Motion — U.S. Army Corp of Eng'rs v. Hawkes Co., 136 S. Ct. 615 (2015) (No. 15-290)

Supreme Court brief2015

Ask Donna

What actually matters in this document.

Text

No. 15-290

LT ET TE

In The

Supreme Court of the Anited States

UNITED STATES ARMY CORPS OF ENGINEERS,

Petitioner,

v.

HAWKES Co., INC. ET AL.

Respondents.

On Petition For A Writ of Certiorari To

The United States Court Of Appeals

For the Eighth Circuit

MOTION FOR LEAVE TO FILE

AND BRIEF OF AMICUS CURIAE

THE NATIONAL ASSOCIATION OF HOME

BUILDERS IN SUPPORT OF

PETITIONER

THOMAS J. WARD*

NATIONAL ASSOCIATION

OF HOME BUILDERS

1201 15th Street, N.W

Washington, D.C. 20005

(202) 266-8200

tward@nahb.org

* Counsel of Record

‘SA ech ine cali aie ridecinlelmttis

October 6, 2015

NORMAN D. JAMES

FENNEMORE CRAIG, P.C.

2394 E. Camelback Rd,

Suite 600

Phoenix, AZ 85016

(602) 916-5346

1

MOTION OF AMICUS CURIAE

FOR LEAVE TO FILE BRIEF IN SUPPORT

OF PETITIONER, UNITED STATES ARMY

CORPS OF ENGINEERS

Amicus curiae National Association of Home

Builders (“NAHB”) respectfully moves for leave of

the Court to file the accompanying brief under

Supreme Court Rules 21, 33.1, 37.2. Counsel for

both parties received timely notice of amicus curiae’s

intent to file the brief. The Solicitor General has

consented to the filing of this brief and written

consent has been filed with the Clerk of the Court;

counsel for Hawkes Co. takes no position.

NAHB has been involved with litigation concerning

whether Clean Water Act jurisdictional

determinations are reviewable under’ the

Administrative Procedures Act. In addition, as a

representative of land developers, NAHB brings

considerate expertise to the issue before the Court.

A large part of building homes consists of obtaining

and preparing the land for construction.' That land

often contains “waters of the United States,” as the

federal government has defined and interpreted that

term. See 33 C.F.R. § 328.3(a); 40 C.F.R. § 122.2.

Often land developers must alter those “waters” to

ensure that their community makes the best use of

1 NAHB estimates that the cost of the “finished” lot

averages 19 percent of the sales price of a home. Heather

Taylor, Cost of Constructing A Homes, Special Studies (Jan. 2,

2014), http://www.nahbclassic.org/generic.aspx?section] D=734

&genericContent] D=221388&channelID=311 (last visited

Sept. 30, 2015)

ll

the land in accordance with local and state zoning

and land use requirements.

Unfortunately, property owners cannot simply look

at their property to determine where “waters of the

United States” are present. They must hire

consultants — engineers, scientists, and regulatory

and compliance specialists, who assist the

developers with the permitting process. Those

specialists will often develop a “jurisdictional

determination” and submit it to the Corps of

Engineers for approval. It is common for the

developer's consultants and the Corps to disagree on

the Corps’ jurisdiction. The amount of jurisdiction

the Corps asserts over a project will affect whether

and how the development proceeds, and sometimes

results in a community not being built.

In its Petition for Review, the government cited an

Endangered Species Act case, National Ass'n of

Home Builders v. Norton, 415 F.3d 8 (D.C. Cir.

2005), to support its belief that approved

jurisdictional determinations are not reviewable

under the Administrative Procedure Act. In the

attached brief, amicus curiae provides the Court

with an analysis of a different NAHB case that is

more analogous to this matter: National Ass’n of

Home Builders v. United States Army Corps of

Engineers, 417 F.3d 1272 (D.C. Cir. 2005).

In addition, NAHB provides an example of situation

where the government conducted a jurisdictional

determination on its own accord for the purpose of

later asserting jurisdiction over thousands of square

miles of land. Incredibly, even in that situation, the

il

go ernment argued that the determination was not

a “final agency action” under the APA.

Given the nationwide importance of the issue

presented to our members, NAHB agrees with the

government that the issue presented in this case is

worthy of this Court’s review. However, NAHB

believes that approved jurisdictional determinations

should be subject to judicial review. Therefore,

amicus curie respectfully requests that the Court

grant leave to file this brief.

i

TABLE OF CONTENTS

Page(s)

ee I onciniconpctcniesnententindenenianwcnhiuniie i

TARE OF AUT ERIE BEBO cvccccccccccccccccccescscesesees ii-il

TABLE OF APPENDICES .................ccccccccseessseeeeees iV

STATEMENT OF INTEREST OF

EE iiepisietteinncedinceseinnnenesctinninisnitnns l

SUMMARY OF ARGUMENT.........0.0... eee 2

IEEE Srentsttniatintnsinpsediemnncianiiiiuntedennitisietandiels 3

1. JURISDICTIONAL DETERMINATIONS

IMPACT LAND DEVELOPERS’ DAY-TO-

ee Se icititcniiiinanigutansnansnsicaingiiineinntin 3

Il. JURISDICTIONAL DETERMINATIONS

CAN PROVIDES THE GOVERNMENT WITH

AUTHORITY TO CONTROL THOUSANDS

OF ACRES OF PRIVATE PROPERTY ........... 6

ee Pccrecciccnsensnacennnnsnsentgansisenteivagenitieniinsnis 12

7]

TABLE OF AUTHORITIES

Page(s)

CASES

Bennett v. Spear, 520 U.S. 154 (1997)........0....00...... 6

National Ass’n of Home Builders v. U.S. E.P.A.,

731 F.Supp.2d 50 (D.D.C. 2010), aff'd on other

grounds, sub nom. National Ass’n of Home

Builders v. E.P.A., 667 F.3d 6

a Ey GNI Giichidhecsinatiianithapliseninnbimininbeccanninianenine 1]

National Ass'n of Home Builders v. Norton,

GUE FBG B D.C. Caer. BGBD ..cccccccccccecccccceccccecssee 2,3

National Ass’n of Home Builders v. United States

Army Corps of Engineers, 417 F.3d 1272

I A a ne 2, 4, 5, 6, 12

National Ass’n of Home Builders v. United States

Army Corps of Engineers, 297 F.Supp.2d 74

ERR APT Se aE La eee 4

Rapanos v. United States, 547 U.S. 715 (2006) .. 3, 8

Sackett v. United States Envtl. Prot. Agency,

566 US. ---, 132 S.Ct. 13867 (2012) .....00.0 0. 7,11

STATUTORY AND REGULATORY

PROVISIONS

I. ctssichiotnnnciaemssincemnssinnteensiocial 11

ill

TABLE OF AUTHORITIES (cont.)

Page(s)

I ios aes ccinictsnicetsnihiseeneaimaaapiainetigl 3,11

re a iccccrtesicninoseieeninennscrstienaitesibeatinemn 3

I siecccsernserssneiciniisisaienenancnssinuisiauanbicss 3

er is ccinriccirneistcessesesientirionnncensisnsinetoninnen 8

8 EERE anes nen eNe ECT aT 11

Ts staceraemnansdiateeitanenteiinninenianbiaines 3

ITE incaisitsiscnciencepttebenbnaheiditenstuninaiinnies 11

OTHER

U S EPA, Memorandum of Agreement Between

the Department of the Army and the

Environmental Protection Agency Concerning

the Determination of the Section 404 Program

and the Application of the Exemptions Under

Section 404(F) of the Clean Water Act,

http://water.epa.gov/lawsregs/guidance/wetlands/

AERP a ER ER AED Beal Pete OS SAARC EUS ee 9-10

IV

TABLE OF APPENDICES

Page(s)

APPENDIX A -— Letter from Benjamin H.

Grumbles, Assistant Administrator to The

Honorable John Paul Woodley, Jr., Assistant

Secretary of the Army, Civil Works (Dec.

APPENDIX B — Memorandum from John Paul

Woodley, Jr., Assistant Secretary of the Army,

Civil Works for Director of Civil Works (Sept.

ESE ERE eee EE ARS IN 4a

APPENDIX C — E-mail from Colonel Thomas

H Magness, SPL, U.S. Army Corps of Engineers

to Steven L Stockton, HQ02, U.S. Army Corps

of Engineers (June 30, 2008 4:53 PM) ............... 6a

APPENDIX D ~ E-mail from Chip R Smith, ASA,

U.S. Army Corps of Engineers, Civil Works to

Mark D Cohen, SPL, U.S. Army Corps of

Engineers (June 13, 2008 8:30:01) ..................... 8a

APPENDIX E — Memorandum from Colonel

Thomas H. Magness, U.S. Army Commander for

the Record (May 23, 2008) .....................ccceeeeeees 10a

1

STATEMENT OF INTEREST OF

AMICUS CURIAE!

The National Association of Home Builders (NAHB)

is a Washington, D.C.-based trade association whose

mission is to enhance the climate for housing and

the building industry. Chief among NAHB’s goals is

providing and expanding opportunities for all people

to have safe, decent, and affordable housing.

Founded in 1942, NAHB is a federation of more than

800 state and local associations. About one-third of

NAHB’s approximately 140,000 members are home

builders or remodelers, and they constitute 80% of

all homes constructed in the United States.

As presented in the attached motion, the cost of land

development can affect whether a homebuilder can

develop a viable community. Furthermore, the

presence of “waters of the United States” on a

homebuilders’ property affect the cost preparing the

land. Thus, NAHB’s members believe it is vital for

them to be able to challenge the government's

jurisdiction over their private property in a court of

law without first incurring tens (or hundreds) of

thousands of dollars in costs and experiencing

substantial project delay in order to contest

jurisdiction.

l Counsel of record for all parties received notice at least

10 days prior to the due date of the amicus curiae's intention

to file this brief. No counsel for a party authored this brief in

whole or in part, and no counsel or party made a monetary

contribution intended to fund the preparation or submission of

this brief. No person other than NAHB, its members, or its

counsel made a monetary contribution to its preparation or

submission.

2

SUMMARY OF ARGUMENT

In its Petition for Review, the government cites an

Endangered Species Act case, National Ass'n of

Home Builders v. Norton, 415 F.3d 8 (D.C. Cir.

2005), to support its argument that approved

jurisdictional determinations are not reviewable

under the Administrative Procedure Act. Amicus

curiae summarizes a different NAHB case that is

analogous to the matter before the Court and

supports the argument that jurisdictional

determinations are judicially reviewable. National

Ass'n of Home Builders v. United States Army Corps

of Engineers, 417 F.3d 1272 (D.C. Cir. 2005).

Additionally, NAHB provides an example of

situation where the government conducted a

jurisdictional determination on its own accord for

the purpose of later asserting jurisdiction over

thousands of square miles of land. Incredibly, even

in that situation, the government argued that the

determination was not a “final agency action” under

the APA.

3

ARGUMENT

I. JURISDICTIONAL DETERMINATIONS

IMPACT LAND DEVELOPERS’ DAY-TO-

DAY BUSINESS.

When the government provides a landowner with an

“approved jurisdictional determination,” it informs

the landowner where “waters of the United States”

are present and where they are not. See 33 C.F.R.

§§ 328.3(a), 331.2 (defining “waters of the United

States and “approved jurisdictional determination”).

With respect to Clean Water Act (“CWA”) section

404, 33 U.S.C. § 1344(a), that landowner may place

dredged or fill material on those portions of her

property that do not contain “waters of the United

States” free from federal governmental interference.

Often, land developers will avoid the “waters of the

United States” completely and only work in the

“upland” areas. They do so because the time and

expense of obtaining a section 404 permit can

drastically alter the expenses of a project.?

The government cites National Ass’n of Home

Builders v. Norton, 415 F.3d 8 (D.C. Cir. 2005) to

support its contention that approved jurisdictional

determinations are not “final agency action” under

the judicial review section of the Administrative

Procedure Act (“APA”), 5 U.S.C. § 704. Pet. for Writ

2 “The average applicant for an individual permit spends

788 days and $271,596 in completing the process, and the

average applicant for a nationwide permit spends 313 days and

$28,915—not counting costs of mitigation or design changes.”

Rapanos v. United States, 547 U.S. 715, 721 (2006) (plurality

opinion).

4

of Cert. at 16. That case involved a challenge to a

survey protocol — a guidance document intended to

assist landowners in avoiding “take” of a rare

butterfly. A more analogous case to the case before

the court, however, is National Ass'n of Home

Builders v. United States Army Corps of Engineers,

417 F.3d 1272 (D.C. Cir. 2005) (hereinafter NAHB v.

Corps). In that case, the D.C. Circuit held that the

APA allows judicial review of a Corps’ CWA program

that affects the manner in which private landowners

may use their property.

In NAHB v. Corps, NAHB challenged a suite of

Corps’ issued general permits known as nationwide

permits (“NWPs’). NWPs “authorize certain

discharges of dredged and fill material into [waters

of the United States] without any detailed, project-

specific review by the Corps’ engineers.” NAHB uv.

Corps, 417 F.3d 1279-80. When a landowner who

needs to discharge dredge or fill material cannot

utilize one of the Corps’ NWPs, she must obtain an

individual permit before discharging pollutants into

waters of the United States. Jd. at 1275.

The District Court held that the NWPs were not

final agency action. It reasoned that the NWP’s

were just “the first step of a larger permitting

process that enables the agency to streamline the

overall process ” National Ass'n of Home

Builders v. United States Army Corps of Engineers,

297 F.Supp.2d 74, 80 (D.D.C. 2003). The Court of

Appeals disagreed. It explained that the impact of

the NWPs on a builder’s’ “day-to-day business” was

not hard to understand.

5)

While some builders can discharge

immediately, others cannot. If fa

builder’s] planned activities do not

meet the applicable NWP’s conditions

and thresholds, they have two options.

They can either put their projects on

hold and run the Corps’ individual-

permit gauntlet or modify the projects

to meet the conditions. Either way,

through increased delay or project

modification, the NWPs directly affect

investment and project development

choices of those whose activities are

subject to the CWA.

NAHB v. Corps, 417 F.3d at 1280.

The impacts of jurisdictional determinations on

builders are very similar to the impacts of the

NWPs. A builder who has obtained an approved

jurisdictional determination providing that no

“waters of the United States” are present on her

property can place dredge or fill material on the

property free from federal governmental

interference.

In contrast, if a Corps’ jurisdictional determination

provides that “waters of the United States” are

present, and the landowner needs to place dredge or

fill material in those areas, she can “either put [her]

project on hold” and try to obtain a costly (and time

consuming) CWA permit, or modify her project to

3 There are, of course, other federal statutes that may

affect land use (i.e. the Endangered Species Act), but they are

not relevant to this example.

6

avoid the jurisdictional waters. Either way,

jurisdictional determinations, like NWPs, “affect

investment and project development choices” and

are therefore “final agency actions.” Jd.; See also

Bennett v. Spear, 520 U.S. 154, 169 (1997) (providing

that while a biological opinion in theory serves an

“advisory function,’ in reality it has a powerful

coercive effect gp

NAHB v. Corps illustrates how Corps’ decisions that

occur before issuance (or denial) of a permit impact

the manner in which landowners may use their

property Therefore, NAHB respectfully request the

Court grant certiorari and affirm the Eighth

Circuit’s holding that CWA jurisdictional

determinations are reviewable under the APA.

II. JURISDICTIONAL DETERMINATIONS

CAN PROVIDE THE GOVERNMENT

WITH AUTHORITY TO CONTROL

THOUSANDS OF ACRES OF PRIVATE

PROPERTY.

In its Pet. for Writ of Cert., the government explains,

“because jurisdictional determinations (unlike EPA

compliance orders) are typically provided to persons

who request them, they are not easily used “to

enable the strong-arming of regulated parties.” Pet.

for Writ of Cert. at 19. While it is true that the

government’ generally conducts jurisdictional

determinations for those who request them, that is

not always the case. When the government conducts

a jurisdictional determination on its own, it is later

able to assert control over large areas of land, which

can affect thousands of private property owners.

Yet, even in such situations, the government will

7

argue that it has not altered any rights or

obligations, or that no legal consequences flow from

such a determination. When this occurs, without

any protections for the regulated public, the “strong

arming” the Court was concerned with in Sackett v.

United States Environmental Protection Agency, 566

U.S. ---, 132 S.Ct. 1367 (2012), is still in existence. The

government’s jurisdictional determination that two

reaches of the Santa Cruz River in Arizona ure

“traditionally navigable waters” provides a perfect

example of such a situation. 4

In May 2008, Colonel Magness, U.S. Army Corps of

Engineers, issued a determination that two reaches

of the Santa Cruz River are “traditionally navigable

waters” (hereinafter the “TNW Determination”).

App. 10a. The government characterized this as a

Clean Water Act jurisdictional determination.

The Santa Cruz River, from the 1800's to today is a

discontinuous stream, normally flowing only in

response to significant rainfall or discharges of

effluent from regional wastewater treatment plants

near Nogales and Tucson, in Southern Arizona. One

of the two TNW reaches is only 22 miles long and the

other is 32 miles long and begins at the discharge

outlet of Pima County’s Roger Road wastewater

treatment plant in Tuscon, AZ. App. 10a-16a.

4 The Corps TNW Determination became the subject of

a Congressional investigation by the Committees on

Oversight and Government Reform and on Transportation

and Infrastructure. The Committees subpoenaed

documents and, ultimately, issued a report on December

16, 2008. NAHB has provided some of the subpoenaed

documents in its Appendix.

8

However, the Santa Cruz River watershed covers

over 10% of Arizona, contains over 8,000 square

miles, and includes the Tucson Metropolitan area —

the second largest population center in Arizona.

The TNW _ Determination was “stand-alone,”

meaning it is not associated with a request from a

property owner or permit application. See App. 4a;

see also 33 C.F.R. §329.14. Instead, the Colonel made

this determination because, in his words, “[wl]e

cannot determine jurisdiction [in the Santa Cruz

River watershed] without first identifying the

nearest downstream TNW” App. 6a. Recognizing

the vital importance of TNWs to CWA jurisdiction

following this Court’s decision in Rapanos v. United

States, 547 U.S. 715 (2006), Colonel Magness issued

the stand-alone TNW Determination “to support

some of the pending JDs” within the watershed.

Id.

In June 2008, the Assistant Secretary of the Army

for Civil Works suspended the TNW Determination

pending a 60-day review by Corps’ Headquarters.

During the review period, Colonel Magness and his

staff emphasized the importance of the Corps’ TNW

Determination for obtaining jurisdiction to regulate

tributaries within the Santa Cruz River watershed.

According to the Colonel, “without this TNW, the

closest TNW may be the Colorado River, several

hundred miles away. Using the [Colorado River] as

a basis for JDs would likely mean that we would lose

most of our jurisdiction in the state.” App. 7a.

Another Corps staff member explained that without

the Corps’ Stand Alone TNW Determination, the

Corps would lose CWA jurisdiction over much of the

Santa Cruz River watershed:

9

If these reaches are not TNWs, there

would be a profound effect on our

ability to regulate tributaries to the

Santa Cruz River. While the Santa

Cruz would still likely be an RPW, the

nearest TNW to the 8,600 square mile

Santa Cruz River Watershed Basin

would be 300 river miles away (the

Colorado River) from the Pima County

line. An inability to find a significant

nexus for these tributaries would lead

to a wide loss of jurisdiction and

ultimately pose serious water quality

concerns for the area.

App. 9a. Thus, the Corps made the TNW

Determination because without it, the Corps would

lose control over thousands of acres of private

property.

Corps Headquarters never completed its 60-day

internal review of the TNW _ Determination.

Instead, in August 2008, EPA Headquarters

declared the Santa Cruz River a “special case”

under the U.S EPA, Memorandum of Agreement

Between the Department of the Army and the

Environmental Protection Agency Concerning the

Determination of the Section 404 Program and the

Application of the Exemptions Under Section 404(F)

of the Clean Water Act [hereinafter the MOU],

available at http://water.epa.gov/lawsregs/guidance/

wetlands/404f.cfm. A special case is “a circumstance

where EPA makes the final determination of the

geographic jurisdictional scope of waters of the

United States for purposes of section 404” of the

CWA. Id. According to the MOU, “[c]ase-specific

10

determinations made pursuant to” it are “binding

on the Government” — both EPA and the Corps —

“and represent the Government's position in any

subsequent Federal action or litigation regarding

the case.” Id.

The EPA concluded its review on December 3, 2008,

affirming the Corps TNW Determination. App. la.

In affirming the TNW Determination, the

EPA described the regulatory and practical

implications for landowners within the Santa Cruz

River watershed:

I have asked EPA Region 9 to begin

immediately to implement _ this

decision and request that you also

transmit this determination to the Los

Angeles District so it may be used by

the Corps to complete pending and

future jurisdictional determinations

for the Santa Cruz River watershed.

App. 2a (emphasis added).

Thus, the government made an immediately binding

determination that two reaches of the Santa Cruz

River were “traditionally navigable waters.” A

decision it made i) so it could assert control over desert

washes and other “tributaries” within 8,600 square-

miles and ii) that would impact the rights of thousands

of private land owners. Yet, neither those people who

own land that contains tributaries of the Santa Cruz

River, or those who own land bordering the Santa

Cruz itself were notified of the determination.5 In

5 Pursuant to the Corps regulations, landowners have a

right to an administrative appeal of approved jurisdictional

11

other words, all of this occurred “behind closed doors.”

NAHB and its affiliates in Arizona disagreed with the

analysis used to support the TNW Determination and

with the process the government used to finalize it.

With respect to the process, NAHB believed that a

binding determination that affects millions of acres

and thousands of private landowners must be

accomplished in accordance with the notice and

comment procedures set forth in the APA. 5 U.S.C. §

553. Therefore, NAHB filed its initial lawsuit

challenging the EPA’s and Corps’ Santa Cruz TNW

determination in 2009.

Without answering NAHB’s_ Complaint, the

government filed a motion to dismiss. Among its

arguments, the government asserted the TNW

Determination is not a “final agency action” under the

APA. 5 U.S.C. § 704. Specifically, the government

explained that the TNW Determination was not a

“final agency action” until used in an enforcement

action or incorporated into a permit decision.®

Therefore, according to the government when it makes

a “binding” decision asserting authority over millions

of acres of land, affecting thousands of private citizens

in a major metropolitan area, none of those citizens

determinations. 33 C.F.R. § 331.1(a). The regulations also

explain that the Corps will notify affected parties of their right

to appeal. 33 C.F.R.§ 331.4.

6 Under the line of cases overturned by Sackett, 566 U.S.

---, 132 S.Ct. 1367 (2012), the District Court ruled that the

Clean Water Act precluded review of the TNW Determination.

National Ass'n of Home Builders v. U.S. E.P.A., 731 F. Supp.

2d 50, 56 (D.D.C. 2010), aff'd on other grounds, sub nom.

National Ass'n of Home Builders v. E.P_A., 667 F.3d 6 (D.C. Cir.

2011).

12

can seek judicial review of that decision until one of

them applies for and completes the Corps’ costly and

time consuming permitting process. Furthermore,

depending on the type of permit sought, the landowner

may have to complete an administrative appeal before

obtaining judicial review See NAHB v. Corps, 417

F.3d at 1275.

Amicus provides this example of a stand-alone

jurisdiction determination to illustrate how the issue

in the case before the Court may affect thousands of

people without them evening knowing it. Amicus

requests that the Court grant certiorari in this matter

and explain to the government that when it asserts

jurisdiction over private property, those landowners

have a right to contest such assertion in court.

CONCLUSION

Whether a landowner may obtain judicial review of a

CWA approved jurisdictional! determination is of vital

importance to the home building industry. Therefore,

NAHB respectfully requests that the Court grant

certiorari in this matter and affirm the decision of the

Court of Appeals for the Eighth Circuit.

13

DATED: October 6, 2015

Respectfully submitted,

NORMAN D. JAMES THOMAS J. WARD*

FENNEMORE CRAIG, P.C. NATIONAL ASSOCIATION OF

2394 E. Camelback Rd, HOME BUILDERS

Suite 600 1201 15th Street, N.W

Phoenix, AZ 85016 Washington, D.C. 20005

(602) 916-5346 (202) 266-8200

tward@nahb.org

*Counsel of Record

APPENDIX

l

APPENDIX

TABLE OF CONTENTS

Page(s)

APPENDIX A — Letter from Benjamin H.

Grumbles, Assistant Administrator to The

Honorable John Paul Woodley, Jr., Assistant

Secretary of the Army, Civil Works (Dec.

RET TERR RC aat Steer eee Reamer la

APPENDIX B — Memorandum from John Paul

Woodley, Jr., Assistant Secretary of the Army.

Civil Works for Director of Civil Works (Sept.

RESET ea Ec neve vice nnn oR 4a

APPENDIX C — E-mail from Colonel Thomas

H Magness, SPL, U.S. Army Corps of Engineers

to Steven L Stockton, HQ02, U.S. Army Corps

of Engineers (June 30, 2008 4:53 PM) ............... 6a

APPENDIX D — E-mail from Chip R Smith, ASA,

U.S. Army Corps of Engineers, Civil Works to

Mark D Cohen, SPL, U.S. Army Corps of

Engineers (June 13, 2008 8:30:01) ...........0......... 8a

APPENDIX E — Memorandum from Colonel

Thomas H. Magness, U.S. Army Commander for

the Record (May 23, 2008).....................:cccceeees 10a

APPENDIX A

la

UNITED STATES ENVIRONMENTAL

PROTECTION AGENCY

WASHINGTON DC 20460

OFFICE OF

DEC 3 2008 WATER

The Honorable John Paul Woodley, Jr.

Assistant Secretary of the Army (Civil Works)

Department of the Army

108 Army Pentagon

Washington DC 20310

Dear Secretary Woodley:

In August 2008, I designated the Santa Cruz and

Los Angeles Rivers as special case pursuant to the

1989 Army/EPA Memorandum of Agreement

Concerning the Determination of the Geographic

Jurisdiction of the Section 404 Program and the

Application of the Exemptions under Section 404(f)

of the CWA. EPA continues to evaluate relevant

information and to coordinate with the Los Angeles

District and others on this matter.

xk

EPA’s determination to affirm the District’s

designation of the two reaches as TNW’’s is based on

several key considerations, including:

e Evidence that the physical characteristics

with the Study Reaches indicate a

susceptibility for use in the future for

2a

commercial navigation, including

commercial water-borne reaction. For

example, river-width, when combined with

flow data from relevant flow gauges, shows

sufficient levels of flow in the Study

Reaches to support navigation.

e Evidence that the Study Reaches, or

portions thereof, have been navigated.

e Evidence of the likelihood of future

commercial navigation use, including two

ongoing Corps of Engineers river

restoration feasibility studies.

e Visual inspection by EPA during site visits

to Study Reaches.

*x***

I have asked EPA Region 9 to begin immediately

to implement this decision and request that you also

to transmit this determination to the Los Angeles

District so it may be used by the Corps to complete

pending and future jurisdictional determinations for

the Santa Cruz River watershed.

In consultation with the Los Angeles District, EPA

is proceeding with its geographic jurisdictional

analysis of the remainder of the Santa Cruz and the

Los Angeles River and will make decisions for both

when our review is complete. I appreciate the Corps

assistance in this important evaluation. Please feel

free to call me or have your staff contact my Chief of

Staff, Greg Peck, with any questions regarding this

matter.

3a

/s/ Grumbles

Benjamin H. Grumbles

Assistant Administrator

cc: Wayne Nastri, Regional Administrator, EPA

Region 9

Stephen A. Owens, Director, ADEQ

APPENDIX B

4a

DEPARTMENT OF THE ARMY

OFFICE OF THE ASSISTANT SECRETARY

CIVIL WORKS

108 ARMY PENTAGON

WASHINGTON DC 20310-0108

SEP 24 2008

MEMORANDUM FOR DIRECTOR OF CIVIL

WORKS

SUBJECT: Traditional Navigable Water

Determinations Under the Clean Water Act

Effective immediately, the determination that a

specific water body is a “traditional navigable water”

(TNW) will be made by the Division Commander.

Such TNW determinations will be based on a formal

report of findings prepared by the District Engineer,

accompanied by a legal opinion of the District

counsel, and forwarded to the Division Commander

for final decision. Every formal report of findings

will be based substantially on applicable portions of

the format described in paragraph (c) of 33 C.F.R.

§329.14.

This directive applies to stand-alone TNW

determinations for watercourses where the District

Engineer proposes an upstream and downstream

limit of navigability. This directive does not apply to

TNW determinations associated with approved

jurisdictional determination(s) or authorizations for

the discharge of dredged or fill material into all

waters of the United States, including wetlands. The

purpose of this directive is to require additional

technical review and_ oversight of TNW

5a

determinations affecting watercourses and/or

significant aquatic resources. This review will

establish whether or not the TNW determination is

supported by the Clean Water Act, the agency’s

implementing regulations, relevant case law. and

existing guidance.

This directive shall remain in effect until

rescinded in writing.

/s/ John Paul Woodley, Jr.

John Paul Woodley, Jr.

Assistant Secretary of the Army

(Civil Works)

APPENDIX C

6a

From: Magness, Thomas H COL SPL

Sent: Monday, June 30, 2008 4:53 PM

To: Stockton, Steven L HQO2

Cc: McMahon, John R BG SPD; Lang, Lawrence

A HQ02; Benavides, Ada HQO2; Moyer, Jennifer A

HQO02; Hannon, James R MVD

Subject: Re: Santa_Cruz_River_TNW_

Determination (UNCLASSIFIED)

Sir

Here are a few points on this:

-- We have a backing of nearly 400 JDs in the LA

District. We are getting crushed under the weight of

these post-Rapanos decisions. We cannot determine

jurisdiction without first identifying the nearest

downstream TNW This decision in Arizona was to

determine the nearest TNW to support some of the

pending JDs. We made these TNW calls on the Gila

River and are now moving forward to look at

associated JDs while similarly moving out on

examinations of other rivers.

-- While Juridsiction [sic] is a complicated measure

of chemical, biological, and physical impacts, the

TNW determination is mostly a function of water

quantity. In other words, does the water body have

sufficient flow to support navigation? I am confident

that we had the evidence and data to support this

case.

Ta

-- On the Gila River, we identified two reaches with

sufficient flow to support navigation. We deployed

scientists to verify, looked at recent and historical

flow data, and collected photographic evidence to

verify these conditions.

-- In making this decision, we have stayed in contact

with HQ Regulatory folks and with other districts

making similar decisions, especially here in the

West. The flow in these reaches is sufficient year-

round to support our navigability decision. While it

is mostly, but not exclusively. effluent from a

wastewater treatment plant, we believe that case

law does allow for this source in decisions of

navigability

-- While not a factor in this decision, without this

TNW, the closest TNW may be the Colorado River,

several hundred miles away. Using the CR as a basis

for JDs would likely mean that we would lose most

of our jurisdiction in the state. I do not believe this

was the intent of the Rapanos decision, even under

the most conservative interpretations.

As you know sir, we are pinched on both ends on this.

In California, we are taking heat from

environmental groups who did not think we made

enough of the LA River as a TNW In Arizona, we

are hearing from developers who don’t agree with

what we have called TNWs.

APPENDIX D

8a

Santa Cruz River TNW Data

From: Smith, Chip R Mr ASA (CW) <email

redacted>

To: Blaine, Marjorie E SPL

Ce: Troxel, Tiffany A SPL; Lester, Cynthia J SPL;

Castanon, David J SPL; Young, Anne M Ms OGC

<email redacted>; Moyer, Jennifer A HQO2;

McLaughlin, Kimberly S HQ02

Sent: Fri Jun 13 08:30:01 2008

Subject: Re: ASA Inquiry on the Santa Cruz River

TNW Determination

Good stuff. How long is the river and what is the

length of the two sections. If these reaches are NOT

TNWs what is the effect on the landscape in terms

of jurisdiction over tribs and wetlands?

Chip

xk

From: Cohen, Mark D SPL <email redacted>

Sent: Friday, June 13, 2008 5:55 PM

To: Smith, Chip R Mr ASA (CW)

Ce: Castanon, David J SPL; Blaine, Marjorie E

SPL; Lester, Cynthia J SPL

Subject: Re: ASA Inquiry on the Santa Cruz River

TNW Determination

Chip,

In response to your questions this morning:

The river is approximately 225 miles long. Reach A

is 22 miles and reach B is 32 miles in length.

9a

If these reaches are not TNWs, there would be a

profound effect on our ability to regulate tributaries

to the Santa Cruz River. While the Santa Cruz

would still likely be an RPW, the nearest TNW to the

8,600 square mile Santa Cruz River Watershed

Basin would be 300 river miles away (the Colorado

River) from the Pima County line. An inability to

find a significant nexus for these tributaries would

lead to a wide loss of jurisdiction and ultimately pose

serious water quality concerns for the area.

Tributaries to the Santa Cruz include many

perennial and intermittent streams, with wetlands

and other high value resources (including Sabino

Canyon, Davison Canyon, and Cienega Creek).

Let me know if you need anything else.

Thanks,

Mark

APPENDIX E

10a

CESPL-RG-A 23 May 2008

MEMORANDUM FOR THE RECORD

SUBJECT: Determination of Two Reaches of the

Santa Cruz River as Traditional Navigable Waters

(TNW)

umm

The Corps’ Los Angeles District has determined that

two reaches of the Santa Cruz River, Study Reach A

from Tubac gage station (USGS # 09481740) to the

Continental gage station (USGS #09482000) and

Study Reach B from Roger Road wastewater

treatment plant (WWTP) downstream to the

Pima/Pinal County line, Arizona, as shown in

Exhibit A, are TNWs (collectively, referred to as the

“Study Reaches”). This determination is consistent

with the Clean Water Act (CWA), the agencies’

regulations (including 33 C.F.R.§ 328.3), relevant

case law, and existing guidance, including the June

5, 2007 joint U.S. Environmental Protection Agency

and Department of the Army legal memorandum

entitled Clean Water Act Jurisdiction Following the

U.S. Supreme Court's Decision in Rapanos v. United

States & Carabell v. United States (Rapanos

Guidance) and Appendix D of the U.S. Army Corps

of Engineers Jurisdictional Determination Form

Instructional Guidebook issued June 5, 2007

(Appendix D).

lla

Background

The Santa Cruz River originates in Arizona, flows

south into Mexico, and then flows north again into

Arizona. It is the primary river which flows from

Nogales, Mexico through Tucson, Arizona, and a

number of Indian reservations, including Tohono

O’odham Nation (TON), to the Gila River near

Phoenix. The watershed of the Santa Cruz River is

approximately 8,600 square miles. Until the late

nineteenth century, the Santa Cruz River was

primarily a perennial watercourse that served the

region's agricultural needs until a quickly

developing industrial society began to tap the river's

subsurface flow (Exhibit B).

The Upper Santa Cruz River Valley, located between

Nogales, Arizona on the US-Mexico border, and

extending 65 miles north to the major urban area of

Tucson, has a long history of European settlement

spanning three centuries. Prior to the discovery of

the area by European explorers, the area was

inhabited for thousands of years by aboriginal native

peoples. The Santa Cruz River has long been an

important corridor for trade and exploration. The

river and its well established riparian habitat have

served as a vital commodity for people and wildlife

in the region.!

In addition to the use of the Study Reaches by

recreational watercraft described in case-specific

1 The Santa Cruz River: A Resource Shared by Two Cities by

Hugh Holub, paper presented to the Border XXI EPA Regional

Water Sub Work Group Meeting on March 6, 2001, Nogales,

Sonora.

12a

analysis below, in the mid 1850s, William Rowlett

and his brother, Alfred, constructed an earthen dam

on the Santa Cruz River south of the present-day

Silverlake Road. They also installed a water-

powered flour mill at this location in 1857/58. In

1860, William Grant purchased the flour mill and

the dam/lake and improved the dam and mill in

order to supply military posts in the southwestern

region. He built a second, larger mill on the river and

purchased the machinery in California. However,

the mill was burned in 1861 to keep it from falling

into Confederate hands. The mill was purchased by

James Lee and returned to operations in 1864. In

1884, the mill, dam, and lake were sold to Frederick

Maish and Thomas Driscoll who developed the

Silver Lake Resort. In 1883, Solomon Warner built

a second dam and mill on the river. The lake was

approximately 60 acres, 8 feet deep, and the Arizona

Citizen reported the use of a flat-bottom boat on the

lake. Waterfowl populated the lake and hunting

organizations claimed exclusive rights to shooting

the waterfowl. The dams at both Silver Lake and

Warner's Lake were breached by floods in 1886 and

1887; the Arizona Star reported on July 13, 1887

that the river was wide and deep enough to float a

“mammoth steamboat.” In 1888, Frank and Warren

Allison purchased Warner Lake, repaired the dam,

and stocked the lake with carp for commercial fish

production selling over 500 pounds of fish per day.

l3a

Both dams were washed out by 1890.2

Further, in the summer of 1951, Glenton G. Syke,

Tucson city engineer, navigated the Santa Cruz

River in a 14-foot-long boat from the San Xavier del

Bac Mission to Congress Street in Tucson.

The Study Reaches were selected based on personal

knowledge of the river by Regulatory staff, evidence

of perennial flows based on stream gage data, and

more readily available evidence of navigability.

Basis for TNW Determination

The Rapanos Guidance indicates that in its context,

the term TNW refers to those waters that are under

the jurisdiction of the Corps, pursuant to 33 C.F.R.

§ 328.3(a)(1), (i.e., “[a]ll waters which are currently

used, or were used in the past, or may be susceptible

to use in interstate or foreign commerce, including

all waters which are subject to the ebb and flow of

the tide.”

As stated in Appendix D: “when determining

whether a water body qualifies as a “traditional

navigable water” (i.e., an (a)(1) water), relevant

considerations include whether a Corps District has

2 History of Navigation of the Santa Cruz River by Don Bufkin,

citation unknown.

3 Admiral of the Santa Cruz by Glenton G. Sykes, The Journal

of Arizona History, Vol. 20, Number 4, Winter, 1979.

14a

determined that the water body is a navigable water

of the United States pursuant to 33 C.F.R. § 320.14,

or the water body qualifies as a navigable water of

the United States under any of the tests set forth in

33 C.F.R. Part 329, or a federal court has determined

that the water body is navigable-in-fact under

federal law for any purpose, or the water body is

“navigable-in-fact” under the standards that have

been used by the federal courts.”

To determine whether the Study Reaches are a

TNW, in accordance to 33 C.F.R. § 328.3(a)(1), a

case-specific analysis to evaluate whether the Study

Reaches are navigable-in-fact, including

consideration of its potential susceptibility to

interstate and foreign commerce, was undertaken.

The Corps has determined that the Study Reaches

are a TNW based on the following factors:

1. The physical characteristics of the Santa Cruz

River within the Study Reaches indicate that they

have the capacity and susceptibility to be navigated

by recreational watercraft.

A. Study Reach A is approximately 22 miles

in length. The river near Tubac is typically more

confined in ordinary flows to a _ channel

approximately 15-20 feet wide with an approximate

1.5 mile wide, densely vegetated floodplain.

Downstream of Amado, the floodplain increases in

width to approximately 2.5 miles; the river channel

is less confined, less vegetated, and more braided.

Exhibit C shows monthly and daily flows for the

Tubac, Amado, and Continental gage stations, as

well as peak flows for the Amado and Continental

gage stations (Tubac information unavailable). The

l5a

monthly gage data indicate perennial flow at Tubac

since 1996, flow most months at the Amado gage

station since 2003 (prior years unavailable), and

intermittent flows at the Contintental gage station.‘

Average daily flows are typically lower in May and

June but increase during the summer monsoon

season which typically begins in July. Average daily

flow rates again typically increase during December

and January. The gage data indicate the highest

daily mean value at the Tubac gage station over the

last 11-12 years was 637 cubic feet per second (cfs)

during October and the lowest daily mean value at

the same station during the same period was 4.5 cfs

during June. The highest daily mean values

typically occur from July-October.5 The range of

mean monthly flows (6.9 to 78 cfs) and the average

daily flow in a representative year of 35 cfs indicate

perennial flow at the Tubac gage station. The mean

monthly discharge information at the Amado gage

station is only available since October, 2003; the

mean monthly discharge at this station in the last

four years varied from .97 cfs to 67 cfs while the daily

mean flow chart at the Amado gage station indicates

perennial flow. The mean monthly discharge at the

Continental gage station since 1940 varies from 43

cfs to 76 cfs while the mean daily values since 1939

4 http://nwis.waterdata.usgs.gov/az/nwis/monthly

5 http://nwis.waterdata.usgs.gov/az/nwis/dvstat

16a

shows flow daily with the exception of mid to late

May through mid-June. This is expected since the

river begins subsurface fiow at this point, which

defines the downstream end of this Study Reach.

B. Study Reach B is approximately 32 miles

in length. The width of the riverbed varies from

approximately 280 feet at the Roger Road WWTP to

approximately 670 feet at Cortaro§ and

approximately 575 feet at Trico Road while the

active (ordinary flow) river channel at all three

locations varies from 40-60 feet; at one location

within this Study Reach, the river diverges into two

similarly-sized channels. The river in Study Reach

B is often confined at its maximum width by steep

banks with soil cement or other bank stabilization in

several locations. In other locations, for example at

Ina Road, the river has lower, easily accessible,

vegetated banks. Some areas are more densely

vegetated than others. Exhibit C shows monthly,

daily, and peak flows for gage stations at Cortaro

and Trico Road (just upstream of the Pima/Pinal

County line). Average daily flows are typically lower

in May and June but increase during the summer

monsoon season which typically begins in July.

Average daily flows again typically increase during

December and January. The highest average daily

mean value at the Cortaro gage station over the last

57-60 years was 703 cfs, also in October, and the

lowest average daily mean value at the same station

over the same period was 22 cfs during June. The

average monthly discharge ranges from 23 to 124 cfs

and the average daily flow in a representative y_ar

of 75 cfs indicate perennial flow at the Cortaro gage

station. At the Trico Road gage station, since 1997,

17a

the average monthly discharge ranged from 3.5 cfs

to 710 cfs and daily mean values since 1989 ranged

from 11 cfs to 863 cfs. The gage data document

perennial flow at the Cortaro and Trico Road gages

every month since 1996 with the exception of

October, 1996.®

C. The peak flow charts demonstrate the

frequency of flows which exceed 1,000 cfs.7 Peak flow

data is unavailable at the Tubac gage station;

however, the maximum peak flow at the Amado gage

station since 2004 was approximately 7,800 cfs and

peak flow has approached or exceeded 2,000 cfs

annually. The maximum peak flow at _ the

Continental gage station was approximately 45,000

cfs in the early 1980s and the minimum peak flow

has exceeded 1,000 cfs 63 times since 1940. The

maximum peak flow at the Cortaro gage station

exceeded 60,000 cfs in the early 1980s and has

exceeded 1,000 cfs on an annual basis from 1940-

1988 with the exception of once in the 1940s and

once in the 1950s; the peak flow at the Cortaro gage

station has also exceeded 1,000 cfs on an annual

basis since approximately 1995. The maximum peak

flow at the Trico gage station exceeded 25,000 cfs in

2007 and the minimum peak flow has been at or

exceeded 1,000 cfs most years since 1989. The

figures at the end of Exhibit C indicate the “real

time” stages for late March-early April, 2008, at the

6 Ibid

7 http://nwis.waterdata.usgs.gov/az/nwis/peak

18a

Tubac, Cortaro, and Trico Road gage stations

indicating flows in the river on a daily basis.® All

three stations indicated flows with depths varying

from 1-2 feet and no precipitation had occurred for

approximately 6 weeks.9 Additional real-time stage

data obtained for late May is also provided for

Tubac, Green Valley (near Continental), Cortaro,

and Trico Road and indicates 1-2 feet of water

currently in the channel at all the above locations.

Extremely light precipitation occurred one day

during this timeframe; however, the amount of

precipitation received would not have been sufficient

to cause surface flows!® A list of the large magnitude

peak flow events of the Santa Cruz River over the

last 100 years is provided at Exhibit D.!!

D. While there is a variation in minimum flow

required for canoeing, studies indicate the 95%

confidence interval on the predicted minimum

canoeing flow of 86 cfs for flatwater is 63 to 118 cfs.!2

Approximately two-three feet of water depth is

sufficient to float a canoe, kayak, or small boat.

8 National Weather Service Advanced Hydrologic Prediction

Service: http://www/nws.noaa.gov/oh/ahps/

9 Personal observation, Marjorie Blaine, Senior Project

Manager, Regulatory Division, Tucson Project Office

10 Ibid

11 http://www.wrh.noaa.gov/twc/hydro/floodhis.php

19a

Based on the above information, during most days

from July-October and again for approximately half

the months of December and January. there is

sufficient flow in the Santa Cruz River within the

Study Reaches to float a canoe (based on the average

daily mean value). Typically a kayak would be able

to navigate in lower flows and less water than

canoes.

E. Based on aerial photographs attached at

Exhibit E, the Santa Cruz River from Tubac gage

station to just upstream of Continental gage station

and Roger Road WWTP to the Pima/Pinal County

line has uninterrupted flow.

F The Arizona Department of Environmental

Quality has adopted water quality standards for the

Santa Cruz River for partial body contact.!3 Partial

body contact allows for use of the surface water

where the body comes into contact with the water

but does not become fully submerged. Allowable uses

under partial body contact would include but are not

limited to boating and wading.

2. The Study Reaches within the Santa Cruz

River have public accessibility.

A. The river has low banks in the vicinity of

Tubac which allows for easy public access; these

12 Riparian Areas of the Southwestern United States:

Hydrology, Ecology, and Management by Malchus B. Baker

and Peter F. Ffolliott, CRC Press, 2004

13 Personal communication with Steve Pawlowski, Arizona

Department of Environmental quality, Unit Manager, Water

Quality Standards and Assessments, April 24, 2008.

20a

areas are currently frequented by riders on

horseback. Resorts along the river provide access for

out-of-state visitors for birding and hiking along the

river.

B. Two Corps of Engineers feasibility studies

for river restoration, El] Rio Medio and Tres Rios del

Norte, are in process. El Rio Medio will begin at

Congress Street and progress downstream to Prince

Road; Tres Rios del Norte will begin at Prince Road

and progress downstream to Sanders Road in

Marana. These projects will provide public trails

along the river. Although the final design for these

two projects has not been completed, it is likely river

access will be provided. The two projects are shown

in Exhibit F

C. There is currently public access to the river

at several bridges, including but not limited to the

Ina Road bridge where there are pull-out areas, the

Cortaro Road bridge (including a parking lot), and at

the Sanders Road bridge in Marana. All of these

bridges have easy access to Interstate 10.

D. The historic 1200-mile Juan Bautista de

Anza National Historic Trail runs from Nogales,

Arizona to San Francisco, California. This trail

parallels and overlaps the Santa Cruz River in the

Study Reaches. The river can be accessed at several

points along this trail in the Study Reaches by auto

or also on foot (Exhibit F).

3. The Study Reaches of the Santa Cruz River

have been used for interstate commerce and have

the potential to be used for commercial activities

involving navigation and interstate commerce in the

future.

2la

A. Navigation has occurred historically and

recent times within the Study Reaches of the Santa

Cruz River.

(1) On August 23, 2005, as part of a

promotion, a local radio show host navigated the

Santa Cruz River in a raft for an unspecified

distance starting at El] Camino de! Cerro (within

Study Reach B) (Exhibit G).

(2) In October, 1994, two members of the

Friends of the Santa Cruz navigated a 17-foot-long

canoe from a point south of Tubac three miles to a

point north of Tubac (Exhibit G).

B. The Santa Cruz River is an international

and interstate water. Several areas along the river

provide access for birding by out-of-state visitors and

resorts bordering the river, such as the Tubac Golf

Resort, host out-of-state visitors who partake in local

recreation including hiking, horseback riding, and

birding along the river. The Tucson Audubon

Society's North Simpson Farm is an area where

prolific riparian habitat restoration projects have

been focused and it is well-known for its

opportunities for birding. This type of “ecotourism”

provides a_ significant water resource-oriented

opportunity in the desert. The Study Reaches and

other areas within the region receive many

interstate and foreign tourists seeking to expand

their “bird list”; the Sonoran Desert, particularly in

riparian areas such as the Santa Cruz River,

provides a significant opportunity to see species

endemic to this area.

22a

C. Use of the river within the Study Reaches

by recreational watercraft provides evidence of the

susceptibility for commercial use.

Determination

Public access points within of the Study Reaches

such as low river banks, bridges, and trail systems,

together with their physical characteristics, such as

frequency, duration, and permanency of flow,

indicate that the Study Reaches have the potential

to be used for commercial recreational navigation

activities, such as canoeing, kayaking, birding,

nature and wildlife viewing. Such attractions and

activities demonstrate that the Study Reaches may

be susceptible to use in interstate commerce.

Collectively, the above discussed factors

demonstrate that the Study Reaches are navigable-

in-fact, and thus a TNW, susceptible to use in

interstate commerce associated with recreational

navigation activities. Therefore, I hereby determine

that the Study Reaches are subject to the

jurisdiction of Section 404 of the CWA, pursuant to

33 C.F.R. § 328.3(a)(1).

This determination does not 1) consider any other

potentially applicable bases for determining CWA

jurisdiction within the Study Reaches or 2) foreclose

analysis of other areas of the Santa Cruz River

outside the Study Reaches for purposes of

determining CWA jurisdiction.

05/23/08

Date /s/ Thomas H. Magness

Thomas H. Magness

Colonel, US Army

District Commander

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.