Petitioners Brief — IMPERIAL IRRIGATION DISTRICT v. BEN YELLEN (Nos. 79-435, 79-421, 79-425)
Supreme Court brief1979
Ask Donna
What actually matters in this document.
Text
ICHAEL RODAK, JR., CLERK
IN THE ”
Supreme Court of the United States
OcToBER TERM, 1979
No. 79-435
IMPERIAL IRRIGATION District, ET AL., Petitioners,
v.
Ben YELLEN, ET AL., Respondents.
BRIEF OF PETITIONER
IMPERIAL IRRIGATION DISTRICT
Of Couns. !: REGINALD L. KNox, JR.
Horton, KNox, CARTER
CHARLES E. CoRKE N, KNOX, CARTE
"419 : : & Foote
4128 55th Avenue, N.E. 7 ay Building, Suite 101
T .
Seattle, Washington 286 Breadeer
(208) 523 9964 El Centro, California
a ae 92243
(714) 352-2821
NortTHcuTt Evy
FREDERICK H. RITTs
Rosert F.. Prerrowskl, JR.
WituiaM H. BURCHETTE
Rap J. GILLIS
Law OFFICES OF
Nortucutt Ey
Watergate 600 Building
Washington, D.C. 20037
(202) 342-0800
Attorneys for Imperial
Irrigation District
January 17, 1980
Press oF Byron S. ADAMS PRINTING, INC., WASHINGTON, D. C.
ay eer Yaw.
AL a ad le, 7 a on 2:
TABLE OF CONTENTS
Page
SINE: Sree nys to base dh obscene oredenieenees 1
GI ec Nadine thea Neh eiecee hina ncaa enenanns 2
|
Statutory Provisions INVOLVED .............00e000: 2
I-III ici cae deveeibacendéecwens ten 3
STATEMENT OF THE OABR 20... ccc ccc cccccccccces 4
I CE 6 tras direc ne ek uenn ehakne een 4
The Relationship of This Case to Arizona v. Cali-
agli. Seas Or aera ey ane rk Aa mee aoe 6
ee eee 9
Historical Background: The origin of Imperial Ir-
rigation District’s presented perfected rights 10
The Colorado River Compact .................. 12
~The Boulder Canyon Project Act .............. 13
The All-American Canal Contract and the Hewes
NGL cs vebackuswd cd abieunucadesccucess 15
er 17
ARGUMENT
I. The Boulder Canyon Project Act Does Not Author-
ize Acreage Limitations on Present Perfected
Rights sane e eee eee ence ence ence rece ceeeeeees 25
A. The plain language of the Project Act specific-
ally requires the satisfaction of present per-
WE IN Gu eitare blake 5540 a5 6KG cee kas owe 25
1. The § 6 Requirement that Present Perfected
PPT eee 25
2. The Incompatibility of §6 and Acreage
EE HAA 5S eh ovis 4b ebaraesd babar’ 30
. ew
ae
II.
IIT.
Table of Contents Continued
Page
B. The legislative history of the Boulder Canyon
Project Act confirms that § 14 was not intended
to imply an authority to limit water deliveries
to 160 acres of private land in single ownership
©. Thirty-one years of consistent administrative
construction by six secretaries confirms that the
Project Act does not authorize acreage limi-
tations in Imperial Valley ..................
D. Congress has ratified administrative construc-
tion to the effect that the Project Act does not
authorize limitations in the District .........
The Decisions Not To Apply An Acreage Limita-
tion To The Privately Owned Lands In Imperial
Irrigation District Have Become Final And Irre-
I bao bata tks enue ks ce ees aneneee ran
pene hemes er errr
Be SOR kc akdv chad enseeseceak>adakeues a5
C. Validation by judicial proceeding ............
D. The attempted destruction of established values
The Court of Appeals Erred In Applying Consti-
tutional ‘‘Case and Controversy’’ Requirements
By Allowing Respondents, Ben Yellen, Et Al., To
Participate As Parties Based On Conjectural
Harm and Speculative Relief ..................
A. The constitutional tests of standing .........
How the respondents got into court .........
The lack of particularized injury ............
ree Cee ery ree
BOQ
Even if it is assumed arguendo that Dr. Yellen,
et al., once had standing, that standing would
necessarily have ceased when one-half the con-
struction costs of the All-American Canal were
EY 5c Gi vince) p 440 bamed connor tiwnsweas
ST sie os cow ek * owe vaiaklut APE Cee PO
38
46
TABLE OF AUTHORITIES ill
Court CasEs:
Adams v. United States, 319 U.S. 312 (1943) ........ 57
American Book Company v. Kansas, 193 U.S. 49 (1895) 86
Andrews v. Lilian Irrigation District, 66 Neb. 458,
92 N.W. 612 (1902), rehearing, 97 N.W. 336 (1903) 71
Ashton v. Cameron County Water District, 298 U.S.
TL I Ee 73
Arizona v. California, 283 U.S. 423 (1931) .......... 68
Arizona v. California, 373 U.S. 546 (1963) ........ passim
Arizona v. California, 376 U.S. 340 (1964) ..7, 26, 27, 28, 30
Arizona v. California, 439 U.S. 419 (1979) ..... 7, 18, 27, 28
Bayside Enterprises Inc. v. NLRB, 429 U.S. 298 (1978) 57
Bekins v. United States, 304 U.S. 27 (1938) .......... 73
Board of Governors v. First Lincolnwood Corp., 439
eG EEO 57
California v. United States, 438 U.S. 645 (1979) ....10, 21,
29, 38
Chicot County Drainage District v. Baxter State Bank,
ee a ceca nc scescces 71
De Funis v. Odegaard, 416 U.S. 312 (1974) .......... 86
Duke Power Co. v. Carolina Environmental Study
FUOUN, BI i OOD ooo c nc ccc c ccc cc cccse 82
Gladstone Realtors v. Village of Bellwood, 47 U.S.L.W.
RE Ee 76, 81
Hanson v. Kittitas Reclamation District, 75 Wash. 297,
a ive cc cence 71
Hewes v. All Persons, No. 15460, Superior Court, Im-
perial County (1933) ............. 15, 16, 47, 50, 64, 69
Ickes v. Fox, 300 U.S. 82 (1987) ........... ccc cee. 35
Ickes v. Fox, 137 F.2d 30 (D.C. Cir. 1943) on remand .. 36
In re Imperial Irrigation District, 10 F. Supp. 832
(1934), rev’d, 87 F.2d 355 (1936) ...............
iv Table of Authorities Continued
Page
Ivanhoe Irrigation District vy. All Parties & Persons,
47 Cal. 2d 597, 306 P.2d 824 (1957) ........ 69, 70, 71
Ivanhoe Irrigation District v. McCracken, 357 U.S. 275 |
(| errerrree reer errr Tear. to passim
Merchants’ National Bank of San Diego v. Escondido
Irrigation District, 144 Cal. 329, 77 P. 937 (1904) 33
Mills v. Green, 159 U.S. 651 (1895) .......-....0 ee . &
Missouri v. Ross, 299 U.S. 72 (1936) .........-eee eee 37
NLRB v. Bell Aerospace Co., 416 U.S. 267 (1974) ....° 57
North Carolina v. Rice, 404 U.S. 244 (1971) ......... 86
Norwegian Nitrogen Products Co. v. United States,
968 UB. BO4 (1GEB) oon ccc cece cecvicctecccude 57
Palmer v. Railroad Commission, 167 Cal. 163, 138 P.
8) re rere rrmrrs Tr yer ters ste 35
Perrine v. Chesapeake & D. Canal Co., 50 US. (9
A: Bi | een eee e eT rer eee
Red Lion Broadcasting Co. v. FCC, 395 U.S. 367 (1969 57
Saxbe v. Bustos, 419 U.S. 65 (1974) ..........-.0008- 61, 62
Senior v. Anderson, 138 Cal. 716, 72 P. 349 (1903) .... 35
Stanislaus Water Co. v. Bachman, 152 Cal. 716, 93 P.
a errr errr rere err ree eee 35
Tacoma v. Taxpayers of Tacoma, 357 U.S. 320 (1958) 72
Turner v. Kings River Conservation District, 360 F.2d
coe Gf | rrr Tre rere rear 81
Udall v. Tallman, 380 U.S. 1 (1965) ............ 57, 58, 59
United States v. Imperial Irrigation Dist., 559 F.2d
509 (9th Cir. 1977), reh. denied, 595 F.2d 525
: . ) rer Ore Prt Ser hore ir Te cee passim
United States v. Imperial Irrigation Dist., 322 F. Supp.
11 (S.D. Cal. 1971), rev’d, 559 F.2d 509 (9th Cir.
1977), reh. denied, 595 F.2d 525 (1979) ....... passim
United States v. Midwest Oil, 236 U.S. 459 (1915) .... 60
Table of Authorities Continued Vv
Page
United States v. Northern Pacific Railway Co., 242 U.S.
ar ek i Oe el ea ce Vurie eres becuase onc 59
United States v. Rutherford, 442 U.S. 544 (1979) ...56, 57
United States v. Tulare Lake Canal Company, 535 F.2d
1093, cert. denied, 429 U.S. 1121 (1977) ..... 24, 25, 84
Wright v. Best, 19 Cal. 2d 368, 121 P.2d 702 (1942) .. 35
Wyoming v. Colorado, 259 U.S. 419 (1922) .......... 67
Yellen, et al. v. Hickel, 335 F. Supp. 200 (S.D. Cal.
| TEPTES READ Bar oS Rr ey eto pepe eNO Qe re ni 6
Yellen, et al. v. Hickel, 352 F. Supp. 1300 (S.D. Cal.
oo BEES Ee Te ee oe Pn hanno oe Meee ea 6
Zemel v. Rusk, 381 U.S. 1 (1965) ...... ccc ccccccecs 57
STATUTES AND Compacts:
Act of February 2, 1911, 36 Stat. 895, 43 U.S.C. 4374 4
Act of July 24, 1912, 37 Stat. 200, 43 U.S.C. §449.... 4
Act of August 9, 1912, 37 Stat. 266
Section 3, 43 U.S.C. §§ 543, 544 ................ 4
Act of August 13, 1914, 38 Stat. 689
Section 12, 43 U.S.C. $418 .......... cc cece cece 4
Act of August 11, 1916, 39 Stat. 508
SUN a WEE, DOIE oo bess kaa vee csevd cas 4
Act of January 25, 1917, Sections 1-4, 39 Stat. 868 .... 4
Act of May 20, 1920, 41 Stat. 605, 43 U.S.C. §375.... 4
Act to Provide for the Application of the Reclamation
Law to Irrigation Districts, 42 Stat. 541, Section 1,
ee Ie EE hc lnc sd < ch ¥o ook ok bane passim
Act of October 14, 1941, 54 Stat. 1119, 16 U.S.C.
DEINE oo act cl cote re coo ee os 4
Boulder Canyon Project Act, 45 Stat. 1057
Section 1, 43 U.S.C. $617 ....... Sia ek song en 2, 6, 13, 15
Section 2(a), 43 U.S.C. §617a ..............000 14
vi Table of Authorities Continued
Page
Section 2(b), 43 U.S.C. § 617a 2.0... .- cece ee eee 14, 15
Section 4(a), 43 U.S.C. § 617c(a) .......-0-+-- 2,7, 13
Section 4(b), 43 U.S.C. § 617ce(b) ...... 2, 14, 15, 23, 46
Section 5, 43 U.S.C. § 617d ......- eee e eee ees passvm
Section 6, 43 U.S.C. $617e 2.02... . cece ees passim
Section 8, 43 U.S.C. § 617g ..... cece eee ee ees 2,.7, 13
Section 9, 43 U.S.C. § 617h ....... cece eee eee passim
Section 13, 43 U.S.C. § 6171 ...... 2, 7, 12, 13, 19, 28, 35
Section 14, 43 U.S.C. § 617m ........e eee eee passim
Section 18, 43 U.S.C. § 617q .....-. eee eee eeees 2, 32
Boulder Canyon Project Adjustment Act, 54 Stat. 779
Section 14, 43 U.S.C. §618m ............-- 32, 35, 62
Cad; Civ. Ondle $008 v0... 5 os cceicenssenses eee 34
Cal. Civ. Code $668 onic ccctedccsesieseenscedenees 33
Cal. Water Code Ann. §§ 22250, 22251 (West 1971) ... 34
Colorado River Basin Project Act, 82 Stat. 886, 887
Section 301(b), 43 U.S.C. § 1521(b) .......... 3, 27, 62
Colorado River Compact, 70 Cong. Rec. 324 (1922) .. 2,7,
12, 22, 26, 36, 65
Desert Land Act, 43 U.S.C. §§ 321 et seg. .......+---- 10
Jutlicial Code, 62 Stat. 689, 928
Section 1254(1), 28 U.S.C. § 1254 ............0-- 2
Section 1738,°28 U.S.C. $1738 ...........eceeees 3, 22
Omnibus Adjustment Act of 1926, 44 Stat. 649, as
amended, 70 Stat. 524
Section 46, 43 U.S.C. §423(e) ........... passim
Reclamation Act of 1902, 32 Stat. 388
Section 1, 43 U.S.C. $301 .... ..cccccccccceces 14, 35
Section 3, 43 U.S.C. §§ 416, 432, 434 ............. 3, 4
Section 5, 43 U.S.C. §§ 392, 431, 439 ..... 3, 6, 31, 48, 67
Section 8, 43 U.S.C. §§ 372, 383 ........ . 8, 19, 35, 38
Table of Authorities Continued vii
Page
Warren Act, 36 Stat. 926
Section 2, 43 U.S.C. § 524 .......... 0... cc cccee. 4
Ee 10
We I OD CRED occ ccc cscccvccccccvcccccs 63
ci cc cnc cscccccesscctecece 63
ee 63
cc cenesccstecvecsces 63
rr 63
IR I END gone as cnccsccccccvececas 63
OO femmes Com, Gees (10GB) wc. cece ccc ccccccces 63
Re Weis Oy PE CRUE) co ccc ccc ccccccccncccccs 63
58 Stat. 463, 489-90 (1944) ...... ccc cee eee 63
er 63
Oo tent. GER, GAS (1945) 25... ccc ccc cece cece 63
re 63
re 63
ee 63
63 Stat. 765, 782 (1949) 2.0.0... eee cece ees Fe pre 63
ee 63
TD ncn isan cnnvsecacvessccucs 63
| ee COG 47
ha oS 60k a Voda vac ccs cecssecse 47
MISCELLANEOUS:
Acreage Limitations in Bureau of Reclamation Proj-
ects: Hearings Before Subcomm. on Public Lands
and Development of the Sen. Comm. on Energy
and Natural Resources, 95th Cong., 2d Sess., pt. 3
I ee essa. ogy bu ski dc donee 61
Colorado River Basin: Hearings on H.R. 6251 and
H.R, 9826 Before the House Comm. on Irrigation
and Reclamation, 69th Cong., 1st Sess., pt. 1 (1926) 40
Vili Table of Authorities Continued
Page
Colorado River Basin: Hearings on S. 728 and S. 1274
Before the Senate Comm. on Irrigation and Recla-
mation, 70th Cong., Ist Sess. (1928) .........+.- 44
Hearings Pursuant to S. Res. 320, Before the Sen.
Comm. on Irrigation and Reclamation, 68th Cong.,
DE Hts. CARED: ck cave cee civcwesevedscreesensts
Hearings on H.R. 13710 Before a Senate Subcomm. on
Appropriations, 72d Cong., 2d Sess. (1933) ...... 61
Hearings on H.R. 3961 Before a Subcomm. of the Sen.
Comm. on Commerce, 78th Cong., 2d Sess., pt. IV
COED bk panGb a Coad hekendncd REDPER PE REEEES «0 51, 61
Hearings on S. 295 Before a Subcomm. of the Sen.
Comm. on Irrigation and Reclamation, 78th Cong.,
eS) ere eee ee tee 61
Hearings before a Subcomm, of the Sen. Military
Affairs Comm., 78th Cong., 2d Sess. (1944) ..... 61
Hearings on H.R. 6335 Before a Subcomm., of the Sen.
Appropriations Comm., 79th Cong., 2d Sess. (1946) 6)
Hearings on Irrigation and Reclamation Before a Sub-
comm, of the House Comm. on Public Lands, 80th
CON, TRE TOE. CERT oc ck eck ctcecevisinenss 61
Hearings on S. 912 Before a Subcomm. of the Sen.
Comm. on Public Lands, 80th Cong., 1st Sess.
| I Serer es Pore re eee Ty ee ee 61
Hearings on S. 1385 Before the Sen. Comm. on Interior
and Insular Affairs, 81st Cong., lst Sess. (1949) .. 61
Hearings on S. 1425, S. 2541, and 8. 3448 Before the
Subcomm. on Irrigation and Reclamation of the
Sen. Comm. on Interior and Insular Affairs, 85th
i ae SS) eae ere ee) oe
H. Rep. No. 1657, 69th Cong., 2d Sess. (1926) ........ 42
Interior Department Appropriation Bil, 1937: Hear-
ings Before Subcomm. of the House Comm. on
Appropriations, 74th Cong., 2d Sess. (1936) ..... 51
Table of Authorities Continued ° ix
Page
Reclamation Reform Act of 1979: Hearings Before
the Subcomm. on Energy Research and Develop-
ment of the Sen. Comm. on Energy and Natural
Resources, 96th Cong., 1st Sess. (1979) ......... 61
Sen. Comm. on INTERIOR AND INsuLaR Arratrs, ACREAGE
Limitation Potricy, 88th Cong., 2d Sess. (1964) .. 61
S. Rep. No. 592, 70th Cong., Ist Sess., Part 2 (1928) .. 44
Water Policies for the Future, Final Report to the
President and to the Congress of the United States
by the National Water Commission (1973) ...... 61
The Hoover Dam Documents, House Document No.
717, 80th Cong., 2d Sess. (1948) ............ 10, 51, 52
ey CS, Se ho hows bed dbawnaccerae. 43
SP Ss Be Ws WOON oh idee cecsovncnnceonuess 45
aoe eS re ener ae 45
RET SOU, TO, GH CEE oko onc hie dukwciccvandes 5
Se I ois Eve io hoods calle ea run 48, 67
er ON Fike kasd osnos a ee 9, 24, 85
ca en SE ee ee ROMER IO PIN «7 48
a 5 eee: Sakis bax arcane tees 54
oe I Nis 6 Kens oer et higke le eee 47
SE a revel ria hee be Wl dred ieee te whee 74
U.S. Department or THE Inrertor, Toe Hoover Dam
he ee ee A Ek 46
2 K. Davis, Apminisrrative Law Treatise 98 (2d ed.
PE Ur pire hn GLE kerr gee rt Men PEM ost tult 67
1 W. Hurcuins, Water Ricuts 1n Nineteen WESTERN
SE: A OUTED oc bah i dkb db sdu Ges cecedees ct 34
IN THE
Supreme Cowt of the United States
OctoBer TERM, 1979
No. 79-435
eS
IMPERIAL IRRIGATION DistRIct, ET AL., Petitioners,
Vv.
BEN YELLEN, ET AL., Respondents.
BRIEF OF PETITIONER
IMPERIAL IRRIGATION DISTRICT
OPINIONS BELOW
The principal opinion of the Court of Appeals is
reported at 559 F.2d 509 (9th Cir. 1977), and appears’
at App. la.’ The opinion of the Court of Appeals modi-
fying its principal opinion and denying the District’s
petition for rehearing is reported at 595 F.2d 524 (9th
Cir. 1979), and appears at App. 64a. The opinion of
the District Court (Turrentine, District Judge) is re-
ported at 322 F. Supp. 11 (S.D. Cal. 1971), and is
printed at App. 78a. The order of the District Court
*In this brief, ‘‘App.’’ is used to designate the appendix to
Imperial Irrigation District’s Petition for Certiorari. References to
the Consolidated Appendix are indicated ‘‘Con. Apx.’’
2
denying the motion of respondents Ben Yellen, et al.,
for leave to intervene after judgment to prosecute an
appeal is unreported and is reproduced at App. 112a.
The decision of the Court of Appeals reversing that
order of the District Court is an appendix to the opin-
ion of the Court of Appeals, 559 F.2d, at 543, and
appears at App. 62a. ,
JURISDICTION
The judgment of the Court of Appeals was entered
August 18, 1977, and was subsequently modified by an
order entered April 23, 1979, which denied Imperial
Irrigation District’s petition for rehearing. The juris-
diction of the Supreme Court was invoked under
§1254(1) of the Judicial Code, 62 Stat. 928, by a
petition for certiorari filed September 14, 1979. Cer-
tiorari was granted December 3, 1979.
STATUTORY PROVISIONS INVOLVED
Relevant extracts from the statutes and compact
involved are printed in the Appendix to Imperial
Irrigation District’s Petition for Certiorari beginning
at page 155a. They are:
Boulder Canyon Project Act, 45 Stat. 1057, $§ 1,
4(a), 4(b), 5, 6, 8, 9, 12, 13, 14 and 18, 43
U.S.C. §§ 617, c(a), ¢(b), d, e, 8; h, k, J, m,
and q. (App. 155a.)
Colorado River Compact, 70 Cong. Ree. 324 (1922),
Art. VIII. (App. 168a.)
Act to Provide for the Application of the Recla-
mation Law to Irrigation Districts, 42 Stat.
541, § 1, 43 U.S.C. $511. (App. 169a.)
3
Colorado River Basin Project Act, 82 Stat. 886,
§ 301(b), 43 U.S.C. § 1521(b). (App. 171a.)
Reclamation Act of 1902, 32 Stat. 388, §§ 3,5, and
8, 43 U.S.C. §§ 372, 383, 392, 416, 431, 434,
and 439. (App. 172a.)
Omnibus Adjustment Act of 1926, 44 Stat. 649, as
amended, 70 Stat. 524, § 46, 43 U.S.C. § 423(e).
(App. 174a.)
Judicial Code, 62 Stat. 689, § 1738, 28 U.S.C.
§ 1738. (App. 176a.)
QUESTIONS PRESENTED
1, Whether the Boulder Canyon Project Act and
this Court’s opinion and decrees in Arizona v. Cali-
fornia require the delivery of water in satisfaction of
‘present perfected rights,’’ as defined therein, on pri-
vately owned lands in excess of 160 acres?
2. Whether principles of finality preclude the re-
versal of administrative and judicial determinations
that vested water rights are not subject to impairment
by the excess lands provisions of the reclamation law?
3. Whether an alleged ‘‘desire’’ to buy land at less
than its market value at prices to be fixed by the Sec-
retary of the Interior under §46 of the Omnibus
Adjustment Act of 1926 created standing to intervene
and appeal from a District Court judgment against
the United States from which the United States did
not appeal? And, if so, whether such standing ceased,
upon the termination of the Secretary’s authority to
fix prices for excess lands, during the pendency of the
appeal?
4
STATEMENT OF THE CASE
The Decisions Below
This suit was instituted by the United States against
Imperial Irrigation District (‘‘the District’’) at the
request of the Secretary of the Interior (‘‘the Secre-
tary’’) in 1967. The Secretary sought a declaratory
judgment that the acreage limitation.’ provisions of
the reclamation law, particularly §46 ofthe Omnibus
Adjustment Act of 1926, 44 Stat. 649, 46 U.S.G, § 423
(e), apply to privately owned ‘lands inthe District
which receive Colorado River water through the All-
American Canal. Specifically, he asked for a declara-
tion that water should not be delivered to lands in
excess of 160 acres per landowner unless and until
the landowner agrees to sell the excess lands at prices
approved by the Secretary.
The State of California intervened in the District
Court proceedings as parens patriae and as owner of
lands in a waterfowl reserve.
* The term ‘‘acreage limitation’’ is a species of statutory limita-
tion on the amount of irrigable land in single ownership that is
eligible to receive project water from federal] reclamation projects.
Various statutes provide for acreage limitations in overlapping and
sometimes inconsistent terms. These include: the Reclamation Act
of 1902, §§ 3, 5, 32 Stat. 388-89 (1902), 43 U.S.C. §§ 416, 432, 434;
Act of February 2, 1911, 36 Stat. 895, 43 U.S.C. § 374; Warren
Act, § 2, 36 Stat. 926, 43 U.S.C. § 524; Act of July 24, 1912, 37
Stat. 200, 43 U.S.C. § 449; Act of August 9, 1912, § 3, 37 Stat.
266, 43 U.S.C. §§ 543, 544; Act of August 13, 1914, § 12, 38 Stat.
689, 43 U.S.C. § 418; Act of August 11, 1916, § 5, 39 Stat, 508, 43
USC. § 627; Act of August 11, 1916, § 6, 39 Stat. 508, 43 U.S.C.
§ 628; Act of January 25, 1917, §§ 1-4, 39 Stat. 868; Act of May
20, 1920, 41 Stat. 605, 43 U.S. C. § 375; Omnibus Adjustment Act
of May 25, 1926, 44 Stat. 649, 46 U.S.C. § 423e; and Act of
October 14, 1941, 54 Stat. 1119, 16 U.S.C. § 590z-2(c¢) (5).
ee a es
5
John M. Bryant and certain other landowners inter-
vened as defendants on their own behalf and as repre-
sentatives of a class comprised of all persons (some
800 in number) owning more than 160 acres of irri-
gable land within the District.
Ben Yellen, M.D., and the other individual respond-
ents, intervenors after judgment, alleged a desire to
buy land from the present owners at prices substan-
tially below market values, and that they would be able
to do so if the present owners were denied water from
the All-American Canal unless they agreed to sell their
excess lands at prices established by the Secretary.
The District Court, after trial, entered judgment
against the United States, holding that the acreage
limitation provisions of reclamation law have no ap-
plication to privately owned lands within the District.
322 F. Supp., at 11.
Respondents applied for leave to intervene to appeal
in the event the United States decided not to appeal.
The District Court denied leave to intervene for this
purpose. App. 112a. The United States decided not to
appeal.’ Respondents appealed the order denying leave
to intervene.
In the meantime, respondents, in a separate case,
obtained a District Court decision (by another judge)
* Solicitor General Griswold explained:
‘IT considered the matter carefully and thoroughly, and over
a considerable period of time. As a result of my consideration,
I became convinced that (a) we would not win the case in the
court of appeals, and (b) we should not win it. In this situa-
tion, I came’ to the conclusion that it was my duty as a
responsible officer of the government not to authorize an ap-
peal.’’ 117 Cong. Rec. 46228 (1971).
6
that the ‘‘residency requirement’’* of §5 of the
Reclamation Act of 1902 applies to lands within the
District. Yellen, et al. v. Hickel, 335 F. Supp. 200
(S.D. Cal. 1971) ; 352 F. Supp. 1300 (S.D. Cal. 1972).
In the ‘‘residency case,’’ respondents alleged that they
would be able to buy land at prices they could afford
if the residency requirement of §5 of that Act were
applied. The Court of Appeals then reversed the order
denying intervention in the present case (the ‘‘acreage
case’’) on the basis that there might be two conflicting
decisions in the Ninth Circuit. 559 F.2d, at 543.
The two eases (‘‘residency’”’ and ‘“‘acreage’’) were
calendared for argument before the same panel. Al-
most three and one-half years after argument, the
Court of Appeals ordered dismissal of the residency
ease for lack of standing," id., at 519, but reversed
the District Court’s judgment in the acreage case as to
both standing and the merits. Jd., at 523-524, 542.
The Relationship of This Case to Arizona v. California
The central issue in this case involves the conflict of
the decision of the Court of Appeals below with the
opinion and decrees of this Court in Arizona v. Cali-
fornia construing the authority of the Secretary under
the Boulder Canyon Project Act (‘‘Project Act’’),
45 Stat. 1057, 43 U.S.C. $§ 617 et seq.
***'N]o such sale [ofa right to the use of water for land in
private ownership] shall be made to any landowner unless he
be an actual bona fide resident on such land ... .’’ 32 Stat.
389, 43 U.S.C. § 431.
5See App. 14a-16a, and p. 77 of this brief, for the Court of
Appeals’ discussion of the curious history of the standing issue in
the residency case.
at tte
fa = ss (lel lta io
DE A MORE lit rete DNL ip A ale tr aac athe i ARAB A RED SEIN si
7
The opinion of this Court in Arizona v. California,
373 U.S. 546 (1963), held that the Secretary is required
by $6 of the Project Act, read in conjunction with
other references in that act (e.g., §§ 4(a), 8, and 13) to
the Colorado River Compact, to deliver water in satis-
faction of ‘‘present perfected rights’? pursuant to
Article VIII of the Compact, which requires that such
rights shall be unimpaired. ‘‘ Present perfected rights’’
as defined by this Court in its original decree in Ari-
zona Vv. California, 376 U.S. 340 (1964), are water
rights perfected under state law or reserved under
federal law prior to June 25, 1929—the effective date
of the Project Act.
This Court has described the §6 requirement that
present perfected rights be satisfied as ‘‘one of the most
significant limitations’’ on the Secretary’s discretion to
deliver water under authority of the Project Act. 373
U.S., at 585.°
This Court’s supplemental decree in Arizona v.
California, 439 U.S. 419 (1979), which adjudicated the
magnitudes and priority dates of present perfected
rights in Arizona, California, and Nevada, requires
the Secretary to deliver to the District the lesser of
(i) 2,600,000 acre-feet of annual diversions or (ii) the
amount of water required to irrigate 424,145 acres,
with a priority date of 1901—these being the District’s
“present perfected rights’’ established by actual use of
water in that quantity on that area of land prior to the
effective date of the Project Act.
° The opinion contains ten references to the Act’s protection of
present perfected rights, at pages 566, 567, 581, 582 n. 83, 584 (two
references), 585, 588, 594, 600.
. 8
On the other hand, the Court of Appeals’ opinion
would require the Secretary and the District to with-
-hold delivery of water from some 60 percent of the
decreed area, 233,000 acres,’ characterized as ‘‘excess
lands’’ (areas in excess of 160 acres per owner), unless
the owner agrees to sell those lands at prices to be
fixed by the Secretary. It is conceded by the Court of
Appeals that owners cannot be compelled to sell.
Thus, the Court of Appeals’ opinion, if given effect,
would stop the delivery of water to some 233,000 acres
that were being irrigated from the Colorado River,
without federal assistance, more than a half century
ago (and in some cases three quarters of a century
ago), long before there was a Boulder Canyon Project,
unless their owners agree to sell them at prices to be
fixed by the Secretary at less than their value.
As the Court of Appeals’ opinion on rehearing can-
didly put it, ‘‘Those who own excess lands will be
required to sell the excess at below-market prices, or
will no longer receive water for irrigating those
lands,’’ notwithstanding that ‘‘it is also clear from the
record in this case that land in the Imperial Valley
has long been devoted to agricultural use, that the
entire economy of the Valley is based on agriculture
and agricultural support industries, that the particular
233,000 acres involved constitutes some of the finest
agricultural land in the world, and that federal irriga-
tion facilities provide the only assured source of water
in the Valley.’’* 595 F.2d, at 528.
’ This figure appears in the Court of Appeals’ opinions, 559 F.2d,
at 522, 595 F.2d, at 528, 530 n. 6.
* Federal irrigation facilities became ‘‘the only assured source
of water in the valley’’ under the Project Act which, in § 6, as-
9
Land Speculation
If water should be denied to the present owners of
these lands, speculators would be the newly enriched
beneficiaries of the decision. The principal respondent,
Dr. Yellen, is on record with an affidavit in which he
says that if the government were to prevail in this
action he and persons similarly situated anticipate be-
ing able to purchase land worth $1200 to $1500 per acre
(as of 1971) for $25 to $50 per acre. App. 245a. Thus,
Dr. Yellen, et al., if they prevail in this suit, will be
able to use § 46, which was intended by Congress to
prevent speculation, to achieve windfall profits. The
Department of the Interior has conceded as much. In
proposed regulations published some 10 years after
this litigation commenced, the Department stated its
intention to reverse ‘‘the current practice of allowing
an excess land purchaser to realize the windfall profits
represented by low-priced federal water in an imme-
diate resale.”* App. 219a. Unfortunately, however,
these regulations, if ever enacted, would not prevent
Dr. Yellen, et al., from reaping windfall profits because
they limit price controls on resale only until one-half
of the project’s costs are repaid—an event which has
already occurred with respect to the All-American
Canal, by the efforts of the landowners who, according
to the Court of Appeals, remain subject to the Secre-
tary’s power to fix prices notwithstanding that re-
payment.
sured the satisfaction of the preproject water rights of these same
lands. See p. 25, infra.
* The proposed regulations were published August 22, 1977, but
the date for receipt of comments has been postponed to the end of
1980, with the expectation of putting them into effect in July 1981,
nearly four years after initial publication. It is not certain that
the regulations will ever be promulgated in the form proposed, or
at all.
10
Historical Background: The origin of Imperial Irrigation District's
present perfected rights
At the outset we wish to dispel any notion that this
case involves rights to use ‘‘low-priced federal water.’’
The water rights at stake here are not—and never have
been—owned by the federal government. The District’s
present perfected rights came into existence without
federal assistance, financial or otherwise, by the efforts
of pioneer settlers who succeeded, despite enormous
hardships, in converting one of the world’s most in-
hospitable deserts into one of its most productive
agricultural areas.”
The following is a condensation of the narrative
given in the opinion of District Judge Turrentine: ™
‘‘The initial appropriations and diversions of
water from the Colorado River were made by the
California Development Company, a privately
owned corporation organized in 1896 and the pre-
decessor in interest of defendant District, which
was organized in July of 1911. These appropria-
2° All of the lands in the decreed area of 424,145 acres in Imperial
Valley were acquired from the United States prior to or soon after
the turn of the century, by entry under the Desert Land Act, 43
U.S.C. §§ 321 et seq., or other homestead laws, 43 U.S.C. §§ 161 et
seq. All of these laws required the applicant to have lived on these
desert lands for a specified period of years. The Desert Land Act
required proof of acquisition of a water right under state law by
bona fide prior appropriations. The history of the homestead laws,
in relation to federal laws concerning irrigation, is summarized in
California v. United States, 438 U.S. 645, 655-663 (1979).
1 See also Arizona v. California, 373 U.S. 546, 552-553. The his-
torical material on the development of Imperial Valley, and on
the Colorado River Compact and the Project Act, is voluminous.
It is cited and summarized in The Hoover Dam Documents, House
Document No. 717, 80th Cong., 2d Sess., at 1-31 (1948). The evo-
lution of the Project Act in the four successive Swing-Johnson
bills is traced there at 32-59.
11
tions and diversions laid the foundation for the
present perfected water rights which have admit-
tedly existed within the boundaries of the District
from and after June 25, 1929, the effective date of
the Boulder Canyon Project Act.
‘*The first water from the Colorado River was
diverted and brought to the Valley in J uly of 1901.
This water, which was diverted about one mile
north of the international boundary with Mexico,
was carried by the Alamo Canal through Mexican
territory and back into the United States at Im-
perial Valley to avoid the high mesa and sandhill
country north of the international boundary, For
most of its 50 mile course in Mexico, this canal
made use of an ancient overflow channel known as
the Alamo River, which formerly led into the
Salton Sea.
* * * * *
“By 1903, through the distributive facilities
constructed by the local mutual water companies,
approximately 25,000 acres of valley lands were in
irrigated cultivation, all as a result of diversions
from the River. By the following winter, the irri-
gated acreage was increased to 100,000. 181,191
acres were irrigated by 1910, 308,009 in 1916, 413,-
440 in 1919, and 424, 145 in 1929, the year when the
Boulder Canyon Project Act took effect.
* * * * *
‘At the time of the taking effect of said Project
Act, the District had a distribution and drainage
system which was wholly financed, constructed,
maintained and operated by local means. The dis-
tribution system then, as of June 25, 1929, com-
prised approximately 1,700 miles of main and lat-
eral canals, providing for the irrigation by waters
diverted by it from the Colorado River of ap-
proximately 424,000 privately owned acres, com-
puted on a single cropping basis. All of this acre-
age was, as of June 25, 1929, being irrigated by
12
and with Colorado River water, carried through
the Alamo Canal. In 1966, just prior to the bring-
ing of this action, there were approximately 438,-
000 acres irrigated with water transported
through the All-American Canal.’’ 322 F.Supp.,
at 12-14.
The Colorado River Compact
On November 24, 1922, the Colorado River Com-
pact, an interstate agreement relating to allocations
and rights in the waters of the River, was signed by
commissioners representing the States of Arizona,
California, Colorado, Nevada, New Mexico, Utah and
Wyoming, and by Herbert Hoover, as representative
of the United States. It became effective June 25,
1929.” ;
Under the Compact, quantities of consumptive use
were apportioned in perpetuity to the Upper Basin
and the Lower Basin. The four upper States (Colo-
rado, New Mexico, Utah, and Wyoming), in return,
agreed not to deplete the flow of the river at a
division point (Lee Ferry, Arizona) below stated ag-
gregates in ten-year periods, and both groups agreed
to share the burden of any future treaty with Mexico.
The protection of prior vested rights was dealt with in
Article VIII, which provided:
‘*Present perfected rights to the beneficial use
of waters of the Colorado River System are un-
impaired by this compact. ...’’*
**The Colorado River Compact was authorized by an Act of
Congress dated August 19, 1921, 42 Stat. 171, and by the acts of
the legislatures of the participating states. Congress approved it
in §13 of the Project Act, 43 U.S.C. § 6171. See also, § 4(a)
thereof.
** The full text of Article VIII appears at App. 168a.
———— ee ae ~
13
The Boulder Canyon Project Act
The Project Act was signed by President Coolidge
on December 21, 1928." It was the last of the four
‘‘Swing-Johnson”’ bills, considered in as many Con-
gresses. The Act inter alia (i) in §§4(a) and 8 gave
consent to the Colorado River Compact, and in $$ 8
and 13 subjected the United States and those claiming
under it to that compact; (ii) in §1 authorized con-
struction of a storage dam (now named Hoover Dam)
and power plant, mandating in § 6 that the dam and
reservoir be used ‘‘[f]irst, for river regulation, im-
provement of navigation, and flood control; second, for
irrigation and domestic uses and satisfaction of present
perfected rights in pursuance of Article VIII of said
Colorado River compact; and third, for power’’; (iii)
directed in §5 that no one should have the use of the
stored water except by contract with the Secretary ;
and (iv) in § 1 authorized the construction of the All-
American Canal.
Section 14 declared the Act to be deemed a supple-
ment to the reclamation law, ‘‘which said reclamation
law shall govern the construction, operation, and man-
agement of the works herein authorized, except as
otherwise herein provided (emphasis added).’’ The
Act in §9 contained a specific acreage limitation, but
** It did not become effective until June 25, 1929, in consequence
of delays of the States in meeting the requirements of § 4(a)
for their ratification of the Colorado River Compact as a seven-
state agreement, or, in the alternative, as a six-state agreement (in
the event that Arizona refused to ratify), accompanied, in the
latter event, by the enactment by California of an act limiting her
rights to water, including ‘present perfected rights and all other
rights which may now exist,’’ to specified quantities. The accom-
plishment of the latier alternative was proclaimed by President
Hoover on June 25, 1929.
14
that limitation in explicit terms applied only to public
lands that the Secretary might open to entry (there
are no public lands open to entry in the District).
The exception to the reclamation law provided for
in § 14 reflected the innovative character of the Project
Act. This was the first great multiple-purpose project.
The Project Act differed from all previous water re-
source project authorizations in almost every respect.
The Boulder Canyon Project was to be financed from
the general treasury, not the Reclamation Fund."
The amount authorized to be appropriated in § 2(b),
$165,000,000, was in excess of the combined total of
all previous reclamation projects. In lieu of the
Reclamation Fund, a new fund in the Treasury, the
Colorado River Dam Fund, was created in §2/a),
into which all federal appropriations, and all future
revenues, were to be paid, and out of which all dis-
bursements were to be made. Disposition of the reve-
nues of this fund bore no relation to the disposition -
of revenues of the Reclamation Fund.
The Secretary was required by § 4(b) of the Project
Act to have in hand contracts assuring the repayment
of the whole federal investment, plus operation and
maintenance, before any money could be appropriated. '
In this respect, the Project Act differed drastically
from the Omnibus Adjustment Act, enacted two years
earlier, which only required that reclamation project
** The Reclamation Fund, created by § 1 of the 1902 Reclamation
Act, 32 Stat. 388, 43 U.S.C. § 391, is a fund into which certain
federal revenues from the western states, e.g., certain proceeds from
the sale of public lands, oil and mineral royalties from public lands,
ete., are paid. Initially, all appropriations for reclamation projects
were made out of this fund, and the aggregate amount of such
appropriations was limited to the fund’s income.
15
repayment contracts be in hand before commencement
of delivery of water, not before construction. As to
flood control (usually a non-reimbursable item), while
an allocation of $25,000,000 was made to this function,
this amount was required by § 2(b) to be repaid out
of revenues in excess of those required for amortiza-
tion of the investment in the dam and power plant.
Contracts for storage and delivery of water under
§ 5 were to be ‘‘for permanent service,’’ whereas simi-
lar contracts under the reclamation law are for a fixed
period.
The All-American Canal Contract and the Hewes Decision
The contract between the United States and the
District combines in one document the functions of a
water storage contract, pursuant to § 5 of the Project
Act, and a repayment contract, pursuant to § 4(b).
Negotiation of the contract providing for the con-
struction of the All-American Canal commenced in
1930. During this negotiation, the District took the
position that it would not contract with the United
States for construction of the All-American Canal and
repayment of the costs thereof if delivery of water
from the canal would be limited to any maximum
acreage in single ownership. Thus, while an early draft
of the contract would have limited deliveries of water
to 160 acres per landowner, the contract as finally
executed contained no acreage limitation provision as
to privately owned lands.
Following signature of the contract and approval by
the District’s electors, the District instituted an in rem
proceeding, Hewes v. All Persons, in the Superior
Court of California to validate the contract as required
16
by 43 LU S.C. §511, by state law, and by Article 31 of
the contract. One of the defendants in the validation
proceedings, an owner of more than 160 acres named
Charles Malan, filed an answer attacking the validity
of the contract on the ground that it would make the
acreage limitation provisions of the reclamation law
applicable to deliveries of water from the All-American
Canal, and would thereby deprive him of the right to
receive water for his lands in excess of 160 acres. In
response to Malan’s claim, Secretary Wilbur, who
signed the 1932 contract on behalf of the United States,
issued a letter-ruling that the acreage limitation pro-
visions of the reclamation law were not applicable to
privately owned lands in the District. App. 213a. On
July 5, 1933, following the Secretary’s ruling, judg-
ment was entered in the Hewes case confirming the
legality of the contract. App. 150a. In reaching its
ultimate holding that the contract was valid, the court
held that neither the contract nor any applicable law
required that water deliveries to private lands within
the District be limited to any maximum acreage held
in single ownership.
Construction of the All-American Canal commenced
on August 8, 1934, with funds allocated by Secretary
Harold L. Ickes, who was also Public Works Adminis-
trator. The first official delivery of water through the
canal to the District occurred on October 13, 1940. The
District’s entire supply of irrigation water has been
transported by the Canal since March of 1942.
From 1933 until 1964, the Department of the Interior
consistently adhered to Secretary Wilbur’s ruling that
the 160-acre limitation did not apply to privately
17
owned lands in the District. During this period, Con-
gress was kept advised of the fact that the 160-acre
limitation was not being applied in the District. Yet
Congress appropriated large amounts for construction
of the project each year from 1936 through 1950.
Moreover, Congress on three occasions has amended or
supplemented the Project Act, and on none of these
occasions did it insert an acreage limitation provision
in the Act.
On December 31, 1964, Frank J. Barry, then Solici-
tor of the Department of the Interior, issued an opinion
that purported to reverse Secretary Wilbur’s ruling of
1933. Con. Apx. 182a. Barry’s opinion reasoned that
the 160-acre limitation of the reclamation law was
applicable to the District because § 14 of the Project
Act incorporates the reclamation law.
Subsequent to the Barry opinion, the Department
of the Interior for several months attempted to nego-
tiate a new contract with the District which would
have incorporated the 160-acre limitation. When the
District refused to negotiate a new contract, insisting
on its rights under the existing contract, the United
States brought this action for declaratory relief.
SUMMARY OF ARGUMENT
I
The opinion in Arizona v. California construed the
Project Act as excluding water rights perfected under
state law prior to the effective date of that Act from
the powers vested in the Secretary to allocate the use
** The District Court noted that the Wilbur ruling had been
adhered to by six subsequent Secretaries in four Presidential
administrations. 322 F.Supp. at 26, n.30.
18
of water stored by Hoover Dam. Indeed, it said that
the Act ‘‘fettered’’ his powers in that respect. 373 U.S.,
at 581. It read the Act as requiring the delivery of
stored water to satisfy those rights, saying:
‘‘One of the most significant limitations in the Act
is that the Secretary is required to satisfy present
perfected rights, a matter of intense importance
to those who had reduced their water rights to
actual beneficial use at the time the Act became
effective.’’ Id., at 584.
The Court’s 1979 decree recognized the fact that,
prior to the authorization of the Boulder Canyon
Project, pioneer settlers in the Imperial Valley in the
period 1901-1929 had succeeded in diverting 2,600,000
acre feet of water annually from the Colorado River to
irrigate 424,145 acres, by means of the privately owned
Alamo Canal. All of the lands involved in this contro-
versy are part of that 424,145 acres.
But if the opinion of the Court of Appeals is given
effect, notwithstanding the opinion and decrees of this
Court in Arizona v. California, the Secretary will de-
liver much less than the decreed quantity of 2,600,000
acre feet annually, to irrigate much less than the
decreed area of 424,145 acres. This is because (if the
court’s figures are right) 233,000 acres of the de-
ereed area will be ineligible to receive water unless
the owners thereof agree to sell the excess lands at less
than market value at prices fixed by the Secretary.
The Court of Appeals concedes that the Secretary
cannot compel them to sell, but thinks that some will
do so.
The Court of Appeals argues that the District, not
the landowners, owns the decreed present perfected
rights, and, therefore, the District can ‘redistribute’?
19
the water that is taken away from excess lands. This
contention is quite untenable, both factually and
legally. The fact is that all lawfully irrigable land in
the District is now receiving water. There is no place
within the District to put the water withheld from
excess lands. Moreover, as a matter of California law,
the District is merely the trustee of water rights for
the landowners, who are the beneficial owners, and
their beneficial interest is a constitutionally protected
property right which is appurtenant to the land irri-
gated. Section 6 directs that these rights be satisfied;
there is no authority for taking them. As a matter of
federal law, § 8 of the Reclamation Act of 1902 stipu-
lates that rights to use of water supplied through
federal works shall be appurtenant to the land irri-
gated, and § 13(d) of the Project Act prescribes that
the ‘‘covenants’’ in §13(c) (which subject all rights
of the United States and water users to the Colorado
River compact) shall ‘‘run with the land.’’ This in-
cludes, by definition, the Compact term ‘present
perfected rights,’’ as adopted by the Project Act.
The Court of Appeals’ holding hinges entirely on
§14 of the Project Act, which provides that the
Act shall be deemed a supplement to the reclamation
law, ‘‘which said reclamation laws shall govern the
construction, operation, and management of the works
herein authorized, except as otherwise herein pro-
vided (emphasis added).’’ The Court ignored the ex-
ception. The specific requirement of §6, which man-
dates the satisfaction of present perfected rights,
controls the general reference to the reclamation law
in §14. The only land limitation appearing in the
Project Act is in $9, which is specifically limited to
desert public lands. The legislative history of the Proj-
20
ect Act shows six efforts, at a time when the § 14 lan-
guage was in the bill, to impose acreage limitations
on private lands, even though previously irrigated.
All of these efforts were eventually unsuccessful. And
if § 14, standing alone, imported into the Project Act
the acreage limitation provisions of the reclamation
law, of course the proposed restrictions, as well as
§ 9, which imposed acreage limitations on public lands
opened for entry, would have been surplusage. More-
over, the legislative history does not contain a single
statement to the effect that §14 authorizes acreage
limitations.
The District Court, in construing the relative effect
to be given §§ 6 and 14 of the Project Act, gave pri-
macy to § 6. It said:
‘*‘Under the decree in Arizona v. California con-
struing the Project Act, the application of a spe-
cific quantity of water to a defined area of land is
an essential element of a perfected right. It was
held in the court’s opinion that the Secretary is
required to satisfy present perfected rights. This
duty of the Secretary to supply water to an area
where present perfected rights exist is repugnant
to the concept that the United States may at the
same time shut off water deliveries destined for
lands, be they excess or not, entitled to the benefi-
cial use of Colorado River water in the exercise
of = rights (footnote omitted). 322 F.Supp.,
at 18.
* * * * *
‘“The combined effect of §§ 6, 8(a) and 13 of
~ the Project Act is to express Congressional intent
that the present perfected rights be protected
from interference by any contrary provision of
the Project Act or reclamation law. The specific
and repeated guarantees found in these sections
21
indicate that any provision such as acreage limita-
tion which would curtail such rights would be de-
tailed in correspondingly exact language. Neither
the references to reclamation law contained in
§$ 1, 4(b), 12 and 14 of the Project Act, nor any
other term thereof demonstrate Congressional in-
tention that acreage limitation[s] apply to pri-
vately owned lands in the District.’’? 322 F.Supp.
at 18-19.
In holding that the Project Act authorizes acreage
limitations, the Court of Appeals relied heavily on this
Court’s opinion in Ivanhoe Irrigation District v. Mc-
Cracken, 357 U.S. 275 (1958), which held that acreage
limitations were required by the various acts authoriz-
ing the Central Valley Project in California. The Court
of Appeals’ reliance on Ivanhoe, as though that case
were authority for the curtailment of present per-
fected rights by subsequent imposition of acreage limi-
tations, is misplaced in four essential respects: (i)
Ivanhoe did not involve the Project Act; (ii) the land-
owners in Ivanhoe did not have vested water rights;
(111) in Ivanhoe the statute did not require the satis-
faction of vested or perfected rights; and (iv) in
Ivanhoe the district and the Secretary agreed that
acreage limitations applied and the contract so pro-
vided, whereas here the District and the Secretary
agreed that acreage limitations did not apply, and the
contract did not contain an acreage limitation provi-
sion. Moreover, the dictum in Ivanhoe, relied on by
the Court of Appeals in this case, to the effect that the
operation of $8 of the Reclamation Act of 1902 is
limited to the acquisition of water rights and does not
extend to operation of the dam, was recently disavowed
by this Court in California v. United States, 438 U.S.
645, 674-75 (1979).
22
Principles of finality require that the decision not
to apply acreage limitations to the District be recog-
nized as irreversible.
Article VIII of the Compact and the Project Act
required the Secretary to make a number of decisions
in carrying out the intent of Congress. Amc others,
he relocated Hoover Dam to Black Canyon rather than
Boulder Canyon, and he determined that the acre-
age limitations should not apply within the District.
Hoover Dam will remain in Black Canyon and acre-
age limitations should not now apply in the District.
Every available legal device was used to make these
decisions final for all time.
The regulations of the Department of the Interior,
in force since 1910, permitted water to pass through
works constructed by the United States to satisfy
vested rights for ownership in excess of 160 acres.
Those regulations are still in effect.
The Secretary contracted with the District in an
attempt to make clear what the rights and obligations
of the parties were. The contract was for permanent
service as required by the Project Act and the parties
agreed that the contract did not require an acreage
limitation.
The Court of Appeals’ decision failed to give full
faith and credit, required by 16 U.S.C. § 1738, to a
1933 judgment of a State court of competent jurisdic-
tion, in proceedings required by 43 U.S.C. § 511, to
validate the contract between the United States and
the District, whereby the United States agreed to
deliver water through the All-American Canal, and
the District agreed to repay the cost of that canal. The
23
contract required this validation proceeding, repeating
the language of 43 U.S.C. §511. The State Court,
deciding pleaded adversary issues, held that neither
the Project Act nor the contract required acreage
limitations on private lands in Imperial Valley, and
that the contract was valid. The Department acquiesced
in the judgment, and submitted the contract to Con-
gress as conforming to §4(b) of the Project Act,
which required assurance of the repayment of the
government’s investment, as a precondition to the
appropriation of funds for construction. The appro-
priations were made.
The validation decree, after it became final, was thus
accepted by the Secretary and by Congress as the
trigger to proceed with and finalize the project.
For more than 30 years the District relied on the
repeated and explicit understanding that acreage limi-
tations did not apply within its boundaries.
Il
The Court of Appeals’ opinions would extend the
concept of standing on an unjustifiable scale. This
is not a class action. There is no allegation of an
injury to a particular respondent, as distinguished
from the public in general, caused by any party to this
action, which a judgment in this suit could redress.
Respondents do not allege, and could not allege, any
preference against other potential purchasers of excess
lands dwelling anywhere in the United States. Even if
the Secretary should be held to possess the power to
refuse delivery of water to excess lands possessing
present perfected rights unless and until the owners
24
authorize him to sell those lands at below-market
prices fixed by the Secretary, there is no assurance at
all that any landowner, if he decided to sell at the
Seeretary’s price, would choose to sell to these particu-
lar respondents. The Secretary cannot compel land-
owners to sell, and cannot choose the buyers if sales
are made. Dr. Yellen, et al., are merely members of the
general public, seeking to second-guess the Solicitor
General of the United States in his perception of the
merits of the case, after he had withdrawn the United
States from it.
This action was brought under § 46 of the Omnibus
Adjustment Act of 1926, which provides that ‘‘untzl
one-half the construction charges against said lands
shall have been fully paid no sale of any such lands
shall carry the right to receive water unless and until
the purchase price involved in such sale is approved by
the Secretary of the Interior . .. (emphasis added).”’
The event which terminated the Secretary’s author-
ity occurred on March 1, 1978, when the District com-
pleted repayment of more than one-half of the con-
struction charges against all lands in the District. App.
243a. The Court of Appeals, in its opinion on rehear-
ing, acknowledged the occurrence of this event but
held that the Seeretary’s authority continues ‘‘regard-
less of the fact that construction charges for the irri-
gation project have been repaid.’’*’ 595 F.2d, at 527.
The only authority cited by the court for this statement
was its own decision in United States v. Tulare Lake
Canal Company, 535 F.2d 1093, cert. denied 429 U.S.
To the contrary, the proposed regulations publish 1 by the
Department on August 22, 1977, construe § 46 of the 1926 Act as
only requiring price approval until one-half of the total construc-
tion costs allocated to irrigation have been paid. § 426.9, App.
236a ; § 426.10, App. 237a.
29
1121 (1977). It went on to say “‘[t]his decision ex-
pressly applies to all federal reclamation projects sub-
ject to Section 46.’’ Ibid. The holding in the present
case is in flat contradiction of the statute. To the extent
that the holding by the Court of Appeals in the Tulare
case supports its holding here, we respectfully suggest
that the Tulare decision should be disavowed by the
Supreme Court.
ARGUMENT
I.
The Boulder Canyon Project Act Does Not Authorize Acreage
Limitations On Present Perfected Rights
A. The plain language of the Project Act specifically requires the
satisfaction of present perfected rights
1. The § 6 Requirement That Present Perfected Rights
Be Satisfied
Section 6 of the Project Act expressly requires that
the Boulder Canyon Project be operated so as to sat-
isfy ‘‘present perfected rights’’:
‘‘The dam and reservoir provided for by section 1
hereof shall be used: First, for river regulation,
improvement of navigation, and flood control; sec-
ond, for irrigation and domestic uses and satisfac-
tion of present perfected rights in pursuance of
Article VIII of said Colorado River compact; and
third, for power.”’
As will be shown, this explicit provision, as construed
in Arizona v. California, cannot be given effect if the
Project Act is construed to imply authority to limit
water deliveries on private lands in the District to
160 acres per landowner.
The’ term ‘‘present perfected rights’’ is not defined
in the Project Act, but has been defined by this Court
as follows:
26
‘“*(G@) ‘Perfected right’-means a water right ac-
quired in accordance with state law, which right
has been exercised by the actual diversion of a
specific quantity of water that has been applied
to a defined area of land or to definite municipal
or industrial works, and in addition shall include
water rights created by the reservation of main-
stream water for the use of federal establishments
under federal law whether or not the water has
been applied to beneficial use;
‘““(H) ‘Present perfected rights’ means _per-
fected rights, as here defined, existing as of June
25, 1929, the effective date of the Boulder Canyon
Project Act....’’ Arizona v. California, 376 U.S.
340, 341 (decree) (1964).
The concept of ‘‘present perfected rights”’ had its ori-
gins in Article VIII of the Colorado River Compact:
‘*Present perfected rights to the beneficial use
of waters of the Colorado River System are un-
impaired by this compact. Whenever storage ca-
pacity of 5,000,000 acre-feet shall have been pro-
vided on the main Colorado River within or for the
benefit of the Lower Basin, then claims of such
rights, if any, by appropriators or users of water
in the Lower Basin against appropriators or users
of water in the Upper Basin shall attach to and be
satisfied from water that may be stored not in con-
flict with Article ITI.
‘‘All other rights to beneficial use of waters of
the Colorado River System shall be satisfied solely
from the water apportioned to that Basin in which
they are situate.”’
Although the Article VIII requirement that present
perfected rights not be impaired applies to all seven
of the Basin States, Article VIII was drafted specifi-
cally to protect landowners in Imperial Valley. Delph
27
Carpenter, one of the authors of the Compact, testified
as follows:
‘During the deliberations of the Colorado River
Commission in Santa Fe, and after 10 days’ work,
a sketch or outline of the progress was released to
the press, stating what had happened and the pro-
posed terms of a treaty... . The Imperial Valley
representatives were immediately responsive.
They came before the Commission and presented
their claims with great vigor. ...
‘In view of that claim, coming as it did from
people who cultivated upward of half a million
acres of very valuable land, Article VIII of the
Compact was drawn at the last session of the pro-_
ceedings.’’ Hearings Pursuant to S. Res. 320, Sen.
Comm. on Irr. & Recl., 68th Cong., 2d Sess., at p.
678 (1925).
The term ‘‘present perfected rights” appears in both
the Project Act (§6) and the Colorado River Basin
Project Act (§ 301(b)), 82 Stat. 886, 43 U.S.C. §§ 1501
et seq., where it is used to limit the Secretary’s discre-
tion to allocate waters between states and to deliver
waters within individual states. And it appears in this
Court’s opinion and decrees in Arizona v. California,
which construed the Project Act’s allocation of main-
stream water among the three Lower States (Arizona,
California and Nevada) and adjudicated present per-
fected rights within those states."* Expressed in terms
of acre-feet of diversions * annually, present perfected
8 373 U.S. 546 (opinion) (1963) ; 376 U.S. 340 (decree) (1964) ;
439 U.S. 419 (supplemental decree) (1979).
** For purposes of illustrating the magnitude of the present per-
fected rights decreed in the Lower Basin states, we have shown
28
rights in the Lower States as decreed by this Court
are as follows:
Arizona 1,059,565
California 2,9 4,451
Nevada 13,034
The importance of the District’s present perfected
rights to the scheme of the Compact and the Project
Act is evident from their magnitude: 2,600,000 acre-
feet of diversions annually—64 percent of the total
present perfected rights decreed by this Court, and 59
percent of the 4,400,000 acre-feet of consumptive use
‘apportioned to California of the first 7,500,000 acre-
feet available.
The requirement of the Project Act that present
perfected rights be satisfied is not limited to interbasin
or even interstate allocations; it extends to intrastate
deliveries of water from the Boulder Canyon Project.
Thus, this Court in Arizona v. California decreed
2,600,000 acre-feet of annual diversions, not to the
Lower Basin and not to California, but to the District.
Section 13(d) of the Project Act, in providing that
conditions and covenants subjecting water deliveries
to the Compact shall be for the benefit of the states
‘Cand the users of water therein,’’ in effect requires
that the rights assured by the Compact, including
present perfected rights, attach to intrastate deliveries
of water. In Arizona v. California, this Court, in four
separate places in its opinion and original decree, con-
these rights only in terms of acre-feet of diversions, For the alter-
native expressions of the decreed rights (i.e., quantities of water
necessary to irrigate stated amounts of acreage), where applicable,
the Court is referred to its decrees at 376 U.S, 340 (1964) and 439
U.S, 419 (1979).
29
firmed that the § 6 requirement that present perfected
rights be satisfied applies to such intrastate deliveries.
In its opinion, the Court said:
‘*. . . Congress intended the Secretary of the In-
terior, through his § 5 contracts, both to carry out
the allocation of the waters of the main Colorado
River among the Lower Basin States and to decide
which users within each State would get water.[*]
... Significantly, no phrase or provision indicating
that the Secretary’s contract power was to be con-
trolled by the law of prior appropriation was sub-
stituted either then or at any other time before
passage of the Act, and we are persuaded that had
Congress intended so to fetter the Secretary’s
discretion, it would have done so in clear and
unequivocal terms, as it did in recognizing ‘present
perfected rights’ in § 6.
* * * * *
| ‘“‘The argument that Congress would not have
| delegated to the Secretary so much power to ap-
portion and distribute the water overlooks the
ways in which his power is limited and channeled
by standards in the Project Act. ... One of the
most significant limitations in the Act is that the
| Secretary is required to satisfy present perfected
rights, a matter of intense importance to those who
had reduced their water rights to actual beneficial
use at the time the Act became effective. § 6.
4 * * * * *
‘*... It will be time enough for the Courts to inter-
vene when and if the Secretary, in makitig appor-
tionments or contracts, deviates from the stand-
7°Our footnote: the disavowal of the foregoing dictum in Cali-
fornia v. United States, 438 U.S. 645, 674 (1978), reinforces the
argument that Congress did not authorize the Secretary to impair
rights previously perfected under state law by prohibiting delivery
of water to areas theretofore served under those rights.
30
ards Congress has set for him to follow, including
his obligation to respect ‘present perfected rights’
as of the date the Act was passed (emphasis
added).”’ 373 U.S., at 580-581, 583-584, 594.
The Court made the point again in its 1964 decree:
‘“‘If insufficient mainstream water is available
for release, as determined by the Secretary of the
Interior, to satisfy annual consumptive use of
7,500,000 acre-feet in the aforesaid three States,
then the Secretary of the Interior, after providing
for satisfaction of present perfected rights in the
order of their priority dates without regard to
state lines ... may apportion the amount remain-
ing ... (emphasis added).”’ 376 ULS., at 342.
In other words, the Secretary’s authority under $5 of
the Project Act to determine which users within each
state shall get water and to contract with such users is
limited by the § 6 requirement that present perfected
rights within each state be satisfied.
2. The Incompatibility of § 6 and Acreage Limitations
While § 9 of the Project Act expressly limits entries
on public lands (cn which there are no present per-
fected rights) to 160 acres, the Act makes no mention
whatever of acreage limitations with respect to private
lands. For this, there is good reason: the Secretary
could not possibly satisfy present perfected rights as
required by § 6 if he were required to limit deliveries
of the water subject to such rights to 160 acres per
landowner, because most of the District ’s present per-
fected rights were perfected on—and have always been
used on—excess lands, to which such rights are appur-
tenant. |
31
Although there is no specific provision in the Project
Act which requires the application of acreage limita-
tions to private lands, the Court of Appeals inferred
such a requirement from § 14 which provides:
‘This act shall be deemed a supplement to the
reclamation law, which said reclamation law shall
govern the construction, operation, and manage-
ment of the works herein authorized, except as
otherwise herein provided.”’
Since the ‘‘reclamation law’’ includes § 5 of the Rec-
lamation Act of 1902 and § 46 of the Omnibus Adjust-
ment Act of 1926—both of which contain acreage limi-
tation provisions—the Court of Appeals reasoned that
§ 14 of the Project Act by implication requires that
deliveries of water to private lands be limited to 160
acres per landowner. The court reconciled this reason-
ing with the explicit § 6 requirement that present per-
fected rights be satisfied on the ground that the Dis-
trict, rather than the landowners, is the owner of the
present perfected rights. From this premise, the court
concluded that the Secretary could satisfy §6 by de-
livering all of the water subject to the District’s
present perfected rights to the District, and that the
District could then withhold water from excess lands
and redistribute it to non-excess lands without impair-
ing present perfected rights. 559 F.2d, at 529-30. This
conclusion is wrong for reasons both practical and
legal.
First, as to the practical impossibility of what the
Court of Appeals has proposed: there is simply no
place within the District to put the water which the
Court of Appeals would have the District withhold
from excess lands and redistribute. All lawfully irri-
32
gable private land—some 438,000 acres—is already
under irrigation (424,145 acres of this is in decreed
present perfected rights). Thus, as a practical matter,
it is physically impossible to redistribute water within
the District.
Second, as to the legal impossibility of redistributing
water subject to present perfected rights: by defini-
tion, a present perfected right is a right ‘‘acquired in
accordance with state law ... by the actual diversion
of a specific quantity of water that has been applied to
a defined area of land .. .’’ prior to the effective date
of the Project Act.” Thus, the attributes of present
perfected rights are defined by state law and are iden-
tical to the attributes of other perfected appropriative
water rights in the particular state except that the
right must have existed as of June 25, 1929, and is
recognized only to the extent that water had been put
to use by that date. Under California law, (i) the land-
owners within an irrigation district are the equitable
owners of the water rights—including present per-
fected rights—held by the district, and have a consti-
tutionally protected interest therein, and (ii) water
rights—including present perfected rights—are appur-
*1 The significance of state law is confirmed by § 18 of the Project
Act which provides:
‘*Sec. 18. [Rights of States to waters within their borders.]
—Nothing herein shall be construed as interfering with such
rights as the States now have either to the waters within their
borders or to adopt such policies and enact such laws as they
may deem necessary with respect to the appropriation, control,
and use of waters within their borders, except as modified by
the Colorado River compact or other interstate agreement.’’
For the relation of this section to present perfected rights, see the
opinion in Arizona v. California, 373 U.S., at 588. Section 18 was
reenacted in 1940 as § 14 of the Boulder Canyon —— Adjust-
ment Act, 54 Stat. 779, 43 U.S.C. § 618m.
33
tenant to the land on which the water is used. Both
of these aspects of a present perfected right would
necessarily be impaired if the Secretary or the District
were to withhold water subject to such rights from
excess lands within the District’s boundaries.
First, as to the ownership aspect of a present per-
fected right: California law as articulated by the
California Supreme Court is to the effect that the
district holds the rights in trust for the landowners:
‘“TT he beneficiaries of the trust, who, upon fa-
miliar equitable principles, are to be regarded as
the owners of the property, are the landowners in
the district, with whose funds the property has
been acquired (Civ. Code, § 853), and in whom,
indeed, is vested by the express provisions of the
statute, in each, the right to the several use of a
definite proportion of the water of the district,
and in all, in common, the equitable ownership of
its water rights, reservoirs, ditches, and property
generally, as the means of supplying water. St.
1887, pp. 34, 35, $$ 11, 18. Such rights as these
cannot be distinguished in any way from other
private rights, and therefore clearly come within»
the protection of the provision of section 13 of
article 1 of the state Constitution—that ‘no person
shall be... deprived of ... property without due
process of law,’ and of the similar provision of
section 1 of the fourteenth amendment to the
Constitution of the United States.’? Merchants’
National Bank of San Diego v. Escondido Irriga-
tion District, 144 Cal. 329, 334, 77 P. 937, 939
(1904).
Thus, the equitable ownership of the present per-
fected rights which the Secretary must satisfy under
§ 6 of the Act is vested in the landowners, not in the
District. And the landowner consequently has a statu-
34
tory right to use a definite, proportional share of the
water distributed by the district:
‘‘ Basis of apportionment among landowners. All
water distributed by districts for irrigation pur-
poses shall except when otherwise provided in this
article be apportioned ratably to each landowner
upon the basis of the ratio which the last assess-
ment against his land for district purposes bears
to the whole sum assessed in the district for dis-
trict purposes.’’ Cal. Water Code Ann. § 22250
(West 1971).
This right may be assigned, not by the District, but
by the individual landowner: —
‘*Assignment of right. Any landowner may as-
sign for use within the district his right to the
whole or any portion of the water apportioned to
him pursuant to Section 22250.” Id., at § 22251.
Second, the present perfected right is appurtenant
to the land on which the water is used. As Hutchins
has written:
‘*The concept of appurtenance of an appropri-
ative right to the land on or in connection with
which the water is used received early acceptance
in California.’? 1 W. Hutchins, Water Rights in
the Nineteen Western States 454 (1971).
The concept of appurtenance is enshrined in the Cali-
fornia Civil Code™ and has been confirmed by Cali-
22 The California Civil Code provides:
‘‘A thing is deemed to be incidental or appurtenant to land
when it is by right used with the land for its benefit, as in the
ease of a way, or watercourse, or of a passage for light, air,
rf _ from or across the land of another.’’ Cal. Civ. Code,
35
fornia courts on a number of occasions. See, e.g., Pal-
mer Vv. Railroad Commission, 167 Cal. 163, 173, 138 P.
997, 1001 (1914); Stanislaus Water Co. v. Bachman,
152 Cal. 716, 724, 93 P. 858, 862 (1908); Senior v.
Anderson, 138 Cal. 716, 723, 72 P. 349, 351 (1903).
The concept of appurtenance is also found in the
Project Act. Section 13(d) in effect provides that
rights assured by the Colorado River Compact (such
as present perfected rights) ‘‘run with the land,’’ and
‘*shall be deemed to be for the benefit of and be avail-
able to”’ the states of the Basin and ‘‘the users of the
water therein ... by way of suit, defense, or otherwise,
in any litigation respecting the waters of the Colorado
River ....’’* And § 14, which incorporates the recla-
mation law ‘‘except as otherwise herein provided,”’
presumably incorporates § 8 of the Reclamation Act of
1902, which provides:
‘TT |he right to the use of water ... shall be ap-
purtenant to the land irrigated and beneficial use
shall be the basis, the measure, and the limit of
the right.’’
Mr. Justice Harlan called attention to this, dissenting
in Arizona V. California, 373 U.S. 546, 623 (1963).
It is true that, under California law, an appropria-
tive water right may be severed from the land. See,
e.g., Wright v. Best, 19 Cal.2d 368, 380, 121 P.2d 702,
709 (1942). However, this Court, in Ickes v. Fox, 300
U.S. 82 (1937), rejected the notion that an appropria-
tive right may be severed by the trustee rather than the
equitable owner. In Ickes, the United States was the
appropriator and legal owner of the water right, as the
23 This provision was re-enacted in the Boulder Canyon Project
Adjustment Act, 54 Stat. 779, § 14.
36
District is here. The United States diverted, stored
and distributed the water for use by others, just as the
District does here. Nevertheless, this Court held that
the water rights were appurtenant to the land and were
enforceable by the landowner, not the trustee. See, on
remand, Ickes v. Fox, 137 F.2d 30 (D.C. Cir. 1943).
From all this it follows that, if water is withheld
from excess lands in the District, as required by the
Court of Appeals’ decision, the equitable owners of
present perfected rights will be denied the use of the
water subject to those rights, as will the lands to
which the rights are appurtenant. A more obvious
impairment of present perfected rights, violating Ar-
ticle VIII of the Compact—and a more obvious failure
to satisfy such rights, violating § 6 of the Project Act—
is difficult to imagine.
Judge Turrentine put it this way:
‘*This duty of the Secretary to supply water to an
area where present perfected rights exist is re-
pugnant to the concept that the United States may
at the same time shut off water deliveries destined
for lands, be they excess or not, entitled to the
beneficial use of Colorado River water in the exer-
cise of these rights.’’ 322 F.Supp., at 18.
Since it is apparent that the Secretary cannot sat-
isfy present perfected rights and impose acreage limi-
tations within the District, the plain language of § 14
—‘‘except as otherwise herein provided’’—must mean
that the acreage limitation provisions of the reclama-
tion law are not incorporated by § 14. This interpre-
tation finds support in the well-settled rule of statu-
tory construction that:
‘‘An interpretation of the statute which would
... render different sections inconsistent with each
37
other, cannot be the true one.’’ Perrine v. Chesa-
peake & D. Canal Co., 50 U.S. [9 How.] 172, 187
(1850).
Also, because § 6 is a specific provision, and § 14 is a
general provision, a construction which in effect makes
§ 14 override § 6 violates the related rule that:
‘‘[S]pecial provisions prevail over general ones
which, in the absence of the special provisions,
would control.”’ Missouri v. Ross, 299 U.S. 72, 76
(1936).
In holding that the Project Act authorizes acreage
limitations, the Court of Appeals relied heavily on this
Court’s opinion in Ivanhoe Irrigation District v. Mc-
Cracken, 357 U.S. 275 (1958), which held that acreage
limitations were required by the various acts authoriz-
ing the Central Valley Project in California. The
Court of Appeals’ reliance on Ivanhoe, as though that
case were authority for the curtailment of present
perfected rights by subsequent imposition of acreage
limitations, is misplaced in four essential respects:
(i) Ivanhoe did not involve the Project Act; (ii) In
Ivanhoe, as the Court said, ‘‘It is interesting to note
that irrigators in this district receive water diverted
from the San Joaquin in which they never had nor
were able to obtain any water right.”’ 357 U.S., at
285. Here, the water rights which would be impaired
are not only vested under state law, but have been
perfected by actual use, thus meeting the federal
statute’s definition of present perfected rights. (iii)
In Ivanhoe, the federal statute was construed as au-
thorizing the federal taking of state-generated water
rights. Here, the statute directs that such rights be
satisfied, not taken. (iv) In Ivanhoe, the district agreed
38
that the acreage limitation should apply, the contract
so stated, and the voters authorized the contract on
that understanding. Here, the reverse is true. Court of
Appeals, 559 F.2d, at 37, relies upon a dictum in Ivan-
hoe which attributes § 8 of the Reclamation Act of 1902
only a restricted mandate to recognize state law in the
acquisition of water rights, not in the operation of a
dam, a dictum which this Court, in California v. United
States, 438 U.S. 645, 674-75 (1979), said ‘‘went further
than was necessary”’’ in restricting the scope of that
section. In any event, that dictum in Ivanhoe is inop-
erative here: §6 of the Project Act unquestionably
controls the Secretary in the operation of the dam and
reservoir, directing that they shall be so operated as
to satisfy rights theretofore perfected under state law.
B. The legislative history of the Boulder Canyon Project Act
confirms that § 14 was not intended to imply an authority to
limit water deliveries to 160 acres of private land in single
ownership
The legislative history of the Project Act spanned a
period of some 10 years.” During that time, the sub-
ject of acreage limitations was thoroughly debated in
the committees and on the floors of Congress. Bills
which contained the same limited incorporation of the
reclamation law (1.e., ‘except as otherwise herein pro-
vided’’) that appears in § 14 of the Project Act were
repeatedly attacked by proponents of acreage limita-
tions on the ground that these bills did not limit de-
liveries of water on private lands to a maximum of
#¢ The first ‘‘Kettner Bill,’’ H.R. 6044, authorizing construction
of a canal connecting the District’s irrigation system to Laguna
Dam, was introduced on June 17, 1919. The Project Act was signed
into law by President Coolidge December 21, 1928, and became
effective June 25, 1929. ;
39
160 acres per landowner. Various amendments were
proposed to provide for acreage limitations, and the
first bill to pass the House contained such an amend-
ment. But, in the end, Congress elected not to limit
water deliveries from the project on private lands to
160 acres, and the bill passed by both houses and signed
by the President contained no acreage limitation pro-
vision, except as to public lands.
The bills that ultimately passed the House and Sen-
ate in 1928 were the fourth in a series of bills intro-
duced by Congressman Swing and Senator Johnson of
California.” The provisions of § 14 of the Project Act
originated in the third set of Swing-Johnson bills.
These bills provided:
‘‘This act shall be deemed a supplement to the
reclamation law, which said reclamation law shall
govern the construction, operation, and manage-
ment of the works herein authorized, except as
otherwise herein provided.”’
As introduced, the third Swing-Johnson bills did not
contain express acreage limitation provisions. These
bills were referred to the Department of the Interior
*° The first Swing-Johnson bills were S. 3511, 67th Cong., 2d
Sess., 62 Cong. Rec. 5929 (April 25, 1922), and H.R. 11449, 67th
Cong., 2d Sess., 62 Cong. Ree. 5985 (April 25, 1922); the second
Swing-Johnson bills were S. 727, 68th Cong., Ist Sess., 65 Cong.
Ree. 146 (Dec. 10, 1923), and H.R. 2903, 68th Cong., Ist Sess.,
65 Cong. Ree. 217 (Dee. 10, 1923) ; the third Swing-Johnson bills
comprised S. 1868, 69th Cong., Ist Sess., 67 Cong. Rec. 1232 (Dee.
21, 1925), H.R. 6251, 69th Cong., Ist Sess., 67 Cong. Ree. 1313
(Dee. 21, 1925), S. 3331, 69th Cong., 1st Sess., 67 Cong. Ree. —
(Feb. 27, 1926); and H.R. 9826, 69th Cong., Ist Sess., 67 Cong.
Ree. 4730 (Feb. 27, 1926); and the fourth Swing-Johnson bills
were S, 728, 70th Cong., Ist Sess., 69 Cong. Rec. 341 (Dec. 9, 1927),
and H.R. 5773, 70th Cong., Ist Sess., 69 Cong. Rec. 97 (Dec. 5,
1927).
40
for comments. Secretary Hubert Work submitted com-
ments and suggested amendments in a letter dated
January 12, 1926. Colorado River Basin: Hearings on
H.R. 6251 and H.R. 9826 Before the House Committee
on Irrigation and Reclamation, 69th Cong., 1st Sess.,
pt. 1, 5-9 (1926). Secretary Work did not recommend
an amendment to expressly require acreage limitations
on private lands.
Congressman Swing redrafted his bill to reflect the
Interior Department’s comments and proposed amend-
ments as contained in Secretary Work’s letter, and
reintroduced the bill as H.R. 9826. H.R. 9826 contained
the limited incorporation of the reclamation law quoted
above (which appears verbatim in § 14 of the Project
Act), but no express acreage limitation. Dr. Elwood
Mead, Commissioner of Reclamation, then appeared
before the House Committee on Irrigation and Recla-
mation to explain the Interior Department’s views on
the bill. Dr. Mead and Congressman Swing both testi-
fied that there was no provision in H.R. 9826 which
would impose acreage limitations on lands receiving
water from facilities authorized by the act:
‘‘Mr. Stnnort. I would like to ask the doctor is
there any provision in the bill sponsored by the
Secretary of a farm unit on the lands to be irri-
gated?
‘‘Doctor Mrap. This bill does not go beyond the
provisions for three things. One is the dam—the
reservoir—and the second is the power plant, and
the third is the all-American canal. That is all it
deals with. It does not deal with irrigation of new
lands at all.
‘(Tp CHAIRMAN. That is reserved for future
legislation ?
‘‘Dr. Meap. Yes, sir.
41
‘*Mr. Sinnott. But as to the old land——
‘“Docror Map. As to the old land, it would be
sold water under a Warren contract.
‘‘Mr. Sinnott. The present owner can occupy
his present farm unit?
‘‘Doctor Meap. Yes, sir.
‘Mr. Stnnott. No matter what that might be?
‘Doctor Merap. Yes.
‘Mr. Sinnort. What is that now in the Imperial
Valley?
‘‘Doctor Mrap. Of course, it varies widely.
There is not any law. There are a good many large
holdings there.
* * * * *
‘‘THE CHAIRMAN. How was the title acquired
to these large holdings? Was it acquired from
the railroads?
‘‘Doctor Mrap. I think in the first place the
title was acquired in 640-acre tracts.
‘*Mr. Swine. That is the maximum under which
title was acquired.
‘*Mr. Stnnott. There is nothing in this bill re-
quiring the landowner to sell the surplus over a
farm unit of 160 acres at a price to be fixed by
oo Secretary, as is now in the present reclamation
aw?
‘*‘Mr. Swina. No, sir.’ Id., at 32-33.
It is to be emphasized that the bill of which Dr.
Mead and Congressman Swing were speaking con-
tained the very same provision which the Court of
Appeals held to require acreage limitations in the
District. Thus, the Court of Appeals’ interpretation
of § 14 is flatly contradicted by the author of that
42
provision (Congressman Swing) and by the agency
responsible for reviewing it (the Department of the
Interior). Moreover, no one suggested in the House
proceedings that the § 14 language authorized acreage
limitations on private lands.
After completion of the hearings on H.R. 9826, the
House Committee on Irrigation and Reclamation
amended the bill to include an express acreage limita-
tion provision.” The committee reported H.R. 9826, as
amended, favorably, but the bill did not come up for a
vote on the House floor.
On the Senate side, S. 3331 was referred to the
Committee on Irrigation and Reclamation, which re-
ported the bill favorably with the limited incorpora-
tion of the reclamation law now appearing in § 14, but
without an express acreage limitation provision other
than that imposed by § 9 on desert public lands.
During debates on the Senate floor, Senator Phipps
offered an amendment to § 5 of the bill, generally simi-
lar to that adopted by the House Committee, which
would have specifically limited deliveries of water on
26«*f A}ll contracts for the delivery of water for irrigation pur-
poses provided for in section 5 shall provide that all irrigable
land held in private ownership by any one owner in excess of
one hundred and sixty acres shall be appraised in a manner
to be preseribed by the Secretary of the Interior and the sale
prices thereof fixed by the said Secretary on the basis of its
actual bona fide value at the date of appraisal without refer-
ence to the proposed construction of the irrigation works
provided for by this act; and that no such excess lands so
held shall receive water from said canal if the owners thereof
shall refuse to execute valid recordable contracts for the sale
of such lands under terms and conditions satisfactory to the
Seeretary of the Interior and at prices not to exceed those
fixed by the Secretary of the Interior ....’’ H, Rep. No. 1657,
69th Cong., 2d Sess, 29-30 (1926).
43
private lands to 160 acres.” 68 Cong. Rec. 4766 (1927).
Senator Phipps also offered a substitute bill which
contained (i) an express acreage limitation identical
to that contained in his proposed amendment, and (ii)
the limited incorporation of the reclamation law which
originated in the third Swing-Johnson bills and was
ultimately carried forward verbatim into § 14 of the
Project Act. Id. at 4764. Neither Senator Phipps’
amendment to §5 nor his substitute bill was adopted.
Again, no one suggested that the result sought by
Senator Phipps—+.e., the application of acreage limi-
tations to private lands—could be achieved through
the language in § 14.
The fourth Swing-Johnson bills, H.R. 5773 and S.
728, were introduced in the first session of the 70th
Congress. Again, both bills contained the § 14 language
incorporating the reclamation law ‘‘except as other-
wise herein provided.’’ H.R. 5773, as introduced, con-
tained the acreage limitation provision that had been
added to the third Swing-Johnson bill by the House
Committee on Irrigation and Reclamation (for the
*7 Senator Phipps’ proposed amendment to §5 of S. 3331 pro-
vided :
‘“‘(b) All contracts for the delivery of water for irrigation
purposes shall provide that all irrigable land held in private
ownership by any one owner in excess of 160 acres shall be
appraised in a manner to be prescribed by the Secretary of
the Interior, and the sale prices thereof fixed by the said
Secretary on the basis of its actual bona fide value at the
date of appraisal, without reference to the proposed construc-
tion of any irrigation works under the provisions of this act;
and that no such excess lands so held shall receive water if the
owners thereof shall refuse to exeeute valid recordable con-
tracts for the sale of such lands under terms and conditions
satisfactory to the Secretary of the Interior and at prices not
to exceed those fixed by the Secretary of the Interior. Con-
tracts respecting water for irrigation and domestic uses shall
be for permanent service.’’
44
text of this provision, see n.26, supra at 42), S. 728,
as introduced, contained no such provision. It was
referred to the Senate Committee on Irrigation and
Reclamation, where Senator Ashurst proposed an
amendment that would have added the acreage limi-
tation provision contained in the House bill. Senator
Ashurst explained his amendment as follows:
‘‘T offered an amendment before the committee
that would subject the privately owned lands to
the same conditions as lands in other irrigation
projects privately owned, so that no water user
might secure water for land in excess of 160
acres.’”’ S. Rep. No. 592, 70th Cong., Ist Sess.,
Part 2 at 26 (1928).
In addition, Senator Phipps, chairman of the com-
mittee, introduced his own bill, S. 1274, which was sub-
stantively identical to S. 728 except that it contained
an express acreage limitation provision in addition to
the § 14 language.* The committee considered S. 728
and S. 1274 together. It did not adopt Senator As-
hurst’s acreage limitation amendment, nor did it re-
port the chairman’s bill, S. 1274, with the acreage
limitation provision. Instead, the Committee reported
S. 728 without an acreage limitation, other than the
present §9 provision as to public lands, and recom-
mended passage.
28 Colorado River Basin: Hearings on S. 728 and S. 1274 Before
the Senate Committee on Irrigation and Reclamation, 70th Cong.,
Ist Sess. 2-3 (1928). The acreage limitation provision proposed by
Senator Phipps in §5(b) of S. 1274 was identical to the amend-
ment to § 5 of S. 3331 which Senator Phipps proposed unsuccess-
4 in the previous Congress, and which is reproduced supra in
n.27.
45
When S. 728 reached the Senate floor, the propon-
ents of acreage limitations renewed their attacks on
the bill and their efforts to amend it. Senator Hayden
proposed an amendment to S. 728 on the Senate floor,
identical with that appearing in H.R. 5773 (see n.26,
supra.).
In explaining this amendment on the Senate floor,
Senator Hayden brought to the attention of his col-
leagues the existence of such a provision in the House
bill:
‘‘We find that in the companion bill to the
measure now under consideration by the Senate
that the House Committee on Irrigation and Rec-
lamation has included a provision limiting the
area in individual ownership to 160 acres. I have,
therefore, rather than copy the law as enacted with
respect to the San Carlos project in Arizona, taken
from the House bill the language of an amendment
which I now offer ... .’’ 69 Cong. Ree. 9451.
The Senate did not adopt Senator Hayden’s amend-
ment. As the debates continued, Senator Ashurst as-
sailed the absence of an acreage limitation provision
in the bill, 69 Cong. Rec. 10471, and reminded the Sen-
ate that he had unsuccessfully proposed an amendment
authorizing acreage limitations in committee. Jd., at
10495. In the closing days of debate on S. 728, Senator
Ashurst stated that he objected to the bill because:
*“*{T Jhe bill authorizes the expenditure of millions
of dollars of Federal funds to irrigate lands owned
largely by private-land speculators in California
re os) in excess of 160 acres.’’ 70 Cong. Ree. 289
At no time during the debate did any member of the
Senate suggest that the § 14 language, which appeared
46
in the bill, would authorize acreage limitations and
thereby dispense with the need for an amendment of
the kind proposed by Senators Ashurst, Hayden and
Phipps. The Senate passed S. 728 without an acreage
limitation provision (cther than § 9) on December 14,
1928. Id., at 603. The House passed the Senate version
on December 18, 1928, id., at 838, and President Cool-
idge signed the bill into law on December 21, 1928.
It is to be emphasized again that all of the above-
described efforts to include an acreage limitation in
the Project Act—both in the House and in the Senate
—were directed to bills which contained language iden-
tical to that of § 14 of the Project Act. If §14 im-
plicitly imposes acreage limitations, as the Court of
Appeals held, all of these efforts would have been.
superfluous. Yet not one statement appears anywhere
in the legislative history of the Project Act in either
the Senate or the House to the effect that § 14 tncor-
porates the acreage limitation provisions of the recla-
mation law.
C. Thirty-one years of consistent administrative construction by
six secretaries confirms that the Project Act does not authorize
acreage limitations in Imperial Valley
Under § 4(b) of the Project Act, before any money
could be appropriated for construction of the All-
American Canal, and before construction could com-
mence, the Secretary was required to insure, by con-
tract or otherwise, payment of construction, operation
and maintenance expenses of the canal. In addition,
§ 5 of the Project Act authorized the Secretary to enter
into contracts for the storage and delivery of water.
Accordingly, as of December 1, 1932, the United States
and the District entered into a contract which pro-
47
vided for the payment of construction costs of the
All-American Canal by the District, and for delivery
of the District’s water through that canal.” This con-
tract made no mention of acreage limitations with
respect to private lands in the Imperial Valley. It was
signed on behalf of the United States by Secretary
Ray Lyman Wilbur on December 1, 1932. He had ap-
proved it as to form on November 4, 1931, after a
public hearing. U.S. DEPARTMENT OF THE INTERIOR,
THE Hoover DaM Contracts 563 (1933).
As required by state * and federal” law, as well as
by Article 31 of the contract,” the contract was sub-
mitted to a state court of competent jurisdiction for a
determination of its validity. Hewes v. All Persons,
supra. Charles Malan, one of the parties to the valida-
tion proceeding, alleged that the contract was invalid
because it would limit deliveries of water on private
lands to 160 acres in single ownership. In specific
response to this allegation, Secretary Wilbur issued a
letter-ruling to the effect that neither the Project Act
nor the contract authorized the application of acreage
limitations to privately owned lands in the District:
‘Early in the negotiations connected with the
All-American Canal contract the question was
raised regarding whether and to what extent the
160-acre limitation is applicable to lands to be
irrigated from this canal. Upon careful considera-
tion the view was reached that this limitation does
not apply to lands now cultivated and having a
*° For the text of the contract, see App. 177a.
*° 1917 Cal. Stat. 245 and 1897 Cal. Stat. 254.
51 42 Stat. 541, 43 U.S.C. § 511.
*? Reproduced at App. 203a.
48
present water right. These lands, having already
a water right, are entitled to have such vested
right recognized without regard to the acreage
limitation mentioned. Congress evidently recog-
nized that these lands had a vested right when
the provision was inserted that no charge shall be
made for the storage, use, or delivery of water to
be furnished these areas.’’ 71 I.D., at 530.
It is significant that this construction of the Project
Act and of the contract was made by the individual
who negotiated and signed the contract on behalf of
the United States.
If Secretary Wilbur had decided otherwise, he
would have been acting in contravention of regula-
tions, in force since 1910 (and still in force today),
which say that the land limitation in §5 ‘‘does not
prevent the recognition of a vested right for a larger
area and protection of the same by allowing the con-
tinued flowing of the water covered by the right
through the works constructed by the Government
under appropriate regulations and charges.” 38 L.D.
637; 43 C.F.R. 230.70; App. 216a. See discussion infra
at 66-67.
Although Secretary Wilbur’s ruling specifically men-
tioned only §5 of the Reclamation Act, and not § 46 of
the Omnibus Adjustment Act, the Department of the
Interior subsequently confirmed that the ruling em-
braced § 46 as well. In a letter dated March 1, 1933,
P. W. Dent, Assistant Commissioner and Chief Counsel
of the Bureau of Reclamation, stated:
‘‘In my view the same principle discussed in the
Secretary’s letter of February 24, based upon
section 5 of the reclamation act, involves precisely
that contained in section 46 of the act of May 25,
49
1926. The latter act merely ties up with and em-
phasizes what has always been the law in this
respect.
‘‘The Secretary’s letter was directed to the spe-
cific allegations in the complaint, which, so far as
could be ascertained, had no direct reference to the
act of May 25, 1926. I assume, however, that re-
gardless of the allegations in the complaint, Mr.
Childers is apprehensive that argument may be
submitted based upon the 1926 act. If this is done
it seems to me the dei2nse would necessarily be
based upon the propositions, first, that the All-
American Canal work constitutes a special project
specifically authorized by the Boulder Canyon
Project Act and that this stands upon a basis quite
different from the ordinary conception of a proj-
ect. The second proposition is that the acreage
limitation in the reclamation law (including sec-
tion 46 of the act of May 25, 1926) does not apply
to the lands having a vested right.’”? Con. Apx.
179a.**
Following Secretary Wilbur’s ruling, the court in
Hewes held that neither the Project Act nor the con-
tract authorized the application of acreage limitations
to privately owned lands in the District, that therefore
the objections of Malan should be overruled, and that
the contract was valid.
For the next 31 years, Secretary Wilbur’s construc-
tion of the Project Act and of the contract was con-
sistently adhered to by the United States. During that
period, the Department of the Interior did not once
refute Secretary Wilbur’s ruling, and on a number
* This Court, in Ivanhoe Irrigation District v. McCracken, 357
U.S. 275, 290 (1958), referred to § 46 of the 1926 act as a ‘‘re-
enactment’’ of § 5 of the 1902 act.
50
of occasions positively reaffirmed it. 322 F.Supp., at
23-27.
Secretary Wilbur was succeeded by Secretary Har-
old L. Ickes, who took office March 4, 1933, and served
until February 15, 1946. He served simultaneously as
Public Works Administrator. Secretary Ickes’ inter-
pretation of the Project Act confirmed that of Secre-
tary Wilbur. As Secretary, Ickes could have repudi-
ated Secretary Wilbur’s ruling of February 25, 1933,
that the Project Act did not authorize imposition of
acreage limitations on private land in Imperial Valley.
He did not. He adhered to it for the 13 years that he
was in office.
Secretary Ickes’ first opportunity to reverse Secre-
tary Wilbur was in the validation proceeding on the
District’s contract, to which Secretary Wilbur’s ruling
had been transmitted. Trial commenced March 16, 1933.
Judgment was not entered until July 5, 1933. Far
from repudiating Secretary Wilbur’s interpretation,
Secretary Ickes concurred in it. As Public Works Ad-
ministrator, he withheld approval of an allocation of
funds to commence construction of the All-American
Canal until an appeal by an excess landowner from
the judgment in the Hewes case was dismissed." When
the appeal was dismissed, in February of 1934, he pro-
ceeded to allocate funds. Between March 20, 1934, and
June 22, 1936, Secretary Ickes, in his capacity as Public
Works Administrator, allocated some $22 million of
P.W.A. funds for the construction of the All-American
Canal, and so advised Congress. Interior Department
* The record in the District Court shows a protest from the at-
torney for the excess landowner against Secretary Ickes’ insistence
on dismissal of his appeal. Exhibit LX-BK.
dL
Appropriation Bill, 1937: Hearings before Subcom-
mittee of House Committee on Appropriations, 74th
- Cong., 2d Sess. 1162 (1936). After June 22, 1936, when
the All-American Canal became a line item in the
Interior Department’s budget, until 1942, when the
Canal was completed, Secretary Ickes regularly sought
congressional appropriations for construction of the
Canal.
Secretary Ickes, not Secretary Wilbur, executed the
repayment agreement with Coachella Valley County
Water District, dated October 15, 1934, covering that
district’s share of the cost of the All-American Canal.
The Hoover Dam Documents, House Document No.
717, 80th Cong., 2d Sess., at A633. The Coachella con-
tract did not include an acreage limitation clause. That
contract’s reference to the reclamation law (Art. 29)
was identical with that in the Imperial contract (Art.
30).°°
Secretary Ickes, throughout his 13-year term of
office, was firm in his opinion that the Project Act did
not impose an acreage limitation on private lands in
Imperial Valley because they possessed vested rights
antedating the Project Act. His appointee, Assistant
Commissioner of Reclamation William E. Warne (later
Assistant Secretary) so testified before congressional
committees in 1944. Hearings on H.R. 3961, 78th Cong.,
2d Sess., Subcommittee of Senate Committee on Com-
merce, pt. IV, at 599. Mr. Warne put Secretary Wil-
*® An acreage limitation was first included in a Coachella contract
in 1947, when the Department, acting through Secretary Krug,
and Coachella entered into a contract for construction and repay-
ment of the cost of a distribution system. U.S. Exhibit 10 in the
District Court. This was the occasion of Solicitor Harper’s opinion,
infra, p. 53, n.37.
52
bur’s letter of February 25, 1933, in the record in
support of the Ickes administration’s statement that
acreage limitations were not applicable in Imperial
Valley.
In 1941, B.P. King, an attorney in the Bureau of
Reclamation, acting pursuant to instructions issued by
Secretary Ickes, completed a comprehensive report en-
titled ‘‘The Excess Land Provisions of the Reclama-
tion Law.” This report concluded that the acreage
limitation provisons of the reclamation law were not
applicable to the District. 322 F.Supp. at 24.
In 1942, Commissioner Page of the Bureau of Rec-
lamation, Secretary Ickes’ appointee, advised the Gen-
eral Counsel of the Federal Land Bank, which was
making loans on farms in the District, that the acreage
limitation provisions of the reclamation law were not
applicable to the District. Ibid.
On May 31, 1945, Interior Solicitor Fowler Harper
issued an opinion to the effect that the acreage limita-
tion provisions of the reclamation law should be writ-
ten into the contract for repayment of the cost of new
distribution works serving Coachella Valley County
Water District, which had no present perfected rights.
Solicitor Harper’s opinion was critical of the Wilbur
ruling but did not purport to overrule it. Solicitor
Harper acknowledged the inapplicability of acreage
limitations to Imperial Irrigation District, where
SF
6 Secretary Ickes executed four other major contracts under the
Project Act: (i) with the City of San Diego, October 2, 1934, The
Posver Dam Documents, House Document No. 717, 80th Cong., 2d
Sess., at A671; (ii) with the State of Arizona, February 9, 1944,
td., at A559; (iii and iv) with the State of Nevada, March 30,
1942, id., at A571 and January 3, 1944, id., at A579. None of these
contains an acreage limitation on private lands.
53
‘‘vested”’ (present perfected) rights existed, but noted
that no such rights appeared to exist in Coachella:
‘‘Although the language of the letter of Secretary
Wilbur seems broad enough to include the Coa-
chella Valley District lands, the letter was clearly
intended only to apply to the Imperial Irrigation
lands. It apparently assumes that all privately
owned land in the District was under irrigation
and has a vested water right. Nothing in the files
indicates whether such is the factual situation,
and there is strong indication that the Coachella
Valley lands are to a very large degree as yet
not irrigated.’’ *’
In 1946, the Bureau of Reclamation, under Secre-
tary J. A. Krug, issued a report entitled ‘‘Landowner-
ship Survey on Federal Reclamation Projects.”’ This
report stated that there were 402 land ownerships
larger than 160 acres per single ownership in the
District, and that the excess land provisions of the
reclamation law were not applicable to these lands.
Ibid.
In 1948, Secretary Krug reaffirmed the nonap pli-
eability of acreage limitations to the District. Follow-
ing the consummation of the Coachella supplemental
contract, which expressly required that water deliv-
eries be limited to 160 acres per landowner, the Vet-
erans of Foreign Wars requested that Secretary Krug
reverse Secretary Wilbur’s ruling so that the District
** As Judge Turrentine observed:
‘“‘There was of course ample data then available to show
that in Imperial Valley there were in excess of 400,000 acres
receiving pre-project irrigation in reliance on rights to Colo-
rado River water. The major weakness of the Harper decision
as it relates to Imperial Valley is its failure to deal with this
question of pre-project water rights.’’ 322 F.Supp., at 25.
54
would be treated in the same fashion as Coachella.
Secretary Krug declined. Without reaching the merits
of the question, he explained the substantial inequity
of reversing 15 years of consistent administrative
interpretation, which had been relied upon by land-
owners in the District:
‘‘T W]e have concluded that inasmuch as the Sec-
retary of the Interior then charged with the
administration of law construed the acreage limi-
tation as not being applicable to lands of the Im-
perial Irrigation District under the facts as he
then understood them, and it being clear that the
then owners and subsequent purchasers of irri-
gable lands in the Imperial Irrigation District
were entitled to rely upon advice from the Sec-
retary and thus establish an economy in the dis-
trict consistently with that advice, they should not
now be abruptly advised that the economy of the
project is to be changed under a contrary ruling
of the present officer charged with the administra-
tion of the law.”’ 71 I.D., at 515; 322 F. Supp., at
24-25.
Solicitor White concurred in Secretary Krug’s de-
cision to reaffirm the Wilbur ruling. Exhibit LX-34 in
the District Court.
In 1952, the contract between the United States and
the District was amended by a supplemental contract,
signed by Secretary Oscar L. Chapman. Solicitor Ed-
ward Weinberg, who participated in the contract
negotiations, testified that the Department had con-
sidered attempting to negotiate an acreage limitation
clause in the supplemental contract, but decided not
to do so. See the discussion of Secretary Krug’s ac-
tions, 322 F.Supp., at 25.
D9
The Wilbur ruling was again affirmed by the Depart-
ment of the Interior in 1958, when the Special Master
in Arizona v. California requested briefs on the ques-
tion of whether the acreage limitation provisions ap-
plied to the District. The Solicitor General requested
the view of the Solicitor of the Department of the
Interior. Solicitor Elmer F. Bennett, acting under
Secretary Fred A. Seaton, replied that acreage limi-
tations did not apply to the District. He specifically
noted the history and consistency of the Department’s
practice in this respect:
‘* “The water contract between the United States
and the Imperial Irrigation District was executed
December 1, 1932, some 25 years ago. The negotia-
tions leading to the contract were lengthy and
extensively in the public view. Except at the time
of court confirmation, J am not aware of any chal-
lenge as to the legality of the contract during this
entire period. Water has been delivered to the
lands of Imperial District pursuant to the con-
tract since the early 1940’s. I am not aware that
any administrative action has been proposed or
taken either by the preceding administration or by
this one to recognize or enforce application of the
160-acre limitation to the lands of the Imperial
Irrigation District.
‘“<The United States acting through the then
Secretary of the Interior accepted the contract as
having been confirmed and acting thereon pro-
ceeded to initiate construction of the All-American
Canal and engage upon a variety of transactions
in reliance upon the validity of the contract. There
must surely arise a point of time, again I believe
long since past, wh a the contract in keeping with
the terms of Article 31 became binding upon the
United States and the District. To treat otherwise
at this date could have far-reaching effect (empha-
sis added).’ ’’ 322 F.Supp., at 26.
06
Judge Turrentine summed up the administrative
practice as follows:
‘‘This history of the administrative practice has
necessarily been selective, but a thorough review
of Departmental policy has failed to disclose a
departure from the interpretation initiated by Sec-
retary Wilbur until 1964. This interpretation was
followed during the incumbencies of six successor
Secretaries and four Presidential administra-
tions.’’ 322 F.Supp., at 26.
He identified the Secretaries:
‘Secretary Ickes under Presidents Roosevelt and
Truman; Secretaries King and Chapman under
President Truman; Secretaries McKay and Sea-
ton under President Eisenhower. During his tenure
under President Kennedy, Secretary Udall did not
disturb the interpretation.’’ Zd., at n.30.
Not until 1964, when Solicitor Barry issued his opin-
ion purporting to overrule Secretary Wilbur’s ruling,
did the Department of the Interior’s policy depart
from the ruling.
Subsequent to the Barry opinion, the Department of
the Interior for several months attempted to negotiate
a new contract with the District which would have
incorporated the acreage limitation provisions of the
reclamation law. When the District declined to nego-
tiate a new contract, insisting on its rights under the
existing contract, the United States brought this action
for declaratory relief.
This Court has repeatedly applied the principle of
statutory interpretation that an agency’s long-standing
construction of its statutory mandate is entitled to
great weight. E.g., United States v. Rutherford, 442
oT
U.S. 544 (1979) ; Board of Governors v. First Lincoln-
wood Corp., 439 U.S. 234 (1978) ; Bayside Enterprises,
Inc. v. NLRB, 429 U.S. 298, 304 (1977) ; NLRB v. Bell
Aerospace Co., 416 U.S. 267, 274-75 (1974) ; Zemel v.
Rusk, 381 U.S. 1, 11-12 (1965) ; Udall v. Tallman, 380
U.S. 1, 16-18 (1965). Administrative interpretation is
particularly persuasive (i) where, as here, the admin-
istrative practice involves a ‘‘contemporaneous con-
struction of a statute by the men charged with the
responsibility of setting its machinery in motion, of
making the parts work efficiently and smoothly while
they are yet untried and new,’’ Norwegian Nitrogen
Products Co. v. United States, 288 U.S. 294, 315
(1933); (ii) where, as here, ‘‘[t]hese agencies co-
operated in developing the act,’’* Adams v. United
States, 319 U.S. 312, 314-15 (1943) ; and (iii) where,
as here, ‘‘Congress has refused to alter the admin-
istrative construction.’’ ** Red Lion Broadcasting Co.
v. FCC, 395 U.S. 367, 384 (1969).
The Court of Appeals acknowledged that, ‘‘in prac-
tice, the Department of the Interior did not enforce
the 160-acre limitation on lands in the Imperial Irri-
gation District.’’ 559 F.2d, at 540. The court concluded,
however, that this practice was not determinative be-
cause it was justified on the basis of (i) the Wilbur
ruling, which the Court of Appeals determined to be
legally incorrect, and (ii) on what the court charac-
terized as ‘‘ previous inaction’’—the Department of the
Interior had used the term ‘‘fairness’’—which, in the
% For the role played by the Interior Department in the draft-
ing of the Project Act, see supra at 39-41.
*° For a discussion of congressional ratification of the Depart-
ment of the Interior’s interpretation of the Project Act to the
effect that it does not authorize acreage limitations in the District,
see infra at 60.
58
court’s view, was not ‘‘an administrative determination
to which the courts should defer.’”’ Ibid.
Of course, a court may always disregard an admin-
istrative practice which is clearly contrary to the sta-
tute pursuant to which the agency purported to act.
Here, however, it would be ludicrous to assert that
Secretary Wilbur’s ruling was clearly wrong. It was
in accord with longstanding regulations and practice
(see infra at 66-67), it was confirmed by a court of
competent jurisdiction (see infra at 69-72), it was
made known repeatedly to Congress, which appro-
priated money to construct the All-American Canal
with knowledge that it was to serve lands possess-
ing vested rights, irrespective of their area, (see infra
at 60-64), and it was adhered to by Secretary Wilbur’s
successors for 31 years. The most that might be said
is that the Project Act is arguably susceptible to
an interpretation other than that ascribed to it by
Secretary Wilbur, and that the Court of Appeals
would have adopted such an alternative interpreta-
tion, instead of that adopted by Judge Turrentine
and the six Secretaries who adhered to Secretary
Wilbur’s interpretation, had the question come before
it for decision. Even if this were supposed to be the
case, however, it would not warrant judicial disregard
of administrative practice many years after the fact.
As this Court has said on numerous occasions:
‘*When faced with a problem of statutory con-
struction, this Court shows great deference to the
interpretation given the statute by the officers or
agency charged with its administration. ‘To sus-
tain the Commission’s application of this statutory
term, we need not find that its construction is the
only reasonable one, or even that it is the result
we would have reached had the question arisen in
the first instance in judicial proceedings.’ Unem-
59
ployment Comm’n v. Aragon, 329 U.S. 143, 153.
See also, e.g., Gray v. Powell, 314 U.S. 402; Uni-
versal Battery Co. v. United States, 281 U.S. 580,
083 (emphasis added).’’ 380 U.S., at 16.
Thus, the Court of Appeals’ disagreement with the
Wilbur ruling, considered in light of the particular
facts surrounding that ruling—namely, its subsequent
judicial, congressional, and administrative ratification
—does not justify retroactive judicial disregard of the
administrative practice based on that ruling.
As to the Court of Appeals’ contention that the
administrative practice involved here should be dis-
regarded because it was justified in part on ‘‘ previous
inaction’’: it is true that several of the later Depart-
mental explanations for the non-application of acreage
limitations to Imperial Valley were to the effect that a
reversal of prior Departmental policy and practice
would be unfair to those who had relied on that policy
and practice. But such a concern with fairness and
constancy is fundamental to the principle of adminis-
trative construction. As this Court in United States v.
Northern Pacific Railway Co., 242 U.S. 190 (1916),
said:
‘‘Statutes should be construed, as far as possible,
so that those subject to their control may, by ref-
erence to their terms, ascertain the measure of
their duty and obligation, rather than that such
measure should be dependent upon the discretion
of executive officers, to the end that ours may
continue to be a government of written laws rather
than one of official grace.’’ Id., at 195.
And with specific regard to expectations created by
long-standing administrative practice, this Court said
60
in United States v. Midwest Oil Co., 236 U.S. 459
(1915):
‘‘Tt may be argued that while these facts and
rulings prove a usage, they do not establish its
validity. But government is a practical affair, in-
tended for practical men. Both officers, lawmakers,
and citizens naturally adjust themselves to any
long-continued action of the Executive Depart-
ment, on the presumption that unauthorized acts
would not have been allowed to be so often repeated
as to crystallize into a regular practice. That pre-
sumption is not reasoning in a circle, but the basis
of a wise and quieting rule that, in determining the
meaning of a statute or the existence of a power,
weight shall be given to the usage itself,—even
when the validity of the practice is the subject of
investigation.’’ Id., at 472-473.
Individuals have for years bought and sold land, built
farms, and paid ad valorem and estate taxes in the
District in reliance on the United States’ continuing
assurance that the Project Act did not authorize acre-
age limitations there.
Moreover, the administrative practice involved here
was not a failure to act or a casual disregard of a
statutory mandate. Rather, it was a deliberate and
positive interpretation of the statute. Clearly, public
reliance on such a practice is a valid reason for con-
tinuing the practice, and in no way should detract from
the importance of the practice for purposes of statu-
tory construction.
D. Congress has ratified administrative construction to the effect
that the Project Act does not authorize acreage limitations in
the District
From 1934, when Secretary Ickes first appropriated
P.W.A. funds for the construction of the All-American
61
Canal, until the present, Congress has been aware of
the fact that deliveries of water to the District from the
All-American Canal were not being limited to 160
acres in single ownership.” Yet Congress has never
amended the Project Act to require such limitation.
Indeed, Congress has three times ‘‘revisited the Act
and left the practice untouched.’’ Saxbe v. Bustos, 419
U.S. 65, 74 (1974). In 1940, after extensive hearings,
Congress enacted the Boulder Canyon Project Adjust-
9 See, e.g., Hearings on H.R. 13710 Before a Senate Subcommit-
tee on Appropriations, 72d Cong., 2d Sess., at 97 (1933) ; Hearings
on H.R. 3961 Before a Subcommittee of the Senate Committee on
Commerce, 78th Cong., 2d Sess., pt. [V at 599, 631, 764-65 (1944) ;
Hearings on S. 295 Before a Subcommittee of the Senate Committee
on Irrigation and Reclamation, 78th Cong., 2d Sess., at 184, 450,
482 (1944); Hearings Before a Subcommittee of the Senate Mili-
tary Affairs Committee, 78th Cong., 2d Sess., at 33 (1944) ; Hear-
ings on H.R. 6335 Before a Subcommittee of the Senate Appro-
priations Committee, 79th Cong., 2d Sess., at 1108-19 (1946) ;
Hearings on Irrigation and Reclamation Before a Subcommittee of
the House Committee on Public Lands, 80th Cong., Ist Sess., at 11
(1947) ; Hearings on S. 912 Before a Subcommittee of the Senate
Committee on Public Lands, 80th Cong., Ist Sess., at 159-60, 162,
166, 179, 431-32 (1947); Hearings on S. 1385 Before the Senate
Committee on Interior and Insular Affairs, 81st Cong., Ist Sess.,
at 12, 15, 50-51 (1949) ; Hearings on S, 1425, S. 2541, and S. 3448
Before the Subcommittee on Irrigation and Reclamation of the
Senate Committee on Interior and Insular Affairs, 85th Cong., 2d
Sess., at 11, 19, 85, App. C at 7 (1958) ; Acreage Limitation Policy,
Committee Print of Senate Committee on Interior and Insular
Affairs, 88th Cong., 2d Sess., at 25, 350-51 (1964) ; Water Policies
for the Future, Final Report to the President and to the Congress
of the United States by the National Water Commission (1973) ;
Acreage Limitations in Bureau of Reclamation Projects: Hearings
Before Subcommittee on Public Lands and Development of the
Senate Committee on Energy and Natural Resources, 95th Cong.,
2d Sess., pt. 3 (1978) ; Reclamation Reform Act of 1979: Hearings
Before the Subcommittee on Energy Research and Development
of the Senate Committee on Energy and Natural Resources, 96th
Cong., Ist Sess. (1979).
62
ment Act, 54 Stat. 779, 43 U.S.C. §§ 618 et seg., which
superseded various financial provisions of the Project
Act, and specifically reenacted certain other provisions
of that Act relating to water rights. In 1946, Congress
passed an act to amend § 9 of the Project Act, 60 Stat.
36, 43 U.S.C. §617h, which limits entries on public
lands to 160 acres. And in 1968, Congress further sup-
plemented the Project Act with the Colorado River
Basin Project Act, 82 Stat. 886, 43 U.S.C. §§ 1501,
‘et seq., enacted after this Court’s opinion and first
decree in Arizona v. California, That Act provided
inter alia that the Secretary, in making allocations
under the Project Act in time of shortage must first
satisfy present perfected rights in order of priority.
In none of these three instances did Congress take
action to require a change in the administrative prac-
tice—known to Congress—of delivering water to the
District without regard to acreage, in satisfaction of
present perfected rights.
This Court has held that, in appropriate circum-
stances, congressional acquiescence in an administra-
tive practice which is not in complete harmony with
the statutory language can have the effect of qualify-
ing that language. For example, in Sazbe v. Bustos,
supra, the Court said:
‘‘Such a history of administrative construction
and congressional acquiescence may add a gloss
or qualification to what is on its face unqualified
statutory language.’’ 419 U.S., at 74.
It is an a fortiori proposition that where, as here,
administrative construction and congressional acquies-
cence therein are in complete conformity with the ‘‘un-
qualified statutory language’’ (1.¢., the § 6 requirement
that present perfected rights be satisfied and the § 14
provision that the reclamation law applies only to the
63
extent that it is not in conflict with specific provisions
of the Project Act), such congressional acquiescence
should be accorded great weight in the construction of
the relevant statute.
Nor has Congress’ role been limited to mere acquie-
scence in the face of a known administrative practice.
Congress has also taken affirmative steps to ratify that
practice. Every year from 1936 through 1950, Congress
appropriated funds for the construction and/or opera-
tion of the All-American Canal with knowledge that
deliveries to the District were not being limited to
160 acres in single ownership.”
In Ivanhoe Irrigation District v. McCracken, supra,
this Court held inter alia that annual appropriation of
funds by Congress for the Central Valley Project con-
stituted ratification of an administrative construction
to the effect that the excess lands provisions of the
reclamation law applied to the Central Valley Project.
357 U.S., at 293. If the same reasoning is applied to
the circumstances of the present case, which involves a
different statute (the Project Act) and a different
administrative construction, one must conclude that
Congress, in making large, annual appropriations for
the All-American Canal, ratified administrative con-
struction to the effect that the Project Act does not
*149 Stat. 1757, 1785 (1936) ; 50 Stat. 564, 596 (1937) ; 52 Stat.
291, 223 (1938); 53 Stat. 685, 718 (1939); 54 Stat. 406, 437
(1940) ; 55 Stat. 303, 336 (1941); 56 Stat. 506, 535-36 (1942) ;
57 Stat. 451, 476 (1943); 58 Stat, 463, 489-90 (1944); 59 Stat.
318, 342 (1945); 59 Stat. 632, 648 (1945); 60 Stat. 348, 368
(1946) ; 61 Stat. 460, 476 (1947) ; 62 Stat. 1112, 1131 (1948) ; 63
Stat. 765, 782 (1949) ; 64 Stat. 275, 285 (1950) ; 64 Stat. 595, 686
(1950). Appropriations for operation were no longer required after
transfer of operation by Secretary Chapman to the District in 1952
(supra, p. 54).
64
authorize application of the excess lands provisions of
the reclamation law to the District.
Judge Turrentine aptly summed up the congres-
sional ratification of Secretary Wilbur’s ruling with
the following findings:
‘“‘Congress for more than 30 years was fully
aware of the 1933 ruling and interpretation of
Secretary Wilbur and of the administrative prac-
tice predicated thereon. The Imperial Valley situ-
ation in light of such interpretation and practice
was called to its attention in appropriation hear-
ings for the construction and operation of the
All-American Canal, at the hearings on the Cen-
tral Valley and San Luis projects and at the
hearings on the Small Projects Act of 1958.
* + ” * ”
‘In addition to the foregoing, copies of the
Bureau of Reclamation’s excess land surveys of
1946 and 1964 were filed with Congress.
‘‘At no time from 1933 to the present has Con-
gress taken any action in derogation of the pro-
priety of the Wilbur interpretation or of the long
standing administrative practice which followed
it.’ 322 F.Supp., at 27.
This congressional ratification of administrative
construction is entirely consistent with the plain lan-
guage of §§6 and 14 of the Project Act, with the
legislative history of the Act, and with the Hewes deci-
sion, and is therefore entitled to great weight.
II.
The Decisions Not To Apply An Acreage Limitation To The
Privately Owned Lands In Imperial Irrigation District Have Become
Final and Irreversible
As with any other major project of comparable size,
Congress left many details—some quite important—
65
to secretarial discretion. These included, for example,
the design, the capacity, and even the location of
Hoover Dam, and the size of the All-American Canal.
Congress’ overriding intention, however, was that deci-
sions once made were not subject to being remade by
each new Secretary of the Interior. Hoover Dam is set
in cement and steel, and located in Black Canyon, not
Boulder Canyon; but it takes no argument to prove
that the Secretary’s discretion having been exercised,
and the cement poured, his decision cannot be remade
even if Boulder Canyon were now proved to be a better
location.
The legal decisions were meant to be equally irre-
voecable—as irrevocable as any aspect of the law, state
or federal, relating to the title to real property. Water
rights, indeed, are real property. In Imperial Valley,
they are the only rights, other than mineral rights and
geothermal rights, that give land its value.
Who was to receive water stored behind Hoover
Dam was a matter of overriding concern throughout
the Colorado River Basin from the first moment the
possibility of such a dam was conceived—a dam ‘‘in
or for the benefit of the Lower Basin.’’ Article VIII of
the Colorado River Compact, written in 1922, expressed
the core principle that, ‘‘ Present perfected rights’’—
water rights perfected by appropriation and use of
water—were to be unaffected by the Compact, except
in one carefully specified particular: they should at-
tach to and be satisfied by the waters stored by any
lower basin reservoir with a capacity of five million
acre-feet or more.
66
Disposition of the water stored behind Hoover Dam
was provided for in the legislation authorizing its
construction. That legislation incorporated and perpe-
tuated, with repeated and meticulous emphasis, the
protections for existing rights specified in the Colorado
River Compact. The dam must be used to satisfy ‘‘pres-
ent perfected rights.’’
Every device known to the law was prescribed in an
effort to put at rest and to determine conclusively any
questions about rights to the use of that water. Speci-
fically, the devices directed to be employed were (1)
general regulations to control the writing of contracts
for the use of water stored behind Hoover Dam, (ii)
contracts ‘‘for permanent service’’ which once written
could not be rewritten, except of course with the con-
sent of the parties, and (iii) the device of the valida-
tion proceeding, 43 U.S.C. § 511, to set the arrange-
ments in the cement of res judicata.
A. Regulations
Secretary Wilbur’s determination that acreage limi-
tations do not apply to privately owned lands in the
District was made in the course of discharging the
responsibility placed on him by the Project Act
in making the contract with the District. It was
a ruling adhered to by all of his successors—
six Secretaries in four Presidential administrations,
over a period of more than three decades—until this
suit was initiated.
If Secretary Wilbur had decided otherwise, he first
would have had to vacate the Department’s 1910 regu-
67
lation (App. 216a) which codified Departmental prac-
tice prevailing since at least 1905:
‘“‘The provision of section 5 “ of the reclamation
act limiting the area for which the use of water
may be sold does not prevent the recognition of a
vested right for a larger area and protection of
the same by allowing the continued flowing of the
water covered by the right through the works
constructed by the Government under appropriate
regulations and charges.”’
It is axiomatic that an agency is bound by its own
regulations and that the public is entitled to rely on
those regulations. Professor Davis puts it this way:
‘‘TA] legislative rule is clearly binding on the
agency that issues it. The best single authority
may now be United States v. Nixon, 418 U.S. 683,
694-696 (1974).’? 2 K. Davis, ADMINISTRATIVE Law
TREATISE 98 (2d ed. 1979).
The 1910 regulation is clearly a legislative rule, and
has remained in force, unchanged, for 70 years. It is
now codified at 43 C.F.R. 230.70. |
Secretary Wilbur’s ruling, and the implementation
of that ruling by Secretaries Ickes, Krug, Chapman,
McKay, Seaton, and Udall (during his tenure under
President Kennedy) were made against the background
of two decisions of this Court which are foundations
to the interpretation of the law of the Colorado River.
The first was Wyoming v. Colorado, 259 U.S. 419
(1922), decided while the Colorado River Compact
*2 Our footnote: this Court, in ]vanhoe Irrigation District v. Mc-
Cracken, supra, called § 46 of the Omnibus Adjustment Act of
1926 a ‘‘reenactment’’ of §5 of the Reclamation Act of 1902, 357
US., at 290.
68
was under negotiation, and declaring that prior ap-
propriation is the controlling principle of interstate
adjudications of interstate water rights among western
states, except where expressly departed from. That
decision produced the Colorado River Compact. The
second was Arizona v. California, 283 U.S. 423, 459
(1931), in which Justice Brandeis articulated the
essential feature of a water right in western states,
acquired by appropriation and use: ‘‘a vested right
to take and divert from. the same source, and to use
and consume the same quantity of water annually
forever, subject only to the right of prior appro-
priations.”’ This decision upheld the authority of the
Secretary, challenged by Arizona, to construct Hoover
Dam. The Project Act was valid because it did not
interfere with those vested rights.
B. Contract
Contract has always been a central device in recla-
mation law to make clear, ‘definite, and durable the
rights, including institutional arrangements for their
satisfaction, in reclamation projects. In the beginning
(7.c., after 1902 when the Reclamation Act was passed)
eontracts arose out of water right applications by
individual farmers using water. Such an arrangement
was cumbersome, and had been largely discarded be-
fore the Project Act in favor of contracts with an
irrigation district or public entity. 43 U.S.C. § 511. The
irrigation district was a practical necessity in the
administration of projects.
There is no question as to the intention of the
parties to the contract between the Secretary of the
Interior and the District. It was just as clear here that
they did not intend to include an acreage limitation—
69
Secretary Wilbur said so in writing—as it was clear
in Ivanhoe that the parties intended the opposite. The
electors of the District approved the contract on that
understanding, as the court in Hewes found. App.
144a, Finding 35.
Not only was the contract a device to secure cer-
tainty ; it was a device to secure consensus and under-
standing among the water users by making clear what
they were receiving and what responsibilities they
were undertaking in exchange for those benefits.
C. Validation by judicial proceeding
The contract between the United States and the
District required judicial validation. 43 U.S.C. § 511.
Article 31 of the contract repeated the language of
that statute.
The purpose of the requirement of validation was
clear. That purpose was to give legal certainty to all
the matters which were the subject of the contract—
to set in legal cement the terms of the mutual under-
takings of the District and the United States, sealed
by the doctrine of res judicata.
The Court of Appeals says that everything deter-
mined by such a proceeding, other than ‘‘validity,”’ is
‘*oure dicta.’’ 559 F.2d, at 526. The court was led into
error by reading, in isolation, two sentences from the
California Supreme Court’s two opinions in Ivanhoe
Irrigation District v. All Parties:
(i) ‘‘The judgment [in a confirmation proceed-
ing] is limited to a determination of the validity of
the oe 47 Cal. 2d at 607, 306 P.2d at 829
(1957).
70
(ii) ‘This proceeding is in rem in nature. In
such an action the only issue involved is the va-
lidity of the contract.”’ 52 Cal. 2d 692, 699, 3 Cal.
Rptr. 317, 320, 350 P.2d 69, 72 (1960).
One of these utterances preceded, and one followed,
the opinion of this Court in Ivanhoe Irrigation Dis-
trict v. McCracken, 357 U.S. 275 (1958). Both sen-
tences are quoted by the Court of Appeals. 559 F.2d,
at 525.
It is clear that these sentences in isolation do not
state the effect of a validation proceeding in California.
A judgment determining solely the abstract question
of validity without reference to what the contract pro-
vided would serve no useful purpose. What is worse,
it would have all the destructive power of a loose can-
non on the pitching deck of a man-of-war in heavy
seas. Such a judgment would conclusively determine
that the contract was binding, but without regard to
how it might be construed or interpreted.
No one can read the two Ivanhoe opinions of the
California Supreme Court and the intervening opinion
of this Court without recognizing that the California
court, in the first case, determined that a contract with
an acreage limitation clause could not be valid. The
second California Supreme Court opinion determined
that the contract was valid incorporating the acreage
limitation. The state court determined, in each in-
stance, what it purported to determine. This Court
would have had no jurisdiction on certiorari to hear
the case and to reverse if the only determination had
been abstract ‘‘validity’’ or the capacity of the District
to enter into some kinds of contracts.
71
Validation proceedings have been an essential part
of reclamation law ever since the California legisla-
ture enacted the Wright Act in 1887. That act estab-
lished the pattern, copied in most of the states of the
west, to achieve the finality of res judicata by a judicial
proceeding.
As early as 1913, in Hanson v. Kittitas Reclama-
tion District, T5 Wash. 297, 134 Pac. 1083 (1913),
the preclusive effect of a validating judgment was
sustained. Andrews v. Lillian Irrigation District, 66
Neb. 458, 92 N.W. 612 (1902), rehearing, 97 N.W. 336
(1903). The Washington court acknowledged the Cali-
fornia Wright Act as the model for the Washington
Act and similar irrigation district laws in fourteen of
the sixteen States in which irrigation was practiced.
The court also pointed out that the in rem proceeding,
which results in a judgment against ‘‘the world,’’ is not
novel. Adjudications in bankruptcy, admiralty, and
receiverships have the same in rem nature.
The usefulness of validation proceedings is depend-
ent on the resulting judgments effectively deciding the
litigated questions. It should be remembered that res
judicata is not a technical and medieval doctrine. It is
a doctrine which it would be necessary to invent if it
did not exist. Most of the changes have been in the
direction of exterding its finality. Chicot County
Drainage District v. Baxter State Bank, 308 U.S.
371 (1940), decided by a unanimous court, illustrates
the reach of finality. In Chicot County, a judgment
based on an unconstitutional statute achieved finality.
Bonds were discharged in a municipal bankruptcy,
and their holders appealed. While appeal was pend-
ing, the bankruptcy law was held unconstitutional by
this Court in another case. The Court held in Chicot
72
County that the discharge was res judicata despite
unconstitutionality of the statute.
This Court, in Tacoma v. Taxpayers of Tacoma, 357
U.S. 320, 336-337 (1958), made an observation that is
particularly appropriate here. Speaking of the finality
to be accorded under the Federal Power Act to a court
of appeals decision on review of an order of the Fed-
eral Power Commission, it said:
‘‘Such statutory finality need not be labeled res
judicata, estoppel, collateral estoppel, waiver or
the like either by Congress or the courts.”’
Justice Whittaker’s language expresses very well
the purpose of Congress in enacting 43 U.S.C. 511,
requiring judicial validation of the contracts of irri-
gation districts with the United States.
Law that has been relied on as final, based on every
legal device to achieve certainty for nearly 50 years,
cannot be rewritten retroactively.
The essence of a rule of property is justifiable re-
liance. The All-American Canal was constructed on the
basis of the explicit and repeated understanding, made
final by every doctrine of repose known to the law, that
it would serve the same lands as the District’s works
which it replaced. The reliance was justifiable, if reli-
ance can be placed on the pledged word of the United
States of America.
The decision of the Court of Appeals would have
been wrong in 1933, had it been substituted for that of
the court validating the agreement of the United States
and the District. It is egregiously wrong in 1980 after
at least two generations, in reliance on the 1933 adjudi-
cation, have paid taxes and land prices based on the
market value of the land irrigated.
73
D. The attempted destruction of established values.
Before leaving the subject of established values and
turning to the subject (in Part III) of the standing
of those who have intervened here in order to seize
those values, it may be permissible to put the contrast
between the two in sharp focus.
There was no increment of unjust enrichment to
the landowners of 50 years ago in consequence of enact-
ment of the Project Act. They were already irrigating
all but three per cent of the land now irrigated by the
All-American Canal. And if there were room for doubt,
that doubt should have been dispelled when the District
in 1934 was forced to seek the benefit of the municipal
bankruptcy law because the land irrigated could not
pay debt service on the existing bonded indebtedness,
quite aside from the new debt to the government.
The present landowners are the purchasers of the
land served by the All-American Canal. They have
nearly all paid the full market value of the land they
own, or if they acquired it by devise or inheritance,
they paid taxes based on market value. The annual ad
valorem assessments are also based on market value.
The Yellen group, if successful in establishing the law
according to their allegations, will buy that land at less
than market value, ripping off the present owners who
have paid full market value, and—the day after their
hoped-for purchase—they will be able to sell at full
market value.
“In re Imperial Irrigation District, 10 F. Supp. 832 (1934).
Reversed in 87 F.2d 355 (1936), after the Municipal Bankruptcy
Act had been declared unconstitutional in Ashton v. Cameron
County Water District, 298 U.S. 513 (1936). After a new munici-
pal bankruptcy act was sustained in Bekins v. U.S., 304 U.S. 27
(1938), the District’s reorganization plan was approved and be-
came effective.
74
It would be ironic if the Yellen group, who are seek-
ing a windfall, should be deemed to have acquired
standing for that effort by invoking what they describe
as the anti-speculation purposes of the reclamation
law. As noted earlier (p. 9) the Interior Department,
in proposing new regulations in 1977 (10 years after
commencing this suit) stated ore of the justifications
of these regulations to be that:
“The regulations discourage speculation by allow-
ing the Department to exercise continuing super-
vision over the sale price of land after it is sold
into non-excess status. This reverses the current
practice of allowing an excess land purchaser to
realize the windfall profits represented by low-
priced federal water in an immediate resale (em-
phasis added).’’ App. 219a.
Further irony is added by an opinion of the Solicitor
of the present Secretary, issued May 18, 1979, (M-
36913, 86 L.D. 300), interpreting the proposed regu-
lations, in which he said:
‘‘To summarize what follows, I hold that section
46 of the Omnibus Adjustment Act of 1926, 43
U.S.C. § 423e, requires the Secretary to control
and approve the purchase price of both initial
sales of excess land, and resales of this formerly
excess land until one-half of the construction
charges allocated to such land has been patd (em-
phasis added).”’ Interior Sol. Op. M-36913, Recla-
mation Law—Control of the Sale Price of Former-
ly Excess Lands, May 18, 1979, p. 1.
If the Solicitor’s language means what it says, the
consequence of the payment of one-half of the con-
struction charges by the present landowners or their
predecessors is this: (i) The present landowners, who,
with their predecessors, made these payments, must
75
nevertheless sell their excess lands at below-market
prices approved by the Secretary (if the Court of
Appeals decision is given effect see 595 F.2d, at 527).
But (ii) Dr. Yellen (or some other buyer at the Sec-
retary’s below-market price) can resell at once at full
market price because, and only because, his unfortu-
nate and unwilling vendor had paid off one-half of the
construction charges. In this instance, the ‘‘ present
practice of allowing an excess land purchaser to realize
the windfall profits’’ is not reversed, but reconfirmed.
This result, outrageously unfair, is what the present
Secretary’s Solicitor reads into § 46 of the 1926 act as
interpreted in his proposed regulations.
Beyond this, the Solicitor says that the proposed
regulations, insofar as they give the Secretary power
to police subsequent resales of lands sold at the Secre-
tary’s price, are not to be made retroactive, because
this would be unfair to those who have bought and
sold excess lands in reliance on past Departmental
practice. This new concern about retroactivity might
well have prevented the filing of this suit in the first
place. ,
Il.
The Court of Appeals Erred In Applying Constitutional “Case
And Controversy” Requirements By Allowing Respondents, Ben
Yellen, Et Al., To Participate As Parties Based On Conjectural
Harm And Speculative Relief
We trust that the Court will reverse the decision of
the Court of Appeals on the merits. But as this Court
may regard the issue of respondents’ standing to
appeal from the judgment against the United States
as a jurisdictional question, we are constrained to point
out to the Court the extreme frailty of their claim of
standing.
76
We contend that (i) the respondents, Dr. Yellen,
et al., never had standing, and (ii) assuming, argu-
endo they once had standing, it has been terminated
under the terms of § 46 of the Omnibus Adjustment
Act, because any authority in the Secretary of the
Interior to fix prices on sales of excess lands in Im-
perial Valley expired on March 1, 1978, while this
case was on appeal.
A. The constitutional tests of standing
In the recent case of Gladstone Realtors v. Village
of Bellwood, 47 U.S.L.W. 4377 (April 17, 1979), this
Court articulated the constitutional limits on standing
in federal courts as follows:
‘‘Tn recent decisions we have considered in some
detail the doctrine of standing in the federal
courts. ‘In essence the question of standing is
whether the litigant is entitled to have the court
decide the merits of the dispute or of particular
issues. This inquiry involves both constitutional
limitations on federal-court jurisdiction and pru-
dential limitations on its exercise. . . . In both
dimensions it is founded in concern about the
proper—and properly limited—role of the courts
in a democratic society.’ Warth v. Seldin, 422 U.S.
490, 498 (1975).
‘The constitutional limits on standing eliminate
claims in which the plaintiff has failed to make
out a case or controversy between himself and the
defendant. In order to satisfy Art .ITI, the plain-
tiff must show that he personally has suffered
some actual or threatened injury as a result of the
putatively illegal conduct of the defendant. Duke
Power Co. v. Carolina Environmental Study
Group, US. ’ , 98 S. Ct. 2620, 2630
(1978) ; Arlington Heights v. Metropolitan Devel-
77
opment Housing Corp., 429 U.S. 252, 260-261
(1977); Simon v. Eastern Kentucky Welfare
Rights Org., 426 U.S. 26, 38 (1976); Warth v.
Seldin, supra, at 499; Linda R.S. v. Richard D.,
410 U.S. 614, 617 (1973). Otherwise the exercise of
federal jurisdiction ‘would be gratuitous and thus
inconsistent with the Art. III limitation.’ Simon
v. Eastern Kentucky Welfare Rights Org., supra,
at 38.”
Dr. Yellen, eé al., fail to pass these tests, as we show
below.
B. How the respondents got into court
Dr. Yellen and his fellow respondents were allowed
by the Court of Appeals (another panel) to intervene
in the acreage case by mistake. As the Court of Ap-
peals said here:
‘‘The order allowing intervention [559 F.2d, at
543] also appears to be based on a misunderstand-
ing as to the identity of the various intervenors.
The district court allowed various interested Im-
perial Valley landowners to intervene as defen-
dants early in the proceedings. This Court’s earlier
order allowing intervention refers to the ‘inter-
ested Imperial Valley landowners’ as the group
seeking to perfect and prosecute the appeal. In
fact, this group had obtained a favorable decision
from the district court and opposed the prosecu-
tion of an appeal by parties other than the govern-
ment. It was the Yellen group, a group of non-
landowners, who had filed the protective notice of
appeal and who sought to prosecute the appeal,
and whose intervention request had been denied
by the district court.’’ 559 F.2d, at 520, n.15.
That order, 559 F.2d, at 543, mistaken as to the
identity of Dr. Yellen and his colleagu2s (believing
them to be intervening landowners, whereas their
78
claim of standing is based on their status as non-
landowners), was mistaken also in its assumption that
Dr. Yellen’s standing in the residency case would be
approved on appeal, and for this reason only (in order
to enable both cases to be heard on the merits in one
proceeding), their intervention on appeal in the acre-
age case was justified. As it turned out, however, the
Court of Appeals reversed the District Court’s holding
that Dr. Yellen had standing in the residency case.
The Court of Appeals concedes:
‘‘Sinee the district court decision in the residency
case must be vacated because of lack of standing
on the part of the plaintiffs therein, the basis for
the order allowing intervention in the acreage case
has disappeared.”’ 559 F.2d., at 520.
And:
‘‘It would be ironic to allow the Yellen intervenors
to use an erroneous district court ruling on stand-
ing in another case to bootstrap themselves into
a position of litigating the important question of
the enforcement of the federal reclamation laws
in this ease.’’ Id., at 521.
But the court proceeded to ‘‘once again examine the
request for intervention,’’ and held, de novo, that the
Yellen intervenors did have standing to intervene after
the judgment against the United States in the acreage
case, in order to prosecute an appeal, notwithstanding
the court’s conclusion denying them standing in the
residency case, even though they were in that case as
plaintiffs, not as intervenors.
C. The lack of particularized injury
When the constitutional requirements for standing
are properly applied, it becomes apparent that there
79
is no more basis for judicial action on their behalf in
the acreage case than there was in the residency case.
These respondents did not intervene in the District
Court proceedings, which lasted nearly four years.
They intervened after a judgment against the United
States, from which Solicitor General Griswold decided
not to appeal (see supra at 5, n.3). Theirs is not a class
action, but one by Dr. Yellen and others alleging that,
as individuals, they have each been caused a particular
injury by the failure of the Secretary to enforce the
excess land provisions of the reclamation law; they
say that if he did enforce those laws each of them
would be able to buy land at less than present market
prices. They do not, and could not, allege (i) that the
Secretary could force a landowner to sell, or (ii) that,
if a landowner did sell, he would select any of these
respondents as a buyer, or (ili) that any respondent
has a preference in any respect against any other citi-
zen of the United States, wherever he resides. Their
claim of standing is analogous to that which might be
asserted by members of the general public, seeking to
intervene after a judgment against the United States
in a civil antitrust suit, who might allege that, if the
government had won, the market price of the com- |
modities manufactured by the defendant would be
lower.
If these respondents had wanted to inject the par-
ticularized issues related to their own individual pock-
etbooks, as distinct from a class action of the general-
ized sort that the United States brought, they should
have done so by intervening at the trial, not after a
judgment on the issues framed by the pleadings of
the United States and the District. There was never
an opportunity, at the trial, to chalienge or rebut their
80)
assertions of fact in post-judgment affidavits, which
the Court of Appeals accepted as true.
The Court of Appeals almost conceded the point,
saying:
‘“‘TA] party possessing the standing to intervene
does not automatically have the ability to appeal
a decision which all other parties have decided
not to appeal. In order to be able to appeal, the
intervenor must have an ‘appealable interest.’
[Citation omitted.] Resolution of this question
_ turns on traditional standing analysis. [Citation
omitted.] Mere interest in the establishment of a
legal precedent is not sufficient. [Citation omit-
ted.]’’ 559 F.2d, at 521.
But the court went on to decide, in result if not in
words, that Dr. Yellen, et al. would have had standing
to intervene in the District Court to participate in the
trial (which they failed to do), and therefore these
respondents had standing to intervene to appeal from
the judgment against the United States, thus substi-
tuting their own value judgment for that of the Solici-
tor General, who had decided that the decision of
District Judge Turrentine was right and should not
be appealed. All parties to the proceedings in Judge
Turrentine’s court were satisfied with the outcome.
Only the newcomer, surfacing after judgment, was not.
The Court of Appeals applied the Article III con-
stitutional: case and controversy requirements cor-
rectly to Yellen v. Andrus, the residency case, saying
that respondents lacked standing because ‘‘the relief
sought by the plaintiffs in this case would not come
through the government action they seek’’ 559 F.2d,
at 518, and that ‘‘any relief that could appropriately
be ordered in this case would not redress plaintiffs’
81
alleged injuries.’’ /d., at 519. Moreover, plaintiffs in
the residency case had suffered no particularized harm:
‘‘The injury plaintiffs allege—the inability to
purchase farming land at prices they can afford—
is neither particularized nor does it flow ‘con-
eretely and demonstrably’ from the government’s
activities, or lack of activity, challenged in the
ecomplaint.”’ Id., at 519.
The Court of Appeals properly cites Turner v. Kings
River Conservation District, 360 F.2d 184, 198 (9th
Cir. 1966), in the residency ease for the proposition
that plaintiffs ‘‘cannot claim injury from any failure
of the government to discharge its duty to the public.”
559 F.2d, at 518, n. 10. The same reasoning should
control in the acreage case between the same parties.
Respondents present only a question ‘‘of broad social
import where no individual rights would be vindi-
cated ....’’ Gladstone Realtors v. Village of Bellwood,
47 U.S.L.W. 4377, 4879 (1979).
If there is a distinction between the residency and
acreage cases, it is a distinction without a difference.
Here, as in the residency case:
‘*('T ]here is nothing in the record to indicate what
price any plaintiff could afford to pay for any
particular farm or that enforcement of the resi-
dency requirement of 43 U.S.C. § 431 will lead to
a decline in farm land prices sufficient to bring
those prices into a range where plaintiffs could
afford to purchase a particular farm.” Jd., at 518.
In the residency case, these same respondents alleged
an injury which is described by the Court of Appeals
as follows:
‘The essence of their case is that their ownership
desires have been blocked because the government,
82
by failing to enforce the residency provision of
43 U.S.C. § 431, permits irrigation water to be
received by nonresident owners of farm land and
that enforcement of the law will result in making
farm land available for purchase at prices plain-
tiffs could afford.’’ Jd., at 518.
This was found not to be enough. If this speculative
parlay would not work in the residency case, it should
have been held just as unworkable in the acreage case
now at issue.”
D. Redress
On rehearing in the acreage case, the court made a
concession and stated an assumption:
‘‘While it is true that landowners cannot be
forced to sell their lands, it is only reasonable
to assume that some land will become available for
sale rather than being put into other than agricul-
tural uses.’’ 595 F.2d, at 527.
This assumption, in a nutshell, is the whole basis
for Dr. Yellen’s ‘‘standing.’’ And, at that, the formula
lacks, of necessity, an essential ingredient: there is not
a shadow of a claim that if an excess landowner should
decide to sell at the Secretary’s below market price,
rather than put his land into ‘‘other than agricultural
uses,’’ he could be compelled to sell to Dr. Yellen or
another of the respondents, instead of electing to sell
to some stranger to this suit. The absence of that ele-
ment of standing, 7.e., that the requested remedy would
redress the claimed injury to a particular individual,
44In Duke Power Co. v. Carolina Environmental Study Group,
438 U.S. 59, 72 (1978), this Court stated that there must be “‘ ‘a
fairly traceable’ causal connection between the claimed injury and
the challenged conduct.’’
83
is fatal here, because this is not a class action, but a
suit in strictly an individual capacity. Consequently,
both injury and redressability must be shown as to
these particular individuals, and this they have not
done and cannot do.
E. Even if it is assumed arguendo that Dr. Yellen, ef al., once had
standing, that standing would necessarily have ceased when
one half the construction costs of the All-American Canal were
repaid.
The standing of respondents was predicated wholly
on the allegation that these particular people would
benefit if the Secretary were enabled to fix prices at
less than market value on the foreed sale of excess
lands.” But the Secretary’s authority to fix prices, if
he ever had it with respect to lands in the District,
expired on March 1, 1978. Section 46 fixes a termina-
tion date on the Secretary’s price-fixing authority in
these terms:
‘*TU |ntil one-half the construction charges against
said lands shall have been fully paid no sale of any
such lands shall carry the right to receive water
unless and until the purchase price involved in
such sale is approved by the Secretary of the
Interior. . . . (emphasis added).’’
‘“s This is a suit to enforce § 46 of the 1926 Act, not a suit to
enforce § 5 of the Reclamation Act which also imposes a land limi-
tation. The Court of Appeals was careful to make this distinction.
559 F.2d, at 537. The distinction was necessary because the court
held that these same respondents lacked standing to sue to enforce
the resideney requirements of § 5. See 559 F.2d, at 517. It would
have strained the imagination tv discover that respondents had
standing nevertheless to enforce the acreage limitation in that same
section. But see /vanhoe Irrigation District v. McCracken, which
referred to the 1926 Act as a ‘‘reenactment’’ of §5 of the 1902
Act. 357 U.S. 275, 290 (1958).
84
On March 1, 1978, the District completed repayment
of more than one-half of the construction charges
against all lands in the District. The court, on re-
hearing, acknowledged this, 595 F.2d, at 527, but held,
on the authority of its decision in United States v.
Tulare Lake Canal Co., 535 F.2d 1093 (1977), that
the Secretary’s authority to fix the sale price ‘‘on
initial break up of excess lands’’ applies ‘‘regardless
of the fact that construction charges for the irrigation
project have been repaid. This decision [Tulare] ex-
pressly applies to all federal reclamation projects sub-
ject to Section 46.’’ 595 F.2d, at 527. The holding here
flies so directly in the face of the statute as to require
no argument. To the extent that Tulare supports it, we
respectfully suggest that this Court disavow that deci-
sion as a precedent.
Moreover, the Department is on record at least twice
with official interpretations of § 46 as terminating the
Secretary’s power to fix prices when half of the con-
struction charge is paid.
Regulations published August 22, 1977 (not to be-
come effective until July 1981), provide that price ap-
proval, with reference to ‘‘involuntary acquisition of
excess land’’ (by foreclosure, inheritance, etc.) will
be required ‘‘until one-half of the total construction
costs allocated to irrigation have been paid in regular
scheduled installments”’ § 426.5(b), App. 232a. So also
to lands which become excess in consequence of the
death of a spouse. § 426.5(c), App. 232a.
And as recently as May
This text is long and has been trimmed here. Open the source document for the complete record.
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.