Joint Appendix Vol II — Lee v. International Soc. for Krishna Consciousness, Inc.

Supreme Court brief1992

Ask Donna

What actually matters in this document.

Text

«

Nos. 91-155, 91-339 | FEB 7% 1992

In The ae

Supreme Court of the United States

October Term, 1991

+

INTERNATIONAL SOCIETY FOR KRISHNA

CONSCIOUSNESS, INC., AND BRIAN RUMBAUGH,

Petitioners and Cross-Respondents,

V.

WALTER LEE,

Respondent and Cross-Petitioner.

+

On Writ Of Certiorari To The United States Court

Of Appeals For The Second Circuit

+

JOINT APPENDIX

VOLUME II (Pages 292-551)

+

Barry A. FIsHER ArTHUR P. BERG

Counsel of Record Counsel of Record

sea ARNOLD D. Ko.uikort

FLEISHMAN, FISHER & Moss1 Mitton H. PACHTER

2049 Century Park East, Attorney for Respondent

Suite 3160 and Cross-Petitioner

Los Angeles, California 90067 One World Trade Center — 66E

(310) 557-1077 New York, New York 10048

Davip M. LipeRMAN (212) 435-6830

2049 Century Park East, Counsel for Respondent

Suite 3160 and Cross-Petitioner

Los Angeles, California 90067

(310) 277-9288

Jay ALAN SEKULOW

1000 Thomas Jefferson Street, N.W.,

Suite 520

Washington, D.C. 20007

(202) 337-2273

Counsel for Petitioners and Cross-Respondents

Petitions For Certiorari Filed July 24, 1991 (No. 91-155),

Aug. 26, 1991 (No. 91-339); Certiorari Granted Jan. 10, 1992

COCKLE LAW BRIEF PRINTING CO., (800) 225-6964

OR CALL COLLECT (402) 342-2831

a

TABLE OF CONTENTS

VOLUME |

Docket Entries

Complaint for Declaratory and Injunctive Relief,

dktd. Oct. 29, 1975

First Amended Complaint, dktd. Oct. 27, 1977

Exhibit A to Amended Complaint — Eastern Air

Lines Regulations

Answer of Defendant Walter Lee to Complaint,

dktd. Jan. 5, 1978

Affidavit of Philip Le B. Douglas in Opposition to

Motion for Protective Order, dktd. Nov. 1, 1984....

Exhibit L to Douglas Affidavit - Affidavit of

Carol Breidenbach

Exhibit M to Douglas Affidavit — Declaration of

Gloria Conklin

Exhibit N to Douglas Affidavit — Affidavit of

Victor C. Fernandez

Exhibit O to Douglas Affidavit —- Declaration of

Pierre Denard

Exhibit P to Douglas Affidavit - Declaration of

Paul Marks

Declaration of Brian Rumbaugh, in Opposition to

Motion to Dismiss, dktd. Aug. 23, 1985

Exhibit 1 to Rumbaugh Declaration —- Map of

Second Floor Central Terminal Main Lobby at

LaGuardia

3

Pe ee, ee eres | Fe. eee

ii

TABLE OF CONTENTS - Continued

Exhibit 2 to Rumbaugh Declaration - Map of

First Floor Central Terminal Circulation Areas

at LaGuardia

Exhibit 3 to Rumbaugh Declaration - Map of

First and Second Floor Delta Unit Terminal Cir-

culation Areas at LaGuardia...................

Exhibit 4 to Rumbaugh Declaration - Map of

Central First Floor Lobby Area of North Termi-

nal of Newark

Exhibit 5 to Rumbaugh Declaration - Map of

Departure Level Mezzanine/Lobby and Corri-

dor Areas of Terminal A at Newark

Exhibit 6 to Rumbaugh Declaration - Map of

Arrivals Level Lobby/Mezzanine Area of Ter-

minal B at Newark

Exhibit 7 to Rumbaugh Declaration - Map of

First Floor IAB Arrivals Lobby at JFK .........

Exhibit 8 to Rumbaugh Declaration - Map of

Second Floor IAB East and West Wing Building

Corridors and Lobby Areas at JFK.............

Exhibits 9-18 to Rumbaugh Declaration - Maps

of Various General Circulation Areas in the

Respective Unit Terminals at JFK

Plaintiffs’ Notice of Motion for Summary Judg-

ment or for a Preliminary Injunction, dktd. Nov.

12, 1988

Civil Rule 3(g) Statement of Plaintiffs’ in Support

of Motion for Summary Judgment, dktd. Nov.

12, 1988

eoeeeoeoeveeeseeweeeeseeeeeeeeeeseeeeeeee es

Bree 2 Ae Fe FT

\eeeoeaoes oon eae gceseseest ede eae © ae

eeesvsenean sp eoenrvae 6

e*e@eeeoeneveoeozc eceoeeeeeaesseeoseese eee eseeeeevne ses ss ee

Page

ili

TABLE OF CONTENTS - Continued

Page

Affidavit of Alan J. Attias in Support of Plaintiffs’

Motion for Summary Judgment, served Nov. 12,

TSEC ee See kcsedbeccvasececscceces 181

Exhibit 1 to Attias Declaration - Fact Sheet for

JFK International Airport................-.0.005. 194

Exhibit 2 to Attias Declaration — Fact Sheet for

LaGuardia Airport...............-2ceeeeeeeeneees 205

Exhibit 3 to Attias Declaration - Fact Sheet for

Newark International Airport..........-......++. 212

Exhibit 4 to Attias Declaration — Port Authority

Capital Program 1987-1991................0.-055- 222

VOLUME II

Exhibit 5 to Attias Declaration — 1986 Airport

DIUM RGE Wee Seu vssevecessccssrsesecccess 292

Exhibit 6 to Attias Declaration — Port Authority

Ey er 342

Exhibit 7 to Attias Declaration —- Port Authority

News, Mar. 12, 1987 (39-87) .............-..5565. 355

Exhibit 8 to Attias Declaration - Getting Around

at JFK, A Guide to John F. Kennedy Interna-

Sedna i wsscsvecvescessccssseses ++ JOD

Exhibit 9 to Attias Declaration - Getting Around

at LGA, A Guide to LaGuardia Airport.......... 392

Exhibit 10 to Attias Declaration - Getting Around

at NIA, A Guide to Newark International Air-

DU SWE U SNe sec e ne csecesscecceresscccrecceceees 419

iv

TABLE OF CONTENTS - Continued

Civil Rule 3(g) Statement of Port Authority in

Opposition to Plaintiffs’ Motion for Summary

Judgment, served Jan. 19, 1988 ................

Affidavit of Morris Sloan in Opposition to Plain-

tiffs’ Motion for Summary Judgment, dktd. Jan.

WEG eR eet bsncerccuesasessecunereneneseasess

Affidavit of Anthony A. Santangelo in Opposition

to Plaintiffs’ Motion for Summary Judgment,

es Sh I osc cK emnueneuaicuseet cies

Affidavit of William F. Boice in Opposition to

Plaintiffs’ Motion for Summary Judgment, dktd.

Jan. 19, 1988 0.0... coc ce ccc cece cece ccccceecees

Exhibit B. to Affidavit of William F. Boice — Civil

Rule 3(g) Statement of Air Canada Group

Defendants in Opposition to Plaintiffs’ Motion

for Summary Judgment........................

Affidavit of Leif Andersson in Opposition to

Plaintiffs’ Motion for Summary Judgment, dktd.

is a se nce eens Deas tenet eer eres

Transcript of Proceedings Before United States

Magistrate Michael A. Dolinger on March 25,

EPs GM. TOE, DE, FO nc ccc ecserecccccvecs

Supplemental Affidavit of Morris Sloane in Oppo-

sition to Plaintiffs’ Motion for Summary Judg-

MOE, GORE. FOU. TA, WOMB. 6 ooo vcccsccvcccvcccs:

Exhibit B to Sloan Affidavit - Amendment to

Airport Rules and Regulations Governing Non-

commercial Activity and Prohibiting Vending

re ee ae eee

Page

=

TABLE OF CONTENTS - Continued

Supplemental Declaration of Frederick V. Hurst,

Jr. in Opposition to Plaintiffs’ Motion for Sum-

mary Judgment, dktd. Apr. 22, 1988 ...........

Settlement Agreement and Release Between

ISKCON and Airline Defendants, dktd. May 10,

rrr Trey re Trt rer Serre

Port Authority’s Objections to Magistrate’s Report

and Recommendation, dktd. Dec. 14, 1988 .....

Judgment of District Court, dktd. Oct. 19, 1989 ....

Mandate of Court of Appeals, filed Feb. 25, 1991...

Page

999

EXHIBIT 5

1986 Airport Highlights

John F. Kennedy international Airport

Newark Interr ational! Aurport

LaGuardia Airport

293

1986: Rebuilding to Meet the

Challenge of the Future

[he year 1986 will be remembered as a pivotal year for

the airports serving the metropolitan area, a year in

which The Port Authority of New York and New Jersey

developed a multi-billion dollar capital plan to rebuild

and modernize Kennedy, Newark and LaGuardia Air

ports

Major components of the plan call for an expansion of the

airport roadway systems, reconfiguration of a number of

existing passenger terminals and construction of major

new terminal facilities. Together, they will enable the

airports to efficiently handle a 50 percent increase in

passenger demand forecast to take place by the end of the

century

logether with expanded ground access and terminal

capacity, capital improvements will be made to parking

facilities, inter-terminal connections and baggage han

dling systems. There will also be an array of new services

restaurants, meeting rooms, communication and finan

cial services, retail shops — that will make air travel to

and from the bi-state region a more efficient and conve

nient experience for all travelers

Equally significant to the redevelopment of the airports

will be improvements to the Capacity and quality of off

airport ground connections. To ensure that this aspect of

airport service is achieved, a key element of the Port

a | 1? ,

Authority plan will be promotion of high occupancy

vehicle and mass-transit options for travel to and from

the airports

294

The need for this extensive redevelopment of the metro

politan area airports was borne out in the region's levels

of air passenger and cargo traffic in 1986. The tri-airport

complex served a record 79 million passengers and han

dled more than 1.4 million tons of cargo last year. Both

Kennedy and Newark recorded gains in cargo volume

over the previous year. Increases in passenger demand

occurred at Newark and LaGuardia Airports. A slight

decline in passenger activity took place at Kennedy Inter

national. This was due mainly to the decline in overseas

travel that took place early in the year. This situation al

JFK had corrected itself to a great extent by the end of the

year

While major planning efforts continued throughout the

year, construction projects moved ahead.at all three air

ports. In addition, considerable effort was focused on

increasing aeronautica! capacity and reducing flight

delays at the airports. As a result of continuing efforts

with the Federal Aviation Administration and the air

lines. the FAA will imple ment a comprehensive plan t

295

reconfigure and greatly expand the region’s air routes

early in 1987. It is anticipated that this program will

reduce flight delays while providing for increased traffic

capacity at all three airports.

Advances were also made during the year in achieving

better utilization of airport gate positions. In 1986, work

continued with airport tenants, local officials and the U.S.

Immigration and Naturalization Service (INS) on reduc-

ing the processing time for arriving foreign travelers.

Introduction of a separate inspection line for U.S. resident

aliens and diplomats, increased staffing and training of

federal inspection personnel, installation of computerized

screening equipment and an expansion of passenger stag-

ing areas will contribute to marked improvement in this

area.

While it has been an active year, we anticipate even

greater challenges in the near future, as the Port Author-

ity begins implementation of an ambitious capital con-

struction program to revitalize the region’s air

transportation facilities.

1986 Airport Highlights

¢ Planning was completed for the major redevelopment

and improvement of JFK, Newark and LaGuardia Air-

ports

e Construction of Terminal C at Newark moved ahead,

while two new cargo terminals were completed

e Pan American World Airways inaugurated shuttle ser-

vice to Boston and Washington from LaGuardia Air-

port

296

Interior reconstruction of the Central Terminal Build-

ing at LaGuardia continued

An improvement program progressed at the Interna-

tional Arrivals Building at JFK with new interline

facility and conveyor system

Construction began on two new cargo terminals at JFK

The first U.S. international clearance center for air

couriers and first U.S. central cargo examination facil-

ity opened at JFK

Implementation of Alr Cargo Fast Flow progressed

with completion of system functional design

Consolidated Ground Transportation Counters in ser-

vice at all three airports

Air traffic results 1985-1986

Le.

pi

we ee tL. oe

onde :

“Seer

.

p * r y —_ —_ + .

~ >

4 a

~ v j ¥ x

ped

f

y _

~r —~ ; + i

ad

= ont

. —

' ; ) Oi » ¥

c ¥

vf r —-

~ “ - y ;

. a a f .

5 a al —_—- > -_>o

x Ty . “

x

.

*

“ -

a + -

a] f \

a = ‘ ,

= a ae ~

~ ro - + . >

e - a 7

— _— -- 7 °

<a «

‘ hy

(

)

|

A

< n

oa f - > - r U

e) - a . : — ~

~ - ; es = e <

“ wt + = ~- >

o DNs - C fs :

‘acl oo j — > a - a “

. — -/ ae we > = _ mn a

Le > “

me €& a & eT ¢ ‘

rae | - +~ ~— - ~ . > ~ + > s

“ « e - — ~~ -

a ” - << “ + -_ . o . 4 7

_ f - > ‘ > 3

1 a a -- = i + 3 = 4

< - — .

‘ = & = oo = fe ¢ " . oO. >

= S TW 4 > = 2 > r

an - 4 a - a s 7 " -

—_—s -“ ~ “ — — 7

—

299

Port Authority police officer aids airy

* >

(;round

‘ } 7s.

a |

7 7

‘ as

.

: y

. ]

At

4 =

‘

. :

v

- ’ |

t i

; y

t t

rT x

*

[ransportation and Terminal Services

rriding goal of the Port Authority is to enabl

nmentally sound wav. Io this end, we aré

ying high-occupancy vehicle (HOV) use Dy

idle a significant increase in activity in

seeking out new bus and limousine services to

r > y . . y : ]

broader range of transportation alternatives t

ir say Olympia Trails, which links Newark an

Airports, including a stop at the World Trade

art express bus service to LaGuardia Airport. A

"

" , _— ' ‘ ry , by ; .

» ¥ r ‘ ‘ i bith i>i ‘ nas aggded

; ‘ - . ;

DS al i I v\ SeTves DOT i4 ms

‘

| a

r A we eW x

y , " y » + q y y ; ‘ 1 KK LA ‘

; ‘ I ] >< Lt Started Yy VVYes

+} }

, ’ , ; ae + i. ‘ ,

aa ' a 4 st ia Vt cio vV Li SnarTread UUU I

: —" :

’ t, ’ . ‘ yok Aj ~ ‘

f V1Ce I mn La\suardla and Kennedy irports

t : ' _

‘ y a. , 4 rats rr | ~<y > 1 -( snort ‘4

t ‘ il . iit AUUILIONII LOT 4 iSiand Oonnecticu

f r ’ | ‘ + . bh osiis! > r " h _.

‘(,roup Nas Started scnedauiled service Detwee

i

’ + + ; > rr }

1 dal ne met! ) an area AIT por S witn tnree

; : . ’

¥ ¥ rhe ¥ aA an } } c itt cre res > o _ iT

_ . - ? , ,? ,

, , >? ¥ 7 — >? 7 “s ?

4 7 * [ I ‘ | A ui ail >} }

I

_ , _ ; nr + y+ >

il { ‘ s ' if I 4 T si ST ;

rr

‘ ; tiny ‘ rr ric t YT S at r

>

\

’

A

302

-d Customs counters were installed at JFK

>

‘

Sixty redesigne

303

additional Port Authority counters are planned at New-

ark and six are planned for JFK, all of which should be

operational in the spring. Staff at these counters provide

travelers with a single impartial source of accurate trans-

portation information and help them to make their

ground transportation reservations.

Contributing to the effective use of public transportation

to the airports is the Port Authority’s AIR-RIDE tele-

phone information service. Last year, a total of 70,000

calls were received, a 17 percent increase over the pre-

vious year. This toll-free service for the metropolitan area

is operated on a 24 hour basis throughout the week, and

provides detailed information about public transporta-

tion to and from Kennedy, Newark and LaGuardia Air-

ports. As part of the system, a special toll-free

information number is available only for the travel indus-

try

Port Authority plans include the development of “satel

lite ground transportation terminals” in Long Island and

New Jersey. The terminals would offer parking and drop-

off areas for air passengers who would then take regu-

larly scheduled limousines and buses to the airports. This

could represent an effective alternative for many air pas-

sengers who now use private automobiles. To initiate this

service, the Port Authority issued requests for proposals

during 1986

One of many convenient retail shops

operating at the airports

[he Port Authority is also developing a ride-sharing pro

gram for JFK that would encourage airport employees to

use high-occupancy vehicles for commuting to and from

the airport

Part of the effort to upgrade the three airport system

includes improving mass transit access to all three air

ports, now and in the future. At Kennedy, for example, a

new rail/bus station for the JFK Express train opened in

the summer. Most significant are our plans for the future

[he JFK 2000 plan is designed to improve mass transit

use by creating a Central Terminal Area transportation

center, where buses and limousines would pick up pas

sengers after they had taken a two minute people. mover

trip from their airline terminal

[he Port Authority also plans to improve the connection

between the Central Terminal Area and the Howard

Beach train station to encourage greater use of the JFK

‘

=

~—

é

>

S

Ss service Is provided around the clock from the terminal buildings to the long-term parking lots at all three airports

ee hi

=

Express. The first phase of these improvements cculd

include improved bus service - possibly an exclusive bus

lane rom the train to the transportation center

In 1986 the Port Authority, in conjunction with New York

City officials, issued a request for proposal to establish a

bus service from the LIRR station in Jamaica to bo

Kennedy and LaGuardia, to encourage further use of

mass transportation for air passengers and airport

employees. In addition, an extension of the Metropolitan

[ransit Authority’s Q3 bus service into JFK will start this

spring

At LaGuardia, new connections to mass transit are being

examined by the New York City Department of Transpor

tation and the Queens Borough President’s planning

office. In addition, the establishment of a high-speed

ferry service from Manhattan to the airport is under

( onsideration

At Newark, we are examining the possibility of providing

a connection from the planned on-airport people mover

system to regional public transportation systems. We also

plan on giving preferential placement of high occupancy

vehicles on sections of curb frontage. This is being dons

to enhance the level of ground transportation service

provided to the traveling public

An additional part of our ground access strategy is

reduce automobile congestion and delays by improvil

the roadway systems at Kennedy, Newark and LaGuardia

Airports. Now underway at Kennedy Airport is a projec

to upgrade 150th Street into an expressway, thereby pro

viding JFK with a second major entrance for traffic

’ y ’ , ; isvct . . ; . i

yroaching from the east, including direct connections

TT)

a}

307

P fe -

-onceptual model of the JFK 2000 redevelopment pro

gram. Roadway construction at JFK.

308

to the major expressways adjacent to the airport. Upon

completion in early 1988, this system of roads will enable

more traffic to be diverted from the now overburdened

Van Wyck Expressway, the airport’s sole major access

route.

Equally significant, the roadways in Kennedy’s and New

ark’s Central Terminal Areas will be reconfigured and

expanded under each airport’s capital program. At

LaGuardia, work will start on a major roadway improve

ment program next year in order to split airport traffic

evenly between the Central Terminal Area and the East

End Area

We undertook several initiatives during 1986 to upgrade

the quality of customer services. A comprehensive eval

uation of all public food and beverage operations within

the passenger terminals at the three airports was com

pleted in 1986. This analysis is designed to achieve imme

diate improvements to existing establishments, as well as

to develop a more consumer-oriented direction for air

port food services over the longer term

During 1986, we also added to the quality and variety of

merchandise sold at the metropolitan area airports, with

the opening of two Bloomingdale’s stores at JFK. One is

in the International Arrivals Building, the other in the

Pan American World Airways lermina!

The Future of John F. Kennedy

International Airport

During 1986, work was completed on plans to rebuild

John F. Kennedy International Airport, to enable the

309

airport to efficiently handle a fifty percent increase in

passenger growth expected by the year 2000. The total

cost Is estimated at between $2 and $3 billion.

Early in 1986, PRC Engineering, Inc. and I.M. Pei &

Partners delivered to the Port Authority a master func-

tional plan for the redevelopment of JFK. At our request

Bechtel Civil, Inc. undertook a constructibility review of

the plan. Bechtel concluded that the JFK 2000 program

was feasible as planned, the Proposed eight-year sched-

ule was practicable and the Project’s construction cost

would be within the estimated range.

Incorporating their comments along with input from the

airlines, the federal agencies involved, transportation

operators and the Urban Land Institute (an independent

organization which conducts research into urban plan-

ning), the Port Authority finalized its plans for rebuilding

Kennedy International Airport. The agency will be work-

ing closely with local officials and communities to assure

that the needs of airport-area communities will also be

considered throughout this massive rebuilding effort.

The heart of the new JFK plan is a speedy, high-tech

System for transporting travelers and their baggage

between airline terminals. A fully automated Passenger

Distribution system will be designed to shuttle pas-

sengers between the terminals and the centrally located

Transportation Center by the use of state-of-the-art auto-

mated vehicles traveling on elevated guideways. The

Transportation Center will serve as a front door for the

Serpent, providing a convenient terminal for patrons

arriving or departing the airport by various transporta-

tion modes. At the same time, it will also provide quicker,

310

more convenient transfer service for passengers connec-

ting between terminals. A user friendly baggage handling

system will also be designed to improve speed and

reliability for all passengers, but especially for interline

passengers.

The Transportation Center, to be located in the heart of

the Central Terminal Area, will be connected to the Inter-

national Arrivals Building by a new and enlarged Federal

Inspection Services Hall designed to handle up to 6,000

passengers per hour, double its present capacity. This

linking of the Transportation Center and the IAB is

expected to provide for better pedestrian flow patterns

and an improved level of passenger service.

The Transportation Center may include such additional

services as restaurants, shops, a business service center, a

new heliport, a new air traffic control tower and possibly

hotel and conference facilities.

Another important aspect of the JFK 2000 plan involves

the capability of the passenger terminal buildings to han-

dle the expected increase in air passenger traffic. On-

going efforts to address this issue include the acquisition

of a computerized gate utilization model to help deter-

mine future gate requirements, as well as improvements

and expansions to the existing terminal facilities.

While design and construction proceed on various ele-

ments of the master plan, several projects are being car-

ried out to provide service improvements to both the

International Arrivals Building and the airport roadway

system, as well as upgrade the level of mass transit

service to the airport. These include a joint program with

New York State to provide a second major entrance to the

311

airport at its eastern approach, a comprehensive improve-

ment program for the International Arrivals Building,

and improvements to the JFK Express, the New York City

Transit Authority’s express train to the airport from

Brooklyn and Manhattan.

The 150th Street entrance to the airport is being rebuilt

into a limited access, median separated expressway. Each

direction will have two lanes, paved shoulders and paral-

lel service roads for public use. Also included is a

restricted service road that will connect the North Cargo

Area to the airport’s Central Terminal Area, thereby

improving commercial access to Kennedy International.

When completed in the spring of 1988, this system of

roads is expected to eliminate much of the intermixing of

slow moving aeronautical vehicles with normal traffic.

Moreover, when combined with the new expressway (the

JFK Expressway), they will provide a second major access

route to Kennedy with direct connections to the Van

Wyck Expressway, the Belt Parkway, and the Nassau

Expressway. This is the first stage of a comprehensive

reconfiguration of the airport roadway system.

Future plans call for the reconfiguration and reconstruc-

tion of the Central Terminal] Area’s roadway network to

increase efficiency and ease congestion. Direct roadway

connections will be provided between each of the four

main terminal areas and the two main airport access

highways, the Van Wyck and JFK Expressways.

The $24 million renovation of the International Arrivals

Building now underway will Significantly upgrade the

facilities there and is expected to be finished in 1987

Two views of conceptual plans for a new east end pas-

senger terminal at LaGuardia.

314

Already in operation is a new automated baggage con

veyor system that dramatically improves the transfer of

luggage between overseas and connecting domestic

flights. The Immigration passenger processing areas are

being expanded for greater efficiency and improved pas-

senger flow. New Customs counters and lighting, better

Signs, additional restrooms and more escalators, are all

designed to speed up processing for passengers at the

International Arrivals Building.

In the summer, a new bus station connecting to the JFK

Express train station at Howard Beach opened to trav-

elers. The new station replaces a provisional facility that

previously had served passengers who connected to the

airport

To complement the up yrading of terminal and transporta

} 5 5 r

tion services, staff advanced with plans to maximize the

airport's runway and taxiway Capacity. Since airside

Capacity will be a key element in determining the future

of Kennedy International, plans are focusing on ways to

increase the flexible use of runways and taxiways and

help tO maintain Kennedy as the Nation’s premier inter

national airport

The Future of LaGuardia Airport

Due to its proximity to Manhattan and wide choice of

domestic flights, LaGuardia Airport is popular, especially

with business fliers. In 1986, LaGuardia’s compact site

handled more than 22 million passengers. Current projec

tions are for 30 million passengers by 1995-2000 - a 40

percent increase in passenger traffic. To accommodate

this projected increase, the Port Authority plans to

r=

oO

a.

a

<

Ss

4°)

=

i)

2

UO

|

=)

3

a » -

“w= i

- Re

=}

i

uv

re

—

&

S

U

316

At LaGuardia are 125 Apple Aides - volunteer senior

citizens from the local area — who provide travelers with

airport information.

317

improve the capacity, and efficiency of the airport

through an ambitious modernization and development

program.

Major components of the $300-plus million capital plan

for LaGuardia Airport include reconstruction of the Cen-

tral Terminal Building (CTB); construction of a new pas

senger terminal at the airport’s east end; and a major

roadway improvement program.

During 1986, work continued on the rearrangement of

interior space on both the first floor Arrivals level and the

second floor Departures level of the CTB. The current,

highly compartmentalized terminal building layout is

being opened up to create a more homogeneous terminal

that will provide more space for passenger circulation

and amenities.

Another important part of the plans for the Central termi

nal Area is provision of a direct entrance to the Parking

Garage from 94th Street. This would eliminate the need

for circling the Garage in order to enter, and thereby

reduce traffic in front of the CTB. Construction for this

segment of the plan will start in 1987.

On the Arrivals level of the CTB, the terminal's streetside

window wall will be moved out by more than 20 feet

along the entire length of the building, to provide addi-

tional space for patron circulation, ground transportation

services and baggage claim areas. On the Departures

level, work includes widening the roadways by at least

an additional lane to reduce congestion in front of the

CTB. Construction on both these projects is scheduled to

Start by 1989

318 esis

The new East End Terminal, to be used by one or more

airlines, would be built adjoining the Eastern Airlines

Shuttle Terminal. The terminal would consist of approx- Conceptual approach to Newark Airport development

imately 250,000 Square feet of space on two levels and Construction at Newark’s Terminal C

include all patron services facilities. Its construction,

scheduled to start in 1990, should help to balance pas-

senger traffic between the Central Terminal area and the ,

East End area, and will be a key element in enabling the | > 6 == —

airport to comfortably handle projected increases in pas- yy)

senger demand.

Construction of a new East End Passenger Terminal will

be complemented with a roadway program that will

reconfigure and expand on-airport roads, while provid

ing new access to LaGuardia’s East End area with con

Struction of new, off airport roadway connections

Starting in 1987, the airport East End roadways will be

realigned and expanded to provided more efficient ser-

vice to travelers. To improve airport access to the East

End, off-airport road work will commence in 1990. Con-

struction of ramps will tie in the 102nd Street Bridge as

arm exit and entrance to the airport. In addition, a new

flyover roadway east-bound from the Grand Central

Parkway to the East End Terminals (Delta Airlines, East

ern Airlines Shuttle and the planned East End Terminal).

will allow the total Separation of Central Terminal] area

and East End vehicle traffic and ease congestion on the

Grand Centra] Parkway

Late in 1986, air service at LaGuardia was augmented

with the inauguration of Pan American’s shuttle flights to

Boston and Washington from a new wing of the Marine

Air Terminal. (New York Air had Previously provided the

320

same service from the Central Terminal.) Built by Pan Am

on an expedited basis in early fall, the new terminal

building includes four new gates and 40,000 square feet

for patron services. Pan Am also provides shuttle pas-

sengers at its terminal with a-courtesy bus that provides

connections to the other terminals at LaGuardia.

The Future of Newark International Airport

Nineteen eighty-six was another banner year for Newark

International Airport in passenger and cargo traffic. It

was also a year in which Newark surpassed Kennedy

Airport to become the region’s busiest airport’in the total

number of passengers handled.

Passenger growth is expected to surge by fifty percent by

the year 2000, and the Port Authority has developed a

program of major improvements to enable these increas-

ing passenger volumes to be served with quality and

comfort.

The centerpiece of the Port Authority’s program is an

ambitious capital redevelopment plan te improve New-

ark international Airport, known as NIA 2000. The NIA

2000 plan reconfigures the airport’s roadways, parking

lots and terminal frontages to provide an optimum bal-

ance between airside development and landside access,

providing for maximum flexibility and expansion to

accommodate future operational needs.

The major elements of the NIA 2000 plan include mod-

ifications to the airport’s main entrance and exit road-

ways, reconstruction of the roadways in the Central

Terminal Area, serving each individual terminal; and a

321

people mover system to enhance the level of service

between Terminals A, B, and C and the existing long term

parking lots. The people mover will also be capable of

connection with off-airport transit systems in place or

under study.

Other elements of the redevelopment program include

dualization of roadways in front of each terminal, with

priority in accommodating high occupancy vehicles; and

construction of structural parking within the CTA, with

direct access to and from the terminal frontages.

While not part of the NIA 2000 plan, a principal project

currently underway is the construction of Terminal C, the

completion of which will contribute 42 new gates and

850,000 additional square feet of space for expanded ser-

vice. At year end, more than two-thirds of the project's

construction had been completed, and we expect the ter-

minal to be operational in 1987.

As an interim improvement measure, construction sta rted

on an additional lane to the existing express road, which

will facilitate vehicular access to and egress from Termi-

nals A, B and C. Construction is scheduled for completion

in 1987. Modifications are also planned to provide public

access to the new terminal’s parking level frontage.

Work began in 1986 to reduce roadway congestion, espe-

cially in front of the terminals, including construction ofa

ground transportation stack area for taxis and limousines.

Additionally, completion of Parking Lot F this fall will

provide 3,000 more long-term parking spaces, bringing

the airport’s total parking capacity to 23,000 cars. In other

work at Newark International, we initiated a new pre-

cashiering system that saves time for parking patrons by

eke,

322

At Newark. Federal Express opened its new Metroplex

while the Port Authority opened a new cargo terminal

324

allowing pre-payment in the terminals for cars parked

less than 24 hours. Existing delays for those parked on a

hourly and daily basis were also reduced with the con-

struction of three additional toll lanes in the Central

Terminal Area. Further improvements are planned for

1987 with the construction of six additi i

tional toll |

peg oll lanes in

Newark International is fast becoming a major terminus

for the small package carrier industry, a fact borne out by

construction undertaken at the airport during 1986. Two

new cargo terminals were completed, one by the Port

Authority, a 50,000 square foot warehouse and office

building, the other the regional headquarters for Federal

Express., A third terminal is now being constructed by

United Parcel Service on an expedited basis, and is

expected to be completed in the spring of 1987. Last year

we also began planning to establish a centralized conge

examination facility at Newark to expedite the clearance

of international cargo.

Overleaf: Terminal C will provide 42 new gates

and 850,000 Square feet of space for expanded

service when completed in 1987.

The Future of Air Cargo

As air cargo continued its growth in 1986, the Port

Authority moved ahead with a five year program of

capital improvements at all three airports. This 100 mil-

lion dollar program in 1986 has already produced new

325

cargo terminals at Newark and construction of additional

cargo terminals at Kennedy.

Last year was also a period in which great strides were

made advancing Air Cargo Fast Flow, the Port Author-

ity’s computerized inventory control and clearance sys-

tem. Finally, the Port Authority opened two buildings at

Kennedy International which marked a first for U.S. air-

ports - the first international clearance center for air

couriers and the first central cargo examination facility.

The combination of these capital and service improve-

ments will increase the cargo handling capabilities of the

three airport systems, and enable Kennedy, Newark and

LaGuardia to efficiently process the more than three mil-

lion tons of cargo expected per year by the end of the

next decade.

Kennedy International, already the world’s biggest and

busiest cargo airport, is forecast to more than double its

present cargo volume by the year 2000. To provide the

airport with the most modern facilities and services to

process these increasing cargo volumes, the Port Author-_

ity began a major building program in the airport’s North

Cargo Area in the spring with groundbreaking for a $20

million cargo terminal complex. The two new terminals

are being built by King Interests, the nation’s largest

third-party air cargo developer, which will also operate

and sublease the facilities. The first building of 175,000

square feet has already been leased and is expected to

open this year. The second facility of 200,000 square feet

is scheduled for completion in 1988. When both facilities

become operational, they will be able to accommodate

four Boeing 747 freighters.

326

The airport’s North Cargo Area will be host to a second

facility scheduled to start construction in 1987. The $13

million Halmar Equities building will be located adjacent

to Springfield Gardens for freight forwarders, agents and

brokers who do not require ramp facilities. The 200,000

Square foot project combines requirements for both cargo

processing and office space. It will consist of 100,000

~ Square feet of warehouse space on the ground floor, with

41 truck docks, and 100,000 square feet of office space on

the second floor.

Other initiatives at Kennedy International included a new

international clearance center for 18 air couriers, which

handle half the air courier traffic at Kennedy. (The

remaining half is handled by DHL, which opened its own

clearance facility at Kennedy in 1985.) The facility, located

in Building 81, is now clearing between 750 and 800 bags

of small packages per week. Its operation not only

relieves congestion in the passenger areas, but expedites

clearance for the air couriers and allows Passengers to

benefit from the shorter federal inspection lines and less

congested roadways in the Central Terminal area.

In another effort at consolidating U.S. Customs inspection

and clearance at the airport, the Port Authority and U.S.

Customs opened a central cargo examination facility at

JFK in the autumn U.S. Customs will release all cargo

formerly cleared at numerous container stations located

around JFK by selectively inspecting only high risk cargo

at the control site. It is estimated that one-third of the 1.1

million tons of cargo handled at JFK will be processed at

this 24,000 square foot facility in Building 88. Its success-

ful operation will enable more container stations to be

i uss

327

licensed without an increase in Customs staff, as inspec-

tors will not have to be assigned to the individual sta-

tions. The resulting efficiencies should attract more

business for Kennedy, now and in the years to come.

ACCEPT, a joint Port Authority and U.S. Customs cargo

automation program for the NY/NJ region, is in opera-

tion at 7 cargo terminals at Kennedy International, which

together account for 50 percent of the airport's cargo

capacity. Use of ACCEPT has reduced the number of

inspections performed by U.S. Customs by nearly 70 per-

cent by enabling the assessment of shipments as either

high risk or low risk. This program is scheduled to be

replaced this spring by the risk assessment component of

U.S. Customs’ Automated Commercial System (ACS),

allowing for speedier cargo clearance for the entire

import community.

Among the more significant changes in the regional air

cargo market was the transformation of Newark Interna-

tional Airport into a major player in cargo handling. For

the ten year period ending in 1985, air cargo volume at

Newark International has grown from 112,000 to 274,000

tons. Last year, the airport handied almost 300,000 tons of

cargo. The Port Authority estimates that by the year 2000,

the airport’s air cargo activity will nearly triple.

One of the major reasons for this resurgence is the phe-

nomenal growth of the overnight small package delivery

industry. Newark’s early concentration on this aspect of

air cargo service, as well as its easy access to and from the

heart of the New York/New Jersey Metropolitan area, has

made it the overnight small package and document cen-

ter for the northeast United States.

328

Anticipating the importance of expanded and technologi-

cally advanced facilities to serve this market, Federal

Express embarked upon the development of a huge and

modern facility - the $53 million Metroplex Hub. The

Metroplex, a regional sorting center for the northeast

United States, is the first major facility outside the Fed-

eral Express headquarters in Memphis to be built on an

airport.

The Metroplex, which opened early in 1986, houses a

state-of-the-art document sorting center capable of han-

dling 18,000 packages and documents per hour. Also new

at the Metroplex are electronic transmission facilities and

Federal Express offices, including substantial ramp and

parking space for aircraft and container transport vehi-

cles. All this has doubled the capacity of Federal Express

to service its stations in 20 cities located throughout the

region.

In another boost to the air cargo industry at Newark

International, United Parcel Service leased 28 acres at the

airport on which to construct and operate a major parcel

distribution facility, expected to open this spring. The

company’s aircraft movements at Newark are expected to

continue to grow from an estimated 1,550 movements in

1986 to some 1,800 by 1990.

Also significant was the mid-year opening of a cargo

terminal constructed on the airport by the Port Authority.

Now occupied by Virgin Atlantic, Continental and Sum-

mit Airlines, together occupying 50,000 square feet, the

new facility is located within the cargo complex on the

north side of the airport.

;

330

To enhance the efficiency of LaGuardia’s capacity to han-

dle current cargo operations, in late 1986 an operator

began converting 35,000 square feet of hanger space into

a cargo handling facility. Work included installation of

truck docks; storage areas and refrigeration facilities for

airlines already operating at LaGuardia.

Tying together the entire Port Authority Air Cargo Center

will be Air Cargo Fast Flow. In June 1986, the Port

Authority signed a contract with Arthur Anderson and

Company to design and develop a state-of-the-art inven-

tory control and clearance system for cargo, and to oper-

ate and maintain it for two years. When the system

becomes operational this autumn, it will significantly

reduce the time for processing of cargo within the region

by allowing for real time communication between car-

riers, container stations and customhouse brokers, and by

establishing an interface with ACS of U.S. Customs.

ACFF is designed to allow for the creation of a paperless

air cargo documentation process with more expeditious

clearance. It will also enable electronic filing of entry

declarations from brokers’ offices, even while the ship-

ment is en route.

By the end of 1986, the detailed functional design of the

ACFF system had been completed and system program-

ming had been initiated. When operational, Air Cargo

Fast Flow promises to benefit everyone — importer,

exporter and airline, Customs and customhouse broker,

terminal operator and even the surface transport opera-

tors, wk.o will now be able to achieve faster turn-around

times for their trucks.

The Future of Heliports

Helicopters will play a central role in the future of trans

portation in the New York/New Jersey region. A new

heliport for Kennedy Airport will be an important feature

of the master plan for rebuilding JFK. Another example of

the Port Authority’s commitment to helicopter service is

the reconstruction and expansion of the Downtown Man

hattan Heliport, now in progress

\ vertical-takeoff-and landing (VTOL) aircraft in demon

stration flight over New York

When completed in the spring of 1987, the Wall Street

Heliport will be one of the country’s most modern heli

ports The old Wall Street | leliport was closed in 1983 for

complete reconstruction of the pier on which it was sit

ated. Operations were temporarily relocated to the World

[rade Center/Battery Park City Heliport

(he new heliport will have triple the parking area of the

old one and be able to handle helicopters weighing 50,000

pounds. By contrast, the weight limit at the old heliport

was 10,000 pounds. Further the new heliport is expected

to handle additional scheduled flights to the airport

Philadelphia and to Atlantic City, New lersey

lhe projec t has been selected by the Federal Aviatior

Administration as one of four sites in the nation for a

National All-Weather Demonstration Heliport that will

equip the facility with state-of-the-art electronic and

visual landing aids. The program will also formulat

procedures for landing in poor weather that may eventu

ally be applied to other helipor ts around the nation

Work also progressed in 1986 on a Port Authority study

}

investigating the potential of vertical takeoff and landing

333

(VTOL) aircraft as a means of alleviating airport conges-

tion while increasing air transportation Capacity at Ken

nedy, Newark and LaGuardia Airports. The use of VTOL

aircraft promises to create totally new short-haul air

transportation systems in the region, operating from city

center to city center. This short haul market is estimated

to be as much as 30 percent of the total at some air hubs

TT

—

i Hil

iN Nite

=

~ Ti i}

PUTT

i

4 Ag wwe

~-

U

Te

Reconstruction of the Wall Street Heliport will

triple its capacity when completed in 1987.

[he particular type of VTOL aircraft being studied is

commonly referred to as “tilt rotor.” The aircraft com-

bines the wings of an airplane with the rotors of the

helicopter, an advanced design that is fuel-efficient, vet

offers twice the speed and range of a helicopter. Conse

quently, it allows the craft to take off and land like a

helicopter yet operate as a conventional fixed wing air

craft in flight

As part of the study, the Port Authority will investigate

the viability of other types of aircraft as well as the cost

334

economics of aircraft, potential markets and carriers, reg

ulatory controls and possible site locations for airports to

serve VTOL aircraft. This effort, which is being coordi-

nated with VTOL studies being conducted by NASA and

the FAA, is to be completed this spring.

As part of this effort, the Port Authority cosponsored

with the FAA a Civil Rotorcraft Forum early in 1986.

Prominent leaders in industry and government attended

the conference in order to assess the potential of tilt-rotor

aircraft in creating a new major segment of the public air

transportation system.

Airports and the Communities

The Port Authority continued in 1986 to be actively

involved in issues affecting the bi-state region, as our

community relations programs touched a wide audience

with a broad range of activities. From employment to

environment, from noise abatement to education, we are

involved in a variety of programs to improve the quality

of life in the New York/New Jersey region

Efforts to alleviate the problem of flight delays made

dramatic progress in 1986, as we worked with the airlines

and the Federal Aviation Administration on a plan to

restructure and expand the air space assigned to the three

airports

Late in 1986, the FAA implemented a preliminary phase

of the plan at Newark International Airport. The next

stage will be the restructuring of airspace along the East

Coast this February. This expansion scheme will assign

more departure routes to Newark, while redistributing

335

other air routes between Kennedy and LaGuardia. The

FAA’s Expanded East Coast Plan will offer parallel and

alternate paths for aircraft now bottlenecked by single-

route systems, and is expected to alleviate airport delays

and improve safety

In 1986, we initiated development of a Flight Track Mon

itoring System in cooperation with the FAA. Using radar

information, the Port Authority will be able to monitor

aircraft adherence to prescribed flight paths in an effort

to reduce noise from flights Straying over residential

areas

In the same spirit of achieving safer and quieter airport

operations, the Port Authority is working closely with

community groups and an outside consultant on

assessing the design of a noise abatement wall, to be

located along the western edge of LaGuardia Airport

[his would reduce noise levels from both aircraft and

ground operations

A significant event in 1986 was the more “Stage 3” air-

craft, employing new technology for quieter operation

began operating out of the three airports. This trend is

expected to continue, as the major air carriers continue to

upgrade their fleets with purchases of the latest aircraft

models. The increased use of quieter widebody aircraft,

which will carry more people per plane than in the past

leads the Port Authority to forecast lower noise beast

despite the growth in passengers. At the same time, we

are urging the federal government to establish a timetable

for phasing out Stage 2 airplanes aircraft that meet

nrecent nn} , ,

present noise standards but remain the root of the noise

336

We also continued with our School Soundproofing Pro

gram during 1986. At present, 17 schools in New York

and New Jersey, affected by noise from aircraft opera

tions, are slated from soundproofing work at a cost of $17

million. This extensive noise abatement program is being

carried out with the support of the Federal Aviation

Administration through Airport Improvement Grants

Port Authority tour guide accompanies community

school children on airport visit

Other efforts in the area ol! environmental protection

continued to move forward during the year The Port

Authority continued its long-term environmental protec

tion program at the three airports in order to minimize

the impact of airport operations on the surrounding com

munities. Among these activities, we continue to bring

together the Flushing Bay lask Force, made up of repre

sentatives from New York State, New York City borough

agencies an

2 and community boards, to monitor projects and

activities affecting Flushing Bay. Similarly, we have par

ticipated with various agencies and community boards

near JFK in a Jamaica Bay Task Force.

. Career opportunities were promoted by the

Port Authority during 1986 with Career Davs and

Mentoring programs at the airports

4

\s the metropolitan area airports continue to be devel

iped 7 } ) Ts)

[ each year to keep up with rising demand, new

employme r

| ent Opportunities are continually created Some

Hs LLM) +

people earned their livelihood at our three airports

TY 1ORG TY } 9G

sat : st ) , i <4 } 4 .

re than 225,000 other jobs are generated in our

ré TION nh \ +} ) ‘ \ rT? } ¥

ne aviation industry and other businesses

[fo make sure that a fair share of newly generated jobs go

to minority group members, the Port Authority partici

pates with the airline industry in funding the council for

Airport Opportunity (CAO), an organization that

advances minority participation in the regional aviation

industry. In 1986, the CAO placed more than 700 individ

uals in aviation related positions, and the aviation indus

try’s continuing growth, along with our extensive

aviation capital program, should dramatically increase

career opportunities in aviation for residents of the Di

State region

Another program aimed at sti! iting the il ¢ ’

is the Airport Services Development Office which begar

yperations in 1984 in Queens County. The purpose of the

Office is to encourage the airlines and other airport ten

ants to patronize local businesses. The success of the

Wueens program lea to decision to fund the progran

for three more veal a 1 ft } ite fund t estaDlisn a

Similar program for the t ty ea surroundins

Newark Internationa!

In the areas of education and career development, we

continue to sponsor Aviation Career Day programs both

in Newark and in Queens, and conduct tour programs for

student groups at the three airports. In addition, we

continued to cosponsor with the FAA and local aviation

organizations a three-year program on aviation Career

awareness, for students from kindergarten through the

ninth grade. As a result, more than 2,400 students com

pleted programs in aviation studies during 1956 he

program, initiated at the request oO! Queens Community

} | »7 } ] II

School LJistrict is conducted at KK

339

Other educational efforts include a Career Bridges pro-

gram at Newark International Airport and a “mentoring”

program conducted by LaGuardia staff. At LaGuardia

Airport, we also participate in the City-as-School Execu-

tive Internship Program, in which high school students

are provided the opportunity to gain experience and on-

the-job education about the world of aviation.

Considerable progress was also made during the year in

upgrading security at all three airports. Efforts included

increased inspection of facilities, equipment improve-

ments and a new identification program. The Port

Authority also worked with the airlines and other ten-

ants, as well as law enforcement agencies such as the

Drug Enforcement Agency, in special programs directed

against solicitation and drug activities.

340

THE PORT AUTHORITY OF NY & NJ

Board of Commissioners

Philip D. Kaltenbacher, Chairman

Robert F. Wagner, Vice Chairman

Jerry Fitzgerald English

James G. Hellmuth

Henry F. Henderson, Jr.

William K. Hutchison

H. Carl McCall

John G. McGoldrick

William J. Ronan

Howard Schulman

Robert Van Buren

Robert V. Van Fossan

Stephen Berger, Executive Director

Robert J. Aaronson, Director, Aviation Department

Alice Herman, General Manager, Aviation Marketing and

Economics Division

Richard L. Rowe, General Manager, John F. Kennedy

International Airport

Vincent Bonaventura, General Manager, New Jersey Air-

orts

Rosie L. Pierce, General Manager, LaGuardia Airport

Philip J. Landi, Manager, P.A. Heliports

Port Authority Aviation Facilities

John F. Kennedy International Airport

LaGuardia Airport

Newark International Airport

Teterboro Airport

Downtown Manhattan Heliport

West 30th Street Heliport

Text: Gary Goldstein

Design: Mano Trombetta

Photography: Jerry Rosen, Randolph Waterman

Chris Sorensen, Michael Spozarsky

Cover: Mano Trombetta

34]

)

EXHIBIT

f

<

_

Z.

<t

—

>

a

—

>

“a

1eTCce

COMM

b

~~

” —

a —~

- —

- —

_ : -

—

= ~~

o

\ / ~

- = —s

~~ >

THE PORT

= mt

—_.

—

- “

—

—~

amd -

—— —_

~

/ ~—

> /

a

~ 7

om ~~

oo ~

. —

343

comprehensive investment plan that meets the region’s

growing needs for moving people and goods between the

states and maintains the transportation and commercial

facilities essential to the region’s future economic health.”

Chairman Kaltenbacher continued, “These invest-

ments will promote mobility within the metropolitan area

and will help protect its pre-eminent role as American’s

aviation gateway, maritime-port, and national and inter-

national center of business and finance. They will be

funded by the Authority on a self-supporting basis, with-

out taxpayer subsidy.”

“Key to the implementation of this program are the

actions also taken today, pending public hearings, to

adjust tolls and fares on the Port Authority’s interstate

transportation network of vehicular crossings and transit

facilities,” the chairman said. “The increased revenues

would bring this network - now operating at a deficit -

closer to levels approaching its own operating and capital

needs over the next five years. With these facilities carry-

ing more of their own weight, current and projected

income levels from the agency’s other facilities, with

some expected adjustments, would be capable of support-

ing the balance of this ambitious and much needed capi-

tal program.”

The capital program anticipates commitments total-

ing approximately $5.8 billion from 1987 through 1991, of

which approximately $4 billion actually would be

expended during this period. Additional spending

beyond the five-year planning period would be needed to

compete the Kennedy and Newark Airport initiatives.

344

The $5.8 billion figure includes $2.4 billion for avia-

tion facilities, $1.5 billion on the interstate transportation

network, approximately $500 million for port commerce

projects, and about $650 million in other regional devel-

opment projects. Approximately $400 million is allocated

for other anticipated capital initiatives and rehabilitation

needs on an agencywide basis for the five-year period.

The remaining $350 million includes the balance of

the regional development projects agreed to by the two

Governors in June 1983, the balance of the funds commit-

ted for the Port Authority’s bi-state bus programs, and a

provision for emergency repairs to Port Authority facili-

ties.

The Port Authority operates six bridges and tunnels

connecting New York and New Jersey; the PATH inter-

state rail rapid transit system; two Manhattan bus termi-

nals; the three major regional airports, a general aviation

facility at Teterboro and two heliports; port commerce

facilities at Port Newark and Elizabeth in New Jersey, and

marine terminals at Howland Hook on Staten Island and

two sites in Brooklyn; and the World Trade Center.

Facilities under development include the Teleport on

Staten Island; the Newark Legal and Communications

Center; and industrial parks in the Bronx, Yonkers, Eliz-

abeth and Newark. Other anncunced projects include a

resource-recovery plant serving Essex County in Newark

and waterfront development projects in Hoboken and

Queens.

Port Authority Executive Director Stephen Berger

explained: “The proposed investments are required

because of the growing demand on our aviation and

345

vehicular and transit services, and the imperative of

maintaining safe and efficient operations on many aging

transportation facilities. We have an obligation to support

the region’s improved economic performance through

our traditional transportation functions and our job-creat-

ing investments in distressed communities in both states.

This is a strategic agenda for an economically integrated

region.”

Highlights of the Port Authority Capital program by

basic business area follow.

Interstate Transportation Network

The Port Authority has recommended a regional

strategy of improving and expanding trans-Hudson pub-

lic transit services as the only practical solution to wors-

ening vehicular congestion and transit system crowding

as economic growth has spurred rush-hour demand.

Working in cooperation with other transportation agen-

cies in both states, the Port Authority plans to undertake

major capital investments to accomplish this goal.

Specifically, the program provides funds necessary

for the completion of the comprehensive PATH transit

system rehabilitation and capacity expansion program

initiated in 1983. This effort, already well underway,

includes replacement or renewal of the entire PATH car

fleet, longer trains on the Newark-to-World Trade Center

and Journal Square-to-33rd Street lines, and moderniza-

tion of key components and stations in the 79-year-old

interstate rail system. An estimated 760 million is allo-

cated for these purposes in the five-year program, in

addition to the $165 million expended since June 1983.

_~

ces lama ga

346

Even with these extensive improvements in PATH’s

equipment and service, the expected continuation of 3

percent yearly growth in trans-Hudson commutation

points toward a shortfall of transit capacity in the lower

Manhattan market by the end of the decade. Anticipated

waterfront development in Hudson County also will

increase peak-period demand for PATH service.

To meet this challenge, the Port Authority has devel-

oped with New Jersey transportation agencies an inte-

grated plan to add substantial and flexible transit

capacity that can meet forecast demand in this market

through the early years of the next century. The plan

includes a new passenger ferry service connecting

Hoboken and lower Manhattan; further investment in

PATH’s Newark-World Trade Center line to accommodate

9-car and eventually 10-car trains in peak periods; and

implementation by New Jersey Transit of the “Reverse-

Kearny-Connection” project - which will enable some

NJT commuter trains now terminating at Newark to

travel on to the commuter rail hub at Hoboken.

The ferry plan calls for a fleet of modern vessels

capable of carrying 4,500 passengers per hour during the

peak period between the existing ferry terminal in

Hoboken and a new landing site and terminal to be

developed at Battery Park City in Lower Manhattan. The

capital program allocates approximately $150 million for

this initiative. The potential for private-sector involve-

ment in the ferry operation will be evaluated as develop-

ment of the system proceeds.

The PATH expanded service plan builds on the exis-

ting plan to extend peak-period trains on the Newark-

347

World Trade Center line from 7 to 8 cars in 1988. The five-

year program provides $70 million to extend station plat-

forms to accommodate trains up to 10 cars in length and

to purchase sufficient additional cars to run 9-car trains

on this line within the five-year planning period, if

demand warrants.

Meeting peak-period demand in the midtown trans-

Hudson market poses more complex problems because of

the larger number of facilities and services in this sector.

Present concerns focus on the Lincoln Tunnel Exclusive

Bus Lane system, which carries almost 65,000 commuters

every morning — more than any other component of the

interstate network. The Port Authority capital program

provides approximately $25 million to help finance devel-

opment in New Jersey of a Hudson Busway, a second

exclusive bus approach to the Lincoln Tunnel.

The Port Authority is also engaged in joint study

with agencies in both states of additional projects and

service improvements for the midtown Manhattan mar-

ket. In furtherance of this objective, the Port Authority

capital plan includes approximately $25 million for traffic

distribution improvements in Manhattan’s Central Busi-

ness District to help alleviate commuter congestion prob-

lems.

The capital program also provides $445 million in

capital investment for the agency’s tunnels and bridges,

the Midtown Bus Terminal, and related facilities. This

spending is aimed at maintaining the structural integrity

of these facilities and improving their operating effi-

ciency. For the five-year period, the plan anticipates capi-

tal commitments of $115 million at the Holland Tunnel,

348

$140 million at the Lincoln Tunnel, $55 million at the

George Washington Bridge, $55 million at the Port

Authority Bus Terminal, and $65 million on the Staten

Island Bridges System.

Annual traffic growth on the Port Authority’s three

bridges linking Staten Island with New Jersey is now

outpacing growth on the trans-Hudson crossings, and the

Port Authority in 1985 announced plans to assess future

needs on this system, which connects two of the region’s

most rapidly growing areas. The plan provides for up to

$20 million of the capital program allocation for the

Staten Island Bridges to be committed for start-up costs

associated with a possible capacity expansion, subject to

further analysis and consultation with transportation

agencies in both states.

Aviation

The aviation capital program reflects the need to

improve passenger circulation systems and other services

at the region’s three major airports to improve upon

present levels of service and to accommodate projected

growth in passenger demand to at least the year 2000.

The plan estimates the commitment of $2.4 billion at

these facilities over the next five years, with additional

spending needed to complete these improvements in the

1990's.

JFK 2000 is an integrated project plan that will recon-

figure the airport’s central terminal area, addressing the

circulation and service problems now evident at the air-

port, and enabling JFK to accommodate demand expected

to increase to 40-45 million passengers per year by the

349

end of the century. In 1986, JFK handled 27.2 million

passengers.

The project includes expansion of the International

Arrivals Building and Federal Inspection (Customs) Hall,

an automated baggage-handling system, a “people

mover” rail system linking terminals to a new central

transportation hub, a reconfigured roadway system, a

new control tower for the Federal Aviation Agency, and

other improvements. The Port Authority anticipates a

commitment by 1991 of $900 million for this project. Total

project cost is now estimated at $2.7 billion.

Passenger demand at Newark International Airport

is expected to grow on the same scale as at JFK, and the

NIA 2000 plan provides for circulation and landside

access improvements, including new roadways, struc-

tural parking facilities and a “people-mover system” for

improved on-airport circulation. The airport’s widely dis-

persed market will be accommodated by development of

satellite “park and fly” terminals, and a future connection

of the “people-mover system” to possible new transit

service linking Newark and Elizabeth. Approximately

$650 million is expected to be committed for NIA 2000 by

1991. Total project cost now is estimated to be $1.35

billion.

The aviation capital plan also provides $200 million

for projects at LaGuardia Airport that are designed to

accommodate expected increases in passenger demand.

Construction of a new passenger terminal and highway

access improvements at the east end of the airport will

create two separate terminal areas, one at the existing

Central Terminal complex and another at the airport's

350

east end, with each capable of handling 15 million pas-

sengers yearly.

In addition to these major capital improvement pro-

jects, the plan allocates funds for a variety of improve-

ments to Port Authority aviation facilities. At Kennedy,

$330 million is earmarked for improvements aimed at

easing congestion on roadway approaches and improving

on-airport cargo facilities. An estimated $210 million will

be used to complete Terminal C at Newark Airport and

construct new maintenance facilities. Modernization of

passenger and parking facilities and improvements to

airside facilities at LaGuardia will cost an estimated $120

million.

Port Commerce

The agency has earmarked $250 million in the capital

plan for improvements at Port Newark and Elizabeth,

which include establishment at Port Newark of a gypsum

processing plant, a second juice processing facility, and

the building of cargo distribution buildings at Elizabeth

to accommodate added cargo carried by larger container-

ships. The agency has allotted $110 million, of which $20

million has already been spent, to help finance renovation

of the Howland Hook Marine Terminal on Staten Island.

The Port Authority anticipates an initial capital out-

lay of about $60 million for essential channel deepening

in Newark Bay, the Kill van Kull and Arthur Kill, which

will help finance dredging of channels and berths serving

Port Newark/Elizabeth and Howland Hook on Staten

Island from 35-foot to 40-foot depths. The agency under-

took this commitment in a 1986 agreement with U.S.

351

Army Corps of Engineers, anticipating the passage of

federal legislation that requires local cost sharing for

channel dredging projects.

The capital plan includes $110 million for additional

port projects, including continuing work at the Fishport

under development in Brooklyn; support of the Oak Point

Rail Link construction in the Bronx, which is designed to

improve rail freight connections between upstate and

downstate New York; a facility in Jersey City and Bayo-

nne for preparation and transshipment of imported cars;

and the agency’s contribution to the planned US Navy

Homeport on Staten Island.

World Trade

The Port Authority’s capital spending plans in the

area of world trade focus on efforts to improve regional

telecommunications capacity and projects to support eco-

nomic development in Newark. The agency has allotted

$110 million between 1987 and 1991 for these efforts.

At the Teleport, the satellite communications center

and office park on Staten Island, two buildings have been

completed and antenna dishes for transmitting data via

satellite are already operating in the facility’s enclosed

earth station field. A fiber-optic cable network connecting

Teleport to points throughout the region has been com-

pleted.

With the City of Newark and the Newark Economic

Development Corporation, work has begun on the New-

ark Legal and Communications Center, a facility designed

for law firms with access to shared computer data banks

and special legal services.

352

Rehabilitation projects within the World Trade Cen-

ter, including fire safety projects, are also planned.

Economic Development

The agency’s capital spending plans in the area of

economic development target investment and the jobs it

produces to inner city areas that have not fully partici-

pated in the region’s overall economic recovery.

Construction continues at the Bathgate Industrial

Park in The Bronx, with completion of all 12 planned

blocks scheduled for 1988.

The Port Authority Industrial Park at Elizabeth has

attracted its first tenants, and paving and utility work is

underway on a major portion of the 125-acre site.

A new industrial park at Yonkers permits the Port

Authority to emphasize economic development directly

related to maintenance of its transportation system by

using part of the site for manufacturing and assembling

the newest PATH rail transit cars.

The agency will also establish an industrial park in

the South Ward of Newark. About $75 million will be

spent at the industrial parks beyond the approximately

$35 million committed to them prior to 1986.

A resource recovery plant in Newark to serve Essex

County will be constructed and operated by a private

firm with Port Authority financing. The facility, toward

which about $300 million is earmarked in the capital

plan, will convert solid waste into thermal and electrical

energy and sell the electricity to local utilities.

353

The agency continues to move forward with planning

for major waterfront development projects in Hoboken

and at Hunters Point, Queens.

At Hoboken, a development plan has been prepared

and discussions continue with the City of Hoboken on the

project timetable and operating issues.

Planning is also underway at Hunters Point, with prepa-

ration of master and alternate master plans in progress.

A total of $175 million has been allocated for water-

front development in the five-year plan, for a total in

economic development projects of $550 million.

Port Authority of New York and New Jersey

Capital Program Summary

1987-1991

(in millions)

Interstate Transportation Network

PATH !mprovement Program! $760

Hudson River Tunnels, Bridges &

PABT System Improvements 380

PATH Station Improvements and

Additional Cars (Newark Service) 70

Hoboken/Battery Park City Ferry Service 150

Staten Island Bridge Improvements? 65

Holland/Lincoln Tunnel Busway 25

Manhattan CBD Distribution

Improvements _ 25

$1,475

' Includes expansion to 8-car trains, Newark Service, and

7-car trains, JSTC/33rd St. Service.

2 Includes up to $20 million for preliminary stages of

possible SIB Expansion.

Aviation

JFK 20002

Other JFK

Newark 20004

Other Newark

LaGuardia

Economic Development

Waterfront Development®

Resource Recovery

Industrial Parks

World Trade

Port

Newark & Elizabeth

Howland Hook

Dredging

Other Projects

Allocation for Regional

Development Projects

Allowance for Projects

in Development

TOTAL

Balance - Bus Program

354

250

90

60

110

Balance — Bank for Regional Development

Provision for Emergency Repairs

TOTAL CAPITAL PLAN

3 Total Project Cost: $2.7 Billion

4 Total Project Cost: $1.35 Billion

> Total Project Cost: $250 Million

2,410

550

110

355

EXHIBIT 7

NEWS THE PORT AUTHORITY OF NY & NJ

39-87 FOR IMMEDIATE RELEASE

March 12, 1987

John F. Kennedy International, Newark International

and LaGuardia Airports served nearly 79 million air trav-

elers in 1986. That figure is expected to increase to more

than 110 million by the late 1990’s. The three airports

comprise the busiest and most heavily used metropolitan

airport complex in the world - and will undergo the

largest redevelopment program in aviation history.

Kennedy and LaGuardia Airports are currently han-

dling double the number of passengers they were

designed to handle. Newark, although virtually rebuilt in

the 1970’s has experienced explosive growth over the last

five years and is currently the seventh busiest airport in

the world in terms of passengers served. On-airport cir-

culation and off-airport ground connections are inade-

quate at all three facilities. Meanwhile, competing air

gateways are emerging as the airline industry changes

and multi-billion dollar investments in other regions

threaten this area’s pre-eminence as an international air

hub for the movement of both people and cargo.

That dominance is at the heart of a prodigious eco-

nomic impact on this region: The aviation industry in the

New York/New Jersey metropolitan area accounts for

nearly 300,000 jobs, $6.2 billion in wages and salaries, $19

billion in overall economic activity, $600 million in

regional taxes and 3.5 percent of the gross regional prod-

uct.

356

“This region’s air transportation services,” said Port

Authority Chairman Philip D. Kaltenbacher, “are critical

to maintaining our role as a national and international

center for business and finance. Even if they were not, the

74 percent increase in nationwide annual air travelers

projected by the Federal Aviation Administration to take

place by 1998 would constrain us to undertake these

measures.

“The size of this industry’s impact on the regional

economy underscores our need to take whatever steps are

necessary to facilitate the swift and convenient movement

of people and the rapid, efficient handling of air cargo

through our airports.

“We are now embarking on an exciting and innova-

tive capital improvement program designed to do just

that.”

NEWARK INTERNATIONAL AIRPORT

Newark International Airport served 29.4 million air

travelers in 1986, tripling its passenger volume in the last

six years. To accommodate this trend and the projected

growth to 40-45 million passengers annually at Newark

by the late 1990’s, the Port Authority has earmarked more

than $1 billion to meet the airport’s growth needs. The

main elements of this program include: major restructur-

ing of the airport’s roadway system; an on-airport “peo-

ple mover” system connecting Terminals A, B and C and

the existing long term parking lots, and having the poten-

tial to connect with an off-airport transit system; the

doubling of pick-up and drop-off capacity of roadways

357

serving Terminals A, B and C; and a structural parking

facility in the central terminal area.

Roadway improvements will incorporate modifica-

tions to the roadways serving the entire central terminal

area (CTA) to provide optimum traffic flow on-airport

and greatly improve the connection between on- and off-

airport roadway systems. Work will be done in a phased

manner to ensure continued operation of the roadway

network throughout the construction period with mini-

mal interference of traffic flow. The roadway modification

program is anticipated to begin by 1988. The configura-

tion and capacity of structural parking facilities will be

designed to complement the other elements of the

redevelopment program.

In addition, a principal project currently under way

and in which the Port Authority will continue to be

heavily involved is the completion of Terminal C and the

financing of construction of the Cl and C2 concourses

and the apron aircraft fueling system. The Port Author-

ity’s role in the terminal’s construction includes work on

adjacent taxiways and courtyards at both ends of Termi-

nal C. The C1 and C2 concourses will provide 41 aircraft

gates for Terminal C. This new terminal, being built at an

estimated cost of $175 million to $200 million, is expected

to be completed by the end of 1987.

As an interim improvement measure, the provision of

an additional lane to the airport’s existing express road

will facilitate vehicular access to and egress from Termi-

nals A, B and C. Modifications are also planned to extend

public access to the new terminal’s parking level fron-

tage.

358

Current efforts to reduce roadway congestion include

the development of a holding area for taxis and lim-

ousines to reduce congestion in front of the terminals.

The completion of Parking Lot F, already under construc-

tion, will provide 3,000 more long-term parking spaces,

bringing the airport’s total parking capacity to 23,000.

The addition of eight new and two reversible exit lanes

and the recent initiation of the pre-cashiering program

allowing for pre-payment in the terminals for those par-

ked for less than 24 hours will help reduce queuing at the

CTA parking lot tolls plaza.

In the aeronautical areas, new taxiway additions and

modifications will help reduce aircraft runway occupancy

times and provide greater flexibility for aircraft ground

movement. Other improvements include centerline light-

ing for Runway 11/29, an instrument landing system for

Runway 11 and a new aircraft noise monitoring system.

There is also provision for taxiway access and installation

of related paving and utilities to the airport’s United

Parcel Service site and other cargo and maintenance sites

at the south end of the airport.

A new maintenance facility will be constructed, pro-

viding 57,800 square feet of space to accommodate the

airport’s maintenance functions and a 38,800 square foot

garage to house the airport’s snow removal vehicles.

JOHN F. KENNEDY INTERNATIONAL AIRPORT

John F. Kennedy International Airport was con-

ceived, designed and constructed more than a generation

ago to serve what was then an extremely optimistic fore-

cast of 15 million air passengers a year. Although the

359

airport's airline terminals have been expanded and air-

field and roadway improvements have been made since

that time, the airport is recognizably the same as it was

when the International Arrivals and Wing Buildings and

nine individual airline terminals, comprising the central

terminal area, were completed in the early 1960's.

In 1986, Kennedy International handled more than

27.2 million air passengers, a volume that is expected to

grow to 40 to 45 million by 1995-2000. More than one-

third of all international air passengers arriving in the

United States enter through Kennedy, making it the

nation’s leading air gateway.

To meet the projected demands of the next decade

and into the 21st century and to provide superior levels

of service for all airport patrons, both domestic and inter-

national, The Port Authority of New York and New Jersey

is planning an extensive redevelopment and reconstruc-

tion program for Kennedy Airport over a ten year period

that will cost approximately $3 billion. More than $1

billion of this amount is included in the present five-year

capital plan. The components of this major capital pro-

gram include airport access improvements, terminal

expansion and the development of a new central pas-

senger services complex.

Transportation Center

A new Transportation Center will be at the heart of

the plan to redevelop the central terminal area. Its main

purpose will be to handle all passengers using public

transportation to or from the airport and travelers

making connecting flights. Buses and limousines will no

360

longer make stops at each airline terminal, but will make

a single stop to drop off or pick up passengers at the new

Transportation Center’s Arrivals and Departures level.

Other improvements will be an expanded Federal

Inspection Services facility, capable of processing twice as

many passengers per hour as currently handled; an auto-

mated baggage sorting system, tying each of JFK’s unit

terminals into a single baggage transfer system; auto-

mobile parking contained within the Transportation Cen-

ter; new food and retail services near a new Meeter/

Greeter Hall; and a new FAA control tower as part of the

complex. Center plans incorporate provision for a chapel

area to serve the spiritual needs of airport travelers and

employees.

Passenger Distribution System

At the Transportation Center, a new fully automated

Passenger Distribution System (PDS), or “people mover,”

will shuttle passengers to each airline terminal at two-

minute intervals, replacing the existing on-airport bus

and taxi operations, as well as providing service to those

who walk between terminals. The PDS will help reduce

traffic congestion and also facilitate the movement of

travelers and luggage between connecting flights.

Baggage Handling System

A major element of the proposed improved \pas-

senger services at JFK is a new and efficient inter-termi-

nal baggage service — a fully automated handling system

that is expected to sharply reduce baggage transfer time.

361

The primary components of this system will include a

central sorting facility located in the Transportation Cen-

ter; a series of high speed conveyers and/or destination-

coded vehicles that will replace the existing “tug and

cart” method; a state-of-the-art, laser-read tag system;

and a coordinated system of baggage collection and dis-

tribution between each airline terminal, the Transporta-

tion Center and the refurbished International Arrivals

Building.

Redeveloped Roadway Network

An entirely redesigned roadway network, con-

structed in phases to minimize traffic problems, will

reduce the most obvious form of airport congestion. This

redeveloped roadway network will include: 1) comple-

tion of the new JFK Expressway, providing direct access

to the passenger terminals from the Belt Parkway at 150th

Street; 2) more direct roadway connections to the pas-

senger terminals, replacing the existing loop road; 3)

direct roadways to the Transportation Center from the

Van Wyck and JFK Expressways, designed to improve

access for public transportation vehicles; 4) modifications

to roadways in front of each passenger terminal to reduce

traffic conflicts; and 5) the completion of a new taxi

holding area to provide a more efficient taxi dispatch

system.

These roadway improvements will result in shorter

travel distances and reduce traffic congestion and travel

times for all movements within the central terminal area.

In addition to the roadway work the Port Authority

is undertaking as part of the overall capital program,

~ soca ell

362

work is also being performed by New York State on the

new Nassau Expressway, at an estimated cost in excess of

$100 million. The State’s project, begun in 1983, will link

the Belt Parkway at Cross Bay Boulevard with the Atlan-

tic Beach Bridge in Nassau County.

Southwest Area Connector

Although it is not part of the improvements currently

programmed, the Port Authority will examine the fea-

sibility of constructing a passenger distribution system

linking the New York City Transit Authority’s JFK

Express station at Howard Beach station with the central

terminal area. Right-of-way provisions may also be made

to allow for future consideration of a single track subway

extension from the Howard Beach station to the central

terminal area.

LAGUARDIA AIRPORT

Due to its proximity to Manhattan and wide choice of

domestic flights, LaGuardia Airport is popular, especially

with business travelers. In 1986, LaGuardia’s compact site

was crowded with more than 22.2 million passengers.

Current projections are for 28 million passengers by

1995-2000, an almost 30 percent increase in passenger

traffic. To handle this projected growth, the Port Author-

ity will increase the capacity and ease of using the airport

through an ambitious modernization and development

program.

The current highly compartmentalized Central Ter-

minal Building (CTB) layout will be opened up to create a

363

more homogeneous terminal that will provide more space

for passenger circulation and amenities. Work has begun

to expand interior space and make it more open for freer

movement on both the first floor arrivals level and the

second floor departures level of the CTB.

On the arrivals level, the terminal’s streetside win-

dow wall will be moved out by more than 20 feet along

the entire length of the building, to provide additional

space for patron circulation, ground transportation ser-

vices and baggage claim areas. On the departures level,

work will include widening the roadways by at least an

additional land to reduce congestion in front of the CTB.

Construction on both these projects is scheduled to start

in 1988.

Another important component of the plans for the

central terminal area is provision of a direct entrance to

the parking garage from the 94th street entrance, which

would eliminate the need for circling the garage in order

to enter, and thereby reduce traffic in front of the CTB.

Construction for this segment of the plan will start in

1988.

The new east end terminal, to be used by one or more

airlines, would be built adjoining the Eastern Airlines

Shuttle Terminal. The new terminal would include

approximately 250,000 square feet of space on two levels

and incorporate all patron services facilities. Its construc-

tion, scheduled to start in 1989, should help to balance

passenger traffic between the central terminal area and

the east end area.

Construction of a new East End Passenger Terminal

will be complemented with a roadway program that will

ee a smell

364

reconfigure and expand on-airport roads while providing

new access to LaGuardia’s east end area with construc-

tion of new off-airport roadways.

Starting in 1987, the airport’s east-end roadways will

be realigned and expanded to provide more efficient ser-

vice to travelers. To improve airport access to the east

end, off-airport road work should commence in 1990.

Construction of ramp connections to the 102nd Street

Bridge, which will serve as an exit and entrance to the

airport, and a new fly-over roadway to provide access

from the eastbound Grand Central Parkway to the east

end terminals (Delta Airlines, Eastern Airlines Shuttle,

and the planned East End terminal), will allow the sep-

aration of central terminal area and east end vehicle

traffic.

Additional capital work at LaGuardia involves mis-

cellaneous improvements to the aeronautical areas; more

aircraft parking space; and construction of a safety over-

run area at the end of Runway 13-31, all of which will

serve to improve operations at the airport.

Also scheduled for construction is an underground

hydrant fueling system, which would improve safety and

obviate the need for fuel trucks in the ramp areas,

thereby reducing overall ramp congestion.

365

EXHIBIT 8

» GETTING

AROUND AT JFK

AGUDETO

JOHN F. KENNEDY

INTERNATIONAL AIRPORT

be oad

TITTITHCITitrT TH YT Ae rons

‘‘\ aor

~

NEW YORK/NEW JERSEY AIRPORTS

Kennedy Newark LaGuardia

WELCOME!

A « + tr

‘AS one O} l¢ wions pusiest alr

handling some 5U million DaSst NVe’;s ¢

veal we re proud to be the world’s gat

to America. In order to ensure that JFI

remains Americas premier gateway

2\st century, we have embarked on ap

gram of redevelopment and reconstruc

without precedent in the history of the

port The groundwork is now being laid {

1 new JFK that will be among the world’s

most modern international! arp yrts

facilities and services that w —

improve the quality of air travel thr

our gateway

36, 0

This Visitor's Guide has been prepared ,

with your comfor and convenience If CONTENTS

mind—to help you find your way around Information for art

and to acquaint you with the many services On internation

available. In addition to the information On domestic {

offered in the following pages, please refer nformation for pa

to the insert in the back pocket of this r flight

Guide. It contains up-to-date information Information for departing

about the airport and its services, including Raeneeen eemiiene us Ot

complete parking rates and ground trans- i aeaaneiihies aninilione me

Health and human ser\

portation schedules. Whether you re land-

ing, taking off or just stopping by on your

way to catch another flight, we re happy to

have you with us and hope you ll come this

way again soon

Re ig

VIOUS SeETVICeS

rassenger convenilel!l

Covernment service

IFK /

K Airport Map

i K relerel fT

} (

Sincerely,

Webel 4 ture

Robert J. Aaronson

Director of Aviation

The Port Authority

of New York and New Jersey

Where t park Your i at Jirer

| transportatiol

Within JFK

lo and from JFK

sportation from JFK to Newark

ternational and LaGuardia air]

+} |

art with an area one-third tl

aT ) r? . ;

nattan A profile of one

tr

rocft r

LLeESi a?’ ] busiest airport

out The Port Authority

Yew jersey

VOW THAT You VE LANDED

INFORMATION FOR

ARRIVING PASSENGERS

ON INTERNATIONAL FLIGHTS

A

U.S. Immigration and Customs forms: \\

ia

Non-U.S. residents:

L.S. Customs: /

baggage inspection

Multilingual services

INFORMATION FOR ARRIVING

PASSENGERS ON DOMESTIC FLIGHTS

WHEN YOU'RE READ)

INFORMATION FOR PASSENGERS

CATCHING ANOTHER FLIGHT 10 TAKE OFT

INFORMATION FOR

DEPARTING PASS} VGERS

Please leave yourself enough time

rs )

’

ry? ; , ‘ |

Ex Play

r? rry ;

t : , ‘ i‘

1¢ rriire

FREE BAGGAGE TRANSFER SERVICI

| esa ry ng When you arrive at JFK: :

- it

ai

For everyone's security: |

rit

How to arrange it — | -

ior tree iweage tI ratJsre ' —

ISS al ind-he Was

r } gy Ke } oT X ra ichine

repress , ke

erred t je ont at i

rm that have been ticketed

| } ‘ Ve t

ting, re lar e pers IL

ggave that 5 wa Our Daggave

r connecting flight at JFK. A

nen de affixed your luggag

International flights: On arrival at JFK, pas

rat 1 Tignts si 1 Claim their Dage

¢

Domestic flights

373

PASSENGER SERVICES AT JFK

You may never require the services listed below.

But if you should, you'll be glad to know they re

available

NFORMATION a

SERVICES AND ASSISTANCE

Police: For general assistance, call

(718) 656-4668. In an emergency,

(718) 656-4333

Information Counters: A centrally-

located information counter—staffed by

bilingual personnel—is on the first floor

of the main lobby of the International

Arrivals Building, (7/8) 656- 7990. In

addition, you'll find information desks at

most other terminals. Consult the chart

on page 14 to determine whether your

airline has one. For information over the

phone, call (7/8) 656-4520.

Ground transportation information:

JFK's consolidated ground transportation

~ counter is located in the first floor lobby

of the International Arrivals Building.

There, knowledgeable staff provide accu-

rate information, free of charge, on how

to get to or from JFK.

s

HEALTH AND HUMAN SERVICES

Medical services: A medical clinic,

+ open 24 hours a day, is located in Build-

ing *198, at 150th Street and South

Cargo Road, (7/8) 656-5344. In an emer-

gency, contact the Airport Police on

(718) 656-4333

374

Dental services: A denta! Office, open

Mondays and Wednesdays from 10 a.m

to 5:30 p.m. and Thursdays from 10 a.m

to 3:30 p.m., is located in Suite 2311 on

the second floor in the East Wing of

the International Arrivals Building,

(718) 656-4747

Assistance for the disabled: Ji)

assure the disabled person maximum

comfort, convenience and ease of move-

ment through the airport, it is wise to

make all necessary arrangements in

advance—through your travel agent or

airline representative. For additional

information about facilities for the dis-

abled at the International Arrivals Build-

ing, contact The Port Authority of New

York and New Jersey at (7/8) 656-4476

Nursery facilities: A nursery, located

on the second floor of the International

Arrivals Building, offers a changing table

and lounge. Additional nursery facilities

are located in the British Airways and

TransWorld Airlines terminal buildings,

but are restricted to use by those airlines

ticketed passengers.

Traveler's Aid: This nationwide social!

service agency, offering various types of

assistance to the traveler, maintains an

Office in the International Arrivals Build-

ing. Its hours are 10 a.m. to 10 p.m.,

weekdays; and 3 p m. to 10 p.m., week-

ends, (7/8) 656-4870

Paging: This service can be arranged by

calling the airline on which the passen-

ger is arriving or departing

Religious services: JFK's tri-faith

chapel plaza, located near the center of

the airport, offers a Roman Catholic

chapel, (7/8) 656-5348. a Jewish interna-

tional synagogue, (7/8) 656-5044 and a

Protestant chapel, (7/8) 656-5693

375

PASSENGER SERVICES AT JPR

At the Catholic chapel, a mass is sched

uled each day at 12:15 p.m., at 5 p.m. on

Saturday and Sunday, and at 9 a.m. and

10 a.m. on Sunday. Confessions are

heard before each mass. For schedules of

services for the synagogue and the Prot

estant chapel, call the appropriate tele-

phone number, as shown above

The chapel plaza is accessible from

the International Arrivals Building by

walking through Parking Lot “2. From

other terminals, please use your Car Or

a taxi.

PASSENGER CONVENIENCES

Banks, cash machines and foreign

currency exchanges: You will find

these facilities in most terminal build-

ings.

= Baggage storage: Staffed baggage

[ia] storage is provided in two locations on

the second floor of the International

Arrivals Building, (7/8) 995-2228

Another baggage storage area is provided

on the third floor of the Pan American

Airlines terminal (7/8) 656-8617 \n

addition, several terminals provide lock

ers for baggage storage.

On-site lodgings: The Internationa!

Hotel, located right here at JFK, may be

contacted through free courtesy tele-

phones in all terminal buildings or at

(718) 995-9000. Other hotels and motels

may be reached through courtesy tele-

0) phones or airline representatives

Oo 8 &

Hotel reservations: A hotel resery4

tion service desk, operated by Meegan

Services, Inc., is staffed 24 hours a day

and is located in the International Arriy

als Building, (718) 995-9292 Hotel reser

vation desks or courtesy telephones are

available in al! other terminals as wel|

Animal shelter: A; animalport,

operated by the American Society for

the Prevention of Cruelty to Animals

(ASPCA), is available for the holding or

boarding of animals of ail sizes, 24 hour:

a day. It is located in Building “189 on

North Service Court in the Air Cargo

Center, (7/8) 656-6042 |

Lost and found: To recover items lost

aboard flights or in airline terminals

contact your airline representative first

If these items cannot be located, contact

the main Lost and Found office on

(718) 656-4120

’

GOVERNMENT SERVICES

Postal services: You will find pyai!

boxes and stamp vending machines at

various locations in all airline terminals

In addit on, there is 4 postal substation in

the East Wing of the Internationa! Arriy |

als Building and a post office in the Aur

Mail Facility. Building #250 on North

Boundary Road in the « argo area (7/8)

917-1438 .

» IRUNU]

fan

SOUT IVY Surpua,

FH) Gsopanwuy

sUMIBoFO]

eUuTYB0"US

MUO Og

ouTyleyy Buypus,

dureys peyeay

VSULTeU

LOM BI fe] ABW

A ARITA,

doys ayourK,

PUBIFE Mon,

»Bu1016 web Bey

1394 “yy

42)UTIO )

OQ PCULIOJU]

Urea i. |

SUOQRAI82y

0H

sdous

}HULIMNOF)

SIU OUT]

arent |

aBuey x { AovUaum»n )

uBjau0y

sdous

aar4 ANG

syIeUS / Hyo )

SITU] yoo )

UT Oey Use)

SIU s2)uUmO )

fejuoy 17)

wu o2je )

doys yry

oo"Y

doug A)ne ]

i aypIVy

yuey

378

Zle Ole bZ VbZe Cie Sle 89 Ze SADA

loys eng doys sng doys sng sdois sng doy sng dows sng doy. sng doy. sng sdois sng

vwuruu 7H + | wurunsoy | V t eu ui 7H reurtins " VUTULALD (Pura UTULIoy Surprng

sARMUTY pw PELIC | fRUOT RIL) U] SIUTPATY Wi] SOPUTEATY wUTpATY SUTPATY sTeALUY

ysnuug VAI YM | URouUsUTYy URRY PRAM LIOR, Lops y mh PouoUTy PUCTPRPUL UU]

pPuyubsoy

SODOTACES OF (TONSA AAA MOL LO

WHERE TO PARK YOUR CAR

AT JFK

Where you park depends on how long you park

here are lots designated for hourly, short

ng-term reduced-rate parking, as described be

All parking rates include New York City Sales Tax

For parking lot rates and information on free |

shuttle service from the reduced-rate lots, consult

he ‘Parking’ section of the insert in the back pocket

of this booklet

Hourly parking: Lot *6, on the Pan Americar

y pa

Airways rooftop is intended for use by drivers wi

ire picking up or dropping off passengers. Note ¢/

this ts the most expensive of the parking optior

wailable to you at JFK and is intended for use for

tivo hours or less

Short-term parking: Lots “|, 2 {and 5 are

travelers who intend to park their cars for per

not exceeding several days

Long-term reduced-rate parking: Lots “8 and 9

ire offered at reduced rates to travelers who plan t

park their cars for periods longer than several day

. . j

VOle that these rf WS are the IPAS ¢€ KDeETISILE vy thre

Ts . ‘ he ii | -~ ; . " ity

rring options availiable. but are aiso located far

thy t fron the t, rina res

af nro ed Tr nese

380

Parking accommodations for the disabled:

Facilities for the disabled vary from airline to airiine.

Therefore, disabled passengers who intend to park

their cars at JFK are advised to contact their airlines

well in advance of their arrival for information on

parking and other services.

Reserved spaces for the disabled—available at

reduced rates—are provided in Central Terminal

areas lots 1, 2, 3, 4, 5 and 6. For rate information,

consult the ‘Parking’ section of the insert in the back

pocket of this booklet.

For additional information on airport services for

the disabled, write The Port Authority of New York

and New Jersey, Aviation Customer and Public Serv-

ices Division, One World Trade Center, Room 65N,

New York, N.Y. 10048, or call (2/2) 466-7503.

AIRPORT PARKING AND DRIVING TIPS

- All parking facilities are provided on a first-come,

first-served basis.

- Allow sufficient time for driving and parking to

ensure that you arrive at your terminal at least one

hour before flight time.

- Always lock your car and take your keys with you.

- Check your lights.

- Do not leave articles—whether you consider them

valuable or not—in your Car.

- Take your parking ticket with you.

-On your parking ticket, be sure to write the lot and

section number where you've parked your Car.

- For assistance, contact the exit booth attendant.

- If you need towing or other types of automotive

services, call the garage or auto club of your choice

- If you intend to park for more than 30 days, you are

required to notify parking lot management. The exit

booth attendant will assist you.

381

PLEASE OBEY SEAT BELT LAWS

THEY'RE FOR YOUR PROTECTION.

isitors flying in to JFK and drivin stinat

| g to destinations

in rei York, New Jersey or Connecticut are required

by law to “buckle up.” Violators of state seat belt

laws are subject to fines.

For your safety, seat belts should be worn by:

«all front seat occupants -

. — under 10 anywhere in the vehicle

dren under four must be secured i

Safety restraint device. a

IF YOU'RE PARKING AT JFK G THESE

TELEPHONE NUMBERS CAN GETVOU

INFORMATION OR ASSISTANCE. FAST.

Current parking and roadway

ect message)............. (718) 495-5400

arking operator Pusaea ee anaes ean (718) 656-5699

a i (718) 917-6085

WU TONG 40% 65566 bd bdks edhe nel (718) 656-4668

5 383

HOW WE TAKE THE WALKING OUT OF

rk ALTO ACCESS ROI rES OW WE TAKE

} GROUND TRANSPORTATION SERVICES

For prices schedules ind a lusting of the my

es offering the services listed below. consult t!

« Major Auto Acges

sz

Ground Transportation’ section of the insert

thy ,

$7

i K por Ket i this booklet

WITHIN JFK

Free 24-hour terminal-to-terminal bus serv-

ice: If you're traveling between JFK's nine termina

board one of our climate-controlled, yellow and

white airline connection buses. These operate fre

;

i charge, 24 hours a day

Taxi service: At each termina! within JFK you

find a taxi dispatcher on duty during peak trave

periods, at designated taxi stands. The dispatcher

will summon a taxi licensed by the New York City

Taxi and Limousine Commission, for trips wit!

IFK and its vicinity

Transportation for the disabled: Au -

n-demand transportation service provided by

uirlines as a courtesy to disabled passengers, pro

des fast point-to-point connections between ter

nals. i his service, which employs vehicles specially

lesigned to accommodate disabled passengers and

ry > . ‘ |

, \ rr ws Br er whee | ilTS iS © alta wed througn VOUT alrilne

: arre

4chington Bridge F Verrazano Na a ipo mnie it

\ George Washing , , epres¢ ative 1,avance of your arrival!

Manhattan Bridge

. Rridos Vidlliia

r r iit ik -

A ’ =

k

384 385

1) AND FROM JFK Taxi service: You wil! find taxis a

each terminal. To assist YOu IN securing one

r if |

VaHAaVIC OUTSICE

> general! ormation aa

rhe listings that follow provide general informati

ormed ax! dispat« 1e S afe On ¢ UTY iT Ine’ p i}

; I ik } ‘

| ground ind local al anspo!l ation se Vi > ava

travel hours at the International Arrivals Building

ble to you at JFK. For specifics, consult the “Ground

ind at the other central terminal area buildings. Ii

lransportation’ section of the insert in the back you arrive during a non-peak period and find 1

if

nocket of this booklet dispatcher on duty, request assistance from a

[ K

mi

' Ull

formed terminal guard or uniformed police officer

For your secunty: Your taxi dispatcher will provide

4t JFK. you can also obtain information by con you with a taxi information flyer with multilingual!

sulting personnel at the Consolidated ( round Trans text. After you nave read it ane secured a taxi, write

portation Counter, located on the first floor of the on this flyer your cD Peguerey ation number

lobby of the International Arrivals Building Know! 1Or ated on the roof of the cab, between the “on” and

edgeable staff will assist you, providing schedules - duty — In Case you have a problem

prices and specific drop-off points with the service provided

Express bus service: Express bus service ts availa Car rental services: You wil! find car rental

ble between JFK and Manhattan and Brooklyn. Bus nse operated by Avis, Budget | o~er Hertz ind

stops are located outside each terminal building National in the International Arrivals Building. At

other locations, use the courtesy telephones pro

. - » - ‘ train T é‘

The JFK Express: This high-speed bus and tr vided. The rental car return facility for all of these

combination links JFK with Manhattan and Brooklyn companies is located at JFK's Federal Circle. eas

ind runs about every 20 minutes. Outside your air accessible from the Van Wyck Expressway and al

line terminal, look for a sign reading ‘Bus/Train to terminal buildings. And remember: Buckle up for

New York City’ At this location, you board a shuttle safety. It’s the lau

bus which takes you to a nearby subway station

? i ; ~ / > ) . ? f

where vou board a train bound for Manhattan and Helicopter service: He lic pter service is availab!

eeaiiets between JFK and the 34th Street Heliport, in midtow:

TOM)

Manhattan. Helicopter service is also available

between JFK and Newark International and LaGuar

dia airports

Limousine service: Upon request, limousine sen

ices offer a single passenger or a group of passengers a

wide array of vehicles—buses, vans, sedans, conier

ence cars—to or from most destinations. Fares are

hased Ol

| | ‘ ri

a per person, hourly or flat rate. Arrange lor

\ \ »cyT sil

1 limousine by calling a company in advance Or Vis!

'

the Consolidated Ground Transportation Counter in

the International Arrivals Building. At other term

; nmnoy}r

nals, use free limousine company courtesy |

_,

near the baggage Ciaim areas

386

PRANSPORTATION FROM JFK TO .

NEWARK INTERNATIONAL AND START WITH AN AREA ONE-THIRD

LAGUARDIA AIRPORTS THE SIZE OF MANHATTAN

lf you want to reach Newark International! or

|aGuardia Airport in a hurry, there are four conve!

ent transfer services to choose from

Express bus service: Express buses operate — atk

between JFK and Newark International and LaGuar ee ynE O SES

lia airports on fixed schedules att LF or « << BL:

ist Rok” g\Gor e

Limousine service: Limousines are available for is giv> 5

' 4

inter-airport connections on a daily, regularly sched wO port 7 ynret™ - mnie

ed D iSiS NS > yenne” es WO" yO

j j ’ > ¢ T\\\ . \

\y 1° Wwh¢ , ‘y

eh . . . jo 4 on - Ol 4%) t \e > ‘

laxi service: See ‘Jaxi service’ listing on page 22 are’ ic OV se OF .

' \O% ‘ stats © . Bec? FK I .

J P , n < t\o on ) . row

Helicopter service: Many airlines offer free or M2 Pe. aca” gis 8

reduced-rate inter-airport transfers via helicopter

For more information, contact your airline repre

388 389

ABOUT THE PORT AUTHORITY OF

NEW YORK AND NEW JERSE)

een) oe

lohn F. Kennedy International Airport is operated by

The Port Authority of New York and New Jersey

Created in 1921, The Port Authority is a bi-state

agency which undertakes port and regional im

provements; provides dock facilities for the harbor

shared by the states of New York and New Jersey

and, in general, promotes and operates trade and

transportation projects to maintain the Port of New

York/New Jersey's position as America’s preeminent

gateway and the world's most dynamic port

. Tes— : al

- JFK occupies a total of 4.930 acres—an area equ _ |

| to the size of Manhattan Island, from the Battery t | ABOL T THIS PI BLICATION

op This booklet is produced by The Port Authority of

- JFK has a total of 150 aircraft gate positions, | | New York and New Jersey in the public interest, for

the widest possible dissemination of useful informa-

serve the various terminals

- JFK's runways extend a total length of nine miles | tion to air travelers. It is not copyrighted. We encour

- JFK's taxiways cover an area of <2 miles age reprinting in any appropriate form, including

. JFK has over 16,000 parking spaces reproduction of this booklet in its entirety. or

FK has 31 cargo buildings

FK has the world's largest animaiport

- JFK has its own Post Office

through adaptation of the visuals or text

Extra copies of this publication—as well as pub-

lished guides to Newark International and LaGuardia

| airports—can be obtained by writing to the Aviation

ere | Customer and Public Services Division, The Port

a | Authority of New York and New Jersey, One World

Trade Center, Room 65N, New York, N.Y. 10048

FK has storage facilities for 52 1 nN ga

yircrait fuel

lights to over |

’

FK has

| cIveS

All passenger flights are serviced wit! - or by telephoning (2/2) 466-7503

tral terminal area, where the International Arriva | i

Building and eight individual terminal Dulidings are )

ated

IFK’s giant physical plant, impressive as it Is

really has one purpose: to serve you. In the future

as in the past, all of us at John F. Kennedy Interna

tional Airport will be working to make our service

and Our servi es— the best of any airport tne | Put ed by the Aviatie , ' .

| ] | Avia DA i Thy r a -

WOT

201)

391

INOUR POCKET

393

392

EXHIBIT 9 ,

GETTING AROUND WELCOME!

We < proud that LaGual!

A GUIDE TO Dusiest airports in the natiol

LAGUARDIA pana

venient service to the

AIRPORT Jersey metropolit

ion passengers in 198

l

that

if} ar@ad

30 million passengers \

vear Z000

sia} lo keep pace with thi

ways are planned to pr

ular access to the airport

lerminal Building is being

exp inded to accommodat

SIONS and Spat 1IOUS Wall

eting areas Also Sstudte

inew terminal which mis

eastern side of the airport

ports increasing number

a, YORK /NEW JERSEY AIRPORTS” —

= Sa Kernesy oes" | a(cuar Cia ; =

= - ya

SS x . ae? » !

394

in addition to the information otfered in

| . ry! t '

ihe following pages, please reier to the insert

n the back pocket of this guide It contai

Ip-to-date information about the airport an

its services, including complete parking

rates and ground transportation schedul

Whether you're landing, taking off, or jus

stopping by on your way to catch another

flight, we're happy to have you with us and

hope you ll come this way again soon

~

’

SLT erely

A

y Lott A itera

Robert J. Aaronson

CONTENTS

395

396

397

WHEN YOU'RE READY

PO FLY...

INFORMATION FOR

DEPARTING PASSENGERS

Please leave yourself enough time.

ensure ample time for parking, Sé rit

reening and unanti ipated lelays, we

wrrive at your terminal af /easi{ one / hi For everyone's security: ‘

r? thy ( ne } lié 1 der arture tire 1\y lf ecurify the a ler . 1 ' : A 4

‘ fics . , . . . iV 4 | ’

be i requires all pa Sengers ti nderg

. at » ‘ sy rif

' , —_ rT Creening. This p SS reg

When you arrive at LaGuardia: Drop your . This process requires that Hh

- Nrougen ; ) ; 9 -

ggage at your airline's curbside check-in s a security device and pass ar vy hand

pI led one is available, or at your airline

held luggage thr. UgN al

DOarding your flight. ((

x

,

Tay Machine hef

keting counter. Then proceed to the gate fron

aution: If you have

hich your flight is scheduled to depart posed film in your carry On luggage, notify the

mah goatee sath tamsa light luggage VOU 7 are at the sex urity check point. Som. Ky

void the traffic congestion on the departure Pe

yXT) 7

it on

iway of the Main Terminal by using the alter

ite departure roadway which is located on the

rd level of the parking garage. This roadway

joes not have skycap service. It is intended for

:

,

se by passengers carrying their luggage (a light

\itcase) into the Main Terminal. From the alter

nate departure roadway, you can enter the Main

lerminal through weather-protected connectors

from the fourth level of the garage. The conne:

tors can be reached from the alternate departure

roadway and all levels of the garage via elevators

or escalators and stairways

399

395

NOW THAT YOU'VE LANDED

INFORMATION FOR

ARRIVING PASSENGERS

INFORMATION FOR PASSENGERS

CATCHING ANOTHER FLIGHT

FREE BAGGAGE TRANSFER SERVICI

: , , re Connecting to another flight at J

When your flight arrives at LaGuardia: you're connecting to another fight at LaGu

lirectly t the baggage Claim area to ge | I a, we urge you to take advanta eo thet

iggage. Information on public transporta | gage transler service off ed by mos

Hy « found at one of the conveniently locate {When you arange in advance to have

fated Ground Transportation | paar a ape . 10

here. knowledgeable Stall provide accurat opener e freely, qu y and c en

nformation. free of charge, on how to get to Or —enan

from LaGuardia | | ve ce ;

Pickup procedure for arriving aevery ward How to arrange it: To ar or ree ba

Passengers arriving at the Main Terminal should |. When purchasing your tickets t ve

be picked up at the Passenger Pickup ves | gent Or airline representative that vou d like

ocated on the lower level (arrivals) roaGway agent or airline representative th oud ik

1 ross the street from the Main Terminal (see your baggage transterred to onnect

1irport map). The Delta and Eastern Airline nah a LaGuardia, Be sure to confirm thal yo

shuttle terminals also have similar curbside aes

ing” areas for briel pers ds while actively oad é. Before departing remind airline personne

me ncntneapee! pwning -wiremers faa licketing your luggage that you want vour Dag

aioe a tickets. Ma ! gage transferred to your connec ting flight. Ar

or Picuup Aswn te cognates, ow | aff ippropriate tag will be affixed to your luggage

ser Pickup Area is congested, follow the tralti ) : -

signs for parking in the metered lots, parking

ts or the parking garage. Motorists meeting |

irriving passengers at the Marine Air Terminal

1 the Eastern Commuter Terminal should use

the parking facilities which are near each ol

these terminals

400

PASSENGER SERVICES

AT LAGUARDIA

In case you need the services listed below here's

where they're ava'lable.

s

‘ORMATION

SERVICES AND ASSISTANCE

Police: For general assistance, ask

any Police Officer for help. In an

emergency, telephone 476-5//1/.

Information: A desk is centrally

located on the departures level (sec-

ond floor) of the Main Terminal. It is

staffed with “AppleAides,” senior

citizens from the local community

who volunteer their time to assist

LaGuardia's travelers. They are very

knowledgeable about the airport and

can also tell you how to get around

New York. The AppleAide desk is

staffed Monday thru Friday from 9

a.m. to 8 p.m., and from 2 p.m. to 6

p.m. on Sunday. The desk is closed

Saturday.

Airport staff at the Manager's office

(718) 476-5000 (weekdays 9 a.m. to

5 p.m.) and at the Operations office

(718) 476-5072 (24 hours a day) are

available to answer questions about

LaGuardia. Refer questions concern.

ing flight arrival and departure sched-

ules to your airline.

401

Ground transportation

information: LaGuardia has six

Consolidated Ground Transportation

Counters; four at the baggage claim

area of the Main Terminal, and one

each at the Delta and Eastern Airlines

Shuttle terminal buildings. At these

counters, knowledgeable staff will

provide you with accurate informa-

tion, free of charge, on how to get to

and from LaGuardia. To obtain ground

transportation information call (7/8)

476-5157 (7:30 a.m. to 11:30 p.m.).

HEALTH AND HUMAN SERVICES

Medical services: Medical assis.

tance is available at a privately oper

ated office in the central part of

Hangar 7, in the Marine Terininal

area. The medical office is open

weekdays from 8 a.m. to 4 p.m., (7/8)

476-5575. In a medical emergency, ask

a police officer for help or call the

police at 476-5///.

Passenger Paging: This service can

be arranged by calling the airline on

which the passenger is arriving or

departing. A complete listing of air

lines and their telephone numbers is

in the insert in the back pocket of this

guide.

Assistance for the disabled: 10

obtain a wheelchair or to arrange for

other types of assistance for the dis

abled, contact your airline representa

tive. (See airline listing in the back

pocket of this guide). Special rest

rooms, telephones and other facilities

for the disabled are provided at the

airport.

402

PASSENGER SERVICES AT

LAGUARDIA

For additional information concerning

facilities for the disabled, write Or

call, and request the booklet Airport

Facilities and Services for the Dis

abled from the Port Authority's Avia

tion Customer and Public Services

Division, One World Trade Center,

Room 65N, New York, NY 10048, or

phone (2/2) 466-7503.

y Nursery/Playground facilities: A

¢ child care nursery, containing two

changing tables, is provided in the

women's room, on the lower level of

the Main Terminal, near the central

lobby area. By taking a nearby escala-

tor to the second floor, you can keep

your toddlers occupied by obtaining

free coloring books and puzzles from

the airport's information counter in

the central lobby area. Across from

this information desk ts KIDSPORT, a

brightly colored area that has ride-on

toys, a crawl-thru tunnel, slide and

pint-sized tables and chairs for chil-

dren to use while working on their

coloring books and awaiting their

flights.

PASSENGER CONVENIENCES

Banks, cash machines and foreign

currency exchanges: You will find

these facilities in most terminal

buildings. Consult the chart on page

14 for specific locations.

Baggage storage: Baggage can be

stored at Mutual of Omaha's travel

insurance counter, located on the

second floor of the Delta Terminal

building (7/8) 651-6725. This is the

only airport facility for baggage

storage It is open from 6 a.m to 8

p.m., Monday thru Friday, and ¢ a.m

to 3.30 p.m. on weekends

Oo

10

: 403

° Hotel reservations: Meegan

,) Services, Inc., provides a hotel

reservation service with desks or

courtesy phones in the American.

Trans World and Eastern Airlines

arrival areas of the Main Terminal.

and at the Delta and Eastern Airlines

Shuttle terminal buildings (7/8)

476-5587. Hotel and motels near the

airport may also be reached from

courtesy telephones on the arrivals

level of the Main Terminal and in the

other terminals, or through your travel

agent or airline representative.

Hotels: Hotels and motels near the

ZS. airport include: Holiday Inn (7/8)

898-1225, Kings Inn (718) 656-5133.

Travelers (7/8) 335-1200. Marriott

(718) 476-5340, Sheraton (7/8)

446-4800 and the West Way (7/8)

274-2800.

Lost and found: To recover items

lost in transit or in airline terminals.

contact your airline representative

first. If baggage cannot be located.

call the Lost and Found office at the

airport's Port Authority Police

Headquarters (7/8) 476-5115.

GOVERNMENT SERVICES

Post Office: A post office is on the

lower level of the Main Terminal in the

central lobby area. It is open from

9 a.m. to 3 p.m. on Monday and

Tuesday, and from 9 a.m. to 4 p.m

Wednesday, Thursday and Friday

Phone (7/8) 429-5689. Mailboxes and

stamp vending machines are

positioned throughout the Main

Terminal.

LAGUARDIA HIGHWAY/TERMINAL MAP

404

on

—

OFES-OLE (BIL) HOH MOH4eW

JUBINESIW 2Ie119] PE VPQejFeae suIOOI 2dUaI9jU0)

Ajuge sauyyqoey Buypus, &

(O9L£ WOOY) ANI) 4IV SN

(1ILE WOOY) esaydsouD] sautpTy Ui2)8e3

>

ae

(ILLE WOOY) GNI) 4Opessequy VMI «+

.

(LOE M WOOY) Qn{D [e4ywWPY seuypTy UB IUTy

400[4 PAE — SQNT) Uj /4IV

18am

eed

yonpmnseg |

| peupusay

Yon j4eynuM)C)

419)883 |

i

yoopensay |

anes

sauspayy | peuyuuay

Wsajseq] | Ayyoupep

]

-

——1

10014 YIP | sanuedeg

EEE

28ino uo )| e84noouo0 )

jeapuy

| | |

be cH | i#

lf

198044 | sBut4| saBul4

saBuy4

jeusuisa] Uyep|

a UBINSU] |aAei]

sousyoep Sujpucs,

$4224) 8,42] aAe2]

wesBo}2)

2ujys2oys

sUBsNe}s2y

sauoygg Asano)

$12}UN0) 18D /WU2y

'

|

221330 190d

sousyoep Buypus,

dwIBiG [eI80g

— —

bak

Aoeuueyd

‘ALAR

Asaeiny

doys 2q0uW5

/puResmon

2Be1015 aBeBBeg

$1240]

0*)-0]-81218Q0]

4aquno)

uo;eULOjU]

a ~~ #UOMeAI82y

193°H

pues

TON PM

wea) 22]

sau0ud

omy] 2214

aBueyoxry

uByjas04

$9 BUG /225j0)

S]IFI_IO)

auyyoep yse)

ep2)2j8)

doys

yin woc”g

doys s2queg

queg

SIIAIIS

rere cree een ENT ARE er mm meme rn eee A ee

jPusMisoy

SUOLAMAS OL AONAM

4Aaey WOLIO

406

WHERE TO PARK YOUR CAR

AT LAGUARDIA

LaGuardia has a parking garage, grade level lots

and metered parking facilities for its patrons

Free bus service to the Main Terminal building

is provided from 5 a.m. to 2 a.m. Extra-wide

parking spaces for disabled motorists, identified

by the international symbol for the disabled, are

available in all parking facilities

Detailed parking information and rates are in |

the insert in the back pocket of this book. |

If you're parking at LaGuardia, dialing

these telephone numbers can get you

information or assistance fast.

Parking operator............. (718) 429-5380

Current parking and roadway

status (taped message)....... (718) 476-5105

Auto service .............. (718) 478-1812

Airport information ...... _. (718) 476-5000

YE ne (718) 476-5115

Airport operations ..... _.. (718) 476-5072

16

SEAT BELT LAW

PLEASE OBEY SEATBELT LAWS

MHEY'RE FOR FOUR PROTECTION

Visitors flying into LaGuardia and driving t

other destinations are required by law to “bucks

up In New York, New Jersey and Connecticut

AIRPORT PARKING AND DRIVING TIPS

. >

¢ All parking is on a lirst-come, lirst-served bas

’

A

¢ Allow sufficient parking and driving time to

wrive at your terminal one hour before flight

time Violators of state seat belt laws are subiect

e Alwa ck Y r Car and take your K¢ itt lines

For your safety, seat belts should be wort

¢ Check your light * all front seat occupants

¢ Do not leave articles in the car

* all children under 10 anywhere in the vehicle

Children under four should be secured in a

child-safety restraint device

lhe driver is responsible for all passen

e« Note the section where vou Dark on vour ticket

¢ Take the parking ticket with you

¢ For assistance, contact attendant at exit boot!

¢ Motorists requiring towing or assistance are

mn ot

under age 16 Passengers 16 and over ir¢

; . . sf

free tr ¢ il the SeTVICE station or auto Ci responsible for themselves Violat 77 Ot the

heir choice

laws are subject to fines of up to $50

409

MAJOR ALTO ACCESS ROUTES

lO LAGUARDIA

A - George Washington Bridge F -

B - Triborough Bridge G

C - Lincoln Tunnel H

D - Holland Tunnel

t srooklyn Battery Tunne

b

vark interna al Airport

immediately adjace

Verrazano Narrows Bridge

Manhattan Bridge

Queens Midtown Tunne

Whitestone Bridge

(joethals Bridge

|

Throgs Neck Bridge

‘?

410

HOW WE TAKE THE WALKING OU

OF FLYING AT LAGUARDIA

GROUND TRANSPORTATION SERVICES

For prices, schedules and a: omplete listing

of the ¢ ompamies offering the services liste qd

below, consult the “Ground lransportatior

section of the insert in the back pocket of

this booklet

WITHIN LAGUARDIA

Free parking lot and inter-terminal bus

service: Free bus service is provided from th

parking lots to the Main Terminal building every

10 to 15 minutes from 5 a.m. to 2 a.m. Since

these yellow and white buses Stop at all termi

nals, with the exception of the Marine Air Termi

nal Building, you can also use them to make a

connecting flight. Passengers transferring to o1

irom the Marine Air Terminal can request trai

portation by calling Butler Aviation at

(718) 476-5200

TO AND FROM LAGUARDIA

The listings that follow provide general informa

tion on ground and local air transportation

services available to you at LaGuardia. For sp:

cifics, refer to the “Ground Transportation

section of the insert in the back pocket of this

booklet

Bus Service: Express bus service is available

to mid-Manhattan with a stop near Grand Central

Station and shuttle service to the Port Authority

Bus Terminal and Rockefeller Center. Bus serv

ice is also available to Brooklyn and the World

lrade Center, located in downtown Manhattan

(financial district). Public transit buses also

provide service to the local community in

Queens and connections to the New York City

Subway

Taxi service: Taxis are available outside each

terminal. To assist you in securing one, uni

formed taxi dispatchers are on duty during peak

travel hours. If you arrive during a nonpeak

period and find no dispatcher on duty, you can

hail a taxi on your Own or request assistance

from a Port Authority police officer

For your security: Multilingual taxi information

liyers are available at each taxi stand. After you

have read it and secured a taxi, please note on

this flyer your cab's identification number

located on the root of the cab, between the “on

and “off” duty sign — in case you have a prob

lem with the service provided

Limousine service: Upon request, limousine

services offer a single passenger or a group ol

passengers transportation in a wide array ol

vehicles buses, vans, sedans, conlerence

cars — to or from many destinations in the New

York metropolitan area. Fares are based on a

per person, hourly or flat rate. Arrangements Ca

be made by visiting aGround Transportation

Counter in the baggage claim area of each

terminal building

Helicopter service: Helico

avaliaDie between LaGuardia and midtow

pier Sery

Manhattan. Connections via helic: ypter are a

available between LaGuardia and John |

Nennedy and Newark International! airports

Car rental services: |n most of the termina

you will find car rental counters « perated by

Avis, Budget, Dollar. Hertz and National. At

other locations, use the courtesy telephones

provided. Rental car return facilities for Avis and

Hertz are located near the Marine Air Termina|

Upon returning to the airport, follow the road

way signing for rental car return. The Budget

Dollar and National car rental c mMpanies are

located off-airport. And remember: Buckle

Up

for safety. It's the lau

413

414

rRANSPORTATION FROM LAGUARDIA = “—

ro JOHN E. KENNEDY AND NEWARK ONCE AN AMUSEMENT PARK. Now ame

: AIRPORTS ) OF THE D'S BUSIES

INTERNATIONAL AIR DNE OF TE

4 The present site of LaGuardia w

first occupied by an amusement park

reach JFK or NIA in a hurry, there wg ansformed in 1929 into a 10

t transfer services to choos¢ acre private flying field, it was later

‘ae the insert the back of this booklet enlarged by purchasing adjoining

) land and filling in 357 acres of water

_— front

Express bus service: Express Duses oper The airport bears the name of

tte between LaGuardia and IFK and NIA Fiorello H. LaGuardia, one of New

fixed schedules York's most admired mayors who

“ served from 1934 to 1945

LaGuardia is located only & higt

way miles from midtown Manhatta!

‘fe

} i ; £

: . ' by : ’ a

reguiany SM re a ned VAaSisS be Although it is only 650 acres i

vT

by;

.

Limousine service: Limousines are ava

’ ’ y oe |

ible for inter-airport connections ON a Galt)

, , 149 ; etal

Taxi service: [axis are readily av wlaDie size, it handled 20 million passenge

oec

tside the arrivals area at all terminals ler during 1985

its! 4 7

i There are two main runways

| Helicopter service: Many airlines offer tree % each 7,000 feet long |

r reduces te inter-airport transier via hel |

pter. For more information, ¢ ontact you! |

representative or travel agent

Seree @eeccetgecag@ us

Almost 8,000 people are employed

at LaGuardia to serve you

LaGuardia has five passenger

terminals: The Main Terminal accom

modates most of the airport's flight

activity; the Eastern Commuter Termi

nal is used by commuters for hourly

flights to such destinations as Boston

and Washington; and two new term:

nals have recently opened in the

eastern section of the airport to meet

the growing passenger demands of

Eastern and Delta airlines, the Marine

Air Terrninal handles general aviation

416

ABOUT THE PORT AUTHORITY OF

NEW YORK AND NEW JERSEY

LaGuardia Airport is operated by the Port

Authority of New York and New Jersey

Created in 1921, the Port Authority is a bi

State agency which undertakes port and regional

improvements; provides dock facilities for the

harbor shared by the states of New York and

New Jersey; and, in general, promotes and « per

ates trade and transportation projects to main

tain the Port of New York/New Jersey's position

as America’s preeminent gateway in the world’s

most dynamic region

ABOUT THE PUBLICATION

This booklet is produced by The Port Authority

of New York and New Jersey in the public inter

est for the widest possible dissemination of

useful information to air travelers. It is not ¢ Opy

righted. We encourage reprinting in any appro

priate form, including reproduction of this

booklet in its entirety, or through adaption of the

visuals or text

Extra copies of this publication — as well as

published guides to Newark International and

Kennedy International Airports — can be

obtained by writing to the Aviation Customer

and Public Services Division, The Port Authority

of New York and New Jersey, One World Trade

Center, Room 65N, New York, NY 10048. or by

telephoning (2/2) 466-7503

Published by the Aviation Customer and Publ —

Divi ion, Avi won Departme nt The Port Auth rity ‘

New York 10d New Jersey

IN OUR POCKET

LJ ay 9 sot f ry

. Ow ft 4 ( irOtl

, my? ’

° iy Tentai Into}!

417

Ai

418

419

EXHIBIT 10

GETTING AROUND

AT NIA

AGUIDE TO

NEWARA INTERNATIONAL

AIRPORT

NEW YORK/NEW JERSEY AIRPORTS

420

WELCOME!

Welcome to Newark International A rl

We hope You emoy your stay

Newark International Airport is constant},

growing in order to serve you with conve

nient passenger and ground transportati:

services. Newark handled nearly 29 millio

passengers in 1985, making it one of the na

tion's fastest growing international airports

Great strides are being made to keep uj

with this strong growth of air passenger an

cargo traffic. Terminal C is currently being

expanded so that by 1987 all passenger

activity, including that currently at the North

lerminal, will be handled in the Centra!

lerminal Area. To satisfy the ProwiIng need

lor parking, new lots have been added an

1dditional ones are planned. Plans are als

underway to provide needed taxiw iVS, TO

and

underway

This Airport Guide has also been rede

signed to better inform you and to hel;

lind your way around our fast growing air

port. In addition to the information offers

the following pages, please refer to th

in the back pocket of the Guide. It contai

the latest information about parking rate:

and ground transportation services

Whether you re taking off or landing. we're

happy to have you with us and h ype you |i

come this way again soon

sincerely

1 f 4 , aah

, loteJ A ttrria- ~? —

Rohe r? | Aare rycy

‘

utilities to service the new building

421 422

VOW THAT YOUVE LANDED...

CONTENES

formation for arriving |

| international | ight ’

in domestic thehts

nformation tor passenger! itching

nother flight

SOTIRERGR TE CEPGTONG PESSENG: INFORMATION FOR ARRIVIN®. PASSENGERS

NIA ON INTERNATIONAL FLIGHTS

Passenger services al INIA

i

Information services and assistanc international flights requiring federal clearanc:

Health and human service arrive at Terminal |

} assenger conveniences

U.S. Immigration and Customs forms: Whi|:

Government services

in flight, you will receive U.S. Immigration and

NIA A t Map

NIA Airpor [ Customs forms. To avoid delays, please fill out

Where to park your Car at NIA these forms before you land. And be sure to

have your passport and health certificate in

Ground transportation service

hand when you leave the plane

Within NIA , _ .

lo and from NIA Non-U.S. residents: If you are not a U.S. resi

. dent, a review of your passport and other docu

lransportation from NIA to Kennedy | ments is required by the U.S. Public Health

International and LaGuardia airports service and the Immigration and Naturalization

Froma pioneering past toa splendl ] service

present U.S. Customs: All! international passengers

Ahout The Port Authority ol New York both U.S. residents and nonresidents then

1 to the baggage claim area and to U.S

Customs. At Newark, U.S. Customs has devised

spec lal pro edures to help speed you through

ind New Jersey

pri Cee

¢ Green lines are for those having nothing to

declare to U.S. Customs

¢ Red lines are for those with meats. fruits

plants or large amounts of currency who are

required to undergo baggage inspection

because of occasional spot checks you may

be required to pass through the Red ling

424

INFORMATION FOR PASS] NGERS

CATCHING ANOTHER FLIGHT

INFORMATION FOR ARRIVING PASSENGERS wn |

ON DOMESTIC FLIGHTS peal ted eae 4

425

WHEN YOURE READY TO TAKE OFF...

INFORMATION FOR

DEPARTING PASSENGERS

Please leave yourself enough time. To

ensure ample time for parking, security screen

ing and unanticipated delays, we urge you to

arrive at your terminal at least one hour prior to

the scheduled departure time of your flight

When you arrive at NIA: Drop off your luggage

at your airline's ticketing counter. Then proceed

to the gate from which your flight is scheduled

to depart

Free baggage transfer service: |f you're con

necting to another flight at NIA, we urge you to

take advantage of the free luggage transfer ser

vice offered by many airlines.

For everyone’s security: To help ensure every

one’s safety, the Federal Aviation Administration

requires all passengers to undergo security

screening. You must walk through a security

device before boarding your flight and pass any

hand-held baggage through an X-ray machine

(Caution: if you have unexposed film in your

carry-on luggage, notify the guard at the security

check point. Some X-ray devices may damage

unexposed film.)

426

PASSENGER SERVICES AT NIA

Just in case you need any of the services below

here's where they're available

INFORMATION

SERVICES AND ASSISTANCE

Police: For general assistance, tele

phone (201) 961-2235. In an emer-

gency, telephone (201) 961-2233.

Information: Information counters

are located near doors 5 and 6 on the

lower (arrivals) level in Terminals A

and B, and next to exit door 8 in Ter

minal C. Staff provide accurate genera!

information free of charge.

Ground Transportation Counters are

located in the baggage claim areas of

Terminals A and B, and next to door 8

on the lower (arrivals) level of Terri

nal C. Passengers using the North

Terminal will find a Ground Transpor

tation Counter staffed by Port Authority

personne! next to door | in the bus

waiting area.

Ground Transportation: NIA's

HEALTH AND HUMAN SERVICES

Medical services: Private medica!

services are available at the Medica!

Clinic (Building 5) on Inner Port

Street. Cali (201) 961-2525

Assistance for the disabled: |t's

‘oN always best to arrange in advance for

the movement of a disabled person

through the airport. When making

your travel arrangements, notify your

travel agent or airline representative if

any member of your party has a dis

. ability and requires special assistance

For information about NJ Transit’s lift

equipped buses call 1-800-772 2287

For additional information concern:

ing facilities for the disabled at NIA,

telephone (201) 961-2154. A booklet,

Airport Facilities and Services for the

Disabled, detailing facilities at Ken

nedy International, LaGuardia and

NIA. is available from the Port Author-

ity of New York and New Jersey by

calling (212) 466-7503.

Nursery facilities: Lounges contain

ing changing tables and chairs are

located in the women’s restrooms on

the concourse level in Terminals A

and B and on the concourse level in

the North Terminal

Lost and found: To recover items

lost aboard flights or in airline areas

within terminals, contact your airline

representative first. If your items can-

not be located, call the main Lost and

Found at (201) 961-2235.

Paging: You can have someone paged

by calling the airline on which the

passenger Is arriving OF departing.

10)

428

PASSENGER CONVENIENCES

Banks, cash machines and foreign

currency exchanges: These facilities

are in most terminal buildings. For

specific locations, consult the grid on

page 14. |

Baggage Storage: Baggage lockers

are located in Satellites B1, B2 and B3

of Terminal B. Luggage can be stored

for a maximum of 24h é

ours at a charge

of 50 cents. -

On-site lodgings: The Newark Inter

national Airport Marriott is located in

the Central Terminal Area and may be

reached by calling (201) 961-2860.

Other nearby hotels and motels may

be reached through courtesy tele. _

phones conveniently located through

out the arrivals level in Terminals A

and B and the North Terminal.

429 ios

GOVERNMENT SERVICES

Postal Services: Mail slots and

stamp vending machines are In fermi

nals A and B and the North lerminal

TERMINAL VAP

NIA HIGHWAY

peuruiu A | Yon

ee —

i @

]

°

7 SS

|

gq peuruiiey

Val AitTTayes

‘

ISANOIUO ) )

Pa4y Saunyiedag ad

Rasy S[RAuy \

; 6

L

|

T

T

tT

>

y eur 2 |

peupmisay

aut tistuy [eACA

PUIQIeW Buipua.,

SYA +) S4ata eu]

euUTUS ao

seUuIoeW dwejss

A2euue YY

Al 4eq

. eel

sdous

VOUL Puelissw .*

SIOTS [TREK

84940)

SIU0OUd 842juUNO ) OWT ]

49jUNO ) UOTJEWOjUY

mesijyea |

Seu0uUd

SUOTCALIBIy [AIO

aBueyoxy

A2U344N_) UBas04

SIZ 196 1182 soue;e1e88 204

P21qesig 40] 40) B Ady

dous e044 AING

syoeusg 42j)j0)

SIIB YOO )

2ulyoep use )

seU0Ud s42)UN0 )

[eu ay ue)

Siesjaje )

doys YIN yoo,

12aQ seq

yueg

SPIITATASN

LAM MOLI

WHERE TO PARK YOUR CAR

AT NEA

\ Tye [ a. ( (

ts are designated as hourly, daily a

term to sult r ne is described be

Parking lot rates and the hedulte tor the t

WKINg lot Dt mboel } ine i ert /

back of this booklet

Hourly Lots: Hourly Lots A, B and C, in the

Central Terminal Area, and Lot |, across the

street from the North Terminal, are intended for

not more than three hours of parking and ar

primarily a convenience for picking uf

ing off passengers. Note that this ts the most

expensive parking option avatlable Ti NIA md

sil I. ris 7) , ; j

oO keep spaces available for picRUI ; ld j

, ; ; an.

frotlte

we must impose penalty fee ‘ai

narking for more than one day

Daily Lots: Daily Lots A, B and C, in the f i

or no Lrea._ and Lot 2 Vest of orti ery

Long-Term Reduced-Rate Lots: Long-Term

Lots D and E, serving Terminals A, B and C, and

Long-Term Lots 3 and 4, serving the North Ter-

minal, are located on the airports outer bounda-

ries. These lots offer reduced rates for the

convenience of patron parking for more than

three days. Note that these are the least expen-

sive of the parking options available, but are

also located farthest from the terminals. Free

round-the-clock bus transportation is provided

from these lots to the Central Terminal Area and

the North Terminal. In some instances transfers

may be required between parking lots and ter-

minals. Refer to the insert at the back of this

brochure.

Parking accommodations for disabled

drivers: Reserved spaces specially designated

for the disabled are available at reduced rates in

Hourly Lots A, B and C immediately adjacent to

Terminals A, B and C in the Central Terminal

Area, and in Hourly Lot 1, across the street from

the North Terminal. Only vehicles with appro-

priately marked license plates and/or municipal

identification are eligible to park in these

spaces. For additional information on parking

and other airport services for the disabled, tele-

phone (201) 961-2154 or write Aviation Customer

and Public Services Division, The Port Authority

of New York and New Jersey, One World Trade

Center, Room 65N, New York, NY 10048.

18

If you're parking at NIA, dialing these

telephone numbers can get you informa-

tion or assistance, fast.

Current parking and roadway

Status (taped message)....... 201) 961-2012

Parking operator............. (201) 961-4751

Airport Auto Service ......... (201) 961-5352

a Re ee (201) 961-2235

When you park, take your car keys, registration

and parking ticket with you. Lock your car. Don't

leave items on your seat; lock them in the trunk.

And remember, when you're driving, buckle

your seat belt — it's the law.

4 Af,

435

7 HOW WE TAKE THE WALKING OUT OF

MAJOR AUTO ACCESS ROUTES EEYING AT MA

TO NIA

GROUND TRANSPORTATION SERVICES

nrice ct ] ‘ ; |

?

Aah) oe If ffering the l I

( ) iit the Lal) q I | yy i!

1 the ert thie rac K r |

| WITHIN NIA

Free 24 hour bus service: |!

between NIA’s Central Terminal! Area

A BandC) and the North Terminal, tak

brown and white connection b ry the

(departures) level of Terminal!

) side doors 6 and 7, or from the bu ad

| at the North Terminal. Buses prov

connection service betwee!

| top outside door 6 on the lower (art

' eve]

Taxi service: [ax stands are

ower (arrivals) lev it Tern

ind at curbside in front of the Nortt

: tands are attended dur! peak per

1 2 ;

7 . arrows DMG’

, Ceorge Washington Bridge i. Verrazano Nar

\ J ]

tart | 4 pal her wh Wilt das

G Manhattan Bridg

, hy br je

R lriborough B 1d¢ 7 eens Midtov

T nme a

|

|

'

) |

Transportation for the disabled: /

|

. ; iy I ; ; rY

| ‘ ndividual etwer eri

"

. : eq nped to i 1 wits ?

: 7} I

n r

il VV il f '

, + >}

r

t } j pt

r r ‘ yrotr ’ ?

r 4

l ;

r

”

rO AND FROM NIA laxi service: You will find ta»

f tings that Ww provide general intor ix mds « de each terminal |

ground and local alr transportatio lO a lestinat ind represe t

ervices available to you at NIA. For additiona lares are posted at the taxi stands. Fr °

formation, refer to the insert in the back of tO midnight, special hare and save’ gor

U publicatior or consult personne! at NIA are ire available for up to Tour | enge

,olidated Ground Transportation Counter traveling to Manhattan. Informat

cated in the North Terminal and on the lower tance are available from the taxi dispat

irrivals) level of Terminal C. Knowledgeable ice officer at each taxi stand

taff will assist you, providing schedules and Car rental service: Car rental c ter

pecilic drop-olf points ocated on the lower (arrivals) leve er

Bus service: Several companies within the A and B and on the Concourse level in the

tri-state region provide bus service to and I! ermmenas When unattended, direct line tel

NIA. For an up-to-date listing of bus companie phones are available at these counters a

ind areas served, see the insert in the back of erminal C. Avis, Budget, Dollar, Hertz ai

this brochure National have car rental facilities at NIA

Helicopter service: Helicopte: ervics

e lower Or arriva ivailable between NIA and Kenned\

tional and Lat jUardia alrp yr

Airlink: Airlink mini-coaches connect lerm

|

ils A, B and C (stops on tl

vel) and the North Terminal with downtow!

Newark. Airlink runs a continuous schedule

18 hours a day and provides access to the Ne

rk/New Jersey area via eight rail lines and |

imerous bus routes operating from Pen:

tation. Newark

Limousine service: Limousine and bus se!

es offer single passengers or groups tran

rtation in a wide array of vehicles USE

ins, sedans, conference Cars —to or from most

lestinations on a per person, hourly or flat rat

Ground Transportation Counters are located «

‘

the lower (arrivals) level in Terminals A, B and

C and on the concourse level in the North

Terminal

———

PRANSPORTATION FROM NIA TO

KENNEDY INTERNATIONAL AND

LaGUARDIA AIRPORTS

wdia in a hurry. there are four convenient

fer services to choose trom

1. Express bus service: Express buses oper

ite between NIA and Kennedy International

1 LaGuardia airports on fixed schedules

2. Limousine service: Limousines are aval!

ible for inter-airport connections on a reg

rly scheduled basis

3 Taxi service: Please see “Taxi serv

sting on Dag

4. Helicopter service: Some airlines offer

free or reduced-rate inter-airport transfer via

helicopter. For more information, conta

your airline representative

FROM A PIONEERING PAST TO \

SPLENDID PRESENT

" ‘ Y A ’

Yew TOTK VEU jer PY met

‘

»-T : ) " rr .

rved the ré Vv! nsince ft forct

VIA 1S low ated in the he

: lersey’s industrial center y

miles from mid-Manhattan. The

veniently loc ated on or

> rr

evVe

ry major highway route in the

} ry\l

WCeSsipie th

441 442

~~

ABOUT THE PORT AUTHORITY O|

VEW YORK AND NEW JERSE}

Newark International Airport is one of thre:

airports operated by The Port Authority of N

York and New Jersey

Created in 1921, The Port Authority is a b

state agency which undertakes port and re

improvements; provides dock fae iities for the

harbor shared by the States of New York

f

(Tt

:

and

_ New Jersey and in general, promotes trade a

commerce and operates transportation project

In addition to its beautiful, spacious tern (O Maintain The Port of New York and New Jer

ils and a vast array of shops and services for ey S position as America's preeminent gatewa\

e alr traveler's convenience, NIA has s i the world's most dynamic region

mpressive Statistics

NIA occu] pies 2,300 acres and has a work

ABOUT THIS PUBLICATION

population of pn re 'his booklet is produced by rhe Port / Authority

NIA's runways extend a total of 4 | NeW York and New Jersey in the publi In

ire connected by more the 1 12 mile terest, for the widest possible dissemination

taxiways . ' useful information to air travelers It is not

ican’ at pyrighted. We encourage reprinting in ar

R total of 28.6 million ippropriate form, including reproduction of

total of 23.6 milli passengers travels this he Oklet In its entirety or through adapti

to. + ane + gala | | the visuals or text

rorti the worid eXtra Copies of this publi icatior — :

NIA. together with Kennedy Internationa published guides to Ken nedy International and

dia airpor i perated Dy the ror AWuUardla en can be obtained by as

+} rity t New \Y Ka 1 NeW Jersey [ rhe t Au tho ify of fh Veu York and New

ite $191 n annually to the res ersey, Aviation Customer and Public Servic:

tivity One World Trade ¢ enter Room 65N

: rk, NY 10048 or} viing (212) 46¢

slantly growing and Changing

rve you, our patrons, wilh a variel

ervices and ground transpor

We handled more than 245 n

x5 and we d like to think we gave

: ’ ire. If you have any sugge

ve im do it Detter, please write

rt Ait! rif rN a

‘ Tse

' ’ v ;

443

444

INOUR POCKET

THE PORT AUTHORITY

445

UNITED STATES DISTRICT COURT

SOUTHERN DISTRICT OF NEW YORK

Pn ere ieienoncananiaal

INTERNATIONAL SOCIETY :

FOR KRISHNA |

CONSCIOUSNESS, INC., 75 Civ. 5388 (MJL)

ae, ‘ CIVIL RULE 3(g)

Plaintiffs, ° STATEMENT OF

| ‘ DEFENDANT

— : SUPERINTENDENT

WALTER LEE, etc., ' OF PORT

et al., ‘ AUTHORITY

Defendants. . POLICE

ro a aainlaeaeedalaael xX

Pursuant to Rule 3(g) of the Civil Rules of the United

States District Court for the Southern District of New

York, defendant Superintendent of Port Authority Police

submits the following:

A. STATEMENT OF CONTROVERTED FACTS

Defendant Superintendent of Port Authority Police

submits the following statement controverting the State-

ment of Facts In Support of Motion for Summary Judg-

ment dated November 11, 1987 submitted by plaintiffs

(hereinafter “Plaintiffs’ 3(g) Statemeni”):

1. Paragraph 8 of Plaintiffs’ 3(g) Statement is incor-

rect insofar as it does not reflect the merger of Northwest

Airlines and Republic Airlines, Inc. and of Ozark Airlines

and Transworld Airlines, respectively.

446

2. Paragraph 18 of Plaintiffs’ 3(g) Statement is incor-

rect insofar as it does not reflect the presence of the Flight

Board on the mezzanine of the IAB.

3. Paragraphs 21 and 22 of Plaintiffs’ 3(g) Statement

is incorrect in their description of the facilities in the East

Wing, second floor of the IAB. In the East Wing, second

floor, the corridors are boarded by four duty-free shops,

two bars, a snack bar, bank, currei..y exchange, book-

store, newsstand, a newsstand, cookie/candy shop, two

travel insurance areas, and a retail Bloomingdales. The

East Wing corridor also includes seating facilities, two

free standing commercial advertising displays and two

free standing public service advertising displays.

4. Paragraph 23 of Plaintiffs’ 3(g) Statement is incor-

rect in its description of the facilities of the West Wing

corridor of the IAB. The West Wing corridor is boarded

by four duty free shops, a newstand, book store, currency

exchange, a snack bar, cookie/candy shop, a cash/trav-

eler’s check machine, two bars and two travel insurance

facilities. The corridor also contains seating areas, two

free standing commercial advertising displays and one

free standing public service advertising display.

5. Paragraph 27, second sentence, of Plaintiffs’ 3(g)

Statement is incorrect in its description of the facilities in

the rear corridor of the Pan American unit terminal. In

the rear corridor are two duty free shops, one currency

exchange, a travel insurance facility, cocktail lounge, cafe-

teria, a toy shop, a bookshop, gourmet food shop, news-

stand, restaurant, bank, and retail Bloomingdales.

6. Paragraph 32 of plaintiffs’ 3(g) statement is incor-

rect in its description of the facilities located in the rear

447

corridor of the Northwest/Delta unit terminal. The rear

corridor is bordered by two gift shops, a coffee shop,

postal facility, newsstand, cutlery shop, restaurant/

lounge, cookie shop, shoeshine stand and two duty free

shops.

7. Paragraph 34, fourth sentence, of Plaintiffs’ 3(g)

Statement is incorrect in its description of the facilities

located in the corridor of the United unit terminal.

Located in the corridor are two currency exchanges, one

gift shop, one newsstand, one cocktail lounge, a duty free

shop, restaurant, coffeeshop, bank, postal facility, shoe-

shine stand, travel insurance facility, and traveler’s

check/cash machine.

8. Paragraph 36, second sentence, of Plaintiffs’ 3(g)

Statement is incorrect in its description of the facilities

located in the main departure level of the American Air-

lines unit terminal. The main departure level contains a

ticketing /baggage check-in area, seating areas, and com-

mercial establishments, including a bank, one restaurant,

two snack counters, two gift shops, two traveler’s check/

cash machines, a currency exchange, duty free shop,

cocktail lounge, newsstand, and shoeshine stand.

9. Paragraph 39, third sentence, of Plaintiffs’ 3(g)

Statement is incorrect in its description of the facilities

located in the back corridor of the British Airways unit

terminal. The property is bordered by two cocktail

lounges, a nursery, gift shop, duty free shop, newsstand,

cookie/candy store, cafeteria, postal facility, travel insur-

ance area, currency exchange, and a bank.

10. Paragraph 52, fifth sentence, of Plaintiffs’ 3(g)

Statement is incorrect in its description of the “AIDS

448

information table” in the central lobby area of the CTB.

The area contains an “Apple Aide” information table.

“Apple Aides” provide information to travelers.

11. Paragraph 53 of Plaintiffs’ 3(g) Statement is

incorrect in its description of the facilities in the fingers

of the CTB. Located at the end of the four fingers are a

newsstand, postal facility, currency exchange, snack bar,

fruit and nut stand, duty free shop, lobster stand, pack-

age fruit stand, and traveler insurance facility.

12. Paragraph 56, the third sentence, of Plaintiffs’

3(g) Statement, is incorrect in its description of the facili-

ties located on the third floor of the CTB. Airline clubs

and airline offices are located on the third floor.

13. Paragraph 57, second sentence, of Plaintiffs’ 3(g)

Statement is incorrect in its description of the facilities of

the Eastern Commuter Terminal. The Eastern Commuter

Terminal contains no passenger service facility; it only

contains ticket/baggage check in counters, boarding gate

areas and baggage retrieval facilities.

14. Paragraph 58, third sentence, of Plaintiffs’ 3(g)

Statement, does not correctly describe the facilities on the

arrivals level of the Eastern Shuttle Terminal. The arrivals

level includes a baggage retrieval area, newsstand, cash

machine, snack bar, car rental and hotel reservation coun-

ters, and a consolidated ground transportation counter

for airport car, limousine and bus services.

15. Paragraph 60 of Plaintiffs’ 3(g) Statement does

not correctly describe the facilities on the arrivals level of

the Delta/Northwest unit terminal. The arrivals level

consists of a baggage retrieval area, car rental and hotel

449

reservation counters, and a consolidated ground trans-

portation counter for airport car, limousine and bus ser-

vice.

16. Paragraph 87, first sentence, of Plaintiffs’ 3(g)

Statement is incorrect. The aviation capital plan contem-

plates an expenditure of $3.2 million for new projects at

La Guardia airport.

17. Paragraph 90, first sentence, of Plaintiffs’ 3(g)

Statement is incorrect. The real estate of the three air-

ports, as well as the structures and improvements situ-

ated thereon, is owned by the cities of New York,

Newark, New Jersey, and Elizabeth, New Jersey, and are

held by the Port Authority pursuant to long term ground

leases.

18. Paragraph 101 of Plaintiffs’ 3(g) Statement is

incorrect. The Port Authority advanced the funds neces-

sary to construct the Northwest Airlines unit terminal at

John F. Kennedy International Airport, and following

completion of the construction, Northwest repaid the

Port Authority at 5.5 percent interest per annum.

19. Paragraph 103 of Plaintiffs’ 3(g) Statement is

incorrect. The Port Authority advanced the funds neces-

sary to construct the TWA unit terminal at JFK and fol-

lowing the completion of construction, TWA repaid the

Port Authority at 5.5 percent interest per annum. British

Airways constructed the British Airways unit terminal at

JFK, and obtained funds therefor from a consortium

called BIDL, Inc.

450

20. Paragraph 121, second sentence of Plaintiffs’

3(g) Statement is incorrect. That sentence should state as

follows:

“In common with other airlines, they lease,

maintain, and operate concourse corners leading

to departure gates.”

21. Paragraph 128 of Plaintiffs’ 3(g) Statement is

incorrect. It should contain the phrase “except for exclu-

sively leased areas” after “La Guardia Airport” and

before “including” in the second line.

22. Paragraph 129, second sentence of the Plaintiffs’

3(g) Statement is incorrect. It should contain the phrase

“except to the common corridor in the four concourses,

excluding structural maintenance” between the words

“repairs” and “replacements”.

23. Paragraph 137, first sentence, of Plaintiffs’ 3(g)

Statement is incorrect. The sentence should state as fol-

lows:

“Delta and Eastern Airlines may each select its

Own airport operator to manage its facilities in

its La Guardia unit terminal, subject to Port

Authority approval.”

24. Paragraph 138, first sentence, of Plaintiffs’ 3(g)

Statement is incorrect. The phrase “and Eastern” should

appear after the word “Delta”.

| 25. Paragraph 140 of Plaintiffs’ 3(g) Statement is

incorrect. At Newark, at JFK wing, and the other termi-

nals, a flat rental fee on space for travel insurance, news-

tand, and gift shop facilities is paid directly to lessees.

The Port Authority receives a percentage of the gross

451

receipts generated by such facilities, up to an amount

equal to the basic rental fee. The amount of the gross

receipts fee exceeding the amount equal to the basic

rental fee is divided equally by the Port Authority and

the airline lessees.

26. Paragraph 143, first and second sentences, of

Plaintiffs’ 3(g) Statement are incorrect. The Port Author-

ity does not maintain a restaurant in the common area. In

areas not leased to airlines, the Port Authority arranges

for contractors to provide supplemental consumer ser-

vices such as newsstands, air transportation insurance,

vending machines, and advertising displays if an airline

desires such services.

27. Paragraph 147, first sentence of Plaintiffs’ 3(g)

Statement is incorrect. The first clause of the sentence

should state as follows: |

“at the unit terminals and the central terminals

at JFK, Newark and La Guardia,”

28. Paragraph 149, first sentence of Plaintiffs’ 3(g)

Statement is incorrect. The sentence should begin

“at JFK, Newark and La Guardia, the Port

Authority 7

B. STATEMENT OF FACTS AS TO WHICH THERE

EXISTS NO ISSUE TO BE TRIED

Defendant Superintendent of Port Authority Police

submits the following statement of material facts as to

which he contends there is no issue to be tried:

452

29. The airport terminals that are under Port

Authority control are the Central Terminal Building

(hereinafter “CTB”) of La Guardia, the Arrivals Building

of the International Arrivals Building (hereinafter “IAB”)

of Kennedy, and the North Terminal at Newark. The other

passenger terminals at the Port Authority airports are

controlled by the airline tenants who lease those termi-

nals. (Affidavit of Morris Sloane, sworn to on January

19,1988 (hereinafter “Sloane Aff.”), 94)

30. Port Authority policy prohibits the continuous

and repetitive distribution of literature and solicitation of

money from passers-by in the airport terminals under

Port Authority control. (Sloane Aff., 95)

31. Despite the Port Authority policy stated in Para-

graph 30, pursuant to agreement between plaintiffs and

the Port Authority entered into in open court before

United States District Judge Robert L. Carter in 1974, the

Port Authority permits leafleting and solicitation in the

terminals under Port Authority control to grant plaintiffs

access to those terminals pendent lite. The Port Authority

permits leafleting and solicitation from 9:00 A.M. to 9:00

P.M. in the main lobby of the second floor of the CTB, on

the second floor of the Arrivals Building of the IAB, and

on the entire concourse of the Main Terminal of the North

Terminal at Newark. (Sloane Aff., 96)

| 32. The Port Authority does not have the right to

impose, and does not impose, restrictions on non-com-

mercial leafleting and solicitation in airline terminal

space leased to airlines. (Sloane Aff., 97)

453

33. Airport-wide restrictions on commercial activity

are not applicable to non-commercial activity. (Sloane

Aff., 47)

34. Members of the Port Authority police force nei-

ther patrol nor are stationed in the portions of the airline

leased areas to which the plaintiffs seek entry. Port

Authority police are only required to respond to screen-

ing check points in those areas pursuant to Federal Avia-

tion Administration Regulations. (Sloane Aff., 78)

35. The Port Authority cannot impose upon the air-

line lessees rules regarding what non-commercial, non-

airline activity may or may not be conducted in space

within each airline’s control. (Sloane Aff., 99)

36. Each airline is responsible for conducting opera-

tions in its leased space. (Sloane Aff., 99)

37. Each airline is responsible for maintaining secu-

rity under the Federal Aviation Administration Regula-

tions in Parts 107, 108 and 129 of Title 14 of the Code of

Federal Regulations. (Sloane Aff., 19)

38. The Port Authority has the right to object to

activity in leased space that creates conditions that are

safety hazards or that interfere with operations. (Sloane

Aff., 49)

39. The only purpose of all three of the Port Author-

ity airports is the facilitation of air passenger and air

cargo transportation. (Sloane Aff., 411)

40. The only purpose of the passenger terminals at

the Port Authority airports that are the subject of this

lawsuit is the facilitation of passenger air travel. (Sloane

Aff., 912)

454

41. All planning and operational decisions that are

made with regard to the Port Authority airport terminals

are directly or indirectly related to effectuating the safe,

efficient and convenient movement of departing and

arriving passengers to and from aircraft. (Sloane Aff.,

q12)

42. Decisions regarding the number and location of

boarding gates, placement of ticket counters, providing

passenger information, the number and types of con-

sumer services at Port Authority airports all have as their

goal assisting the air passenger to reach his or her desti-

nation as quickly as possible, and to make any time spent

in the terminal as convenient and pleasant as possible.

(Sloane Aff., 412)

43. Port Authority airport operations are financed

by user fees, not by the general tax revenues of any state,

county or city. These user fees are rentals paid by airline

tenants (such as the airline defendants in this suit), land-

ing, terminal and ramp gate fees paid by individual and

corporations for use of the airports by itinerant and les-

see aircraft, fees paid by ground transportation providers

(such as auto rental agencies and limousine services), fees

paid by providers of other passenger services (such as

restaurants and shops), and fees paid directly by air

passengers (such as parking lot fees). (Sloane Aff., 913)

44. The Port Authority, which has no power to levy

or collect taxes and whose financial obligations are not

guaranteed by any other government body, must operate

as a self-sustaining enterprise. The Port Authority must

raise the funds necessary for the improvement, construc-

tion or acquisition of its facilities by reliance upon its

455

reserve funds and its future revenues. In the past, such

moneys have been supplemented in certain cases by fed-

eral and state contributions. (Sloane Aff., 414)

45. The P

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Joint Appendix Vol II — Lee v. International Soc. for Krishna Consciousness, Inc. · 505 U.S. 830 | Frix