Opposition Brief — SD Warren Co. v. Maine Bd. of Environmental Protection

Supreme Court brief2006

Ask Donna

What actually matters in this document.

Text

@

No. 04-1527

Supreme Cour tS

JUN 15 2095"

| OFMICE OF” 2E tii

~

In The

Supreme Court of the Anited States

¢

S.D. WARREN COMPANY,

Petitioner,

v.

MAINE DEPARTMENT OF

ENVIRONMENTAL PROTECTION,

Respondent.

sf

On Petition For A Writ Of Certiorari

To The Maine Supreme Judicial Court

SJ

BRIEF FOR THE INTERVENORS IN OPPOSITION

¢

SEAN MAHONEY

(Counsel of Record)

VERRILL DANA, LLP

One Portland Square

Portland, ME 04112

(207) 774-4000

RONALD A. KREISMAN

25 Page Street

Hallowell, ME 04347-1418

(207) 626-0248

Attorneys for Intervenors

American Rivers and Friends

of the Presumpscot River

COCKLE LAW BRIEF PRINTING CO (800) 225-6964

OR CALL COLLECT (402) 342-2831

QUESTIONS PRESENTED BY PETITIONER

Does the mere flow of water through an existing dam

constitute a “discharge” under Section 401, 33 U.S.C.

§ 1341, of the Clean Water Act, despite this Court’s

holding last year in Miccosukee that a discharge re-

quires the addition of water from a distinct body of

water?

Does the State of Maine’s expansive application of

Section 401 conflict with the Federal Energy Regula-

tory Commission’s comprehensive licensing authority

over hydroelectric generating projects under the Fed-

eral Power Act, 16 U.S.C. §§ 791a et seq.?

ii

- PARTIES TO THE PROCEEDINGS

The parties to the proceedings are Petitioner S.D.

Warren Company, the owner and operator of five hydroe-

lectric projects on the Presumpscot River (the “Projects”),

Respondent Maine Department of Environmental Protec-

tion (“DEP”), the state agency that issued the Section 401

water quality certification at issue, and Intervenors

American Rivers and Friends of the Presumpscot River,

who have been parties in this action at all stages of admin-

istrative and judicial review. Pet. App. 18, 21, and 37.

RULE 29.6 STATEMENT

American Rivers is a not-for-profit corporation organ-

ized in Washington, D.C. Friends of the Presumpscot River

is a non-profit entity organized pursuant to the Maine

Nonprofit Corporations Act, 13 M.R.S.A. §§ 101-1406.

Neither entity has a parent company nor has either issued

stock. Each is recognized as tax exempt under Section

501(c)(3) of the Internal Revenue Code.

iii

TABLE OF CONTENTS

Page

Questions Presented by Petitioner ........................:000008 i

Parties to the Proceedings ................c.cccsceceeeeeeeeeeeeeeeeees ii

EE eT ii

eT v

a ee 1

EE ee 1

Ee 1

STIs edecrebrmecinticeedneseousssssesenegecccosescsccccococes 3

EE 3

1. Petitioner’s First Question Presented for Review

Fails, Procedurally and Substantively, to Meet

the Standards for Granting Certiorari ................ 4

A. Petitioner’s Failure to Raise or Address

the First Question Presented Before the

SJC Requires Denial of Certiorari ............. 4

B. The SJC’s Decision That Petitioner’s Pro-

jects Result in a Discharge Under Section

401 Is Consistent With Prior Decisions of

This Court and Courts of Appeals .............. 5

i. The SJC’s Decision Does Not Conflict

oe 6

ii. The Maine SJC’s Decision Does Not

Conflict With Other Decisions of This

Court or Courts of Appeals................... 7

iii. The Application of Section 401 Re-

quires No Clarification From This

iv

TABLE OF CONTENTS -— Continued

Page

2. The Second Question Presented By Peti-

tioner Does Not Present A Conflict Or

Controversy That Merits This Court’s Re-

WE ccncccisnsiesicdnneiicitniiibantshtniethieanisatitiiiiaimbinniaiitinn 13

I SADT T ET ne 15

Vv

TABLE OF AUTHORITIES

Page

FEDERAL CASES

Alabama Rivers Alliance v. FERC, 325 F.3d 290

ets MEE SUT scncenicisiticncinneidnliiiienianidnsisinibiiniamsmieaianes 9, 11,12

California v. FERC, 495 U.S. 490 (1990)..................0000000s 13

Catskill Mountains Chapter of Trout Unlimited,

Inc. v. City of New York, 273 F.3d 481 (2nd Cir.

See ccrsctinnteenriesininsstiaittaiteaantituhiaiiedeiagasdeideasiitecabdiiiaaintlaadiaa tid 8, 12

Dubois v. Department of Agriculture, 102 F.3d 1273

eS TEI: TUITE insecieicicehsesnbiiavandieninpuaibinnaebeapscticiupiaietaendibiitile 7,12

Illinois v. Gates, 462 U.S. 213 (1982)............ cece ceeeeeeeeeeeeees 4

Nat'l Wildlife Fed’n v. Consumers Power Co., 862

ee EET TIEED: TUTTI sicitsicniceiciasniiinisieitainareniapasiuminintidataish 7,12

North Carolina v. FERC, 112 F.3d 1175 (D.C. Cir.

IITUT icsicisienisiniunecienitaiiienainalitinihiaiindiguieiinsitaaceamaiiil 9, 10, 11, 12

Oregon Natural Desert Ass’n v. Dombeck, 172 F.3d

IE Be cinncccninsnisieticetiinichietsctiitennpatasiiniiuipaiuiaiinatiia 12

PUD No. 1 v. Washington Dep't of Ecology, 511 U.S.

Fe IE ccrsccesnnstnrreniiesinnnnnnennennenintaniniineaened passim

South Florida Water Mgmt. Dist. v. Miccosukee

een 3, 4, 6, 7, 8

Yee v. City of Escondido, 503 U.S. 519 (1992).................004. 5

STATE CASES

Power Authority of New York v. Williams, 101

el icisiiscinsnsciinerciiiiiteaiensiinmintaieatenansiinaiinial .12

S.D. Warren Co. v. Board of Environmental Protec-

ae, See ee Oe Ge cannsenctcescsderseteemniasenensscsenienenean 1

vi

TABLE OF AUTHORITIES — Continued

Page

STATUTES AND REGULATIONS

ee OE 3

STE, UN TITTITTT coininerninitnnniiccdinenpaieniibatipuesesinmmedioaeis 14

SPE ETEts Ut TIE nscsenisstanteituncecuaiipansitiiennisundnandmintdamenesetiinattil 14

its Ue aT atecccisccnciinniceieninietantsedsidienajapiiendinsbeemamainedetes 1

ee sO SII sccvecsiesiissipcianeiiinisicingsiiainicleitataalaianiniaiboaiiibid 2,7

8 RRR NRO NU Den mE E TEN 3, 14

as iii eisa iinet ciihininintetciaeeneeaa cla ial neate 7

te Hi TTTIET sciinicieccieni hicesieniamnnenciteiniiinicipniiibnisbeabigsidiiieiinibidin 7

SC Ue TIITII ssiccstncssinsinnniniicniesiibciiileaniapiniiibiiiat ial alia leaden 7

I i I a iiciaicciciiaiaiaciiaasiiaiisiieaiialealiniiaioniaeliabiaiiais 6

AGENCY DECISIONS

City of Augusta, Georgia, 109 F.E.R.C. { 62,210

SITs aaah inna 12

City of Fort Smith, 42 F.E.R.C. J 61,362 (1988)............... 13

In re Central Vermont Pub. Serv. Corp., 85 F.E.R.C.

ans OUIIITIIIE cbcisihtchnnnsinniedchigheindimenddeiniiiiadiinialibsinimaiibais 13

S.D. Warren Co., 105 F.E.R.C. J 61,013 (2003)................... 3

Virginia Electric and Power Co., 77 F.E.R.C.

| TE A ean ence nS ae a ERA NN TP TEN een 11

Vii

TABLE OF AUTHORITIES -— Continued

Page

OTHER

Brief for Petitioner, PUD No. 1 v. Washir~ton Dep't

of Ecology, 511 U.S. 700 (1994), 1993 W. 632338. .......... 9

Brief of the United States as Amicus Curiae, PUD

No. 1 v. Washington Dep't of Ecology, 511 US.

700 (1994) (1992 Lexis U.S. Briefs 1911).................e0ee 9

1

OPINIONS BELOW

The decision of the Maine Supreme Judicial Court

(“SJC”) is reported at S.D. Warren Co. v. Board of Envi-

ronmental Protection, 2005 ME 27 (2005). Pet. App. 1-18.

The decision of the Maine Superior Court (Pet. App. 19-34)

is unreported.

¢

JURISDICTION

The judgment of the SJC was entered on February 15,

2005. Pet. App. 1. The petition for a writ of certiorari was

filed on May 12, 2005. This Court’s jurisdiction is invoked

under 28 U.S.C. § 1257(a).

4

STATEMENT OF THE CASE

Petitioner owns seven dams on the Presumpscot

River, which stretches just 27 miles from Maine’s Sebago

Lake to the Atlantic Ocean. Six of Petitioner’s dams

generate electricity by removing water from the Presump-

scot, running that water through turbines, and then

discharging that water back into the Presumpscot. In

2001, five of those dams (the “Projects”) required new

licenses from the Federal Energy Regulatory Commission

(“FERC”) in order to continue operating. Current opera-

tions of the Projects prevent the Presumpscot River from

meeting its water quality standards.’

* The DEP made this finding, see Pet. App. 88-89, 106-107, 111-112,

116, and it was affirmed by three reviewing tribunals. Pet. App. 12, 25-

33, and 49. Specifically, Petitioner’s Projects significantly alter the

(Continued on following page)

2

Petitioner’s Projects are licensed by FERC. Section

401 of the Clean Water Act (“CWA”) requires that any

applicant for a federal license whose operations “may

result in any discharge into the navigable waters” obtain a

certification from the affected state that such discharge

will comply with state water quality standards. 33 U.S.C.

§ 1341(a)(1).

In 1999, Petitioner filed applications to renew the

FERC licenses for its Projects that were to expire in 2001.

As required by Section 401, Petitioner also filed applica-

tions with the Maine Department of Environmental

Protection (“DEP”) for water quality certification. As is

routine with virtually all states in FERC relicensing

procedures, Maine reviewed the impacts of Petitioner’s

Projects on the Presumpscot’s ability to meet its water

quality standards. The Maine DEP then issued its Section

401 certification in April 2003, with conditions that DEP

determined were necessary to ensure that operation of the

Projects will not continue to violate those water quality

standards. Pet. App. 121-139. As required by the CWA and

its own regulations, FERC incorporated Maine’s Section

chemical, physical and biological nature of the Presumpscot River by

impounding the water above each of its dams, then removing the water

from the river and running it through its turbines to generate electric-

ity, and then discharging that water back into the Presumpscot River,

often times leaving that portion of the riverbed just below the dam

(known as bypass reaches) devoid of any water. The Maine Board of

Environmental Protection found, and Petitioner did not contest, that

Petitioner’s Projects have caused long stretches of the natural river bed

to be essentially dry and thus unavailable as habitat for indigenous

populations of fish and other aquatic organisms; that the Projects have

blocked passage of eels and sea-run fish to their natural spawning and

nursery waters; that the Projects have eliminated the opportunity for

fishing in long stretches of the river; and that the dams have prevented

recreational access to and use of the river. Pet. App. 49.

3

401 certification and its conditions into the renewed

licenses for the Projects ultimately issued to Petitioner. 33

U.S.C. § 1341(d); 18 C.F.R. § 4.34(b).

Petitioner unsuccessfully challenged the Maine DEP’s

Section 401 certification before the Board of Environ-

mental Protection, Pet. App. 35-73, the Superior Court,

Pet. App. 19-34, and the SJC, Pet. App. 1-18. Petitioner

also unsuccessfully challenged the FERC licenses them-

selves which, based on the recommendation of FERC and

other federal agency staff and independent of the Section

401 certification, incorporated into the licenses almost the

same conditions as contained in the Section 401 certifica-

tion. S.D. Warren Co., Project Nos. 2897-003, 2932-003,

2941-002, 2931-002 and 2942-005. 105 FE.R.C. § 61,013

(2003) (“FERC’s Multi-Project Order”).

In its petition for writ of certiorari, Petitioner argues

for the first time that this Court’s decision in South

Florida Water Mgmt. Dist. v. Miccosukee Tribe, 541 U.S. 95

(2004), supports its assertion that its Projects should be

exempt from Section 401 because they do not result in any

discharge into the Presumpscot River. Petitioner also

asserts that Maine’s Section 401 certification represents a

“power grab” by Maine usurping FERC’s broad authority

under the Federal Power Act.

¢

ARGUMENT

Summary

This Court should deny this petition for certiorari for

three basic reasons. First, Petitioner’s first question

presented does not warrant this Court’s review because

4

Petitioner failed to raise it below and it was not addressed

by the SJC and the lower tribunals. Second, the SJC’s

decision is consistent with the decisions of this Court and

other Courts of Appeals on Section 401’s applicability to

hydroelectric projects and the authority of states to condi-

tion Section 401 certifications. This Court’s decision in

Miccosukee is not applicable to Section 401 and thus the

SJC’s decision does not conflict with it. And third, the

SJC’s decision is consistent with the practice of state and

federal regulatory agencies applying Section 401 to hy-

droelectric projects; that practice requires no clarification

by this Court. Certiorari should therefore be denied.

1. Petitioner’s First Question Presented for Review

Fails, Procedurally and Substantively, to Meet

the Standards for Granting Certiorari.

A. Petitioner’s Failure to Raise or Address the

First Question Presented Before the SJC Re-

quires Denial of Certiorari.

Petitioner contends that the SJC’s decision directly

conflicts with this Court’s decision in Miccosukee. Pet. 7-

17. Although Miccosukee was decided on March 23, 2004,

well before briefing (September 2, 2004) and oral argu-

ment (November 16, 2004) was complete in the SJC,

Petitioner failed to even cite Miccosukee, never mind to

argue its merits. As such, the application of Miccosukee to

a Section 401 certification was not addressed by the SJC.

It is well established that this Court does not consider

issues that were not raised or considered in the lower

courts. See Illinois v. Gates, 462 U.S. 213, 218 n.1 (1982)

(“the Court developed the rule that a claim would not be

considered here unless it had been either raised or

5

squarely considered and resolved in state court”). Only in

“very rare exceptions” will the Court examine claims not

addressed below when reviewing state court judgments.

Yee v. City of Escondido, 503 U.S. 519, 533 (1992).

There are no such exceptional circumstances to merit

review of Petitioner’s first question presented here. On

this basis alone, certiorari should be denied.’

B. The SJC’s Decision That Petitioner’s Projects

Result in a Discharge Under Section 401 Is

Consistent With Prior Decisions of This

Court and Courts of Appeals.

Just as Petitioner now attempts to manufacture an

issue that merits this Court’s review, it attempts to manu-

facture a conflict between the SJC’s decision and prior

decisions of this Court and courts of appeals. No such

conflict exists. Rather, courts have consistently found that

the operation of hydroelectric projects such as Petitioner’s

involve at least one discharge when the project returns

water back into the river after using it to generate electric-

ity; therefore the licensing of such projects triggers Section

401, just as the SJC found in this case.

? As noted above, Petitioner’s appeal of the FERC licenses them-

selves was recently and summarily rejected. Intervenor’s Appendix

(“Inter. App.”) 1. As such, even if this Court were to grant this petition

for certiorari and ultimately to agree with Petitioner’s argument, in

whole or in part, Petitioner would still have to operate its Projects

under its FERC licenses, which incorporate almost all of the conditions

contained in the Section 401 certification. See FERC’s Multi-Project

Order, { 61,013; Inter. App. 2-7.

6

i. The SJC’s Decision Does Not Conflict

with Miccosukee.

Petitioner claims that the SJC’s decision is “directly

contrary to this Court’s decision in Miccosukee” and that

the SJC “erroneously ignored Miccosukee.” Pet. 9, 13. Even

if the Court were willing to overlook Petitioner’s failure to

even raise Miccosukee below, Petitioner’s argument fails

because it ignores the clear limits of Miccosukee and the

fundamental difference between Section 401 and Section

402 of the CWA.

The issue addressed by the Court in Miccosukee was

what constituted a “discharge of a pollutant” under Sec-

tion 402 of the CWA. Miccosukee, 541 U.S. at 102-103. The

Court’s opinion did not address in any manner what

constituted the more broadly and separately defined scope

of “any discharge” under Section 401. 33 U.S.C. § 1362(16).

As such, this Court did not address the distinction be-

tween Section 402’s “discharge of pollutant” and Section

401’s “any discharge.” Moreover, because neither the legal

nor factual issues in Miccosukee were suitably raised or

developed below, the Court remanded without reaching

any final decision on either issue. Jd. at 112. In light of

Miccosukee’s substantive limitation to Section 402 and its

procedural limitation of an undeveloped record, Peti-

tioner’s attempt to stretch the Miccosukee decision as one

relevant to the SJC’s decision of what constitutes “any

discharge” under Section 401 should be rejected.

Moreover, Section 402 is fundamentally different

than Section 401. The former’s purpose is to regulate the

discharge of pollutants to navigable waters by requiring

a National Pollutant Discharge Elimination System

(“NPDES”) permit issued under Section 402 before “the

—

discharge of any pollutant by any person” to navigable

waters is allowed. 33 U.S.C. §§ 1311(a), 1342. Section 401’s.

purpose is quite different — to give states the ability to

ensure that federally licensed projects (i.e., licensing that

is not controlled by the state in which a project is situated)

including hydroelectric projects will comply with the

state’s water quality standards. See PUD No. 1 v. Wash-

ington Dep't of Ecology, 511 U.S. 700, 707-08 (1994).

Section 401’s cooperative federalism approach to protect-

ing and improving water quality is clearly broader than

Section 402. That difference is reflected in how Congress

limited Section 402’s application to the “discharge of any

pollutant” as opposed to Section 401’s application to any

federally licensed activity that “may result in any dis-

charge.” 33 U.S.C. §§ 1341(a)(1), 1342(a).

Miccosukee addresses only what constitutes a “dis-

charge of a pollutant” under Section 402 and is therefore

limited to the question of whether an NPDES permit is

required for the activity in question. The SJC’s decision

addresses what constitutes “any discharge” under Section

401. As such, the conflict that Petitioner claims to exist

between the SJC’s decision and this Court’s decision in

Miccosukee is illusory.

ii. The Maine SJC’s Decision Does Not Con-

flict With Other Decisions of This Court

or Courts of A»peals.

The same illusory tension exists between the SJC’s

decision and the decisions cited by Petitioner. Specifically,

each of the pre-Miccosukee cases that Petitioner claims the

SJC decision conflicts with - Nat? Wildlife Fed’n v. Con-

sumers Power Co., 862 F.2d 580 (6th Cir. 1988), Dubois v.

Department of Agriculture, 102 F.3d 1273 (1st Cir. 1996)

8

and Catskill Mountains Chapter of Trout Unlimited, Inc. v.

City of New York, 273 F.3d 481 (2nd Cir. 2001) — addressed

whether an NPDES permit under Section 402 was neces-

sary. None of them addressed Section 401 in general nor

what constituted “any discharge” under Section 401 in

particular. Thus, the interpretations of what constitutes

an “addition” and thus a discharge of pollutants under

Section 402 by these three Courts of Appeals are, like this

Court’s decision in Miccosukee, not applicable to what

constitutes “any discharge” under Section 401.

Petitioner also tries to create tension between the

cases that have addressed what constitutes “any dis-

charge” under Section 401 and the SJC’s decision. But its

efforts to do so, which include aii but ignoring this Court’s

decision in PUD No. 1,’ are unavailing.

In PUD No. 1, the petitioner conceded that the hy-

droelectric project at issue would “at a minimum result in

two possible discharges — the release of dredged and fill

material during the construction of the project, and the

discharge of water at the end of the tailrace after the

water has been used to generate electricity.” PUD No. 1,

511 U.S. at 711. Although conceded, the issue was fully

briefed to this Court. In its brief, petitioner described the

operations of its run-of-river facility and concluded that “a

discharge from a hydroelectric facility occurs when water

is released or emitted that has been removed or blocked

* Petitioner’s only cite to PUD No. 1 is in a footnote and is to a

portion of the dissent. Pet. 20 n.6.

9

from the flow of the stream.” Brief for Petitioner, PUD No.

1, 1993 WL 632338 at *29.*

Similarly, the United States, having been invited by

the Court to file an amicus brief, observed that “Congress

employed the term ‘discharge’ when used without qualifi-

cation (as in Section 401(a;) more broadly than the term

‘discharge of any pollutant’ which is used in a number of

other provisions of the CWA,” and concluded that a dam’s

release of water is a “discharge” that triggers § 401. Brief

of the United States as Amicus Curiae Supporting Affir-

mance at 15 n.4. (1992 Lexis U.S. Briefs 1911.) Satisfied

that Clean Water Act jurisdiction had been triggered, the

PUD No. 1 Court then proceeded to the merits.

Having ignored the PUD No. 1 decision, Petitioner

attempts to distinguish the decisions by the D.C. Circuit

Court of Appeals since PUD No. 1 that address what

constitutes a discharge under Section 401, North Carolina

v. FERC, 112 F.3d 1175 (D.C. Cir. 1997) and Alabama

Rivers Alliance v. FERC, 325 F.3d 290 (D.C. Cir. 2003).

Those decisions, tuough, are consistent with the acknowl-

edgement in PUD No. 1 that the discharge of water back

* Petitioner in PUD No. 1 explained the basis for that conclusion in

its brief as follows: “The operation of a hydroelectric facility necessarily

results in the discharge of water... . In general, hydroelectric projects

use the gravitational force of water as it moves down a stream from an

upper to a lower elevation to drive a mechanical turbine that spins a

generator, and thus produces electricity. The force of the falling water is

exploited by a dam, or by a diversion structure like the Elkhorn

Project’s weir, that diverts water into a penstock, which then conveys

the water down and into the turbine. Water that has passed through the

turbine is then returned to the stream somewhere below the powerhouse,

through a conveyance known as a tailrace. Thus, hydroelectric facilities

typically involve at least one discharge. Brief for Petitioner, PUD No. i,

1993 WL 632338 at *27-*28 (emphasis added).

10

into a river after it has been used to generate electricity

triggers Section 401.

In North Carolina, the D.C. Circuit upheld FERC’s

ruling that an application to operate a pipeline that would

withdraw water from the impounded portion of a river

above a dam to use as drinking water would not result in

“any discharge” and Section 401 certification was not

required for the license amendment. North Carolina, 112

F.3d at 1187.° As support for its decision, FERC contrasted

the proposed pipeline withdrawal with the discharge that

is associated with the typical operations of a hydroelectric

project:

The ‘discharge’ from the operation of the [hydroe-

lectric] project is the water that leaves the project

as it flows through a dam, or through penstocks,

powerhouse turbines and tailraces, and reenters

the river or some other waterway.

In a proceeding for a new license (relicense) of

the project after the original license has expired,

if no new facilities are proposed to be con-

structed, then the activity requiring certification

is the continued operation of the project. The

place of discharge is the place at which project

waters leave the project impoundment or bypass

facilities and reenter the river or other waterway.

* Initially, FERC ruled that Section 401 did not apply because

FERC’s regulations governing license amendments did not require

Section 401 certification. North Carolina, 112 F.3d at 1172. The D.C.

Circuit expressed “serious reservations” about FERC’s attempt to

redefine the statutory term “any discharge,” but deferred addressing

the issue because on appeal, FERC discarded the regulation as a basis

for its decision. Jd. at 1186.

11

Virginia Electric and Power Co., 77 F.E.R.C. ¥ 61,519

(emphasis added).°

The D.C. Circuit’s subsequent decision in Alabama

Rivers squarely addressed whether the flow of water

through turbines constituted a discharge for purposes of

Section 401. Specifically, the D.C. Circuit held that “an

increase in the volume of water passing through the dam’s

replacement turbines may result in any discharge into the

navigable waters within the meaning of [Section 401).”

Alabama Rivers, 325 F.3d at 296-299.’

Collectively, the decisions in PUD No. 1, North Caro-

lina and Alabama Rivers stand for the proposition that

when a hydroelectric project removes water from a river,

uses it to generate electricity and then returns that water

to the river, there is a discharge for purposes of Section

401. In the case below, the Maine SJC concluded that

“water that leaves the river and runs through the dam

before returning to the river constitutes a discharge for

the purposes of [Section 401].” Pet. App. 10. That conclu-

sion is entirely consistent with the decisions in PUD No. 1,

* Underscoring this analysis by FERC is the fact that the very

same licensee who in North Carolina vigorously opposed the applicabil-

ity of Section 401 in the context of a license amendment to withdraw

water did not contest Section 401’s applicability a few years later when

it sought to renew its license from FERC. Like the petitioner before this

Court in PUD No. 1, the licensee, Dominion North Carolina Power, fully

acquiesced that water flowing through its turbines and discharged

downstream constituted a “discharge” triggering the Section 401

certification process. Int. App. 8-20.

" As did the court in North Carolina, the Alabama Rivers court

expressed serious reservations about FERC’s argument that “any

discharge” and “discharge of any pollutant” are one and the same but

did not address the issue because FERC failed to properly present it for

review. Alabama Rivers, 325 F.3d at 298 n.11.

12

North Carolina and Alabama Rivers. Moreover, nothing in

the SJC’s decision applying Section 401 conflicts with the

decisions applying Section 402 in Consumers Power,

Catskill Mountain or Dubois. Accordingly, there is no

conflict that merits granting certiorari.

iii. The Application of Section 401 Requires

No Clarification From This Court.

Petitioner’s claim that without this Court’s clarification

there will continue to be uncertainty as to what constitutes

“any discharge” under Section 401 is as manufactured as the

claim of conflict between the SJC’s decision and decisions of

this Court and other courts of appeals. Simply put, there is

no uncertainty among the courts or the regulatory agencies

as to the legal test to apply in determining whether a li-

censed activity “may result in any discharge.”

Courts and regulatory agencies have all recognized

that Section 401’s use of the phrase “any discharge” is

broader and more inclusive than Section 402’s use of the

phrase “discharge of any pollutant” such that “any dis-

charge” includes, but is not limited to, the discharge of a

pollutant. See, e.g., Power Authority of New York v. Wil-

liams, 101 A.D.2d 659, 660 (1989) (“This broad definition

of the word ‘discharge’ and its application to ‘any dis-

charge’ in [Section 401] requires that we reject petitioner’s

fundamental argument, i.e., that for section 401 to apply, a

discharge must contain a specific and identifiable pollut-

ant.”); Oregon Natural Desert Ass’n v. Dombeck, 172 F.3d

1092, 1098 (9th Cir. 1998) (“‘Discharge’ is the broader

term because it includes all releases from point sources,

whether polluting or nonpolluting.”); City of Augusta,

Georgia, 109 F.E.R.C. 9 62,210 ¥ 11 (2004) (“As defined in

13

the CWA, the term ‘discharge’ includes a ‘discharge of a

pollutant,’ and thus the former term comprises a broader

class of activities than the latter.”); and Pet. App. 35, 41

(finding by Maine Board of Environmental Protection that,

consistent with position of U.S. Environmental Protection

Agency, “any discharge” as used in Section 401l(a) is

broader than “discharge of pollutants.”)

Thus, in determining if an activity “may result in any

discharge,” courts and regulatory agencies uniformly agree

that there must be some release, addition or flow from the

licensed activity to the navigable water. See, e.g., PUD No.

1, 511 U.S. 700, 711 (no dispute among FERC, State of

Washington, EPA and owner of hydroelectric project that

release of water at end of tailrace constitutes discharge

under Section 401); In re Central Vermont Pub. Serv.

Corp., 85 F.E.R.C. 7 61,410, 62,557 (1998) (a “discharge”

from the operation of a hydroelectric project is the water

that leaves the project as it flows over or through a dam,

or through penstocks, powerhouse turbines and tailraces,

and reenters the river or enters some other waterway);

City of Fort Smith, 42 F-E.R.C. J 61,362 at 62,047 (1988)

(same). Accordingly, there is no legal issue this Court

needs to clarify that merits granting certiorari.

2. The Second Question Presented By Petitioner

Does Not Present A Conflict Or Controversy

That Merits This Court’s Review.

No dispute exists in this case or in the courts below

concerning either FERC’s exclusive licensing authority

over hydroelectric projects, California v. FERC, 495 U.S.

490 (1990) or states’ authority to certify with conditions

that such projects meet applicable water quality stan-

dards. See PUD No. 1, 511 U.S. at 707-08. That question

14

was explicitly addressed and resolved by this Court’s

decision in PUD No. 1. In addition, there is no dispute or

confusion as to the application of Section 401 to the

licensing of hydroelectric projects, as set forth above. As

such, there is no legal or factual dispute which merits

certiorari as to the second question presented.

Substantively, Petitioner's argument ignores the

system of cooperative federalism created by the CWA, and

specifically Section, 401, that gives states a clear and

defined role in enforcing water quality standards within

the state. 33 U.S.C. § 1341(d); 18 C.F.R. §§ 4.38(f)(7), 16.8.

As this Court held in PUD No. 1, a state may place condi-

tions on the activity as a whole that are necessary to meet

state water quality standards. 511 U.S. at 712-719. In

makirg this conclusion, this Court also ruled that Section

401 did not interfere with FERC’s exclusive licensing

authority. Jd. at 721-22.

Because the SJC’s decision is consistent with the

language of the CWA and FERC’s regulations and this

Court’s decision in PUD No. 1, it is difficult to discern

what Petitioner is asking this Court to review. At best,

Petitioner’s argument is a fact-bound issue that does not

warrant this Court’s review. Certiorari should be denied as

to Petitioner’s second question presented.

+

15

CONCLUSION

The petition for writ of certiorari should be denied.

Respectfully submitted,

SEAN MAHONEY

(Counsel of Record)

VERRILL DANA, LLP

One Portland Square

Portland, ME 04112

(207) 774-4000

RONALD A. KREISMAN

25 Page Street

Hallowell, ME

(207) 626-0248

Counsel for Intervenors

American Rivers and Friends

of the Presumpscot River

App. 1

United States Court of Appeals

FOR THE DISTRICT OF COLUMBIA CIRCUIT

No. 04-1105 September Term, 2004

S.D. Warren Co.,

Petitioner,

v.

Federal Energy Regulatory Commission,

Respondent.

On Petition for Review of Orders of the

Federal Energy Regulatory Commission

Before: GINSBURG, SENTELLE and HENDERSON, Circuit

Judges.

JUDGMENT

(Filed May 6, 2005)

This cause was heard on the record from the Federal

Energy Regulatory Commission and on the briefs and

arguments by counsel. For the reasons set out in the

accompanying memorandum, it is

ORDERED thai the petition for review is denied.

Pursuant to D.C. Circuit Rule 36, this disposition will

not be published. The Clerk is directed to withhold issuance

of the mandate herein until seven days after resolution of

App. 2

any timely petition for rehearing or rehearing en bane. See

Fed. R. App. P. 41(b); D.C. Cir. Rule 41.

Per Curiam

FOR THE COURT:

/s/_ Mark J. Langer

Mark J. Langer, Clerk

S.D. Warren Co. v. FERC, No. 04-1105

MEMORANDUM

The Federal Energy Regulatory Commission (FERC or

Commission) issued a series of orders granting licenses to

S.D. Warren Company (Warren) to operate and maintain

five hydroelectric projects on the Presumpscot River in the

State of Maine. S.D. Warren Co., Project Nos. 2897-003,

2932-003, 2941-002, 2931-002 and 2942-005, 105 FERC

{ 61, 013 (2003) (Multi-Project Order); S.D. Warren Co.,

Project No. 2931-002, 105 FERC 461,010 (2003); S.D.

Warren Co., Project No. 2932-003, 105 FERC {761,011

(2003); S.D. Warren Co., Project No. 2941-002, 105 FERC

{ 61,012 (2003); and, S.D. Warren Co., Project No. 2942-

005, 105 FERC ¥ 61,009 (2003). Pursuant to the terms of

the Federal Power Act (FPA), 16 U.S.C. §§ 792 et seq., the

FERC attached conditions to the licenses to protect envi-

ronmental and recreational interests affected by Warren’s

hydroelectric projects. The conditions included fishway

prescriptions filed by the Department of Interior (Interior)

under § 18 of the FPA, id. at § 811, that required Warren

to install eel ladders at each project dam to facilitate

upstream migration by American eel and mandated an

eight-hour shutdown of the project turbines for an eight-

week period in the fall of each year to protect downstream

eel migration. Multi-Project Order, 105 FERC at 61,138,

App. 3

{i 42-43. Interior also placed conditional obligations on

Warren to provide upstream and downstream fish passage

facilities at each project dam as fish passage is achieved at

the next most downstream dam. /d. at 61,137-38, {{ 35-

41. Specifically, if fish passage is achieved at a down-

stream dam not controlled by Warren over which the

FERC lacks jurisdiction, within two years Warren is

required, inter alia, to construct denil fish ladders at its

most downstream dam. Jd. at 61,137, { 36. Construction of

fish passage facilities at each of Warren’s upstream dams

is conditioned on the attainment of specific fish population

triggers at the next downstream dam. Jd. The FERC also

attached conditions imposed by the State of Maine pursu-

ant to the state water quality certification (WQC) process

under § 401 of the Clean Water Act, 33 U.S.C. § 1341(d).

Maine’s WQC conditions imposed, inter alia, dissolved

oxygen standards and minimum bypass flows (intended to

mitigate the dewatering of the Presumpscot River spill-

ways below each project) and required Warren to develop a

recreational facility enhancement plan for each project.

See Multi-Project Order, 105 FERC at 61,136, 7 25. In

addition, pursuant to §10(a) of the FPA, 16 U.S.C.

§ 803(a), the Commission imposed conditions designed to

ensure that the projects would “be best adapted to a

comprehensive plan for ... the adequate protection,

mitigation, and enhancement of fish and wildlife (includ-

ing related spawning grounds and habitat), and for other

beneficial public uses, including ... recreation[].” Jd. at

§ 803(a)(1). Based on the Final Environmental Impact

Statement (FEIS) issued by the Commission staff on June

26, 2002, the FERC required Warren, inter alia, to develop

a Shoreline Management Plan (SMP) for its two largest

projects with a shoreline buffer zone of 200 feet. Multi-

Project Order, 105 FERC at 61,141-42, {]{ 64-66. The

App. 4

FERC also required Warren to monitor and report on

recreational use near the project sites every 12 years. Id.

at 61,149-50, Article 409. The FERC issued the licenses for

a 40-year term. Jd. at 61,144, { 86.

Warren petitioned the Commission for rehearing: On

rehearing, the FERC upheld the orders with respect to the

license requirements which it had included and denied

rehearing as to the § 18 and § 401 conditions, concluding

that it had no authority to revise or remove those provi-

sions from the licenses. S.D. Warren Co., Project Nos.

2897-005, 2931-004, 2932-006, 2941-004, and 2942-007,

106 FERC { 61,087, 61,293-94, {7 3, 4, 7, 11-14, 16 & nn.

7-8, 13 (issued January 29, 2004) (Rehearing Order). See

Bangor Hydro-Elec. Co. v. FERC, 78 F.3d 659, 663 (D.C.

Cir. 1996) (“[I]t is not the Commission’s role to judge the

validity of Interior’s position — substantially or proce-

durally.”); 33 U.S.C. § 1341(d) (“Any certification provided

under [§ 401] ... shall become a condition on any Federal

license or permit subject to the provisions of this section.”).

See also Alabama Rivers Alliance v. FERC, 325 F.3d 290,

292-93 (D.C. Cir. 2003) (same).

Warren challenges the sufficiency of the evidence in

the record to support the Commission’s § 10 conditions and

Interior’s § 18 prescriptions. Warren also challenges the

40-year license term as arbitrary and capricious. We

uphold the Commission’s orders because they are sup-

ported by substantial evidence in the record, 16 U.S.C.

§ 8251(b), and because the Commission “examined the

relevant data and provided a reasoned explanation sup-

ported by a stated connection between the facts found and

the choice made.” North Carolina v. FERC, 112 F.3d 1175,

1189 (D.C. Cir. 1997) (internal quotation marks omitted).

The conditions imposed by the Commission under § 10 are

App. 5

supported by substantial evidence. The FEIS upon which

the Commission relied considered the comments of several

entities, including the FWS and National Park Service, as

well as the Maine Department of Marine Resources, the

Maine Atlantic Salmon Commission, the Maine Depart-

ment of Inland Fisheries and Wildlife and three individu-

als. See Multi-Project Order at 61,135, {18 & n.5. The

Commission altered the scope of the conditions recom-

mended by the FWS, reducing the 500-foot buffer zone for

the SMPs to 200 feet and decreasing the reporting re-

quirement for recreational use studies from every six

years to every 12 years, because the FWS had failed to

provide sufficient evidence to support its more stringent

recommendations. Jd. at 61,141-42, {{ 64-66.

With respect to Warren’s challenge to Interior’s

fishway prescriptions under § 18, we apply the same

arbitrary and capricious standard that governs the actions

of the Commission. Wisconsin Power & Light Co. v. FERC,

363 F.3d 453, 461 (D.C. Cir. 2004). Interior’s fishway

prescriptions must be “reasonably related” to its goal of

fish preservation. Bangor Hydro-Electric, 78 F.3d at 663.

The scientific evidence in the record demonstrates signifi-

cant populations of American eel and a 2000 study of the

Presumpscot projects commissioned by Warren documents

the extent to which the project dams impaired the ability

of the eels to migrate upstream due to difficulty ascending

dam faces. Studies of similar projects demonstrated the

hazards of downstream migration, specifically, high

mortality rates caused by project turbines. Interior’s

prescriptions are reasonably calculated to mitigate these

harms. The required eel passageways provide for efficient

upstream migration at a “relatively low cost,” according to

the FEIS. Interior’s requirement that Warren shut down

App. 6

turbine operation for a period of eight hours per day for

eight weeks during peak migration is likewise a reason-

able prescription. Interior reasonably concluded that

current scientific evidence does not permit a reliable

estimate of a shorter peak migratory period that would

ensure similar protection of the eel with a less stringent

shutdown requirement. Interior has directed Warren to

conduct a three year study of migratory patterns, the

results of which may enable Interior to reduce the 8/8

requirement without proportionally increasing the risk to

migrating eels. Likewise, Interior’s prescriptions with

respect to anadromous fish species are reasonable. The

fish passageway requirements are conditioned on restora-

tion of the relevant species to the areas below each project. .

In the absence of species restoration, Warren need not

undertake any construction based on the prescription. The

target levels for fish population that trigger action,

roughly 20 per cent of the maximum estimated population

size, are reasonably calculated to ensure that Warren need

not undertake construction at its upstream projects

unnecessarily.

The conditions imposed by the FERC require Warren

to undertake a “moderate amount of construction and

environmental mitigation and enhancement measures.”

See Multi-Project Order at 61,144, 4 86. The record evi-

dence supports the Commission’s assessment. More

extensive construction that might be required under

Interior’s conditional fishway prescriptions could, if

actually imposed, provide a basis for extending the license

term. Until that time, the 40-year license term, instead of

the 50-year license Warren had sought for “extensive”

construction, cannot be considered arbitrary or capricious.

App. 7

M.G. Deacon, Jr. [LOGO]

Vice President

[Illegible] & Hydro

Dominion Generation

Innsbrook Technical Center

5000 Dominion Boulevard, Glen Allen, VA 23060

August 26, 2003

Ms. Magalie R. Salas, Secretary

Federal Energy Regulatory Commission

888 First Street, N.E.

Washington, DC 20426

(Filed Aug. 27, 2003)

Dear Ms. Salas:

Virginia Electric and Power Company, doing business as

Dominion Virginia Power (Dominion) is working with

FERC staff to complete the record for the license renewal

for Roanoke Rapids and Gaston, project no. 2009. Attached

you will find the State of North Carolina’s CWA Section

401 Certification for the project.

If you have any questions related to this submittal, please

call Jim Thornton (804) 273-3257.

Sincerely,

isi MGDJ

M. G. Deacon, Jr.

App. 8

Attachment

ec: Mr. Allan Creamer, FERC, Washington, DC

App. 9

[LOGO] [Names Omitted In Printing]

July 30, 2003

(Filed Aug. 27, 2003)

Mr. Malcolm G. Deacon, Jr. Vice President —

Fossil and Hydro

Dominion Energy and Dominion Generation

Innsbrook Technical Center

5000 Dominion Blvd.

Glen Allen, VA 23060

Dear Mr. Deacon:

Re: Certification Pursuant to Section 401 of the Federal

Clean Water Act for the Roanoke Rapids and Lake

Gaston FERC Relicensing Project

WQC Project #02-0919

FERC Number 2009

Halifax County and adjacent counties

Attached hereto is a copy of Certification No. 3208

Issued to Dominion North Carolina Power dated July 30,

2003. If we can be of further assistance, do not hesitate to

contact us.

Sincerely,

/s/

Alan W. Klimek, P.E. Director

Attachments

ce: Raleigh and Washington DWQ Regional Offices

Doug Huggett, Division of Coastal Management

File Copy

Central Files

Darlene Kucken; DWQ Basinwide Planning

Program Unit

Jim Mead, NC Division of Water Resources

App. 10

Marc Bernstein, NC Attorney General’s Office

Robin Smith, DENR

Thomas Leahy, Ill P-E., City of Virginia Beach, VA

Jean McCarter, Lake Gaston Association

Bob Lindsay, Roanoke River Basin Association

Garland Pardue, US Fish and Wildlife

Service — Raleigh

David Rackley, National Marine Fisheries Service,

Charleston, SC

Shannon Denton, NC Wildlife Resources Commission

Ron McKittrick, Federal Energy Regulator

Commission

Sara Winslow, NC Division of Marine Fisheries

Bud Laroche, Virginia Department of Game

and Inland Fisheries

Rheta Geddings, SC Department of Health and

Environmental Control

Ellen Gifinsky, VA Water Control Board,

Wetlands Program

Joseph Hassell, VA Department of

Environmental Quality

NORTH CAROLINA 401 WATER

QUALITY CERTIFICATION

THIS CERTIFICATION is issued in conformity with

the requirements of Section 401 Public Laws 92-500 and

95-217 of the United States and subject to the North

Carolina Division of Water Quality (DWQ’) Regulations in

15 NCAC 2H, Section .0500. It is issued to Dominion

North Carolina Power (“the applicant”) in Halifax County

and adjacent counties pursuant to a revised application

filed on the 20th day of November, 2002 to, among other

things, retain the Gaston and Roanoke Rapids dams

across the Reanoke River.

RPO

App. 11

The application provides adequate assurance that the

retention of fill material into the waters of the Roanoke

River in conjunction with retention and operation of these

dams and other project activities will not result in a

violation of applicable Water Quality Standards, discharge

guidelines and other applicable State laws. Therefore, the

State of North Carolina certifies that this activity will not

violate the applicable portions of Sections 301, 302, 303,

306, 307 of PL 92-500 and PL 95-217 if conducted in

accordance with the application and conditions hereinafter

set forth.

This approval is only valid for the purpose and design

that you submitted in your application, as described in the

revised application. If you change your project, you must

notify us and may be required to send us a new application

for a new Certification. If the property is sold, the new

owner must be given a copy of the Certification and

approval letter and is thereby responsible for complying

with all conditions. For this approval to be valid, you must

follow the conditions listed below. The issuance of this

Certification shall not exempt the applicant from comply-

ing with any and all statutes, rules, regulations, or ordi-

nances tuat may be imposed by other government agencies

(local, state and federal) which have jurisdiction, including

but not limited to applicable river buffer rules in 15A

NCAC 2B .0200, erosion and sedimentation control re-

quirements in 15A NCAC Chapter 4 and under the Divi-

sion’s General Permit NCG010000, and any requirements

pertaining to wetlands under 15A NCAC 2B .0200, 15A

NCAC 2H .0500 and 15A NCAC 2H .1300. This Certifica-

tion is issued on the express representation by the appli-

cant that the Settlement Agreement referenced herein has

been executed by all necessary signatories and therefore is

App. 12

in effect. If the Settlement Agreement is not in effect as of

July 30, 2003 then this Certification may be modified by

DWQ in order to coincide with the relevant provisions of

that Settlement Agreement.

Condition(s) of Certification:

1 Flow In the Bypass Reach -

1.1 Flow of water in the bypass reach shall not be

1.2

less than 325 cfs at any time except as modified

by future adaptive management studies as ap-

proved in writing by DWQ. The adaptive man-

agement studies shall focus on the spawning

window (at least March 15 through June 15).

However, slight reduction in flows in the winter

months may be approved, but shall not result in

minimum flows less than 300 cfs. The flow shall

be released from both the north and south ends

of the dam so that it is evenly distributed into

the reach. The precise schedule for release may

be developed in consultation with the Coopera-

tive Management Team (“CMT”) consisting of

representatives of the NC Department of Envi-

ronment and Natural Resources (“DENR”), NC

Wildlife Resources Commission (“WRC”), US

Fish and Wildlife Service (“USFWS”), National

Marine Fisheries Service (“NMFS”) and the ap-

plicant.

The applicant shall provide on a periodic basis

for the duration of 24 consecutive hours, flow to

the bypass reach of 500 cfs (“freshet flow”) on a

schedule provided by DWQ in consultation with

WRC. The scheduling of the 500-cfs flow may be

on weekends in order to minimize the cost of

hydropower losses.

— —

1.3

1.4

App. 13

The applicant shall follow an annual schedule

provided by DWQ upon consultation with WRC

to the applicant by November 30 for the follow-

ing year. The annual scheduling of the 500-cfs

may not exceed a total of 17 days of the freshet

flows. After the annual schedule has been pro-

vided to the applicant, DWQ may modify the

schedule in consultation with WRC but shall

give the applicant a minimum of 10 days notice

prior to modification of the 500-cfs schedling.

Whenever flood flows require opening o. the

Roanoke Rapids darn floodgates for at ieast one

24-hour period and up to 21 days, this will

count as one of the 500-cfs flow days. (A 22 to

42-day flood release would vount as two freshet

flow days, etc.) If, during a study cycle, the flow

for a period of 21 days equals or exceeds 500 cfs,

the number of freshet flows requirec for that

year will be reduced by one. The applicant shall

provide to DENR and WRC by March 31 of the

following year, a report that lists the days that

the 500 cfs freshest flow was passed into the by-

pass reach. Consistent with article FL1, section 4

of the Settlement Agreement, during cycles two,

three and four of the bypass reach study, the an-

nual scheduling of the 500-cfs may not exceed a

total of 13 days of the freshet flows.

The applicant shall reduce flood flow releases at

the Roanoke Rapids dam from 35,000 cfs (or

any flow greater than 5,000 cfs through the

floodgates) to 25,000 cfs in consultation with

the US Army Corps of Enginvers (“USACE”).

Once the flood releases through the Roanoke

Rapids floodgates are reduced to 5,000 cfs, the

applicant shall reduce the flows in the bypass

reach per the rates in Table 1 below:

1.5

1.6

App. 14

Table 1

Hour Release (cfs)

0 5,000

4 4,000

8 3,000

12 2,000

16 1,500

20 1,000

24 700

28 500

32 325

If flood releases occur but do not reach 5,000 cfs

through the floodgates, the table above shall

still be used starting at the maximum flood re-

lease. The bypass reach flow may be temporarily

modified if required by unusual circumstances

upon written agreement between the DWQ and

the USACE and in consultation with the Licen-

see and the WRC. Temporary changes will be

coordinated with the other agendas of the CMT

in a timely manner.

If DWQ, in consultation with the CMT, delays

Implementation of this condition to allow for

the collection of baseline data, Implementation

shall begin as determined by DWQ. If the im-

plementation of this condition is not so delayed,

then the applicant shall begin releasing water

into the bypass reach within one week of accep-

tance of the new license for Federal Energy

Regulatory Commission Project No. 2009 (“new

FERC license”).

The applicant, in consultation with the CMT,

shall conduct the study described in article

FL1, section 4 of the Technical Settlement (Ap-

pendix B) of the Settlement Agreement. Consis-

tent with such article, the applicant shall not

App. 15

adopt a new flow regime for the bypass reach

without written approval from DWQ.

2 Minimum Releases from the Roanoke Rapids

dam - The following schedule shall be followed for

the minimum release of water from the dam. “Decla-

ration” refers to the daily mean of the USACE

weekly declaration. The applicant shall implement

this new flow regime within 30 days of acceptance of

the new FERC license.

2.1 - Minimum and Target Flow Releases

from Roanoke Rapids Dam

Timeframe Condition Minimum Flow

Jan. 1-15 Declaration < 6000 cfs} 2000 cfs

Declaration < 6000 cfs| 2500 cfs

Jan. 15-Feb. 28/29 |Declaration < 6000 cfs! 2500 cfs or

declaration,

whichever is less

Declaration > 6000 3000 cfs

March Declaration < 3500 cfs) minimum flow =

Declaration > 3500 minimum flow =

two of the weeks

Rampup _ [Ramp up from min.

by 5000 cfs hold for 1

pon Geneome

oad

App. 16

App. 17

flood control releases from the Roanoke Rapids

dam, the applicant shall work in conjunction

with the USACE to reduce flows in the main-

stream river gradually during the months of

May through September to minimize the effects

of inflow of water with low oxygen levels into

Roanoke River from downstream wetlands.

Upon agreement with the USACE and in con-

sultation with DWQ, the applicant shall im-

plement the following step-down schedule from

a 20,000-cfs flow:

Ramp down p down to min.

ow + 5000 cfs, hold

or one hour then go

minimum flow.

April 1-June 15 All conditions = mean of

eekly declaration,

peaking

Ramp from one to

weekly declara-

ion cannot exceed

cfs per hour

June 16-June 30 All conditions 2800 cfs or

declaration,

whichever is less

July 1-September All conditions 2000 cfs

15

Sept. 16-Nov. 15 All conditions 1500 cfs

Nov. 16-Nov. 30 All conditions 2000 cfs

Dec. 1-Dec.31 |Declaration < 6000 cfs|__ 2000 cfs

Declaration > 6000 cfs| 2500 cfs

2.2 When the USACE declares a drought, the ap-

Table 3

Hour Flow (cfs)

0 17,000

8 14,000

16 12,000

20 11,000

24 10,500

28 10,000

32 9,500

6 9,000

plicant shall maintain the following drought

minimum flows unless otherwise directed by

the USACE in consultation with DWQ and

WRC:

Table 2

January — August

2000 cfs

September — November /|1500 cfs

December

2000 cfs

2.3 Transition from Flood Control to Normal Hy-

dropower Operations —

The applicant shall work in conjunction with

the USACE to gradually reduce flows in the by-

pass reach per the schedule described in Condi-

tion 1 of this Certification. Following USACE

This schedule may be revised upon written re-

quest to DWQ if the ongoing USACE section

216 study indicates a different step-down

schedule should be followed.

Table 3, above, represents a maximum flow re-

duction schedule. A slower step-down schedule

(one that reaches the 9000 cfs flow over a longer

period of time) may be approved by the USACE

in consultation with DWQ and the applicant on

a case by case basis. During the time-frame

needed to execute the flow reduction schedule,

the applicant would not engage in _ load-

following operations. The applicant shall im-

plement the step-down flow schedule beginning

App. 18

when the applicant has accepted the new FERC

license.

3 Downstream Water Quality -

3.1 Minimum Flow — Minimum flows to address

3.2

downstream uses are discussed in Condition 2

of this Certification.

Erosion and Sedimentation — The applicant

shall develop a plan to monitor the effect of

within-day peaking on benthic macroinverte-

brates, fish communities and stream bank ero-

sion along the Roanoke River downstream of

the Roanoke Rapids dam. The development of

that plan shall be in cooperation with a CMT

consisting of WRC, DENR, USFWS, NMFS, the

Nature Conservancy (“TNC”), and the appli-

cant, with the Regional Partnership of Local

Governments (“RPLG”) as an ex officio member.

Monitoring cycles shall consist of five-year peri-

ods beginning when the applicant accepts a new

FERC license. The applicant shall be required

to fund the cost of Implementing the monitoring

plan up to the amount of $30,000 annually

(2002 dollars adjusted according to the Con-

sumer Price Index). Any portion of the $30,000

not utilized shall be carried forward to the Li-

censee’s future annual budget cycles and shall

be in addition to the $30,000 allocated for that

cycle. In the thirtieth year of the license, the Li-

censee shalt consult with the GMT to determine

if an increase in funding of the monitoring pro-

gram is appropriate. Within one year of the ac-

ceptance of the new FERC license, the applicant

shall transmit the plan to DWQ for written ap-

proval and subsequent implementation by the

applicant. If DWQ does not provide written

comments to the applicant within 60 days of

App. 19

receipt of this plan, then the plan may be Im-

plemented as submitted. During the first moni-

toring cycle, data collection shall not be

required to start until year two to allow for de-

velopment of the monitoring plan and protocols.

DWQ, in consultation with the CMT, will re-

view monitoring data at the end of each cycle to

determine if it establishes a link between the

applicant’s within-day peaking and (a) erosion

of the banks of the Roanoke River downstream

of the Roanoke Rapids dam and/or (b) negative

effects on downstream benthic macroinverte-

brate or fish species and communities. If such a

link is established, then DWQ - in consultation

with the CMT — will develop an approach that

requires the applicant to address those effects

by modifying one of the following: maximum

peaking flow; difference between base flow and

peak flow on peaking days; ramping rates; du-

ration of base flow (in hours) between peaking

releases; modification of the definition of a

peaking period in condition 8 of this Certifica-

tion; or some other modification that the CMT

suggests might reduce adverse impacts of

within-day peaking on aquatic biota and/or

stream bank stability. Seasonal variations may

also be incorporated in this approach. Upon

written notice of the development and written

approval from DWQ for this approach, the ap-

plicant shall Implement this approach.

If subsequent monitoring indicates a continuing

link between within-day peaking operations

and bank erosion and/or negative effects on

downstream aquatic species and immunities,

then DWG - in consultation with the CMT - will

develop an additional Incremental modification

from the [sic] those listed in the paragraph

3.3

App. 20

above that the applicant must implement to

further reduce those effects. Upon written noti-

fication of any additional incremental modifica-

tion, and so long as such modifications reduce

the latitude available to the applicant for

within-day peaking by a proportional amount

equivalent to 5 divided by the period of the new

FERC license in years, the applicant shall im-

plement such modification. The exact means for

calculating the proportionality of steps will be

determined by DWQ in consultation with the

CMT. If any operational changes subject to this

section (3.2) would conflict with release re-

quirements subject to sections 2, 3.4 or 3.5 of

this Certification, then the flow-related condi-

tions of these other sections shall take prece-

dence.

Minimum Oxygen Releases from the Roanoke

Rapids Dam — Water flowing through the hy-

dropower turbines from the Roanoke Rapids

dam shall meet or exceed the Instantaneous

dissolved oxygen standard in effect as of the

date of the discharge. The Instantaneous dis-

solved oxygen standard as of the date of this

Certification is 4.0 mg/L (ppm) (15A NCAC 2B

.0211(3)(b)).

Water flowing through the hydropower turbines

from the Roanoke Rapids dam shal] meet or ex-

ceed the mean, daily dissolved oxygen standard

in effect as of the date of the discharge. The

mean, daily dissolved oxygen standard as of the

data of this Certification is 5.0 mg/L (ppm) (15A

NCAC 2B .0211(3)(b)). The daily mean oxygen

concentration shall be calculated as the mean of

all instantaneous analyses collected in a 24-

hour period to be no less than 24, hourly meas-

urements. If dissolved oxygen concentrations

App. 21

immediately upstream of the project do not

meet or exceed the instantaneous dissolved

oxygen standard and mean, daily dissolved

oxygen standards in effect as of the date of the

discharge, then the Raleigh Regional Office of

DW@Q shall be notified in writing and via tele-

phone. In any case, the dissolved oxygen in the

water flowing through the hydropower turbines

from the Roanoke Rapids dam shall equal or

exceed the upstream dissolved oxygen concen-

tration.

Oxygen concentrations shall. be measured in

the tailrace.

Within six months of the applicant’s acceptance

of a new FERC License, the applicant shall

submit a draft agreement to DWQ regarding

the location of the sampling point upstream of

the project if the dissolved oxygen water quality

standard is not met in the tailwaters below

Roanoke Rapids dam, then the applicant shall

begin sampling for dissolved oxygen levels

within two business days in Lake Gaston and in

the tailwaters below Lake Gaston.

Data from the Roanoke Rapids monitoring shall

be maintained on a real-time basis via Internet

and forwarded to the Wetland/401 Unit, the

Ecosystems Unit and the Raleigh and Washing-

ton Regional Offices of DWQ every other month

from November 1 through May 31 and monthly

from June 1 through October 31. Data must be

submitted electronically and DWQ shall be no-

tified in writing that the data have been sent.

Data must include Flow (cfs), Dissolved Oxygen

concentrations (mg/L) and Water Temperature

(°C).

3.4

App. 22

In the event of temporary emergency conditions

arising in the performance of the above condi-

tions, the applicant shall cooperate in good faith

with DWQ and WRC to take such reasonable

steps to protect the water quality of the Roa-

noke River below the Gaston and Roanoke Rap-

ids dams.

Flow Augmentation from Lake Gaston Storage

during Drought Conditions — Conditions requir-

ing flow augmentation from Gaston storage:

If all four of the following conditions are met,

the applicant shall begin augmenting down-

stream flows from the Lake Gaston storage in

consultation with DWQ and WRC.

a) USACE is operating Kerr reservoir under

its drought management strategy,

b) Roanoke Rapids dam is not in a hydro-

power peaking mode and is only releasing

drought minimum flows as directed by the

USACE drought management strategy or

when condition 2.2 is in effect,

c) A weekly declaration from USACE is is-

sued that is less than the total of drought

minimum flow required at the Roanoke

Rapids dam, and

d) Lake Gaston water level is above 197' msl.

Lake Gaston storage — Lake Gaston normal wa-

ter level shall be regulated by the applicant: in

order to maintain the existing uses of the lake

with the following provisions. if all of the

drought storage is used for downstream flow

augmentation, then the applicant shall regulate

Lake Gaston from 197.5’ msl to 196.5' msl, in

App. 23

order to meet system operational needs with

the following provisions:

a) For the purpose of flow augmentation

downstream under the conditions listed

above, Lake Gaston has 3 feet of drought

storage.

b) Lake Gaston has approximately 60,000

acre-feet of storage between 200' msl and

197' msl.

c) The applicant utilizes one foot of storage

for normal operation between 200' msl and

199’ msl.

Once above conditions are met, Lake Gaston

storage shall be used to augment the down-

stream flow to adhere to the FERC minimum

flow, per direction of DWQ.

Once Lake Gaston reaches 197' msl. flow aug-

mentation shall cease and flow entering the

project from Kerr Lake shall equal the flow

leaving the Roanoke Rapids dam, after account-

ing for consumptive withdrawals, evaporation

and inflows to Lake Gaston and Roanoke Rap-

ids Lake.

When the USACE weekly declaration begins to

exceed the Roanoke Rapids dam drought mini-

mum flows, the applicant shall allow Lake Gas-

ton to refill to 199.5' msl prior to:

a) exceeding drought minimum flow at the

Roanoke Rapids dam and,

b) starting to operate the Roanoke Rapids pro-

ject in a hydropower peaking mode.

3.5

App. 24

The applicant shall implement these conditions

only upon consultation with and direction from

the USACE and DWQ.

Downstream Water Quality Monitoring -

The applicant shalt fund three of the current

USGS continuous water quality monitoring sta-

tions for dissolved oxygen and temperature at

Halifax, Oak City and Jamesville. These sta-

tions shall be operated continuously throughout

the year.

The applicant shall provide funding annually

by March Ist of each year to DENR.

The stations shall be monitored to document

that dissolved oxygen levels in the Roanoke

River, as a result of the drainage of water from

the floodplain resulting from project operations,

equals or exceeds the instantaneous dissolved

oxygen standard and mean, daily dissolved oxy-

gen standards in effect as of the date of the dis-

charge in the mainstem river (15A NCAC 2B

-.0211(3)(b)). This concentration shall be calcu-

lated using all available daily data or as (at

least) the mean of 24, hourly instantaneous

analyses.

At such time DWQ establishes that the appli-

cant’s operations do not or no longer affect

downstream water quality, applicant funding

shall no longer be required.

If funding is discontinued in accordance with

this Condition and subsequent applicant opera-

tional changes enable DWQ to demonstrate

that water quality monitoring is again neces-

sary, the applicant’s funding requirement shall

App. 25

be reinstated. The study period shall be mutu-

ally agreed upon by the applicant, DWQ and

WRC.

Data shall be forwarded to the Wetland/401

Unit, the Ecosystems Unit and the Raleigh and

Washington Regional Offices of DWQ every

other month (bi-monthly) from November 1

through May 31 and monthly from June 1

through October 31. Data must be submitted

electronically. Data must include all available

parameters collected by the USGS (e.g. stage or

flow) in addition to: site, date, time, depth, dis-

solved oxygen concentrations (mg/L.), and wa-

ter temperature (oC). In the event of emergency

water quality conditions, the applicant shall co-

operate in good faith with DWQ and WRC to

take such reasonable steps to protect the water

quality of the Roanoke River below the Roanoke

Rapids dam.

The applicant, DWQ and WRC shall mutually

agree upon a method of evaluating data col-

lected within the first year of monitoring. Data

evaluation shal! occur on a five-year cycle.

If during water quality data evaluation, DWQ

(in consultation with WRC) finds that scientific

data establish a causal link between the appli-

cants rescheduling of the USACE’s weekly dec-

laration and the reduction of water quality in

the mainstem river below State standards, the

applicant with concurrence of DWQ and WRC

shall identify and implement operational

changes that will significantly reduce the appli-

cant’s water quality impacts.

Each operational change implemented accord-

ing to the preceding paragraph must reduce the

App. 26

applicant’s rescheduling of the USACE weekly

declaration by a proportional amount equiva-

lent to 5 divided by the period of the new FERC

license in years. Thus, if as the result of moni-

toring, the applicant implements a change to

reduce its rescheduling of the USACE weekly

declaration at the end of each monitoring cycle,

by the end of the last monitoring cycle, each day

the applicant shall release one seventh of the

USACE weekly declaration. The exact means

for calculating the proportionality of steps will

be determined by DWQ in consultation with

WRC and the applicant.

The applicant’s flexibility for scheduling re-

leases during a peaking day is not constrained

by this condition.

The applicant is not required by this Certifica-

tion to make modifications to the USACE

weekly declaration.

The maximum operational duty of the applicant

under this Condition is reached when the daily

water flow through the Roanoke Rapids dam

equals one-seventh of the USACE weekly decla-

ration as long as this flow does not conflict with

the requirements of condition 3.4 above.

App. 27

FERC license and shall report proposed new or

expanded consumptive uses to DWQ and DWR

within 30 days of receiving a request for the

proposed new or expanded withdrawal and be-

fore submitting any requests to FERC. Condi-

tions 4 through 7 of this Certification apply to

large consumptive uses, but not exclusively.

Conservation and Drought Management -

In anticipation of low flow conditions, such as

occur during critical droughts, the applicant

shall take actions as described in this Certifica-

tion to ensure that sufficient water of adequate

quality is and will be available to assure com-

pliance with State water quality standards and

other appropriate requirements of State law. In

furtherance of the purposes of this condition,

article FL6, section 3 of the Technical Settle-

ment (Appendix B) of the Settlement Agree-

ment (“FL6 §3”), is made part of this

Certification as if set forth fully herein. Any

amendment to FL6 § 3 shall not become a part

of this Certification except through the proce-

dures set forth in condition 7. The applicant

shall take all actions specifically required of the

applicant by FL6 §3 and shall take all other

necessary actions within its authority to im-

4 Reporting of Consumptive Uses - plement FL6 § 3.

The applicant shall identify and report in writ- 6 No Rights Granted -

ing existing and proposed consumptive uses to

DW@Q and the NC Division of Water Resources

(“DWR”). The applicant shall report the existing

or projected (as appropriate) average consump-

tive withdrawal and maximum capacity for

each withdrawal. The applicant shall report ex-

isting consumptive uses to DWQ and DWR

within 60 days of the acceptance of the new

This Certification does not grant or affirm any

property right, license or privilege in any waters

or any right of use in any waters. This Certifica-

tion does not authorize any person to interfere

with the riparian rights, littoral rights or water

use rights of any other person, and this Certifi-

cation does not create any prescriptive right or

App. 28

any right of priority regarding any usage of wa-

ter. No person shalt interpose this Certification

as a defense in any action respecting the de-

termination of riparian or littoral rights or

other water use rights. No consumptive user is

deemed by virtue of this Certification to possess

any prescriptive or other right of priority with

respect to any other consumptive user regard-

less of the quantity of the withdrawal or the

date on which the withdrawal was initiated or

expanded. This Certification issues on the ex-

press understanding of DENR that, pursuant to

Federal Power Act section 27, 16 U.S.C. § 821,

the new FERC license does not establish or de-

termine a proprietary right to any use of water.

It establishes the nature of the use to which a

proprietary right may be put under the Federal

Power Act.

Continuing Compliance -

The applicant shall conduct its activities in a

manner consistent with State water quality

standards (including any requirements result-

ing from compliance with section 303(d) of the

Clean Water Act, 33 U.S.C. § 1313(d)) and any

other appropriate requirements of State law

and federal law. If DWQ determines that such

standards or laws are not being met (including

the failure to sustain a designated or achieved

use or to comply with any new or amended wa-

ter quality standards or other appropriate re-

quirements of State or federal law) or that

State or federal law is being violated, or that ,

further conditions are necessary to assure com-

pliance, DWQ may reevaluate and modify this

Certification to include conditions appropriate

to assure compliance with such standards and

requirements in accordance with 154A NCAC

App. 29

2H.0507(d). Before modifying the Certification,

DWQ will notify the applicant and FERC, pro-

vide public notice in accordance with 15A

NCAC 2H.0503 and provide opportunity for

public hearing in accordance with 15A NCAC

2H.0504. Any new or revised conditions will be

provided to the applicant in writing, will be

provided to the USACE for reference in any

permit issued pursuant to Section 404 of the

Clean Water Act, 33 U.S.C. § 1344, for the pro-

ject, and shall also become conditions of the

new FERC license for the project. This condi-

tion shall constitute “reserved authority” as

that term is used in Section 9.2 of the Settle-

ment Agreement. The conditions of this Certifi-

cation are not modified or superseded by any

condition or article of the new FERC license.

Definitions/Glossary of Terms -

The listed terms are definitions utilized

throughout this Certification unless otherwise

specified in specific conditions of the Certifica-

tion.

cfs — (Cubic feet per second) — Volume of one

cubic foot of water passing a given point in one

second.

Day — The 24 hour period from midnight to

midnight.

Diadromous Fish - Fish that live as adults in

a salt water system and spawn in a fresh water

system (anadromous) or fish that live as adults

in fresh water and spawn in salt water

(catadromous).

Drought Declaration — For the purpose of

this settlement agreement, a declared drought

App. 30

is whenever the USACE activates the Drought

Advisory Committee.

Electrical Demand Emergency - A condition

of the applicant’s power grid that potentially

would lead to reduction in voltage (brownouts)

or removing alternating customers from electri-

cal service (rolling black-outs) because demand

exceeds production within the applicants ser-

vice area.

Flood Control — The controlled release of wa-

ter from the USACE Kerr dam when the level

in Kerr Reservoir is in or above Zone E of the

' guide curve. 7

Instantaneous Flow — The flow in cfs passing

a point at a particular instant.

Kerr Dam (Buggs Island Dam) — The dam on

the Roanoke River immediately upstream of the

Gaston dam, forms Kerr Lake federally owned

and operated by the USACE.

mg/L (milligrams per liter) — An expression

of chemical concentration of matter (solid, liq-

uid or gas) dissolved in a liquid (usually water).

Minimum Flow and Target Flow — Unless

otherwise stated, minimum flow and target flow

shall refer to the sum of the instantaneous re-

leases made by the applicant from Roanoke

Rapids dam.

MWH (megawatt hour) — A unit of measure

for the production of electricity equal to 1 mil-

lion watts for one hour.

Peaking Day — Any day when the amount of

water released by the applicant from the Roa-

noke Rapids dam exceeds the daily mean of the

App. 31

USACE weekly declaration by 1000 cfs aver-

aged over the day.

Peaking Period — Any two-hour period when

the mean rate of release in cfs exceeds the

hourly mean of the daily release by 2500 cfs or

more, or as modified as per section 3.2.

ppm (parts per million) — An expression of

chemical concentration of matter (solid, liquid

or gas) dissolved in a liquid (usually water).

One ppm = one mg/L.

Settlement Agreement -— The “Comprehen-

sive Relicensing Settlement Agreement for the

Roanoke Rapids and Gaston Dam Project,

FERC Project No. P-2009,” effective July 2003.

USACE Weekly declaration - The total

amount of water the USACE allocates for release

in one week, plus additional water (energy) util-

ized by the applicant or Progress Energy from

their storage accounts, including adjustments the

USACE may make during the week. The declara-

tion may be referred to in either power (MWH) or

flow (cfs) units. When compared to or used to de-

fine minimum flow or target flow, the weekly dec-

laration shall be net of evaporation, consumptive

uses and local inflows into Lake Gaston and Roa-

noke Rapids Lake, except that water withdrawals

shall not be considered consumptive uses to the

extent they are supported by the release of water

from dedicated storage in Kerr Reservoir.

Week - The period of 7 days covered by the

weekly declaration of the Corps, currently, Sat-

urday 0000 hours through Friday 2400 hours.

Weekly Declaration Flood (WDFlood) — any

flood plain inundation that results (or would

App. 32

result) from a USACE weekly declaration of

flood control releases whether or not the appli-

cant releases peaking flows during the week.

Within-day Peaking - Any day with one or

more peaking periods.

Within-week Peaking — Any week with one or

more peaking days.

Violations of any condition herein set forth may result

in revocation of this Certification and may result in

criminal and/or civil penalties or other enforcement action.

This Certification shall become null and void unless the

above conditions are made conditions of the FERC Permit

This Certification shall expire upon expiration of the

FERC permit.

If this Certification is unacceptable to you, you have the

right to an adjudicatory hearing upon written request within

sixty (60) days following receipt of this Certification. This

request must be in the form of a written petition conforming to

Chapter 150B of the North Carolina General Statutes and filed

with the Office of Administrative Hearings, PO. Box 27447,

Raleigh, N.C. 27611-7447. If modifications are made to an

original Certification, you have the right to an adjudicatory

hearing on the modifications upon written request within sixty

(60) days following receipt of the Certification. Unless such

demands are made, this Certification shall be final and binding.

This the 30th day of July 2003

DIVISION OF WATER QUALITY

/s/ [illegible]

Alan Klimek, P.E., Director

Certification Number 3208

App. 33

Certificate of Completion

DWQ Project No.: 02-0919 County: Halifax and other

adjacent counties

Applicant: Dominion North Carolina Power

Project Name: Roanoke Rapids and Lake Gaston FERC

Project

Date of issuance of 401 Water Quality Certification:

July 30, 2003

Upon completion of all work approved within the 401

Water Quality Certification or applicable Buffer

Rules, and any subsequent modifications, the appli-

cant is required to return this certificate to the

401/Wetlands Unit, North Carolina Division of Water

Quality, 1621 Mail Service Center, Raleigh, NC,

27699-1621.This form may be returned to DWQ by the

applicant, the applicant’s authorized agent, or the pro-

ject engineer. It is not necessary to send certificates

from all of these.

Applicant’s Certification

I, , hereby state that, to the best of my

abilities, due care and diligence was used in the ob-

servation of the construction such that the construc-

tion was observed to be built within substantial

compliance and intent of the 401 Water Quality Certi-

fication and Buffer Rules, the approved plans and

specifications, and other supporting materials.

Signature: Date:

Agent’s Certification

I, , hereby state that, to the best of my abilities,

due care and diligence was used in the observation of

the construction such that the construction was ob-

served to be built within substantial compliance and

Intent of the 401 Water Quality Certification and

App. 34

Buffer Rules, the approved plans and epecifications,

and other supporting materials.

Signature: Date:

If this project was designed by a Certified Professional

I, , as a duly registered Professional

(i *., Engineer, Landscape Architect, Sur-

veyor, etc) in the State of North Carolina, having been

authorized to observe (periodically, weekly, full time)

the construction of the project, for the Permittee

hereby state that, to the best of my abilities, due care

and diligence was used in the observation of the con-

struction such that the construction was observed to

be built within substantial compliance and intent of

the 401 Water Quality Certification and Buffer Rules,

the approved plans and specifications, and other sup-

porting materials.

Signature: Registration No. Date

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.