Respondents Brief — Universities Research Assn., Inc. v. Coutu
Supreme Court brief1981
Ask Donna
What actually matters in this document.
Text
=
*’ Supreme Court, U. S.
FILED
AUG4 1980
No. 78-1945 {.WICHAEL RODAK, JR., CLERK |
3n the
Supreme Court of the Gnited States
Octoser TrRM, 1979
=
UNIVERSITIES RESEARCH ASSOCIATION, INC.,
Petitioner,
v
STANLEY E. COUTU, ET AL.,
Respondents.
On Writ of Certiorari to the United States Court of
Appeals for the Seventh Circuit.
BRIEF FOR THE RESPONDENTS
Hvuexu B. ARNOLD
DanreL N. Kapgan
ARNOLD AND KapJAn
11 South LaSalle Street
Chicago, Illinois 60603
(312) 236-0415
Counsel of record for Service
Rosert Jay Nye
Nyz anp Nyrg
420 North Euclid Avenue
Oak Park, Illinois 60302
(312) 386-7373
Attorneys for Respondent
Stanley E. Coutu, and the
Respondent Class.
The Scheffer Press, Inc.— (312) 263-6850
—_—tA~Aa~
QUESTIONS PRESENTED FOR REVIEW
i. Whether a government contractor which performs
Davis-Bacon Act (40 U.S.C. §§276a-276a-7) “construction,
alteration and/or repair” work with its own employees
is required to pay those employees the minimum wage
rates published in the Federal Register which the Aet
requires for that work, and is the statutory requirement
for payment of those wage rates incorporated in its gov-
ernment contract by operation of law and by refererice,
when the contract specifies that:
(a) the contractor is responsible for “sonstrastion,
alteration and/or repair” concerning the public
buildings and public works on the government
project,
(b) the contractor will include Davis-Bacon Act
wage stipulations in subcontracts letting portions
of the contract work to others, and
(c) if the contractor performs Davis-Bacon work
with its own employees the contract will be modi-
fied to incorporate Davis-Bacon Act stipula-
tions.
2. Whether the Supreme Court will consider the ques-
tion presented by petitioner concerning existence of an
employee private remedy under the Davis-Bacon Act,
when:
(a) that question was not raised, briefed, argued or
ruled on in the proceedings below which have
been brought here for review, and
(b) the record does not therefore include (as it did
in McDaniel v. University of Chicago, 7 Cir. 1975,
512 F.2d 583, vacated and remanded for fur-
ther consideration 423 U.S. 809 (1975), reaf-
firmed on remand, 1977, 548 F.2d 689, certiorari
denied 434 U.S. 1033 (1978) ), evidence or ad-
missions establishing the ineffectiveness of cer-
tain express remedies provided in the Act.
—~ sn
3. If the Supreme Court elects to consider this issue
presented by petitioner: Whether wage-earners have a
right of action against their contractor-employer to re-
cover unpaid wages required by the Davis-Bacon Act (40
U.S.C. §§276a-276a-7) and by the government contract
provisions required by §276a of the Act, when—because
there are ne contract amounts withheld sufficient to as-
sure employee payments (see 40 U.S.C. §276a-2(a)) nor
is there a surety payment bond for the protection of em-
ployees (see 40 U.S.C. §276a-2(b))—such employee right
of action is the only remedy available to make effective
the congressional purpose of the Davis-Bacon Act to
require contractors to pay their employees the waiges
required by the Act.
LIST OF PARTIES
The petitioner in this Court is Universities Research
Association, Ine. Petitioner is the named defendant in a
complaint filed in the district court for the Northern
District of Illinois. The respondent in this Court is
Stanley E. Coutu, on his own behalf and on behalf of
a class which has been certified by the district court. The
class as so certified is described as follows:
“All ‘mechanics and/or laborers’ employed by defen-
dant pursuant to Contract No. AT(49-8)-3000 be-
tween defendant and the United States of America
‘for construction, alteration and/or repair, inelud-
ing painting and decorating, of public buildings and
public works of the United States’ who have been
paid wages less than ‘the wages * * * determined by
the Secretary of Labor to be prevailing for the vari-
ous classes of laborers and mechanics * * * in the
city, town, village, or other civil subdivision of the
State’ in which the work was performed, all as stated
and defined in the Davis-Bacon Act, 40 U.S.C. §276a,
et seq.”
— 4 —
TABLE OF CONTENTS
PAGE
Questions Presented for SIE satiate auteiicincnstiscen t
RETRO AREAS ELE ON SER REDD SERIA et «Se AEE u
I cleat pe itt
laa lcnimntinamiai vu
rE ot RRR eT, 1
ST OIG ais icsssstsassevecsnene sinc vermcsaenss 8
MIT, si ietistcidsitedasateakan oraicahdiorsinasS Rinssanbeiaataighicsmbdiapiaenanclconats 10
I. The Davis-Bacon Act (40 U.S.C. §§276a-276a-
7) requires payment to wage-earners of mini-
mum wage rates contained in the Secretary
of Labor’s prevailing wage determinations, for
all labor concerning “construction, alteration
and/or repair including painting and deco-
rating, of public buildings or public works of
the United States” (see 40 U.S.C. §276a).
This statutory requirement prevails although
the contractor-employer’s government contract
may fail to contain an express stipulation by
the contractor-employer to pay the statutory
WED THEOD- TOF GRE WORK, onscsessesicserssecesesessmeccoese 10
A. The Davis-Bacon Act exists to protect em-
ployees from substandard earnings by fix-
ing a floor under wages on Government
projects, Our respondent class of laborers
and mechanics are the “especial” bene-
I eT, BO, tisnieirciieneerestntpttinensnsin 10
1. The Government contract requires
ROTI - TTR, — cs cercecrnteansnsinttinperesveniese 10
2. Purpose and policy of the Act to in-
sure payment of prevailing wages. .... 12
3. Right to minimum wage is fixed by
IE I cacshasciiacinscisippnunteienaaniaitadusibiiaieatcassien 13
pay ee
PAGE
4. Character of laborers’ work deter-
RD i so a noilaaeamicumacanes 15
B. Where a government contract clause is re-
quired by statute or by procurement reg-
ulation to be included in a government
contract, that clause is deemed incorpo-
rated, as a matter of iaw, into the con-
tract. The Davis-Bacon Act minimum wage
stipulation is part of the subject govern-
ment contract by operation of law, and
employees who perform Davis-Bacon Act
work must be paid the minimum wage rates
established by the Secretary of Labor’s
published wage determinations. .............. . 16
1. Davis-Bacon clauses in our contract. .... 17
2. The Davis-Bacon Act mandatory re-
SINS." Seasnthsmstecussarensheicarsmncimaaeenaienes 18
3. Incorporation of mandatory clauses—
the “Christian Doctrine”. . ............008 20
4, Applicable prevailing wage determina-
UIE INE iiipseiisistnedsncenihichontstaehinnintpensenenicegiins 23
C. A contractor takes a government contract
subject to all applicable statutes. All
statutes relating to the subject matter of
the contract and existing at the time of
contracting become a part thereof and
must be read into the contract. Our peti-
tioner contractor-employer is charged with
knowledge that construction work per-
formed by its employees is subject to the
Davis-Bacon Act and is obligated to pay
the statutory wage rates. ........csssesseseeees 25
1. Davis-Bacon is part of all government
CONSTTUCHION CONTACTS. .......sessececeecessees 25
2. Petitioner’s actions imply assumption
of Davis-Bacon obligations. ................ 26
—v—
D. Contrary to petitioner’s Point I.D. (Petr.
E.
F.
Brief at 25-28), the Seventh Cireuit’s deci-
sion is not inconsistent with express terms
of the Davis-Bacon Act. The defense that
a contract was not advertised or bid, but
is instead a negotiated cost-plus-a-fixed-fee
contract, was expressly anticipated by
Congress in 40 U.S.C. §276a-7. Further,
the claim that federal law grants AEC/
ERDA/DOE authority to establish con-
trary specific wage rates is not true and
is no defense under 40 U.S.C. §276a-3. ....
1. Davis-Bacon applies to all contract
SIO. . - scsisncarscinanssehinedstisimsaa
2. No federal law or approval for con-
CERRY WHO -TOBOB. .cccccinicnsicccitentien
The Davis-Bacon Act 1935 amendments
were intended, inter alia, to prevent. utili-
zation by contractors and agencies alike
of every device resulting in non-payment
of proper prevailing wages at government
projects, including the “arbitrary classifi-
cation” and “underclassification” device. ....
1. Senate hearings and Davis-Bacon vio-
NIE, evseasssieciidecntiicdeneeeenee
2. The “arbitrary classification” and “un-
derelassification” deviCe@. ..ccccccsececeee
3. Neglect of the prevailing wage prin-
GED, sisriinstdissimocnuenntnnaiaamann
The Executive and the Judiciary must de-
fer to Congressional policies represented
by the Davis-Bacon Act. The Davis-Bacon
Act Congressionally-mandated effects on
the procurement process may not be
avoided, even to satisfy other proper pro-
CUTOUNENE ODIOCEIVOD. ..,000<ceyercszenrgderavespyronnqeonnes
PAGE
31
31
31
33
34
Sey
— a
G. The decision of the Seventh Circuit does
not affect administrative functions under
the Davis-Bacon Act. Further, there is no
administrative procedure available to an
employee for adjudication and vindication
of his claim that he has performed Davis-
Bacon Act work under a Davis-Bacon Act
contract, for which his contractor-employer
has not paid the published Davis-Bacon
II WOUND, sc cscesccocsessccssescscssncscoesveces
II. Wage-earners have a right of action against
their contractor-employer to recover unpaid
wages required by the Davis-Bacon Act (40
U.S.C. $§§276a-276a-7) and by the govern-
ment contract provisions required by 4$276a
of the Act, when—because there are no con-
tract amounts withheld sufficient to assure em-
ployee payments (see 40 U.S.C, 4§276a-2(a) )
nor is there a surety payment bond for the
protection of employees (see 40 U.S.C. §276a-
2(b))—such employee right of action is the
only remedy available to make effective the
Congressional purpose of the Davis-Bacon Act
to require contractors to pay their employees
the wages required by the Act. .....ccscsseesereveees
A. The “right of action” question was not
raised, briefed, argued or ruled on in the
proceedings below which have been brought
here for review. Should the Supreme
Court elect, nevertheless, to consider this
question, it must be presumed that the
courts below have found and concluded (as
in McDaniel v. University of Chicago, 7
Cir, 512 F.2d 583 and 548 F.2d 689,
certiorari denied 434 U.S. 1033) that such
employee right of action is the only remedy
available to make effective the Congres-
sional purpose to require contractors to
pay their employees the wages required by
I iii i hasdanmsasisnninorssesvhscesasensstoossocsnenes
PAGE
36
39
— vu —
PAGE
B. There is a private right of action for back
wages against a contractor in favor of em-
ployees who have performed Davis-Bacon
Act work under a contract procuring
Davis-Bacon Act work of “construction,
alteration and/or repair, including paint-
ing and decorating, of public buildings or
public works of the United States”. There
is no administrative determination that
this contract is not covered by the Act,
nor does the right of action here asserted
require any such determination. ............... 41
1. The Davis-Bacon Act governs concern-
eee Ss - UIE ncdicctdiinbetion 41
2. This right of action is predicated on
Davis-Bacon Act rights. ......cccccsseseees . 42
3. Congress has approved, not disap-
proved, the private right... 45
COD iciscesiisiaccsicscacieanicsasiienededinnclsdateaedibsscunsictaiaians 50
DOE, cisincsssnemictiosiveiiniedteniniaininbipmnanainaaiiis At
TABLE OF AUTHORITIES
CasEs
PAGE
Ainslie Corp, v. Middendorf, 381 F.Supp. 305 (D.
BE, TICE). | cancsciinteinennimsrerisnlininsimaastauiacciiins 20
Antoni v. Greenhow, 107 U.S. 769, 2 S.Ct. 91
EAIIIOED savaiscnsidininatinssinneaanedeinslaiageieashlaaieanneniabncaeiitiadins 26
Armour Packing Co. v. United States, 209 U.S. 66,
ae en FINE sduthensscicentdadsssuiilebiniuipteidaseanbiobiaiaailainaiadienanes ~
Art Center School v. United States, 142 F. itll 916
CCE ATL, WR) — i csiercscstericncosssnsicessvanieneniatiasiosersitacmevensantan 24
Assn. of American Railroads v. Castle, 562 F.2d 1310
COB TEE. OTT csvecsisnissscermersniccmansiteassttonbetiels perenne 19
Bateson-Stolte, Ine. v. United States, 305 F.2d 386
(CECI. TOGB) cnccrorsrcscsrscivrccascsnssonneroncnsssptsiedosssessioonseseseseoes 13
— viii —
PAGE
Beley v. Naphtaly, 169 U.S. 353, 18 S.Ct. 354
I Si a a ee 14
Board of Supervisors v. Lackawanna Iron & Coal
.Co., 93 U.S. 619, 23 L.Ed. 989 (1877) woes 28
Bulkley v. United States, 86 U.S. 37 (1874) wu 28
Bushman Construction Co. v. Conner, 260 F.Supp.
FE IL, IE» Sitcsegeineaninensccraenenonovicvinesmnceininrchadanes
Cannon v. University of Chicago, 99 S.Ct. 1946
(L9TD) sesssssessscsssseessssseesesesssnsssesssssnsecssnsnsessesnsnesensnsnsssessanneees 49
City of Tullahoma v, Coffee County, 204 F.Supp. 794
- (E.D. Tenn. 1962), rev’d on other grounds 328 F.2d
NL NINE ics chapetissubncnietsaiaticeibonpsconnctsncediennstonisien 21
Commissioner v. Bilder, 369 U.S. 499, 82 S.Ct. 881
UIE SEI aisccslaigec scctlec i iasdasdannaiamanmaboatieiatbawaaaasenanioinoutace 14
Compagnie Generale Transatlantique v. American
Tobacco Co., 31 F.2d 663 (C.C.A. 2, 1969) ....0....... 22
Cort v. Ash, 422 U.S. 66, 95 S.Ct. 2080, 45 L.Ed.2d
RI Sica ahd ala ara ai aunt aks ate uleddgbigimboacoe 44
Coutu v. Universities Research Association, Inc., 595
F.2d 396 (C.A. 7, April 4, 1979) ....2, 6, 11, 30, 37, 40, Az
Drivers, Salemen, Local Union No, 695 v. N.L.R.B.,
Sen ee ee AAT, TR) eivincehictstnaviccccoeens 13
Farmers’ & Merchants’ Bank v. Federal Reserve
Bank, 262 U.S. 649, 43 S.Ct. 651 (1923) wo... 25
Gillioz v. Webb, 99 F.2d 585 (C.A. 5, 1988) oe. 13
G. L. Christian and Associates v. United States, 312
F.2d 418, 160 Ct.Cl. 1 (1963), opinion on reargu-
ment denied 320 F.2d 345, 160 Ct.Cl. 58 (1963),
certiorari denied, 376 U.S. 954 (1963), rehearing
denied 376 U.S. 929, 377 U.S. 1010 (1964) ........ 20, 21, 41
G.L. Christian and Associates v. United States
(Christian [), 312 F.2d 418, 160 Ct.Cl. 1 (1963 ..21, 41
ait.
PAGE
G.L. Christian and Associates v. United States
(Christian IT), 320 F.2d 345, 160 Ct.Cl. 58 (1963) ..21, 41
Hartford Accident & Indemnity Co, v. N.O. Nelson
Mfg. Co., 291 U.S. 352, 54 S.Ct. 392 (1934) ...:.... 23
Hendrickson v. Apperson, 245 U.S. 105, 38 S.Ct. 44
PURIST P ssicncestcinshedssinnnsteeehiciepnabiedkcnnbaniiadmeniiaionsiiaiatiaademnammaaaaa 25
Home Building & Loan Assn. v. Blaisdell, 290 U.S.
Sam OE TRAM, SRR GRBIR) ccserentvcnccsenicenn 25
Hudson Distributors, Inc. v. Eli Lilly & Co., 377 U.S.
ma OE EA. BSTD CTRGO) cette . 14
J.I. Case v, Borak, 377 U.S. 426 (1964) wc ecco 12
McCown v. Heidler, 527 F.2d 204 (C.A. 10, 1975) .... 14
McDaniel v. University of Chicago, 512 F.2d 583 (C.A.
7, 1975), vacated and remanded, 423 U.S. 809, 96
S.Ct. 20, 46 L.Ed.2d 30 (1975), reaffirmed on re-
mand, 548 F.2d 689 (C.A. 7, 1977), certiorari
denied, 434 U.S. 1033, 98 S.Ct. 765, 54 L.Ed.2d
780 (1978) ssiunsaiensisicaebasbaiectacemnieesisaniabaniaanc aaa i, 6, 40, 44
MeDaniel v. University of Chicago (McDaniel I),
S53 F298 G66: (CA. T, AUG) ccctcctie 9, 12, 40, 44, Aw
McDaniel v. University of Chicago (McDaniel II),
548 F.2d 689 (C.A. 7, 1977) ........... 9, 12, 40, 44, 45, Av
McLean v, United States, 226 U.S. 374, 33 S.Ct. 122
EIIEAE D scosiicionisntssincionsanonnnadioupesnanesiciniinienpneielianiaessiaaaanaananaIAm 14
M’Cracken v. Hayward, 11 L.Ed. 397 (1844) ........... 26
Northern Pacific Ry. Co. v. Wall, 241 U.S. 87, 36 S.Ct.
MD TING) acs ccniceticcresticerssientincemninainiitienaaas 25
Ogden v. Saunders, 25 U.S. (12 Wheat.) 212, 6 L.Ed.
COG (1827) crresesssescesssesssnseessssnesssneessssnsnsnnersnntecssneneseanessenns 26
Paul v. United States, 371 U.S. 245, 83 S.Ct. 426
CRD wscssctisesissierssinnsetnennintiretex vseseteineninentesteimnnstaemeaai 16
Perry v. Sindermann, 408 U.S. 593, 92 S.Ct. 2694
CRETE) asvceenssrssnnnsenacsessssasansinaseneenianiecinnsciegetsannhtnianneliennninan 28
— J ==
PAGE
Piper v, Chris-Craft Industries, Inc., 430 U.S. 1, 97
SR NY MUTED. serintniotcinnichhitichiouh setaccatnadesneesiabecksbiiabesun 50
Seaboard Surety Co. v. Standard Acc. Ins. Co., 277
SGe INTL EINE ok cccscanhhdiasnpisspndbn deena ditahbenatiboniis 47
Securities Investor Protection Corp. v. Barbour,
421 U.S. 412, 95 S.Ct. 1733, 44 L.Ed.2d 263
SUIITIT-(ieshcassdiceitadiasnthatiiddhigsacadidcaiasideataeadiabesaaahinlnbcaicuentesia 44
Southern Surety Co. v. Oklahoma, 241 U.S. 582, 36
MAINE ETI s,s. csicat Lassen erpbapnnsdedleeiasiausnionasaansiokans 26
Strong v. American Fence Const. Co, 245 N.Y. 48,
I alas ea cela ki cae neck Se etal 47
Touche Ross & Co. v. etsiaetiai 99 S.Ct. 2479
| ___RREEIP AETS SPEN por aera ese Un sono PRUE ae TEO NOI EO ore 50
Transamerica Mortgage Advisors, Ine. v. Lewis, 100
i _, ga rnreRececyec enncee eer svenmn enn Ce PRI 49
United States v. Binghamton Construction Co., 347
U.S, 171, 74 S.Ct. 438, rehearing denied 347 U.S.
UW WT TR CED secesscericessssnacssnccssvsesssheresisiens 5,
940, 74 S.Ct. 625 (1954) woe 5, 13, 14, 19, 30, 50
U.S. (Hillsdale Rock Co., Inc.) v. Cortelyou & Cole,
Inec., 581 F.2d 239 (C.A, 9, 1978) ......cccccscesccrrseees 39
United States ex rel. Von Hoffman v. City of Quincy,
Ba OD uaneitiaanitintitenitapinncatinanicbtinitiomnnliie .26, 48
United States v. McKinnon, 289 F.2d 908 (C.A. 9,
ETS TERR RRR NeeeT aeRO s DOEPREEO renee ON Hea OER
United States v. New Orleans Public Service, Inc.,
oo EF Fuk Se Se |. y 5 een neeenmennnenrenne .20, 22
Walker v. Whitehead, 83 U.S. 314, 21 L.Ed. 357
IN ‘cisichsbsichcd tlhe siobie pm seiniaavbainstiophnanonseiednanliagnae a 26
Whirlpool Corp. v. Marshall, 100 S.Ct. 883 (1980) .... 50
Winston Bros. Company v. United States, 458 F.2d
AQ (CLC), 1972) errsseesscrossssessrrsnnessesnnnneeessnnnecessannneessssnne 24
Woods v. Lovett, 313 U.S. 362, 61 S.Ct. 983 (1941) .... 25
a oe
PAGE
STATUTES
Contract Disputes Act of 1978, 41 U.S.C. §§601-613, |
a 36
Copeland (Anti-Kickback) Act, section 2, 40 U.S.C.
ae SESE EAN eat am alin she RN dol et 20
Davis-Bacon Act, 40 U.S.C. §§276a-276a-7 ....i, ii, 10, 39, 46,
47, At
0 i scuesenitaes M, 5, 34,
I UIE cctesactiacsbccesdenscsagassuass 10, 18, 29, 37, 42,45
I I a Cs saenbsaiesmuaciowuinantiogs Ai
a ash caesessiomneninhonaaanal 42
OP Res SPEND | Sac vcscesesccncnashciccvtecsconosensi it, 37, 39, 40, 42
Oe Pe ETD ecsccacesacasiccsienstsainacsnaeeconsncncsoas ii, 39, 40, 42
Re I I Shien ihisscsdtinscicansactnesomsananmvavevebeoncniis 28, 29
I oo casdainilcnnasnnanenapbsapedndontuandanoonnaaee 36
I I a a aici. ch aempanadeennlienbaconians 28, 29
Department of Energy Organization Act of 1977,
P.L. 95-91, 42 U.S.C. $7194 (Title V, §504, 91 Stat.
er ERE Ae Miele tee et eA Ce a SR Se Snr eR ARP 36
Federal Property and Administrative Services Act of
I i I EE vided cocenessndusnsbainanpensahviannschicuiniiaid 29
Freedom of Information Act, 5 U.S.C. §552 et seq. ....11, 27
McNamara-O’Hara Service Contract Act of 1965,
REN IEEE actinicecasucencterinticaneencissctelanstatenesaaiaionives 34
Miller Act, 40 U.S.C. §§$270a-270e oo... cccecssseeceesseeee 47
RR RID "cdi LasSiccanishsianctanabhacanionooionoexenisdsvetuesinnes 47
Portal-to-Portal Act of 1947 ..ccccssssssssssnessnesssecsssesenseenes 46
NE ic caiga clic ads dede tats iaaanecnanneaneibasiepacaion 46
RE EN REESE aU RRS TS EE OO aT 47
29 U.S.C. §259(b)(B) ccssessssccsescssescssessssseccescsescessessseseseen 30
— Ti —
PAGE
Reorganization Plan No. 14 of 1950, 5 U.S.C. $903
note, 15 F.R. 3176, 64 Stat, 1267 ceccoccssseccusssseesseaen 20
Walsh-Healey Public Contracts Act, 41 U.S.C. $435-
WED scenssninsnsersssuicnnihelianssibipibnnaddamamiadad auger 34, 46
OTHER LEGISLATIVE AUTHORITIES
93 Cong. Rec. 1488-1517, 1556-1574, 4383-4391
COON ccsessniciniaivucastadsiat aes (cee een 46
93 Cong. Rec. 2081-2098, 2110-2135, 2175, 2192-2198,
2230-2277, 2287-2311, 2348-2377, 4371-4372 (1947) .... 46
120 Gomme. Bee: TOR CUBED scstncnctea . 46
H.R. 2157, 80th Cong., Ist Sess. (1947) wu... 46
H.R. Hearings on Administration of the Davis-Bacon
Act, Committee on Education and Labor, 87th
Cong., 2nd Sess. (1962) ou... 24, 30, 35, 37, 38, 43, 44
H.R. Report 74-1162, 74th Cong., 2nd Sess. (eencern-
che Devine. Bab) ocnciincicnossmmucsiamaae 35
H.R. Report 80-71, 80th Cong., Ist Sess. (1947) .... 46
H.R. Report (Conference Report) 80-326, 80th Cong.,
Be i CREE) « seciiccceensiecctcieenenanenl 46
H.R. Report 89-948, 89th Cong., lst Sess. (concern-
ing Service Contracting Act) ......cccsssssscesssseeseeees 36
H.R, Report 91-468, 91st Cong., Ist Sess. eee 35
S. 70, 80th Cong., Ist Sess. (1947) ...semscsersessee 46
S. Hearings on Administration of the Davis-Bacon
Act, Committee on Education and Labor, 73rd
Coma, Bad Gan. (IBDE) .scccenrdessnssicmneieesschpeeeiins 31, 32, 34
S. Report 74-332, 74th Cong., Ist Sess. (1935) ........ 32, 33
S. Report 74-1157, 74th Cong., 1st Sess. (concern-
Seame “Walele- Tica Rah) ncescectcesesnsevorenstiorcmncnnentn 35
—
S. Report 80-37, 80th Cong., Ist Sess. (1947) wo...
S. Report 80-48, 80th Cong., Ist Sess. (1947) cou.
S. Report 91-427, 91st Cong., Ist Sess. woe
Ruites Anp REGULATIONS
Rules of the United States Supreme Court
Rule 23-1(c) ............... ee nniinnsnsecenssanesvensonss
Rule 21.1(a) (effective June 30, 1980) wwe.
AEC/ERDA/DOF Regulations
Equitable Adjustments Clause, 41 C.F.R. §9-
oi cri ccxanmsuseseuisdinasesseonassececsene
Disputes Clause, 41 C.F.R. §9-7.802-5 (1978
E.R.D.A. procurement regulations, 41 C.F.R. §§9-
18.701-52(b) and (b)(1) (1977 ed.) ccsccceccssssssseee |
Department of Energy procurement regulations,
41 C.F.R. %§9-18.701-52(b) and (b)(1) (1979
Department of Labor Regulations
29 C.F.R. §§1.5(b) and 1.7(a)(2) (1977 ed.) uu...
ME MINED WED oscscsscsescosesesecsacecsnsncacnsesessscese
Department of Labor Wage Determinations
42 F.R. 30078 et seq. (June 10, 1977) wn. eeeeeee
43 F.R. 11360 et seq. (March 17, 1978) «0...
43 F.R. 11360, 11379-11383 (March 17, 1978) ....
Federal Procurement Regulations, 41 C.F.R. $1-
sa svanasitensesesncsensecoscceteabes
36
16
24
— sw —
PAGE
MISCELLANEOUS AUTHORITIES
17 Am.Jur.2d, Contracts, §257, at 654-656 (1964 ed.) .. 26
1 Commission on Government Procurement Report
(1969 Commission on Government Procurement) .. 35
3 Corbin on Contracts, §51, at 197 (1960 ed.) «0.00... 26
3 Corbin on Contracts, §551, at 200-201 (1960 ed.) .... 23
17A Corpus Juris Secundum, Contracts, §330, at 295
RI NE icsssbsscns slasictcmsisicapsnmiesnntecenunniinaianicnasninnobmandnnse 26
ER EERE ESOL PS SCS A 23
ge SEA TCR Ra ey Bereta Rt eeehr LS ele 28
Dees and Ginsberg, Contract Interpretation and De-
fective Specifications, (Gov’t. Contracts Monograph
No. 4, 1975 ed.; The George Washington Univer-
ED csssinssnssossicrsndssemnncannhapesiessansesnnnieseibocinionsiecssenimenss 20,21
Opinion of the Attorney General, 43 Op. Att’y. Gen.
No. 14 (March 9, 1979), 1979 Labor Law Reports
EArt a HURL IIII: saicdesansetsin cteascapstlichelg soasitsollesiapebstiencsaun 35
Williston on Contracts, §615, at 1767 (1936 ed.) ........ 26
4 Williston on Contracts, §615, at 597 (ed ed. 1961) .. 26
In THE
SUPREME COURT OF THE UNITED STATES
Ocroser TERM, 1979
No. 78-1945
UNIVERSITIES RESEARCH ASSOCIATION, INC.,
Petitioner,
v
STANLEY E. COUTU, ET AL., :
Respondents.
On Writ of Certiorari to the United States Court of
Appeals for the Seventh Circuit.
BRIEF FOR THE RESPONDENTS
STATEMENT OF THE CASE
1. Certiorari was granted in this cause to review a:
decision of the Seventh Circuit which reversed a sum-
mary judgment entered by the district court and re-
manded the case for completion of discovery and for
trial. The district court description of the motion and
affidavit, pursuant to which that summary judgment had
been entered, is as follows (See J.A. 31-32, 81):
“Defendant has filed a motion for summary judg-
ment supported by the affidavit of John R. Frazier,
Chief Legal Counsel for the Fermi National <Ac-
celerator Laboratory claiming that there is no issue
of material fact and Defendant is entitled to judg-
=
ment as a matter of law. Defendant asserts that the
only contract between defendant and the United
States government is Contract No. EY-76-C-2-3000, as
amended, formerly designated AT(49-8)-3000, and
that ‘{nJo Davis-Bacon Act, 40 U.S.C. §276, et seq.,
stipulations requiring the payment of prevailing
wages have ever been made a part of or incorporated
in said contract .. .’ [Affidavit of John R. Frazier,
para. 3].”
2. An accurate description of the nature of this cause,
the government contract in issue, the contentions of the
parties, and the conclusions of the court of appeals, is
found in the opinion of the Seventh Circuit, Coutu v.
Universities Research Association, Inc., 595 F.2d 396
(J.A. 35-46). For the convenience of the Court, relevant
portions of that opinion are reprinted in the Appendix
to this brief, at Az.
3. The government contract pursuant to which re-
spondent and his class were employed manifestly pro-
cures and continues today to procure “construction, al-
teration and repair” of the buildings, facilities and sys-
tems at the Fermi National Accelerator Laboratory site
owned by our government. Indeed, under the original
January 23, 1968 contract and until fourteen modifica-
tions and some four years later, the parties had expressly
excluded “operation, maintenance, and use” from the
petitioner’s responsibilities. Thus, paragraph “1” of Ar-
ticle XXXVIII of the contract, the last article in the
contract, reads (Contract, page 70):
“The operation, maintenance, and use of the ac-
celerator complex when completed are not within the
scope of this contract.”
=
Modification No. 14, dated April 6, 1972, continues the
construction responsibilities of the petitioner (see, @.g.,
Contract, Recitals, Modification No. 14, at 1) and adds—
as only part of “Phase II” of the work procured by the
contract—certain “operation, use and maintenance” func-
tions. Phase IT also added certain “alterations and modi-
fications” and certain “construction of additional new
facilities [and] alterations or repair of existing facili-
ties” responsibilities. (Contract, Article II, Modification
No. 14, at 8, 10.)
4. Neither petitioner nor the United States as amicus
has pointed to any governmental ruling or decision char-
acterizing this government contract as not covered by the
Davis-Bacon Act. They appear simply to infer the exist-
ence of such a ruling from contract provisions which first
provide that Davis-Bacon Act work under the contract
should be subcontracted out by petitioner rather than
performed with petitioner’s own employees, second re-
quire that petitioner include in those subcontracts the
appropriate Davis-Bacon Act stipulations, and third state
that if petitioner does use its own employees for Davis-
Bacon Act work the contract will be modified to include
Davis-Bacon Act clauses so far as petitioner’s own work-
force is concerned. Those contract provisions, however,
are consistent only with conclusions that the contract is
covered by the Davis-Bacon Act and that the contracting
agency does view it as covered.’ They both contemplate
that Davis-Bacon work is being procured by means of
Further evidence exists, too, establishing that both
the petitioner and the agency know that the contract is
covered by the Davis-Bacon Act. Discovery, until it was
stayed to permit summary judgment proceedings on pe-
titioner’s “the contract does not contain express Davis-
—_
the government contract, and require that Davis-Bacon
work be subject to contract clauses applicable to that
work. Thus, contrary to the contention of the petitioner
that the contract “does not specify that [Davis-Bacon
prevailing wage] rates be paid” (see “Question Pre-
sented”, Petr. Brief, at 2), and contrary to the conten-
tion of the United States that the contract “has been ad-
ministratively determined not to call for Davis-Bacon
work” (see “Question Presented”, Amicus Brief, at 1),
it is clear that the contract does specify that Davis-Bacon
wage rates be paid and the contracting agency has de-
termined that the contract calls for Davis-Bacon work
to which Davis-Bacon obligations are applicable.
5. The petitioner has appended to its contract an
“Appendix B” containing certain employee classifications
* (Continued)
Bacon Act stipulations” point, disclosed the existence of
approximately 135 forms entitled “Request for Davis-
Bacon Determination,” dated almost monthly between
September 13, 1968 and December 5, 1975. The forms
were initially prepared by petitioner, then submitted to
AEC/ERDA for the views of the area manager and his
three-man “Davis-Bacon Committee,” thereafter circu-
lated among the members of the committee, and finally
returned to petitioner with a “recommendation” (by the
committee) which the area manager “approved” concern-
ing whether or not the Davis-Bacon Act was applicable
to the work thus described by petitioner. We do not yet
know whether petitioner submitted descriptions of all
work to be performed under the contract; nor do we yet
know how many or which of the forms actually submit-
ted (if any) include work which was performed by the
respondent class. Without commenting on the propriety
or legal effect of those forms and recommendations, how-
ever, there were 129 recommendations that “Davis-Bacon
Act is applicable” and 6 recommendations that “Davis-
Bacon Act is not applicable”.
— po
and salary and benefit schedules. As the United States
has noted (Amicus Brief, at 11, n. 11):
“The hourly rates specified by the contract for con-
tractor employees * * * are somewhat less than the
prevailing wages established by the Department of
Labor for similar classifications of Davis-Bacon Act
workers * * *.”
These “Appendix B” classifications and salary schedules
do not, under the contract (see, e.g., Contract “Appendix
B”’ at 33; J.A. 61) or under the Davis-Bacon Act, set the
upper limit of wages to be paid petitioner’s workers. See
United States v. Binghamton Construction Co., 347 U.S.
171, 177-178 (1954). The contracting agency itself does 1.0t
view petitioner’s action in preparing those classifications
and schedules and their attachment to the contract as rep-
resenting binding contracting agency representations
that they are proper. See Kennedy Deposition, at 79-82.
6. The issue in the courts below, and that which was
initially presented to this Court in petitioner’s certiorari
petition (see “Question Presented”, Petition, at 2), did
not question the very existence of a private remedy to
respondent and his class for nonpayment of their Davis-
Bacon minimum wages. The appeal below was from a
summary judgment based simply on the one sentence in
petitioner’s counsel’s affidavit that
“No Davis-Bacon Act, 40 U.S.C. §276a, et seq.,
stipulations requiring the payment of prevailing
wages have ever been made a part of or incorporated
in said Contract .. .” (Pet. App. C, at A25; J.A.
31-32, 81). |
The first district judge to rule on the sufficiency of the
complaint had rejected that same contention when he
denied petitioner’s prior motion to dismiss the suit. See
~~ a
Pet. Appendix B, at Al5; J.A. 24. The Seventh Circuit,
in its decision now under review, likewise rejected that
contention, declaring (Pet. App. A, at A5; J.A. 39; 595
F.2d 396, 398): |
“We hold that summary judgment was improperly
entered against plaintiff and his class because the
required wage stipulations were incorporated by op-
eration of law.”
The question of the existence of a private remedy was
neither briefed nor argued in the Court of Appeals. In
fact, that question was treated by petitioner as settled in
its brief to the Seventh Circuit (Deft. Brief at 1, 8, 17-18;
7th Cir. Docket No. 78-1165).
After request by this Court that respondent submit a
brief in response to the Petition in this cause, our Brief
in Opposition was filed. Then Supreme Court Rule 23-
1(¢) (now Rule 21.1(a)) was quoted and, inter alia, re-
spondent and the class pointed out that
“arguments by petitioner to the effect that respond-
ent has no right of action under or by reason of the
Act, and that respondent has failed to exhaust ad-
ministrative remedies, are not so fairly comprised
[in the “Question Presented”] and have already been
recently considered by this Court twice in related
litigation.” (Brief in Opposition, at 26-29.)
The related litigation, there noted, is McDaniel v. Uni-
versity of Chicago, 512 F.2d 583 (C.A. 7, 1975), vacated
and remanded “for further consideration in light of
SIPC v. Barbour, 421 U.S. 412, 95 S.Ct. 1733, 44 L.Ed.2d
263 (1975) and Cort v. Ash, 422 U.S. 66, 95 S.Ct. 2080,
45 L.Ed.2d 26 (1975)”, 423 U.S. 809, 96 S.Ct. 20, 46
L.Ed.2d 30 (1975), reaffirmed on remand, 548 F.2d 689
(C.A. 7, 1977), certiorari denied, 434 U.S, 1033, 98 S.Ct,
Pon. Jom
765, 54 L.Ed.2d 780 (1978). Counsel are the same in both
the instant Coutw and the McDaniel cases, and the Uni-
versity of Chicago is one of the members of petitioner
Universities Research Association, Inc. |
Certiorari was granted without specific designation
by the Court of the issues to be argued. Thereafter pe-
titioner filed its brief on the merits, much of which deals
with the question of the existence of a private remedy.
See, e.g., Petr. Brief, at 15-21, 28-32, 33. All of the brief
by the United States as amicus curiae deals with that
question. See “Question Presented” and “Argument”,
Amicus Brief, at 1, 17.
7. Further, the record in the instant Coutw case does
not fairly present questions concerning the existence
vel non of a private remedy on behalf of respondent
and his class. McDaniel on the contrary did present that
record. There the record established, among other things,
that no surety payment bonds upon which wage-earners
might sue were required of or submitted by the contractor
(see McDamel Appendix at 21-22, 7th Cir. Docket No. 73-
1438), and that no funds were withheld from the contrac-
tor with which to pay those wage-earners (see [bid., Affi-
davit at 23-24). We may, of course, speculate in the cause
now on review that because of the virtually-identical fact
situations presented in both cases, the express statu-
tory remedies here were as ineffective as there. But
this Court has never been known for a proclivity to render
advisory opinions on questions neither presented nor
supported by a record made below. Respondent does
not, in this cause, contend that the Davis-Bacon Act. con-
tains an alternative private federal remedy for laborers
and mechanics who simply choose not to utilize express
remedies provided by the Act in situations where those
ce oes
remedies are effective to afford them the relief intended
by Congress. Respondent does submit, however, that if
this Court elects to hear and decide questions concerning
the existence under the Davis-Bacon Act of a private
federal remedy other than on surety payment bonds, fun-
damental fairness requires that the ineffectiveness of the
express statutory remedies otherwise provided in the
Davis-Bacon Act be presumed.
SUMMARY OF ARGUMENT
Our respondent employees have performed Davis-Bacon
Act work under a Davis-Bacon Act government con-
tract, for which their contractor-employer has paid them
less than the published Davis-Bacon Act minimum wage
rates. The contract expressly concerns “construction”
work, expressly informs petitioner that Davis-Bacon Act
duties are applicable to such work, and expressly con-
templates that the petitioner pay its own employees in
accordance with the Davis-Bacon Act if those employees
perform Davis-Bacon work. There is no ageney view
contrary to the conclusion that this contract’ concerns
Davis-Bacon Act work to which the statutory obligations
extend. The Act represents fundamental procurement
and socio-economic policies established by Congress. Un-
der applicable legal doctrine and precedents, both the
Act and the mandatory government contract clauses
prescribed by the Act are part of the contract by opera-
tion of law. In addition, references in the contract to the
Act, petitioner’s experience with applying the Act to its
own subcontractors, and petitioner’s performance of
Davis-Bacon work with its own employees, necessarily
imply the incorporation ci Davis-Bacon obligations into
the contract and oblige petitioner to pay the statutory
_ on
wage. The court of appeals correctly concluded that pe-
titioner’s mere assertion that the contract contains “no
Davis-Bacon Act stipulations” is no basis for a summary
judgment in favor of the petitioner-employer.
The question of the existence of an employee right of
action to recover unpaid Davis-Bacon Act minimum wages,
was not raised, briefed, argued or ruled on in the pro-
ceedings below in this cause. In the event the Supreme
Court elects to consider this question, the Court must.
presume a record which reflects—as in the recent related
McDaniel case, 7 Cir., 512 F.2d 583 (1975), 548 F.2d 689
(1977), certiorari denied 434 U.S. 1033 (1978)—that there
are no withheld contract amounts to assure employee
payments and no surety payment bond upon which re-
spondents might recover. Our respondents assert, thus,
that their right of action exists under circumstances
which render other statutory relief unavailable. This
employee right of action is the only remedy here avail-
able to make effective the Congressional purpose of the
Davis-Bacon Act to require contractors to pay their em-
ployees the wages required by the Act. Congress created
the federal statutory right to these minimum wages and
conferred a private right of action on employees under
the Act. The Congressional purpose will be undermined
in the circumstances of this case absent relief against
the contractor-employer by these particular persons in-
tended to be protected by the Act. This remedy is an
essential and rational part of and complement to its
remedial scheme. There is, finally, no ageney—other
than our courts—assigned by law to adjudicate respond-
ents’ claims and enforce their rights.
— =
ARGUMENT
I.
THE DAVIS-BACON ACT (40 U.S.C. §§276a-276a-7)
REQUIRES PAYMENT TO WAGE-EARNERS OF
MINIMUM WAGE RATES CONTAINED IN THE
SECRETARY OF LABOR’S PREVAILING WAGE DE.
TERMINATIONS, FOR ALL LABOR CONCERNING
“CONSTRUCTION, ALTERATION AND/OR REPAIR
INCLUDING PAINTING AND DECORATING, OF
PUBLIC BUILDINGS OR PUBLIC WORKS OF THE
UNITED STATES” (see 40 U.S.C. §276a). THIS STAT-
UTORY REQUIREMENT PREVAILS ALTHOUGH
THE CONTRACTOR-EMPLOYER’S GOVERNMENT
CONTRACT MAY FAIL TO CONTAIN AN EXPRESS
STIPULATION BY THE CONTRACTOR-EMPLOYER
TO PAY THE STATUTORY WAGE RATES FOR SUCH
WORK.
A. The Davis-Bacon Act exists to protect employees
from substandard earnings by fixing a floor under
wages on Government projects. Our respondent class
of laborers and mechanics are the “especial” bene-
ficiaries of the Act.
1. The Government contract requires Davis-Bacon
work. The Government contract involved in this case
clearly contemplates, by its express terms, the perform-
ance of construction work within the meaning of the
Davis-Bacon Act (40 U.S.C. §§276a-276a-7). Among other
provisions, it characterizes the “two categories of work
contemplated by this contract” (Contract No. AT(49-8-
3000, Appendix “A” thereof) for which petitioner is re-
sponsible, as
“a. Construction: Includes design, fabrication or
procurement, erection, test and inspection, assembly
a
and installation of the systems, components, build-
ings, etc., comprising the accelerator and the conven-
tional facilities, as described * * * below.
“b, Research and Development: * * *” [Appen-
dix “A” to Contract, at p. 1.].
Further, by Supplemental Agreement dated April 6, 1972
“effective as of July 1, 1971” the contract was revised,
certain prefatory Recitals stating, iter alia, that “the
Association shall continue the design and construction
of the accelerator and related facilities” (Modification No.
14, at 1).
And if that were not enough to demonstrate that peti-
tioner is the contractor primarily responsible for the con-
struction called for by the contract, we also have peti-
tioner characterizing itself as “This Federally assisted
construction contractor’ in a November 25, 1978 certi-
fication to the government that it does not maintain seg-
regated facilities for its employees “under its Prime
Contract No. AT (4908)-3000”.?
*The contract, originally dated January 23, 1968, “ef-
fective as of January 5, 1967” is not in the trial court
record and, of course, not therefore in the Record on
Appeal in the Court of Appeals. It, or portions of it,
may have been furnished to the district court by the
petitioner. Respondent has secured a copy of the contract,
or portions of it, through Freedom of Information Act
procedures. 5 U.S.C. $552 et seq. Discovery procedures
initiated by the respondent and his class prior to sub-
mission by petitioner of the summary judgment motion
which resulted in the district court judgment reversed
in this case by the Seventh Circuit, including procedures
for production of documents (see J.A. 64 entitled
“Amended First Request to Produce”), were stayed pend-
ing disposition of the said motion and determination of the
legal question presented. See also Coutu opinion, 595 F.
2d 396, at 397. It is apparent that there may be other agree-
ments and documents yet to be discovered, concerning
petitioner’s Davis-Bacon duties.
a
2. Purpose and policy of the Act to insure payment of
prevailing wages.
In McDaniel I,’ the Seventh Circuit, noting that “we
should be especially ‘alert to provide such remedies as are
necessary to make effective the congressional purpose’ J.1.
Case v, Borak, 377 U.S. 426, 433 (1964), described that
purpose as “insuring the payment of ‘prevailing wages to
laborers and mechanics on all government contracts in ex-
cess of $2000” and the “basic premise of this legislation
* * * to foster economic stability throughout the nation by
requiring that those employed on federal projects receive
fair and equitable wages.” (512 F.2d 583, 587; emphasis
supplied.) In McDaniel II, again holding that a private
remedy under the Davis-Bacon Act is necessary to effectu-
ate the intention of Congress in enacting that statute, the
court quoted from 1931 and 1964 legislative history and
declared, inter alia, that “the plaintiff class of laborers
and mechanics are the ‘especial’ beneficiaries of the Davis-
Bacon Act,” that the Act “by its terms mandates that the
contract * * * provide that laborers and mechanics hired
by the contractor be paid the minimum wages determined
by the Secretary of Labor to be prevailing for the cor-
responding class of laborers in the locality,” that the
laborer is “not only the principal beneficiary of the statute,
but also a third-party beneficiary of a contract provided
for by the statute,” and that “the fundamental purpose of
the Act was to benefit laborers and mechanics by paying
them wages prevailing in private industry” (548 F.2d
689, 692-693; emphasis supplied). Noting also that “the
Supreme Court of the United States recognized in United
*The McDaniel case involves employees at Argonne
National Laboratory in DuPage County, Illinois; the
instant Coutu case involves employees at the National
Accelerator Laboratory in Kane County, Illinois.
=
States v. Binghamton Const. Co., Inc., 347 U.S. 171, 74
S.Ct. 488, 98 L.Ed. 594 (1954) that laborers are. the
primary beneficiaries of the Davis-Bacon Act” (tbid.),
the Seventh Cireuit quoted this Court’s Binghamton hold-
ings that:
“The language of the [Davis-Bacon] Act and its
legislative history plainly show that it was not en-
acted to benefit contractors, but rather to protect their
employees from substandard earnings by fixing a
floor under wages on Government projects” (347 U.S\:
at 176-77, 74 S.Ct. at 441); and “On its face, the
[Davis-Bacon] Act is a minimum wage law designed
for the benefit of construction workers” (347 U.S. at
178, 74 S.Ct. at 442).
See, also, Bateson-Stolte, Inc. v. United States, 305 F.
2d 386 (Ct.Cl. 1962), where the court said (305 F. 2d at
389): ‘‘Let it be remembered that the provision for the
payment of a minimum wage was not for the benefit of
the contractor and was no warranty that he would not
be required to pay a higher wage. United States v. Bing-
hamton Construction Co. 347 U.S. 171, 74 S. Ct. 438, 98
L.Ed. 594.’’
3. Right to minimum wage is fixed by the Act. Plainly,
if the Davis-Bacon Act is to serve the manifest purpose
and policy of Congress, it must be recognized that the
Act is remedial and required to be “liberally construed to
effectuate its beneficent purpose” (Driers, Salesmen,
Local Union No 695 v. N.L.R.B., 361 F.2d 547, 553 (C.A.
D.C. 1966); Gillioz v. Webb, 99 F.2d 585 (C.A. 5, 1938)).
To construe the Act as requiring payment of the statutory
wages only if the government contract contains a com-
mitment by the defendant in language even more express
and explicit than that which we already have, is to disre-
gard completely the meaning of the Act, its history, its
purpose, and indeed, the basic principle that the goal of
ol oe
statutory construction is to ascertain and effectuate Con-
gressional intent.‘
Further, all the authoritative references to the effects
and the purposes' of the Davis-Bacon Act, speak of rights
assured to workmen on government projects by the Act.
For example, this Court, also in Binghamton, teaches that
itis the Act itself which fixes and vests the right to the
minimum wage. Thus, “The Davis-Bacon Act requires
that the wages * * * shall be not less than the minimum
wages” (347 U.S. at 172, 74 S.Ct. at 439; emphasis sup-
plied). When referring to the Act, our legislators and our
courts uniformly and invariably describe it as legislation
which assures payment to such workmen of the statu-
torily-defined minimum wage. Neither the Congress nor
* See, e.g., Hudson Distributors, Inc. v. Eli Luly & Co.,
377 U.S. 386, 395, 84 S.Ct. 1273, 1280 (1964) (stating that
where “legislative history clearly indicate[s] the purpose
of Congress that purpose must be upheld”) ; Commissioner
v. Bilder, 369 U.S. 499, 505, 82 S.Ct. 881, 884 (1962)
(declaring that “we must give the statute effect in
accordance with the purpose so clearly manifested by
Congress”); McLean v. United States, 226 U.S. 374, 33
S.tC, 122, 125 (1912) (stating that the Court must “keep
in mind the purpose which impelled the enactment”) ;
Beley v. Naphtaly, 169 U.S. 353, 359-360, 18 S.Ct. 354,
356) (1898) (“The act of Congress should not be so con-
‘strued as to except from its remedial provisions those
who were without an actual grant * * *. Such a construc-
tion ought to be put upon a statute as will best answer
the intention which the makers had in view * * *. The
equitable construction which restrains the letter of a
statute is defined by Aristotle * * *.”); McCown ve
Heidler, 527 F.2d 204, 207 (C.A. 10, 1975) (“the Act
should be interpreted to attain that end” and “should be
construed ‘not technically and restrictively, but flexibly
to effectuate its remedial purposes’ ”, and “No legislative
enactment should be rendered ineffective to attain its
purpose if such a construction can be avoided”.),
_ we
the courts view the Act (as petitioner would have us view
it) as legislation simply establishing contract formalities
to be followed or not followed at the whim or pleasure
of the contracting parties and, if not followed, of no
benefit to workmen otherwise performing Davis-Bacon
Act construction work.
4. Character of laborers’ work determines coverage.
The purpose of the Davis-Bacon Act is, of course, to
establish substantive rights of workers actually to receive
the benefit of the wage rates which Congress has pro-
vided for them when they are engaged upon covered work.
Both the Federal Procurement Regulations and the regu-
lations of the contracting agency in the subject case
(E.R.D.A., now the Department of Energy, formerly the
A.E.C.), confirm that position. For example, 41 C.F.R.
§1-18.701-2 (1977 ed.) (Federal Procurement Regulations
—Labor Standards for Contracts Involving Construe-
tion), states in pertinent part:
‘*{C]ontraets predominantly for nonconstruction work
may also involve construction work. Construction
items under such contracts are not exempted from
the requirements of this subpart simply because the
work is to be performed under a contract which also
requires, for example, the furnishing of supplies.”’
And again, so far as E.R.D.A. regulations are concerned,
41 C.F.R. §§$9-18.701-52(b) and (b)(1) (1977 ed.) (Admin-
istrative controls and criteria for application of the
Davis-Bacon Act in operational or maintenance activities),
state in pertinent part:
‘*(b) The classification of a contract as a contract
for operational or maintenance activities does not
necessarily mean that all work and activities at the
contract location are classifiable as outside of Davis-
Bacon Act coverage, since it may be necessary. to
—
separate out work which should be classified as
covered. Therefore, heads of procuring activities shall
establish and maintain controls for the careful
scrutiny of proposed work assignments under such
a contract to assure that: (1) * * * If the actual work
assignments do involve coverec work, the contract
should be modified to include applicable provisions
of the Davis-Bacon Act.” [Emphasis supplied].°
Thus we see that even under applicable Regulations,
it is the actual work performed by a workman which
determines whether he is entitled to the Davis-Bacon
minimum wage. How the contractor’s government contract
may be characterized or classified by him or by the con-
tracting agency is not controlling. And it is further clear
that under these, as well as previously cited, regulations,
the ‘‘applicable provisions of the Davis Bacon Act’’ must
be deemed included in the contract and the contract thus
appropriately modified, as to work performed by laborers
which is within the scope and coverage of the Act. See
Paul v. United States, 371 U.S. 245, 255, 83 S.Ct. 426,
433 (1963) (declaring that Federal Procurement Regula-
tions have ‘‘of course, the force of law’’).
B. Where a government contract clause is required by
statute or by procurement regulation to be included
in a government contract, that clause is deemed in-
corporated, as a matter of law, into the contract.
The Davis-Bacon Act minimum wage stipulation is
part of the subject government contract by opera-
tion of law, and employees who perform Davis-Bacon
Act work must be paid the minimum wage rates
established by the Secretary of Labor’s published
wage determinations.
'The new 5 ya of Energy regulation is iden-
- See 41 C §§9-18.701- 52(b) and (b)(1) (1979
= oe
1. Davis-Bacon clauses in our contract. Of course, the
government contract involved in this cause expressly con-
templates that construction work, to which Davis-Bacon
Act minimum wage requirements apply, will be per-
formed. The contractor-employer is also required to
include all provisions relative to Davis-Bacon Act work
in all subcontracts it lets for such construction, although
that clause states that it ‘‘does not contemplate the per-
formance of [Davis-Bacon] work by the Association, with
its own employees’’. Article XXXIII, para. 1, of the
contract (J.A. 55). In addition, however, by letter dated
the date of the original contract (January 23, 1968), from
the A.E.C. Chicago Operations Office Manager to the
president of the petitioner contractor-employer, the fur-
ther ‘‘understandings’’ of the government and the con-
tractor concerning that contract provision were stated
that:
‘‘If * * * work be performed by the Association
with its own employees which AEC determines is
subject to the Davis-Bacon Act, the contract will be
modified as appropriate to incorporate the provisions
relative to labor and wages required by law.’’ [Em-
phasis supplied.]* (J.A. 62).
And, further, the district judge to whom the case had
first been assigned and to whom, apparently, ‘‘a copy
of [the contract] ha{d] been submitted * * * by defen-
dant’’ (J.A. 21), referred in his opinion—rejecting peti-
tioner’s motion to dismiss—to further like correspondence
between A.E.C. and petitioner, dated April 6, 1972 (the
date of Modification No. 14 to the contract), which he
*This is the only other express contract provision yet
discovered by respondent class relative to Davis-Bacon
= obligations imposed on the contractor-employer it-
self.
—;
noted ‘‘has seemingly been incorporated into the alleged
contract’’ (J.A. 24, 63).
Even in the light of the these express contract provi-
sions referring to and confirming the application of
Davis-Bacon Act requirements to petitioner itself when
and if it performs Davis-Bacon work with its own em-
ployees, petitioner still claims that it itself is not bound
by any such contract provisions, even as to Davis-Bacon
Act work actually performed by its own employees. Mani-
festly, the requirements are expressed in petitioner’s con-
tract, whether or not they are in the precise language
that petitioner would prefer.
And as we shall see below, the requirements are in peti-
tioner’s contract by operation of law, whether they ap-
pear therein via the explicit words which petitioner pre-
fers must be persent, or not.
2. The Davis-Bacon Act mandatory requirement. Sec-
tion 1 of the Davis-Bacon Act (40 U.S.C. §276a) requires,
inter alia, that
“every contract * * * shall contain a stipulation that
the contractor or his subcontrator shali pay all
mechanics and laborers * * *the full amounts accrued
at time of payment, computed at wage rates not less
than those [determined by the Secretary of Labor to
be prevailing for the corresponding classes of laborers
and mechanics employed on projects of a character
similar to the contract work in the (locality) in
which the work is to be performed]. (Emphasis
supplied).
The requirement that every contract involving construc-
tion on government projects shall contain the required
minimum wage stipulation, cannot be construed as any-
A
thing but mandatory. As was recently said in Assn. of
American Railroads v. Castle, 562 F.2d 1310, 1313 (C.A,
D.C. 1977), “The word ‘shall’ is the language of command
in a statute, and there is no doubt that the Congress has
commanded [what the statute requires}.” (Emphasis sup-
plied.)
But we need not rely alone on mere, albeit accurately
applicable generalizations. This Court has already author-
itatively construed the Davis-Bacon Act as mandatory. In
Binghamton—as here—a government contractor claimed
that the wage rates expressly contained in its contract
amounted to a binding representation or warranty as to
the wage rates which it must actually pay its workers
for Davis-Bacon work. This Court concluded—as the Sev-
enth Circuit has concluded in the case at bar—that the
contractor’s contention must be rejected (347 U.S. at 178,
74 S.Ct. at 442):
**On its face, the Act is a minimum wage law de-
signed for the benefit of construction workers, The
Act does not authorize or contemplate any assurance
to a successful bidder that the specified minima
will in fact be the prevailing rates. Indeed, its re-
quirement that the contractor pay ‘not less’ than the
specified minima presupposes the possibility that the
contractor may have to pay higher rates. Under these
circumstances, even assuming 2, representation by the
Government as to the prevailing rate, respondent’s
reliance on the representation in computing its bid
cannot be said to have been justified.” [Emphasis sup-
plied. ]
Further, it is not only the Davis-Bacon Act itself and
the decisions of this Court construing it, whieh mandate
the inclusion of the minimum wage stipulation in our con-
tract. The regulations issued by the Secretary of Labor
eT ee
pursuant to 40 U.S.C. §276ce’ and Reorganization Plan
No. 14 of 1950,° complement the requirements of the Act
by commanding a like incorporation of the applicable
regulations, among which are included the standard con-
tract clauses which stipulate compliance with the Act’s
minimum wage obligations, See the Secretary’s regula-
tions $3.11 (29 C.F.R. §3.11 (1978 ed.)). “Regulations
part of contract”. Here, too, there is no doubt that “the
verb ‘shall’ in the regulation is mandatory”, Aimslie Corp.
v. Middendorf, 381 F.Supp. 305, 308 (D.Mass. 1974).
3. Incorporation of mandatory clauses—the ‘“Chris-
tian Doctrine”. It is clear that the Davis-Bacon Act
minimum wage provisions represent long-standing and
fundamental procurement policies of the United States.
The cases which deal with government contracts teach
that contract clauses made mandatory by procurement
regulation, are incorporated into government contracts
as a matter of law. Is it not even more certain that con-
tract clauses made mandatory by statute are so incor-
porated as a matter of law! Dees and Ginsburg, Con-
tract Interpretation and Defective Specifications at 4
(Government Contracts Monograph No. 4, 1975 Edition;
The George Washington University); G.L. Christian and
Associates v. United States, 312 F. 2d 418, 160 Ct. Cl.
1, opinion on reargument denied 320 F. 2d 345, 160 Ct. Cl.
58, certiorari denied 375 U.S. 954 (1963), rehearing denied
376 U.S. 929, 377 U.S. 1010 (1964). See also, e.g., United
States v. New Orleans Public Service, Inc., 553 F.2d
"Section 2 of the Copeland (Anti-Kickback) Act of
June 13, 1934, c. 482, 48 Stat. 948; as amended May 24,
1949, c. 139, §134, 63 Stat. 108, and August 28, 1958, P.L.
85-800, §12, 72 Stat. 967.
*5 U.S.C. $903 note, 15 F.R. 3176, 64 Stat. 1267.
aie
459 (C.A. 5, 1977); City of Tullahoma v. Coffee County,
204 F. Supp. 794 (E.D. Tenn. 1962), rev’d on other
grounds 328 F. 2d 683 (C. A. 6, 1964).
In Dees and Ginsburg, Contract Interpretation and
Defective Specifications (Government Contracts Mono-
graph No 4, 1975 Edition; The George Washington
University), the authors cited, among others, the three
federal statutes that “impose certain minimum standards
for wages * * * of employees working for Government con-
tractors” (id., at 1-2), spoke of the rule that such “statu-
tory requirements aud regulations which implement [them]
have the force and effect of law [and] contracts made in
violation of such requirements are illegal” (7d., at 3), and
discussed the doctrine which requires that government
contracts be interpreted as incorporating mandatory
clauses specified by law:
“In G. L. Christian & Associates v. United States,
the Court of Claims held that the Termination for
Convenience clause which had been consciously omit-
ted by the Government (and the contractor) had the
force and effect of law and was incorporated in the
contract as a matter of law. The Court emphasized
the fact that pertinent regulations made the incorpo-
ration of the clause in a contract mandatory and that
a Termination for Convenience clause was historical-
ly an important component of a Government con-
tract.” (id., at 4; emphasis supplied.)
So far as the Christian case opinions themselves are
concerned (Christian I, 312 F.2d 418, 160 Ct.Cl. 1 (1963) ;
and Christian IT, 320 F.2d 345, 160 Ct.Cl. 58 (1963)), it
should be noted that there the contractor’s prime objec-
tion to the “incorporation” doctrine was that the subject
contract clause was required only by “pre-existing regula-
tion,” the court pointing out that there was no question
al
but that “if a statute requires the inclusion of a * * °
clause, such a provision would be read into the agree-
ment whether the negotiators put it there or not” (320
F.2d at 350; emphasis supplied). And, speaking further
concerning the “incorporation” doctrine, the Court of
Claims said (320 F.2d at 350-351):
“The concept of such incorporation is not novel.
* * * It was important then, and it is important
now, that procurement policies set by higher author-
ity not be avoided or evaded (deliberately or negli-
gently) by lesser officials, or by a concert of contrac-
tor and contracting officer. * * * Obligatory Congres-
sional enactments are held to govern federal contracts
because there is a need to guard the dominant legisla-
tive policy against ad hoc encroachment or dispensa-
tion by the executive [citation].”
“Like other individuals who deal with the Federal
Government [citation], potential contractors can
validly be bound to discover the published directives
telling them the limits and the scope of the agree-
ments the Government can make. Our concern is not
at all whether the policy of embodying mandatory
contractual provisions in regulations is the best one.
Our special interest is only the legality of such a
practice, and we hold that, in the procurement field as
in others, an authorized regulation can impose such
peremptory requirements on federal officials and those
who seek to enter into transactions with the Govern-
ment.” [Italics by the court; other emphasis sup-
plied. ]
See too, e.g., United States v. New Orleans Public Service,
Inc., 553 F.2d 459, 469 (C.A. 5, 1977), holding “the clause
is incorporated into the contract, even if it has not been
expressly included in a written contract or agreed to by
the parties”; Compagnie Generale Transatlantique v.
American Tobacco Co., 31 F.2d 663, 666 (C.C.A. 2, 1929),
jth ou
holding that “a lawful statute in force at the time the
contract was made is read into the contract and becomes
part of it” and “Such a contract must be and is deemed
to be modified to conform to the statute”; 3 Corbin on
Contracts, §551, at 200-201 (1960 ed.), noting the same re-
sult “even though the parties know nothing of the statute
and do not include the provision, and even though they
know of it and expressly agree upon the exact contrary”;
17A Corpus Juris Secundum, Contracts, §330, at 301
(1963 ed.), noting that “where a provision is integrated
into a contract by force of statute, as a matter of public
policy, it must be interpreted and given effect in ac-
cordance with the intention of the legislature, irrespective
of how the contractors understood it”.
Also of particular signifiance on this point is this
Court’s opinion in Hartford Accident & Indemnity Co. v.
N. O. Nelson Mfg. Co., 291 U.S. 352, 54 S.Ct. 392 (1934),
where the Court required that a contractor’s bond be con-
strued to include a clause required by state statute but
omitted from the express terms of the bond, and said:
“All that the statute does by force of section 3
is to standardize the form, at least in some particu-
lars, when bonds are freely given, and to define the
consequences attaching to the standard thus pre-
scribed. ° * °
“Liberty of contract is not an absolute concept.
[citations.] It is relative to many conditions of time
and place and circumstance. * * * Principal and surety
in writing it became subject to the statutes then in
force, and by these they must abide.” [291 U.S. at
359, 360-361; 54 S.Ct. at 395-396; emphasis supplied. ]
4. Applicable prevailing wage determinations exist.
The district court entered the summary judgment, the
reversal of which by the Seventh Cireuit is here on
| eee
review, under the erroneous belief that there are and
have been no prevailing wage determinations by the
Secretary of Labor applicable to the subject government
contract. On the last page of its Memorandum Order,
the court commented that “it would be improper for this
court to declare in the first instance that this contract is
now subject to the Davis-Bacon Act and to make appro-
priate wage determinations for the parties” (see J.A. 34).
The trial court need have had no such concern. For
many years the Secretary of Labor has issued wage de-
terminations, all published in the Federal Register, ap-
pliacble to labor on government projects in Kane County,
Illinois, where the subject project is located and where
the construction activities required under the contract are
being and have been performed. See Statement of Arthur
J. Goldberg, Secretary of Labor (Hearings on Admini-
stration of the Davis-Bacon Act, Committee on Educa-
tion and Labor of the House of Representatives, 87th
Cng., 2d Sess., 1962), at 47, 48, 50; 29 Code of Federal
Regulations, Labor, Subtitle A, Part I, Procedures for
Predetermination of Wage Rates, §§1.5(b) and 1.7(a)(2)
(1977 ed.) ; 43 Federal Register 11360, 11379-11383 (March
17, 1978); 42 Federal Register 30078 et seq. (June 10,
1977).
There is no problem in locating the published “Gener-
al Wage Determinations Decisions” of the Secretary of
Labor. One of the most recent compilations is found in
43 Federal Register 11360 et seg. (March 17, 1978) and,
of course, constructive notice of those determinations
exists by reason of their publication in the Register (see,
e.g., Art Center School v. United States, 142 F.Supp. 916,
918 (Ct.Ci. 1956); Winston Bros. Company vy. United
States, 458 F.2d 49, 52-53 (Ct.Cl. 1972).
~
C. A contractor takes a government contract subject
to all applicable statutes. All statutes relating to the
subject matter of the contract and existing at the
time of contracting become a part thereof and must
be read into the contract. Our petitioner contractor-
employer is charged with knowledge that construc-
tion work performed by its employees is subject to
the Davis-Bacon Act, and is obligated to pay the
statutory wage rates.
1. Davis-Bacon Act is part of all government con-
struction contracts. Whether or not the mandatory stipula-
tion required by the Davis-Bacon Act to be included in
“every contract * * * for construction, alteration, and/or
repair, including painting and decorating, of public build-
ings or public works * * *” is deemed incorporated, as a
matter of law, into the contract, it is basic hornbook
law that the Davis-Bacon Act itself is a part of the con-
tract. Statutes relating to the subject matter of a contract
and existing at the time of execution of such contract,
become a part thereof and must be read into the contract,
as if they were expressly referred to or incorporated in
its terms.
See, e.g., Woods v. Lovett, 313 U.S. 362, 370, 61 S.Ct.
983, 987 (1941) (“laws which subsist * * * enter into and
form a part of it, as if they were expressly referred
to or incorporated in its terms”); Home Building & Loan
Assn. v. Blaisdell, 290 U.S. 398, 429-430, 54 S.Ct. 231,
237 (1934) (concerning Minnesota Mortgage Moratorium
Law); Farmers’ ¢ Merchants’ Bank v. Federal Reserve
Bank, 262 U.S. 649, 660, 48 S.Ct. 651, 655 (1923) (“This
principle embraces alike those laws which affect its con-
struction and those which affect its enforcement or dis-
charge”); Hendrickson v. Apperson, 245 U.S. 105, 38
S.Ct. 44, 45 (1917) (Kentucky statute authorizing appoint-
ment of special collectors); Northern Pacific Ry. Co. v.
=
Wall, 241 U.S. 87, 91-92, 36 S.Ct. 493, 495 (1916) (Car-
mack Amendment to the Interstate Commerce Act);
Southern Surety Co. v. Oklahoma, 241 U.S. 582, 587, 36
S.Ct. 692, 694 (1916) (Oklahoma enabling act and Okla-
homa Constitution); d4rmour Packing Co. v. United States,
209 U.S. 66, 81, 82, 28 S.Ct. 428, 435, 486 (1907) (“the
design of the statute to prohibit” “abuses of unequal
rates”); Antoni v. Greenhow, 107 U.S. 769, 2 S.Ct. 91,
95 (1883) (rule applies to “those laws which affect its
validity, construction, discharge, and enforcement”) ;
Walker v. Whitehead, 83 U.S. 314, 317, 21 L.Ed. 357, 358
(1873) (Georgia statute held to impair obligation of
contract); United States ex rel. Von Hoffman vy. City of
Quincy, 71 U.S. 535, 550 (1867) (“These are as much
incidents and conditions of the contract as if they rested
upon the basis of a distinct agreement”); M’Cracken v.
Hayward, 11 L.Ed. 397, 399 (1844) (“laws in existence
* * * measure of the obligation to perform”); Ogden v.
Saunders, 6 L.Ed. 606, 621-622 (1827) (“the law of the con-
tract * * * forming a part of it”); 17A C.J.S., Contracts,
$330, at 295 (1963 ed.); 17 Am.Jur.2d, Contracts, §257, at
654-656 (1964 ed.); 3 Corbin on Contracts, $51, at 197
(1960 ed.); Williston on Contracts, §615, at 1767 (1926
ed.) ; 4 Williston on Contracts, §615, at 597 (3d ed. 1961).
Thus, as the Ninth Circuit declared in United States v.
McKinnon, 289 F.2d 908, 909 (C.A. 9, 1961), concerning
a claim for extra work by a government contractor, “one
just must take his government contracts subject to appli-
cable statutes.”
2. Petitioner’s actions imply assumption of Davis-
Bacon obligations. It is asserted in this cause by respon-
dent and the respondent class that they, as employees of
the petitioner, were assigned and did perform work con-
stituting construction work within the meaning of the
ae” a
Davis-Bacon Act. At this point in the proceedings, and
for purposes of the summary judgment now on appeal
which was granted on other grounds, this assertion must
be taken as true. It is clear, then, that to the extent the
petitioner’s employees were performing Davis-Bacon Act
construction work so assigned to them, the petitioner is
and has placed itself in the position of a subcontractor
under its prime contract. Article XXXIII (“Labor Provi-
sions”) of the contract prescribes that such work is to
be done by subcontract which shall “contain the provi-
sions relative to labor and wages” required by Davis-
Bacon. In the capacity of a subcontractor performing
construction work on the project, well knowing of the
contract requirement that all such subcontractors are
obligated to pay the statutory wages, petitioner must
be deemed by implication to have undertaken those same
obligations.°
It is not unusual for a general contractor also to act
as a subcontractor on the job. Indeed, in Bushman Con-
struction Co. v. Conner, 260 F.Supp. 779 (D.Colo., 1966),
it is noted that “The prime contractor did only the
cement and carpentry work. All of the other construction
was subcontracted” (260 F.Supp. at 782). And anyone
familiar with construction activities is familiar with the
practice of the general contractor “acting as his own
carpentery (or cement, or electrical, or plumbing, or
painting) subcontractor.”
* Indeed, petitioner in its capacity as prime contractor
has entered into a number of construction subcontracts,
al] including the Davis-Bacon Act required stipulations
and the standard contract clauses promulgated by pro-
curement regulations and included within printed forms
used with those subcontracts. Copies of certain of those
subcontracts have heen obtained by the respondent class,
again through Freedom of Information Act procedures.
5 U.S.C. $552 et seq.
— oan
That which is implied in a contract situation is as
effectual as what is expressed. Bulkley v. United States,
86 U.S. 37, 40 (1874) (saying, in addition, that “Human
affairs are largely conducted upon the principle of im-
plications”’; Board of Supervisors v. Lackawanna Iron
é Coal Co., 93 U.S. 619, 624, 23 L.Ed. 989, 991 (1877);
Perry v. Sindermann, 408 U.S. 593, 599-602, 92 S.Ct. 2694,
2699-2700 (1972) (affirming reversal of a summary judg-
ment in a teacher’s action claiming the existence of a
“de facto tenure program” for “absence of such an explicit
contractual provision may not always foreclose the possi-
bility”). Indeed, the rules with respect to the creation
of implied contracts apply in government contract situa-
tions, and “A contract may be implied where all the
formalities in connection with the execution of a contract
have not been complied with” (91 C.J.S., United States,
§89, at 170 (1955 ed.)).
Assuming then, arguendo, that by reason of the gov-
ernment contract in the case at bar our _petitioner-
contractor is not bound by the Davis-Bacon Act in its
capacity as prime contractor, it is nonetheless bound as a
subcontractor who, without question, is expressly au-
thorized by that contract to perform Davis-Bacon Act
work and likewise obliged to pay the statutory wage.
D. Contrary to petitioner’s Point I.D. (Petr. Brief at 25-
28), the Seventh Circuit’s decision is not inconsistent
with express terms of the Davis-Bacon Act. The de-
fense that a contract was not advertised or bid, but
is instead a negotiated cost-plus-a-fixed-fee contract,
was expressly anticipated by Congress in 40 U.S.C.
§276a-7. Further, the claim that federal law grants
AEC/ERDA/DOE authority to establish contrary
specific wage rates is not true and is no defense un-
der 40 U.S.C. §276a-3.
1. Davis-Bacon applies to all contract types. Peti-
tioner has plainly forgotten to read the last section in
—_
the Davis-Bacon Act. Congress in that section anticipated
the very defense which petitioner now asserts in its
sub-point I.D.I. (Petr. Brief, at 25-26). That sub-point is
entitled “The Act Does Not Apply to a Contractor Unless
the Bid Specifications Set Forth the Wage Rate Require-
ments” (Jd. at 25). Yet Congress has mandated to the
contrary :
§276a-7. Cost-plus-a-fixed-fee contracts; contracts
without advertisement
The fact that any contract authorized by this or
any other Act is entered into without regard to sec-
tion 3709 of the Revised Statutes of the United
States [41 U.S.C. $5], or upon a cost-plus-a-fixed-fee
basis or otherwise without advertising for proposals,
shall not be construed to render inapplicable the
provisions of the Act of March 3, 1931, as amended
by the Act of August 30, 1935 (49 Stat. 1011; U.S.C.,
title 40, sec. 276(a)), if such Act would otherwise
be applicable to such contract.’
2. No federal law or approval for contrary wage
rates. Simply because AKC/ERDA/DOE has authority
to enter into contracts does not mean that it has au-
thority to “provide for the establishment of specific
wage rates” within the meaning of 40 U.S.C. §276a-3.
Further, the mere fact that certain employee classifica-
tions and salary schedules were prepared by petitioner
and appended to its contract, does not mean that AEC/
ERDA/DOE has established those classifications and
rates. Nor does that contracting agency itself view peti-
tioner’s action in preparing those classifications and
schedules and their attachment to the contract as repre-
senting binding contracting agency representations that
they are “established” (see, e.g., Kennedy Deposition,
See also 41 U.S.C, §258 to the same effect.
— ven
at 79-82). Petitioner’s sub-point I.D.2. (Petr. Brief, at
26-28, entitled “The Act Does Not Apply to the Extent
the Government Otherwise Has Established Specific Wage
Rates” (Id., at 26), is without substance. As the Seventh
Cireuit said (595 F.2d at 401-2) in this connection, among
other things “defendant has been unable to identify any-
thing in the Atomic Energy Act or any other federal
statute that authorizes ERDA to establish specific wage
rates.” —
The Portal-to-Portal Pay Act, at 29 U.S.C. §259(b(3),
designates the only agency upon whose written deter-
minations a contractor may rely in defense of its failure
to pay Davis-Bacon minimum wages. That agency is the
Secretary of Labor, not ERDA nor any other agency,
administrator or department. And finally, this Court’s
Binghamton decision precludes petitioner’s claim that a
contracting agency — whether the Corps of Engineers
there or the AEC/ERDA/DOE here — gives “assurance”
to the contractor that wage rates included in a govern-
ment contract “will in fact be the prevailing rates” (347
U.S. at 178).™
* At least since the Bmghamton decision in 1954, and
most probably for many years before, government con-
tractors acknowledged that it is the contractor’s responsi-
bility under the Davis-Bacon Act properly to classify
and set rates for their workmen, rather than a responsi-
bility of the contracting agency. See, e.g., the prepared
statement of the Associated General Contractors of
America before the Special Subcommittee on Labor of
the Committee on Education and Labor of the House
of Representatives (H. Hrgs. 1962 on “Administration
of the Davis-Bacon Act”, at 456-457): “The Davis-Bacon
Act requires that contractors classify and pay their
mechanics and laborers at least the required minimum
wage rate for the classification commonly used to per-
form the particular work in the locality of the project”
(Emphasis supplied.).
i aes
E. The Davis-Bacon Act 1935 amendments were in-
tended, inter alia, to prevent utilization by contrac-
tors and agencies alike of every device resulting in
non-payment of proper prevailing wages at govern-
ment projects, including the “arbitrary classifica-
tion” and “underclassification” device.
1. Senate hearings and Davis-Bacon violations. The
1935 amendments expanded the scope of the Act and
sought to prevent all abuses to which the prevailing
wage principle in the 1931 Act had been subjected. They
were adopted after lengthy hearings in 1934 before a
Subcommittee of the Committee on Education and Labor
of the Senate, pursuant to Senate Resolution 228 au-
thorizing “an investigation of the relationship existing
between certain contractors and their employees in the
United States”. During those hearings it became clear
that the 1931 Davis-Bacon Act requirements were being
disregarded on large numbers of government projects.
Neither size of the project, nor identity of the govern-
ment department for which it was being performed,
served to insulate a project from non-compliance. None
were immune. Sworn testimony was heard concerning
devices to evade payment of prevailing wages at, among
others, the Department of Justice Building (S. Hearings,
at 83-85, 91, 108, 117), the Senate Office Building (Jd., at
87), the New House Office Building (Jd., at 90-91, 109-
117, 152, 153), and even the United States Supreme
Court Building in which this brief has been filed and this
cause is now pending (/d., at 91, 117).”
2. The “arbitrary classification” and “underclassifica-
tion” device. Among the devices which Congress was in-
* More than 90 other federal projects, in the District
of Columbia and elsewhere around the nation, were the
subject of like testimony at the Senate Subeommittee
hearings,
a tn
formed were in use as a means to deprive workers on
government projects of the prevailing wage which Con-
gress had in 1931 directed that they receive, was the
so-called “arbitrary classification” or “underclassification”
device. Thus, in its report submitted pursuant to S. Res.
228 (S. Rept. No. 332, part 2, 74th Cong., 1st Sess.), the
Committee on Education and Labor, chaired by Senator
Walsh, pointed out;**
“Instances of failure by Federal Emergency Relief
Administration officials to pay the prevailing wages
on Public Works projects, and the creation by such
officials of arbitrary classifications known as semi-
skilled labor” (S.Rept. No. 332, part 2, at 2).
“(T]he matter of classification, with the result that
many contractors were able to circumvent the law
by hiring mechanics as common laborers, and then
assigning them to tasks which fell within the pur-
view of one of the skilled crafts” (Jd. at 5).
“The Board of Labor Review [created to hear issues
under contracts by the Public Works Administration
pursuant to the National Industrial Recovery Act]
heard many cases in connection with these com-
plaints [concerning “new grades and classifications
* * * permitting high-grade skilled laborers to be
placed in lower categories so that their rates of pay
were less than those prevailing for skilled labor’’]
but, in the opinion of this committee, have been
unable to rectify conditions as affecting a considerable
portion of the underclassified laborers” (Jd., at 12).
“The * * * rates * * * have been largely broken
down by intermediate classifications of labor * * *.
Testimony concerning the “arbitrary classification”
device is found in S. Hrgs, Ed.-Lab Subcom. (1934) at
76-77, 82-83, 105, 108, 110, 188, 160, 161, 206, 211, 212, 213,
414, 460, 469, 471, 473, 483.
sepec nies
The whole tendency has been for wages of the skilled
group to descend toward the level of the unskilled
group, this by reason of intermediate classification
devices” (Id., at 16-17).
These “arbitrary”, “under-”, “mis-”, and “intermediate”
classifications had the effect, of course, — if not the
purpose — of reducing wages being paid to workmen
on government projects below Congress-mandated pre-
vailing wage rates for similar work elsewhere in the
community. They still have that effect, and in this cause
now on review concerning these respondent workmen
before this Court. For, as accurately noted by the United
States as amicus curiae (Amicus Brief, at 11, n. 11):
“The hourly rates specified by the contract for con-
tractor employees * * * are somewhat less than the
prevailing wages established by the Department of
Labor for similar classifications of Davis-Bacon Act
workers * * *.”
3. Neglect of the prevailing wage principle. Con-
gress, of course, can only legislate; it is for the other
agencies of government to apply Congresional policy.
Yet Congress was informed in the Senate Subcommittee
hearings, of numbers of instances where agencies were
either ineffective concerning or neglectful of the Davis-
Bacon Act minimum wage principle. Thus the Senate
Committee on Education and Labor reported that there
is “laxity toward contractors guilty of improper practices
[existing] in certain Government departments’’ (S. Re-
port No. 332, part 3, 74th Cong., Ist Sess., at 3), that
notwithstanding complaint to certain agencies ‘‘no action
was forthcoming” (/d., at 4), and that “It is not ap-
narent to the committee in the survey it has caused to
oe
be made * * * that any agencies have been effective in
obtaining the results set out for them” (/d., at 16).%*
The hearings further revealed the identity of many
government projects concerning which, notwithstanding
claims made to government agencies, workers had never
received payment or restitution for unpaid portions of
their wages.*° Deficiencies in the District of Colum-
bia alone were asserted to ‘‘run into the millions’”’ (S.
Hearings, 1934, at 6).
F. The Executive and the Judiciary must defer to Con-
gressional policies represented by the Davis-Bacon
Act. The Davis-Bacon Act Congressionally-mandated
effects on the procurement process may not be
avoided, even to satisfy other proper procurement
objectives.
No one can deny that the procurement process would
be easier and cheaper for the government and for cer-
tain government contractors, had Congress not enacted
the Davis-Bacon Act (40 U.S.C. §276a et seq.), the Walsh-
Healey Public Contracts Act (41 U.S.C. $35 et seq.) and
the McNamara-O’Hara Service Contract Act (41 U.S.C.
§351 et seq.). Yet these statutes represent important
* Testimony supporting these conclusions is in Hear-
ings before the Subcommittee of the Committee on Edu-
cation and labor of the U.S. Senate, 73d Cong., 2d Sess.,
pursuant to S.Res. 228 (1934), at, e.g. 16-17, 18, 24, 30,
60, 62, 68-69, 95-96, 138, 141, 142, 144, 150, 176, 181,
538, 623.
% Among these projects were, again, the Department of
Justice Building (S. Hearings, 1934, at 84), the New
House Office Building (Jd. at 91), the N.Y. Federal Court-
house (Jd. at 137, 138), and others noted at Id. 6, 10,
17, 18, 19, 21, 24, 26, 32, 60, 76, 88, 89, 107, 118, 141, 142,
193, 203, 259. The workers were made whole, however,
an the Supreme Court Building project (Jd. at
—
policy decisions which have been consistently reaffirmed
by Congress, notwithstanding their impact on the pro-
curement porcess.** Thus, the Attorney General of the
United States, in an opinion issued on March 9, 1979,
in response to a request of the President (43 Op. Atty.
Gen. (op. no. 14); see 1979 Labor Law Reports (C.C.H.),
731,253 (4-13-79)), has noted:
‘Congress considered the contract labor standards
statutes to be among the ‘ancillary’ statutes which
affect procurement [citing at fn, 32: S.Rept.91-427,
9ist Cong., 1st Sess., at 6, 13-14; H.R.Report 91-
468, 91st Cong., Ist Sess., at 151.]. * * *
“(These are] statutory socio-economic programs
implemented through the procurement process * * *
[which the 1969 Commission on Government Procure-
ment] viewed * * * as extraneous burdens on the
procurement system [noting at fn. 49: See CGP Re-
port, vol. 1, at 111-18. The report refers to the Labor
Department’s wage-hour regulations as ‘collateral’
ones that ‘affect’ procurement. Id. at 33.]
‘*As the Commission report points out, these pro-
grams serve a broad variety of interests: labor, en-
vironment, small business, anti-discrimination, pro-
tection of domestic industry, and others. * * * The
contract wage-hour statutes in particular are the re-
sult of a strong legislative concern that the govern-
ment’s general interest in efficient, economical pro-
curement will not be satisfied at the expense of
contractors’ employees. [noting at fn. 52: See H.R.
Rept. 1162, 74th Cong., 2d Sess., at 2 (Davis-Bacon
Act); S.Rept. 1157, 74th Cong., 1st Sess., at 4 (Walsh-
7° “7 A] clear public policy of insisting that all who do
business with the Government pay employees minimum
prevailing wages thus seems to be indicated.” Statement
of the Deputy General Counsel, Office of the Comptroller
a H.R. Hearings, 1962, at 287 (emphasis sup-
plied),
=
Healey Act); H.R.Rept. 948, 89th Cong., 1st Sess.,
at 3 (Service Contracting Act).].’’
The effects of the legislative policies represented by the
Davis-Bacon Act and thus described, are effects which
the government procurement agencies and government
contractors must accept, and to which the courts must
defer. Our petitioner has, of course, any number of con-
tractual, administrative, judicial and statutory remedies
in proceedings involving the government, for any uncer-
tainties, inequities and improprieties petitioner has sus-
tained or may hereafter suffer by reason of its contract.”
Congress has authorized a suspension of the provisions
of the Act only by the President, and by him only ‘‘in
the event of a national emergency’’ (40 U.S.C. §276a-5).
Its requirements cannot be suspended, nor liability for
violation of its provisions defended, by simply disregard-
ing or neglecting it.
G. The decision of the Seventh Circuit does not affect
administrative functions under the Davis-Bacon Act.
Further, there is no administrative procedure avail-
able to an employee for adjudication and vindica-
tion of his claim that he has performed Davis-Bacon
Act work under a Davis-Bacon Act contract, for
which his contractor-employer has not paid the pub-
lished Davis-Bacon Act minimum wage.
The Seventh Circuit in the case at bar has done nothing
to affect or impair whatever any administrative func-
17 See, for example: (a) Contract Disputes Act of 1978,
41 U.S.C. §§601-613, P.L. 95-563, (b) Wunderlich Act, 41
U.S.C. §§321-322, (c) 42 U.S.C. §7194(a)(b), providing
for Department of Energy adjustments to rules, regula-
tions and orders to prevent special hardship, inequity
or unfair distribution of burdens, (d) Disputes Clause,
AEC/ERDA/DOE regulations, 41 C.F.R. §9-7.802-5, (e)
Equitable Adjustments Clause, AEC/ERDA/DOE regula-
tions, 41 C.F.R. §9-1.5004-2.
tions assigned by the Davis-Bacon Act. Its decision that
the Act applies concerning this government contract has
no effect on the functions of the Secretary of Labor in
making the prevailing wage rate determinations upon
which respondent here relies (40 U.S.C. §276a), the func
tions of the Comptroller General to pay over to laborers
(from any accrued contract payments which may have
been withheld) any wages found to be due them pursuant
to the Act (40 U.S.C. §276a-2(a)), or the functions of
the Comptroller General to distribute a list of defaulting
contractors to all departments of the government (40
US.C. §276a-2(a)).
Further, the decision does not interfere with or disre-
gard any agency or agency procedure assigned by law to
adjudicate respondent’s claims and vindicate his rights.
There is no such agency, nor any such procedure. The
court of appeals sought unsuccessfully to uncover some
(see 595 F.2d 396, 400; J.A. 43); the United States noted
that there is none (see Amicus Brief, at 9, fn. 7); and
the petitioner has failed to point to one. Finally, the
Solicitor of Labor, the Comptroller General, and even
the (then) Atomic Energy Commission, have all testified
(H.R. Hearings before the Special Subcommittee on
Labor of the Committee on Education and Labor, on
“Administration of the Davis-Bacon Act”, 87th Cong.,
2d Sess., 1962) that even among the agencies themselves
there is no agreement concerning decision-making under
the Act—except for the above-noted functions explicitly
“There is no administrative procedure now available
expressly providing review * * *. Several contracting
agencies, including the Department of Energy, have ob-
jected to the proposed regulations * * *.” (Zbtd.)
a he
assigned by the Act itself.’ Is it any wonder, then, that
neither the Seventh Circuit nor the United States nor
the petitioner nor the respondent has found an agency—
other than our courts—in which the within claims and
rights can be adjudicated and enforced.”
** See, for views of the Labor Department on this| “situa-
tion which is presently complicating effective administra-
tion and enforcement of the act”, H.R. Hearings 1962, at
831-832, 901-902 [“‘we say the law has meant one thing
and * * * the Comptroller General * * * has said that it
means another”], 912-919; for views of the Comptroller
General that “jurisdiction over enforcement activities
under the act is at best divided”, H.R. Hearings 1962, at
284, 285 [“delays enforcement action and promotes incon-
sistencies”], 285-286 [“assumption of authority to de-
termine amounts of wage underpayments under * * * the
Secretary’s regulations has caused conflict”], 290, 295
(“The Davis-Bacon Act, itself, appears to make us re-
sponsible for determining the extent of violations for
purposes of debarment and wage adjustments”], 297
[“Nobody is given the authority to make the final de-
termination. Certainly it is denied to the contracting
agencies and is not given to the Secretary of Labor.”],
298-300, 321, 322, 1127-1128 [“the Secretary of Labor
must be eliminated from consideration for the reason that
there is no language giving him authority except that of
determining prevailing wage rates. * * * Nowhere is a
contracting agency authorized to make final determina-
tions of the amounts due aggrieved workers * * *.], 1128-
1131; for views of the Atomic Energy Commission, H.R.
Hearings 1962, at 615-616, 619-620 [“It is all very in-
formal and sort of works this way.”], 634-635 [“A.E.C.
procurement regulations * * *are not regulations in the
most formal sense * * *.”].
2°TIn addition to the noted conflict among the agencies
as to which has what functions in attempts to enforce the
Davis-Bacon Act, it is also clear that the statutory scheme
does not place the matter of construction of the cover-
age terminology within the special competence of any of
the various agencies. As the Solicitor of Labor advised
in his additional prepared statement, H.R. Hearings,
ceed cet
II.
WAGE-EARNERS HAVE A RIGHT OF ACTION
AGAINST THEIR CONTRACTOR-EMPLOYER TO
RECOVER UNPAID WAGES REQUIRED BY THE
DAVIS-BACON ACT (40 U.S.C. §§276a-276a-7) AND BY
THE GOVERNMENT CONTRACT PROVISIONS RE-
QUIRED BY §276a OF THE ACT, WHEN—BECAUSE
THERE ARE NO CONTRACT AMOUNTS WITHHELD
SUFFICIENT TO ASSURE EMPLOYEE PAYMENTS
(see 40 U.S.C. §276a-2(a)) NOR IS THERE A SURETY
PAYMENT BOND FOR THE PROTECTION OF EM.-
PLOYEES (see 40 U.S.C. §276a-2(b))—SUCH EM.
PLOYEE RIGHT OF ACTION IS THE ONLY REM.
EDY AVAILABLE TO MAKE EFFECTIVE THE CON-
GRESSIONAL PURPOSE OF THE DAVIS-BACON ACT
TO REQUIRE CONTRACTORS TO PAY THEIR EM-
PLOYEES THE WAGES REQUIRED BY THE ACT.
A. The “right of action” question was not raised,
briefed, argued or ruled on in the proceedings below
which have been brought here for review. Should the
Supreme Court elect, nevertheless, to consider this
question, it must be presumed that the courts below
2° (Continued)
1962, on “Administration of the Davis-Bacon Act,” at 822:
“No attempt was made by Congress in 1931, 1932 or 1935
to formulate definitions for the terms ‘construction, al-
teration and/or repair,’ or the terms ‘public buildings
and public works.’ It thus seems clear that Congress in-
tended no specialized meaning for this language. * * * The
terms ‘construction, ‘prosecution,’ ‘completion,’ and ‘re-
pair’ have also been defined by the regulations to incor-
porate the generally accepted, practical meaning of these
words as intended by Congress * * *.” And, of course,
our courts have no difficulty in applying statutory lan-
guage to the facts. See, e.g., U.S. (Hillsdale Rock Co.,
Inc.) v. Cortelyou & Cole, Inc., 581 F.2d 239, 243 (9th
Cir. 1978), where the Ninth Cireuit agreed with the dis-
trict court that “Hillsdale’s efforts were involved in the
‘construction, alteration, or repair of any public build-
>’ 9
ing or public work of the United States’ ”.
ay ee
have found and concluded (as in McDaniel v. Unt-
versity of Chicago, 7 Cir., 512 F.2d 583 and 548 F.2d
689, certiorari denied 434 U.S. 1033) that such em-
ployee right of action is the only remedy available
to make effective the congressional purpose to re-
quire contractors to pay their employees the wages
required by the Act.
Respondents have heretofore, in our “Brief in Opposi-
tion to Petition for Certiorari (at 26-29) and in para-
graphs 6-7 of the “Statement of the Case” in our instant
brief (at 5-8), sufficiently delineated the factual and
procedural posture of this cause at the time it was
brought here for review. There was no question in the
courts below on the summary judgment which the Sev-
enth Cireuit reviewed and reversed (Coutu v. Universi-
ties Research Association, Inc., 7 Cir., 595 F.2d 396-402;
J.A 35-46) concerning the existence of an employee right
of action. The closest petitioner ever got to that ques-
tion, and only then with respect to the “contract” issue
(Point I in this brief) rather than to any “right of ac-
tion” issue was petitioner’s assertion that “Plaintiff
Failed To Exhaust Administrative Remedies” (Deft.
Brief, 7th Cir. Docket No. 78-1165, at 14-16).
Further, our respondents assert in this case that their
right of action exists under circumstances which render
other statutory relief unavailable. Thus it must be pre-
sumed (as the lower courts doubtless would have found
if the “right of action” issue had been raised below) that
there are no amounts withheld by the government from
which respondents might be paid, see 40 U.S.C, §276a-
2(a), and that petitioner has not submitted a surety pay-
ment bond on which respondents might sue to recover un-
paid wages, see 40 U.S.C. §276a-2(b).
— on
The argument under this point II, therefore, is pre-
sented in the event this Court elects to consider the
“right of action” question.
B. There is a private right of action for back wages
against a contractor in favor of employees who have
performed Davis-Bacon Act work under a contract
procuring Davis-Bacon Act work of “construction,
alteration and/or repair, including painting and dec-
orating, of public buildings or public works of the
United States”. There is no administrative determina-
tion that this contract is not covered by the Act, nor
does the right of action here asserted require any
such determination.
1. The Davis-Bacon Act governs concerning this con-
tract. Both petitioner and the United States as amicus
concede that the right of action does exist if the Davis-
Bacon Act “obligation was assumed or * * * contemplated
by the contracting parties” (Petr. Brief, at 30), or if the
suit concerns “a contract that contains Davis-Bacon stip-
ulations” (Amicus Brief, at 17, n. 14), and that “An em-
ployee should also be able to recover in a contract action
if Davis-Bacon Act stipulations are inadvertently omit-
ted from a contract [since] the Davis-Bacon stipulations
would be deemed to be incorporated by operation of law”
(Iitd.)** The instant suit satisfies those descriptions of
employee private suits which even petitioner and the
United States agree are proper.
* Amicus, suggests that the “incorporation by opera-
tion of law” doctrine described in the Christian opinions,
312 F.2d 418 (Ct. Cl.), rehearing denied, 320 F.2d 345,.
cert. denied, 375 U.S. 954 (1963), requires that “the con-
tracting agercy concedes that the omission was erro-
neous’’ (Amicus Brief, at 17, n.14). No such require-
ment for a government agency concession is present in
the Christian case cr in the other authorities which deal
with the doctrine.
a oe
Respondents have hereinbefore summarized the facts
which show that the instant government contract is
covered by the Davis-Bacon Act and that the contracting
agency (AEC/ERDA/DOE) does view it as covered.
Statement of the Case, at 3-4. The facts are also
clear that to the extent that the petitioner contractor-
employer uses its own employees for Davis-Bacon Act
work, the ageney views that work as covered. [bid. Pe-
titioner and amicus, however, without pointing to any
governmental ruling or decision characterizing the con-
tract as not covered by the Act, make that non-existent
ruling the sime qua non and the essence of their position.
(See, e.g., Petr. Brief at 2, Amicus Brief at 1, 17).
Respondent and the respondent class do not, however,
assert the existence of any “erroneous coverage determina-
tion”, and their right of action does not depend upon the
assertion or existence of administrative error.
Whatever may be the reason—and whether that rea-
son involves administrative or eontractor individual or
collaborative error, disregard, neglect or intent—the ex-
press statutory requirements provided in the Davis-Bacon
Act as means by which respondent wage-earners might
recover their unpaid minimum wages have not been im-
plemented. The contracting agency did not withhold funds
from the petitioner, see 40 U.S.C. §276a, and the peti-
tioner did not submit a surety payment bond, see 40
U.S.C. §276a-2(b). In addition the ageney did not in-
voke available sanctions of termination, see 40 U.S.C.
§276a-1, and the Comptroller General did not invoke
the available blacklisting procedure, see 40 U.S.C. §276a-
2(a).
2. This right of action is predicated on Davis-Bacon
Act rights. The Davis-Bacon Act manifestly confers a
private right of action upon wage-earners. Congress in-
= =
tended it and the Act refers to it. Petitioner, however,
would have that suit limited only to situations where the
government contract contains explicit and complete con-
tract clauses detailing all a contractor’s Davis-Bacon Act
duties. The United States, on the other hand, approves
suit ‘‘if Davis-Bacon Act stipulations are imadvertently
omitted from a contract’’ (Amicus Brief, at 17, n.14), but
would have that suit limited only to situations where the
contracting agency concedes that the omission was in-
advertent. Neither limitation is proper nor required by
the Act, by administrative functions assigned by the Act,
or by concerns for economy.
Neither the United States nor this Court need be con-
cerned about the costs involved in complying with Davis-
Bacon nor the extent of private litigation to be anticipated.
At least as late as 1962, it was made clear by the De-
puty General Counsel of the Office of the Comptroller
General and the Chairman of the House Subcommittee
on Labor, that very few enforcement attempts—govern-
mental or private—had been made by any procedures
whatever”; and by the then Solicitor of Labor that even
employee wage suits on the required payment bounds
have ‘‘not been effective in the past; it has not been
used. It exists under the Davis-Bacon Act, but it has not
been used under the Davis Bacon Act.’’ H.R. Hearings,
1962, at 902. And so far as costs are concerned, the
Solicitor’s prepared statement submitted to the Subcom-
mittee on Labor of the Committee on Education and
Labor of the House of Representatives, contained a sec-
tion entitled ‘‘Does the Davis-Bacon Act Inflate Federal
Construction Costs’’, answered ‘‘no’’ to that question,
summarized the evidence for that conclusion, and restated
7? H.R. Hearings, 1962, on “Administration of the Davis-
Bacon Act’’, 87th Cong. 2d Sess., at 301-302.
mer ven
the congressional policy decision upon which the Act is
based. (H.R. Hearings, 1962, at 818-819.)**
Thus we come to one of the few suits ever filed under
the Davis-Bacon Act—the suit which did deal directly
with the right of wage-earners to sue their contractor-
employer when there is no payment bond available—
McDamel v. University of Chicago, 512 F.2d 583 (7th
Cir. 1975), reaffirmed on remand, 548 F.2d 689 (7th
Cir. 1977), certiorari denied, 434 U.S. 1033 (1978). There
the right of action upon which in the instant case, too,
respondents rely, was discussed. In McDaniel I, the
Seventh Circuit held that since the employees had avail-
able to them neither direct payment by the government
out of amounts withheld, nor an action against their em-
ployer and its surety on a surety payment bond, the em-
ployee suit against their contractor-employer alone was
required and “consistent with the congressional purpose
in the Davis-Bacon Act”. See 512 F.2d at 585, 587.
In McDaniel II, after remand by this Court ‘‘for fur-
ther consideration in light of Securities Investor Pro-
tection Corp. v. Barbour, 421 U.S. 412 (1975) and Cort v.
Ash, 422 U.S. €% (1975)”, 423 U.S. 809 (1975), the Sev-
enth Circuit reaffirmed McDaniel I. In the course of its
second opinion, the ccurt in McDaniel II dealt at length,
inter alia, with the two factors which petitioner and
amicus now claim as the basis for denying the right of
our respondents to whatever remedy remains under the
Davis-Bacon Act after agency and contractor non-compli-
ance with the withholding and bonding requirements es-
** See also the Solicitor’s testimony that “Congress has
not injected a cost factor into the Davis-Bacon Act = one
of the standards to be used in determinin
rates will apply’’ (H.R. Hearings, 1962, at in), ama. and <n
like testimony of then Secretary of Labor Arthur J.
Goldberg (id., at 47, 49, 53, 55)).
ea tem
tablished by law.* In McDaniel II, the court con-
sidered all factors in light of this Court’s opinions in
Cort and Securities Investor, and disagreed ‘directly and
emphatically with assertions now again made by peti-
tioner and amicus. Thus the Seventh Circuit held, inter
alia, (a) that far from there being any congressional in-
tent to deny this remedy, Congress intended it, (b) that
Congress later also recognized ‘‘that laborers have rights
of action under the contractual provisions required by 40
U.S.C. §276a,” (c) that Congress also recognized that
“laborers are able to sue at least as third-party bene-
ficiaries of the contract required by 40 U.S.C, §276a,”
(d) that “Davis-Bacon Act contemplates by its terms some
private enforcement” and “a private action,” and that
“the policy * * *, private suit, is not really in question,”
and (e) that because the other remedies based on with-
holding of contractor payments and the submission of
a@ surety payment bond were “ineffective” this “private
right of action in the Davis-Bacon Act is necessary to
effectuate the intention of Congress in passing the
statute”. See 548 F.2d at 694-695.
3. Congress has approved, not disapproved, the pri-
vate right. Amicus claims that Congress rejected em-
ployee wage suits because it rejected Congressman Goo-
dell’s amendment which would have allowed ‘‘judicial
review’’ (Amicus Brief, at 24-25). The amendment was
introduced for the purpose of permitting judicial review
of the Secretary of Labor’s prevailing wage determina-
* The two factors asserted in defense of the existence
of an employee private suit, are “strong evidence of con-
essional intent to deny any remedy other than the en-
orcement provisions expressly contained in the Davis-
Bacon Act” (see amicus brief, at 23; petr. brief, at 31);
and “It would also be inconsistent with the legislative
scheme to imply a private enforcement remedy” (see
am'cus brief, at 30; petr. brief, at 31).
—_ ee
tions.”* In the case at bar, as in McDaniel, the wage-earners
rely on the Secretary’s wage determinations, and simply
seek in this suit to recover what they are due by reason
of those determined wage rates.
Amicus also claims that Congress did not know what it
was doing when it enacted the Portal-to-Portal Act limi-
tations provisions concerning suits (including class ac-
tions) under the Davis-Bacon Act. (Amicus Brief, at 24-
29). Plainly, however, Congress knew what it was about.
Much of the debate in 1947 related to the advisability and
propriety of including the Davis-Bacon Act and the Walsh-
Healey Public Contracts Act, along with the Fair Labor
Standards Act, in the 1947 legislation.*® Congress also
knew what it was doing when it rejected S. 70, a bill similar
to H.R, 2157, but which contained no reference whatever
to the Davis-Bacon Act or to the Walsh-Healey Public
Contracts Act. Cf. S. Report No. 37 (80th Cong., 1st Sess.)
concerning S. 70.*"
*° See, e.g., Congressman Fogarty’s statement, 110 Cong
Ree. 1201 (1964).
*° In addition to at least 70 separate references to)the
Davis-Bacon Act in the Senate debates (93 Cong. Ree.
2081-2098, 2110-2135, 2175, 2192-2198, 2230-2277, 2287-2311,
2348- 2377, 4371-4372 (1947)), and over 20 separate refer-
ences to the Davis-Bacon Act in the House debates (93
Cong. Ree. 1488-1517, 1556-1574, 4383-4391 (1947)), there
are like references in the lengthy 8. Report No, 48, in
H.R. Report No. 71, and in the Conference Report (H.R.
Report No. 326, 80th Cong., 1st Sess.), on H.R. 2157 which
became the Portal-to-Portal Pay Act of 1947.
7 Further, amicus’ assertion that ‘‘ reference in 29 U.S.C.
255 to the Walsh-Healey and Davis-Bacon Acts was itself
an afterthought’’ reflects just what vocal opponents of the
Portal-to-Portal Act argued in seeking to exclude the
Davis--Bacon Act and Davis-Bacon suits from its coverage.
See, e.g., S. Report No. 48, ‘‘Minority Views,’’ at 2-3.
Both the Senate and the House rejected that assertion,
and H.R. 2157, as amended in conference, became law.
poy. geen
Amicus forgets that there is no limitation provision set
forth in the Davis-Bacon Act, 40 U.S.C. $§$276a-276a-7.
There is a one-year provision for suits under the Miller
Act, 40 U.S.C. §§270a-270e, concerning ‘‘Every suit insti-
tuted under this section’’ [§270b(b)]. Suits instituted
under the Davis-Bacon Act are not suits instituted under
section 270b of the Miller Act. In addition, however, suits
arising under the Davis-Bacon Act and predicated on
rights established by that Act alone, are expressly subject
to the Portal-to-Portal Act two-year (if by willful vio-
lation, three-year) limitation provision (29 U.S.C. $255
(a)). Thus the Portal-to-Portai Act not only affirms the
existence of a Davis-Bacon Act private action, but clearly
excludes the proposition that such right of action is pre-
dicated upon or is limited to an action pursuant to the
provisions of the Miller Act. Were the right of action in-
deed so limited, it would have to be barred after one
year — not two years (and for willful violation, three
years) — to be consistent with the Miller Act and to
obviate additional multitudes of legal and practical prob-
lems arising out of any presumed conflict between these
limitations provisions.
Amicus suggests next that a private right of action in
favor of laborers and materialmen ‘‘cannot be inferred
from the obligations imposed on contractors under [the
Miller Act]”, so “there is no reason to infer a similar pri-
vate right of action in favor of laborers and mechanics
from the obligations imposed under [the Davis-Bacon
Act]” (Amicus Brief, at 29, n. 23). The fact that the one
statute is not the other, and the differences in the pur-
poses and history of them both, are reason enough. But in
addition, the basic premise of amicus is incorrect, for
“Where the general contractor fails to furnish such
a bond, the laborers and materialmen * * * may sue
the general contractor and recover from him. Strong
v. American Fence Const. Co., 245 N.Y. 48” (Seaboard
a
Surety Co. v. Standard Acc. Ins. Co., 277 N.Y. 429
(1938); emphasis supplied).
Thus, the prime authority quoted by amicus for its propo-
sition is noted as authorizing and not rejecting a private
remedy for an intended beneficiary when there is no con-
tractor’s bond. And as to the remaining cases cited (Ami-
cus Brief, at 28-29), none of them stand for the proposition
asserted.
Finally, amicus suggests that it ‘‘would be inconsistent
with the legislative scheme” (Amicus Brief, at 30-35) to
permit these wage-earners a remedy for the deprivation
of their wages earned under and assured to them by the
Davis-Bacon Act. There is no inconsistency. We have al-
ready pointed to the evidence establishing that this suit
does not affect administrative functions under the Davis-
Bacer Act, that there are no administrative procedures
available to employees for adjudication and vindication
of their Davis-Bacon Act rights, and, indeed, that ‘‘ Nobody
is given the authority to make the final determination’”’
(Resp. Brief, at 38). In these circumstances, then, to
refuse respondents a remedy when Congress has so clearly
intended that they be paid for their labor the amounts to
which the Act entitles them by right, would amount to
action patently inconsistent with the legislative scheme.
And that deprivation would not alone be contrary to the
legislative purpose and scheme; it would conflict with
basic Fifth Amendment due process rights. See United
States ex rel. Von Hoffman v. City of Quincy, 71 U.S.
403, 410 (‘‘A right without a remedy is as if it were not.
For every beneficial purpose it may be said not to exist.
** * A different result would leave nothing * * * but an
abstract right—of no practical value—and render the pro-
tection of the Constitution a shadow and a delusion.’’)
Notwithstanding the general and conclusory assertions
by petitioner and amicus concerning the effect upon re-
ice,
spondents’ cause of this Court’s recent ‘‘private right of
action’’ trilogy (see Petr. Brief, at 30-31; Amicus Brief, at
19-20, 34), it is clear that this private suit satisfies all
the appropriate criteria. Thus, for example,
(1)
(2)
(3)
(4)
(5)
(6)
this being a situation ‘‘in which it is clear that
federal law has granted a class of persons certain
rights,” the remedy exists unless it is shown that
Congress had ‘‘an explicit purpose to deny such
cause of action.” Cannon v. University of Chica-
go, 99 S.Ct. 1946, 1956 (1979) ;
the remedy being ‘‘necessary or at least helpful
to the accomplishment of the statutory purpose,
the Court is decidedly receptive to its implication
under the statute.’’ Cannon, id., at 1961;
the fact that other provisions of the Davis-Bacon
Act (see, e.g., 40 U.S.C. §$276a—2) ‘‘create express
remedies [is not acceptable] as a sufficient reason
for refusing to imply an otherwise appropriate
remedy under a separate section’”’ (see 40 U.S.C.
§276a). Cannon, id., at 1965;
to the extent that Congress may be said to have
failed ‘‘expressly to consider [this] private reme-
dy is not inevitably inconsistent with an intent
on its part to make [this] remedy available’’ for
this intent appears ‘‘implicitly in the language
or structure of the statute, or in the circumstances
of its enactment.’’ Transamerica Mortgage Advt-
sors, Inc. v. Lewis, 100 S.Ct. 242, 246 (1979).
since the statute declares and creates certain em-
ployee rights, the statute ‘‘by its terms neces-
sarily contemplates that the issue of [those rights]
under its criteria may be litigated somewhere.’’
Transamerica, ibid.
the fact that employees were intended by Con-
gress as the especial beneficiaries of the minimum
wage rates required to be paid them under the
Davis-Bacon Act, ‘‘strongly suggests that Con-
gress was [not] unwilling to impose * * * poten-
tial monetary liability to a private suitor’’. Trans-
america, id., at 248.
(7)
(8)
—_
this being a situation in which ‘‘the statute in
question * * * prohibited certain conduct or
created federal rights in favor of private par-
ties,’’ it falls within the class of those cases in
which implied private remedies exist. Touche Ross
¢é Co. v. Redington, 99 S.Ct. 2479, 2485 (1979).
this is a situation ‘‘where congressional purposes
are likely to be undermined absent private en-
forcement’’ and the private remedy is sought by
‘the particular class intended to be protected by
the statute’’. Piper v. Chris-Craft Industries, Inc.,
430 U.S. 1, 25, 97 S.Ct. 926, 941 (1977). Plainly,
since a purpose of ‘‘conferring a right of action
on employees to recover from the contractor”’
(Umted States v. Binghamton, 347 U.S. 171, 176
(1954) is expressed in the statute itself, the
private remedy serves ‘‘rationally to complement
its remedial scheme’’ (see Whirlpool Corp. v.
Marshall, 100 S.Ct. 883, 891 (1980)).
CONCLUSION
The judgment of the court of appeals should be affirmed.
Respectfully submitted,
Huecu B. Arnoup
Dantet N. Kansan
ARNOLD AND Kapgan
11 South LaSalle Street
Chicago, Illinois 60603
(312) 236-0415
Rosert Jay Nve
NYE AND NYE
420 North Euclid Avenue
Oak Park, Illinois 60302
(812) 386-7373
Attorneys for Respondent
Stanley E. Coutu, and the
Respondent Class.
August 1, 1980
eer) a8
APPENDIX
Portions of opinion of the Court of Appeals
for the Seventh Circuit, in Coutu v.
Universities Research Association, Inc.,
595 F.2d 396 (J.A. 35-46):
“This action was brought by plaintiff, an electro-
nies technician, and his class seeking $5,000,000 in
damages and other relief on the ground that defen-
dant did not pay them the prevailing wages required
by the Davis-Bacon Act (40 U.S.C. §276 et seq.) for
their construction work. Defendant is a not-for-profit
consortium of universities formed to facilitate scien-
tific research and to design, construct and operate
the Fermi National Accelerator Laboratory in Ba-
tavia, Illinois. This facility is a 6800-aecre Kane Coun-
ty site containing laboratories, research offices, re-
lated facilities, and the world’s largest proton ac-
celerator system. It is used to earry out research in
the field of high-energy physics by numerous scien-
tists from institutions located throughout the world.
(App. 50 n. 3.) The Davis-Bacon Act requires govern-
ment construction contracts to contain a provision
stating that the minimum wages to be paid various
classes of laborers and mechanies shall be based upon
the wages to be determined by the Secretary of Labor
to be prevailing where the work is to be performed.
40 U.S.C. §276a(a). * * *.
“Plaintiff and his class alleged in their ‘First
Cause of Action’ (hereinafter ‘Count I’) that defen-
dant violated the Davis-Bacon Act by not paying
members of plaintiff’s class the minimum wages ‘re-
quired to be paid pursuant to the said contract and
the prevailing wage determinations of the Secretary
of Labor and the Davis-Bacon Act’ (App. 2). Count
I was dismissed in an unreported October 8, 1975,
— Au—
memorandum opinion and order of [a district judge].
However, that order did not dismiss the remaining
six Counts of the complaint.
“On August 10, 1976, [another district judge] to
whom the class action had been transferred, certi-
fied the plaintiff class. Discovery was apparently
stayed in February 1977. In March 1977, defendant
filed a motion for summary judgment. In November
1977, [the district judge] handed down a memoran-
dum order granting that motion. The court noted
that in Count IT the plaintiff class alleged that the
contract fell within the purview of the Davis-Bacon
Act and that the contract by its terms provides for
‘payment to members of plaintiff class at the legal
wage rate applicable to work actually performed.’
* * * The court then held that the contract failed to
contain the ‘requisite Davis-Bacon Act specifications
for maintenance of the claims stated in Count IIT’
and accordingly dismissed that Count. Counts III
through VII of the complaint were based on state
claims, and the district court declined to assert pend-
ent jurisdiction over them ‘due to the legally insub-
stantial nature of the federal claims.’ Therefore, the
complaint was dismissed in its entirety.
«* * * [I]n dismissing Count I [the first district
judge] held only that if the contract was not a Davis-
Bacon Act contract plaintiff could not recover. Clear-
ly if a contract contains the required wage stipula-
tions, this would show that it was a Davis-Bacon Act
contract. [That district judge] apparently recognized,
however, and we agree, that clauses in the contract
other than the wage stipulations may reveal that the
contract was one for Davis-Bacon Act work (App.
25).
“Thus two theories of recovery remained open to
the plaintiff class after [the first district judge’s]
dismissal: (1) there may have been Davis-Bacon Act
stipulations in the contract or (2) there may have
— Aut —
been other evidence that the contract was oné for
Davis-Bacon Act work, in which case the required
stipulations arguably become a part of the contract
by operation of law. [The second district judge’s]
grant of summary judgment was based on the affi-
davit (n. 4 supra) tending to disprove only the first
of these two theories. We hold that summary judg-
ment was improperly entered against plaintiff and
his class because the required wage stipulations were
incorporated by operation of law.
*‘The Davis-Bacon Act Applies to Construction,
Alteration or Repair Work Performed
by Defendant
“The key provision in the contract between de-
fendant and the United States Government acting
through ERDA is Article XXXIII which provides
in pertinent part as follows:
‘This contract does not contemplate the per-
formance of work by the Association, with its
own employees, which the Commission determines
is subject to the Davis-Bacon Act. Such work,
if any, performed under this contract shall be
procured by subcontracts which shall be subject
to the written approval of the Commission and
contain the provisions relative to labor and wages
required by law to be included in contracts for
the construction, alteration and/or repair, in-
cluding painting and decorating, of a publie build-
ing or public work.’
In this lawsuit, plaintiff contends that defendant’s
own employees performed and are performing con-
struction, alteration and repair work at the Fermi
Laboratory, so that the Davis-Bacon Act wage pro-
visions are applicable to the work done by plaintiff
and his class. We agree that. if the defendant actually
performed such work with its own employees at the
rom
Fermi Laboratory, they became entitled to the pre-
vailing wages in Kane County where the work was
to be performed. * * *
“Indeed, in a January 23, 1973 [sic. 1968], letter
from the Atomic Energy Commission’s Chicago Op-
erations Office Manager to the president of the de-
fendant, both these parties foresaw that conditions
might arise which might make it necessary for the
defendant to perform Davis-Bacon Act work and in
such instance to modify the contract to incorporate
the Davis-Bacon Act provisions relative to labor and
wages. Since under McDaniel I the contract was al-
ready so modified by operation of law, amendments
to the cotnract were not needed to accomplish that
result.
«* * * Because the provision to pay the prevail-
ing wage rate was incorporated by operation of law,
the affidavit relied upon by the district court to the
effect that no Davis-Bacon Act ‘stipulations requir-
ing the payment of prevailing wages have ever been
made a part of or incorporated in’ the contract (see
n. 4 supra) is insufficient to support the grant of
summary judgment. * * *
“Tt is uncontested that the Secretary of Labor has
published general wage determinations in decisions
published in the Federal Register that are applicable
to labor on government projects in Kane County,
Illinois, where the Fermi Laboratory is located and
where the defendant’s alleged construction activity
has been performed. Therefore the district court was
mistaken in concluding that to sustain plaintiff’s posi-
tion would require it to make wage determinations for
the parties.
= AY —
“Exhaustion of Administrative Remedies
Is Not Required
“If defendant or our own research had uncovered
administrative regulations affording plaintiff and his
class relief in this situaton, we might require recourse
to that remedy before permitting this lawsuit to pro-
ceed. The Davis-Bacon Act itself does not contain a
provision requiring exhaustion of administrative rem-
edies in this kind of case. Moreover, we rejected
such an argument in the second McDaniel case where
the University of Chicago had argued that admin-
istrative procedures afforded adequate relief to the
individual employees of a government contractor.
* * * As the Government itself recognized in Mc-
Daniel IT.
‘Neither the statute nor the regulations promul-
gated thereunder provide any administrative
remedy in favor of an employee who has been
injured by the failure to include the prevailing-
wage provisions in a contract.’ (Solicitor Gen-
eral’s amicus curiae brief opposing the petition
for a writ of certiorari in University of Chicago
and Argonne v. McDaniel, 434 U.S. 1033, at 25,
n. 20.)
«* * * Plaintiff must now be permitted to resume
discovery (or employ other suitable means) to de-
termine whether defendant used plaintiff and his
class to perform construction, alteration or repair
work at the Fermi Laboratory. If so, under the
Davis-Bacon Act they will be entitled to recover
wages that the Secretary of Labor has determined
to be prevailing for the corresponding classes of
laborers and mechanics employed on similar projects
in Kane County, Illinois. Since the district court
had jurisdiction over Count II, it also had pendent
jurisdiction to decide state claims presented in Counts
TII- 7”
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.