In the Supreme Court of the Anited States

UNITED STATES ARMY CORPS OF ENGINEERS,

PETITIONER

Vv.

HAWKES Co., INC., ET AL.

ON WRIT OF CERTIORARI

TO THE UNITED STATES COURT OF APPEALS

FOR THE EIGHTH CIRCUIT

JOINT APPENDIX

DONALD B. VERRILLI, JR. M. REED HOPPER

Solicitor General Pacific Legal Foundation

Department of Justice 930 G Street

Washington, D.C. 20530-0001 Sacramento, CA 95814

SupremeCtBriefs@usdoj.gov mrh@pacificlegal.org

(202) 514-2217 (916) 419-7111

Counsel of Record Counsel of Record

for Petitioner for Respondents

PETITION FOR A WRIT OF CERTIORARI FILED: SEPT. 18, 2015

CERTIORARI GRANTED: DEC. 11, 2015

TABLE OF CONTENTS

Page

Court of appeals docket entries .................c..c.scecsseeereesereereeees 1

District court docket entries ...................c.cccsecseseseeceseeeeseneeeees 3

Amended complaint for declaratory and injunctive

ee 7

Amended complaint exhibits:

Exhibit A (Letter of Mar. 15, 2011) ........0.....cccccccccessesees 27

Exhibit B (Letter of Aug. 25, 2011) ...0.........cccccecceseseees 31

Exhibit C (Administrative appeal decision) ................. 37

Materials Previously Reproduced

The following documents have been omitted from the

Joint Appendix but may be found in the appendix to the

petition for a writ of certiorari in this case.

Court of appeals opinion (Apr. 10, 2015) ..................cece0000 la

District court memorandum opinion and order

Ee 22a

' 1 juriedictional determination

Eee 44a

Court of appeals order (July 7, 2015) ...............ccccccecesesees 103a

Statutory and regulatory provisions ..................c.s00s00 105a

(I)

UNITED STATES COURT OF APPEALS

FOR THE EIGHTH CIRCUIT

Docket No. 13-3067

HAWKES Co., INC.; PIERCE INVESTMENT COMPANY;

LPF PROPERTIES, LLC, PLAINTIFFS-APPELLANTS

v.

UNITED STATES ARMY CORPS OF ENGINEERS,

DEFENDANT-APPELLEE

DOCKET ENTRIES

DATE PROCEEDINGS

9/19/13 Civil case docketed. [4077221] (13-3067)(CYZ)

12/11/14 ARGUED & SUBMITTED in St. Paul to Judges

4/10/15

James B. Loken, Myron H. Bright, Jane Kelly on

12/11/2014 Mr. Reed Hopper for Appellants

Hawkes Co., Inc., Pierce Investment Company

and LPF Properties, LLC and Mr. Robert

Lundman for Appellee United States Army

Corps of Engineers. No Rebuttal RECORD-

ED [4224907] [13-3067] (CYZ)

OPINION FILED—THE COURT: James B.

Loken, Myron H. Bright and Jane Kelly AU-

THORING JUDGE: James B. Loken (PUB-

LISHED). CONCUR BY: Jane Kelly

[4264064] [13-3067] (CMD)

(1)

DATE

PROCEEDINGS

4/10/15

6/9/15

W/T/15

TAG/15

JUDGMENT FILED—The judgment of the orig-

inating court is REVERSED and REMANDED

in accordance with the opinion. JAMES B.

LOKEN, MYRON H. BRIGHT and JANE

KELLY Hrg Dec 2014 [4264084] [13-3067]

(CMD)

a a

PETITION for enbanc rehearing and also for re-

hearing by panel filed by Appellee United States

Army Corps of Engineers w/service 06/09/2015

[4283652] [13-3067] (RL)

JUDGE ORDER: Denying [4283652-2] peti-

tion for enbanc rehearing filed by Appellee

United States Army Corps of Engineers. The

petition for panel rehearing is also denied.

[4283652-3] PUBLISHED ORDER. Hrg Dec

2014 [4292636] [13-3067] (MER)

MANDATE ISSUED. [4295880] [13-3067]

(MER)

i a it fe

3

UNITED STATES DISTRICT COURT

FOR THE DISTRICT OF MINNESOTA

Civil Docket No. 0:13-cv-00107-ADM-TNL

HAWKES Co., INC. ET AL, PLAINTIFFS

v.

UNITED STATES ARMY CORPS OF ENGINEERS,

DEFENDANT

DOCKET ENTRIES

DOCKET

DATE NUMBER PROCEEDINGS

V1V/13

3/13/13

l

IN

COMPLAINT for Declaratory and

Injunctive Relief against Us Army

Corps Of Eng. (Filing fee $ 350

receipt number 0864-3411674.)

Filed by Hawkes Co., Inc. LPF

Properties, LLC, Pierce Investment

Company. Filer requests summons

issued. (Attachments: # 1 Ex-

hibit(s) A-C, # 2 Civil Cover Sheet)

(Merz, Gregory) (Entered:

01/11/2013)

*_ *- *&* & *

AMENDED COMPLAINT for

Declaratory and Injunctive Relief

against United States Army Corps of

Engineers. Filed by Hawkes Co.,

Inc., LPF Properties, LLC, Pierce

Investment Company. No sum-

DOCKET

DATE NUMBER PROCEEDINGS

mons requested.

(Attachments:

# 1 Exhibits(s) A, B, C) (Merz,

Gregory) (Entered: 08/13/2013)

* + + *

4/19/13 ll MOTION to Dismiss for Lack of

Jurisdiction by United States Army

Corps of Engineers. (Dertke, Dan-

iel) (Entered: 04/19/2013)

4/19/13 12 MEMORANDUM in Support re 11

MOTION to Dismiss for Lack of

Jurisdiction filed by United States

Army Corps of Engineers. (Attach-

ment: Certificate of Service).

(Dertke, Daniel) Modified text on

4/19/2013 = (Imb).

04/19/2013)

*_ = *&* © *

(Entered:

5/29/13 25 MEMORANDUM by Pacific Legal

Foundation re 11 MOTION to Dis-

miss for Lack of Jurisdiction Amicus

Curiae Memorandum of Law in

Support of Plaintiffs’ Opposition to

US Army Corps Motion to Dismiss

filed by Pacific Legal Foundation.

(Attachments: # 1 LR7.1/LR722

Word Count Compliance Certificate)

(Kaardal, Erick)

05/29/2013)

(Entered:

DOCKET

DATE NUMBER PROCEEDINGS

5/31/13

6/21/13

8/1/13

8/1/13

26

IS

Is

MEMORANDUM in Opposition re

11 MOTION to Dismiss for Lack of

Jurisdiction filed by Hawkes Co.,

Inc., LPF Properties, LLC, Pierce

Investment Company. (Attach-

ments: # 1 LRT7.1/LR722 Word

Count Compliance Certificate)

(Merz, Gregory) (Entered:

05/31/2013)

*_ *+ *&* © *

Reply to Response to Motion re 11

MOTION to Dismiss for Lack of

Jurisdiction filed by United Staets

Army Corps of Engineers. (Attach-

ments: # 1 LR7.1/LR72.2 Word

Count Compliance Certificate) (Der-

tke, Daniel) (Entered: 06/21/2013)

* * * &© *

MEMORANDUM OPINION AND

ORDER granting 11 Defendant’s

Motion to Dismiss for Lack of Juris-

diction (Written Opinion). Signed

by Judge Ann D. Montgomery

on 08/01/2013. (TLU) (Entered:

08/01/2013)

JUDGMENT (Attachments: # 1

Civil Notice—appeal) (jz) (Entered:

08/01/2013)

DOCKET

DATE NUMBER PROCEEDINGS

IIT/13

32

NOTICE OF APPEAL TO 8TH

CIRCUIT by Hawkes Co., Inc., LPF

Properties, LLC, Pierce Investment

Company. Filing fee $ 455, receipt

number 0864-3699153. (Hopper, M)

(Entered: 09/17/2013)

7

UNITED STATES DISTRICT COURT

FOR THE DISTRICT OF MINNESOTA

Court File No. 13-107 (ADM/THL)

HAWKES Co., INC., PIERCE INVESTMENT COMPANY, AND

LPF PROPERTIES, LLC, PLAINTIFFS

vz.

UNITED STATES ARMY CORPS OF ENGINEERS,

DEFENDANT

Filed: Mar. 13, 2013

AMENDED COMPLAINT FOR DECLARATORY

AND INJUNCTIVE RELIEF

Plaintiffs Hawkes Co., Inc., Pierce Investment

Company, and LPF Properties, LLC, for their Amend-

ed Complaint seeking declaratory and injunctive relief

allege as follows:

INTRODUCTION

1. In this action, the Plaintiffs seek review pur-

suant to the Administrative Procedure Act (“APA”), 5

U.S.C. § 551, et seq., of a final agency action of the

United States Army Corps of Engineers (the “Corps”),

finding that certain property in which the Plaintiffs

have an ownership or other beneficial interest (the

“Property”) is a water of the United States under the

Federal Water Pollution Control Act, 33 U.S.C. § 1251,

et seg., known as the Clean Water Act (“CWA”), and

therefore subject to the Corps’ jurisdiction.

8

2. As a result of the Corps’ unlawful assertion of

jurisdiction, Plaintiffs are unable to use the Property

without fear of a CWA enforcement action, fines, and

penalties. The Corps’ improper assertion of jurisdic-

tion also subjects Plaintiffs to an unlawful and burden-

some permitting requirement.

3. Plaintiffs seek by this action a declaration that

the Property is not a water of the United States under

the CWA. Plaintiffs also seek an injunction enjoining

the Corps from exercising jurisdiction over Plaintiffs’

Property.

4. The Court’s review of the agency action that is

the subject of this proceeding is based upon the ad-

ministrative record before the Corps at the time the

Corps made its decision.

JURISDICTION AND VENUE

5. This Court has jurisdiction over the subject

matter of this action pursuant to 28 U.S.C. § 1331 (fed-

eral question jurisdiction); 28 U.S.C. § 2201 (author-

izing declaratory relief); 28 U.S.C. § 2202 (authorizing

further “necessary or proper relief”); and 5 U.S.C.

§ 702 (providing for judicial review of agency action

under the APA).

6. The Property consists of approximately 530

acres of real estate located in New Maine Township,

Marshall County, Minnesota. Venue in this judicial

district is proper under 28 U.S.C. § 1931(e)(2) because

the Property that is the subject of the action is located

within this district.

9

PARTIES

7. Plaintiffs Pierce Investment Company (“Pierce

Investment”), a Minnesota corporation with its princi-

pal place of business in Minnesota, and LPF Proper-

ties, LLC (“LPF Properties”), a North Dakota limited

liability company with its principal place of business in

North Dakota, each own portions of the Property.

8. Plaintiff Hawkes Co., Inc, (“Hawkes”) is a

North Dakota corporation with its principal place of

business in North Dakota. Hawkes will pay royalties

to the owners of the Property in consideration of its

use of the Property to expand Hawkes’ existing nearby

peat mining operations to the Property.

9. All three plaintiffs are owned by the same four

or five members of the Pierce family, and Kevin Pierce

is an officer of all three plaintiffs and has been acting

on their behalf in these proceedings.

10. Defendant United States Army Corps of En-

gineers is a branch of the Department of the Army and

an agency of the United States.

LEGAL BACKGROUND

11. In 1972, Congress enacted the CWA to regu-

late “navigable waters.”

12. Section 301(a) of the CWA, 33 U.S.C. § 1311(a),

prohibits the unpermitted discharge of dredged and fill

material into “navigable waters.”

13. Section 502(7) of the CWA, id. § 1362(7), de-

fines “navigable waters” to mean the “waters of the

United States, including the territorial seas.”

10

14. Section 404 of the CWA, 33 U.S.C. § 1344,

authorizes the Secretary of the Army, through the

Corps, to issue permits for the discharge of dredged

and fill material into “navigable waters.”

15. By regulation, the Corps may determine

whether a particular parcel of property contains “wa-

ters of the United States” by issuing an Approved

Jurisdictional Determination (“JD”). 33 C.F.R.

§§ 320.1(a)(6), 331.2.

16. The Corps has promulgated regulations defin-

ing “waters of the United States.” Jd. § 328.

17. Under those regulations, navigable waters, in-

terstate waters, intrastate waters with uses that could

affect interstate or foreign commerce, impoundments

of waters, tributaries of waters, territorial seas, and

wetlands adjacent to other waters that are not them-

selves wetlands, are considered “waters of the United

States.” See id. § 328.3.

18. In 2001, the United States Supreme Court, in

Solid Waste Agency of Northern Cook County v.

United States Army Corps of Engineers (“SWANCC”),

531 U.S. 159 (2001), held that isolated, intrastate,

non-navigable bodies of water are not “waters of the

United States.”

19. In response to the SWANCC opinion, the

Corps, along with the United States Environmental

Protection Agency (“EPA”), issued an Advance Notice

of Proposed Rulemaking on the Clean Water Act Reg-

ulatory Definition of “Waters of the United States,”

seeking comment on whether and how the agencies

should amend the definition of the term in order to

11

account for the Supreme Court’s decision. 68 Fed.

Reg. 1991 (Jan. 15, 2003).

20. The Corps did not follow through with the rule-

making.

21. Notwithstanding SWANCC, the Corps and

EPA continued to interpret their authority under the

CWA to extend to waterbodies and wetlands so long as

these features had at least a “hydrological connection”

to navigable-in-fact waterbodies. See, e.g. United

States v. Rapanos, 376 F.3d 629, 638 (6th Cir. 2004),

vacated, remanded by Rapanos v. United States, 547

U.S. 715 (2006).

22. In Rapanos v. United States, the Supreme

Court rejected the agencies’ hydrological connection

theory of CWA jurisdiction. See 547 U.S. at 739

(piurality opinion); id. at 780-82 (Kennedy, J., concur-

ring in the judgment).

23. In that decision, Justice Scalia authored a

plurality opinion, joined by three other Justices, which

concluded that the Corps’ jurisdiction over

non-navigable waters only extends to “relatively per-

manent, standing or continuously flowing bodies of

water” that are “connected to traditional interstate

navigable waters.” Jd. at 739, 742 (plurality opinion).

In addition, wetlands adjacent to such jurisdictional

waters will qualify as jurisdictional when “the wetland

has a continuous surface connection with that water,

making it difficult to determine where the ‘water’ ends

and the ‘wetland’ begins.” Jd. at 742.

24. Justice Kennedy concurred in the judgment

but adopted a broader interpretation of the Corps’ jur-

isdiction over non-navigable waters, finding them

12

jurisdictional if they “possess a ‘significant nexus’ to

waters that are or were navigable in fact or that could

reasonably be so made.” Rapanos, 547 U.S. at 759

(Kennedy, J., concurring in the judgment). Accord-

ing to Justice Kennedy, a significant nexus exists

where non-navigable waters, either alone or in combi-

nation with similarly situated waterbodies, “signifi-

cantly affect the chemical, physical, and biological in-

tegrity” of navigable-in-fact waters (also known as

“traditional navigable waters”). Jd. at 780. The

Eighth Circuit Court of Appeals recognizes both the

plurality opinion and Justice Kennedy’s significant

nexus test as supporting CWA jurisdiction over wet-

lands. United States v. Bailey, 571 F.3d 791 (8th Cir.

2009).

25. After Rapanos, the Corps, in conjunction with

EPA, issued a non-binding guidance document opining

on the scope of the agencies’ CWA jurisdiction. See

Clean Water Act Jurisdiction Following the U.S. Su-

preme Court’s Decision in Rapanos v. United States &

Carabell v. United States (Dec. 2, 2008). In that

guidance document, the Corps and EPA assert their

intention to exercise jurisdiction over “waters of the

United States” that satisfy either the Scalia “relatively

permanent” test or the Kennedy “significant nexus”

test.

26. In April, 2011, the Corps and EPA issued a new

draft guidance document, but it has not yet been final-

ized. See Draft Guidance on Identifying Waters Pro-

tected by the Clean Water Act (2011). In that guid-

ance document, the Corps and EPA state their inten-

tion to continue to assert jurisdiction over “waters of

the United States” that satisfy either the Scalia or the

13

Kennedy test. The document also notes the agencies’

intention to engage in APA rulemaking after finalizing

the new guidance.

FACTUAL ALLEGATIONS

The Property

27. The Property contains peat and, as such, is

necessarily wetland. All peat mining occurs in wet-

lands because peat is only found in wetland environ-

ments. Thus peat mining is known as a “wetland de-

pendent” activity and, in Minnesota, peat mining and

wetland replacement and restoration associated with

peat mining are regulated under permits issued by the

Minnesota Department of Natural Resources.

28. The Plaintiffs’ Property is located over 120

river miles from the nearest traditional navigable

water (“TNW”), the Red River of the North.

29. There is no significant connection between

Plaintiffs’ Property and the Red River of the North

located 120 river miles away. There is no significant

e .emical, physical or biological impact on, or connec-

tion between, the wetlands on Plaintiffs’ Property and

the Red River of the North.

30. There is no continuous surface connection be-

tween wetlands on Plaintiffs’ Property and a water of

the United States, such that it is difficult to determine

whe~e the water ends and the wetland begins. A

farm, a separate, shallow ditch dug for farming pur-

poses in an area the Corps concedes is upland at the

border of the farm most distant from Plaintiffs’ Prop-

erty, and a sizable upland area are all located between

Plaintiffs’ Property and the area that the Corps claims

14

is a “relatively permanent water.” In other words,

the wetlands on Plaintiffs’ Property are easily distin-

guishable from any jurisdictional water.

31. The wetlands on Plaintiffs’ Property are not

“waters of the United States” and in the two years that

the Corps has had to establish that there is a signifi-

cant nexus between the Red River of the North and

Plaintiffs’ Property, there is no information in the

administrative record to support any such significant

nexus.

Administrative Proceedings Before the Corps and

Plaintiffs’ Exhaustion of their Administrative Remedies

32. Hawkes is in the business of mining and pro-

cessing peat. A portion of Hawkes’ business involves

the sale of peat meeting certain specifications to the

golf course industry for use in construction of greens.

In order to be suitable for the standards imposed by

the industry the peat must meet certain quality stand-

ards.

33. The Property has substantial amounts of high

quality peat that able to meet Hawkes’s requirements

for the next ten to fifteen years.

34. In October 2006, Pierce Investment obtained

an option to purchase the Property, subject to receiv-

ing approval to conduct peat mining operations on the

Property.

35. On March 20, 2007, Kevin Pierce, with Hawkes,

met initially with representatives of the Corps and

the Minnesota Department of Natural Resources

(“MDNR”). The discussion at this meeting focused

on potential roadblocks to the plan to mine peat on the

15

Property, including discussion of the Property's status

as a rich fen and a wetland.

36. On January 15, 2008, Mr. Pierce again met with

representatives of the Corps and the MDNR to review

plans to conduct peat mining on the Property.

37. At this meeting, Mr. Pierce, on behalf of

Hawkes, discussed with the Corps and MDNR repre-

sentatives the high quality of the peut available at the

Property and the importance to Hawkes’ business of

being able to mine peat on the Property. As Mr.

Pierce explained, the peat then available to Hawkes

provided approximately seven to ten years (as of Jan-

uury 2008) of future operations. Mr. Pierce also ex-

plained that, by expanding peat mining to the Proper-

ty, Hawkes would extend the lifespan of its peat min-

ing operation by ten to fifteen years.

38. On or about December 13, 2010, Huwkes ap-

plied for a permit from the Corps under Section 404 of

the CWA two expand its existing peat mining operations

to a portion of the Property.

39. As part of its permit application, Hawkes iden-

tified fifteen sites that it had evaluated as potential

alternatives to the Property. None of those sites pro-

vided a viable alternative to peat mining on the Prop-

erty.

40. In January 2011, Mr. Pierce again met with the

Corps and MDNR representatives. At that meeting,

Corps representatives spent the majority of time at-

tempting to persuade Mr. Pierce to abandon his plans

to mine peat on the Property. To that end, Corps

representatives emphasized the cost assuciated with

the permitting process, that there was no guurantee

16

that a permit would ever be granted, and that, even if a

permit were to be granted, the process would take

many years before it would be completed. Mr. Pierce

advised that he had an option to purchase the Property

and that he intended to proceed.

41. On or about March 15, 2011, the Corps issued a

letter to Hawkes indicating the Corps had made a

“preliminary determination that this wetland is a wa-

ter of the United States and is regulated by the Corps

under Section 404 of the Clean Water Act.” See Ex-

hibit A. The Corps’ letter went on to assert that “at a

minimum” an environmental assessment will be re-

quired.

42. Mr. Pierce again met with representatives of

the Corps and the MDNR on April 23, 2011. At that

meeting, one of the Corps representatives, Tamara

Cameron, expressed the opinion that the Property

would be completely and permanently destroyed if

peat were to be mined on the Property. Ms. Cameron

also stated that it could take years before a permit

would be granted and that the process would be very

costly.

43. On May 31 through June 3, 2011, representa-

tives of the Corps conducted a site visit of the Proper-

ty. At that time, a Hawkes employee told Steve Eg-

gers, from the Corps, how important expanding opera-

tions to the Property was to Hawkes’ ability to contin-

ue its business and how much he hoped that Hawkes

would be able to begin mining on the Property soon.

In response to these comments, Mr. Eggers suggested

to the employee that he should start looking for an-

other job, or words to that effect. Mr. Eggers has

previously been the subject of complaints on one or

17

more occasions regarding his over-zealous actions on

behalf of the Corps.

44. On or about August 25, 2011, the Corps sent

another letter to Hawkes with a list of nine additional

information items that would be needed in connection

with the permit application. These included hydro-

logical assessments of the wetland and of groundwater

flow spatially and vertically, functional resource as-

sessments including vegetation surveys, inventorying

and analyzing the quality of wetlands in the entire

watershed, evaluation of upstream potential impacts,

and more. See Exhibit B. The cost of performing all

of these requirements is anticipated to exceed One

Hundred Thousand Dollars ($100,000.00).

45. Faced with these overly burdensome demands

by the Corps and disagreeing with the Corps’ prelimi-

nary determination of jurisdiction, Plaintiffs requested

information on the basis for this determination.

46. On November 1, 2011, representatives of the

Corps met with the then owner of the Property. Al-

though Mr. Pierce had asked to be present in any

meeting between the Corps and the landowner, the

Corps chose to exclude him from this meeting. At the

meeting, the Corps representatives emphasized to the

landowner the harm that would result if peat mining

were to be permitted on the Property and insisted that

the landowner try to sell the Property to a wetlands

bank or to another party. The Corps made these

statements even though the Corps representatives

were aware that Mr. Pierce had obtained an option to

purchase the Property. The Corps also indicated that

there is a very good possibility that an Environmental

Impact Statement (“EIS”) will be required by the

18

Corps for the permit application. An EIS will delay

issuance of the permit for several years.

47. On November 8, 2011, the Corps provided

Plaintiffs with a copy of a “draft” Jurisdictional De-

termination (the “draft JD”) for the Property. The

draft JD reflected a conclusion that the Property was

connected by a Relatively Permanent Water (“RPW”)

—a series of culverts and unnamed streams which

flowed into the Middle River—to a TNW (the Red

River) and the Property was, therefore, subject to the

Corps’ jurisdiction under the CWA. The draft JD did

not determine that there was a significant nexus be-

tween the Property and any navigable waters.

48. On December 1, 2011, Corps representatives

conducted a site visit of the Property for the purpose

of making a jurisdictional determination.

49. By correspondence dated December 19, 2011,

Plaintiffs, through their wetland consultant, identified

numerous errors in the draft JD and provided the

Corps with additional information to be considered in

connection with its jurisdictional determination. This

information showed that there was, in fact, no RPW

that connected the Property to a TNW

50. On or about February 7, 2012, Defendant is-

sued an Approved Jurisdictional Determination (the

“Initial JD”), concluding that there was a significant

nexus between the Property and the Red River and

accordingly, the Property was a “water of the United

States” subject to the Corps’ jurisdiction under the

CWA.

51. On or about April 4, 2012, Plaintiffs filed a

timely appeal of the JD under 33 C.F.R. § 331.6 setting

19

forth the reasons why the Property is not a water of

the United States.

52. On or about April 23, 2012, the Regulatory

Appeals Review Officer sent Plaintiffs’ consultant a

letter indicating that the appeal was appropriate for

consideration by the administrative appeals program

and the Corps then provided the administrative record

to the Review Officer.

53. The parties presented their oral arguments

before the Review Officer on July 24, 2012, and an

Administrative Appeal Decision was issued on October

24, 2012, finding that the appeal had merit and that

the administrative record “[did] not contain sufficient

documentation/analysis to support a finding of Clean

Water Act jurisdiction.” See Exhibit C. In support

of that conclusion, the Administrative Appeal Decision

noted, among other things:

e “The [Administrative Record] does not con-

tain data supporting flow regime, volume,

duration, or frequency from the wetlands to

the river. Additionally, the District states

that indicators of the transport of energy,

materials, and nutrients were observed dur-

ing a site visit, but there is no quantitative

date [sic] given to support the finding.”

(footnote omitted)

e “While the [Administrative Record] provides

information indicating an OHW [i.e., “ordi-

nary high water”) mark for the unnamed

tributary exists, it does not provide suffi-

cient evidence to establish a significant nex-

us that the number of flow events, volume,

20

duration, and frequency of water flowing

through the tributary are such that it has an

appreciable effect on the TNW” (footnote

omitted)

e “The [Administrative Record] included a de-

scription of the stream channel riparian cor-

ridor from the unnamed tributary to the

TNW. However, the water flow regime in-

formation was not sufficient to indicate that

a significant nexus exists.” (footnote omit-

ted)

54. Following remand, on or about December 31,

2012, the Corps issued a revised JD (the “Revised JD”)

and advised that the Revised JD is a “final Corps per-

mit decision in accordance with 33 C.F.R. § 331.10.”

According to 33 C.F.R. § 331.21, Plaintiffs are consid-

ered to have exhausted their administrative remedies

when a final decision is made pursuant to 33 C.F.R.

§ 331.10.

55. The Revised JD does not contain any new in-

formation to support a significant nexus between the

Property and the Red River of the North. However,

the Revised JD still purportedly relies on Justice

Kennedy’s “significant nexus” test to assert jurisdic-

tion over the Property, which is described by the Re-

vised JD as a “Non-Relatively Permanent [Water] that

flow[s] directly or indirectly into [a] Traditional Navi-

gable [Water].”

56. The Revised JD does not add any new infor-

mation that would demonstrate how Plaintiffs’ land, ei-

ther quantitatively or qualitatively, significantly af-

fects the physical, biological, and chemical integrity of

21

the Red River of the North located 120 river miles

from the property. Even though the Corps has had

two years to establish jurisdiction, its Revised JD, like

the Initial JD, speaks only to the overall functions

provided by wetlands in general and stream headwa-

ters in general and, as the Review Officer found, it

does “not speak to how the specific onsite wetland and

tributaries have a significant nexus that is more than

speculative or insubstantial on the chemical, physical

or biological integrity of the downstream TNW ”

57. Any further efforts to obtain a permit to con-

duct peat mining on the Property would be futile, ei-

ther because the Corps has already decided that it will

not issue a permit or because the delay and expense of

finally obtaining a permit would substantially impede,

if not prevent, Hawkes from proceeding with its plans

to mine peat on the Property.

Applicable Tests for Exercise of

Jurisdiction Under the CWA

58. The controlling tests for defining “waters of

the United States” are Justice Scalia’s plurality opin-

ion in Rapanos v. United States and Justice Kennedy’s

significant nexus test.

59. The Revised JD does not meet either applica-

ble test for assertion of jurisdiction under the CWA.

60. First, the Revised JD does not meet Justice

Sealia’s “relatively permanent” test because there is

no substantial evidence that Property contains any

“relatively permanent, standing or continuously flow-

ing bod[y] of water” that is connected to a jurisdic-

tional water such that one cannot distinguish tell

where the wetlands on Plaintiffs’ Property end and the

22

alleged jurisdictional water begins. Rapanos, 547

U.S. at 739 (plurality opinion). Upland area clearly

separates the two locations.

61. Second, the Revised JD does not meet Justice

Kennedy’s “significant nexus” test. No substantial

evidence supports the Revised JD’s conclusion that a

significant nexus exists between the Property and the

Red River of the North. The Revised JD does not es-

tablish a significant nexus because there is no new

evidence in the Revised JD to determine the qualita-

tive or quantitative effect on the Red River of the

North. Such evidence is necessary to distinguish

between a jurisdictional significant nexus and a non-

jurisdictional insignificant nexus as indicated by the

Corps’ own Review Officer.

62. Since no substantial evidence exists to support

the Revised JD’s conclusion that a significant nexus

exists between the Property and the Red River of the

North, the JD impermissibly assumes, contrary to

Justice Kennedy’s concurring opinion in Rapanos, that

a non-speculative effect is necessarily a significant

effect.

Plaintiffs’ Property is not subject to the CWA be-

cause it does not contain any “waters of the United

States.” Therefore, the Revised JD is arbitrary and

capricious, contrary to law, and unsupported by sub-

stantial evidence. See 5 U.S.C.§ 706(2).

23

FIRST CLAIM FOR RELIEF—

INJUNCTIVE RELIEF

63. Plaintiffs hereby reallege and incorporate by

reference the allegations contained in all preceding

paragraphs as though fully set forth herein.

64. Plaintiffs wish to conduct their business activi-

ties on the Property that the Corps wrongfully claims

to be subject to its CWA permitting authority.

65. Plaintiffs are and will continue to be directly

affected and injured by the Corps’ expansive and un-

lawful assertion of CWA jurisdiction over their Prop-

erty.

66. The Corps’ Revised JD imposes significant in-

jury on Plaintiffs by preventing them from using their

Property as they wish without risking an enforcement

proceeding, fines, and penalties. The Corps’ Revised

JD also imposes on Plaintiffs the illegal, burdensome,

and expensive requirement that they obtain a Section

404 CWA permit in order to conduct their peat mining

activities. As aresult, Plaintiffs’ use of their property

has been, is being—and unless the Court grants relief

—will continue to be adversely affected. Hence, the

Corps’ unlawful exercise of jurisdiction causes Plaintiff

irreparable injury.

67. Setting aside the Corps’ Revised JD will re-

dress Plaintiffs’ injuries by allowing Plaintiffs to use

their property.

68. Plaintiffs have no plain, speedy, and adequate

remedy at law. Absent judicial intervention, Plaintiff

will continue to suffer irreparable injury.

24

69. The Corps’ Revised JD is a final agency action

subject to judicial review under the APA. See 5

U.S.C. § 702; 33 C.F.R. § 320.1(a)(6).

70. Accordingly, injunctive relief enjoining the

Corps from exercising jurisdiction under the CWA is

appropriate.

SECOND CLAIM FOR RELIEF—DECLARATORY

JUDGMENT

71. Plaintiffs hereby reallege and incorporate by

reference the allegations contained in all preceding

paragraphs as though fully set forth herein.

72. An actual and substantial controversy exists

between Plaintiffs and the Corps over the Corps’ fail-

ure to comply with the CWA in determining that

Plaintiffs’ Property contains a jurisdictional water-

body.

73. Plaintiffs contend that their Property contains

no jurisdictional waterbodies, whereas the Corps,

through its Revised JD, contends that it does. The

Corps has had two years to develop information sup-

porting its allegations of jurisdiction, there is a com-

plete administrative record on which the Revised JD

was made, and any further administrative proceedings

before the Corps would be futile. Therefore, no fur-

ther factual development is necessary to resolve the

legal issues raised by this action.

74. The Corps’ Revised JD is a final agency action

subject to judicial review under the APA. See 5

U.S.C. § 702; 33 C.F.R. §§ 320.1(a)(6) & 331.21.

25

75. The case -is currently justiciable because the

Corps has unlawfully asserted jurisdiction over Plain-

tiffs’ Property.

76. Plaintiffs are currently and continuously in-

jured by the Corps’ unlawful exercise of jurisdiction

because the existence of the Revised JD decreases the

value of their Property and prevents them from exer-

cising their livelihood on their Property.

77. Plaintiffs are currently and continuously in-

jured by the Corps’ unlawful exercise of jurisdiction

because they cannot conduct peat mining on their

property without fear of an enforcement action being

brought against them. The Revised JD increases the

likelihood that Plaintiffs will be subject to an enforce-

ment action should they initiate these activities. Fur-

ther, the Revised JD increases Plaintiffs’ potential

civil and criminal liability should they initiate these

activities.

78. Plaintiffs are currently and continuously in-

jured by the Revised JD because it obligates them to

go through the time consuming and expensive process

of obtaining a Section 404 permit from the Corps be-

fore conducting their proposed activities, and the

Corps has informed Plaintiffs in its correspondence of

the substantial and expensive area wide research pro-

jects that it would require of Plaintiffs’ in an effort to

obtain a Section 404 permit from the Corps.

79. Plaintiffs are, therefore, entitled to a declara-

tory judgment declaring that the Revised JD is invalid

and that the Corps does not have jurisdiction over the

Property pursuant to the CWA.

26

PRAYER FOR RELIEF

Wherefore, Plaintiffs pray for judgment as follows:

1. A declaration that Plaintiffs’ Property is not

subject to the CWA;

2. A declaration that Defendant’s Revised Ap-

proved Jurisdictional Determination is invalid;

3. An injunction enjoining Defendant from exer-

cising jurisdiction over Plaintiffs’ Property;

4. An award of attorney’s fees, to the extent al-

lowed by law pursuant to 28 U.S.C. § 2412(d)(1)(A),

together with expenses, and costs; and,

5. For any such other and further relief that the

Court deems proper under the circumstances of this

case.

DATED: Mar. 13, 2013.

Respectfully submitted,

GRAY, PLANT, MOOTY,

MOOTY & BENNETT, PA.

By /s/ GREGORY R. MERZ

GREGORY R. MERZ (185942)

Nancy Quattlebaum Burke (161044)

500 IDS Center

80 South Eighth Street

Minneapolis, MN 55402

(612) 632-3257 / 3029

Attorneys for Plaintiffs

27

[SEAL OMITTED]

DEPARTMENT OF THE ARMY

ST. PAUL DISTRICT, CORPS OF ENGINEERS

180 FIFTH STREET EAST, SUITE 700

ST. PAUL MINNESOTA 55101-1678

Mar. 15, 2011

REPLY TO

ATTENTION OF

Operations

Regulatory (2007-01914-LSP)

Kevin Pierce, Vice President

Hawkes Peat Company, Inc.

P.O. Box 14111

Grand Forks, North Dakota 58208

Dear Mr. Pierce;

The St. Paul District, Corps of Engineers (Corps) is

in receipt of a permit application from Hawkes Peat

Company regarding a proposal to expand a peat min-

ing operation at the company’s Mercil Site. The pro-

ject is located in the SW \%, and S %, and the NW %,

Sec. 13, T. 157N., R.44W Marshall County, Minnesota.

The proposed project will involve the expansion of

the current peat mining operation near Newfolden,

Minnesota by approximately 150 acres. The project

will involve the construction of drainage ditches, re-

moval and stockpiling of topsoil overburden, mining of

peat over an approximately 20 year time frame and

restoration of the site at the cessation of the mining

operation.

28

The Corps has made a preliminary determination

that this wetland is a water of the United States and is

regulated by the Corps under Section 404 of the Clean

Water Act. The activity as proposed would require

Department of the Army authorization under Section

404.

The Corps’ evaluation of a Section 404 permit

application involves multiple analyses, including

(1) evaluating the proposal’s impacts in accordance

with the National Environmental Policy Act (NEPA)

(33 CFR part 325), (2) determining whether the pro-

posal is contrary to the public interest (33 CFR

§ 320.4), (3) determining whether the proposal com-

plies with the Section 404(b)(1) Guidelines (Guidelines)

(40 CFR part 230). Information about the Corps

permitting process can be obtained online at

The processing of a standard individual permit for

the proposed peat mine will, at a minimum, require an

environmental assessment (EA) to satisfy the re-

quirements of NEPA. An EA is used to determine

whether an Environmental Impact Statement (EIS)

must be prepared to disclose and evaluate the impacts

of your proposal. There are two possible outcomes

from an EA: a finding of no significant impact

(FONSI) or a determination that an EIS will be re-

quired. Due to the nature of the proposed site (rich

fen), the Corps would like to meet with you to discuss

the federal requirements for preparation of environ-

mental documents.

It is our understanding that this project exceeds the

state threshold for a mandatory Environmental As-

29

sessment Worksheet (EAW) and may require the prep-

aration of a state EIS. Therefore, to allow for timely

joint review by both state and federal agencies, we

recommend that your environmental document ad-

dress the requirements of both state and federal pro-

grams.

We would like to meet with you at your earliest con-

venience, so that we may discuss with you the infor-

mation we will need to review your proposal and reach

a permit decision. We would also like to coordinate

with the State of Minnesota so that both agencies

could be represented at the meeting.

Because the proposal involves several state and

federal agencies located in St. Paul, this may be the

most efficient location for a meeting. If you need ad-

ditional information or would like to discuss this pro-

ject further, please contact Larry Puchalski at 218-

444-6381, the Corps’ project manager for the County in

which this proposal is located.

30

Sincerely,

/s/ [ILLEGIBLE]

for Tamara E. Cameron

Chief, Regulatory Branch

Cf:

Kurt Johnson, NRRI

Steve Hofstad, BWSR

Danny Thorstad, Marshall County SWCD

Garry Bennett, MnDNR Waters, Thief River Falls

Julie Jordan, MnDNR Lands and Minerals, Hibbing

Nathan Kestner, MnDNR Region 1 Environmental

Review, Bemidji

Steve Colvin, Unit Director, MnDNR Environmental

Review

Randall Doneen, MnDNR Environmental Review Op-

erations Lead, St. Paul

Jennifer Engstrom, MnDNR Mineland Reclamation

Manager, St. Paul

Jill Clancy, Corps of Engineers, St. Paul

Steve Eggers, Corps of Engineers, St. Paul

31

[SEAL OMITTED]

DEPARTMENT OF THE ARMY

ST. PAUL DISTRICT, CORPS OF ENGINEERS

180 FIFTH STREET EAST, SUITE 700

ST. PAUL MINNESOTA 55101-1678

REPLY TO

ATTENTION OF

Operations

Regulatory (2007-01914-DJS)

Aug. 25, 2011

Mr. Kevin Pierce

Hawkes Peat Company Inc.

P.O. Box 14111

Grand Forks, North Dakota

Dear Mr. Pierce:

This letter is in regard to the permit application you

submitted on behalf of Hawkes Peat Company Inc., for

your proposed peat mining expansion proposal at the

Mercil Property Site. The project location is in Sec-

tion 13, T. 157N., R. 44W., Marshall County, Minnesota.

In order for the Corps to issue a Public Notice (PN)

for your proposed project, our regulations require that

specific information be submitted for it to be a com-

plete application. Items generally necessary for a

complete application are listed in 33CFR 325.1. A

public notice is the primary method by which the

Corps advises interested parties and commenting

agencies of the proposed activity. The notice must

include information sufficient to explain the nature of

the activity and the probable impact on the public

32

interest. Depending on the scale and magnitude of

the proposed project, information sufficient to gener-

ate meaningful comment may vary with each proposal.

Based on the proposal and comments received, addi-

tional resources assessments/studies or analyses eval-

uating the site or nature of the activity and magnitude

of the impacts/effects, individually and cumulatively,

may be required during the permit review process.

One specific area of information that is required in-

cludes the amount of wetland/waters of the U.S. im-

pacted by filling or dredging and the proposed com-

pensatory mitigation for those impacts. Based on the

results of our site visit on June 1, 2011, the wetland

determination and general wetland impact assessment

you submitted in your application is not sufficient to

depict the actual extent, location and type of wetlands

at the site and thus, determine the impacts that may

result from your proposed project.

During our site visit, we observed additional wet-

land areas on the parcel that were not included in your

wetland determination. The determination submitted

in your application utilized the National Wetland In-

ventory (NWI). The NWI has limited accuracy in

several parts of northern Minnesota. Therefore, a

wetland delineation completed in accordance with the

1987 Corps of Engineers Wetland Delineation Manual

and appropriate Regional Supplement (Great Plains

Region) is required.

An understanding of the amount, type and location

of wetlands on the project site and an accurate impact

assessment is fundamental to our review. Based on

the results of the delineation, the overall impacts to

33

aquatic resources may be greater than the 150 acres

identified in your application. The areas of proposed

roads, sedimentation basins, drainage ditches and

stock piles must also be evaluated for the presence of

wetlands. The impact assessment should include the

amount of types of wetland impacts of the project

including all direct impacts, temporary and permanent

(e.g., direct fill and excavation); and all indirect tem-

porary and permanent impacts (e.g., lateral effect as a

result of ditching and wetland conversion). Upon re-

ceipt of this information, we should be able to issue a

public notice of your permit application, in accordance

with our regulations, inviting public and resource

agency comment on your proposal, which would in-

clude the U.S. Environmental Protection Agency and

the U.S. Fish and Wildlife Service.

The following additional information is needed to

facilitate our analysis of the potential effects of your

proposed project:

1. The depth of peat across the site; the proposed

depth of mining and the peat reserves proposed

to be left in place at the end of the operation;

2. A hydrogeologic assessment of the rich fen sys-

tem including the mineral/nutrient composition

and pH of the groundwater; groundwater flow

spatially and vertically; discharge and recharg-

es areas;

3. A functional/resource assessment of the site in-

cluding a vegetation survey and identification of

native fen plant communities across the site;

and

34

4. An inventory of similar wetlands in the general

area(watershed), including some analysis of

their quality—to provide some assessment of

the extent of the loss of the specified amount

and quality of rich fen community relative to the

overall amount and quality of that resource in

the area (watershed).

5. An inventory of rich fen plant communities that

are within sites of High and Outstanding Biodi-

versity Significance in the area (watershed).

6. Information on potential impacts to unmined

upstream portions of this rich fen (i.e. state land

to the west) through disruption of groundwater

flow, lowering of the water tables, and changes

in surface runoff.

7. Details of the proposed road construction and

removal and/or mitigation upon closure of the

operation.

8. Information on the planned site reclamation as

described in your application related to the

amount of peat that will be removed from the

site due to mining and the anticipated wetland

community that will result. Please discuss how

this wetland community would replace the func-

tions lost from the existing fen ecosystem.

9. To facilitate our review of your mitigation pro-

posal, please provide us with any examples of

successful restorations to a fen community with

a similar level of quality.

As discussed with you in March 2011, in order for

the Corps to reach a permit decision, the Corps must

complete multiple analyses which includes evaluating

35

the probable impacts of the project in accordance with

the National Environmental Policy Act; demonstrating

compliance with the Section 404(b)(1) guidelines (al-

ternatives, avoidance and minimization, compensatory

mitigation); evaluating the impacts of the activity on

the public interest; and demonstrating compliance with

other applicable laws, such as the National Historic

Preservation Act and the Endangered Species Act.

The Corps would like to meet with you and your

agent or consultant to further discuss your alterna-

tives analysis, proposed mitigation and the level of

analysis required to comply with the National Envi-

ronmental Policy Act (NEPA) and Section 404 of the

Clean Water Act (CWA). We also recommend coordi-

nating this meeting with the State of Minnesota, so

that both federal and state agencies can be represent-

ed at the meeting. Please contact Mr. Dan Seemon in

our St. Paul office at (651) 290-5380. In any corre-

spondence or inquiries, please refer to the Regulatory

number shown above.

36

Sincerely,

/s/ LLLLEGIBLE]

for Tamara E. Cameron

Chief, Regulatory Branch

Copy furnished:

Kurt Johnson, NRRI

Danny Thorstad, Marshall County SWCD

Garry Bennett, MnDNR Waters, Thief River Falls

Julie Jordan, MnDNR Lands and Minerals, Hibbing

Nathan Kestner, MnDNR Region 1 Environmental

Review, Bemidji

Steve Colvin, Unit Director, MnDNR Environmental

Review

Randall Doneen, MnDNR Environmental 1 Review

Operations Lead, St. Paul

Jennifer Engstrom, MnDNR Mineland Reclamation

Manager, St. Paul

Steve Eggers, Corps of Engineers, St. Paul

37

ADMINISTRATIVE APPEAL DECISION

HAWKES PEAT COMPANY, INC.

JURISDICTIONAL DETERMINATION

FILE NO. MVP 2007-01914-DJS,

ST. PAUL DISTRICT

Oct. 24, 2012

Review Officer(s): Mr. Mike Vissichelli, U.S. Army

Corps of Engineers, North Atlantic Division (Lead)

Ms. Tonya Acuff. U.S. Army Corps of Engineers,

Mississippi Valley Division

Appellant/Applicant: Mr. Kevin Pierce, Marshall

County, Minnesota

Authority: Section 404 of the Clean Water Act

Receipt of Request for Appeal: 6 April 2012

Date of Acceptance of Request for Appeal: 23 April

2012

Approved JD Appeal Conference Call: 24 July 2012

Summary of Appeal Decision: I find that one of Mr.

Pierce’s reasons for appeal have merit. There is in-

sufficient documentation in the record to support the

finding that the wetland on Mr. Pierce’s property,

along with other similarly situated wetlands adjacent

to the tributary, has a significant (more than insub-

stantial or speculative) effect on the chemical, physical,

and biological integrity of the Red River of the North.

The administrative record does not support the Dis-

trict’s determination that a significant nexus exists

between the subject property wetlands and the tradi-

tional navigable water, Red River of the North. The

38

remaining reasons for appeal have been determined

not to have merit.

Background Information:

Mr. Pierce (appellant) is challenging the assertion by

St. Paul District, MVP (the “District”), that the U.S.

Army Corps of Engineers has jurisdiction over his

property. In particular, he alleges that a significant

nexus does not exist between the 155 acres of wetlands

on his property and the Red River of the North, a

navigable water of the United States. The property

(known as the Mercil Site) is located in Section 13,

Township 157 North, Range 44 West, near Newfolden,

Marshall County, Minnesota.

The District contends that the onsite wetlands are

adjacent to a non-Relatively Permanent Water (RPW)

that flows directly or indirectly into a traditional nav-

igable waterway (TNW) which is the Red River of the

North.

The District claims jurisdiction over the wetlands via

significant nexus to the downstream TNW.

Mr. Pierce’s consultant, Mr. Brian Ross with Widseth,

Smith, Nolting & Associates (WSN), provided infor-

mation in December 2010 to the St. Paul District to

establish the lack of Corps jurisdiction of the site’s

wetlands based on the no hydrologic connectivity to a

navigable water of the U.S. There is no question that

the site contains wetlands: the appellant is arguing

that the wetlands are isolated and therefore, not regu-

lated. The approved jurisdictional determination

(AJD) sent to the appellant on 7 February 2012, did

not identify the limits of Corps jurisdiction on the site.

39

The consultant stated that if the site is determined to

be jurisdictional, they would furnish a wetland deline-

ation for Corps review at a later date.

Information Received During the Appeal and its Dispo-

sition:

1. The District provided a copy of the administrative

record (AR), which was reviewed and considered in

this request for appeal. The AR was provided on 3

May 2012.

2. The appellant’s agent provided clarifying infor-

mation at the time of the submittal of the RFA.

3. The District provided additional clarifying infor-

mation via email dated 17 September 2012, regarding

procedures used to calculate the drainage basin size at

the request of the RO.

Evaluation of the Reason for Appeal/Appeal Decision

Findings:

APPEAL REASON #1: There is no basis for jurisdic-

tion because the expansion area wetland’ is not adja-

cent to the ditch or the non-Relatively Permanent

Water. ‘

FINDING: This reason for appeal does not have mer-

it.

ACTION: No action required.

DISCUSSION: The appellant states in the RFA that

“The Corps must show a substantial nexus to the Red

River of the North. In order to do so, the Corps must

' This refers to the project area which is a 155-acre expansion of

the ongoing peat mining operation.

40

first connect the river to the expansion area wetland

by showing that the expansion area wetland is ‘adja-

cent’ to a jurisdictional water” It further states that

“there is no wetland adjacent to a ‘tributary’ or other

jurisdictional water here that would allow for the as-

sertion of jurisdiction.” Additionally, if the expansion

area wetland is to be jurisdictional, it must mean that a

jurisdictional water is ‘neighboring’ the expansion

”

area

The District staff (William Baer and Craig Jarnot)

made a site visit on 1 December, 2011* to the property

of Mr. Jon Hirst who owns the property southeast of

the expansion area. The District observed a non-

jurisdictional, man-made ditch located along the north-

ern border of the property (and adjacent to the larger

wetland complex). Water flow is described as travel-

ing through the excavated ditch and through the

pasture/hayfield. The water then flows into a natural,

meandering channel to the Middle River. The Dis-

trict notes that there were ordinary high water (OHW)

indicators within the natural channel reach. The indi-

cators were natural lines impressed upon the bank,

shelving, changes in the character of the soil, sediment

sorting, leaf litter disturbed or washed away, scour,

deposition, bed and banks, and changes in the plant

community. The rationale for the District’s findings

that the natural channel contained a definable OHW

indicator in accordance with Regulatory Guidance

letter (RGL) 05-05* is supported in the AR. Accord-

® AR page COE000068

* Regulatory Guidance Letter No. 05-05, Subject: Ordinary

High Water Mark (OHWM), 7 December 2005

41

ing to the AR, OHW indicators were found in the man-

made ditch (matted down, bent, or absent vegetation

within the majority of the ditch). However, the AR

also noted that it was difficult to tell if this was due to

water movement, or wildlife grazing/travel activity.

The expansion area wetland is part of a contiguous, ap-

proximately 591l-acre complex of wetlands within the

Snake River drainage area, HUC 0902309, as demar-

cated by the United States Geological Service (USGS).

The District is asserting jurisdiction over the expan-

sion area via adjacency to non-RPW located along the

southern border of the wetland complex. In the Sec-

tion II.B.1.(a) of the JD form, the District identifies

the wetlands as being “adjacent to non-RPWs that flow

directly or indirectly into TNWs”

For CWA purposes, the term “adjacent” means bor-

dering, contiguous, or neighboring as stated in 33

C.F-R. 328.3(c). Revised Rapanos guidance, released

on December 2, 2008‘, further addresses the definition

of adjacency, stating that:

* On June 5, 2007, the U.S. Environmental Protection Agency and

U.S. Army Corps of Engineers (Agencies) issued joint agency

guidance regarding Clean Water Act (CWA) jurisdiction following

the U.S. Supreme Court’s decision in the consolidated cases Ra-

panos v. United States and Carabell v. United States (“Rapanos”).

In response to comments received, the agencies provided revised

guidance on December 2, 2008 (Revised Guidance), which remains

the most current and in effect. It ~~ d be eetvenses at: huinu

e pa.go lReatadl ures! CW AGuL A | CEA OF Following

_Rapanos120208. pdf.

42

[T)he agencies consider wetlands adjacent if one of

the following three criteria are satisfied. First,

there is unbroken surface or shallow sub-surface

connection to jurisdictional waters. Second, they

are physically separated from jurisdictional waters

by man-made barriers, natural rivers berms, beach

dunes and the like, Or third, their proximity to a ju-

risdictional water is reasonably close, supporting

the science-based inference that such wetlands have

an ecological interconnection with jurisdictional

waters.

The District determined that the project area is part of

a larger complex, of which, a portion is adjacent to a

drainage ditch and flows ultimately to the Red River of

the North. The District indicated current drainage

on the site flowed through the man-made ditch,

through the natural stream channel, to the Middle

River, and then to the Red River of the North, a

TNW’ While the man-made ditch along the southern

border of the wetland is not jurisdictional, it provides a

discrete hydrologic connection from the wetland to the

Red River. Using a non-jurisdictional ditch to estab-

lish adjacency to a TNW is supported by the Revised

2008 Guidance‘, which states:

“Ditches (including roadside ditches) excavated

wholly in and draining only upiands and that do not

carry a relatively permanent flow of water are gen-

erally not waters of the United States because they

are not tributaries or they do not have a significant

nexus to downstream traditional navigable waters.

® Support for flow rationale is found in AR Pgs COE000020-22

[Figs 2, 3, and 4}; AR pg COE000142 [site visit)

43

Even when not jurisdictional waters subject to

CWA § 404, these geographic features (e.g., swales,

ditches) may still contribute to a surface hydrologic

connection between an adjacent wetland and a tra-

ditional navigable water.”

This reason for appeal does not have merit because

the District supported in the AR the rationale, in

accordance with applicable law, regulation, and pol-

icy, for stating that the expansion area wetlands are

adjacent to the man-made ditch and non-RPW.

APPEAL REASON #2: The Corps mapped the incor-

rect drainage area for the expansion.

FINDING: This reason for appeal does not have mer-

it.

ACTION: No action required.

DISCUSSION: The appellant states in the RFA that

“The Corps has incorrectly mapped the drainage area

to overestimate the relevant reach and overstate its

claim of any nexus to the Red River of the North.

Figure 4 of the JD shows a much more inclusive drain-

age area for the ravine than actually exists.” The

appellant states that “furthermore, our analysis of the

light detection and ranging (LiDAR) data shows a

drainage divide at the north of the main expansion

area wetland basin. The LiDAR data shows a north-

west to southwest trending trough highlighted by the

1140 contours just north of the drainage divide.

North of the drainage divide, there are surface water

channels within the wetlands that carry the water to

the southeast.” The appellant states in the RFA that

the drainage area is 551 acres, which is less than the 1

44

square mile needed to meet the District’s definition of

tributary “seasonal flow”

In Section III.B.1.i of the JD Form’, the District iden-

tified the drainage area as 2.4 square miles (or 1536

acres) and located within Hydrologic Unit Code (HUC)

09020309, as noted on AR COE000005.

The Corps mapped the drainage area using various

hydrology database tools within ArcToolbox and also

LiDAR data available’

This reason does not have merit because the District

supported in the AR the rationale and methods used in

determining the drainage basin for the project area.

The District used best available information in the de-

termination of the project area’s drainage basin.

While the appellant stated the drainage area is incor-

rect, the District supported their methods of using

LiDAR and associated program tools to calculate the

drainage area.

APPEAL REASON #3: The “relevant reach” is not a

tributary or other jurisdictional water.

FINDING: This reason for appeal does not have mer-

it.

ACTION: No action required.

* AR page COE000006

’ Per a clarifying email to the Review Officer dated 17 September

2012, Tim Smith, Regulatory project manager, described the drain-

age basin mapping techniques used by the Corps in determining

the project drainage area.

45

DISCUSSION: The appellant states in the RFA that

“the Corps identifies a ‘tributary”’ of the Middle River

that is allegedly part of a relevant reach, but nothing

in that location meets the definition of a tributary.

Rather, a grassed swale leads to an erosional] ravine

that incises the upland plain area.”

According to the Guidebook’, “A tributary, as defined

here, is a natural, man-altered, or man-made water

body that carries flow directly or indirectly into a

TNW”

Both the Guidebook and the Revised 2008 Guidance

state that “A tributary is the entire reach of the stream

that is of the same order (ie, from the point of conflu-

ence, where two lower order streams meet to form the

tributary, downtream to the point such tributary en-

ters a higher order stream.)”

The AR identified the relevant reach on a map labeled

Figure 4° The map depicts jurisdiction being asser-

ted through the 1,518 linear-foot natural, unnamed

tributary which flows into the Middle River. The

Middle River ultimately flows into the Red River of

the North (TNW). The relevant reach is described in

* AR page COE000022

* The U.S. Army Corps of Engineers Jurisdictional Determina-

tion Form Instructional Guidebook is used as the U.S. Army

Corps of Engineers Regulatory Program Standard Operating

Procedures for conducting an approved jurisdictional determina-

tion evaluation and the documenting practices to support an ap-

proved jurisdictional determination. 2007 version, Page 40.

° AR page COE000022

46

the AR" as the confluence of two first order streams

which enter the Middle River (a second order stream).

In Section III.B.1.(ii)(c) of the JD form, the District

documented the natural tributary used for establishing

relevant reach as having both a bed and bank, and

OHW indicators which included the features of clear,

natural impressed lines on the bank, changes in the

character of soil, shelving, leaf litter disturbed or

washed away, sediment sorting, and abrupt change in

plant community.

This reason for appeal does not have merit because the

District supported in the AR the rationale for the iden-

tification of the relevant reach used for jurisdiction in

accordance with the Regulations.

APPEAL REASON #4: In the RFA, the appellant

alleges that a significant nexus does not exist between

the expansion area wetland and the Red River of the

North. The following are several specific reasons for

appeal relating to the District’s determination:

APPEAL REASON 4a): There is no significant chem-

ical connection to support nexus to TNW.

FINDING: This reason for appeal has merit.

ACTION: Upon remand, the District shall reconsider

the JD and provide sufficient documentation of a sig-

nificant nexus on the wetlands, including an analysis of

whether the wetlands have more than a speculative or

insubstantial effect on the chemical integrity of the

nearest traditional navigable water (TNW), the Red

River of the North. In doing so, the District shall

" AR page COE000016

47

document the hydrologic, ecologic, and other functions

performed by the tributary and all of its adjacent

wetlands. Specifically, the District will document the

volume, duration, and frequency of water flow from the

wetlands to the TNW.

DISCUSSION: The appellant stated in the RFA that

“the District provides no measureable or quantitative

data on how the expansion area wetlands would affect

the Red River of the North. The Corps only talks in

generalities about the functions of headwater streams

and their importance for nutrient transformation”

In the AR”, the District described the stream chemical

properties as follows:

“(Sjurface flows were not observed in the tributary

by the Corps staff. The contributing area to the

tributary is predominantly comprised of open space

with limited agricultural usage (row crops and hay)

and residential dwellings. Water quality has not

been formally assessed by the MPCA but is ex-

pected to be good based on adjacent land uses,

amounts of wetlands in the area, and buffers from

the tributary.”

The District states in the additional significant nexus

information” that “there is no water quality data for

the unnamed tributary. However, general inferences

about potential pollutants can be made by evaluating

the land use within, and upstream of, the drainage area

of the relevant reach. The contributing area to the

tributary is predominantly comprised of open spaces

% AR page COE000008

* AR page COE000016

48

with limited agricultural usage (row crops and hay)

and residential dwellings. In general, areas with lim-

ited impervious and agricultural use have a better

water quality and are less likely to have water quality

impairment. As a result, the discharges from the

relevant reach would be viewed as having a beneficial

effect on the downstream TNW.”

The 2008 Guidance states “ agencies will con-

sider other relevant factors, including the functions

performed by the tributary together with the wet-

lands, and any adjacent wetlands, which affect down-

stream traditional navigable waters, such as the ca-

pacity to transfer nutrients and organic carbon vital to

support downstream food webs (e.g., macroinverte-

brates present in headwater streams convert carbon in

leaf litter making it available to species downstream)

”

The AR does not contain data supporting flow regime,

volume, duration, or frequency from the wetlands to

the river. Additionally, the District states that

indicators of the transport of energy, materials, and

nutrients were observed during a site visit, but there is

no quantitative date given to support the finding.

The District’s use of the word “suggest”, and “rea-

sonable to conclude” in their descriptions of ground

water influence on tributary flow implies speculation.

There were no specific facts documented that could

verify these assertions.

“ AR page COE000016

49

APPEAL REASON 4(b): There is no significant phys-

ical connection to support nexus to TNW.

FINDING: This reason for appeal has merit.

ACTION: Upon remand, the District shall reconsider

the JD and provide sufficient documentation of a sig-

nificant nexus on the wetlands, including an analysis of

whether the wetlands have more than a speculative or

insubstantial effect on the physical integrity of the

nearest traditional navigable water (TNW), the Red

River of the North. In doing so, the District shall

document the hydrologic functions performed by the

tributary and all of its adjacent wetlands. Specifical-

ly, the District will document the number of flow

events per year, volume, duration, and frequency of

flow events from the wetlands to the TNW.

DISCUSSION: The appellant stated in the RFA that

“the physical connection between the expansion area

wetland, and any wetlands in the relevant reach to the

Red River of the North, is insignificant because the

drainage area is small and outflow is limited by the

basin orientation.” The RFA further states that

there is little to no runoff of water from the wetlands

to the TNW, therefore there is no significant physical

connection of runoff reaching the river.

The District identified a 155-acre forested wetland on

the appellant’s property, and determined that this

wetland area is part of a larger wetland complex that is

adjacent to an unnamed, non-RPW tributary. Per the

50

Rapanos guidance, a wetland adjacent to a non-RPW

requires a significant nexus evaluation”

The 155-acre wetland in question is located within

a larger 550-acre wetland complex. The complex

wetlands are adjacent to a 448 linear-foot, non-

jurisdictional drainage feature that flows approxi-

mately 512 feet into an unnamed tributary of the Mid-

dle River for 1518 linear feet, into the Middle River

which then flows into the Red River of the North.

Ultimately, the water flows through two tributaries,

and 30 or more miles, before entering the TNW.

The AR included documentation regarding precipita-

tion amounts, snowfall amounts, watershed size, drain-

age area, and estimated acre-feet of water storage

within the wetlands, but did not contain any esti-

mated flow events per year. The unnamed tributary

was determined by the District to have a bed and bank

and an OHW indicator in accordance with RGL 05-05°

In regards to the “physical” nexus with the down-

stream TNW, the District described stream surface

flow as follows:

‘© In his concurring opinion in Rapanos, Justice Kennedy con-

cluded that wetlands are waters of the United States “if the wet-

lands, either alone or in combination with similarly situated lands

in the region, significantly affect the chemical, physical and biolog-

ical integrity of other covered waters more readily understood as

‘navigable’” According to the Rapanos guidance, similarly situ-

ated wetlands include all wetlands adjacent to the same tributary,

thus in this case, all wetlands adjacent to the man-made ditch must

be included in the significant nexus evaluation.

© AR page COE000023

51

“The District was only able to observe the tributary

once on December 1, 2011. At that time, there was

no surface flow in the channel but pools were ob-

served sporadically throughout its length. These

observations were made at a severe drought in this

portion of Minnesota and suggest that there is a

groundwater component to the flow in the channel.

To further evaluate flow in the tributary the Dis-

trict utilized its seasonal stream evaluation proto-

col. In general, tributaries that have drainage ar-

eas in excess of one square mile typically meet the

agency’s definition of seasonal flow (continuous flow

for at least three months). The drainage area for

the unnamed tributary was determined to be 2.4

square miles or almost 2.5 times the threshold iden-

tified during the District’s assessment of flow dura-

tion on first and second order tributaries. Given

this information, it is reasonable to conclude that

the tributary has seasonal flow between ice out

and mid-June. Flow may persist longer in years

with normal precipitation of groundwater discharge

is supplying flow to the tributary. However, addi-

tional site investigations would be required to con-

firm this contribution”

Additional tributary flow information was provided in

the supplemental significant nexus attachment” pro-

vided inthe AJD. The District stated that:

“Flow in the unnamed tributary has not been qual-

itatively assessed and the only direct observations

of the channel were made in December of 2011 at

which time there was standing water in pools but no

7 AR page COE000016.

52

continuous flow. In northern Minnesota, it is ex-

pected that for this type of stream channel, velocity

would typically be highest in the spring (March and

April) in response to snowmelt and precipitation.

Stream flow would steadily decline through late

April and May and would be expected to completely

dissipate by sometime in June or July when evapo-

transpiration rates are highest. Flow may be ob-

served periodically outside of this time frame in

response to precipitation events.”

The 2008 Revised Guidance states that “Principle con-

siderations when evaluating significant nexus include

the volume, duration, and frequency of the flow of

water in the tributary and the proximity of the tribu-

tary to a traditional navigable water. In addition to

any available hydrologic information (e.g., gauge data,

flood predictions, historic records of water flow, statis-

tical data, personal observations/records, etc.), the

agencies may reasonably consider certain physical

characteristics of the tributary to characterize its flow,

and thus help inform the determination of whether or

not a significant nexus is present between the tribu-

tary and downstream traditional navigable waters.

Physical indicators of flow may include the presence

and characteristics of a reliable ordinary high water

mark (OHWM) with a channel defined by bed and

banks. Other physical indicators of flow may include

shelving, wracking, water staining, sediment sorting,

and scour.”

While the AR” provides information indicating an

OHW mark for the unnamed tributary exists, it does

'S AR page COE000068

53

not provide sufficient evidence to establish a signifi-

cant nexus that the number of flow events, volume,

duration, and frequency of water flowing through the

tributary are such that it has an appreciable effect on

the TNW. The District stated that flow was present

during the site visit; however, the District could not

definitively identify any type of flow present in the

channel by either precipitation runoff or by ground-

water flow. Additionally, the District stated that ad-

ditional site investigations would be needed to deter-

mine the site’s hydrologic connectivity.

APPEAL REASON 4(c): There is no significant bio-

logicai connection to support nexus to TNW.

FINDING: This reason for appeal has merit.

ACTION: Upon remand, the District shall reconsider

the JD and provide additional documentation of a sig-

nificant nexus on the wetlands, including an analysis of

whether the wetlands have more than a speculative or

insubstantial effect on the biological integrity of the

nearest traditional navigable water (TNW), the Red

River of the North. In doing so, the District shall

document the hydrologic, ecologic, and other functions

performed by the tributary and all of its adjacent

wetlands.

DISCUSSION: The appellant states in the RFA that

“the ravine and the expansion area wetland provide no

fish habitat to support a biological connection. The

ravine is without flowing water during a vast majority

of the year, and in some years there is no flow in the

ravine at all. Furthermore, the Middle River biome, a

bottomland forest, is different from the Mercile wet-

land (expansion area), a rich fen, and so they are not

54

connected biologically or ecologically, and they are

separated by a twenty-foot vertical gradient.”

The AR” included a description of the stream channel

riparian corridor from the wnnamed tributary to the

TNW. However, the water flow regime information

was not sufficient to indicate that a significant nexus

exists. As indicated in Reason 4(b), field assessments

did not provide evidence of water flow.

The 2008 Guidance states “ habitat services

such as providing spawning areas for recreationally or

commercially important species in downstream waters,

and the extent to which the tributary and adjacent

wetlands perform functions related to maintenance of

downstream water quality such as sediment trapping.”

The District also did not indicate if the expansion area

wetland supports any aquatic/wildlife diversity. The

AR” mentioned aquatic species that the Red River of

the North supports, but no mention of species being

located within the tributary or wetland. Additional

information is needed to indicate if the wetland pro-

vides any significant biological/ecological contribution

to the TNW.

CONCLUSION:

In discussing the significant nexus in the Rapanos

memo, Justice Kennedy stated: “The required nexus

must be assessed in terms of the status’s goals and

purposes. Congress enacted the Clean Water Act

(CWA) to ‘restore and maintain the chemical, physi-

® AR page COE000008

” AR page COE000018

55

cal, and/or biological integrity of the Nation’s waters

” Consistent with Justice Kennedy’s in-

struction, EPA and the Corps will apply the significant

nexus standard in a manner that restores and main-

tains any of these three attributes of traditional navi-

gable waters. While the District does not need to

clearly support all three attributes, they do need to

clearly support that the onsite wetlands and tributary

provide more than a speculative or insubstantial effect

on the physical, chemical, or biological integrity of the

Red River of the North. The decision is being re-

manded to document whether a significant nexus does

indeed exist between the onsite wetlands and tributary

and the Red River of the North for any of the attrib-

utes.

Based on the information contained in Reason #4 (a),

(b), and (c), the AR does not provide sufficient docu-

mentation to establish a significant nexus between the

expansion area wetlands and the Red River of the

North based on the information provided.

The District speaks to the overall functions provided

by stream headwaters, the similarly situated wetlands,

and wetlands in general, within the review area.

However, they do not speak to how the functions that

the specific onsite wetland and tributaries have a sig-

nificant nexus that is more than speculative or insub-

stantial on the chemical, physical, or biological integ-

rity of the downstream TNW

For the reasons stated above, I find that the appeal

has merit since the District’s AR does not support its

determination that the subject property contains ju-

risdictional wetlands and waters. I am remanding the

AJD back to the District for reconsideration in light of

56

this decision. The District shall complete these tasks

within 60 days from the date of this decision and upon

completion, provide the Division office and appellant

with its decision document and final AJD.

/s/ [ILLEGIBLE]

for John W. Peabody

Major General, U.S. Army

Commanding