Petition for Writ of Certiorari — Moore v. United States
Supreme Court brief1985
Ask Donna
What actually matters in this document.
Text
- wv S
Ps A on 7 49 — Office - Supreme Court, US
FILED
No. O¢T Na, 1994
AEE 2 NDE -_
IN THE SUPREME COURT OF THE UNITED © ~'*vAS
=p
STATES —
October Term, 1984
CLARENCE MOORE
ve
UNITED STATES OF AMERICA,
CLARENCE MOORE,
Petitioner
PETITION FOR WRIT OF CERTIORARI TO THE
UNITED STATES COURT OF APPEALS FOR THE
SIXTH CIRCUIT
David A. Burkhalter, II
Counsel of Record
901 Bearden Drive
P. O. Box 11841
Knoxville, TN 37939-1841
(615) 584-0241
October 19, 1984
ane Hs
QUESTIONS FRESENTED
l. Whether the United States is
barred from collecting the civil
penalties sought, because it
arbitrarily, capriciously, unreasonably,
erroneously and without authority,
failed to act in conformity with the
procedure provided by law in assessing
such penalties, with prejudice to
Petitioner.
2. Whether the lower courts erred in
granting summary judgment to the United
States when the record, taken in light
most favorable to Petitioner, showed he
was not involved in the relevant mining
Operations and by law was not subject to
the Surface Mining Control and
Reclamation Act.
3. Whether the lower courts erred in
ruling that Petitioner was not entitled
to judicial review under the
Administrative Procedure Act.
4. Whether 30 USC Sec. 1268(c) is
unconstitutional as applied or on its
face so that judicial review cannot be
foreclosd despite a failure to prepay a
penalty.
i, Se
PARTIES
Petitioner: Clarence Moore
Respondent: United States of America
f= ler a
yo ee
aah ls Meal “7
ee a ee
=
TABLE OF CONTENTS
Page
Question Presented. ....+..es hk
vl . ORE EIS Sg ee ee ee eRe
Table of Statutes and
ee a
Reference to Official and
Unofficial Reports of Lower
Ut I le ae
Statement of Grounds on which
Jurisdiction Invoked, , ...., ,10
Statement of the Case
Es Nature of the Case,
Course of Proceedings. .... .12
II. Statement of the Facts. ... 1/7
Argument:
I. The United States is barred from
collecting the civil penalties sought,
because it arbitrarily, capriciously,
unreasonably, erroneously and without
authority, grossly failed to act in
conformity with the procedure provided
by law in assessing such penalties with
prejudice to Petitioner... .....21
II. The lower courts erred in granting
Summary judgment to the United Staes
when the record, taken in the light most
favorable to Petitioner, showed he was
not involved in the relevant mining
Operations and by law was not subject to
the Surface Mining Control and
Reclamation Bet. . .. i 1 tte
a
III. The lower courts erred in ruling
that Petitioner was not entitled to
judicial review under the Administrative
Procedure Act.
IV. 30 USC Sec. 1268 (c) is
unconstitutional as applied and on its
face and judicial review cannot be
foreclosed despite a failure to prepay a
penalty. .
Conclusion,
Appendix
Certificate.
~34
~45
>)
56
91
TABLE OF STATUTES AND OTHER AUTHORITIES
STATUTES Page
5 uSC Sec. 101 36
5 uSC Sec. 551 36
5S uSC Sec. 702 36,37,40,43
5 uSC Sec. 706 34,44
28 USC Sec. 1291 10
28 USC Sec. 1345 40
28 USC Sec. 1655 40
28 USC Sec. 2201 39
30 USC Sec. 802(e) 32
30 USC Sec. 1201 et seq. Passim
30 USC Sec. 1202 47
30 USC Sec. 1268 (b) 13
30 USC Sec. 1268(c) Passim
30 USC Sec. 1268 (d) 13
30 USC Sec. 1270 40
30 USC Sec. 1270(c) 40,41
30 USC Sec. 1271(a) (2) 48
30 USC Sec. 1276(a) (2) 40
42 USC Sec. 2000e et seq. 31
Rules
Rule 4(a) (4), Federal Rules of Appellate
Procedure 15,16
Rule 42, Federal Rules of Civil
Procedure 16
Rule 56, Federal Rules of Civil
Procedure 32
Regulations
—ee ee ee
Page
30 CFR 723.2 7
TR AOR,
we
TABLE OF CASES
Abbott Laboratories v. Gardner, 387 U.S.
Page
i ee, , Cl. Ct«w:C«SSC87 , 38, 38, 43
B & M Coal Corp. v. Office of Surface
Mining Reclamation and Enforcement, 699
F.2d 381 (7th Cir. 1983). ia
Blackhawk Mining Co. v. United States
Department of Interior, 711 F. 2d 753
(6th Cir. 1983)., .22
Eskra v. Morton, 380 F.Supp. 205 (W.D.
Wis. 1974) rev'd on other grounds, 524
F.2d 9 (7th Cir. 1975).. a. + ae
Fuentes v. Shevin, 407 U.S. 67 (1972).. .51l
Graham v. Office of Surface Mining
Reclamation & Enforcement, 722 F.2d 1106
(3rd Cir. 1983). . iy *
Hodel v. Virginia Surface Mining &
Reclamation Association, 452 U.S. 264
it. 5 5 . « .25,28,52,53
John Walters Coal Co. v. Watt, 553
F.Supp. 838 (E.D. Ky. 1982).. ae
Johnson v. Robison, 415 U.S. 361 (1974). 46
Lindsey v. Normet, 405 U.S. 56 (1972).. .47
Matthews v. Eldridge, 424 U.S. 319
(1976). . ; 45
New Jersey Life Insurance Co. v. Getz,
622 F.2d 198 (6th Cir. 1980).. 33
“iia aia
ae
Page
Standard Oil Co. v. Federal Energy
Administration, 440 F.Supp. 328 (N.D.
ee. eat foe ge es sy ae
State of Georgia, Departuwent of Human
Resources v. Califano, 446 F.S upp. 404
ke a ee ee ee
Save our Cumberland Mountains, Inc. v.
Watt, 550 F.Supp. 979 (D.C. 1982)... 23,24,54
United States v. Crooksville Coal Co.,
560 F.Supp. 141 (S.D. Ohio 1982). .... .22
United States v. Dix Fork Coal Co., 692
Wome Gen teem Gabe ZUOETS « + «© 2 0 es wea
United States v. Hill, 553 F.Supp. 810
ae ee
United States v. Log Mountain Mining
Co., 550 F.Supp. 811 (E.D. Tenn. 1982). . .22
United States v. Thompson Brothers Coal
Co., Inc., "32 F.Supp . 979 (W.D. Pa.
1982). 22
Wong Yang Sung v. McGrath, 339 U.S. 35
PE aOR ere aoe ee oto a. Se ah ae
oe
Pleegl laeniin ia)
lea
. Seno!
ae ea
7
Ad
ak pe
9,
a
.
*)
ee
a ree’
|
REFERENCE TO OFFICIAL AND UNOFFICIAL
REPORTS OF LOWER COURT OPINION
The text of the Orders,
Memoranda, and Opinions of the lower
courts are reproduced in the Appendix.
The district court's orders and
memoranda entered October 29, 1982 and
December 13, 1982, are reported at
F.Supp. | (E.D. Tenn. 1982). The
order of the Court of Appeals entered
July 24, 1984, is unpublished.
- - . EE NER ee Ae. =
-10-
STATEMENT OF GROUNDS ON WHICH
JURISDICTION INVOKED
The Petitioner (and
co-defendant below, Julian H. Crews, who
is not a party to this .Petition) was
found liable for a civil penalty in the
amount of $45,000.00 by final order of a
district court pursuant to the Surface
Mining Control and Reclamation Act of
1977, 30 U.S.C. Sec. 1201 et seq.,
Petitioner appealed to the United States
Court of Appeals for the Sixth Circuit
pursuant to 28 U.S.C. Sec. 1291.
The Court of Appeals affirmed
the district court's ruling by a final
order filed on July 24, 1984. The right
of appeal is not available in this
action.
The Petitioner respectfully
seeks further review of this case by
requesting the Court to grant’ this
drei ee
y
|
Petition for Writ of Certiorari,
submitted pursuant to 28 U.S.C. Sec.
1254(1), timely filed under 28 U.S.C.
Sec. 2101(c).
-12—-
STATEMENT OF THE CASE
I. NATURE OF THE CASE, COURSE OF
PROCEEDINGS
(All references to the record are to the
Joint Appendix filed by the parties in
the Court of Appeals)
The Petition of Clarence Moore
arises from a final judgment on December
13, 1982, by the United States District
Court for the Eastern District of
Tennessee, Northern Division. Summary
judgment was entered in favor of the
United States on ‘iceman 29, 1982, and a
subsequent order was entered on December
13, 1982, disposing of a motion filed by
Petitioner to amend or to reconsider the
initial judgment.
The Complaint was brought by
the United States on September 2, 1982,
for the collection of civil penalties
at De
allegedly owed by Petitioner and Julian
H. Crews d/b/a D.C. Coal Company,
pursuant to 30 USC Sec. 1268(d) of the
Surface Mining Control and Reclamation
Act of 1977, 30 USC Sec. 1201 et seg.
(JA p. 3). Julian H. Crews and PD. C.
Coal Company are not parties to this
Petition, but will be referred to from
time to time when relevant and (for
purposes of clarity. The civil
penalties were allegedly owed in
accordance with 30 USC Sec. 1268(b) and
(d). (JA p. 3). The United States
sought penalties in the amount of Forty
Five Thousand Dollars ($45,000.00). (JA
p. 4).
An Answer and Counter-Claim
was filed on October 4, 1982. On
October 12, 1982, Petitioner filed a
motion for judgment on the pleadings or
in the alternative for summary judgment,
i
|
ak
(¢
ty on
aw Os
eee:
=
' eae
-14-
with supporting brief. An Amendment to
Answer was filed on October 14, 1982.
The United States filed a
reply to the counter-claim and a
cross-motion for summary judgment, with
supporting brief, on October 19, 1982.
A motions hearing was held on October
29, 1982, on the cross motions of the
parties.
Honorable Robert L. Taylor,
judge, presiding, entered an Order with
Memorandum on the day of the hearing
granting summary judgment in favor of
the United States in the amount of Forty
Five Thousand Dollars ($45,000.00).
Subsequently, on November 1, 1982,
Petitioner filed a response to the
United States’ cross-motion for summary
judgment, with supporting memorandum and
affidavit.
On November 8, 1982,
WN IR A a MR ERAN ate
atta
Petitioner filed a motion to amend the
judgment or in the alternative to
reconsider, with supporting memorandum.
An initial Notice of Appeal was filed on
November 26, 1983, but on November 29,
1982, the United States responded to the
motion to amend or reconsider.
The District Court on December
13, 1982, entered an Order granting the
motion to reconsider to the extent set
forth in a supporting memorandum. The
action of the District Court on December
13, 1982, necessitated the filing of a
new Notice of Appeal under Rule 4(a) (4)
of the Federal Rules of Appellate
Procedure. The new Notice of Appeal was
filed on December 30, 1982, and docketed
in the United States Court of Appeals
for the Sixth Circuit as Case No.
83-5014 on January 13, 1983. The
initial appeal of this case, docketed as
ities
. —
se Bical omy: tthe AREA CLA ale PS Nl
Pode a icaiald Seah sii
Nye nwer dahl taie Jew
nite
Case No. 82-5742, was dismissed on
January 11, 1983, by an order entered
upon consideration of the stipulation of
the parties to voluntarily dismiss the
case pursuant to Rule 42 and _ Rule
4(a) (4) of the Federal Rules of
Appellate Procedure.
a
4
5
j
4
;
‘
j
:
mi
II. STATEMENT OF THE FACTS
The relevant facts are
contained in the Complaint, Answer and
Affidavits filed in this cause in the
District Court and as revealed in the
transcript of proceedings held October
29, 1982, on the respective motions of
the parties.
The Complaint alleged that
both Petitioner and Crews operated a
surface coal mining and reclamation
operation in Campbell County on which
certain violations occurred giving rise
to the civil penalties sought. The
United States brought the action on
penalties assessed pursuant to Cessation
Order (CO) 200228, for which a proposed
assessment of civil penalty was issued
on April 2, 1982. (JA p. 3). The
proposed assessment was issued nearly
three (3) years from July 2, 1979, the
PASI.
aed
rs ee se, AG
witie
issue date of CO 200228. (JA p. 20).
A final order was issued on
June 1, 1982, requiring payment of the
civil penalty in the amount of
$45,000.00 (JA p. 20). The United
States claimed that the civil penalty
had not been paid and had not _ been
placed in escrow and Moore and Crews
had, therefore, waived all legal rights
to contest the existence of the alleged
violations and the amount of the penalty
pursuant to 30 USC Sec. 1268(c).
(Complaint, p. 1).
Fetitioner did not deny a
failure to pay the amount of the
prbposed assessment into escrow. (JA p.
20). However, Petitioner averred that
at no time during which any available
administrative remedy was open to him
could he have afforded to either pay the
penalty or place the amount in escrow
a ra
A tat
- =
s~ r
=" -~
ta
= bal
alu
while seeking administrative’ relief.
(JA p. 20 and p. 72).
CO 200228 was issued on July
2, 1979, for failure to abate violations
cited in Notice of Violation (NOV)
79-II-l1-15 (originally issued
erroneously as NOV 79-II-11-5). (JA p.
24 and p. 27). NOV 79-II-11-15 was
issued on May 11, 1979, on an area
identified only as a surface mine in
Campbell County, Tennessee. (JA p. 28).
The following violations were cited: 1)
failure to pass surface draineage
through a sedimentation pond, 2) failure
to post blasting signs at mine
entrances, 3) failure to remove all
topsoil to be salvaged before mining
Operations, and 4) failure to construct
and maintain access and haul roads,
Culverts, ditches and right of ways to
prevent addition of suspended solids to
o®
a ee ee ee ee ee
-20-
stream flow. (JA p. 30 and p. 31).
Petitioner denied any
participation in the minesite or mining
operations on which NOV 79-II-11-15 and
CO 200228 were issued. The only
connection between Petitioner and the
minesite in question was equipment he
had leased to Crews on April 19, 1979.
(JA p. 72 and p. 74).
The failure of the United
States to abide by the statutory
requirements and regulations resulted in
prejudice to the rights of Petitioner.
(JA p. 72).
afita
ARGUMENT
I. THE UNITED STATES IS BARRED FROM
COLLECTING THE CIVIL PENALTIES SOUGHT,
BECAUSE IT ARBITRARILY, CAPRICIOUSLY,
UNREASONABLY, ERRONEOUSLY AND WITHOUT
AUTHORITY GROSSLY FAILED TO ACT IN
CONFORMITY WITH THE PROCEDURE PROVIDED
BY LAW IN ASSESSING SUCH PENALTIES, WITH
PREJUDICE TO PETITIONER.
Petitioner respectfully
| contends that he has the right, through
judicial review, to show that he was
| prejudiced by the government's gross
failure to comply with 30 USC Sec.
1268(c), and the United States is barred
from collecting the civil penalty of
$45,000.00.
The decisions which thusfar
have upheld the constitutionality of 30
\
‘
|
'
|
=
.
|
|
:
|
~22-
USC Sec. 1268(c) are not controlling in
this case, The following cases, on
facts vastly different from the instant
case, have upheld the constitutionality
of 30 GC ser. 1268 (c): Graham v.
Office of Surface Mining Reclamation &
Enforcement, 722 F.2d 1106 (3rd Cir.
1983); B & M Coal Corp. v. Office of
Surface Mining Reclamation &
Enforcement, 699 F.2d 381 (7th Cir.
1983); Blackhawk Mining Co. v. United
States Department of the Interior, 711
F.2d 753 (6th Cir. 1983); United States
v. Log Mountain Mining Co., 550 F.Supp.
811 (E.D. Tenn. 1982); John Walters Coal
Co. v. Watt, 553 F.Supp. 838 (E.D. Ky.
1982), United States v. Crooksville Coal
Co., 560 F.Supp. 141 (S.D. Ohio 1982).
None of the cases cited above
involved a difference of three years
from the issue date of a violation to
i
j
'
i
4
:
j
:
(
|
i
att.
the issuance of a proposed notice of
assessment. In the instant case, CO
200228 was issued on July 2, 1979, but
the proposed notice of assessment was
not issued until April 2, 1982. (JA p.
20 and p. 3).
The Department of the Interior
and the Secretary have’ taken the
position that that portion of 30 USC
Sec. 1268(c) which requires that an
Operator be informed of a proposed
assessment within 30 days of the
issuance of an NOV or CO may bar
collection of any penalty assessed in
violation of the 30-day requirement.
Save Our Cumberland Mountains, Inc. v.
Watt, 550 F.Supp. 979, 982 (D.C. 1982)
rev'd 725 F.2d 143, judgment and opinion
vacated on rehearing en banc (D.C. Cir.
April 2, 1984). The Secretary also has
taken the position that a showing of
Fo
actual prejudice by an operator will bar
imposition of a penalty assessed in
violation of the 30-day requirement of
30 USC Sec. 1268(c). Id. at n.4. In
either case, collection of the
staggeringly large penalties the United
States has imposed against Petitioner
should be barred.
Significantly, the word
"shall" when used in the penalty and
enforcement provisions of the Act, was
construed by the Court in Save Our
Cumberland Mountains, supra, as imposing
a mandatory duty on the government to
act in accordance with the provision of
the statute to which it applies. Id. at
982. 30 USC Sec. 1268(c) in pertinent
part provides:
"Upon the
issuance of a notice or
order charging that a
violation of the Act has
occurred the Secretary
shall inform the operator
ET
o2G«
within thirty days of the
proposed amount of said
penalty."
The requirement of notification within
30 days is unequivocal and cannot be
presumed to be a gratuitous addition to
the statutory provisions. Congress
could have easily provided that the
Secretary inform an operator within a
"reasonable time" of the proposed amount
of a penalty; instead Congress provided
that the Secretary "shall inform the
operator within 30 days"of such amount.
The intent of Congress is clear and
unambiguous and should not be judicially
abrogated. Hodel v. Virginia Surface
Mining & Reclamation Assoc. 452 US 264,
304, 69 L.Ed. 2d 1, 33, 101 S.Ct. 2352,
2374 (1981).
The government previously has
argued that Petitioner actually
benefitted from the three-year delay in
atG<
assessing the penalty because penalties
were higher in 1979, when the NOV
72-II-11-15 was issued, than in 1982,
when the government finally assessed the
penalty of $45,000. (See, District
Court Memorandum, December 13, 1982, p.
2 Appendix p. 70). However, it is
quite irrelevant to a dying man or woman
that the life-saving operation available
in 1979 for $100,000.00 is now available
for $45,000.00, if they can afford
neither.
The cases, cited above,
neither deal with the issue of inability
to pay a substantial civil penalty nor
with the resulting prejudice due to the
application of the prepayment escrow
Provision in such a case. In contrast,
Petitioner could not afford to pay the
$45,000 assessed against him at any time
during which the government claims he
@27<
could have preserved his legal righte by
doing so. (JA p. 20 and p. 72). The
record shows that Petitioner may have
been able to prepay the proposed
assessment during the summer of 1979 had
it been issued in conformity with the
law, but this is by no means certain.
The speculative nature of the preceding
proposition is the result of the
government's gross failure to comply
with the law, and Petitioner should not
be further penalized for the
government's failure to initiate the
collection process timely and properly.
At any rate, the record shows that
Petitioner could not afford to pay the
$45,000.00 penalty when it was finally
issued in the winter of 1982. And for
reasons set out hereinbelow the
prepayment provision of 30 USC Sec.
1268(c) works prejudice at any time when
-28-
applied to circumstances as presented in
the instant case.
The multiple procedural steps
included in the Act have been touted by
the government as adequate safeguards to
an operator's legal rights, despite the
harsh prepayment provision of 30 USC
Sec. 1268(c). However, under facts
Similar to the instant case such
safeguards are illusory. This Court has
suggested this view by recognizing that,
"Once the escrow requirement is met,
{then} the operator receives a _ full
adjudicatory hearing, before an
administrative law judge, with a right
of appeal to an administrative board and
judicial review of the final decision.”
Hodel 452 US 304, 69 L.Ed 2d 1, 33, 101
S.Ct. 2352, 2374 (1881). The government
would seek to foreclose all review even
if an operator cannot afford in effect
go Be * Sains
ru
ay tel
a Tae Se eee ; =,
te 4
a)
a ©) a i
}
~
1-7
=-29-
to pay for the right of appeal. Such a
view is repugnant to our system of
justice.
-30-
II. THE LOWER COURTS ERRED IN GRANTING
SUMMARY JUDGMENT TO THE UNITED STATES
WHEN THE RECORD, TAKEN IN THE LIGHT MOST
FAVORABLE TO PETITIONER MOORE, SHOWED HE
WAS NOT INVOLVED IN THE RELEVANT MINING
OPERATIONS AND BY LAW WAS NOT SUBJECT TO
THE SURFACE MINING CONTROL AND
RECLAMATION ACT.
Petitioner averred that he was
not involved with the mining operation
Or activities from which CO 200228
arose, except for the leasing of certain
equipment. (JA po. 20 and p®* 73).
Nevertheless, the district court in the
face of Moore's denial said that
"Moore's involvement ... may well have
been covered by the Surface Mining Act"
(emphasis added), citing United States
v. Dix Fork Coal Co., now officially
reported at 692 F.2d 436 (6th Cir. 19).
The Dix Fork opinion applied
to the instant case absolves Petitioner
of liability under the Act. The Court
of Appeals for the Sixth Circuit found
the "agent" in Dix Fork, supra, to be
nttn
one who "had been delegated and had
assumed and executed" the responsibility
of ensuring compliance with the Act for
his son's mining company. 692 F.2d at
441. The Sixth Circuit Court found that
parallel definitions of "“agent" from
other statutory schemes were
appropriate, noting that 30 USC Sec.
1201 et seq. contained no definition for
"agent". Looking to the definition of
"agent" under Title VII, 42 USC Sec.
2000 et seq., the court in Dix Fork,
supra, found an “agent" was one who as a
"supervisory or managerial
employee ... “had authority to make
employment decisions. Id.
The Sixth Circuit Court then
gave the following definition from the
Coal Mines Health and Safety Act:
(e) "agent" means any
person charged. with
responsibility for the
operation of all or part
eee en es
(MAPA
a ‘ia _
AaB s a
3%
of a coal mine or _ the
supervision of the miners
in a coal mine,
30 USC Sec. 802(e). Id.
Petitioner was not an "agent"
under either definition and cannot be
held responsible for alleged violations
of the Act resulting in the assessment
of civil penalties. It can only be
presumed that the equipment Petitioner
Moore leased to Crews was the only basis
for naming him in NOV 79-II-11-15. The
record shows that Petitioner Moore was
added to the NOV three days after its
issuance on May 1l, 1979, absent any
reasons for the action except as the
"result of additional information." (JA
p. Sl and p. 57).
Of course, the disputed
factual issues raised would ordinarily
preclude the granting of summary
judgment under Rule 56 of the Federal
sey hice
atte
Rules of Civil Procedure. In
considering a motion for summary
judgment, the evidence is to be viewed
in light most favorable to the party
Opposing the motion. New Jersey Life
Insurance Co. v. Getz, 622 F.2d 198 (6th
Cir. 1980). Further, the Court of
Appeals recognized that on review it
must do the same. Id. at 200. The
district court and the court of appeals
failed to follow ‘the established
standard. However, the essence of the
lower courts' final decisions to grant
summary judgment to the United States is
that Petitioner Moore had no right to
judicial review due to a failure to
exhaust administrative remedies.
Petitioner Moore respectfully disagrees
with such a conclusion.
athe
Iit. THE LOWER COURTS ERRED IN RULING
THAT PETITIONER WAS NOT ENTITLED TO
JUDICIAL REVIEW UNDER THE ADMINISTRATIVE
PROCEDURE ACT.
The scope of the judicial review
of agency action is found at 5 U.S.C.
Sec. 706, part of what is still
popularly referred to as the
Administrative Procedure Act. The scope
of judicial review contained within 5
U.S.C. Sec. 706 requires that the Court
"hold unlawful and set aside agency
action, findings, and conclusions”
which, inter alia, are “arbitrary,
capricious, an abuse of discretion,”
illegal or without observance of
required procedure.
Section 706 in
full provides:
To the extent
necessary to decision and
when presented, the
reviewing court shall
decide all relevant
questions of Taw,
- =
interpret constitutional
and statutory provisions.
4 etermine the meanin
or applicability of the
erms of an agency action.
The reviewing court
shall--
(1) compel agency action
unlawfully withheld or
unreasonably delayed; a
(2) hold unlawful and set
aside agency action,
findings, and conclusions
found to be--
(A) arbitrary, capricious,
an abuse o iscretion, or
otherwise not in
accordance with law;
(B) contrary to
constitutional right,
power, privilege, Or
immunity;
(C) in excess of statutory
jurisdiction, a TTF,
or limitations, or short
of statutory right;
(D) without observance of
procedure required by law;
(E) unsupported by
substantial evidence in a
case subject to sections
556 and 557 of this title
or otherwise reviewed on
the record of an agency
hearing provided by
Te
statute; or
(F) unwarranted by the
facts to the extent that
the facts are subject to
trial de novo by the
reviewing court.
In making the
foregoing determinations,
the court shall review the
whole record or those
parts of it cited by a
party, and due account
shall be taken of the rule
of prejudicial error.
(Emphasis added).
The Department of Interior is an
Executive Department specifically
subject to having its actions reviewed
under the Administrative Procedure Act.
See, 5 U.S.C. Sec. 101, Sec. 551, and
Sec. 702. An example of judicial review
of action by the Department of the
Interior, even though such action by
statute was termed "final and
conclusive", is Eskra v. Morton, 380 F.
Supp. 205 (W.D. Wis. 1974) reversed on
other grounds, 524 F. 2d 9 (7th Cir.
es FS cee mr eae Oe
1975).
Title 5 U.S.C. Sec. 702 provides
in pertinent part:
A person suffering
legal wrong because of
agency action within the
meaning of a relevant
statute, is entitled to
judicial review thereof.
An action in a court of
the United States seeking
relief other than money
damages and_~ stating a
Claim that agency action
or an officer or employee
thereof acted or failed to
act in an official
Capacity or under color of
legal authority shall not
be dismissed nor relief
therein denied on the
grounds that it is against
the United States or that
the United States is an
indespensable party....
The presumption and policy in
favor of review established by this
Court is very strong. Abbott
Laboratories v. Gardner, 387 US 136, 18
L.Ed 2d 681, 87 S.Ct. 1507 (1967).
There is a presumption in favor of
judicial review to all those suffering
«38«
legal wrong or adversely affected or
aggrieved by agency action within the
meaning of a relevant statute, so long
as such relief is not precluded by
Statute nor committed by law to agency
discretion. Id., 387 US at 140, 141, 18
L.Ed.2d at 687, 87 S.Ct. at 1511.
The Supreme Court in Abbott
~~
Laboratories v. Gardner, supra, in
considering the Administrative Procedure
Act, stated as follows:
~e«- [It] provides
specifically not only for
review of "[a]gency action
made reviewable by
statute" but also for
review of “final agency
action for which there is
no other adequate remedy
in a court,” §$ USC Sec.
704. The legislative .
material elucidating that
seminal act manifests a
congressional intention
that it cover aé_ broad
spectrum of administrative
actions, and this Court
has echoed that theme by
noting that the
Administrative Procedure
Act's "generous review
_
provisions must be given a
hospitable
interpretation..."
[Court's citations
omitted]... the Court
[has] held that only upon
a showing of clear and
convincing evidence of a
contrary legislative
intent should the courts
restrict access to
judicial review. See
also, Jaffe, Judicial
Control of Administrative
Action 336-359 (1965).
Id. at 140, 141. (Emphasis added).
Agency action which "requires an
immediate and significant change in the
Plaintiffs' [person's aggrieved] conduct
and their affairs, with serious
penalties attached to noncompliance"
requires that access to the courts be
permitted under the Administrative
Procedure Act and the Declaratory
Judgment Act, 28 US Sec. 2201. Cf., 387
US at 153.
The Surface Mining Control and
a anne at gant Stal Phin MRR Sine ly shes .
nr NN RC NTS a TOE ac I MENA CARE Matt OME gee LO AG ty an a
-40-
Reclamation Act of 1977 undoubtedly is a
"relevant statute" for purposes of the
presumption of review under 5 USC Sec.
702. The independant jurisdiction of
the district court was invoked under 30
USC Sec. 1268(d), as well as 28 USC Sec.
1345 and 28 USC Sec. 1355. These
Statutes certainly do not_ preclude
judicial review. In fact, the Surface
Mining Control and Reclamation Act at 30
USC Section 1276 provides for judicial
review. Moreover, 30 usc Section
1276 (a) (2) provides that the
availability of review in ae civil
penalty proce2ding is not to be
construed to limit rights afforded by 30
USC Sec. 1270. Specifically, 30 USC
Sec. 1270(c) provides:
Nothing in this
section shall restrict any
right which any person (or
class of persons) may have
under any statute or
common law to seek
a
enforcement of an
provisions of this Act an
the regulations
thereunder, or to seek an
other relie
reiier agains e
ecretary or e
appr
ppropriate State
regulatory authority).
(Emphasis Added).
Petitioner Moore must be included in the
broad language of 30 USC Section 1270(c)
as a person who may exercise available
rights such as those afforded under the
Administrative Procedure Act.
The question that must now be
addressed in view of the very strong
presumption favoring judicial review is
the effect of 30 USC 1268(c).
Petitioner Moore, for reasons stated
hereinabove, did not prepay the
$45,000.00 civil penalty assessment into
escrow as purportedly required to seek
judicial review. The Act through 30 USC
Section ~1268(c) provides that failure to
-42-
prepay the penalty will result in a
“waiver of all legal rights to contest
the violation or the amount of the
penalty.” Petitioner Moore does not
seek per se to contest the “violation”
or the “amount” of the penalty. So far
as Petitioner's rights under the
Administrative Procedure Act are
concerned, he requests this Court to
consider whether the Government acted
arbitrarily, capriciously, or illegally
in assessing a $45,000 penalty in April,
1982, pursuant to a Cessation Order
issued on July 2, 1979, when he was not
involved at the minesite in question and
he has been prejudiced thereby.
In light of the strong policy
favoring judicial review, Petitioner
Moore must prevail ‘unless the united
States can show “clear and convincing
evidence of a contrary legislative
ai3e
intent...." See, Abbott Laboratories v.
Gardner, supra. The United States can
not produce such clear and convincing
“evidence. Petitioner Moore respectfully
submits that he is entitled to judicial
review to determine if the agency acted
illegally, arbitrarily, in abuse of its
discretion, or capriciously. The
relevant statute, 30 USC Sec. 1201 et
seg., does not preclude review (and in
fact provides for review), and_ the
strong presumption of review afforded by
5 USC Sec. 702 is intact and
controlling. Standard 0il Co. v.
Federal Energy Administration, 440 F.
Supp. 328 (N.D. Ohio 1975).
The proposed notice of
assessment on the cessation order was
issued on April 2, 1982, nearly three
years after the issuance of the
cessation order, in gross violation of
¢
id SL
ed ran,
-~44-
the 30-day requirement of 30 USC Sec.
1268(c).
The arbitrary action and
unreasonable delay and failure of the
agency to follow the prescribed
procedures resulted in prejudice to
Petitioner Moore. Procedural
irregularities alone, if prejudicial,
are grounds for reversal of agency
action. Cf., State of Georgia,
mS
Department of Human Resources v.
Califano, 446 F. Supp. 404, 410, 411
(N.D. Ga. 1977). The arbitrary,
Capricious and legally unfounded action
of the agency in this case is so
erroneous on its face as to be reversed
under 5 USC Sec. 706.
-~45-
IV. 30 USC SEC. 1268 (c) IS
UNCONSTITUTIONAL AS APPLIED AND ON ITS
FACE AND JUDICIAL REVIEW CANNOT BE
FORECLOSED DESPITE A FAILURE TO PREPAY A
PENALTY.
Judicial review of agency action
is proper when the constitutionality of
an act and its implementing regulations
is questioned. A constitutional
challenge should not be precluded
because a party has either failed to
raise a constitutional question during
administrative review, or having failed
to resort to available administrative
remedies, raises the question for the
first time in a district court. er.
Matthews v. Eldrige, 424 US 319, 329-331
ns. 10 and 11, 47 L.Ed.2d 18, 29-31 96
S.Ct. 893, 903-907 (1976).
This 7 keeping with the rule
that review of a constitutional challege
to the statute upon which agency action
rests is not barred because certain
~46-
facts or conclusions are presumptively
made unreviewable by the words of the
statute. Johnson v. Robison, 415 US
361, 367, 39 te BA. 39, 396, 97 S.Ct.
1160, 1166 (1974). As was the case in
Johnson, supra, the statute in this
case, 30 USC Sec. 1268(c), does not
explicitly bar consideration of a
constitutional challenge, and to. the
extent it was applied in such a manner
it would be unconstitutional.
Also, to the extent 30 USC Sec.
1268(c) purports to restrict access to
the courts, or if by application an
operator is prevented from seeking
judicial review, it is unconstitutional.
Section 1268(c) as applied is a
violation of the Fifth Amendment in that
it restricts access to the cowrts
unreasonably and is in direct conflict
with the statutory presumption of review
af Pe
given to all litigants coming within the
purview of 5 USC Secs. 701-706.
Petitioner Moore has shown he is
entitled to judicial review.
To the extent prepayment is
required to achieve review of alleged
arbitrary, capricious, illegal or
unconstitutional agency action, it is an
umdue burden on Petitioner's statutory
right to review and cannot be sustained.
Lindsey v. Normet, 405 US 56, 76-78, 31
L.Ed.2d 36, 52-53, 92 S.Ct. 862, 875-877
(1972). Prepayment of a full assessment
bears no relation to the actual harm to
be prevented by the Surface Mining
Control and Reclamation Act of 1977.
See 30 USC Sec. 1202. Nor does such a
requirement serve the objective of civil
penalties. See 30 CFR 723.2.
In the instant case, the
violations for which CO 200228 were
Yo
issued were not so serious a threat to
the environment as to require cessation
of mining activities when initially
observed. If the violations cited in
NOV 79-II-11-15 had been a= serious
threat to the environment, a cessation
of mining activities would have been
ordered pursuant to 30 USC Sec.
1271(a) (2). Yet, Petitioner Moore, who
was not involved in the mining
activities complained of, was expected
to pay $45,000 for such violations.
Subsection 1271 (a) (2) provides in
pertinent part:
(a) (2) When, on the basis
of any Federal inspection,
the Secretary or his
authorized representative
determines that any
condition or practices
exist, or that any
permittee is in violation
of any requirement of this
Act or any permit
condition required by this
Act, which condition,
practice, or violation
also creates an imminent
-49-
danger to the health or
safety of the public, or
is causing, Or can
reasonably be expected to
cause Significant,
imminent environmental
harm to land, air, or
water resources, the
Secretary or his
authorized representative
shall immediately order a
cessation of surface coal
mining and reclamation
Operations or the portion
thereof relevant to the
condition, practice, or
violation.
30 USC Sec. 1271(a) (2).
Requiring prepayment only serves
to deprive an operator of the means to
remedy any perceived harm to the
environment by depriving him or her of
the resources necessary to conduct
mining or reclamation work, and the
amount of the penalty may be unrelated
to the actual cost of protecting the
interest to be served. To that extent
it is invalid. 405 US 56 at 76-78.
To the extent that prepayment is
-50-
perceived or cited as a more efficient
way to ensure that operators comply with
the Surface Mining Control and
Reclamation Act, it is equally invalid.
“In the context of this case, an argument
based on efficient administration must
be rejected, at least so far as it is
used to bar application of the
Administrative Procedure Act and deny to
Petitioner Moore the right to judicial
review. Wong Yang Sung v. McGrath, 339
US 35, 46, 94 L.Ed. 616, 626, 70 S.Ct.
445, 452 (1950).
Conditioning access to judicial
review on prepayment into escrow of an
assessed penalty, as has been the
construction of 30 USC Sec. 1268(c) by
the courts which have considered the
issue, is not the only time the
condition is imposed. Prepayment also
is required by Sec. 1268(c) even at the
atu
administrative level for meaningful
review of the penalty.
Even a temporary deprivation of
property before a hearing is held is a
deprivation rising to constitutional
levels. Fuentes v. Shevin, 407 US 67,
S85, 90 n.22, 32 L.EG. 24 556, 572, 576,
92 S.Ct. 1983, 1966-1997, 1999 (1972).
In this case, Petitioner could not
afford to prepay the penalty demanded of
him at any stage of review,
administrative or judicial. Therefore,
he had no meaningful nor realistic means
to protect his rights and property. For
this reason 30 USC Sec. 1268(c), at
least in this case and as applied, is
invalid and cannot be used to bar the
claims and challenges of Petitioner
Moore.
As noted, Petitioner Moore could
not afford to pay the proposed penalty
«$2-
into escrow, and the cases which have
upheld 30 USC Sec. 1268(c) against
constitutional challenge are not
controlling under the facts of this
case.
Finally, this Court has not
passed upon the constitutionality of the
Act's civil penalty provisions, but has
indicated that facts similar to those
presented in the instant case would
present a proper case for considering
the issue. Hodel v. Virginia Surface
Mining & Reclamation Association, 452 US
264, 304, 69 L.Ed. 2d 1, 33, 101 S.Ct.
2352, 2374 (1981). In the absence of a
definitive ruling from this Court, the
lower courts have felt justified in
upholding the harsh provision, even when
presented with egregious circumstances
evident in the instant case. The Court
in Hodel stated:
ak Se.
In challenging the Act's
Civil penalty provision
appellees did not allege
that they, or any one of
them have had civil
penalties assessed against
them. Moreover, the
District Court did not
find, as it did in ruling
on the immediate cessation
Order provisions, that any
appellee coal mine
Operators have been
affected or harmed by any
of the statutory
procedures for the
assessment and collection
of fines. Thus, the
record in the case belies
any suggestion that there
is a concrete case or
controversy concerning the
operation of these
provisions. In these
circumstances, we must
conclude that appellees'
challenge is premature and
that it was improper for
the court below to render
a decision on this claim.
Id. at 304.
The implication is that’ the
district court was not- necessarily
incorrect in its ruling striking down
the provisions, but rather that it was
not rendered at the proper time in the
ite
proper case.
The instant case presents
precisely the case which the Court
indicated would be ripe for
consideration of the constitutionality
of 30 USC Sec. 1268(c), because of the
size of the penalty, the delay in its
assessment, the inability of Petitioner
Moore to pay, the prejudice which has
resulted, and the failure to allow
Petitioner judicial review under the
Administrative Procedure Act. The
Department of the Interior and_ the
Secretary have maintained that under
such circumstances imposition of a
penalty and its collection miyhnt be
barred. Save Our Cumberland Mountains,
Inc. v. Watt, 550 F.Supp. at 982 (D.C.
1982).
e<—_
eS ae
=e
CONCLUSION
For the foreaoing reasons, the
Petitioner requests the Court to bar the
collection of the civil penalty sought,
to grant Certiorari in this case, strike
down 30 USC Sec. 1168 (Cc) as
unconstitutional, and set a standard for
enforcement of the Surface Mining
Control and Reclamation Act of 1977 in
line with Constitutional constraints.
David Burkhalter JL
Aitorney at Law
P.0 |
, 31935-1841
<s
if.
APPENDIX
ae
Judgment of District Court
aS.
INDEX TO APPENDIX
Order of Court of Appeals
United States Constitution,
28
28
28
30
30
30
30
30
30
Amendment Five
USC
USC
USC
USC
USC
USC
USC
USC
USC
Sec.
Sec.
Sec.
Sec.
Sec.
Sec.
Sec.
Sec.
Sec.
Page
58,60 ,66,68
73
77
1254 (1) 78
1291 79
2101(c) 80
1268 (b) 81
1268 (c) 81
1268 (d) 81
1271(a) 83
1276 (a) (2) 89
1276 (b)
89
-58-
UNITED STATES DISTRICT COURT FOR THE
EASTERN DISTRICT OF TENNESSEE NORTHERN
DIVISION
UNITED STATES OF AMERICA, )
)
¥i }CiIV.
)3-82-524
JULIAN H. CREWS, ET AL )
ORDER
For the reasons stated in a
memorandum opinion this day passed to
the Clerk for filing, it is ORDERED that
plaintiff's motion for summary judgment
in the amount of $45,000.00 be, and the
same hereby is, granted. It is further
ORDERED that defendants’ motion for
Summary judgment be, and the same hereby
is, denied.
Enter: October 29, 1982.
/s/
United States
-59-
District Judge
6.
IN THE UNITED STATES DISTRICT COURT FOR
THE EASTERN DISTRICT OF TENNESSEE
NORTHERN DIVISION
UNITED STATES OF AMERICA, )
)
Ve ) Civ.
) 3-82-524
JULIAN H. CREWS, ET AL )
)
MEMORANOD U M
This is an action for
collection of a civil penalty of
$45,000.00 for failure to abate two
violations of the Surface Mining Control
and Reclamation Act of 1977, 30 U.S.C.
Sec. 1201 et seq. The case is before
the Court on cross motions for summary
judgment. Defendants do not contest the
fact of the mining violation or the
amount of the penalty. They allege,
however, that Cessation Order 200228, on
which the penalty was assessed, is
aG@i-=
defective and void on its face.
On May ll, 1979 a reclamation
specialist inspected defendants' surface
mining operation in Campbell County,
Tennessee, A Notice of Violation was
issued, naming four specific violations
of the Surface Mining Act. The notice
required defendants to complete remedial
measures by June 4, 1979. The Notice
contained the following penalty
provisions:
For each
violation covered by this
Notice, a penalty of up to
$5000 may be assessed for
each day during which that
violation continues.
If you fail to
abate any of the
violations within the time
set for abatement or to
meet any interim tep, you
must be assessed a minimum
penalty of no less than
$750 for each day during
which the violation
continues beyond the time
set for abatement, and you
must be issued a cessation
atin
Order requiring you’ to
cease surface coal mining
operations on the portions
relevant to the
violations.
On July 2, 1979 the inspector again
inspected the cite. He issued Cessation
Order 200228 after finding defendants
had not remedied two of the four
violations. The Cessation Order
provided:
If this Order is
being issued for failure
to abate a violation(s)
which was the subject of a
prior Notice of Violation,
a minimum penalty of $750
Or more must be assessed
for each day beginnin
today, during which the
violation(s) continues
beyond the abatement
period set forth in that
Notice.
The affirmative obligations *nd time for
abatement remained as stated in May 1l,
1979 Notice of Violation.
-6§3-
Defendants contend the
Cessation Order is void because it
required abatement prior to issuance.
This argument is totally without merit.
Plaintiff gave defendants from May 11,
1979 until July 2, 1979 to abate the
violations without incurring a penalty.
Defendants had notice of the
consequences of failure to comply with
the Notice of Violation and failed to do
so. The Cessation Order merely
implemented the sanctions contemplated
in the Notice of Violation. This
procedure complied with the Surface
Mining Act, 30 U.S.C. Sec. 1271(a) (3):
When, on the basis of a
Federal inspection. . .the
Secretary or his
authorized representative
determines that any
permittee is in violation
of any requirement of this
chapter or any permit
condition, required by
this chapter; but such
violation does not create
an imminent danger to the
-64-
health or safety of the
public, or cannot be
reasonably expected to
cause significant,
imminent environmental
harm to land, air, or
water resources, the
Secretary or authorized
representative shall issue
a notice to the permittee
or his agent fixing a
reasonable time but not
more than ninety days for
the abatement of the
violation and_ providing
opportunity for public
hearing.
Defendants also argue that
issuance of the Notice of Assessment on
April 2, 1982, more than 30 days after
the Notice of Violation or Cessation
Order, violated 30 U.S.C. Sec. 1268(c)
and worked to their prejudice. We have
previously held that the thirty-day time
period is not jurisdictional. United
States v. Moore, No. 3-81-520 (E.D.
Tenn., filed July 21, 1982), appeal
docketed, No. 82-5478 (6th Cir. Aug. 10,
1982). Defendant has failed to show,
win
and we cannot find, how he has been
prejudiced by plaintiff's delay in this
case.
For the foregoing reasons, it
is ORDERED that plaintiff's motion for
Summary judgment in the amount. of
$45,000.00 be, and the same hereby is,
granted. It is further ORDERED that
defendants' motion for summary judgment
be, and the same hereby is, denied.
/s/
United States
District Judge
-66-
UNITED STATES DISTRICT COURT FOR THE
EASTERN DISTRICT OF TENNESSEE NORTHERN
DIVISION
UNITED STATES OF AMERICA, )
)
Ve )CIV.
) 3-82-524
JULIAN H. CREWS, ET AL )
ORDER
For the reasons stated in a
memorandum opinion this day passed to
the Clerk for filing, it is ORDERED that
the motion to reconsider and = make
additional findings and conclusions be,
and the same hereby is, granted to the
extent of the memorandum opinion. It is
further ORDERED that defendants’ motion
to amend judge be, and the same hereby
is, denied.
Enter: December 13, 1982.
/s/
United States
a@%x
District Judge
«f@e
IN THE UNITED STATES DISTRICT COURT FOR
THE EASTERN DISTRICT OF TENNESSEE
NORTHERN DIVISION
UNITED STATES OF AMERICA, )
)
Ve ) Civ.
) 3-82-524
JULIAN H. CREWS, ET AL )
)
MEMORANOD U M
Defendants move to reconsider
Or amend the judgment of this Court
entered October29, 1982. On that date,
after hearing the argument of counsel
and considering defendants' position, we
granted judgment against defendants in
the amount of $45,000.00 for failure to
abate surface mining violations,
Defendants contend that we did
not fully consider all the relevant
facts at the time judgment was entered.
«@@0
Specifically, they point to the
affidavit of defendant, Clarence Moore,
filed November 1, 1982. At the hearing,
however, defendants' counsel stated the
substance of the affidavit and we
considered it as if it had been filed.
We will, however, address the specifics
of the affidavit at this time. Moore
alleges that he was prejudiced by
receiving the notice of the penalty
assessment during the early spring of
1982 rather than during the summer of
1979 when the violations occurred. He
says he “quite possibly” would have had
$45,000.00 in 1979 to place in escrow so
that he might appeal the penalty. See
30 U.S.C. Sec. 1268(c). He further
States that he was not responsible for
the violations. We assume this is the
issue he would have raised in 1979.
Defendant Moore, however, could have
—— |
_ =
raised this issue without prepayment of
any penalty in 1979. See 30 U.S.C. Sec.
1275; 43 C.F.R. Sec. 4.1160 et seg.
Since he did not do so, his argument of
prejudice by this delay is without
merit. We also note that the delay may
have worked to defendants' benefit as
the potential penalty in 1979 was
substantially higher under the then
effective regulations. 30 C.F.R. Sec.
723.14; 42 Fed.Reg. 62703 (1977),
Plaintiff's brief p. 5.
As stated above, defendant
Moore also alleges that he was not
responsible for the mining activities
that lead to the issuance of Cessation
Order 200228 that is the basis of this
action. Since he failed to exhaust his
administrative remedies as to this
claim, he may not now raise the issue
before this Court. ss aan oe
=
1268(c). We note, however, that this
contention is weak at best, since Moore
has been engaged in other mining
activities, leased the equipment used
where the instant violations occurred,
and failed to raise the issue until the
present time. The scope of "agents" who
may be held responsible for correction
of surface mining violations is broad.
See United States v. Dix Fork Coal Co.,
No. 81-5125 (6th Cir., filed Nov. 9,
1982). Moore's involvement, therefore,
may well have been covered by the
Surface Mining Act.
Moore also states that he did
not receive notice of Violation 79-II-5
and Cessation Order 200208. As_ these
documents are not the subject of the
instant lawsuit, these contentions are
without merit.
The Court in its memorandum
atta
Opinion of October 29, 1982 addressed
the remaining legal contentions raised
in the cross-motions for summary
judgment. Further reconsideration of
the case is therefore unnecessary.
Accordingly, it is ORDERED that’ the
motion to reconsider and make additional
findings =a conclusions be, and the
same hereby is, granted to the extent of
this memorandum. It is further ORDERED
that defendants' motion to amend the
judgment be, and the same hereby is,
denied.
/s/
United States
District Judge
me
NO. 83-5014
UNITED STATES COURT OF APPEALS FOR THE
SIXTH CIRCUIT
UNITED STATES OF AMERICA,
Plaintiff-Appellee
Ve Ci¥.
)
)
)
)
)3-82-524
JULIAN H. CREWS, AND )
CLARENCE MOORE, d/b/a )
D.C. COAL COMPANY, )
)
)
Defendants-Appellants.
BEFORE: LIVELY, Cheif Judge, ENGEL,
Circuit Judge and PECK, Senior Circuit
Judge.
This cause having come onto be
heard upon the record, the briefs and
Oral argument of the parties, and upon
due consideration hereof,
It is ORDERED that the
judgement of the district court be, and
it hereby is, affirmed upon the opinion
of the district court.
ENTERED BY ORDER OF THE COURT.
«74.
FILED: July 24, 1984
/s/
~ John P. Hehman, Clerk
-/5-
-NO TEXT-
-NO TEXT-
ate =
=
CONSTITUTION OF THE UNITED STATES OF
AMERICA
Amendment 5
Criminal actions--Provisions
concerning--Due process of law and just
compensation clauses.
No person shall be held to answer for a
capital, or otherwise infamous crime,
unless on a presentment or indictment of
a Grand Jury, except in cases arising in
the land or naval forces, or in the
Militia, when in actual service in time
of War or public danger; nor shall any
person be subject for the same offence
to be twice put in jeopardy of life or
limb; nor shall be compelled in any
criminal case to be a witness against
himself, nor be deprived of life,
liberty, or property, without due
process of law; nor shall _ private
property be taken for public. use,
without just compensation.
me Gan,
re ms fs
7 : -
Soe ow
Ie
28 U.S.C. Sec. 1254. Court of appeals;
certiorari; appeal; certified questions
Cases in the courts of appeals may be
reviewed by the Supreme Court by the
following methods:
(1) By writ of certiorari
granted upon the petition of any party
to any civil or criminal case, before or
after rendition of judgment or decree;
(2) By appeal by a party
relying on a State statute held by a
court of appeals to be invalid as
repugnant to the Constitution, treaties
or laws of the United States, but such
appeal shall preclude review by writ of
certiorari at te instance of such
appellant, and the review on appeal
shall be restricted to the Federal
questions presented;
(3) By certification at any
time by a court of appeals of any
question of law in any civil or criminal
case as to which instructions are
desired, and upon such certification the
Supreme Court may give binding
instructions or require the entire
record to be sent up for decision of the
entire matter in controversy.
os
28 U.S.C. Sec. 1291. Fimal decisions of
district courts
The courts of appeals’ shall
have jurisdiction of appeals from all
final decisions of the district courts
of the United States, the United States
District Court for the District of the
Canal Zone, the District Court of Guam,
and the District Court of the Virgin
Islands, except where a direct review
may be had in the Supreme Court.
ss; ae Gor
eS ogee i va aa .
a | ot ‘ee nora) eae
ea ete Be
es Thagok te Pear
tug
-80-
28 U.S.C. Sec. 2101. Supreme Court;
time for appeal or certiorari;
docketing; stay
(a) eee
(b) coe
(c) Any other appeal or any
writ of certiorari intended to bring any
judgment or decree in a civil action,
Suit or proceeding before the Supreme
Court for review shall be taken or
applied for within ninety days after the
entry of such judgment or decree. A
justice of the Supreme Court, for good
cause shown, may extend the time for
applying for a writ of certiorari for a
period of not exceeding sixty days.
(d) eee
[ny teas
sit.
30 U.S.C. Sec. 1268. Penalties
(a) ees
(b) Hearing. A civil penalty
shall be assessed by the Secretary only
after the person charged with a
violation described under subsection (a)
of this section has been given an
Opportunity for a public hearing. Where
such a public hearing has been held, the
Secretary shall make findings of fact,
and he shall issue a written decision as
to the occurrence of the violation and
the amount of the penalty which is
warranted, incorporating, when
appropriate, and order therein requiring
that the penalty be paid. When
appropriate, the Secretary shall
consolidate such hearings with other
proceedings under section 521 of this
Act. Any hearing under this’ section
shall be of record and shall be subject
to section 554 of title 5 of the United
States Code. Where the person charged
with such a violation fails to avail
himself of the opportunity for a public
hearing, a civil penalty shall be
assessed by the Secretary after the
Secretary has determined that a
violation did occur, and the amount of
the penalty which is warranted, and has
issued an order requiring that’ the
penalty be paid.
(c) Notice; waiver. Upon the
issuance of a notice or order charging
that a violation of the Act has
occurred, the Secretary shall inform the
Operator within thirty days of the
proposed amount of said penalty. The
person charged with the penalty shall
ote Saua — o = :
“wet ae aaa .
cages as Ags Ses |
ESE. ae age a8
Age
7
%
ee en es
oa Ctr id
aoe Bee aaccae oe
rt) ir Bis mie $eies. =
ue ae - a; ee oN ¥ age: ae : hole aa. Se ’
—
—
Seu ee Rat he
es
then have thirty days to pay’ the
proposed penalty in full or, if the
person wishes to contest either the
amount of the penalty or the fact of the
violation, forward the proposed amount
to the Secretary for placement in an
escrow account. If through
administrative or judicial review of the
proposed penalty, it is determined that
no violation occurred, or that’ the
amount of the penalty should be reduced,
the Secretary shall within thirty days
remit the appropriate amount to the
person, with interest at the rate of 6
percent, or at the prevailing Department
of the Treasury rate, whichever is
greater. Failure to forward the money
to the Secretary within thirty days
shall result in a waiver of all legal
rights to contest the violation or the
amount of the penalty.
(d) Recovery in civil action.
Civil penalties owed under this Act, may
be recovered in a civil action brought
by the Attorney General at the request
of the Secretary in any appropriate
district court of the United States.
(e) cee
[f} tae
(9) eee
(Hh) ae.
(i) eeee
=83-
30 U.S.C. Sec. 1271. Enforcement.
(a) Notice; Federal
inspection; waiver; cessation order;
affirmative obligations; hearince;
suspension or revocation of permits;
contents of notices and orders;
expiration date. (1) Whenever, on the
basis of any information available to
him, including receipt of information
from any person, the Secretary has
reason to believe that any person is in
violation of any requirement of this Act
Or any permit condition required by this
Act, the Secretary shall notify the
State regulatory authority, if one
exists, in the State in which such
violation exists. If no such State
authority exists or the State regulatory
authority fails within ten days after
notification to take appropriate action
to cause said violation to be corrected
Or to show good cause for such failure
and transmit notification of its action
to the Secretary, the Secretary shall
immediately order Federal inspection of
the surface coal mining operation at
which the alleged violation is occurring
unless the information available to the
Secretary is a result of a previous
Federal inspection of such surface coal
mining operation. The ten-day
notification period shall be waived when
the person informing the Secretary
provides adequate proof that an imminent
danger of significant environmental harm
exists and that the State has failed to
take appropriate action. When the
Federal inspection results from
information provided to the Secretary by
any person, the Secretary shall notify
such person when the Federal inspectior
-84-
is proposed to be carried out and such
person shall be allowed to accompany the
inspector during the inspection.
(2) When, on the basis of any
Federal inspection, the Secretary or his
authorized representative determines
that any condition or practices exist,
Or that any permittee is in violation of
any requirement of this Act or any
permit condition required by this Act,
which condition, practice, or violation
also creates an imminent danger to the
health or safety of the public, or is
causing, or can reasonably be expected
to cause Significant, imminent
environmental harm to land, air, or
water resources, the Secretary or his
authorized representative shall
immediately order a cesstion of surface
coal mining and reclamation operations
or the portion thereof relevant to the
condition, practice, or violation. Such
cessation order shall remain in effect
until the Secretary or his authorized
representative determines that the
condition, practice, or violation has
been abated, or until modified, vacated,
or terminated by the Secretary or his
authorized representative pursuant to
Subparagraph (a)(5) of this section.
Where the Secretary finds that the
ordered cessation of surface coal mining
and reclamation operations, or. any
portion thereof, will not completely
abate the imminent danger to health or
safety of the public or the significant
imminent environmental harm to land,
air, or water resources, the Secretary
shall, in addition to the cessation
order, impose affirmative obligations on
the operator requiring him to take
| res, a ae
a in sgh “bebypas “a Ot"?
q | p-al- tee baron be is
Be Pe STE BAF).
ee eee oe dee | se et: Ae
wht eee > a 4 PI sos; "eel aan
; te 2: tbe ger Reese
x eet! Meee te) 8 vip aE :
so! [age Yok ae ae x
) ms 4 7
- —_ at 6 , “* ~ a] ‘
- aol *
i Pe , Pre 1 ive
: 4
: ii a 6 im C“
* .
4
@
’
a %
; - —
;
; i
.
‘
Py
: ‘
is t
%
= {
7 5 -
- ”
ts os hj
‘= ~ } '
oe, ; :
*
‘
I > 7) - - rc > <
~
; ¢ Lop Lf
é;e£ .? 7 La
4
7 4 { i? as AH a é
- ‘ « = g . a
<< a 4 a
¥ “| :
- 4 -# ) 21 2 als =
; ¢ as =e as . Ge
Py = -%, :
a Ge 8 < ; = aif
; i FF - oe
r ‘ it ¥ 2 ;
~85-
whatever steps the Secretary deems
necessary to abate the imminent danger
or the significant environmental harm.
(3) When, on the basis of a
Federal inspection which is carried out
during the enforcement of a Federal
program or a Federal lands program,
Federal inspection pursuant to section
502, or section 504(b) or during Federal
enforcement of a State program in
accordance with subsection (b) of this
section, the Secretary or his authorized
representative determines that any
permittee is in violation of any
requirement of this Act or any permit
condition required by this Act; but such
violation does not create an imminent
danger to the health or safety of the
public, or cannot be reasonably expected
to cause significant, imminent
environmental harm to land, air, or
water resources, the Secretary or
authorized representative shall issue a
notice to the permittee or his agent
fixing a reasonable time but not more
than ninety days from the abatement of
the violation and providing opportunity
for public hearing.
If, upon expiration of the
period of time as originally fixed or
subsequently extended, for good cause
shown and upon the written finding of
the Secretary or his authorized
representative, the Secretary or his
authorized representative finds that the
violation has not been abated, he shall
immediately order a cessation of surface
coal mining and reclamation operations
or the portion thereof relevant to the
violation. Such cesation order shall
fa em
+
ay
idee sei Se ee
fh r erates
—a~ te Sala
ee a oy gees
elev hashh fare
1 Pein
.-. i adie cae
a, ra ‘<3 Or:
“8 p> Paley:
oF age:
: : e Sree
, - PL ead
’ a Rae oor ee
ae Pha? eke ue
4 oe ° ote: ee Ey hod
“Tt ee tks akon ~ =e re
e¢ ip “Marts
re F hee 3
1fie Latte ; ele
ean ease
os
qn elk ees ee
fag fej ae
SP: SEFC
Goatees:
. vie SB wotie =a oan =i
cTiAse tees tor Sore ie
aed! SOW eae Seat Aas ra
ja?
-86-
remain in effect until the Secretary or
his authorized representative determines
that the violation has been abated, or
until modified, vacated, or terminated
by the Sectetary or his authorized
representative pursuant to subparagraph
(a) (5) of this subsection, the Secretary
shall determine the steps necessary to
abate the violation in the most
expeditious manner possible, and shall
include the necessary measures in the
Order.
(4) When, on the basis of a
Federal inspection which is carried out
during the enforcement of a Federal
program or a Federal lands’ program,
Federal inspection pursuant to section
502 or section 504 or during Federal
enforcement of a State program in
accordance with subsection (b) of this
section, the Secretary or his authorized
representative determines that a pattern
of violations of any requirements of
this Act or any permit conditions
required by this Act exists or has
existed, and if the Secretary or his
authorized representative also find that
such violations are caused by the
unwarranted failure of the permittee to
comply with any requirements of this Act
Or any permit conditions, or that such
violations are willfully caused by the
permittee, the Secretary or his
authorized representative shall
forthwith issue an order to the
permittee to show cause as to why the
permit should not be suspended or
revoked and shall provide opportunity
for a public hearing. If a hearing is
requested the Secretary shall inform all
interested parties of the time and place
esi tantaee ge
aia | Ss iaonentom. bg
VERO Paulie. Oey ee ee eo “aviaagua 2
ve ent ALS cot se tee, wilh eee
te es 9 gees a oe,
(es rt wee 07 Meme ee Fae ett # eyned, Linge
v, reich a | _e 4) = ; ;
. i ) 4 . a al fo
ae fy3 a" ke LN einai ma re Vet eke ii Me se te Ks me a ey fe
: ; A : ‘ ; Sie we walle hg:
‘ : = ; j i
oot ‘ *e I : as 1“ c
t 7 ? et Pe ae
, : al ry ? = a! Sia? ad Jz i " i “} * ' : pv
Epa : - “ ae it / ole. oa 7 ia | al a a i it ~¥ AF
pus ; = es ae oT 5 er ee 4 tia me
Eas $25 rs ae) be mil aoe Ere
> 7
- - 2) a)
‘ ; aa] 7 4 4 b>
‘ i)
if”
: fl 4 4
.
* a
’ at.
* ate
s A ‘ t
al
ao ‘ a
= ‘, ; a, s
ig
4. ‘ t Pili P
‘ > 4 - “
&
mA" ‘ Sat > -
‘ e 4 I -¢ 7 or \ soe @
- s mi > pe SS Ae ee
\ ae 2 hy aged SRA ee
«! bees f peer 2 ores
A - = 7
a 1 ° 7 “+ > Ss Mo i - -) ~ ™"
4 { ™ - . n
s ? ’ > I I efit = = Ly. =
F. = ~— hella = ——— en EE EE EE —
' gy ia iorssiie:. > 3678350, Oo, OF Seeai ves
os a ES Se ks of ee ee ee eS eee CR oe ee ee
Oy
oth. vie
ea eh rae
~ :
atta
of the hearing. Upon the permitte's
failure to show cause as to why the
permit should not be suspended or
revoked, the Secretary or his authorized
representative shall forthwith suspend
Or revoke the permit.
(5) Notices and orders issued
to this section shall set forth with
reasonable specificity the nature of the
violation and the remedial action
required, the period of time established
for abatement, and a reasonable
description of the portion of the
surface coal mining and _ reclamation
Operation to which the notice or order
applies. Each notice or order issued
under this section shall be given
promptly to the permittee or his agent
by the Secretary or his’ authorized
representative who issues such notice or
order, and all such notices and orders
shall be in writing and shall be signed
by such authorized representatives. Any
notice or order issued pursuant to this
section may be modified, vacated, or
terminated by the Secretary or his
authorized representative. A copy of
any such order or notice shall be sent
to the State regulatory authority in the
State in which the violation occurs:
Provided, That any notice or order
issued pursuant to this section which
requires cessation of mining by the
Operator shall expire within thirty days
of actual notice the operator unless a
public hearing is held at the site or
within such reasonable proximity to the
site that any viewings of the site can
be conducted during the course of the
public hearing.
-88-
‘ ‘ ij - *
hee ae. oe eel Artis en (ne OFS ures ‘ ‘ana
¢ . — — eer PR ao ly BID ep i iy Pom 0 haa tinal or “
’ : : y ; _ a eS aie ~
a ye 7 7
.
i
tel
i
’
a ; bg ‘ t
‘AM ; "
: &
4 ~ 3
r
,
. - d
‘
J , ie
,
a A
> > . ¢ c
‘ t .
: 7
5
¥., s ina
om ; 4 << y <
é
wm
u + bial
Be j
Sa . Ae
7 §
‘ * *
;
© Coe Lake
sien iemndnhianadlint tdieemaceadceed
¢ ”
i ‘- i”
re a4 ~—
im 7 -
et ee wp + gears
™ 7 ‘
> Mew me ey oe oe,
-89-
30 USC Sec. 1276. Judicial Review.
(a) (1) ...
(2) Any order or decision issued by the
Secretary in a civil penalty proceedings
Or any other proceeding required to be
conducted pursuant to 5 U.S.C. Sec.
554(1970) shall be suejct to judicial
review on or before 30 days from the
date of such order or decision in
accordance with subsection (b) of this
section in the United States District
Court for the district in which the
surface coal mining operation is
located. In the case of a proceeding to
review an order or decision issued by
the Secretary under the penalty section
of this Act, the court shall have
jurisdiction to enter an order requiring
payment of any civil penalty assessment
enforced by its judgment. This
availability of review established in
this subsection shall not be construed
to limit the operations of rights
established in Section 520.
(b) Findings of Secretary as
conclusive. The court shall hear such
petition or complaint solely on _ the
record made before the Secretary.
Except as provided in subsection (a),
the findings of the Secretary if
supported by substantial evidence on the
record considered as a whole, shall be
conclusive. The court may affirm,
vacate, or modify any order or decision
Or may remand the proceedings to the
Secretary fcr such further action as it
may direct.
[G) ase
(da)
(e)
-90-
sti.
CERTIFICATE
I, David A. Burkhalter, II, a
member of the Bar of the Court, pursuant
to Supreme Court Rule 19 and Rule 28,
hereby certify that I have served Robert
Ss. More, Special Assistant U.S.
Attorney, Department of the Interior, P.
O. Box 15006, Knoxville, TN 37901, and
the Solicitor General, Department of
Justice, Washington, D.C., 20530, with
three (3) true and exact copies of the
foregoing Petition and filed with the
Court forty (40) true and exact copies,
properly addressed to the Clerk of the
Court, by depositing same in a United
States Post office, first-class postage
pre-paid, or with the Knoxville terminal
Federal Express, a corporation offering
overnight delivery of documents 9 and
other articles, this the 24; day of
October, 1984.
STATE OF TENNESSEE
COUNTY OF KNOX
Pr SUBSCRIBED ang sworn to before
mé@ - this the Sy, day of
, i AT SLOP , 984.
PPS LL
: Yhllis, A wd,
c a en
My Comm ibn Expires: af> 4/4
, A.
~
aS
etle
ix
nt “S
S iN
i: )
\
i,
¥
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.