APPENDIX :

Supreme Comet of the United States

OCTOBER TERM, 1975

No. 75-777

NATION’'t LABOR RELATIONS BOARD,

Petitioner,

—

ENTERPRISE ASSOCIATION OF STEAM, Hot WATER, Hy-

DRAULIC SPRINKLER, PNEUMATIC TUBE, ICE MACHINE

AND GENERAL PIPEFITTERS OF NEW YORK AND VICIN-

ITY, LOCAL UNION No. 638, ETC.

ON WRIT OF CERTIORARI TO THE UNITED STATES COUFT OF

APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT

PETITION FOR CERTIORARI FILED NOVEMBER 28, 1975

CERTIORARI GRANTED FEBRUARY 23, 1976

Supreme Court of the United States

OCTOBER TERM, 1975

No. 75-777

NATIONAL LABOR RELATIONS BOARD,

Petitioner,

_—

ENTERPRISE ASSOCIATION OF STEAM, HoT WATER, Hy-

DRAULIC SPRINKLER, PNEUMATIC TUBE, ICE MACHINE

AND GENERAL PIPEFITTERS OF NEW YORK AND VICIN-

ITY, LOCAL UNION No. 638, ETC.

ON WRIT OF CERTIORARI TO THE ' NITED STATES COURT OF

APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT

INDEX

Page

cs ac ncassenesevenecncevenssecesecaccssscensenens 1

Board Case No. 29-CC-336

a - tia v. ot "aot ini A an RO 2

a sspuannbensusburcscceccnseusenouses 5

a cesasaaenanese 0 ER 13

Excerpts from transcript of testimony in Case No. 29-CC-336.. 15

Excerpts from transcript of testimony in Case 72-Civil 1393.. 18

Witnesses :

a ccenecesnonnnanenenaeaonne 19

A 31

ii INDEX

Page

EERIE era eR ne MD Roce ot ta 36, 50

ne I So oO 44

UG ae 48, 52

Plaintiff’s Exhibits:

ee. ae I Oe Sk OO etintncintencice ee ee ee 54

we Eg BR ara Se Sone, 58

Sk Uh mceinhieniatnctianstenndeinaaaed toe ee eee 67

eg Brrr eet See 72

ee Se I aii perenne tobe tare Saale 77

BUN SUP oncsueccaseninieeutnditeiadicad tidiaviidadiet ee ee 79

Sela “Tt Ce to aie 83

a seaieans atiekansaddoubdecoonnniamieiee eas corsets 90

Defendant’s Exhibit:

OUI TE ccassnesplbvvnnaniendlichtinnesstatcsencsaceeesod cn en ee 98

Order of the Supreme Court granting certiorari... 101

(The decision of the Board and the decision and judgment

of the Court of Appeals were printed in the petition for writ

of certiorari and thus need not be reprinted. )

CHRONOLOGICAL LIST OF RELEVANT

DOCKET ENTRIES

Date Docket Entry

10/6/72 Charge Filed, NLRB Case No. 29-CC-336

10/26/72 Complaint and Notice of Hearing issued

10/31/72 Order Rescheduling Hearing issued

11/2/72 Hearing in Section 10(1) Proceeding, Case No.

72-Civil-1339

11/9/72 Respondent Union’s Answer in NLRB Case No.

29-CC-336

11/15/72 Hearing opened in NLRB Case No. 29-CC-336

11/15/72 Hearing closed in NLRB Case No. 29-CC-336

3/30/72 Administrative Law Judge’s Decision issued

4/11/72 Respondent Union’s Exceptions to the Decision of

the Administrative Law Judge, received

4/12/73 General Counsel’s Exceptions to the Administrative

Law Judge’s Decision, received

7/5/73 Decision and order issued by the National Labor

Relations Board, dated

8/30/73 Order Correcting Decision and Order, dated

7/1/75 Decision of Court of Appeals

7/1/75 Judgment of Court of Appeals

2/23/76 Order of Supreme Court granting certiorari

(1)

2

FORM NLRB 508 Form Approved

(12-65) Budget Bureau No. 64-R003.12

UNITED STATES OF AMERICA

NATIONAL LABOR RELATIONS BOARD

CHARGE AGAINST LABOR ORGANIZATION OR ITS AGENTS

DO NOT WRITE IN THIS SPACE

Case No.: 29-CC-336

Date Filed: 10-6-72

INSTRUCTIONS: File an original and 3 copies of this

charge and an additional copy for each organization,

each local and each individual named in item 1 with the

NLRB regional director for the region in which the

alleged unfair labor practice occurred or is occurring.

1. Labor Organization or its Agents against which

charge is brought

a. Name: Enterprise Association, Steam Fitters,

Local No. 638, U.A., AFL-CIO

b. Union Representative to Contact:

William B. Daley

ce. Phone No.: 674-3937

d. Address (Street, city, State and ZIP code):

841 Broadway, New York, New York

e. The above-named organization(s) or its agents

has (have) engaged in and is (are) engaging in

unfair labor practices within the meaning of

section 8(b), subsection(s) 4/i) (ii)(B) of the

National Labor Relations Act, and these unfair

labor practices are unfair labor practices affect-

ing commerce within the meaning of the Act.

bo

Basis of the Charge (Be specific as to facts, names,

addresses, plants involved, dates, places, etc.)

3

Since on or about August 7, 1972, the above des-

ignated labor organization, by its officers, agents

and/or officials has engaged in, or induced or en-

couraged individuals employed by The Austin Com-

pany, Ine. Hudik-Ross, Inc. and other persons en-

gaged in commerce or in an industry affecting com-

merce to engage in a strike or a refusal in the course

of their employment to use, manufacture, process,

transport, or otherwise handle or work on any goods,

articles, materials or commodities or to perform any

services and/or has threatened, coerced or restrained

The Austin Company, Inc. Hudik-Ross, Inc. and

uther persons engaged in commerce or an industry

affecting commerce, where in either case an object

thereof is forcing or requiring the Austin Company,

Inc. and Hudik-Ross, Inc. to cease using, selling,

handling, transporting or otherwise dealing in the

products of Slant, Fin Corporation, or to cease doing

business with Slant/Fin Corporation.

Name of Employer: The Austin Company, Inc.

Location of Plant Involved (Street, city, State and

ZIP code): 450 West lst Avenue, Roselle, New Jer-

sey 07203

Type of Establishment (Factory, mine, wholesaler,

ete.) : General Contractor

6. Identify Principal Product or Service:

7. No. of Workers Employed: 300

10.

Full Name of Party Filing Charge:

) The Austin Company, Ince.

Address of Party Filing Charge (Street, city, State

and ZIP code) :

450 West Ist Ave., Roselle, New Jersey 07203

Telephone No.: 201-245-4000

11. Declaration:

I declare that I have read the above charge and that

the statements therein are true to the best of my

knowledge and belief.

By .s/ (illegible)

(Signature of representative or person making charge)

District Superintendent

(Title or office, if any)

Address 450 West lst Ave., Roselle, N.J. 07203

(Telephone number): 201-345-4000

(Date): October 6, 1972

Willfully false statements on this charge can be punished

by fine and imprisonment (U.S. Code, Title 18, Section

1001)

5

UNITED STATES OF AMERICA

BEFORE THE

NATIONAL LABOR RELATIONS BOARD

REGION 29

Case No. 29-CC-336

ENTERPRISE ASSOCIATION OF STEAM, HOT WATER, Hy-

DRAULIC SPRINKLER, PNEUMATIC TUBE, ICE MACHINE

AND GENERAL PIPEFITTERS OF NEW YORK AND VICIN-

ITY, LOCAL UNION NO, 638 OF THE UNITED ASSOCIATION

OF JOURNEYMEN AND APPRENTICES OF THE PLUMBING

AND PIPEFITTING INDUSTRY OF THE UNITED STATES AND

CANADA, AFL-CIO

and

THE AUSTIN COMPANY, INC.

COMPLAINT AND NOTICE OF HEARING

It having been charged by The Austin Company, Inc.,

herein called Austin, that Enterprise Association of

Steam, Hot Water, Hydraulic Sprinkler, Pneumatic Tube,

Ice Machine and General Pipefitters of New York and

Vicinity, Local Union No. 638 of the United Association

of Journeymen and Apprentices of the Plumbing and

Pipefitting Industry of the United States and Canada,

herein called Respondent, has engaged in, and is engag-

ing in, certain unfair labor practices affecting commerce

as set forth and defined in the National Labor Relations

Act, as amended, 29 U.S.C., Sec. 151, et seg., herein called

the Act, the General Counsel of the National Labor Re-

lations Board, herein called the Board, on behalf of the

Board, by the undersigned Regional Director for Region

29, pursuant to Section 10(b) of the Act and the Board’s

Rules and Regulations Series 8, as amended, Section

102.15, hereby issues this Complaint and Notice of Hear-

ing and alleges as follows:

1. The Charge in this proceeding was filed by Austin

on October 6, 1972, and served by registered mail upon

Respondent on or about October 6, 1972.

6

2. (a) Slant/Fin Corporation, herein called Slant/

Fin, is, and has been at all times material herein, a cor-

poration duly organized under, and existing by virtue of,

the laws of the State of New York.

(b) At all times material herein, Slant/Fin has

maintained its principal office and place of business at

100 Forest Drive at East Hilis in the Town of Greenvale,

State of New York, where it is, and has been at all times

material herein, engaged in the manufacture, sale and

distribution of heating, ventilating and air-conditioning

units, and related products.

(c) During the past year, which period is represen-

tative of its annual operations generally, Slant/Fin, in

the course and conduct of its business operations, manu-

factured, sold and distributed at its place of business,

products valued in excess of $50,000, of which products

valued in excess of $50,000 were shipped from said place

of business in interstate commerce directly to states of

the United States other than the state in which it is

located.

(d) Slant, Fin is, and has been at all times material

herein, a person engaged in commerce and in an industry

affecting commerce within the meaning of Sections 2(1),

(6) and (7), and 8(b) (4) of the Act.

3. (a) Austin is, and has been at all times material

herein, a corporation duly organized under, and existing

by virtue of, the laws of the State of Ohio.

(b) At all times material herein, Austin has main-

tained its principal office and place of business at 450

West First Avenue, in the City of Roselle, State of New

Jersey. It is, and has been at all times material herein,

engaged in the business of providing and performing en-

gineering and generel contracting services and related

services at various building and construction jobsites in

various states of the United States, including the states

of New Jersey and New York.

(ec) During the past year, which period is repre-

sentative of its annual operations generally, Austin, in

the course and conduct of its business, purchased and

caused to be transported and delivered, inter alia, to its

place of business, in Roselle, New Jersey, and to various

7

building and construction jobsites in the State of New

York, building supplies and other goods and materials

valued in excess of $50,000, of which goods and materials

valued in excess of $50,000 were transported and deliv-

ered to its place of business and to said jobsites in inter-

state commerce directly from states of the United States

other than the states in which said place of business and

jobsites are located.

(d) Austin is, °nd has been at all times material

herein, a person enga, . in commerce and in an industry

affecting commerce within the meaning of Sections 2(1),

(6) and (7) and 8(b) (4) of the Act.

4. (a) Hudik-Ross Co., Inc., herein called Hudik-Ross,

is, and has been at all times material herein, a corpora-

tion duly organized under, and existing by virtue of, the

laws of the State of New York.

(b) At all times material herein, Hudik-Ross has

maintained its principal office and place of business at

251 West 42nd Street, in the City of New York, State

of New York. It is, and has been at all times material

herein, engaged in the business of providing and perform-

ing heat, ventilation and air-conditioning contracting

services and related services at various building and con-

struction jobsites in the State of New York.

(ec) During the past year, which period is repre-

sentative of its annual operations generally, Hudik-Ross,

in the course and conduct of its business, purchased and

caused to be transported and delivered to its place of

business, and to various building and construction job-

sites in New York State, heating, ventilating and air

conditioning supplies, and other goods and materials

valued in excess of $50,000, of which goods and materials

valued in excess of $50,000 were transported and deliv-

ered to said place of business and to said jobsites in

interstate commerce directly from states of the United

States other than the state in which said place of busi-

ness and jobsites are located.

(d) Hudick-Ross is, and has been at all times ma-

terial herein, a person engaged in commerce and in an

industry affecting commerce within the meaning of Sec-

tions 2(1), (6) and (7) and 8(b) (4) of the Act.

8

5. Respondent is, and has been at all times material

herein, a labor organization within the meaning of Sec-

tion 2(5) of the Act.

6. William Daley is, and has been at all times ma-

terial herein, the business agent of Respondent, acting

on its behalf, and as agent thereof.

7. (a) At all times material herein, Austin has been

the engineer and general contractor for the construction

of the Norwegian Home for the Aged located at 1250

67th Street, Brooklyn, New York, herein called the Nor-

wegian Home jobsite.

(b) At all times material herein, Austin, in its

capacity of engineer, prepared the engineering job spe-

cifications for the construction of the Norwegian Home.

The said job specifications, prepared by Austin, require

the installation of heating and air-conditioning units at

the Norwegian Home jobsite known as climate command

units, which units are manufactured by Slant/Fin. Said

job specifications further require that the main water

flow and condensate assembly for the above mentioned

units shall be factory installed as an integral part of

said units manufactured by Slant/ Fin.

(ce) Pursuant to an agreement with Slant/Fin, and

in accordance with the Norwegian Home job specifications

described in subparagraph (b) above, Austin has, at all

times material herein, purchased from Slant, Fin and

caused to be delivered to the Norwegian Home jobsite,

climate command heating and air-conditioning units to

be installed at said Norwegian Home jobsite.

8. In or around Apri! 1972, Austin subcontracted to

Hudik-Ross the heating, ventilation and air-conditioning

work to be performed at the Norwegian Home jobsite,

including the installation of the climate command heat-

ing and air-conditioning units with factory installed main

water flow and condensate assemblies, manufactured by

Slant Fin.

9, At all times material herein, Hudik-Ross and Re-

spondent have been parties to a collective bargaining

agreement covering employees of Hudik-Ross and Hudik-

Ross has employed individuals at its various building

and construction jobsites, including the Norwegian Home

9

jobsite, who are members of, or are represented by, Re-

spondent.

10. At no time material herein have Slant/Fin and

Respondent been parties to a collective bargaining agree-

ment and the employees of Slant/Fin are not members

of, or represented by, Respondent.

11. At all times material herein, Respondent has been

engaged in a labor dispute with Slant/Fin because Slant/

Fin is not a party to a collective bargaining agreement

with Respondent and does not employ individuals who are

members of, or represented by, Respondent, and because

the main water flow and condensate assemblies for the

command control heating and air-conditioning units man-

ufactured by Slant/Fin for Austin, to be installed at the

Norwegian Home jobsite, have been factory installed by

employees of Slant/Fin who are not members of, or

represented by, Respondent, and have not been installed

at said jobsite by employees of Hudik-Ross, who are

members of, or represented by, Respondent.

12. (a) On or about June 22, 1972, and on various

other dates presently unknown during the months of

July, August and September 1972, Respondent, by Wil-

liam Daley, its business agent at the Norwegian Home

jobsite, in furtherance of its dispute with Slant/Fin, as

described above in paragraph 11, threatened Austin that

it would refuse to permit its members employed by

Hudik-Ross at the Norwegian Home jobsite, to handle,

work on or install the climate command heating and

air-conditioning units manufactured by Slant/Fin and

scheduled to be installed at the Norwegian Home jobsite.

(b) On or about September 21, 1972, and on vari-

ous other dates presently unknown during the months of

September and October 1972, Respondent, by William

Daley, its business agent, in furtherance of its dispute

with Slant/Fin, as described above in paragraph 11,

threatened Hudik-Ross that it would refuse to permit its

members employed by Hudik-Ross at the Norwegian

Home jobsite, to handle, work on or install the climate

command heating and air conditioning units manufac-

tured by Slant/Fin and scheduled to be installed at the

Norwegian Home jobsite.

10

13. Since on or about September 15, 1972, Respond-

ent, in furtherance of its dispute with Slant/Fin as de-

scribed above in paragraph 11, has engaged in a strike

among individuals employed by Hudik-Ross at the Nor-

wegian Home jobsite, and has caused such individuals

employed by Hudik-Ross at the Norwegian Home jobsite

to refuse to work on, install, or otherwise handle the

climate command heating and air-conditioning units

manufactured by Slant, Fin and scheduled to be installed

at the Norwegian Home jobsite.

14. Since on or about September 15, 1972, Respondent

has engaged in a strike, as described above in paragraph

13, and by such conduct and by other means including

requests, appeals, orders and instructions, Respondent

induced and encouraged individuals employed by Hudik-

Ross, and other persons engaged in commerce and in

industries affecting commerce, to engage in a strike and

a refusal] in the course of their employment to use, manu-

facture, process, transport and otherwise handle and

work on goods, articles, materials and commodities, and

to perform services for their respective employers.

15. By the conduct described above in paragraphs 12,

13 and 14, Respondent threatened, coerced and restrained

Hudik-Ross, Austin, and other persons engaged in com-

merce and in industries affecting commerce.

16. Respondent engaged in the conduct described above

in paragraphs 12 through 15, in furtherance of its dis-

pute with Slant/ Fin, as described above in paragraph 11,

and with an object or objects: (a) to force and require

Hudik-Ross, and other persons, to cease using, handling,

transporting, and otherwise dealing in climate command

heating and air-conditioning units with factory installed

main water flow and condensate assemblies or other re-

lated units or products manufactured by Slant/Fin, not-

withstanding that Hudik-Ross was required to install

said climate command heating and air-conditioning units

at the Norwegian Home jobsite pursuant to the terms of

its contract with Austin, as described above in paragraph

&; ‘b) to force and require Hudik-Ross and other per-

sons, to cease doing business with Austin, Slant/Fin and

other persons; and (c) to force and require Austin and

11

other persons to cease using, handling, transporting or

otherwise dealing in the products of Slant, Fin, and other

producers or manufacturers, and to cease doing business

with Slant/Fin and other persons.

17. By the acts described above in paragraphs 12

through 15, and by each of said acts, for the objects de-

scribed above in paragraph 16, Respondent engaged in,

and is engaging in, unfair labor practices affecting com-

merce within the meaning of Section 8(b) (4) (i) and

(ii) (B) and Section 2‘6) and (7) of the Act.

18. The acts of Respondent described above in para-

graphs 12 through 16, occurring in connection with the

operations of Slant, Fin, Austin and Hudik-Ross, de-

scribed above in paragraphs 2, 3 and 4, respectively,

have a close, intimate and substantial relation to trade,

traffic and commerce among the several states and tend

to lend to labor disputes burdening and obstructing

commerce and the free flow of commerce.

PLEASE TAKE NOTICE that on the 8th day of No-

vember, 1972 at 11:00 a.m. at 16 Court Street, fourth

floor, in the Borough of Brooklyn, City and State of

New York, a hearing will be conducted before a duly

designated Administrative Law Judge of the National

Labor Relations Board on the allegations set forth in the

above Complaint, at which time and place you will have

the right to appear in person, or otherwise, and give

testimony. Form NLRB-4668, Statement of Standard Pro-

cedures In Formal Hearings Held Before The National

Labor Relations Board In Unfair Labor Practice Cases,

is attached.

YOU ARE FURTHER NOTIFIED that, pursuant to

Sections 102.20 and 102.21 of the Board’s Rules and

Regulations, the Respondent shall file with the under-

signed Regional Director, acting in this matter as agent

of the Natioinal Labor Relations Board, an original and

four (4) copies of an answer to the said Complaint

within ten (10) days from the service thereof, and that

unless it does so, all of the al'egations in the Complaint

shall be deemed to be admitted by it to be true and may

be so found by the Board.

Dated at Brooklyn, New York, this 26th day of Octo-

ber, 1972.

12

/s/ Samuel M. Kaynard

SAMUEL M. KAYNARD

Regional Director, Region 29

National Labor Relations Board

16 Court Street, Brooklyn, New

York 11241

13

UNITED STATES OF AMERICA

BEFORE THE

NATIONAL LABOR RELATIONS BOARD

Case No. 29-CC-336

ENTERPRISE ASSOCIATION OF STEAM, HoT WATER, Hy-

DRAULIC SPRINKLER, PNEUMATIC TUBE, ICE MACHINE

AND GENERAL PIPEFITTERS OF NEW YORK AND VI-

CINITY, LOCAL UNION No. 638 OF THE UNITED ASSO-

CIATION OF JOURNEYMEN AND APPRENTICES OF THE

PLUMBING AND PIPEFITTING INDUSTRY OF THE UNITED

STATES AND CANADA, AFL-CIO

and

THE AUSTIN COMPANY, INC.

ANSWER

ENTERPRISE ASSOCIATION, etc., the Respondent

herein, answers the Complaint in the within case as

follows:

1. Admits the allegations contained in paragraphs

1, 2(a), 2(b), 2(c), 2/d), 3fa), 3(b), 3(e), 3(d), 4(a),

4(b), 4(c), 4(d), 5, 6, 7(a), 9 and 10 of the Complaint.

2. States that it is without knowledge or information

sufficient to form a belief as to the truth of the allega-

tions contained in paragraphs 7(b), 7(c) and 8 of the

Complaint.

3. Denies the allegations contained in paragraphs 11,

12(a), 12(b), 13, 14, 15, 16, 17 and 18 of the Com-

plaint.

14

Dated: New York, N. Y.

TO:

November 9, 1972.

DELSON & GORDON

By /s/ Ernest Fleischman

ERNEST FLEISCHMAN

Attorneys for Respondent Union

230 Park Avenue

New York, N. Y. 10017

Samuel M. Kaynard, Esq.

Regional Director

Region 29

National Labor Relations Board

16 Court Street

Brooklyn, N. Y.

The Austin Company, Inc.

450 West First Avenue

City of Roselle

New Jersev

15

BEFORE THE

NATIONAL LABOR RELATIONS BOARD

Second Region

Case No. 29-CC-336

In the Matter of:

ENTERPRISE ASSOCIATION OF STEAM, Hot WATER, Hy-

DRAULIC SPRINKLER, PNEUMATIC TUBE, ICE MACHINE

AND GENERAL PIPEFITTERS OF NEW YORK AND VI-

CINITY, LOCAL UNION No. 638 OF THE PLUMBING &

PIPEFITTING INDUSTRY OF THE UNITED STATES AND

CANADA, AFL-CIO,

AND

THE AUSTIN COMPANY, INCc., Charging Party.

16 Court Street

Brooklyn, New York

November 15, 1972

BEFORE:

RAMEY DONOVAN, Administrative Law Judge

Appearances:

HOWARD EDELMAN, ESQ.

Counsel for the General Counsel

DELSON & GORDON, ESQS.

230 Park Avenue

New York, New York

Appearing on behalf of the Respondent

BY: ERNEST FLEISCHMAN, ESQ., of Counsel

16

[3] PROCEEDINGS

JUDGE DONOVAN: The hearing will be in order.

This is a formal hearing in the matter of the Enter-

prise Association of Steam, Hot Water, Hydraulic

Sprinkler, Pneumatic Tube, Ice Machine and General

Pipefitters of New York and vicinity, Local Union Num-

ber 638 of the United Association of the Plumbing &

Pipefitting Industry of the United States and Canada,

AFL-CIO, and the Austin Company, Inc., Case No. 29-

CC-0336.

Mr. Edelman, you may proceed.

MR. EDELMAN: Your Honor, this matter was tried

in a 10L proceeding before Judge Bruchhausen on No-

vember 2, 1972.

The facts brought out in the trial of that case [4]

would be the facts that would be brought out in the

trial of this complaint.

There were no issues of credibility with respect to

the 10L proceeding, and there are no issues of credi-

bility with respect to this case.

The facts really are not in dispute.

That being the case, your Honor, General Counsel

would like to propose that the record in the 10L proceed-

ing constitute the record in this proceeding, and that

would include—well, the record is from page 1 to page

142.

The particular case is Kaynard versus Enterprise,

Local 638, 72 Civil 1339.

The exhibits in connection with that case would be

part of the record.

Those exhibits would be Petitioner’s Exhibits 1

through 11 and Respondent’s Exhibit B.

* * * *

‘7! JUDGE DONOVAN: Now, Mr. Fleischman, do

you join in the proposed stipulation of Mr. Edelman

with respect to Exhibit 2, the transcript in the District

Court proceeding as constituting the record in this case?

MR. FLEISCHMAN: I do.

JUDGE DONOVAN: All right.

17

I’ll receive General Counsel’s Exhibit 2 into evidence,

which includes the transcript of testimony and the ex-

hibits referred to therein.

(Document referred to marked General Counsei’s

Exhibit 2 in evidence.)

& * * *

18

UNITED STATES DISTRICT COURT

EASTERN DISTRICT OF NEW YORK

72-C-1339

SAMUEL KAYNARD, REGIONAL DIRECTOR OF REGION 29

OF THE NATIONAL LABOR RELATIONS BOARD, for and

on behalf of the NATIONAL LABOR RELATIONS BOARD,

PETITIONER,

—against—

ENTERPRISE ASSOCIATION OF STEAM, Hot WATER, Hy-

DRAULIC SPRINKLER, PNEUMATIC TUBE, ICE MACHINE

AND GENERAL PIPEFITTERS OF NEW YORK AND VI-

CINITY, LOCAL UNION No. 638 OF THE UNITED Asso-

CIATION OF JOURNEYMEN AND APPRENTICES OF THE

PLUMBING AND PIPEFITTING INDUSTRY OF THE UNITED

STATES AND CANADA, AFL-CIO, RESPONDENT.

United States Courthouse

Brooklyn, New York

November 2, 1972

10:30 o’clock A.M.

Before:

HONORABLE WALTER BRUCHHAUSEN,

U.S.D.J.

EMANUEL KARR

Official Court Reporter

'2| Appearances:

NATIONAL LABOR RELATIONS BOARD,

Attorney for Petitioner

BY: HOWARD EDELMAN, ESQ., of Counsel.

MESSRS. DELSON & GORDON,

Attorneys for Local 638

BY: ERNEST FLEISHMAN, ESQ., of Counsel.

* * + *

19

[26] MR. EDELMAN: Your Honor, the petitioner

will call as its first witness Robert Grand.

ROBERT S. GRAND, called as a witness on behalf of

the petitioner, having been duly sworn by His Honor,

Judge Bruchhausen, testified as follows:

Direct examination by Mr. Edelman:

Q Mr. Grand, are you employed by The Austin Com-

pany?

A Yes I am.

Q What is your position?

A District superintendent.

Q How long have you been employed by Austin?

A Going on thirty-nine years.

Q How long have you held the position of District

superintendent?

A Going on twenty-eight years.

Q Will you describe for us your job, which would

include the duties that you carry out.

[27] A _ Yes.

I plan the project, I schedule the project, I assign

the Austin key personnel to the project, I remove them

from the project at the proper times; I visit the project

on a regular basis, discussing with the superintendent

regarding the problems that come up regarding the

progress of the work, I conduct and arrange for meet-

ings between Austin personnel and subcontractors on

the project in order to tie in the work of the various

people.

THE COURT: Let me just come back a ways.

What position is Austin in, what do they do?

MR. EDELMAN: They are the general contractors,

they are building it and they are also the engineer, they

design it.

THE COURT: I see.

A (continuing) And finally I see to it that the job

is properly completed and turned over to the union.

Q In your capacity as district manager or district

superintendent, do you supervise more than one project

at a time?

A Yes I do.

20

Q Have you been supervising, among other projects,

the construction of the Norwegian Home?

A Yes.

[28] Q In connection with the Norwegian Home job,

can you describe in general the duties of The Austin

Company in connection with its capacity as general con-

tractor of the job.

A The duties of The Austin Company are actually

passed on through me as the head of construction, with

duties similar to what I have stated, plus the prepara-

tion of the drawings and the specifications which are

put out for bids.

Q Well, let me ask you, what does Austin actually

do in connection with the job, do they contact any of the

operations on the job itself?

A Yes. We bill the complete project, and as such we

ourselves are employers of labor, carpenters, bricklayers,

cement finishers, ironworkers and operating engineers.

We sub-contract electrical and mechanical trades, the

mechanical trades including plumbing, the sprinkler

work, the heat, ventilation and air conditioning. We

also sublet specialties such as the asbestos tile flooring,

ceiling work, carpeting and various things similar to

that.

Q You have already indicated that Austin has drawn

up the plans and specifications for this job.

A Yes.

(29; Q Can you tell me what the plans and specifica-

tions for a job include, describe them so that a reader of

the record might get a visual picture of them.

A Yes.

The Austin Company is responsible for the design of

the complete project. In doing this they prepare draw-

ings and specifications for all of the various subcon-

tractors, plus the specifications necessary for the pur-

chase of material. The drawings are quite elaborate on

a project such as this. I haven’t counted them, but it

could consist of forty or fifty drawings, specifications

could consist of two hundred pages of material, the par-

ticular specifications for the HVAC—

21

Q Excuse me, HVAC, what would that mean?

A Heating, ventilation, and air conditioning.

HVAC, for example, is basically a 65 page specifica-

tion and it does call for supplements to those specifica-

tions for items of equipment purchased by others which

will be incorporated to the work by the heating, ven-

tilating and air conditioning subcontractor, and those

pages might add twenty or so pages to the work in

question.

Q With respect to the HVAC specifications, was there

a section of those specifications which related specifically

to room heating and air conditioning units?

A There is a reference in the basic heating, venti-

lating {30] and air conditioning specifications which

refer to another specification as part of the contract of

work to be performed by this contractor, although pur-

chased by others, and there were the specifications cover-

ing the Slant/Fin units.

Q In other words, part of the engineering specifica-

tions drawn up by Austin covered specifically the Slant,

Fin units.

A Yes, sir.

MR. EDELMAN: I would like to have this document

marked as petitioner’s exhibit 1 for identification.

THE CLERK: Five page document headed, Specifica-

tion 202 for room heating and air conditioning units for

the Norwegian Christian Home Health Facility is marked

for identification petitioner’s exhibit number one.

So marked.

BY MR. EDELMAN:

Q Mr. Grand, I show you exhibit one for identifica-

tion and ask you if you have ever seen it before and do

you recognize it?

A Yes, I think these are the specifications drawn up

by the Austin engineering department for the purchase

of these units and for shipment to the heating, ventila-

tion and air- {31]| conditioning contractor as part of his

work, namely, the installation of these units.

22

Q In other words, this would cover the type of units

to be used on the job and how it is to be installed and

the specifications that the units shall cover?

A Yes, sir. 4 " 3

THE CLERK: Document marked for identification

plaintiff's exhibit one now received in evidence.

BY MR. EDELMAN:

Q Mr. Grand, I would ask you if you were to read

aloud the first paragraph in the specifications.

A It reads:

“furnish at the job site Slant/Fin Climate [32] Com-

mand Air Conditioners. The unit shall be complete with

cabinet, filters, cooling chassis, heating coil, fans, main

water flow and condensate assembly, controls, vent door,

outdoor air plenun and outdoor air grille.”

Q Now, turn to the third page of the exhibit, as part

of the specifications which relate to the main water flow

and condensate assembly, I would ask you if you would

read that section, please.

A The part reads:

“the main water flow and condensate assembly shall

be factory installed as an integral part of the unit by

the manufacturer. The assembly shall be of copper con-

struction tested to 150 psi leakage. Two shut off valves

shall be provided to isolate the cooling chassis from the

main line water supply for servicing. An automatic

three-way valve shal! be incorporated in this assembly to

respond to the contro] panel’s demand for cooling or

heating. It will be directing water flow either through

the water cooled condenser of the cooling chassis or to

the hot water coil mounted in the lower part of the

cabinet.”’

THE COURT: Do I take it that not only does the

Slant/Fin manufacture but the specifications call for

them to install, too: is that it?

MR. EDELMAN: In other words the specifications

[33] set forth the particular type of units to be used,

the model number, full and in detail, and the specifica-

tions further provide that the internal piping of main

23

water through the condensate assembly shall be piped

and connected by employees of Slant/Fin.

THE COURT: I see.

{837} Q Is Austin performing the HVAC work on the

job?

A The Austin Company has subcontracted the HVAC

work—

THE COURT: He is asking whether the company

itself, I think counsel is not asking at the moment about

the subcontractor.

A The Austin Company is not performing the work

of the subcontractor.

[38] Q Was this work subcontracted?

A Yes it was.

Q And to whom was it subcontracted?

A To the Hudik-Ross Company, Inc.

Q Was there a written subcontract executed between

Austin and Hudik-Ross?

A Yes, there was.

Q Were employees of Hudik-Ross members of this

Union?

A Yes, as I understand it.

MR. EDELMAN: I would like to have this document

marked as Petitioner’s Exhibit 2.

THE CLERK: Six-page document headed the Aus-

tin Company, Lump Sum Sub-Contract, marked for iden-

tification as Plaintiff’s Exhibit 2.

MR. EDELMAN: Is it correct that Hudik-Ross em-

ployees were members of Local 638, Mr. Fleishman?

MR. FLEISHMAN: Yes. That is correct. They were

members oi Local 638.

* * * -_

THE CLERK: Purchase order from the Austin [39]

Company dated January 14, 1972, marked for identifica-

tion as Plaintiff’s Exhibit 3.

+ * * o

THE CLERK: Two-page letter from Slant/Fin to

Mr. Walter Bogucki, dated January 19, 1972, marked

for identification as Plaintiff’s Exhibit number 4.

24

[40] Q Is it your statement that the three docu-

ments that you have, Exhibits 2, 3 and 4, constitute a

subcontract between the Austin Company and Hudik-

Ross?

A Yes, sir.

+ 7 eo o

(42) Q All right.

Mr. Grand, in connection with the sub-contract, was

it Hudik’s responsibility to purchase the required unit?

A It was not.

Q And who purchased the required units?

A The Austin Company.

* aa * o

[43} Q Mr. Grand, I show you Petitioner’s Exhibit

marked for identification number 5 and ask you if you

recognize it?

A I do recognize it but—

Q@ Can you tell me what that is?

A That this is a change order to the original order,

which is attached, and really should be marked as a

separate exhibit because that precludes the other one

(indicating).

This (indicating), the original purchase order, that

is the original purchase order, the other one (indicat-

ing) is a change to that purchase order.

Q Would it be fair to say that the second page of

ine Exhibit is the purchase order?

A That is correct.

Q And that the first page is an amendment to the

purchase order?

A Correct.

Q And that the third page is also part of the [44]

original purchase order?

* * a o

THE CLERK: Document marked for identification

as Plaintiff’s Exhibit 5, now received in evidence.

* * > *

Q With respect to the Slant/Fin unit and in con-

nection with the sub-contract between Austin and Hudik,

what was Hudik’s responsibility concerning the unit?

25

A Hudik should receive, unload, new to place of in-

stallation, install and pipe to it and try it.

Q In other words, connect up the unit so that it

was operable?

A Correct.

Q Basically then, would you say its job was one of

installation?

A Yes, sir.

Q By the way, how did Hudik come about being

awarded the sub-contract?

[45] A By competitive bidding.

MR. EDELMAN: Id like to have this document

marked as Petitioner’s Exhibit 6.

THE CLERK: Installation instructions marked for

identification as Exhibit number 6.

* * * *

Q Mr. Grand, have you ever seen Petitioner’s Ex-

hibit marked for identification 6?

A Yes, I have.

Q Can you tell me what that is?

A It is prepared by Slant/Fin and submitted to the

Austin Company giving a general description of the

unit, of their units furnished.

Q_ Is it the Slant/Fin climate command unit?

A Yes, it is.

Q Are those the units that were used on the job?

A Yes.

Q_ I see.

The accompanying diagram, is that a diagram of the

unit used on the job?

A Yes, sir.

Q With all the installation instructions?

A Correct.

(46] Q Would the main water flow and condensate

assembly be set forth on that diagram?

A The piping shown, it is not diagramed to say—

it does show the gate valves, it does show the couplings,

it does show the control.

Q In other words, there are certain pipes—

26

A The pipes that are visible are the water and con-

densate connections.

* * * *

THE CLERK: Diagram marked for identification as

Petitioner’s Exhibit 6, now received in evidence.

me * _ *

[47] Q Now, referring to that document, you indi-

cated that there was certain piping that was part of the

main water flow and condensate assembly that was rep-

resented on the diagram at page 3; is that correct, sir?

A Yes, sir.

MR. EDELMAN: Your Honor, I wonder if we can

mark off that piping that represents part of the main

work flow and condensate assembly so it may be re-

ferred to and be referred to it by myself.

THE COURT: You may do it.

Q Mr. Grand, would you circle the area that rep-

resents the main water flow and condensate assembly

piping?

A All right.

(The witness encircled the point indicated,)

MR. EDELMAN: May the record indicate that the

diagram on page 3, the top diagram on page 3 has been

circled twice in red ink by Mr. Grand as the areas

which indicate the piping which is a part of the main

water flow and [48] condensate assembly.

* * * *

Q I say did there come a time when the Slant, Fin

units were delivered to the Norwegian job site?

A Yes, sir.

Q And when did that take place, on or about?

[49] A On or about the middle of June.

Q That would be 1972, I assume?

A 1972.

Q What was the purpose of these units?

A These units provided the heating and cooling of

a majority of the rooms in the building, the rooms

occupied or to be occupied by the residents of the build-

ing.

* * * *

27

Q Is there a unit in each room?

A There is a unit in each of the rooms that I

described.

[50] Q In connection with the Norwegian job site,

does Austin employ members of the steamfitting trade?

A No, we do not.

Q Does Austin have any contact with Local 638 or

any other steamfitting labor organization?

A The Austin Company does have a national agree-

ment with UAS, of which Local 638 is a part, but this

is not for this type of work.

Q What type of work is it for?

A It is mainly process installation.

Q What is process installation?

A Process as differs from comfort, heating of a build-

ing, cooling of a building is all part of comfort work;

processing involves machinery and equipment feeding

any kind of gases, water, steam or anything else.

Q Was there any contract with Local 638 to per-

form any of the work, did Austin have a contract with

Local 638 to perform any work on the Norweigan job?

A We had no contract with Local 638.

[52] CROSS EXAMINATION

BY MR. FLEISHMAN:

Q When Hudik-Ross bid on this job, the specifica-

tions were made available to Hudik-Ross?

A Yes, sir.

Q And the specifications called for Slant/Fin units?

A Yes, sir.

Q So Hudik-Ross knew that as part of the heating

maintenance and air conditioning work, if the contract

was awarded to it, it would have to install Slant/Fin

climate control units?

A Yes, sir.

Q And this matter of the Slant/Fin unit wasn’t

brought to Hudik-Ross’ attention after the contract was

awarded to it; am I correct?

28

They knew about it before they got the job that this

was part of the work they were going to do?

[53] A Yes, sir.

Q Now they also had the specifications given to them

which related to the Slant/Fin units?

A Yes, sir.

Q And are these (indicating) the specifications?

I show you Plaintiff's Exhibit number 1.

A These are the specifications covering the Slant,

Fin units.

Q And these specifications were drawn by Austin?

A Austin Engineering.

Q Now, in the specifications there are certain words,

sentences, which are underlined.

Were they in the original specifications?

A They were not.

Q They were not?

A The underlining, the words were in the specifica-

tions, the underlining was not.

* * * =

[54] Q Now I call your attention to page 201-3 of

Petitioner’s Exhibit 1 in evidence and ask you, does that

relate to the work in dispute at this time?

A Would you repeat that, what part of it are you

asking me about?

Q The parts that are underlined.

A It does relate to the dispute in question as it has

been shown to me.

THE COURT: This was Exhibit 1?

MR. FLEISHMAN: That is correct, page 201-3.

Q And that states that this work is to be factory

installed?

A Correct.

[55] Q This was part of the specifications on which

Hudik-Ross bid on this particular job?

A Yes.

Q And the job was awarded to Hudik-Ross in Jan-

uary 1972?

A Correct.

29

[58] Q Mr. Grand, I show you Respondent’s A for

identification, and in general terms what would you call

it?

[59] A A bulletin put out by Slant/Fin showing their

climate command self-contained heating and cooling unit.

* * * *”

{60} Q I ask you to turn to page 3 of Respondent’s

Exhibit A for identification and to turn to page 3 of

Petitioner’s Exhibit 6 in evidence and cumpare the two

and tell me whether they refer to the same unit.

A They don’t appear to me to talk about the same

unit.

Q Will you read me the numbers of the models as

set forth in Petitioner’s Exhibit 6?

A The WC6, WC9, WC12 and WC16.

eo * * *

Mr. Grand, I ask you to look at Petitioner’s—

Respondent’s Exhibit A, on page 3, and they have the

model numbers there.

Can you read the model numbers which this brochure

{61] covers?

A The model numbers are WC6. WC9, WC12 and

WCl16.

Q And those are exactly the same numbers that ap-

pear on Petitioner’s Exhibit 6?

A That is correct.

* * * *

Q Mr. Grand, I ask you to look at page 4 of Re-

spondent’s Exhibit for identification and read it, Re-

spondent’s Exhibit A, and read the last paragraph on

that page.

A It reads:

“Monoflo tees by-pass and three-way valves shown are

an integral part of each unit and are factory-installed

within the cabinet.”

Q Did you leave out a word there?

A_ I don’t believe so.

Q What is the first word in that paragraph?

A “Note.”

30

Q I don’t think you read that.

A Well—

Q Now, this was called to the attention of people,

wasn’t it, wasn’t it, this is something special?

A Yes.

{63} MR. EDELMAN: Your Honor, I am going to

object to this whole line of questioning, there is nothing

in the complaint that specifies, and [64] as a matter of

fact we concede that the steamfitters have performed

other work in connection with their subcontract except

the work related to the Slant Fin units.

-_ * * *

Q Let us clarify this one point.

The Austin Company has a contract with the In-

ternational Union?

A Yes, sir.

Q But it doesn’t cover this type of work?

A No, sir.

Q So that in effect the Austin Company has no ~!

lective bargaining agreement with this or any other

steamfitting union covering this type of heating, ventilat-

ing and [65] air conditioning?

A Correct.

& e a &

Q Directing your attention to Petitioner’s Exhibit 1,

page 3, and the paragraph referring to the main water

flow and condensate assembly which has been underlined,

you say the original specifications did not contain that

underlining; is that correct?

A Correct.

Q Other than that, that is an exact photocopy of the

original specifications?

A Yes, sir.

Q. Do you know who underlined that particular sec-

tion?

A I did.

e * + a

[66] Q And in what connection did you underline it?

A In connection with this dispute now.

eal

31

Q In other words, to point out the places that are

in dispute. : . ,

[72] PETER PLATH, called as a witness, having heen

first duly sworn by the Clerk of Court, testified as

follows:

DIRECT EXAMINATION

BY MR. EDELMAN:

Mr. Plath, are you current employed?

Yes.

And your employer’s name?

The Austin Company.

How long have you been employed by Austin?

Since 1959 with the exception of two years in the

What is your present position with Austin?

Project superintendent.

Are you connected with the Norwegian job?

Yes. ; :

What is your position in connection with this job?

Project superintendent.

73] Q Have you been project superintendent from

the inception of this project?

A Yes.

Q When was that?

A Late September in 1971.

Q Can you describe for us your duties as a project

superintendent in this job?

A To direct Austin employees on the job, coordinate

activity of sub-contractors and assure that the job is

done according to plans and specifications.

Q In connection with your authority and duties, do

you have authority to hire and fire employees if need be?

Yes.

Are you a member of Local 638?

No.

Are you a member of any labor organization?

No.

be]

Zro po>oOs pOrore

> OPO Pp

32

Q Did there come a time in connection with your

job as the superintendent of the job when the Slant Fin

units arrived at the job site?

A Yes.

Q When did this take place?

A They came in two shipments, one on the 14th of

June, 72, and the second shipment was on the 21st of

June, ’72.

(74) Q How many units in total were on both ship-

ments?

A In total it was 114.

Q_ Individual units?

A Yes,

Q Identical units?

A Not identical. I believe there are three or four

different types.

Q Did they all contain the same prepiped water main

flow and condensate assembly?

A Yes.

Q I direct your attention to the latter part of June,

say the last week in June, and I ask you if you can

recall having a conversation during this period with a

Mr. William Daly.

A Yes.

Q Can you tell me who Mr. William Daly is?

A The business agent of the Steamfitters local in

New York City.

Q Have you ever had any dealings with Mr. Daly

before this conversation?

A No. I had met him before, but that was it.

Q Were you informed that he was a representative

or an agent or delegate of Local 638 on those occasions?

(75; A Yes,

* * * *

Q You indicated that you had a conversation with

Mr. Daly.

Can you teil me where the conversation took place?

A On the job site outside of the building.

Q As closely as you can, when did this conversation

take place?

A The 22nd of June.

33

On or about the 22nd of June?

Yes.

Morning or afternoon?

Shortly before noontime.

Can you describe the conversation that took place?

[76] A He stated that his men would not install the

Slant Fin units as the piping inside those units was

steamfitter’s work.

Q Do you know George Zimmerman?

A Steamfitter foreman for Hudik-Ross.

* * * *

Q Do you have any—do you know whether he is a

member of any labor organization?

A_I believe he is a member of the Steamfitters Union

of New York City.

OPO PO

Q Would that be Local 638?

A Yes. .

Q You said he is employed by Hudik-Ross’

A Yes.

Q Is he on the job site, the Norwegian Home?

A Yes.

Q Does he work there every day?

A Yes.

Q In connection with the Slant Fin units, do you

recall having any conversations at any time with (77)

Mr. Zimmerman?

A Yes.

Q Was it one conversation or more?

A It was almost on a regular basis.

Q When you say “regular basis,” how regular, daily,

weekly, monthly?

A At times daily, at other times twice a week, other

times weekly.

Q Over what period of time did you have these

conversations?

A In about the end of June to the present time,

with the exception of the period while they were on

strike, which was between the first week of July to

August 7th. ;

Q Were these conversations that you had with Mr.

Zimmerman concerning the Slant Fin units, were they

similar conversations or did they widely differ?

34

A No, they were always the same.

Q Well, tell me as best you can, what the sum and

substance of these conversations were?

A I would ask the question when are you going to

start hooking up the Slant/Fin units, and the answer

in general would be, I haven’t got the go ahead from

the unit.

(78| Q As project engineer, would you know when

the unit should have been installed?

A As project superintendent.

Q I'm sorry, project superintendent.

A The original schedule called for installation to

start the first week in July and run over a period of

five to six weeks.

The fact that they did go on strike on the 1st of July,

they came back to work on August 7th. At that time

they should have started installing the Slant/Fin units.

Q Had there been no strike, the installation should

have taken place in July?

A Exactly.

Q But the strike intervened?

A Yes.

Q But was concluded in August?

A Right.

Q And you claim thereafter the installation should

have taken place?

A Yes.

* * * e

(79| Q Mr. Plath, I show you Petitioner’s Exhibit

marked No. 7 for Identification, and ask you if you ever

have seen that before.

A Yes.

Q Can you tell us what it is?

A It’s a schedule which indicates the progress of

the various major items on the job.

Q Who prepared it?

A I did.

Q Is there any reference on this schedule to Hudik-

Ross in connection with the Slant/Fin unit?

35

A Yes. On the second page under H.V.A.C., the item

marked “Permimeter radiation and fin units.”

Q That would be abbreviated “Per. rad. & fin units’”’”

A Right. . .

[80] Q Bearing in mind that the strike ended on

August 7th, when then should, based on this chart, when

then should the work have begun and when should the

work have been concluded?

A It should have started on the 7th of August and

continued for six weeks, which would bring us to the

last of the week of September 11th.

Q By the middle of September, the work would have

been concluded?

A That’s right.

* * * *

{82} Q Mr. Plath, I show you Petitioner’s Exhibit

marked for identification No. 8, and ask you if you have

ever seen that before?

A Yes.

Q Will you tell us what it is?

A It is the minutes of the meeting held on the 29th

of June, ’72.

Q Did you prepare those meeting minutes?

A Yes.

Q Is there any reference to the Slant/Fin units in

those minutes?

A Yes, on the third page, paragraph B.

Q Would you read that?

A “Slant/Fin units 114, by Austin. On-job hookup

of same being handled by F. Hudik. Steamfitters Union

[83] states they will not hook up same as they are pre-

assembled.”

Q On what—how did that statement come to be in

the minutes—

MR. FLEICHMAN: I object. But anyway, I will

stipulate that that was so.

36

(88] FRANK HUDIK, called as a witness, having been

first duly sworn by the Clerk of the Court, testified as

follows:

DIRECT EXAMINATION

BY MR. EDELMAN:

Q Mr. Hudik, are you connected with the corpora-

tion, Hudik-Ross?

A Yes, I am.

Q What is your connection with that corporation?

A Iam the president of that corporation.

Q What type of corporation is Hudik-Ross?

A Mechanical contracting company that does heat-

ing, ventilating and air-conditioning work.

Q Are you in any way connected with the Norwegian

Home for the Aged job?

A Yes,

Q And what is your connection?

A We are performing the mechanical contracting

work such as heating, ventilating and air-condition.

Q Is that under a sub-contract?

A Yes, with The Austin Company.

Q I show you Petitioner’s Exhibits 2, 3 and 4, and

ask you if you will look at them and tell me if you

ever have seen those before and if you have, tell me what

|89| they are.

A Sub-contract for the particular job known as the

Norwegian Christian Home for the Aged.

* * * *

Q How did you become to be awarded this sub

contract?

A We bid for the job and we were the low bidder.

(90; Q As part of your sub-contract with Austin,

were you required to install Slant. Fin climate control

units?

A Yes, we were.

Q In connection with this unit, what was the sum

and substance of the work you were required to per-

form?

37

A There were plans and specifications stipulated for

the job. The specifications stipulated that we were to

receive and install the Slant, Fin units in the building.

Q You are talking about the—is this your sub-

contract which required this?

A With The Austin Company, yes, to receive and in-

stall these units.

Q Were there also specifications, job specifications,

in connection with your work as H.V.A.C. contractor?

A Yes.

Q Did these job specifications also relate to the

Slant/Fin unit?

A Yes.

Q Did you look at the job specifications in this con-

nection?

{91} A When we did the job?

Q At any time.

A Yes.

Q And did the job specifications require Slant, Fin

units?

A The job specifications stipulated that somebody

else, The Austin Company, would furnish the units, the

Slant/Fin units to us for installation by us.

The specification so stipulated.

Q Do you recall the specification stipulating any-

thing concerning the main water flow and condensator?

A The specifications stipulated that the main water

flow and assembly was to be fabricated, installed and

pretested at the factory.

Q Did you have any authority to substitute any

other unit to replace the Slant/Fin unit?

A No.

Q Did you have authority to alter in any way the

job specifications for this job?

A No.

Q Did you have authority to take apart and re-

assemble the main water flow and condensate assembly

in the field?

A No.

[92] Q I show you Petitioner’s Exhibit 6, a diagram

of the Slant/Fin unit, and I ask you if you can identify

38

on that diagram on page 3, the visible parts of the main

water flow and condensate assembly.

A Basically as outlined in red with the addition of a

line running through the unit from the left-hand side of

the illustration to the right-hand side of the illustration.

Q Using again this diagram, as a guide, what would

be your job in connection with the installation of this

unit?

A To connect to an inlet on one side of the unit ex-

terior to the casing and connect to the opposite side of

the unit, exterior, to the casing.

Q Would it be a fair description to say that in the

room the unit was to be installed with two pipes, ap-

preximately in a space between the two pipes the width

of the unit and these pipes were to be connected to the

unit?

A That’s correct.

Q Can you mark on that diagram where the pipes

would be connected?

A Well, the other one because of the isometrics here.

MR. EDELMAN: Let the record show the [93] wit-

ness has indicated his answer by a black “X” on the

diagram.

Do you have a regular complement of employees?

Yes.

About how many in your complement?

Are you referring specifically to steamfitters?

I am referring specifically to steamfitters.

Anywhere between 10 and 20 steamfitters.

And that would depend on the number of jobs un-

der construction?

A That’s correct.

Q The size of the job?

A That’s right.

Q These steamfitters you have in your employ, are

they represented by any labor organization?

A Yes.

Q And that labor organization is what?

A Local 638.

Q Do you have a collective bargaining agreement with

Local 638?

A Yes, we do.

OPO PO PO

a

a

39

Q Is there a present collective bargaining agreement

with Local 638?

A Yes.

{194} Q Have you had a prior series of agreements of

collective bargaining with Local 638?

A Yes.

Mr. Hudik, I show you Petitioner’s Exhibit,

marked for identification, Nos. 9 and 10, and ask you to

look at them, and I ask you if you have seen them efore

and if you have, tell me exactly what they are.

A Exhibit No. 9 is the working agreement, a work-

ing [95] agreement that we had with the Enterprises

Association, Local Union 638. It is dated ’66 and then

’69. ’69 terminates.

Exhibit No. 10 is an interim agreement which we

signed with the Local 638 to allow us to work during a

period of June 30, 1972, to June 30, 1973.

Q Would the ’66—’69 agreement, is that incorporated

and part of your present agreement?

A Yes.

Q The addendum just modifies the working agree-

ment to bring up the wage schedules and other amend-

ments to date?

A Yes.

Q You had a similar amendment to the agreement

which expired in 1972?

Yes.

And when did the agreement expire in 1972?

In June.

Of 1972?

Yes.

Q I direct your attention to the working agreement,

specifically directing your attention to Rule 9 of the

working agreement, and I ask you to look it over.

A ° Yes, I am familiar with it.

[96] Q Is Rule 9, as it is contained in this exhibit,

in your present contract?

A Specifically?

Q Yes.

A I don’t know how to answer the question.

PO POP

40

We don’t get an additional contract, we get just amend-

ments and the amendments specifically spell out just the

changes in the contract.

Q Has the amendment changed Rule 9?

A No, it has not.

Q Did the prior amendment change Rule 9?

A No, it has not.

* * * *

Q Did there come a time when the Slant Fin units

arrived on the job site?

A Yes.

Q Do you recall approximately when they arrived?

A I thought they arrived in August but I was cor-

rected [97] and I know they arrived in June.

Of 1972?

Yes, 1972.

* * eo *

Who is Arthur Chersin?

Arthur Chersin is an employee of ours.

What is his position?

Project engineer.

And what was the conversation—

An estimator.

* * * *

POPOPO PO

I direct your attention to September 15th on or

about that time and ask if you had knowledge whether

the Slant /Fin units had been installed as of that date?

A They had not been installed as of that date.

[98] Q And should they have been installed as of that

date?

A They should have been started. The installation

of the Slant/Fin units should have been started in ac-

cordance with the progress of the job.

* * * *

[100] Q Mr. Hudik, * * * I direct your attention to

September 22nd, on or about that date, and ask if you

recall having a conversation with Mr. Daley at that

time?

A Yes, I co.

Q Where cid the conversation take place?

A It took place in a restaurant in New York.

41

What was the name of the restaurant?

Downey’s.

Can you tell us what the conversation was?

Mr. Daly and I were discussing the job and Mr.

Daly said that we were in violation of the contract,

the units received on the job were in violation of the

contract, [101] and that he could not allow us to install

the units as they existed on the job.

I told him that this was part and parcel of the plans

and specifications, and I had no choice in the matter,

but he insisted that we were in violation of Article 9,

and that he could not allow us to proceed.

Q Have the units been installed to date?

A No.

PO PO

CROSS-EXAMINATION

BY MR. FLEICHMAN:

o o * *

Q Were you the individual, Mr. Hudik, who checked

the plans and specifications on this job, prior to bidding

on the same?

A No.

Q Who did the estimating for you?

A Chersin.

Q Mr. Chersin?

A Yes.

[102} Q Did you bid the job personally?

A No.

Q You weren’t in charge of the bidding?

A That is a broad question.

Q Did you know what the job called for in the way

of heating, ventilation and air-conditioning?

A When we bid the job?

Q Yes.

A No.

Q When did you first find out about that you had

bid on the job?

A Just after the job was bid and we were told that

were [sic] were in the running.

42

Q Did you inquire as to what was called for in the

way of heating, ventilating and air-conditioning work?

A When? .

Q At anytime prior to the awarding of the job

to you.

A No.

Q And who was in charge of that?

A Mr. Chersin.

+ a & e

[104] Q Did you know whether there was any work

to be done there by the manufacturer at this factory

rather than at the job site, that is, piping, branch

piping, convectors, condensate assemblies, etc.?

A At what time are you asking me this?

Q Shortly after you obtained the contract.

[105] A _ I did know.

Q You did know?

A Of course I did.

Q But Mr. Chersin had read the specifications before

the contract was awarded to your company?

A I can’t tell you what Mr. Chersin did.

Q Who signed the bid letter? .

A I don’t recall.

Q How many men are in the administrative end

of your business?

A About 10.

Q And who signs the bid letters, usually?

A Usually the estimator signs the bid letters.

Q And he is authorized to do that?

A Yes.

Q And in accordance with the practice in your busi-

ness, the estimator reads the plans and specifications

and calculates how much he can do the job for, and then

signs the bid letter; is that correct?

A Yes.

Q And in this particular job, Mr. Chersin did the

estimating?

A That’s correct.

5 ei lille

43

[108] Q You had had collective bargaining agree-

ments with Local 638 for many, many years?

A Yes.

* * * *

Q I show you Respondent’s Exhibit B for Identifica-

tion and ask you whether that is your signature.

{109} A _ Yes, it is.

Q And this contract covers the period ’69 through

June 30th, I think, of 1972?

A June 30, 69 to ’72, oh, yes. Right.

Q This agreement, that is the one which is Re-

spondent’s Exhibit B in Evidence, incorporates by ref-

erence, does it not, Rule 9 which appeared in the 1966-

69 agreement, Petitioner’s Exhibit 9?

A Yes.

Q Petitioner’s Exhibit 10, which is the interim agree-

ment, effective July 1, 1972, contains or incorporates

all of the provisions of the old Rule 9, plus a few other

relating to identification of work done in the shop?

{110} A That’s correct.

Q So that from at least 1966 until the present time,

Rule 9, as originally set forth, has continued?

A That’s correct.

Q And when you met with Mr. Daly on September

22nd, he told you that your company was violating Rule

9 of the agreement?

A That’s correct.

& * * o

[111] Q Your estimator has the authority to sign bid

letters?

A Yes.

44

[115] GEORGE ZIMMERMAN, called as a witness,

having been sworn by the Clerk of the Court, testified

as follows:

DIRECT EXAMINATION

BY MR. EDELMAN:

Are you currently employed?

Yes.

Who is your employer?

Hudik-Ross.

How long have you been employed by Hudik-

OPO PO

Ross?

A About 13 years.

Q What is your present capacity with Hudik-Ross?

A The man in charge of the job of the Norwegian

Home.

Q Would that be a job foreman?

A Similar. We don’t specify foreman.

Q Have you been on the Norwegian Home job site

[116] since Hudik began working on it?

Yes.

Presently working on this job site?

Yes.

Are you a member of Local 638?

Yes.

How long have you been a member?

Twenty-two years.

Is there a shop steward on the Norwegian job

™”

SOPOLPOP,OD

OPO POLO PO p®,

Yes.

Is he a regular employee of Hudik-Ross?

Yes.

Is he there every day?

Yes.

What is his name?

George Zimmerman.

You are the shop steward?

Yes, I am.

I assume then, well, why don’t you state your

functions in connection with your capacity as a shop

steward?

ie A i: i ee

45

A Represent the union as far as our working agree-

ment goes.

[117| Q If a problem arises at the job site, do you

get in touch with the union?

A I notify the business agent.

Q Who would that be?

A Bill Daly.

Q Do you recall the time coming when the Slant/

Fin units arrived on the job site?

A Yes.

Q Did you unload them or take part in the unload-

ing?

A Yes, I did.

Q Had you connected them as yet?

A No.

Q Can you tell why you have not connected them?

A Well, the piping to me was in violation of our

contract.

Q That is why you didn’t connect them?

A Yes.

Q Did you tell any representative of Austin or

Hudik-Ross that you were not going to connect the

units because it was a violation of your contract?

A I notified my business agent first.

Q Mr. Daly?

[118] A Yes.

Q And did you receive any instructions from Mr.

Daly?

A To hold off until there was a decision made.

Q A decision made by whom?

A His superior or anyone further on.

Q Did you inform either representatives of Hudik-

Ross or Austin as to the union’s position?

A After Bill Daly was informed, yes, sir.

Q Who did you inform?

A Pete Plath, the job superintendent, and Art

Chersin.

Q You informed these individuals?

A Right.

46

Q Is it a fact that from time to time they asked

you whether or not you would be able to install the

units?

Right, yes.

Did you answer them on each occasion?

I answered them, yes.

And what was your answer?

That I couldn’t proceed with it.

And did you indicate a reason why?

Because it is the usual procedure that I had to

wait for a decision.

[119] Q Did you ever tell either Mr. Plath or Mr.

Chersin that the units were prepiped and that you

couldn’t install them for that reason?

A That is what the original thing was.

* & + *

CROSS-EXAMINATION

POPO POY

BY MR. FLEICHMAN:

Q Mr. Zimmerman, how long have you been a steam-

fitter?

A Twenty-two years.

Q How long have you worked for Hudik-Ross?

A Approximately 13 years.

Q And during all of this period, was Hudik-Ross

in contractural agreement with Local 638?

A Yes, he was.

Q Now, with respect to the Slant/Fin climate com-

mand unit, I show you Respondent’s Exhibit A, and ask

you to turn to page 3 and state whether this is a fair

representation of the unit?

(120) This is the unit of our job.

Q This is the unit?

A Right.

[121] Q Are there any other units on the market

similar to these?

A Yes, there is.

47

[122] Q Have you worked on any of these units?

A_ I worked on most of them.

Q And can you give me the name of, say, one unit?

A American Standard.

Q American Standard?

A Right.

Q Does it have an air-conditioning unit?

A Yes, it does.

Q Does it have hot water generated in the base-

ment?

A Yes, it does.

Q Does it have a bypass arrangement?

A No.

Q Does it have a condenser?

No.

Q Does it have a fan?

A Yes.

Q Now, the piping in that unit that is for the

connecting of various parts, who did that work?

A It was prefabricated on the job.

Q And what was done by Local 638 men on the job?

A All pipings to the stubs which is the final con-

nection [123] on the unit.

Q Was this done while you were employed by Hudik-

Ross?

A Yes.

A

* o o *

I show you Petitioner’s Exhibit 9 which is [124]

the 1966-69 contract and call your attention to Rule 9.

First of all, what is the title of that rule?

A “Cutting pipe and making up fittings.”

Q Under what language does the test of cutting

and connecting fabricating the water main flow and

condensate assemblies come?

A Under the heading ‘Radiator branches, coil con-

nections shall be cut and threaded by hand on the job,

in accordance with Rule 5.”

Q And Rule 5 refers to what?

A Two-man trade.

Q So that can you state whether or not this rule,

as you read it, has been applied consistently, to the

48

best ha your knowledge, in connection with work of this

type:

A On all jobs I have ever been on, it has been ap-

plied all the time.

Q As part of your duties, do you have to work in

accordance with plans and specifications?

A Yes, I do.

Q And did you have—and this applied also to this

particular job?

A Yes.

Q And were you able to—did you also have [125]

copies or a copy of Respondent’s Exhibit A?

A Yes.

Q And did you have any other material relating to

Slant /Fin units?

A Yes, the complete breakdown of the unit.

Q When the units were delivered, did you do any-

thing with respect to the units?

A Yes. I distributed them on the job and started

mounting.

Q Did you examine what was behind the faceplate?

A Yes, I did.

Q How did you do that?

A Taking the front cover off.

Q And then you saw the parts which you claim

came within Rule 9?

A Right.

Q What was the time juxtaposition or relationship

between when you took the cover off and saw what was

there, and you called Mr. Daly?

A The next day, that night. I couldn’t say exactly

= It was within the period of time that I unloaded

them,

[129] WILLIAM J. DALY, called as a witness, having

been first duly sworn by the Clerk of the Court, testified

as follows:

49

DIRECT EXAMINATION

BY MR. FLEICHMAN:

Q Are you associated with Local 638?

A Yes.

Q How long have you been a member of Local 638?

A Thirty-four years, excluding time in service, five

years in service.

Were you ever a working steamfitter?

A Yes, I was.

Q How many years?

A Twenty-two or twenty-three years.

Q What is your present position with the union?

A

Q

A

©

I am a business agent.

How many years have you been a business agent?

Eleven years.

. * . *

[130] Q Was the Norwegian Home for the Aged with-

in your territory?

A Yes, it is.

Q When did you first hear of the dispute in con-

nection with this Slant/Fin unit?

A Well, I had a call from my foreman that a truck-

load of these units came in and he asked me if I would

stop out to look at them.

The following day I was out on the job and there was

another truck there. They were unloading. Whether

it was the same truck or a new one, I am not sure.

Q When was that?

A The dates I am not too sure of.

Q Was there then a dispute as to certain work to

be done—

A Well—

[131] Q (Continuing)—with respect to the unit?

A With respect to the unit, the piping that was on

it, I met the superintendent there, Pete there, and I

mentioned there was a violation here.

Q What violations were you referring to?

A The violation of Rule 9 of the agreement.

50

And who was the agreement between?

Between 638 and Hudik-Ross Company.

Was the dispute with Hudik-Ross?

With Hudik-Ross, yes.

Did you have occasion to examine the unit?

Yes, I did.

Did you do that in connection or accompanied

by Mr. Zimmerman?

A I did.

Q What did you do in connection with the examina-

tion of the Slant/Fin unit? What did you see?

A I seen all the internal piping that was hooked

up to the coil which is usually done by the steamfitter

at the job site over the years I have been around.

Q Were there branches there?

A Branches, correct.

Q Did you inform Hudik-Ross as to whether any

provisions of the agreement was being violated?

(132) A Yes, I did.

Q Who did you inform?

A The first one I informed was the superintendent,

John Guilfoyle, and after that I informed Frank Hudik

himself.

Q What particular portion of the trade agreement

did you rely on?

A I relied on Rule 9, that all branch work should

be done on the job site.

Q Was this an innovation on the part of Local 638

or was it traditional?

A Well, in the years I have been around, I have

seen it happen once before with one of our contractors

and it was corrected. That is the only other time I ever

ran into it.

Q Otherwise, all other instances, who did the work?

A The steamfitter on the job site did it.

[133] FRANK HUDIK, called as a rebuttal witness,

having been previously sworn by the Clerk of the Court,

resumed the stand and testified further as follows:

OPO PO PO

neaataak

~ ew

TE ers. Mer

51

[135] CROSS-EXAMINATION

BY MR. FLEICHMAN:

[136] THE COURT: You may bring out what is the

situation with one and what are the specifics as to the

other.

Q All right. Let’s get down to this:

Did you tell Mr. Daly that Rule 9 did not apply to

this unit because of the nature of its construction?

A Yes.

Q Did you say that was so because the work had

been pre-assembled in Slant/Fin’s factory?

A Yes.

Q That was the reason why you told Mr. Daly [137]

that, because it had been pre-assembled in the Slant/

Fin factory?

A Pre-assembled and pretested.

Q In the Slant/Fin factory?

A Correct.

Q But you didn’t tell him that it wasn’t the work of

Steamfitters Local 638 because the contract didn’t pro-

vide for such work?

A Would you give me that again, please?

Q As I understand it, Mr. Daly told you that this

particular work was work belonging to the steamfitters,

in accordance with Rule 9 of the contract.

A Correct.

Q And your reply to him was, but it had already

been done at the factory?

A And pretested.

Q And pretested?

A Correct.

Q And that removed it, did you say, from Rule 9?

A I don’t remember whether I said anything like

t.

Q That’s right, you don’t remember that.

All you said is that it had been pre-assembled and

pretested?

A That’s correct, I think so.

52

[138] Q And Mr. Daly said but the contract is clear

that that—that this type of work has to be done on the

job?

A Mr. Daly said that we were in violation of Rule 9.

Q And your only reply to that was that the work

had been pre-assembled and pretested at the Slant/Fin

factory?

A I believe so. Words to that effect.

* * * +

[139] WILLIAM J. DALY, recalled as a witness, hav-

ing been previously sworn by the Clerk of the Court,

resumed the stand and testified further as follows:

DIRECT EXAMINATION

BY MR. FLEICHMAN:

Q Mr. Daly, when you had this conversation with

Mr. Hudik and you maintained that having the work

done in the Slant/Fin factory was a violation of Rule

9, what was Mr. Hudik’s reply to that?

A Well, the only thing I can recall is that he did

mention it wasn’t bought by him, the equipment, and

that was the end of it. He did not buy the equipment.

* * * -

What did he say with respect to Rule 9, any viola-

tion of Rule 9?

A I don’t know whether he agreed or disagreed. The

only reason he stated—the only statement that he made

to me was the fact that he did not buy this equipment.

He didn’t say whether it was a violation or wasn’t a

violation [140] one way or the other.

Q Did Local 638 at any time have a labor dispute -

with Slant/Fin because Slant/Fin does not or did not

have a collective bargaining agreement with Local 638

or employed members of 638?

A To my knowledge, never.

Q Did you ever speak to anybody of Slant/Fin?

A Never did. Definitely not.

me

eee

53

Q Did you ever attend any meeting at which a rep-

resentative of Slant/Fin was present?

A No, I did not.

Q Did you ever tell Mr. Hudik that you wanted a

collective bargaining agreement with Slant/Fin or you

wanted Slant/Fin to employ members of Local 638?

A Never did.

* + & *

54

PLAINTIFF’S EXHIBIT 1 ev. 72C1393

SPECIFICATION 201

ROOM HEATING AND AIR CONDITIONING UNITS

THE NEW HEALTH RELATED FACILITY

NORWEGIAN CHRISTIAN HOME FOR THE AGED,

b.OOKLYN, NEW YORK

THE AUSTIN COMPANY ROSELLE, NEW JERSEY

GENERAL

Furnish at the jobsite Slant/Fin Climate Command Air

Conditioners. The units shall be complete with cabinet,

filters, cooling chasis, heating coil, fans, main water flow

and condensate assembly, controls, vent door, outside

air plenum and outdoor air grille.

Each unit must fit in the space allowed and in no case

be greater than 9 inches in depth.

Materials, equipment—shall be first quality and in strict

accordance with all of the governing codes local and

state, laws, regulations, and ordinances including the

City of New York Building Code, Underwriters Labora-

tories, Inc.. NFPA, NEMA and Providence Washington

Ins., Co.

CAPACITY

Unit capacity shall be as indicated on the schedule on

sheet 204 dated 11-20-71 and on the drawings.

CABINET

Cabinet will be constructed of 18 gauge zinc coated cold

rolled steel that has been thoroughly degresed and

finished in a standard factory

55

FILTER

An expanded aluminum mesh washable filter will be

provided with the unit, so located that it can be re-

moved for cleaning without removing the Front Panel.

COOLING CHASSIS

The cooling chassis will be constructed of 18 gauge zinc

coated cold rolled steel with a baked prime coat grey

finish. This chassis will contain an evaporator coil of

aluminum fin and copper tube construction, a capillary

tube refrigerant flow control, a fully hermetic reciprocat-

ing R-22 compressor, a copper and steel construction

tube-in-tube water cooled condenser, an evaporator fan

and drain pan assembly, and associated electrical con-

trols.

The condensate drain pan wil! be constructed of 18 gauge

cold rolled steel, protected with a zine coating, with the

water collecting surfaces coated with a non-metallic

waterproofing compound.

The evaporater fan motor shall be a two speed, shaded

pole, thermally protected motor designed to operate on

115 volt or 208 volt CPS, single-phase, AC electrical

service, @s required by unit size.

There will be two aluminum forward curved centrifugal

blower wheels, one mownted on either end of the fan

motor, enclosed in blower housings. The blower wheels

shall be statically and dynamically balanced for quiet

operation.

The evaporator drain pan, fan motor and blower wheels

and housings will be assembled in such a manner as to

permit installation and removal as a unit for ease in

cleaning the drain pan.

MAIN WATER FLOW AND

CONDENSATE ASSEMBLY

The main water flow and condensate assembly shall be

factory installed as an integral part of the unit by the

manufacturer. The assembly shall be of copper con-

56

struction tested to 150 psi leakage. Two shut-off-valves

shall be provided to isolate the cooling chassis from the

main line water supply for servicing. An automatic

three-way valve shall be incorporated in this assembly

to respond to the control panel’s demand for cooling or

heating, thereby directing water flow either through the

water cooled condenser of the cooling chassis or to the

hot water coil mounted in the lower part of the cabinet.

The hot water coil shall be of copper tube and aluminum

fin construction.

& o @ 7

PIPE COVE MOLDING

Pipe cove molding will be installed in each room con-

taining Climate Command units to provide concealment of

piping along wall at floor level. Molding will run from

unit to wall and from unit to unit in rooms containing

more than one unit.

Pipe cove molding shall be constructed with 22 gauge

steel and shall be provided with mounting brackets to

support 114” copper tubing of the main loop, 34” con-

densate line and the cover. Finish shall be factory stand-

ard baked enamel in shell white.

ELECTRIC MOTORS

Motors shall be of General Electric Co., Westinghouse or

approved equal, induction types and shall be designed,

wound and built for quiet operation.

Motors shall be of the 40 degree C. ambient type and are

to be rated in accordance with the American Standards

for Rotating Electrical Machinery “(A.S.A.—C50 and

are to comply with the regulation of the National Elec-

trical Code.)

Motors below |. horse power shall be wound for 120

volt, 60 hertz single phase, alternating current; and

motors of !. horse power and above shall be for 208

volt, 60 hertz, 1 phase, alternating current.

Motor speeds shall not exceed 1800 RPM.

— ee

57

Name plate ratings shall not be less than brake HP of

equipment to be driven, in full range of operation con-

ditions.

Two speed motors shall be of the induction type, single

wound.

EXCEPTIONS

Any exceptions to this specification shall be listed in writ-

ing along with alternate prices listed in bid.

GUARANTEE

Manufacturer shall furnish a written guarantee for a

period of ome year after completion of installation and

start-up covering any defects in materials and work-

manship resulting from his work.

W.O. 70-1012 November 29, 1971

Room Heating and

Air Conditioning Units

58

PLAINTIFF’S EXHIBIT 2

THE AUSTIN COMPANY

LUMP SUM SUBCONTRACT

THIS SUBCONTRACT entered into this 14th day of

January, 1972, by and between THE AUSTIN COM-

PANY, an Ohio Corporation of Cleveland, Ohio (herein-

after called “CONTRACTOR”), and Hudik-Ross Co.,

Inc. (hereinafter called “SUBCONTRACTOR” ), for cer-

tain work to be performed by Subcontractor in connec-

tion with construction work being, or to be performed

by the Contractor for Norwegian Christian Home for

the Aged, Inc. (hereinafter called “OWNER”), at:

1255 Ovington Avenue, Brooklyn, N.Y.

WITNESSETH: That it is hereby agreed by and be-

tween the parties hereto as follows:

ARTICLE 1. Subcontractor shall provide all the neces-

sary materials and perform all of the following work, to

be installed on the premises of Owner in accordance with

terms and requirements of covering Purchase Order No.

1012-27, General Requirements, dated 1/4/71. The Spe-

cifications for pages SEE THE PURCHASE ORDER,

inclusive, dated And drawings SEE THE

PURCHASE ORDER.

ARTICLE 2. (a) The price to be paid by Contractor

and accepted by Subcontractor for the performance of

this Subcontract is Two Hundred & Sixty Nine Thousand

Five Hundred & Fifty & 00/100 Dollars ($269,550.00)

subject to deductions and additions as herein provided.

Payments on account shall be made: On the 20th day of

each month, following the month of performance, eighty-

five (85°: ) per cent of the cost of the work in place, as

approved by Contractor, and proportionate to the amount

of this Subcontract, for labor and materials acceptably

incorporated into the work up to the last working day of

the preceding month, less the aggregate of previous pay-

ments, provided that Subcontractor shall have paid in full

Re aaand

59

all bills for labor and materials, and if requested by

Contractor, shall have submitted to it receipted invoices

as evidence of payment of all accounts in full. The bal-

ance shall be paid thirty (30) days after entire comple-

tion and final acceptance. No certificate given or pay-

ment made (except the final certificate or the final pay-

ment) shall be evidence of the performance of this Sub-

contract either wholly or in part, and no payment shall

be construed to be an acceptance of defective work or

improper materials.

(b) No extra work shall be performed or paid for un-

less Contractor shall have issued, prior to the beginning

thereof, its written order therefor. No increase or de-

crease in the price of the work to be performed shall be

made, nor shall any claim be made for damages or antic-

ipated profits except upon the written approval of Con-

tractor.

(d) Contractor may disburse from monies owing by

it to subcontractor such sums as it may determine to

be necessary to pay for materials, equipment, labor or

supplies used, ordered, or delivered for incorporation into

work to be performed by subcontractor.

Should subcontractor, in case of dispute, fail to pay

claimed obligations for such materials, equipment, labor

or supplies, subcontractor shall post bond or securities

sufficient to protect Owner and Contractor against filing

of any lien or encumbrance against property of Owner.

(e) Subcontractor shall procure Contractor’s written

approval before subletting any portion of this Subcon-

tract for a sum exceeding five hundred ($500.00) dollars.

(f) Subcontractor, at Contractor’s option and expense,

shall furnish an approved Surety Company’s bond for

the performance of this subcontract.

ARTICLE 3. (a) Subcontractor shall substantially com-

plete the work under this Subcontract to the entire satis-

faction of Contractor and Owner, within ninety (90)

working days after the date Subcontractor begins, or is

instructed to begin, said work, whichever is earlier.

Time is of the essence of this Subcontractor.

60

(b) A working day is a day, exclusive of Sundays,

Saturdays and legal holidays, on which Subcontractor is

able to employ effectively more than fifty per cent (50% )

of the usual daily man hours (Job Staff excluded) for

regular working hours.

(ce) Should Subcontractor be delayed in the substantial

completion of said work by Contractor or Owner, fire,

strikes, lockouts, acts of public officials, embargoes or

war, then said time shall be extended for a period equiv-

alent to the time lost by reason of any of said causes,

but no such allowance shall be made unless a claim

therefor be presented in writing to Contractor within

twenty-four (24) hours of the occurrence thereof.

ARTICLE 4. Subcontractor shall submit for approval 3

copies of all shop or setting drawings and schedules re-

quired for his work. Contractor’s approval of such

drawings or schedules shall not relieve Subcontractor of

responsibility for errors of any sort in such shop draw-

ings nor of responsibility for deviation therein from

drawings and specifications furnished by Contractor un-

less Subcontractor has, in writing, advised Contractor of

such deviation.

ARTICLE 5. Guarantee—Subcontractor shall repair and

make good any damages, defects, or faults in Subcon-

tractor’s work or materials, including materials or equip-

ment partially or completely covered by manufacturer’s

guarantee, together with work of other trades disturbed

as a result of such repairs, that may appear within one

years after date of final acceptance. Subcontractor shall

also, within guarantee period, make any corrections or

adjustments necessary to meet specified performance re-

sults.

ARTICLE 6. (a) Contractor, at any time before com-

pletion of the work, may order additions, omissions or

alterations to or in the said work, materials or equip-

ment, but no such changes shall be made except by a

written order signed by Contractor in which the addi-

tional amount to be paid by it therefor or to be deducted

ee ee ry

oe ee

ee ee ee eee

tame > Shee

61

from said contract price, together with additional time,

if any, for the performance thereof, shall be stated. Unit

prices, if any are named in this Subcontract, shall be

used in determining the value of such changes.

(b) All clauses of this Subcontract shall apply to any

changes, omissions or extra work in like manner and to

the same extent as the work contracted for, and no

changes, omissions or extra work shall annul or invalidate

this Subcontract.

(ec) Should Contractor request Subcontractor to work

overtime in order to expedite the final completion of the

work, Subcontractor shall do so, and Contractor shall

pay therefor only the actual labor cost over the rate of

regular time for said overtime. Time slips covering said

overtime, must be submitted to, checked and approved

by Contractor at the site of the work. No commission or

overhead shall be paid to Subcontractor for or on ac-

count of said overtime. lf Subcontractor, in the opinion

of Contractor, unduly delays the progress of the work,

then, if requested by Contractor, Subcontractor shall at

its sole expense perform such overtime work as may be

necessary to finish said work within the specified time.

Contractor’s decision governing the necessity of said

overtime shall be final.

ARTICLE 7. (a) Subcontractor shall provide proper

facilities at all times for the inspection of the work by

Contractor, Subcontractor, within twenty-four (24)

hours after receiving written notice from Contractor to

that effect, shall proceed to remove from the ground or

buildings all material, whether worked or unworked,

condemned by Contractor, and take down all portions of

the work which Contractor shall by like written notice

condemn as unsound or improper, or as in any way fail-

ing to conform to the drawings and specifications.

(b) Subcontractor shall cooperate with Contractor and

all other subcontractors and materialmen employed on

the work in order to avoid complications and insure first-

class workmanship in every respect, and in the manufac-

turing, assembling and erection of the work shall em-

62

ploy only workers who are qualified, careful and efficient,

in strict conformity with the best standard practices.

ARTICLE &. (a) Subcontractor shall comply with all

laws relating to workmen’s compensation, occupational

diseases, wages and hours, taxes and contributions in

respect to unemployment insurance and all other laws

and regulations, state and federal, applicable to persons

directly or indirectly employed by said Subcontractor and

other persons on said work. Subcontractor shall main-

tain in force insurance protection in amounts agreed

upon covering Subcontractor’s liability under workmen's

compensation and occupational disease laws, Subcon-

tractor’s general liability (bodily injuries and property

damage) including contractual coverage for undertakings

under this Article and Subcontractor’s liability with re-

spect to the ownership and operation of automobiles. It

also agrees, when required by law, to make payments to

Subecontractor’s employees or their dependents and to

save Owner and Contractor harmless from all liability

for such payments. Should any part of this subcontract

be sublet, Subcontractor shall, in addition-to the fore-

going types of insurance, maintain Owner’s and Con-

tractor’s Protective Liability Insurance in the same

amounts, except that Owner’s and Contractor’s Protec-

tive Liability Insurance need not be maintained to the

extent that its subcontractors maintain the same cover-

ages required for Subcontractor. Certificates of all such

insurance shall be furnished to the Contractor.

(b) Subcontractor agrees to indemnify and save harm-

less Owner and Contractor against all liability for per-

sonal injuries, including death resulting therefrom, sus-

tained by any person directly or indirectly employed by

Subeontractor or its subcontractors, caused or alleged to

have been caused, directly or indirectly, by an act or

omission, negligent or otherwise, by Owner or Contractor

or persons directly or indirectly employed by them, and

to assume the defense of any action brought by persons

so injured or their personal representatives against

Owner or Contractor to recover damages for such in-

juries.

(c) Subcontractor also agrees to indemnify and save

harmless Owner and Contractor against all liability for

personal injuries, including death resulting therefrom,

and against all liability for property damage, sustained

by any other persons or corporations whatsoever, includ-

ing Contractor’s or Owner’s employees, caused or alleged

to have been caused, directly or indirectly, by any act or

omission, negligent or otherwise, on the part of Subcon-

tractor, or its Subcontractors, or persons directly or in-

directly employed by them and arising out of the per-

formance, or In any way connected with the performance,

of this contract, even though some act or omission, negli-

gent or otherwise, of Owner or Contractor or persons

directly or indirectly employed by them may also be a

cause or an alleged cause of such injury.

(d) The extent of the Subcontractor’s obligation un-

der Article 8 shall be governed by the law of the State

of Ohio.

ARTICLE 9. (a) Subcontractor agrees (1) to pay all

federal or state sales and use taxes or similar levies on

all material, tools and equipment furnished under this

subcontract, and (2) to assume all risk and liability for

loss or damage, however caused, to Subcontractor’s ma-

any such damage or injury suboccurring, without any

expense whatsoever to Contractor or Owner.

ARTICLE 10. (a) Subcontractor, for itself and all per-

sons, partnerships or corporations performing labor, do-

ing work or furnishing materials in and about the erec-

tion and construction of said work, hereby expressly

waives any and all liens of every kind or nature to which

it and/or they are or may be entitled under any A

Statute or otherwise. oo

64

(b) Subcontractor shall disclose this provision of this

Subcontract to all said persons, partnership or corpora-

tions before any such labor or work is performed or ma-

terial furnished and before any agreement with refer-

ence thereto is made by Subcontractor.

(c) Upon completion of all work required hereunder,

Subcontractor shall submit with its invoices an affidavit

by a qualified representative, to the effect that all obliga-

tions for labor and materials have been paid in full, ac-

companied by a waiver of lien rights.

ARTICLE 11. Subcontractor has thoroughly familiar-

ized itself with the building site conditions and with the

request for quotations, instructions to bidders, bulletins

issued prior to the date for receiving of proposals, form

of proposals, plans and specifications for said work, ma-

terial and equipment, and is familiar with the shipping

and delivery facilities and all other matters and condi-

tions which will affect the operation and completion of

said work and it assumes all risks therefrom.

ARTICLE 12. No assignment of this Subcontract or

any money due, or which may become due hereunder shall

be made without the written consent of Contractor.

ARTICLE 13. If Subcontractor becomes insolvent, or if

a petition in bankruptey be filed by or against it, or if

it should make a general assignment for the benefit of

creditors, or if a receiver should be asked or appointed

for it, or if it should refuse or fail, except in cases for

which extension of time is provided, to supply enough

properly skilled workmen or proper materials, or if it

should fail to make prompt payment to its subcontrac-

tors or for material or labor (except where the liens of

all such parties have been waived) or disregard laws,

regulations, ordinances or the instructions of Contractor,

or otherwise be guilty of a substantial violation of any

provision of this Subcontract, or should the Subcontrac-

tor at any time refuse to start said work promptly, neg-

lect to supply a sufficient number of properly skilled

workmen, or sufficient materials of the proper quality,

—_—— ~~ ee

—_——_ en ee ee

65

or fail in any respect to prosecute the work with prompt-

ness and diligence, or if Subcontractor fail in the per-

formance of any of the agreements herein contained.

Contractor may, after twenty-four hours’ written notice

to Subcontractor, provide any such labor or materials,

and deduct the cost thereof from any money then due

or thereafter to become due to Subcontractor under this

Subcontract; and at its option may terminate the em-

ployment of Subcontractor for the said work and ter-

minate this Subcontract and may enter upon the prem-

ises and take possession, for the purpose of completing

the work comprehended under this Subcontract, of all

materials, tools and appliances thereon, and employ any

other person or persons to finish the work, and provide

the materials therefor; and in any such case of such

termination of Subcontract or discontinuance of the em-

ployment, Subcontractor shall not be entitled to receive

any further payment under this Subcontract until the

said work shall be wholly finished, at which time, if the

unpaid balance of the amount to be paid under this Sub-

contract shall exceed the expenses incurred by Contrac-

tor in finishing the work and all other charge, expense

or damage, such excess shall be paid by Contractor to

Subcontractor; but if such expense and damage shall

exceed such unpaid balance, Subcontractor shall pay the

difference to Contractor.

ARTICLE 14. (a) ARBITRATION. In the event of

any disagreement arising under this Subcontract, it shall,

upon written notice of either to the other party, be sub-

mitted to three arbitrators for decision. Each party shall

choose one arbitrator within ten days after receipt of

such notice, the third to be chosen within ten days by

the two thus selected. However, if within the time stipu-

lated the two arbitrators appointed by the parties do

not agree upon a third or a party who has been notified

of a disagreement fails to appoint an arbitrator, then

a third arbitrator or an arbitrator to represent the party

in default, or both such arbitrators, may upon petition

of either party be appointed by a Judge of a Court of

general jurisdiction where the work is performed. The

66

decision of a majority of said arbitrators shall be final

and binding upon both parties to this contract. Such

arbitrators’ decision shall be delivered to each party in

writing on or before ten (10) days (or such further

time as the arbitrators may fix) after the submission of

any matter to them for their decision. Each party shall

pay the cost and expense of the arbitrator it selects, but

the cost and expense of the third arbitrator and the

remainder of the expense of the arbitration shall be borne

equally by the parties hereto, Arbitration proceedings

shall not take place until after the completion or alleged

completion of the work, except in a case where either

party claims that the disagreement is of such nature as

to make immediate arbitration proceedings necessary

while the evidence is available. Without the consent of

any interested insurance carrier, the foregoing provi-

sions of this Article shall not require arbitration of any

disagreements arising hereunder where any such dis-

agreement has to do with any claimed liability of either

party hereto which is protected in whole or in part by

insurance.

(b) This entire agreement shall be and become a part

of said purchase order by Contractor to Subcontractor

as fully as though the terms hereof were written in said

purchase order.

The foregoing agreement is binding upon the under-

signed, their successors, executors, administrators and

assigns.

IN WITNESS WHEREOF, the Parties have hereunto

subscribed their names the day and year shown in said

Purchase Order.

By

Subcontractor

THE AUSTIN COMPANY

By (illegible)

Contractor

——

67

PLAINTIFF’S EXHIBIT 8

FROM

THE AUSTIN COMPANY

450 W. First Ave.

Roselle, New Jersey 07203

PURCHASE ORDER No, 1012-27

On Each Package and Invoice

Name of Job

Norwegian Christian

Home for the Aged, Inc.

CHARGE TO or

Work Order No. 70-1012

Date of Delivery

Attn: Mr. Frank Hudkik,

Pres,

Tele: 212-L.W-4-2630

Date of Order January 14, 1972

NAME of

VENDOR Hudik-Ross Co., Inc.

Address 251 West 42nd Street, New York, N.Y. 10036

Deliver or Ship to The Austin Company

1255 Ovington Avenue

Brooklyn, New York.

Care of Norwegian Christian Home for th

Via Railroad or Truck ¥ TERM’ 5 agin Inc.

PLEASE FURNISH SUBJECT TO CONDITIONS BELOW:

68

PURCHASE ORDER AND SUBCONTRACT

Furnish all necessary labor, mechanics, tools equipment

and materials required for furnishing and _ installing

complete the Heating, Ventilation and Air Conditioning

work for the building we are constructing for the Nor-

wegian Christian Home for the Aged, Inc., Brooklyn,

New York in strict accordance with the Austin Company

Drawings 70-1012 sheets 201 to 208 inclusive all revised

1/7/72, Specification 200, Heating, Ventilation and Air

Conditioning, Pages i, ii, iii, 200-1 to 200-65 inclusive

all dated 11/19/71, addendum No, 1. Pages 200—addl 1

to 200—addl 16 inclusive all dated 11/20/71.

The following allied specification, indicating equipment

furnished and delivered by others for installation by this

sub-contractor are incorporated into this subcontract:

A. Specification 201 — Room Heating and Air Condition-

ing Units, Pages 201-1 to 201-6

inclusive all dated 11/29/71.

B. Specification 202 — Cooling Tower, Pages 202-1 to

202-3 inclusive all dated 11/9/71.

C. Specification 208 — Self Contained Air Conditioning

Units, Pages 203-1 to 203-5 in-

clusive all dated 11/30/71.

D. Specification 204 — Hot Water Gene: «tors, Pages

204-1 to 204-6 inclusive all dated

10/15/71 and addendum No. 1

Ada. 1-1 and Add 1-2 both dated

11/9/"*.

E. Specification 205 — Evapora:ive Coolers, Pages 205-1

to 205-4 inclusive all dated

10/15/71. Addendum No. 1 add

—l-1 dated 12/17/71.

F. Specification 206 — 10,000 Gallon Fuel Oil Tank,

Pages 206-1 and 206-2, and

Sketch 206-2.

69

G. Specification 207 — Heating and Ventilating Units,

Pages 207-1 to 207-5 inclusive all

dated 11/30/71.

“he above stated drawings and specifications initiated by

» th parties signing this subcontract are to be consid-

ered as subcontract drawings and specifications.

Not included in the scope of this work are the following

items:

A. Excavation and backfill.

B. Furnish and install linen chute.

C. Electrical Work

D. Furnish and install stack for Hot Water Gen-

erator.

E. Sales and Use Tax.

The hand written objections, Pages 1 and 2 affixed to this

purchase order and subcontract, is included and becomes

part of the subcontract documents.

Included in the amount noted in Article Two of the sub-

contract are the various changes as discussed on Janu-

ay 7th 1972 at the time the Letter of Intent was signed

y representatives of both The Austin Com

Hudik Ross Co., Ine. —

In accordance with the Austin Company Letter of Intent

dated January 7, 1972, a copy of the Slant Fin Commer-

cial Division Letter of January 13, 1972 addressed to

the Austin Company stating the Guarantee as requested

by this subcontractor is affixed to this purchase order and

subcontract. This document is incorporated into and

becomes part of this purchase order and subcontract.

The Honeywell recommended Climate Command Control

System attached hereto (noted in Slant Fin Letter of

January 13, 1972) is also included as part of the sub

contract documents.

Terms of Payment: Per Article Two of this Subcontract.

Equal Employment Opportunity Clause attached hereto

70

is incorporated into and becomes part of this Purchase

Order and Subcontract.

This subcontractor agrees to comply with all safety and

health standards as required by the Williams-Steiger

Occupational Safety & Health Act.

The attached conditions and General Requirements of

the Purchase Order shall be incorporated into and be-

come part of this Purchase Order and Subcontract.

In the event that The Austin Company authorizes this

subcontractor to perform additional work on a Time and

Material basis the following shall apply:

Actual cost of Material, Equipment and Labor in-

cludes Insurance, Taxes and Fringe Benefits plus

10°% for overhead and 10% for profit.

Tax Exemption Certificate is affixed to this purchase

order and subcontract.

HES/emk

The following Conditions form a part of this Order:

1 SHIPPING NOTICE—shall be mailed as soon as Material has

been forwarded, giving Order Number, Car Number and

Initials, also condensed description of Material otherwise

Vendor is liable to demurrage.

2 INVOICE IN TRIPLICATE. To mailing address above.

3 CAR LOADS—shall be loaded to minimum capacity—if not, the

Vendor agrees to pay the excess freight.

4 PATENTS—Vendor agrees to protect and hold harmless Pur-

chaser and Owner from and against aii and every demand or

demands of any nature or kind by reason of the use of any

patented invention, article or appliance, that has been or may

be adopted or used in the construction of any of the Material

or Articles called for on this Purchase Order.

5 CARTAGE OR PACKAGES—no charges will be allowed for

either.

6 INSURANCE—It is understood that Vendor will carry Public

Liability, Workmen’s Compensation and Property Damage or

other necessary insurance and agrees to protect and indemnify

The Austin Company against all claims for damages, lawsuits,

etc. which may arise in connection with the fulfillment of this

Purchase Order. Any limitation of the liability or responsi-

WR ead a ee eee ve et Bets

71

bility of Vendor by provisions of Vendor's delive tickets

other instruments, shall be entirely ineffective. ” 7

7 It is agreed that goods or services furnished under this Purchase

Order shall comply with all Federal,

pe eel an State and other laws ap-

/s/ H. E. Stillwell

H. E. STILLWELL,

Proj. Purch. Agt.

PURCHASING AGENT

72

DISTRICT PURCHASING

FROM

THE AUSTIN COMPANY

PURCHASE ORDER NO. 1012-23A

On Each Package and Invoice

Name of Job

Norwegian Christian

Home for the Aged, Inc.

CHARGE TO or

Work Order No. 70-1012

Date of Delivery

Date of Order March 22, 1972

NAME of

VENDOR MECHANICAL SALES CORP.

Address P.O. Box 321, Passaic, New Jersey 07050

Deliver or Ship to .

The Austin Company, 1250 - 67th Street, Brooklyn,

New York

Care of Norwegian Christian Home for the Aged, Inc.

Via Railroad or Truck TERMS—

PLEASE FURNISH SUBJECT TO CONDITIONS BELOW:

PLAINTIFF'S EXHIBIT 5

CHANGE ORDER “A”

Refer to our original Purchase Order No. 1012-23 dated

January 4, 1972 and make the following changes:

1. Change name of Vendor to:

SLANT FIN CORPORATION

c/o Mechanical Sales Corp.

P.O. Box 321

Passaic, New Jersey 07055

oO beeen ema

ee ee

es me ane om

teeth eae es eer =

73

2. Delete the furnishing and delivery of Stamped Alum-

inum Exterior Grilles (114), Wall Boxes (114), and

Baked Enamel Finish for Exterior Grilles.

PRICE | A _.$741.00 (CREDIT)

This Change Order shall be incorporated into and be-

come part of our original Purchase Order No. 1012-23

dated January 4, 1972. All other terms and conditions

shall remain the same except as detailed herein.

The following Conditions form a part of this Order:

1 SHIPPING NO™ICE—shall be mailed as soon as Material has

been forwarded, giving Order Number, Car Number and

Initials, also condensed description of Material otherwise

Vendor is liable to demurrage.

2 INVOICE IN TRIPLICATE. To mailing address above.

3 CAR LOADS—shall be loaded to minimum capacity—if not, the

Vendor agrees to pay the excess freight.

4 PATENTS—Vendor agrees to protect and hold harmless Pur-

chaser and Owner from and against all and every demand or

demands of any nature or kind by reason of the use of any

patented invention, article or appliance, that has been or may

be adopted or used in the construction of any of the Material

or Articles called for on this Purchase Order.

5 CARTAGE OR PACKAGES~—no charges will be allowed for

either.

6 INSURANCE—It is understood that Vendor will carry Public

Liability, Workmen’s Compensation and Property Damage or

other necessary insurance and agrees to protect and indemnify

The Austin Company against all claims for damages, lawsuits,

etc. which may arise in connection with the fulfillment of this

Purchase Order. Any limitation of the liability or responsi-

bility of Vendor by provisions of Vendor’s delivery tickets or

other instruments, shall be entirely ineffective.

7 It is agreed that goods or services furnished under this Purchase

Order shall comply with all Federal, State and other laws ap-

plying thereto.

W. M. Bocock!

PURCHASING AGENT

74

DISTRICT PURCHASING

FROM

THE AUSTIN COMPANY

PURCHASE ORDER NO. 1012-23

On Each Package and Invoice

Name of Job _

Norwegian Christian

Home for the Aged, Inc.

CHARGE TO or

Work Order No. 70-1012

Date of Delivery

Attn: Sam Jaffe

Tele: 773-7040

Date of Order January 4, 1972

NAME of

VENDOR Mechanical Sales Corp.

Address P.O. Box 321, Passaic, New Jersey 07055

Deliver or Ship to

The Austin Company

1250-67th Street, Brooklyn, New York

Care of

The Norwegian Christian Home for the Aged, Inc.

Via Railroad or Truck TERMS—

PLEASE FURNISH SUBJECT TO CONDITIONS BELOW:

PURCHASE ORDER

Furnish and deliver all of the required room heating and

air conditioning units as shown and called for on the

Austin Company Specifications 201-1 to 201-6 dated

November 29, 1971, and The Austin Company Drawing

number 204 revised November 20, 1971.

" ‘

ee he ee

75

The above revised drawing ard specifications are now

all in your possession.

The Mecianical Sales Corporation quotation number

SF 107-471 dated December 13, 1971 is incorporated into

and becomes part of this Purchase Order.

Fifty four (54) Slant/Fin Climate Com-

mand WC9—unit “B”

Fifty (50) Slant/Fin Climate Command

WC12—unit “C”

Ten (10) Slant/Fin Climate Command

WC16—unit “D”

All the above for the sum of Bs $51,100.00

Include Painted baked enamel exterior

louver to match exterior of building,

add the sum of $ 285.00

Include Insulated pipe cove moulding,

add the sum of . ——<CssS—S—s $ 3,712.00

TOTAL AMOUNT OF THIS PUR-

CHASE ORDER —— $55,097.00

The prices stipulated above includes the following:

Freight

Fresh air intake with aluminum louver, natural

color

Motorized damper door with on-off switch

Pipe cove (uninsulated) moulding with accessories

Seven (7) master control units with eleven (11)

Slaves, including wall mounted thermostat and

automatic changeover control

Special N.Y.C. code electrical plug in recepticles and

prewired

Five (5) year compressor warranty

Factory assembled and prepiped units with gate

valves for mono-flow series loop installation

76

Self-contained thermostats and push button control

board

It is agreed that you shall submit in triplicate to the

Austin Company, 450 W. First Avenue, Roselle, New

Jersey—07203, three (3) copies of shop drawings and

engineering data for formal approval by the Austin

Company within three weeks from date of this Purchase

Order.

Shipment shall be made complete within 8 to 11 weeks

after date of receipt of approval of the shop drawings.

This purchase is exempt from Sales and Use Tax. At-

tached hereto is a copy of the Tax Organization Certi-

ficate.

The following Conditions form a part of this Order:

1 SHIPPING NOTICE—shall be mailed as soon as Material has

been forwarded, giving Order Number, Car Number and

Initials, also condensed description of Material otherwise

Vendor is liable to demurrage.

INVOICE IN TRIPLICATE. To mailing address above.

3 CAR LOADS—-shall be loaded to minimum capacity—if not, the

Vendor agrees to pay the excess freight.

4 PATENTS— ‘Vendor agrees to protect and hold harmless Pur-

chaser and Owner from and against all and every demand or

demands of any nature or kind by reason of the use of any

patented invention, article or appliance, that has been or may

be adopted or used in the construction of any of the Material

or Articles called for on this Purchase Order.

CARTAGE OR PACKAGES—no charges will be allowed for

either.

6 INSURANCE-—It is understood that Vendor will carry Public

Liability, Workmen's Compensation and Property Damage or

other necessary insurance and agrees to protect and indemnify

The Austin Company against all claims for damages, lawsuits,

etc. which may arise in connection with the fulfillment of this

Purchase Order. Any limitation of the liability or responsi-

bility of Vendor by provisions of Vendor's delivery tickets or

other instruments, shall be entirely ineffective.

th

ou

7 It is agreed that goods or services furnished under this Purchase

Order shall comply with all Federal, State and other laws ap-

niving thereto.

/s/ H. E. Stillwell

H. E. STILLWELL,

Purch. Agt.

PURCHASING AGENT

mer 19L faawt.cé's Exhb

—

a

main power supply wire

— screw

é condensate tube

3 way valve wire -——

retaining strap

}

unions

gate |, a

}

thermostat bulbd

If sesired, the entire air conditioning chassis may be removed from

‘ne cabinet. Shut water off by closing gate valves at each end of

unit. Kemeve 2 screws and retaining strap, uisconnect 2 unions,

unplug main power supply wire, unclip thefmostat bulb and push

: > recess unce: chassis. ir conditioning chassis is now free

*o csiide out of cabinet.

e “onnment electrical cable to receptacle in handy box inside cabinet.

.ir conditioning chassis was removed for installation, reinstall

reversing steps outlined above.

«?t

PLONG-WALL PIPING: 1 1/4" supply tubing and 3/4" condensate line

may ce concealed within prefabricated pipe-cove molding (available

‘ir. 5" lengths only).

|

= 24" "

koe

on 2' centers (3 per 5' length). Rest bottom of

tshed floor line; use spacers if working on sub-

t 1 1/4" supply tubing on lower arm of bracket; in-

vr iCKk

ah g

‘

—

mr

c

a

er

. wa

fc. +

es . .

wt ie Re

“4.1 3/8" condensate line on upper arm of bracket. Install

CG .aneing valve at beginning or end of each loop, and install flow

-- sting (B & G Thermoflo, Taco #737, or similar) in each loop,

t accurate balancing after installation is complete. After

X AK RK

LL

= re, ee

os Lee ees Same oe

79

PLAINTIFF’S EXHIBIT 8

CONSTRUCTION PROGRESS MEETING NO, 12

W. O. 70-1012

BROOKLYN, NEW YORK

NORWEGIAN CHRISTIAN HOME

A meeting was held on the job site on Thursday, 6/29/72

PRESENT:

Mr. A. Churson—Hudik-Ross, Inc.

Mr. A. J. Desiderio—A. J. Desiderio, Inc.

Mr. R. S. Grand—The Austin Company

Mr. P. D. Plath—The Austin Company

Mr. J. Puchalski—The Austin Company

DISCUSSION:

ELECTRICAL—P & T ELECTRIC COMPANY, INC.

1) Manpower—1 +- 9

2) Percentage complete—50

3) Purchasing

a)

b)

c)

d)

Motor Control Center & Switchboard—ITE—MCC

back boxes on job—MCC panels delivered 6/12—

Switchboard—has slipped—originally not delivered

on 6/23 as promised—EXPEDITE

Nurses Call System, Paging and TV System—

Roughing material is in stock—fabrication of bal-

ance of order to be completed by 6/22—P & T

to confirm if this is complete

Fire Alarm, Smoke Detector and Door Release

Systems—All materials and equipment are in

stock.

Light Fixtures—major items are in stock—re-

mainder are being fabricated—no delivery prob-

lems—fixture schedule was mailed to Austin week

of 6/5

80

Construction

a) Basement Slab Conduits—95° complete—balance

consists of work in the Electrical Equipment

Room—This work is proceeding very slowly—

P & T will concentrate on this item—need mini-

mum of one week to complete

b) Switchgear—estimate one week to install and two

to three weeks for Con Edison to complete serv-

ice hook-up—P & T may be able to get a tempo-

rary hook-up if the permanent hook-up is too late

—The ITE equipment will be required for a tem-

porary hook-up.

c) Conduit in dry wall—estimate 3 days/floor—more

men will be added in order to maintain this

schedule.

PLUMBING—A. J. DESIDERIO, INC.

1)

2)

Manpower—1 + 12—workforce will be reduced by 2

on 6 /30—Union Agreement expires end of July 1972

Percentage complete—45 %

a) Fire Hose Cabinets—being installed

b) Kitchen Equipment—a coordination meeting will

have to be held to clear up questions on roughing

and installation—to be set up for week of July 3rd.

c) Sanitary risers—complete through roof

d) Water risers—all risers are completed with the

exception of P-9—to be completed by July 6th.

e) Insulation—3 men on job—expecting strike on

July 1st.

f) Basement Cast Iron—complete except for kitchen

connections,

g) Street Connections—started 6/26—work is pro-

ceeding slowly—A.J.D. to expedite.

81

H.V.A.C.—HUDIK-ROSS, INC.

1)

2)

Manpower—Sheet metal workers—2, Pipefitter—

1 + 6—Austin feels that a minimum of 12 pipefitters

are required on the job. H. R. stated that they have

sufficient manpower at this time

Percentage complete—40

a) Fuel Oil Tank—Approval to proceed was mailed

to H. R. on 5 26—estimate 3 days to install pip-

ing. H. R. will coredrill necessary holes in the

basement walls—This work to be completed week

of July 3rd

b) Slant Fin Units (114)—by Austin—on job hook-

up of same being handled by F. Hudik—Steam-

fitters Union states that they will not hook up

same as they are preassembled

c) Roof fans—by Hudik-Ross—no delivery dates—

H. R. to inform Austin of delivery dates by July

6th

d) Cooling Tower and Evaporative Cooler—by Aus-

tin—Baltimore Air Coil. Rigged on roof on 6, 5—

no work has been done on these units to date.

e) Sheetmetal—all S.D. have been approved with the

exception of the 5th floor and the Mechanical

Equipment Room, and have been released for fab-

rication. Suna Sheetmetal to resubmit S.D. on

ductwork in Central Wash Areas—H-R will sub-

mit S.D. to Austin by 7/7 on future in the Me-

chanical Equipment Room—This area is still on

hold because of this item

f) Emergency Generator Exhaust Stack—H-R stated

that this is not included in their contract—re-

quest for extra sent to Austin on 6 26—PUR-

CHASING PLEASE NOTE

g) Automatic Controls—D.D. returned approved to

H-R on 6/27—type of valves are still in ques-

tion—J. Puchalski to advise

82

h) Starters for Equipment—H.R. questioned loca-

tion of same

i) Construction Schedule—H.R. will send a copy of

their schedule to the job and to Austin/Roselle

week of 7/3

FIRE PROTECTION

GOULD AUTOMATIC SPRINKLER

1) Manpower—2—back on job as of 6/27

2) Percentage complete—25 %

a) Basement Piping—-complete except for Mechani-

cal Equipment Room which is on hold.

b) Shop Drawings—Ist thru 4th floor are approved

—5th floor $.D. will be completed by 7/7 provid-

ing coordination drawing is transmitted by A. J.

Desiderio to Gould by 6/30

¢) Ist Floor Piping—work started on 6 27—estimate

3 days to complete

d) Street Connections—to start week of 7/3—esti-

mate one week to complete

P. D. Plath

Project Superintendent

ce:

All Present

V. Napoli

. Churson

. Desiderio

Ottman

. Stenger

Plath

Bennett

. Rumzie

. Bandtlow

MacDonald

Ernst

Schaeffer

Grand

DAOOM AS UMA > >

83

PLAINTIFF'S EXHIBIT 9

ENTERPRISE ASSOCIATION — LOCAL UNION 638

WoRKING AGREEMENT

Effective July 11, 1966 Terminates June 30, 1969

This WORKING AGREEMENT made and entered

into this day of , 196, by

and between ENTERPRISE ASSOCIATION OF

STEAM, HOT WATER, HYDRAULIC, SPRINKLER,

PNEUMATIC TUBE, ICE MACHINE AND GENERAL

PIPE FITTERS OF NEW YORK AND VICINITY,

LOCAL UNION NO. 638 OF THE UNITED ASSO-

CIATION OF JOURNEYMEN AND APPRENTICES

OF THE PLUMBING AND PIPE FITTING INDUS-

TRY OF THE UNITED STATES AND CANADA

(hereinafter referred to as ENTERPRISE, 841 Broad-

way, New York City, N.Y.), and HUDIK-ROSS CO.,

INC. |Full Name of Employer—(If a partnership give

names of all partners and firm name)| of 230 West

41st Street, New York, N.Y. 10036 | Business Address!

(hereinafter referred to as the EMPLOYER),

WITNESSETH:

WHEREAS, ENTERPRISE is a Labor Union repre-

senting steamfitters and apprentices engaged in the

steamfitting trade and its allied branches in the area

comprising the City of New York and Nassau and Suffolk

Counties, State of New York; and

WHEREAS, the EMPLOYER has occasion to employ

steamfitters and apprentices in connection with such

work and desires to enter into an agreement with

ENTERPRISE with respect to such employment and the

terms and conditions governing the same;

NOW, THEREFORE, it is mutually agreed between

the parties hereto as follows:

84

ARTICLE ONE

WORKING RULES—WAGES AND HOURS

The parties agree that during the term of this agree-

ment, the attached Rules, numbered “I” to “XXIV” in-

clusive, governing wages, hours, Welfare Fund, Pension

Fund, Educational Fund, Vacation Plan, Security Fund,

Industry Promotional Fund and other conditions of em-

ployment shall apply to the hiring and employment of

all steamfitters and apprentices and shall be in full force

and effect and constitute part of this agreement. The

parties hereto agree to observe and enforce all of the

terms and conditions contained in said Rules.

ARTICLE TWO

STRIKES OR LOCKOUTS

It is further mutually agreed that no strike against

the EMPLOYER shall be ordered by any officer of or

entered into by any member of ENTERPRISE, nor shall!

any lockout against members of ENTERPRISE be de-

clared by the EMPLOYER, so long as this agreement

and the rules hereto attached are conformed to by both

parties,

ARTICLE THREE

JOINT ARBITRATION PLAN

It is further mutually agreed that both parties to this

agreement shall abide by a Joint Arbitration Plan that

may be agreed upon by the representatives of the several

employers’ associations and a majority of the unions

of the building trades of New York City.

It is mutually agreed between the parties hereto that

in event of disputes between trades, and disputes rela-

tive to question of jurisdiction of trade, the parties will

abide by previous decisions as to jurisdiction published

in the latest issue of the B.T.E.A. Handbook, commonly

known as “The Green Book.”

It is mutually agreed between the parties hereto that

disputes between trades, and disputes relative to juris-

diction of trade not covered by decision in the latest

85

issue of the B.T.E.A. Handbook, commonly known as

“The Green Book,” shall be adjusted in accordance with

the principles of the New York Plan for the Settlemen:

of Jurisdictional Disputes as set forth in the Joint Arbi-

tration Plan of the New York Building Trades as adopted

on July 9, 1903 and amended on April 22, 1905, and as

thereafter amended, except to the extent that Section 3

of the said Joint Arbitration Plan requires the employer

to employ only members of the union directly or indi-

rectly through subcontractors or otherwise.

Pending determination of any dispute under the New

York Plan for the settlement of jurisdictional disputes

as stated in the preceding paragraph the members of the

union shall remain at work on the project without change

in status.

ARTICLE FOUR

TERM OF THIS AGREEMENT

It is further mutually agreed that no change in this

agreement shall be asked for by either party hereto, to

take effect prior to the first day of July, 1969.

ARTICLE FIVE

It is understood and agreed that this agreement is

based upon the Principles for Trade Agreements as

set forth in the printed annex to this agreement, and

nothing in the Rules of the Enterprise Association at-

tached hereto, or within this agreement shall be in-

terpreted to contradict or nullify any of the said Prin-

ciples.

Tt is understood and agreed that in case any provision

of this agreement shall be found to be contrary to law,

such finding shall not in any way affect the other provi-

sions of this agreement, which shall, notwithstanding,

continue in ful] force and effect.

In the event of change of applicable Federal laws af-

fecting this agreement, by virtue of which change it shall

become legal for the Enterprise Association to demand

that only members of Enterprise Association be employed

in the performance of work under its jurisdiction, or to

86

institute what is commonly known as the “closed shop,”

the Employer agrees that in such event and on the giving

of ten (10) days’ notice to the Employer by Enterprise

Association in writing by registered mail, this agreement

shall be deemed amended to the end that on and after

the conclusion of the said ten (10) days period only mem-

bers of the Enterprise Association shall be employed by

the Employer in the performance of work coming with-

in the jurisdiction of Enterprise Association and only

members of the Metal Trades Branch of Local Union 638

shall be empioyed in the performance of service work

more particularly described in Rule XVI of this agree-

ment.

ARTICLE SIX

This agreement shall supersede and replace all previ-

Ous agreements entered into between ENTERPRISE

and the EMPLOYER, upon the understanding that the

EMPLOYER shall continue to be responsible for any

moneys heretofore payable with respect to the Pension

Fund, Welfare Fund, Educational Fund, Vacation Plan

and the Security Fund.

IN WITNESS THEREOF, this agreement has been

signed by a duly authorized officer of ENTERPRISE

and the EMPLOYER the day and year first above

written.

ENTERPRISE ASSOCIATION, LOCAL UNION 638

By /s/ John J. Tracey

Business Agent-at-Large

Hudik-Ross Co., Inc.

By /s/ Frank Hudik

Employer

Date Signed 3-14-67

(Full Individual, Firm or Corporate Name)

Business Agent

Address :

87

RULES

Rules of the Enterprise Association applying to worl:

at the steamfitting trade and its many branches, in

the City of New York and in Nassau and Suffolk Coun-

ties, New York.

RULE I

WORKING DAY

SECTION 1. The hours of labor shall be seven (7)

hours per day, to be performed between the hours of

eight (8:00) o’clock A.M. and four (4:00) o’clock P.M.,

as designated by the employer, every day except Satur-

day, Sunday and legal holidays.

SECTION 2. No steamfitter or apprentice shall be al-

lowed to apply to any shop or office for employment

except between the hours of eight (8:00) o’clock A.M.

and four (4:00) o’clock P.M.

SECTION 3. If a steamfitter is employed on Tempo-

rary Heat, the twenty-four hour day shall be divided

into three (3) shifts of eight (8) hours each. One or

more of these shifts may be used.

SECTION 4. Each shift shall be known as the work-

ing day for temporary heat, every day including Satur-

day, Sunday and legal holidays.

SECTION 5. The working days above named shall

be known as regular time and shall be time actually em-

ployed at work.

* a & &

RULE V

MEN TO WORK IN UNITS OF TWO

All work to be performed within the jurisdiction of

Enterprise Association must be performed by journey-

men steamfitters or apprentices working in units of two,

88

one of whom must be a steamfitter. A unit shall be

composed of:

A. Steamfitter with a steamfitter, or

B. Steamfitter with an apprentice.

RULE VI

WHERE STEAMFITTERS AND APPRENTICES

ARE TO BE AT 8:00 O'CLOCK A.M.

Each steamfitter and apprentice shall be paid from

the time at which he arrives at his work within the terri-

tory of Greater New York and all of Long Island and

there shall be no board or carfare paid to steamfitters

or apprentices working in said territory.

A steamfitter who is sent to work outside of the

above noted territory shall take the boat, train or car

leaving either of the extreme points of the territory, as

directed by his employer, going on boat, train or car

leaving nearest eight (8:00) o’clock A.M. and returning

take the boat, train or car arriving nearest four (4:00)

oclock P.M.

RULE VII

EXPENSES ALLOWED TO STEAMFITTERS

Each steamfitter working outside of the limits de-

scribed in Rule No. VI shall receive from his employer

traveling expenses to and from the place at which thc

work is located for as many trips as he is directed by

his employer to make. He shall also receive a reason-

able amount of board paid by him and he shal! receive

regular wages for all regular time consumed in traveling.

If the steamfitter leaves his work before it is com-

pleted and without the consent of his employer, it shall

be at his own time and expense.

RULE VIII

In going from his shop to his work, or from his work

to the shop, a distance of more than one (1) mile, each

a —

89

steamfitter or apprentice shall receive from his em-

ployer the necessary fare.

RULE IX

CUTTING PIPE AND MAKING UP FITTINGS

Pipe up to and including four inches (4”) diameter,

with the exception of sprinkler work, radiator branches,

convector branches and coil connections shall be cut,

threaded and have fittings screwed on by hand or ma-

chine either on the job or in the shop of the direct

employer at the option of the employer. If the pipe is

cut and threaded on the job the work shall be done

in accordance with Rule V.

If the pipe is cut, threaded and fittings are screwed

on in the shop of the direct employer and said shop is

equipped with permanently installed pipe cutting and

threading machinery and it has been the practice of the

employer to cut and thread pipe and screw on fittings

in said shop, then the work shall be done by a steam-

fitter working alone. When a direct employer who has

had no permanently installed pipe cutting machinery in

his shop desires to do this work in his shop, such work

shall be done in accordance with Rule V.

Radiator branches, convector branches and coil con-

nections shall be cut and threaded by hand on the job

in accordance with Rule V.

All fittings on sprinkler work five inches (5”) and

under shall be made up according to Rule V.

All pipe used for temporary radiator connections hav-

ing been cyt by hand on the job and returned to the

shop may be used again.

RULE X

WELDING

Acetylene, electric or other forms of cutting or welding

shall be done either in the shop or on the job of the direct

employer at the option of the employer.

90

If welding is done in the shop of the direct employer,

the work shall be done by a steamfitter working alone.

All welding work done on the job shall be done in ac-

cordance with Rule V.

The fabrication of van stone joints, the making of

hammer welds, or the welding of boiler headers, street

steam headers, circular coils, trombone coils, zigzag coils,

trunk coils, double pipe refrigerating machine coils, at-

mospherie type condensers, absorbers, weak liquor coolers

and rectifiers of refrigerating machines may be done by

the employer without reference to any jurisdiction by

Enterprise Association. All other pipe welding is to be

performed by journeymen steamfitters.

RULE XI

TEMPORARY HEAT

SECTION 1. Steamfitters working alone shall have

jurisdiction in the operation and or maintenance of all

temporary heat work at all times whenever temporary

heat is on a building regardless of the source of heat

supply. If the fire is banked or if no heat is in the

radiators, steamfitters shall have no claim for temporary

heat operation and or maintenance. Steamfitters shall

have no claim for temporary heat operation and or main-

tenance in any building or structure or addition there-

to that will have a total of 1,500 sq. ft. of radiation

or less, exclusive of mains and risers installed in said

building or structure or addition thereto when com-

pleted.

* = * .

PLAINTIFF'S EXHIBIT 10

INTERIM AGREEMENT

IT IS AGREED AND UNDERSTOOD, by and be-

tween the undersigned Employer and ENTERPRISE

ASSOCIATION, STEAMFITTERS LOCAL 638, herein-

after referred to as the Union, that

91

1. Except as specifically modified herein the agree-

ment between the Employer and the Union which ex-

pired on June 30, 1972 shall be extended for an addi-

tional period of one year and shall terminate on June

30, 1973.

2. Rule XXIV (Industry Promotion Fund) and Rule

XXV (Urban Affairs Fund) shall be deleted.

3. Rules II, II, IX, X, XI, XVII and XXIII shall be

modified as follows:

(A). Rule II (Rate of Wages)

From July 1, 1972 to June 30, 1973 inclusive the

hourly wage rate of $8.115 shall be increased by .685¢

per hour. This sum of .685¢ per hour shall be deposited

weekly in an escrow bank account opened and main-

tained by the Employer in the Employer’s name as

Escrowee, to be paid to Steamfitters and or Apprentices

and to the Steamfitters Local 638 fringe benefit funds

when the increase is approved by the Construction In-

dustry Stabilization Committee. The bank book show-

ing such deposits and all supporting data shall be fur-

nished to the Union from time to time on the Unions

request. In the event the full increase is not approved

in its entirety so much as is approved shall be disbursed

by the Employer out of the escrow account at the

Union’s request and the parties shall renegotiate the

wage increase at the discretion of the Union.

The Union shall have the right to allocate the wage

increase among the wage rate and the Steamfitters Local

638 fringe benefit funds.

Section III shall read as follows:

“Section III]. Apprentices shall be paid a progressively

increased schedule of wages for five years based on the

following percentages of the wage rate payable to jour-

neymen steamfitters, and subject to the provisions of

Rule XX with respect to payments to Apprentices for

attendance at classes:

lst half of lst year 40% of a journeyman

steamfitter’s rate of wage

92

2nd half of 1st year 45° of a journeyman

steamfitter’s rate of wage

Ist half of 2nd year 50% of a journeyman

steamfitter’s rate of wage

2nd half of 2nd year 55% of a journeyman

steamfitter’s rate of wage

Ist half of 3rd year 60° of a journeyman

steamfitter’s rate of wage

2nd half of 3rd year 65° of a journeyman

steamfitter’s rate of wage

Ist half of 4th year 70% of a journeyman

steamfitter’s rate of wage

2nd half of 4th year 75% of a journeyman

steamfitter’s rate of wage

5th year 85° of a journeyman

steamfitter’s rate of wage

In addition to the hourly rates above, contributions to

the Welfare, Pension and Vacation Funds shall be made

at the same percentage of Fund payments for Steam-

fitters as the percentage of wages. The other Funds

shall be at the same rate as for Steamfitters.”’

As so modified Rule II shall continue in effect for the

period of this Agreement.

(B) Rule III (Rate for Overtime and Holidays)

A new Section III shall be added: There shall be no

overtime worked unless consented to by the Union.

(C) Rule IX (Cutting Pipe and Making Up Fittings)

New paragraphs shall be added to Rule IX reading

as follows:

“All pipe which is cut, threaded, grooved or has fittings

made up in the shop must be labeled before leaving the

shop. Labels shall be obtained by the employer by written

application to the Union. Labels shall bear, both the

Employer’s and Employees’ names before the label is

affixed. Unlabeled work shall not be installed.

All Pipe hangers, except sprinkler work made of

manufactured and, or fabricated components, shall be

assembled and erected on the job in accordance with

Rule V. Sprinkler hangers shall be assembled on the

job or in the shop of the direct employer.

93

All hanger rods shall be cut on the job or in the shop

of the direct employer.

The erection of all hangers, supports, stands and

structural attachments for work covered by this agree-

ment is the work of steamfitter and/or apprentice work-

ing in the geographic jurisdiction of the Union.”

As so modified Rule IX shall continue in effect for

the period of this Agreement.

(D) Rule X (Welding)

A new paragraph shall be added to Rule X reading

as follows:

“All pipe fabrication performed in a shop must be

labeled before leaving the shop. Labels shall be

obtained by the Employers by written application

to the Union, and labels shall bear the employers

and employees names before use. Unlabeled work

shall not be installed.”

As so modified Rule X shall continue in effect for the

period of this Agreement.

(E) Rule XI (Temporary Heat)

It is specifically understood that the within Rule XI

shall also apply to air conditioning and all references

to temporary heat shall be deemed to apply to air con-

ditioning as if the same were set forth at length in this

Rule.

(F) Rule XII (Care of Tools)

The within Rule XII shall be rewritten so as to sub-

stitute the following language for the priod language

in Rule XII:

“RULE XII, TOOLS AND SHANTIES

Section I. The Employer shall provide all neces-

sary tools required for the fitter to perform the

work. The fitter shall comply with all Employer

rules and regulations in the use and care of these

tools, and promptly report any that are missing,

destroyed or in need of repair.

Section II. The Employer shall provide suitable

shanties and dressing facilities on al] jobs. These

94 : 95

shall be heated during winter months. Where these

are prefabricated for job assembly, they shall be

assembled by fitters.

The Employer agrees not to discriminate in any

way against any person so designated as Job

Steward, either due to his being designated or to

his activities in behalf of Enterprise Association

1

Section III. In the event an employee’s working

clothes are destroyed by fire during other than work-

ing hours, the Employer shall compensate the em-

ployee for the replacement of these articles, but in

no event shall the amount for replacement exceed

Fity Dollars ($50.00) per man. In the event per-

sonal property, including street or dress clothes of

an employee, are destroyed due to fire, during work-

ing hours, the amount of damage shal! be limited to

and its members.”

(H) Rule XXIII (Surety Company Bond)

The within Rule XXIII shall be rewritten so as to

substitute the following language for the prior language

in Rule XXIII:

“RULE XXIII. BONDING AND FUND PAY-

MENT REQUIREMENTS AND

.

7

|

Seventy-Five Dollars ($75.00) .” ADMINISTRATION

(G) Rule XVIT (Job Stewards) Section I. Each Employer shall furnish a bond to

ithi ( — ; the joint benefit of the Trustees of the Steamfitters’

The within Rule XVIF shall be rewritten $0 as to sub | ites Welfare Fund, the Steamfitters’ Industry

- ead pe language for the prior language Pension Fund, the Steamfitters’ Industry Educa-

in Rule } ,

“RULE XVII—JOB STEWARDS

Where the Employer employs four (4) or more units

(as defined in Rule V) of Enterprise Association

members on a job, then the members of Enterprise

Association on the job shall select from one of such

units a Job Steward, who shall be a working steam-

fitter and who shall act in behalf of the interests

of the Union and whose duties shall not interfere

with the work he is employed to perform by his

Employer.

When the Employer of a Job Steward has four (4)

or more units working overtime on the job where

the Job Steward is employed, the Job Steward and

his partner shall be included in one of the units

working overtime.

The steamfitter in charge shall be the Shop Steward

whenever less than four (4) units are employed

on the job.

tional Fund, the Steamfitters’ Industry Vacation

Plan, the Steamfitters’ Industry Security Benefit

Fund, guaranteeing payment to said Trustees,

jointly and severally, of any and all amounts due

from said Employer to each of all of said Funds or

Plan, pursuant to the terms of this Agreement.

Such bond shall be in form and substance satis-

factory to the said Trustees, jointly.

The aggregate amount of the bund shal! be deter-

mined by the following:

0to20 Local 638 Employees $ 5,000.00

21to70 Local 638 Employees $10,000.00

Over 70 Local 638 Employees $30,000.00

Section II. Each Employer will make the required

Fund payments provided for in this Agreement

within fourteen (14) calendar days following the

close of the work week, i.e., for a work week end-

ing on Wednesday the Fund payments must be paid

no later than the second following Wednesday ex-

cept where Trustees have, in writing, authorized

other terms.

96

Application for such less frequent payments should

be made in writing by the Employer and shall, upon

approval require a bond for double the amount re-

quired in Section I.

Reporting of Fund payments by employees name

shall be submitted at the same time as payments.

Section IV. The Trustees may at any time direct

a payroll audit of any Employer to verify the Fund

payments.

The Trustees shall notify the appropriate Enterprise

Association officials of all delinquent Employers for

action as provided below. All Bonds furnished un-

der this Rule shall provide for the payment of in-

terest at 8° per annum on any delinquent Fund

payments or wages in addition to the principal

amount and shall also reimburse the Funds for the

reasonable expense of collecting such delinquency.

The Union may remove the men from a contractor

who has been found delinquent in his Fund pay-

ments.”

4. Where the prior agreement, which terminated on

June 30, 1972 made references to the “Association”

such references shall be modified or deleted insofar as

they are inconsistent with the intention of the parties

to enter into an agreement which is independent of

and separate from any “Association” contract.

5. If an agreement is reached prior to June 30, 1973

by the Union with the Associations, this agreement

shall terminate and the parties automatically be bound

by the terms of such Association agreement and a full

agreement embodying such termis shall be executed by

the Employer and the Union. However, the wages due

and payable and other conditions of employment as set

forth in this Agreement shall not be affected for the

periods in effect prior to the date of the Association

contract.

97

6. The parties agree to incorporate this Agreement

in a full contract if so requested by the Union.

For the Employer

/s/ \Mlegible}

Hudik-Ross Co., Inc.

251 W. 42nd St.

NY, NY 10036

For The Enterprise

Association

Local 638

By /s/ John J. Tracey

Business Agent at Large

Dated July 1, 1972

98

DEFENDANT'S EXHIBIT B

ENTERPRISE ASSOCIATION

Of Steam, Hot Water, Hydraulic, Sprinkler, Pneumatic

Tube, Compressed Air, Ice Machine, Air Condition-

ing and General Pipe Fitters of New York

and Vicinity

A.F.L.-C.1.0.

STEAMFITTERS LOCAL UNION 638

OF THE UNITED ASSOCIATION

{Union Label 285 |

SECRETARY'S OFFICE MEETS AT

841 BROADWAY ROOSEVELT AUDITORIUM

New York, N.Y. 10003 100 East 17th Street

Phone ORegon 4-3937 New York City, N.Y.

The undersigned hereby agrees to continue in force

the Working Agreement that expired on June 30, 1969

with the following modifications, it being understood

that this Agreement will be continued until a more

formal and detailed agreement is drawn and executed.

All the Articles and Rules enumerated in said Work-

ine Acreement are to remain the same excent Rules IT,

(Waces). XXIII. (Surety Bond) and XXIV. (Industry

Promotional Fund). A new Rule, XXV. (New York

City Buildine and Construction Industry Board of Urban

Affaivs Fnnd) will he added.

From July 16. 1969 to December 31, 1969, inclusive,

rerular time for a steamfitter shall be paid for at the

rate of $6.31 per hour plus 6% Welfare, 7% Pension,

9° Voeeation. 50¢ ner hour Security Benefit Fund, 3¢

ner hour Educational Fund, 3¢ per hour Industry Promo-

tional Fund and le per hour Industrial Board of Urban

Affairs. (See Rules XVIII, XIX, XX, XXI, XXII,

XXIV, and new Rule XXV).

99

Thereafter, from 1-1-70 to 7-1-70, inclusive, the Em-

ployer shall pay an additional 45¢ per hour to cover

Wages and Fringe Benefits.

Irom 7-2-70 to 12-30-70, inclusive, the Employer shall

pay an additional 50¢ per hour to cover Wages and

fringe benefits.

From 12-31-70 to 6-30-71, inclusive, the Employer shall

pay an additional 60¢ per hour to cover Wages and

fringe benefits.

From 7-1-71 to 12-29-71, inclusive, the Employer shall

pay an ac itional 65¢ per hour to cover Wages and

fringe beneiits.

From 12-30-71 to 6-30-72, inclusive, the Employer shali

pay an additional 65¢ per hour to cover Wages and

fringe benefits.

The usual percentage of the Steamfitter’s Wage plus

Fringe Benefits will be paid for the operation and/or

maintenance of temporary heat and in the employment

of Apprentices.

Rule XXIII is modified to require Employer to make

Fringe Benefit payments within 14 days after they be-

come due and if any Employer is delinquent in making

these payments, he will be required to post a $10,000.00

bond; in addition, he will be required to pay a late

charge at a rate of interest to be agreed upon by the

parties hereto and such Employer will be required to

produce his payroll records for an audit so that a veri-

fication of the correct amount due may be obtained.

Rule XXIV will be jointly administered when Federal

Law so permits.

Rule XXV (new). A new Fund will become part of

this agreement, said Fund to be known as the New York

City Building and Construction Industry Board of Ur-

ban Affairs Fund.

The term of this agreement shall be three (3) years

and no change will be asked by either party hereto, to

take effect before July 1, 1972, except that from January

1, 1970 through the term of this agreement, the parties

will agree to the allocation of the increases mentioned

herein, all of which shall be incorporated in the more

100 101

formal agreement to be drawn and executed by the SUPREME COURT OF THE UNITED STATES

arties.

4 ENTERPRISE ASSOCIATION No. 75-777

LOCAL UNION 638

NATIONAL LABOR RELATIONS BOARD, PETITIONER

BY: /s/ Hudik-Ross Co., Inc. v.

ENTERPRISE ASSOCIATION OF STEAM, HOT WATER, Hy-

/s/ John J. Tracey | DRAULIC SPRINKLER, PNEUMATIC TUBE, ICE MACHINE

B.A. at Large AND GENERAL PIPEFITTERS OF NEW YORK AND VI-

CINITY, LOCAL UNION No. 638, ETC.

/s/ [Illegible} ORDER ALLOWING CERTIORARI. Filed February 23, 1976

Employer

July 16, 1969 The petition herein for a writ of certiorari to the

United States Court of Appeals for the District of

Columbia Circuit is granted.

UU. S. GOVERNMENT PRINTING OFFicE, 1976 206293 247

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Appendix — National Labor Relations Board v. Enterprise Ass'n of Steam, Hot Water, Hydraulic Sprinkler, Pneumatic Tube, Ice Machine & General Pipefitters · 424 U.S. 908 | Frix