Amicus Curiae Brief — Department of the Air Force, et al., Petitioners v. Prutehi Guahan, fka Prutehi Litekyan
Supreme Court briefMay 29, 2026
Ask Donna
What actually matters in this document.
Text
No. 25-579
In the Supreme Court of the United States
UNITED STATES DEPARTMENT OF THE AIR FORCE, et al.,
Petitioners,
V.
PRUTEHI GUAHAN,
Respondent.
——————
ON WRIT OF CERTIORARI
TO THE UNITED STATES COURT OF APPEALS
FOR THE NINTH CIRCUIT
BRIEF OF AMICI CURIAE
STATE OF WEST VIRGINIA
AND 20 OTHER STATES
IN SUPPORT OF PETITIONERS
JOHN B. MCCUSKEY
Attorney General
OFFICE OF THE
WEST VIRGINIA
ATTORNEY GENERAL
State Capitol Complex
Building 1, Room E-26
Charleston, WV 25305
mwilliams@wvago.gov
(304) 558-2021
MICHAEL R. WILLIAMS
Solicitor General
Counsel of Record
MATTHEW K. NIU
Caldwell Fellow
Counsel for Amicus Curiae State of West Virginia
TABLE OF CONTENTS
Introduction and Interests of Amici Curiae ..................... 1
Summary of Argument ........................................................ 3
Argument .............................................................................. 4
I.
The Ninth Circuit improperly allowed review
of a non-final agency action ........................................ 4
A. The application was the start of the relevant
process—not the end ............................................... 4
B. The Ninth Circuit threw a wrench in
cooperative federalism processes like
RCRA’s .................................................................... 11
II.
The Ninth Circuit improperly layered a
needless NEPA review on top of RCRA’s
comprehensive provisions......................................... 15
A. Under the functional equivalence doctrine,
NEPA review was not required ........................... 16
B. Considering the harms, the Court should
exercise caution before extending
burdensome NEPA review ................................... 24
Conclusion ........................................................................... 29
II
TABLE OF AUTHORITIES
Page(s)
Cases
Abbott Labs. v. Gardner,
387 U.S. 136 (1967) ......................................................... 5
Advanced Integrative Med. Sci. Inst.,
PLLC v. Garland,
24 F.4th 1249 (9th Cir. 2022) ......................................... 6
Alabama ex rel. Siegelman v. EPA,
911 F.2d 499 (11th Cir. 1990) ..................... 17, 18, 20, 24
Amoco Oil Co. v. EPA,
501 F.2d 722 (D.C. Cir. 1974) ...................................... 19
Appalachian Power Co. v. EPA,
477 F.2d 495 (4th Cir. 1973) ......................................... 20
Appalachian Voices v. FERC,
139 F.4th 903 (D.C. Cir. 2025) ..................................... 25
Arkansas v. Oklahoma,
503 U.S. 91 (1992) ......................................................... 11
Balt. Gas & Elec. Co. v. Nat. Res. Def.
Council, Inc.,
462 U.S. 87 (1983) ......................................................... 19
Bd. of Regents of State Colls. v. Roth,
408 U.S. 564 (1972) ......................................................... 8
Bennett v. Spear,
520 U.S. 154 (1997) ........................................... 5, 6, 9, 10
Biden v. Texas,
597 U.S. 785 (2022) ......................................................... 7
Birckhead v. FERC,
925 F.3d 510 (D.C. Cir. 2019) ...................................... 22
III
Buckeye Power, Inc. v. EPA,
481 F.2d 162 (6th Cir. 1973) ......................................... 20
Cal. Cmtys. Against Toxics v. EPA,
934 F.3d 627 (D.C. Cir. 2019) ........................................ 7
Cent. N.Y. Fair Bus. Ass'n v. Kempthorne,
No. 6:06-CV-1501, 2007 WL 1593727
(N.D.N.Y. June 1, 2007) ................................................. 5
Corner Post, Inc. v. Bd. of Governors of
Fed. Rsrv. Sys.,
603 U.S. 799 (2024) ......................................................... 4
Cowpasture River Pres. Ass’n v. Forest
Serv.,
911 F.3d 150 (4th Cir. 2018) ......................................... 27
Cronin v. U.S. Dep’t of Agric.,
919 F.2d 439 (7th Cir. 1990) ......................................... 26
Dalton v. Specter,
511 U.S. 462 (1994) ................................................... 5, 10
DOT v. Pub. Citizen,
541 U.S. 752 (2004) ........................................... 16, 17, 18
Driftless Area Land Conservancy v. Rural
Utilities Serv.,
74 F.4th 489 (7th Cir. 2023) ........................................... 5
Env’t Def. Fund, Inc. v. EPA,
489 F.2d 1247 (D.C. Cir. 1973) .............................. 17, 18
EPA v. EME Homer City Generation, LP,
572 U.S. 489 (2014) ....................................................... 12
Flint Ridge Dev. Co. v. Scenic Rivers Ass’n
of Okla.,
426 U.S. 776 (1976) ........................................... 16, 18, 24
IV
Fourth Estate Pub. Benefit Corp. v. WallStreet.com, LLC,
586 U.S. 296 (2019) ......................................................... 8
Franklin v. Massachusetts,
505 U.S. 788 (1992) ......................................................... 5
Friends of the Everglades, Inc. v. Sec’y of
U.S. Dep't of Homeland Sec.,
No. 25-12873, 2026 WL 1077624 (11th
Cir. Apr. 21, 2026) ........................................................... 8
FTC v. Standard Oil Co. of Cal.,
449 U.S. 232 (1980) ................................................... 6, 14
Georgia v. Tenn. Copper Co.,
206 U.S. 230 (1907) ....................................................... 11
Getty Oil Co. (Eastern Operations), Inc. v.
Ruckelshaus,
467 F.2d 349 (3d Cir. 1972) .......................................... 19
Getty Oil Co. (Eastern Operations), Inc. v.
Ruckelshaus,
409 U.S. 1125 (1973) ............................................... 19, 20
Gill v. DOJ,
913 F.3d 1179 (9th Cir. 2019) ....................................... 10
Greenpeace, Inc. v. Waste Techs. Indus.,
No. 4:93CV0083, 1993 WL 134861 (N.D.
Ohio Mar. 5, 1993) ................................................... 20, 21
Gregory v. Ashcroft,
501 U.S. 452 (1991) ....................................................... 11
Hodel v. Va. Surface Min. & Reclamation
Ass’n, Inc.,
452 U.S. 264 (1981) ................................................. 11, 12
V
Holtz & Krause, Inc. v. DNR,
270 N.W.2d 409 (Wis. 1978) ......................................... 20
ICC v. Atl. Coast Line R. Co.,
383 U.S. 576 (1966) ......................................................... 5
Illinois v. Lidster,
540 U.S. 419 (2004) ......................................................... 9
In re Aiken Cnty.,
645 F.3d 428 (D.C. Cir. 2011) ........................................ 9
Ind. & Mich. Elec. Co. v. EPA,
509 F.2d 839 (7th Cir. 1975) ......................................... 20
Int’l Harvester Co. v. Ruckelshaus,
478 F.2d 615 (D.C. Cir. 1973) ...................................... 17
Kewayfati v. Bondi,
165 F.4th 342 (5th Cir. 2026) ......................................... 2
Ky. Waterways All. v. Ky. Utilities Co.,
905 F.3d 925 (6th Cir. 2018) ......................................... 12
Loper Bright Enters. v. Raimondo,
603 U.S. 369 (2024) ....................................................... 19
Lujan v. Nat’l Wildlife Fed’n,
497 U.S. 871 (1990) ......................................................... 7
MacDonald, Sommer & Frates v. Yolo
Cnty.,
477 U.S. 340 (1986) ......................................................... 8
Maine v. Taylor,
477 U.S. 131 (1986) ....................................................... 11
Marsh v. Or. Nat. Res. Council,
490 U.S. 360 (1989) ....................................................... 17
Martin v. Waddell’s Lessee,
41 U.S. (16 Pet.) 367 (1842) .......................................... 11
VI
Meghrig v. KFC W., Inc.,
516 U.S. 479 (1996) ......................................................... 2
Merrell v. Thomas,
807 F.2d 776 (9th Cir. 1986) ................................... 19, 20
Merrell v. Thomas,
484 U.S. 848 (1987) ....................................................... 19
Metro. Edison Co. v. People Against
Nuclear Energy, 460 U.S. 766 (1983) ......................... 25
Mont. Env’t Info. Ctr. v. Burgum,
No. 1:26-cv-00021-TJC (D. Mont. filed
Mar. 3, 2026), ECF No. 1 ............................................. 15
Morton v. Mancari,
417 U.S. 535 (1974) ....................................................... 18
Nat’l Soc’y Prof’l Eng’rs v. United States,
435 U.S. 679 (1978) ....................................................... 19
New York v. United States,
505 U.S. 144 (1992) ....................................................... 12
Ohio Forestry Ass’n v. Sierra Club,
523 U.S. 726 (1998) ......................................................... 9
Pacito v. Trump,
169 F.4th 895 (9th Cir. 2026) ......................................... 2
Parsons v. DOJ,
878 F.3d 162 (6th Cir. 2017) ........................................... 8
People Against Nuclear Energy v. U.S.
Nuclear Regul. Comm'n,
678 F.2d 222 (D.C. Cir. 1982) ...................................... 25
Portland Cement Ass’n v. Ruckelshaus,
486 F.2d 375 (D.C. Cir. 1973) .......................... 17, 19, 22
Portland Cement Corp. v. EPA,
417 U.S. 921 (1974) ....................................................... 17
VII
Power Reactor Dev. Co. v. Int’l Union of
Elec., Radio & Mach. Workers, AFLCIO,
367 U.S. 396 (1961) ..................................................... 8, 9
RadLAX Gateway Hotel, LLC v.
Amalgamated Bank,
566 U.S. 639 (2012) ....................................................... 18
Robertson v. Methow Valley Citizens
Council,
490 U.S. 332 (1989) ....................................................... 19
Rochester Tel. Corp. v. United States,
307 U.S. 125 (1939) ......................................................... 8
Sackett v. EPA,
566 U.S. 120 (2012) ......................................................... 7
San Luis & Delta-Mendota Water Auth. v.
Jewell,
747 F.3d 581 (9th Cir. 2014) ......................................... 16
Seven Cnty. Infrastructure Coal. v. Eagle
Cnty.,
605 U.S. 168 (2025) .......................... 15, 16, 23, 24, 26, 29
Solid Waste Agency of N. Cook Cnty. v.
U.S. Army Corps of Eng’rs,
531 U.S. 159 (2001) ....................................................... 11
Strycker’s Bay Neighborhood Council, Inc.
v. Karlen,
444 U.S. 223 (1980) ....................................................... 23
Tex. Comm. on Nat. Res. v. Bergland,
573 F.2d 201 (5th Cir. 1978) ......................................... 20
U.S. Dep’t of Energy v. Ohio,
503 U.S. 607 (1992) ....................................................... 13
VIII
U.S. Forest Serv. v. Cowpasture River
Pres. Ass’n,
590 U.S. 604 (2020) ....................................................... 27
Union Elec. Co. v. EPA,
427 U.S. 246 (1976) ................................................. 12, 20
United States v. Bormes,
568 U.S. 6 (2012) ..................................................... 18, 19
Vanda Pharms., Inc. v. FDA,
123 F.4th 513 (D.C. Cir. 2024) ....................................... 4
W. Neb. Res. Council v. EPA,
943 F.2d 867 (8th Cir. 1991) ......................................... 20
Webster v. U.S. Dep’t of Agric.,
685 F.3d 411 (4th Cir. 2012) ........................................... 2
Winter v. Nat. Res. Def. Council, Inc.,
555 U.S. 7 (2008) ........................................................... 16
Wyoming v. Hathaway,
525 F.2d 66 (10th Cir. 1975) ................................... 20, 22
Wyoming v. Kleepe,
426 U.S. 906 (1976) ....................................................... 20
Federal Statutes
5 U.S.C. § 704 .................................................................. 4, 10
16 U.S.C. § 1535 .................................................................. 12
28 U.S.C. § 2412 .................................................................. 26
33 U.S.C. § 1251 .................................................................. 12
42 U.S.C. § 4321 .................................................................. 16
42 U.S.C. § 4331 .................................................................... 3
42 U.S.C. § 4332 .................................................................. 19
IX
42 U.S.C. § 4336 ............................................................ 16, 21
42 U.S.C. § 4336a ................................................................ 27
42 U.S.C. § 6921 .................................................................. 21
42 U.S.C. § 6922 .................................................................. 21
42 U.S.C. § 6925 .............................................................. 9, 23
42 U.S.C. § 6926 ............................................................ 1, 6, 7
42 U.S.C. § 6930 .................................................................. 21
42 U.S.C. § 6961 .................................................................. 13
42 U.S.C. § 6974 .................................................................. 21
Federal Regulations
40 C.F.R. Pt. 270, Subpt. B ............................................... 23
40 C.F.R. § 124.5 ................................................................... 6
40 C.F.R. § 124.6 ................................................................... 6
40 C.F.R. § 124.9 ................................................................. 21
40 C.F.R. § 124.10 ................................................................. 6
40 C.F.R. § 124.11 ................................................................. 6
40 C.F.R. § 124.12 ................................................................. 6
40 C.F.R. § 124.13 ................................................................. 6
40 C.F.R. § 124.14 ................................................................. 6
40 C.F.R. § 124.19 ................................................................. 5
40 C.F.R. § 262.13 ............................................................... 21
40 C.F.R. § 264.51 ............................................................... 21
40 C.F.R. § 264.56 ............................................................... 21
40 C.F.R. § 270.51 ............................................................... 10
X
40 C.F.R. § 1500.1 ............................................................... 23
40 C.F.R. § 1506.11 ............................................................. 16
State Statutes
ALA. CODE § 22-28-2 ........................................................... 12
ALA. CODE § 22-28-16 ......................................................... 12
ALASKA STAT. § 46.03.100 .................................................. 12
ALASKA STAT. § 46.03.900 .................................................. 12
ARIZ. REV. STAT. § 49-421 ................................................. 12
ARIZ. REV. STAT. § 49-426 ................................................. 12
ARK. CODE § 8-7-203 .......................................................... 12
ARK. CODE § 8-7-215 .......................................................... 12
CAL. HEALTH & SAFETY CODE § 39047 ........................... 12
CAL. HEALTH & SAFETY CODE § 42300 ........................... 12
CAL. PUB. RES. CODE § 21080.5 ........................................ 20
COLO. REV. STAT. § 25-8-103 ............................................. 12
COLO. REV. STAT. § 25-8-501 ............................................. 12
CONN. GEN. STAT. § 22a-423 .............................................. 12
CONN. GEN. STAT. § 22a-430 .............................................. 12
DEL. CODE tit. 7, § 6002 ..................................................... 12
DEL. CODE tit. 7, § 6003 ..................................................... 12
FLA. STAT. § 403.031 .......................................................... 13
FLA. STAT. § 403.161 .......................................................... 13
GA. CODE § 12-9-3 ............................................................... 13
GA. CODE § 12-9-7 ............................................................... 13
XI
HAW. REV. STAT. § 342B-1 ................................................. 13
HAW. REV. STAT. § 342B-11 ............................................... 13
IDAHO CODE § 39-4403 ....................................................... 13
IDAHO CODE § 39-4408 ....................................................... 13
ILL. COMP. STAT. 5/3.315.................................................... 13
ILL. COMP. STAT. 5/9(b) ...................................................... 13
IND. CODE § 13-11-2-158 .................................................... 13
IND. CODE § 13-18-4-5 ........................................................ 13
IOWA CODE § 455B.171....................................................... 13
IOWA CODE § 455B.183....................................................... 13
IOWA CODE § 455B.186....................................................... 13
KAN. STAT. § 65-164 ............................................................ 13
KAN. STAT. § 65-165 ............................................................ 13
KY. REV. STAT. § 224.1-010 ................................................ 13
KY. REV. STAT. § 224.70-110 .............................................. 13
LA. STAT. § 30:2004 ............................................................. 13
LA. STAT. § 30:2076 ............................................................. 13
MASS. GEN. LAWS ch. 21, § 26A ........................................ 13
MASS. GEN. LAWS ch. 21, § 43 ........................................... 13
MD. CODE, ENV. § 9-301 .................................................... 13
MD. CODE, ENV. § 9-322 .................................................... 13
ME. REV. STAT. tit. 38, § 361-A ......................................... 13
ME. REV. STAT. tit. 38, § 413 ............................................. 13
MICH. COMP. LAWS § 324.301 ............................................ 13
MICH. COMP. LAWS § 324.3112 .......................................... 13
XII
MINN. STAT. §§ 115.01 sub. 10, 115.07 .............................. 13
MISS. CODE § 49-17-5 ......................................................... 13
MISS. CODE § 49-17-29 ....................................................... 13
MO. REV. STAT. § 644.016................................................... 13
MO. REV. STAT. § 644.051................................................... 13
MONT. CODE § 75-5-605 ...................................................... 13
N.C. GEN. STAT. § 143-212 ................................................. 13
N.C. GEN. STAT. § 143-215.1 .............................................. 13
N.D. CENT. CODE § 61-28-02 ............................................. 13
N.D. CENT. CODE § 61-28-06 ............................................. 13
N.H. REV. STAT. § 485-A:2................................................. 13
N.H. REV. STAT. § 485-A:13............................................... 13
N.J. ADMIN. CODE § 7:14A-1.2 .......................................... 13
N.J. ADMIN. CODE § 7:14A-2.1 .......................................... 13
N.M. STAT. § 74-2-2 ............................................................ 13
N.M. STAT. § 74-2-7 ............................................................ 13
N.Y. ENV’T CONSERV. LAW § 17-0701 .............................. 13
N.Y. ENV’T CONSERV. LAW § 17-0105 .............................. 13
NEB. REV. STAT. § 81-1502 ................................................ 13
NEB. REV. STAT. § 81-1506 ................................................ 13
NEV. REV. STAT. § 445A.390 .............................................. 13
NEV. REV. STAT. § 445A.465 .............................................. 13
OHIO REV. CODE § 6111.01 ................................................ 13
OHIO REV. CODE § 6111.04 ................................................ 13
OKLA. STAT. tit. 27A, § 2-1-102 .......................................... 13
XIII
OKLA. STAT. tit. 27A, § 2-6-304 .......................................... 13
OR. REV. STAT. § 468.005 ................................................... 13
OR. REV. STAT. § 468B.050 ................................................ 13
R.I. GEN. LAWS § 46-12-1................................................... 13
R.I. GEN. LAWS § 46-12-5................................................... 13
S.C. CODE § 48-1-10 ............................................................ 13
S.C. CODE § 48-1-110 .......................................................... 13
S.D. CODIFIED LAWS § 34A-2-2 ........................................ 13
S.D. CODIFIED LAWS § 34A-2-21 ...................................... 13
TENN. CODE § 69-3-103 ...................................................... 13
TENN. CODE § 69-3-108 ...................................................... 13
TEX. HEALTH & SAFETY CODE § 382.003 ........................ 13
TEX. HEALTH & SAFETY CODE § 382.0518 ...................... 13
UTAH CODE § 19-1-103 ....................................................... 13
UTAH CODE § 19-5-107 ....................................................... 13
VA. CODE § 62.1-44.3........................................................... 13
VA. CODE § 62.1-44.5........................................................... 13
VT. STAT. tit 10, § 1251 ....................................................... 13
VT. STAT. tit 10, § 1259 ....................................................... 13
W. VA. CODE § 22-11-3 ....................................................... 13
W. VA. CODE § 22-11-8 ....................................................... 13
WASH. REV. CODE § 90.48.020 ........................................... 13
WASH. REV. CODE § 90.48.160 ........................................... 13
WIS. STAT. § 283.01 ............................................................. 13
WIS. STAT. § 283.31 ............................................................. 13
XIV
WYO. STAT. § 35-11-103 ...................................................... 13
WYO. STAT. § 35-11-301 ...................................................... 13
35 PA. CONS. STAT. § 691.1 ................................................. 13
35 PA. CONS. STAT. § 691.202 ............................................. 13
327 IAC § 5-2-2 ................................................................... 13
Other Authorities
A. Dan Tarlock,
Safe Drinking Water: A Federalism
Perspective,
21 WM. & MARY ENVTL. L. & POL’Y
REV. 233 (1997) ............................................................. 12
Alan Masinter,
The National Environmental Policy
Act and the Value of Information,
22 N.Y.U. J. LEGIS. & PUB. POL’Y 465
(2020) .............................................................................. 26
Albert C. Lin,
Revamping Our Approach to Emerging
Technologies,
76 BROOK. L. REV. 1309 (2011) .................................... 25
Application,
BLACK’S LAW DICTIONARY
(12th ed. 2024) ................................................................. 6
Bradley C. Karkkainen,
Whither NEPA?,
12 N.Y.U. ENV’T L.J. 333 (2004) ................................. 22
CEQ,
ENVIRONMENTAL IMPACT STATEMENT
TIMELINES (2010-2018) (2020),
https://perma.cc/RL9L7HDE ..................................... 26
XV
Cmdr. Charles W. Tucker,
Compliance by Federal Facilities with
State and Local Environmental
Regulations,
35 NAVAL L. REV. 87 (1986) ......................................... 12
Denis Binder,
NEPA at 50: Standing Tall,
23 CHAP. L. REV. 1 (2020) ............................................ 25
EPA,
Off. of Solid Waste and Emergency
Response, Directive
No. 9522.1979(01), Opinion Letter on
Applicability of the National
Environmental Policy Act's
Environmental Impact Statement
Requirements to EPA's Actions Under
the Resource Conservation and
Recovery Act (Mar. 22, 1979), 1979 WL
51519 .............................................................................. 21
Final,
BLACK’S LAW DICTIONARY
(12th ed. 2024) ................................................................. 6
Frank B. Cross,
The Judiciary and Public Choice,
50 HASTINGS L.J. 355 (1999) ....................................... 26
GUAM EPA,
ANDERSEN AIR FORCE BASE, GUAM:
HAZARDOUS WASTE MANAGEMENT
FACILITY PERMIT (2018),
https://tinyurl.com/2dak2r2s ......................................... 9
XVI
H.R. REP. No. 94-1491 (1976), reprinted in
1976 U.S.C.C.A.N. 6238 ............................................... 22
KRISTEN HITE,
CONG. RSCH. SERV., IF11932,
NATIONAL ENVIRONMENTAL POLICY
ACT: JUDICIAL REVIEW AND REMEDIES
(2025) ........................................................................ 25, 26
L. Diane Schenke & Sharon Shutler,
The Application of NEPA to
Restoration Plans Under the Oil
Pollution Act,
45 BAYLOR L. REV. 345 (1993) ..................................... 20
Lori Hackleman Patterson,
NEPA’s Stronghold: A Noose for the
Endangered Species Act?,
27 CUMB. L. REV. 753 (1997) ....................................... 22
Mark C. Rutzick,
A Long and Winding Road: How the
National Environmental Policy Act
Has Become the Most Expensive and
Least Effective Environmental Law in
the History of the United States, and
How to Fix It, REGUL. TRANSPARENCY
PROJECT (Oct. 16, 2018),
https://tinyurl.com/3br559z5. ...................................... 27
NIKKI CHIAPPA ET AL.,
BREAKTHROUGH INST.,
UNDERSTANDING NEPA LITIGATION: A
SYSTEMATIC REVIEW OF RECENT
NEPA-RELATED APPELLATE COURT
CASES (2024),
https://perma.cc/FX4M-YPYA ................................... 15
XVII
Press Release,
Duke Energy, Dominion Energy and
Duke Energy Cancel the Atlantic Coast
Pipeline (July 5, 2020),
https://tinyurl.com/3mx8sere ...................................... 27
Request,
BLACK’S LAW DICTIONARY
(12th ed. 2024) ................................................................. 6
INTRODUCTION
AND INTERESTS OF AMICI CURIAE
It might be surprising to think that a waste disposal
site at an isolated air base across the Pacific Ocean might
have vast implications for all the States. But here, it does.
Things started simple enough. For four decades, the
U.S. Air Force has disposed of World-War-II era
munitions at Andersen Air Force Base in Guam. To
conduct those activities, the Air Force secured a permit
under the Resource Conservation and Recovery Act of
1976. Every so often, the Air Force must renew its permit.
And because States and territories administer the RCRA
permit process, see 42 U.S.C. § 6926(b), the Air Force
submits its application to the Guam Environmental
Protection Agency.
But things went sideways in 2021, when the Air Force
once more sought to renew its permit. This time, before
the Guam EPA could even reach any final decision, a
“direct action” group sued the Air Force. The group
insisted that the Air Force needed to prepare an
Environmental Impact Statement or an Environmental
Assessment under the National Environmental Policy Act
of 1969 before the Air Force could put pen to paper on any
permit application. The Ninth Circuit agreed.
So activists have successfully employed NEPA to hit
the brakes on ongoing state review under a cooperative
federalism scheme. Allowing this kind of midstream
judicial review is problematic enough; after all, the
Administrative Procedure Act contemplates that courts
will review “final agency action,” not every preliminary or
intermediate step. But truth be told, NEPA had no role
to play in this story at all. Because RCRA already
provides for a sweeping environmental review, layering
2
NEPA over top of it does nothing but throw up an
unnecessary roadblock.
If the Ninth Circuit’s logic stands, then cooperative
federalism schemes like RCRA’s will be subject to serial
lawsuits and challenges. Each procedural step will thus
become another opportunity for opponents to attack. But
as even the Ninth Circuit has recognized in other cases,
the APA “prevents piecemeal or premature review of
agency action.” Pacito v. Trump, 169 F.4th 895, 930 (9th
Cir. 2026). And “[f]ederal courts are courts of limited
jurisdiction—not overseers of unfinished agency
business.” Kewayfati v. Bondi, 165 F.4th 342, 346 (5th
Cir. 2026). Nothing about a federal submission to a state
process changes these bottom-line rules. Maybe even
more so in a cooperative federalism scheme, judicial
review should wait until some final decision—not a
request for a final decision—is on the table. Otherwise,
state permit authority will effectively be cut down as
review is punted to federal courts.
Perhaps worse still would be the consequences from
adopting the Ninth Circuit’s view that NEPA mandates
redundant review processes even when another
“comprehensive environmental statute” like RCRA gives
the federal government all the information it needs.
Meghrig v. KFC W., Inc., 516 U.S. 479, 483 (1996). NEPA
has already become a weapon of choice for those opposed
to development of critical infrastructure projects. But if
the decision below stands, then those project opponents
will be emboldened to push ever more aggressive readings
of NEPA in seemingly every conceivable context—all for
no discernible benefit in return. Yet Congress didn’t mean
for NEPA to “impose red tape for its own sake.” Webster
v. U.S. Dep’t of Agric., 685 F.3d 411, 424 (4th Cir. 2012). It
intended to balance environmental consciousness with the
3
need to “fulfill the social, economic, and other
requirements.” 42 U.S.C. § 4331(a). The decision below
threatens that balance.
In granting this petition, the Court has already
recognized that this otherwise localized dispute about
weapons disposal carries national weight. The Court
should now take the next step and reverse.
SUMMARY OF ARGUMENT
I. The Air Force’s application was not final, so it was
not properly subject to judicial review. It did not mark the
end of any agency decision-making process, but rather
only the beginning. It also did not impose legal
consequences; consequences would follow from the Guam
EPA’s decision on the application, not the application
itself. Allowing this sort of early review conflicts with the
notions of cooperative federalism embodied in RCRA and
other environmental statutes. These suits shift decision
authority away from the States—who Congress intended
to decide—and place it instead in the hands of federal
judges.
II. The Ninth Circuit also erred in thinking that the
Air Force’s RCRA application was subject to NEPA’s
environmental evaluation requirements. RCRA already
provides for a comprehensive scheme of environmental
review. That more specific statute prevails over NEPA’s
general provisions, affording a functional equivalent that
obviates the need for duplicative evaluations under the
NEPA framework.
Mandating NEPA review in
circumstances like these—where it serves no useful
function—only heightens the problems with NEPA. It
transforms the statute from a useful informational device
into a weapon to impede important development and other
projects.
4
ARGUMENT
I.
The Ninth Circuit improperly allowed review of
a non-final agency action.
The Ninth Circuit first erred in thinking that now is the
right time for judicial review. The Air Force’s RCRA
permit renewal application was just an initial, nonreviewable step. Treating it more than that will ultimately
impair the States’ role in statutes like RCRA, as the
center of attention shifts to premature review in federal
court.
A. The application was the start of the relevant
process—not the end.
Because RCRA lacks its own judicial review provision,
the APA decides when judicial review of a RCRA-related
decision can be had. And the APA limits judicial review to
“final agency action.” 5 U.S.C. § 704. This provision
“codifies the understanding that premature review
squanders judicial resources, and that litigants are
generally best served by a system which prohibits
piecemeal appellate consideration of rulings that may fade
into insignificance by the time proceedings conclude.”
Vanda Pharms., Inc. v. FDA, 123 F.4th 513, 521 (D.C. Cir.
2024). It then works “work[s] hand in hand” with Section
704’s injury requirement,1 Corner Post, Inc. v. Bd. of
Remember that Respondent attacks the submission of the
application itself. See App.23 (alleging that “Defendants’ decision to
submit an application” to Guam EPA triggered NEPA obligations).
By attacking the application, Respondent has created a problem with
Section 704’s injury requirement, too, as Respondent has not alleged
any injury from the application. Rather, Respondent focuses on the
harms that would result if the application is approved and disposal
activities are conducted. See App.7 (“The aforementioned cultural,
1
5
Governors of Fed. Rsrv. Sys., 603 U.S. 799, 808 (2024),
guaranteeing that a given case presents the court with a
crystallized dispute before the court jumps in.
“The cases dealing with judicial review of
administrative actions have interpreted the ‘finality’
element in a pragmatic way.” Abbott Labs. v. Gardner,
387 U.S. 136, 149 (1967). Generally, “two conditions must
be satisfied for agency action to be ‘final.’” Bennett v.
Spear, 520 U.S. 154, 177-78 (1997). First, the action must
denote a “completed … decisionmaking process.”
Franklin v. Massachusetts, 505 U.S. 788, 797 (1992).
Second, the action must determine “right[s] or
obligation[s]” or have direct “legal consequences.” ICC v.
Atl. Coast Line R. Co., 383 U.S. 576, 602 (1966); see also
Dalton v. Specter, 511 U.S. 462, 469 (1994). At bottom,
though, Section “704 asks whether a terminal event has
occurred.” Driftless Area Land Conservancy v. Rural
Utilities Serv., 74 F.4th 489, 493 (7th Cir. 2023)
(Easterbrook, J.) (cleaned up).
Taking a pragmatic view, the Air Force’s application
was not a “final agency action” in any sense. See 40 C.F.R.
§ 124.19(l)(2) (explaining that a “final permit decision” is
required for “final agency action” under RCRA).
social, spiritual, health, professional, scientific, recreational, aesthetic,
economic, and other interests of Prutehi Litekyan and its members in
Guam will be adversely affected and irreparably injured by the
proposed OB/OD operations at the EOD Range on Andersen AFB.”
(emphasis added)). Respondent is thus not aggrieved by the action it
purports to challenge. Cf. Cent. N.Y. Fair Bus. Ass'n v. Kempthorne,
No. 6:06-CV-1501, 2007 WL 1593727, at *5 (N.D.N.Y. June 1, 2007)
(dismissing NEPA challenge to submission of “land-into-trust
applications” to the Secretary of the Interior because, “even if
acceptance of the applications constituted ‘final agency action,’
plaintiffs do not (and could not) allege how they were aggrieved by the
acceptance of the applications”).
6
1. An application for a RCRA permit is not the
“consummation” of a decision-making process. Bennett,
520 U.S. at 177. Rather, an “application” is just a “request
or petition,” Application, BLACK’S LAW DICTIONARY
(12th ed. 2024), to “seek[] permission for the exercise of a
privilege,” Request, BLACK’S LAW DICTIONARY (12th ed.
2024). At most, it is a “threshold determination that
[Guam EPA’s] further inquiry is warranted” and serves
“only to initiate” the reciprocal response from the state
regulator. FTC v. Standard Oil Co. of Cal., 449 U.S. 232,
241-42 (1980). Because it requires Guam EPA’s “further
… action,” Final, BLACK’S LAW DICTIONARY (12th ed.
2024), the application alone is “merely tentative,” Bennett,
520 U.S. at 178. It is the start and not the end. See, e.g.,
Advanced Integrative Med. Sci. Inst., PLLC v. Garland,
24 F.4th 1249, 1258 (9th Cir. 2022) (holding that an
application for the renewal of a waste discharge permit
would “begin” the “agency’s decisionmaking process,”
which would not finish “until the [applicant] had exhausted
the [administrative] appeal process” (cleaned up)).
Although the Ninth Circuit thought the application
“marked an endpoint,” Pet.App.23a, the Air Force still has
every opportunity to withdraw, modify, or adjust its
application—or make another decision entirely. Indeed,
the whole point of the application process is that the
Guamanian agency will have a chance to request—or more
accurately, demand—changes from the Air Force lest it
risk losing its permit. See, e.g., 40 C.F.R. §§ 124.5(c),
124.6. Likewise, the required public comments and
hearings might prompt changes. See 40 C.F.R. §§ 124.10124.14. Yet in assuming that none of that will happen, the
Ninth Circuit improperly dismissed both the importance
of public involvement and the central role that a state
regulator plays under delegated RCRA authority. See 42
U.S.C. § 6926(b). It presumed instead that Guam EPA
7
acted as a mere rubberstamp—even though, under
RCRA, its view carries the same weight as the federal
regulator’s. Id. § 6926(d).
Far from turning on an endpoint, the Ninth Circuit’s
logic allows litigants to challenge any internal agency
“assessment, plan, or decision” that takes a position on
anything. Pet.App.25a. But this Court already closed the
door on such a broad conception of judicial review: a party
can’t sue to “demand a general judicial review” of an
agency’s “day-to-day operations.” Lujan v. Nat’l Wildlife
Fed’n, 497 U.S. 871, 899 (1990). “To the extent that the
Court of Appeals understood itself to be reviewing an
abstract decision”—or assessment or plan—“apart from
specific agency action, as defined in the APA, that was
error.” Biden v. Texas, 597 U.S. 785, 809 (2022).
The Ninth Circuit also here put too much weight on
Sackett v. EPA, 566 U.S. 120, 127 (2012), in suggesting the
application was more than some interlocutory step. See
Pet.App.23a. Other lower courts have rightly warned that
“courts should resist the temptation to define the [finality
of an agency] action by comparing it to superficially
similar actions in the caselaw.” Cal. Cmtys. Against
Toxics v. EPA, 934 F.3d 627, 631 (D.C. Cir. 2019).
Unfortunately, the Ninth Circuit succumbed to that
temptation here. The EPA compliance order at issue in
Sackett offered no mechanism for further agency review
after it is issued. Sackett, 566 U.S. at 127. It also marked
the beginning and end of the relevant decision—a selfcontained decision made by the federal agency. And it
effectively bound another federal agency on issuance. Id.
at 126.
In contrast to Sackett, the application here was only the
start of a decision process by a separate governmental
decisionmaker (Guam EPA) who was free to exercise
8
independent judgment. An agency action is not final
where it “only affects [a plaintiff’s] rights adversely on the
contingency of future administrative action.” Rochester
Tel. Corp. v. United States, 307 U.S. 125, 130 (1939);
contra Pet.App.25a; see also, e.g., Parsons v. DOJ, 878
F.3d 162, 168 (6th Cir. 2017) (explaining that an agency
action is not final where it merely prompts actions by
other parties, even when those other parties are
“government actors”). And as for the Air Force, nothing
commits it to its present course; it can reconsider its
position until the moment before Guam EPA decides on
its application. No one is bound.
Thus, Respondent’s argument that this is final agency
action fails on the first prong.
2. Beyond lacking completeness or consummation,
the application also does not determine “rights or
obligations” or have “direct legal consequences.”
Rights and obligations cannot flow to the Air Force
from an application alone because no “legitimate claim of
entitlement” to dispose of hazardous waste arises until
after the state agency approves the application. See Bd.
of Regents of State Colls. v. Roth, 408 U.S. 564, 577 (1972).
In other words, “[a] request cannot determine rights or
obligations until another party acts on it, and when it does,
that decision then becomes legally binding.” Friends of
the Everglades, Inc. v. Sec’y of U.S. Dep't of Homeland
Sec., No. 25-12873, 2026 WL 1077624, at *3 (11th Cir. Apr.
21, 2026) (cleaned up). This requirement of mutuality—an
offer and acceptance—applies when it comes to
constitutional property rights, Roth, 408 U.S. at 577, land
zoning, MacDonald, Sommer & Frates v. Yolo Cnty., 477
U.S. 340, 351 (1986), copyright registration, Fourth Estate
Pub. Benefit Corp. v. Wall-Street.com, LLC, 586 U.S. 296,
300 (2019), and nuclear reactor operation, Power Reactor
9
Dev. Co. v. Int’l Union of Elec., Radio & Mach. Workers,
AFL-CIO, 367 U.S. 396 (1961). It should be no different
in the RCRA context, where hazardous-waste activities
happen only after approval of the application and issuance
of the permit. See 42 U.S.C. § 6925; cf. In re Aiken Cnty.,
645 F.3d 428, 437 (D.C. Cir. 2011) (holding that challenge
to ongoing administrative proceedings after Department
of Energy’s submission—and later attempt to withdraw—
application to the Nuclear Regulatory Commission was
“premature”).
An application also cannot command the Air Force “to
do anything or to refrain from doing anything” because
the material terms of the “doing” aren’t yet set. See Ohio
Forestry Ass’n v. Sierra Club, 523 U.S. 726, 733 (1998). A
state agency can place conditions on the permit, 42 U.S.C.
§ 6925(c)(3); in practice, Guam EPA has done so at
Andersen. See GUAM EPA, ANDERSEN AIR FORCE BASE,
GUAM: HAZARDOUS WASTE MANAGEMENT FACILITY
PERMIT 1 (2018), https://tinyurl.com/2dak2r2s. Past
conditions have included requirements for facility safety,
security, inspection, contingency planning, and
recordkeeping, among others. See generally id. So before
the new permit is approved, the Air Force has no way of
knowing the legal obligations that will flow from it. Any
analysis of tentative legal obligations thus becomes
speculative at best, as “new potential legal obligations …
[can]not yet be[] determined.” Pet.App.65a (Van Dyke, J.,
dissenting).
Faced with facts like these, the Ninth Circuit again
looked to authority examining “quite different
circumstances”—namely, Bennett. Illinois v. Lidster, 540
U.S. 419, 424 (2004). In particular, it perceived “the Air
Force’s waste disposal plan [to be] closely analogous to the
agency action at issue in Bennett itself,” which this Court
10
held was a final one. Pet.App.30a-31a (citing Bennett, 520
U.S. at 157-58, 178). But in Bennett, an affected agency
could not “disregard the issued opinion” without
“subject[ing] it or its employees to substantial civil and
criminal penalties, including imprisonment.” Gill v. DOJ,
913 F.3d 1179, 1185 (9th Cir. 2019) (cleaned up). The
decision in Bennett also closed the door on specific agency
actions unless those actions complied with “prescribed
conditions.” 520 U.S. at 178.
Again: neither the Ninth Circuit nor Respondent have
pointed to such Bennett-like consequences from the
application here. See also supra note 1. Were the Air
Force to withdraw it, no consequences would follow.
Further, any “prescribed conditions” or authorization will
attach only on approval. Contrast with Bennett, 520 U.S.
at 170 (characterizing the challenged action as a “permit
authorizing the agency action”). And the application alone
did not commit the agency to continue its waste disposal
operations in any way. (Its present disposal activities
result from the prior renewal application, not the current
one. See 40 C.F.R. § 270.51(a), (d).) Without a legal
penalty for removing the application, or an affirmative
duty to do anything after submitting it, it’s hard to spot
any consequences at all. The consequences will instead
arise from whatever Guam EPA does with that application
(and the Air Force’s later implementation of it)—when
Respondent is free to try to challenge the action. See 5
U.S.C.A. § 704 (contemplating that judicial review is not
available unless “no other adequate remedy in a court” is
available). And even Bennett recognized that an agency
action can’t be final when it merely submits information to
a recipient who then has “discretion to accept or reject
[it].” Bennett, 520 U.S. at 178 (describing Dalton).
11
Respondent has thus failed to satisfy the second prong
of this test, too.
B. The Ninth Circuit threw a wrench in
cooperative federalism processes like
RCRA’s.
Respondent’s dismissive reading of the finality
requirement offends the States.
It helps to first level set. States enjoy “traditional and
primary power over land and water use.” Solid Waste
Agency of N. Cook Cnty. v. U.S. Army Corps of Eng’rs,
531 U.S. 159, 174 (2001). So the Court has long sought to
leave them room to exercise “broad regulatory authority
to protect … the integrity of [their] natural resources.”
Maine v. Taylor, 477 U.S. 131, 151 (1986). In other words,
States hold an “absolute right,” Martin v. Waddell’s
Lessee, 41 U.S. (16 Pet.) 367, 367 (1842), and “final power”
over “all the earth and air within [their] domain[s],”
Georgia v. Tenn. Copper Co., 206 U.S. 230, 237 (1907). And
when Congress has not made it “unmistakably clear” that
it “intends to alter the usual constitutional balance
between the States and Federal Government,” the Court
won’t assume it has. Gregory v. Ashcroft, 501 U.S. 452,
460 (1991) (cleaned up).
Congress has been careful to respect the States’
important role in all manner of environmental statutes. It
most often does so by employing cooperative federalism.
“Cooperative federalism” is “a partnership between the
States and the Federal Government.” Arkansas v.
Oklahoma, 503 U.S. 91, 101 (1992). It “allows the States,
within limits established by federal minimum standards,
to enact and administer their own regulatory programs,
structured to meet their own particular needs.” Hodel v.
Va. Surface Min. & Reclamation Ass’n, Inc., 452 U.S. 264,
12
289 (1981). Cooperative federalism is a key feature of
“numerous federal [environmental] statutory schemes,”
including the Clean Water Act, the Alaska National
Interest Lands Conservation Act, New York v. United
States, 505 U.S. 144, 167 (1992), the Clean Air Act, EPA v.
EME Homer City Generation, LP, 572 U.S. 489, 511 n.14
(2014), the Endangered Species Act, 16 U.S.C. § 1535, the
Safe Drinking Water Act, see A. Dan Tarlock, Safe
Drinking Water: A Federalism Perspective, 21 WM. &
MARY ENVTL. L. & POL’Y REV. 233, 247 (1997), and, of
course, RCRA, Ky. Waterways All. v. Ky. Utilities Co.,
905 F.3d 925, 929 (6th Cir. 2018).
States play all kinds of roles in these cooperative
federalism regimes. In the Clean Air Act, for example,
States formulate their own plans to implement the Act’s
requirements. Union Elec. Co. v. EPA, 427 U.S. 246, 24952 (1976). And under the Clean Water Act, States have
the “primary responsibilit[y] and right” “to prevent,
reduce, and eliminate pollution.” 33 U.S.C. § 1251(b). But
most relevant here, Congress has expressly empowered
States to subject federal facilities to state air, water,
waste, and other environmental limits and permitting
requirements. See, e.g., Cmdr. Charles W. Tucker,
Compliance by Federal Facilities with State and Local
Environmental Regulations, 35 NAVAL L. REV. 87, 91-93
(1986) (describing RCRA, CWA, and CAA provisions).
States have in turn passed many statutes requiring all
entities—federal facilities included—to submit to their
permitting authority through relevant applications.2 That
See, e.g., ALA. CODE §§ 22-28-2(4), 22-28-16(d); ALASKA STAT.
§§ 46.03.900(18), 46.03.100(a); ARIZ. REV. STAT. §§ 49-421(3), 49426(A); ARK. CODE §§ 8-7-203(8), 8-7-215(b); CAL. HEALTH & SAFETY
CODE §§ 39047, 42300(a); COLO. REV. STAT. §§ 25-8-103(13), 25-8501(1); CONN. GEN. STAT. §§ 22a-423, 22a-430(a); DEL. CODE tit. 7,
2
13
then brings us to RCRA, which “obligate[s] a federal
polluter, like any other, to obtain permits from … the state
permitting agency.” U.S. Dep’t of Energy v. Ohio, 503
U.S. 607, 613 (1992); see also 42 U.S.C. § 6961(a).
The Ninth Circuit’s approach upends the cooperative
federalism embodied in RCRA and many other statutes.
If the Ninth Circuit is right, then challengers will be
motivated to file actions early and often (under NEPA or
otherwise). These challenges will either halt the state
review process before it starts (and before States get a
reasonable opportunity to weigh in) or render it moot after
§§ 6002(40), 6003(a); FLA. STAT. §§ 403.031(9), 403.161(1); GA. CODE
§§ 12-9-3(23), 12-9-7(a)(2); HAW. REV. STAT. §§ 342B-1, 342B-11;
IDAHO CODE §§ 39-4403(21), 39-4408(1); 415 ILL. COMP. STAT. 5/3.315,
5/9(b); IND. CODE §§ 13-11-2-158(a), 13-18-4-5(a); 327 IAC § 5-2-2;
IOWA CODE §§ 455B.171(20)(a), 455B.183, 455B.186; KAN. STAT.
§§ 65-164, 65-165; KY. REV. STAT. §§ 224.70-110, 224.1-010(16); LA.
STAT. §§ 30:2004(11), 30:2076; ME. REV. STAT. tit. 38, §§ 361-A(4),
413(1); MD. CODE, ENV. §§ 9-301(f), 9-322; MASS. GEN. LAWS ch. 21,
§§ 26A, 43(2); MICH. COMP. LAWS §§ 324.301(h), 324.3112(1); MINN.
STAT. §§ 115.01 sub. 10, 115.07(a); MISS. CODE §§ 49-17-5(3)(b), 49-1729(1)(a); MO. REV. STAT. §§ 644.016(19), 644.051(1); MONT. CODE § 755-605(1)-(2); NEB. REV. STAT. §§ 81-1502(10), 81-1506(1); NEV. REV.
STAT. §§ 445A.390, 445A.465(1); N.H. REV. STAT. §§ 485-A:2(IX), 485A:13(I)(a); N.J. ADMIN. CODE §§ 7:14A-1.2, 7:14A-2.1; N.M. STAT.
§§ 74-2-2(O), 74-2-7(A); N.Y. ENV’T CONSERV. LAW §§ 17-0105(1), 170701(1); N.C. GEN. STAT. §§ 143-212(4), 143-215.1(a); N.D. CENT.
CODE §§ 61-28-02(5), 61-28-06(1)-(2); OHIO REV. CODE §§ 6111.01(I),
6111.04(A); OKLA. STAT. tit. 27A, §§ 2-1-102(10), 2-6-304(A); OR. REV.
STAT. §§ 468.005(5), 468B.050(1); 35 PA. CONS. STAT. §§ 691.1, 691.202;
R.I. GEN. LAWS §§ 46-12-1(13), 46-12-5(a)-(b); S.C. CODE §§ 48-110(1), 48-1-110(a); S.D. CODIFIED LAWS §§ 34A-2-2(3), 34A-2-21;
TENN. CODE §§ 69-3-103(28), 69-3-108(b); TEX. HEALTH & SAFETY
CODE §§ 382.003(10), 382.0518(a); UTAH CODE §§ 19-1-103(4), 19-5107(3); VT. STAT. tit 10, §§ 1251(8), 1259(a); VA. CODE §§ 62.1-44.3,
62.1-44.5(A); WASH. REV. CODE §§ 90.48.020, 90.48.160; W. VA. CODE
§§ 22-11-3(14), 22-11-8(a)-(b); WIS. STAT. §§ 283.01(11), 283.31(1);
WYO. STAT. §§ 35-11-103(a)(vi), 35-11-301(a).
14
it’s done. For instance, under the Ninth Circuit's rule,
Guam EPA could invest months developing permit
conditions—negotiating
monitoring
requirements,
specifying closure plans, tailoring corrective action
schedules to local conditions—only to discover that a
federal court has already passed judgment on some
central issue that resets the board. The State’s technical
expertise and local knowledge, which Congress made
central to the RCRA scheme, would be rendered advisory
at best. More likely, the relevant State wouldn’t be able
to build a record at all, as litigation would leave it
uncertain about what parts of the submitted application
will actually hold. All the relevant action will then shift to
federal courts, and the States who are supposed to keep
hold of the wheel will instead become nothing more than
silent passengers. And these problems will not be
confined to NEPA or RCRA. For instance, challengers to
a disfavored federally driven infrastructure project could
challenge a state certification application under CWA
Section 401 right out of the gate, arguing that it lacks some
critical information (before the State even offered a
chance to correct it). See Standard Oil, 449 U.S. at 242.
The consequences are also asymmetric. A challenger
who succeeds in blocking an application before the State
acts pays no cost for having bypassed the state process.
But a State that loses its opportunity to shape the permit
through conditions and public comment cannot recover
that role after the fact. Federal court review of an
unapproved application thus substitutes a judicial
determination for the regulatory judgment Congress
assigned to the States. And because a challenger will
enjoy multiple chomps at the apple (by filing early and
often), this kind of preemptive strike could become
accepted practice in any cooperative federalism regime in
which federal actors are regulated entities.
15
To be sure, others beyond the States would be hurt,
too. Courts are the most obvious victims, seeing as
seriatim litigation could quickly clog their dockets at a
time when NEPA litigation is already increasing. NIKKI
CHIAPPA ET AL., BREAKTHROUGH INST., UNDERSTANDING
NEPA LITIGATION: A SYSTEMATIC REVIEW OF RECENT
NEPA-RELATED APPELLATE COURT CASES 3 (2024),
https://perma.cc/FX4M-YPYA.
Really, that’s no
hypothetical; just witness how a single Montana coal
mining company has been fighting NEPA challenges for
almost 20 years. See Compl., Mont. Env’t Info. Ctr. v.
Burgum, No. 1:26-cv-00021-TJC (D. Mont. filed Mar. 3,
2026), ECF No. 1. Federal applicants will also need to
avoid death by a thousand cuts. And it will hurt the public
at large, as important projects could be delayed through
the ancient tactic of war by attrition.
But the injury to federalism is enough, all on its own,
to turn the Ninth Circuit’s adventuresome approach to
finality around. Especially considering how it’s not even
certain that “Congress and the President in 1970 actually
intended or anticipated judicial review of agency
compliance with NEPA,” Seven Cnty. Infrastructure
Coal. v. Eagle Cnty., 605 U.S. 168, 179 n.2 (2025), the Court
should not use that statute as a means to topple the
sovereign bargain reflected in cooperative-federalism
statutes like RCRA.
II.
The Ninth Circuit improperly layered a needless
NEPA review on top of RCRA’s comprehensive
provisions.
The Ninth Circuit further erred in thinking that
NEPA’s requirements apply at all when an agency
submits a RCRA application. Heaping cumulative NEPA
requirements on top of an already comprehensive RCRA
16
regime ignores ordinary principles of statutory
construction—and invites nothing but more delay and
obstruction. Yet Congress intended NEPA to “inform
agency decisionmaking, not to paralyze it.” Seven Cnty.,
605 U.S. at 173; see also San Luis & Delta-Mendota Water
Auth. v. Jewell, 747 F.3d 581, 644 (9th Cir. 2014)
(condemning “efforts to use NEPA as an obstructionist
tactic” (cleaned up)).
A. Under the functional equivalence doctrine,
NEPA review was not required.
1. In passing NEPA, Congress created a process by
which federal agencies were to consider the
environmental effects of their actions. See 42 U.S.C.
§ 4321. NEPA doesn’t dictate outcomes, but instead
“imposes only procedural requirements to ensure that the
agency, in reaching its decision, will have available, and
will carefully consider, detailed information concerning
significant environmental impacts.” Winter v. Nat. Res.
Def. Council, Inc., 555 U.S. 7, 23 (2008) (cleaned up).
But implementing this seemingly understated goal is a
bit trickier than it might first appear, as NEPA’s
requirements are subject to a host of statutory exceptions.
See 42 U.S.C. § 4336(a); see also 40 C.F.R. § 1506.11.
Likewise, NEPA compliance is not required where it
results in overly burdensome practical consequences
tantamount to a “clear and fundamental conflict of
statutory duty.” Flint Ridge Dev. Co. v. Scenic Rivers
Ass’n of Okla., 426 U.S. 776, 788-89, 791 (1976). And
compliance is also unnecessary “where an agency has no
ability to prevent a certain effect due to its limited
statutory authority over the relevant [environmental]
actions.” DOT v. Pub. Citizen, 541 U.S. 752, 770 (2004).
17
These exceptions reflect how NEPA “is subject to a
construction of reasonableness.” Portland Cement Ass’n
v. Ruckelshaus, 486 F.2d 375, 381 n.19 (D.C. Cir. 1973),
cert. denied, 417 U.S. 921 (1974). Put differently,
“inherent in NEPA and its implementing regulations is a
rule of reason.” Pub. Citizen, 541 U.S. at 767 (cleaned up).
And “[w]here the preparation of a[ NEPA environmental
document] would serve no purpose in light of NEPA’s
regulatory scheme as a whole, no rule of reason worthy of
that title would require an agency to prepare” one. Id.
(cleaned up). “Application of the ‘rule of reason’ thus turns
on the value of the new information to the still pending
decisionmaking process.” Marsh v. Or. Nat. Res. Council,
490 U.S. 360, 374 (1989).
One of the best manifestations of this “rule of reason”
is the functional equivalence doctrine. Under that
doctrine, federal agencies need not comply with NEPA’s
requirements under “organic legislation [that] mandate[s]
specific procedures for considering the environment that
are functional equivalents of the impact statement
process.” Alabama ex rel. Siegelman v. EPA, 911 F.2d
499, 504 (11th Cir. 1990). This exception avoids duplicative
administrative burdens on federal agencies where they
are already “set[ting] forth the environmental
considerations” and providing an opportunity for public
comment. Env’t Def. Fund, Inc. v. EPA, 489 F.2d 1247,
1255-56 (D.C. Cir. 1973). Courts recognize that “[t]o
require a ‘statement’ in addition to a decision setting forth
the same considerations, would be a legalism carried to
the extreme.” Int’l Harvester Co. v. Ruckelshaus, 478
F.2d 615, 650 n.130 (D.C. Cir. 1973). Imposing further
NEPA requirements would provide no new information—
and it would thus serve no statutory purpose. This
functional equivalence doctrine thus “strike[s] a workable
balance between some of the advantages and
18
disadvantages of full application of NEPA.” Env’t Def.
Fund, 489 F.2d at 1256 (cleaned up).
The doctrine is consistent with the Court’s precedents
“as a matter of judicial construction.” Siegelman, 911
F.2d at 505 n.12. This Court has already recognized
reasonable NEPA exceptions outside the express
statutory exceptions—at least twice, in fact. When NEPA
and the Interstate Sales Full Disclosure Act would have
required the Department of Housing and Urban
Development to file an EIS, this Court found it
“inconceivable that an environmental impact statement
could, in 30 days, be drafted, circulated, commended upon,
and then reviewed and revised in light of the comments.”
Flint Ridge Dev., 426 U.S. at 788-89. And the Court
excused the Federal Motor Carrier Safety Administration
when it lacked discretion to regulate cross-border
operations, such that it could not control their
environmental impacts. See Pub. Citizen, 541 U.S. at 770.
Just as in those cases, the functional equivalence doctrine
denotes “inconceivable” circumstances where imposing
NEPA requirements does nothing but impair ordinary
agency operations.
And it implements the ordinary rule of statutory
construction that “a specific statute will not be controlled
… by a general one.” Morton v. Mancari, 417 U.S. 535,
550-51 (1974). “That is particularly true where …
Congress has enacted a comprehensive scheme and has
deliberately targeted specific problems with specific
solutions.”
RadLAX Gateway Hotel, LLC v.
Amalgamated Bank, 566 U.S. 639, 645 (2012) (cleaned up).
Because NEPA applies to all federal agencies, it
necessarily speaks in generalized terms. Thus, NEPA
must give way to other statutes’ more “precisely drawn,
detailed” requirements. United States v. Bormes, 568
19
U.S. 6, 12 (2012) (cleaned up). Holding otherwise would
allow NEPA to “sabotage the delicate machinery that
Congress
designed”
in
other
comprehensive
environmental statutes. Merrell v. Thomas, 807 F.2d 776,
779 (9th Cir. 1986), cert. denied, 484 U.S. 848 (1987).
The doctrine also comports with NEPA’s purpose. In
NEPA, Congress declared “sweeping policy goals” for “a
broad national commitment to protecting and promoting
environmental quality.” Robertson v. Methow Valley
Citizens Council, 490 U.S. 332, 348, 350 (1989). But as in
the Sherman Act, Congress “did not intend the text” of
NEPA to “delineate the full meaning of the statute or its
application in concrete situations.” Nat’l Soc’y Prof’l
Eng’rs v. United States, 435 U.S. 679, 688 (1978). That’s
why it expressly recognizes places where it cannot apply.
42 U.S.C. § 4332 (requiring compliance only “to the fullest
extent possible” (emphasis added)). That’s also why it
defers to other environmental statutes. See id. §§ 4334,
4335. NEPA is thus “best read[],” Loper Bright Enters.
v. Raimondo, 603 U.S. 369, 395 (2024), as simply requiring
federal agencies to be aware of a project’s environmental
impacts and make the public aware of them, too, Balt. Gas
& Elec. Co. v. Nat. Res. Def. Council, Inc., 462 U.S. 87, 97
(1983). Whether it achieves those aims under the banner
of NEPA or some other statute does not matter, as
Congress’s policy goals are satisfied either way.
Practical experience confirms the doctrine serves
these purposes. Virtually all the federal courts of appeal
have applied this doctrine.3 “Courts have upheld the
See, e.g., Portland Cement, 486 F.2d at 384-85 (applying the doctrine
to the Clean Air Act); Amoco Oil Co. v. EPA, 501 F.2d 722, 750 (D.C.
Cir. 1974) (same); Getty Oil Co. (Eastern Operations), Inc. v.
Ruckelshaus, 467 F.2d 349, 359 (3d Cir. 1972), cert. denied, 409 U.S.
3
20
functional equivalency doctrine exception where the
fundamental purpose of the statute was environmental
protection,” including cases “involving the Toxic
Substances Control Act, the Ocean Dumping Act, the Safe
Drinking Water Act, and the Federal Insecticide,
Fungicide and Rodenticide Act.” L. Diane Schenke &
Sharon Shutler, The Application of NEPA to Restoration
Plans Under the Oil Pollution Act, 45 BAYLOR L. REV.
345, 352 (1993) (cleaned up). Even some States apply it to
State Environmental Protection Acts, or SEPAs. See,
e.g., Holtz & Krause, Inc. v. DNR, 270 N.W.2d 409, 420
(Wis. 1978); CAL. PUB. RES. CODE § 21080.5(a), (b)(1). But
if the Ninth Circuit has its way, then five decades of
authority will fall by wayside, introducing broad new
uncertainties as to capital-intensive projects that require
certainty.
So the functional equivalence doctrine has a role to
play in cases like these.
2. NEPA review should not have applied here
because the RCRA application process is functionally
equivalent to NEPA’s procedures. See, e.g., Siegelman,
911 F.2d at 504-05; Greenpeace, Inc. v. Waste Techs.
1125 (1973) (same); Appalachian Power Co. v. EPA, 477 F.2d 495, 508
(4th Cir. 1973), abrogated on other grounds by Union Elec. Co. v.
EPA, 427 U.S. 246, 254-55 (1976); Tex. Comm. on Nat. Res. v.
Bergland, 573 F.2d 201 (5th Cir. 1978) (applied to the National Forest
Management Act); Buckeye Power, Inc. v. EPA, 481 F.2d 162, 173-74
(6th Cir. 1973), abrogated on other grounds by Union Elec. Co., 427
U.S. at 254-55 (applied to the CAA); Ind. & Mich. Elec. Co. v. EPA,
509 F.2d 839, 843 (7th Cir. 1975) (same); W. Neb. Res. Council v. EPA,
943 F.2d 867, 871-72 (8th Cir. 1991) (applied to the Safe Drinking
Water Act); Wyoming v. Hathaway, 525 F.2d 66, 71-72 (10th Cir.
1975), cert. denied, 426 U.S. 906 (1976) (same); Siegelman, 911 F.2d at
504-05 (applied to RCRA); cf. Merrell, 807 F.2d at 779 (referring to
the doctrine in the Federal Insecticide, Fungicide, and Rodenticide
Act).
21
Indus., No. 4:93CV0083, 1993 WL 134861, at *10 (N.D.
Ohio Mar. 5, 1993); accord 40 C.F.R. § 124.9(b)(6).
The statute’s processes closely track one another.
NEPA requires a State to identify whether its action will
affect the environment, seek public comment, and then
publish its decision after reviewing and revising it. 42
U.S.C. § 4336(a)-(b). RCRA does the same. “For
instance, the standards of performance for the handling of
hazardous waste must be such as may be necessary to
protect human health and the environment.” EPA, Off. of
Solid Waste and Emergency Response, Directive No.
9522.1979(01), Opinion Letter on Applicability of the
National Environmental Policy Act's Environmental
Impact Statement Requirements to EPA's Actions Under
the Resource Conservation and Recovery Act (Mar. 22,
1979), 1979 WL 51519 (cleaned up). RCRA requires
agencies to identify the amount of hazardous waste it may
generate in a calendar month, whether it receives, treats,
stores, disposes, transports, and recycles the waste. See
42 U.S.C. §§ 6922, 6930, 6921(d); 40 C.F.R. § 262.13.
Agencies must minimize hazards “from fires, explosions,
or any unplanned sudden or non-sudden release of
hazardous waste or hazardous waste constituents to air,
soil, or surface water,” 40 C.F.R. § 264.51, and “assess
possible hazards to human health or the environment,
including direct and indirect effects,” id. § 264.56. States
and EPA publish public notice and comment for the
proposed permit application. 42 U.S.C. § 6974(b)(1)-(2).
Then they issue the permit with a plethora of conditions
on all the activities to ensure environmental safety.
Altogether, these procedures ensure that the Air Force
will take account of all relevant environmental issues; the
public will then have an opportunity to weigh in on them,
too.
22
Aside from procedural similarity, RCRA also fulfills
NEPA’s basic purposes. RCRA protects the environment
in a specific way: requiring specific hazardous waste
standards, an application for a permit, and public
comment. One could say it acts as “extra protection” for
NEPA review. Portland Cement, 486 F.2d at 383-84. At
a minimum, by ensuring that the relevant environmental
considerations are all brought out into the light, RCRA
makes NEPA “redundant” (even if “less stringent” in
some subjective sense). Lori Hackleman Patterson,
NEPA’s Stronghold: A Noose for the Endangered Species
Act?, 27 CUMB. L. REV. 753, 763 (1997).
And given how NEPA and its attendant litigation so
often produces delay, RCRA’s delineated timing
requirements—what one might call a need for an
“unusually expeditious decision”—could “be thwarted by
a NEPA impact statement requirement.” Portland
Cement, 486 F.2d at 384. Indeed, “it would only serve to
impede” the Air Force’s “efforts” at orderly,
environmentally conscious waste disposal “to compel it to
stop what it is doing so as to file an impact statement.”
Hathaway, 525 F.2d at 71. Congress intended RCRA to
put all waste disposal issues under a single umbrella for
reasons precisely like these; bolting on a NEPA review
contravenes that intent. H.R. REP. No. 94-1491, at 4
(1976), reprinted in 1976 U.S.C.C.A.N. 6238, 6242, 1976
WL 14072 (House committee describing its hope that
RCRA would “permit the environmental laws to function
in a coordinated and effective way”).
In holding otherwise, the Ninth Circuit did too much
flyspecking. Contra Birckhead v. FERC, 925 F.3d 510,
515 (D.C. Cir. 2019) (confirming a NEPA court’s role is not
to flyspeck). It correctly acknowledged that NEPA’s
procedural requirements and Guam EPA’s RCRA
23
permitting process “[b]oth require some analysis of the
environmental impact of a proposed action and some
degree of public involvement.” Pet.App.27. But it then
mistakenly fixated on the timing and breadth of RCRA’s
environmental considerations. See Pet.App.37a-39a.
The purported timing issue is of no moment. For one,
the Air Force had to consider specific environmental
issues when it submitted its application in the first place.
See 42 U.S.C. § 6925(b); see also 40 C.F.R. Pt. 270, Subpt.
B. For another, environmental considerations will be
further developed, and public comment will be had, once
Guam EPA considers the application. Trying to segment
and separately evaluate those two aspects of an integrated
process serves no purpose, as it would just require the
agency to memorialize the same facts over and over.
NEPA’s purpose was never “to generate paperwork—
even excellent paperwork.” 40 C.F.R. § 1500.1(c).
And as for the breadth of the environmental
considerations, “NEPA imposes no substantive
environmental obligations or restrictions.” Seven Cnty.,
605 U.S. at 173. It does not even require an agency to
“weigh environmental consequences in any particular
way.” Id. Rather, “the central principle of judicial review
in NEPA cases is deference” to the agency’s decision. Id.
at 179.
RCRA thus ensures that environmental
considerations would have been “reasonably” weighed
upon the application’s determination. Id. at 173. The
Ninth Circuit should have recognized as much and moved
on. See Strycker’s Bay Neighborhood Council, Inc. v.
Karlen, 444 U.S. 223, 227 (1980) (“[T]he only role for a
court is to insure that the agency has considered the
environmental consequences.”).
At bottom, if the Court does not perceive RCRA’s
comprehensive procedures to be functionally equivalent to
24
NEPA’s, then every RCRA permit application submitted
to a state agency—for any federal facility, anywhere in the
country—could require a separate, prior round of NEPA
review. The practical consequence would be to interpose
a federal procedural layer before every stateadministered permitting decision. And like the Ninth
Circuit’s decision about “final agency action,” that holding
would undermine the efficiency and autonomy that
Congress sought to preserve when it allowed for a
delegation of RCRA authority to the States.
So, far from “shunt[ing] aside” “the duty NEPA
imposes upon the agencies to consider environmental
factors,” Flint Ridge Dev., 426 U.S. at 787, RCRA is
“comprehensive in its field of application” and “ensure[s]
that EPA [and the States] consider[] fully, with the
assistance of meaningful public comment, environmental
issues involved in the permitting of hazardous waste
management facilities,” Siegelman, 911 F.2d at 505. The
Air Force was quite right to think that a further round of
NEPA review was uncalled for in the face of such
sweeping protections.
B. Considering the harms, the Court should
exercise
caution
before
extending
burdensome NEPA review.
The Court has sometimes construed NEPA’s scope
with an eye toward its practical consequences. See, e.g.,
Seven Cnty., 605 U.S. at 190. And here, requiring further
NEPA review where it would not serve any useful function
would not just be some innocuous belt-and-suspenders
approach. Rather, it would allow NEPA to impede
essential activities (like the mission-critical ordnance
disposal at issue here) with little-to-no discernible
return—an all too familiar story when it comes to NEPA.
25
Recall how we got here. “Since its enactment more
than thirty years ago, [NEPA] has assumed quasiconstitutional status as one of the foundational laws of the
modern administrative state.” Bradley C. Karkkainen,
Whither NEPA?, 12 N.Y.U. ENV’T L.J. 333, 333 (2004)
(cleaned up). It was enacted without much fanfare. Albert
C. Lin, Revamping Our Approach to Emerging
Technologies, 76 BROOK. L. REV. 1309, 1336 n.152 (2011)
(“[M]any legislators viewed the statute as an
uncontroversial way to burnish their environmental
credentials, and the legislation received relatively little
attention from lobbyists and interest groups.”). But it has
since become the most heavily litigated federal
environmental statute. KRISTEN HITE, CONG. RSCH.
SERV., IF11932, NATIONAL ENVIRONMENTAL POLICY
ACT: JUDICIAL REVIEW AND REMEDIES 1 (2025).
Concomitantly, “NEPA has morphed into one of the most
exacting burdens on the federal government.”
Appalachian Voices v. FERC, 139 F.4th 903, 921 (D.C.
Cir. 2025) (Henderson, J., concurring).
The reason is easy to spot: “NEPA quickly became a
main weapon of NIMBYs”—that is, those screaming,
“Not in my backyard!”—“because of its universality.”
Denis Binder, NEPA at 50: Standing Tall, 23 CHAP. L.
REV. 1, 43 (2020). In early cases, litigants tried to use
“NEPA to block or delay proposed construction of
government projects-low-income housing, federal
detention centers, Job Corps centers, postal service
facilities,” and more. People Against Nuclear Energy v.
U.S. Nuclear Regul. Comm'n, 678 F.2d 222, 229 (D.C. Cir.
1982), rev’d on other grounds sub nom. Metro. Edison Co.
v. People Against Nuclear Energy, 460 U.S. 766 (1983).
And over time, particularly when paired with the APA,
NEPA “transformed from a modest procedural
requirement into a blunt and haphazard tool employed by
26
project opponents (who may not always be entirely
motivated by concern for the environment) to try to stop
or at least slow down new infrastructure and construction
projects.” Seven Cnty., 605 U.S. at 183. Now, the statute
“is notorious for special interest abuse” and “can be used
by anyone interested in frustrating or delaying a major
government action.” Frank B. Cross, The Judiciary and
Public Choice, 50 HASTINGS L.J. 355, 375 (1999).
Not surprisingly, then, painful consequences follow
when a given action finds itself caught up in NEPA.
Most obviously, even NEPA fans concede that “NEPA
compliance does come with costs”—big ones, actually.
Alan Masinter, The National Environmental Policy Act
and the Value of Information, 22 N.Y.U. J. LEGIS. & PUB.
POL’Y 465, 471-72 (2020). First come the costs of
conducting a NEPA review—a process that requires
hundreds of pages of analysis and years of work, leading
to millions of dollars of total expenses. See CEQ,
ENVIRONMENTAL IMPACT STATEMENT TIMELINES (20102018) 1 (2020), https://perma.cc/RL9L7HDE. Then comes
the expensive slog of litigation. See CHIAPPA, supra, at 56 (finding that NEPA challenges took an average of more
than four years). If a NEPA challenge succeeds, the
plaintiff might even collect attorneys’ fees. See 28 U.S.C.
§ 2412(d). On top of all those costs come the financing
expenses, price changes, and other burdens that come
with delay and uncertainty. And often, this expense
proves fatal to the endeavor. Cronin v. U.S. Dep’t of
Agric., 919 F.2d 439, 443 (7th Cir. 1990) (Posner, J.)
(describing how “costly and time-consuming” NEPA
evaluations “ha[ve] been the kiss of death to many a
federal project”).
If costs don’t push a project into oblivion, delay
becomes the name of the game—and it might still be
27
enough to kill a project off in the end. Take the Atlantic
Coast Pipeline, for instance. Quoting NEPA and Dr.
Seuss, the Fourth Circuit had paused the project. See
Cowpasture River Pres. Ass’n v. Forest Serv., 911 F.3d
150, 183 (4th Cir. 2018). Although this Court stepped in
and reversed, see generally U.S. Forest Serv. v.
Cowpasture River Pres. Ass’n, 590 U.S. 604 (2020), that
action proved to be too late to save the needed energy
project. Project sponsors withdrew it because of the
“ongoing delays and increasing cost uncertainty which
threaten[ed] the economic viability of the project.” Press
Release, Duke Energy, Dominion Energy and Duke
Energy Cancel the Atlantic Coast Pipeline (July 5, 2020),
https://tinyurl.com/3mx8sere. This kind of story isn’t
unusual, either, as government agencies have taken more
than five years to complete the average environmental
assessment. See Mark C. Rutzick, A Long and Winding
Road: How the National Environmental Policy Act Has
Become the Most Expensive and Least Effective
Environmental Law in the History of the United States,
and How to Fix It 12, REGUL. TRANSPARENCY PROJECT
(Oct. 16, 2018), https://tinyurl.com/3br559z5. Though
Congress has now passed time limits, 42 U.S.C. § 4336a(g),
agencies have sometimes ignored even those
prescriptions.
And the States suffer at every turn. Most directly, the
unchecked expansion of NEPA review threatens to
federalize projects that States are already regulating.
When courts construe NEPA’s reach broadly, a single
minor federal permit can swallow an entire statepermitted project. And the displacement is not merely
procedural. When a federal court vacates an agency
action for insufficient NEPA analysis, the state-level
permits, investments, and regulatory decisions built
around the federal approval are thrown into uncertainty.
28
More broadly, the economic consequences for the
States are substantial. When NEPA litigation delays or
kills a project, the State loses not just the project itself but
the tax revenue, employment, economic activity, and
affordability benefits that would have accompanied it.
States rich in energy and mineral resources are
particularly exposed: capital flows to jurisdictions with
more predictable regulatory environments, whether that
means other countries or simply other States with less
federal land and fewer federal permitting triggers. And
because the States cannot control the scope of federal
NEPA review or predict how a federal court will assess its
adequacy, they cannot offer the regulatory certainty that
project sponsors need to commit investment. So States
bear the economic costs of federal procedural excess
without having any meaningful ability to prevent it.
Maybe such consequences could be justified where the
environment demands it, though even that idea warrants
scrutiny. But certainly not where other protective
measures (like those embodied in the RCRA process) are
well taken care of. And even less so at a time when energy
crises, housing crises, and infrastructure needs call for
more efficient permitting and processes.
So the answer should be plain. Where another
statute—like RCRA—already ensures that the relevant
environmental considerations are addressed, and where
the State is already exercising the regulatory authority
that Congress delegated to it, more process serves no
informational purpose.
It simply displaces state
judgment with federal litigation, trading the ability of
state regulators for the uncertainty of judicial review.
Adding injury to insult, it also does harm to the State’s
economy along the way.
29
Just recently, this Court offered “[a] course correction
of sorts … to bring judicial review under NEPA back in
line with the statutory text and common sense.” Seven
Cnty., 605 U.S. at 184. The Court should do so again here.
Otherwise, the Ninth Circuit's rule will invite challengers
to short-circuit state regulatory processes across the
country—turning every preliminary step in a cooperative
federalism scheme into an occasion for federal litigation,
and every comprehensive environmental statute into a
backdrop for redundant NEPA review.
CONCLUSION
The Court should reverse.
Respectfully submitted.
JOHN B. MCCUSKEY
Attorney General
OFFICE OF THE
WEST VIRGINIA
ATTORNEY GENERAL
State Capitol Complex
Building 1, Room E-26
Charleston, WV 25305
mwilliams@wvago.gov
(304) 558-2021
MICHAEL R. WILLIAMS
Solicitor General
Counsel of Record
MATTHEW K. NIU
Caldwell Fellow
Counsel for Amicus Curiae State of West Virginia
30
ADDITIONAL LEGAL
REPRESENTATIVES OF THE STATES
STEVE MARSHALL
Attorney General
State of Alabama
BRENNA BIRD
Attorney General
State of Iowa
CORI MILLS
Acting Attorney General
State of Alaska
RUSSELL COLEMAN
Attorney General
State of Kentucky
TIM GRIFFIN
Attorney General
State of Arkansas
LIZ MURRILL
Attorney General
State of Louisiana
JAMES UTHMEIER
Attorney General
State of Florida
AUSTIN KNUDSEN
Attorney General
State of Montana
CHRIS CARR
Attorney General
State of Georgia
MICHAEL T. HILGERS
Attorney General
State of Nebraska
RAÚL LABRADOR
Attorney General
State of Idaho
DREW WRIGLEY
Attorney General
State of North Dakota
THEODORE E. ROKITA
Attorney General
State of Indiana
DAVE YOST
Attorney General
State of Ohio
31
ALAN WILSON
Attorney General
State of South Carolina
MARTY JACKLEY
Attorney General
State of South Dakota
JONATHAN SKRMETTI
Attorney General &
Reporter
State of Tennessee
KEN PAXTON
Attorney General
State of Texas
DEREK BROWN
Attorney General
State of Utah
KEITH KAUTZ
Attorney General
State of Wyoming
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.