Joint Appendix — Stewart v. Dutra Constr. Co.

Supreme Court brief2005

Ask Donna

What actually matters in this document.

Text

rs) Supreme Court, U.&

/ FILED

| OFFICE OF THE CLERK

In The an

Supreme Court of the Anited States

°

WILLARD STEWART,

Petitioner,

V.

DUTRA CQNSTRUCTION CO.,

Respondent.

r

On Writ Of Certiorari To The

United States Court Of Appeals

For The First Circuit

o

JOINT APPENDIX

e

DAVID B. KAPLAN* HARVEY WEINER*

THOMAS M. BOND FREDERICK E. CONNELLY, JR.

TIMOTHY M. BAROUCH JOHN J. O'CONNOR

THE KAPLAN/BOND GROUP PEABODY & ARNOLD LLP

Boston Fish Pier 30 Rowes Wharf

West Building, Suite 304 Boston, Massachusetts 02110

Boston, Massachusetts 02210 (617) 951-2100

(617) 261-0080 (617) 951-2125 fax

(617) 261-1558 fax Counsel for Respondent

DAVID W. ROBERTSON

MICHAEL F. STURLEY

727 Eest Dean Keeton Street

Austin, Texas 78705

(512) 232-1350

(512) 471-6988 fax

Counsel for Petitioner

May 24, 2004 *Counsel of Record

Petition For Certiorari Filed December 3, 2003

Certiorari Granted February 23, 2004

COCKLE LAW BRIEF PRINTING CO (800) 225-6964

OR CALL COLLECT (402) 342-2831

i

TABLE OF CONTENTS

Page

District Court Docket EntrieS..............:cccccscccssseeseseseeeereeees 1

Court of Appeals Docket Entries ....................ccccscceeeeeeeeeeees 7

Amended Complaint, Willard T. Stewart v. Dutra

Construction Company, Inc., No. 95-11046-RCL

(D. Mass. Filed: September 12, 1996) ................:::ccceeeee 11

Defendant, Dutra Construction Company, Inc.’s,

Motion for Summary Judgment, Willard T. Stew-

art v. Dutra Construction Company, Inc., No. 95-

11046-RCL (D. Mass. Filed: September 16, 1996)........ 17

Defendant, Dutra Construction Company, Inc.’s,

Supplemental Motion for Summary Judgment,

Willard T. Stewart v. Dutra Construction Com-

pany, Inc., No. 95-11046-RCL (D. Mass. Filed:

October 18, 1996)..................... sseduapeaininindnimanditiemiaiainnieine 42

Answer of Dutra Construction Company, Inc. to

Plaintiffs Amended Complaint, Willard T. Stew-

art v. Dutra Construction Company, Inc., No. 95-

11046-RCL (D. Mass. Filed: December 3, 1996)........... 67

Defendant’s Response to Plaintiffs Request For

Admissions (Originally Attached as Exhibit C to

Plaintiffs Motion for Rehearing) Willard T.

Stewart v. Dutra Construction Company, Inc.,

C.A. No. 95-12311-NG (D. Mass. Filed: October 6,

United States Coast Guard Certificates of Inspec-

tion for Super Scoop (Originally Attached as Ex-

hibit D to Plaintiffs Motion for Rehearing)

Willard T. Stewart v. Dutra Construction Com-

pany, Inc., No. 95-11046-RCL (D. Mass. Filed:

BIE GEE CIE ciucensriesitninenepesiileionensianinessnenntetininapiensnasedin 89

ii

TABLE OF CONTENTS - Continued

~ Page

International Load Line Certificate by the Ameri-

can Bureau of Shipping for the Super Scoop

(Originally Attached as Exhibit E to Plaintiffs

Motion for Rehearing) Willard T. Stewart v.

Dutra Construction Company, Inc., No. 95-11046-

RCL (D. Mass. Filed: October 6, 1999) ....................06. 103

Section 148 of Dutra Construction Company, Inc.’s

Contract for Dredging (Originally Attached as

Exhibit F to Plaintiffs Motion for Rehearing)

Willard T. Stewart v. Dutra Construction Com-

pany, Inc., No. 95-11046-RCL (D. Mass. Filed:

Coatebber 6, 1GBB). .ccccccccceccodecscoccsnccssensnnennsniennenaaaaaane 109

Defendant’s Opposition to Plaintiffs Motion for

Rehearing, Willard T. Stewart v. Dutra Construc-

tion Company, Inc., No. 95-11046-RCL (D. Mass.

Filed: Osteber 3B, 2GGGP ..cocceccescccsocsccoseseussennanuaann 148

The following documents have been omitted in the

printing of this Joint Appendix. They may be found

in the Appendix to the Petition for Writ of Certio-

rari at the following pages:

Motion for Summary Judgment, United States

District Court for the District of Massachusetts,

Dated Marels 3B, 1660 ....ccccccccccessssssscsccsosssosnensennenl App. 33

Opinion, United States Court of Appeals for the

First Circuit, Filed October 31, 2000.................... App. 15

Defendant, Dutra Construction Co., Inc.’s Motion

for Renewed Summary Judgment on All Remain-

ing Counts, United States District Court for the

District of Massachusetts, Filed November 5,

>) TN HN EN App. 30

iii

TABLE OF CONTENTS - Continued

Page

Judgment, United States District Court for the

District of Massachusetts, Filed May 21, 2002.....App. 32

Opinion, United States Court of Appeals for the

First Circuit, Filed September 4, 2008 ................... App. 1

1

Relevant Docket Entries

United States District Court

District of Massachusetts (Boston)

CIVIL DOCKET FOR CASE #: 1:95-cv-11046-RCL

Filing Date #

05/19/1995

09/10/1996

09/12/1996

09/16/1996

09/16/1996

10/02/1996

1

14

17

18

19

Docket Text

Complaint filed. Case assigned to Judge:

Lindsay. Receipt #: none Amount: $ waived.

(fmr) (Entered: 05/23/1995)

Answer by Dutra Construction to com-

plaint; jury demand, filed c/s. (fmr)

(Entered: 06/09/1995)

Motion by Willard T. Stewart for leave

to file amended complaint, filed. (sat)

(Entered: 09/11/1996)

baa * *

Amended complaint by Willard T.

Stewart filed. (Answer due 9/22/96 for

Dutra Construction). Amended com-

plaint amends [1-1] complaint. (sat)

(Entered: 09/12/1996)

Motion by Dutra Construction for

summary judgment, filed; c/s. (sat)

(Entered: 09/16/1996)

Memorandum by Dutra Construction in

support of [18-1] motion for summary

judgment, filed; c/s. (sat) (Entered:

09/16/1996)

Response by Willard T. Stewart in

opposition to [18-1] motion for summary

judgment, filed; c/s. (sat) (Entered:

10/03/1996)

10/18/1996 23

10/18/1996 24

12/03/1996 28

02/06/1997 30

02/10/1997 32

06/17/1998 36

2

Supplemental Motion by Dutra Con-

s*ruction for summary judgment, filed

c/s. (mh) (Entered: 10/18/1996)

Supplemental Memorandum by Dutra

Construction in support of [23-1] motion

for summary judgment, filed c/s. (Imh)

(Entered: 10/18/1996)

* * *

Answer by Dutra Construction to amended

complaint, filed.; jury demand; c/s. (sat)

(Entered: 12/03/1996)

* * *

Suggestion of bankruptcy by Dutra

Construction, filed; c/s. (sat) (Entered:

02/06/1997)

* * *

Judge Reginald C. Lindsay. Procedural

Order entered. In order to avoid the

necessity for counsel to appear at peri-

odic status conference, the Court enters

the following Administrative Order: The

above-captioned case is dismissed

without prejudice to either party moving

to restore it to the docket, upon final

determination of bankruptcy proceed-

ings, by filing an appropriate motion.

Entered cc/cl (lau) (Entered: 02/10/1997)

~ * *

Judge Reginald C. Lindsay. Clerk’s

Notes: re: status conference; plaintiff

moves to restore this case to the docket-

motion allowed. Case to be reopened.

Counsel report that there is a motion

for summary judgment pending. Only

03/26/1999

03/29/1999

04/19/1999

06/09/1999

06/15/1999

42

45

47

49

3

remaining discovery has to do with

experts depositions; depositions to be

held once the summary judgment has

been decided, if necessary. Counsel to

check with their clients to see if they

agree to mediation. (lau) (Entered

06/18/1998)

* * *

SUPPLEMENTAL Memorandum of law

by Willard T. Stewart re: Contra Defen-

dant’s motion for summary judgment,

filed; c/s. (sat) (Entered: 03/26/1999)

Judge Reginald C. Lindsay. Clerk’s Notes:

re: motion hearing held. After oral argu-

ment, court ruled from the bench, granting

[18-1] motion for summary judgment, and

denying [23-1] motion for summary judg-

ment, all for reasons stated on the record.

Court Reporter: Teri Gibson (sat) (Entered:

03/30/1999)

* * *

Notice of appeal by Willard T. Stewart

filed. Appeal record due on 5/19/99 (lau)

(Entered: 04/20/1999)

* * *

Motion by Willard T. Stewart to stay

pending appeal, filed; c/s. (sat) (Entered:

06/09/1999)

Response by Dutra Construction in opposi-

tion to [47-1] motion to stay pending

appeal, filed. (seh) (Entered: 06/16/1999)

* * ”

4

10/06/1999 56 Motion by Willard T. Stewart for rehear-

10/26/1999

12/17/1999

01/05/2000

11/21/2000

11/29/2000

11/05/2001

11/05/2001

61

69

70

81

82

ing, filed. (sat) Modified on 10/27/1999

(Entered: 10/06/1999)

* * *

Response by Dutra Construction in

opposition to [56-1] motion for rehearing,

filed; c/s. (sat) (Entered: 10/27/1999)

* * *

Judge Reginald C. Lindsay. Endorsed

Order entered denying [56-1] motion for

rehearing. [EOD Date 12/21/99]. Copy

sent to counsel on 12/21/99. (sat) (En-

tered: 12/21/1999)

* * *

Notice of appeal by Willard T. Stewart

filed. Appeal record due on 2/4/00 (sat)

(Entered: 01/06/2000)

* * *

Opinion of the Court of Appeals re: [65-

1} appeal, [45-1] appeal, entered. (jr)

(Entered: 11/21/2000)

Mandate of US Court of Appeals re: [65-

1) appeal, [45-1] appeal affirming the

judgment of the district court. (jr)

(Entered: 11/29/2000)

* * *

Motion by Dutra Construction for

RENEWED summary judgment on all

remaining counts, filed; c/s. (sat) (En-

tered: 11/06/2001)

Memorandum by Dutra Construction in

support of [81-1] motion for RENEWED

02/08/2002

05/21/2002

05/21/2002

05/21/2002

05/30/2002

09/30/2003

91

92

5

summary judgment on all remaining

counts, filed; c/s. (sat) (Entered: 11/06/2001)

* * *

Response by Willard T. Stewart in opposi-

tion to [81-1] motion for RENEWED

summary judgment on all remaining

counts, filed; c/s. (sat) (Entered:

02/08/2002)

-_ * *

Judge Reginald C. Lindsay. Endorsed

Order entered granting [81-1] motion for

RENEWED summary judgment on all

remaining counts.... Motion allowed

based on the application of Morehead v.

Atkinson-Kiewit, 97 F.3s 603 (lst Cir.

1996) to the undisputed facts of record in

this case. [EOD Date 5/21/02]. Copy sent to

counsel on 5/21/02. (sat) (Entered:

05/21/2002)

Judge Reginald C. Lindsay. Judgment on

all counts entered for Dutra Construction

against Willard T. Stewart. [EOD Date

5/21/02]. Copy sent to counsel on 5/21/02.

(sat) (Entered: 05/21/2002)

Case closed. (sat) (Entered: 05/21/2002)

Notice of appeal by Willard T. Stewart

filed. Appealing: [90-1] judgment order.

Appeal record due on 6/14/02 (kf) (En-

tered: 05/31/2002)

* * *

MANDATE of USCA as to [91] Notice of

Appeal filed by Willard T. Stewart; This

cause came on to be heard on appeal

from the United States District Court for

6

the District of Massachusetts, and was

argued by counsel. Upon consideration

whereof, it is now here ordered, ad-

judged and decreed as follows: The

district Court’s grant of summary

judgment is affirmed. (Ramos, Jeanette)

(Entered: 09/30/2003)

* * *

7

U.S. Court of Appeals for the First Circuit

4/27/99

3/15/00

3/15/00

4/14/00

4/14/00

4/17/00

No. 99-1487

CIVIL CASE docketed. Notice filed by

Appellant Willard Stewart. [99-1487] (eiln)

[99-1487]

* * *

BRIEF filed by Appellant Willard Stewart in

99-1487. Pages: 44, Copies: 9, delivered by

mail. Certificate of service date 3/15/00.

[462726-1] Appellee brief due 4/14/00. [99-

1487] (eiln) [99-1487]

APPENDIX filed by Appellant Willard

Stewart in 99-1487. Copies: 5. Volumes: 1.

Delivered by mail, filed. Certificate of service

date 3/15/00 [462727-1] [99-1487] (eiln) [99-

1487]

BRIEF filed by Appellee Dutra Construction

in 99-1487, Appellee Dutra Construction in

00-1090. Pages: 31, Copies: 10, delivered by

hand. Certificate of service date 4/14/00.

[465855-1] Reply brief due 4/28/00 in 99-

1487, in 00-1090. [99-1487, 00-1090] (lina)

[00-1090 99-1487]

* * *

DISCLOSURE STATEMENT on behalf of

Appellee Dutra Construction filed. [99-1487]

(lina) [99-1487]

PETITION filed by Appellant Willard Stewart

in 99-1487, and 00-1090 Petition for initial

hearing en banc. Certificate of Service dated

4/17/00. (99-1487, 00-1090] (eiln) [00-1090

99-1487]

* * *

6/14/00

6/14/00

9/7/00

10/31/00

10/31/00

1/28/00

8

ORDER filed by Chief Judge Juan R. Torru-

ella, Judge Bruce M. Selya, Judge Michael

Boudin, Judge Norman H. Stahl, Judge

Sandra L. Lynch, Judge Kermit V. Lipez

denying petition request for hearing enbanc.

[99-1487, 00-1090] in 99-1487, 00-1090 (eiln)

[99-1487]

ORDER filed by Chief Judge Juan R. Torruella,

Judge Bruce M. Selya, Judge Michael Boudin,

Judge Norman H. Stahl, Judge Sandra L.

Lynch, Judge Kermit V. Lipez denying petition

request for hearing enbanc. [99-1487, 00-1090]

in 99-1487, 00-1090 (eiln) [99-1487]

* * *

CASE ARGUED 09/07/00. Selya, Bownes,

Stahl, JJ. (ceca) (00-1090 99-1487]

OPINION issued by Selya, Circuit Judge,

Bownes, Senior Circuit Judge, and Stahl,

Circuit Judge. Signed Judge Bruce M. Selya,

Authoring Judge. PUBLISHED [511310-1]

[99-1487, 00-1090] (turn) [00-1090 99-1487]

JUDGMENT entered closing case. The

judgment of the district court is affirmed.

{511315-1] (99-1487, 00-10901 (turn) [00-

1090 99-1487]

x * *

No. 00-1090

ORDER filed to consolidate for purposes of

briefing and oral argument the following

cases: 99-1487. [00-1090] (eiln) [00-1090]

* * x

6/12/02

6/12/02

11/15/02

11/15/02

12/16/02

1/17/03

1/17/03

9

No. 02-1713

CIVIL CASE docketed. Opening forms sent.

Notice filed by Appellant Willard Stewart.

Appearance form due 6/26/02. Docketing

Statement due 6/26/02. Transcript Re-

port/Order due 6/24/02. Fee due 6/26/02. [02-

1713] (mlyn)

RECORD filed: Pleading included: 1-91. No

Transcript(s) filed. (663149-1] [02-1713]

(mlyn)

* * *

BRIEF filed by Appellant Willard Stewart.

Length: 7,404 words, Copies: 9, delivered by

hand. Certificate of date 11/15/02. [703492-1]

Appellee brief due 12/16/02. brief due

12/30/02. [02-1713] (mlyn)

* * *

APPENDD. filed by Appellant Willard

Stewart. Copies: 5. Volumes: 1. Delivered by

hand, filed. Certificate of service date

11/15/02. [703494-1] [02-1713] (mlyn)

DISCLOSURE STATEMENT on behalf of

Appellee Dutra Construction filed. [02-1713]

(mlyn)

* * *

ORDER filed by Judge Juan R. Torruella,

Judge Sandra L. Lynch, Judge Jeffrey R.

Howard. Upon consideration of motion, It is

hereby granted that appellant’s reply brief

be accepted for filing this day. [02-1713]

(mlyn)

REPLY BRIEF filed by Appellant Willard

Stewart. Length: 6 pgs, Copies: 8, delivered

9/4/03

9/4/03

12/12/03

10

by hand. Certificate of service date 1/15/03.

(718483-1] [02-1713] (mlyn)

baad * *

JUDGMENT filed Judge Juan R. Torruella,

Judge Sandra L. Lynch, Judge Jeffrey R.

Howard. This cause came on to be heard on

appeal from the United States District Court

for the District of Massachusetts, and was

argued by counsel. Upon consideration

whereof, it is now here ordered, adjudged

and decreed as follows: The district court’s

grant of summary judgment is affirmed.

[785881-1) [02-1713] (mlyn)

OPINION: Judge Juan R. Torruella, Judge

Sandra L. Lynch, Judge Jeffrey R. Howard.

Signed Judge Juan R. Torruella. PUB-

LISHED. [785884-1] [02-1713], (mlyn)

* * *

U.S. SUPREME COURT NOTICE filed

regarding petition for writ of certiorari. Filed

in the Supreme Court on 12/3/3. Supreme

Court case number: 03-814. [02-1713] (darl)

11

UNITED STATES DISTRICT COURT

DISTRICT OF MASSACHUSETTS

WILLARD T. STEWART

Plaintiff, CIVIL ACTION

v. NO. 95-11046 (RCL)

DUTRA CONSTRUCTION CoO.,

INC.

Defendant.

ee ee i ee

ED CO

JURY TRIAL DEMANDED

(Filed Sept. 12, 1996)

FIRST CAUSE OF ACTION

Plaintiff hereby claims of the defendant a sum in

excess of One Hundred Thousand Dollars ($100,000.00) in

damages upon the following causes of action:

1. Plaintiff is a seaman.

2. This action is brought pursuant to the Maritime

Law of the United States as modified by the Jones Act, 46

U.S.C. §688, et seq.

3. At all times material hereto, defendant, Dutra

Construction Company, Inc., was doing business at 347

Congress Street, Suite 204, Boston, Massachusetts.

4. At all times material hereto, plaintiff was in the

employ of the defendant as a member of the crew of

defendant's #4 scow to the dredge “SUPER SCOOP” at the

rate of pay and for the terms as set forth in his contract of

employment.

12 :

5. On or about July 15, 1993, while the said scow

and dredge were in Boston Harbor, Boston, Massachu-

setts, plaintiff suffered injuries while under the employ-

ment of defendant. .

6. Plaintiff’s injuries were caused by the negligence

of the defendant, by its agents, servants, workmen and

employees, by the unseaworthiness of the scow and

dredge, and by the defendant’s breach of its obligations

under the circumstances.

7. Solely by reason of the negligence of the defen-

dant, plaintiff sustained personal injuries.

WHEREFORE, plaintiff demands judgment against

the defendant in excess of the sum of One Hundred Thou-

sand Dollars ($100,000.00), with costs and interest, and

brings this action to recover same.

SECOND CAUSE OF ACTION

In Admiralty

Plaintiff claims of defendant maintenance and cure

and wages in such amount as may be determined by the

Court upon the following cause of action:

8. Plaintiff repeats and realleges each and every

allegation contained in paragraphs 1 through 7 inclusive

of this complaint, with the same force and effect as if fully

set forth and repeated herein.

9. Plaintiff, by virtue of his services upon the said

scow and dredge, claims maintenance and cure and wages

for the period off this disability in an amount which to

your Honorable Court shall deem just and proper upon the

trial of this cause.

13

10. All and singular, the premises contained herein

are true and within the admiralty and maritime jurisdic-

tion of the United States and this Honorable Court.

WHEREFORE, plaintiff prays that judgment be

entered against the defendant for such maintenance and

cure and wages as the court may determine to be due and

owing upon the trial of this cause, and for such interest,

costs, and counsel fees as the court may deem just and

proper.

THIRD CAUSE OF ACTION

11. Plaintiff repeats and realleges each and every

allegation contained in paragraphs 1 through 10 inclusive

of this Complaint, with the same force and effect as if fully

set forth and repeated herein.

12. Jurisdiction herein arises under the Longshore

and Harbor Workers’ Compensation Act Amendments of

1972. Public Law No. 92576, §18(a), 86 Stat. 1263, 33

U.S.C. §905 amending §5 of the Longshore and Harbor

Workers’ Compensation Act, Ch. 509, §5, 44 Stat. 1426, 33

U.S.C. §905 (LHWCA).

13. Plaintiff’s injuries were caused by the negligence

of the defendant, its agents, servants, and/or employees

and/or ostensible agents, servants, and/or employees

and/or the unseaworthiness of the “SUPER SCOOP” in the

following respects, including but not limited to:

(a) failing to provide a safe place for plaintiff to

perform his duties;

14

(b) failing to provide plaintiff with proper, safe,

seaworthy, and/or adequate vessel appliances, gear,

appurtenances, and/or equipment;

(c) failing to properly and adequately inspect,

maintain, and/or repair the vessel’s gear, lines, shackles,

deck, and/or appurtenances in a safe and seaworthy

condition;

(d) failing to warn plaintiff and/or his co-workers

of a defective, dangerous, and/or hazardous condition of

the vessel’s gear, lines, shackles, deck, and/or appurte-

nances when defendant knew or should have known of

such condition;

(e) failing to inspect, remove, remedy, and/or

correct a defective, dangerous, and/or hazardous condition

when defendant knew or should have known of its exis-

tence;

(f) failing to discover, in the exercise of reason-

able care, a defective, dangerous, and/or hazardous condi-

tion of the vessel;

(g) permitting a defective, dangerous, and/or

hazardous condition to exist;

(h) failing to take proper and necessary precau-

tions and/or steps to prevent injury;

(i) failing to comply with governmental and/or

other applicable safety regulations;

(j) failing to observe safe boating methods,

practices, and/or procedures during the boom-jump opera-

tion;

15

(k) failing to properly remove, store, clean,

and/or clear poly bags, trash, and/or other items from all

boat deck working surfaces;

(1) failing to properly and adequately coat the

boat decking surface with anti-slip and/or other non-skid

materials;

(m) failing to use due care under the circum-

stances and being otherwise negligent under defendant’s

rules, regulations, customs, and/or practices; and

(n) otherwise being careless, reckless, and/or

negligent in the maintenance and/or operation of the

vessel.

14. The injuries in question were caused solely by

the negligence of defendant, its agents, servants, and/or

employees and/or ostensible agents, servants, and/or

employees and were due in no manner to any act and/or

omission on the part of plaintiff.

15. As a direct and proximate result of the negli-

gence of defendant, plaintiff has suffered, and will in the

future continue to suffer, pain and hardship, loss of in-

come, medical expenses, and an inability to perform his

usual duties.

WHEREFORE, plaintiff demands judgment against

the defendant in excess of the sum of One Hundred Thou-

sand Dollars ($100,000.00), with costs and interest, and

brings this action to recover same.

16

LAW OFFICES OF THOMAS J. HUNT

By: /s/ Thomas J. Hunt

Thomas J. Hunt, Esquire

One Union Street

Boston, MA 02108

(617) 227-8081

and

MARVIN I. BARISH LAW OFFICES,

PC.

By: /s/ Marvin |. Barish

Marvin I. Barish, Esquire

Gregory L. Nester, Esquire

Suite 801 — The Curtis Center

Sixth and Walnut Streets

Philadelphia, PA 19106

(215) 923-8900

ATTORNEYS FOR PLAINTIFF

17

UNITED STATES DISTRICT COURT

FOR THE

DISTRICT OF MASSACHUSETTS

WILLARD STEWART )

Plaintiff ) CIVIL ACTION

V ) NO. 95-11046-RCL

s.

DUTRA CONSTRUCTION _)

CO., INC., )

Defendant )

(Filed Sept. 16, 1996)

Now comes the defendant, Dutra Construction Co.,

Inc. and asks the Court to grant it Summary Judgment on

all counts. As grounds, therefore, the defendant argues

that there is no genuine issues of material fact and the

defendant is entitled to a judgment as a matter of law.

Specifically, the Court should find as a matter of law that

the plaintiff is not a seaman within the meaning of the

Jones Act (46 U.S.C. 688) and has no standing to bring a

claim pursuant to the Jones Act or the doctrine of mainte-

nance and cure. -

The plaintiff has recently filed a motion for leave to

amend complaint to add a count under Section 905B of the

Longshore and Harbor Workers’ Compensation Act. It is

the defendant’s position that as a matter of law the plain-

tiff is not entitled to Section 905B benefits. The defendant

reserves the right to supplement its Motion for Summary

Judgment if the Court allows the plaintiff to amend its

complaint.

18

In support of this Motion, the defendant refers to and

incorporates herein the attached Memorandum of Law,

relevant portions of the transcript of the plaintiff’s deposi-

tion and the Complaint. -

“REQUEST FOR ORAL ARGUMENT”

The defendant believes that oral argument will assist

the Court in deciding this matter and therefore requests to

be heard.

By its attorneys,

/s/ Frederick E. Connelly, Jr. __

Frederick E. Connelly, Jr.,

BBO# 544538

PEABODY & ARNOLD

50 Rowes Wharf

Boston, MA 02110

617/951-2100

CERTIFICATE OF SERVICE

I, Frederick E. Connelly, Jr., hereby certify that I have

this 12th day September, 1996 served a copy of the forego-

ing upon the plaintiff by mailing same postage prepaid to:

Gregory L. Nester, Esq.

Marvin I. Barish Law Offices, P.C.

Suite 801 — The Curtis Center

Independence Mall West

Sixth and Walnut Streets

Philadelphia, PA 19106

Thomas J. Hunt, Esq.

One Union Street

Boston, MA 02108

/s/

19

Frederick E. Connelly, Jr.

20

UNITED STATES DISTRICT COURT

FOR THE

DISTRICT OF MASSACHUSETTS

WILLARD STEWART )

Plaintiff ) CIVIL ACTION

V ) NO. 95-11046-RCL

s.

DUTRA CONSTRUCTION _)

CO., INC., )

Defendant )

DEFENDANT, DUTRA CONSTRUCTION CO., INC.’S,

M T I

MOTION FOR SUMMARY JUDGMENT

The defendant, Dutra Construction Co. (“Dutra”),

asserts that no genuine issues of material fact exist in this

case, and submits the following memorandum in support

of its Motion for Summary Judgment pursuant to Fed. R.

Civ. P. 56(c).

I. CONCISE STATEMENT OF MATERIAL FACTS

RE CH _IT N-

The plaintiff, Willard Stewart (“Stewart”) was injured

on July 15, 1993 while employed by Dutra. Stewart was

hired to work on the dredge Superscoop. Ninety-nine

percent of his time while on the job was on the Superscoop

21

(Stewart Deposition Transcript at 33, Ex “A”).' Dutra was

hired to perform drilling, blasting and dredging for an

immersed tube tunnel (later to be christened the Ted

Williams Tunnel). This was the first time Stewart had

worked for Dutra (S. Tr. at 28, Ex “A”). The plaintiff was

hired as an engineer (S. Tr. at 34, Ex “A”).

The Superscoop is a dredge (S. Tr. at 31, Ex “A”) which

does its digging with a clamshell bucket (S. Tr. at 31, Ex

“A”). The Superscoop’s only form of propulsion was its

anchors and cables (S. Tr. at 35, Ex “A”). The Superscoop

does not have a propeller. (Jd.) While on the job, over a

twelve hour period, the Superscoop would be moved six

times and the average move was between thirty and fifty

feet (S. Tr. at 35, Ex “A”). Each move would take approxi-

mately five Minutes. (/d.) The remainder of the time the

Superscoop would be in one location for dredging (S. Tr. at

36, Ex “A”). While dredging, the Superscoop would be

secured by four anchors. (Jd.)

The Superscoop did not contain sleeping quarters. The

workers were brought to shore after each shift by a work

boat (S. tr. at 32, Ex “A”). The plaintiff was living in East

Boston (S. Tr. at 38, Ex “A”).

At the time the plaintiff was injured, he was on Scow

#4 working on the wiring (S. Tr. at 53, Ex “A”). The Scow

was tied up along side the Superscoop. The Scow was out

of commission and no dredging had been done that day (S.

Tr. at 49, Ex “A”). The engine on the scow that controlled

The deposition transcript of Willard Stewart shall herein after be

referred to as “S. Tr.”

22

the hopper had been repiaced (S. Tr. at 45, 46, Ex “A”). The

plaintiff was not wearing a life vest (S. Tr. at 65, Ex “A”).

In his complaint, the plaintiff alleges that his injuries

were caused by the negligence of the defendant, its agents,

servants, workmen and employees, by the unseaworthi-

ness of the dredge, and by the defendant’s breach of its

obligations under the circumstances (Stewart Complaint,

Ex “B”).

Stewart brought suit against his employer, Dutra

Construction Co. pursuant to the Jones Act, 46 U.S.C.

§688 et seq and the doctrine of maintenance and cure. (Jd.)

The plaintiff alleges that he was a member of the crew of

defendant’s dredge “Superscoop”. (Jd). On September 3,

1996 the plaintiff filed a motion for leave to amend the

complaint and to add a third count. The defendant re-

serves the right to address this count if the Court allows

plaintiff’s motion despite the late filing. (In this last cause

of action, the plaintiff makes a claim under §905 of the

Longshore and Harbor Workers’ Compensation Act

Amendments of 1972.)

Il. ARGUMENT

A. Summary Judgment is Appropriate when there

is No Genuine Issue of Material Fact

Fed. R. Civ. P. 56(c) provides that a summary judg-

ment “shall be rendered forthwith if the pleadings, deposi-

tions, answers to interrogatories, and admissions on file,

together with the affidavits, if any, show that there is no

genuine issue as to any material fact, and that the moving

party is entitled to judgment as a matter of law.” The non-

moving party must come forward with proof that a genuine

issue of material fact precludes judgment if a motion for

23

summary judgment is properly supported. Thomas v.

Digital Equipment Corporation, 880 F. 2d 1486, 1489 (1st

Cir. 1989) (emphasis in original), citing Anderson uv.

Liberty Lobby, Inc., 477 U.S. 242, 106 S. Ct. 2505, 2510, 91

L. Ed. 2d. 202 (1986). See also Mack v. Great Atlantic and

Pacific Tea Company, 871 F. 2d 179, 181 (1st Cir. 1989),

United States v. One Parcel of Real Property, 900 F. 2d 470,

474 (lst Cir. 1990). A defendant moving for summary

judgment is entitled to have its motion allowed if it pro-

duces evidence demonstrating the absence of a genuine

issue of material fact with respect to an essential element

of the plaintiff’s claim and the plaintiff cannot come

forward with “genuine” evidence to rebut the motion.

Celotex Corporation v. Catrett, 477 U.S. 317, 322, 106

S. Ct. 2548, 2552-2553, 91 L. Ed. 265 (1986).

The U.S. Supreme Court has held that determination

of seaman status under the Jones Act is a mixed question

of fact and law. McDermott International, Inc. v. Wilander,

498 U.S. 337, 358 111 S.Ct. 807, 112 L. Ed. 2nd 866

(1991). However, the Court went on to say that summary

judgment is “mandated where the facts and the law will

reasonably support only one conclusion”. Jd at 356. Such is

the case here. That summary judgment is appropriate in

some circumstances was reasserted by the Supreme Court

in Chandris v. Latsis, 115 S. Ct. 2172, 2191 (1995). The

court wrote that where undisputed facts reveal that a

maritime worker has a clearly inadequate temporal

connection to vessels in navigation, the court may take the

question from the jury by granting summary judgment. /d.

Dutra maintains that when the law of the First

Circuit is applied to the facts in this case, the only conclu-

sion is that Stewart was not a Jones Act seaman working

24

on a vessel. Likewise, he is not entitled to recover pursu-

ant to the General Maritime Law for unseaworthiness.

B. The Plaintiff is Not Entitled to Recover as a

Jones Act Seaman Employed on a Vessel and

His Claim Should be Dismissed as a Matter of

Law.

The Jones Act, 46 U.S.C. 688, states that:

Any seaman who shall suffer personal injury in

the course of his employment may, at his elec-

tion, maintain an action for damages at law.

1. The Plaintiff Was Not a Seaman Under the

_— DiGiovanni r Br r

The plaintiff has the burden of establishing that he

qualifies as a “seaman” under the Jones Act. Bernard v.

Binnings Construction Co. Inc. 741 F. 2d 824, 827 (5th cir.

1984). The plaintiff is a “seaman” for the purposes of the

Jones Act if he proves by a preponderance of evidence that

“(1) he was assigned permanently to a “vessel” or per-

formed a substantial part of his work on a vessel, and (2)

he performed duties which contributed to the function or

operation of the vessel during a trip or at anchorage in

preparation for a trip or which contributed to the mission

of a trip. Dean v. McKie Co. 771 F Supp 466, 470 (D. Mass.

1991); Morris v. Massachusetts Maritime Academy, 409

Mass 179, 192, 565 N.E. 2d 422, 430 (1991). See also

Bennett v. Perini Corporation, 510 F. 2d 114, 115 (1st cir.

1975). In every instance the Court must first decide

whether the structure in question was a vessel.

The United States Court of Appeals, First Circuit

decided the issue of what constitutes a vessel under the

nN

25

Jones Act in the case of DiGiovanni v. Taylor Brothers Inc.

959 F. 2d 1119 (1st Cir. 1992). Finding that past decisions

in both the first and fifth circuits “produced a difficult

dividing line” Jd. at 1122, the Court decided to look first at

the use of the structure rather than simply to the physical

characteristic in deciding whether a structure is a vessel

under the Jones Act. Jd. at 1123. In summation the Court

wrote:

if a barge, or other float’s purpose or primary

business is not navigation or commerce, then

workers assigned thereto for its shore enterprise

are to be considered seaman orly when it is in

actual navigation or transit. Jd. at 1123.

In applying this simplified and effective rule to the

facts presented it, the DiGiovanri court denied the plain-

tiff Jones Act recovery. Those facts were set forth by the

court as follows:

Briefly, the facts are these. The BETTY F was a

barge, 100 fe-i in length, with a 40 foot beam

and a raked bow and stern, and with nautical

equipment, such as navigation and anchor lights.

In all respects it met the commonly understood

characteristics of a vessel, and, indeed, was in-

spected by the Coast Guard. It had no means of

self-propulsion, except that positional movement

could be achieved by manipulating its spud an-

chors. Its current use was to float at the James-

town, Rhode Island, bridge, bearing a crane that

was being used for bridge construction. Its per-

manent station was Davisville, Rhode Island,

from which it was towed, by a tug, from time to

time, to perform various shore jobs. It had been

at the Jamestown bridge for a month. It was po-

sitioned about the bridge, and moved away from

the pilings at night, to prevent damage.

26

Plaintiff ’s principal duty was to handle a tag line

to guide the crane, but he also did maintenance

work, such as painting, and tended lines. Al-

though he was attached to the BETTY F, at the

time of his injury he was standing on the deck of

a supply barge in order better to manipulate the

line. Its deck proved to be slippery, and he fell.

The supply barge was in general use to carry

supplies, but also served as a work platform. /d.

at 1120, 1121.

The use of the barge in the DiGiovanni case is very

similar to the way the Superscoop barge was used by

Dutra. The Superscoop has many of the same characteris-

tics as the BETTY F. It contains some nautical equipment

and was inspected by the Coast Guard. Like the BETTY F

the Superscoop had no means of self-propulsion, except

that positional movement could be ».hieved by use of

winches and anchors. (S. Tr. at 3&, Ex “A”) Its use in

Boston Harbor was to float bearing a crane that was used

for dredging to lay a tunnel (as opposed to bridge construc-

tion). Like the BETTY F, the Supersccop was towed to the

site by tug. (S. Tr. at 31, Ex “A”) The Superscoop was more

stationary than the Betty F, which had to be moved away

from the bridge every night.

The DiGiovanni court went on to say that looking to

the use of the structure, rather than simply to the physical

characteristics of the structure, does appear a reasonable

resolution of Jones Act principles as agaimst mere defini-

tions of vessels. Jd. at 1123. If a structure is operational in

navigation than a worker is entitled to seaman status no

matter the characteristics of the structure. Just as clearly,

if the worker on a barge is not in navigation he is not

covered under the Jones Act. A worker is not exposed to

seaman’s hazards “by what the vessel did in the past, or by

27

its future potential”. Jd. at 1123. Therefore, Stewart can

find no support for his claim of being a Jones Act seamen

by the fact that the Superscoop may have been used in

some sort of navigation before his accident or may be so

used in the future. There is no dispute that at the time he

was injured the Superscoop was stationary and that

during the Boston Harbor project it was used as a platform

for a dredging crane.

The Superscoop fails to meet the “vessel” test and

definition set forth in Bernard v. Binnings Construction

Co. 741 F.2d 824 (5th cir. at 1984) and adopted by the First

Circuit in DiGiovanni:

Floating is not enough /d. at 828. Nor is capabil-

ity of movement across navigable water Jd. at

829. Rather, the test is whether it was designed

or used primarily for the transportation of cargo,

equipment or persons across navigable waters or

was, at the time of Bernard's injuries, engaged in

navigation. DiGiovanni at 1123.

The DiGiovanni court, satisfied it now had a workable

rule, applied the rule for the sake of comparison to the

facts in the Supreme Court case of Southwest Marine Inc.

v. Gizoni 112 S.Ct. 486, 494 cited at DiGiovanni, 1123. In

Gizoni the worker was a ship repairer who at the time of

his accident was on a work platform engaged in transport-

ing a rudder to a ship. He was injured when his foot went

through the deck. In discussing the Gizoni case the DiGio-

vanni court wrote: “The platform, in other words, at the

time of plaintiff’s injury, was engaged in transportation,

and the plaintiff was a participant in that operation.

Under our rule we would be more favorable to the worker

than was the Gizoni court.” Jd. at 1124. While the Gizoni

court remanded the case, the DiGiovanni court if presented

28

with the same facts would have ruled as a matter of law

that the plaintiff was a seamen. /d. at 1124.

The court was very clear in pointing out that Mr.

DiGiovanni does not measure up to the plaintiff in Gizoni.

The movement of the barge “about the piers for working

convenience and at night for safety ... This was hardly

navigation or commerce, and did not diminish the primary

nature of the platform’s shore use and purpose.” Jd. at

1124. The DiGiovanni court held as a matter of law that

Mr. DiGiovanni was not entitled to Jones Act recovery.

Presented with the facts in Stewart, there is no doubt that

following the rule as set forth in DiGiovanni, as a matter

of law the plaintiff’s claim for Jones Act recovery must be

denied. Stewart is no more of a seaman than was DiGio-

vanni.

2. The First Circuit’s Decision in DiGi :

is Now Widely Followed

The United States District Court, E.D. New York in

the matter of Tonnesen v. Yonkers Contracting Co 847

F. Supp. 12 (E.D. N.Y. 1994) wrote:

other courts, including the court of appeals for

the ninth circuit, have followed the first circuit’s

holding in DiGiovanni. See Kathriner v.

UNISEA, Inc. 975 F. 2d. 657, 661 (9th cir 1992);

Hatch v. Durocher Dock & Dredge, Inc. 820 F.

Supp 314, 316 (E.D. Mich. 1993). The Court

could not locate any courts which had rejected

DiGiovanni, or applied an alternative standard.

Id. at 15.

The Court added:

The Court concludes that this standard is well

reasoned, clear, and easy to apply. Most impor-

tantly the Court concludes that the first circuits

analysis correctly applies the law as enumerated

by the Supreme Court in Wilander and Gizoni.

Id. at 16.

Many of the recent cases share facts similar to those

in Duncan. In Tonnesen the plaintiff was injured when he

was struck by a wooden building form that swung free

while suspended from the crane on the barge on which

plaintiff worked. Jd. at 14. Like the Superscoop, the barge

in Tonnesen was a “crane barge” which only moved in

navigation while being towed to and from a work site, and

when changing position at the site. Jd. Applying the

DiGiovanni standard, the Court first determined the

primary purpose of the “vessel”. Jd. at 15. The Court

further cited DiGiovanni:

If the primary purpose in navigation (i.e. the

transportation of people or goods on the water)

then the vessel is presumed to be in navigation.

See Jd. at 1122. If the primary purpose is other

than navigation then the question of whether the

worker is there to perform a maritime function or

a shore enterprise must be answered. See Jd. If

the worker’s function is not maritime (i.e. fur-

thering the navigation of the structure at sea)

then the worker is only considered a seaman

when the structure is [in navigation] (i.e. mov-

ing) see Jd. at 15.

Stewart fares no better than did Mr. Tonnesen in

claiming Jones Act seaman status. The primary purpose of

the Superscoop is dredging, work which is performed with

the crane. The plaintiff can not seriously argue otherwise.

30

There is no evidence that the Superscoop was involved in

the transportation of goods or people (i.e. navigation). If

the Superscoop’s purpose is not navigation then the

plaintiff’s function is not navigation and thus not mari-

time. Also, the building of a tunnel to be used by automo-

biles is no more a maritime function than the building of a

bridge for the same purpose. Therefore, Stewart is left to

prove the Superscoop was in navigation at the time of the

accident. It was not. The Superscoop was stationary. It is

not enough that the barge could move up and down with

the tide. Jd.

The same conclusion has been reached in other cases

with facts nearly identical to those facing the Court in

Stewart. In Nielsen v. Weeks Marine Inc. 910 F. Supp. 84

(E.D.N.Y 1995) the plaintiff worked on a derrick barge

renovating certain ships and piers on Staten Island. Jd. at

86. Like the Superscoop the barge in Nielsen could not

travel independently through open waters but could move

by its own cables by using anchors and motorized winches.

Id. The Court held that:

The fact that plaintiff on occasion participated in

handling the lines as the barge was moved along

the pier did not transmogrify it into a vessel in

navigation. Since plaintiff had no relationship to

a vessel in navigation he has no claim under the

Jones Act. Id. at 88.

Likewise, the fact that Stewart may have tended lines

or worked on the anchor winches on occasion as one of his

duties of a deck hand does not transform the Superscoop

into a vessel in navigation.

In Hatch v. Durocher Dock & Dredge, Inc. 33 F.3d 545

(6th cir. 1994), the Sixth Circuit Court of Appeals found

31

DiGiovanni to be well reasoned and highly persuasive. In

Hatch the “deckhand/pile driver was assigned to a derrick

barge with no internal propulsion system and used as a

piledriver in a dock building project. Plaintiff sometimes

helped to move the barge. He injured his back stepping

from a platform onto the barge. Since the barge’s primary

purpose was construction rather than transportation and

was not “actually underway” when plaintiff was injured,

the Court granted Defendant’s Motion for Summary

Judgment. See Jd. at 548. The Court added:

It is clear, however, that a plaintiff alleging sea-

man status must at a minimum show that the

purported vessel was “in navigation” at the time

of the injury. Id.

Stewart can not meet this minimum prerequisite.

While many of the cases cited involve the construction

of bridges, use of the Superscoop to dredge for a tunnel

makes it no more of a vessel than the other crane barges.

All are being used as work platforms.

3. , — a

7 ue, a, bl Not Rel )

Counsel for the plaintiff recently filed am opposition to

a motion for summary judgment filed by Dutra in an

action with nearly identical issues. The defendant antici-

pates that Stewart will rely upon maiiy of the same

arguments and addresses them here.

The plaintiff is expected to cite the case of McDermott

International, Inc. v. Wilander, 498 U 8. 337 (1991) for the

proposition that there is no requirement that ai..employee

aid in the navigation of a vessel in an order ‘o qualify as a

32

Jones Act Seaman. This issue is not in dispute. The

defendant acknowledges that Stewart’s duties contributed

to the function of the Superscoop. The relevant issue is

whether the Superscoop is a vessel pursuant to the Jones

Act. That issue was never before the McDermott court, a

case that was dealing not with a work platform but the

American-Flag Vessel M/V Gates Tide, a paint boat. The

court in McDermott wrote “The question presented here is

narrow.... we are asked only if Wilander should be

precluded from seaman status because he did not perform

transportation-related functions on board.” Jd at 356, 357.

The plaintiff will also cite the 1995 Supreme Court

case of Chandris v. Latsis, 115 S. Ct. 2172 (1995). While

the Court in McDermott addressed the type of activities a

worker must perform to fall within the protection of the

Jones Act, the Chandris court determined “what relation-

ship a worker must have to the vessel” in order to obtain

seaman status. Jd at 2181. As in McDermott, whether or

not the “structures” were vessels under the Jones Act was

not in question and thus not an issue. The subject vessels

in Chandris consisted of six passenger cruise ships.

Whether the structure was a “vessel in navigation” was

also not in question in Chandris. At the time of his injury,

the plaintiff was on board one of the cruise ships sailing to

Bermuda. /d. Therefore, answering the two part Chandris

test in the affirmative is irrelevant to the issue whether

the Superscoop was a vessel in navigation. It should be

pointed out that the Court in Chandris was not unaware

of the First Circuit’s decision in DiGiovanni and cited

DiGiovanni. Id. at 2192. At no point did the Chandris

court address the rule for seaman established by the

DiGiovanni court.

33

The plaintiff may also cite cases from the Fifth Circuit

(Offshore Company v. Robison, 266 F.2d 769 (5th Cir. 1959)

and Ducote v. Keeler & Co., Inc., 953 F.2d 1000 (5th Cir.

1992)) which the DiGiovanni court has specifically decided

not to follow or would surely have rejected.

The holding by the first circuit in DiGiovanni that the

barge’s prior use or future use is irrelevant, is a clear

rejection of the fifth circuits thinking in Ducote. The

Ducote court reversed the district court’s summary judg-

ment for the defendant and remanded the case. Jd. at

1004. In Ducote the plaintiff was operating a drag-

line/crane from the deck of a spud barge. He was in the

process of driving piles at the time he was injured.

In reversing the lower court the court in Ducote

focused on two factors. First, the court looked at “the

purpose for which this barge was constructed”. Jd. at 1003.

Secondly, the court looked at the future use of the barge

during the project. The court wrote “the scope of the

project, however, called for the spud barge to be moved

approximately five miles along the bank of the Red River.

This planned movement distinguishes this spud barge

from the structures in the Cook line of cases”. Id. at 1004.

This way of thinking was rejected by the first circuit in

DiGiovanni. The DiGiovanni court made clear that it was

more interested in the use of the barge at the time of the

plaintiff’s injury and not the shape of the barge or its

potential use in the future.

Ill. CONCLUSION

The evolution of the definition of “seamen” and “ves-

sel” in the First Circuit for purposes of recovery under the

Jones Act bars the plaintiff from recovery in this case. The

34

same standards apply to Count II of the plaintiff’s com-

plaint (Maintenance and Cure). There exists no genuine

issue of material fact in this case, and summary judgment

should enter for Dutra Construction Co. on all counts.

By its attorneys,

/s/ Frederick E. Connelly, Jr.

Frederick E. Connelly, Jr.,

BBO# 544538

PEABODY & ARNOLD

50 Rowes Wharf

Boston, MA 02110

617/951-2100

CERTIFICATE OF SERVICE

I, Frederick E. Connelly, Jr., hereby certify that I have

this day September, 1996 served a copy of the foregoing

upon the plaintiff by mailing same postage prepaid to:

Gregory L. Nester, Esq.

Marvin I. Barish Law Offices, P.C.

Suite 801 — The Curtis Center

Independence Mall West

Sixth and Walnut Streets

Philadelphia, PA 19106

Thomas J. Hunt, Esq.

One Union Street

Boston, MA 02108

/s/ Frederick E. Connelly, Jr. __

Frederick E. Connelly, Jr.

35

EXHIBIT “A”

UNITED STATES DISTRICT COURT

DISTRICT OF MASSACHUSETTS

CA # 95-11046 (RCL)

WILLARD T. STEWART

Plaintiff

VS.

DUTRA CONSTRUCTION CoO., INC.

Defendant

DEPOSITION OF WILLARD T. STEWART, taken

pursuant to Notice under the applicable provisions of the

Massachusetts Rules of Civil Procedure on behalf of the

Defendant, before Joan M. Barry, a Notary Public in and

for the Commonwealth of Massachusetts, at the offices of

Peabody & Arnold, &§0 Rowes Wharf, Boston, Massachu-

setts, on Tuesday, May 21, 1996, commencing at 11:30 a.m.

NEAL A. SALLOWAY — COURT REPORTERS

FIVE CARDIGAN ROAD

WEST PEABODY, MA 01960

(617) 581-3993 — (508) 535-0313

PE ES:

PEABODY & ARNOLD

(by Frederick E. Connelly, Jr., Esq.)

50 Rowes Wharf

Boston, Massachusetts 02110

On behalf of the Defendant

MARVIN E. BARISH, ESQ.

36

(by Gregory L. Nester, Esq.)

The Curtis Center

Sixth and Walnut Streets

Suite 801

Philadelphia, Pennsylvania 19106

On behalf of the Plaintiff

INDEX

DEPONENT DIRECT CROSS

Willard T. Stewart

By Mr. Connelly 4

EXHIBITS

EXHIBIT NO. DESCRIPTION PAGE NO.

1 Photocepy 136

[4) MR. NESTER: I would like him to read and

sign. Okay. I'll explain that to him afterwards. We'll waive

notary. He doesn’t have to do it in front of a notary.

MR. CONNELLY: All objections reserved until

the time of trial, except as to form. All motions to strike

are reserved. As far as reading and signing, twenty-one

days will be enough time once he receives it?

MR. NESTER: Once I receive it, it should be. If

that’s problematic, I'll let you know.

WILLARD T. STEWART

37

having been first duly sworn, deposes and terti-

fies as follows:

EXAMINATION

BY MR. CONNELLY:

Q. Mr. Stewart, my name is Frederick Connelly, and

I represent the defendant, Dutra Construction Company. I

am going to be asking you some questions today.

I first want to go over a few groundrules so the pro-

ceedings will go a little smoother. You may have discussed

some of this with your attorney already. You’re going to

have to answer each question outloud, okay, and

* * *

[28] A. Uh-huh

Q. So, for those ten years, you were assisting them

in building an island, right?

A. They were still working on it.

Q. What is that island for?

A. Containment area for dredge from the Baltimore

Harbor, from Baltimore Harbor and the ship channel.

Q. Where is Great Lakes located?

A. Their main office is in Chicago. They have an

office in Baltimore, one in, I think, New York, and I think

in Florida somewhere.

Q. Had you ever worked for Dutra before the Boston

job?

A. No.

38

Q. So, Great Lakes job ended, and you had about

four mounts off?

A. Approximately, yes.

Q. And when you were not working, would you

collect unemployment?

A. Uh-huh.

Q. Yes?

A. Yes.

MR. NESTER: One second.

* * *

[31] Q. Had you ever worked on a dredge like that

before?

A. That particular — every one is a little different. I

have worked on that similar, but not exactly the same.

Q. All right. Describe for me this dredge. What is it

called, the Super Scoop?

A. Yes.

Q. What is a Super Scoop?

A. It’s a dredge, yes.

Q. Describe it for me?

A. It does, it’s digging with a clamshell bucket. It’s

like a crane, a crane laddered on a barge.

Q. Okay. When you arrived in Boston, was the Super

Scoop already here?

A. Yes.

39

Q. Do you know how it got here?

A. It had been here, I guess, approximately a week.

Q. Do you know how it got here?

A. I believe it was towed by a tug, I believe.

Q. From California?

A. Yes.

* * *

[33] there.

Q. Okay, and there was only one dredge on the Super

Scoop?

A. Yes.

Q. And that always remained on it as far as you

know?

A. Yes.

Q. Hew much of your time was spent on the Super

Scoop during the time you were on the job?

A. I would say 99 and 9/10s.

Q. 99 and 9/10s?

A. Right.

Q. So, just about all your time was on the Super

Scoop?

A. Yes.

Q. What engines on the Super Scoop did you have

responsibility for?

40.

A. The main engine on the hoist. They had two deck

engines. Occasionally, if they had a problem with the boat,

I would deal with that. They would ask me to come check

it out, but — F

Q. What boat is that?

A. The work boat they had.

[34] (Discussion held off the record.)

Q. We were discussing the engines that you are

responsible for, three main ones were the main engine to

hoist and the two deck engines?

A. Yes.

Q. Ard you had spent all your time on the Super

Scoop working on those?

A. Yes.

Q. Were you the only person or engineer on the

Super Scoop?

A. No. There’s three engineers. Not at the same

time. I mean, shift work.

Q. Okay. During your shifts, were you the only

engineer on the Super Scoop?

A. Yes.

Q. Now, I take it none of these engines had anything

to do with the movement of the Super Scoop and the water?

A. The deck engines do. They operate, hoist, cables

and ankers and so on.

Q. What would these be used for?

41

A. Moving Super Scoop to do the dredging operation.

* * *

(53) Q. And you were going to say, hey, I'll help you,

tell me what to do?

A. Yes, basically, yes.

Q. Did you start working with him before you were

i. jured? .

A. I wasn’t working with him. He said, he had — He

was finishing up with the engine, he was finishing up. I

said, well, since you're all right, I'll feed the wires down

through and go ahead and wire up the remote control and

take care of that. That’s something he would have done if I

weren't there to help him.

Q. What job was this to huok it up? I don’t under-

stand. What are you hooking up?

A. They had a remote control unit. They operated a

scow from the tug boat by remote control.

Q. And that was unhooked when he replaced the

engine?

A. Yes. They took the top building off of the scow.

They took the top building off where the wires are up

through and up through and then there was the control

panel down blow.

They disconnected it. So, they could take this building

off and disconnected the wiring from the

* * *

42

UNITED STATES DISTRICT COURT

FOR THE DISTRICT OF MASSACHUSETTS

WILLARD STEWART,

Plaintiff, CIVIL ACTION NO.

- 95-11046-RCL

DUTRA CONSTRUCTION

CO., INC.,

Defendant.

DEFENDANT, DUTRA CONSTRUCTION CO.,

INC."S SUPPLEMENTAL MOTION FOR

SUMMARY JUDGMENT

Now comes the defendant, Dutra Construction Co,

Inc. (“Dutra”), and respectfully requests the Court to grant

it summary judgment on all counts. Dutra submitted a

Motion for Summary Judgment with respect to all counts

of the plaintiff's original Complaint. Since that time, the

court has allowed the plaintiff to amend his Complaint to

add a count under Se ‘ion 905(b) of the Longshore and

Harbor Workers’ Compensation Act. Having reserved its

rights to supplement its initial Motion for Summary

Judgment, the defendant hereby submits its Supplemental

Motion for Summary Judgment and argues that there is

no genuine issues of material fact and that the plaintiff is

not entitled to Section 905(b) benefits as a matter of law.

In support of its Supplemental Motion, Dutra refers to

and incorporates herein the attached Memorandum of

Law, relevant portions of the transcript of the plaintiffs

deposition and the Amended Complaint.

43

REQUEST FOR ORAL ARGUMENT

The defendant believes that oral argument will assist

the court in deciding this matter and therefore requests to

be heard.

By its attorneys,

/s/ Frederick E. Connelly, Jr.

Frederick E. Connelly, Jr.,

BBO #544538

Moujan M. Walkow,

BBO #630658

PEABODY & ARNOLD

50 Rowes Wharf

Boston, MA 02110

617/951-2100

CERTIFICATE OF SERVICE

I, Frederick E. Connelly, Jr., hereby certify that I have

this 17 day of October, 1996, served a copy of the foregoing

upon the plaintiff by mailing same postage prepaid to:

Gregory L. Nester, Esq.

Marvin I Barish Law Offices, P.C.

Suite 801 — The Curtis Center

Independence Mall West

Sixth and Walnut Streets

Philadelphia, PA 19106

Thomas J. Hunt, Esq.

One Union Street

Boston, MA 02108

/s/ Frederick E. Connelly, Jr.

Frederick E. Connelly, Jr.

44

UNITED STATES DISTRICT COURT

FOR THE DISTRICT OF MASSACHUSETTS

WILLARD STEWART,

Plaintiff,

v. CIVIL ACTION NO.

DUTRA CONSTRUCTION 95-11046-RCL

CO., INC.,

Defendant.

DEFENDANT, DUTRA CONSTRUCTION CO.,

INC."S MEMORANDUM IN SUPPORT OF ITS

SUPPLEMENTAL MOTION FOR SUMMARY JUDGMENT

The defendant, Dutra Construction Co. (“Dutra”),

incorporates herein by reference its Memorandum in

Support of its Motion for Summary Judgment and submits

the following memorandum in support of its Supplemental

Motion for Summary Judgment pursuant to Fed. R. Civ. P.

56(c). Dutra asserts that no genuine issues of material fact

exist in this case and that Dutra is entitled to summary

judgment as a matter of law on all counts of the plaintiff’s

Amended Complaint.

The plaintiff was hired by Dutra out of the union hall

in late 1992 (Stewart Deposition Transcript at 26, Exhibit

45

“A”).' He was responsible for maintaining the engines on

the Superscoop (S. Tr. at 33), and generally, it was part of

his job to “do what it took to get [the dredge] running

again” when it shut down (S. Tr. at 50). He also checked

the oil on the scows once per week or checked the engine

(S. Tr. at 46). His employment duties included working on

the scows, as the operation of the scows was necessary for

dredging (S. Tr. at 49-50).

Il. ARGUMENT

C. The Plaintiff is Not Entitled to Recover Und

the Longshore and Harbor Workers’ Compen-

sation Act (“LHWCA")

The LHWCA, 33 U.S.C. 905(b), provides in pertinent

part that

in the event of injury to a person covered under

this chapter caused by the negligence of a vessel,

then such person . . . may bring an action against

such vessel.

Although Jones Act and LHWCA actions are mutually

exclusive, and the plaintiff would be entitled to proceed

under the LHWCA in the absence of a Jones Act case, the

facts of this particular case bar LHWCA recovery.

In his amended complaint, the plaintiff has added a

count under Section 905(b) authorizing covered employees

to sue a vessel as a third party for injury caused by the

negligence of the vessel (Stewart Amended Complaint,

' The deposition transcript of Willard Stewart shall hereinafter be

referred to as “S. Tr.”

46

Exhibit “B”). While Dutra may be subject to suit under

Section 905(b) in its capacity as “vessel owner,” Dutra is

immune from tort actions under the LHWCA in its capac-

ity as the plaintiff’s employer. See DiGiovanni v. Traylor

Bros., Inc.” 855 F. Supp. 37 (D.R.I. 1994) (citing Levens v.

Pintail Enters. Inc., 943 F.2d 528, 531 (5th Cir. 1991), cert.

denied, 504 U.S. 940 (1992)). To prevail, \he plaintiff must

show that any negligence on Dutra’s part is attributable to

it as vessel owner rather than as Stewart’s LHWCA

er.ployer. See id. Thus, the court must decide whether

Dutra’s alleged negligence occurred in its vessel capacity

(allowing suit to be brought under Section 905(b)) or in its

employer capacity (immunizing it from suit).’

The nearly identical issue was before the Unites

States Court of Appeals for the First Circuit in the case of

Morehead v. Atkinson-Kiewit, 75 F.3d 736 (1st Cir. 1996).°

In Morehead, the plaintiff was injured when he stepped

backwards into an open hatch on one of the barges (Mare-

head Opinion at 4). The evidence showed that the hatch

had been left open for several days to allow access to a

marine surveyor. (/d.) The plaintiff alleged that the vessel

* The plaintiff has alleged in his amended complaint negligence of

Dutra and unseaworthiness of the Superscoop. Section 905(b) provides

in pertinent part: “The liability of the vessel under this subsection shall

not be based upon the warranty of the seaworthiness or a breach

thereof at the time the injury occurred.” Because of this statutory bar to

the plaintiff's urseaworthiness claim, the defendant will only address

the plaintiff's negligence allegations.

* While the Morehead opinion has been withdrawn from publica-

tion because a rehearing en banc is pending, the court’s decision is

sound. The slip opinion is attached hereto as Exhibit “C” and will

hereinafter be referred to as “Morehead Opinion.”

47

owner was negligent for allowing the hatch to remain open

and for failing to warn. (Jd. at 5).

In deciding under what capacity the barge

owner/employer, Atkinson-Kiewit, was negligent, the court

followed the reasoning that “a court may have to divide

the single defendant into a hypothetical independent

employer and independent vessel owner.” (/d. at 24). The

Morehead court explained that the plaintiff’s burden

would not and should not be easy:

The statutory language and the legislative his-

tory of the 1972 and 1984 Amendments plainly

evidence Congress’ intent that the workers’ com-

pensation scheme be the primary remedy for all

covered workers, regardless of an employer’s

commercial practice in regard to vessel owner-

ship.... We are not disposed to upset the bal-

ance by expanding the liability of employers that

act simultaneously as vessel owners.

(Id. at 24-25). The court further wrote that “[t]he exception

in Section 905(b) for third-party negligence, removed in

1984, explicitly requires a finding of vessel fault.” (More-

head Opinion at 30).

The Morehead court adopted the reasoning of the

seminal case of Scindia Steam Navigation Co. v. De los

Santos, 451 U.S. 156 (1981):

[O}nce longshore workers came on board and be-

gan carrying out their cargo duties under a ste-

vedore’s supervision, the vessel itself had no

general duty to exercise reasonable care to in-

spect for unsafe workplace conditions; rather it

could rely on the longshore worker’s employer to

do so. °

48

(Id. at 26, quoting Scindia, 451 U.S. at 172). Applying the

reasoning of Scindia to the facts before it, the Morehead

court concluded that “Scindia’s principle of limited liability

of the vessel sensibly and logically applies, because the

employees effectively assumed control of the barge work-

ing under [Atkinson-Kiewit] in its capacity as their em-

ployer rather than ... as the charterer (hence owner) of

the barge.” (/d.)

The Morehead court rejected the argument that a

vessel assumes a greater duty of care when there is no

independent employer responsible for workplace condi-

tions. (Morehead Opinion at 19). The court cited Castorina

v. Lykes Bros. S.S., 758 F.2d 1025 (5th Cir.), cert. denied,

474 U.S. 846 (1985). In Castorina, a longshore worker

exposed to asbestos during cargo operations alleged that

his employer-vessel owner knew of the harm of a vessel

and failed to make the vessel safe. The court refused to

impute any knowledge of this damage by the employer to

it as vessel, writing: “To impute this knowledge to a

shipowner-employer would be to hold it liable in tort for

damages arising from its negligence as stevedore, and

effectively to eliminate the exclusivity provisions of Sec-

tions 905(a) and (b).” Jd at 1033.

Therefore, the plaintiff cannot argue that Dutra had

knowledge as dredging company/contractor that the hatch

was open or unguarded and that the knowledge should be

imputed to Dutra as vessel owner.

The plaintiff is expected to argue that the allegedly

negligent acts performed by co-workers which led to his

accident were performed in furtherance of the vessel or

that the work he was performing when injured was in

furtherance of the vessel. The Morehead court recognized

49

this competing analysis and rejected it. (Jd at 29). In

Morehead the plaintiff argued that the act of leaving the

hatch open was to help the vessel and not in furtherance of

some construction activity. In response the court wrote: -

One of the essential purposes of the 1972 and

1984 Amendments was to provide employees and

employers with a greater degree of certainty as

to the coverage in effect. The legislative history

of the 1984 Amendment documents this concern:

[T]he situation in which a worker may be

covered at one time, and not covered at an-

other, depending on the nature of the work

which the worker is performing at the time

of the injury must be avoided since such a

result would be enormously destabilizing,

and would thus defeat one of the essential

purposes of these amendments.

1984 U.S.C.C.A.N. at 2736-2737. A “functional”

interpretation, hinging the type of liability on the

nature and purpose of the duties being per-

formed by covered employees at any given time,

would increase uncertainty and the frequency of

disputes over the scope of coverage.

(Morehead Opinion at 31). In referencing the dual capacity

of the employee, the Morehead court noted that both types

of activities — construction and scowmen’s work, — as-

signed to the harbor workers were performed for Atkinson-

Kiewit as employer and not as vessel owner. (Jd. at 26).

The Morehead court emphasized that because the em-

ployment contemplated both construction and linehan-

dling, a single, overall classification was most appropriate

for determining the types of remedies available. (Jd. at 31).

Thus, rejecting the plaintiff’s argument in that case, the

Morehead court pointed out that “[a]s is typical in the case

50

of harbor workers ... the men were expected to lend a

hand with supporting maritime chores as well as pursuing

their particular construction trade,” and therefore, “the

barges tended by its carpenters/scowmen were operated

within [Atkinson-Kiewit’s]- control and knowledge qua

employer.” (Jd. at 28).

The same holds true in the case at bar. Stewart and

his fellow dredge workers’ employment contemplated that

their duties would also alternate between work for Dutra

as employer and for Dutra as vessel owner. Dutra hired

harbor workers through the union hall (S. Tr. at 26). The

plaintiff and the other employees on the Superscoop were

hired to do tasks relating to both dredging and work on

the vessels (S. Tr. at 33, 34, 46, 50). The various engines

that Stewart was hired to maintain were used for dredging

(the engines that ran the crane), dumping (the engines on

the scows) and moving the dredge (deck winches). (S. Tr. at

33-35, 46). At the time he was injured, the plaintiff was

working on the remote control for the scow engine which

allowed easier dumping of the dredged materials. (S. Tr. at

45). He was therefore performing his regular duties as

engineer on a dredging operation. Attempts by the plaintiff

in Morehead to bifurcate his vessel and construction

activities were rejected by the court because the workers

were hired to perform both. (See Morehead Opinion at 18).

Other employees were also performing “employment

duties” when the plaintiff was allegedly injured on the

scow (S. Tr. at 50, 53), The operator of the crane was

maneuvering the bucket while the deckhands/scowmen

were tending lines. (S. Tr. at 129-131). Brad Shoffit was

the supervisor of the dredging operation and the captain of

the superscoop. (S. Tr. at 129-131). All employees were

involved in the dredging process. The Morehead court

51

noted that the owner did not employ a separate crew on its

barges. (Morehead Opinion at 17). The same applies to

Dutra in the case at bar.

Thus, the Superscoop and the adjoining scow were

‘ operated within Dutra’s control and knowledge qua em-

ployer. Furthermore, there is no claim or evidence that the

alleged negligent conditions are attributable to the errors

of separate maritime agents acting specifically for the

vessel. (See Morehead Opinion at 26-27).

Ill. CONCLUSION

Wherefore, the defendant, Dutra Construction Co.,

Inc., respectfully requests that the court grant its Motion

for Summary Judgment on all counts of the plaintiff’s

Amended Complaint.

By its attorneys,

/s/ Frederick E. Connelly, Jr.

Frederick E. Connelly, Jr.,

BBO #544538

Moujan M. Walkow,

BBO #630658

PEABODY & ARNOLD

50 Rowes Wharf

Boston, MA 02110

617/951-2100

CERTIFICATE OF SERVICE

I, Frederick E. Connelly, Jr., hereby certify that I have

this 17 day of October, 1996, served a copy of the foregoing

upon the plaintiff by mailing same postage prepaid to:

52 -

Gregory L. Nester, Esq.

Marvin I Barish Law Offices, P.C.

Suite 801 — The Curtis Center

Independence Mall West

Sixth and Walnut Streets

Philadelphia, PA 19106

Thomas J. Hunt, Esq.

One Union Street

Boston, MA 02108

/s/ Frederick E. Connelly, Jr.

Frederick E. Connelly, Jr.

EXHIBIT A

UNITED STATES DISTRICT COURT

DISTRICT OF MASSACHUSETTS

CA # 95-11046 (RCL)

WILLARD T. STEWART

Plaintiff

VS.

DUTRA CONSTRUCTION CoO., INC.

Defendant

DEPOSITION OF WILLARD T. STEWART, taken

pursuant to Notice under the applicable provisions of the

Massachusetts Rules of Civil Procedure on behalf of the

Defendant, before Joan M. Barry, a Notary Public in and

for the Commonwealth of Massachusetts, at the offices of

Peabody & Arnold, 50 Rowes Wharf, Boston, Massachu-

setts, on Tuesday, May 21, 1996, commencing at 11:30 a.m.

53

NEAL A. SALLOWAY — COURT REPORTERS

FIVE CARDIGAN ROAD

WEST PEABODY, MA 01960

(617) 581-3993 — (508) 535-0313

APPEARANCES:

PEABODY & ARNOLD

(by Frederick E. Connelly, Jr., Esq.)

50 Rowes Wharf

Boston, Massachusetts 02110

On behalf of the Defendant

MARVIN E. BARISH, ESQ.

(by Gregory L. Nester, Esq.)

The Curtis Center

Sixth and Walnut Streets

Suite 801

Philadelphia, Pennsylvania 19106

On behalf of the Plaintiff

INDEX

DEPONE DIRECT CROSS

Willard T. Stewart

By Mr. Connelly 4

54

EXHIBITS

EXHIBIT NO. DESCRIPTION PAGE NO.

1 Photocopy 136

[4] MR. NESTER: I would like him to read and

sign. Okay. I'll explain that to him afterwards. We'll waive

notary. He doesn’t have to do it in front of a notary.

MR. CONNELLY: All objections reserved until

the time of trial, except as to form. All motions to strike

are reserved. As far as reading and signing, twenty-one

days will be enough time once he receives it?

MR. NESTER: Once I receive it, it should be. If

that’s problematic, I'll let you know.

WILLARD T. STEWART

having been first duly sworn, deposes and testifies as

follows:

EXAMINATION

BY MR. CONNELLY:

Q. Mr. Stewart, my name is Frederick Connelly, and

I represent the defendant, Dutra Construction Company. I

am going to be asking you some questions today

I first want to go over a few groundrules so the pro-

ceedings will go a little smoother. You may have discussed —

some of this with your attorney already. You're going to

have to answer each question outloud, okay, and

* * *

55

[26] Q. Do your hammer toes in any way affect the

work you can do?

A. No.

Q. If at any time during the deposition today you

think of any other injuries or claims you’ve made that you

didn’t think of before, just let me know.

Okay?

A. Sure.

Q. When did you first start working for Dutra?

A. I believe it was December, 1992. November or

December. I know it was cold weather.

Q. And you were hired out of the union hall?

A. Yes.

Q. Okay. When had you last worked before you

began working at the Boston job?

A. Where did I last work before that?

MR. NESTER: For Dutra or anybody?

Q. Anybody?

A. Iworked for —I was off work for like four months

before I worked — I worked in Baltimore.

Q. You worked where?

A. In Baltimore, Baltimore area.

Q. And what company was that for?

56

[33] there. ,

Q. Okay, and there was only one dredge on the Super

A. Yes.

Q. And that always remained on it as far as you

A. Yes.

Q. How much of your time was spent on the Super

Scoop during the time you were on the job?

A. I would say 99 and 9/10s.

Q. 99 and 9/10s?

A. Right.

Q. So, just about all your time was on the Super

A. Yes.

Q. What engines on the Super Scoop did you have

responsibility for?

A. The main engine on the hoist. They had two deck

engines. Occasionally, if they had a problem with the boat,

I would deal with that. They would ask me to come check

it out, but —

Q. What boat is that?

A. The work boat they had.

[34] (Discussion held off the record.)

57 i

Q. We were discussing the engines that you are

responsible for, three main ones were the main engine to

hoist and the two deck engines?

A. Yes.

Q. And you had spent all your time on the Super

Scoop working on those?

A. Yes.

Q. Were you the only person or engineer on the

Super Scoop?

/. No. There’s three engineers.~Not at the same

time. I mean, shift work.

Q. Okay. During your shifts, were you the only

engineer on the Super Scoop?

A. Yes.

Q. Now, I take it none of these engines had anything

to do with the movement of the Super Scoop and the

water?

A. The deck engines do. They operate, hoist, cables

and ankers and so on.

Q. What would these be used for?

A. Moving Super Scoop to do the dredging operation.

[35] Q. Okay.

A. And-

Q. Do they have any other purposes than moving the

Super Scoop?

A. No.

58

Q. And those would be used how — Would it be by

ankers?

A. Yes, ankers and the cables.

Q. And did it have any other form of propulsion

_ other than that?

A. No.

Q. It didn’t have a propeller, no.

Q. And how many times during a day would it move?

Let me rephrase that.

How many times during a shift would it move?

A. I don’t know. Say working a twelve-hour shift,

maybe, mostly I guess the work, I would guess six times.

Q. And how far would it be moved?

A. On each move, thirty feet, fifty feet.

Q. How long would each move take?

A. Normally, just a few minutes, maybe five

minutes.

* * *

[45] So, I went over to see what I could do to help the

Caterpillar man finish up and get the show on the road.

He was finishing up with the engine. So, I decided, I

disconnected the wiring the day before. So, I fed the wires

back down there and connected the wires back up for the

remote control for the lights and so on and on that little

building on that thing, and while I was doing this, I was

on my knees feeding the wire down through, and they

59

decided to move the scow around to the other side of the

dredge to start filling it up and apparently, I could pretty

much nearly drop the bucket in there, swing it around and

everything went flying and when it snapped, I don’t know

what happened, and when I slipped, that’s when it all

happened.

Q. We'll break it down to make it a little clearer.

Starting with the — Was the engine on the scow that

needed replacing?

A. Yes.

Q. They were going to replace the entire engine?

A. The scow 4.

Q. How many scows were being used out there?

[46] A. I think two.

Q. What were the other scow’s number?

A. 151 — something like that. 151. I can’t remember

exactly.

Q. Had you been on the scows at all either shortly

before the accident? Had you been on either scow before

the day of your -

A. Yes. I check the oil once a week or check the

engine.

Now, the scows, do they have self propulsion?

No.

They have to be torqued, don’t they?

Yes.

> & Pe ©

60

Q. The engine you're talking about is the hopper?

A. Yes.

Q. Which opens up into the ocean and dumps the

dredging material?

Yes.

Onto the fish and clams below?

Yes.

> 2 >

Q. So, the engine in the scow number 4 blew out or

something?

* * *

[50] Q. All right.

A. I wasn’t ordered to. It was part of my job when

the dredge is shut down to do what it took to get it run-

Q. Okay. The dredge was shut down. So, you couldn’t

work.

There was no reason for you to work on the engine of

the dredge?

A. Not at that time, no.

Q. So, basically, until this scow gets fixed, you had

nothing to do?

MR. NESTER: I'll object to the form of the

question.

Q. Let me ask you, did you have any work to do on

the Super Scoop until scow number 4 was fixed?

61

A. I could have. I probably — but not that it was

important as getting the scow, to get the dredge back in

operation.

Q. Now, was a Caterpillar mechanic there?

| A. Yes.

Q. His job was to replace the scow engine?

A. Yes.

Q. Did he have anyone helping him?

[51] A. .No, not at that time, no.

Q. What was the first day he was out there?

A. Firstday.

Q. Was that the first day?

A. I believe the day before, I believe he got there the

day before.

Q. Did you check with anyone, any supervisor before

you went on to the scow?

A. I talked to the captain, yes.

Q. Who was that?

A. Brad Shoffit.

Q

. What did you say to him and what did he say to

you?

A. Idon’t remember.

Q. In any event, you went from the Super Scoop onto

the scow?

62

A. Yes.

Q. And was the scow along side of the Super Scoop

at this point?

A. Yes.

Q. Directly along side?

A. Yes.

Q. And how would you get from the Super Scoop to

[52] the scow?

A. It was like a, the ladder built right into the side of

the — You step off the deck, go off the ladder and onto the

scow.

The scow was higher than the Super Scoop?

Yes.

Would the scow be tied to Super Scoop?

Ropes.

Okay. Several different ropes?

Ropes or cables from the winches.

And were there any buffers between the two?

Normally, yes. There are tires in there.

Just black tires?

Yes.

Hung along side?

Yes.

> Oro Pro > Oo > OPO

63

So, you climb aboard the scow?

Yes.

Did you have any tools with you?

I don’t think so.

Q. Okay. And then you, I take it, went to find the

Caterpillar mechanic?

A. Yes.

> © > ©

[53] Q. And you were going to say, hey, I'll help you,

tell me what to do?

A. Yes, basically, yes.

Q. Did you start working with him before you were

injured?

A. I wasn’t working with him. He said, he had — He

was finishing up with the engine, he was finishing up. I

said, well, since you're all right, I'll feed the wires down

through and go ahead and wire up the remote control and

take care of that. That’s something he would have done if I

weren't there to help him.

Q. What job was this to hook it up? I don’t under-

stand. What are you hooking up?

A. They had a remote control unit. They operated a

scow from the tug boat by remote control. -

@. And that was unhooked when he replaced the

erigine?

A. Yes. They took the top building off of the scow.

They took the top building off where the wires are up

64

through and up through and then there was the control

panel down blow.

They disconnected it. So, they could take this building

off and disconnected the wiring from the

* * *

[129] A. No.

Q. What people, what crew members were onboard

the Super Scoop at the time you were injured. You men-

tioned Malcolm Oldham?

A. Malcolm Oldham, Bill Duncan, I think, was

onboard.

Q. What was he?

A. Pardon me.

Q. What was his job?

A. He was a mate.

Q. Did he ever operate the Super Scoop?

A. I don’t think so. I don’t know.

Q. Who else was onboard? Was Brad Shoffit on-

board? \

A. Yes.

Q. He was?

A. Yes. I’m trying to think. Stanley Oldham, I think

he was on. I think Roger Hammond. He was a civil engi-

neer. I believe he was on.

Q. Roger Hammond?

65

A. Yes.

Q. Who would you take orders from?

A. Roger.

[130] Q. Roger would give you orders?

A. No. Who did I take orders from?

Q. Yes.

A. The only one that gave me orders, if anybody,

would be Brad Shoffit. He was the captain.

Q. Okay. Any other names of people out —

A. Pardon me.

Q. Can you recall names of any other people working

out there?

A. I think Stanley Oldham, I think, was working. I

am bad at remembering names. You'll have to ask me.

Q. Okay. In the six or seven months you had been

working on the Super Scoop before the day of your acci-

dent, how many times had you seen a scow being brought

along side the Super Scoop, a couple of times a week or —

A. Oh, yes, early in the job, it was a couple of times a

day.

Q. Were they all brought in the same way by putting

the bucket in the scow?

A. No. They brought them in with a tug boat some-

times and push. Once, occasionally, they put the bucket in

to, you know, bring it in a little closer to hold it until they

66

got it tied up mostly was what they [131] used the bucket

for.

Q. Okay. When you went from the Super Scoop onto

the scow, it was tied up.

Is that right?

A. Yes.

Q. So, it had to be untied by the deck hands?

A. Yes.

Q. And then the bucket would have pushed it away

and brought it around?

A. Yes.

Q. And you didn’t realize any of that was going on?

A. No.

Q. And just, I believe I asked you this, just so I’m

clear, the engine that was being worked on on the scow

was the engine used to open the hoppers?

A. Yes.

It wasn’t to propel the scow?

No.

You never slept on the Super Scoop. Is that right?

Pardon me.

op & Pp

There was no place for you to sleep on the

* * *

67

UNITED STATES DISTRICT COURT

FOR THE DISTRICT OF MASSACHUSETTS

WILLARD T. STEWART, )

a )

Plaintiff ) CIVIL ACTION

V. ) NO. 95-11046 (RCL)

DUTRA CONSTRUCTION ?

CO., INC., '

Defendant. )

ANSWER OF D TION

O PLAINTIFF’ r

(Filed Dec. 3, 1996)

Now comes the Defendant, Dutra Construction Co.,

Inc., by and through its attorneys, Peabody & Arnold, and

herewith gives its answer to the plaintiff’s complaint,

reserving all rights to seek additional defenses to the

complaint by appropriate motion.

All allegations not specifically admitted herein are

denied. The defendant, Dutra Construction Co., Inc.,

(hereinafter “Dutra”) answers each numbered paragraph

as follows:

First Cause of Action

1. The defendant denies the allegations contained in

paragraph one.

2. The defendant denies that the plaintiff has stand-

ing or is entitled to bring an action under the Jones Act, 46

U.S.C. §688 et seq or under the General Maritime Laws of

the United States District Court.

a.

3. The defendant denies the allegations contained in

paragraph three.

68

4. The defendant admits that it employed the plaintiff

but denies that he was the member of a crew. The defen-

dant denies the remaining allegations of paragraph four.

5. The defendant denies the allegations contained in

paragraph five.

6. The defendant denies the allegations contained in

paragraph six.

7. The defendant denies the allegations contained in

paragraph seven.

Wherefore, the defendant demands that the plaintiff’s

complaint against it be dismissed and that judgment enter

for the defendant, together with its costs.

on se of Acti

The defendant denies that the plaintiff is entitled to

maintenance and cure and wages and further answers as

follows:

8. The defendant incorporates herein by reference its

answers to paragraphs 1-7 and makes that its answer to

paragraph eight.

9. The defendant denies the allegations contained in

paragraph nine.

10. The defendant is unable to admit or deny the

allegations of jurisdiction and calls upon the plaintiff to

prove same. The defendant denies that the plaintiff has

standing or is entitled to bring an action under the Jones

Act (46 (USC §688 et seq) or under the General Maritime

Laws ot the United States District Court.

69

Wherefore, the defendant demands that the plaintiffs

complaint against it be dismissed and that judgment enter

for the defendant, together with its costs.

Third C f Acti

11. The defendant incorporates herein by reference

its answers to paragraphs 1-10 and makes that its answer

to paragraph 11.

12. The defendant denies the allegations contained

in paragraph twelve.

13. The defendant denies the allegations contained

in paragraph thirteen.

(a) The defendant denies the allegations con-

tained in paragraph thirteen (a).

(b) The defendant denies the allegations con-

tained in paragraph thirteen (b).

(c) The defendant denies the allegations con-

tained in paragraph thirteen (c).

(d) The defendant denies the allegations con-

tained in paragraph th)rteen (d).

(e) The defendant denies the allegations con-

tained in paragraph thirteen (e).

(f) The defendant denies the allegations con-

tained in paragraph thirteen (f).

(g) The defendant denies the allegations con-

tained in paragraph thirteen (g).

(h) The defendant denies the allegations con-

tained in paragraph thirteen (h).

70

(i) The defendant denies the allegations con-

tained in paragraph thirteen (i).

(j) The defendant denies ‘* allegations con-

tained in paragraph thirteen (j).

(k) The defendant denies the allegations con-

tained in paragraph thirteen (k).

(1) The defendant denies the allegations con-

tained in paragraph thirteen (I).

(m) The defendant denies the allegations con-

tained in paragraph thirteen (m).

(n) The defendant denies the allegations con-

tained in paragraph thirteen (n).

14. The defendant denies the allegations contained

in paragraph fourteen.

15. The defendant denies the allegations contained

in paragraph fifteen.

THE DEFENDANT, DUTRA CONSTRUCTION

CO., INC. ASSERTS THE FOLLOWING

AFFIRMATIVE DEFENSES

Now comes the defendant and incorporates the follow-

ing affirmative defense into each and every count con-

tained in its Answer to Plaintiff’s complaint as follows:

AND FURTHER ANSWERING, AND AS A COM-

PLETE AND SEPARATE DEFENSE, the defendant says

that if the plaintiff was injured as alleged, which is spe-

cifically denied, those injuries were the sole and proximate

cause of actions of third parties for who the defendant is

not legally responsible.

71

AND FURTHER ANSWERING, AND AS A COM-

PLETE AND SEPARATE DEFENSE, the defendant says

that if the plaintiff was injured as alleged, which is spe-

cifically denied, those injuries were the result of an Act of

God for which the defendant is not legally responsible.

FURTHER ANSWERING, AND AS A COMPLETE

AND SEPARATE DEFENSE, the defendant says that if

the plaintiff was injured as aileged, which is specifically

denied, it was due in whole or in part to the plaintiff’s

own negligence and failure to exercise his duty of care,

skill, and knowledge in the performance of his work

reasonably to be required of a person of the plaintiff’s

experience and not due to any negligence or fault on the

part of the defendant or any persons for whom the defen-

dant may be legally responsible.

AND FURTHER ANSWERING, AND AS A COM-

PLETE AND SEPARATE DEFENSE, the defendant says

that if the plaintiff was injured as alleged, which is spe-

cifically denied, such injury was without fault, knowledge

or privity of the defendant, that the damages claimed

herein exceed the value of the vessel, including her pend-

ing freight; and the defendant herewith claims benefits of

any and all laws and statutes of Liability of the defendant,

including 46 U.S.C. Section 183(b).

AND FURTHER ANSWERING, AND AS A COM-

PLETE AND SEPARATE DEFENSE, the defendant says

that if the injury alleged was sustained, they did not occur

while the plaintiff was in the service of the vessel.

AND FURTHER ANSWERING, AND AS A COM-

PLETE AND SEPARATE DEFENSE, the defendant says

that the plaintiff breached his contractual duties to the

72

vessel owner and, therefore, cannot recover under the

Walker Doctrine.

AND FURTHER ANSWERING, AND AS A COM-

PLETE AND SEPARATE DEFENSE, the defendant says

that the Dredge Superscoup and Scow No. 4 is not a vessel

as that term is used in the Jones Act, 46 U.S.C. Section

688 et seq, General Maritime Law, or any other applicable

statute, both state and federal, and, therefore, plaintiff is

not entitled to recover.

AND FURTHER ANSWERING, AND AS A COM-

PLETE AND SEPARATE DEFENSE, the defendant says

that the plaintiff is not entitled to a trial by jury.

AND FURTHER ANSWERING, AND AS A COM-

PLETE AND SEPARATE DEFENSE, the defendant states

that it did not own the “vessel” as alleged. As a result the

plaintiff lacks jurisdiction under either the Merchant

Marine Act or the general maritime law to pursue this

case of action.

AND FURTHER ANSWERING, AND AS A. COM-

PLETE AND SEPARATE DEFENSE, the defendant says

that the plaintiff is barred from bringing a civil claim

because he received payments as a result of a workers

compensation claim or similar claim.

AND FURTHER ANSWERING, AND AS A COM-

PLETE AND SEPARATE DEFENSE, the defendant says

that if it was negligent it was negligent in its capacity as

employer and not as vessel owner, thus barring the plain-

tiff’s claim brought pursuant to Section 905(b) of the

Longshore & Harbor Workers Compensation Act.

73

WHEREFORE, the defendant demands that the

plaintiffs complaint against it be dismissed and that

judgment enter for the defendant, together with its costs.

JURY CLAIM

The defendant demands a trial by jury for all applica-

ble Counts.

By its attorneys,

/s/ Frederick E. Connelly, Jr.

Frederick E. Connelly, Jr.,

BBO #544538

PEABODY & ARNOLD

50 Rowes Wharf

Boston, MA 02100

617/951-2100

CERTIFICATE OF SERVICE

I, Frederick E. Connelly, Jr., hereby certify that I have

this 2 day of December, 1996, served a copy of the forego-

ing upon the plaintiff by mailing same postage prepaid to:

Gregory L. Nester, Esq.

Marvin I Barish Law Offices, P.C.

Suite 801 — The Curtis Center

Independence Mall West

Sixth and Walnut Streets

Philadelphia, PA 19106

Thomas J. Hunt, Esq.

One Union Street

Boston, MA 02108

74

/s/ Frederick E. Connelly, Jr.

Frederick E. Connelly, Jr.

75

UNITED STATES DISTRICT COURT

DISTRICT OF MASSACHUSETTS

WILLIAM P. KROMHOUT, ?

Plaintiff ‘

v. C.A. NO. 95-12311-NG

DUTRA CONSTRUCTION )

COMPANY, INC.,

Defendant )

DEFENDANT’S RESPONSE TO PLAINTIFF'S RE-

QUEST FOR ADMISSIONS

(Filed Oct. 6, 1999)

REQUEST NO. 1

On December 14, 1992, the defendant, Dutra, owned,

operated, and controlled the BARGE SUPER SCOOP.

RESPONSE NO. 1

Objection on the grounds that the term “controlled” calls

for a legal determination which the defendant is not

qualified to make. Without waiving this objection and

subject to it, the defendant states that on December 14,

1992 it owned and operated the Superscoop.

REQUEST NO. 2

On December, 14, 1992, the SUPER SCOOP was located

in Boston Harbor on navigable waters of the United States

and was engaged in the dredging operations referred to as

“Third Harbor Tunnel.”

76

RESPONSE NO. 2

The defendant admits that on December 14, 1992 the

Superscoop was located in Boston Harbor and was en-

gaged in the dredging operation referred to as “Third

Harbor Tunnel.”

“REQUEST NO. 3

The defendant admits that construction of the Superscoop

was completed in approximately June, 1976.

RESPONSE NO. 3

The defendant admits the allegations contained in Re-

quest No. 3.

REQUEST NO. 4

The SUPER SCOOP was formerly operating on the west

coast of the United States and sailed through the Panama

Canal under tow to the Boston area to participate in the

dredging operation for the Third Harbor Tunnel.

RESPONSE NO. 4

The defendant admits the allegations contained in Re-

quest No. 4.

REQUEST NO.5

Movement of the SUPER SCOOP was a necessary part of

the dredging operation and was done by the use of the 4

anchors and this was a daily operation.

RESPONSE NO. 5

The defendant admits that on most days during the time

that the Superscoop was performing dredging it would be

moved a short distance by use of its anchors.

77

REQUEST NO. 6

The SUPER SCOOP had a raked bow.

RESPONSE NO. 6

The defendant denies that the Superscoop has a standard

raked bow.

REQUEST NO. 7

The SUPER SCOOP was A.B:S. qualified.

RESPONSE NO. 7

The defendant admits the allegations contained in Re-

quest No. 7.

REQUEST NO. 8

The SUPER SCOOP had load line markings under Ameri-

can Bureau of Shipping Certificate No. 61-29, 944 and had

inspection periodically.

RESPONSE NO. 8

The defendant admits the allegations contained in Re-

quest No. 8.

REQUEST NO. 9

The SUPER SCOOP was a documented vessel.

RESPONSE NO. 9

The defendant admits the allegations contained in Re-

quest No. 9.

REQUEST NO. 10

The SUPER SCOOP was Coast Guard inspected.

78

RESPONSE NO. 10

The defendant admits the allegations contained in Re-

quest No. 10.

REQUEST NO. 11

The SUPER SCOOP had navigation lights.

RESPONSE NO. 11°

The defendant admits the allegations contained in Re-

quest No. 11.

REQUEST NO. 12

The SUPER SCOOP had deck engines.

RESPONSE NO. 12

The defendant admits that the Superscoop had deck

engines but denies that the engines were for propulsion

other than the short distances the Superscoop would be

moved by its anchors.

REQUEST NO. 13

The SUPER SCOOP’s purpose is for dredging operations.

RESPONSE NO. 13

The defendant admits the allegations contained in Re-

quest No. 13.

REQUEST NO. 14

The SUPER SCOOP mission was to dredge for the Third

Harbor Tunnel.

79

RESPONSE NO. 14

The defendant admits the allegations contained in Re-

quest No. 14.

REQUEST NO. 15

The SUPER SCOOP had ballast tanks to maintain a

seaworthy trim.

RESPONSE NO. 15

The defendant admits that the Superscoop had ballast

tanks.

REQUEST NO. 16

The SUPER SCOOP had a head and an area for the crew

to eat in.

RESPONSE NO. 16.

The defendant admits the allegations contained in Re-

quest No. 16.

REQUEST NO. 17

Brad Shoffit was the captain of the SUPER SCOOP.

RESPONSE NO. 17

The defendant admits that Brad Shoffit was the person in

charge of all employees on the Superscoop and was at

times referred to as “Captain.”

REQUEST NO. 18

Brad Shoffit hired and fired the members of the crew.

80

RESPONSE NO. 18

The defendant admits that Brad Shoffit was one of several

employees of Dutra who had the authority to hire and fire

employees working on the Superscoop.

REQUEST NO. 19

Crewmembers were required to wear life jackets.

RESPONSE NO. 19

The defendant admits that persons working on the Super-

scoop were required to wear life jackets.

REQUEST NO. 20

Crewmembers were transported to and from the SUPER

SCOOP by a crew boat.

RESPONSE NO. 20

The defendant admits the persons working on the Super-

scoop were transferred to the Superscoop by boat.

REQUEST NO. 21

Captain Brad Shoffit considered Bill Kromhout to be a

member of the crew of the SUPER SCOOP.

RESPONSE NO. 21

The defendant admits that at times the employees work-

ing on the Superscoop, including engineer Bill Kromhout,

were referred to as members of a crew.

REQUEST NO. 22

Captain Brad Shoffit specifically asked to hire Malcolm

Oldham as the operator.

81

RESPONSE NO. 22

The defendant admits that Malcolm Oldham was already

employed on the Superscoop and was filling in on a regu-

lar basis as an operator. When a position for a full time

operator became available, Brad Shoffit asked the union

representative whether or not Malcolm Oldham could fill

that position.

REQUEST NO. 23

Greasing the upper sheaves can be done externally of the

housing but greasing the lower sheaves requires that you

must get within the confines of the housing.

RESPONSE NO. 23

Objection on the grounds that the request is confusing,

overly broad and subject to varying interpretations. There

are many sheaves located upon the Superscoop.

REQUEST NO. 24

The lattice work does not prevent a person’s body from

entering the area where the plates go up and down.

RESPONSE NO. 24

Objection on the grounds that the request is confusing,

overly broad and subject to varying interpretations.

REQUEST NO. 25

In order to grease the sheaves on the tag line tower, you

grease from one side and then go to the other side of the

tag line towers and grease from that side.

82

RESPONSE NO. 25

The defendant admits that this is usually the procedure

followed by the engineer.

REQUEST NO. 26

Captain Shoffit believed that an operator must have good

hearing and remembered that Malcolm Oldham had a

hearing aide on December 14, 1992.

RESPONSE NO. 26

The defendant admits that Brad Shoffit testified at his

deposition that in his opinion Malcolm Oldham was

wearing a hearing aide on December 14, 1992. Brad

Shoffit also testified that many persons working on a

dredge because of the loud noise have imperfect hearing.

REQUEST NO. 27

Malcolm Oldham did not get a hearing aide until after this

incident occurred.

RESPONSE NO. 27

The defendant is not able to admit or deny due to insuffi-

cient information at this time and will supplement after

additional investigation and discovery.

REQUEST NO. 28

It is not noisy in the operator’s cabin.

RESPONSE NO. 28

Objection on the grounds that the request is confusing and

subject to varying interpretations. Specifically, what is

noisy to one person is not noisy to another.

REQUEST NO. 29

Captain Shoffit was by himself at the Massachusetts

General Hospital when he saw and talked to the plaintiff.

RESPONSE NO. 29

The defendant denies the allegations contained in Request

No. 29.

REQUEST NO. 30

Malcolm Oldham told Captain Shoffit that Kromhout was

trying to get the hose off when the injury occurred.

RESPONSE NO. 30

The defendant admits that Malcolm Oldham told Brad

Shoffit that as far as he was aware Mr. Kromhout was

trying to free his hose when the injury occurred and that

Malcolm Oldham was not aware that Mr. Kromhout was

performing greasing operations on the tag line counter-

weights until after the accident.

REQUEST NO. 31

Since there was no “lockout-tagout” in place on December

12, 1992 to perform the greasing of sheaves operation, the

method to perform the greasing operation was through

oral communication.

RESPONSE NO. 31

The defendant denies the allegations contained in Request

No. 31.

REQUEST NO. 32

When greasing the counterweights, the upper sheaves can

be greased from the outside because the grease fittings are

accessible from outside the tower.

RESPONSE NO. 32

The defendant admits the allegations contained in Re-

quest No. 32.

REQUEST NO. 33

When greasing the counterweight, the lower sheaves can

only be greased from the inside the tower.

RESPONSE NO. 33

The defendant admits that the proper procedure to grease

the lower sheaves of the tag lire counterweight was to

make certain that the bucket was on deck before begin-

ning greasing. At that time it was safe to place one’s hands

through the tower which housed the tag line counter-

weight.

REQUEST NO. 34

On December 14, 1992, the battery box was located far-

thest away from the operator on the side of the tower in

which the counterweights go up and down.

RESPONSE NO. 34

The defendant admits the allegations contained in Re-

quest No. 34.

REQUEST NO. 35

At some time after December 14, 1992, the battery box

was moved to its present location.

RESPONSE NO. 35

The defendant has insufficient knowledge upon which to

base his response and will supplement this answer after

further investigation and discovery.

REQUEST NO. 36

Mark Korkowski, while acting as an agent of Dutra

Construction Company, Inc., signed and delivered APPLI-

CATION FOR INSPECTION OF U.S. VESSEL (See

Exhibit 1).

RESPONSE NO. 36

Although the defendant believes that Request No. 36 is an

accurate statement, it is not able to admit or deny since no

Exhibit 1 was attached to the Plaintiff's Request For

Admissions.

REQUEST NO. 37

Dutra Construction Company, Inc. and SUPER SCOOP

were under the jurisdiction of OSHA as of December 14,

1992.

RESPONSE NO. 37

Objection on the grounds that this request requires the

defendant to make a legal conclusion which it is not

qualified to make. Further, this is an issue to be decided

by the fact finder at trial.

REQUEST NO. 38

The crane aboard the SUPER SCOOP has been an inte-

gral part of the barge since it was affixed.

RESPONSE NO. 38

The defendant admits the allegations contained in Re-

quest No. 38.

REQUEST NO. 39

Movement of the SUPER SCOOP was done by deck

members and was done during the dredging operation as a

necessary part of the dredging operation.

RESPONSE NO. 39

The defendant admits that the Superscoop would be

moved a short distance by use of its anchors and deck

engines during the dredging operation.

KENNETH W. SMITH, HEREBY CERTIFIES THE

FOLLOWING: I AM GENERAL COUNSEL FOR DUTRA

CONSTRUCTION COMPANY, INC., A DEFENDANT IN

THE ABOVE-ENTITLED ACTION AND I SIGN THE

FOREGOING RESPONSES TO REQUEST FOR ADMIS-

SION FOR AND ON BEHALF OF THE SAID DEFEN-

DANT AND AM DULY AUTHORIZED TO DO SO.

THE MATTERS STATED WITHIN THE FOREGO-

ING RESPONSES TO REQUEST FOR ADMISSION ARE

NOT WITHIN MY PERSONAL KNOWLEDGE AND I AM

INFORMED THAT THERE IS NO SINGLE OFFICIAL

OF DUTRA CONSTRUCTION COMPANY, INC. WITH

PERSONAL KNOWLEDGE OF ALL SUCH MATTERS

AND THAT THE MATTERS STATED IN THE FOREGO-

ING RESPONSES TO REQUEST FOR ADMISSION

HAVE BEEN ASSEMBLED BY REPRESENTATIVES OF

THE DEFENDANT.

87

I AM INFORMED BY SAID REPRESENTATIVES

THAT THE MATTERS SET FORTH IN THE AFORE-

SAID RESPONSES TO REQUEST FOR ADMISSION

ARE IN ACCORDANCE WITH THE INFORMATION

POSSESSED BY THE DEFENDANT AND ARE TRUE

RESPONSES AS FAR AS IT IS POSSIBLE TO VERIFY

THEM. |

SIGNED UNDER THE PAINS AND PENALTIES OF

PERJURY THIS 24th DAY OF JUNE, 1998.

DUTRA CONSTRUCTION

COMPANY, INC.

/s/ Kenneth W. Smith

By: Kenneth W. Smith,

General Counsel

Dutra Construction

Company, Inc.

AS TO OBJECTIONS:

/s/ Frederick E. Connelly, Jr.

Frederick E. Connelly, Jr.,

BBO # 544538

PEABODY & ARNOLD

50 Rowes Wharf

Boston, MA 02110

617/951-2100

CERTIFICATE OF SERVICE

I Frederick E. Connellv, Jr., hereby certify that I have

this 25 day of June, 1998, served a copy of the foregoing

upon the plaintiff by mailing same postage prepaid to:

David P. Kaplan, Esq.

The Kaplan/Bond Group

Boston Fish Pier

West Building, Suite 304

P.O. Box 1404

Boston, MA 02205-1404

/s/ Frederick E. Connelly, Jr.

Frederick E. Connelly, Jr.

89

UNITED STATES COAST GUARD CERTIFICATES

OF INSPECTION FOR SUPER SCOOP (ORIGI-

NALLY ATTACHED AS EXHIBIT D TO PLAINTIFF’S

MOTION FOR REHEARING)

WILLARD T. STEWART

V.

DUTRA CONSTRUCTION CoO., INC. CIVIL ACTION

NO. 95-11046-RCL

(D.MASS. FILED: OCTOBER 6, 1999)

CERTIFICATION DATE: 10JAN94

EXPIRATION DATE: 10JAN96°

UNITED STATES OF AMERICA

DEPARTMENT OF TRANSPORTATION

UNITED STATES COAST GUARD

[SEAL] Certificate of Inspection

VESSEL NAME OFFICIAL NUMBER

SUPER SCOOP D574373

CALL SIGN SERVICE

INDUSTRIAL VESSEL

HOME PORT HULL MATERIAL

SAN FRANCISCO, CA STEEL

HORSEPOWER PROPULSION

PLACE BUILT DATE BUILT

MERMENTAU, LA 01JAN76

GROSS TONS NET TONS

1290 1290

DWT LENGTH

176.00

OWNER OPERATOR

DUTRA CONSTRUCTION ‘DUTRA CONSTRUCTION

CO INC CO INC

90

1000 POINT SAN PEDRO _=_—: 1000 POINT SAN PEDRO

RD RD

SAN RAFAEL, CA 94901 SAN RAFAEL, CA 94901

THIS VESSEL MUST BE MANNED WITH THE FOL-

LOWING LICENSED AND UNLICENSED PERSONNEL

INCLUDED IN WHICH THERE MUST BE 0 CERTIFI-

CATED LIFEBOATMEN AND 0 CERTIFICATED

TANKERMAN.

__.. MASTER ___ MASTER & 1ST

CLASS PILOT

__.. -CHIEFMATE ___. CLASS PILOT

__. 2ND MATE __. RADIO OFFICER(S)

__.. MATES ___ OPERATOR(S)

__.. ABLE SEAMEN __.. CHIEF ENGINEER

__.. ORDINARY SEAMEN ____ 1ST ASST.ENGINEER

__.. DECKHANDS __.._ 2ND ASST.

ENGINEER

ENGQ’RS.

__.._ :- FIREMEN-

WATERTENDERS

OILERS

IN ADDITION, THIS VESSEL MAY CARRY 0 PASSEN-

GERS, 0 OTHER PERSONS IN CREW, 0 PERSONS IN

ADDITION TO CREW, AND NO OTHERS. TOTAL

PERSONS ALLOWED: 0

ROUTE PERMITTED AND CONDITIONS OF OPERA-

TION:

91

~OCEANS-

UNMANNED.

2 he ie 2h 2h i a ie ie 2k aie oie ie ofc 2h 2s 2c ak ak 2c 2h 2c 2c 2 fe 2c 2k 2k 2k 2c 2c 2c 2c 2c 2c 2c 2c 2c 2c aie 2k 2k a ae afc 2c ofc 2k afc 2c ac ac akc fc

VESSEL MAY CARRY UP TO 10 INDUSTRIAL PER-

SONNEL WHEN OPERATING ON PROTECTED WA-

TERS. ALL PERSONS SHALL WEAR COAST GUARD

APPROVED PERSONAL FLOATATION DEVICES

WHILE ON DECK.

WHILE VESSEL IS MANNED A RESCUE VESSEL (M/V

HUMMINGBIRD) SHALL BE STANDING BY

2A 2h ee 2 a Te a oe ok ae oe ok eo A a a a a oa i a i eo oe ok oe ok oe a oe oo ak ok ake

NO MORE THAN 466 SHORT TONS OF DECK CARGO

MAY BE -CARRIED. THE VERTICAL CENTER OF

GRAVITY OF THIS DECK CARGO MUST NOT EXCEED

SIX FEET ABOVE THE DECK. CARGO MUST BE

POSITIVELY SECURED AGAINST SHIFTING BEFORE

LEAVING PROTECTED WATERS.

***SEE NEXT PAGE FOR ADDITIONAL

CERTIFICATE INFORMATION ***

WITH THE INSPECTION HAVING BEEN COMPLETED

AT CAPE CANAVERAL, FLORIDA

CERTIFIED BY THE OFFICER IN CHARGE MARINE

INSPECTION, JACKSONVILLE, FL

WITH THE APPLICABLE VESSEL, INSPECTION LAWS

AND THE RULES AND REGULATIONS PRESCRIBED

THEREUNDER.

7:

ON 10JAN90 THIS VESSEL IS

TO BE IN ALL RESPECTS IN CONFORMITY

92

PERIODIC REINSPECTIONS

DATE ZONE SIGNATURE

THIS CERTIFICATE ISSUED BY:

A. REGALBUTO, CAPTAIN, USCG

OFFICER IN CHARGE, .iARINE INSPECTION

JACKSONVILLE, FL

INSPECTION ZONE

~HULL EXAMS-

-EXAM TYPE- -NEXT EXAM-

DRYDOCK 31JAN95

INTERNAL STRUCTURAL —— 31DEC94

~LAST EXAM- ~PRIOR EXAM-

26APR93 08JAN90

18DEC91 08JAN90

~STABILITY-

LETTER APPROVAL DATE/22DEC87 OFFICE/GMSC

-INSPECTION STATUS-

*PRESSURE VESSELS*

TYPE LOCATION

AIR RECEIVER CRANE MACH SPAC

AIR RECEIVER MAIN DECK COMP

LAST NEXT

10JAN94 10JAN96

10JAN94 10JAN96

93

-LIFESAVING EQUIPMENT-

. NUMBER PERSONS

TOTAL EQUIPMENT FOR LIFEBOATS (TOTAL)... 10

LEP OATE (PUREED cccccccccccscccccescccccscccesccocsenesesees

LIFEBOATS (STARBD)* .............:cccccccceceeeeeeeeeeeeeees

MOTOR LIFEBOATS%™..............ccccccccceeeeeeeeeeeeeeeeeees

LIFEBOATS W/RADIO™ ..............:ccccccccceeeeeeeeeeeeenees

RESCUE BOATS/PLATFORMG.............cccccceeeeeeeeeeees 1

SOUL ATATE Se TREO cccccevccccccccccsescccccsssscsesccnsssconnes

LIFE FLOATS/BOUYANT APP WORKBOATS

CRE TRIED ccccccccccsceccccccsesccccccscsscososacenoncsecs

LIFE PRESERVERS (ADULT) .............::::ceceeeeeeeeeeees 10

LIFE PRESERVERS (CHILD) ...............cccccceeeeeeeeeeees

RING BUOYS (TOTAL) ............::cccccceseeeeeeeeeeeeeeeeseeees 2

WOE BNI” crcccescccccecsssscsccrcccsscsosccssocnssccsssosoooes 2

WITH LINE ATTACHED ...............::cccccceseeeeeeeeeees 2

EEE cetnsnccncsnasssinocsscnsecesnssccseesscessseninesnmnensasonts

Tee GFE BB eccccecccccsescccescccscccescnssvssconcnescossoss

PORTABLE LIFEBOAT RADIOS ................::0cecceeeeees

EQUIPPED WITH EPIRB?.................ccccecccceeeeeeeeeeeees NO

(*INCLUDED IN TOTALS)

-FIRE FIGHTING EQUIPMENT-

*FIXED EXTINGUISHING SYSTEMS*

SPACE PROTECTED AGENT CAPACITY

FUEL TRANSFER ROOM/ CO2 50

MAIN DECK

*FIRE EXTINGUISHERS — HAND PORTABLE

AND SEMI-PORTABLE*

A-II B-I 6 B-II B-III

B-IV B-V C-I C-II

*** EB ND***

94

Department of Transportation

United States Coast Guard

Washington, D.C. 20593-0001

[SEAL] [SEAL]

CERTIFICATE OF FINANCIAL

RESPONSIBILITY (WATER POLLUTION)

KNOW ALL PERSONS BY THESE PRESENTS THAT

___ No. 830 416-07 Vessel Operator DUTRA CONSTRUC-

TION CO., INC. has established financial responsibility to

meet liability under section 311(p) of the Federal Water

Pollution Control Act, as amended, which may result from

the operation of the vessel named below:

Name of Vessel

SUPER SCOOP Expires FEB 20, 1995

The use of this certificate is subject to the provisions

of Part 130 of Title 33 of the Code of Federal Regulations,

as it is or may be amended, and the conditions on the

reverse of this Certificate. This Certificate is void if there

are any erasures or alterations hereon, and is void if the

operator named hereon is not the party responsible for

operating the vessel.

/s/ Robert M. Skall

Assistant Chief, Marine

Environmental Response

Division

Office of Marine Safety,

Security and

Environmental Protection

By Direction of the Commandant,

U.S. Coast Guard

95

United States of America

Department of Transportation

United States Coast Guard

[SEAL] TEMPORARY CERTIFICATE OF INSPECTION

This Temporary Certificate of Inspection is issued

under the provisions of Title 46 United States Code

Section 3309 in lieu of the regular certificate of inspection,

and shall be in force only until the receipt or board said —

vessel of the original certificate of inspection, this certifi-

cate in no case to be valid after one year from the date of

inspection.

VESSEL OFFICIAL NUMBER

SUPER SCOOP D574 373

CLASS GROSS TONS HOMEPORT

INDUSTRIAL = j999 SAN FRANCISCO,

VESSEL CA

OWNER/ADDRESS OPERATOR/ADDRESS

DUTRA CONSTRUCTION DUTRA CONSTRUCTION

COMPANY INC. COMPANY INC.

2199 CLEMENT AVENUE 2199 CLEMENT AVENUE

ALAMEDA, CA. 94501 ALAMEDA, CA. 94501

The following complement of licensed officers and crew is

required to be carried; included in which there must be __

Certificated Lifeboatmen and ___ Certificated Tankermen:

____ Master ____ Master & 1st Class

Pilot

_____ Chief Mate ____ Class Pilot

_____ 2nd Mate _____ Radio Officer

_____ Mate(s) _____ Operator(s)

_____ Able Seamen _____ Chief Engineer

_____ Ordinary Seamen _____ 1st Asst. Engineer

Deckhands 2nd Asst. Engineer

Engineer(s).

96

Firemen-Watertenders

Oilers

In addition, this vessel may carry __ other persons in

crew, ___ passengers, ___ persons in addition to the crew,

and __. Total persons allowed 0.

Maximum steam pressure allowed N/A p.s.i.

DATE DAY DOCK NO. 26APR98

ROUTE PERMITTED AND CONDITIONS OF OPERA-

TION

—~OCEANS-

UNMANNED

—-RIVERS-—

VESSEL MAY CARRY UP TO TEN (10) INDUSTRIAL

PERSONNEL WHEN OPERATING ON PROTECTED

WATERS ALL PERSONNEL SHALL WEAR COAST

GUARD APPROVED PERSONNEL FLOATATION

DEVICES WHILE ON DECK.

WHILE VESSEL IS MANNED A RESCUE VESSEL (M/V

HUMMINGBIRD) SHALL BE STANDING, BYE.

NO MORE THAN 446 SHORT TONS OF DECK CARGO

MAY BE CARRIED THE VERTICAL CENTER OF

GRAVITY OF THIS CARGO SHALL NOT EXCEED (6)

SIX FEET ABOVE THE DECK, CARGO MUST BE

POSITIVELY SECURED AGAINST SHIFTING BEFORE

LEAVING PROTECTED WATER.

97

Inspection of the above vessel, was completed on 10

JANUARY 1994 DH I, HEREBY CERTIFY that on this

date the vessel was in all respects in conformity with

applicable vessel inspection laws and regulations pre-

scribed thereunder.

OFFICER IN CHARGE MARINE INSPECTION

A. REGALBUTO, CAPTAIN, USCG

INSPECTION ZONE

JACKSONVILLE, FLORIDA

CERTIFICATION DATE: 12DEC91

EXPIRATION DATE: 12DEC93

UNITED STATES OF AMERICA

DEPARTMENT OF TRANSPORTATION

UNITED STATES COAST GUARD

[SEAL] Certificate of Inspection

VESSEL NAME OFFICIAL NUMBER

SUPER SCOOP D574373

CALL SIGN SERVICE

INDUSTRIAL VESSEL

HOME PORT ~ HULL MATERIAL

SAN FRANCISCO, CA STEEL

HORSEPOWER PROPULSION

PLACE BUILT DATE BUILT

MERMENTAU, LA 01JAN76

GROSS TONS NET TONS

1290 1290

DWT LENGTH

176.00

98

OWNER OPERATOR

DUTRA CONSTRUCTION DUTRA CONSTRUCTION

CO INC CO INC

2199 CLEMENT AVENUE 2199 CLEMENT AVENUE

ALAMEDA, CA 94501 ALAMEDA, CA 94501

THIS VESSEL MUST BE MANNED WITH THE FOL-

LOWING LICENSED AND UNLICENSED PERSONNEL

INCLUDED IN WHICH THERE MUST BE O CERTIFI-

CATED LIFEBOATMEN AND 0 CERTIFICATED

TANKERMAN.

__.. MASTER __. MASTER & 1ST

CLASS PILOT

__.. - CHIEFMATE __. CLASS PILOT

__.. - 2ND MATE __. RADIO OFFICER(S)

__.. MATES __. OPERATOR(S)

__. ABLE SEAMEN __. CHIEF ENGINEER

__.. ORDINARY SEAMEN ____ 1ST ASST. ENGI-

NEER

__. DECKHANDS __.. 2ND ASST.

ENGINEER

ENG’RS.

____- FIREMEN-

WATERTENDERS

OILERS

IN ADDITION, THIS VESSEL MAY CARRY 0 PASSEN-

GERS, 0 OTHER PERSONS IN CREW, 0 PERSONS IN

ADDITION TO CREW, AND NO OTHERS. TOTAL

PERSONS ALLOWED: 0

ROUTE PERMITTED AND CONDITIONS OF OPERA-

TION:

99

~OCEANS-

UNMANNED.

24 He ee eee a oe fe ae ae ae oe ae ae he oe he a ae oe a ae ae ae oe ac he a ae he ae ae ae ae ae ae ae a ae oe ae a he ae ae oie a oe ae a ae

-RIVERS-

VESSEL MAY CARRY UP TO 10 INDUSTRIAL PER-

SONNEL WHEN OPERATING ON PROTECTED WA-

TERS. IN BOSTON HARBOR BETWEEN EAST

BOSTON AND SOUTH BOSTON UNDER REASON-

ABLE OPERATING CONDITIONS. ALL PERSONS

SHALL WEAR COAST GUARD APPROVED PERSONAL

FLOATATION DEVICES WHILE ON DECK.

WHILE VESSEL IS MANNED A RESCUE VESSEL (M/V

CASTINE) SHALL BE STANDING BY.

2H ee he oe ee ae ae ee he he oe ae oe oe ae he he ae he ae he ae ae hee ae ae a hee a he oe ae oe oe ee a oe a a

NO MORE THAN 466 SHORT TONS OF DECK CARGO

MAY BE CARRIED. THE VERTICAL CENTER OF

GRAVITY OF THIS DECK CARGO MUST NOT EXCEED

SIX FEET ABOVE THE DECK. CARGO MUST BE

POSITIVELY SECURED AGAINST SHIFTING BEFORE

LEAVING PROTECTED WATERS.

***SEE NEXT PAGE FOR ADDITIONAL

CERTIFICATE INFORMATION ***

WITH THE INSPECTION HAVING BEEN COMPLETED

AT BOSTON, MASSACHUSETTS

CERTIFIED BY THE OFFICER IN CHARGE MARINE

INSPECTION, BOSTON, MASSACHUSETTS

WITH THE APPLICABLE VESSEL, INSPECTION LAWS

AND THE RULES AND REGULATIONS PRESCRIBED

THEREUNDER.

100

ON 12DEC91 THIS VESSEL IS

TO BE IN ALi RESPECTS IN CONFORMITY

PERIODIC REINSPECTIONS

DATE ZONE SIGNATURE

THIS CERTIFICATE ISSUED BY:

/s/ W.H. Boland, Jr.

W. H. BOLAND, JR. CAPTAIN, USCG

OFFICER IN CHARGE, MARINE INSPECTION

BOSTON. MASSACHUSETTS

INSPECTION ZONE

—HULL EXAMS-—

—EXAM TYPE- -NEXT EXAM-

DRYDOCK 31JAN93

INTERNAL STRUCTURAL 31DEC94

-LAST EXAM- -PRIOR EXAM-

08JAN90 29APR87

18DEC91 08JAN90

-STABILITY-

LETTER APPROVAL DATE/22DEC87 OFFICE/GMSC

-INSPECTION STATUS-

*PRESSURE VESSELS*

TYPE LOCATION

AIR RECEIVER MACHINERY SPACE

AIR RECEIVER PUMP ROOM

LAST NEXT

12DEC91 12DEC93

12DEC91 12DEC93

101

-LIFESAVING EQUIPMENT-

NUMBER PERSONS

TOTAL EQUIPMENT FOR LIFEBOATS (TOTAL)... 10

EA ESD CE IEED” cocvecccccccccccccscensovecsonoesensssscseee

LIFEBOATS (STARBD)* .............ccccccccesssseeeeeseeeeees

MOTOR LIFEBOATS.~................sscssssssseeessssesseeeees

LIFEBOATS W/RADIO™ ...............ccccceesceeeeeeeeeeeeeeess

RESCUE BOATS/PLATFORMGB................:ccccecceeeeeeees 1

INFLATABLE RAPT. ..............cccccscsssssssssssssseesseeeeees

LIFE FLOATS/BOUYANT APP WORKBOATS

FRE TRIED coccccccccesccccccncsscesecsoncccnseessssveonees

REQUIRED

LIFE PRESERVERS (ADULT) .........csc:scessessesseeeeesees 10

LIFE PRESERVERS (CHILD) ...........:.00sessesseeseeeeeen

RING BUOYS (TOTAL) ........:csescessessesssessesseeseesseesees 2.

Fe AACA TL RET Te 2

WITH LINE ATTACHED™.....0......ccscccsessesssessesseeses 2

Ss NE TEER EE IIT

IMMERSION SUITS. ..........csessessessesssessesseeseeseesseesees

PORTABLE LIFEBOAT RADIOS ..........:0::0s000e00000000

EQUIPPED WITH EPIRB?...............scssessessessessesseeses NO

(INCLUDED IN TOTALS)

-FIRE FIGHTING EQUIPMENT-

*FIRE EXTINGUISHERS - HAND PORTABLE AND

SEMI-PORTABLE*

A-II B-I 6 B-II B-III

B-IV B-V C-I C-Il

~CERTIFICATE AMENDMENTS-

PORT AMENDING/BOSMS

DATE AMENDED/07FEB92

102 103

—-AMENDMENT- - INTERNATIONAL LOAD LINE CERTIFICATE BY

THE AMERICAN BUREAU OF SHIPPING FOR THE

DRYDOCK INTERVAL CHANGED FROM ONCE IN 5 SUPER SCOOP (ORIGINALLY ATTACHED AS

YEARS TO TWICE IN 5 YEARS DUE TO PERMISSIVE EXHIBIT E TO PLAINTIFF’S MOTION |

MANNING FOR REHEARING)

+** END*** . WILLARD z STEWART

DUTRA CONSTRUCTION CO., INC.

CIVIL ACTION NO. 95-11046-RCL

(D.MASS. FILED: OCTOBER 6, 1999)

: | INTERNATIONAL LOAD LINE CERTIFICATE (1966)

Issued under the provisions of the International

Convention on Load Lines, 1966, under the

authority of the Government of the

[SEAL] UNITED STATES OF AMERICA,

Commandant, U. S. Coast Guard,

by the American Bureau of Shipping

duly authorized for assigning purposes under the provi-

sions of the Convention

7609467-2

: Certificate No.

Official number

Name of Ship or

Distinctive Letters

SUPER SCOOP 574,373

Length (L) as defined in

Port of Registry Article 2 (8); i.e., 46 CFR

42.13-15

ALAMEDA 168'-11-1/2"

104

Freeboard assigned as: * ( Anew ship

¢ ( Delete whatever

( is inapplicable.

Type of Ship ¢ ( Type “B” with

( increased freeboard

Freeboard from deck line

Tropical 5 feet 2 inches (T)

Summer 5 feet 3-% inches (S)

Winter 5 feet 5-% inches (W)

Winter: North Atlantic 5 feet 7-% inches (WNA)

Load Line

1-5/s inches above (S)

Upper edge of line at level of center of rim

1-5/ inches below (S)

3-/s inches below (S)

Note: Freeboards and load lines which are not appli-

cable need not be entered on the certificate.

Allowance for fresh water for all freeboard 1-'/s inches.

Note: All measurements are to upper edge of the

respective horizontal lines.

The upper edge of the deck line from which these free-

boards are measured is OPPOSITE TOP OF STEEL

UPPER deck at side.

NOTE:

STABILITY OF THIS VESSEL HAS BEEN CHECKED

AND FOUND SATISFACTORY PROVIDED THE RE-

STRICTIONS SET FORTH IN THE ATTACHED STA-

BILITY LETTER DATED 14 JULY 1977 ARE

OBSERVED.

105

THIS CERTIFICATE IS VALID. FOR UNMANNED

OPERATION ONLY.

Date of initial or periodical survey 26 FEBRUARY 1981

THIS IS TO CERTIFY that this ship has been sur-

veyed and that the freeboards have been assigned and

load lines shown above have been marked in accordance

with the International Convention on Load Lines, 1966.

This Certificate is valid until 26 FEBRUARY 1986 **,

subject to annual surveys in accordance with Article

14(1)(c) of the Convention, and endorsement thereof on the

reverse side of the Certificate. -

**At the expiration of this certificate, applicable

reissuance should be obtained in accordance with the Load

Line Regulations.

[SEAL]

Issued at New York, N.Y. 1 JUNE 1981

The undersigned declares that he is duly authorized

by the said Government to issue this Certificate.

/s/ A.M. Crahan

A.M. CRAHAN,

ASSISTANT SECRETARY

American Bureau of Shipping

ANNUAL SURVEYS

THIS IS TO CERTIFY that at an annual survey

required by Article 14(1)(c) of the Convention, this ship

was found to comply with the relevant provisions of the

Convention.

106

Place Date

Surveyor to the American Bureau of Shipping

(Signature)

Place Richmond California Date 31 August 1983

K.Kaufman Surveyor to the American Bureau of Shipping

(Signature)

Place San Diego, Ca. Date 3 October 1984

/s/ [Illegible] Surveyor to the American Bureau of Shipping

(Signature)

Place Date

Surveyor to the American Bureau of Shipping

(Signature)

EXTENSION OF LOAD LINE CERTIFICATE

The provisions of the Convention being fully complied

with by this ship, the validity of this Certificate is, in

accordance with Article 19(2) of the Convention, extended

until

Place Date

Surveyor to the American Bureau of Shipping

(Signature)

Notes:

1. When a ship departs from a port situated on a

river or island waters, deeper loading shall be permitted

corresponding to the weight of fuel and all other materials

107

required for consumption between the point of departure

and the sea.

2. When a ship is in fresh water of unit density the

appropriate load line may be submerged by the amount of

the fresh water allowance. Where the density is other than

unity, an allowance shall be made proportional to the

difference between 1.025 and the actual density.

3. It is the owner’s responsibility to furnish the

master wit approved information and instructions for

loading and ballasting this vessel to provide guidance as to

stability of the vessel under varying conditions of service

and to avoid unacceptable stresses in the vessel’s struc-

ture, as defined in 46 CFR 42.09-1.

4. The Winter North Atlantic Load Line applies only

to vessels of 328 ft. in length or less, which enter any part

of the North Atlantic Ocean during the winter months as

defined by the Load Line Regulations in 46 CFR 42.30-5

and 42.30-35. The periods during which the other seasonal

load lines apply in different parts of the world are as

stated in the Load Line Regulations of 46 CFR 42.30-5 to

42.30-30, inclusive.

5. This Load Line Certificate will be canceled by the

Commandant, U.S. Coast Guard, if -

(a) The annual surveys have not been carried

out within three months either way of each

anniversary date of the certificate.

(b) The certificate is not endorsed to show that

the ship has been surveyed as indicated in

(a).

108

(c) Material alterations have been made to the

hull or superstructures such as would neces-

sitate the assignment of an increased free-

board.

(d) The fittings and appliances for the protec-

tion of the openings, guardrails, freeing

ports, or the means of access to the crew’s

quarters have not been in as effective a con-

dition as they were when the Certificate was

issued.

(e) The structural strength of the ship is low-

ered to such an extent that the ship is un-

safe.

6. When this Certificate has expired or been can-

celed, it must be delivered to the assigning Authority.

109

SECTION 148 OF DUTRA CONSTRUCTION

CO., INC.’"S CONTRACT FOR DREDGING

(ORIGINALLY ATTACHED AS EXHIBIT F

TO PLAINTIFF’S MOTION FOR

REHEARING)

WILLARD T. STEWART

V.

DUTRA CONSTRUCTION CO., INC.

CIVIL ACTION NO. 95-11046-RCL

(D.MASS. FILED: OCTOBER 6, 1999)

SECTION 148

DREDGING

Item No. Description Unit

148.01 Dredging (Alt. 1) CY

148.02 Dredging (Alt. 2) CY

148.31 Removal and Disposal of Ledge (Alt.1) CY

148.32 Removal and Disposal of Ledge (Alt.2) CY

Except as indicated below and on the Plans, all work shall

be in accordance with the pertinent requirements of

Standard Specifications Section 148, Dredging.

DESCRIPTION

ADD THE FOLLOWING TO SECTION 148.20 GENERAL

148.20 GENERAL

When the nature of the material to be dredged requires

blasting, the Contractor’s blasting program and methods

shall be those necessary to accomplish the dredging shown

on the Contract Drawings in accordance with the proce-

dures specified herein. The Contractor will be required to

make necessary plans, examinations, surveys, test blasts

110

to determine the quantity of explosives that can be fired,

and thereafter control the quantity of explosives in any

one blast.

The foundation course method shall consist of either

screeded gravel (Alternate 1) or sand placed by pumping

methods (Alternative 2). The two methods require differ-

ent amounts of dredging.

The Work of this Section also includes furnishing, install-

ing and maintaining geotechnical instrumentation as

shown on the plans and collecting, reducing, plotting,

interpreting and reporting instrumentation data for both

the Contractor installed instrumentation and the instru-

mentation installed by the Department’s Management

Consultant prior to award of this Contract.

ADD THE FOLLOWING NEW SECTIONS:

148.26 APPLICABLE PUBLICATIONS

The Contractor shall comply fully with all state, local and

federal regulations including, but not limited to, the

following regulations and reports:

A. Code of Massachusetts Regulations, 527 CMR: Board

of Fire Prevention Regulations.

B. Organized Crime Control Act of 1970, Title XI, Regu-

lation of Explosives (P.L. 91-452).

C. Commerce in Explosives, Part 181 of Title 26, Code of

Federal Regulations.

D. Safety and Health Regulations for Construction, Title

29, Labor Chapter XVII, Bureau of Labor Standards,

Department of Labor Parts 1910 and 1926.

E. Interstate Commerce Commission Regulations.

111

F. Applicable U.S. Coast Guard Regulations and state,

county, municipal, or port authority codes, rules, regu-

lations and laws.

G. Federal Register, Volume 36, Number 10, 15 January

1971, Department of the Treasury.

H. The Erosion and Sedimentation Control Plan (Exhibit

II-C).

I. USDOT Geotechnical Engineering Notebook, Geo-

technical Guideline No. 7, Guide Controlled Blasting

Specification.

Should two regulations or requirements conflict, the most

stringent shall apply.

148.27 MATERIAL TC BE REMOVED

The material to be removed includes hard material. Hard

material is defined as material requiring blasting or the

use of special equipment for economical removal, and

includes boulders or fragments too large to be removed in

one piece by the dredge. All such material shall be consid-

ered ledge for the purpose of measurement and payment.

148.28 ARTIFICIAL OBSTRUCTIONS

Except as indicated on the Plans, the Department has no

knowledge of cables, pipes, or other artificial obstructions

or of any wrecks, wreckage, or other material.

Contractor is alerted to the fact that the Subaru area was

previously utilized to dock and repair U.S. Naval vessels.

It is not known whether munitions were deposited in this

area. Contractor is to exercise care when excavating and

dredging this area and take necessary precautions to protect

its workers and equipment during the progress of the work.

Should munitions be discovered by the Contractor, the

112

situation will be considered a changed condition and will

be addressed in accordance with Section 4.03. Contractor

shall excavate down approximately 40 feet to original pier

depth and conduct investigations prior to continuing the

Work. Investigation plan is to be submitted to the Engi-

neer for approval.

148.29 PERMITS

The Contractor shall comply with all conditions and

requirements of the Corps of Engineers Permit and other

local, state or federal permits. The Department will secure

the permit for all dredging. The Department will secure

the permit for disposal of material designated for the

Massachusetts Bay Disposal Site. The Contractor shall

obtain all other permits required by the work.

The Contractor shall be responsible for obtaining all

licenses, permits, and approvals, and the keeping of

accounts and records, as well as arranging the transporta-

tion and protection of all explosives used for the work.

Should the Contractor fail to comply with above require-

ments, the Engineer may order a suspension of that part

of work involved until the deficiencies are corrected. The

Contractor will not be entitled to additional compensation

for suspension of the work due to its ywn deficiencies.

14830 SUBMITTALS AND COORDINATION OF

WORK

A. The Contractor shall submit to the Engineer for

review, detailed information on proposed equipment,

methods, and sequence of operations.

B. The Contractor shall prepare a blasting plan. Blasting

plan shall include a test blasting plan as described

herein. The blasting plan shall include the following:

113

. Contractor shall submit a Test Blasting Plan to the

Engineer and U.S. Coast Guard for review and ac-

ceptance. No blasting shall occur until the Blasting

Plan is accepted by the Engineer and the U'S.

Coast Guard.

. The Contractor shall submit a weekly blasting op-

eration schedule to facilitate monitoring of the ef-

fects of blasting operations.

. The Contractor shall hold weekly coordination

meetings with adjacent property owners, public

agencies, local authorities, and mariners during

the dredging and blasting operations.

. The Contractor shall submit a Blasting Plan which

includes, as a minimum:

a. Proposed method of transportation, storage,

and handling of explosives.

b. Procedure for monitoring the blast operations

c. Location, size, depth, maximum charge

weight per delay and round and spacing of

blast holes, type of explosive and method of

loading and detonating, stemming, and

maximum number of holes to be detonated

per blast. Additionally, type of blasting equip-

ment to be used and when last tested.

d. Type of instrumentation to be used, manufac-

tured, and when last calibrated and/or certi-

fied.

e. List of licenses, permits and/or clearances re-

quired, when applied for, and date of ap-

proval or anticipated approval by federal,

state, and local concerns.

114

f. A format for maintaining a record of individ-

ual blasts (ie., the “Daily Blasting Log”)

throughout the life of the job designed to re-

cord pertinent data before, during, and after

the blasting operation.

g. Names and qualifications of specialists for vi-

bration control analysis. Names and ad-

dresses of all certified blasters and users.

h. Plan showing location and warning signs and

signals to be used. Method of controlling ves-

sel traffic and communications.

i. |Name and address of Contractor’s represen-

tative to which any claims for damage due to

blasting should be addressed.

j. Prior to commencing the work, the Contractor

shall prepare a Test Blast Plan. This Plan

shall include the planned test patterns and

weights of explosives of each test blast, with

anticipated peak particle velocities at struc-

tures most likely to be affected from the test

blast. The results of the Test Blast Program

will determine the allowable Contractor pro-

duction rates.

k. Sequence of blasting, lifts (if used), direction

of advance, description of equipment, sched-

ule, and restricted zones.

1. Location of blast monitoring instruments.

Contractor to monitor blast vibrations at all

structures located within a 1,000-foot radius

of the limits of the work.

m. The requirements of paragraph 148.67. C.1

C. Schedules for blasting shall be thoroughly coordinated

with the proper federal, state and local authorities,

115

General Ship Corporation and the New England

Aquarium. No blasting will be done unless approved

by the Engineer.

. The Contractor will be required to obtain all necessary

permits from the local authorities to perform blasting

operations. The Engineer shall be notified in writing

that all permits have been obtained, and shall be fur-

nished with copies prior to commencement of blasting

operations.

. Work in areas adjacent to the ship channel shall be

coordinated with the U.S. Coast Guard and the Com-

monwealth of Massachusetts Port Authority and the

Boston Harbormaster.

. Report of Loss: Should a loss or theft of explosives

occur, all circumstances and details shall be immedi-

ately reported to the nearest office of the (ATF) Alco-

hol, Tobacco, Firearms as well as to the local law

enforcement authorities and the Engineer.

. At least 30 days prior to installing each geotechnical

instrument, submit to Engineer for approval the type

of equipment, planned location, installation schedule

and monitoring schedule for that instrument.

. Within 5 days of installing each geotechnical instru-

ment, submit to Engineer as-built location as specified,

and installation record sheet.

When readings indicate ground or structure movement

the Engineer shall be notified immediately. Within 24

hours of reading an instrument, submit to Engineer

raw, reduced and plotted data on all readings.

At least 15 days prior to commencement of any dredg-

ing work the Contractor shall submit:

Se

116

1. Manufacturers’ product data on all instruments

specified herein, including any requests for consid-

eration of substitutions, as specified herein, and

warranty provisions.

2. Detailed step-by-step procedures, for all instru-

ments specified herein, for:

e factory calibration

e pre-installation acceptance tests

e installation

e post-installation acceptance tests

e protection from damage

e maintenance of readout units

e field calibration of readout units

e maintenance of installed components

e collection of initial data

e collection of subsequent data

e data reduction

e data processing

e data plotting

e data reporting

e coordination with the Engineer to ensure com-

patibility of collected data

e data interpretation

together with all required field and office forms.

The installation procedures shall include lists of

tools and materials required, and specifications for

——

117

required grout mixes. Field calibration procedures

shall include schedules.

K. Within 2 Days of receipt of each instrument at the site,

submit to Engineer copy of factory calibration, manu-

facturer’s test equipment certification and completed

copy of quality insurance checklist.

L. Within 2 Days of receipt of the first of each instrument

type, submit to Engineer the manufacturer’s instruc-

tion manual for that instrument.

M. Within 14 Days of receipt of each instrument at the

site, submit to Engineer result of pre-installation ac-

ceptance test.

N. Within 14 Days after award of the Contract, submit to

the Engineer for approval resumes of geotechnical en-

ginec-ing specialist(s) sufficient to define details of di-

rect site experience, with names and telephone

numbers of individuals who can be contacted for refer-

ences.

O. Contractor shall submit munitions excavation plan to

the Engineer prior to excavating/dredging beyond 40

foot depth.

148.31 ENVIRONMENTAL PROTECTION

The Contractor shall provide, and maintain during the life

of the Contract, environmental protective measures. The

Contractor shall also provide clean up of oil spills and

debris, that occur during the dredging operations and

maintenance of the trench in accordance with Section 7.02.

The Contractor shall comply with all federal, state, and

local regulations pertaining to water, air, and noise

pollution and the requirements of these Special Provisions.

The Contractor will provide a fisheries biologist to the

Engineer to monitor fish runs and report on any possible

118

fish kills from the blasting operations during the full

duration of the blasting operations. The Contractor shall

cooperate with the biologist in observations and collection

of any dead fish by providing a boat and operator as

needed during blasting operations. No separate payment

will be made for use of the boat and operator. All costs

associated with this work will be included in the Unit

Prices for Payment Items of this Section.

148.32 RESPONSIBILITIES

A. General: The Contractor shall be responsible for the

blasting program and methods necessary to accom-

plish the dredging shown on the Contract Drawings in

accordance with the procedures specified herein. The

Contractor will be required to make necessary plans,

examinations, surveys, and test blasts to determine

the quantity of explosives that can be fired without

damaging property, and to thereafter control the

- quantity of explosives fired in any one blast to prevent

injuries to persons or damage to structures, homes,

utilities, vehicles, vessels moored or underway, or any

property.

B. The Contractor shall, in addition, process any and all

claims of private citizens arising out of said use of explo-

sives promptly; in particular, all property damage claims

shall be acknowledged by the Contractor immediately,

and the claimed damage inspected within thirty (30)

days following initial notification.

C. Public Meeting: The Contractor shall have specialists

qualified in vibration and airblast control available for

up to three (3) days if requested to prepare for and

participate in a public meeting, conducted by the En-

gineer to better inform the public about anticipated

drilling and blasting operations.

119

D. Preblast and Postblast Survey: The Contractor shall

provide a specialist on vibration control to work with a

representative of the Engineer in making a preblast

structural survey. All structures located within 1000 ft

of the work will be inspected and their condition

documented. A’.y existing outstanding architectural

defects, such s broken or fallen plaster or broken

windows, she « be photographically documented.

During the blasting phase, the Contractor shall

conduct a scructural survey of all structures located

within 1000 ft of the work and document their condi-

tion and any changes thereto. Such post-blast survey

shall be conducted on a monthly basis at a minimum.

. Instrumentation:

The Contractor shall:

1. Furnish components of instrumentation that are to

be installed during construction as shown on the

plans and specified herein.

2. Furnish portable readout instruments for the Con-

tractor’s use.

3. Furnish portable readout instruments for the En-

gineer’s use. This equipment will be returned to

the Contractor upon completion of the work.

4. Install, protect from damage, and maintain in-

stalled components of instrumentation during con-

struction.

5, Maintain and calibrate portable readout instru-

ments for the Contractor’s and Engineer’s use.

6. Collect, reduce, process, plot, and report data.

These tasks are referred to herein as the Contrac-

tor’s monitoring program.

7. Provide access to the Engineer for data collection.

120

8. Coordinate with the Engineer to ensure compati-

bility of collected data.

9. Interpret data resulting form both the Engineer’s

and the Contractor’s monitoring programs.

10.Implement recommendations developed from in-

terpretations of monitoring program data.

F. Vibration Specialist shall be employed to monitor

vibration levels at all buildings located within 1000 ft

radius of the work.

148.33 QUALIFICATIONS OF PERSONNEL

A. Personnel:

1. The Contractor shall obtain a blasting permit from

the Boston Fire Department. The operator shall

exhibit a certificate of competence and evidence of

a valid blasting bond.

2. The Contractor shall retain a specialist qualified in

vibration control methods who is capable of analyz-

ing results obtained from seismograph readings and

who has a minimum of three years of direct field

experience monitoring the type of construction

specified herein. Specialist shall be subject to the

Engineer’s acceptance.

3. The Contractor shall provide a geotechnical engi-

neering specialist with five years minimum rele-

vant experience, to furnish and install all

geotechnical instrumentation, to maintain and

calibrate instrumentation as required, and to col-

lect, reduce, process, plot, interpret and report

data to the Engineer. Specialist shall be accepted

by the Engineer.

4. The Contractor shall also provide a survey special-

ist to make survey measurements for vertical and

121

lateral deformation monitoring. Specialist shall be

accepted by the Engineer.

MATERIALS

ADD THE FOLLOWING:

148.34 GEOTECHNICAL INSTRUMENTATION

A. Inclinometer

1. Provide inclinometer probe, cable, pulley assembly,

cable hold, and readout unit with overall sensitiv-

ity of +0.0001- foot lateral movement per two feet

of casing. A minimum of two probes, cables, pulley

assemblies, cable holds and indicators shall be

provided for the Contractor’s monitoring program,

and one of each for the Engineer’s monitoring pro-

gram. The probe shall have two servo accelerome-

ters in waterproof housing. One accelerometer will

have sensing axis in the plane of the spring loaded

wheels which ride in the casing grooves. The sec-

ond accelerometer will sense at 90° (n/2 rad) so that

the angle of inclination of sensor and casing is meas-

ured in the orthaganal direction. Cable should be

125 feet long. Indicator shall be portable, battery

powered, microprocessor-based computer, to re-

cord, check and reduce data. Permanent storage of

the database will be on 3.5-inch disk. Indicator

shall be contained in study case with watertight

and dustproof construction.

. Provide inclinometer casing 2.75 in. o.d. ABs plas-

tic with four internal longitudinal grooves, precisely

manufactured to fit probes’ wheel dimensions. The

grooves shall be spaced on the inside circumference

of the casing at 90° (7/2 rad) forming symmetrical

relationship between su. ossive casing sections.

122

Couplings shall be low profile slip type with per-

manent internal alignment key.

Readout unit shall be Digitilt PC as manufactured

by Slope Indicator Co. or Inclinometer Data Logger

as manufactured by Geo Group, Inc., or acceptable

equivalent. The time interval between recordings

two feet apart in the casing shall be such that the

reading stabilizes to within +1 unit of display

within 8 seconds. Readout unit shall include a bat-

tery charger.

Provide one set of inclinometer software, GTILT,

as supplied by Mite Software Corporation, Edmon-

ton, Alberta, or acceptable equivalent.

3. Grout mix shall be submitted to the Engineer for

acceptance and shall contain cement, bentonite

and water.

4. Surface protection shall be flush with the ground

surface in paved or other areas. Surface protection

shall consist of a minimum 2-foot-long roadway box

with a plain, unmarked locking lid. Roadway boxes

shall have a diameter adequate to allow attach-

ment of cable support assembly.

Inclinometer installations outside the right-of-way shall

not extend above existing grade.

Deformation Monitoring Points

1.

Deformation monitoring points (DMPs) will be used to

monitor vertical and/or horizontal deformation of vari-

ous facilities at selected locations shown on the Plans.

The following five types of DMPs shall be used to

monitor deformation:

a. DMP-Type 1 shall consist of a 1'/-inch PK-nail

driven into an asphalt-covered surface.

123

b. DMP-Type 2 shall consist of a 1l-inch-long by ‘/-

inch diameter punchmarked carriage bolt screwed

in a 2-inch-long by ‘«-inch diameter tamp-in an-

chor. These tamp-in anchors shal] typically be

drilled and epoxied into vertical surfaces of build-

ing foundations.

c. DMP-Type 3 shall consist of a /:-inch-long by °/-

inch diameter punchmarked carriage bolt screwed

into a 1l-inch-long by °/is-inch diameter tamp-in an-

chor. These tamp-in anchors shall typically be

drilled and epoxied into horizontal concrete and

rock surfaces (e.g., sidewalks, grenite curbstones).

d. DMP-Type 4 shall consist of 5-foot length of */-inch

diameter steel rod and a surface roadway box. Top

of rod shall be rounded anc punchmarked at its

center.

e. DMP-Type 5 shall consist of an observable point

punchmarked on the top horizontal surface of steel

sheeting or a soldier pile. The steel surface within

3 inches of the point shall be cleaned by wire brush

to permit easy identification of the exact point. The

point shall also be clearly identified using fluores-

cent spray paint adjacent to the point.

C. The Contractor shall furnish portable readout instru-

ments for use during the Contractor’s monitoring pro-

gram. At least two identical readout units shall be

furnished for each instrument, the second unit for use

during the Engineer’s monitoring program.

. The Contractor shall furnish all installation tools,

materials and miscellaneous instrumentation compo-

nents. ;

. Manufacturer of each instrument shall provide an

instruction manual which shall include the following:

124

1. A description of the purpose of instrument.

2. Theory of operation.

3. Step-by-step procedure for:

a. A pre-installation acceptance test when in-

struments are received on site, to ensure the

instruments are functioning correctly prior to

installation.

b. Calibration of readout units.

4. A list of calibration equipment required and rec-.

ommended frequency of calibration.

5. Step-by-step instrument installation procedure

including materials, tools, spare parts and any

borehole requirement, and post-ins‘tallation accep-

tance tests.

6. Maintenance procedures for each instrument. —

7. Step-by-step data collection procedure for each in-

strument.

8. Data reduction, processing, plotting and interpre-

tation procedures for each instrument.

F. A factory calibration shall be conducted on all instru-

ments at manufacturer’s facility prior to shipment.

Each factory calibration shall include a calibration

curve with data points clearly indicated and a tabula-

tion of the data. Each instrument shall be marked

with a unique identification number.

125

CONSTRUCTION METHODS

ADD THE FOLLOWING:

148.61 INSPECTION

The Contractor shall keep records of work performed, and

verify that gauges, targets, ranges, and other markers are

in place and usable for the intended purpose. The Contrac-

tor shall furnish boats, boatmen, laborers, and materials

necessary for inspecting, supervising, and surveying the

work as specified in Section 4.17.

148.62 CONDUCT OF DREDGING WORK

A. The tunnel trench payment lines are the lines and

grades, and the bottom width shown on the Plans. The

Contractor may dredge to a steeper slope, however, in

ledge, the excavated surface shall not encroach within

the payment lines shown on the Plans.

B. The Contractor shall perform additional dredging and

blasting required at the tunnel element joint locations,

as shown on the plans, if Alternate 2, Pumped Sand

Foundation, is selected.

C. The Contractor shall schedule and arrange dredging,

blasting, and disposal operations so as not to interfere

with or hinder, navigation, Port operations, or work of

other Contractors. Should it become necessary to shift

or move floating equipment, or to interrupt the Con-

tractor’s operation to accommodate the movement of

vessels and other floating equipment, this shall be

done immediately or when directed by the Engineer,

and the Contractor will not be entitled to extra com-

pensation.

D. Each night between sunset and sunrise and during

periods of restricted visibility, the Contractor shall

provide lights for floating plants, pipelines, ranges,

126

and markers. The Contractor shall also provide lights

for buoys that could endanger or obstruct navigation.

When night work is in progress, the Contractor shall

maintain lights from sunset to sunrise for the observa-

tion of dredging operations. Lighting shall conform to

United States Coast Guard requirements for visibility

and color.

. The Contractor shall furnish, set, and maintain

ranges, buoys, and markers needed to define the work

area and to facilitate inspection. The Contractor shall

establish and maintain tide board gauges in approved

locations. The Contractor shall install and maintain a

recording type tide gauge. Electronic ranging and

acoustic sounding will also be utilized for dredging

control.

. The Contractor shall maintain the plant, scows,

barges. pipelines, and associated equipment to meet

the requirements of the work.

. The Contractor shall conduct a Water Quality Moni-

toring Plan in accordance with the requirements of the

permits noted in Subsection 7.03.

Should allowable water quality levels be exceeded due

to Contractor’s operations, Contractor will be required

to adjust its operations in such a manner that accept-

able water quality standards are obtained. Adjust-

ments to Contractor’s operations may include, but are

not limited to:

1. Dredging with an enclosed bucket clamshell

dredge.

2. Reduction in overall dredging rate.

3. Use of silt curtains or similar sedimentation barri-

ers.

127

4. Prohibition of dragging clamshell bucket across

bottom to smooth it before subsequent dredging.

5. Prohibition of overflow from barge.

6. Reduction in speed at which bucket is raised or

lowered through the water column.

7. Reduction in dredging during periods of relatively

strong ambient transport and mixing (high winds,

spring tides, ship traffic, etc.). :

Adjustments to Contractor dredging operations in or-

der to comply with permits and/or requirements of the

water quality program shall not be cause for increase

in Contract price or increase in Contract duration. Silt

curtains shall satisfy the requirements specified in the

Erosion and Sedimentation Control Plan (Exhibit II-

C).

. The Contractor shall use silt curtains whenever the

limits established by the Water Quality Certificate are

exceeded and in accordance with Exhibit II-C, Erosion

and Sedimentation Control Plan.

The Contractor shall use silt curtains when dredging

during months of February, March, April and May,

and during the period of September 15 through Octo-

ber 15. Silt curtains shall satisfy the requirements

specified in Exhibit II-C.

The Contractor shall remove fill located below MHW and

above native material in South and East Boston by land

excavation methods and equipment in accordance with

Section 120. Dredging of this material will only be al-

lowed with the authorization of the Engineer.

The Contractor may remove native material at BMIP in

South Boston and BIF in East Boston by dredging.

However, material removed from South Boston must be

brought ashore and transported to the South Boston

128

Processing Facility. Similarly, material removed from

East Boston must be transported to Governor’s Island.

Material destined for the South Boston Processing Fa-

cility must be brought ashore in South Boston. Should

new facilities be required to bring material ashore in

South Boston, Contractor shall obtain all necessary

permits required for the construction of these facili-

ties. The cost of these facilities and permits shall be

included in the unit price bid for the work of this Sec-

tion.

L. Contractor must dispose of Harbor Sediments at

Governor’s Island in East Boston. Harbor Sediments

are to be taken ashore within the right-of-way adjacent

the excavation support system in East Boston. Silt cur-

tains shall be used around the off loading barges at all

times. Should Contractor elect to construct new facilities

to take material ashore, Contractor shall obtain all nec-

essary permits required for the construction of these fa-

cilities. The cost of these facilities and permits shall be

included in the unit price bid for the work for this Sec-

tion. Harbor sediments shall be removed prior to dredg-

ing other material in the harbor.

M. Contractor shall install and maintain silt curtain around

General Ship’s intake located at the northwest corner of

Pier 5 prior to commencement of dredging and shall not

remove silt curtain until backfilling is completed.

N. All rock removed from the harbor shal] be either

reused by the Contractor or transported to, and dis-

posed of, at the Massachusetts Bay Disposal Site.

148.63 SEQUENCE OF OPERATIONS

Dredging of the tunnel trench shall proceed in a manner to

accommodate the placing of tunnel elements in accordance

with the requirements specified in Section 961 and Section

8.03.

129

148.64 LIMITATIONS ON DREDGING IN AD-

VANCE OF PLACING PREFABRICATED

TUNNEL ELEMENTS

The Contractor shall be responsible for maintaining the

dredged trench as specified hereinafter. The Contractor is

cautioned that an open trench may produce changes in the

density of the water which may affect the buoyancy of the

tunnel elements.

148.66 TEST BLAST PROGRAM

A. A test blast program shall be conducted by the Con-

tractor, consisting of at least six individual test blasts

prior to commencement of full scale production blast-

ing. The purpose of the test program is to allow the

Contractor to establish safe limits of vibration. The

test blast program shall be conducted and reported in

strict accordance with procedures outlined in the sec-

tions of these specifications covering blasting methods

and vibration control.

B. No test blasting shall be started until after the

locations, for the individual test blasts have been re-

viewed and approved by the Engineer.

C. The test event shall begin with a small number of

charges and extend upward to the maximum yield to

be used. The final test event shall simulate, as close

as practicable, the explosive charge type, size, overly-

ing water depth, charge concentration, charge separa-

tion, initiation methods, and implacement conditions

anticipated for the largest detonations. Une copy of

the record for the test blasts shall be submitted in

tabular form to the Engineer.

D. After the series of test blasts, the Contractyy shall

examine the representative structures of the preblast

130

survey as previously specified. Any new damage re-

sulting from the test blasting shall be photographed

and reported in detail to the Engineer.

At the conclusion of the test blast program, the

Contractor shall examine all reports, surveys, test

data, and other pertinent information; the conclusions

reached shall be the basis for developing a completely

engineered Blasting Plan. The procedure shall in-

clude sketches showing blasting patterns, weights

and explosives, wiring, and charge emplacement. Cop-

ies of the developed procedure shall be submitted for

review to the Engineer and upon completion of the

review and acceptance, it shall be appended to, and

become a part of, the aforementioned Blasting Plan. A

maximum period of 21 calendar days will be required

for review and acceptance by the Engineer. Such re-

view period shall not be the basis for a claim for de-

lay. In no event shall operational blasting proceed

until the developed procedure for blasting has been

reviewed and accepted by the Engineer. If the proce-

dure is not acceptable, the contractor should revise

and resubmit the procedure. The Engineer shall have

10 days for review and acceptance of all revised pro-

cedures.

148.67 BLASTING METHODS AND PROCEDURES

A.

General: The Contractor shall take appropriate

measures for avoiding blast damage which shall in-

clude, but are not limited to:

1. Choosing a suitable ignition pattern with milli-

second delay detonators to minimize the instan-

taneous impulse.

2. Taking precautions to avoid flashover which

shall include the following measures, unless oth-

erwise allowed by the Engineer:

- 131

a. Keeping the top of the hole uncharged for a

depth equal to at least one-half the burden

width.

b. Using low sensitivity explosives in the entire

pattern or loading the holes alternatively

with high and low sensitivity explosives.

c. Inspecting the ignition system using ground

fault testing.

Only Class B explosives shall be used by the

Contractor, except that Class A explosives will be

allowed for blasting caps only.

Storage facilities for explosives shall be con-

structed, as a minimum, to conform to Type 2,

Storage Facilities as specified in Part 181 of Title

26, Code of Federal Regulation, listed in the

above references, Subpart J, which includes re-

quirements for hinges and hasps, and the locking

system. The Contractor shall be responsible for

obtaining storage facilities and coordinating

transportation routes and obtaining all necessary

permits therefor.

The amount of explosives permitted aboard the

drill boat at any one time will be subject to the

approval of the Engineer, but in no case shall

such amount exceed that required by the Con-

tractor for one day’s operations. The Contractor

will be required to return all explosives remain-

ing on the drill boat or barge at the end of the

day to the storage facility.

Only detonating fuses which are insensitive to

external shock and friction are allowed.

132

~

Existing Conditions:

Contractors are expected to examine the site of the

work, cores and logs, and after investigation, decide

for themselves the character of materials and make.

their bids accordingly. The Engineer assumes no re-

sponsibility for the types of material encountered, nor

does it guarantee that other materials will not be en-

countered in performance of the work. The removal

cost of such other materials shall be included in the

Bid Prices.

Blasting Control:

1.

Submittals: The Contractor shall submit a

weekly blasting operation schedule to the Engi-

neer. This schedule shall be provided seven (7)

days prior to commencement of blasting. On a

weekly basis, the Contractor shall submit, in

tabular form, a record for each blast which shall

consist of date, time and location of blast,

amount of explosives used, peak particle velocity,

and all other data necessary to adequately con-

trol blasting operations. See Figure 148-1 for

minimum content of the weekly blasting record

(a copy is attached to this Special Provision). A

memorandum or telephone report on vibration

intensity shall be submitted within 24 hours

when specifically requested by the Engineer or

without request when such intensity exceeds a

peak particle velocity of 1.5 inches per second at

any structure.

The vibration specialist shall adopt appropriate

measures for blast damage reduction and shall

be fully involved in a design of the test blasting

and monitoring program and the final production

blasting and monitoring program. Twenty-one

days shall be allowed for the Engineer to review

133

and accept the final blasting plan. The vibration

specialist shall be retained throughout the opera-

tional program to provide and verify round-by-

round blasting records. Location of blast monitor-

ing instruments shall be selected by the Contrac-

tor and are to be approved by the Engineer.

Millisecond delay caps shall be used on all blast-

ing work.

Blasting shall be controlled in such a manner

that the maximum ground vibration level at any

structure shall not exceed a zero-to-peak particle

velocity of 1.9 inches per second. The instrumen-

tation shall record all three components (vertical,

longitudinal, and transverse with respect to the

location of the blast) of particle velocity direct (or

shall have sufficient resolution of acceleration or

displacement such that particle velocity can be

readily and accurately determined from the re-

cord). The instantaneous vector sum of the three

directional components of vibration will be used

to compute the maximum vibration level.

Blasting shall be controlled such that the maxi-

mum water overpressure is 15 pounds per square

inch at nearest underwater structure. The in-

strumentation shall record dynamic water pres-

sure and frequency of underwater shock waves.

Transducers shall be suspended in the water ad-

jacent to and directly in front of the underwater

structure being monitored. |

Explosives will be contained within the drill

holes using care to prevent spillage.

D. Safety: The Contractor shall take all reasonable

precautions for protection of individuals and property.

Such precautions shall include, but are not limited to:

134

The Contractor shall take all necessary precau-

tions to prevent damage to any vessel (moored or

under-way), structures or property, and preserve

the crew or occupants thereof from exposure to

injury as a result of his operations. No blasting

_ or dredging will be permitted when LNG and/or

oil tankers enter the harbor.

The Contractor shall take all precautions neces-

sary to warn and protect any swimmers, boaters,

or other individuals in the water, prior to any

blasting; also, coordinate operations with Gen-

eral Ship Corporation personnel to avoid injury

to underwater divers.

Transport of explosives and detonators shall be

in vehicles suitably grounded and protected from

lightning strikes and electrical storm phenom-

ena, in accordance with federal and state re-

quirements, and to the satisfaction of the

Engineer.

No explosive material shall be handled, trans-

ported, or in any way made use of, during any

period of electrical storm, of lightning or other

electrical phenomenon. In the event that any

such condition should appear imminent or occur,

or if some known leakage of electricity should oc-

cur in the neighborhood of, or in the work area

while the transport, handling, making up, charg-

ing, or such like use of explosives is being ef-

fected, then the work area shall be evacuated

and abandoned completely until at least 30 min-

utes after the condition has ceased or the leakage

stopped. The Engineer will be notified prior to

any blasting or loading operation so that station-

ary or mobile radio transmission is not made on

the site.

135

The handling, storage, and use of explosives

shall be governed by the applicable provisions of

the Section on “Blasting” of the Corps of Engineers

Manual, EM-385-1-1, dated April 1981, entitled,

“Safety and Health Requirements Manual”, as

amended, referred to in Clause 56, “Accident Pre-

vention”. In addition, the Contractor shall make

necessary arrangements as may be required by

the applicable U.S. Coast Guard, State, County,

Municipal or Massachusetts Port Authority

codes, rules, regulations and laws, and shall be

responsible for compliance therewith, including

storage of explosives. All handling, use, and stor-

age of explosives will be under the personal su-

pervision of a Licensed Blaster. No blasting is

permitted when visibility is less than 1,500 feet

in fog or rain, and between beginning of evening

nautical twilight and ending of-morning nautical

twilight or when a vessel is within 1,500 feet of

the blast.

A warning whistle shall be sounded prior to any

blast.

148.68 WORK RESTRICTIONS

A. To reduce impacts to fish, the Contractor will be

required to schedule work as follows:

1.

No blasting will be permitted during periods of

dead slack water.

Blasting will be minimized during peak fish

runs. During these periods, consistent with all

safety requirements, the Engineer may order a

temporary halt to blasting operations in the

event that a peak fish run is detected in the vi-

cinity or appears imminent.

136

B. Unless specifically approved by the Department,

blasting will not be allowed during the following peri-

ods:

April 1 through June 15

¢ September 15 to October 15

C. No blasting will be permitted within 600 feet of an in-

place tube section.

D. No blasted rock shall protrude above pre-construction

harbor bottom levels. Contractor shall conduct sound-

ings at regular intervals during progress of the blasting

work and furnish data to the Engineer. Should data in-

dicate protrusion of rock above pre-construction levels,

contractor shall remove all such rock at no increase in

contract cost or contract duration.

148.70 UNAUTHORIZED TUNNEL TRENCH EX-

CAVATION

Should the trench be dredged beyond the indicated grades,

side slopes and depth shown on the plans without authori-

zation or should contractor’s construction methods create

unsuitable foundation conditions, the additional excava-

tion

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.