Petition for Writ of Certiorari — General Public Utilities Corp. v. United States

Supreme Court brief1985

Ask Donna

What actually matters in this document.

Text

ve

FILED

IN THE | NOV 15 1904

Supreme Court of the Hniteh. states STEVAS.

OCTOBER TERM, 1984 a

>

GENERAL PUBLIC UTILITIES CORPORATION, JERSEY CEN-

TRAL POWER & LIGHT COMPANY, METROPOLITAN EDISON

COMPANY and PENNSYLVANIA ELECTRIC COMPANY,

Petitioners,

—_V.—

UNITED STATES OF AMERICA,

Respondent.

PETITION FOR A WRIT OF CERTIORARI TO

THE UNITED STATES COURT OF APPEALS

FOR THE THIRD CIRCUIT

David Klingsberg

Counsel of Record

Myron Kirschbaum

Aaron Stiefel

KAYE, SCHOLER, FIERMAN,

HAYS & HANDLER

425 Park Avenue

New York, New York 10022

(212) 407-8000

James B. Liberman

BISHOP, LIBERMAN & COOK

1155 Avenue of the Americas

New York, New York 10036

(212) 704-0100

Samuel B. Russell

RYAN, RUSSELL & MCCONAGHY

520 Penn Square Center

Reading, Pennsylvania 19603

(215) 372-4761

Attorneys for Petitioners

QUESTION PRESENTED

Whether the court of appeals erred in holding that, under

the discretionary function exception to the Federal Tort Claims

Act, the United States is insulated from liability for the

negligent failure of government agency officials to warn peti-

tioners, the owners of the Three Mile Island nuclear electric

generating facility, of serious safety hazards of which the

agency was aware as a result of its investigation of an event at

another utility’s nuclear facility as well as other information it

had obtained.

il

TABLE OF CONTENTS

QUESTION PRESENTED .4 dccssassesseutaearens

OPINIONS BELOW . ..3.045siesveuedeeseeeaeaneee

JURISDICTION. ...3.<0cs4050ub eee eee

STATUTES INVOLVED .....ccssccucueeseeeeesesens

STATEMENT OF THE CARE .<csvascueuuuverseeens

REASONS FOR GRANTING THE WRIT...........

THE DECISION BELOW CONFLICTS WITH APPLI-

CABLE DECISIONS OF THIS COURT AND

OTHER COURTS OF APPEARS ses issscseseces es

A.

The Courts Have Repeatedly Upheld FTCA

Claims, Such As Petitioners’, Which Involve A

Negligent Failure To Warn Of Safety Hazards ...

. The Government’s Negligent Failure To Warn

Petitioners Of Known Safety Hazards Involved

No Social, Economic Or Political Policy Judg-

ments And, Under This Court’s Recent Decision

In Varig, Is Not Protected By The Discretionary

Function Exceptim .....:s:csceetesasseuepessees

The Third Circuit Erroneously Concluded Based

On Varig That Petitioners’ Claim Is Barred By

The Discretionary Function Exception Because

The Claim Challenges Regulatory Activities .....

CONCLUSION ..... . ..0s s¢n0a eee

APPENDIX

eee

TABLE OF AUTHORITIES

Cases PAGE

Andrulonis v. United States, No. 79-CV-847 (N.D.N.Y.

October 3, 1984) (available on LEXIS, Genfed Li-

La? ccdicgne hens see bdo eke sae ene 12, 13

Block v. Neal, 460 U.S. 289 (1983) .................. 12

Dalehite v. United States, 346 U.S. 15 (1953)..... 8, 9, 10, 16

Eastern Air Lines, Inc. v. Union Trust Co., 221 F.2d 62

(D.C. Cir.), aff’d per curiam sub nom. United States

v. Union Trust Co., 350 U.S. 907 (1955) ........... 7, 10

Estate of Callas v. United States, 682 F.2d 613 (7th Cir.

ee ay oe each baba shee ett baaawenece 8, 10

Hitchcock v. United States, 665 F.2d 354 (D.C. Cir.

ee ae ee kak sb as oe so bk 0 bode we eee 8

indian Towing Co. v. United States, 350 U.S. 61

ieee de weaen dade eek sce vensenacuns 7, 10, 15

Ingham v. Eastern Air Lines, Inc., 373 F.2d 227 (2d

Cir.), cert. denied, 389 U.S. 931 (1967)............. 7, 10

Scheuer v. Rhodes, 416 U.S. 232 (1974).............. 3

United Air Lines, Inc. v. Wiener, 335 F.2d 379 (9th Cir.),

cert. dismissed, 376 U.S. 951 (1964) ............... 7, 10

United States v. S. A. Empresa de Viacao Aerea Rio

Grandense (Varig Airlines), 104 S. Ct. 2755

Es ore eek ie yee eudeacseee.e 6a 6, 8 and passim

Statutes and Regulations

SL ede kdeaseeesesene 2

Ee hei dees Ase Oe 6

a kee ehaabeseuen eds 5

ERS 2

PAGE

es EN 0444 64 RR dh adedasecuwches 2, 6,9, 12

EP re rrr nT ir aP 12

Energy Reorganization Act, § 206, 42 U.S.C. § 5846... 3

Energy Reorganization Act, § 208, 42 U.S.C. § 5848... 3

ee ae OTD oo 5 bd ddnnseess babu ctasuses 3

Other Authorities

U.S. Nuclear Regulatory Commission Annual Report

IN THE

Supreme Court of the United States

OCTOBER TERM, 1984

No.

—~<~_>-

GENERAL PUBLIC UTILITIES CORPORATION, JERSEY CEN-

TRAL POWER & LIGHT COMPANY, METROPOLITAN EDISON

COMPANY and PENNSYLVANIA ELECTRIC COMPANY,

Petitioners,

—_—V.—

UNITED STATES OF AMERICA,

Respondent.

>

PETITION FOR A WRIT OF CERTIORARI TO

THE UNITED STATES COURT OF APPEALS

FOR THE THIRD CIRCUIT

OPINIONS BELOW

The opinion of the court of appeals is unreported. (1a-17a.)'

The opinion of the United States District Court for the Eastern

District of Pennsylvania denying respondent’s motion to dis-

miss is reported at 551 F. Supp. 521. (18a-35a.)

l References are as follows: “J.A.” refers to the Joint Appendix filed

in the court of appeals which includes the complete text of petitioness’

Amended Complaint in this action; “__a” refers to the Appendix

herein which contains, among other things, pertinent excerpts from

petitioners’ Amended Complaint.

JURISDICTION

The judgment of the United States Court of Appeals for the

Third Circuit was entered on September 28, 1984 (36a), and

this petition is filed within 90 days of that date. This Court has

jurisdiction under 28 U.S.C. § 1254(1).

STATUTES INVOLVED

1. The Federal Tort Claims Act (“FTCA”), 28 U.S.C.

§ 2671 et seq., which provides in pertinent part:

“The United States shall be liable, respecting the provi-

sions of this title relating to tort claims, in the same

manner and to the same extent as a private individual

under like circumstances. . . .” 28 U.S.C. § 2674.

> > >

“The provisions of this chapter. . . shall not apply to—

(a) Any claim based upon an act or omission of an

employee of the Government, exercising due care, in the

execution of a statute or regulation, whether or not such

Statute or regulation be valid, or based upon the exercise

or performance or the failure to exercise or perform a

discretionary function or duty on the part of a federal

agency or an employee of the Government, whether or

not the discretion involved be abused.” 28 U.S.C.

§ 2680(a).

2. Portions of the Energy Reorganization Act of 1974, 42

U.S.C. § 5801, ef seq. (37a-38a.)

STATEMENT OF THE CASE

This action arises from the March 28, 1979 accident at

petitioners’ nuclear electric generating facility known as Three

Mile Island Unit No. 2 (*TMI”).? The complaint alleges that

negligent acts and omissions of employees of the Nuclear

Regulatory Commission (“NRC” or the “Commission”) con-

tributed to the catastrophic damage suffered by petitioners as a

result of the accident.

No answer to the complaint has been filed, and no discovery

haf been conducted. Accordingly, the only facts before the

district court and the court of appeals were those contained in

the complaint. Those facts must be accepted as true and must

be construed liberally in petitioners’ favor. Scheuer v. Rhodes,

416 U.S. 232, 236 (1974).

As alleged in the complaint, the NRC has undertaken,

Pursuant to statutes and regulations as well as long-standing

practice, to operate a central warning system for the protection

of operators of nuclear plants as well as the public. (40a-41a;

J.A. 71-73.)° Because it would be unrealistic for each operator

2 __— Plaintiff Metropolitan Company (“Met-Ed”) owns an undivided

$0% interest in TMI, which it operated under license from the NRC

prior to the accident. Jersey Central Power & Light Company

(“JCP&L”) and Pennsylvania Electric Company (“Penelec”) each own

an undivided 25% interest in TMI. General Public Utilities (GPU) is

an investor-owned public utility holding company which owns all the

common stock of JCP&L, Met-Ed and Penelec and coordinates their

operations to function as a single, integrated electric utility system

known as the GPU system. Disclosure statements, dated January 13,

1983, which are similar to that required by Rule 28.1 of the Supreme

Court Rules, as amended, were supplied to the Third Circuit pursuant

to Local Rule 25.

3 Section 208 of the Energy Reorganization Act of 1974, 42 U.S.C.

§ 5848, requires the NRC to disseminate information on any “abnor-

mal occurrence,” including its causes and action to prevent reoccur-

rence, as soon as the information becomes available to it. (38a.)

Similarly, the Commission's regulations impose a duty on the NRC to

administer programs for “notifying licensees regarding generic prob-

lems so as to achieve appropriate precautionary or corrective action.”

10 C.F.R. 1.64 ,1977). (41a; J.A. 72.) The NRC is also required by

statute to obtain reports from licensees and suppliers, which it analyzes

and uses in its warning system regarding nuclear safety hazards and

defects. Section 206, Energy Reorganization Act of 1974, 42 U.S.C.

§ 5846. (37a-38a.)

4

of a nuclear facility to monitor operating experience through-

out the industry, the NRC serves as a clearinghouse, gathering

information about generic safety hazards and rapidly dis-

seminating it to plant operators. (45a-46a; J.A. 91-93.) As the

NRC has stated, “when an inspection or investigation discloses

events or conditions that present a potential or actual threat to

public health and safety,” the NRC “routinely communicates

what it has found” to all licensees of nuclear plants. U.S.

Nuclear Regulatory Commission Annual Report 1978. (J.A.

74.) Prior to the TMI accident, the NRC’s warning system was

relied upon by all nuclear plant operators, and was crucial to

the existence of the nuclear power industry. Following the TMI

accident, and as a result of shortcomings in the NRC’s opera-

tion of its warning system disclosed by the accident, the

nuclear industry created a private organization to fulfill this

crucial function and supplement the NRC’s warning system.

(46a; J.A. 93.)

In a report entitled “Three Mile Island—A Report to the

Commissioners and to the Public,” the NRC admitted that

eighteen months before the TMI accident, an accident occurred

at the Davis-Besse nuclear plant in Ohio which was “@lmost an

exact copy of the accident that subsequently occurred at TMI.”

(39a; J.A. 70.) The Davis-Besse and TMI reactors were both

pressurized water reactors manufactured by the Babcock &

Wilcox Company (“B & W”). The NRC promptly investigated

the Davis-Besse event and identified the pertinent safety haz-

ards. (4la-42a; J.A. 80-81.) The NRC was aware that the

safety hazards discovered at Davis-Besse existed at other nu-

clear facilities, because it knew that “similar pieces of equip-

ment with comparable probabilities of similar failure modes

were installed on other B&W plants.” (40a; J.A. 70.) Yet the

NRC failed to warn the petitioners or other plant operators of

the hazards it had discovered. (/d.) As alleged in the com-

plaint, if the NRC had warned petitioners of the known safety

hazards revealed by the Davis-Besse event and certain other

precursors, the TMI accident would not have occurred. (40a;

J.A. 71.)

es oe a ee = owe-me= we a

Both the Davis-Besse and TMI accidents involved a stuck-

open valve at the top of the “pressurizer” which resulted in a

loss of water essential to cooling the reactor’s nuclear core.

The NRC learned from the Davis-Besse accident that the

emergency procedures in effect at B & W-designed nuclear

plants directed plant operators to monitor the water level in the

system using an indicator, i.e., water level in the pressurizer,

which proved to be inaccurate and misleading under certain

circumstances. In a January 1978 internal memorandum, NRC

employees noted that the operators at Davis-Besse had been

misled by this inaccurate indicator into thinking that there was

sufficient water in the reactor coolant system and had shut off

the flow of replacement water. (43a; J.A. 86-87.) The NRC

employees expressed concern that since “operators would con-

trol makeup flow based on the pressurizer level as part of their

normal procedures,” operators of B & W-designed plants

“could erroneously shut off makeup flow” even where the

system was actually experiencing a critical water shortage. (/d.)

Nevertheless, the NRC failed to transmit this essential safety

information to the owners of B & W-designed nuclear plants.

(44a; J.A. 88.)

As a result, on March 28, 1979 petitioners were misled as to

the true water level in the TMI reactor coolant system. Like the

operators at Davis-Besse before them, the TMI control room

operators reduced the flow of vital replacement water even as

the nuclear core was uncovering, overheating and beginning to

melt. Had the NRC warned petitioners not to rely on the

misleading indicator, the TMI accident would not have oc-

curred. (40a; J.A. 71.)

Petitioners brought this action in the United States District

Court for the Eastern District of Pennsylvania which had

jurisdiction pursuant to 28 U.S.C. § 1346(b).* The district

4 Petitioners are seeking review only with respect to their first cause of

action, based on the failure to warn described in text, and not their

6

court denied a motion to dismiss brought by respondent,

holding that (1) the petitioners had stated a claim upon which

relief could be granted and (2) that claim was not barred by the

discretionary function exception or the misrepresentation ex-

ception to the Federal Tort Claims Act, 28 U.S.C. § 2680(a),

(h). Recognizing the significance of the litigation involved, the

district court certified the following question for interlocutory

appeal pursuant to 28 U.S.C. § 1292(b):

“Is our decision correct that neither the misrepresentation

nor the discretionary function exception [to the Federal

Tort Claims Act] bars this suit?” (35a.)

The case was argued before the Third Circuit on September

13, 1983. However, in a letter dated October 25, 1983, the

Third Circuit advised the parties that it would await this

Court’s decision in United States v. S. A. Empresa de Viacao

Aerea Rio Grandense (Varig Airlines), Nos. 82-1349, 82-1350

(here‘nafter cited as Varig), which was then sub judice, before

rendering a decision. After Varig was decided, 104 S.Ct. 2755

(1984), the Third Circuit, relying entirely on Varig, held that

the government’s failure to warn of known, serious safety

hazards was protected by the discretionary function exception.

Although the government’s negligent failure to warn in this

case involved no social, political or economic policy or regula-

tory decisions, the court of appeals held that the government

was immune from liability because the NRC’s categorization

of an event as an abnormal occurrence requiring congressional

notification might, under certain circumstances, entail “con-

siderations of public health and safety”, as well as “technical

and scientific evaluations”, and because the NRC was acting

here “in its role as regulator. . . .” (13a.) As we demonstrate

below, the Third Circuit’s decision conflicts with applicable

decisions of this Court and other courts of appeals.

second cause of action, which relates to the NRC’s undertaking to

review and approve safety analyses prepared by nuclear reactor manu-

facturers.

REASONS FOR GRANTING THE WRIT

THE DECISION BELOW CONFLICTS WITH

APPLICABLE DECISIONS OF THIS COURT

AND OTHER COURTS OF APPEALS

A. The Courts Have Repeatedly Upheld FTCA Claims, Such

As Petitioners’, Which Involve A Negligent Failure To

Warn Of Safety Hazards

Stripped of the industry jargon and scientific detail, peti-

tioners’ claim is simply that the NRC, having undertaken to

warn nuclear plant operators, such as petitioners, of safety

hazards, identified a serious safety hazard and failed to warn

petitioners. (39a-40a; J.A. 69-70.) The complaint alleges that if

a warning had been communicated, the TMI accident would

never have occurred. (40a; J.A.71.) Claims such as this, based

on a negligent failure to warn of safety hazards, have re-

peatedly been upheld under the Federal Tort Claims Act by this

Court and the courts of appeals. E.g., Indian Towing Co. v.

United States, 350 U.S. 61 (1955) (negligent failure to warn of

shipping hazard); Ingham v. Eastern Air Lines, Inc., 373 F.2d

227 (2d Cir.), cert. denied, 389 U.S. 931 (1967) (negligent

failure to warn of air traffic hazards); United Air Lines, Inc. v.

Wiener, 335 F.2d 379 (9th Cir.), cert. dismissed., 379 U.S. 951

(1964); Eastern Air Lines, Inc. v. Union Trust Co., 221 F.2d 62

(D.C. Cir.), aff’d per curiam sub nom. United States v. Union

Trust Co., 350 U.S. 907 (1955) (same).

As this Court held under the FTCA in Jndian Towing:

“It is hornbook tort law that one who undertakes to warn

the public of danger and thereby induces reliance must

perform his ‘good Samaritan’ task in a careful manner.”

350 U.S. at 64-65.

Thus, the Third Circuit’s decision here, holding that peti-

tioners’ failure to warn claim is barred by the discretionary

function exception to the FTCA, represents a significant de-

parture from the prior decisions of this Court and other courts

8

of appeals in failure to warn cases. Furthermore, this Court’s

opinon in Varig, on which the Third Circuit relied almost

entirely, was not a failure to warn case and did not define the

discretionary function exception to include a negligent failure

to warn of known safety hazards. Indeed, as demonstrated

below, it is clear from Varig that petitioners’ claim is not

covered by the discretionary function exception.

B. The Government’s Negligent Failure To Warn Petitioners

Of Known Safety Hazards Involved No Social, Economic

Or Political Policy Judgments And, Under This Court’s

Recent Decision In Varig, Is Not Protected By The Discre-

tionary Function Exception

In Varig, 104 S. Ct. 2755 (1984), this Court reaffirmed that

the rationale for the discretionary function exception to the

Federal Tort Claims Act was that

“Congress wished to prevent judicial ‘second-guessing’ of

legislative and administrative decisions grounded in so-

cial, economic and political policy through the medium of

an action in tort.” Jd. at 2765.

Accord, Dalehite v. United States, 346 U.S. 15, 36 (1953);

Estate of Callas vy. United States, 682 F.2d 613, 619-20 (7th Cir.

1982); Hitchcock v. United States, 665 F.2d 354, 363-64 (D.C.

Cir. 1981).

The claims in Varig which, unlike the present case, were

resolved after trial or on summary judgment rather than on a

motion to dismiss the complaint on its face, arose from

allegedly negligent certifications, by the Federal Aviation Ad-

ministration and its predecessor, of aircraft which did not

comply with FAA safety regulations. The aircraft had been

inspected pursuant to a “spot-check” program designed by the

FAA “to encourage manufacturers and operators to comply

fully with minimum safety requirements.” /d. at 2766. The

Court found no indication in the record, however, that in the

course of the “spot-check” program the defective component

“was actually inspected or reviewed by an FAA inspector.” Jd.

Under these circumstances, the Court held that the FAA’s

determination to utilize a “spot-check” system to monitor the

Se ee nee

9

manufacturers’ regulatory compliance was protected by the

discretionary function exception. Thus, the Court stated:

“The FAA’s implementation of a mechanism for com-

pliance review is plainly discretionary activity of the

‘nature and quality’ protected by § 2680(a). . . . Deci-

sions as to the manner of enforcing regulations directly

affect the feasibility and practicality of the Government’s

regulatory program; such decisions require the agency to

establish priorities for the accomplishment of its policy

objectives by balancing the objectives sought to be ob-

tained against such practical considerations as staffing

and funding. Here, the FAA has determined that a pro-

gram of ‘spot-checking’ manufacturers’ compliance with

minimum safety standards best accommodates the goal of

air transportation safety and the reality of finite agency

resources. . . . It was precisely this sort of judicial

intervention in policymaking that the discretionary func-

tion exception was designed to prevent.” Id. at 2768

(emphasis added).

In addition, the Court stated: “It follows that the acts of FAA

employees in executing the ‘spot-check’ program in accordance

with agency directives are protected by the discretionary func-

tion exception.” Jd. (emphasis added).°

The case at bar, however, is totally unlike Varig, for it

involves no high-level planning decision involving “social,

economic and political” judgments and no acts or omissions of

5

This analysis of the discretionary function exception is consistent

with this Court’s analysis more than thiry years ago in Dalehite v.

United States, 346 U.S. 15 (1953). In Dalehite the Court held that the

discretionary function exception protected not only discretionary pol-

icy decisions “made by executives or administrators in establishing

plans, specifications or schedules of operations,” id. at 35-36, but also

the “acts or omissions of government employees, exercising due care in

carrying out statutes or regulations whether valid or not.” Jd. at 33

(emphasis added). The Court held, however, that the “tortious conduct

of [government] agents acting within their scope of business” is not

protected. Jd. at 27-28.

10

government employees properly carrying out government pro-

grams “in accordance with agency directives.” Rather, the

complaint alleges that government employees negligently failed

to warn petitioners of known safety hazards—a clear example

of operational negligence which has long been held to be

outside the discretionary function exception. Indeed, the

courts, including this Court, have consistently upheld the

validity of claims under the FTCA alleging such operational

neglience. E.g., Indian Towing Co. v. United States, 350 U.S.

61 (1955); Estate of Callas v. United States, 682 F.2d 613, 624

(7th Cir. 1982) (once “policy decision to erect warning signs has

. . . been made. . . the government has no discretion to carry

Out its policies negligently”); Jngham v. Eastern Air Lines,

Inc., 373 F.2d 227 (2d Cir.), cert. denied, 389 U.S. 931 (1967)

(policy decision to establish air traffic control system was

exercise of discretion at planning level; failure to report

weather changes as necessary is not discretionary function);

United Air Lines, Inc. v. Wiener, 335 F.2d, 397 (9th Cir.), cert.

dismissed, 379 U.S. 951 (1964) (finding it was “negligence at

the operational level of the government to fail to inform

United of the details of the government’s hazardous activity”);

Eastern Air Lines, Inc. v. Union Trust Co., 221 F.2d 62, 77

(D.C. Cir.), aff’d per curiam sub nom. United States v. Union

Trust Co., 350 U.S. 907 (1955) (“discretion was excerised when

it was decided to operate the tower, but the tower personnel

had no discretion to operate it negligently”). See, Dalehite v.

United States, 346 U.S. 15 (1953) (establishing the distinction

between negligence at the planning level and operational negli-

gence).

As described above, this case involves a program established

by the NRC for collecting information regarding operating

experience at nuclear plants industrywide, analyzing that infor-

mation and warning nuclear plant owners of defects and

hazardous conditions. Clearly, the NRC’s decisions as to the

content of this warning system, such as staffing and funding,

involved “social, economic and political” judgments which are

protected by the discretionary function exception. Moreover,

as this Court held in Varig, the actions of NRC employees

following the directives of their superiors in performing the

i nT NiO whe neal ket

1]

specifics of the NRC’s undertaking are likewise protected by

the discretionary function exception.

In Varig, however, it was the FAA’s initial decision to

establish only a “spot-check” program and the implementation

by FAA officials of that decision, rather than the carelessness

of FAA employees in carrying out the program, that was

challenged by the plaintiffs. Here, it is neither the NRC’s

decision as to the scope of its undertaking nor the actions of

NRC employees in carrying out that undertaking “in accord-

ance with agency directives” which petitioners claim was negli-

gent. Petitioners’ claim is that NRC employees were negligent

in failing to provide a warning of known safety hazards as

required by the NRC’s own undertaking. In fact, the com-

plaint alleges that if the warning system was carried out as

established by the NRC the Three Mile Island accident would

never have happened. (40a; J.A. 71.) Thus, under Varig, the

discretionary function exception does not apply to the facts

alleged in the complaint.

No social, economic or political judgments, or actions in

furtherance of such judgments, are at issue here. Pursuant to

the NRC’s undertaking, NRC employees gathered information

regarding operating experience at the Davis-Besse plant and

other information and identified a serious safety hazard. (4la-

44a; J.A. 80-81; 86-88.) Due to simple negligence, however, a

warning regarding the hazard was not disseminated as it should

have been under the NRC program. Under the facts alleged in

the complaint, this failure to warn involved no balancing of

competing social interests which would implicate the discre-

tionary function exception, for there was no conceivable rea-

son for not issuing a warning. In fact, it appears from the

allegations of the complaint that the NRC never even made a

decision as to whether or not to issue such a warning; once

identified, the safety hazard was negligently forgotten until

after the TMI accident.

It is precisely the distinction between, on the one hand,

policy determinations and acts in accordance with such deter-

minations and, on the other hand, simple operational negli-

gence, that the Third Circuit ignored in holding that

12

petitioners’ claim is barred by the discretionary function excep-

tion. In applying the rationale of Varig to the entirely dissimilar

facts of this case, the Third Circuit erroneously read Varig as

protecting operational conduct by government employees, re-

gardless of whether such conduct actually involved the exercise

of policy judgment or discretion. Thus, the Third Circuit’s

erroneous application of Varig would eliminate a major aspect

of FTCA liability, contrary to what this Court and Congress

intended.

At the very least, the Third Circuit’s erroneous reading of

Varig would eliminate the entire area of FTCA claims involving

inspections actually made by the government. Surely, this was

not the Court’s intention in deciding Varig. Indeed, just last

year the Court upheld the validity of a negligent inspection

claim brought under the FTCA against the Farmers Home

Administration, holding that the claim was not barred by 28

U.S.C. § 2680(h), the misrepresentation exception to the

FTCA. Block v. Neal, 460 U.S. 289 (1983).

Recently, in Andrulonis v. United States, No. 79-CV-847

(N.D.N.Y. October 3, 1984) (available on LEXIS, Genfed

library, Dist file), the court cited this same distinction, between

acts in furtherance of a policy determination and simple

operational negligence, in holding that Varig did not bar an

FTCA claim for negligence in the development of a rabies

vaccine. The court said:

“It is significant to note that the plaintiffs in Varig did

not allege specific acts of negligence on the part of FAA

employees in the actual inspection of the defective planes.

Instead, the plaintiffs were challenging the effectiveness

of the FAA’s spot-checking system in insuring compliance

with safety regulations. The Court held that a challenge to

the method selected by the FAA in the exercise of its

regulatory authority implicated policy decisions; these

policy decisions and their implementation were the type of

exercise of discretionary authority that Congress intended

to immunize from tort liability under the discretionary

function exception, 28 U.S.C. § 2680(a).”

on Anlst, a, sd itllaaiaatailll

AS lt Od 2 mane en Oa

an int cet a te AP ae A id

13

Here, as in Andrulonis and unlike in Varig, the complaint

does not challenge “policy decisions” or “their implementa-

tion,” but rather “specific acts of negligence” by government

employees in carrying out their responsibilities under the

NRC’s warning program.

In sum, a proper reading of this Court’s decision in Varig

requires that the Third Circuit’s decision be reversed and

petitioners be permitted to pursue their claims against the

government.

C. The Third Circuit Erroneously Concluded Based On Varig

That Petitioners’ Claim Is Barred By The Discretionary

Function Exception Because The Claim Challenges Regu-

latory Activities

In Varig, this Court held that the discretionary function

exception to the FTCA “was intended to encompass the discre-

tionary acts of the Government acting in its role as a reguiator

of the conduct of private individuals.” 104 S. Ct. at 2765.

Purporting to follow this principle, the Third Circuit held that

petitioners’ claim is barred by the discretionary function excep-

tion since the NRC was “unquestionably acting in its role as

regulator of the conduct of private individuals.” (13a.)

Again, the Third Circuit seems to have misunderstood this

Court’s holding in Varig and the nature of the wrong alleged in

the complaint. First, as the language quoted above from Varig

makes clear, only the “discretionary acts” of the government

are protected, even when it is acting in a regulatory capacity.

Since the failure to warn alleged in the cogaplaint did not entail

any “discretionary acts,” defined by this Court as involving or

carrying out determinations of policy, the discretionary func-

tion exception does not apply.

Moreover, the wrong alleged in this action was not per-

formed by the NRC “acting in its role as a regulator of the

conduct of private officials,” as that phrase was used in Varig

by this Court. In Varig, the FAA was charged with negligently

certifying that the design of certain aircraft complied with FAA

14

safety regulations. 104 S. Ct. at 2758. However, in the present

case, the NRC is not charged with negligence in certifying

regulatory compliance. Rather, the complaint alleges that the

NRC undertook the non-regulatory function of monitoring

nuclear experience industrywide and warning the owners and

operators of nuclear plants of hazards discovered at other

plants. (40a; J.A. 71.) Indeed, the investigation and warning

function is so plainly non-regulatory that the nuclear generat-

ing industry has since formed a private organization to per-

form it. (46a; J.A. 93.) The NRC was not “regulating” the

plants receiving such warnings, but rather providing them with

essential safety information based on events discovered at

other plants throughout the country, pursuant to its congres-

sional mandate to perform that function.

The Third Circuit’s misunderstanding of the complaint

(from which all inferences were required to be drawn in

petitioners’ favor on the motion to dismiss) is further demon-

strated by its description of petitioners’ first cause of action as

challenging the NRC’s failure “to characterize the Davis-Besse

event as ‘an abnormal occurrence’—which the statute required

it to report—or a ‘generic problem’—for which the regulations

specified notification.” (lla.) In fact, nowhere in the com-

plaint do petitioners allege any failure by the NRC to properly

“characterize” the Davis-Besse event. Rather, the complaint

alleges a failure by the NRC to warn of serious safety hazards

which NRC employees actually uncovered in the course of

their investigation of Davis-Besse and otherwise. (4la-42a,

43a-44a; J.A. 80-81, 86-88.)

Moreover, the Third Circuit totally ignores the fact that the

complaint is based not merely on the NRC’s statutory duties

but also on its undertaking in fact to operate an industrywide

warning system and to provide the owners and operators of

nuclear plants with warnings of serious safety hazards uncov-

ered at other plants throughout the country. (45a; J.A. 91-92.)

This Court has consistently held that such an undertaking,

independent of statutory duties, gives rise to a common law,

non-regulatory duty on the part of the government to exercise

15

due care, violation of which is subiect to Federal Tort Claims

Act liability. See, e.g., Indian Towing Co. v. United States, 350

U.S. 61, 69 (1955).

In contrast to the FAA’s function in Varig, the NRC was

performing neither a discretionary nor a regulatory role in this

instance. Thus, the Third Circuit’s decision barring petitioners’

claims based on the discretionary function exception conflicts

with the applicable decisions of this Court and other courts of

appeals and should be reversed.

16

CONCLUSION

Based on the foregoing, the petition for a writ of certiorari

should be granted and the judgment of the court of appeals

reversed summarily on the authority of United States v. S. A.

Empresa de Viacao Aerea Rio Grandense (Varig Airlines), 104

S. Ct. 2755 (1984), and Dalehite v. United States, 346 U.S. 15

(1953).

Dated: November 13, 1984

Respectfully submitted,

David Klingsberg

Counsel of Record

Myron Kirschbaum

Aaron Stiefel

KAYE, SCHOLER, FIERMAN,

Hays & HANDLER

425 Park Avenue

New York, New York 10022

(212) 407-8000

James B. Liberman

BISHOP, LIBERMAN & COOK

1155 Avenue of the Americas

New York, New York 10036

(212) 704-0100

Samuel B. Russell

RYAN, RUSSELL & MCCONAGHY

530 Penn Square Center

Reading, Pennsylvania 19603

(215) 372-4761

Attorneys for Petitioners

UNITED STATES COURT OF APPEALS

FOR THE THIRD CiRCUIT

No. 83-1017

—-

GENERAL PUBLIC UTILITIES CORPORATION, JERSEY CEN-

TRAL POWER & LIGHT COMPANY, METROPOLITAN EDISON

COMPANY, PENNSYLVANIA ELECTRIC COMPANY,

Appellees

Vv.

UNITED STATES OF AMERICA,

Appellant

Appeal from the United States District Court for the Eastern

District of Pennsylvania (D.C. Civil Action No. 81-4950)

+

Argued September 13, 1983

Before:

WEIS, HIGGINBOTHAM, and SLOVITER, Circuit Judges.

Opinion Filed September 28, 1984

+

J. Paul McGrath, Esa.

Assistant Attorney General

Peter F. Vaira, Jr., Esq.

United States Attorney

Jeffrey Axelrad, Esq.

Director, Torts Branch

2a

James P. Klapps, Esq. (ARGUED)

Special Counsel

K. Roxanne McKee, Esq.

Trial Attorney

Torts Branch, Civil Division

U.S. Department of Justice

Washington, D.C. 20530

Of Counsel:

E. Leo Slaggie, Esq.

Acting Solicitor

Michael B. Blume, Esq.

Juan L. Rodriguez, Esq.

Nuclear Regulatory Commission

Attorneys for Appellant

David Klingsberg, Esq. (AKGUED)

KAYE, SCHOLER, FIERMAN, HAYS & HANDLER

425 Park Avenue

New York, N.Y. 10022

Of Counsel:

Milton Handler, Esq.

Myron Kirschbaum, Esq.

Aaron Stiefel, Esq.

James B. Liberman, Esq.

DEBEVOISE & LIBERMAN

26 Broadway

New York, N.Y. 10004

Samuel B. Russell, Esq.

RYAN, RUSSELL & MCCONAGHY

530 Penn Square Center

Reading, PA 19603

Attorneys for Appellees

ee ee oe

3a

OPINION OF THE COURT

WEIS, Circuit Judge.

Alleging that the Nuclear Regulatory Commission failed to

warn them of equipment defects, the owners of the Three Mile

Island nuclear facility seek substantial damages attributed to a

valve failure at the plant. We conclude that the claims against

the government are barred by the discretionary function excep-

tion of the Federal Tort Claims Act.

The plaintiffs’ complaint asserts a right to recover under the

Tort Claims Act, 28 U.S.C. § 2671 et seq., because the Com-

mission did not comply with statutory directives or its own

regulations. The government moved to dismiss, asserting the

discretionary functicn and misrepresentation exceptions to the

Act, id. §§ 2680(a), (h). The district court denied the motion

but sua sponte certified its order as one involving a controlling

issue Of law under 28 U.S.C. § 1292(b). We accepted the

appeal.

Plaintiffs own and operate the Three Mile Island Unit No. 2

nuclear facility in Londonderry Township, Pennsylvania. '

Their complaint seeks more than four billion dollars in dam-

ages.

On March 28, 1979, a pilot-operated valve at Unit No. 2

failed to close properly, causing the reactor’s coolant system to

lose significant quantities of water and steam. The instruments

that should have indicated that the valve remained open

incorrectly showed it as being closed. A series of procedures

undertaken in the belief that the valve was closed deprived the

reactor of proper coolant, and it began to overheat. The

nuclear core and protective claddings were severely damaged,

resulting in the staggering financial losses to plaintiffs.

l Plaintiffs Metropolitan Edison Company, Jersey Central Power &

Light, and Pennsylvania Electric Company all sell electrical energy to retail

customers and other electrical companies. Each owns an interest in Three

Mile Island Unit No. 2. Plaintiff General Public Utilities Corporation is a

holding company owning all of the common stock of the electric companies.

In March 1979, Metropolitan Edison was the operator of Three Mile Island

Unit No. 2.

4a

The complaint is in two counts. The first alleges that the

Nuclear Regulatory Commission failed to exercise due care to

discover, analyze, and warn of safety hazards. In particular,

Count I alleges that in September 1977, 18 months before the

Three Mile Island incident, a similar event occurred at the

Davis-Besse nuclear power plant in Ohio. That facility was

operated by the Toledo Edison Company and had been de-

signed by the Babcock & Wilcox Company, which also pre-

pared the plans for Three Mile Island.’ Plaintiffs contend that

the Commission failed to properly forward information to

them about the cause of the Davis-Besse failure as well as the

corrective measures developed to prevent similar occurrences.

The second count complains that the Commission negli-

gently approved the Three Mile Island design and construction

plans at a time when it knew or should have known that the

pilot-operated relief valve could stick and cause a loss-of-

coolant accident. Plaintiffs allege that the agency failed to

require the manufacturer, Babcock & Wilcox, to analyze small

breaks in a coolant system such as the one that was caused by

the faulty valve at Three Mile Island.

In ruling on the government’s motion to dismiss, the district

court reviewed the Commission’s statutory authority and the

methods it uses to collect and disseminate safety information.

Owners and operators are required to notify the Commission

of defects in a facility that would create a substantial safety

hazard, and the Commission is obligated to submit reports to

Congress listing “abnormal occurrences.” This information is

also to be given wide dissemination to the public.

In carrying out its responsibility, the Commission has devel-

oped a series of mechanisms for the exchange of information

with licensees. When the most serious events occur, a Bulletin

is issued. It requires a response and may direct licensees to take

specific action on a one time basis. For lesser degrees of

danger, the Commission distributes a Circular, which does not

2 Plaintiffs have also filed a suit against Babcock & Wilcox, alleging

that it knew of the Davis-Besse incident but neverthe’ess completed Three

Mile Island Unit No. 2 with a defective valve.

da

mandate action or necessitate a reply. Other information

worthy of general distribution is provided in Licensee Event

Reports. NRC Inspectior and Enforcement Manual, Chap.

1125 (1977).

A Licensee Event Report was used to describe the Davis-

Besse incident and was sent to plaintiffs and other licensees in

January 1978.) No further warning or information was given

to plaintiffs, and their operating license was issued by the

Commission in February 1978.

The theories of liability asserted in the complaint are negli-

gence, negligence per se, and the “Good Samaritan” rule of the

Restatement (Second) of Torts §§ 323 and 324A. Plaintiffs

allege that they relied on the Commission but it failed to

exercise due care in the performance of its undertakings. The

district court concluded that the Energy Reorganization Act

imposed a duty on the Commission to monitor the nuclear

energy industry and alert licensees to safety problems.

Although the district court construed the complaint to essen-

tially allege a failure to warn, it determined that the misrepre-

sentation exception to the Tort Claims Act did not apply

because the plaintiffs’ losses were the result of the govern-

ment’s failure to disclose safety, not commercial, information.

The district judge-also rejected the Commission’s contention

that the discretionary function exemption barred the suit,

observing that the “governing standards are not so vague or

inexact as to call for unfettered scientific ‘discretion.’ ” When

decisionmakers exceed the scope of applicable regulations, he

reasoned, the government cannot invoke the discretionary

function exception.

After denying the motion to dismiss, the court certified the

following question for immediate interlocutory review: “Is our

decision correct that neither the misrepresentation nor the

discretionary function exception bars this suit?”

3 There is no reference to this report in the plaintiffs’ complaint, but

the district court observed that “plaintiffs do not, however, contest defen-

dant’s assertion that they received a Licensee Event Report.”

6a

Because the statutory exceptions constitute retentions of the

sovereign immunity that is otherwise waived in the Act, a

negative answer to either of the grounds for the district court’s

decision will require dismissal of the plaintiffs’ suit. We do not

discuss the misrepresentation issue because we conclude that

the discretionary function exception applies to this case.‘

One of the cases relied on by the district court in reaching its

conclusion was United Scottish Insurance Co. v. United States,

692 F.2d 1209 (9th Cir. 1982). Shortly after the district court

issued its order, the Supreme Court granted certiorari in United

Scottish and consolidated it with S.A. Empresa De Viaco

Aerea Rio Grandense (Varig Airlines) v. United States, 692

F.2d 1205 (9th Cir. 1982). The Supreme Court had not decided

those cases when the case at bar was presented to this panel. In

view of their relevancy, we chose to await the Court’s action.

Following the Court’s reversal of both cases, United States v.

S.A. Empresa De Viaco Aerea Rio Grandenese (Varig Air-

lines), 52 U.S.L.W. 4835 (June 19, 1984), we asked the parties

to comment on the decision.

In the Varig cases, the plaintiffs asserted liability against the

United States under the Tort Claims Act on allegations that the

Federal Aviation Administration had negligently certified com-

mercial aircraft. In each instance, an in-flight fire had caused

damage to the plane resulting in deaths and injuries.

Suits were brought by representatives of the deceased pas-

sengers and the owners of the planes. The plaintiffs contended

that the FAA certified the planes despite nonconformity with

the agency’s fire protection standards and, because of this

negligence, the government was responsible in damages.

4 Section 2680(a) provides that the Torts Claims Act shall not apply

to:

“(a) Any claim based upon an act or omission of an employee of the

Government, exercising due care, in the execution of a statute or

regulation, whether or not such statute or regulation be valid, or based

upon the exercise or performance or the failure to exercise or perform

a discretionary function or duty on the part of a federal agency or an

employee of the Government, whether or not the discretion involved

be abused.”

28 U.S.C. § 2680(a).

7a

The Supreme Court disagreed, stating that when the discre-

tionary function exception is invoked the basic inquiry is

“whether the challenged acts of a Government employee—

whatever his or her rank—are of the nature and quality that

Congress intended to shield from tort liability.” 52 U.S.L.W. at

4837. The discretionary function exception “plainly was in-

tended to encompass the discretionary acts of the Government

acting in its role as a regulator of the conduct of private

individuals.” Jd.

In the legislative history, the Court discerned a marked

emphasis on protection for regulatory activities. This suggested

that an underlying basis for excepting discretionary functions

was a congressional desire to prevent the use of a tort action as

a vehicle for “judicial ‘second guessing’ ” of administrative

decisions grounded in social, economic, and political policy.

Id.

The Court reviewed the FAA’s design regulations as well as

its compliance procedures and concluded that when an agency

determines the extent to which it will supervise the safety

procedures of private individuals, it “is exercising discretionary

regulatory authority of the most basic kind.” Jd. at 4839. The

Court noted that FAA employees conducting compliance re-

views “were specifically empowered to make policy judgments

regarding the degree of confidence that might reasonably be

placed in a given manufacturer, the need to maximize com-

pliance with FAA regulations, and the efficient allocation of

agency resources.” Jd.

In holding that the plaintiffs’ suits were barred, the Court

also discussed Dalehite v. United States, 346 U.S. 15 (1953), a

decision whose continued vitality had been questioned in recent

years. The Court rejected “the supposition that Dalehite no

longer represents a valid interpretation of the discretionary

function exception.” 52 U.S.L.W. at 4837.

Dalehite was a claim against the United States for massive

damages resulting from a disastrous explosion of fertilizer in

the harbor at Texas City, Texas. The government was charged

with various acts of negligence: the cabinet level decision to

institute the fertilizer program, the failure to conduct further

8a

experimentation into the possibility of explosion, deficiencies

in the drafting of a basic plan of manufactuie, and the failure

to properly police the loading and storage of the fertilizer

aboard ships.

In holding for the government, Dalehite concluded that the

discretior»ry function exception encompassed more than the

initiation of programs and activities. It included determina-

tions made by executives or administrators in establishing

plans, specifications, or schedules of operations. “Where there

is room for policy judgment and decision there is discretion. It

necessarily follows that acts of subordinates in carrying out the

operations of government in accordance with official direc-

tions cannot be actionable.” 346 U.S. at 35-36.

Varig and its reaffirmation of Dalehite has reduced some of

the uncertainty generated by the numerous courts of appeals’

decisions that have wrestled with the vague contours of the

discretionary exception.* Our canvas of authorities is accord-

ingly narrow, and our task is to determine if the actions of the

Nuclear Regulatory Commission fall within the Varig and

Dalehite perimeters.

It should be noted that the issue of negligence is not relevant

to the discretionary function inquiry. Moreover, in the proce-

dural posture of this case, we assume that the government did

not exercise due care. The question is whether the challenged

conduct comes within the exception. We consider seriatim the

allegations of the plaintiffs’ complaint.°

The first count charges that the Commission either did not

sufficiently investigate the Davis-Besse incident or, having

5 For a review of some of the pre- Varig cases, see Bernitsky v. United

States, 620 F.2d 948 (3d Cir.), cert. denied, 449 F.2d 870 (1980). See also

Reynolds, “The Discretionary Function Exception of the Federal Tort Claims

Act,” 57 GEO. L.J. 81, 82 (1968); Comment, “Scope of the Discretionary

Function Exception under the Federal Tort Claims Act,” 67 GEO. L.J. 978

(1979).

6 Because of our disposition of this appeal, we need not discuss the

“Good Samaritan” theory advanced by plaintiffs since that contention would

do no more than establish negligence.

9a

obtained information that could have been used to correct the

dangerous condition, failed to convey that information to

plaintiffs. Thus, the attack is on the thoroughness of the

investigation or, as an alternative, the failure to communicate

safety information in the agency’s possession.

The Energy Reorganization Act gives the Commission the

responsibility to “[rjeview the safety and safeguards of all

[nuclear] facilities, materials, and activities.” 42 U.S.C.

§ 5843(b)(2). The statute specifies that “such review functions

shall include but not be limited to—(A) monitoring, testing

and recommending upgrading of systems designed to prevent

substantial health or safety hazards.” Jd. The Commission is

also required to submit reports on “abnormal occurrences” —

“an unscheduled incident or event which the Commission

determines is significant from the standpoint of health or

safety.” Id. § 5848.

To assist the Commission in the performance of its safety

function, section 206 of the Act requires owners and operators

to notify the agency when a facility “contains a defect which

could create a substantial safety hazard, as defined by regula-

tions which the Commission shall promulgate.” /d.

§ 5846(a)(2). To insure compliance, the Commission “is autho-

rized to conduct such reasonable inspections and other en-

forcement activities as needed.” Jd. § 5846(d).

Although the statute directs the Commission to review the

safety of nuclear facilities, the means of accomplishing that

duty has been left to the agency. Section 203(b)(2) provides a

nonexhaustive listing of “review functions” and, by implica-

tion, allows the Commission to add others. For example, the

agency has, by regulation, undertaken a program of “notifying

licensees regarding generic problems so as to achieve precau-

tionary or corrective measures.” 10 C.F.R. § 1.64 (1978).

The Act also assigns to the Commission the determination of

what events constitute an “abnormal occurrence” or a “sub-

stantial safety hazard” that triggers the obligation of owners

and operators to report defects, see 10 C.F.R. § 21.3(k) (1978).

As to enforcement, the agency has the authority, not only to

ee

10a

conduct inspections, but to develop “other enforcement activi-

ties as needed.” Thus, the Commission has decided that it may,

in some circumstances, issue a Bulletin requiring licensees to

take specific action in aid of the investigation and evaluation

of an event.

In Varig, the plaintiffs challenged the FAA’s practice of

insuring compliance through a “spot check” system and its use

on the defective planes. See 52 U.S.L.W. at 4838-39. The Court

found both actions within the discretionary exemption stating,

“Decisions as to the manner of enforcing regulations directly

affect the feasibility and practicality of the Government’s

regulatory program.” /d. at 4839. Agencies are required to

balance “the objective sought to be obtained against such

practical considerations as staffing and funding.” /d. There-

fore, the FAA’s alleged failure to check specific items in the

course of certification fell squarely within the discretionary

function exception of section 2680(a).

That same analysis applies to the circumstances here. Con-

gress has directed the Commission to pursue safety-related

functions in the nuclear energy field, but has left implementa-

tion to the agency’s “ ‘judgment of the best course.’ ” Varig, 52

U.S.L.W. at 4838 (quoting Dalehite, 346 U.S. at 34). Thus, the

Commission determines what information should be collected

and how, whether incidents are to be investigated and in what

manner, and what data should be disseminated and in what

form. In formulating the means to accomplish its regulatory

objectives, the agency must engage in the same balancing the

Court spoke to in Varig.

That reasoning is no less applicable to the plaintiffs’ allega-

tion that the Commission’s investigation of the Davis-Besse

incident was wanting. Limitations on an investigation into

matters that come within the regulatory control of the Com-

mission are no different in principle than the FAA’s use of a

spot check system. The intensity and breadth of an investiga-

tion is necessarily influenced by the resources available, both in

terms of technically-trained personnel and funding. Of neces-

sity, judgments must be made as to priorities and allocations of

resources.

BOA “ont NAIR AES BI I hei Bt Nk SN in si nie

ce

lla

That in hindsight the Commission’s judgment may have

been ill-advised in no way changes the character of the func-

tion under scrutiny. The extent and scope of an investigation

remains a matter of the agency’s discretion. As this court

stated in Bernitsky v. United States, 620 F.2d 948, 955 (3d Cir.

1980), “Decision making as to investigation and enforcement,

particularly when there are different types of enforcement

action available, are discretionary judgments.”

Count I’s accusation of failure to furnish information in the

agency’s possession has several aspects. Plaintiffs complain

that, although it should have been widely disseminated, “vital

information regarding safety hazards was not sent out in any

form.” A fair statement of their position is not that they were

totally unaware of the Davis-Besse occurrence, but that the

Commission had specific data that it was under a duty to

circulate to all who might be affected by a similar hazardous

condition.

In essence, plaintiffs challenge the Commission’s failure, on

the basis of the information it had, to characterize the Davis-

Besse event as either an “abnormal occurrence”—which the

statute required it to report—or a “generic problem”—for

which the regulations specified notification. They argue that

because of the possible catastrophic consequences of a valve

failure, the Commission had no discretion under the governing

statutes and regulations—it was duty bound to report the

incident.

Use of the word discretion in this sense exposes the funda-

mental flaw in the plaintiffs’ position. The exemption from the

Tort Claims Act is based on the nature of the governmental

discretionary function, not whether there is an option to

choose. Regulatory activities are within the exemption, not

because alternatives exist in particular circumstances, but be-

cause of the fundamental character of the role assigned to the

agency.

If a government employee performing a discretionary func-

tion acts negligently, the exemption remains applicable even

though the activity constitutes an abuse of discretion. As the

l2a

Statute itself provides, discretionary functions are exempt

“whether or not the discretion involved be abused.” 28 U.S.C.

§ 2680(a).

The Energy Reorganization Act’s mandate that the Commis-

sion provide information on “abnormal occurrences” is trig-

gered by the happening of “an unscheduled incident or event

which the Commission determines is significant from the

standpoint of public health or safety.” 42 U.S.C. § 5848. Thus,

before the obligation to disseminate information attaches the

Commission is required to judge whether the incident raises

concerns about public health or safety.

The legislative history leaves no doubt that this determina-

tion has been entrusted to the discretion of the Commission.

The Senate had left “abnormal occurrence” undefined in its

bill, but intended that the Commission develop “uniform

criteria.” Sen. Rep. No. 980, 93d Cong., 2d Sess., reprinted in

1974 U.S. Code Cong. & Ad. News 5470, 5531. The Con-

ference Committee, however, added the definition that appears

in the statute “to make it clear that the Commission will

determine which abnormal occurrences are significant enough

to be reported.” Conf. Rep. No. 1445, 93d Cong. 2d Sess.,

reprinted in 1974 U.S. Code Cong. & Ad. News 5538, 5551.

Whether an event is significant from the standpoint of

health or safety may be easily determined in some situations—

perhaps even by a layman unacquainted with nuclear energy

technology. In other instances, however, it may require scien-

tific sophistication to understand the factual data before even

approaching the second question of effect on public health and

safety. The Commission’s manual on “abnormal occurrences”

states that “[w]jhether a particular event will be determined to

be an abnormal occurrence will depend on the specific facts

and circumstances of the event.”

The plaintiffs’ theory—that the Davis-Besse event gave no

alternative but to report—must not be allowed to obscure the

nature of the Commission’s function: that is, to determine on

the basis of information in its possession whether a specific

event constitutes “an abnormal occurrence” that requires aoti-

fication to Congress and the public. This is not a mere

l3a

ministerial task. Technical and scientific evaluations of nuclear

processes and facilities must be taken into account along with

considerations of public health and safety—matters within the

specialized knowledge of the Commission.

In following the dictates of the statute, the Commission is

unquestionably acting in its role as regulator of the conduct of

private individuals. See Varig, 52 U.S.L.W. at 4837. Moreover,

excluding the Commission’s role from the scrutiny of a tort

action provides an example of the underlying reason for the

discretionary function exclusion—to prevent judicial second-

guessing.’

There is no substantial distinction between the choice made

by the FAA as to its method of inspection and decisions made

by the Nuclear Regulatory Commission to classify certain

incidents as statutory “abnormal occurrences.” If anything, the

discretion entrusted to the Commission would seem to be

greater than that given the FAA.

In Dalehite, the Court used very broad language—“where

there is room for policy judgment anc decision there is discre-

tion.” 346 U.S. at 36. The discretionary tag the Court attached

to the government’s specifications of bag labels and bills of

lading in Dalehite, see id. at 39, iiaplicate far less of a policy

determination than the classification of a nuclear event as an

abnormal occurrence.

Plaintiffs rely on our case of Griffin v. United States, 500

F.2d 1059 (3d Cir. 1974), as excluding professional and scien-

tific judgments from the discretiona y category. Griffin con-

7 After defining “abnormal occurrence,” section 208 of the Energy

Reorganization Act continues: “Nothing in the preceding sentence shall limit

the authority of a court to review the determination of the Commission.” 42

U.S.C. § 5848. Although this provision might appear to suggest some

relaxation of the opposition to judicial “second-guessing” of the Commis-

sion’s determination, there is a marked difference between direct judicial

review of an agency decision and contesting that decision through the

medium of a tort suit. Not only are the standards in the two proceedings

likely to differ, but a tort action could have an undesirable inhibiting effect

on official activity and decisionmaking. See United States v. Muniz, 374 U.S.

150, 163 (1963).

l4a

trasted that type of decisionmaking with policy determinations

in the social and economic realm. Griffin, however, must be

read cautiously because in Varig the discretionary exception

covered an agency decision that rested on highly technical

information.* In any event, we find a distinct difference be-

tween applying rigid scientific specifications in a testing proce-

dure and the making of a judgment on public health and safety

after evaluating the happening of an out of the ordinary event

at a nuclear power facility.

What we have said is equally applicable to the plaintiffs’

contention that it should have been given information about

the Davis-Besse incident because the Commission knew or

should have known that the problems at the Ohio plant were

“generic.” See 10 C.F.R. § 1.64. The same considerations and

balancing that go into the agency’s determinations about

investigation, evaluation, and information exchange are at

work in the identification of generic probiems. The program

for notifying licensees of generic problems is but one part of

the overall discretionary function the Commission undertakes

when it monitors the safety of the nuclear industry.

We conclude, therefore, that Count I of the plaintiff’s

complaint comes within the discretionary function exemption.

Count II, which alleges that the Commission failed to exercise

due care in licensing the Three Mile Island plant, requires less

discussion. An agency entrusted with the task of approving

entities for licensing is engaged in activity that is at the heart of

the regulatory function.

8 In Griffin, the government was found liable for negligent approval

of a batch of polio vaccine. The panel majority held the discretionary

function exception inapplicable because the “decision involved] not public

policy but a scientific judgment as to the accuracy of test results.” 500 F.2d at

1066 n. 16. In addition, the government employees had relied on a factor not

in the regulations, and the court held that “{t}he violation of a discretionary

command takes what otherwise might be characterized as a ‘discretionary

function’ outside the scope of the statutory exception.” /d. at 1068-69. Judge

Van Dusen dissented, concluding that a function was no less discretionary

because it was scientific. We need not determine the continued vitality of

Griffin here, but note that our pre-Varig cases on the discretionary function

must be re-evaluated.

lSa

Section 2232 of the Atomic Energy Act of 1954, 42 U.S.C.

§ 2232 (1982), governs the Commission’s review of license

applications, see id. at § 5843(b). Applicants are to submit

“such information as the Commission . . . may determine to

be necessary to decide” the qualifications of the applicant and

such technical information “as the Commission may. . . deem

necessary in order to enable it to find that utilization or

production of special nuclear material . . . will provide ade-

quate protection to the heaith and safety of the public.” The

statute allows the Commission to determine what amount of

information is needed when it is passing on an application for

a license.

Exercising its authority, the Commission decided to consider

numerous factors. These include the site for the facility, its

design, the materials and method of construction, the plant’s

safety features and procedures, the financial qualifications of

the applicants, the technical expertise of the operators, and the

adequacy of the applicants’ quality assurance program for all

stages from design through operation. See 106 C.F.R. Parts 50

(facilities), 55 (operators), 100 (site criteria). Each of these

considerations is part of the Commission’s overall objective of

ascertaining whether there is a reasonable assurance that the

nuclear facility can be operated without endangering the health

and safety of the public. 10 C.F.R. §§ 50.35(c), 50.57(a)(3)

(1978).

Plaintiffs allege that the Commission acted negligently when

it approved the Babcock & Wilcox design because the agency

“should have known that it was necessary to require manufac-

turers . . . to analyze small breaks ia the reactor coolant

system such as a stuck-open pilot-operated reiief valve.” Ac-

cording to the complaint, the safety analyses submitted by

Babcock & Wilcox generally considered small breaks of only

about five square inches. The valve that malfunctioned in the

Three Mile Island incident had an aperture of approximately

one square inch.

When an agency determines the amount of information

needed to fulfill its regulatory mission, it is exercising the

l6a

essence of a discretionary function. Varig leaves no doubt on

that score. As we noted earlier, an action will not lie under the

Tort Claims Act for an abuse of the agency’s discretion.

It is also appropriate to take note of statements on the

Commission’s licensing role in the congressional Conference

Report to the Energy Reorganization Act. After pointing out

that the Commission would have certain research capabilities

that “may be characterized as confirmatory assessment,” the

Report states that “[i]f the license application is inadequate in

any respect considered significant by the regulatory agency, the

license is refused.” Conf. Rep. No. 1445, 93d Cong., 2d Sess.,

reprinted in 1974 U.S. Code Cong. & Ad. News 5538, 5548

(emphasis added). The Report continues:

“It would be a serious mistake, however, to make a

regulatory agency responsible for the performance of

research that gces beyond the need for confirmatory

assessment. . . . The regulatory agency should never be

placed in a position 10 generate, and then have to defend,

basic design data of its own... .

“As with research, the regulatory agency need not and

should not perform process development, develop cun-

struction procedures or designs, or conduct quality con-

trol work (which is the responsibility of the licensee or

vendor). . . . The regulatory agency should not assume

any part of the burden of the applicant to prove the

adequacy of a license application.”

Id. at 5548-49.

It is the burden and responsibility of the applicant to

demonstrate the adequacy of its application. The Commis-

sion’s obligation is to assess the application according to what

the agency determines is significant from the standpoint of

health or safety. The exercise of this authority falls squarely

within the discretionary function. Therefore, Count II is also

excluded by the discretionary function exemption of the Tort

Claims Act.

17a

Consequently, in response to the question submitted by the

district court, we answer that the discretionary function excep-

tion is a bar to the plaintiffs’ suit in this case. This case will

therefore be remanded to the district court for proceedings

consistent with this opinion.

A True Copy:

Teste:

Clerk of the United States Court of Appeals

for the Third Circuit

18a

UNITED STATES DISTRICT COURT

E.D. PENNSYLVANIA

Civ. A. No. 81-4950

Nov. 24, 1982.

+

GENERAL PUBLIC UTILITIES CORPORATION, JERSEY CEN-

TRAL POWER & LIGHT COMPANY, METROPOLITAN EDISON

COMPANY, PENNSYLVANIA ELECTRIC COMPANY

Vv.

UNITED STATES OF AMERICA.

+

DAVID KLINGSBERG, James B. Liberman, New York City,

Samuel B. Russell, Allen Seltzer, Reading, Pa., for plaintiffs.

JAMES P. KLAPPS, Asst. Director, Torts Branch, J. Paul

McGrath, Asst. Atty. Gen., Civ. Div., Dept. Justice, Roxanne

K. McKee, Michael B. Blume, Trial Attys., Torts Branch, Civ.

Div., Dept. Justice, James A. Fitzgerald, Acting Sol. Nuclear

Regulatory Com’n, Washington, D.C., Peter F. Vaira, Jr., U.S.

Attorney, Philadelphia, Pa., for defendant.

++

MEMORANDUM AND ORDER

TROUTMAN, District Judge.

Background

In the early morning hours of March 28, 1979, a turbine

generator at plaintiffs’’ Three Mile Island Unit 2 nuclear

1 Plaintiff, General Public Utilities Corp. (GPU), is an investor-owned

public utility holding company operating pursuant to the Public Utility

19a

facility (TMI), designed by Babcock & Wilcox (B & W), expe-

rienced a shutdown “trip” due to a loss of feedwater. Subse-

quently, a rapid heat buildup raised the pressure in the reactor

coolant system and caused a pilot-operated relief valve to

open, thereby relieving excess pressure. Shortly thereafter, the

reactor shut down and pressure in its coolant system dropped

to within the normal range; the pilot-operated relief valve

should have closed. It failed to do so. Worse, the instrumenta-

tion designed to indicate the true position of the relief valve

also failed; it incorrectly indicated that the valve was closed

when, in fact, it was open.

Thereafter, a “loss-of-coolant accident” occurred; signifi-

cant quantities of coolant water and steam were lost through

the malfunctioning valve. As a result thereof, pressure in the

reactor coolant system continued to drop and coolant water

and steam escaped. Within a few minutes of the original

“trip”, the engineered safety system began high-pressure injec-

tion of water into the reactor coolant system.

Continued monitoring by plant operators incorrectly lead

them to believe that the facility was “going solid”; i.e., that the

pressurizer was dangerously close to filling with water. Follow-

ing B & W generated and Nuclear Regulatory Commission

(NRC) approved procedures, and attempting to guard against

this eventuality, TMI operators reduced the high pressure

injection of water into the coolant system and initiated max-

imum let-down of coolant. The reduction of high-pressure

coolant injection exasperated the developing problem; i.e.,

coolant which escaped through the malfunctioning valve was

not replaced.

Within one or two hours of the original “trip”, TMI opera-

tors, again acting pursuant to B & W established and NRC

approved procedures, shut down the plant’s four reactor

coolant pumps which normally circulate coolant through the

Holding Company Act of 1935, 15 U.S.C. § 79. GPU owns all the common

stock of its co-plaintiffs, Jersey Central Power & Light Company (JCP & L),

Metropolitan Edison Company (Met Ed), and Pennsylvania Electric Com-

pany (Penelec). For the sake of clarity, these parties will simply be referred to

as “plaintiffs”.

20a

reactor vessel. Once this occurred, the reactor vessel was

deprived of the coolant water and steam which had previously

circulated through it, the nuclear core began to uncover and it,

along with the protective cladding, was severely damaged.

Radioactive material from the damaged core spread through-

out the building and adjacent structures. As a result, the public

was exposed to catastrophic dangers. The resulting damage to

plaintiffs is allegedly in excess of four billion dollars.

The complaint further alleges that eighteen months earlier,

on September 24, 1977, a “loss-of-coolant” accident occurred

at the Davis-Besse nuclear power plant designed by B & W and

operated by Toledo Edison Company. Importantly, the acci-

dent at Davis-Besse closely paralleled the events which later

occurred at TMI. The ultimate consequences of terminating

high pressure injection at Davis-Besse were, however, severely

mitigated by the fact that the Ohio plant was only operating at

9% capacity at the time of its accident. TMI, by contrast, was

operating at 97% capacity.

Plaintiffs assert that the NRC failed to properly disseminate

information to them regarding the cause of the Davis-Besse

accident and also the corrective measures subsequently devel-

oped to prevent similar accidents. Moreover, plaintiffs com-

plain that the NRC negligentiy approved the TMI construction

plans, containing the faulty pilot-operated relief valve at a time

when it knew, or should have known, that the valve could stick

and cause a “loss-of-coolant” accident.

The two-count complaint seeks recompense in Count [| for

the purported failure of defendant, United States, acting

through its agent, the NRC to properly warn and advise

plaintiffs of existing hazards and defects in their plant. Count

II inveighs against the NRC’s purported negligent approval of

B & W’s emergency procedures. Specifically, the complaint

asserts three grounds for relief: breach of the Good Samaritan

duty’, negligence, and negligence per se.

2 See, Restatement of Torts (2d) which provides:

§ 324 A. Liability to Third Person for Negligent Performance of

Undertaking

One who undertakes, gratuitously or for consideration, to render

services to another which he should recognize as necessary for the

2la

Jurisdiction is predicated upon the Federal Tort Claims Act,

28 U.S.C. § 1346(b)? (FTCA), which generally imposes govern-

protection of a third person or his things, is subject to liability to the

third person for physical harm resulting from his failure to exercise

reasonable care to protect his undertaking, if

(a) his failure to exercise reasonable care increases the risk of such

harm, or

(b) he has undertaken to perform a duty owed by the other to the

third person, or

(c) the harm is suffered because of reliance of the other or the third

person upon the undertaking.

This method of imposing liability is recognized by federal courts as the law

of Pennsylvania, Evans v. Liberty Mutual Insurance Co., 398 F.2d 665 (3d

Cir. 1968) and may be used by plaintiffs to affix governmental liability in a

Federal Tort Claims Act suit. Toppi v. United States, 327 F.Supp. 1277 (E.D.

Pa. 1971). See also, Blessing v. United States, 447 F.Supp. 1160 (E.D. Pa.

1978). Additionally, Pennsylvania recognizes negligent inspection as an

actionable tort. Mays v. Liberty Mutual Ins. Co., 323 F.2d 174 (3d Cir.

1963); Evans v. Otis Elevator Co., 403 Pa. 13, 168 A.2d 573 (1961). Most

recently, § 324A and its companion, § 323 of the Restatement of Torts (2nd),

were applied to a claim arising out of a maritime accident brought under the

Suits in Admiralty Act, 46 U.S.C. § 742. See, Patentas v. United States, 687

F.2d 707 (3d Cir. 1982).

§ 323 of the Restatement provides:

Negligent Performance of Undertaking to Render Services.

One who undertakes, gratuitously or for consideration, to render

services to another which he should recognize as necessary for the

protection of the other’s person or things, is subject to liability to the

other for physical harm resulting from his failure to exercise reason-

able care to perform his undertaking, if

(a) his failure to exercise such care increases the risk of such harm,

or

(b) the harm is suffered because of the other’s reliance upon the

undertaking.

3 28 U.S.C. § 1346(b) provides that

[s]ubject to the provisions of chapter 171 of this title, the district

courts, together with the United States District Court for the District

of the Canal Zone and the District Court of the Virgin Islands, shall

have exclusive jurisdiction of civil actions on claims against the United

States, for money damages, accruing on and after January 1, 1945, for

injury or loss of property, or personal injury or death caused by the

negligent or wrongful act or omission of any employee of the Govern-

ment while acting within the scope of his office or employment, under

circumstances where the United States, if a private person, would be

liable to the claimant in accordance with the law of the place where the

act or omission occurred.

22a

mental liability, inter alia, “under circumstances where the

United States, if a private person, would be liable”. Resolution

of the Government’s motion to dismiss* requires construction

of two important exceptions to the general abrogation of

sovereign immunity contained in the FTCA. The “misrepresen-

tation exception”, 28 U.S.C. § 2680(h), prevents the imposi-

tion of governmental liability on any claim arising out of, inter

alia, a “misrepresentation”. The “discretionary function” ex-

emption, 28 U.S.C. § 2680(a), shields governmental conduct

from liability where the claim is grounded in “the failure to

exercise or perform a discretionary function or duty”. It

applies even where there is an abuse of discretion. Dalehite v.

United States, 346 U.S. 15, 33-36, 73 S.Ct. 956, 966-68, 97

L.Ed. 1427 (1955).

The Government’s Duty

Plaintiffs asseverate that the NRC breached its duty to warn

of design hazards when it failed to employ either of the two

primary methods which it uses to provide licensees with safety

information. The first is the issuance of an “IE Bulletin”.

When the NRC determines that a specified event may have

“generic” applicability, it issues an IE Bulletin in order to

“achieve appropriate precautionary or corrective action” by

nuclear licensees and operators. 10 CFR § 1.64. The NRC also

requires that all IE Bulletins be responded to so that it, the

NRC, may “assess [ ] the situation”. See, U.S. Nuclear Regu-

latory Commission, Office of Inspection and Enforcement,

Inspection and Enforcement Manual (Manual), Chapter 1100,

MC 1125-031. The second mode of NRC licensee notification

is the distribution of “Circulars”. These are designed simply to

4 Fed.R.Civ.P. 12(b)(1) and (6). For present purposes we assume the

veracity of plaintiffs’ factual allegations. Walker Processing Equipment Co.

v. Food Machinery & Chemical Corp., 382 U.S. 172, 86 S.Ct. 347, 15

L.Ed.2d 247 (1965). We do not, of course, accord this same deference to the

conclusion of law contained in the complaint. Frederiksen v. Poloway, 637

F.2d 1147, 1150 n. 1 (7th Cir.), cert. denied, 451 U.S. 1017, 101 S.Ct. 3006,

69 L.Ed.2d 389 (1981).

23a

“inform the licensee or permit holder” of issues regarding

“safety, safeguards, or environmental interest”. Jd. at

MC1125-032. Importantly, Circulars do not require a licensee’s

response to the NRC; they generally signify a lesser degree of

“danger” than does an IE Bulletin.

The final information gathering and dissemination function

which the NRC performs is the compilation and submission of

“abnormal occurrence” reports to the Congress. An “abnor-

mal occurrence” is defined as, inter alia, a “major deficiency in

design, construction, use of, or management” of a licensed

nuclear facility. See, Energy Reorganization Act of 1974,

(Energy Act) § 208, 42 U.S.C. § 5848. Importantly, plaintiff

asserts that it is among the intended beneficiaries of the NRC’s

statutory obligation.

In any event, after the Davis-Besse accident, the NRC

neither distributed an IE Bulletin, Circular, nor issued an

abnormal occurrence report to the Congress. (Plaintiffs do

not, however, contest defendants’ assertion that they received a

Licensee Event Report, issued by the Office of Resource

Management, NRC, regarding the Davis-Besse accident.)

Rather than issue any warning, the Government approved

plaintiffs’ construction plans; this notwithstanding the fact

that they called for inclusion of the faulty pilot-operated relief

valve. Plaintiffs contend that their license issuance, which

authorized them to operate an incorrectly designed plant, and

the failure to widely disseminate corrective measures designed

after Davis-Besse, violated defendant’s duty to monitor the

nuclear power industry and to warn licensees of dangerous

practices and conditions.

Before turning to issues raised by the misrepresentation and

di.cietionary function exceptions, the Government argues a

very basic tort concept: that the NRC owes no duty to

plaintiffs or the nuclear power industry. Defendant asserts that

the myriad of regulatory activities and standards promulgated

by the NRC simply describe minimal safety standards to which

the industry must adhere. Moreover, defendant argues that all

of these regulations are designed to and, in fact, inure only to

the benefit of the public. An evaluation of the relevant stat-

utes, regulations and legislative history establishes, however,

24a

that the relationship between the NRC and the nuclear industry

contains elements of symbiosis, which may form the predicate

for imposing liability.

Specifically, the Government’s statutory and regulatory obli-

gations imposed by §§ 206 and 208 of the Energy Act, 42

U.S.C. §§ 5846 and 5848, and the regulations promulgated

thereunder, create a duty on behalf of the Government to

properly and carefully regulate, monitor and warn the nuclear

power industry of existing dangers.

For example, § 206 of the Energy Act, 42 U.S.C.

§ 5846(a)(2), requires nuclear plant operators to notify the

NRC of any plant “defect” which rises to the level of a

“substantial safety hazard”. Moreover, § 208 of the Energy

Act, 42 U.S.C. § 5848, directs the NRC to prepare quarterly

Congressional reports listing “abnormal occurrences” at nu-

clear facilities. Additionally, the NRC is charged with provid-

ing “wide dissemination” of “abnormal occurrence” reports.

Because the legislative history of the Energy Act cross

references §§ 206 and 208, 42 U.S.C. §§ 5846 and 5848, the

reports of defects made to the Commission pursuant to § 206

inure to the benefit of electric utilities. These same reports

frequently form the basis of the Commission’s Congressional

“abnormal occurrence” reports, mandated by § 208 of the

Energy Act and receive industry-wide dissemination. Hence,

plaintiffs are one of the intended beneficiaries of those statu-

tory provisions.

The fact that §§ 206 and 208, 42 U.S.C. §§ 5846 and 5848,

run to plaintiffs’ benefit finds support in the legislative history

of the Energy Act as well. Specifically, S.Rep. No. 980, 93rd

Cong., 2d Sess. reprinted in 1974 U.S.Code Cong. &

Admin.News 5470, 5527-28, demonstrates that Congress “in-

tended” the obligation of licensees to report safety defects to

the appropriate governmental authorities to benefit “electric

utilities in particular”. The Senate report noted that valves

were “the most frequent components involved in abnorma!

occurrences . . . the breakdown of a valve has potentially

catastrophic implications”. Jd. Continuing, the report virtually

predicated many of the events which were to occur at TMI and

observed that

25a

[t]he system most requently involved in abnorma?! occur-

rences. . . was the primary cooling system, which is used

to prevent a meltdown of the nuclear core of a reactor.

The system next most frequently affected by defects. . .

was the emergency core cooling system, which prevents a

meltdown in case the primary cooling system fails. A

meltdown is the worst conceivable reactor accident; such

an accident could result in breaching of the containment

vessel of a powerplant and in the release of radioactive

fallout equivalent to many Hiroshima bombs.

Id. The report finally notes that the combined effect of

industry reporting safety defects to the Government, 42 U.S.C.

§ 5846, and the requirement that the Commission report “ab-

normal occurrences” to the Congress on a quarterly basis, 42

U.S.C. § 5848, will “substantially ungrade the Federal re-

sponse to defects in all licensed nuclear facilities”. 1974

U.S.Code Cong. & Admin.News at 5528. Upon signing the

Energy Act, President Ford echoed a similar sentiment and

observed that the NRC will be “fully empowered to see to it

that reactors using nuclear materials will be properly [ ]

designed [and] constructed”. Presidential Documents: Gerald

R. Ford, Vol. 10; Number 41, p. 1271, 1273 (October 11,

1974).

Two particularly important regulations promulgated pur-

suant to the Energy Act also merit consideration. As noted,

infra, 10 CFR § 1.64 requires the Office of Inspection and

Enforcement to “notify licensees regarding generic problems so

as to achieve appropriate precautionary or corrective actions”.

(emphasis added). Plaintiffs’ contention is, of course, that the

defect which existed at Davis-Besse was improperly designed

into their plant and was “generic” in nature. Further, that the

NRC not only failed to disseminate “appropriate precau-

tionary Or corrective actions”, /d., but also it approved TMI’s

plans notwithstanding the fact that they contained a “generic

problem”.

The NRC’s duty to monitor the industry and warn of safety

problems does not, however, amount to a guarantee of plant

safety. Far from it. 10 CFR 60, App. B, clearly specifies that

26a

although the licensee may delegate its obligation to establish

and execute quality assurance programs, the licensee neverthe-

less “shall retain responsibility therefor”. /d.

Accordingly, we conclude that the Act’s plain language,

legislative history, and regulations, support plaintiffs’ assertion

that the NRC has undertaken some duty to carefully monitor

nuclear experiences and to disseminate appropriate warnings.

Moreover, this duty runs, infer alia, to the nuclear power

industry. See also, Regulation of Nuclear Power Reactors and

Related Facilities, \6 Atomic Energy Law Journal 256 (1974).

Application of the Federal Tort Claims Act

The existence and alleged breach of the duty does not,

however, end our inquiry. If the purported breach occurred

through a misrepresentation or the exercise of discretion, suit

is nevertheless barred. As such, the mere breach of a duty may

be an insufficient predicate to impose liability. United States v.

Neustadt, 366 U.S. 696 at 710-11, 81 S.Ct. 1294 at 1302, 6

L.Ed.2d 614; Green v. United States, 629 F.2d 581, 584 (9th

Cir.1980) (“[T]he existence of a duty on the part of the

Government to provide information to plaintiffs [does not]

render the [misrepresentation] exception inapplicable”); Pre-

ston v. United States, 596 F.2d 232, 238 n.9 (7th Cir.), cert.

denied, 444 U.S. 915, 100 S.Ct. 228, 62 L.Ed.2d 169 (1979)

(where the breach of an existing duty occurs through a misrep-

resentation, suit is barred.) Accord, Cross Brothers Meat

Packers, Inc. v. United States, 533 F.Supp. 1319, 1323

(E.D.Pa. 1982).

Misrepresentation Exception

We now turn to the “misrepresentation” exception. Plain-

tiffs contend that the governmental duty owed to them was

breached by the NRC’s negligent failure to properly perform

its undertaking of nuclear plant inspection, licensing and

distribution of supplemental safety notices. The NRC, on the

other hand, characterizes the complaint as alleging only a

negligent misrepresentation; i.e., by failing to warn when there

was a duty to do so, it misrepresented to plaintiffs the fact that

the plant was safe when, in reality, it was not.

27a

The FTCA’s “misrepresentation exception” includes a juris-

dictional prohibition against suits for “negligent misrepresen-

tation”. United States v. Neustadt, 366 U.S. at 706-07, 81

S.Ct. at 1300. Additionally, the Supreme Court has cautioned

that our inquiry necessitates “looking beyond the literal mean-

ing” of the complaint to determine the “real” cause of action.

Id. at 703, 81 S.Ct. at 1298. This frequently “decisive and

difficult” task requires separating cases of “true negligence”

from those of “misrepreseatation in negligence’s clothing”.

Cross Brothers Meat Packers v. United States, 537 F.Supp. 204

at 205 (E.D.Pa. 1982) (denying motion to reconsider}.

The initial issue then becomes one of characterization. Does

the complaint at bar sound in “negligent misrepresentation” or

“negligence”? The inquiry is a difficult one and conflicts

between decided cases are not subject to facile resolution.

Two Supreme Court cases highlight the conflicting lines of

authority. United States v. Neustadt, supra, and Indian Towing

v. United States, 350 U.S. 61, 76 S.Ct. 122, 100 L.Ed. 48

(1955).

Neustadt involved a couple who obtained FHA mortgage

approval prior to the purchase of their home. Specifically,

defendant therein, the FHA, approved the mortgage 2pplica-

tion for $24,000. Structural damage manifested itself shortly

after plaintiffs closed on the house. Plaintiffs, claiming that

they relied upon the FHA’s valuation of the house when they

$ Interestingly, plaintiffs have a suit currently pending against B & W,

the plant designers. The allegations there track the ones at bar and complain

generally that defendant therein knew of the Davis-Besse accident and

nevertheless completed construction of the TMI plant with the faulty pilot-

operated relief valve. Moreover, plaintiffs complain in the other suit that B &

W promulgated safety regulations designed to av-ud a similar accident and

that they failed to notify plaintiffs of the new procedures. The complaint

against B & W sounds in misrepresentation and not negligence. Here, of

course, plaintiffs assert that similar allegations purportedly sound in negli-

gence and not misrepresentation.

Recently, the New York Court granted B & W's motion for summary

judgment on all of plaintiffs’ claims grounded in strict liability. See, General

Public Utilities Corp. v. Babcock & Wilcox Co., $47 F.Supp. 842

(S.D.N.Y.1982).

28a

prepared their offer, sued for the difference between the FHA’s

appraised value and the house’s fair market value.

The Supreme Court held that the FHA negligently misrepre-

sented the house’s value to plaintiffs, but that the suit was

barred by the misrepresentation exception. The Court also

observed that the FTCA’s misrepresentation exception gener-

ally governs governmentally transmitted “information for the

assistance and guidance of other persons in the conduct of

their economic and commercial affairs”, and is confined “very

largely to the invasion of interests of a financial or commercial

character in the course of business dealings”. 366 U.S. at 710

and 711 and n. 26, 81 S.Ct. at 1302 and n. 26.

in Indian Towing, supra, the Coast Guard undertook to

operaie a lighthouse off the Louisiana coast. Having assumed

“operational control” of the lighthouse, the Coast Guard

failed to properly maintain it. The court held that once the

Governmen: had undertaken control of the lighthouse it was

then obligated to maintain it in proper working order. The

negligent failure to properly do so provided a liability-creating

predicate.

The parallel between the case at bar and Neustadt and

Indian Towing is obvious. Plaintiffs contend that the NRC’s

Statutory and actual assumption of the duty to inspect and

approve license applications, operating procedures and design

specifications, etc., is much like the beacon which the Coast

Guard provided to warn mariners in /ndian Towing. Since the

duty was purportedly breached, plaintiffs urge that the Gov-

ernment’s motion to dismiss must be denied.

The Government, on the other hand, views the case as

falling squarely within the line of cases which follow Neustadt.

Its assertion is that a look beyond the literal wording of the

complaint discloses, at best, a simple negligent misrepresenta-

tion to plaintiffs of their plant’s safety. Moreover, the NRC’s

purported failure to warn can amount to a negligent misrepre-

sentation by omission since the exception applies to cases

where “mere ‘talk’ or failure to ‘talk’ on the part of a

government employee is asserted as the proximate cause of the

damages”. City & County of San Francisco v. United States,

615 F.2d 498, S05 (9th Cir.1980), quoting, National Mfg. Co.

v. United States, 210 F.2d 263, 276 (8th Cir.1954).

29a

The case at bar actually represents a hybrid case falling

somewhere between Neustadt and Indian Towing. The Indian

Towing line of cases usually involves the negligent “operational

control”® of the harm-causing instrumentality. Damages gener-

ally are expressed in terms of personal injury or loss of

property. The cases which follow Neustadt concern governmen-

tal transmission of false or inadequate information which

results in damages flowing from commercial decisions based

thereon. Under Neustadt, there is no “operational control”

and frequently no liability. Green v. United States, 629 F.2d at

581. In the case at bar, we have the Neustadt element of the

transmittal of false information coupled with the /ndian Tow-

ing element of property damage.

We recognize that the characterization of plaintiffs’ com-

plaint as sounding in actionable negligence or in inactionable

negligent misrepresentation is not free from doubt and that the

decided cases are not fully reconcilabie, Green v. United

States, 629 F.2d at 585. Nevertheless, we conclude that the

NRC’s lack of “operational control” of TMI’, coupled with

plaintiffs’ allegations of “misrepresentation” in the B & W

suit’ and the NRC’s “failure to talk” here, warrants our

conclusion that the suit sounds in negligent misrepresentation

6 Plaintiffs asseverated at oral argument that “operational control” is

not a sine qua non for imposing governmental liability. Rather, they argue

that liability may be imposed if the Government fails to warn of a dangerous

condition after engendering reliance. This theory is supported by S.A.

Empresa De Vincas Aerea Rio Grandense (Varig Airlines) v. United States,

81-5366 (9th Cir. October 8, 1982) and Barnson ». United States, 531 F.Supp.

614 (D.Utah 1982) (denying motion to dismiss a complaint grounded in the

Government's inspection of a privately owned, federally licensed mine.) See

also, Blessing v. United States, 447 F.Supp. 1160 (E.D.Pa.1978). However, in

most cases in which governmental liability is found, some degree of opera-

tional control frequently exists.

7 Plaintiffs correctly argue that Toole v. United States, 588 F.2d 403

(3d Cir. 1978), imposed liability absent operational control of the harm-caus-

ing instrumentality. However, Toole did not address the misrepresentation

exception and did not consider whether the lack of operational control would

affect the Court's characterization of the suit as sounding in negligence or

misrepresentation.

8 See, note 5, supra.

30a

as defined in Neustadt and its progeny. This does not, however,

end our inquiry.

Most of the cases which discuss the scope of the misrepresen-

tation exception opine that.it is limited “very largely”, Neu-

stadt, 366 U.S. at 711 and n. 26, 81 S.Ct. at 1302 n. 26, to the

invasion of financial interests or that it is “most often”

applicable to suits alleging improper governmental evaluation

of economic factors. Ramirez v. United States, 567 F.2d 854,

856 (9th Cir.1977). Plaintiffs, therefore, argue that notwith-

standing any characterization of their complaint as sounding in

“negligent misrepresentation”, this action is not necessarily

barred because the complained of misrepresentation does not

relate to the invasion of financial interests. Hence, according

to plaintiffs, assuming a negligent misrepresentation, they may

nevertheless maintain this suit which seeks recompense for the

Government’s failure to provide safety data, rather than the

faulty transmission of information containing an economic

forecast.

Countering, the Government urges that the multitude of

cases which discuss the misrepresentation bar as being “very

largely” confined to cases involving financial interests, does

not preclude the possibility that suits based upon misrepresen-

tations of non-financial interests and factors are also barred.

Indeed, one court noted that it was “unaware” of any Congres-

sional indication to limit the misrepresentation exception to

cases alleging financial or commercial loss and concluded that

recovery for personal injury, wrongful death or property dam-

age is also barred. Lloyd v. Cessna Aircraft Co., 429 F.Supp.

181, 187 (E.D.Tenn.1977). Other courts disagree. See, e.g.,

Kohn v. United States, 680 F.2d 922, 926 (2nd Cir. 1982) (the

misrepresentation exception bars only those suits seeking dam-

ages for commercial decisions predicated upon incorrect or

incomplete information.) In any case, most courts continue to

hold that the misrepresentation bar goes “most often” to cases

involving business transactions. Although there may be and

probably are grounds for differences of opinion, we conclude

that the scope of the misrepresentation exception is not so

broad as to bar this suit.

Our conclusion is not altered by the NRC’s attempt to

characterize their function as supplying business information

3la

.o piaintiffs. True, plaintiffs are claiming economic damage

due to their reliance upon the NRC’s misrepresentations.

However, the type of information relied’ upon by plaintiffs

differs substantially from that which is traditionally discussed

in the cases in which suit is barred. See e.g., Neustadt.

Moreover, the fact that plaintiffs’ damages are expressed as

business losses does not transform safety misrepresentations

into commercial ones. The articulated “test” for determining

the type of misrepresentations which occurred is “not whether

the injury was economic, but whether it resulted from a

commercial decision based upon governmental misrepresenta-

tions”. Preston v. United States, 596 F.2d 232, 239 (7th

Cir.1979). Hence, our inquiry focuses upon whether plaintiffs’

9 Patentas v. United States, 687 F.2d 707 at 717, stressed the fact that

reliance upon the Government’s undertaking which induces forebearance

from engaging in a similar, private undertaking, is one method of properly

alleging a claim under the Good Samaritan rule.

Patentas, authored by Judge Becker, considered whether plaintiifs could

maintain suit against the Coast Guard for the faulty inspection of a ship

which exploded during the unloading of its oil cargo. The ship, ELIAS,

suffered a fire while at sea. Prior to its unloading, a Coast Guard inspector

checked to determine whether it was safe to unload the cargo and to be sure

that the cause of the fire had been remedied. The Coast Guarda determined

that the ship was safe when, in fact, it was not. Thereafter, while unloading,

the ship exploded killing thirteen people.

Patentas held that the district court properly dismissed the complaint. In

discussing the scope of the Government’s Good Samaritan liability, the court

noted that none of the plaintiffs had known of the purpose of the Coast

Guard inspection. The announced role is that reliance upon the Govern-

ment’s inspection must be alleged in order to state a claim under the FTCA

for failure to conduct a proper inspection.

In the case at bar, plaintiffs have argued that due to the NRC’s undertak-

ing, they and the industry forebore from “developing their own private

warning system to monitor nuclear operating experience industrywide”. See,

Plaintiffs’ Memorandum In Opposition To Defendants’ Motion To Dismiss

(Documen. 18) at 66-67, n. 12. Moreover, in a recently filed amended

complaint, plaintiffs have specifically alleged the element of reliance as part

of their complaint. See, Paragraphs 66A, 66B, 66C of plaintiffs’ amended

complaint.

Accordingly, the Patentas rule aids plaintiffs to the extent that this action

is not otherwise barred by the misrepresentation exception.

32a

injuries arise from an economic or a safety misrepresentation.

The fact that the injury manifested itself as economic harm is

irrelevant to this determination. As the Third Circuit noted,

Congress, in enacting the FTCA, “focused its attention upon

the type of governmental activity that might cause harm, not

the type of harm caused”. Quinones v. United States, 492 F.2d

1269, 1280 (3d Cir.1974) (emphasis added). Applying these

standards we conclude that plaintiffs have suffered losses due

to safety and not commercial misrepresentations and deny

defendant’s motion predicated upon the misrepresentation ex-

ception.

Discretionary Function Exception

We now consider the Government’s claim that the “discre-

tionary function exception” bars this suit.'° Briefly, this excep-

tion precludes an FTCA suit against the Government for the

harm resulting from the improper exercise of official discretion

and is grounded in notions of separation of powers. The

Government argues that its decision to issue a license to

plaintiffs, to promulgate IE Bulletins, Circulars and to notify

Congress of “abnormal occurrences”, etc., all involve the

exercise of executive discretion which is not subject to judicial

scrutiny. For example, defendant argues that prior to the

issuance of an “IE Bulletin”, NRC officials must exercise their

experience, expertise and discretion in determining whether the

event is “important”, has “potential” for being “generic in

nature” and whether “timely information is necessary for

licensees”. See Manual, Chapter 1100-1125-041. Similar deter-

minations must be made prior to the issuance of Circulars

which consider whether an event “warrants wide dissemina-

tion”. Jd. at 1125-042.

10 In view of our conclusion we need not address plaintiffs’ alternate

argument that if the discretionary function exception is applicable, we should

not dismiss the suit af this juncture. This argument is grounded on the

allegation that the record does not now reveal whether NRC scientists

actually made a discretionary decision not to warn of Davis-Besse or whether,

through default or caprice, they simply abdicated their responsibility.

33a

In Griffin v. United States, 500 F.2d 1059, 1063-66 (3d

Cir.1974), the Third Circuit rejected a contention similar to the

one which the Government makes today. Here, the Govern-

ment contends that it employed discretionary decision-making

authority in determining how, if at all, to notify nuclear

licensees of the Davis-Besse accident and of other so-called

“precursors”. Defendant asserts that the scientific judgments

which it made in determining the “generic” applicability of the

Davis-Besse accident are the kinds of decisions of which the

discretionary function exception bars review.

Plaintiff in Griffin had ingested a live polio vaccine; the

Governnent had previously tested the lot from which it came

and certified it as safe. The decision to certify the vaccine

required reference by Government scientists to five criteria.

Hence, whether the vaccine was safe required exercise of

scientific judgment, expertise and discretion by Government

scientists.

The court held that the “discretionary function” exception

did not dar suit since the judgment involved was of a scientific

nature and that the discretionary function exception only bars

suit predicated upon policy-making decisions; i.e., those which

consider the feasibility or practicability of Government pro-

grams. Cf., Dalehite, supra, (barring suit challenging the

Governnent’s decision to create a fertilizer export program

using volatile chemicals which resulted in an unprecedented

explosion.) The Griffin court viewed scientific “judgments”,

similar io the ones at bar, as essentially ministerial acts per-

formed by Government physicians whose responsibility was

“limited” to “merely executing policy judgments” of the Sur-

geon Geeral. 500 F.2d at 1059. Judge Becker also concluded

that regulatory decisions of a scientific or professional charac-

ter, aS opposed to policy-oriented conclusions, are properly

reviewable. Blessing v. United States, 447 F.Supp. at 1178.

Defendant attempts to distinguish Griffin by asserting that

the degree of scientific judgment there involved was subject to

exact, specific statutory commands, see e.g., Griffin v. United

States, ‘00 F.2d at 1062-63, n. 7, whereas here in the NRC’s

34a

scientific judgments as to whether an “abnormal event” oc-

curred at Davis-Besse or whether “generic problems” existed,

requires reference to broad, inexact statutory commands. Con-

tinuing, defendant urges that the lack of specific statutory

guidelines within which NRC scientists exercise their “discre-

tion” distinguishes this case from Griffin.

We disagree. Although NRC scientists possess judgmental

latitude broader than that which existed in Griffin, we con-

clude that the governing standards are not so vague or inexact

as to call for unfettered scientific “discretion”. Indeed, equally

broad exercises of judgment have survived similar challenges.

For example, Caban v. United States, 671 F.2d 1230, 1233

(2nd Cir.1982) held that an immigration officer’s judgment

governed by standards requiring reference as to how an appli-

cant “appears” and requiring that the official be properly

“satisfied” of the proofs of entitlement, are not so broad as to

compel immunization from suit under the discretionary func-

tion exception. Ingham v. Eastern Airlines, 373 F.2d 227, 233

(2nd Cir.), cert denied, 389 U.S. 931, 88 S.Ct. 295, 19 L.Ed.2d

292 (1967) held that the duty to report changing weather

conditions when “necessary” was sufficient guidance to with-

stand challenge. Accord, Wenninger v. United States, 234

F.Supp. 499, 504 (D.Del. 1964), aff'd, 352 F.2d 523 (3d

Cir.1965). Moreover, there is nothing so unique in the type of

injury at bar as to preclude application of traditional tort

principles. Allen v. United States, 527 F.Supp. 476, 488

(D.Utah 1981).

Finally, the Griffin court noted that the judgments which

Government scientists may permissibly make are circumscribed

by applicable regulations; where decision-makers exceed that

scope, liability may properly be imposed. 500 F.2d at 1068-69.

See also, United Scottish Ins. Co. v. United States, 614 F.2d

188, 198 (9th Cir.1979) (the breach of “duty creating” regula-

tions vitiates the Government’s ability to assert the discre-

tionary function exception).

35a

Conclusion

The issues which we have addressed, the initial characteriza-

tion of the suit as sounding in misrepresentation or negligence,

the contours of the misrepresentation exception and the proper

breadth of the Government’s discretion are all “controlling

issues” which admit to a “substantial ground for difference of

opinion”. 28 U.S.C. § 1292(b). Indeed, in deciding these issues

we have considered numerous decisions which are admittedly

not “fully reconcilable”. Green v. United States, 629 F.2d at

585. Moreover, our conclusion to deny the . overnment’s

motion to dismiss subjects the Government to tremendous trial

costs, a staggering amount of potential liability!’ and forces

them to defend a suit in which they may ultimately prevail on

jurisdictional issues. As such, we conclude that the “ultimate

termination” of this litigation may well be “materially ad-

vanced” by an immediate appeal. See, Katz v. Carte Blanche

Corp., 496 F.2d 747, 755 (3d Cir.1974), 28 U.S.C. § 1292(b).

Accordingly, we will certify this matter for an immediate

interlocutory appeal and stay all proceedings in this Court

pending the outcome thereof. Jd. The question which we

certify to the Third Circuit is no broader than that which has

previously been certified for such an appeal, Zenith Radio

Corp. v. Matsushita Electric Industrial Co., Inc., 478 F.Supp.

889, 946 (E.D.Pa. 1979), and is as follows:

“Is our decisicn correct that neither the misrepresentation

nor the discretionary function exception bars this suit?”

An appropriate order will issue.

li We recognize that the amount in controversy, coupled with the

industry involved and the identity of the defendant invites a visceral reaction

quite unlike that which normally permeates litigation. However, we have at

all times sought to dispense true Plutonic justice; i.e., justice deriving from

“reason unaffected by passion”.

36a

UNITED STATES COURT OF APPEALS

FOR THE THIRD CIRCUIT

No. 83-1017

as

GENERAL PUBLIC UTILITIES CORPORATION, JERSEY CEN-

TRAL POWER & LIGHT COMPANY, METROPOLITAN EDISON

COMPANY, PENNSYLVANIA ELECTRIC COMPANY,

WS.

UNITED STATES OF AMERICA,

Appellant.

(D.C. Civil No. 81-4950)

ON APPEAL FROM THE UNITED STATES DISTRICT COURT

FOR THE EASTERN DISTRICT OF PENNSYLVANIA

i

Present:

WEIS, HIGGINBOTHAM and SLOVITER,

Circuit Judges.

-t-

JUDGMENT

This cause came on to be heard on the record from the

United States District Court for the Eastern District of Penn-

sylvania and was argued by counsel September 13, 1983.

On consideration whereof, it is now here ordered and ad-

judged by this Court that the within cause be, and the same is

hereby remanded to the said District Court for further pro-

ceedings consistent with the opinion of this Court.

ATTEST

/s/ SALLY MRVOS

Clerk

September 28, 1984

37a

Provisions of the Energy Reorganization Act of 1974,

42 U.S.C. § 5801, et seq.

Section 206, 42 U.S.C. § 5846:

Compliance with safety regulations

Notification to Commission of noncompliance

(a) Any individual director, or responsible officer of a firm

constructing, Owning, operating or supplying the components

of any facility or activity which is licensed or otherwise

regulated pursuant to the Atomic Energy Act of 1954 as

amended, or pursuant to this chapter, who obtains information

reasonably indicating that such facility or activity or basic

components supplied to such facility or activity—

(1) fails to comply with the Atomic Energy Act of

1954, as amended, or any applicable rule, regulation,

order or license of the Commission relating to substantial

hazards, or

(2) contains a defect which could create a substantial

safety hazard, as defined by regulations which the Com-

mission shall promulgate,

shall immediately notify the Commission of such failure to

comply, or of such defect, unless such person has actual

knowledge that the Commission has been adequately informed

of such defect or failure to comply.

Penalty for failure to notify

(b) Any person who knowingly and consciously fails to

provide the notice required by subsection (a) of this section

shall be subject to a civil penalty in an amount equal to the

amount provided by section 2282 of this title.

Posting of requirements

(c) The requirements of this section shall be prominently

posted on the premises of any facility licensed or otherwise

38a

regulated pursuant to the Atomic Energy Act of 1954, as

amended.

Inspection and Enforcement

(d) The Commission is authorized to conduct such reason-

able inspections and other enforcement activities as needed to

insure compliance with the provisions of this section.

Section 208, 42 U.S.C. § 5848:

Abnormal occurrence reports

The Commission shall submit to the Congress each quarter a

report listing for that period any abnormal occurrences at or

associated with any facility which is licensed or otherwise

regulated pursuant to the Atomic Energy Act of 1954 as

amended, or pursuant to this chapter. For the purposes of this

section an abnormal occurrence is an unscheduled incident or

event which the Commission determines is significant from the

standpoint of public health or safety. Nothing in the preceding

sentence shall limit the authority of a court to review the

determination of the Commission. Each such report shall

contain—

(1) the date and place of each occurence;

(2) the nature and probable consequence of each occur-

rence;

(3) the cause or causes of each; and

(4) any action taken to prevent reoccurrence;

the Commission shall also provide as wide dissemination to the

public of the information specified in clauses (1) and (2) of this

section as reasonably possible within fifteen days of its receiv-

ing information of each abnormal occurrence and shall provide

as wide dissemination to the public as reasonably possible of

the information specified in clauses (3) and (4) as soon as such

information becomes available to it.

Excerpts From The Amended Complaint

FIRST CAUSE OF ACTION

NRC’s Failure to Perform with Due Care its Undertaking to

Discover, to Analyze and to Warn of Safety Hazards

20. Plaintiffs repeat and reallege paragraphs 1-19 as pre-

viously set forth.

21. The NRC had undertaken to discover, to analyze and to

warn licensees of nuclear plants, including Met-Ed, of defects

and hazardous conditions in plant components, systems, anal-

yses, procedures and instructions. The NRC knew or should

have known that plaintiffs would rely on the said undertaking,

and plaintiffs did so rely. As set forth below, a proximate

cause of the March 28, 1979 accident at TMI-2, its disastrous

effects and the resulting damages to plaintiffs was the NRC’s

failure to perform this operational undertaking with due care.

22. As alleged in detail herein, the NRC negligently or

wrongfully failed to warn licensees of other B&W-supplied

nuclear plants, including Met Ed, of defects and hazardous

conditions in plant components, systems, analyses, procedures

and instructions of which the NRC, in the exercise of due care,

should have known as a result of its investigation of a similar

incident in September 1977 at the Davis-Besse nuclear plant of

the Toledo Edison Company and as a result of other ‘‘precur-

sors’? of the TMI-2 accident. The NRC has admitted its

negligent or wrongful failure, which is documented in a four-

volume report that the NRC approved, published and released

to the public in January 1980, entitled ‘‘Three Mile Island—A

Report to the Commissioners and to the Public’’ (hereinafter,

‘*Special Inquiry’’). The NRC, in its Special Inquiry, admits

that ‘‘The information concerning the incident that occurred at

Davis-Besse was not effectively distributed to other B&W

utilities, specifically to Metropolitan Edison,’’ even though

‘*it]he incident that occurred at Davis-Besse is almost an exact

copy of the accident that subsequently occurred at TMI.’’

40a

(Special Inquiry, Vol. 11, Part 1 at 155-56). The Special Inquiry

also states that the NRC knew that “‘similar pieces of equip-

ment [to that involved in the incident at Davis-Besse] with

comparable probabilities of similar failure modes were in-

stalled on other B&W plants. . . ."” (/d. at 156). Yet the NRC

failed to warn the licensees of such plants, including Met-Ed,

of the similar dangers. The NRC also admitted that ‘‘precur-

sors’’ such as “‘the Michelson report [a study by an NRC

consultant concerning, among other things, the response of

B&W reactors during a small-break loss-of-coolant accident

occurring at the top of the pressurizer] should have produced

guidance that, if it had been used, would have prevented the

extensive core damage that occurred at TMI.’’ (Special In-

quiry, id. at 138, emphasis in original). Had the NRC warned

Met-Ed of the defects and hazardous conditions which, in the

exercise of due care, should have been known to the NRC from

its investigation of the Davis-Besse incident and from other

precursors, Met-Ed would have used the information, instruc-

tions and guidance to prevent the extensive core damage that

occurred at TMI-2.

The NRC Undertaking

23. The NRC has undertaken to render services to licensees

of nuclear plants which, as the NRC has or should have

recogni=ed, are necessary for the protection of the property of

owners, Operators and licensees of nuclear plants, including

plaintiffs. Specifically, th NRC in fact undertook to discover

information from varicus sources, including operating experi-

ence at other nuclear plants, to analyze that information, and

to warn licensees of defects and hazardous conditions in plant

components, systems, analyses, procedures and instructions.

24. The NRC’s undertaking to discover, to analyze and to

warn licensees of defects and hazardous conditions was per-

formed pursuant to statutory and regulatory requirements. In

particular, Section 208 of the Energy Reorganization Act of

1974, 42 U.S.C. § 5848, requires the NRC to disseminate

information on any abnormal occurrence, including its causes

4la

and any action taken to prevent reoccurrence, ‘‘as soon as such

information becomes available to it.’’ Likewise, 10 C.F.R.

§ 1.64 imposes a duty on the NRC to administer programs for

“*notifying licensees regarding generic problems so as to

achieve appropriate precautionary or corrective action.’’ These

Statutory and regulatory requirements were promulgated for

the particular benefit of owners, operators and licensees of

nuclear plants, as well as for the protection of the public health

and safety. Thus, plaintiffs are members of the class which the

statutory and regulatory requirements were designed to pro-

tect.

25. The Energy Reorganization Act requires the NRC to

obtain, from any entity which constructs, owns, operates or

supplies components to a nuclear facility, reports of (a) non-

compliance with the Atomic Energy Act or any applicable rule,

regulation, order, or license of the NRC relating to substantial

safety hazards, in any component or analysis of a nuclear

facility or (b) any defect which could create a substantial safety

hazard, as defined by NRC regulations.

26. The NRC has in fact undertaken to disseminate among

licensees of nuclear plants information derived from operating

experience at all nuclear plants in the United States, including

data on component failures and procedure changes, and has

done so pursuant to mandatory regulations and agency operat-

ing procedures. 10 C.F.R. § 1.64 (1977); NRC Manual Ch.

0127 (1978); Inspection and Enforcement Manual Ch. 1110

(1977). Methods of dissemination include the issuance of

Bulletins and Circulars to warn licensees of events or condi-

tions of generic importance to safety. Inspection and Enforce-

ment Manual Ch. 1125 (1978).

37. On September 26, 1977, the NRC commenced an inves-

tigation into the accident at Davis-Besse as required by its

regulations. An NRC inspector from the Office of Inspection

and Enforcement identified both the problem of operator

response during the accident and the need for revised operator

42a

training. The NRC inspector and six other members of the

NRC staff, including senior engineers from the Office of

Nuclear Reactor Regulation, attended meetings at Davis-Besse

during the week following the accident.

38. Within two weeks of the September 24, 1977 accident,

members of the NRC Office of Nuclear Reactor Regulation

and the Office of Inspection and Enforcement met to discuss

the NRC investigation of the accident. Subsequently the Office

of Inspection and Enforcement, which had assumed primary

responsibility for investigation of the accident, was directed to

ascertain ‘‘the operator’s role in participating in the event

...°’ and to investigate ‘‘the operator’s decision to secure HPI

[high-pressure injection] flow based on pressurizer level indica-

tion ....’’ Internal NRC memorandum from Denwood F.

Ross to Karl V. Seyfrit, October 20, 1977.

39. On October 21, 1977, the Assistant Director of the

Division of Reactor Operations Inspection of the Office of

Inspection and Enforcement requested that Toledo Edison

explain in its Licensee Event Report why the operators termi-

nated high-pressure injection during the September 24, 1977

accident. In fact, the Toledo Edison report did not relate the

reasons for the termination of high-pressure injection by the

operators, and the NRC negligently or wrongfully failed to

report such reasons and related safety problems to licensees.

40. Following the September 1977 incident at Davis-Besse,

the NRC failed to use due care in performing its undertaking

to warn Met-Ed and other licensees of B&W-supplied nuclear

plants of defects and hazardous conditions in certain compo-

nents, systems, procedures and instructions which the NRC, in

the exercise of due care, should have discovered and analyzed.

These failures to use due care were inconsistent with duties

previously assumed and undertaken by the NRC through past

practice and regulations.

41. In addition, the NRC’s negligence or wrongful conduct

contravened duties imposed on the NRC by statute and regula-

tions.

43a

50. In September 1977, the NRC Reactor Systems Branch of

the Division of Systems Safety, Office of Nuclear Reactor

Regulation, received copies of a report prepared by Carlyle

Michelson, a Tennessee Valley Authority engineer and a con-

sultant to the NRC Advisory Committee on Reactor Safe-

guards (“ACRS”). The report, entitled “Decay Heat Removal

Probiems Associated with Recovery from a Very Small Break

LOCA for a B&W 205—Fuel Assembly PWR,” stated that,

during certain small-break loss-of-ccolant accidents, the pres-

surizer water level on B&W plants would give an erroneous

indication of the amount of water in the reactor coolant

system.

51. In January 1978, the Reactor Systems Branch ac-

knowledged the concerns of the Michelson report in a memo-

randum expressing concern that a misleading indication from

the pressurizer of the amount of water in the reactor coolant

system during a loss-of-coolant accident caused by a small

break at the top of the pressurizer would induce plant opera-

tors to turn off the liigh-pressure injection of replacement

coolant. The Reactor Systems Branch specifically noted in the

memorandum that such an incident had already occurred at

Davis-Besse as a result of a stuck-open pilot-operated relief

valve. The memorandum recognized that “operators would

control makeup flow [i.e., high-pressure injection] based on

the pressurizer level as part of their normal procedures” and

that as a result, “the operator could erroneously shut off

makeup flow [high-pressure injection] when significant [steam]

void occurs elsewhere in the system or loss of inventory

[coolant] is continuing.” The memorandum concluded that the

NRC should review the proposed procedures of plants which

were in the licensing process in order to ensure that plant

operators would have adequate information before terminating

the flow of high-pressure injection during such an incident. At

that time, TMI-2 was in the NRC licensing process, prior to the

issuance of its operating license.

52. In January 1978, Michelson provided the ACRS with a

revised version of his report. The revised Michelson report

44a

stated that plant operators, in reliance on the erroneous indica-

tion provided by the pressurizer water level of the amount of

water in the reactor coolant system, would terminate the

automatically activated high-pressure injection. The report

also revealed that the loss-of-coolant accident which would

cause such operator response had not been analyzed by B&W.

53. In the exercise of due care, the NRC should have

known, as a result of the Michelson Report and the Reactor

Systems Branch memorandum, that one potential consequence

of the predicted termination of high-pressure injection was

core uncovery and fuel damage.

54. After receiving the Michelson report, the NRC failed to

use due care in performing its undertaking to warn Met-Ed and

other licensees of B&W-supplied plants of generic defects and

hazardous conditions in components, systems, analyses, proce-

dures and instructions. These failures to use due care were

inconsistent with duties previously assumed and undertaken by

the NRC.

55. In addition, the NRC’s negligence or wrongful conduct

contravened duties imposed on the NRC by statute and regula-

tions.

* * *

Reliance on Undertaking and Proximate Cause

64. The aforesaid failures of the NRC to exercise due care in

the performance of its undertaking to discover, to analyze and

to warn plaintiffs of defects and hazardous conditions were

proximate causes of the accident at TMI-2 on March 28, 1979,

its disastrous effects and the resulting damages to plaintiffs.

Each of the acts or omissions set forth above was a substantial

factor in bringing about the accident, its effects and the

resulting damages.

65. Plaintiffs suffered harm to their property (a) because of

plaintiffs’ reliance upon the NRC’s undertaking to discover, to

analyze and to warn them of substantial safety hazards, and

4$a

(b) because the NRC’s failure to use due care to perform said

undertaking increased the risk of such harm.

66. Plaintiffs relied on the NRC to discover, to analyze and

to issue warnings of defects and hazardous conditions in

components, systems, analyses, procedures and instructions in

accordance with the NRC’s undertaking in fact and in accord-

ance with the NRC’s statutory and regulatory duties. Specifi-

cally, plaintiffs relied on the NRC to exercise due care to

discover, to analyze and to warn them of substantial safety

hazards based on operating experience at similar B&W-sup-

plied plants and other sources. Met-Ed maintained a formal

program for the review of communications from the Office of

Inspection and Enforcement to determine promptly whether

any adverse condition reported by the NRC required corrective

action at TMI-2. Consequently, had the NRC performed with

due care its undertaking to discover, to analyze and to warn

Met-Ed of substantial safety hazards, Met-Ed would have

taken prompt corrective action, thus avoiding the March 28,

1979 accident, its disastrous effects and the resulting damages

to plaintiffs.

66A. Plaintiffs’ knowledge of and reliance on the NRC’s

undertaking to discover, analyze and issue warnings of defects

and hazardous conditions in components, systems, analyses,

procedures and instructions induced them to forego certain

other possible remedies or precautions against the risk of such

defects and hazardous conditions.

66B. In light of the potentially devastating hazards of nu-

clear power recognized by Congress, the NRC’s undertaking

was central to the existence of the nuclear industry. Electric

utilities would not have chosen nuclear power over fossil fuels,

and would not have continued to operate nuclear plants,

without the assurances of safety provided by the NRC’s warn-

ing system or some alternative private system. Had the NRC

ceased operating its system, nuclear plant operators, including

plaintiffs, would have had to cease or drastically cut back their

operations or devise an alternative warning system.

46a

66C. Since it would have been totally unrealistic for each

plant to dispatch a team of investigators every time an unusual

occurrence with potentially generic significance took place at

another plant, the only realistic alternative to the NRC’s

warning system would have been a private central organization

to monitor nuclear operating experience nationwide and to

warn nuclear plant operators of generic safety hazards. As

long as the NRC’s warning system was in operation and it was

believed that the NRC was performing its undertaking with

due care, such a private organization would have been duplica-

tive and unnecessary. However, since the accident at TMI-2 and

the disclosure of the NRC’s failure to exercise due care in the

performance of its undertaking in connection with the Septem-

ber 24, 1977 event at Davis-Besse, the owners and operators of

nuclear plants, including plaintiffs, have in fact formed the

Institute of Nuclear Power Operations (INPO) which, among

other things, now monitors nuclear operating experience in-

dustrywide and warns the owners and operators of nuclear

plants of defects and hazards discovered at other plants.

Plaintiffs’ knowledge of and reliance on the NRC’s undertak-

ing to discover, analyze and issue warnings of generic safety

hazards and defects induced them to forego the possibility of

joining with other owners and operators of nuclear plants prior

to March 28, 1979 to form such a private central organization.