USCA Case #24-1119 | Document #2058570 Filed: 06/07/2024 Page 17 of 96

Section A: North Dakota’s Power Environment

North Dakota Transmission Authority (NDTA)

The North Dakota Transmission Authority (NDTA) was established in 2005 by the North Dakota

Legislative Assembly at the behest of the North Dakota Industrial Commission. Its primary

mandate is to facilitate the growth of transmission infrastructure in North Dakota. The Authority

serves as a pivotal force in encouraging new investments in transmission by aiding in facilitation,

financing, development, and acquisition of transmission assets necessary to support the expansion

of both lignite and wind energy projects in the state.

Operating as a ‘builder of last resort,’ the NDTA intervenes when private enterprises are unable or

unwilling to undertake transmission projects on their own. Its membership, as stipulated by statute,

comprises the members of the North Dakota Industrial Commission, including Governor, Attorney

General, and Agriculture Commissioner.

Statutory authority for the North Dakota Transmission Authority (NDTA) is enshrined in Chapter

17-05 of the North Dakota Century Code. Specifically, Section 17-05-05 N.D.C.C. outlines the

powers vested in the Authority, which include:

1. Granting or loaning money.

. Issuing revenue bonds, with an upper limit of $800 million.

2

3. Entering into lease-sale contracts.

4. Owning, leasing, renting, and disposing of transmission facilities.

5

. Entering contracts for the construction, maintenance, and operation of transmission

facilities.

6. Conducting investigations, planning, prioritizing, and proposing transmission corridors.

7. Participating in regional transmission organizations.

In both project development and legislative initiatives, the North Dakota Transmission Authority

(NDTA) plays an active role in enhancing the state's energy export capabilities and expanding

transmission infrastructure to meet growing demand within North Dakota. Key to its success is a

deep understanding of the technical and political complexities associated with energy transmission

from generation sources to end-users. The Authority conducts outreach to existing transmission

system owners, operators, and potential developers to grasp the intricacies of successful

transmission infrastructure development. Additionally, collaboration with state and federal

officials is essential to ensure that legislation and public policies support the efficient movement

of electricity generated from North Dakota's abundant energy resources to local, regional, and

national markets.

As the energy landscape evolves with a greater emphasis on intermittent generation resources,

transmission planning becomes increasingly intricate. Changes in the generation mix and the

redistribution of generation resource locations impose strains on existing transmission networks,

4

(Page 406 of Total) 189a

USCA Case #24-1119 | Document #2058570 Filed: 06/07/2024 Page 18 of 96

potentially altering flow directions within the network. A significant aspect of the Authority's

responsibilities involves closely monitoring regional transmission planning efforts. This includes

observing the activities of regional transmission organizations (RTOs) recognized by the Federal

Energy Regulatory Commission (FERC), which oversee the efficient and reliable operation of the

transmission grid. While RTOs do not own transmission assets, they facilitate non-discriminatory

access to the electric grid, manage congestion, ensure reliability, and oversee planning, expansion,

and interregional coordination of electric transmission.

Many North Dakota service providers are participants in the Midcontinent Independent System

Operator (MISO), covering the territories of several utilities and transmission developers.

Additionally, some entities are part of the Southwest Power Pool (SPP), broadening the scope of

transmission planning. Together, North Dakota utilities and transmission developers contribute to

a complex system overseeing the transmission of over 200,000 megawatts of electricity across

100,000 miles of transmission lines, serving homes and businesses in multiple states.

MISO and SPP also operate power markets within their respective territories, managing pricing

for electricity sales and purchases. This process determines which generating units supply

electricity and provide ancillary services to maintain voltage and reliability. Overall, the NDTA's

involvement in regional transmission planning and coordination is crucial for ensuring the

reliability, efficiency, and affordability of electricity transmission across North Dakota and beyond.

FERC-Recognized Regional Transmission Organizations and Independent System Operators

(www.ferc.gov)

Generation Adequacy, Transmission Capacity & Load Forecast Studies

The North Dakota Transmission Authority (NDTA) conducts periodic independent evaluations to

assess the adequacy of transmission infrastructure in the state. In 2023, the NDTA commissioned

two generation resource adequacy studies, one for the Midcontinent Independent System Operator

(MISO) and another for the Southwest Power Pool (SPP). Additionally, the NDTA recently

completed a generation resource adequacy study examining the impact of the EPA's proposed

Mercury and Air Toxics Standards (MATS) Rule. A transmission capacity study commissioned by

the NDTA is scheduled for completion in the summer of 2024.

Regular load forecast studies are also commissioned by the NDTA, with the most recent study

5

(Page 407 of Total) 190a

USCA Case #24-1119 | Document #2058570 Filed: 06/07/2024 Page 19 of 96

completed in 2021. This study, conducted by Barr Engineering, provided an update to the Power

Forecast 2019, projecting energy demand growth over the next 20 years. The 2021 update

incorporates factors such as industries expressing interest in locating in North Dakota, abundant

natural gas availability from the Bakken wells, and the potential for carbon capture and

sequestration from various sources. The 2021 update and the full study can be obtained from the

North Dakota Industrial Commission website: Power Forecast Study — 2021 Update,

https://www.ndic.nd.gov/sites/www/files/documents/Transmission-Authority/Publications/taannualreport-21.pdf

The Power Forecast 2021 Update projects a 10,000 GWhr increase in energy demand over the next

two decades under the consensus scenario, requiring approximately 2200 to 2500 MW of

additional capacity to meet demand. These projections are closely tied to industrial development

forecasts and are coordinated with forecasts used by the North Dakota Pipeline Authority. These

projections were highly dependent on industrial development and are premised on new federal

regulations not forcing the early retirement of even more electric generation units.

Meeting this growing demand poses significant challenges for utilities responsible for providing

reliable service. While there is considerable interest in increasing wind and solar generation,

natural gas generation is also essential to provide stability to weather-dependent renewable

sources. Importantly, load growth across the United States is driven by the electrification of

transportation, heating/cooling systems, data centers, and manufacturing initiatives.

Studies consistently highlight the critical importance of maintaining existing dispatchable

generation to prevent grid reliability failures. Ensuring uninterrupted power supply is paramount

for national security, public safety, food supply, and overall economic stability. The NDTA's

ongoing assessments and proactive planning are crucial for meeting the evolving energy needs of

North Dakota while maintaining grid reliability and resilience.

The timing and implementation of resources to meet this growing demand is a significant challenge

for the utilities. Importantly, electric demand growth across the United States over the next several

decades is projected to be dramatic due to the electrification of transportation, home

heating/conditioning, data center and artificial intelligence centers, as well as the effort to bring

manufacturing back to the USA. Studies by NDTA and others all point to the critical need to keep

all existing dispatchable generation online to avoid catastrophic grid reliability failures, and have

been warning that the push to force the retirement of reliable, dispatchable fossil fuel generation

units is occurring before it is projected there will be sufficient intermittent units in place to cover

the anticipated increase in demand. And when demand for electricity exceeds the dispatchable

supply, the foreseeable result will be blackouts or energy rationing.

Current North Dakota Generation Resources

Here is the current breakdown of North Dakota's generation resources:

1. Renewable Generation:

e Wind Generation: North Dakota has 4,250 MW of wind generation capacity in

service, making it a significant contributor to the state's renewable energy portfolio.

The average capacity factor for these generating facilities is 40% to 42%.

e The 4,000 MW of wind generation receives a reduced capacity accreditation in the

ISO of approximately 600 MW since it is intermittent. This is representative of the

6

(Page 408 of Total) 191a

USCA Case #24-1119 | Document #2058570 Filed: 06/07/2024 Page 20 of 96

amount that is estimated to be available for the peak demand in the summer.

e Solar Generation: Although North Dakota currently lacks utility-scale solar

generation facilities in operation, some projects are in the queues of regional

transmission organizations like MISO and SPP, indicating potential future

development in this area.

2. Thermal Coal Generation:

e North Dakota currently operates thermal coal generation at six locations,

comprising a total of 10 generating units with a combined capacity of

approximately 4,048 MW.

e The average capacity factor for these generating plants ranged from 65% to 91% in

2021, excluding the retired Heskett Station.

e Rainbow Energy operates the Coal Creek Station and the DC transmission line that

transports ND produced energy to the Minneapolis region. Rainbow Energy is

assessing a CO2 capture project for the facility. In addition, approximately 400

MW of wind generation is planned for that area of McLean County to utilize the

capacity on the DC line.

3. Hydro Generation:

e North Dakota has one hydro generation site equipped with 5 units, boasting a total

capacity of 614 MW.

e However, the average capacity factor declined to approximately 43% in 2021 due

to limitations imposed by water flow in the river, particularly during drought years.

4. Natural Gas Generation:

e North Dakota operates three sites for electric generation utilizing natural gas,

comprising 21 generating units with a total capacity of 596.3 MW.

e These units include reciprocating engines and gas turbines, with variation in

summer capacity influenced by the performance of gas generators in hot weather.

e Total natural gas generation in North Dakota remained steady from 2019 through

2021, amounting to 1.445 GWhr in 2021.

5. Total Generation:

e The combined total capacity of all types of utility-scale generation in North Dakota

is approximately 8,863 MW.

e Wind generation receives a reduced capacity accreditation in the ISO of

approximately 600 MW due to its intermittent nature, down from 4,250MW of

installed capacity, representing the estimated amount available during peak summer

demand. However, newer installations have demonstrated slightly higher capacity

for accreditation.

This comprehensive overview underscores the diverse mix of generation resources in North

Dakota, with significant contributions from wind, coal, hydro, and natural gas. Continued

assessment and adaptation to evolving energy needs and market dynamics are essential for

ensuring a reliable and sustainable energy future for the state.

(Page 409 of Total) 192a

USCA Case #24-1119 | Document #2058570 Filed: 06/07/2024 Page 21 of 96

energy sites of

NORTH DAKOTA

<e

REISS SSS RR

NSS LY SSSSQ SSNS SAAQHy

WSVvws \ SEROS LNG

Xs SS SS

AS SS

SS

2 RS

ERAS

SNS oa SSS

tant BOK SK SITS

Ss AS WNVVO”

RQAVPA Vases Sebi

SSPE Tay

SSSSNOS E

IN ©

NX

KeSN, 3)

PNSMA |

SES

RSE,

( & ) Natural Gas Processing © Coal-Based Generation ©) Lignite Mine ( $3) Hydro Power

(B) wi @) ®

> Wind Farm : Synfuels Plant iY) | Ethanol Plant Petroleum Refinery

i> a is yRS Recovered Eneray ar , ,

(33 Solar F (4) Biodiesel Plant 6) ) P

eid olar Farm rN odiese' n { SS) Gesaration a8 eaking Station

€B Renewable Dieset Refinery Bakken Formation Se Olt Fields

+ Map courtesy of Bismarck State College National Energy Center of Excellence.

Electric Generation Market & Utilization

In recent decades, North Dakota has emerged as a significant exporter of electricity, primarily

fueled by the development of thermal lignite generation in the western part of the state since the

1960s. Concurrently, transmission infrastructure has been expanded to facilitate the export of

electricity to markets predominantly situated to the east. Moreover, North Dakota has garnered

recognition as an excellent source of wind generation, leading to additional transmission

development to accommodate the transmission of this renewable energy to markets.

According to data from the Energy Information Administration, in 2020, North Dakota generated

a total of 42,705 MWh of electricity from all sources, with 46% of this total being exported beyond

the state's borders over two large high voltage direct current lines (HVDC), which serve load in

the neighboring state of Minnesota and multiple 345kv and 230kv alternating current (AC)

transmission lines serving surrounding states. Wind generation accounted for 31% of North

Dakota's total electricity generation in 2020, highlighting the growing significance of renewable

8

(Page 410 of Total) 193a

USCA Case #24-1119 | Document #2058570 Filed: 06/07/2024 Page 22 of 96

energy in the state's energy portfolio. Notably, industrial demand in North Dakota experienced

substantial growth, expanding by nearly 11% in 2020.

While demand for electricity in markets outside of North Dakota, and in most areas within the

state, has remained relatively stable in recent years, the Bakken region has witnessed notable

demand growth. Over the past 16 years, total electricity generation in North Dakota has increased

from 29,936 MWh to 42,705 MWh, with retail sales climbing from 10,516 MWh to 22,975 MWh.

This growth is primarily attributed to the burgeoning development of the Bakken oil fields.

Industrial consumption in North Dakota also witnessed a robust increase of over 11% in 2020,

with power forecasts projecting a continued upward trajectory in demand.

Generation by Type in North Dakota

$0000 —_———__ = “NS

Thousand MWh

es ee =>

0

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021

eaeeeCoal ==—NaturalGas e=meeHydroelectric —_=-Wind

Grid Resource Adequacy and Threats to Growth Opportunities

In 2023, both the MISO and SPP grid operators issued warnings about the adequacy of generation

resources to meet peak demand situations. This highlights a growing concern that the desired pace

of change towards a more sustainable energy future is outpacing the achievable pace of

transformation. This concern is underscored by the stark increase in grid events necessitating the

activation of emergency procedures. For instance, prior to 2016, MISO had no instances

requiring the use of emergency procedures, but since then, there have been 48 Maximum

Generation events.

Many experts in the industry project that, despite ambitious goals, realistic scenarios still foresee

a substantial dependence on fossil fuel energy—potentially up to 50%—even by 2050. While

efforts to decarbonize fossil fuel resources are underway, achieving complete carbon neutrality or

a fully renewable energy grid by 2050 appears increasingly unlikely. The scalability and

9

(Page 411 of Total) 194a

USCA Case #24-1119 | Document #2058570 Filed: 06/07/2024 Page 23 of 96

affordability of storage technology, particularly for renewable energy sources, remain significant

challenges.

In response to these challenges, Governor Burgum has issued a visionary goal for North Dakota

to achieve carbon neutrality in its combined energy and agriculture sectors by 2030. Governor

Burgum's approach emphasizes innovation over mandates, aiming to attract industries and

technologies that support this goal to the state. The initiative seeks to leverage advancements in

carbon capture and sequestration technologies to retain conventional generation in North Dakota

while also promoting sustainable agricultural practices and other innovative solutions, such as CO2

sequestration from ethanol production and enhanced oil recovery. These efforts demonstrate a

commitment to proactive and pragmatic solutions to address the complexities of achieving carbon

neutrality in the energy and agriculture sectors.

The state's vision for a decarbonized energy generation future faces significant challenges due to

the individual and cumulative impact of expansive federal rulemakings. These regulations would

curtail the flexibility to achieve the 2030 goal through the deployment of carbon capture and

sequestration (CCS) technologies. Furthermore, they would impose financial burdens on electric

cooperatives and utilities with limited resources, diverting investment away from future growth

options toward retrofitting existing facilities with costly emissions technologies to comply with

new federal requirements.

This regulatory burden not only impedes progress towards decarbonization but also introduces

opportunity costs for utilities and cooperatives. The funds that would otherwise be allocated for

future growth and innovation in clean energy solutions are instead diverted to compliance

measures, hindering the state's ability to transition to a more sustainable energy future efficiently

and effectively.

Ultimately, the restrictive nature of these federal rulemakings poses a significant obstacle to North

Dakota's efforts to achieve its decarbonization goals and undermines the state's vision for a cleaner

and more sustainable energy generation landscape. It highlights the need for a balanced approach

to regulation that supports innovation and investment in carbon reduction technologies while also

allowing for continued economic growth and development in the energy sector.

Grid Reliability Is Already Vulnerable

The fragility of grid reliability is already evident as warnings have been issued due to the declining

ratio of dispatchable and intermittent generation supplies. This concerning trend poses significant

threats to public safety, economic stability, and national security. Grid reliability is vital for

ensuring continuous access to essential services, such as food production and military operations.

Dispatchable reliable generation forms the backbone of grid stability, enabling the balancing of

supply and demand fluctuations. Failure to address these reliability concerns will compromise

critical infrastructure and expose society to substantial risks. Urgent action is required to safeguard

grid reliability and mitigate the potential consequences for public safety and national security.

10

(Page 412 of Total) 195a

USCA Case #24-1119 | Document #2058570 Filed: 06/07/2024 Page 24 of 96

NERC’s 2023 Reliability Risk Assessment

The North American Electric Reliability Council’s 2023 Reliability Risk Assessment! are

concerning as demonstrated in the slides below. The electrification of the US economy, data & Al

center growth and the build it at home initiatives will substantially increase the demand for

electricity generation and transmission.

NERC’s 2023 Summer Reliability Assessment warns that two-thirds of North America is at risk

of energy shortfalls this summer during periods of extreme demand. While there are no high-risk

areas in this year’s assessment, the number of areas identified as being at elevated risk has

increased. The assessment finds that, while resources are adequate for normal summer peak

demand, if summer temperatures spike, seven areas — the U.S. West, SPP and MISO, ERCOT,

SERC Central, New England and Ontario — may face supply shortages during higher demand

levels.

“Increased, rapid deployment of wind, solar and batteries have made a positive impact,” said Mark

Olson, NERC’s manager of Reliability Assessments. “However, generator retirements continue to

increase the risks associated with extreme summer temperatures, which factors into potential

supply shortages in the western two-thirds of North America if summer temperatures spike.”

The North American Electric Reliability Corporation (NERC) recently released its 2023 Long-

Term Reliability Assessment (LTRA), which found MISO is the region most at risk of capacity

shortfalls in the years spanning from 2024 to 2028 due to the retirement of thermal resources with

inadequate reliable generation coming online to replace them.”

1 NERC. "North American Reliability Assessment." North American Electric Reliability Corporation, May 2023,

https://www.nerc.com/news/Headlines%20DL/Summer%20Reliability%20Assessment%20Announcement%20May

%202023.pdf.

2 North American Electric Reliability Corporation, “2023 Long-Term Reliability Assessment,” December, 2023,

https://www.nerc.com/pa/RAPA/ra/Reliability%20Assessments%20DL/NERC_LTRA_ 2023.pdf.

11

(Page 413 of Total) 196a

USCA Case #24-1119 | Document #2058570 Filed: 06/07/2024 Page 25 of 96

— NPCC

Maritimes

NPCC

New England

NPCC

New York

B High Risk

® Elevated Risk

@ Normal Risk

High Risk: shortfalls may occur at normal peak conditions

Elevated Risk: shortfalls may occur in extreme conditions

Normal Risk: low likelihood of electricity supply shortfall

Figure 1: Risk Area Summary 2024—2028°

MISO is the region most at risk of rolling blackouts in the near future.

In 2028, MISO is projected to have a 4.7 GW capacity shortfall if expected generator retirements

occur despite the addition of new resources that total over 12 GW, leaving MISO at risk of load

shedding during normal peak conditions. This is because the new wind and solar resources that are

being built have significantly lower accreditation values than the older coal, natural gas, and

nuclear resources that are retiring. °

MISO’s Response to the Reliability Imperative (2024)

On February 26, 2024, the Midcontinent Independent System Operator (MISO) released “MISO’s

Response to the Reliability Imperative*,” a report which is updated periodically to reflect changing

conditions in the 15-state MISO region that extends through the middle of the U.S. and into

Canada. MISO’s new report explains the disturbing outlook for electric reliability in its footprint

unless urgent action is taken. The main reasons for this warning are the pace of premature

retirements of dispatchable fossil generation and the resulting loss of accredited capacity and

reliability attributes.

From 2014 to 2024, surplus reserve margins in MISO have been exhausted through load growth

and unit retirements. Since 2022, MISO has been operating near the level of minimum reserve

3 Midcontinent Independent Systems Operator, “MISO’s Response to the Reliability Imperative,” February, 2024,

https://cdn.misoenergy.org/2024%20Reliability%o20Imperative%20report%20Feb.%2021%20Final504018 .pdf?v=20

240221104216.

4 MISO. "MISO’S Response to the Reliability Imperative Updated February 2024." MISO, February 2024,

https://cdn.misoenergy.org/2024%20Reliability%20Imperative%20report%20Feb.%2021%20Final504018.pdf?v=20

240221104216.

12

(Page 414 of Total) 197a

USCA Case #24-1119 | Document #2058570 Filed: 06/07/2024 Page 26 of 96

margin requirements. >

According to the Reliability Imperative, MISO uses an annual planning tool called the OMS-MISO

Survey to compile information about new resources utilities and states plan to build and older

assets they intend to retire. The 2023 survey shows the region’s level of “committed” resources

declining going forward, with a potential shortfall of 2.1 GW occurring as soon as 2025 and

growing larger over time.

MISO lists U.S. Environmental Protection Agency (EPA) regulations that prompt existing coal and

gas resources to retire sooner than they otherwise would as a compounding reason for growing

challenges to grid reliability. From the report, there is a section titled, “EPA Regulations Could

Accelerate Retirements of Dispatchable Resources,” which states:

“While MISO is fuel- and technology-neutral, MISO does have a responsibility to inform

state and federal regulations that could jeopardize electric reliability. In the view of MISO,

several other grid operators, and numerous utilities and states, the U.S. Environmental

Protection Agency (EPA) has issued a number of regulations that could threaten

reliability in the MISO region and beyond.

In May 2023, for example, EPA proposed a rule to regulate carbon emissions from all

existing coal plants, certain existing gas plants and all new gas plants. As proposed, the

rule would require existing coal and gas resources to either retire by certain dates or else

retrofit with costly, emerging technologies such as carbon-capture and storage (CCS) or

co-firing with low-carbon hydrogen.

MISO and many other industry entities believe that while CCS and hydrogen co-firing

technologies show promise, they are not yet viable at grid scale — and there are no

assurances they will become available on EPA’ optimistic timeline. If EPA’s proposed rule

drives coal and gas resources to retire before enough replacement capacity is built with

the critical attributes the system needs, grid reliability will be compromised. The proposed

rule may also have a chilling effect on attracting the capital investment needed to build

new dispatchable resources.”

Despite these reliability warnings issued by MISO, EPA did not consider the reliability impacts of

the proposed MATS rules required emission control upgrades and additions to units. It is likely

that many units that would have to incur millions of dollars to retrofit emissions controls to comply

with this proposal would not do so.°®

In light of these shortcomings, the NDTA contracted with Center of the American Experiment to

model the impacts of the MATS rules on resource adequacy, reliability, and cost of electricity to

consumers. The findings of this analysis are detailed in Section D.

> Midcontinent Independent Systems Operator, “MISO’s Response to the Reliability Imperative,” February, 2024,

https://cdn.misoenergy.org/2024%20Reliability%o20Imperative%20report%20Feb.%2021%20Final504018 .pdf?v=20

240221104216.

® Rae E. Cronmiller, “Comments on Proposed National Emission Standards for Hazardous Air Pollution: Coal-and

Oil-Fired Electric Utility Steam Generating Units Review of the Residual Risk and Technology Review,” The National

Rural Electric Cooperative Association, June 23, 2023, Attention Docket ID NO. EPA-HQ-OAR-2018-0794.

13

(Page 415 of Total) 198a

USCA Case #24-1119 | Document #2058570 Filed: 06/07/2024 Page 27 of 96

Conclusion: The Long Term Reliability of the MISO Grid is Already

Precarious

As the state agency responsible for the strategic buildout and framework of electricity distribution,

the North Dakota Transmission Authority (NDTA) is deeply concerned about the potential impact

of federal rulemakings on the generation fleet in North Dakota and the ability to support future

growth initiatives. The current strain on the electric transmission system due to load growth is

already posing significant challenges to grid reliability, particularly in areas facing transmission

constraints and limited access to dispatchable generation.

The escalating frequency of grid events requiring emergency procedures, such as the 48 Maximum

Generation events in MISO since 2016 and the increasing number of alerts issued by SPP, over

194 alerts issued in 2022, underscores the urgency of addressing transmission congestion and

bolstering reliable generation capacity. The economic growth and security of North Dakota are

directly tied to the timely development of new transmission facilities in tandem with dependable

dispatchable electric generation.

The impacts of grid strain extend beyond the energy sector, affecting multiple industries,

ratepayers, and overall economic stability. Volatile wholesale prices and transmission congestion

undermine business operations and investment confidence, hindering economic growth and

prosperity. Moreover, reliable electricity supply is critical for essential services, including

Department of Defense facilities, underscoring the broader implications of grid reliability issues.

Achieving a balanced generation portfolio requires careful consideration of reliability and

resilience under all weather conditions, especially amidst the electrification of America and the

imperative to safeguard public welfare and security.

Additionally, over 50% of the electricity generated in North Dakota is exported to neighboring

states, magnifying the ripple effects of any regulations impacting dispatchable electricity

generation resources. By responsibly managing the generation portfolio and prioritizing generation

adequacy, North Dakota and the nation can seize significant opportunities for economic growth,

innovation, and sustainable development.

section B: The Proposed MATS Rule Will Dramatically

Affect North Dakota Lignite Electric Generating Units

The revised MATS Rule includes a proposal to eliminate the “low rank coal” subcategory

established for lignite-powered facilities by requiring these facilities to comply with the same

mercury emission limitation that currently applies to Electric Generating Units (EGUs)

combusting bituminous and subbituminous coals, which is 1.2 pounds per trillion British thermal

units of heat input (Ib/TBtu). EPA’s proposal is a substantial lowering of the current mercury

14

(Page 416 of Total) 199a

USCA Case #24-1119 | Document #2058570 Filed: 06/07/2024 Page 28 of 96

limitation for lignite fired EGUs, which is 4.0 lb/TBtu.”* The proposal also includes a significant

reduction in the particulate matter standard applicable to all existing units from 0.03 lb/mmBtu to

0.01 lb/mmBtu. Because North Dakota is somewhat unique to the degree in which its power

generation relies upon lignite coal, the compliance costs for this Rule, while likely to substantial

for coal plants all around the country, will be most acutely inflicted upon North Dakota’s lignitebased power generation facilities.

Numerous comments in the administrative record, including from the regulated facilities in North

Dakota and the North Dakota Department of Environmental Quality, provided EPA with notice

that the new emission standards are not technologically feasible, will impose crippling compliance

costs that may require facility retirement, and will result in a significant portion of the dispatchable

power provided by coal-generation facilities being taken off the grid. This report will summarize

some of those concerns in the section that follows, however, a full study of the technological

feasibility of complying with the new emissions standards is beyond the scope of this report. For

purposes of this report, we assume the regulated facilities and state regulator were forthright in

their concerns about the feasibility of lignite-based facilities meeting the new standards.

The Proposed MATS Rule Eliminates the Lignite Subcategory for Mercury

Emissions

Although the Proposed Rule affects all coal electrical generating utilities (EGUs), reducing the

lignite emissions standards to levels of other coal ranks effectively eliminates the lignite subcategory and would have drastic consequences for North Dakota's lignite EGU industry.? EPA

original decision to regulate separately a subcategory of lignite units was well-supported with

documented information and a thorough analysis. In its comments filed in this Docket, on June

22, 2023, the North Dakota Department of Environmental Quality (hereafter DEQ) encouraged

EPA to review that prior determination and reaffirm the need for a lignite subcategory and the

associated emissions standards. '°

Specifically, DEQ summarized the original MATS proposal in 2011 and final MATS rule in 2012,

in which EPA presented a body of evidence in support of the lignite category. For example, the

EPA wrote:

“For Hg emissions from coal-fired units, we have determined that different emission

limits for the two subcategories are warranted. There were no EGUs designed to burn

a non-agglomerating virgin coal having a calorific value (moist, mineral matter free

7 Jason Bohrer, “Comments on National Emission Standards for Hazardous Air Pollutants: Coal- and Oil-Fired

Electric Utility Steam Generating Units Review of the Residual Risk and Technology Review, 88 Fed. Reg. 24854

(Apr. 24, 2023), June 23, 2024.

8 8 J. Cichanowicz et al., Technical Comments on National Emission Standards for Hazardous Air Pollutants: Coaland Oil-fired Electric Utility Steam Generating Units Review of Residual Risk and Technology, (June 2, 2023)

(“Cichanowicz Report”).

° EPA characterizes lignite as "low rank virgin coal". 88 Fed. Reg. 24,854, 24,875. For this comment letter, lignite

will be used in place of low rank virgin coal.

10 David Glatt, P.E., “Comments on the Proposed Rulemaking Titled "National Emission Standards for Hazardous Air

Pollutants: Coal- and Oil-Fired Electric Utility Steam Generating Units Review of the Residual Risk and Technology

Review" (Docket ID No. EPA-HQOAR-2018-0794),” On Behalf of the North Dakota Department of Environmental

Quality, June 22, 2023.

15

(Page 417 of Total) 200a

USCA Case #24-1119 | Document #2058570 Filed: 06/07/2024 Page 29 of 96

basis) of 19,305 kJ/kg (8,300 Btu/Ib) or less in an EGU with a height-to-depth ratio

of 3.82 or greater among the top performing 12 percent of sources for Hg emissions,

indicating a difference in the emissions for this HAP from these types of units.

The boiler of a coal-fired EGU designed to burn coal with that heat value is larger

than a boiler designed to burn coals with higher heat values to account for the larger

volume of coal that must be combusted to generate the desired level of electricity.

Because the emissions of Hg are different between these two subcategories, we are

proposing to establish different Hg emission limits for the two coal-fired

subcategories.”

As explained by DEQ, EPA has not provided any scientific justification to support abandoning the

lignite subcategory and requiring those facilities to comply with the emission standards applicable

to other coal types. The most EPA identified in support of its proposal was a reference to

information nearly 30 years old, which predated EPA’s original determination.

The Proposed MATS Rule Will Not Provide Meaningful Human Health or

Environmental Benefits

Section 112(f)(2) of the CAA directs EPA to assess the remaining residual public health and

environmental risks posed by hazardous air pollutants (HAPs) emitted from the EGU source

category.'! Further regulation under MATS is required only if that residual risk assessment

demonstrates that a tightening of the current HAP emission limitations is necessary to protect

public health with an ample margin of safety or protect against adverse environmental effects.

When reviewing whether to revise the MATS Rule, EPA determined that further regulation of

mercury and other HAPs would be unnecessary to address any remaining residual risk from any

affected EGU within the source category. The stringent standards based on state-of-the-art control

technologies that are currently imposed on coal-fired EGUs have already achieved significant

reductions in HAP emissions. As EPA itself noted, the MATS rule has achieved steep reductions

in HAP emission levels since 2010, including a 90 percent reduction in mercury, 96 percent

reduction in acid gas HAPs, and an 81 percent reduction in non-mercury metal HAPs.

Data from EPA and the U.N Global Mercury Assessment show mercury emissions from U.S.

power plants are now so low they accounted for only 0.12 percent of global mercury emissions in

2022, assuming all other sources remained constant at 2018 levels. '? These data demonstrate that

1 J. Cichanowicz et al., Technical Comments on National Emission Standards for Hazardous Air Pollutants: Coaland Oil-fired Electric Utility Steam Generating Units Review of Residual Risk and Technology, at 29, Figure 6-7 (June

2, 2023) (“Cichanowicz Report”).

Fact Sheet, EPA Proposal to Strengthen and Update the Mercury and Air Toxics Standards for Power Plants,

https://www.epa.gov/system/files/documents/2023-04/Fact%20Sheet_ MATS%20RTR%20Proposed%20Rule.pdf

13 United Nations, “Global Mercury Assessment 2018,” UN Environment Programme, August 21, 2019,

https://wedocs.unep.org/bitstream/handle/20.500.11822/27579/GMA2018.pdf?sequence=1 &isAllowed=y

16

(Page 418 of Total) 201a

USCA Case #24-1119 | Document #2058570 Filed: 06/07/2024 Page 30 of 96

US mercury emissions from power plants are lower than global cremation emissions, and North

Dakota coal facilities emitted 9.25 times less mercury in 2021 than global cremations in 2018. '*

Category US Tons Percent of Global Emissions

Artisanal and small-scale mining 971.4) 37.68

Global stationary combustion of coal 517.45 21.16

Non-ferrous metals production 359.39) 14.69

Cement production | 256.48 10.49

Waste from products | 161.63 6.61

Vinyl chlorine monomer | 64.09 2.62

Biomass burning 57.05 2.33

Ferrous metals production 43.89 1.79

Chlor alkali production 16.66 0.68

Waste incineration 16.44 0.67

Oil refining | 15.81 0.65

Stationary combustion of oil and gas | 7.84) 0.32

Cremation | 4.14 0.17

US stationary combustion of coal 2.90) 0.12

North Dakota coal combustion | _—_0.46, 0.018

As the above chart indicates: the annual mercury emissions from global cremations (where the

mercury primarily comes from individuals with dental fillings) exceed the mercury annually

emitted by all coal-fired EGUs in the United States combined, and is orders of magnitude more

than the mercury emissions from all coal-fired EGUs in North Dakota.

Moreover, the Administrative Record indicates EPA has performed a comprehensive and detailed

risk assessment that clearly documents the negligible remaining residual risks posed by the very

low amount of HAPs now being emitted by coal-fired EGUs. EPA first performed that risk

assessment in 2020, which concluded that “both the actual and allowable inhalation cancer risks

to the individual most exposed were below 100-in-1 million, which is the presumptive limit of

14 ERM Sustainability Initiative, “Benchmarking Air Emissions of the 100 Largest Power Producers in the United

States,” Interactive Tool, accessed February 29, 2024, https://www.sustainability.com/thinking/benchmarking-airemissions-100-largest-us-power-producers/

15 UN Environmental Programme. (2018). Global Mercury Report 2018, Technical Background Report to the Global

Mercury Assessment. https://www.unenvironment.org/resources/publication/global-mercury-assessment-technicalbackground-report

17

(Page 419 of Total) 202a

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.