IN THE ; ——

Supreme Court of the Anited States

OCTOBER TERM, 1988

JOHN A. BERSANI, NEWPORT GALLERIA GROUP,

ROBERT J. CONGEL and the PYRAMID COMPANIES,

Petitioners,

v.

UNITED STATES ENVIRONMENTAL PROTECTION

AGENCY, et al.,

Respondents.

PETITION FOR A WRIT OF CERTIORARI TO THE

UNITED STATES COURT OF APPEALS FOR THE

SECOND CIRCUIT

Gary H. Baise

Counsel of Record

Albert J. Beveridge, III

Virginia S. Albrecht

David M. Friedland

BEVERIDGE & DIAMOND, P.C.

1333 New Hampshire Ave., N.W.

Washington, D.C. 20036

(202) 828-0200

Attorneys for Petitioners.

PRESS OF BYRON S. ADAMS, WASHINGTON, D.C. (202) 347-8203

QUESTION PRESENTED

Section 404 of the Clean Water Act and its regu-

lations allow the Army Corps of Engineers to issue

permits for dredge and fill activities in wetlands where

no practicable alternative site “is available.’’ In this

case, the Corps issued a permit, finding that no al-

ternative site was available at the time of permit re-

view. EPA vetoed the permit on the ground that an

alternative was available to the applicant when it

“entered the market.”

The question for this Court is whether the Second

Circuit erred in upholding EPA’s “market entry”’ the-

ory of practicable alternatives where the theory pro-

vides no standard to guide the regulated community,

is inconsistent with the purpose of the Act and the

language of the regulations, overrides determinations

of state and local officials, and contradicts the settled

practice of the Corps of Engineers?

LIST OF PARTIES AND RULE 28.1 LIST

The parties to the proceedings below were the

Petitioners, John A. Bersani, Newport Galleria Group,

Robert J. Congel and the Pyramid Companies, and

the Respondents, United States Environmental! Pro-

tection Agency, United States Army Corps of Engi-

neers, Lee Thomas, in his official capacity as

Administrator of the United States Environmental

Protection Agency, Richard K. Dawson, in his official

capacity as Assistant Secretary for Civil Works,

United States Army, and Jennifer Joy Wilson, in her

official capacity as Assistant Administrator for Ex-

ternal Affairs, United States Environmental] Protec-

tion Agency.

Joseph Robichaud and Citizens in Support of At-

tleboro Mall intervened on behalf of Petitioners in the

court below. Sierra Club, Environmental Defense

Fund, National Wildlife Federation, National Audubon

Society, Conservation Law Foundation of New Eng-

land, Inc., Massachusetts Audubon Society, Citizens

for Responsible Environmental Management, Massa-

chusetts Society for Conservation Professionals, Au-

dubon Society of Rhode Island, Rhode Island

Association of Conservation Commissioners and Nat-

ural Resources Defense Council intervened on behalf

of Respondents in the courts below.

The caption of the Second Circuit’s opinion is in-

correct because it lists Intervenors Robichard and Cit-

izens in Support of Attleboro Mall and the

Homebuilding Association of Massachusetts as parties

adverse to Petitioners, when, in fact, these parties

intervened on behalf of Petitioners. The Homebuilding

Association of Massachusetts did not appeal the dis-

trict court’s decision. Petitioners have correctly cap-

tioned the case, John A. Bersani, Newport Galleria

Group, Robert J. Congel and the Pyramid Companies

v. United States Environmental Protection Agency, et

al., for this Petition for Certiorari.

Pursuant to Rule 28.1 of the Supreme Court Rules,

Petitioners Newport Galleria Group and the Pyramid

Companies submit the following information:

Petitioner Newport Galleria Group is a gen-

eral partnership, none of whose partners is

a corporation. Pyramid Companies is an as-

sociation of related partnerships, none of

whose partners is a corporation.

iv

TABLE OF CONTENTS

Page

QUESTION PRESENTED. .0...2..:0:.ccccccccscsscsscccsscssssssceeees i

LIST OF PARTIES AND RULE 28.1 LIST ................. ii

I OE IIIS sins innienennensiinntiscinsaeiansnaiine iv

ET [i SURED - cccosccénnvutansiacnsasenssadnsednotesdens vi

IIIT MIIIUIET sichnecpicnsanindisenhptenenasodennnanciintionnadsion 1

III llc snatintnsen adscasatinnsabeninapnedinnlibliatneniiininsocie 2

STATUTES AND REGULATIONS INVOLVED ........... 2

BE ATEEIICE OF TEER CAGE ccccscrccccessscccscccscccosssesccces 2

i SEIN ecseasdncinnindsctsdiiniunaadmineninnameiene 2

B. The Statutory And Regulatory Frame-

CE eeieenistiaatnnectintinnsecnitnditeaheitiniennesnns 4

C. Pyramid’s Project And The Site ............ 6

oe 7

1. State and Local Permit Proceedings

and Approval of Massachusetts

Supreme Judicial Court ..................... 7

2. Corps Regulatory Proceedings .......... 7

3. EPA Regulatory Proceedings ............ 8

4. District Court Opinion ...................00 9

5. Second Circuit Opinion ................c0 9

REASONS FOR GRANTING THE WRIT ..................... 10

I. THE PETITION FOR CERTIORARI

SHOULD BE GRANTED BECAUSE THE

MARKET ENTRY THEORY PROVIDES

NO STANDARDS AGAINST WHICH THE

REGULATED COMMUNITY CAN MEAS-

CORR Oee GHUPUPEPTADT © sinicenicciscnsenapinticiasnctnone 13

A. The Point Of Market Entry Remains

i ee 13

B. The Market Entry Theory Is Unworkable

eee, § | Be 15

Il. THE PETITION FOR CERTIORARI

SHOULD BE GRANTED BECAUSE THE

MARKET ENTRY THEORY IS CON-

TRARY TO THE STATUTORY AND REG-

CL sAUIESE GPUMEEEEEEED ‘cthsertinecscadossennscannsnccants 18

A. The Market Entry Theory Is Inconsistent

With The Purpose of Section 404 ......... 18

B. The Market Entry Theory Is Contrary To

The Language Of The Section 404(b\1)

GID | Kiciciintacstadiatdnaddtanmndsapenntiaisdnsiss 25

C. The Second Circuit Decision Distorts The

Regulatory Scheme By Allowing EPA To

Ignore Its Burden Of Proof Under Sec-

GRUUE SINE cntstetninseosossocsnnussaasbennbtasastiacents 27

CORT ATI ancscspscnssenennnnssencensencesscveninntintninennidinanitionate 28

TABLE OF AUTHORITIES

CASES: Page

Atchison, Topeka & Santa Fe Railway v. Wichita

Board of Trade, 412 U.S. 800 (1973) .............. 15

Bersani v. EPA, 674 F. Supp. 405 (N.D.N.Y.

QOD cccrsccestscvconestasnstecnniocnnssnieseinainiuennnensteneciecs 2.9

Bersani v. Robichaud, 850 F.2d 36 (2d Cir.

ROD cccoceccnncnstazecnectonecinesnsenismiecacinenians passim

Bethlehem Steel Corporation v. EPA, 723 F.2d 1303

QO Se nae 24

Chevron, U.S.A., Inc. v. NRDC, 467 U.S. 837

RR eee 10

Citizens for Responsible Environmental Manage-

ment v. Attleboro Mall, Inc., 400 Mass. 658,

B12 NIE.Be GER CAGED ccccecccssesccesscsssccessnssessese: 7

Commonwealth of Pennsylvania v. Union Gas Co.,

832 F.2d 1 (3d Cir. 1987), cert. granted,

__.U.S. —_, 108 S.Ct. 1219 (1988) ............... 10

Environmental Defense Fund, Inc. v. Ruckelshaus,

439 F.2d 584 (D.C. Cir. 1971) ..............cccc0ese 15

Friends of the Earth v. Hintz, 800 F.2d 822 (9th

Che. BIRD ccencesccnsstenvensphcnnibassonmenuieuinsianteionsonees 27

General Electric Co. v. Gilbert, 429 U.S. 125

CRIED cecerscnseststesnesseerserecuenennmamaennes 29

Gwaltney of Smithfield, Ltd. v. Chesapeake Bay

Foundation, __U.S. ~~, 108 S. Ct. 376

CRB TD cccoccsccsscavsssssniosssssscsusnescnensanssuecscssemnstensens 26

Hough v. Marsh, 557 F. Supp. 74 (D. Mass.

ROBY cccrncscnecsnsevsssesencenensssesnssetsunmuessnssnnmmenssadvenss 27

Industrial Union Department v. American Petro-

leum Institute, 448 U.S. 607 (1980) ................ 28

Mall Properties, Inc. v. Marsh, 672 F. Supp. 561

(D. Mass. 1987), appeal denied, 841 F.2d 440

(1st Cir. 1988), cert. denied sub nom. New Ha-

ven v. Marsh, __U.S. _—, 109 S.Ct. 128

(2BGED .ccersscssincisintsnaniadiabiienindgaaaaaien 21

vil

Table of Authorities Continued

Page

Monongahela Power Co. v. Marsh, 809 F.2d 41 (D.C.

Cir. 1987), cert. denied, __U.S. __, 108 S.Ct.

ee eerie aietehteenainnitithdipeadieeceateintceecnteetliiees 22,23

Morton v. Ruiz, 415 U.S. 199 (1974) .0.........00000..... 18

Natvonal Association of if Greeting Card Publishers v.

U.S. Postal Service, 462 U.S. 810 (1983) ....... 29

National Audubon Society v. Hartz Mountain De-

velopment Corp., 14 Envtl. L. Rep. 20724

(Envtl. L. Inst.) (D.N.J. Oct. 24, 1983) .......... 26

South Terminal Corp. v. EPA, 504 F.2d 646 (1st

Ne I lie rece t e 18

Steadman v. SEC, 450 U.S. 91 (1981) ........000000..... 28

Tull v. United States, __U.S. —, 107 S.Ct. 1831

TUTE? aidiciddendiestaltiidbaaitnepacdidacnaithenniteadaiiiaanitaiaaietnitinstnactiais 10

United Scenic Artists Local 829 v. NLRB, 762 F.2d

I I a i 28

United States v. Riverside Bayview Homes, Inc., 474

tials 10,23

FEDERAL STATUTES:

Administrative Procedure Act

eR a ee 18

RE Se re 2

Federal Water Pollution Control Act

Section 301, 38 U.S.C. § 13111 ............................ 4

Section 408, 38 U.S.C. § 1348 ........................... 19,20

Section 404, 33 U.S.C. § 1344 ......................00. passim

FEDERAL REGULATIONS

ee eT seiceesienaeiiiiaimiiinian 5

A 4

OU ira i 5

ee eae 18

eee ef 0 RE,

viii

Table of Authorities Continued

Page

40 C.FR. § ZOOM) rcccccccccccccccccccccccccccscccssscosessooes 16

44 Fed. Reg. 58,076 (October 9, 1979) ...........00+ 6

45 Fed. Reg. 85,336 (December 24, 1980) ....... 6,19,27,28

LEGISLATIVE HISTORY

S. 2770, and debate on same, 92d Cong. Ist Sess.

CRT ED ccnecaninicssnnssntnincsnstesiotesnntenssnnmstateneasensnonnsss 24

S. Conf. Rep. No. 1236, 92d Cong., 2d Sess.

COTE ‘snccendsatabbinndnctotnssniostintinninbéonesiscusianesnineaiouse 23

Senate Consideration of the Conference Report

ERIRTIID sccenecncenspovecinsnennnscehinpanvsssonsanensentonntatutssiness 24

H.R. 11896, 92d Cong., 2d Sess. (1971) ................ 24

MISCELLANEOUS:

EPA Final Determination of the Assistant

Administrator for External Affairs (May 13,

BOBS) nccaccccccccccnccccssccesccossssscccsnsassssescsscoesssocssooees passim

The Conservation Foundation, Protecting America’s

Wetlands: An Action Agenda, the Final Report

of the National Wetlands Policy Forum

CRIIEED . cccsiunnsuntnssnnennnianssinipinsanignanenniiniscmensagemsens 16

United States General Accounting Office, WET-

LANDS, The Corps Of Engineers’ Administra-

tion Of The Section 404 Program, Report to the

Chairman, Subcomm. on Investigations and

Oversight, Comm. on Public Works and

Transportation, House of Representatives

(Washington, D.C.: GAO/RCED-88-110, July,

RITE ccasndnincicstudedasnesaibisenisusisataninisintanhanniiamnenbess 4

IN THE

Supreme Court of the United States

OCTOBER TERM, 1988

No.

JOHN A. BERSANI, NEWPORT GALLERIA GROUP,

ROBERT J. CONGEL and the PYRAMID COMPANIES,

Petitioners,

Ve

UNITED STATES ENVIRONMENTAL PROTECTION

AGENCY, et al.,

Respondents.

PETITION FOR A WRIT OF CERTIORARI

TO THE UNITED STATES

COURT OF APPEALS FOR THE SECOND CIRCUIT

Petitioners John A. Bersani, Newport Galleria Group,

Robert J. Congel and the Pyramid Companies respectfully

pray that a writ of certiorari issue to review the judgment

and opinion of the United States Court of Appeals for the

Second Circuit, entered in this proceeding on June 8, 1988,

rehearing and suggestion for rehearing en banc denied,

September 2, 1988.

OPINIONS BELOW

The opinion of the United States Court of Appeals for

the Second Circuit, with the dissenting opinion of Judge

Pratt, (App. A), is reported at 850 F.2d 36 (2d Cir. 1988).

The Order of the United States Court of Appeals for the

Second Circuit, denying Petitioners’ Petition for a Re-

hearing and Suggestion for Rehearing En Banc, (App. D),

dated September 2, 1988, is not reported. The opinion of

the United States District Court for the Northern District

of New York, (App. B), is reported at 674 F. Supp. 405

(N.D.N.Y. 1987). The Final Determination of the Assistant

Administrator for External Affairs, United States Envi-

ronmental Protection Agency, Concerning the Sweedens

Swamp Site in Attleboro, Massachusetts Pursuant to Sec-

tion 404(c) of the Clean Water Act (‘Final Determina-

tion”), (App. C), dated May 13, 1986, is not reported.

JURISDICTION

The Petitioners brought suit in the United States Dis-

trict Court for the Northern District of New York, invok-

ing federal jurisdiction pursuant to 28 U.S.C. § 1331 and

the Administrative Procedure Act, 5 U.S.C. § 702. The

Second Circuit denied Petitioners’ petition for rehearing

on September 2, 1988. Jurisdiction is conferred on this

Court by 28 U.S.C. § 1254(1).

STATUTES AND REGULATIONS INVOLVED

The relevant statutory provision, Section 404 of the

Clean Water Act (“the Act’’), 33 U.S.C. § 1344, is repro-

duced in the Appendix (App. E), as is the key regulatory

provision, 40 C.F.R. § 230.10(a), (App. F).

STATEMENT OF THE CASE

A. Introduction

This case presents an issue that is critical to the admin-

istration of a permit program jointly administered by the

United States Army Corps of Engineers (the “‘Corps’’) and

the United States Environmental Protection Agency

(“EPA” or the ““Agency”), under Section 404 of the Clean

Water Act (“CWA” or “the Act’’). Section 404(a) of the

Act authorizes the Corps to issue permits for the discharge

of dredged or fill material into the Nation’s waters if the

proposed project satisfies regulations promulgated by EPA

and the Corps pursuant to Section 404(b). Under the Sec-

tion 404(b) regulations, no permit will be issued if a prac-

ticable alternative site “‘is available’ to the applicant.

Section 404(c) authorizes EPA to veto a Corps-issued per-

mit to protect certain environmental interests.

In this case, the Corps found that no alternatives were

available to the Petitioner at the time of permit review

and decided to issue a permit. EPA determined, however,

in a departure from settled administrative practice, that

availability of alternatives should be judged as of the time

the applicant “entered the market” and, applying that the-

ory, vetoed the applicant’s project.

As Judge Pratt observed in dissent below, the market

entry theory “‘approaches a sensitive environmental prob-

lem through a time warp, it ignores the statute’s basic

purpose, and it creates unfair and anomalous results.”’ 850

F.2d at 48; App. A 25a.

In addition, the theory establishes a standardless inquiry

that virtually invites arbitrary and unequal application. It

makes no sense in the real world of land use planning,

financing and development, and it severely erodes the abil-

ity of public facilities planners, state and local land use

planners and private investors to make reasoned judg-

ments in carrying out their responsibilities.

Moreover, the theory contradicts the practice and un-

derstanding of the Corps, which, as the permitting au-

thority under the Act, is the agency most intimately

involved in administering the relevant regulations. It is

also contrary to the language of the regulations and to

EPA’s own previous interpretation of those regulations. If

left uncorrected, the Second Circuit’s adoption of EPA’s

‘market entry’ theory as the only correct understanding

of the regulations will throw what had previously been

settled administrative practice of permit review into a state

of irremediable confusion.

B. The Statutory And Regulatory Framework

The Clean Water Act prohibits the discharge of any

pollutant, including dredged or fill materials, into the Na-

tion’s waters, including wetlands, except in compliance with

the Act. CWA § 301(a), 33 U.S.C. § 1311(a). Section 404

is an exception to the Act’s general prohibitions. It es-

tablishes a permit program under which the Corps may

authorize discharges of dredged and fill materials in cer-

tain circumstances. CWA § 404, 33 U.S.C. § 1844. The

program regulates a vast array of activities, ranging from

the construction of a tennis court in a homeowner’s back-

yard to construction of new residential subdivisions, office

parks, and shopping malls to large public construction proj-

ects involving, for example, highways, port improvements,

public marinas, parks, public housing, schools and colleges.

The Corps administers the program and reviews approx-

imately 14,000 individual permit applications every year.’

Thousands of other projects are regulated by general per-

mits issued in accordance with Section 404(e). 33 U.S.C.

§ 1344(e); 33 C.F.R. Part 330.

Although EPA has authority to issue permits under

other sections of the Act, Congress made the Corps the

permitting authority under Section 404, in recognition of

the Corps’ special expertise in this area. 33 U.S.C. §

1344(a); App. E 1lla. Section 404(b) provides that the

Corps must base its permit decision on guidelines (the

‘ United States General Accounting Office, WETLANDS, The Corps

Of Engineers’ Administration Of The Section 404 Program, Report to

the Chairman, Subcomm. on Investigations and Oversight, Comm. on

Public Works and Transportation, House of Representatives 11 (Wash-

ington, D.C.: GAO/RCED-88-110, July, 1988) (In 1986, the Corps issued

approximately 10,500 permits and denied an estimated 500 applications;

3,000 applications for permits were cancelled or withdrawn).

“‘404(bX1) guidelines’) developed by EPA in conjunction

with the Corps. 33 U.S.C. § 1344(b); App. E 1lla. These

guidelines require the Corps to consider a comprehensive

range of environmental, scientific, and economic factors in

making its permitting decisions. 40 C.F.R. Part 230. In

addition, the Corps applies a wide-ranging “‘public interest

review” under regulations that were already in effect at

the time the Clean Water Act was passed.’

Of particular importance here, the Corps may not issue

a permit if there is a “practicable alternative” available

to the applicant that ‘would have less adverse impact on

the aquatic ecosystem.” 40 C.F.R. § 230.10(a); App. F

113a-114a. An alternative is “practicable” if it is available

to, or can reasonably be obtained by, the applicant and

will fulfill the applicant’s project purpose. 40 C.F.R. §

230.10(aX2); App. F 113a. With respect to ‘‘non-water-

dependent activities’ proposed for wetlands (i.e., activities

that could be accomplished on non-wetland sites, such as

construction of a shopping mall), practicable alternatives

are “presumed to be available” unless the applicant clearly

demonstrates otherwise. 40 C.F.R. § 230.10(aX3); App. F

113a-114a.

Finally, Section 404(c) of the Act authorizes EPA to

overrule a Corps decision to grant a permit and so to

prohibit the use of a specific area as a discharge site for

dredged or fill material whenever EPA “determines ...

that the [proposed] discharge . . . will have an unacceptable

adverse effect” on one of five specifically enumerated en-

vironmental interests. 33 U.S.C. § 1344(c); App. E 1lla-

?In this review, the Corps balances the “national concern for both

protection and utilization of important resources,”’ considering a wide

range of factors such as “conservation, economics, aesthetics, general

environmental concerns, wetlands ... and, in general, the needs and

welfare of the people.”’ 33 C.F.R. § 320.4.

sceeiceietiiiiaatamaamiaaiiaineaiaitaailiaiiititiliiiiiaaiaaie

112a. In exercising this authority, EPA has the burden of

proving that an “unacceptable adverse effect’’ will occur.®

In this case, Pyramid sought to fill a wetland and in

an approximately 18-month period obtained all the nec-

essary permits from the local government and the State

of Massachusetts, including approval under the Massachu-

setts Wetlands Protection Act, and from the Corps pur-

suant to Section 404(a) and (b). In approving the project,

the Corps specifically found that no practicable alternatives

were available to Pyramid. EPA, however, overrode the

Corps’ decision, vetoing the permit on the ground that a

site optioned by a competing shopping center developer

three months before Pyramid began searching for sites in

the Attleboro, Massachusetts area “‘is available’ to Pyr-

amid within the meaning of the guidelines.

C. Pyramid’s Project And The Site

Pyramid is a large shopping center developer in the

Northeast. It began searching actively for suitable sites in

the Attleboro, Massachusetts area in September 1983. JA

225, JA 291.4 Pyramid purchased an 82-acre site (‘South

Attleboro”) from the Edward J. DeBartolo Corporation

(‘‘DeBartolo’’), another shopping center developer, in De-

cember 1983, and proposed to build a two-level shopping

mall. App. C 95a. The site contains 49.6 acres of red maple

swamp.

Pyramid has a competitor in the vicinity, New England

Development Company (““NED”’’). On July 1, 1983, before

Pyramid began looking for sites in the area, NED had

*45 Fed. Reg. 85,336, 85,338 (December 24, 1980); 44 Fed. Reg.

58,076, 58,080 (October 9, 1979).

‘ References to the Joint Appendix filed in the court below are as

follows: “JA ..”” References to documents in the Administrative

Record which are not included in the Joint Appendix are as follows:

“AR, _._..” References to the Appendix filed with this Petition are

as follows: “App. A —,” and so forth.

acquired a two-year option on another shopping center site

(“North Attleboro’’). Id.

D. Proceedings To Date

1. State and Local Permit Proceedings and Approval of

Massachusetts Supreme Judicial Court

After acquiring its site in December 1983, Pyramid ap-

plied for and obtained all necessary state and local ap-

provals.© Among other things, Pyramid obtained a state

wetlands permit for the project pursuant to the Massa-

chusetts Wetlands Protection Act, and the Massachusetts

Supreme Judicial Court upheld the permit. Citizens for

Responsible Environmental Management v. Attleboro Mall,

Inc., 400 Mass. 658, 511 N.E.2d 562 (1987).

2. Corps Regulatory Proceedings

Pyramid applied to the New England regional office of

the Corps (‘“‘“NE Corps’’) for an individual permit in July

1984. The application stated that North Attleboro was

“unavailable.”” AR, B-2 11. Because the NE Corps was

unable to resolve certain policy issues not relevant to this

Petition, the Corps’ Director of Civil Works ordered the

case to be elevated to Corps headquarters.

The Director of Civil Works determined that the project

satisfied the 404(bX1) guidelines and the Corps’ public in-

terest review regulations, and directed the local office to

issue a permit. On the key issue of availability of alter-

natives, the Director agreed with the NE Corps and found

* The land was rezoned for development as a shopping center, and

the Massachusetts Department of Public Works approved all necessary

roadway modifications. State water quality certification was issued in

March 1985, pursuant to Section 401 of the Clean Water Act, 33 U.S.C.

§ 1341. In accordance with the Massachusetts Environmental Policy

Act, an Environmental Impact Report was prepared and approved by

the Commonwealth’s Office of Environmental Affairs. AR, B-4. The

Mayor, City Council, City Planner, and the City’s economic development

agency all support the project. JA 89.

ata erin

that North Attleboro was not available “because it has

been optioned by another mall developer.” JA 83. On June

28, 1985, the NE Corps formally notified the regional of-

fices of EPA and the United States Fish and Wildlife

Service that it intended to issue a permit to Pyramid. AR,

B-16.

3. EPA Regulatory Proceedings

In July 1985, EPA’s Regional Administrator notified the

Corps and Pyramid that he intended to initiate veto pro-

ceedings under Section 404(c). AR, B-I8. On March 4, 1986,

the Regional Administrator recommended to EPA head-

quarters that Pyramid’s project be prohibited, urging a

legal rationale that headquarters would later reject. JA

119-196. EPA’s Assistant Administrator for External Af-

fairs (‘Assistant Administrator’’) issued a Final Determi-

nation on May 13, 1986, prohibiting the project because it

would have avoidable, and, therefore, “‘unacceptable,”’ ad-

verse effects on wildlife. App. C 108a.

In reaching this conclusion, the Assistant Administrator

first found that of the environmental interests protected

by Section 404(c), only wildlife would be adversely affected.

Id. at 82a. She then examined whether the adverse effect

was unacceptable “‘by reviewing whether there are prac-

ticable, less environmentally damaging alternatives” to the

South Attleboro site. Jd. at 83a.

Turning to “‘practicable alternatives,”’ the Assistant Ad-

ministrator rejected the longstanding Corps understanding

that the availability of alternatives is considered at the

time of permit review. Instead, she changed the rules of

the game and determined that availability should be tested

as of the time the applicant ‘‘entered the market.” Jd. at

95a. She did not, however, define what constitutes ‘‘mar-

ket entry.” This theory had never been advanced or sug-

gested, either by the Corps or EPA, before this proceeding.

Pyramid had begun its investigation of the trade area

in September 1983, approximately eight weeks after its

competitor NED had optioned the North Attleboro site.

The Assistant Administrator, however, applying the ret-

roactive market entry theory, relied on alleged “trade cus-

tom’”’ to find that Pyramid must have “entered the market”

before the date on which NED had optioned North Attle-

boro. Jd. at 95a n.15. Then, ignoring the fact that EPA’s

own regulations place the burden in a 404(c) proceeding

on the Agency, the Assistant Administrator concluded that

“{ojn this record, I cannot find that Pyramid has met its

burden of showing that the North Attleborough [sic] site

was unavailable.” Jd. at 95a-96a. Since, according to this

novel analysis, the North Attleboro site was “available’’

to Pyramid when it entered the market, the Assistant

Administrator concluded that any adverse effects resulting

from Pyramid’s project were ‘avoidable’ and therefore

“unacceptable.” Jd. at 108a. She therefore vetoed the per-

mit.

4. District Court Opinion

The district court upheld EPA’s Final Determination.

Although the court rejected the Agency’s “trade custom”

inference, it deferred to EPA’s interpretation of the reg-

ulation, holding that its “carefully circumscribed” function

was to “uphold a reasonable [EPA] interpretation, even if

the court would not have reached the same conclusion in

2 first instance.” 674 F. Supp. at 412; App. B 45a.

5. Second Circuit Opinion

The Second Circuit affirmed, with one judge dissenting.

850 F.2d at 43; App. A 5a. While it was uncertain whether

EPA’s interpretation merited deference, the court ruled

that the “‘market entry’’ theory was the only reasonable

interpretation of the regulations. 850 F.2d at 44; App. A

17a. Rejecting Pyramid’s argument that “market entry”

was little more than a standardless evasion, the court ob-

served that there was no need to “‘pin down the standard,”’

for to do so would only “‘confuse things further.’’ 850 F.2d

at 45; App. A 22a.

|

10

Judge Pratt dissented on the ground that the market

entry theory improperly focuses on the decision-making

techniques and tactics of a developer at the time it entered

the market, rather than the actual alternatives to devel-

opment in wetlands, which is Section 404’s central pur-

pose. 850 F.2d at 48; App. A 25a. The proper time to

analyze the availability of alternatives, Judge Pratt found,

is as of the time EPA makes its 404(c) decision, a position

that is “reinforced by the present-tense language of the

regulation, which commands EPA to determine whether

an alternate site ‘is available.’ ”” 850 F.2d at 49; App. A

29a.

REASONS FOR GRANTING THE WRIT

This case raises important issues of statutory and reg-

ulatory construction in the administration of the Clean

Water Act.* The Corps evaluates approximately 14,000 in-

dividual applications for Section 404 permits per year. The

cornerstone of the Corps’ Section 404 analysis is its thresh-

old determination whether there is a practicable alternative

site for the proposed project. Until the decision in this

case, the Corps and EPA had always evaluated the avail-

ability of alternatives as of the time of permit review.

*This Court has granted certiorari in other cases to review similar

issues. See, e.g., Commonwealth of Pennsylvania v. Union Gas Company,

832 F.2d 1343 (3d Cir. 1987), cert. granted, __._ U.S. —_., 108 S. Ct.

1219 (1988) (Certiorari granted to determine whether private parties

may sue states in federal court to recover cleanup costs under the

Superfund law); Tull v. United States, __U.S. ——, 107 S.Ct. 1831,

1835 (1987) (Certiorari granted to determine whether a jury trial is

required to determine liability and assess penalties for violation of Sec-

tion 404 of the Clean Water Act); United States v. Riverside Bayview

Homes, Inc., 474 U.S. 121, 126 (1985) (Certiorari granted to review

validity of Corps’ regulations defining ‘‘adjacent wetlands” as “waters

of the United States” under the Clean Water Act); Chevron, U.S.A.,

Inc. v. NRDC, 467 U.S. 837 (1984) (Certiorari granted to review validity

of EPA’s “bubble” concept under the Clean Air Act).

1]

In this case, the Second Circuit ignored this settled ad-

ministrative practice and endorsed EPA’s novel ‘market

entry’’ theory of practicable alternatives, which the Agency

had announced for the first time in this proceeding. But

EPA’s “market entry” theory provides no standard against

which the regulated community can measure its conduct,

no guidance for future regulatory decisions, and no stand-

ard against which a reviewing court can assess adminis-

trative decisions. Indeed, EPA appears to take the position

that it can review the availability of alternatives as of any

time it sees fit in each particular case. The Second Circuit

has compounded the harm caused by EPA’s erroneous rul-

ing by holding that the “market entry” theory is the only

correct interpretation of the regulation. What may have

been only an unfair, ad hoc ruling against Pyramid by

EPA has thus been converted into precedent binding on

EPA and, apparently, the Corps in the Second Circuit.

But the Corps disagrees with the “market entry” theory.

Unless the decision is reversed, the result will be to throw

the administration of the Section 404 program into a state

of unparalleled confusion and uncertainty.

Moreover, the market entry standard imposes an op-

pressive and unworkable burden on private and public per-

mit applicants. Since the applicant has the burden of

demonstrating the absence of alternatives during the per-

mitting stage (as opposed to the 404(c) veto stage) and

since the court below declined to define what acts con-

stitute market entry, no applicant will ever be able to

satisfy the market entry “‘standard.”’

Indeed, private investors are constantly searching for

attractive investment opportunities; they are never not in

the market. The impact on public capital facilities planning

can also be devastating. Consider, for example, a state

highway authority that assembles parcels of land over a

period of years to build a new road. Does the state high-

way authority enter the market when it first identifies the

a

12

need for a new road, or when it first selects a route, or

when it purchases the first parcel?

Finally, the market entry theory is contrary to the plain

language of the regulations and inconsistent with the in-

tent of the Clean Water Act to protect the Nation’s water

resources, including wetlands. To accomplish this purpose,

Congress mandated an inquiry into the wetland resource.

Until the decision in this case, the Corps and EPA had

always properly interpreted the statute as requiring a prac-

ticable alternatives analysis which focused on the wetland

resource: before the Corps could issue a permit, it had to

determine that there was no other available site whose

development would cause less environmental damage. The

“market entry” theory shifts the focus away from the

land, making the protection afforded the wetland depend-

ent on the owner’s business practices and the date the

owner is deemed to have entered the market. This inquiry

loses sight of the real purpose of the Clean Water Act.

In addition, the market entry theory subtly undercuts

Congress’ purpose in creating the Section 404 permitting

program within the Clean Water Act. That permitting pro-

gram reflects Congress’ recognition that environmental

protection must accommodate reasonable economic devel-

opment. In order to balance these conflicting goals, Con-

gress built the practicable alternatives analysis into the

Section 404 permitting decision. The Second Circuit de-

cision will destroy that balance by giving EPA discretion

to shift the timing of the alternatives analysis with each

new case, and will encourage ad hoc decision making. EPA

will always have grounds to veto a permit if it so chooses.

Unless reversed by this Court, the Second Circuit's opin-

ion will allow federal officials absolute discretion to deny

permits based on case-by-case determinations of the point

of “market entry,” regardless of other priorities contem-

plated by Congress or by local and state planning and

environmental authorities. Congress did not contemplate

a

13

giving EPA this kind of authority when it enacted Section

404.

I. THE PETITION FOR CERTIORARI SHOULD BE

GRANTED BECAUSE THE MARKET ENTRY THEORY

PROVIDES NO STANDARDS AGAINST WHICH THE

REGULATED COMMUNITY CAN MEASURE ITS CON-

DUCT

A. The Point Of Market Entry Remains Wholly Undefined

The “market entry”’ theory endorsed by the Second Cir-

cuit is virtually meaningless, providing no guidance to the

regulated community of the standard to which it will be

held.

The Second Circuit acknowledges that the Section

404(bX1) regulations are written in the present tense, on

their face mandating an inquiry into whether an alterna-

tive “is available’ to the applicant at the time the permit

is reviewed. 850 F.2d at 43; App. A l6a. Yet the court

ignores the regulatory language and Congressional intent

and asserts that EPA’s retrospective inquiry into possible

alternatives at the time of “market entry” is the only

possible interpretation of the regulatory term “‘is avail-

able.” 850 F.2d at 44; App. A 17a. Moreover, the court

compounds its error by ruling that it “is unnecessary to

pin down the [market entry] standard . . . and that it would

confuse things further to attempt to do so.” 850 F.2d at

46; App. A 22a. But confusion is precisely what this opin-

ion has sown.

EPA has consistently refused to define “market entry.”

In the Final Determination, EPA’s Assistant Administra-

tor referred to “‘market entry” alternatively as the “period

when the developer is selecting a site for its project,”

App. C 93a, “‘follow[ing] the market area,” id. at 95a n.15,

“exploring the ... trade area,” id. at 95a, or “searchfing]

for alternative sites.’ Jd. at 94a.’ In its district court briefs,

‘The Agency seemed to recognize that it was on difficult ground,

!

14

the government “defined” market entry as ‘‘the time of

project planning,”’ Defendants’ District Court Brief at 24,

“the time Pyramid began investigating the market,’’ id.

at 59, “searchfed] for a site,”’ id., “‘select[ed] the site,”

id. at 60, or “‘made its business decisions,” id. at 66.

On appeal, EPA once again refused to specify the point

in time at which the availability inquiry begins. Instead,

it claimed the need to “reserve judgment” on this decisive

question, Brief of Appellees at 32 n.20, stating opaquely

that the market entry theory “‘... tak[es] account of the

temporal continuum in which a wetland site-selection plan

evolves.”” Jd. at 28. As to which of numerous possible

events would “trigger the application of the ‘is available’

test,"” EPA commented blithely:

The plain answer is that while no one of these

points may be definitive, each may be germaine

[sic], individually and collectively.

Id. at 34 n.21 (emphasis in original).

EPA's equivocation is intolerable in light of the central

role the alternatives analysis plays in the regulatory frame-

work. An applicant simply cannot rebut the presumption

that an alternative is available if EPA is allowed to shift

the target date with each case.

The Second Circuit’s opinion suffers from the same flaw.

Though the court held that the “market entry” theory is

the only correct interpretation of the regulations, it too

declined to define the term either in the abstract or as

for, after announcing the new theory, the Assistant Administrator

stated, “I need not, and do not, decide here what the relevant time

period would be in other circumstances... .’’ App. C 93a n.14. Were

this true, the issue might not warrant this Court’s review. However,

given the Second Circuit’s declaration that “market entry” is the only

possible standard, and the Corps’ contrary practice, review is critical

to clarify this murky area of regulatory practice.

15

applied to this litigant in this case.* The point of market

entry is left wholly undefined, with the result that the

Second Circuit’s opinior fails to provide guidance for fu-

ture conduct by permit applicants and future decisions by

the Corps and EPA.

The potential for chaos in the administration of the Sec-

tion 404 program is compounded because the Corps does

not agree with EPA’s “market entry” concept. Thus, ap-

plicants for permits will not know what presumption it is

they will be required to rebut. And if it is the ‘“‘market

entry” presumption, they will not know how to rebut it

because the term is undefined and undefinable.

B. The Market Entry Theory Is Unworkable As A Practical

Matter

Moreover, as a practical matter, governmental public

facilities agencies planning to build schools, hospitals, and

airports; land use planners attempting to establish a com-

patible mix of land uses within their jurisdictions; and

private sector parties such as land developers, home build-

ers and industrial companies are constantly evaluating the

market for land use and development opportunities. They

are always in the market, and therefore, in the context

of their operations, ‘“‘market entry” is a meaningless con-

cept. As Judge Pratt, in dissent, observed: ‘‘Without an-

* The uncertainty resulting from the Second Circuit’s ruling stems in

part from its refusal to undertake the kind of judicial review required

in challenges to administrative action. As the District of Columbia Cir-

cuit has observed:

Judicial review must operate to ensure that the administrative

process itself will confine and contro] the exercise of discretion.

Courts should require administrative officers to articulate the

standards and principles that govern their discretionary decisions

in as much detail as possible.

Environmental Defense Fund v. Ruckelshaus, 439 F.2d 584, 598 (D.C.

Cir. 1971); see also Atchison, Topeka & Santa Fe Railway v. Board of

Trade, 412 U.S. 800, 806-07 (1973).

nT

16

swers to these questions [about the meaning of market

entry] a developer can never know whether to proceed

through the expense of contracts, zoning proceedings, and

EPA applications.” 850 F.2d at 49; App. A 27a.

The uncertainty is compounded by the difficulty in iden-

tifying wetlands and the possibility that a landowner may

be unaware that his property is a wetland. EPA’s own

regulations note that one needs a “‘specialist’’ to determine

wetland boundaries, 40 C.F.R. 230.41(aX2). The recent re-

port of the National Wetlands Policy Forum (convened by

the Conservation Foundation at the request of EPA) con-

firms the problem:

Determining whether a particular piece of

property is a wetland can sometimes be difficult.

To an untrained person, for instance, some for-

ested wetlands may appear very similar to nearby

upland forests. An expert in vegetation, soil, and

water conditions may be needed to tell the dif-

ference. For this reason, a landowner may not

even realize that a piece of land qualifies as a

wetland and is therefore subject to regulation.°

Notwithstanding these difficulties, the “market entry” the-

ory requires an applicant to survey the market long before

it may be aware that its site is even a wetland covered by

the Act. If it proceeds with construction unaware that the

site is a wetland, it will be impossible for an applicant, for

example, a commercial home builder, to show that it had

considered alternatives when it entered the market years

earlier. See Amici Petition for Certiorari of National As-

sociation of Home Builders et al.

Other practical difficulties with the ‘“‘market entry’’ the-

ory depend on the nature of the permit applicant, its pro)-

*The Conservation Foundation, Protecting America’s Wetlands: An

Action Agenda, The Final Report of the National Wetlands Policy Forum

36 (1988).

17

ect and its site. Many such problems are elaborated by

amici urging this Court to review the Second Circuit de-

cision. For present purposes, a few examples will suffice.

Local, state and regional planning efforts will be under-

mined. Under the market entry theory, EPA could, for

example, claim the authority to deny a municipality’s ap-

plication for a permit to construct a resource recovery fa-

cility on the ground that the town council did not consider

all alternative sites at its first public hearing concerning

the facility years earlier. See Amicus Petition for Certiorari

of American Planning Association.

The theory will be equally damaging to the nation’s port

authorities, many of which have owned substantial parcels

of wetlands adjacent to waterways for decades. If, for

example, a port authority applies for a permit to expand

commercial activity in a wetland, then, presumably, under

the Second Circuit holding, the Corps would be required

to consider alternatives available when the port “entered

the market.” It remains an open question whether market

entry occurred when the state passed legislation creating

the port authority forty years earlier, or when the port

purchased the property in question some twenty years ear-

lier, or when the port’s consultants first identified the need

for additional commercial development five years ago. The

uncertainty surrounding the timing of the alternatives

analysis will undoubtedly delay or impair the port’s ability

to upgrade deteriorating facilities as financial markets may

either refuse to finance such projects or exact high pre-

miums to compensate for the increased risks. Other public

facilities agencies will face similar problems, and the re-

quirement that they actually make inquiries about availa-

bility, thus virtually advertising their intentions to buy

property for roads, schools and the like, will undoubtedly

add to the cost of acquiring needed land."

’ Had EPA submitted its ‘“‘market entry”’ theory to formal rulemak-

18

Only this Court can rectify the chaotic situation created

by the Second Circuit opinion by requiring the agencies

to articulate a standard with sufficient clarity to apprise

the regulated community of the standard to which it will

be held.”

Il. THE PETITION FOR CERTIORARI SHOULD BE

GRANTED BECAUSE THE MARKET ENTRY THEORY

IS CONTRARY TO THE STATUTORY AND REGULA-

TORY SCHEME

A. The Market Entry Theory Is Inconsistent With The Pur-

pose of Section 404

The Second Circuit has held that the market entry the-

ory is the only correct interpretation of the regulations.

The court’s only justification for the decision is its asser-

tion that the market entry theory is consistent with the

objectives of the Clean Water Act, and that the Corps’

and EPA’s prior understanding of the regulation would

“thwart” these objectives.'? 850 F.2d 43-44; App. A 16a-

ing procedures, as its regulations require, it would have become aware

of these practical difficulties. The ‘‘market entry” theory is a modifi-

cation to the “basic application’ of the Section 404(b\1) guidelines.

Under the guidelines themselves, such modifications may only be ac-

complished by notice and comment rulemaking and in conjunction with

the Corps. 40 C.F.R. § 230.2(c). In addition, the Administrative Pro-

cedure Act, 5 U.S.C. § 552, requires that agency “policies affecting

individual rights and obligations be promulgated pursuant to certain

stated procedures so as to avoid the inherently arbitrary nature of

unpublished ad hoc determinations.”’ Morton v. Ruiz, 415 U.S. 199, 232

(1974). The “‘market entry” theory is such a policy.

1! See South Terminal Corp. v. EPA, 504 F.2d 646, 670 (1st Cir.

1974) (EPA regulation requiring denial of permit for construction of

parking spaces unless they ‘‘will not interfere’’ with attaining air quality

standards was held impermissibly vague: ‘“‘The prospective applicant for

a permit is utterly without guidance as to what he must prove, and

how. And the standard is so vague that it invites arbitrary and unequal

application’’).

2 The only evidence the court offers in support of its claim that

EPA's retrospective analysis is consistent with Congressional intent is

19

17a. The court is wrong.

Congress passed the Clean Water Act in 1972 to protect

the Nation’s water resources, including wetlands. 33 U.S.C.

§ 1251. Recognizing the need to accommodate reasonable

economic development and other values in the public in-

terest, Congress did not ban the “discharge’”’ of all “‘pol-

lutants” but set up permitting programs to regulate such

discharges. Section 404 established the permitting program

that regulates the discharge of dredged and fill materials.

33 U.S.C. § 1344(a); App. E llla. To effectuate the bal-

ancing between environmental and other goals, Congress

required the regulations governing Section 404 permitting

decisions to include consideration of whether the permit

applicant could accomplish its purpose at an alternative

site that would have less adverse environmental impacts."

one line from the preamble to EPA's regulations. According to the

court:

[T]he preamble to the 404(bX1) guidelines states that the purpose

of the ‘practicable alternatives’ analysis is ‘to recognize the special

value of wetlands and to avoid their unnecessary destruction, par-

ticularly where practicable alternatives were available in non-aquatic

areas to achieve the basic purpose of the proposal.’ 45 Fed. Reg.

85,338 (1980) (emphasis added by the court).

850 F.2d at 43-44; App. A 16a. The Agency's preamble is, of course,

not evidence of Congressional intent. In addition the phrase the court

quotes is out of context. Notwithstanding the court’s emphasis on the

past tense “were available,’’ the sentence was written in the past tense

because EPA was explaining the meaning of a regulatory test it had

once proposed to adopt but since had decided to reject. Quoted in its

entirety, the sentence reads: “The original purpose, which many com-

menters commended, was to recognize the special values of wetlands

and to avoid their unnecessary destruction, particularly when practic-

able alternatives were available in non-aquatic areas to achieve the basic

purposes of the proposal.’’ 45 Fed. Reg. 85,338-339.

's 33 U.S.C. § 1344(b) (requiring that the governing regulations be

based on the ocean discharge criteria contained in Section 403(c), 33

|

20

Thus, Congress commanded an objective inquiry into the

impacts on the physical environment that would result from

the choice of one site over another.

As Judge Pratt pointed out in dissent, the “market en-

try” theory strays from the statute’s central purpose. It

disregards the environmental impacts on the land in ques-

tion and on alternative sites and instead makes the pro-

tection afforded the wetland dependent on when the owner

“entered the market.’’ Such an inquiry, however, does not

protect the wetland:

The market entry theory in effect taints a par-

ticular developer with respect to a particular site,

while ignoring the crucial question of whether the

site itself should be preserved. Under the market

entry theory, developer A would be denied a per-

mit on a specific site because when he entered

the market alternatives were available, but la-

tecomer developer B, who entered the market

after those alternatives had become unavailable,

would be entitled to a permit for developing the

same site. In such a case, the theory no longer

protects the land, but instead becomes a distorted

punitive device: it punishes developer A by de-

nying him a permit, but grants developer B a

permit for the same property—and the only dif-

ference between them is when they ‘entered the

market.’

850 F.2d at 48; App. A 26a-27a (Judge Pratt dissenting).

Not only does the market entry theory fail to protect

the wetland but it leads inevitably to consideration of fac-

tors far different from those contemplated by Congress

when it mandated consideration of the relative environ-

mental impacts resulting from the use of alternative sites.

U.S.C. § 1343(c)); 33 U.S.C. § 1343(cX1\F) (requiring consideration of

“land based alternatives’’).

21

In this case, for example, EPA demanded copies of private

business memoranda, correspondence and other records

concerning Pyramid’s relationship with the previous owner

of the South Attleboro site, Pyramid’s business plans in

other trade areas outside of the Attleboro trade area, cost

estimates for various features of Pyramid’s proposed proj-

ect, and details of Pyramid’s dealings with real estate

agents and potential tenants for its shopping mall.“ JA

267-271. This is not the inquiry into the impacts on the

physical environment that Congress contemplated when it

established the alternatives analysis.

The court suggests that the ‘‘market entry’ theory vin-

dicates the Act’s goals because it creates an incentive for

‘The result of this and other similar tangents pursued by EPA is

that EPA simply lost sight of the purpose of the alternatives analysis,

which is to determine whether. in fact, an alternative “‘is available.”’

Instead, it recast the inquiry to determine whether the applicant had

been “truly fastidious” in investigating alternatives. Brief of Appellee

at 32 n.20. The bankruptcy of EPA’s position is summed up by a

hypothetical it posed:

A hypothetical case in which the applicant convincingly demon-

strates that when it undertook its market survey an alternative

was not obtainable, and only much later became so, might at least

in some circumstances possibly call for a different Section 404(c)

outcome.

Id. As this hypothetical so candidly suggests, EPA’s “‘market entry”

theory simply does not protect the wetland resource. It merely punishes

or rewards developers based on EPA’s perception of their bona fides.

‘8 See Mall Properties, Inc. v. Marsh, 672 F. Supp. 561, 566-68 (D.

Mass. 1987), appeal denied, 841 F.2d 440 (Ist Cir. 1988), cert. denied

sub nom. New Haven v. Marsh, __U.S. —_, 109 S.Ct. 128 (1988).

(Where Corps’ denial of permit is based on economic factors, such

factors must be “proximately related to changes in the physical envi-

ronment ... Corps may not... consider effects unrelated to the impact

which a proposed project will have on the environment.’’) Because the

date of market entry is totally unrelated to the impacts a given project

will have on the environment, it is an improper basis for a permit

decision under Section 404.

22

developers to search for alternative sites at the time they

first consider development.* Such an incentive, however,

exists regardless of the timing of the alternatives analysis.

No developer would choose a wetland site and risk its

costly investment on a hunch that by the time of permit

review all uplands sites would no longer be available. In-

deed, the applicant’s knowledge that it will be required

during permitting to establish the absence of uplands al-

ternatives is by itself a substantial incentive to avoid a

wetlands site.

Not only does the market entry theory lead the Agency

far afield of the inquiry Congress contemplated but it sub-

tly undermines the integrity of the balance Congress sought

to establish through the alternatives analysis. As Judge

Pratt pointed out in dissent:

Congress designed [Section 404} to preserve the

environment consistent with reasonable accom-

modation to the economic and social needs of the

public; it was not concerned with the identities

or past activities of particular developers.

850 F.2d at 48; App. A 26a.

Accordingly, Congress established a permit program un-

der Section 404(a) which is intended to authorize dis-

charges as long as there is compliance with certain

requirements.'? Congress contemplated that in making a

permitting decision the Corps would balance environmental

‘6 Conversely, the court argues that if alternatives were not available

when the developer purchased its site, but became available by the time

of permit application, the application would be denied. 850 F.2d at 44;

App. A 17a. Pyramid has always agreed with this statement. If a

feasible alternative is available at the time of permit review, the ap-

plication should be denied.

‘7 Monongahela Power Co. v. Marsh, 809 F.2d 41, 46 (D.C. Cir. 1987),

cert. denied, U.S. , 108 S.Ct. 68 (1988) (Section 404(a) estab-

lishes an exemption from ‘‘Section 301(a)'s broad ban on discharge of

pollutants into navigable waters’’).

i

23

protection and economic concerns, and that the Corps could

determine under Section 404(b) that economic concerns or

other competing values outweighed environmental protec-

tion in a particular case.* EPA, on the other hand, was

empowered under Section 404(c) to veto the Corps’ deci-

sion to grant a permit in the event EPA determined that

the proposed project “will have an unacceptable adverse

effect on municipal water supplies, shellfish beds and fish-

ery areas (including spawning and breeding areas), wildlife,

or recreational areas.’’’*

Thus, Congress gave discrete roles to the Corps and

EPA. It authorized the Corps to make the permitting de-

cision based on numerous environmental and economic fac-

tors in its public interest review and on the balancing

process inherent in the 404(bX1) guidelines’ practicable al-

ternatives analysis. Congress gave EPA the power to veto

a project based on environmental considerations. In this

case, EPA did not rely on its environmental expertise.

Rather, it rejected the Corps’ analysis of available alter-

natives and economic impacts, and offered its market entry

theory instead.” In doing so, the Agency upset the political

* “(Where it appears that a wetland covered by the Corps’ definition

is in fact lacking in importance to the aquatic environment—or where

its importance is outweighed by other values—the Corps may always

allow development of the wetland for other uses simply by issuing a

permit.” United States v. Riverside Bayview Homes, 474 U.S. 121, 135

n.9 (1985); Monongahela Power Co. v. Marsh, 809 F.2d at 46 (In en-

acting Section 404, “Congress insisted upon stringent federal discipline

in an effort to curb ecological pollution and degradation without in-

terfering unjustifiably with farming, forestry, and other legitimate ac-

tivities reserved for regulation primarily by local governments’’).

* 33 U.S.C. § 1344(c), App. E 1lla-112a; S. Conf. Rep. 1236, 92d

Cong., 2d Sess., at 141 reprinted in 1972 U.S. Code Cong. & Admin.

News 3776, 3818-19.

* In addition, as discussed more fully in the Petition for Certiorari

filed by the Citizens In Support of Attleboro Mall, EPA’s consideration

of cumulative impacts in the context of a Section 404(c) action was

rs |

24

compromise struck by Congress.”! The Second Circuit opin-

ion, by endorsing the market entry theory and giving EPA

unlimited authority to shift the time of market entry on

an ad hoc basis, effectively vitiates the Congressional com-

promise.”

Moreover, as Judge Pratt pointed out, the market entry

theory may also be easily circumvented:

wholly improper. Section 404(c) authorizes the Administrator to prohibit

or restrict the use of a “defined area’ when the Administrator “‘de-

termines ... that the discharge of ... materials into such area will

have an unacceptable adverse effect.’’ 33 U.S.C. § 1344(c); App. E

llla-112a. Clearly, the statute contemplates a site-specific inquiry. Thus,

the issue in a 404(c) case should be whether the environmental impacts

on the “defined area” are so great as to cause an unacceptable adverse

effect. EPA, however, ignored the Congressional intent and improperly

based its decision on the “cumulative loss” in Massachusetts. App. C

107a.

2: After considering several different administrative arrangements for

handling the discharge of dredged and fill materials, each of which

proposed a different allocation of permitting authority between the .

Corps and EPA, Congress ultimately decided to give the permitting

authority to the Corps. In so doing, it expressly carved the Section

404 program out of EPA’s permitting authority under other sections

of the Act. It made this choice in recognition of the Corps’ special

expertise on dredge and fill matters and long experience in managing

related permitting programs under Sections 9 and 10 of the Rivers and

Harbors Act of 1899, 33 U.S.C. §§ 401 and 402, and to avoid “‘creat{ing]

a burdensome bureaucracy.” S. 2770, 92d Cong., 1st Sess. (1971), re-

printed in Senate Committee on Public Works, A Legislative History

of the Water Pollution Control Act Amendments of 1972 (“1972 Leg.

Hist.”) at 1685-92; Senate Debate on S. 2770, 92d Cong., 1st Sess.

(1971), reprinted in 1972 Leg. Hist. at 1386, 1392; H.R. 11896, 92d

Cong., 2d Sess. (1971), reprinted in 1972 Leg. Hist. at 1063-64; Senate

Consideration of the Conference Report (Oct. 4, 1972), reprinted in

1972 Leg. Hist. at 177.

* See Bethlehem Steel Corp. v. EPA, 723 F.2d 1303, 1309 (7th Cir.

1983) (““{W]here a statute strikes a political balance but administration

of the statute is entrusted to an agency that may not embody that

balance, it is dangerous to defer automatically to the agency’s view. . .

The court must enforce the compromise, not the maximum position of

one of the interest groups among which the compromise was struck’’).

In this case, for example, if a Donald Trump had

“entered the market’’ after NED took the option

on the North Attleboro site and made it un-

available, under EPA’s approach he apparently

would have been entitled to a permit to develop

Sweedens Swamp. But after obtaining the permit

and the land, could Trump then sell the package

to Pyramid to develop? Or could he build the mall

and then sell the developed site to Pyramid? If,

on the one hand, the answer to these questions

is “‘yes’’, then the market entry theory is no more

than a troublesome mirage that could easily be

circumvented by Pyramid’s using a second party

to buy the land and obtain the permit. If, on the

other hand, the answer is ‘“‘no”, then Pyramid is

forever tainted, forever prohibited—somewhat like

a bill of attainder—from owning this particular

site, and only because at some time in the past

it had “entered the market” while an alternative

was still available.

850 F.2d at 48-49; App. A 27a.

In sum, the market entry theory is inconsistent with

the purpose of Section 404 itself. The result is a standard

that is unworkable in the real world and that will not

protect wetlands.

B. The Market Entry Theory Is Contrary To The Language

Of The Section 404(b)(1) Guidelines

The market entry theory is also inconsistent with the

language of the Section 404(b\1) guidelines. As noted ear-

lier, the guidelines require the Corps to determine whether

“there is a practicable alternative to the proposed dis-

charge.” 40 C.F.R. § 230.10(a) (emphasis added); App. F

113a. The term “practicable alternative’’ is also defined in

the present tense:

26

An alternative is practicable if it is available. . . .

If it is otherwise a practicable alternative, an

area not presently owned by the applicant which

could reasonably be obtained, utilized, expanded

or managed in order to fulfill the basic purpose

of the proposed activity may be considered.

40 C.F.R. § 230.10(aX2) (emphasis added); App. F 113a.

An alternative “is available,’’ then, only if it is available

to, or could reasonably be obtained by, the applicant at

the time the Corps makes its decision on the permit ap-

plication. By finding that it should consider availability

retroactively to the time the applicant “entered the mar-

ket,”” EPA distorted the language of the regulation.

Stated simply, EPA says “is” means “was.”

This Court recently rejected a similar effort to convert

present-tense language to the past tense, enjoining courts

and presumably agencies to give statutes their “most nat-

ural reading.’’ Gwaltney of Smithfield, Ltd. v. Chesapeake

Bay Foundation, __U.S. —— , 108 S.Ct. 376, 381 (1987).*

Furthermore, although no cases have directly addressed

the timing of the practicable alternatives test, in every

reported case the Corps has analyzed availability of alter-

native sites at the time of permit review, and the courts

have affirmed decisions based on that analysis. Indeed,

= The Second Circuit’s reading of the guidelines is both unnatural

and strained: “{Tyhe ‘present’ of the regulations might be the time the

application is submitted; the time it is reviewed; or any number of

other times."” 850 F.2d at 43; App. A 16a. The two specific times

mentioned by the Court are consistent with Petitioner's position. As

to what “any number of other times” might be, that is precisely what

we have been asking for over two years.

* See National Audubon Society v. Hartz Mountain Development Corp.,

14 Envtl. L. Rep. 20724, 20731 (Envtl. L. Inst.) (D.N.J. Oct. 24, 1983)

(Corps, with court approval, examined over a dozen alternatives avail-

able to applicant at time of permit review. Neither the Corps nor the

court speculated as to what alternatives might have been available to

8 TT EH

27

not only has the Corps applied a present-tense analysis,

but EPA itself has consistently done so in prior 404(c)

proceedings.”

C. The Second Circuit Decision Distorts The Regulatory

Scheme By Allowing EPA To Ignore Its Burden Of

Proof Under Section 404(c)

The Second Circuit opinion, by allowing EPA to ignore

its burden of proof under Section 404(c), distorts the reg-

ulatory scheme. When EPA invokes its 404(c) authority,

overriding a contrary Corps decision, the regulations place

on the Agency the burden of proving that an applicant’s

project will have an “‘unacceptable adverse effect” on the

proposed site.”

EPA simply ignored its burden, claiming that a veto

was warranted because it was not satisfied that Pyramid

had demonstrated, at the permitting stage under Section

able to applicant at time of permit review. Neither the Corps nor the

court speculated as to what alternatives might have been available to

the applicant at some indeterminate point when the company “entered

the market”); Friends of the Earth v. Hintz, 800 F.2d 822 (9th Cir.

1986) (Court affirmed Corps’ evaluation of alternatives available at time

of permit review despite the fact that filling had already occurred and

applicant was applying for an after-the-fact permit); cf Hough v. Marsh,

557 F. Supp. 74, 83-84 (D. Mass. 1982) (Court invalidates 404 permit

where it was doubtful that information used in alternatives analysis

accurately depicted market conditions at time of permit decision).

* Excluding the decision under review here, EPA had issued only

four 404(c) Final Determinations prior to its veto in this case. In two

of these cases, the question of practicable alternatives was not an issue.

In the two others, EPA examined only alternatives that were available

to the applicant at the time of the 404(c) proceeding. “Final Deter-

mination of the Assistant Administrator for External Affairs Concern-

ing the Jack Maybank Site on Jehossee Island, South Carolina Pursuant

to Section 404(c) of the Clean Water Act,” April 5, 1985 (“Maybank

Determination”), “Final Determination of the Administrator Concern-

ing M.A. Norden Site Pursuant to Section 404(c) of the Clean Water

Act,” June 15, 1984 (“Norden Determination’’).

* See 45 Fed. Reg. 85,336, 85,338 (December 24, 1980).

28

404(a), the absence of available alternatives. But EPA can-

not meet its burden during the veto proceeding by claiming

that an applicant did not meet its burden during the per-

mitting phase.”’ This is especially true where, as here, the

permitting authority found that the applicant had met its

permitting burden. JA 82. As EPA explained in the pream-

ble to its 404(c) regulations:

[T]he Administrator’s authority . . . under Section

404(c) operates independently of [the Corps’] per-

mitting authority in 404(a).... If the Adminis-

trator uses his 404(c) ‘veto,’ then he does have

the burden to justify his action, but that burden

does not come into play until he begins a 404(c)

proceeding.

45 Fed. Reg. at 85,338. The Agency’s administrative

sleight-of-hand does not meet its burden of proof, and the

Second Circuit, by failing to hold the Agency to its burden,

undermines the regulatory scheme.”

CONCLUSION

Because the Second Circuit’s endorsement of the market

entry theory is inconsistent with the language of the Sec-

tion 404(bX1) guidelines and the purpose of Section 404

of the Act, because that theory provides no guidance to

the regulated community, and because the lower court

opinion creates enormous confusion for any private or pub-

lic entity subject to Section 404 jurisdiction, the Petition

for Certiorari should be granted.

* Where an agency has the burden of proof, it must satisfy that

burden by a preponderance of the evidence. Steadman v. SEC, 450

U.S. 91, 102 (1981); see Industrial Union Department v. American

Petroleum Institute, 448 U.S. 607, 652-53 (1980) (agency cannot avoid

its statutory burden by relying on policy that imposed burden on in-

dustry); United Scenic Artists Local 829 v NLRB, 762 F.2d 1027, 1034

(D.C. Cir. 1985) (agency cannot create a presumption on grounds of

policy to avoid necessity for making findings required by statute).

* The Second Circuit properly declined to defer to EPA’s interpre-

ae te WR we

29

Respectfully submitted,

Gary H. Baise

Counsel of Record

Albert J. Beveridge, III

Virginia S. Albrecht

David M. Friedland

BEVERIDGE & DIAMOND, P.C.

1333 New Hampshire Ave., N.W.

Washington, D.C. 20036

(202) 828-0200

Attorneys for Petitioners

Date: December 1, 1988.

tation in this case. 850 F.2d at 45; App. A 20a. The Corps and EPA

disagree on the interpretation of the Section 404(bX1) guidelines; there-

fore, the Court must use its own judgment in construing the regula-

tions. General Electric Co. v. Gilbert, 429 U.S. 125, 144-145 (1976).

Moreover, because the Corps is the permitting authority, and addresses

the zoning, economic and financial issues implicated in the practicable

alternatives analysis in 14,000 permit applications each year, deference

to the Corps, not EPA, is warranted. See National Association of Greet-

ing Card Publishers v. U.S. Postal Service, 462 U.S. 810, 821 (1983)

(where statute divided ratemaking responsibility between two agencies,

Court deferred to agency in which ratemaking authority was ‘vested

primarily’).

INDEX TO APPENDICES

APPENDIX A:

Bersani v. Robichaud, 850 F.2d 36 (2d Cir.

a seassncenscscocores la

APPENDIX B:

Bersani v. EPA, 674 F. Supp. 405 (N.D.N.Y.

as scessnnssocscouscnss 3la

APPENDIX C:

EPA Final Determination of the Assistant Ad-

ministrator for External Affairs (May 13,

SITTIN caltinsemssdsonccscoscnsceccoccccocscccccscess 64a

APPENDIX D:

Bersani v. Robichaud, No. 87-6275, No. 87-6295,

(2d Cir. Sept. 2, 1988) (rehearing and sugges-

tion for rehearing en banc denied) ................. 109a

APPENDIX E:

a ss scscasscesconnecccccccooccccsess llla

APPENDIX F:

40 CPR. § 290.106) .....2.0.0.0000.00c0ccccececceseceseseee 113a

la

APPENDIX A

UNITED STATES COURT OF APPEALS,

SECOND CIRCUIT.

Nos. 852, 902, Dockets 87-6275, 87-6295.

John A. BERSANI, Newport Galleria Group, Robert J.

Congel and the Pyramid Companies,

Appellants.

v.

Joseph ROBICHAUD and Citizens in

Support of Attleboro Mall,

Intervenor-Plaintiffs-A ppellants,

Home Building Association of Massachusetts,

Intervenor-Plaintvff.

United States Environmental Protection Agency, United

States Army Corps of Engineers, Lee Thomas, in his of-

ficial capacity as Administrator of the United States En-

vironmental Protection Agency, Richard K. Dawson, in his

official capacity as Assistant Secretary for Civil Works,

United States Army, and Jennifer Joy Wilson, in her of-

ficial capacity as Assistant Administrator for External Af-

fairs, United States Environmental Protection Agency,

Appellees,

Sierra Club, Environmental Defense Fund, National Wild-

life Federation, National Audubon Society, Conservation

Law Foundation of New England, Inc., Massachusetts Au-

dubon Society, Citizens for Responsible Environmental

Management, Massachusetts Society for Conservation

Professionals, Audubon Society of Rhode Island, Rhode

Island Association of Conservation Commissioners and

Natural Resources Defense Council,

Intervenor-Defendants.

Argued March 16, 1988.

Decided June 8, 1988.

2a

On appeal from a judgment entered October 23, 1987

in the Northern District of New York, Thomas J. McAvoy,

District Judge, 674 F.Supp. 405, granting appellee’s mo-

tion for summary judgment and denying appellants’ motion

for summary judgment, in an action brought by developers

to challenge the final determination of the Environmental

Protection Agency denying them permission to construct

a shopping mall on a swamp, the Court of Appeals, Tim-

bers, Circuit Judge, held: (1) that EPA’s “market entry”

theory, considering availability of alternative sites at time

developer entered the market for site instead of at time

it applied for permit, was consistent with both regulatory

language and past practice; and (2) that EPA’s interpre-

tation, while not necessarily entitled to deference, was

reasonable and thus was properly upheld by district court.

Affirmed.

George C. Pratt, Circuit Judge, filed a dissenting opin- .

ion. |

Albert J. Beveridge, III, Washington, D.C. (Gary H. Baise,

Virginia S. Albrecht, Marc A. Zeppetello, David M. Fried-

land, and Beveridge & Diamond, Washington, D.C., on the

brief), for appellants.

Paul D. Kamenar, Washington, D.C. (Daniel J. Popeo,

Washington, D.C., and Henry M. Holzer, Brooklyn, N.Y.,

on the brief), for intervenor-appellants.

Donald A. Carr, Dept. of Justice, Washington, D.C.

(Roger J. Marzulla, Acting Asst. Atty. Gen., Peter R.

Steenland, Jr., Margaret N. Strand, Dept. of Justice, Gail

B. Cooper, E.P.A., Washington, D.C., and Ann H. Wil-

liams-Dawe, E.P.A., Boston, Mass., on the brief), for

appellees.

e———

:

3a

James T.B. Tripp, Environmental Defense Fund, New

York City (Michael E. Herz, Environmental Defense Fund,

New York City, Michael J. Bean, Environmental Defense

Fund, Washington, D.C., Hope Babcock, National Audubon

Society, Washington, D.C., Robert Dreher, Sierra Club Le-

gal Defense Fund, Washington, D.C., Jerry Jackson, Na-

tional Wildlife Federation, Washington, D.C., and Peter

Shelley, Conservation Law Foundation of New England,

Boston, Mass., on the brief), for intervenor-appellees.

R. Sarah Compton, Carl W. Schwarz, Kurt J. Olson,

and McDermott, Will & Emery, U.S. Chamber of Com-

merce, Washington, D.C., and Robin S. Conrad, National

Chamber Litigation Center, Washington, D.C., filed a brief

as amicus curiae.

Before TIMBERS, PRATT and MINER, Circuit Judges.

TIMBERS, Circuit Judge:

Appellants John A. Bersani, the Pyramid Companies,

Newport Galleria Group and Robert J. Congel (‘‘Pyramid”’,

collectively) appeal from a judgment entered October 23,

1987 in the Northern District of New York, Thomas J.

McAvoy, District Judge, granting summary judgment in

favor of appellees, the United States Environmental Pro-

tection Agency (“EPA”’), the United States Army Corps

of Engineers (the “‘Corps’’), Lee Thomas, the Administra-

tor of the EPA, Richard K. Dawson, Assistant Secretary

for Civil Works, United States Army, and Jennifer Joy

Wilson, Assistant Administrator for External Affairs of

the EPA (the “Federal Appellees’’ collectively), and de-

nying Pyramid’s motion for summary judgment. Bersani

v. EPA, 674 F.Supp. 405 (N.D.N.Y. 1987).

This case arises out of Pyramid’s attempt to build a

shopping mall on certain wetlands in Massachusetts known

as Sweedens Swamp. Acting under the Clean Water Act,

33 U.S.C. § 1251 et seg. (1982), EPA vetoed the approval

4a

by the Corps of a permit to build the mall because EPA

found that an alternative site had been available to Pyr-

amid at the time it entered the market to search for a

site for the mall. The alternative site was purchased later

by another developer and arguably became unavailable by

the time Pyramid applied for a permit to build the mall.

On appeal, the thrust of Pyramid’s argument is a chal-

lenge to what it calls EPA’s “market entry” theory, i.e.,

the interpretation by EPA of the relevant regulation, which

led EPA to consider the availability of alternative sites at

the time Pyramid entered the market for a site, instead

of at the time it applied for a permit. Pyramid argues

principally (1) that the market entry approach is contrary

to the regulatory language and past practice; and (2) that

since the Corps, another agency which was jointly re-

sponsible with EPA for administering the program in ques-

tion, interpreted the pertinent regulation in a different

way than EPA had, and since the market entry issue does

not involve environmental expertise, this Court should not

defer to EPA’s interpretation of the regulation. Other sub-

ordinate claims are raised by appellants as well as by two

intervenors and the amicus curiae.’

‘The amicus curiae, the United States Chamber of Commerce

(“Chamber of Commerce’’) filed a brief in support of Pyramid’s position.

This brief raises two points also raised in Pyramid’s brief, and one new

point: that EPA exceeded its authority under § 404(c) by engaging in

a de novo review of Pyramid’s compliance with the regulation in ques-

tion.

The Citizens in Support of Attleboro Mall and Joseph Robichaud

(“Citizens”’, collectively) nave intervened as plaintiffs/appellants and have

submitted a brief raising two issues not covered by Pyramid in its

brief: (1) whether EPA exceeded its authority under the relevant statute

by considering the historical and cumulative effects of discharges on

other wetlands, and (2) whether EPA arbitrarily rejected Pyramid’s

mitigation efforts.

The Conservation Law Foundation (““CLF’’) has intervened as a

defendant/appellee and has submitted a brief raising six points, four of

.

5a

We hold (1) that the market entry theory is consistent

with both the regulatory language and past practice; (2)

that EPA’s interpretation, while not necessarily entitled

to deference, is reasonable; and (3) that EPA’s application

of the regulation is supported by the administrative record.

We agree with the district court’s conclusion that EPA’s

findings were not arbitrary and capricious. We also hold

that Pyramid’s other arguments, and the arguments of one

intervenor and the amicus, lack merit.

We affirm.

I.

We shall summarize only those facts and prior proceed-

ings believed necessary to an understanding of the issues

raised on appeal.

A. Statutory and Regulatory Framework

One of the sections of the Clean Water Act (the ‘“‘Act’’)

relevant to the instant case is § 301(a), 33 U.S.C. § 1311(a)

(1982), which prohibits the discharge of any pollutant, in-

cluding dredged or fill materials, into the nation’s navig-

which are covered by the Federal Appellees in their brief. In the other

two points, CLF: (1) answers the arguments of the Citizens and the

Chamber of Commerce, asserting that EPA’s decision was wholly within

its authority, and (2) asserts that in any event the appropriate remedy

for any defects in EPA’s decision would be a remand.

Upon reviewing each of these new points, we hold (1) that EPA’s

decision was wholly within its authority, and (2) that EPA did not

arbitrarily reject Pyramid’s efforts at mitigation but rather had ample

basis to reject these efforts on the ground that they were not likely

to succeed. In light of our holding with regard to the district court’s

decision, discussed in the body of our opinion, we need not reach the

issue of whether remand would be the appropriate remedy for defects

in EPA’s actions.

The other arguments of the two intervenors and the amicus will be

dealt with in our discussion of the arguments of Pyramid and the

Federal Appellees.

6a

able waters, except in compliance with the Act’s provisions,

including § 404. It is undisputed that Sweedens Swamp is

a “navigable water’, as defined in 33 U.S.C. § 1362 (1982),

and that Pyramid’s shopping center proposal will involve

the discharge of dredged or fill materials.

Section 404 of the Act, 33 U.S.C. § 1344 (1982 & Supp.

III 1985), focusing on dredged or fill materials, provides

that the United States Army and EPA will share respon-

sibility for implementation of its provisions. EPA and the

Corps also share responsibility for enforcing the Act. 33

U.S.C. §§ 1311 (1982), 1319 (1982), 1344(n) and (s) (1982).

Section 404(a) authorizes the Secretary of the Army, acting

through the Corps, to issue permits for the discharge of

dredged or fill materials at particular sites. 33 U.S.C. §

1344(a) (1982). Section 404(b) provides that, subject to §

404(c), the Corps must base its decisions regarding permits

on guidelines (the ‘‘404(b\1) guidelines”) developed by EPA

in conjunction with the Secretary of the Army. 33 U.S.C.

§ 1344(b) (Supp. III 1985).

The 404(bX1) guidelines, published at 40 C.F.R. Part 230

(1987), are regulations containing the requirements for is-

suing a permit for discharge of dredged or fill materials.

40 C.F.R. § 230.10(a? covers “‘nonwater dependent activ-

* Section 230.10(aX2) and (3) provide:

“(a) Except as provided under section 404(b\2) [pertaining to nav-

igation] no discharge of dredged or fill material shall be permitted if

there is a practicable alternative to the proposed discharge which would

have less adverse impact on the aquatic ecosystem, so long as the

alternative does not have other significant adverse environmental con-

sequences.

(2) An alternative is practicable if it is available and capable of being

done after taking into consideration cost, existing technology, and lo-

gistics in light of overall project purposes. If it is otherwise a practicable

alternative, an area not presently owned by the applicant which could

reasonably be obtained, utilized expanded or managed in order to fulfill

7a

ities” (i.e., activities that could be performed on non-wet-

land sites, such as building a mall) and provides essentially

that the Corps must determine whether an alternative site

is available that would cause less harm to the wetlands.

Specifically, it provides that “‘no discharge of dredged or

fill material shall be permitted if there is a practicable

alternative” to the proposal that would have a “‘less ad-

verse impact”’ on the “‘aquatic ecosystem’’. It also provides

that a practicable alternative may include “an area not

presently owned by the applicant which could reasonably

be obtained, utilized, expanded or managed in order to

fulfill the basic purpose of the proposed activity.” 40 C.F.R.

230.10(aX2). It further provides that, “‘unless clearly dem-

onstrated otherwise’’, practicable alternatives are (1) “‘pre-

sumed to be available” and (2) “presumed to have less

adverse impact on the aquatic ecosystem”. 40 C.F.R.

230.10(aX3). Thus, an applicant such as Pyramid must re-

but both of these presumptions in order to obtain a permit.

Sections 230.10(c) and (d) require that the Corps not per-

mit any discharge that would contribute to significant deg-

radation of the nation’s wetlands and that any adverse

impacts must be mitigated through practicable measures.

In addition to following the 404(bX1) guidelines, the

Corps may conduct a “public interest review’. 33 C.F.R.

§ 320.4 (1987). This public interest review is not mandatory

the basic purpose of the proposed activity may be considered.

(3) Where the activity associated with a discharge which is proposed

for a special aquatic site [defined in Subpart E to include wetlands]

does not require access or proximity to or siting within the special

aquatic site in question to fulfill its basic purpose (i.e., is not “water

dependent’), practicable alternatives that do not involve special aquatic

sites are presumed to be available, unless clearly demonstrated oth-

erwise. In addition, where a discharge is proposed for a special aquatic

site, all practicable alternatives to the proposed discharge which do not

involve a discharge into a special aquatic site are presumed to have

less adverse impact on the aquatic ecosystem, unless clearly demon-

strated otherwise.”

8a

under § 404, unlike consideration of the 404(b) guidelines.

In a public interest review, the Corps’ decision must reflect

the ‘national concern” for protection and use of resources

but must also consider the “‘needs and welfare of the peo-

ple.” Jd.

Under § 404(c) of the Act, 33 U.S.C. § 1344(c), EPA

has veto power over any decision of the Corps to issue a

permit. It is this provision that is at the heart of the

instant case.

Specifically, § 404(c) provides that the Administrator of

EPA may prohibit the specification of a disposal site

‘“‘whenever he determines, after notice and opportunity for

public hearings, that the discharge of materials into such

area will have an unacceptable adverse effect” on, among

other things, wildlife. An ‘“‘unacceptable adverse effect”

is defined in 40 C.F.R. § 231.2(e) as an effect that is likely

to result in, among other things, “significant loss of or

damage to ... wildlife habitat”. The procedure under §

404(c) begins with the Regional Administrator (““RA’’) who,

under § 231.3(a), must notify the Corps and the applicant

when it is possible he will find an ‘unacceptable adverse

effect’’. If within 15 days the applicant fails to satisfy the

RA that no such effect will occur, the RA must publish

his proposed determination to veto the grant of a permit.

* Section 404(c), 33 U.S.C. § 1344(c), authorizes the Administrator:

“to prohibit the specification (including the withdrawal of specification)

of any defined area as a disposal site, and he is authorized to deny or

restrict the use of any defined area for specification (including the

withdrawal of specification) as a disposal site, whenever he determines,

after notice and opportunity for public hearings, that the discharge of

such materials into such area will have an unacceptable adverse effect

on municipal water supplies, shellfish beds and fishery areas (including

spawning and breeding areas), wildlife, or recreational areas. Before

making such determination, the Administrator shall consult with the

Secretary. The Administrator shall set forth in writing and make public

his findings and his reasons for making any determination under this

subsection.”

ee TG

9a

A period for public comment and an optional public hearing

follows, after which the RA either withdraws the deter-

mination or submits a recommended determination to the

national Administrator, whose decision to affirm, modify

or rescind the RA’s recommendation is the final deter-

mination of EPA for purposes of judicial review. The bur-

den of proving that the discharge will have an

“unacceptable adverse effect” is on EPA. 45 Fed.Reg.

85,336, 85,338 (1980); 44 Fed. Reg. 58,076, 58,080 (1979).

In short, both EPA and the Corps are responsible for

administering the program for granting permits for dis-

charges of pollutants into wetlands under § 404. The Corps

has the authority to issue permits following the 404(b\1)

guidelines developed by it and EPA; EPA has the au-

thority under § 404(c) to veto any permit granted by the

Corps. The Corps processes about 11,000 permit applica-

tions each year. EPA has vetoed five decisions by the

Corps to grant permits.

B. Factual Background of the Sweedens Swamp Project

Sweedens Swamp is a 49.5 acre wetland which is part

of an 80 acre site near Interstate 95 in South Attleboro,

Massachusetts. Although some illegal dumping and motor-

bike intrusions have occurred, these activities have been

found to have had little impact on the site which remains

a “high-quality red maple swamp” providing wildlife hab-

itat and protecting the area from flooding and pollution.

The effort to build a mall on Sweedens Swamp was

initiated by Pyramid’s predecessor, the Edward J. De-

Bartolo Corporation (‘DeBartolo’). DeBartolo purchased

the Swamp some time before April 1982. At the time of

this purchase an alternative site was available in North

Attleboro (the ‘“‘North Attleboro site”). Since Massachu-

setts requires state approval (in addition to federal ap-

proval) for projects that would fill wetlands, DeBartolo

applied to the Massachusetts Department of Environmen-

tal Quality Engineering (““DEQE”’) for permission to build

10a

on Sweedens Swamp. DEQE denied the application in April

1982.

Pyramid took over the project in 1983 while the appeal

of the DEQE denial was pending. In April 1983, Massa-

chusetts adopted more rigorous standards for approval of

permits. The new standards added wildlife habitat as a

value of wetlands to be protected and required the absence

of a “practicable alternative”. In March 1985, DEQE

granted approval under the old, less stringent, regulations.

The Massachusetts District Court reversed on the ground

that DEQE should have applied the new regulations, but

the Massachusetts Supreme Judicial Court ultimately up-

held DEQE’s approval. Citizens for Responsible Environ-

mental Management v. Attleboro Mall, Inc., 400 Mass. 658,

511 N.E.2d 562 (1987).

One of the key issues in dispute in the instant case is

just when did Pyramid begin searching for a suitable site

for its mall. EPA asserts that Pyramid began to search

in the Spring of 1983. Pyramid asserts that it began to

search several months later, in September 1983. The dif-

ference is crucial because on July 1, 1983—a date between

the starting dates claimed by EPA and Pyramid—a com-

petitor of Pyramid, the New England Development Co.

(‘““NED’’), purchased options to buy the North Attleboro

site. This site was located upland and could have served

as a “practicable alternative’ to Sweedens Swamp, if it

had been “available’’ at the relevant time. Thus, if the

relevant time to determine whether an alternative is

“available” is the time the applicant is searching for a

site (an issue that is hotly disputed), and if Pyramid began

to search at a time before NED acquired options on the

North Attleboro site, there definitely would have been a

“practicable alternative’ to Sweedens Swamp, and Pyra-

mid’s application should have been denied. On the other

hand, if Pyramid did not begin its search until after NED

acquired options on the North Attleboro site, then the site

arguably was not “available” and the permit should have

lla

been granted. Of course it also is possible that the North

Attleboro site remained “available” after NED’s acquisi-

tion of the options, since Pyramid arguably could have

purchased the options from NED. Moreover, since the

North Attleboro site indisputably was “‘available’’ when

Pyramid’s predecessor, DeBartolo, purchased Sweedens

Swamp, one might argue, as EPA does, that Pyramid

should be held to stand in its predecessor’s shoes. The

district court apparently agreed with Pyramid on the issue -

of when Pyramid entered the market, stating that ‘“Pyr-

amid initially became interested in developing a shopping

mall in the Attleboro area in September 1983”. Bersani

v. EPA, supra, 674 F.Supp. at 409.

In December 1983, Pyramid purchased Sweedens Swamp

from DeBartolo. In August 1984, Pyramid applied under

§ 404(a) to the New England regional division of the Corps

(the “NE Corps’’) for a permit. It sought to fill or alter

32 of the 49.6 acres of the Swamp; to excavate nine acres

of uplands to create artificial wetlands; and to alter 13.3

acres of existing wetlands to improve its environmental

quality. Later Pyramid proposed to mitigate the adverse

impact on the wetlands by creating 36 acres of replace-

ment wetlands in an off-site gravel pit.

During the review of Pyramid’s application by EPA, by

the Fish and Wildlife Service (““FWS’’) and by the Corps,

Pyramid submitted information on ‘“‘practicable alterna-

tives’, especially the North Attleboro site. In rejecting

that site as an alternative, Pyramid asserted that building

a mall there was not feasible, not that the site was un-

available. In the words of the district court, Pyramid

claimed that

“the site lacked sufficient traffic volume and sufficient

access from local roads, potential department store

tenants had expressed strong doubts about the fea-

sibility of the site and previous attempts to develop

12a

the site had met with strong resistance from the sur-

rounding community.”

Bersant, supra, 674 F.Supp. at 410 (emphasis added).

In November 1984, EPA and FWS submitted official

comments to the NE Corps recommending denial of the

application because Pyramid’s proposal was inconsistent

with the 404(bX1) guidelines. Pyramid had failed (1) to

overcome the presumption of the availability of alterna-

tives and (2) to mitigate adequately the adverse impact on

wildlife. EPA threatened a § 404(c) review. Pyramid then

proposed to create additional artificial wetlands at a nearby

upland site, a proposal it eventually abandoned.

In January 1985, the NE Corps hired a consultant to

investigate the feasibility of Sweedens Swamp and the

North Attleboro site. The consultant reported that either

site was feasible but that from a commercial standpoint

only one mall could survive in the area. On February 19,

1985, the NE Corps advised Pyramid that denial of its

permit was imminent. On May 2, 1985, the NE Corps sent

its recommendation to deny the permit to the national

headquarters of the Corps. Although the NE Corps ordi-

narily makes the final decision on whether to grant a

permit, see 33 C.F.R. § 325.8 (1982), in the instant case,

because of widespread publicity, General John F. Wall, the

Director of Civil Works at the national headquarters of

the Corps decided to review the NE Corps’ decision. Wall

reached a different conclusion. He decided to grant the

permit after finding that Pyramid’s offsite mitigation pro-

posal would reduce the adverse impacts sufficiently to al-

low the “practicable alternative’ test to be deemed

satisfied. He stated:

“In a proper case, mitigation measures can. be said

to reduce adverse impacts of a proposed activity to

the point where there is no ‘easily identifiable differ-

ence in impact’ between the proposed activity (in-

13a

cluding mitigation) versus the alternatives to that

activity.”

Although he did not explicitly address the issue, Wall

apparently assumed that the relevant time to determine

whether there was a practicable alternative was the time

of the application, not the time the applicant entered the

market. In other words, Wall appears to have assumed

that the market entry theory was not the correct approach.

For example, while addressing the traditional “‘practicable

alternatives” analysis as an alternative ground for his de-

cision, Wall found that the North Attleboro site was un-

available “‘because it has been optioned by another

developer”. Since the site was not optioned at the time

EPA argues Pyramid entered the market, this language

suggests (to Pyramid at least) that Wall could not have

been employing the market entry approach.

On May 31, 1985, Wall ordered the NE Corps to send

Pyramid, EPA and FWS a notice of its intent to grant

the permit. The NE Corps complied on June 28, 1985.

On July 23, 1985, EPA’s RA initiated a § 404(c) review

of the Corps’ decision. Following the procedure set forth

in 40 C.F.R. Part 231 (discussed above), EPA published

notice of its intent te prohibit the project in the Federal

Register; held a public hearing on September 26, 1985; and

permitted a period for public comment which closed on

October 4, 1985. A second hearing was held on November

18, 1985.

On March 4, 1986, the RA recommended that EPA veto

the permit because of adverse impacts on wildlife and

available “‘practicable alternatives’. In particular, the RA

found that Pyramid had not overcome the presumption

that an alternative existed, in part because Pyramid had

failed to provide information on the availability of the

North Attleboro site. After first refusing to provide the

information, Pyramid later had claimed “there is no fur-

ther or more detailed information. It simply does not

i

l4a

exist.’’ The RA alternatively reasoned that the North At-

tleboro site had been available to DeBartolo, and that EPA

should attribute this availability to Pyramid because Pyr-

amid had benefitted from DeBartolo’s application for state

approval.

On May 13, 1986, EPA issued its final determination,

which prohibited Pyramid from using Sweedens Swamp.

It found (1) that the filling of the Swamp would adversely

affect wildlife; (2) that the North Attleboro site could have

been available to Pyramid at the time Pyramid investigated

the area to search for a site; (3) that considering Pyramid’s

failure or unwillingness to provide further materials about

its investigation of alternative sites, it was uncontested

that, at best, Pyramid never checked the availability of

the North Attleboro site as an alternative; (4) that the

North Attleboro site was feasible and would have a less

adverse impact on the wetland environment; and (5) that

the mitigation proposal did not make the project preferable

to other alternatives because of scientific uncertainty of

success. In the second of these findings, EPA used what

Pyramid calls the ‘‘market entry’ approach.

On July 1, 1986, Pyramid commenced the instant action

in the district court to vacate EPA’s final determination

as arbitrary and capricious. After the parties filed cross-

motions for summary judgment, the newspapers reported

that Pyramid intended to enter a joint venture with NED

to build a mall at the North Attleboro site. Affidavits

submitted concerning this development did not indicate

whether Pyramid planned to continue the Sweedens Swamp

project. Since the joint venture agreement was still in

draft form, EPA did not take the position that the case

was moot.

On October 6, 1987, the court granted EPA’s motion

for summary judgment. The court stated that, with regard

15a

to the market entry theory, EPA’s interpretation of its

regulations was entitled to deference. This appeal followed.

For the reasons which follow, we affirm.

Il.

One of Pyramid’s principal contentions is that the mar-

ket entry approach is inconsistent with both the language

of the 404(bX1) guidelines and the past practice of the

Corps and EPA.

A.

With regard to the language of the regulations, Pyramid

reasons that the 404(b\1) guidelines are framed in the

present tense, while the market entry approach focuses on

the past by considering whether a practicable alternative

was available at the time the applicant entered the market

to search for a site. To support its argument that the

404(bX1) guidelines are framed in the present tense, Pyr-

amid quotes the following language:

‘“‘An alternative is practicable if it is available... . If

it is otherwise a practicable alternative, an area not

presently owned by the applicant which could reason-

ably be obtained, utilized, expanded or managed in

order to fulfill the basic purpose of the proposed ac-

tivity may be considered.”’

40 C.F.R. § 230.10(aX2) (emphasis added). It then argues

that EPA says “‘is’’ means “‘was’’. It cites Gwaltney of

Smithfield v. Chesapeake Bay Foundation, 108 S.Ct. 376,

381 (1987), to indicate that the Supreme Court believes

that the “‘most natural’’ reading of present tense langauge

in § 505(a) of the Act refers only to the present and future.

While this argument has a certain surface appeal, we

are persuaded that it is contrary to a common sense read-

ing of the regulations; that it entails an overly literal and

a

l6a

narrow interpretation of the language; and that it creates

requirements not intended by Congress.

First, while it is true that the language is in the present

tense, it does not follow that the “most natural” reading

of the regulations would create a time-of-application rule.

As EPA points out, ‘‘the regulations do not indicate when

it is to be determined whether an alternative ‘is’ avail-

able,” (emphasis in original), i.e., the “‘present’’ of the

regulations might be the time the application is submitted;

the time it is reviewed; or any number of other times.

Based upon a reading of the language in the context of

the controlling statute and the regulations as a whole,

moreover, we conclude that when the agencies drafted the

language in question they simply were not thinking of the

specific issues raised by the instant case, in which an ap-

plicant had available alternatives at the time it was se-

lecting its site but these alternatives had evaporated by

the time it applied for a permit. We therefore agree with

the district court that the regulations are essentially silent

on the issue of timing and that it would be appropriate

to consider the objectives of the Act and the intent un-

derlying the promulgation of the regulations. Bersani, su-

pra, 674 F.Supp. at 412.

Second, as EPA has pointed out, the preamble to the

404(b\1) guidelines states that the purpose of the “‘prac-

ticable alternatives” analysis is “to recognize the special

value of wetlands and to avoid their unnecessary destruc-

tion, particularly where practicable alternatives were avail-

able in non-aquatic areas to achieve the basic purpose of

the proposal.”’ 45 Fed. Reg. 85,338 (1980) (emphasis added).

In other words, the purpose is to create an incentive for

developers to avoid choosing wetlands when they could

choose an alternative upland site. Pyramid’s reading of the

regulations would thwart this purpose because it would

remove the incentive for a developer to search for an

alternative site at the time such an incentive is needed,

i.e., at the time it is making the decision to select a par-

l7a

ticular site. If the practicable alternatives analysis were

applied to the time of the application for a permit, the

developer would have little incentive to search for alter-

natives, especially if it were confident that alternatives

soon would disappear. Conversely, in a case in which al-

ternatives were not available at the time the developer

made its selection, but became available by the time of

application, the developer’s application would be denied

even though it could not have explored the alternative site

at the time of its decision.

Pyramid attacks this reasoning by arguing that few de-

velopers would take the risk that an available alternative

site would become unavailable and that EPA’s reading

improperly considers the motives and subjective state of

mind of the applicant. These arguments are wide of the

mark. Whether most real-life developers would take such

a risk is irrelevant. The point is that Pyramid’s time-of-

application theory is completely at odds with the expressed

intent of the regulations to provide an incentive to avoid

choosing wetlands. Similarly, EPA’s interpretation does

not require courts to investigate the subjective state of

mind of a developer. EPA discusses state-of-mind issues

only because it is discussing the purpose behind the reg-

ulations, which is concerned with incentives, and thus in

fact is indirectly concerned with the developer’s state of

mind.

In short, we conclude that a common-sense reading of

the statute can lead only to the use of the market entry

approach used by EPA.

B.

With regard to the past practice of the Corps and EPA,

Pyramid asserts that neither has ever applied a market

entry approach. It first cites two previous final determi-

nations of EPA, known as the “Final Determination of

the Assistant Administrator for External Affairs Concern-

18a

ing the Jack Maybank Site on Jehossee Island, South Car-

olina Pursuant to Section 404(c) of the Clean Water Act,”

April 5, 1985 (‘“‘“Maybank Determination”’), and the ‘Final

Determination of the Administrator Concerning M.A. Nor-

den Site Pursuant to Section 404(c) of the Clean Water

Act,” June 15, 1984 (““Norden Determination”). On the

basis of these determinations, Pyramid argues that, had

EPA been using a market entry approach in these cases,

it would have examined whether alternatives were avail-

able at earlier times and that EPA had failed to make

such an examination. Pyramid also cites National Audubon

Society v. Hartz Mountain Dev. Corp., 14 Envtl.L. Rep.

20724 (Envtl.L.Inst.) (D.N.J. Oct. 24, 1983), Friends of the

Earth v. Hintz, 800 F.2d 822 (9 Cir.1986), and Hough v.

Marsh, 557 F.Supp. 74 (D.Mass.1982), as examples of cases

in which courts have upheld Corps decisions which had

examined only those practicable alternatives that were

available at the time of the permit review.

Our examination of these prior decisions has satisfied

us, however, that the issue raised in the instant case sim-

ply has not been addressed before. In National Audubon

Society, the actual issue was whether the alternative site

had to be available to the applicant or any developer. In

Hintz, the court, while addressing other issues, simply ap-

proved a Corps decision in which only those alternatives

available at the time of the review were considered. In

Hough, the court invalidated a permit not because the

Corps had considered past alternatives but rather because

it assumed that such alternatives continued to exist during

the entire selection process. Similarly, the Maybank De-

termination in fact addressed another issue. In the Norden

Determination, where about 40 possible alternative sites

were identified, of which seven were available at the time

of application, EPA did not address the timing issue ex-

plicitly, because it was not required to—the presence of

the seven currently available alternatives made it unnec-

essary to reach the issue.

3

)

19a.

We believe that the issue essentially is one of first

impression. We view EPA’s action in the instant case as

an application of the regulatory language to the specific

needs of this case which arose here for the first time. We

therefore hold that EPA has not acted contrary to prior

practice under the regulations.

Ill.

We turn next to the issue of whether EPA’s interpre-

tation of the 404(bX1) guidelines is entitled to the defer-

ence usually accorded an agency with regard to its

interpretation of regulations it is charged with adminis-

tering, see EPA v. National Crushed Stone Ass’n, 449 U.S.

64, 83 (1980), and participated in formulating. See also

United States v. Hescorp. Heavy Equip. Sales Corp., 801

F.2d 70, 76 (2 Cir.), cert. denied, 107 S.Ct. 672 (1986).

The district court implied in its decision that it was ac-

cording EPA such deference in examining its market entry

approach.

Pyramid contends that such deference was unwarranted

because two agencies—EPA and the Corps—developed and

administered the regulations, and the Corps reached a dif-

ferent conclusion from that of EPA on the market entry

issue. It asserts that, contrary to EPA’s market entry

approach, the ‘Corps’ position is that the availability should

be determined as of the time an application is under re-

view.”” Pyramid points out that under § 404(b) the regu-

lations are to be developed by EPA “‘in conjunction with’”’

the Secretary of the Army (who acts through the Corps).

It cites General Elec. Co. v. Gilbert, 429 U.S. 125, 144-45

(1976), for the proposition that a court must use its own

judgment in construing a regulation when two agencies

with responsibility for administering it reach divergent

conclusions. It also contends that the Corps has greater

experience with and expertise in assessing the ‘‘availabil-

ity” of alternatives than EPA, because it is the Corps that

makes the initial decision on thousands of applications while

20a

EPA reviews under § 404(c) only rarely. Furthermore,

Pyramid claims that the availability analysis implicates zon-

ing, economic and financial issues, not environmental ones.

In response, EPA asserts that the Corps did not take

a developed opposing policy position on the issue of what

time is relevant in the “practicable alternatives’’ analysis.

The reason for this is that the Corps, acting through Gen-

eral Wall, based its decision primarily on its finding that

Pyramid’s mitigation proposal was workable. EPA also as-

serts, on the issue of its expertise, that its “selective and

most infrequent invocation” of its veto power underscores

EPA’s “seriousness” about using the veto. Finally EPA

asserts that the Act’s legislative history indicates that Con-

gress intended EPA to have the “final word’ on any dis-

putes with the Corps.

While none of EPA’s assertions is entirely persuasive,

there also are difficulties with Pyramid’s position. It is

undeniable, for example, that Wall in fact did find that

the North Attleboro site was “unavailable’’ and thus it

appears that the Corps tacitly was applying a time-of-

application test. On the other hand, it is possible that Wall

believed that Pyramid did not enter the market until after

NED had purchased the North Attleboro site. Accordingly,

Wall may have found the alternative site “unavailable”

under the market entry approach. Pyramid’s and EPA’s

other arguments similarly cut both ways or are inconclu-

sive.

Even if we are not thoroughly persuaded that EPA’s

interpretation was entitled to deference, however, we

nevertheless conclude that the district court’s decision in

its favor must be upheld. As Pyramid itself points out (to

the detriment of its argument), the issue of deference is

separate from the issue of the standards of review of the

district court and of our Court.

On appeal, we must subject the district court’s judgment

to plenary review, Potenze v. New York Shipping Ass'n,

2la

804 F.2d 235, 239 (2 Cir.1986), cert. denied, 107 S.Ct.

1955 (1987), and apply the same summary judgment test

as applied by the district court. See T.W. Elec. Serv., Inc.

v. Pacific Elec. Contractors Ass’n, 809 F.2d 626, 630 (9

Cir.1987). An agency’s interpretation of its own regula-

tions raises a question of law, White Indus. v. FAA, 692

F.2d 532, 534 (8 Cir.1982), and thus is freely reviewable

by our Court. Pennzoil Co. v. FERC, 789 F.2d 1128, 1135

(5 Cir.1986).

The standard of review for the district court in this case

is that the court shall set aside EPA’s findings, conclusions

or actions only if they are “arbitrary, capricious, an abuse

of discretion, or otherwise not in accordance with law.”

Administrative Procedure Act § 10(e), 5 U.S.C. § 706(2\A)

(1982). As stated by the Supreme Court in Motor Vehicle

Mfrs. Ass'n v. State Farm Mut. Auto. Ins. Co., 463 U.S.

29 (1983),

“{A] reviewing court may not set aside agency rule

that is rational, based on consideration of the relevant

factors, and within the scope of the authority dele-

gated to the agency by the statute.... The scope of

review under the ‘arbitrary and capricious’ standard

is narrow and a court is not to substitute its judgment

for that of the agency. Nevertheless, the agency must

examine the relevant data and articulate a satisfactory

explanation for its action including a ‘rational con-

nection between the facts found and the choice

made.’ ”’

Id. at 42-43 (quoting Burlington Truck Lines, Inc. v. United

States, 371 U.S. 156, 168 (1962)).

Applying these standards, we are convinced that EPA’s

market entry interpretation was reasonable, and therefore

was neither “arbitrary and capricious” nor “not in ac-

cordance with law.” We therefore hold that the district

court correctly found that EPA’s interpretation of the reg-

ulations was reasonable.

22a

IV

Finally, we turn to Pyramid’s subordinate claims, three

of which warrant brief mention. Pyramid claims (1) that

the market entry theory violates administrative law prin-

ciples because it is not specific enough to put the public

on notice of when it must consider alternative sites; (2)

that EPA’s application of the market entry theory was

unfair in this case; and (3) that the district court exceeded

its authority in supplying a rationale for EPA’s decision

which was not offered by EPA.

As for the claim that the market entry approach is not

specific enough, Pyramid reasons that any number of points

in time could constitute “entry” into the market. It spec-

ulates whether market entry occurs “from the time the

first internal memorandum is written,”’ or the time ‘‘the

first consultant [is] hired,”’ or the time the ‘‘first negoti-

ation for a site [is] conducted.”” We are persuaded, how-

ever, that EPA is correct in asserting that it is unnecessary

to pin down the standard to such a degree and that it

would confuse things further to attempt to do so. Since

the point of “‘entry’’ necessarily will vary from case to

case, we believe the concept of “‘market entry”’ is the best

method and is specific enough to put a developer on notice

of when it should be considering alternative sites.

With regard to the claim that EPA applied the market

entry approach unfairly in the instant case, Pyramid as-

serts that the way EPA announced a “‘new”’ standard (the

market entry rule) and then applied it “retroactively” in

this case was fundamentally unfair. It also asserts that

EPA’s failure to address evidence that the North Attleboro

site was unavailable at the time of Pyramid’s market entry

was unfair. According to Pyramid, such fundamental un-

fairness violates the principles underlying the Administra-

tive Procedure Act. See Morton v. Ruiz, 415 U.S. 199, 232

(1974).

23a

As we held above, however, we view EPA’s interpre-

tation of the rules as a reasonable application of the reg-

ulatory language to the unique facts of this case—a case

in which it became necessary for the first time to reach

the issue of when availability should be determined. EPA

did not create and announce a “new” standard and apply

it retroactively to Pyramid. Rather, EPA interpreted the

law to apply it to the facts of this case.

ne Ae Re re

Moreover, we believe the extensive administrative re-

cord supports a finding that the North Attleboro site was

available to Pyramid when it entered the market. Even if

Pyramid were found not to have entered the market until

September 1983, after NED had acquired options to pur-

chase the North Attleboro site, it does not necessarily

follow that the site was unavailable. Aside from the fact

that NED did not acquire all the options for the North

Attleboro site until June 1984, it also was possible for

Pyramid to attempt to purchase the options from NED.

The record shows no such attempts to purchase the site,

or even to investigate its availability. Alternatively, even

though the district court apparently was not persuaded by

it, there also is evidence in the record to show that Pyr-

amid actually entered the market in the Spring of 1983,

before NED had purchased its options. Finally, the evi-

dence shows that the North Attleboro site had been avail-

able to DeBartolo, Pyramid’s predecessor. EPA could

reasonably have determined that Pyramid should be held

to “stand in the shoes” of DeBartolo, especially since it

was able to obtain state approval of the project under the

less-stringent state standards that had originally applied

to DeBartolo.

Finally, Pyramid contends that the district court im-

properly supplied a rationale for EPA’s final determination

that EPA itself did not articulate. It is true that the dis-

trict court rejected one of EPA’s grounds for finding that

Pyramid had failed to rebut the presumption that a prac-

ticable alternative was available. This ground was that the

= | |

24a

“trade custom” of developers was to investigate a poten-

tial development site for many months before purchasing

it. EPA reasoned that, if Pyramid had purchased Swee-

dens Swamp in December 1983, it was unlikely, in view

of the trade custom, that it had entered the market only

eight weeks earlier—in September 1983—as Pyramid

claimed. The court accepted what it characterized as EPA’s

finding that the North Attleboro site in any event was

still available in September 1983, when even Pyramid ad-

mitted it had entered the market.

Pyramid asserts that EPA did not make this finding

and that the court improperly supplied a rationale for

EPA’s determination that EPA did not articulate itself.

This assertion fails, however, because EPA did make the

finding. In its final determination it stated several reasons

why it believed the North Attleboro site should be deemed

to have been “‘available’’. It stated, among other things,

(1) that NED could “have been talked into relinquishing

its interest’’ in the site even in September or December

1983; (2) that Pyramid never investigated the availability

of the North Attleboro site because it believed it was too

far from the highway; and (3) that Pyramid had refused

to provide EPA with information on the time of its entry

into the market, stating that such information ‘simply

does not exist’’. Thus, the trade custom ground to support

the finding of availability was accompanied by several other

grounds in the final determination. The district court

therefore did not “supply” a rationale for EPA. Rather,

EPA supplied several for itself.

We affirm the district court’s decision in all respects.

V.

To summarize:

We hold (1) that the market entry theory is consistent

with both the regulatory language and past practice; (2)

that EPA’s interpretation, while not necessarily entitled

25a

to deference, is reasonable and its application of its rule

is supported by the record; and (3) that Pyramid’s other

arguments lack merit.

Affirmed.

GEORGE C. PRATT, Circuit Judge, dissenting:

Finding that a ‘“‘common-sense reading’ of 33 U.S.C. §

1344(c) “‘can lead only to the use of the market entry

approach’’, the majority today holds that in determining

whether an “alternative is available’, EPA is to look, not

at the present circumstances and most current data, but

rather at circumstances and data which existed, perhaps

years earlier, when the developer ‘“‘entered the market’.

This market entry theory approaches a sensitive environ-

mental problem through a time warp, it ignores the stat-

ute’s basic purpose, and it creates unfair and anomalous

results. I therefore dissent.

I. The Legislative History and Purpose of Section 1344.

Section 1344 was enacted by congress in 1972 as part

of a broad-based improvement to a national water policy

that had been, as congress termed it, “inadequate in every

vital aspect.”” S.Rep. No. 414, 92 Cong., 2d Sess. 7 (1972).

Specifically, the section was intended to address the del-

icate balance between those activities which endanger “‘ma-

rine environment [and] ecological systems” on the one

hand, and those activities “essential for the maintenance

of interstate and foreign commerce” on the other.

Conf.Rep. No. 1236, 92nd Cong., 2d Sess. 43-44 (1972).

Section 1344 is unusual: its primary purpose is neither

to punish those who illegally infringe on national wetlands,

nor, as the majority opines, “to provide an incentive [to

developers] to avoid choosing wetlands’’. To the contrary,

the statute is directed at the land itself without any regard

to whether the party seeking to develop it has clean hands.

Thus, if the “biological integrity’’ of a specific wetland

26a

area outweighs the “interstate and foreign commerce’’ ad-

vantages that the site could provide, the site should remain

undeveloped regardless of which developer is seeking the

permit. See S.Rep. No. 414, 92nd Cong., 2d Sess. 7 (1972);

Conf.Rep. No. 1236, 92nd Cong., 2d Sess. 43-44 (1972).

Conversely, if the balance weighs in favor of commerce

or other economic advantages, then the land should be

developed, again regardless of the specific developer in-

volved. Jd. In short, congress designed the section to pre-

serve the environment consistent with reasonable

accommodation to the economic and social needs of the

public; it was not concerned with the identities or past

activities of particular developers.

Il. The Purpose of Section 1344 and the Market Entry

Theory.

In this case I have no problem with EPA’s basic ap-

proach. It conscientiously attempted to weigh. the economic

advantages against the ecological disadvantages of devel-

oping Sweedens Swamp and, in approaching this deter-

mination, it properly looked to alternate available sites.

However, EPA went wrong—seriously wrong—when it

adopted the market entry theory to decide whether an

alternate site was available. By focusing on the decision-

making techniques and tactics of a particular developer,

instead of the actual alternatives to disturbing the wetland,

EPA ignored the statute’s central purpose.

The market entry theory in effect taints a particular

developer with respect to a particular site, while ignoring

the crucial question of whether the site itself should be

preserved. Under the market entry theory, developer A

would be denied a permit on a specific site because when

he entered the market alternatives were available, but

latecomer developer B, who entered the market after those

alternatives had become unavailable, would be entitled to

a permit for developing the same site. In such a case, the

theory no longer protects the land, but instead becomes

27a

a distorted punitive device: it punishes developer A by

denying him a permit, but grants developer B a permit

for the same property—and the only difference between

them is when they “entered the market’”’.

The market entry theory has further problems. In this

case, for example, if a Donald Trump had “entered the

market’’ after NED took the option on the North Attleboro

site and made it unavailable, under EPA’s approach he

apparently would have been entitled to a permit to develop

Sweedens Swamp. But after obtaining the permit and the

land, could Trump then sell the package to Pyramid to

develop? Or could he build the mall and then sell the

developed site to Pyramid? If, on the one hand, the answer

to these questions is “‘yes’”’, then the market entry theory

is no more than a troublesome mirage that could easily

be circumvented by Pyramid’s using a second party to buy

the land and obtain the permit. If, on the other hand, the

answer is “‘no’’, then Pyramid is forever tainted, forever

prohibited—somewhat like a bill of attainder—from owning

this particular site, and only because at some time in the

past it had “entered the market” while an alternative was

still available.

Furthermore, in a business that needs as much pre-

dictability as possible, the market entry theory will re-

grettably inject exquisite vagueness. When does a developer

enter the market? When he first contemplates a devel-

opment in the area? If so, in what area—the neighborhood,

the village, the town, the state or the region? Does he

enter the market when he first takes some affirmative

action? If so, is that when he instructs his staff to research

possible sites, when he commits money for more intensive

study of those sites, when he contacts a real estate broker,

when he first visits a site, or when he makes his first

offer to purchase? Without answers to these questions a

developer can never know whether to proceed through the

expense of contracts, zoning proceedings, and EPA appli-

cations. Such a vague standard as “market entry” falls

28a

far short of the requirement that an agency articulate its

standards with sufficient clarity so that the affected com-

munity may know what those standards are. See Motor

Vehicle Manufacturers Ass’n v. State Farm Mutual Insur-

ance Co., 463 U.S. 29, 48 (1983); Port Terminal Railroad

Ass'n v. United States, 551 F.2d 1336, 1344-45 (5th Cir.

1977).

Even more important, the result reached by EPA and

the majority is contrary to what congress sought to achieve

when it passed § 1344. Pyramid has been “‘punished’’ for

beginning its quest when the North Attleboro site was still

available; but Sweedens Swamp nevertheless could be de-

stroyed through an identical application by some other

developer who happened to enter the market after that

alternate site became unavailable. And this would be so

even if another, better-suited site should become available

after the second developer enters the market, because the

“common sense” market entry theory looks only, and

blindly, to the alternatives available at the time the ap-

plicant “‘entered the market”’.

III. The Proper Theory for Determining Whether an AIl-

ternate Site is Available.

Since congress delegated to EPA the responsibility for

striking a difficult and sensitive balance among economic

and ecological concerns, EPA should do so only after con-

sidering the circumstances which exist, not when the de-

veloper first conceived of his idea, nor when he entered

the market, nor even when he submitted his application;

rather, EPA, like a court of equity, should have the full

benefit of, and should be required to consider, the circum-

stances which exist at the time it makes its decision. This

is the only method which would allow EPA to make a

fully informed decision--as congress intended—based on

whether, at the moment, there is available a site which

can provide needed economic and social benefits to the

public, without unnecessarily disturbing valuable wetlands.

29a

Such a “time of decision’ theory is reinforced by the

present-tense language of the regulation, which commands

EPA to determine whether an alternate site ‘‘is available’.

See Gwaltney of Smithfield v. Chesapeake Bay Foundation,

108 S.Ct. 376, 381 (1987) (present tense language in reg-

ulation means agency should apply that regulation to pres-

ent, not past, circumstances). It is also supported by the

express statements of congress when it passed the statute,

and, I would submit, by true ‘“‘common sense”’. Any agency

given the unenviable task of balancing essentially incom-

parable factors in determining what is in the public’s best

interest, should look to the most up-to-date data, and eval-

uate the most current circumstances. Any other analysis

would effectively tie the agency to an irrelevant date in

the past, when the question to be decided is how to balance

the environmental and commercial interests of the present

and the future.

30a

UNITED STATES COURT OF APPEALS

SECOND CIRCUIT

UNITED STATES COURTHOUSE

FOLEY SQUARE

NEW YORK 10007

8 June, 1988

RE: BERSANI v EPA

Docket No.: 87-6275, 87-6295

Gentlemen:

The court has rendered a decision in the above-entitled

case. The decision of the district court has been

Judgment affirmed by published signed opinion.

Dissenting by published signed opinion.

Judgment filed.

A copy of the opinion will be mailed to you. Additional

copies of the opinion may be obtained from this office in

accordance with §0.17(7) of the rules of this court supple-

menting the Federal Rules of Appellate Procedure.

Judgment has been entered today and a mandate will issue

only to the District Court in accordance with Rule 41 of

the Federal Rules of Appellate Procedure.

Your attention is directed to the provision of Rule 39 of

the Federal Rules of Appellate Procedure requiring the

itemized and verified bill of costs, if any, to be filed with

proof of service, within 14 days after entry of judgment.

Very truly yours,

ELAINE B. GOLDSMITH, Clerk

by /s/ DONNA J. MORGAN

Deputy Clerk

) 3la

APPENDIX B

CLERK’S OFFICE

United States District Court

FOR THE

ND/NY

Civil Action No. 85-CV-772

John A. Bersani, et al

vs.

U.S. EPA, et al

There was entered on the docket Oct. 23, 1987

JUDGMENT: Defts’ motionf/summary judgment is granted;

Pitfs’ motion f/summary judgment is denied.

J.R. SCULLY, CLERK

32a

UNITED STATES DISTRICT COURT,

N.D. New York.

No. 86-CV-772.

John A. BERSANI, Newport Galleria

Group, Robert J. Congel and the

Pyramid Companies,

Plaintiffs,

and

Citizens in Support of Attleboro Mall

and Joseph Robichaud,

Intervenor-Plaintiffs,

cand

Home Builders Association of Massachusetts,

Intervenor-Plainttff,

v.

UNITED STATES ENVIRONMENTAL PROTECTION

AGENCY; United States Army Corps of Engineers; Lee

Thomas, in his official capacity as Administrator of the

United States Environmental Protection Agency; Richard

K. Dawson, in his official capacity as Assistant Secretary

for Civil Works, United States Army; and Jennifer Joy

Wilson, in her official capacity as Assistant Administrator

for External Affairs, United States Environmental Pro-

tection Agency,

Defendants,

and

Conservation Law Foundation of New England, Environ-

mental Defense Fund, National Audubon Society, Sierra

33a

Club Legal Defense Fund, and National Wildlife Federa-

tion, Intervenor-Defendants.

Oct. 6, 1987

Shopping mall developers brought action to challenge

final determination of Environmental! Protection Agency

that denied permission to construct shopping mall on

swamp. Agency moved for summary judgment. The Dis-

trict Court, McAvoy, J., held that: (1) Agency could con-

sider avoidability of loss in conjunction with its magnitude

in determining whether environmental effect was unac-

ceptable and significant; (2) Agency properly concluded that

alternative to construction of mall on swamp was feasible

and available; and (8) Agency did not act arbitrarily in

concluding that significant loss of wildlife resources would

result from construction of mall on swamp.

Motion granted.

Beveridge & Diamond, P.C., Washington, D.C., Levine,

Gouldin & Thompson, Binghamton, N.Y., for plaintiffs;

Gary H. Baise, Virginia S. Albrecht, Marc Zeppetello,

Washington, D.C., David M. Gouldin, Binghamton, N.Y.,

of counsel.

Mintz, Levin, Cohn, Ferris, Glovsky & Popeo, Boston,

Mass., for intervenor-plaintiff Home Builders Ass’n of Mas-

sachusetts; Michael S. Gardener, of counsel.

Paul D. Kamenar, Washington, D.C., for intervenor-

plaintiffs Citizens in Support of Attleboro Mall and Joseph

Robichaud.

Lawrence R. Liebesman, U.S. Dept. of Justice, Land

and Natural Resources Div., Washington, D.C, for

defendants.

Gail B. Cooper, Office of General Counsel, E.P.A.,

Washington, D.C., for defendants.

Ann Williams-Dawe, Boston, Mass., for defendants U.S.

E.P.A.

34a

James T.B. Tripp, New York City, for defendant-inter-

venor Environmental Defense Fund.

Robert Dreher, Washington, D.C., for defendant-inter-

venor Sierra Club Legal Defense Fund.

McDermott, Will & Emery, Washington, D.C., for ami-

cus curiae United States Chamber of Commerce; R. Sarah

Compton, of counsel.

Chernin & Gold, Binghamton, N.Y., for amicus curiae

U.S. Chamber of Commerce; Donald M. Flanagan, of

counsel.

DECISION AND ORDER

McAVOY, District Judge.

Plaintiffs John A. Bersani, the Pyramid Companies’,

Robert J. Congel and the Newport Galleria Group? have

‘brought this action challenging a ‘“‘Final Determination”

rendered by the defendant United States Environmental

Protection Agency (the “EPA’’) on May 13, 1986, pursuant

to Section 404(c) of the Clean Water Act, 33 U.S.C. section

1344(c). This Final Determination vetoed a decision ren-

dered by the defendant United States Army Corps of En-

gineers (the “Corps’’) in June 1985, which decision granted

Pyramid permission to construct a shopping mall in certain

wetlands, known as ““Sweden’s Swamp,”’ located in South

Attleboro, Massachusetts. Pyramid seeks an order from

' Pyramid is an association of partnerships which is in the business

of developing, constructing and operating shopping centers in the

Northeastern United States.

* The plaintiffs will be collectively referred to as “Pyramid.”

*The EPA Administrator delegated the authority to make a final

decision regarding permits issued under Section 404(a) of the Act to

the Assistant Administrator of External Affairs at the time of the

proceeding at issue. This final determination constitutes final agency

action under Section 404(c) of the Act for the purposes of judicial

review. 40 C.F.R. sections 231.5 and 231.6.

———————

35a

this Court vacating the EPA’s determination on the

grounds that it is arbitrary, capricious and otherwise not

in accordance with the law. See 5 U.S.C. sections 704, 706.

The court has before it plaintiffs’ and defendants’ cross-

motions for summary judgment.‘

BACKGROUND

1. Statutory and Regulatory Framework

The Clean Water Act (the “‘Act’’), 33 U.S.C. sections

1251 et seg., the basic federal legislation controlling water

pollution, embodies Congress’ effort to restore and main-

tain the chemical, physical, and biological integrity of the

Nation’s waters. 33 U.S.C. section 1251. Section 301(a) of

the Act, 33 U.S.C. section 1311(a), forbids the discharge

of any pollutant into “navigable waters’’> unless permitted

by the Army Corps of Engineers pursuant to Section 404.

See 33 U.S.C. section 1344.

Section 404(a) authorizes the Secretary of the Army,

acting through the Corps, to issue permits for the dis-

charge of dredged or fill material at specified disposal

‘Both Intervenor-Plaintiffs and Intervenor-Defendants have submit-

ted motions for summary judgment. The arguments of the former are

incorporated into the discussion concerning the plaintiffs’ motion and

the arguments of the latter are incorporated into the discussion re-

garding the defendants’ motion.

Oral argument on these motions was heard by this court on April

2, 1987. Thereafter, Intervenor-Defendants’ raised the question of

whether this lawsuit was moot. After three months of discovery, the

parties withdrew their assertion of mootness.

* Section 502 of the Act defines navigable waters as “waters of the

United States.”’ 33 U.S.C. section 1362(7). There is no dispute that the

wetlands comprising Sweden’s Swamp are navigable waters. See 33

C.F.R. section 323.2. Nor is there any dispute that the plaintiff's pro-

posal involves the discharge of dredged and fill materials, which are

pollutants within the meaning of the Act, into those waters. See 33

U.S.C. section 1362(6) (pollutant includes dredged spoil).

36a

sites. 33 U.S.C. section 1344(a). Criteria known as the

Section 404(b) guidelines developed by the EPA, in con-

junction with the Corps, govern these permitting decisions.

33 U.S.C. section 1344(b).* Generally, the Corps must em-

ploy a “practicable alternative’ analysis in determining

whether to allow a proposed discharge. 40 C.F.R. section

230.10 provides, in part:

(a) Except as provided under section 404(b\2) [per-

taining to navigation] no discharge of dredged or

fill material shall be permitted if there is a prac-

ticable alternative to the proposed discharge which

would have less adverse impact on the aquatic eco-

system, so long as the alternative does not have other

significant adverse environmental consequences.

(2) An alternative is practicable if it is available

and capable of being done, after taking into ac-

count cost, existing technology, and logistics in

light of overall project purposes. If it is otherwise

a practicable alternative, an area not presently owned

by the applicant which could reasonably be obtained,

utilized, expanded or managed in order to fulfill the

basic purpose of the proposed activity may be con-

sidered.

(3) Where the activity associated with a discharge

which is proposed for a special aquatic site [defined

in Subpart E to include wetlands] does not require

access or proximity to or siting within the special

aquatic site in question to fulfill its basic purpose (i.e.,

is not “water dependent’), practicable alternatives

that do not involve special aquatic sites are pre-

sumed to be available unless clearly demonstrated

otherwise. In addition, where a discharge is proposed

for a special aquatic site, all practicable alternatives

to the proposed discharge which do not involve a dis-

charge into a special aquatic site are presumed to —

* The section 404(bX1) guidelines are published at 40 C.F.R. Part 230.

37a

have less adverse impact on the aquatic ecosystem,

unless clearly demonstrated otherwise.

40 C.F.R. sections 230.10(aX2) and (8) (emphasis added).’

When the proposed discharge involves a special aquatic

site such as wetlands, a more stringent standard is im-

posed. Indeed, Section 230.10(aX3) creates a presumption

that a practicable alternative exists when the discharge

involves wetlands and the activity, here a shopping mall,

is not ‘‘water dependent.” Then the applicant must “clearly

demonstrate” that no such alternative does in fact exist.

Section 404(c) grants the Administrator of the EPA au-

thority to prohibit, deny or restrict a Corps-issued permit

for the use of a specific site when the Administrator de-

termines that the proposed discharge ‘‘will have an un-

acceptable adverse effect on municipal water supplies,

shellfish beds and fishery areas (including spawning and

breeding areas), wildlife, or recreational areas.’’ 33 U.S.C.

section 1344(c) (emphasis added). An “unacceptable ad-

verse effect’”’ is one which has an “impact on an aquatic

or wetland ecosystem which is likely to result in significant

degradation of municipal water supplies (including surface

or ground water) or significant loss of or damage to

fisheries, shellfishing, or wildlife habitat or recreation

areas.”’ 40 C.F.R. section 231.2(e) (emphasis added). This

“veto” power must be exercised in accordance with es-

tablished procedure. See 40 C.F.R. Part 231.

2. Procedural History

Pyramid initially became interested in developing a shop-

ping mall in the Attleboro area in September 1983, and

7 The other Section 404(b\1) criteria which must be satisfied before

a permit may issue are (1) compliance with other applicable laws, (2)

the absence of significant degradation of the Nation’s waters, and (3)

the adequate mitigation of potential adverse impacts. See 40 C.F.R.

sections 230.10(b)-(b).

38a

focused its attention on an 82-acre site in South Attleboro

about one-fourth mile north of the Rhode Island border.

Although the project contemplated altering or filing 32.2

acres of 49.6 acres of wetlands, the plan also called for

excavating 9.0 acres of uplands (non-wetlands) to create

new wetlands and altering an existing 13.3 acres of wet-

lands to enhance its value for wildlife, fisheries and other

quality maintenance.* Another 4.0 acres of existing wet-

lands would remain undisturbed.’ Upon completion of con-

struction, 26 acres of wetlands including marsh areas, red

maple swamp and open water would remain. Additionally,

Pyramid proposed an off-site mitigation project which

would result in the creation of 36 acres of replacement

wetlands in an abandoned gravel pit.’

State Proceedings

In April 1982, the Massachusetts Department of Envi-

ronmental Quality Engineering (MDEQE) denied state per-

mission to construct a mall at the Sweden’s Swamp site

to Pyramid’s predecessor, the Edward J. DeBartolo Cor-

poration. The DeBartolo Corporation requested an adju-

dicatory hearing, prior to which Pyramid assumed control

of the project. In March 1985, the MDEQE issued a

*The May 13, 1986 Final Determination of the Assistant Adminis-

trator for External Affairs (FD) is document H-119 in the certified

index to the Administrative Record. The March 5, 1986, Recommen-

dation of the EPA Regional Administrator (RD) is document B-25 in

the certified index. The Statement of Findings and Environmental As-

sessment of the Corps (SOF/EA) is document B-16 in the certified

index. All other documents will be referred to by the number assigned

them in the certified index.

The alteration of these additional 13.3 acres is necessary to provide

onsite capability for storage and treatment of stormwater runoff from

the development. FD, Plaintiffs Exhibit B, at 5; B-2, “Section 404

Application,”” at 31-64.

*SEOF/EA at 1.

“ FD at 5; C-54, “Final Report on Mitigation Site,” at 1-6.

‘

39a

Superseding Order of Conditions which overturned the in-

itial denial and authorized the project. This decision was

appealed on the ground that the MDEQE had improperly

reviewed Pyramid’s project under the state’s 1978 wet-

lands protection regulations rather than under the more

stringent regulations which had taken effect in April 1983.

On September 30, 1986, a state court rule that the

MDEQE’s decision to grandfather the project was error

and remanded the matter to the MDEQE to determine

the rights of the parties under the 1983 regulations. As

a consequence of this ruling, the new regulations, which

prohibit the filling of more than 5,000 square feet of bor-

dering vegetated wetlands, applied to Pyramid’s proposal,

see Laurie Carroll v. DEQE, No. 76012, (Mass.Super.Ct.

September 30, 1986), and barred its implementation. This

decision was reversed on appeal. See Citizens for Respon-

sible Environmental Management v. Attleboro Mall, Inc.,

400 Mass. 658, 511 N.E.2d 562 (1987).

Federal Proceedings

In May 1984, the Corps, the Fish and Wildlife Service

and the EPA held a meeting with Pyramid wherein Pyr-

amid’s proposal was discussed and compared to that of its

predecessor, the DeBartolo Corporation. Pyramid re-

quested that the project be authorized under a Corps “‘na-

tionwide permit,” a general permit requiring no application

or public review. At that time, the EPA informed Pyramid

of the rebuttable presumption that practicable, less envi-

ronmentally damaging alternatives exist for non-water de-

pendent projects located in wetlands. RD at 3. See 40

C.F.R. section 230.10(a). Thereafter, the Corps exercised

its discretionary authority and required Pyramid to apply

for an individual Section 404(a) permit.

The state regulations differ from the federal regulations in that

they do not include the protection of wildlife habitat or the existence

of practicable alternatives as considerations. See RD at 5.

40a

In connection with its August 1984, Section 404(a) ap-

plication, Pyramid submitted information concerning prac-

ticable alternative sites for its shopping mall.'* A site three

miles north in North Attleboro, Massachusetts was chiefly

considered by the Corps and the EPA." Pyramid relied

on séveral factors in concluding that the North Attleboro

site was not a practicable alternative; namely, the site

lacked sufficient traffic volume and sufficient access from

local roads, potential department store tenants had ex-

pressed strong doubts about the feasibility of the site and

previous attempts to develop the site had met with strong

resistance from the surrounding community.'* In Novem-

ber 1984, after Pyramid had first presented its offsite

mitigation proposal to convert a gravel pit into wetlands,

the EPA recommended that the Corps deny the permit

because of Pyramid’s perceived failure to overcome the

presumption that a less environmentally damaging prac-

ticable alternative existed. In January 1985 the Corps re-

tained a consultant to examine the practicability of a mall

at the North Attleboro site and the Corps and the EPA

conducted an on-site investigation of the North Attleboro

property. RD at 5. As a result, the Corps advised Pyramid

that refusal of its permit was imminent. Jd. In April 1985,

Pyramid presented its plan for the creation of 36 acres

of new wetlands in an effort to mitigate the loss which

would occur at Sweden’s Swamp.

On May 2, 1985, the Division Engineer of the New

England Division of the Army Corps sent his recommen-

2 At this time, Pyramid had not yet proposed any off-site mitigation.

B-2; B-4.

RD at 4; B-2; B-173, ‘Feasibility Analysis’’ prepared for State

Properties of New England (New England Development Co); B-226,

“Letter dated December 10, 1984 from State Properties of New Eng-

land. to Corps, EPA and FWS.”’

'* B-2 at 13-15; RD at 34-37.

‘RD at 5. Pyramid eventually dropped the site from consideration.

4la

dation on Pyramid’s application to the Director of Civil

Works, Major General Wall, at Corps Headquarters in

Washington, D.C. This recommendation urged that the

permit be denied because a practicable alternative with a

less adverse effect on the aquatic ecosystem existed.'* In

his review of the application, Major General Wall con-

cluded:

In a proper case, mitigation measures can be said

to reduce adverse impacts of a proposed activity to

the point where there is no “easily identifiable dif-

ference in impact” between the proposed activity (in-

cluding mitigation) versus the alternatives to that

activity. In such a case, mitigation measures would

have made a contribution to the satisfaction of 40

C.F.R. 230.10(a) [the practicable alternatives test].

B-13 at 5 (emphasis added); SOF/EA, Views of the Chief

of Engineers at 5. Under this interpretation, proposed mit-

igation at one site would suffice to establish that no less

damaging practicable alternative existed. However, Major

General Wall also employed a traditional analysis of the

practicable alternatives and found:

[]Jrom the point of view of the applicant in this case,

i; appears that the North Attleboro site is not avail-

eble. The north site is controlled by a competitor who

tas an interest in developing a regional shopping mall

in the same trade area as the applicant. Even if it

vere available to the applicant, he makes a convincing

ergument that it would not successfully fulfill the pur-

poses of his proposed project, from his particular point

d view.

B-13 at 1; SEOF/EA, Views of Chief of Engineers at 1.

RD at 6; B-11, “Corps Recommendation dated May 2, 1985"; B-

12, ‘Corps Recommendation.”

42a

Although Sweden’s Swamp is characterized in this report

as a wetland of relatively low value and degraded by un-

controlled use and by dumping of solid waste, its function

as a wildlife habitat is recognized. Jd. at 2. Major General

Wall directed the New England Division of the Corps to

prepare a notice of intent to issue the permit and to rec-

oncile its findings with the foregoing determination. Jd.

Accordingly, the Corps concluded that no practicable

alternative to the South Attleboro site existed because the

North Attleboro site was not available to Pyramid and

substantial doubt existed as to whether the site would

fulfill Pyramid’s purpose. Although the Corps determined

that the proposed project would not have an adverse effect

on water quality, flood control or drinking water supplies,

it expressed concern that the proposed reduction in on-

site wetland acreage “‘could cause substantial adverse im-

pact on local stocks of those species associated with for-

ested wetland cover type ... (i.e., red-shouldered hawk,

small birds, small mammals such as skunk, possum and

raccoon, and certain reptiles and amphibians.’’) SOF/EA

at 16. The Corps, therefore, conditioned the issuance of

any permit specifying Sweden’s swamp as a disposal site

upon the Corps’ approval of Pyramid’s mitigation efforts.

Id. at 36.

On June 28, 1985, the Division Engineer notified the

regional offices of the EPA and the United States Fish

and Wildlife Service (FWS) of the Corps’ intent to issue

a permit to Pyramid.

EPA’s Decision

On July 23, 1985, the EPA’s Regional Administrator

notified the Corps and Pyramid that he intended to initiate

Section 404(c) proceedings.'’ The EPA based this decision

upon its belief that an unacceptable adverse effect to wild-

* RD at 7: B-316.

————————————

|

43a

life could result from filling Sweden’s Swamp. On March

4, 1986, the Regional Administrator made a ‘‘Recom-

mended Determination” to prohibit the specification of

Sweden’s Swamp as a disposal site for dredged or fill

material. The Recommendation was based upon the finding

that Pyramid’s project was likely to have unacceptable

adverse impacts on the wildlife habitat at Sweden’s Swamp.

On May 13, 1986, the EPA issued its Final Determination

prohibiting the specification of Sweden’s Swamp as a dis-

posal site for fill material.

The Final Determination described Sweden’s Swamp as

a typical, well-established functioning red maple swamp

which provides excellent wildlife habitat for a variety of

birds, mammals, and amphibians, and provides flood stor-

age capacity, groundwater discharge and water purifica-

tion. FD at 30. It further found that the destruction of

the wetlands proposed by Pyramid would adversely affect

wildlife by driving away or killing animals currently living

there. See FD at 10-12. The EPA declared:

In determining whether these adverse impacts are un-

acceptable [within the meaning of section 404(c)], it

is relevant to examine next the avoidability of this

wetland loss by reviewing whether there are practic-

able, less environmentally damaging we to

the proposed project.

FD at 13.

In the EPA’s opinion, another less environmentally dam-

aging site in the area, i.e., the North Attleboro site, was

a feasible alternative which had been available at the time

Pyramid initially selected a site for its project. FD at 16-

26, 31. Thus, the EPA reasoned that any adverse effects

resulting from Pyramid’s project were avoidable and were

therefore unacceptable within the meaning of Section

404(c). The Final Determination concluded that ‘‘based on

the excellent wildlife value of the wetland ... its site and

setting, the avoidability of the loss, and the significance

a

44a

of such areas in Massachusetts, . . . filling Sweden’s Swamp

to build the proposed mall would have unacceptable ad-

verse effects within the meaning of section 404(c).’’ FD

at 31.

DISCUSSION

I. Summary of Arguments

The plaintiffs contend that the EPA’s decision to deny

the permit is incorrect as a matter of law because (1) the

EPA impermissibly relied on the “‘avoidability’’ of envi-

ronmental impacts in determining their ‘‘unacceptability”’

under Section 404(c) and (2) the EPA impermissibly re-

considered the Section 404(b) availability question and

backdated that inquiry.’® Plaintiffs also argue that even if

the EPA’s statutory and regulatory interpretations are up-

held as reasonable, the EPA’s conclusion was arbitrary

and capricious. The defendants, on the other hand, argue

that Section 404(c) clearly allows the EPA to prohibit the

filling of a wetland where that filling would have an un-

acceptable adverse impact on wildlife. The EPA contends

that it was authorized to consider the Section 404(b\1)

guidelines in determining whether the environmental im-

pacts were unacceptable and that its decision to assess the

practicable alternatives available at the time of project

planning was proper and consistent with the Act’s and the

regulations’ goals.

2. Standard of Review

As noted, the court has before it now the parties’ cross-

motions for summary judgment. Summary judgment is ap-

propriate when there is no genuine issue as to any material

fact and the moving party is entitled to judgment as a

matter of law. Fed. R.Civ.P. 56(c). The facts in this case

‘* The plaintiffs also allege that the EPA impermissibly amended a

regulation without the procedures mandated by the Administrative Pro-

cedure Act. The court rejects this contention.

45a

are undisputed. In reviewing the EPA’s decision, the court

must engage in a two-fold inquiry and determine (1)

whether the EPA’s interpretation of Section 404 and its

implementing regulations was reasonable and (2) whether

the EPA’s application of this interpretation to the facts

was rational.

An agency’s interpretation of the statute and regulations

it is charged with administering is entitled to deference.

See EPA v. National Crushed Stone Ass’n., 449 U.S. 64,

83, 101 S.Ct. 295, 307, 101 S.Ct. 295, 307, 66 L.Ed.2d

268 (1980). This is also true when the agency participated

in formulating a disputed regulation. See United States v.

Hescorp. Heavy Equip. Sales Corp., 801 F.2d 70, 76 (2d

Cir.1986) (treasury regulation construed) (citing Miller v.

Youakim, 440 U.S. 125, 144, 99 S.Ct. 957, 968, 59 L.Ed.2d

194 (1979)). Its interpretation need not be the only rea-

sonable one, and the court must uphold a reasonable inter-

pretation, even if the court would not have reached the

same conclusion in the first instance. A court may not

substitute its own construction of a statutory provision for

a reasonable interpretation made by the administrator of

an agency when a “statute is silent or ambiguous with

respect to the specific issue. [Then] the question for the

court is whether the agency’s answer is based upon a

permissible construction of the statute.’’ The court, must,

however, reject administrative constructions which are con-

trary to clear congressional intent. United States v. Riv-

erside Bayview Homes, Inc., 474 U.S. at 121, 131, 106

S.Ct. 455, 461, 88 L.Ed.2d 419 (1985); Chemical Mfrs.

Ass’n v. Natural Resources Defense Council, Inc., 470 U.S.

116, 126, 105 S.Ct. 1102, 1108, 84 L.Ed.2d 90 (1985);

Chevron, U.S.A., Inc. v. Natural Resources Defense Council

Inc., 467 U.S. 837, 104 S.Ct. 2778, 2782, 81 L.Ed.2d 694

(1984); Biggs v. Lyng, 823 F.2d 15, 18 (2d Cir.1987).

Because the Clean Water Act does not set forth the

standards for review of the EPA’s substantive decisions,

the court must look to the standards articulated in the

46a

Administrative Procedure Act for guidance. See Avovelles

Sportsmen’s League, Inc. v. Marsh, 715 F.2d 897 (5th

Cir.1983). The proper inquiry for the court is whether the

EPA’s Final Determination is “arbitrary and capricious,

an abuse of discretion, or otherwise not in accordance with

the law.”’ See Administrative Procedure Act section 10(e),

5 U.S.C. section 706(2KA); Buttrey v. United States, 690

F.2d 1170, 1183-85 (5th Cir.1982), cert. denied, 461 U.S.

927, 103 S.Ct. 2087, 77 L.Ed.2d 298 (1983). In undertaking

this task, the court must remain mindful of the carefully

circumscribed nature of its function. In Motor Vehicle Mfrs.

Ass’n v. State Farm Auto Ins. Co., 463 U.S. 29, 42-43,

103 S.Ct. 2856, 2866-67, 77 L.Ed.2d 443 (1983), the

Supreme Court delineated the boundaries of the court’s

review in applying the arbitrary and capricious standard.

[A] reviewing court may not set aside an agency rule

that is rational, based on consideration of the relevant

factors, and within the scope -of the authority dele-

gated to the agency by the statute ... The scope of

review under the “arbitrary and capricious” standard

is narrow and a court is not to substitute its judgment

for that of the agency. Nevertheless, the agency must

examine the relevant data and articulate a satisfactory

explanation for its action including a “rational con-

nection between the facts found and the choice made.”

Burlington Truck Lines, Inc. v. United States, 371

U.S. 156, 168 [83 S.Ct. 239, 246, 9 L.Ed.2d 207]

(1962). In reviewing that explanation, we must “‘con-

‘sider whether the decision was based on a consider-

ation of the relevant factors and whether there has

been a clear error of judgment.”’ Bowman Transpor-

tation, Inc. v. Arkansas-Best Freight System, Inc., 419

U.S. 281, 285; [95 S.Ct. 438, 442, 42 L.Ed.2d 447

(1974)}; Citizens to Preserve Overton Park v. Volpe,

401 U.S. 402, 416 [91 S.Ct. 814, 824, 28 L.Ed.2d 136

(1971)]. Normally, an agency rule would be arbitrary

and capricious if the agency has relied on factors

j ™

47a

which Congress has not intended it to consider, en-

tirely failed to consider an important aspect of the

problem, offered an explanation for its decision that

runs counter to the evidence before the agency, or is

so implausible that it could not be ascribed to agency

expertise.

Accord Sierra Club v. United States Army Corps of En-

gineers, 772 F.2d 1048, 1051 (2d Cir.1985); Avovelles

Sportsmen’s League, Inc. v. Marsh, 715 F.2d 897, 904 (5th

Cir.1983); Great Salt Lake Minerals and Chems. v. Marsh,

596 F.Supp. 548, 553 (D.Utah 1984). In reviewing the

EPA’s determination of the facts in the case at bar, the

court is limited to a review of the administrative record.

Camp v. Pitts, 411 U.S. 138, 142, 93 S.Ct. 1241, 1244,

36 L.Ed.2d 106 (1973); accord Buttrey v. United States,

690 F.2d 1170, 1184 (5th Cir.1982) (reviewing decision of

Corps under Section 404(b) Guidelines). Keeping these

principles in mind, the court now turns to an examination

of the issues at hand.

3. Use of Section 404(b)(1) Guidelines in Section 404(c)

Review

Pyramid contends that the avoidability of potential ad-

verse environmental impacts of a proposed disposal of fill

material may not be considered in evaluating the unac-

ceptability of those impacts and challenges the EPA’s use

of this criterion. Pyramid would have this court adopt a

narrow construction of Sections 404(b) and (c) and the

regulations promulgated thereunder. Pyramid contends that

the EPA may not consider nonenvironmental findings al-

ready made by the Corps at the permitting stage in de-

termining whether a proposal will have unacceptable

adverse environmental results within the meaning of Sec-

tion 404(c) and 40 C.F.R. section 231.2(e). The EPA, on

the other hand, argues that the use of the “practicable

alternatives” test set forth in the Section 404(b\1) guide-

lines governing the Corps’ decision are equally applicable

48a

to an EPA decision under Section 404(c). Moreover, the

EPA asserts that independent consideration of the “‘prac-

ticable alternatives’ test was proper.

Statutory Language

Section 404(c) allows the EPA to forbid specification of

a particular disposal site when it determines that a pro-

posed discharge “‘will have an unacceptable adverse ef-

fect.” 33 U.S.C. section 1344(c). The statute itself restricts

the EPA in only two ways. First, the EPA must provide

for notice and a public hearing, which it undeniably did

in the case at bar, and second, the EPA must evaluate

unacceptable adverse effects in terms of municipal water

supplies, shellfish beds and fishery areas, wildlife or rec-

reation areas. 33 U.S.C. section 1344(c). The 404(c) reg-

ulations reiterate this latter limitation and define an

“unacceptable adverse effect” as an “impact on an aquatic

or wetland ecosystem which is likely to result in significant

loss of or damage to”’ any of the environmental interests

enumerated in Section 404(c), including wildlife areas.

Pyramid contends that neither the statute itself nor the

implementing regulations authorize the EPA to take into

account the existence of a “practicable alternative’’ when

making a determination that a proposed project will have

an unacceptable adverse impact and result in significant

degradation to one of the enumerated environmental in-

terests. Section 404(c) does not define the term “unac-

ceptable adverse effects” or specify the factors relevant

to an “unacceptability”’ determination. On the other hand,

nothing in the statute prohibits the use of the 404(b\1)

guidelines in making that determination. In addition, the

Section 404(c) regulations note that the EPA should con-

sider the “‘relevant portion of the [404(b)] guidelines’”’ in

making a Section 404(c) unacceptability determination. 40

C.F.R. section 231.2(e).

These guidelines are based in part on the Section 403(c)

criteria regulating ocean discharges. Section 403(c) iden-

49a

tifies a broad range of factors to be considered by the

Administrator in promulgating guidelines under Section

403(c).** Section 403(cX1XF) includes the availability of

other “‘possible locations and methods of disposal’’ as a

factor. The 404(bX1) guidelines likewise mandate consid-

eration of the availability of other possible locations in

order to minimize unnecessary destruction of aquatic re-

sources. Under Pyramid’s analysis, however, the only rel-

evant portions of the 404(bX1) guidelines are those which

directly pertain to the five resources listed in Section

404(c).

The court rejects Pyramid’s contention that the fact that

Section 403(c) and Section 404(b) are concerned with a

greater number of environmental factors than is Section

404(c) limits the manner in which the EPA may determine

the effect on the 404(c) resources, including the use of the

practicable alternatives test. Both the 404(b\1) guidelines

and the section 403 criteria, upon which they are pat-

terned, provide a means to evaluate the desirability of

discharges into the aquatic environment. Applying these

* Section 403(c) states, in part:

(cX1) The Administrator shall . . . promulgate guidelines for determining

the degradation of the waters of the territorial seas, the contiguous

zone, and the oceans, which shall include:

(A) The effect of disposal of pollutants on human life . . .;

(B) the effect of disposal of pollutants on marine life. . . .;

(C) the effect of disposal of pollutants on aesthetic, recreation and

economic values;

(D) the persistence and permanence of the effects of the disposal

of pollutants; :

(E) the effect of the disposal at varying rates, of particular vol-

umes and concentrations of pollutants;

(F) other possible locations and methods of disposal or recycling

of pollutants including land-based alternatives; and

(G) the effect on alternate uses of oceans, such as mineral ex-

ploitation and scientific study.

33 U.S.C. section 1343(cK1KAHG).

50a

standards to a proposed discharge in a particular context

does no violence to the policy underlying the Act. These

guidelines provide a useful tool for evaluating discharges

into the aquatic environment. Furthermore, the fact that

Section 403(c) explicitly allows an agency to consider a

certain factor does not necessarily mean that the absence

of such a provision in Section 404(c) precludes consider-

ation of that factor. Instead, use of these criteria makes

the general standard workable. Moreover, the EPA did

not use the Section 404(bX1) guidelines to find an unac-

ceptable adverse impact on any resource not specified in

Section 404(c). The unacceptability of the site was deter-

mined with respect to wildlife, a category explicitly enum-

erated thereunder.”

Alternatively, Pyramid argues that the EPA’s interpre-

tation is in contravention to the clear language of the

regulations. An unacceptable adverse effect is defined as

an “impact on the aquatic or wetland ecosystsm which is

likely to result in sign

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.