedure, and it...the employee-
plaintiff has been prevented from
exhausting his contractual remedies by the
union's wrongful refusal to process the
grievance," Vaca v. Sipes, 386 U.S. at 185
(emphasis original); second, where
grievants allege a breach of the duty of
fair representation with regard to
negotiating the collective bargaining
agreement. Seé Williams, 617 F.2d at 1328.
The district ccurt correctly found
neither exception applicable. See Carr v.
Pacific Maritime Ass'n, No. CV 85-7243 FFF
(C.D. Cal., filed June 3, 1987); Brooks v.
Pacific Maritime Ass'n, No. CV 86-345 FFF
(C.D. Cal. Sep. 29, 1987); Checkers v.
Pacific Maritime Ass'n, No. CV 86-1859 FFF
25 a
(C.D.Cal. Sep. 29, 1987). The first
exception to the exhaustion requirement is
inapplicable, because the grievants can
utilize the contractual remedy process
without the help or approval of the union.
Thus, this case is distinguishable from
those where the union has assumed sole
responsibility of preparing and presenting
the grievant's claim. See Vaca v. Sipes,
386 U.S. at 185. Nor is this a case where
the grievants are seeking a remedy not
available through the grievance procedure,
such as modification of the contract. See
Beriault, 501 F.2d at 266. Plaintiffs are
not challenging some aspect of the
registration process that cannot be
corrected under existing grievance
procedures; instead, they merely allege
that certain union representatives on the
Joint Registration Committee and the Port
26 a
LRC unfairly reviewed their applications.
This allegation neither excuses plaintiffs’
failure to file their grievances on time or
to state their complaints with specificity,
nor justifies their decision to sidestep
the grievance process.
E. We do not consider plaintiffs'
argument that their failure to exhaust
contractual remedies is excused because of
delays in the grievance process, as that
allegation was not raised in the complaint.
Nor could they have raised such a claim
when their suits were filed, as they sought
judicial relief either before or shortly
after filing their group grievances. The
Carr Group brought suit on November 5,
1985, eleven days after filing its amended
grievance before the Port LRC; the Brooks
action was filed on January 15, 1986, one
day before that group submitted its
27 a
grievance to the Coast LRC; the Checkers
action was filed on March 24, 1986, one day
before that group filed its group grievance
before the Coast LRC. Thus, plaintiffs base
their assertion of unreasonable delay on
what occurred after, rather than prior to,
their resort to the district court.
For the same reasons, we do not
consider Wasserman's and Schreiner's claims
that the Port LRC's delay in deciding their
section 13 claims excuses their failure to
exhaust the grievance procedures. In July
1985, the Coast LRC remanded Wasserman's
section 13 grievance for further
proceedings before the Port LRC. On
October 3, 1985, the Port LRC considered
his individual grievance. On month later,
Wasserman filed suit in district court.
See Carr v. Pacific Maritime Ass'n, No. CV
85-7243-FFF (C.D.Cal. Nov. S, 1985).
28 a
Schreiner brought suit less than four
months after filing his second complaint
with the Port LRC. See Carr v. Pacific
Maritime Ass'n, No. CV 85-7243-FFF
(C.D.Cal. Nov. 5, 1985). Schreiner's and
Wasserman's claims are based on what
occurred after, rather than prior to, the
commencement of this action. The district
court was therefore correct in dismissing
both Wasserman's and Schreiner's claims
without prejudice and allowing them to
pursue their contractual remedies.
AFFIRMED.
HALL, Circuit Judge, dissenting:
The federal courts have long
followed a policy of giving great deference
to private dispute resolution in labor
relations. That policy is generally a
sound one, but private resolution has its
29 a
limits. As the United States Supreme Court
noted in Hines _v. Anchor Motor Freight,
Inc., 424 U.S. 554, 571 (1976), "Congress
has put its blessing on private dispute
settlement arrangements provided in
collective agreements, but it was
anticipated, we are sure, that the
contractual machinery would operate within
some minimum levels of integrity." In the
factual situation presented by this appeal,
the private law system appears to have
failed in its fundamental function of
dispensing industrial justice. This case
is thus an appropriate one for judicial
intervention.
I.
Appellants have made quite a
compelling and troubling showing that the
1984-85 registration process was tainted
with nepotism and favoritism: perhaps 309
30 a
of the 410 successful longshore registrants
(out of 22,250 total applicants) had either
family or other close connections with
union or PMA officials, or with union
members. Allegations regarding the
composition of the Port LRC that conducted
the challenged registration process, and
then decided appellants’ and the individual
grievances that followed, are even more
troubling: several of the union and PMA
representatives to that committee
themselves had relatives among the
successful applicants.
Appellants also persuasively argue
that the informal grievance and arbitration
procedures, conducted within an extremely
constricted time frame and without
provisions for any meaningful discovery,
were wholly inadequate to the task of
fairly adjudicating the individual or class
31a
claims of nepotism and favoritism that
arose out of the 1984-85 registration.
Appellants' showing is sufficient to raise
serious questions of bias in, and futility
of, resort of the grievance and arbitration
process.
It is generally true that employees
must attempt to exhaust the grievance and
arbitration procedures established in a
collective bargaining agreement prior to
bringing an enforcement action in district
court under section 301 of the Labor
Management Relations Act, 29 U.S.C. §185.
Republic Steel Corp. v. Maddox, 379 U.S.
650, 652-53 (1965); Vaca v. Sipes, 386 U.S.
171, 184-85 (1967); Beriault v. Local 40
Super Cargoes & Checkers of ILWU, 501 F.2d
258, 262 (9th Cir. 1974). This exhaustion
requirement is, however, "subject to a
number of exceptions for the variety of
32 a
situations in which doctrinaire application
of the exhaustion rule would defeat the
overall purposes of federal labor relations
policy." Glover v. St, Louis-San Francisco
Ry.Co., 393 U.S. 324, 329-30 (1969);
Williams _v. Pacific Maritime Ass'n., 617
F.2d 1325, 1328, n.13 (9th Cir. 1981),
cert. denied, 449 U.S. 1101 (1981).2
In Williams, 617 F.2d at 1328-29 n.
13, we noted that there are several
situations in which an employee's failure
to completely exhaust contractual remedies
will be excused: (1) where the adjudicating
body in the private law system lacks
neutrality because it was chosen by the
very defendants against whom the employee's
1 through this exception is a judge-
made one, it should also be remembered that
the exhaustion requirement itself is a
judge-made requirement, not one mandated by
section 301 or the collective bargaining
agreement.
>
real complaint is made, Glover, 393 U.S. at
330-31; (2) where plaintiff's attempt to
use the grievance process is not successful
because the process is not "plain, speedy,
and adequate," see, Maddox, 379 U.S. at
652-53; and (3) where the judicial relief
requested is beyond the limited powers of
the arbitrator to grant, Beriault, 501 F.2d
at 266.
II.
Appellants' most compelling argument
concerns the first exception, namely, that
bias of the Port LRC makes the exhaustion
of administrative procedures futile.
Futility due to lack of neutrality can
arise where the union and management are in
collusion. Submission to administrative
procedures "would entrust representation of
the complaining employee to the very union
he claims refused hin fair
34 a
representation...." Lusk v. Eastern
Products Corp., 427 F.2d 705, 708 (4th Cir.
1970) (plaintiffs alleged that the
agreement bargained for between union and
management deprived them of proper wages;
lower court dismissed on theory that
defendants were required to submit
complaint to arbitration, appellate court
would have reversed on that theory but
affirmed on another theory). A grievance
and arbitration procedure, "administered by
the union, by the company, or both to pass
on claims by the very employees whose
rights they have been charged with
neglecting and betraying," could not be
trusted to remedy discrimination practiced
by union and employer in concert. Glover,
393 U.S. at 330-331. See also, Battle v.
Clark Equipment Co., 579 F.2d 1338, 1345-46
(7th Cir. 1978) overruled on other grounds,
35 a
679 F.2d 685 (7th Cir. 1982) (employees
alleged that their signatures to a
modification to the collective bargaining
agreement were fraudulently obtained, court
ruled that summary judgment could not be
sustained on the ground that appellants
failed to exhaust administrative remedies) ;
Fu fe) No Vv >» @€23 F.28 212
(Sth Cir. 1969), cert. denied, 406 U.S. 946
(1972) (appellant, who had been fired, was
not required to exhaust administrative
remedies which dictated that he bring
unfair practice charges before, first, the
very person who fire him, and second, the
board whose member he had accused of
misconduct).
In the instant case, appellants
present a plausible argument showing a
Similar type of futility due to collusion
between union and management to engage in
36 a
nepotism and favoritism during the
registration process. The registration
process is conducted by the Port LRC, which
is composed of representatives of the union
and management. If appellants’ allegations
are true, both union and management members
of the Port LRC panel that actually heard
and rejected appellants' group grievance
had close relatives who were successful
registrants in the 1984-85 registration
procedures. 2 Furthermore, the Port LRC not
only controls the registration process, but
also decides appeals regarding its own
registration decisions. Any pursuit of the
nepotism and favoritism claims through the
2 For example, when the Port LRC met
on October 16, 1985, to hear appellants'
grievance, David Aiian, President of Local
#13, sat as committee chair; Charles Young
was present to represent management.
During the 84-85 registration, Arian's
sister and Young's mother and girlfriend
were registered.
37 a
Port LRC would require Arian and Young (and
any other LRC members in a like situation?)
to concede their own misconduct. As we
stated in Williams, "({i]t is unlikely that
such persons could be entirely fair and
impartial. This lack of neutrality in the
adjudicating bodies renders exhaustion of
remedies futile." 671 F.2d at 1329, n.13.
A
Apparently, the majority recognizes
that the Port LRC may have been biased in
its review of the group. registration
3 Other members of the Port LRC who
reviewed the grievances and who also had
relatives registered are as follows:
Name Affiliation Relatives
Registered
D. Bark ILWU #63 2 sons
H. Kazmark ILWU #63 5 family members
A. Luera ILWU #13 7 family members
J. McCoy ILWU #13 1 family member
R. Ortega ILWU #13 3 family members
G. Peyton ILWU #63 2 family members
38 a
grievance. However, they decline to
address the merits of the appellants' bias
argument, denying the appellants’ access to
federal court solely because appellants’
attempt to file a registration grievance
was untimely, no matter how badly tainted
with bias the grievance procedures may have
been. I do not read our precedents as
requiring such a harsh application of the
exhaustion requirement.
The majority holds that appellants
"waived" their right to claim bias on the
part of the Port LRC by failing to raise
the objection when the committee convened.
The case on which they rely, Sheet Metal
Workers e ion ssociatio oca
#420 v. Kinney Air Conditioning Co., 756
F.2d 742 (9th Cir. 1985), simple does not
39 a
compel such a conclusion. 4 Kinney was an
action brought in federal court by a union
to enforce an arbitration award that was
entered against an employer after an
4 Such a conclusion is also not
mandated by the other three circuits which
the majority claims have similar rules.
Majority opinion at 5113. The cases cited
all involve appellants who went through an
arbitration process without objecting until
they received an adverse ruling. Then they
complained in federal court about bias
situations which they knew of prior to
proceeding with the arbitration. Such
situations are different from the instant
case where appellants claim that an attempt
to file a grievance would have been
fruitless. See Early; 699 F.2d at 558
(dismissed employee should have objected at
hearing to seating of local union president
when employee feared president would be
biased due to employee's past participation
in dissident union groups); Cook
Industries, 449 F.2d at 107-8 (appellant
cannot remain silent during arbitration
when he knows that one of four arbitrators
is employed by a competitor and then raise
the issue when an adverse ruling is
received); Unite W , 648 F.2d
at 913-14 (petitioner cannot wait until
second remand to challenge the composition
of the original hearing board that
investigated his dismissal from his
employment).
40 a
adjudication on the merits of the union's
contract claim. The employer claimed the
award should be vacated due to the
partiality of the arbitration panel. ve
rejected Kinney's bias argument because the
employer was a party to the agreement which
established the arbitration procedure,
because the panel members' financial
interest in the outcome of the proceedings
were known to Kinney before the hearing,
and because Kinney failed to object to the
selection of the panel members at the time
they were seated. Id. at 746.
Kinney does not rule on when a party
may be excused from exhausting the
grievance procedure before filing in
federal court. Rather, the petitioners in
Kinney had exhausted the grievance
procedure and were suing to vacate the
arbitrator's award. The court was
41 a
unwilling to allow the petitioners, who had
willing gone through the entire arbitration
hearing without complaint of partiality, to
make this argument for the first time in
federal court, as a way of circumventing
the arbitrator's adverse decision.
The instant case is distinguishable
from Kinney in several important respects.
First, appellants are not signatories to
the applicable collective bargaining
agreement. Unlike the employer in Kinney,
they had no direct say in the establishment
of procedures for selecting panelists who
would hear and impartially decide their
grievances, and for otherwise ensuring that
longshore registrations were conducted in
conformity with the substantive terms of
the agreement. In further contract to
Kinney, appellants never obtained a
determination on the merits of their
42 a
contract claims. It cannot be said of
appellants, as it could of the employer in
Kinney, that they came to federal court
seeking a redetermination of issues decided
adversely to them in the private system of
dispute resolution.
Furthermore, appellants in the
instant case implicitly did raise their
objection to having members of that body
adjudicate their grievance. By alleging
particular family connections between
successful registrants and PMA and union
officials, members, and employees, the
appellants’ objection to the Port LRC's
lack of neutrality appeared on the face of
the grievances. Thus, appellants have
preserved their right to claim bias on the
part of the Port LRC. Appellants' failure
to timely file their grievance is explained
by their belief that the Port 1RC would not
43 a
have given them a fair hearing and their
lack of pertinent information. The
appellants knew that many of the Port LRC
members were biased. In fact, there has
been a long history of court actions
against the Pacific Maritime Association
and the ILWU on just these grounds.°
5 This is the twelfth time allegations
of bias by the ILWU and the Pacific
Maritime Association have come before this
court. See Ritza v. ILWU, 837 F.2d 365
(9th Cir. 1988) (per curiam);
ILWU, No. 84-4061 (9th Cir. Apr. 22, 1985)
(slip opinion); Scott v, Pacific Maritime
Ass'n., 695 F.2d 1199 (9th Cir. 1983);
Williams vy. Pacific Maritime Ass'n., 617
F.2d 1321 (9th Cir. 1980); cert. denied,
449 U.S. 1101 (1981); Gibson vy. Local 40,
Supercargoes and Checkers, ILWY, 543 F.2d
1259 (9th Cir. 1976); NLRB v. ILWU, 514
F.2d 481 (9th Cir. 1975); Beriault v. Local
40, Supercargoes and Checkers, ILWY, 501
F>2d 258 (9th Cir. 1974); Griffin v.
Pacific Maritime Ass'n., 478 F.2d 1118 (9th
Cir. 1973)(per curiam), cert. denied, 414
U.S. 859 (1973); Pacific Maritime Ass'n, v.
NLRB, 452 F.2d 8 (9th Cir. 1971); Local 13,
ULWU vy. Pacific Maritime Ass'n., 441 F.2d
1061 (9th Cir. 1971) cert. denied, 404 U.S.
1016 (1972);
Ass'n., 434 F.2d 281 (9th Cir. 1970), cert.
44 a
Because the appellants were unaware of the
identities of the particular Port LRC
members who were to hear their cases, they
were unable to collect evidence in a timely
fashion. See section III of this dissent.
The majority's puzzling
interpretation of Kinney seems to suggest
that plaintiffs may be excused from the
requirement that they file their
registration grievances with the Port LRC
because of that committees' bias against
such claims, but that they would remain
subject to a separate requirement that they
present their bias "claim" in that forum
before proceeding to federal court with a
section 301 action. The majority's argument
suggests that because the longshoremen
denied, 401 U.S. 1009 (1971); Williams v.
Pacific Maritime Ass'n., 384 F.2d 935 (9th
Cir. 1967), cert. denied, 390 U.S. 987
(1968).
45 a
failed to complete this latter step, they
waived their right to object to the bias of
the board. This interpretation would
completely emasculate the bias/futility
exception. If the longshoremen had filed a
timely claim, they would not need the
exception to the exhaustion requirement
(for they would have successfully exhausted
the grievance procedure). The underlying
premise of the exception is that to force
the plaintiffs to file with a biased board
and go through their entire procedure is a
waste of time and money, merely delaying
their entry into federal court.© We should
6 The attempt to exhaust contractual
remedies made by petitioners in Glover
consisted simply of informal complaints to
the company regarding discrimination; they
have utilized the grievance procedure by
filing a formal complaint with the union or
the company. In the instant case there
have been at least as many complaints of
bias against the Pacific Maritime
Association and the International
46 a
not read Kinney so as to effectively over-
rule Glover. Thus the appellants should be
excused from failing to meet the 10-day
filing deadline, and indeed from filing at
all, because it would have been a futile
Longshoremen's and Warehousemen's Union, as
evidenced by the long list of lawsuits
(including this one) filed against them on
this ground. See n.5, above.
Additionally, appellants herein attempted
to comply by filing their claims five
months after the occurrence (there is no
time limit in the collective bargaining
agreement as to non-section 13 claims, and
the Port LRC could have granted a 6-month
filing extension on the section 13 claims).
Ritza also accepts the proposition
that there are exceptions to the exhaustion
requirement, making no mention of a
requirement that the petitioner first
"attempt" (but presumably fail) to utilize
the grievance procedure. Rather, the point
of the exception is that the plaintiff does
not have to fulfill the Maddox requirement
of first attempting to use the grievance
procedure. 837 F.2d at 370.
Thus, if plaintiffs fit within the
bias/futility exception, they are excused
from the requirement that they seek relief
in the grievance and arbitration process,
whether in a timely or untimely fashion.
47 a
act to submit a nepotism grievance to a
biased Port LRC panel on which both union
and management representatives had engaged
in the cronyism of which the appellants
complained. It is unlikely that if
appellants had filed their appeal within
ten days, the LRC would have found that it
was, indeed, selecting registrants
unfairly.
B
I would require the district court
to hold an evidentiary hearing (or at least
consider affidavits submitted by the
applicants’) on the issue of the potential
bias of the Port LRC regarding plaintiffs’
non-section 13 claims. In this manner,
7 In the instant case the judge made
no factual finding as to whether the panel
was actually biased, ruling instead that
mandated dismissal on the grounds
that petitioners waived their bias
objection by not presenting it to the LRC.
48 a
only meritorious claims of futility of
exhaustion due to bias will reach the
federal courts. Thus I would remand this
case for a judicial finding as to whether
the bias of the Port LRC made filing a
grievance with them futile. If the judge
finds that this exception to the exhaustion
requirement has been proven by the
plaintiffs,® I would allow them to file in
federal court. If the plaintiffs fail to
8 Because I do not command a majority
of this panel, I will not delineate the
standard of proof that the plaintiffs would
be required to satisfy. However, there are
a number of options, including requiring
the plaintiff to show a prima facie case of
bias so as to get past summary judgment;
having them prove bias by a preponderance
of the evidence; or requiring them to show
bias by clear and convincing proof. If
they make only a prima facie showing, they
will have to prove bias at trial. I
believe an argument can be made (for
requiring clear and convincing proof in an
evidentiary hearing before trial, in order
to further the policy of private dispute
resolution in the employment context,
except where this machinery breaks down.
49 a
prove that the Port LRC was biased, the
judge should then dismiss the complaint.
Iil
Appellants' second argument for why
they should be excused from exhausting
their contractual remedies is that the
grievance process is inadequate. Unlike
the bias/futility exception (see n.6,
supra) this exception does, in the normal
Situation, require that appellants make
some attempt to implement the procedures
and find them inadequate. See Maddox, 379
U.S. at 653.9
A
It is undisputed that appellants
attempted to follow contractual procedures
9 Maddox was decided prior to Glover.
It is only logical that for the inadequate
exception the petitioner must attempt to
implement the procedures before finding
them inadequate, while with the futility
exception such an attempt would be useless.
50 a
A
—
for obtaining relief on their group
grievance by filing before the
discretionary six-month deadline for
section 13 grievances. The majority
summarily dismisses plaintiffs' attempt
because their grievance wasn't filed within
the 10-day filing period. It was highly
unreasonable to expect individuals to
muster, in ten days and without any
discovery, proof of pervasive nepotism and
favoritism sufficient to prepare a
grievance stating a claim for violation of
the collective bargaining agreement.1°
10 Details of the identities of those
registered was not known during the 10-day
appeal period; identities of those
individuals who would hear appeals was not
known; thus the specific family connections
could not be known during the 10-day
period. The information regarding family
connections of those registered was not
easily obtained because the Port LRC has
never published, or made available to
anyone other than union or PMA officials, a
list of applicants who were registered
51a
Instead, appellants diligently pursued such
proof through the informal channels of
discovery before filing their "group
grievance" in October 1985, well within the
six-month period allowable at the
discretion of the Port LRc.12 Given the
during the 1984-85 registration process.
Appellants gathered information by
interviewing a substantial number of people
over a long period of time.
Of course, the collective bargaining
agreement neither required nor forbade
appellants' investigation. However, the
fact that they felt the need to conduct an
independent investigation indicates that,
although they knew that grievances were
supposed to be filed within the 10-day
period, they believed it would have been
futile to proceed before a biased panel of
the Port LRC without rock-solid and
compelling proof of a violation of the
collective bargaining agreement.
11 «It is important to note that there
is no time limit stated ir the collective
bargaining agreement for filing non-section
13 grievances.
The Coast LRC, apparently with the
consent of union representatives,
established the ten-day period for
52 a
potentially hostile forum to which
appellants were initially required to
present their proof, I would hold that
their attempt to pursue contractual
remedies was sufficient to satisfy the
Maddox requirement that grievants must
generally attempt to use the administrative
grievance process before asking for a
judicial declaration of its inadequacy.12
The majority treats appellants’
grievances arising out of the 1984-85
registration. It may not have been, and
the Coast Arbitrator concluded it was not,
an abuse of discretion to refuse to apply
the six-month limitations period to
appellants' section 13 claims. Note,
however that that was the only issue
presented to the neutral arbitrator.
Whether appellants' non-section 13 claims
were timely filed is a separate issue that
was decided only by the Port LRC and
(implicitly) by the district court.
12 The plaintiff in maddox made no
attempt to use the 3-step administrative
grievance procedure to recover severance
pay. Instead, three years later, he filed
an action in federal court.
53 a
unsuccessful attempt as if it were equal to
no attempt and states that appellants are
barred from federal court because
"grievants must present and prosecute their
grievances through contractual procedures
before complaining of the inadequacy of
those processes" and appellants have not
completed such processes. (Majority
opinion at page 5115-16). They rely on
Hines, 424 U.S. at 563, and Beriault, 501
F.2d at 262, to support their assertion. I
do not read these two cases to preclude an
exception in the instant case.
The Hines case contains absolutely
no discussion of what the "attempt" must
consist of, as the appellant in Hines had
fully exhausted the grievance procedure,
and obtained an adverse administrative
decision. The court allowed the federal
suit, despite a final arbitration decision
54 a
{
“on the merits, because the grievance
procedure and arbitration had been
inadequate. This inadequacy stemmed from
the union's failure to even minimally
investigate the theft charges against the
appellee, which later information revealed
to be false. The court held that "[ajs is
the case where there has been a failure to
exhaust, however, we cannot believe that
Congress intended to foreclose the employee
from his §301 remedy otherwise available
against the employer if the contractual
processes have been seriously flawed by the
union's breach of its duty to represent
employees honestly and in good faith and
without invidious discrimination or
arbitrary conduct." Hines, 424 U.S. at
55 a
570.13
Likewise in Beriault the Court again
noted the general rule that employees must
attempt to exhaust the grievance
arbitration procedure, but goes on to note
that "fujnder certain circumstances,
however, an employee may obtain judicial
review of his’ breach-of-contract claim
despite his failure to pursue contractual
remedies." Beriault, 501 F.2d at 262. In
Beriault the plaintiffs made no real effort
to prosecute their grievance. Id. These
plaintiffs failed to present any evidence
to support their grievance at a hearing
13° In Hines there was no conspiracy
between the union and the employer. The
employer honestly believed the employee was
stealing, the union just failed to
adequately investigate the charges. There
was no bias on the part of the arbitration
hearing committee, thus the futility/bias
exception was not applicable. Yet the
court allowed petitioner to file in
district court under section 301.
56 a
befcre the Joint Port Labor Relations
Committee. Plaintiffs were invited to
return and present additional evidence at a
later time, but again failed to do so.
Plaintiffs' actions in Beriault, thus,
cannot be said to be in any way similar to
the appellants' actions in the case at bar.
The appellants in the instant case made
every reasonable attempt to gather and
present evidence of bias, but the Port LRC
refused to hear it. Further, the Port LRC
had discretion to allow plaintiffs'
grievances to be filed for a period of up
to six months. Considering the difficulty
of obtaining evidence, plaintiffs' good
faith effort to file their grievance should
have been allowed.
B
Furthermore, unlike the majority, I
would not reject the appellants’ argument
57 a
that their failure to exhaust
administrative remedies should be excused
because the grievance procedures are
subject to unreasonable delays. As far as
we can tell, at the time this appeal was
filed, those members of the appellant
Classes who timely filed individual
grievances alleging favoritism and nepotism
were still awaiting a decision by the Port
LRC. Certainly the majority would not
expect appellants to sit on their contract
rights until an "unreasonable" period of
time had elapsed, and risk running afoul of
the statute of limitations for a court
action. I would accept the appellants'
argument about unreasonable delays in the
private law system at least insofar as it
illuminates the fundamental procedural
inadequacy of the grievance and arbitration
procedure to deal with a large class of
58 a
related grievances arising out of an
allegedly discriminatory registration
process.
IV
The majority further believes that
even if the Port LRC was biased, or the
grievance procedures-were inadequate, any
such bias or inadequacy was cured by having
an independent arbitrator available at the
end of the grievance and arbitration
process. I recognize and concede the
validity of this argument with respect to
the section 13 claims. See Ritza v. Int'l.
© emen's W hou ° ion, 837
F.2d 365, 370 (9th Cir. 1988). However,
independent arbitration was not available
to appellants for their non-section 13
Claims of favoritism (nepotism) and bad
faith in the registration and employment of
59 a
longshore workers and clerks.14 Thus these
Claims are not barred by the Ritza
analysis.
V
Appellants' showing, with respect to
both the registration process and the
procedures for guaranteeing that
registration is conducted in accordance
with the tervs of the collective bargaining
agreement, is sufficiently troubling as to
indicate that this is, regrettably, one of
those are cases in which the private law
system has broken down. It would have been
a futile act to submit a timely grievance
based only on rumors and speculations for
investigation and decision to a biased Port
14 Independent arbitration is
available only for section 13 claims, by
appeal from the Port LRC to the Coast LRC,
and then to the Coast Arbitrator. In the
case of non-section 13 grievances, the Port
LRC is the sole and final arbiter.
60 a
LRC panel on which both union and
management representatives had what appears
to be a serious conflict of interest. The
private machinery for dispensing industrial
justice appears to have broken down in this
case. If appellants can prove bias, I
would excuse them from exhausting the
contractual grievance procedures, and allow
them to proceed with their proof on the
merits of their group grievance. Thus I
would REVERSE AND REMAND.
61 a
FILED
JUN 3, 1987
UNITED STATES DISTRICT COURT
CENTRAL DISTRICT OF CALIFORNIA
Case No.
CV 85-7243 FFF
JOHN CARR, et al.,
)
)
Plaintiffs, )
) STATEMENT OF
Ve ) UNCONTROVERTED
) FACTS AND
PACIFIC MARITIME ASSN., ) CONCLUSIONS OF
et al., ) LAW
)
Defendants. )
)
The motions of defendants Pacific
Maritime Association ("PMA"), International
Longshoremen's and Warehousemen's' Union
("ILWU"), and International Longshoremen's
and Warehousemen's Union Locals 13 and 63,
for summary judgment were heard by this
Court on April 20, 1987. The Court, having
considered the evidence, determines’ the
following facts to be uncontroverted and
makes the following conclusions of law.
62 a
i
UNCONTROVERTED FACTS
1. PMA is a multi-employer
association that handles labor relations
matters for employers in the _ shipping
industry in ports along the pacific coast.
ILWU and its Local 13 and 63 represent the
longshoremen, clerks, and foremen who
comprise the affected bargaining unit in
this industry.
2. PMA and ILWU operate dispatch
halls in each port area from _ which
longshore labor is dispatched to various
waterfront locations. From time to time,
PMA and ILWU agree to register or
deregister laborers. Only registered
longshoremen are eligible for dispatch from
these halls.
3. In August 1984, the Joint Coast
Labor Relations Committee ("Joint Coast
LRC") which is composed of employer and
63 a
labor union representatives, authorized the
registration of 300 additional Class B
longshoremen and 50 additional Class B
marine clerks for the Los Angeles/Long
Beach area. Approximately 30,000
applications were distributed to interested
persons. By September 26, 1984,
approximately 22,250 completed applications
were returned.
4. The plaintiffs, 109 unsuccessful
applicants for registration, contend that
the registration process was tainted by
favoritism, nepotism, cronyism, coaching of
certain applicants and improper scoring of
certain applications. It is uncontroverted
that the allegations of improprieties were
common knowledge among members of the
casual longshore work force. Most of the
plaintiffs worked as casual longshoremen
and clerks.
64 a
—__—_
a
‘
,
-
.
-
-
5. By April 9, 1985 the
registration committee completed the
registration of 50 clerks and 250
longshoremen. The committee agreed to
proceed with the registration of 87
additional longshoremen. The additional
registrations were completed by May 4,
1985.
6. The union and employer members
of the registration committee could not
agree on the mechanics of an appeal
procedure for unsuccessful registration
applicants. The disagreement was referred
to the Joint Coast LRC. On April 26, 1985,
the Joint Coast LRC instructed the
registration committee to post notice when
the current phase of registration had been
completed. The Joint Coast LRC further
instructed that grievances concerning that
phase of registration must be filed within
65 a
ten days of the posting of such notice.
7. On May 6, 1985, the registration
committee posted notice of the termination
of the initial phase of the registration
process at various locations including the
offices of the PMA, the ILWU Local 13
longshore dispatch hall, the ILWU Local 63
dispatch hall, and the casual dispatch hall
located at Berth 179, Wilmington,
California. The notice advised that
appeals or grievances filed after May 15,
1985 would be considered untimely.
8. Several of the plaintiffs saw
the posted notice. The notice was also
widely discussed.
9. In response to the notice,
approximately 318 appeals were filed by
unsuccessful applicants. Of these, 30 were
subsequently registered.
10. On October 16, 1986, plaintiffs
; 66 a
Te Ee
filed a formal group grievance with the Los
Angeles-Long Beach Port LRC. The grievance
complained of arbitrary testing, selections
for registration based on family
connections, and selective disclosure of
information to aid certain applicants.
11. The employment of longshore
workers is governed by a collective
bargaining agreement, the Pacific Coast
Longshoremen's and Clerk's Agreement
("PCLCA"). The plaintiffs' grievance
alleged the registration process violated
various provisions of PCLCA that call for
good faith in the registration process,
promotion from the ranks, promotion based
on merit, and provisions that forbid
favoritism and discrimination.
12. The instant action was filed
November 5, 1985.
13. The Joint Port LRC denied
2 67 a .
plaintiffs' grievance on April 11, 1986.
The grounds for the denial were that the
grievance was not filed within the ten-day
period specified in the May 6, 1985 notice.
In addition, the denial was based on PCLCA
§17.41, which provides that one may file a
Claim for discrimination within ten days of
the occurrence of the discrimination.
14. Plaintiffs appealed their
grievance to the Joint Coast LRC which
upheld the Port LRC's decision. They then
appealed the discrimination claims to the
Coast Arbitrator, Sam Kagel. There is no
evidence that plaintiffs ever objected to
the lack of neutrality of either LRC or the
arbitrator.
15. On January 15, 1987, Kagel
issued his decision denying plaintiffs'
Claims on the grounds of untimeliness. He
found that grievants knew or should have
68 a
known of the May 15, 1985 appeal deadline
and the alleged improprieties in the
registration process. He also rejected
plaintiffs' argument that the appeal
limitations periods should have been
extended.
16. The PCLCA states that it
provides the exclusive remedy for disputes
arising between employees and the PMA. In
addition, the Joint Coast LRC's Memorandum
of Coastwise Rules Covering Registration
and Deregistration of Longshoremen and
Clerks provides that the PCLCA's grievance
procedures shall be the exclusive remedy
with respect to registration disputes
between an applicant for registration, the
PMA, and the ILWU. The PCLCA and Coastwise
Rules also provide that no other remedies
may be utilized until the grievance
procedure has been exhausted.
69 a
17. Plaintiff John Carr alleges
that he was told by Local 13 President
David Arian that there was no need to
appeal the denial of this application for
registration, but rather to update his
application. Plaintiff Jesse Gann's
"understanding" from a loudspeaker
announcement was that one must have had an
interview in order to appeal. Neither Carr
nor Gann denies knowledge of the widely
disseminated notices explaining the appeals
procedure.
18. At least one of the plaintiffs,
Stanley Wasserman, did file a timely
individual grievance regarding the denial
of his registration. That grievance is
still pending.
19. Any statement of uncontroverted
fact that are included in the conclusions
of law are incorporated herein.
70 a
CONCLUSIONS OF LAW
1. The Court has jurisdiction over
this action pursuant to Section 301 of the
Labor Management Relations Act, 29 U.S.C.
§185.
2. Exhaustion of contract grievance
procedures is a prerequisite to a Section
301 action. Republic Steel Corp. v.
Maddox, 379 U.S. 650, 85 S.Ct. 614, 13
L.Ed.2d 580 (1965). Failure to invoke a
timely grievance constitutes a failure to
exhaust the grievance procedures. “Sée,
Stephens _v. Postmaster General, 623 F.2d
594, 595 (9th Cir. 1980).
3. When a collective bargaining
agreement calls for final and binding
arbitration, the arbitrator's decision is
ordinarily final, see United Steel Workers
v. Enterprise Wheel and Car Corp., 363 U.S.
593, 599, 80 S.Ct. 1358, 1362 (1960),
71a
including the arbitrator's decision
regarding the timeliness of the grievance.
See John Wiley & Sons, Inc. v. Livingston,
376 U.S. 543, 84 S.Ct. 909 (1964).
4. The Coast Arbitrator's decision
concerning plaintiff's claims of
discrimination is final and binding. No
extraordinary circumstances are present
that would justify overturning that
decision.
5. The remainder of plaintiffs'
group claims are similarly barred due to
the failure to file them by May 15, 1985.
In that regard, the decisions of joint
employer grievance committees are binding.
See Donley v. Motor Freight Express, 344
F.Supp. 290 (W.D. Penn. 1972), aff'd, 481
F.2d 1398 (3d Cir. 1973).
6. This Court cannot accept
plaintiffs' argument that they attempted to
72 a
exhaust their administrative remedies once
they had sufficient evidence with which to
do so. Arbitrator Kagel's finding that
plaintiffs were in a position to file their
Claims of discrimination prior to May 15,
1985 was supported by the record and
applies with equal force to all of
plaintiffs' claims.
7. The Court also rejects
plaintiffs' attempt to excuse their failure
to exhaust administrative remedies on the
grounds that defendants repudiated the
PCLCA's procedures or that the procedures
were somehow inadequate. Plaintiffs
offered only speculative argument in this
regard.
8. Similarly untenable is
plaintiffs' contention that exhaustion was
futile because the Joint Port LRC was
biased against them. Plaintiffs failure to
ve @
challenge the composition of the Committee
when they submitted their grievance to it
effects a waiver of the bias objection.
Cf. Sheet Metal Workers Int'l Ass'n v.
Kinney Air Cond., 756 F.2d 742 (9th cir.
1985).
9. In addition, the Court finds no
basis for excusing the untimeliness of
plaintiffs' claims on the grounds that the
union defendants breached their duty of
fair representation. This is not a case in
which the unions are alleged to have
breached their duty in negotiating a
collective bargaining agreement, see
Williams _v. Pacific Maritime Ass'n., 617
F.2d 1321 (9th cir. 1980), or in which the
plaintiffs were prevented from exhausting
contractual remedies by the unions'
wrongful refusal to process a grievance.
See Vaca v. Sipes, 386 U.S. 171, 87 S.Ct.
74 :~«a
903 (1967).
10. The testimony of plaintiffs
Carr and Gann that they relied on erroneous
advice and understandings concerning the
appeal process does not raise a material
issue of fact barring summary judgment.
Under the circumstances, it was not
reasonable to disregard the information
contained in the notice of termination of
the initial phase of the registration
process. Cf. Stephens v. Postmaster
General, 623 F.2d, 594, 595 (9th Cir.
1980).
11. Defendants' motions for summary
judgment are hereby GRANTED. Nothing
herein is intended to prevent the
plaintiffs from proceeding with any
grievances that were timely filed.
12. All statements of undisputed
facts that are deemed to be conciusions of
75 a
law are so found.
13. The Court incorporates its
comments from the bench on April 20, 1987
as further explanation for its
determinations.
DATED: June 2, 1987
FERDINAND F. FERNANDEZ
U.S. DISTRICT JUDGE
76 a
FILED
JUN 3, 1987
UNITED STATES DISTRICT COURT
CENTRAL DISTRICT OF CALIFORNIA
JOHN CARR, et al., Case No.
CV 85-7243-FFF
Plaintiffs,
SUMMARY JUDGMENT
Vv.
PACIFIC MARITIME ASSN.,
et al.,
)
)
)
)
)
)
)
Defendants. )
)
The motions of defendants Pacific
Maritime Association International
Longshoremen's and Warehousemen's Urion and
International Longshoremen's and
Warehousemen's Union Locals 13 and 63 for
summary judgment under Rule 56 of the
Federal Rules of Civil Procedure were heard
in the United States District Court for the
Central District of California before the
77 a
Honorable Ferdinand F. Fernandez, United
States District Judge. George W. Shaeffer,
Jr. appeared for plaintiffs; Dennis A.
Gladwell, Gibson, Dunn & Crutcher, appeared
for defendant Pacific Maritime Association;
George Shibley appeared for defendant
International Longshoremen's' and
Warehousemen's Union Local 13; and William
Carder of Leonard, Carder & Zuckerman,
appeared for defendants'9 International
Longshoremen's and Warehousemen's Union and
its Local 63.
After full consideration of the
moving and responding papers, all support
papers and exhibits, and oral argument of
counsel and the plaintiff, the Court finds
that there is no triable issue of material
fact as to defendants' formative defense
that plaintiffs' suit is barred by their
failure to exhaust contractual remedies.
78 a
Therefore, defendants are entitled to
summary judgment in this case.
In accordance with the Statement of
Uncontroverted Facts and Conclusions of Law
filed herein,
IT IS SO ORDERED AND ADJUDGED:
i. That plaintiffs' allegations
concerning Section 13 of the collective
bargaining agreement between the ILWU and
Pacific Maritime Association are barred by
their failure to exhaust administrative
remedies.
.. That plaintiffs' claims under
other provisions of the collective
bargaining agreement -*re barred by
plaintiffs' failure to exhaust contractual
remedies.
3. That defendants are entitled to
summary judgment, and this case shall be
dismissed with prejudice, provided,
79 a
however, that nothing in this judgment is
intended to prevent the plaintiffs from
proceeding with grievances which were
timely filed pursuant to the applicable
agreements and notices.
Dated: June 3, 1987
Ferdinand F. Fernandez
U.S. District Judge
A0306.APP
80 a
The Petitioners before this Court
are:
John Carr, Arron Alexander, Mike Andrews,
Elie Anthony, Anna Ashbrook, Raymond G.
Ayala, Patsy Badderley, David Balsley, Don
Bean, Ken Bennett, James Biller, William
Blackwood, Jim Bockrath, Conrad Bojorquez,
Don Brickey, Dennis Brueckner, John Bryant,
Glen Buchanan, Jon J. Buchanan, John
Burtsch, Keath Butner, Paul Butner, Isadore
Califano, Pat Califano, Joe Camello,
Richard Campos, Jim Carbone, Jennifer
Chambers, Gary Coad, Russ Coates, Kay
Collins, James Cuff, Antonio DelIorio,
Richard DePippo, Tim DeSantis, Miodrag
Dimitrijevic, James W. Duff, Vince Ferrara,
Linda Galaz, Jess Gann, Robert C. Gonzales,
Ruben A. Gonzales, JTEes Charles
Greisjraber, Michael J. Gutierrez, D. Roy
Haggerty, Judy Haggerty, Patty Hamlin, Bill
Haney, Charles Hecht, Raymond Jones, John
Kalina, Henry Keliihoomalu, Vince Lauro,
Frank Lipanovich, John Madrigal, Savetta
Mann, George Martin, William Martin, Vince
Mattera, Madison D. May, Jack McConnachie,
Sr., Bill McFarland, David McKelvey, Rudy
Melgosa, Jenny Milburn, Ron Miller, Bert
M.D. Minter, George Mitchell, Sam Morreale,
Ty Neal, Ramon Ochart, Cheryl Y. Olivas,
Jim Pandora, Bill Pearia, Dee Pollock,
Maria Radakovic, Dennis Regan, Jerry Rios,
Rich Risso, Jr., Roy Risso, David Rivera,
Richard Rivera, Harry Roberts, Frank
Rodriguez, Raul Rodriguez, Raul Rojas,
Reginald Roland, Diana Rosas, George
Roybal, Jeff Schaap, Joe Schaffer, Jr.,
Steve Schaffer, Neal Schreiner, Jim Seixas,
Joe Simon, David Singh, Gary B. Taylor,
8la
Astrid B. Thangen, Steve Torres, Gary
Trujillo, John Tuck, Ralph Tupaz, Jim
Vickers, Stanley Wasserman, B.J. White,
Peter Camez, William R. Cannady, Phil
Menzes, Judy Checkers, Patricia Potter, Ed
Harris, Jose Miranda, Augustine Onorato,
Frank Onorato, Linda oOnorato, Gabino
Pedroza, Greg Brooks, Robert Campbell, Ron
Chamberlin, Ben Lopez, Frank Mattera,
Bertrand Miller, Armand Montano, Tom Utley,
Ronald Booher, John Carlisle, and Kevin
Juergensen.
82 a
RELEVANT SECTIONS OF THE
APPLICABLE COLLECTIVE BARGAINING
AGREEMENT DISCUSSED IN THE PETITION
§8.31 provides in relevant part:
"The Joint Port Labor Relations Committee
in any port, subject to the ultimate
control of the Joint Coast Labor Relations
Committee, shall exercise control over
registered lists in that port, including
the power to make additions to or
subtractions from the registered lists as
may be necessary...."
§8.43 provides: "Their shall be no
favoritism or discrimination in the hiring
or dispatching or employment of any
longshoremen qualified and eligible under
the agreement."
§8.44 provides: "Any longshoremen or
dispatching hall employee found guilty by
the Joint Port Labor Relations Committee of
favoritism or discrimination or bribery
shall immediately be discharged and dropped
from the registered list."
§9.1 provides: "The principle of
promotion from the ranks is’ hereby
recognized and agreed to. For the purpose
of this Contract Document, promotion is
defined as upgrading registered long-
shoremen covered by this Contract Document
and the classifi-cations contained in the
respective Port Supplements."
83 a
§9.2 provides in relevant part:
"There shall be established in each port a
joint committee of registered lcngshoremen
and of employers. It shall be the duty of
such committee to establish qualifications
for promotions tc classifications covered
by this Contract Document, including
trainees, and to pass on alle such
promotions. The promotions committee shall
determine the trainees under policies laid
done by the Joint Port Labor Relations
Committee. Such qualifications’ shall
include length of service in the industry,
competency and ability to perform skilled
operations...."
§18.1 provides: "As an explicit
condition hereof, the parties are committed
to observe this Agreement in good faith.
The Union commits the locals and every
longshoremen it represents to observe this
commitment without resort to gimmicks of
subterfuge. The Employers give the same
guarantee of good faith observance on their
part."
§13 provides: "There shall be no
discrimination in connection with any
action subject to the terms of this
Agreement either in favor of or against any
person because of membership or non-
membership in the Union, activity for or
against the Union or absence thereof, or
race, creed, color, sex, age, national
origin or religious or political beliefs.
§17.23 provides: "If the grievance
is not settled as provided in 17.21 or
17.22 or does not arise on the job, it
84 a
shall be referred to the Joint Port Labor
Relations Committee which shall have the
power and duty to investigate and
adjudicate it.
§17.24 provides: "In the event that
the Employer and Union members of any Joint
Port Labor Relations Committee shall fail
to agree upon any question before it, such
question shall be immediately referred at
the request of either party to the
appropriate Joint Area Labor Relations
Committee for decision.
§17.4 provides: "When any
longshoremen (whether a registered
longshoremen or an applicant for
registration or a casual longshoreman)
claims that he has been discriminated
against in violation of Section 13 of this
Agreement, he may at his’ option and
expense, or either the Union or the
Association may at its option and at their
joint expense, have such complaint
adjudicated hereunder, which procedure
shall be the exclusive remedy for any such
discrimination."
§17.41 provides: "Such remedy shall
be begun by the filing of the grievance
with the Joint Port Labor Relations
Committee setting forth the grievance and
the facts as to the alleged discrimination.
Such a grievance shall be timely if
presented within ten (10) days of the
occurrence of the alleged discrimination.
Such grievance shall be investigated by the
Joint Port Labor Relations Committee at a
regular or special meeting of the Committee
85 a
at which the individual involved shall be
permitted to appear to state his case, at
which time he may present oral and written
evidence and argument.
§17.411 provides: "With respect to
any claim of violation of Section 13, the
Joint Port Labor Relations Committee shall
extend the time for filing of such claim
beyond the time established in Section
17.41 whenever such extension is necessary
because the period of limitation otherwise
applicable is determined to be unlawful or
because in the judgment of the Committee in
the exercise of its sound discretion, such
an extension is otherwise necessary to
prevent inequity but in no event shall the
time for filing of such claims be extended
beyond six (6) months from the date of the
occurrence of the alleged discrimination."
§17.42 provides: "Either the
Employers, the Union or the man involved
may appeal the decision of the Joint Port
Labor Relations Committee. Such appeal
shall be to the Joint Coast Labor Relations
Committee by letter addressed to the Joint
Coast Labor Relations Committee. To be
timely, such appeal must be delivered or
mailed within seven (7) days of the
decision of the Joint Port Labor Relations
Committee."
§17.421 provides: "If such an
appeal is taken within the time limits
allowed, the Joint Coast Labor Relations
Committee shall either confirm or reverse
or modify the decision of the Joint Port
Labor Relations Committee without any
86 a
further hearing, or order a further hearing
and thereupon issue its decision on the
basis of the entire record including that
at both hearings."
§17.43 provides: "An appeal from
the decision of the Joint Coast Labor
Relations Committee can be presented to the
Coast Arbitrator (or by agreement of the
Joint Coast Labor Relations Committee to an
Area Arbitrator) by the individual
involved, the Employers or the Union.
Appeal shall be by a written request for an
arbitrator's hearing mailed or delivered to
the Union and the Employer representatives
of the Joint Coast Labor Relations
Committee if by an individual, or to the
individual and the other party's represent-
ative on the Joint Coast Labor Relations
Committee if by either the Union or the
Employers. Such an appeal shall be timely
\only if such request for an arbitrator's
hearing is so filed in writing with the
Joint Coast Labor Relations Committee no
later than seven (7) days after issuance of
the decision of the Joint Coast Labor
Relations Committee from which an appeal to
an arbitrator is taken.
§17.431 provides: "The arbitration
procedure shall be carried on in accordance
with the procedures generally applicable
under this Agreement for arbitration before
the Coast Arbitrator."
Sections 8.31, 8.43, 8.44, 9.1, 9.2,
13.1, and 18.1 of the PCCD are identical to
the terms of the PCLCD except for the
reference to "clerks" instead of
"longshoremen".
87 a