Joint Appendix — Seven County Infrastructure Coalition, et al., Petitioners v. Eagle County, Colorado, et al.

Supreme Court briefAug 28, 2024

Ask Donna

What actually matters in this document.

Text

No. 23-975

In the

Supreme Court of the United States

________________

SEVEN COUNTY INFRASTRUCTURE COALITION

and UINTA BASIN RAILWAY, LLC,

Petitioners,

v.

EAGLE COUNTY, COLORADO et al.,

Respondents.

________________

On Writ of Certiorari to the

United States Court of Appeals for the

District of Columbia Circuit

________________

CORRECTED JOINT APPENDIX

Volume I of II

________________

NATHANIEL H. HUNT

PAUL D. CLEMENT

KAPLAN KIRSCH

MATTHEW D. ROWEN

KEVIN WYNOSKY*

& ROCKWELL LLP

CLEMENT & MURPHY, PLLC

1675 Broadway

706 Duke Street

Suite 2300

Alexandria, VA 22314

Denver, CO 80202

(202) 742-8900

(303) 825-7000

nhunt@kaplankirsch.com paul.clement@clementmurphy.com

* Supervised by principals of the firm

who are members of the Virginia bar

Counsel for Eagle County Counsel for Petitioners

(Additional Counsel Listed on Inside Cover)

August 28, 2024

Petition for Writ of Certiorari Filed Mar. 4, 2024

Petition for Writ of Certiorari Granted June 24, 2024

WENDY PARK

CENTER FOR

BIOLOGICAL DIVERSITY

1212 Broadway

Suite 800

Oakland, CA 94612

(510) 844-7138

wpark@biologicaldiversity.org

Counsel for Center for

Biological Diversity, et al.

JAY C. JOHNSON

FRED R. WAGNER

VENABLE LLP

600 Massachusetts Ave. NW

Washington, DC 20001

JONATHAN A. STEARMER

625 South 400 West

Vernal, UT 84078

Counsel for Petitioners

ELIZABETH B. PRELOGAR

Solicitor General

UNITED STATES

DEPARTMENT OF JUSTICE

950 Pennsylvania Ave., NW

Washington, DC 20530

(202) 514-2217

supremectbriefs@usdoj.gov

Counsel for United States

JA i

TABLE OF CONTENTS

Volume I

Excerpts from Seven County Infrastructure

Coalition’s Response to OEA Request for

Information (Apr. 19, 2019) .......................... JA-1

J. Putnam Letter to J. Wayland, Colorado

Department

of

Public

Health

and

Environment

Preliminary

Comments

(May 9, 2019) ................................................. JA-7

E. Gaddis Letter to J. Wayland, Utah Department

of Environmental Quality Preliminary

Comments (June 14, 2019).......................... JA-13

S. Hackett Letter to J. Wayland, Colorado

Department of Public Health & Environment

Scoping Comments (Aug. 5, 2019) .............. JA-22

Excerpts from SCIC Response to OEA’s Second

Request for Information (Oct. 10, 2019) ..... JA-28

Excerpts from SCIC Uinta Basin Oil Pipeline

Study: Final Report (Sept. 2017) ................ JA-33

Excerpts from R.L. Banks & Associates to SCIC,

Pre-Feasibility Study of a Prospective

Railroad Connecting the Uinta Basin to the

National Rail Network (Aug. 9, 2018) ........ JA-35

Eagle County Comments on Draft Environmental

Impact Statement Before the Surface

Transportation Board (Feb. 12, 2021) ........ JA-41

EPA

Map

of

Counties

Designated

“Nonattainment” for Clean Air Act’s National

Ambient Air Qualty Standards (NAAQS)

(Feb. 12, 2021) ............................................. JA-93

JA ii

Table of Contents Excerpts, Unita Basin Railway,

Final Environmental Impact Statement, STB

Docket No. FD 36284 (Aug. 2021)............... JA-94

Summary Excerpts, Unita Basin Railway, Final

Environmental Impact Statement, STB

Docket No. FD 36284 (Aug. 2021)............. JA-106

Section 2 Excerpts, Unita Basin Railway, Final

Environmental Impact Statement, STB

Docket No. FD 36284 (Aug. 2021)............. JA-138

Section 3.2 Excerpts, Unita Basin Railway, Final

Environmental Impact Statement, STB

Docket No. FD 36284 (Aug. 2021)............. JA-194

Section 3.3 Excerpts, Unita Basin Railway, Final

Environmental Impact Statement, STB

Docket No. FD 36284 (Aug. 2021)............. JA-206

Section 3.4 Excerpts, Unita Basin Railway, Final

Environmental Impact Statement, STB

Docket No. FD 36284 (Aug. 2021)............. JA-243

Section 3.6 Excerpts, Unita Basin Railway, Final

Environmental Impact Statement, STB

Docket No. FD 36284 (Aug. 2021)............. JA-303

Section 3.7 Excerpts, Unita Basin Railway, Final

Environmental Impact Statement, STB

Docket No. FD 36284 (Aug. 2021)............. JA-309

Section 3.13 Excerpts, Unita Basin Railway,

Final Environmental Impact Statement, STB

Docket No. FD 36284 (Aug. 2021)............. JA-326

Volume II

Section 3.15, Unita Basin Railway, Final

Environmental Impact Statement, STB

Docket No. FD 36284 (Aug. 2021)............. JA-348

JA iii

Appendix C, Unita Basin Railway, Final

Environmental Impact Statement, STB

Docket No. FD 36284 (Aug. 2021)............. JA-475

Appendix E, Unita Basin Railway, Final

Environmental Impact Statement, STB

Docket No. FD 36284 (Aug. 2021)............. JA-487

Appendix L Excerpts, Unita Basin Railway, Final

Environmental Impact Statement, STB

Docket No. FD 36284 (Aug. 2021)............. JA-497

Appendix S Excerpts, Unita Basin Railway, Final

Environmental Impact Statement, STB

Docket No. FD 36284 (Aug. 2021)............. JA-506

Appendix T Excerpts, Unita Basin Railway, Final

Environmental Impact Statement, STB

Docket No. FD 36284 (Aug. 2021)............. JA-511

Table

3

Excerpts,

Energy

Information

Administration, Capacity of Operable

Petroleum Refineries by State as of January 1,

2022 (2022) ................................................ JA-544

Ute

Indian

Tribe

of

Uintah

and

Ouray Reservation Support Statement

(Sept. 22, 2021)) ......................................... JA-546

Excerpts from Center for Biological Diversity’s

Supplemental Comments (Oct. 18, 2021) . JA-548

SCIC, Industry Support Letters for Rail, 2018,

cited in Center for Biological Diversity’s

Supplemental Comments (Oct. 18, 2021) . JA-572

JA iv

The following opinions, decisions, judgments, and

orders have been omitted in printing this joint

appendix because they appear on the following page in

the appendix to the Petition for Certiorari:

Appendix A

Opinion of the United States Court of Appeals for

the D.C. Circuit (Aug. 18, 2023).......... Pet.App.1a

Appendix B

Order Denying Petition for Rehearing En Banc

(Dec. 4, 2023) ..................................... Pet.App.72a

Appendix C

Surface Transportation Board Final Decision

(Dec. 15, 2021) ................................... Pet.App.74a

Appendix D

Surface Transportation Board Decision (Jan. 4,

2021)................................................. Pet.App.190a

JA 1

Excerpts from Seven County Infrastructure

Coalition’s Response to OEA Request for

Information (Apr. 19, 2019)

Craig Route

MP 0.0 to South Myton Bench and Leland Bench—Up

to 200 feet each side of centerline with potential

variance to 500 feet each side of centerline

OEA Information Request: Provide any currently

available information regarding the terminus points of

the proposed rail line at Myton and Leland Bench in

the Uinta Basin, including available information

related to the types of facilities that could be

constructed at those points and information regarding

any existing proposals for new facilities at those

locations.

Coalition Response: Each of the three alternative

routes proposed (Indian Canyon, Wells Draw, and

Craig) would have one or two terminus points within

the Uinta Basin. All three routes would have one

terminus

point

located

at

Leland

Bench,

approximately 9.5 miles south of Fort Duchesne,

Utah. Wells Draw and Craig would have a second

terminus point located at South Myton Bench,

approximately 3.5 miles southwest of Myton, Utah.

These terminus points are in essence “ends of track”

in areas that the Coalition believes will provide access

to an area of freight shipper and/or receiver interest.

The Coalition anticipates that a transload facility

would be constructed in the vicinity of one or both of

these ends of track.

At this time, the Coalition is not proposing to

construct any transload facilities. Unless those plans

change (at which time, the Coalition would notify the

JA 2

STB), the Coalition anticipates that any transload

facilities will be constructed by shippers, receivers, or

third-party freight consolidators or distributors.

However, there are currently no existing proposals for

new transload facilities at these locations. While the

Coalition anticipates discussing potential transload

facilities with third-parties (e.g., the Ute Indian Tribe,

private developers, operators, freight consolidators,

shippers, or receivers), the Coalition has not entered

into any formal negotiations with such parties at this

time. The Coalition notes that it has signed a

Memorandum of Understanding (MOU) with Uintah

Advantage, the developer of a proposed crude oil

upgrader facility near the Leland Bench end-of-track.

This MOU contemplates that Uintah Advantage

would potentially require railway freight services and

that it may provide to the Coalition certain land it

currently controls at this location, to enable

construction of a transload facility by the Coalition or

others.

Shippers and receivers may in fact determine that

other locations for transload facilities are more

suitable for their needs, and may choose to construct

facilities at any location alongside the proposed

routes, or at a separate location connected to the

proposed routes by a private industrial spur track.

However, to facilitate access to the rail line, the

Coalition selected the proposed terminus points based

on:

1. Proximity to Primary Traffic Source: The

railway’s anticipated primary traffic source is the

crude oil production industry, which produces

crude oil and consumes fracturing sand and

JA 3

tubular product (e.g., steel pipe and drill stem). As

shown in Figure 1 below, the two selected

terminus points are in close proximity to the

principal production areas of the major crude oil

production field in the Uinta Basin. The proposed

Terminus points would also provide convenient

access for other Uinta Basin commodities (e.g.,

agricultural products).

Figure 1: Uinta Basin Oil Production Heat Map,

2015-2018

2. Topography and Location: Economical

development of railway transload facilities

requires topography that is conducive to railway

terminal construction. Economical sites must be

mostly flat, not cut by watercourses or wetlands,

and not occupied by uses that would require

expensive relocations. This typically precludes

sites that have been already developed for

industrial use, residential use, or are occupied by

major pipeline or electrical transmission

JA 4

infrastructure. Sites for transload facilities must

also be appropriately zoned or readily able to be

rezoned.

3. Surrounding Land Uses: The terminus points

were chosen based on the potential for transload

facility developers to assemble real estate in

sufficient size to construct a facility capable of

handling complete unit trains. Generally, a

terminal or transload capable of accepting unit

trains must be at least 200 acres in size.

Because the Uinta Basin Railway would be a commoncarrier rail line, it would be open to all shippers and

receivers of goods and commodities at any location

along its route where shippers and receivers propose

to deliver or receive rail cars or trains from the

railway. Shippers and receivers may choose to

construct their own individual transloads, work

cooperatively to construct joint transloads, or contract

with developers and operators of transloads.

Developers and operators would contract with

shippers and receivers to transload, store, or

distribute their goods and commodities, and contract

with the Uinta Basin Railway for transportation

services.

The number and size of potential transload

facilities is unknown at this time. However, generally,

a transload facility would:

•

Transfer goods and commodities from railway

cars to trucks for immediate furtherance to

another location, or to storage facilities for

future furtherance to another location, or to

manufacturing plants;

JA 5

•

Transfer goods and commodities to railway

cars from trucks and pipelines, from storage

facilities, or from manufacturing plants;

•

Reload goods and commodities delivered by

railway cars, truck or pipeline, onto other

railway cars, trucks or pipelines;

•

Accept intact inbound trains from the railway

for unloading or loading, and stage outbound

trains for operation by the railway after

loading or unloading; and

•

Store, distribute, consolidate, sort, process, or

manufacture goods and commodities.

It is possible that one or more transloaders of

small volumes of inbound or outbound commodities

(e.g., lumber and other building materials or

agricultural products), or manufacturing plants or

processing plants generating less-than-trainload

volumes, would be constructed on the railway. In such

a case, the typical practice would be to handle these

small volumes as added “head end” cars to unit trains

of other commodities. An inbound unit train would

stop momentarily to drop off inbound miscellaneous

head end cars to the small transload facility or

manufacturing or processing plant before proceeding

to its own destination, and outbound unit trains would

stop momentarily to pick-up outbound miscellaneous

cars.

Locomotives inbound on unit trains are

anticipated to either layover at unit-train capable

transload facilities until an outbound train is ready, or

may be aggregated by the railway and operated to

another transload facility or back to the railway’s

JA 6

connection with the national railway network. Minor

servicing and refueling of locomotives at unit-train

capable transload facilities is a typical industry

practice.

The proposed Uinta Basin Railway may construct

a small terminal at an additional location for servicing

or storage of locomotives, track maintenance

machinery and rail cars used in track maintenance,

material storage, small quantities of rail cars carrying

miscellaneous inbound or outbound freight, or empty

cars awaiting loads of miscellaneous outbound freight.

This small terminal may be co-located with a large

unit train transload terminal, or at a different

location. The need for a small terminal is

indeterminate at this time, as is the location(s).

OEA Information Request: Confirm that the

proposed rail line would be constructed as a single

track.

Coalition Response: The proposed rail line

would be constructed as a single main track, with

sidings to enable trains to meet and/or pass at

locations to be determined (a siding is a track of

sufficient length to contain a complete train, parallel

to the main track and connected at both ends to the

main track).

JA 7

J. Putnam Letter to J. Wayland, Colorado

Department of Public Health and Environment

Preliminary Comments

May 9, 2019

Re: Colorado Department of Public Health and

Environment’s Preliminary Comments on the

Proposed Uinta Rail Line

Dear Mr. Wayland:

The Colorado Department of Public Health and

Environment (CDPHE) appreciates the opportunity to

provide preliminary scoping comments on the Seven

County Infrastructure Coalition Uinta Basin Railway

proposal. We are encouraged to see that the Surface

Transportation Board’s Office of Environmental

Analysis is preparing an Environmental Impact

Statement (EIS) that will analyze the potential

environmental impacts for the proposed rail line.

CDPHE conducts National Environmental Policy Act

(NEPA) reviews and provides comments as a

cooperative agency to ensure compliance with

applicable Federal and State requirements intended

to avoid or minimize impacts to public health and the

environment. We respectfully submit the following

preliminary comments.

CDPHE believes it is essential to expand the

study area contemplated for the EIS in order to

capture potential effects from enabling more trains

every day, some portion of which will be carrying

crude oil, Gilsonite and other substances in

environmentally sensitive and populated areas in

Colorado. Regardless of the alternative chosen, your

letter indicates that the proposed project will induce

additional rail activity—as many as six trains per day.

JA 8

This activity would likely travel through Colorado,

both on the Union Pacific line east of Axial or on the

main east-west Union Pacific line from the Utah

border to the the Denver area and then south and east

to the Colorado border.

The EIS needs to thoroughly analyze and discuss

the safety risks associated with routing additional

hazardous rail cargo along the environmentally

sensitive corridors to which the new project would

connect. Any rail traffic induced by the proposed

project and using the Union Pacific system would

transit through metropolitan Denver, and depending

on the route, through populated areas like Pueblo,

Colorado Springs, Glenwood Springs, Steamboat

Springs, Craig, and Grand Junction (along with many

other cities and towns). Adding more oil train traffic

in particular raises safety risks for the often densely

populated areas that must be carefully analyzed. The

EIS should include consideration of the environmental

justice implications of these additional hazardous

trains.

Similarly, both the Craig Line and main UP line

parallel sensitive river systems—the Yampa and

Colorado Rivers, along with South Boulder Creek.

Both could be affected by any spills that may occur

from incidents associated with the new rail traffic

induced by the project. The Yampa River is a vital wild

river and the rail line follows the Yampa just

upstream of Dinosaur National Park. Any spills could

have catastrophic effects on wildlife, recreation,

agriculture and drinking water. Similarly, the

Colorado River is the most important river in the

Southwest United States, providing water supply for

JA 9

millions, habitat for endangered species, heavily-used

recreation resources and irrigation water. South

Boulder Creek is a critical source for water for the

Denver Water system, habitat for the Prebles’

Meadow Jumping Mouse and valuable recreation.

CDPHE regulates water quality in all of these river

systems.

Air quality impacts from pollutant emissions are

limited by regulations, standards and implementation

plans established under the federal Clean Air Act, as

Administered by CDPHE’s Air Pollution Control

Division (APCD) under authorization of the U.S.

Environmental Protection Agency. In order to provide

thorough comments, APCD requests additional

information regarding the commodities and products

that will be transported into Colorado as a result of

the proposed project. We recommend that the EIS

include a cumulative effects analysis, including

climate change impacts, with a description of the

anticipated environmental impacts of the proposed

action in relationship to all other effects from past,

present and reasonably foreseeable future federal,

non-federal, and private actions within the spatial and

temporal bounds of the proposed project.

The proposed project may require a Land

Development Air Pollutant Emissions Notice (APEN).

Under Colorado air quality regulations, land

development refers to all land clearing activities,

including but not limited to land preparation such as

excavating or grading, for residential, commercial or

industrial development. Land development activities

release fugitive dust, a pollutant regulated by APCD.

Small land development activities are not subject to

JA 10

the same reporting and permitting requirements as

large land activities. Specifically, land development

activities that are less than 25 contiguous acres and

less than six months in duration do not need to report

air emissions to the APCD. However, it is important

to note that even if a permit is not required, fugitive

dust control measures included in the Land

Development APEN Form APCD-223 must be

followed at the site. APCD also has APEN

requirements for internal combustion engines;

however, non-road engines are not required to submit

an APEN. APEN forms and guidance documents can

be accessed online: https://www.colorado.gov/pacific/

cdphe/air/air-permit. All applicable requirements and

permits should be discussed in the EIS.

APCD recognizes that the transportation of

products and commodities via rail could potentially

reduce transportation emissions as compared to the

current method of truck transportation. However,

according to the Uinta Basin Railway Project website,

the proposed action may result in increased oil and

gas, agriculture, and mining activity. Emissions from

these activities can travel great distances, affecting

air quality and public health including in the

Denver/North Front Range ozone nonattainment area.

In addition, Colorado recently established new

greenhouse gas (GHG) emissions reduction goals of

50% GHG reductions by 2030 and 90% GHG

reductions by 2050 (based on 2005 levels) stemming

from House Bill 1261, which was signed by Governor

Polis on May 1, 2019. Therefore, we request an

analysis of intrastate and interstate air pollution

transport from criteria pollutant and GHG emissions

that may result from the proposed project and

JA 11

potential mitigation measures. Consideration of these

indirect, secondary and cumulative impacts is

required by the Council on Environmental Quality

regulations

implementing

the

National

Environmental Policy Act.

Several sections of the proposed Craig Route are

less than 10 miles away from Dinosaur National

Monument (DNM), as depicted in Figure 3—Craig

Study Area. DNM is a class II air quality “floor” under

the prevention of significant deterioration federal

1963 Clean Air Act, as amended, but is a class I area

by Colorado standards for sulfur dioxide (SO2). This

means that development can be permitted in the

vicinity (within 10-25 kilometers depending on the

size of the development) of the park as long as the

levels of all criteria pollutants except SO2 do not

exceed the Class II increment requirements. Class I

increment consumption requirements apply for SO2

(Colorado Regulation No. 3, Part D, §VIII.B).

According to the National Park

Service, ozone, visibility, and nitrogen deposition

impacts are of significant concern for DNM. Increased

energy development in the Uinta Basin may emit

significant quantities of air pollutants in the DNM

area, resulting in visibility degradation, adverse

effects to human health, and adverse ecosystem effects

from nitrogen deposition and ozone impacts to

vegetation. These effects should be thoroughly

discussed in the EIS.

CDPHE expects that the EIS will thoroughly

consider alternatives such as the use of pipelines for

oil transportation, along with mitigation for all of the

JA 12

safety risk, water, species, air quality and climate

impacts that may be associated with impacts.

CDPHE appreciates the opportunity to provide

these preliminary scoping comments and looks

forward to reviewing the project EIS. If you have any

questions or need additional assistance, please call me

at

303-692-3397

or

email

me

at

john.putnam@state.co.us.

Sincerely,

[signature]

John Putnam

Director of Environmental Programs

JA 13

E. Gaddis Letter to J. Wayland, Utah

Department of Environmental Quality

Preliminary Comments

June 14, 2019

Dear Mr. Wayland,

Thank you for the opportunity to submit

preliminary comments on the Seven County

Infrastructure Coalition proposal to build an 80-mile

rail line to transport commodities and products in and

out of the Uinta Basin.

The Utah Department of Environmental Quality’s

Division of Water Quality (DWQ) is tasked with

protecting, maintaining, and enhancing the quality of

Utah’s surface and underground waters for their

designated beneficial uses. Beneficial uses include

drinking water, recreation, protection of aquatic life,

and agriculture. To protect these beneficial uses, the

state develops numeric and narrative water quality

standards for surface waters in Utah. DWQ collects

water-quality data, monitors the health of the state’s

waterways, issues permits for surface water

discharges, evaluates the condition of watersheds, and

coordinates with partners on water-quality issues

associated with specific public health concerns.

DWQ’s scoping comments address common

impacts to water quality from railways in general as

well as conditions that are specific to the local area

covered by the three proposed routes.

General Comments

Soil erosion and product spills pose the greatest

water-quality impacts from rail line construction and

operations. According to Priscila Silva Lucas, et.al,

JA 14

railway disturbances can often result in significant

impacts to the environment:1

“The abrupt change of soil required to establish

the railway embankment leads to vegetation loss,

compresses the soil, and compromises water drainage

(Ferrell and Lautala 2010). Thus, soil becomes

exposed and subject to an increasing runoff that

promotes its erosion (Chen et al. 2015).

The erosion of rail embankments can result in a

washing out of sediments (Jin et al. 2008) that cause

water pollution.

Infrastructures associated with railways (e.g.,

leakages of petroleum products from fuel storage

tanks) contribute, together with pollutants, to aquatic

ecosystems. (Schweinsberg et al. 1999; Vo et al. 2015).

Levengood et al. (2015) documented high

concentrations of PAHs [polycyclic aromatic

hydrocarbons] and heavy metals in waterways

bisected or bordered by railways. They showed that

the PAH concentration was higher downstream than

upstream of the railway (Levengood et al. 2015). They

also found that phenanthrene and dibenzo (a, h)

anthracene (a PAH element) concentrations at some

sites represented a risk to aquatic life.”

Water quality impacts will vary based on railway

alignment,

acreage

disturbed,

proximity

to

waterways, frequency of rail traffic, and products and

Lucas P.S., de Carvalho R.G., Grilo C. 2017, Railway

Disturbances on Wildlife: Types, Effects, and Mitigation

Measures. In: Borda-de-Agua L., Barrientos R., Beja P., Pereira

H. (eds), Railway Ecology. Springer, Cham.

1

JA 15

commodities carried on the rail line.2 These impacts

will also vary between the construction and postconstruction (operational) phases.

•

•

Impacts during the construction phase

o

Soil erosion and subsequent impacts on water

quality are greatest during construction.

Removal of vegetation for initial clearing and

grading activities expose soil and make it

more susceptible to erosion. Rail line

alignment, location of construction staging,

and erosion control measures could

ameliorate some of these impacts.

o

Heavy-machinery traffic may increase

erosion depending on the type of roadways

used (paved versus gravel or dirt roads).

o

Heavy-machinery emissions and deposition

may also be an issue depending on proximity

to waterways. (See comments below on

impacts from emissions).

Impacts during the operational phase (postconstruction)

o

There is high potential for an increase in

runoff and erosion due to elevated railways.

The extent of the impacts depends on the rail

alignment and proximity to waterways.

o

Soils in the area are subject to freeze-thaw

cycles that could increase the potential for

Environmental Protection Agency. 1996. Indicators of the

Environmental Impacts of Transportation: Highway, Rail,

Aviation, and Maritime Transport. EPA 230-R-96-009

2

JA 16

erosion, particularly during spring runoff and

storm events.

o

Exhaust emissions of carbon monoxide (CO),

oxides of nitrogen (NOx), volatile organic

compounds (VOCs), sulfur dioxide (SO2),

particulate matter, particulate matter (PM),

carbon dioxide (CO2), methane (CH4),

nitrous oxide (N20), and ammonium (NH4)

from train traffic are expected. The impact to

water quality from dry and wet deposition of

these chemicals into nearby waterways is

unclear.3 Emissions of creosote, polycyclic

aromatic hydrocarbons (PAHs), and phenols

from railroad ties treated with creosote are

also a source of concern.4

o

Spills of waxy crude, fracturing sand, coal,

soda ash, Gilsonite, phosphorus, and diesel

fuel leaks or discharges into waterways could

cause significant water-quality impacts,

depending on the extent and location of the

spill. Effective spill prevention and response

protocol will be critical to protecting water

resources along the route.

o

Soils in proximity to rail lines have higher

levels of PAHs from fuel and creosote

3 Ibid.

4 Martin Kohler,*, Tina Künniger, Peter Schmid, Erika Gujer,

Rowena Crockett, and Max Wolfensberger. 2000.

Inventory and emission factors of creosote, polycyclic aromatic

hydrocarbons (PAH) and phenols from railroad ties treated with

creosote. Environmental Science & Technology 34 (22), 4766-4772

DOI: 10.1021 /es000103h

JA 17

leaching from railway ties.5 There could be

potential impacts to aquatic life from PAHs

depending on the hydrocarbon load that

reaches the waterway from runoff or erosion.

Utah does not currently have water-quality

criteria for PAHs as they are still considered

an emerging contaminant. National criteria

could

be

referenced

to

compare

concentrations in affected waters.

o

Livestock transport along the rail line could

result in increased fecal matter entering

nearby waterways from either direct

deposition or runoff, depending on the

frequency of livestock transport and

proximity of the rail line to waterways.

o

Herbicides along the rail route could be an

additional source of water pollution.6 “...

Schweinsberg et al. (1999) discovered that in

Germany before the 1990s, a much higher

total amount of these compounds [herbicides]

were applied on railway tracks than in

agriculture. Recently, Vo et al. (2015) showed

that many herbicides applied during the

operation of the railway are at concentrations

that are lethal to most of the aquatic fauna,

particularly fish populations; they indicate

that compounds such as Imazapyr or Diuron

concentrations can take 6 and 48 months,

5 Wilkomirski B, Sudnik-Wøjcikowska B, Galera H, Wierzbicka

M, Malawska M. 2011. Railway transportation as a serious

source of organic and inorganic pollution. Water Air Soil

Pollution. 218(1-4):333- 345. DOI:10.1007/s11270-010-0645-0

6 Op. cit., Railway Disturbances on Wildlife.

JA 18

respectively, to drop below 50 (percent) of

their original levels.”

Comments Specific to the Affected Area

Erosion will be one of the primary issues for all

routes since the geology/soils in the region are

significant natural sources of soluble salts. Geologic

features are dominated by the slightly-to-moderately

saline Uinta and Duchesne River formations and the

highly saline Mancos Shale formation. Total dissolved

solids (TDS), selenium (Se), arsenic (As), and boron (B)

water-quality impairments in the area are generally

due to the composition of the bedrock coupled with

erosion-causing activities such as oil and gas

operations, irrigation, grazing, and road construction.

The proposed setback distance from surface waters

and wetlands will play a large role in the severity of

erosion-related impacts.

Watershed planning is an important tool for

protecting vital water resources. The Duchesne River

Watershed Restoration Plan covers portions of the

proposed routes and is intended to help local

communities, watershed organizations, and agencies

operating within the Duchesne River watershed

develop and implement plans to meet water-quality

standards, protect water resources and provide a

cohesive strategy for implementing needed waterquality improvements in the Duchesne River and

tributaries.7 One of the goals of the plan is to “improve

Uinta Basin Watershed Council. 2015. Duchesne River

Watershed Restoration Plan. https://deg.utah.gov/legacy/

programs/water-quality/watersheds/docs/2015/08Aug/Duchesne.

pdf

7

JA 19

water quality in the watershed by decreasing total

dissolved solids (TDS) and sediment loads.” Railroad

construction is contradictory to this goal, since the

project will likely increase erosion and related water

quality impacts. The Duchesne Plan, however, is not

intended to prevent projects that increase erosion.

Rather, it focuses on responsible erosion-control

practices to reduce erosion from anthropogenic

activities in the watershed.

All three proposed routes cross impaired water

segments, designated geographically as water-quality

assessment units (AUs). An AU is deemed impaired

when it fails to meet the water-quality standards

associated with its beneficial uses. Following Section

303(d) of the Clean Water Act, DWQ identifies and

prioritizes impaired waters that require restoration to

meet water-quality standards. As part of the

restoration process, total maximum daily loads

(TMDLs) are written to mandate the maximum

allowable discharge of a pollutant from both point and

non-point sources to a water segment while still

meeting applicable water-quality standards. Several

of the assessment units associated with the rail lines

have TMDLs in place for total dissolved solids and/or

are impaired for other pollutants commonly associated

with soil disturbance in these areas. DWQ has

attached a table with the beneficial use(s),

impairments, and TMDLs for AUs along the proposed

routes as an addendum to this letter.

Conclusion

Erosion and spills present the most significant

impacts to water quality along the three proposed

routes. The extent of the erosion impacts will depend

JA 20

on the alignment of the routes and their proximity to

waterways. Spills are always a concern along

transportation corridors, but safety and response

protocols can minimize these impacts. Increases to rail

traffic beyond the frequency proposed in the scoping

document would likely increase impacts from erosion

and possible spills and should be taken into

consideration along with other impacts that may

qualify as cumulative impacts under 40 CFR § 1508.7.

The project as proposed will require construction

storm water permit coverage since it will disturb more

than one acre. The UPDES Construction General

Permit Number UTRC00000 permit application and

requirements are available on the DWQ webpage.

Projects that require a U.S. Army Corps of Engineers

(USACE) Individual Section 404 Permit will require a

Section 401 Water Quality Certification through

DWQ. The purpose of the Section 401 Certification is

to allow the state to certify whether projects/activities

will violate any applicable state water-quality

standards. An application for a Section 401 Water

Quality Certification should be made simultaneously

with an application for a Section 404 Permit through

USACE.

JA 21

Thank you again for the opportunity to comment

on the proposed rail line in the Uinta Basin. Please

feel

free

to

contact

Elise

Hinman

at

ehinman@utah.gov or (801) 536-4346 with any

questions or concerns.

Sincerely,

[signature]

Erica Gaddis, PhD

Director

EBG/EH/blj

JA 22

S. Hackett Letter to J. Wayland, Colorado

Department of Public Health & Environment

Scoping Comments

August 5, 2019

Re: Colorado Department of Public Health and

Environment’s Scoping Comments on the Seven

County Infrastructure Coalition—Uinta Basin

Railway Environmental Impact Statement

Dear Mr. Wayland:

The Colorado Department of Public Health and

Environment (CDPHE) appreciates the opportunity to

provide scoping comments on the Seven County

Infrastructure Coalition (Coalition) Uinta Basin

Railway proposal (Uinta Basin Railway or Railway).

We are encouraged to see that the Surface

Transportation Board’s Office of Environmental

Analysis is preparing an Environmental Impact

Statement (EIS) that will analyze the potential

environmental impacts for the Uinta Basin Railway.

CDPHE conducts National Environmental Policy Act

(NEPA) reviews and provides comments as a

cooperative agency to ensure compliance with

applicable Federal and State requirements intended

to avoid or minimize impacts to public health and the

environment. Based on its potential negative impacts

to public health and the environment, as well as

potential wildlife impacts identified by Colorado Parks

and Wildlife, CDPHE recommends that the Craig

route not be chosen as the final route for this project.

CDPHE believes it is essential to expand the

study area contemplated for the EIS in order to

capture potential effects from enabling more trains

every day, some portion of which will be carrying

JA 23

crude oil, gilsonite, coal and other mineral and

agricultural products in environmentally sensitive

and populated areas in Colorado. Regardless of the

alternative chosen, the Coalition estimates that the

Uinta Basin Railway will induce additional rail

activity—as many as seven trains per day. If the

Coalition chooses the Craig Route, this additional rail

activity would enter into Colorado via the Union

Pacific (UP) rail line east of Axial. After passing

through the UP Craig Subdivision, it would travel

through the Denver area and then south and east to

the Colorado border.

The EIS needs to thoroughly analyze and discuss

the safety risks associated with routing additional

hazardous rail cargo along the environmentally

sensitive corridors to which the Uinta Basin Railway

would connect. Any rail traffic induced by the Railway

and using the UP system would transit through

metropolitan Denver, and depending on the route,

through populated areas like Pueblo, Colorado

Springs, Glenwood Springs, Steamboat Springs,

Craig, and Grand Junction (along with many other

cities and towns). Adding more oil train traffic in

particular raises safety risks for the often densely

populated areas that must be carefully analyzed. The

EIS should include consideration of the environmental

justice implications of this additional rail activity.

Similarly, both the Craig Line and main UP line

parallel sensitive river systems—the Yampa and

Colorado Rivers. Both could be affected by any spills

that may occur from incidents associated with the new

rail traffic induced by the Uinta Basin Railway. The

Yampa River is a vital wild river and the rail line

JA 24

follows the Yampa just upstream of Dinosaur National

Park. Any spills could have catastrophic effects on

wildlife, recreation, agriculture and drinking water.

Similarly, the Colorado River is the most important

river in the Southwest United States, providing water

supply for millions, habitat for endangered species,

heavily-used recreation resources and irrigation

water. CDPHE regulates water quality in these river

systems.

Air quality impacts from pollutant emissions are

limited by regulations, standards and implementation

plans established under the federal Clean Air Act, as

Administered by CDPHE’s Air Pollution Control

Division (APCD) under authorization of the U.S.

Environmental Protection Agency (EPA). CDPHE

recommends that the EIS include a cumulative effects

analysis, including climate change impacts, with a

description of the anticipated environmental impacts

of the proposed action in relationship to all other

effects from past, present and reasonably foreseeable

future federal, non-federal, and private actions within

the spatial and temporal bounds of the proposed

project.

While the notice indicates that the EIS will

evaluate potential air quality impacts from the

operation of trains on the Uinta Basin Railway, the

freighted product and rail line construction activities,

it does not indicate that the EIS will quantify potential

greenhouse gas emissions resulting from the

downstream combustion of the crude oil, gilsonite and

coal that it will transport. Because the Uinta Basin

Railway is a necessary precondition for the

downstream combustion of these products, they are

JA 25

connected actions under NEPA and they must be

considered together in a single EIS.

The proposed project may require a Land

Development Air Pollutant Emissions Notice (APEN).

Under Colorado air quality regulations, land

development refers to all land clearing activities,

including but not limited to land preparation such as

excavating or grading, for residential, commercial or

industrial development. Land development activities

release fugitive dust, a pollutant regulated by APCD.

Small land development activities are not subject to

the same reporting and permitting requirements as

large land activities. Specifically, land development

activities that are less than 25 contiguous acres and

less than six months in duration do not need to report

air emissions to the APCD. However, it is important

to note that even if a permit is not required, fugitive

dust control measures included in the Land

Development APEN Form APCD-223 must be

followed at the site. APCD also has APEN

requirements for internal combustion engines;

however, non-road engines are not required to submit

an APEN. APEN forms and guidance documents can

be accessed online: https://www.colorado.gov/pacific/

cdphe/air/air-permit.

All applicable requirements and permits should

be discussed in the EIS.

APCD recognizes that the transportation of

products and commodities via rail could potentially

reduce transportation emissions as compared to the

current method of truck transportation. However,

according to the Uinta Basin Railway website, the

proposed action may result in increased oil and gas,

JA 26

agriculture, and mining activity. Emissions from

these activities can travel great distances, affecting

air quality and public health including in the

Denver/North Front Range ozone nonattainment area.

In addition, Colorado recently established new

greenhouse gas (GHG) emissions reduction goals of

50% GHG reductions by 2030 and 90% GHG

reductions by 2050 (based on 2005 levels) stemming

from House Bill 1261, which was signed by Governor

Polis on May 30, 2019. Therefore, we request an

analysis of intrastate and interstate air pollution

transport from criteria pollutant and GHG emissions

that may result from the proposed project and

potential mitigation measures. Consideration of these

indirect, secondary and cumulative impacts is

required by the Council on Environmental Quality

regulations implementing NEPA.

Several sections of the proposed Craig Route are

in close proximity to Dinosaur National Monument

(DNM). DNM is a class II air quality “floor” under the

prevention of significant deterioration federal 1963

Clean Air Act, as amended, but is a class I area by

Colorado standards for sulfur dioxide (SO2). This

means that development can be permitted in the

vicinity (within 10- 25 kilometers depending on the

size of the development) of the park as long as the

levels of all criteria pollutants except SO2 do not

exceed the Class II increment requirements. Class I

increment consumption requirements apply for SO2

(Colorado Regulation No. 3, Part D, §VIII.B).

According to the National Park Service, ozone,

visibility, and nitrogen deposition impacts are of

significant concern for DNM. Increased energy

development in the Uinta Basin may emit significant

JA 27

quantities of air pollutants in the DNM area, resulting

in visibility degradation, adverse effects to human

health, and adverse ecosystem effects from nitrogen

deposition and ozone impacts to vegetation. These

effects should be thoroughly discussed in the EIS.

CDPHE expects that the EIS will thoroughly

consider alternatives such as the use of pipelines for

oil transportation, along with mitigation for all of the

safety risk, water, species, air quality and climate

impacts that may be associated with impacts.

CDPHE appreciates the opportunity to provide

these scoping comments and looks forward to

reviewing the project EIS. If you have any questions

or need additional information, please call me at 303692-3662 or email me at sean.hackett@state.co.us.

Sincerely,

______________________

Sean Hackett

CDPHE Energy Liaison

JA 28

Excerpts from SCIC Response to OEA’s Second

Information Request, FD 36284

October 10, 2019

*

*

*

OEA Request: If it is assumed that “helper”

locomotives would be used on the proposed rail line,

provide the estimated number of helper locomotives

that would be used on a train, the type of train

(manifest or oil), and where along the proposed rail

line they would be used, with references to mileposts.

Response:

The use of “helper” locomotives is not anticipated

on the UBRY. Trains are expected to operate with

eight 4,300 to 4,400-horsepower locomotives without

addition or subtraction en route between the railroad’s

proposed interchange with the national railroad

network at Kyune, and the loading terminal(s)

proposed at South Myton Bench and Leland Bench. It

is expected that a 110-car loaded train will require

30,000 horsepower, or seven 4,300-horsepower

locomotives, to overcome gravity and rolling

resistance. It is anticipated that an eighth locomotive

will be added to reduce the risk of train stalling should

a locomotive experience mechanical failure.

OEA Request: Indicate whether the estimated

average number of crude oil trains per day assumes

that crude oil currently trucked to Salt Lake City

refiners would continue to move by truck or whether

it would be transported as part of the 3.5 loaded trains

per day estimate.

JA 29

Response:

The estimated average number of crude oil trains

per day assumes that rail transportation will not

displace truck transportation for purposes of shipping

crude oil to Salt Lake City refiners. Based on recent

analysis, rail shipment from the Uinta Basin to Salt

Lake City refiners is not economically viable for

several reasons including (1) the lack of infrastructure

to receive and unload crude oil unit trains in the

vicinity of the Salt Lake City-area refineries and then

transport that oil via pipeline to the refineries and

additional costs associated with constructing and

operating such infrastructure; (2) the operating and

capital cost of transloading oil from truck to rail within

the Uinta Basin, which is not required for the existing

all-truck haul; and (3) the relatively short haul by a

connecting carrier (either UP or BNSF) to the Salt

Lake City area, which reduces the economies of rail

transportation. Thus, it is not anticipated that crude

oil will be shipped by rail from the Uinta Basin to Salt

Lake City refiners.

OEA Request: Provide any assumptions made

regarding the number of new oil and gas wells that

would be drilled to provide production sufficient to

supply the anticipated number (trains/day, plus

trucking, if applicable) of crude oil transport.

Response:

Oil production in the Uinta Basin is expected to

continue transitioning from a historic pattern of

vertical wells with a single completion per well and

each well on a single well pad, to vertical wells with

multiple laterals per well (“horizontal wells”) at

various depths and in various directions radiating

JA 30

from the vertical well. This transition is expected to

result in multiple completions per well and multiple

wells on a single well pad. Laterals are typically

completed sequentially, i.e., after the oil from the first

lateral completed for a given well is extracted, the

second lateral is completed and its oil resource

extracted, and so forth. “Completion” consists of the

activity of hydraulically fracturing the lateral.

•

To produce 130,000 barrels of oil per day, it is

anticipated that 130 new lateral completions will

be required initially, and 26 new lateral

completions will be required per year to sustain

that production level to account for the gradual

decline in production of the initial 130 lateral

completions.

•

To produce 350,000 barrels of oil per day, it is

anticipated that 350 new lateral completions will

be required initially and 70 new lateral

completions will be required per year to sustain

that production level to account for the gradual

decline in production of the initial 350 lateral

completions.

At present, new oil well completions in the Uinta

Basin are initially producing between 500 and 3,000

barrels per day, with an average of 500 barrels per day

for wells producing from the Green River Formation,

and 1,000 barrels per day for wells producing from the

Wasatch Formation.

As of October 2019, five oil rigs were drilling oil

wells in Uintah and Duchesne Counties, sustaining a

production of approximately 90,000 barrels of oil per

day. Accordingly, each rig is sustaining approximately

18,000 barrels per day of production. Of the

JA 31

approximately 90,000 barrels of oil produced each day,

approximately 70,000 to 80,000 barrels of oil are

trucked to refineries in the Salt Lake City area each

day. The balance of the oil produced in Uintah and

Duchesne Counties is trucked to rail transload

facilities outside of the Uinta Basin and then

transported by rail to refineries or export terminals in

areas other than Salt Lake City. Assuming oil rig

productivity neither declines nor improves, a total of

11.66 oil rigs would be required to produce 130,000

barrels of oil per day in addition to the maximum of

80,000 barrels per day that can be consumed by Salt

Lake City refineries. Assuming oil rig productivity

neither declines nor improves, a total of 23.66 oil rigs

would be required to produce 350,000 barrels per day

in addition to the maximum of 80,000 barrels per day

that can be consumed by Salt Lake City refineries.

Regardless of whether the UBRY is developed, it is

anticipated that new oil production in the Uinta Basin

will be driven by market factors and will continue to

be transported by truck.

No assumptions have been made about the

number of gas wells that could be drilled in the future.

While natural gas has historically been produced in

the Uinta Basin, it is not expected that natural gas, in

either its gas or liquid form, will be shipped via the

UBRY. Natural gas produced in the Uinta Basin is

currently being transported by pipeline on a regional

basis; this practice is expected to continue regardless

of the UBRY project.

OEA Request: Indicate if it was assumed that most

new oil and gas wells would be drilled in Duchesne and

JA 32

Uintah counties, given that is where most of the

current oil and gas production occurs.

Response:

It is assumed that all crude oil shipped on the

UBRY will come from known oil resources and

reserves in Duchesne and Uintah counties. At present,

there are no other known significant sources of crude

oil that would be economically available for railway

transportation, as opposed to pipeline or truck

transportation, in the area of the UBRY. No gas (e.g.,

liquified natural gas) is expected be shipped on the

UBRY, regardless of location of production.

OEA Request: Provide assumptions used in

estimating the number of manifest trains, including

assumptions about the quantity of fracking sand, well

pipe and equipment, and other goods that would be

needed for new wells and the production of crude at

the assumed/forecast level. Also provide assumptions

about the number of carloads, averaged per day and

per year, of such commodities that would be

transported to the Uinta Basin on the proposed rail

line.

Response:

As stated previously, no manifest trains are

expected to be operated on the UBRY. Thus, no such

assumptions have been made.

JA 33

Excerpts from SCIC Uinta Basin Oil

Pipeline Study: Final Report

September 2017

3.2 Refiner Interviews

Interview Process

•

Refiner interviews were conducted either in

person, by telephone and/or via e-mail

•

Purpose of the interviews was to ultimately

identify:

o Alternate market locations for Uinta waxy

crude oil.

o Rank those alternate market locations by

‘Higher Priority’ and ‘Lower Priority’.

o Identify refinery locations and/or regions

where there is significant local

o opposition to receipt of crude oil by rail.

o Identify refinery locations where Uinta waxy

crude oil is NOT a good fit.

•

Refiner interview questions included the

following:

o How waxy crude oils are captured in refiner

linear program runs.

o Views on prospective Uinta waxy crude oil

pricing differentials vis-a-vis WTI.

o Potential demand for Uinta crude oil.

o Potential opportunities to blend Uinta Basin

waxy crude oil with other crude oils in

o order to obtain a price uplift.

o Other commercial considerations

Findings Summary

•

There are nine top rated refinery targets outside

the SLC refining region.

•

Seven of the nine are in the USGC:

JA 34

Louisiana

Calumet Shreveport

ExxonMobil Baton Rouge

Marathon Garyville

Valero St Charles

Texas

ExxonMobil Baytown

Shell Deer Park

Valero Port Arthur

•

The other two top rated refinery targets are both

BP refineries.

Indiana

BP Whiting

Washington

BP Ferndale

Six of the nine top rated refineries have rail

offload. The three that do not are all interested in

adding rail offload capability.

•

There are no top rated California refineries owing

to significant local opposition to crude by rail – of

any kind.

In all, there are 64 refining locations with the

capability of processing some Uinta waxy crude oil in

meaningful quantities. See Table 8 and Table 9 in

Appendix 1 for a complete list.

•

Appendix 1 Table 8: Refinery Targets

(see foldout on next page)

USCA Case #22-1019

Document #1989949

Filed: 03/13/2023

JA34-a

Page

444OilofPipeline

615 Study

Unita Basin

Seven County Infrastructure Coalition

Appendix 1

Table 8: Refinery Targets

Refiner

Location

State

Atmospheric

Distillation

Potential Products

Catalytic

Distillate Gas Oil Residual Total

Fuels Solvent

Lubricant

Produced From

Distance from

Reforming High

Hydro- Hydro- Hydro- HydroDeasphalting

Capacity Running Uinta Basin Uinta basin

Pressure

cracking cracking cracking cracking

Waxy Crude

Scale Distance

Rail

Steam

Notes

Offload Capability

Salt Lake City Refineries - Presently Served by Trucks

Big West Oil

Chevron

North Salt Lake

Utah

Salt Lake City

Utah

32,000

56,000

8,500

8,500

HollyFrontier

Woods Cross

Utah

26,400

8,400

Tesoro

Salt Lake City

Utah

63,000

177,400

11,400

1%

65,000

6,000

9,000

124

119

Small

Closer

N

N

Small

Closer

N

N

9,000

RPPs, Extracted Base

Oil, Converted Base

Oil

126

Small

Closer

N

N

-

RPPs

119

Small

Closer

N

N

Converted Base Oil

1,048

1,347

1,310

Medium Medium

Y

N

RPPs

RPPs

Top-Ranked Alternate Market Locations

BP Cherry Point

BP Products

Calumet Specialty Products

Ferndale

Washington

Whiting

Indiana

Shreveport

Louisiana

236,000

430,000

60,000

ExxonMobil

Baton Rouge

Louisiana

523,200

ExxonMobil

Baytown

Texas

584,000

Marathon Petroleum

Garyville

Louisiana

574,000

Shell / PEMEX

Deer Park

Texas

340,000

Valero

Valero

Port Arthur

Texas

St Charles

Louisiana

415,000

220,000

3,382,200

24%

31,000

65,000

47,000

65,000

12,500

27,000

27,000 16,500

29,500

29,500 28,000

38,000

117,000

117,000

60,000

60,000

123,000

28,000 70,000

123,000

98,000

24,500

RPPs

Base Oil User

Converted Base Oil,

Base Oil User

Extracted Base Oil,

Converted Base Oil,

Base Oil User

Extracted Base Oil,

Converted Base Oil

RPPs, Converted

Base Oil

Converted Base Oil

Converted Base Oil

May be difficult to reconfigure rail rack to add steam - designed for Bakken offload

Large

Medium

Small

Medium

Y

Y

Considering rail rack with steam for offload of Canadian underdiluted bitumen blend

Uinta yellow wax is an approved crude. Shreveport will NOT take in black wax crude.

1,581

Large

Distant

Y

Y

Genesis Energy Terminal, Baton Rouge 60,000 bbls/d

1,412

Large

Medium

N

1,622

Large

Distant

N

N

Proposed Pinoak terminal in Garyville would be a potential fit.

1,338

Large

Medium

Y

Y

Kinder Morgan Deer Park rail terminal is immediately to the west of the refinery site.

1,475

1,640

Large

Medium

Y

Y

Rail offload at Valero's Lucas terminal in Beaumont

Medium Distant

Y

Y

30,000 bbls/d rail offload at the refinery.

1,654

Large

Distant

N

N

1,439

Large

Medium

N

N

2,091

2,093

Medium Distant

Y

N

Medium Distant

Y

1,636

Medium Distant

2,106

Large

Distant

Y

1,475

Large

Medium

Y

1,640

Large

Distant

1,617

Large

Distant

1,406

Large

Medium

Y

Trafigura Terminal in Corpus Christi 30,000 bbls/d offload

1,065

Small

Medium

Y

Sovereign Development rail offload in Ardmore 40,000 bbls/d offload

1,667

Medium Distant

Better fit from refinery perspective than Baton Rounge, but have not created rail offload capability at Baytown

Lower-Ranked Alternate Market Locations

Marathon Petroleum

Catlettsburg

Kentucky

292,000

Marathon Petroleum

Galveston Bay

Texas

481,000

PBF

PBF

Paulsboro

New Jersey

Delaware City

Delaware

166,000

190,200

PBF

Toledo

Phillips 66

Linden (Bayway)

Motiva

Port Arthur

Motiva

RPPs, Extracted Base

Oil

Extracted Base Oil,

75,000 144,000

Converted Base Oil

Base Oil User

12,000

13,000

17,000

-

69,000

22,300

51,800

52,000

22,300

Converted Base Oil

52,000

RPPs, Converted

Base Oil

Ohio

188,000

New Jersey

251,000

Texas

635,000

82,000

82,000 39,000

Norco (St Charles)

Louisiana

250,000

44,000

44,000

Motiva

Convent

Louisiana

255,000

40,000

Valero

Corpus Christi

Texas

300,000

10,000

Valero

Ardmore

Oklahoma

88,000

Valero

Meraux

Louisiana

128,000

Valero

Sunray

Texas

172,000

Valero

Valero

Memphis

Tennessee

Texas City

Texas

195,000

231,000

33,500

Valero

Houston

Texas

103,000

18,000

Valero

Three Rivers

Texas

22,000

-

14,000

22,000

18,000

14,500

91,000

10,000

29%

10,500

50,000

14,000

48,700

48,700

27,000

27,000

28,500

4,016,200

RPPs, Converted

Base Oil

RPPs, Converted

Base Oil

52,000 52,000

50,000

Converted Base Oil

Extracted Base Oil,

Converted Base Oil

RPPs, Extracted Base

Oil, Converted Base

Oil

Converted Base Oil

28,500

-

71,900

Extracted Base Oil

71,900

28,000

28,000

Extracted Base Oil

Converted Base Oil,

Base Oil User

Converted Base Oil

1,900

Extracted Base Oil,

Converted Base Oil

RPPs, Extracted Base

Oil, Converted Base

Oil, Base Oil User

745

Medium Closer

1,499

1,402

Medium Medium

1,389

Small

Medium

1,337

Small

Medium

No rail at Paulsboro refinery, but can rail to PBF's Delaware City refinery and barge the oil to Paulsboro.

70,000 bbls/d rail offload servicing PBF's Delaware City and Paulsboro refineries

75,000 bbls/d rail offload

N

Have own rail offload? Can be served by Jefferson (Beaumont) or GT Logistics (Port Arthur) rail terminals

Potential rail service by IMTT (St Rose), LBC (Geismar), EnLink (St Gabriel)

Potential rail service by IMTT (St Rose), LBC (Geismar), EnLink (St Gabriel)

Potential rail service by IMTT (St Rose), LBC (Geismar), EnLink (St Gabriel)

Medium Medium

22

JA 35

Excerpts from R.L. Banks & Associates to

SCIC, Pre-Feasibility Study of a Prospective

Railroad Connecting the Uinta Basin to the

National Rail Network

August 9, 2018

*

*

*

Because of the more speculative nature of these

prospects, RLBA used Higher and Lower forecasts,

with Lower forecasts reflecting lower, later developing

or no forecasted rail carloads and Higher forecasts

reflecting the dates and volumes presented by the

interviewee, translated into carloads.

3. Prospective Uinta Basin Rail Shippers

with Limited Traffic Volume Forecasting

Ability - Forecasts of conventional oil production were

handled a third way that RLBA deemed more

appropriate to the situation. More specifically,

attempts to use a more conventional approach to

forecasting potential use of the UBRR by crude oil

producers would have been thwarted by the fact that

producers don’t tend to forecast as far into the future

as required to support prospective railroad carloads

and that production is distributed across a large

number of producers. So, in the alternative, RLBA

decided to discuss potential total Uinta Basin

production with almost all of the largest producers

currently in the Basin and to use the extremes

manifest in their estimates to drive its Lower and

Higher carload forecasts. Further detail on RLBA’s

Higher and Lower forecasts for each commodity can be

found in the following sections.

JA 36

2.3 Developing Higher and Lower Forecast

Volumes

The railroad industry is different from most other

industries in two major ways: 1) it requires a small

cost of materials relative to revenues earned to

produce its outputs; and 2) it also requires a high

capital investment relative to revenues. However,

once a railroad achieves a break-even level of freight

traffic, a surprisingly large percentage of incremental

revenue drops to the “bottom line” as traffic is added

and a railroad can become highly profitable when

measured against just about any metric except return

on invested capital. A common expression of this

phenomenon is that the railroad industry is said to

manifest extremely high operating leverage. As a

result, for a railroad to succeed, it must attract and

keep a significant volume of traffic on which it can

charge competitive rates. The need to achieve and

sustain a high volume of traffic and revenue is even

more critical in the case of a railroad such as that

investigated herein because the financial performance

of the Uinta Basin Railroad will be tested further by

the need to overcome the extremely high capital costs

that are a necessary element of a railroad being

constructed in excess of 126 miles.

As a consequence of the above, it is absolutely

essential that the SCIC be provided one or more traffic

volume and associated revenue forecasts in which it

can repose confidence. Through the course of the

study, RLBA determined there to be four significant

potential challenges to the achievement of the

projected volumes forecasted herein, including:

JA 37

1. Stability of the Future Price of Oil - The

World oil market has been anything but stable since

1973, and there is every reason to think that such

volatility might continue. The viability of the UBRR is

grounded on the assumption that oil markets will be

stable or favorable, which is a reasonable assumption

to make. However, a significant and long-term

downturn in the price of WTI, particularly in the early

years of the prospective railroad, could result in

significant shortfalls from the performance indicated

herein;

2. Barriers to Timely Construction of the

UBRR - There are risks that permits or financing associated with the UBRR might be denied or delayed

significantly, to the point that prospective Uinta Basin

rail shippers might seek alternative “take away”

capability or divert investment dollars to other

regions, thereby diverting or postponing volumes of

crude oil and other commodities which otherwise

might traverse the UBRR;

3. Reluctance to Commit - While the economics

of the UBRR may be promising, the region’s producers

might be reluctant or otherwise unable to make the

commitments necessary to secure financing, even if

such assurances are ultimately required to advance

the project and;

4. Unknown Demand - The demand for Uinta

Basin’s waxy crude, which is not well known outside

of Utah, in large part due to lack of transportation

infrastructure to ship product out of the Uinta Basin,

may not be as readily accepted as initial indications

would suggest. While there appear to be a large

number of refineries at least prospectively interested

JA 38

in Uinta Basin crude, additional work should be

undertaken to increase the likelihood that sufficient

demand will manifest itself by the time the UBRR is

about to be constructed. Ideally, that demand will

manifest itself not only in interest expressed by outof-state refineries that the Basin’s waxy crudes have

been modeled successfully by the refineries, but also

that the volumes desired are significant enough in

total to consume the supply side at pricing at or near

WTI taking into consideration the need to unload unit

trains at or nearby refineries to keep rail transport

costs to a minimum, and that arrangements already

have been or can be made to provide sufficient heating

to prevent the waxy crude from “setting up.”

In light of these challenges, to best define the

potential volumes, RLBA developed forecasts of the

carloads it believes are reasonable to assume would be

carried by the prospective railroad during the period

2022 through 2034 (and every year beyond) were it

built, managed and operated at a reasonable cost.

More specifically, RLBA developed “Lower” and

“Higher” forecasts in connection with crude oil and

seven other commodities it believes might be hauled

on that railroad in its early years.

A summary of estimated annual Higher and

Lower forecasts of various commodities is shown in

Table 2-2.

The carloads in the Higher forecast reflect

assumptions made by RLBA consistent with a theme

that decisions would be made that would result in

actions that would be favorable to the prospective

railroad’s viability. Primary among those favorable

assumptions is that Basin oil producers will be able

JA 39

and motivated to extract, and market conditions will

encourage the extraction of, no less 225,000 bpd on a

consistent basis if the railroad is built and operated as

presently envisioned. That threshold volume has been

articulated by several major oil producers in the Basin

even though it represents almost a tripling of recent

production volumes there. The application of those

assumptions results in a forecast of [redacted]

carloads over the prospective railroad in its first full

year, 2022, in the Higher case and carloads hauled by

that railroad in the Higher case in 2034 and beyond.

As a sensitivity test, RLBA also developed a Lower

case in which [redacted] carloads were forecast to be

carried in 2022 and [redacted] were assumed to be

hauled in 2034 and beyond.

Table 2-2

Estimated Annual Carloads

Originating/Terminating in Uinta Basin,

2022-2044

[redacted]

In both the Higher and Lower cases, railroad

volumes were assumed to ramp up in the early years

of the forecast, driven by increased production of crude

oil in the Basin and the inputs that enable same, as

well as greater and greater acceptance of the Basin’s

crudes at various refineries, primarily located in Gulf

Coast states. Similarly, and perhaps more

importantly, the viability of the prospective railroad is

extremely dependent upon and sensitive to

assumptions made about the ramp up rate and total

production of crude oil in the Basin. Not only is crude

oil by far the largest single commodity moved on the

prospective railroad, but frac sand and steel pipe

JA 40

movements into the Uinta Basin, supporting the

production of crude oil are obviously equally

dependent upon how much oil is extracted in the Basin

and are also significant contributors to the prospective

railroad’s viability.

2.4 Additional Study Contributions

To further assist in the study, the SCIC

contracted with Marc Eckels, an experienced oil and

gas consultant based in Park City, UT, to interview

representatives of select refineries primarily in the

Gulf Coast and discuss with them in detail, to the

extent possible, the prospective interest of those

refineries in the Basin’s oil. After interviewing in

person representatives of five companies operating

eleven refineries believed to be possible consumers of

Basin crudes, Mr. Eckels concluded that demand

exists today for at least somewhere between 320,000

and 340,000 bpd of Basin oil.

Several caveats should be taken into

consideration in digesting that forecast. First, and

most importantly, the work performed by Mr. Eckels

is not complete, as he was only able to meet with

officials representing eleven of the nineteen refineries

he originally targeted. It is the intent of Mr. Eckels to

make a good faith effort to complete interviews with

representatives of the remaining eight refineries. As

such, the results of this report are subject to change

pending the outcome of said interviews.

Map 4-1: Proposed National Destinations and

Routings for Uinta Basin Crude Oil

(see foldout on next page)

A REP OR T TO:

SE VEN COUN T Y IN FR ASTRUC TURE COALITION

JA40-a

USCA Case #22-1019

Map 4-1

Proposed National Destinations and Routings for Uinta Basin Crude Oil

ANACORTES, WA

(Marathon Petroleum)

PORTLAND, OR

(Interchange)

CHICAGO, IL

(Interchange)

CATTLESBURG, KY

(Marathon Petroleum)

SALT LAKE CITY, UT

(Existing Customers)

PRICE, UT

Document #1989949

CRAIG, CO

CUSHING, OK

(Crude Oil Distribution)

RIFLE, CO

MEMPHIS, TN

(Interchange)

SHREVEPORT, LA

(Calumet Specialty Products)

DEER PARK, TX

(Shell / Permex)

BATON ROUGE, LA

(Exxon Mobil)

GARYVILLE, LA

(Marathon Petroleum)

PASCAGOULA, MS

(Chevron)

NEW ORLEANS, LA

(Interchange)

GALVESTON BAY, TX

(Marathon)

PORT ARTHUR, TX

(Valero)

Filed: 03/13/2023

BAYTOWN, TX

(Exxon Mobil)

NORCO, LA

(Shell)

BNSF Railway

Union Pacific Railroad

Other Railroads

Origin

Destination

Interchange

0

100

200

300

600

SCALE OF MILES

Map not necessarily to scale, not all lines shown

PAGE 51

N

Page 450 of 615

CONVENT, LA

(Shell)

P REPARED BY:

THE R.L. BAN KS & ASSOCIATES, IN C. TEAM

JA 41

Eagle County Comments on Draft

Environmental Impact Statement Before the

Surface Transportation Board, STB Docket

No. FD 36284 (Feb. 12, 2021)

Introduction

The Board of County Commissioners of Eagle County

Colorado (“Eagle County”), a political subdivision of

the State of Colorado, hereby submits the following

comments in response to the Uinta Basin Railway

Draft Environmental Impact Statement (“DEIS”),

issued by the Surface Transportation Board’s (“STB”

or “Board”) Office of Environmental Analysis (“OEA”)

on October 30, 2020, in Seven County Infrastructure

Coalition—Construction and Operation—in Utah,

Carbon, Duchesne, and Uintah Counties, Utah,

Finance Docket No. FD 36284. Chaffee County, Lake

County, the Town of Buena Vista, the City of Salida,

and Eagle River Watershed Council have authorized

Eagle County to represent that they each adopt and

join in these comments.

In accordance with the National Environmental

Policy Act of 1969 (“NEPA”), the OEA has prepared

the DEIS in order to evaluate the environmental

impacts of a proposal submitted by the Seven County

Infrastructure Coalition (“Coalition”) to construct an

approximately 85-mile rail line connecting the Uinta

Basin in Utah to the national rail network (“Uinta

Basin Railway” or “Project”), primarily for the

purposes of shipping crude oil produced in the Uinta

Basin to markets elsewhere, and its alternatives. As

one of the jurisdictions through which the DEIS

projects an overwhelming majority of the shipments of

crude oil are projected to pass, and whose communities

JA 42

are accordingly likely to bear potentially far-reaching

impacts, Eagle County is a key stakeholder in the

outcome of the Project and an important voice in this

environmental review process. As such, Eagle County

urges the OBA to address serious flaws in the DEIS,

including most importantly the lack of consideration

of a proposal to offer new service on a 163.1 mile long

connecting line between Parkdale, Colorado, and a

location known as Sage, near Dotsero, Colorado,

known as the Tennessee Pass Line (Colorado, Midland

and Pacific Railway Co. (“CMP”), Verified Notice-Lease

and Operation Exemption Containing Interchange

Commitment-Union Pacific R.R. Co., STB Docket No.

36471 (Filed December 31, 2020) (the “CMP Notice of

Exemption”)), as well as failures to adequately state

the Project’s purpose and need, consider downline

impacts and reasonable alternatives, evaluate

environmental impacts, or propose mitigation

measures. Because CMP filed its Notice of Exemption

after the STB issued the DEIS, this Board must, at a

minimum, publish a supplement to the DEIS to

address the potential effects of the Project on the

Tennessee Pass Line.

I.

Factual and Procedural Background

Eagle County, CO, is one of several western

Colorado counties through which the vast majority of

shipments resulting from the Project are anticipated

to pass via a line owned by the Union Pacific Railroad

Company (“UP”) known as the Central Corridor. See

DEIS at 2-1; 3.1-13; Colorado Department of

Transportation, Colorado Freight and Passenger Rail

Plain, 22, 50 (2018) (“Colorado State Rail Plan”),

available

at:

https://www.codot.gov/programs/

JA 43

transitandrail/plans-studies-reports/statewidetransit

plan/2018-colorado-freight-and-passenger-railplan.pdf. The Central Corridor is the only regularly

used rail line to cross the Colorado Rocky Mountains,

via a route that is known as the Moffat Tunnel

Subdivision, and is therefore an important route for

UP and BNSF Railway (“BNSF”), which has operating

rights over the Central Corridor. Colorado State Rail

Plan at 22. The Central Corridor also is used to serve

Amtrak’s California Zephyr daily passenger service as

well as seasonal ski train passenger service between

Denver and Winter Park, Colorado. Colorado State

Rail Plan at 21.

Eagle County, CO, is also the county in which the

Tennessee Pass Line, the only east-west rail

alternative in Colorado to the Moffat Tunnel

Subdivision, connects to the Central Corridor near the

community of Dotsero on the western border of the

County. The Tennessee Pass Line is owned by UP and

has not been abandoned, although it has not seen

freight service in over 20 years. Colorado State Rail

Plan at 50. The Tennessee Pass Line runs through the

Eagle River Valley alongside a portion of the I-70

Corridor, which is home to a number of burgeoning

communities that have developed substantially over

the past few decades, with future growth anticipated.

Colorado Department of Transportation, I-70

Mountain

Corridor

Final

Programmatic

Environmental Impact Statement 1-14 to 1-15 (2011),

available at: https://www.codot.gov/projects/i-70-oldmountaincorridor/final-peis/final-peis-filedownload.html. The alpine character of the area, with

stunning vistas and rugged terrain, also creates

challenges in the operation and maintenance of

JA 44

transportation infrastructure. Id. at 1-1. On its

eastern end the Tennessee Pass Line joins BNSF/UP

mainlines at Pueblo, CO.

On October 30, 2020, OEA issued the DEIS for the

Project, which is a proposal to construct an

approximately 85-mile long rail line connecting two

tennini in the Uinta Basin near South Myton Bench,

Utah, and Leland Bench, Utah to the national rail

network via an existing line at Kyune, Utah. DEIS at

1-1. The Project has been submitted for STB review by

the Coalition, an independent political subdivision of

the State of Utah composed of member counties

Carbon, Daggett, Duchesne, Emery, San Juan, Sevier,

and Uintah Counties. DEIS at S-2. The Coalition does

not propose to operate the Uinta Basin Railway itself,

but rather intends to contract with an existing rail

carrier, the Rio Grande Pacific Corporation (“RGPC”),

to provide common carrier rail service. DEIS at S-2, 11. The stated purpose of the Project is “to provide

common carrier rail service connecting the Basin to

the interstate common carrier rail network using a

route that would provide shippers with a viable

alternative to trucking.” DEIS at 1-3.

On December 9, 2020, in response to requests

from a number of parties for extension of the comment

period, the STB extended the initial 45-day public

comment period for the DEIS, originally requiring

submissions due by December 14, 2020, to January 28,

2021. Notice, Docket No. FD 36284 (Service Date Dec.

9, 2020). In light of the December 31, 2020, filings by

RGPC and its subsidiary and the apparent

connections between the Uinta Basin Railway and the

proposed operations on the Tennessee Pass Line,

JA 45

described further below, Eagle County filed a Motion

for Extension of Time and Petition for Reconsideration

of the STB’s regulatory process for the Uinta Basin

Railway proposal on January 25, 2020. The Board

further extended the deadline for comment to

February 12, 2021, in response to Eagle County’s

request. Notice, Docket No. FD 36284 (Service Date

January 28, 2021).

On December 31, 2020, CMP, a wholly-owned

subsidiary of the RGPC, submitted a Notice of

Exemption announcing that CMP would be entering

into a lease with UP for the majority of the Tennessee

Pass rail line between Parkdale and Sage, Colorado,

and that it had filed for common carrier authority to

operate. Verified Notice of Exemption, Rio Grande

Pacific Corp.—Continuance in Control Exemption—

Colorado, Midland & Pacific Ry. Co., STB Docket No.

FD 36470 (filed Dec. 31, 2020) (the “RGP Notice of

Exemption”);·see also the CMP Notice. In its press

release announcing the lease with UP, CMP stated

that it intended to explore development opportunities

for freight rail services originating or terminating on

the Tennessee Pass Line.1

II. Legal Background

NEPA is “our basic national charter for protection

of the environment.” Barnes v. U.S. Dep’t of Transp.,

655 F.3d 1124, 1131 (quoting former 40 C.F.R.

1 See https://rgpc.com/wp-content/uploads/2021/01/TN-Pass-

press-release-final-CMP.pdf.

JA 46

§ 1500.1(a) (2019)).2 NEPA is intended to ensure that

Federal agencies consider the environmental impacts

of their actions in the decision-making process

concerning proposed federal actions. “For any

proposed major federal action ... NEPA requires the

agency to prepare an [EIS].” Lands Council v. Powell,

395 F.3d 1019, 1026 (9th Cir. 2004). An EIS must

provide “full and fair discussion of significant

environmental impacts and [] inform decision makers

and the public of reasonable alternatives that would

avoid or minimize adverse impacts or enhance the

quality of the human environment.” 40 C.F.R. § 1502.l

(2020). Specifically, an EIS must include details on the

environmental impact of a proposed action, any

adverse environmental effects which cannot be

avoided should the proposal be implemented, and

alternatives to the proposed action. 42 U.S.C.

§ 4332(2)(C)(i)-(iii). Environmental impacts that must

be covered in an EIS include reasonably foreseeable

environmental trends and planned actions in the area.

49 C.F.R. § 1502.15. Reasonably foreseeable impacts

are those that are “sufficiently likely to occur that a

person of ordinary prudence would take it into account

in reaching a decision.” Mid States Coalition for

Progress v. STB, 345 F.3d 520, 549 (8th Cir. 2003). The

fact that the specifics of a reasonably foreseeable

impact are not known with precision does not mean

that they may be ignored when the nature of the effect

is reasonably foreseeable. Id. 345 F.3d at 549-50.

As discussed in this section, new NEPA regulations were

promulgated in 2020. Hereinafter, where a NEPA regulation is

not dated or is dated 2020, it refers to the current regulations.

2

JA 47

A. Council on Environmental

NEPA Regulations

Quality

The Council on Environmental Quality (“CEQ”)

first promulgated regulations governing the

implementation of NEPA in 1978. See 40 C.F.R.

§§ 1500-1508. In July 2020, the CEQ adopted

comprehensive revisions to these regulations. 85 Fed.

Reg. 43,304 (July 16, 2020). On January 20, 2021,

President Biden signed Executive Order 13990,

“Protecting Public Health and the Environment and

Restoring Science to Tackle the Climate Crisis.” 86

Fed. Reg. 7037 (Jan. 25, 2021). Simultaneously,

President Biden announced a list of agency actions

that heads of agencies would review in accordance

with Executive Order 13990, which included, inter

alia, CEQ’s July 2020 NEPA regulations.3

While the relevant portions of CEQ’s July 2020

NEPA regulations do not conflict with its NEPA

regulations that preceded those revisions, i.e. it is

possible for the STB to comply with both versions, we

note that the July 2020 regulations appear to be

narrower in some respects. Given the uncertainty

around the status of CEQ’s current interpretation of

NEPA, we urge OEA to ensure that the DEIS

comports with both the pre-2020 NEPA regulations

and those NEPA regulations adopted in July 2020.

Inasmuch as CEQ’s pre-2020 NEPA regulations were

based upon and implemented statute, and inasmuch

as federal court decisions interpreting those

regulations were also grounded in statute, they are

See https://web.archive.org/web/20210120151809/https:/build

backbetter.gov/press-releases/fact-sheet-list-of-agency-actionsfor-review/

3

JA 48

still good law and should guide OEA’s preparation of

the EIS for the Uinta Basin Railway.

B. STB’s NEPA Regulations

The STB has also adopted its own regulations

governing how NEPA applies to railroad construction

projects. 49 C.F.R. Part 1105. Under these

regulations, the OEA generally prepares an EIS for

new railroad construction proposals. 49 C.F.R.

§ 1105.6(a). The STB invites public comment on the

scope of the environmental review and on the DEIS.

49 C.F.R. § 1105.l0(a). The FEIS should discuss the

comments received on the DEIS and note any changes

made in response to them. Id. When determining

whether to authorize a construction project, the STB

considers the environmental record, which includes

the FEIS and any comments and responses concerning

environmental issues. Id. § 1105.l0(f).

III. Comments

A. The Federal Railroad Administration

and Pipeline and Hazardous Materials

Safety

Administration

Must

Be

Cooperating Agencies.

Under NEPA, a “cooperating agency” means any

Federal agency, other than a lead agency, that has

jurisdiction by law or special expertise with respect to

any environmental impact involved in a proposed

project or project alternative.” 40 C.F.R. § 1508.5. The

lead agency is required to “[ r]equest the participation

of each cooperating agency in the NEPA process at the

earliest possible time.” 40 C.F.R. § 1501.6(a)(1). An

agency may also request the lead agency to designate

it a cooperating agency. Id. § 1501.6. In this instance,

the knowledge arising from the Federal Railroad

JA 49

Administration’s (“FRA”) general rail safety expertise

and the Pipeline and Hazardous Materials Safety

Administration’s (“PHMSA”) regulation of hazardous

materials shipments is essential to a thorough

analysis of potential risks and anticipated impacts in

connection with the Project.

Between 1992 and 1998, the Central Corridor was

among the locations in Utah and Colorado that

experienced seven derailments that caused releases of

diesel fuel, taconite, and sulfuric acid into rivers

adjacent to the railroad serious enough to trigger

enforcement of the Clean Water Act.4 UP entered into

a consent decree with the U.S. Department of Justice

in 2000 that required the railroad to pay $800,000 in

fines and institute a number of operating safety

measures, including the “implementation of a

comprehensive rock fall hazard mitigation project”.5

Given the history of wrecks and spills in the

Central Corridor, the proposed shipment of crude oil

from the Project presents elevated risks and potential

impacts to communities along the line in the event of

a derailment or other accident. The DEIS identifies

the potential for 40% increased risk of rail-related

accidents along UP’ s Central Corridor. DEIS at 3.2-6.

In a 2018 report to Congress comparing the shipment

of crude oil by rail, truck, and pipeline, PHMSA noted

that the safety record of crude oil shipments by rail

between 2007 and 2016 was highly variable, with rail

4 U.S. Dept. of Justice, Press Release, June 8, 2000, available at:

https://www.justice.gov/archive/opa/pr/2000/June/328enrd.htm.

5 U.S. v. Southern Pac. Transp. Co., Notice of Lodging of Consent

Decree Under the Sections 309(b) and 311(b) of the Clean Water

Act, 65 Fed. Reg. 38,574 (Dep’t of Justice, June 21, 2000).

JA 50

in some years involving almost 900% more crude oil

spills than either pipeline or truck shipments.6

PHMSA noted that variability of rail’s safety record

for crude oil spills was driven by “high-impact

incidents.”7 In other words, when things go wrong

with shipments of crude oil by rail, they go

dramatically wrong. Accordingly, the Project does not

consist solely of the construction of rail facilities and

generalized operations, but expressly involves the

shipment of a commodity whose handling is governed

by a specific and specialized regulatory regime.8

The expertise of these sister U.S. Department of

Transportation agencies will aid in the thorough

evaluation of risks and potential impacts of the Project

and will not be duplicative or redundant with the

STB’s role as lead agency. For instance, “Congress

vested the FRA with primary authority over national

rail safety policy and assigned the [Surface

Transportation Board] the duty to ... [assess]

individual railway proposals subject to its authority.”

Tyrrell v. Norfolk S. Ry. Co., 248 F.3d 517,523 (6th Cir.

2001). Although the DEIS reflects that OEA “sent

consultation letters to agencies soliciting their input,

comments, ideas, and concerns” of a generic nature

(DEIS at 5-2), Table 5.1 of the DEIS lists FRA, but not

PHMSA, among the agencies contacted, and does not

reflect the affirmative outreach to those two agencies

6 PHMSA,

Report to Congress—Shipping Crude Oil by Truck,

Rail and Pipeline (March 19, 2019), at 7, Fig. 3. Available at:

https://www.plm1sa.dot.gov/news/report-congress-shippingcrude-oil-truck-rail-and-pipeline,

7 Id.

8 49 C.F R. part 174.

JA 51

as their respective expertise would demand in

accordance with the CEQ regulations.

B. The Project’s DEIS Fails To Consider

New Proposed Operation Over the Tennessee

Pass Line, Either As a Connected Action or In Its

Downline Impact Analysis

CMP’s recent Notice of Exemption to conduct

freight service on the Tennessee Pass Line in Colorado

demonstrates that the proposal to provide new service

on the Tennessee Pass Line and the Uinta Basin

Railway are connected actions, and they must be

analyzed together in a Supplemental DEIS. Despite

the assertions of CMP’s parent, RGP, that it does not

currently plan to ship crude oil over the Tennessee

Pass Line (Seven County Infrastructure Coalition,

Comment, STB Docket No. FD 36284—STB OEA

Document Number EI-27080 (Filed January 26, 2021),

Verified Statement of Mark W. Hemphill), the

Coalition also observes in that filing that the

Tennessee Pass Line has not been abandoned, and

therefore remains part of the national freight rail

network. The Coalition does not rule out what future

operations CMP may conduct on the Tennessee Pass

Line.

According to the DEIS, if the STB authorizes the

proposed construction and operation of the Uinta

Basin Railway, RGPC would operate and maintain the

line. DEIS at 2-L Further, OEA states that RGPC is

intended to be included when the DEIS refers to the

Coalition. DEIS at 1-1 n. 1, 2-1 n. 1. Accordingly,

RGPC is the party that will be subject to a common

carrier obligation and is effectively an applicant in this

proceeding.

JA 52

On December 31, 2020, RGPC announced that its

wholly owned subsidiary, CMP, had entered into a

lease with Union Pacific Railroad for the majority of

the Tennessee Pass Line between Parkdale and Sage,

Colorado, and that it had filed for common-carrier

authority to operate with the STB. RGP Notice of

Exemption. In its press release announcing the lease

with UP, CMP stated that it intended to explore

development opportunities for freight rail services

originating or terminating on the Tennessee Pass

Line.9 While the same release states that RGPC had

no plans to carry crude oil from Utah over the

Tem1essee Pass Line, it appears this was included

only to address speculation and community concern;

nothing in the RGPC Notice of Exemption or CMP

Notice of Exemption precludes transport of oil and, as

a common carrier, RGPC would be required to provide

rail service to any shipper upon reasonable request.

1.

The proposal to reinstitute freight

rail service on the Tennessee Pass

Line is a federal action that must be

considered connected and evaluated

together with the Project for the

purposes of NEPA

The Tennessee Pass rail line is connected to the

Uinta Basin Railway for the purposes of NEPA

analysis. CEQ regulations provide that an agency

must consider connected actions in determining the

scope and significance of a federal action. 40 C.F.R.

§§ 1501.3(b), 1501.9(e)(1). Actions are connected if

See https://rgpc.com/wp-content/uploads/2021/01/TN-Passpress-release-final-CMP.pdf.

9

JA 53

they are “closely related,” 40 C.F.R. § 1501.9(e)(1).

CMP is a wholly owned subsidiary of RGPC, a real

party in interest in the instant STB proceeding, and a

physical connection between the Uinta Basin Railway

line and the Tennessee Pass line in Colorado could be

readily established. Moreover, the Tennessee Pass

line would connect the Project line with the most likely

markets for the crude oil that is expected to be

transported from the Uinta Basin, and would serve as

an alternative route to the line that has been

identified as likely to be used for the vast majority of

daily shipments expected to result from the Project.

The Uinta Basin Railway and the Tennessee Pass line

are interrelated parts of a larger action—a rail

network in Utah and Colorado for the transport of

freight -- and they depend on this larger action for

their justification. Id. § 1501.9(e)(1)(iii).

CMP’s lease with UP and related STB proceeding

to transpo1t freight over the Tennessee Pass Line

represent fundamental changes in the scope of the

“project” to be analyzed in the Uinta Basin Railway

EIS. The introduction of freight service on the

Tennessee Pass Line—including, potentially, oil from

the Uinta Basin—presents a significant new

circumstance that raises new environmental concerns

about the impacts of the Uinta Basin Railway.

Transport of crude oil over the remote, steep, winding,

and mountainous Tennessee Pass Line would

introduce risks associated with accidents, including

spills or releases in or near sensitive areas such as a

river, wetland, important wildlife habitat area, or

recreational sites.

JA 54

In such circumstances, OEA must prepare a

Supplemental DEIS. The duty to prepare a

Supplemental DEIS is based on the need to facilitate

informed decision making. S. Utah Wilderness

Alliance v. Norton, 301 F. 3d 1217, 1238 (10th Cir.

2002), rev’d on other grounds and remanded, 542 U.S.

55 (2004). A supplement is required where there are

“significant new circumstances or information

relevant to environmental concerns and bearing on

the proposed action or its impacts.” 40 C.F.R.

§ 1502.9(d)(1)(ii).10

While failure to issue a supplemental EIS is not

unlawful if the relevant environmental impacts have

already been considered in the NEPA process, Friends

of Marolt Park v. U.S. Dept. of Transp., 382 F.3d 1088,

1097 (10th Cir. 2004), that is not the case here. The

DEIS for the Project considers downline impacts in

Colorado only in the Moffat Tunnel Subdivision, and

the Tennessee Pass Line is not mentioned at all.

Indeed, the Tennessee Pass Line could conceivably

serve as an alternative to the UP’s Moffat Tunnel

Subdivision to Denver, which under the DEIS is

currently expected to carry the vast majority of

increased rail traffic caused by the Project. See the

10 STB’s regulations implementing NEPA provide that an EIS

“may be supplemented” in the face of significant new and

relevant information, see 49 C.F.R. § 1510(a)(5), whereas CEQ’s

regulations make supplementation mandatory in circumstances

where there is significant new information relevant to

environmental concerns. Compare 49 C.F.R. § 1510(a)(5) with 40

C.F.R. § 1502.9(d)(1)(ii). Where an agency’s regulations conflict

with NEPA and the implementing regulations promulgated by

the CEQ, CEQ’s regulations are controlling. Sierra Club v. US.

Dept. of Agriculture, 777 F. Supp. 2d 44, 68 (D.D.C. 2011).

JA 55

Map attached as Exhibit A to these Comments,

showing the relationship between the Project, the

Tennessee Pass Line, the connection both lines share

to the UP Central Corridor, and the surrounding

freight rail network. Consideration of the Tennessee

Pass Line proposal in conjunction with the Uinta

Basin Railway is necessary to prevent OEA from

conducting piecemeal environmental reviews that will

not result in an understanding of the full impacts of

the rail system additions being contemplated. See, e.g.,

W Chi. V United States Nuclear Regulatory Com., 701

F.2d 632, 650 (7th Cir. 1983) (“piecemealing” allows

an agency to evade NEPA requirements “by

segmenting an overall plan into smaller parts

involving action with less significant environmental

effects”). This is contrary to the intent of NEPA to

provide a comprehensive, full, understanding of a

proposal’s impact prior to approving a project. See,

e.g., Citizens Comm. To Save Our Canyons v. United

Stales Forest Serv., 297 F.3d 1012, 1028 (10th Cir.

2002) (“One of the primary reasons for requiring an

agency to evaluate connected actions in a single EIS is

to prevent agencies from minimizing the potential

environmental consequences of a proposed action (and

thus short-circuiting NEPA review) by segmenting or

isolating an individual action that, by itself, may not

have a significant environmental impact.”).

Accordingly, OEA must prepare a Supplemental

DEIS that analyzes the impacts of reintroducing

service on the Tennessee Pass line along with the

other impacts of the Uinta Basin Railway identified in

the DEIS.

JA 56

2.

Even if not a connected action,

opening of the Tennessee Pass Line

must be considered as part of the

downline impacts of the Project

Even if the introduction of new service along the

Tennessee Pass Line did not constitute a “connected

action,” it would nevertheless need to be considered in

the downline impact analysis. The DEIS defines the

“downline study area” as “segments of existing rail

lines outside of the Uinta Basin that could experience

an increase in rail traffic above OEA’s thresholds at 49

C.F.R. § 1105.7(e)(5) if the proposed rail line were

constructed.” DEIS at 3.2-1.

As discussed above, the OBA analyzed potential

markets and rail routes in order to identify rail lines

over which downline impacts should be assessed. This

assessment did not anticipate the introduction of new

service over the Tennessee Pass Line, although it has

not been abandoned. However, RGPR’s and CMP’s

recent filings regarding renewed operations over the

Tennessee Pass Line, combined with the strategic

connection that the Tennessee Pass Line makes

between the Project and the most likely markets for

Uinta Basin-sourced crude oil, make consideration of

the downline impacts to the area and communities

adjacent to the Tennessee Pass Line necessary in

order to consider all reasonably foreseeable impacts

caused by the Project.

The need to evaluate impacts is particularly the

important here given the general absence of service

along this line for more than 20 years, the growth of

development in the area that may increase the

severity of safety risks and impacts, and the often-

JA 57

difficult access and challenging terrain of the route.

The Board’s environmental regulations at 49 C.F.R.

§ 1105.7(e)(3) require the assessment of impacts a

project may have on land use patterns in affected

communities, including:

(i) Based on consultation with local and/or

regional planning agencies and/or a review of

the official planning documents prepared by

such agencies, state whether the proposed

action is consistent with existing land use

plans. Describe any inconsistencies.

(ii) Based on consultation with the U.S. Soil

Conservation Service, state the effect of the

proposed action on any prime agricultural land.

The terrain through which the Tennessee Pass

Line travels is characterized by rangelands and a

narrow mountain river valley. Communities along the

line have experienced significant development since

the line was last active in the mid-l 990s and many are

laid out longitudinally in parallel with the river and

rail line because of the topographic limitations

imposed by steep canyon sides. Examples of

development that a Supplemental DEIS must take

into account include:

•

The Town of Minturn has developed and is

expanding a significant network of trails. See

the Town of Minturn 2009 Community Plan at

21-22,

available

at:

https://www.mintum.org/sites/g/files/vyhlif348

6/f/uploads/2009communityplan.pdf

•

The rail line runs through the downtown Avon,

which has been developed as a pedestrian and

bicycle zone that is a significant focus of

JA 58

resident and visitor activity. See the Town of

Avon’s

website

at:

https://www.avon.org/2038/Free-Spaces-toExplore.

•

The Town of Buena Vista is bisected by the rail

line, and any slow or stopped trains that block

at-grade crossings would hamper emergency

response.

•

In general, the re-introduction of freight rail

service will drive additional expense and

impose the administrative burden on

municipalities

of

training

local

first

responders to address rail-related accidents

and incidents.

C. The DEIS’s Existing Downline Impact

Analysis Is Insufficient

Among other requirements for environmental

reporting, the STB’s environmental regulations

require rail construction proposals to “ [d]escribe the

effects, including indirect or downline impacts, of the

new or diverted traffic over the line if the thresholds

governing energy, noise and air impacts in

§§ l105.7(e)(4), (5), or (6) are met.” 49 C.F.R.

§ 1105.7(e)(11)(v).

The threshold for energy according to 49 C.F.R.

§ l105.7(e)(4) is: “If the proposed action will cause

diversions from rail to motor carriage of more than:

(A) 1,000 rail carloads a year; or (B) An average of 50

rail carloads per mile per year for any part of the

affected line, quantify the resulting net change in

energy consumption and show the data and

methodology used to arrive at the figure given.” Id.

§ 1105.7(e)(4)(iv).

JA 59

The threshold for air according to § l105.7(e)(5) is

(as is relevant here):

•

“If the proposed action will result in ... [a]n

increase in rail traffic of at least 100 percent

(measured in gross ton miles annually) or an

increase of at least eight trains a day on any

segment of the rail line affected by the

proposal,” Id. § 1105.7(e)(5)(i); or

•

“If the proposed action affects a class I or

nonattainment area under the Clean Air Act,

and will result in , ... [a]n increase in rail traffic

of at least 50 percent (measured in gross ton

miles annually) or an increase of at least three

trains a day on any segment of rail line.” Id.

§ 1105.7(e)(5)(ii).

•

However, these regulations also provide that for

new construction of a line or reinstitution of

service over a previously abandoned line, only

the train car threshold (not the percentage

threshold) applies. Id. §§ 1105.7(e)(5)(i)(C),

1105.7(e)(5)(ii)(C).

The threshold for noise according to § 1105.7(e)(6)

is: “If any of the thresholds identified in

[§ 1105.7(e)(5)(i), i.e. the air quality threshold] are

surpassed, state whether the proposed action will

cause (i) An incremental increase in noise levels of

three decibels Ldn or more; or (ii) An increase to a

noise level of 65 decibels Ldn or greater.”

§ 1105.7(e)(6).

The DEIS states that “to assess the potential

impacts of increased rail traffic on main lines outside

of the immediate Project area, OEA defined a

downline study area that extends from the proposed

JA 60

connection near Kyune to the northern, eastern, and

southern edges of the Denver Metro/North Front

Range air quality nonattainment area.” DEIS at S-11.

For the downline study area, the DEIS identifies that

“[t]he impacts from the additional traffic on these

main lines could include air quality impacts associated

with locomotive exhaust, increased wayside noise,

increased risk of accidents at at-grade road crossings,

and increased vehicular delay at road crossings.” Id.

However, in the DEIS the OEA states that it “does not

expect that downline impacts would be significant.”

Id. The downline study area, based expressly on the

threshold levels in 49 C.F.R. § 1105.7(e)(5), were

applied in the DEIS to analyze downline impacts

related to roadway vehicle safety and delay (DEIS at

3.1.-1 to 3.1-2), and rail operations safety (DEIS at 3.21), in addition to air quality (DEIS at 3.7-3).

Appendix C to the DEIS provides how the OEA

identified the study area for its downline impact

analysis. Appendix C first notes the STB’s

environmental regulations provided at § 1105.7(e) and

provides that OEA determined that the eight- and

three-train thresholds for air impacts and the noise

thresholds in § 1105.7(e)(6) were applicable to the

Project. The OEA further provides that, “[b]ased on its

experience applying the thresholds for air and noise

on freight rail construction and operation projects,

OEA has determined that these thresholds should also

apply to freight rail safety and grade-crossing safety

and delay.” DEIS App. C, at C-1. In determining which

potential downline routes might be affected, and

therefore must be analyzed, Appendix C provides that:

JA 61

There are many factors that determine

possible destinations for loaded crude oil

trains originating in the Basin and the routes

those trains could take within the national

(downline) freight rail network to reach those

destinations. The possible destinations and

routes then determine where the estimated

increase in rail traffic could warrant analysis

based on the Board’s thresholds. OEA

determined the downline study area by first

considering the likely destinations for crude

oil that would be transported by the proposed

rail line. OEA then considered potential

routing to those destinations and where the

estimated project-related rail traffic would

exceed the analysis thresholds.

After analyzing the feasibility and market

dynamics of a number of refineries with actual or

potential rail connections between them and the Uinta

Basin Railway, OEA concluded that “a reasonable

estimated distribution of destinations for Uinta Basinsourced crude oil transported on the proposed rail line

would be 50 percent to Houston/Port Arthur, 35

percent to Louisiana Gulf Coast, 10 percent to Puget

Sound, and 5 percent to P ADD 2 refineries in Kansas

and Oklahoma.” DEIS App. C, at C-3 to C-4.

The OEA then estimated the most likely routing

between the Uinta Basin and these destinations on UP

and BNSF Railway lines using a routing program and

calculated the number of additional trains per day

expected on each route for both low and high

estimates. DEIS App. C, at C-4. It concluded that the

overwhelming majority of rail traffic from Kyune to

JA 62

Denver would travel along UP’s Central Corridor via

the Moffat Tunnel Subdivision, and that the

regulatory threshold for air quality would be exceeded

along this route and within the metropolitan Denver

area. DEIS App. C, at C-5 to C-6.11 Furthermore, for

Uinta Basin-related traffic from Denver to

Houston/Port Arthur and Louisiana, the high traffic

scenario exceeded three trains a day, and nearly met

the three train threshold for the low rail traffic

scenario. DEIS App. C Table C-4, at C-5. In fact, OEA

calculated that the total average trains per day

reaching Houston/Port Arthur in the high traffic

scenario would be 5.26 trains, and likewise the

average daily trains for the Louisiana destination

under the high traffic scenario would be 3.68 trains,

both above the three-train threshold. Id.

The OEA states that because Denver is a

nonattainment area (i.e. the three train threshold

applies there), and because of uncertainty associated

with the estimated distribution of rail traffic out of

Denver, it set the downline study area for the Project

as the boundaries of the Denver Metro/North Front

Range air quality nonattainment area. DEIS App. C,

at C-5.

11 The DEIS does not expressly identify the route as the Central

Corridor or the Moffat Tunnel Subdivision, but the map on page

C-6 of Appendix C and the OEA’s description reflects this.

JA 63

1.

The downline impact analysis

inappropriately omits consideration

of other hazardous or dangerous

commodities and of the uniquely

hazardous character of crude oil

shipments

In addition to conventional crude oil, the Coalition

admits that other commodities, including natural gas

and coal, may also be shipped over the constructed rail

line to other markets. DEIS at 2-1. Indeed, in addition

to some of the largest oil shale deposits in the world,

the Uinta Basin is also home to some of the largest

natural gas fields in Utah, as well as marginal coal

deposits. See Michael D Vanden Berg, Utah’s Energy

Landscape, Circular 121, Utah Geological Survey,

Utah

Department

of

Natural

Resources,

16,

29,

34

(2016),

available

at:

https://ugspub.nr.utah.gov/publications/circular/c121.pdf.

However,

although

shipment

of

these

commodities is expressly contemplated, the DEIS

analysis of downline impacts focuses exclusively on oil

shipments, based on the assertions of the Coalition

that the primary commodity expected to be

transp01ied over the constructed rail lines will be

crude oil. DEIS at 2-1; App. C, at C-1. Accordingly,

expected shipping routes for crude oil have informed

the downline study area, excluding routes that are

likely to serve markets for other commodities,

including oil shale, natural gas, coal, and other

mineral deposits. Id. For instance, the OEA’s analysis

eliminated westward routes from consideration under

its downline impact analysis due to its market

JA 64

analysis for crude oil, even though West Coast ports

may very well serve as the logical rail destination for

expanding

international

markets

for

other

commodities such as natural gas.

Many of the additional non-oil commodities that

are explicitly identified as potentially transported

have particular impacts that cannot be properly

assessed by merely looking at the shipment of oil. To

take but two examples, the unique and dangerous

aspects of coal (e.g. impacts of fugitive coal dust and

combustion) and natural gas (e.g. vaporization and

flammability) require specific consideration. See

PHMSA, Risk Assessment of Surface Transport of

Liquid

Natural

Gas,

Final

Report,

92

(March

20,

2019),

available

at:

https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/

docs/research-anddevelopment/hazmat/reports/7l651

/fr2-phmsa-hmtrns16-oncall-20mar20l9-v3.pdf

(noting the particular difficulty in cleaning up an LNG

incident); Robert. Kotchenruther, Fugitive Dust .from

Coal Trains. Factors Effecting Emissions &

Estimating PM2. 5, EPA Region 10, NW-AIRQUEST

(2013).

Changing market factors and transportation

dynamics, as well as the effects of induced demand,

discussed below at Section III.E, suggest that even if

current expected volumes of non-oil shipments are

low, they may not remain that way. This is

particularly so considering the significance of

resources in the Uinta Basin and the long-term

presence and operability of rail infrastructure.

Yet no explanation is provided for why the

impacts from shipment of these other commodities,

JA 65

which are clearly reasonably foreseeable, are not or

should not be considered in assessing downline

impacts. The complete reliance on oil shipments in

considering downline impacts reflects the same sort of

shortcut analysis used in applying air quality

standards to rail safety impacts, discussed further

below at III.C.2.

2.

The threshold for assessing air

quality issues is inadequate to

analyze safety issues particular to

shipping oil

The OEA states that “[b]ased on its experience

applying the thresholds for air and noise on freight

rail construction and operation projects, OEA has

determined that these thresholds should also apply to

freight rail and safety and grade-crossing safety and

delay.” DEIS App. C, at C-1. Unless OEA “describes

its basis for applying the standard under which it has

arrived at this conclusion, supported by plausible

explanation,” there is no basis for determining

whether the decision is arbitrary, capricious, an abuse

of discretion, or otherwise not in accordance with the

law. See Ober v. Whitman, 243 F.3d 1190, 1195 (9th

Cir. 2001). A review of STB decisions indicates no

explanation of why OEA could use the threshold for

air for freight rail and safety and grade-crossing safety

and delay.

Even if OBA may have applied these thresholds

for safety-related issues in other cases, simply relying

on prior use is not sufficient because “[e]ach project is

different, and the agency is required to rationally

explain its decision in the context of project-specific

effects.” Northern Plains Resource Council, Inc. v.

JA 66

Surface Transp. Bd., 668 F.3d 1067, 1078 (9th Cir.

2011). The particularly hazardous nature of crude oil

makes air quality standards inadequate for analyzing

the safety issues presented by these trains throughout

their trip from the Uinta Basin to their likely

destinations,

including

Houston/Port

Arthur,

Louisiana, Puget Sound, Kansas, and Oklahoma.

DEIS App. C, at C-3 to C-4. As the Congressional

Research Service recently noted, “[u]nit trains of crude

oil concentrate a large amount of potentially

environmentally harmful and flammable material,

increasing the probability that, should an accident

occur, large fires and explosions could result.” John

Frattelli et al., US. Rail Transportation of Crude Oil:

Background and Issues for Congress, Congressional

Research Service, 12 (2014), available at:

https://fas.org/sgp/crs/misc/R43390.pdf. The risks

involved with crude oil accidents are arguably less

about volume of oil and more about where a spill

occurs; a spill near a sensitive ecosystem, such as a

river, will have a greater impact and cost more to clean

up than a larger spill in a less sensitive area. Id. at.

11.

OBA attempts to downplay the downline safety

risks of the Project by focusing on the “waxy” semisolid

character of Uinta Basin crude oil at room

temperatures, which makes it potentially easier to

contain event of a spill. DEIS at 3.3-29. However

“cleanup friendly” it may be compared to other crude

oils, waxy crude remains a highly flammable

commodity

whose

dangers

should

not

be

underestimated or considered through the rubric of an

air quality standard. Furthermore, waxy crude

presents its own unique logistical challenges and

JA 67

impacts, including, for instance, the need to heat it at

various stages to enhance its fluidity.

Accordingly, it is therefore in error to use air

quality limits completely unconnected to the risks

associated with waxy crude oil to establish the

standard for evaluating the downline impacts

envisioned under the Project.

3.

The OEA incorrectly limits analysis

to contiguous rail segments where

an applicable regulatory threshold

is reached rather than to anticipated

routes serving a project that has

reached the applicable regulatory

threshold(s)

OEA does not explain why it does not consider all

downline impacts for the entire journey to expected

refining destinations, rather than focus only on

individual segments over which the increase in traffic

is expected to exceed the regulatory threshold

provided in the STB’s regulations for air quality

impacts. In its methodology, OEA apparently limited

the scope of the downline study area by only including

contiguous12 segments of rail connected to the Project

that were themselves expected to see an increase of

traffic. DEIS App. C. at C-1. However, the STB’s

regulations require rail construction proposals to

“describe the downline impacts if the thresholds

governing energy, noise and air impacts in

12 As discussed below, OEA does not mention or explain why only

contiguous segments of rail line that meet the regulatory

thresholds are included in the downline study area, even though

OEA’s own analysis indicates that this threshold may be met in

other areas of the country as a result of the project.

JA 68

§ 1105.7(e)(4), (5), or (6) are met.” 49 C.F.R.

§ l105.7(e)(11)(v). The regulations do not limit the

evaluation of downline impacts only to segments

where thresholds are met; rather they logically

require downline impacts to be considered when the

thresholds are met by the project. Otherwise, it would

be possible to completely discount all downline

impacts if routes connecting to the Project were

numerous enough to diffuse the average number of

trips per route. This would certainly undermine the

purpose of 49 C.F.R. § 1105.7(e)(11)(v).

Here, according to the proponent’s and OEA’s own

analysis, the regulatory thresholds are met by the

Project, both on the line to be constructed and on

existing segments, particularly the segments between

Kyune and Denver. No explanation is given as to why

it is appropriate to completely ignore downline

impacts over the great majority of the routes that the

project-generated traffic would use; rather doing so

would conflict with the requirement of 49 C.F.R.

§ 1105.7(e)(11)(v) to “describe the effects ... , of the new

or dive1ted traffic over the line.”

4.

The scope of the downline study area

does not include analysis of

segments of rail line outside of Utah

and Colorado that may or will likely

exceed the regulatory thresholds

that OEA uses

Even if OEA were correct in the manner in which

it applied the regulatory thresholds to define the

downline impact study area, the resulting study area

does not reflect OEA’s own methodology. In

establishing the downline study area OEA relies on

JA 69

the thresholds provided in 49 C.F.R. § 1105.7(e)(5)

relating to air impacts, i.e. an increase in eight trains

a day on average, or three trains a day on average in

air quality non-attainment areas. See DEIS at 3.1-1 to

3.1-2; 3.2-1; 3.7-3; App. C, at C-1). Nothing in the

threshold or methodology suggests that segments of

rail line, yards, or terminals that meet the threshold

but are non-contiguous with other lines that meet the

threshold, should be excluded. OEA does not mention

or explain why segments of rail lines outside of Utah

and Colorado that may meet the regulatory thresholds

are not included in the downline study area, even

though OEA’s own analysis indicates that the

increased traffic may result in exceeding the threshold

there. OEA’s analysis clearly establishes the

expectation that Uinta Basin crude oil will likely end

up in only a few places, mostly in Houston/Port Arthur

and Louisiana. Although OEA does not share the

specific routing data it used, the routes owned by the

two railroads analyzed (BNSF and UP), and the

incentive to route efficiently, would suggest that much

or all of this traffic would likely take the same limited

number of routes and pass through the same yards,

some of which may be within nonattainment areas.

Not considering the impacts in these areas, let alone

not including them in the downline study area, is

irrational.

For instance, the greater Houston metropolitan

area, through which traffic between Houston and the

Uinta Basin is expected to be the greatest, and

through which through traffic to Louisiana appears

likely to travel, is identified as a nonattainment area.

See EPA, Green Book, https://www3.epa.gov/

airquality/greenbook/map/mapnpoll.pdf (EPA Green

JA 70

Book) (visited Jan. 21, 2021); Texas Department of

Transportation, Texas Non-Attainment Areas,

https://gistxdot.opendata.arcgis.com/datasets/texasnonattainment-areas (visited Jan. 21, 2021). Areas in

Kansas and Louisiana through which Uinta Basinrelated trains might travel may also qualify under the

established regulatory air thresholds for nonattainment areas. See EPA Green Book.

OEA estimates in the high rail traffic scenarios

that 5.26 additional trains per day on average will

travel between Houston/Port Arthur and Uinta Basin,

and that 3.68 additional trains per day on average will

travel between Uinta Basin and Louisiana. DEIS,

App. C, Table C-4, at C-5. Averaging the high and low

rail traffic scenarios for traffic to Houston/Port Arthur

also results in an average that exceeds the threshold

for nonattainment areas (3.55 trains per day on

average), indicating that the range of expected

increased traffic to this destination is above the

regulatory threshold OEA uses. OEA does not even

mention these expected exceedances, let alone explain

why they would not qualify to be included in the

downline study area.

5.

The OEA incorrectly excludes

multiple routes that in aggregate

would

meet

the

regulatory

thresholds that OEA uses to identify

the scope of the downline impacts

Even if specific routes east of the Denver

metropolitan area individually would not experience

expected increases in traffic that would reach the

regulatory threshold cited by OEA, OEA’s data clearly

shows that in the aggregate routes to some of the

JA 71

destinations for traffic would exceed thresholds under

the high rail traffic scenario. Specifically,

Houston/Port Arthur and Louisiana would see 5.26

and 3.68 more trains per day on average, respectively,

under the high rail traffic scenario. Combined, these

two destinations would also see 3.13 more trains per

day on average under the low rail traffic scenario, and

8.94 more trains per day on average under the high

rail traffic scenario. These increases would all exceed

the threshold for nonattainment areas, such as the

Houston metropolitan area, and the combined high

rail traffic scenario would exceed the eight trains per

day threshold applicable for all rail lines in aggregate

along all of the potential routes to Houston. OEA does

not explain how the aggregate impact of these trains

would not result in comparable impacts that should be

taken into account as downline impacts. This is

particularly the case with rail-related accidents,

which will still have the same likelihood of occurring

whether they are calculated along one or several lines.

Increased downline impacts do not vanish or decrease

merely because there are two or three routes to the

same destination, rather than one.

D. The Project DEIS’s Stated Purpose and

Need Is Unsupported

An environmental impact statement must include

a discussion of the purpose of and need for the

proposed action. 40 C.F.R. § 1502.13. When reviewing

an application for authorization, the agency is to base

the purpose and need on the goals of the applicant and

the agency’s authority. Id.

In the DEIS, OEA states that the purpose of the

Project is “to provide common carrier rail service

JA 72

connecting the Basin to the interstate common carrier

rail network using a route that would provide shippers

with a viable alternative to trucking.” DEIS at 1-3.

The Project is needed, according to the Coalition,

because freight from the Uinta Basin can only move

into and out of the basin on one of two two-lane

highways (U.S. Highways 191 and 40). Id. The DEIS

states that the Project is to “provide customers in the

Basin with multi-modal options for the movement of

freight to and from the Basin; promote a safe and

efficient system of freight transportation in and out of

the Basin; further the development of a sound rail

transpo1tation system; and foster sound economic

conditions in transportation and effective competition

and coordination between differing modes of

transportation.” Id. Based on these assertions, OEA

states that the Coalition’s stated purposes “appear to

be consistent with” the public convenience and

necessity standard contained in 49 U.S.C. § 10901(c)

and the Rail transportation Policy contained in 49

U.S.C. § 10101.

1.

Purpose and need conclusions are

unsupported in the record

OEA fails adequately to justify its statement of

the purpose and need for the Project. In particular, the

alleged need for the Project - to provide an alternative

means to transport crude oil from the Basin to

markets across the United States—is unsupported.

While an agency may not completely ignore a project

proponent’s stated objectives, Colo Envtl. Coalition v.

Dombeck, 185 F.3d 1162, 1175 (10th Cir. 1999), it also

may not simply accept a proponent’s stated objectives.

Id. Rather, an agency must develop its own purpose

JA 73

and need based on the agency’s independent review of

the underlying problem or opportunity, informed by

the goals of the applicant and the agency’s authority.

40 C.F.R. § 1502.13.

Here, OEA fails to provide a justification for its

acceptance of the asserted need for alternative

transporation modes into and from the Uinta Basin.

OEA does not analyze whether opportunities for

highway transport of crude oil from the Uinta Basin

are currently inadequate, whether a pipeline exists or

might be constructed to transport crude oil from the

Basin, or whether markets exist for any increased

crude oil that development of this proposed rail line

might facilitate or make more likely. On the contrary,

OEA seems simply to accept that the absence of a

railroad in this area demonstrates the need for one.

2.

The DEIS suggests without support

that the public convenience and

necessity supports the purpose and

need of the Project

OEA states that the Coalition’s purpose appears

to be consistent with the public convenience and

necessity contained in 49 U.S.C. § 10901 and the Rail

Transportation Policy contained in 49 U.S.C. § 10101,

without explaining how the public convenience and

necessity analysis actually fits into the Project’s

purpose and need.

In authorizing construction of a rail line, the STB

is required to grant authorization unless it would be

inconsistent with the public convenience and

necessity. 49 U.S.C. § 10901(c). See also Alaska

Survival v. STB, 705 F.3d 1073, 1085 (9th Cir. 2013).

To determine public convenience and necessity, the

JA 74

STB looks at a “variety of circumstances” surrounding

the proposed action. Northern Plains, 668 F.3d at

1078. ln the context of an authorization to construct or

operate a rail line, the factors commonly cited by the

STB have been “whether: (1) the applicant is

financially fit to undertake the construction and

provide service; (2) there is a public demand or need

for the proposed service; and (3) the construction

project is in the public interest and will not unduly

harm existing services. Public convenience and

necessity is also evaluated in light of the rail

transportation policy of 49 U.S.C. § 10101.” Dakota,

Minnesota and Eastern R.R. Corp. Construction Into

the Powder River Basin, STB Finance Docket

No. 33407, slip op. at 16 (Service Date Dec. 10, 1998).

See also Northern Plains, 668 F.3d at 1092. While the

statutory language has been read to emphasize the

interests of private parties, particularly shippers,

some broader consideration of the public interest must

still be considered. See Alaska Survival, 705 F.3d at

1085. Exemption from the application process under

49 U.S.C. § 10502 requires a finding, in part, that the

procedures are not necessary to carry out the rail

transportation policy set forth in 49 U.S.C. § 10101.

Aside from quoting the policy statements

provided in 49 U.S.C. § 10101 and noting the benefit

to certain shippers, the DEIS contains no analysis or

assessment of the public convenience and necessity.

DEIS at 1-3 to 1-4. In fact, several of the federal policy

objectives in Section 10101, such as promotion of a

safe, efficient, and competitive rail transportation

system, may be hindered by limitations in the

economic situation or market positioning of the Project

proposal. 49 U.S.C. § 10101(3), (4), (5). The Project’s

JA 75

consequences will likely also detract rather than

encourage and promote energy conservation, 49

U.S.C. § 10101(14), while there is also serious concern

that construction and operation will be to the

detriment of public health and safety, 49 U.S.C.

§ 10101(8).

Rather than considering the public convenience

and necessity standard, OEA attempts to boot the

issue over to the Board, stating that “[w]hile the Board

will ultimately determine whether to authorize or

deny the petition, the Coalition’s stated purposes

appear to be consistent with the PC&N contained in

§ 10901 and the Rail Transportation Policy contained

in § 10101.” DEIS at 1-3. Yet in its January 5, 2021

decision

granting

exemption

status

and

“preliminarily” determining the “transportation

merits” of the proposed construction, the Board

suggests the opposite, stating that “[t]he decision

issued today is a preliminary determination that does

not prejudge the Board’s final decision, nor diminish

the agency’s environmental review process concerning

the proposed Line’s construction.” Seven County

Infrastructure Coalition—Rail Construction &

Operation Exemption—In Utah, Carbon, Duchesne,

and Uintah Counties, Utah, STB Docket No. FD

36284, slip op. at 10 (Service Date Jan. 5, 2021).

Unfortunately, the Board’s January 5th decision does

exactly that by suggesting that the Board’s public

convenience and necessity standard has been met

without engaging in by far the most important public

engagement component that is part of the approval

process. As a result, the OBA and the full Board can

each refer to the other while neither actually does the

work of considering the public interest component that

JA 76

both federal statute and the STB’s own precedent

states is required. Two incomplete and insufficient

analyses of the public convenience and necessity do

not add up to a complete and sufficient analysis under

this standard.

E. The Project’s DEIS Fails To Analyze The

Increased Risk of Cataclysmic Wildfire

in The Project Area and in DroughtRavaged Adjacent To Downline Rightsof-Way

The DEIS fails to adequately assess the potential

consequences that the increased risk of fire due to the

additional

shipments

of

highly

flammable

commodities such as crude oil will have on impacted

communities and ecosystems, particularly those

downline of the Project.

Focusing predominantly on wildfires caused by

regular railroad operations--e.g., exhaust sparks and

hot brake shoe fragments-the analysis in the DEIS

completely omits consideration of ignition due to the

primary commodity proposed to be shipped, crude oil,

which is highly flammable. See DEIS at 3.4-38–39.

Given that the DEIS itself projects a collision or

derailment to occur within the project area alone every

3-10 years, DEIS at 3 .2-4, and accidents along certain

downline routes eve1y 2-4 years, DEIS at 3.2-6, it is

unreasonable to fail to consider the potential risk and

effect of wildfires caused by the contents of the

commodities to be shipped in addition to regular

railroad operations.

Furthermore, in its analysis of wildfire risks due

to the Project the OEA also focuses primarily on the

probability of accidents without considering their

JA 77

potential severity. OEA’s conclusion that the risk of

fire from train accidents is “very low” is based largely

on low probabilities relative to other sources of

wildfire. See DEIS at 3.4-39. For instance, the DEIS

states that “[o]f all the wildfires with a reported cause,

approximately 0.5 percent and 0.2 percent of the fires

in the lower 48 states and Utah, respectively, were

caused by railroads.” DEIS at 3.4-13. Although the

percentage of wildfires caused by railroads may

appear small in comparison to the many causes of such

blazes, this statistic fails to measure the size and

impact of rail-caused wildfires in remote regions

where firefighting crews may have difficulty gaining

access. Additionally, the Project would introduce a

new causal risk of wildfire to an area where such

hazards currently do not exist.

The potential impact of catastrophic fires and

explosions caused by crude-by-rail shipments is far

from unforeseeable. In 2013, the blaze and explosions

from an oil train derailment in Lac Megantic, Canada,

left 47 people dead, 2000 people forced from their

homes, and much of the downtown core destroyed.13 In

2014-2015, the Pipeline and Hazardous Materials

Safety Administration (“PHMSA”) embarked on a

rulemaking process regarding safety measures for

shipping high-hazard flammable trains precisely

because of this risk. See, e.g., Notice of proposed

rulemaking, 79 Fed. Reg. 45,015 (Sept. 30, 2014). In

doing so, PHMSA noted that “[t]he growing reliance

on trains to transport large volumes of flammable

liquids poses a significant risk to life, property, and

https://www.tsb.gc.ca/eng/rappor1s-reports/rail/2013/rl

3d0054/r 13d0054-r-es.html.

13

JA 78

the environment. These significant risks have been

highlighted by the recent instances of trains carrying

crude oil that derailed in Casselton, North Dakota;

Aliceville, Alabama; and Lac-Megantic, Quebec,

Canada.” Id. 79 Fed. Reg. at 45,016.

In terms of geographic scope, there is no

discussion of increased fire risk in downline routes

through Colorado in Appendix C, “Downline Analysis

Study Area and Train Characteristics”, or serious

consideration anywhere in the DEIS regarding the

downline impact of wildfires. The assumed route to

Denver over the UP Moffat Tunnel Subdivision runs

adjacent to hundreds of thousands of acres of public

lands, including the Colorado National Monument

near Grand Junction, the White River National Forest

from Palisade through Glenwood Canyon to Dotsero,

and the Medicine Bow-Routt and Arapaho Roosevelt

National Forests to the East. In 2020, Colorado’s

historic wildfires ravaged many of these areas.

•

•

The Pine Gulch Fire, (north of Grand Junction)

was at the time the largest fire in Colorado

history, burning 139,000 acres.14

Surpassing the Pine Gulch Fire in size was the

East Troublesome Fire, (adjacent to the UP

ROW near Grandby) which, when fully

contained on November 30, had burned a total

of 193,812 acres.15

14

“Pine Gulch, Fire Information—lnciWeb the Incident

Information System”. https://inciweb.nwcg.gov/incident/6906/

“East Troublesome Fire Information—InciWeb Incident

Information System”, https://inciweb.nwcg.gov/incident/7242/.

15

JA 79

•

The Grizzly Creek Fire that surrounded the UP

ROW in Glenwood Canyon burned 323,631

acres, closed Interstate 70 through the canyon,

and forced rerouting of freight and Amtrak rail

traffic north over UP’s Wyoming route between

Denver and Salt Lake City.16

In total, the suppression costs for all fires during the

2020 Colorado fire season amounted to well over $200

million.17 The lack of consideration in the DEIS

evaluating how the Project will exacerbate the risk of

wildfire, and the ensuing costs to local communities

who are most directly affected, is glaring.

The mitigation measures for wildfire in the DEIS

are likewise inadequate. OEA concludes that the

probability of a major rail accident that could cause a

fire would be low if the mitigation measures set forth

in the Draft EIS are implemented. OEA recommends

requiring the Coalition develop and implement a

wildfire management plan in consultation with

appropriate state and local agencies, including local

fire departments. “The plan should incorporate

specific information about operations, equipment, and

personnel on the rail line that might be of use in case

See https://inciweb.nwcg.gov/incident/6942/.

https://www.postindependent.com/news/amtrak-union-pacific

divert-trains-from-glenwood-springs-while-grizzly-creek-firerages-in-canyon/.

https://www.thedenverchannel.com/news/wildfire/train-serviceresumes-in-area-struck-by-grizzly-creek-fire

16

17 Victoria Carodine, How 2020 Has Affected the Way We Should

Manage Forest Fires, 5280, https://www.5280.com/2020/12/how2020-has-affected-the-way-we-should-manage-forest-fires/ (Dec.

15, 2020)

JA 80

a fire occurs and should evaluate and include, as

appropriate, site-specific techniques for fire

prevention and suppression. If OEA’s recommended

mitigation is implemented, OEA concludes that the

impacts of wildfire on vegetation would not be

significant.” DEIS at 3.4-39.

The DEIS ‘s mitigation measures do not take into

account the increased risk of wildfire based on climate

change. The DEIS ignores the reality that any such

response plan may not prevent a fire from spreading

quickly under the current high drought conditions in

Colorado and Utah, conditions that are predicted to

persist and increase due to climate change. In

Colorado and Utah, like in other Western states,

wildfires over the past few decades have become larger

and more frequent, and global climate model

projections indicate an increase in the frequency and

severity of heatwaves, drought, and wildfires due to

climate change warming. See Amber Childress et al.,

Colorado Climate Change Vulnerability Study, A

Report by the University of Colorado Boulder and

Colorado State University to the Colorado Energy

Office, at 14, 32-33 (2015), available at:

https://wwa.colorado.edu/climate/co2015vulnerability

/co_vulnerability_report_2015_final.pdf;

Colorado

Department of Public Safety, 2018-2023 Colorado

Hazard Mitigation Plan, at 3-238, 3-306 (2018),

available

at:

https://www.colorado.gov/pacific/mars/atom/151586;

Utah Department of Public Safety, Division of

Emergency Management, 2019 Utah State Hazard

Mitigation Plan, at 268 (2019) (“Utah SHMP”),

available

at:

https://hazards.utah.gov/wpcontent/uploads/UtahState-Hazard-Mitigation-Plan-

JA 81

2019.pdf.; U.S. Environmental Protection Agency,

What Climate Change Means for Colorado, EPA 430F-16-008, at 1 (Aug. 2016), available at:

https://19january2017snapshot.epa.gov/sites/producti

on/files/2016-09/documents/climate-change-co.pdf.

Increased wildfires will significantly impact

ecosystems and communities both directly and

indirectly through their impact on water quality and

supply. Childress et al., supra, at 33, 67, 69. Increased

risks of wildfire, heatwaves, and other climate-related

impacts also increase the risk of damage to

infrastructure, including rail lines and associated

facilities. Childress et al., at 119; Utah SHMP at 246.

The DEIS acknowledges the general threat of

wildfire but fails to meaningfully or adequately apply

this info1mation through analysis. The Discussion of

“Wildfire Ecology” within the Project area (DEIS at

3.4-13-15) generally recognizes that Utah suffers from

increasing risk of catastrophic wildfires, with an

estimate of 800 to 1,000 wildfires every summer, and

in 2017 consuming over 200,000 acres in the state. The

DEIS states: “In Utah, firefighters suppress 95

percent of wildfires on initial attack, but adverse

weather and topography, heavy fuel loads, and urban

development all combine to create catastrophic

wildfire conditions in the state (Utah Division of

Emergency Management 2019).” DEIS 3.4-13. OEA

also recognizes that the impacts of fire can last many

years. “Forest fires along portions of US 191 and

Argyle Canyon Road in 2019 have left behind hillsides

with few shrubs, little herbaceous vegetation, and

charred trunks. Once the forest begins to regrow, over

many years, these areas would provide a partial visual

buffer from the proposed rail line.” DEIS at 3.12-8

JA 82

(Emphasis added). However, the DEIS fails to

consider the foreseeable implications of these

statements or connect them to other data included in

the DEIS. For instance, likelihood of drought and

wildfire will likely further postpone any regrowth,

while the acknowledged vulnerability of the Project

area to landslides (see DEIS at 3.57 to 3.5-8) will be

exacerbated by the lack of vegetation. Similarly,

climate-related considerations addressed in the DEIS

are largely limited to air quality assessment,

notwithstanding the predicted effect that such

warming will have on wildfire risks. See DEIS at 3.71, 3.15-27.

F. The Project’s DEIS Fails To Consider the

Increase in Environmental Impacts

Resulting From the Increased Fossil

Fuel Extraction and Consumption That

Will Result From the Project

NEPA requires consideration of connected

actions,

which

includes

actions

that

are

interdependent parts of a larger action and depend on

the larger action for their justification. 40 C.F.R.

§ 1501.9(e)(1)(iii). The pre-2020 NEPA regulations

also require the consideration of reasonably

foreseeable “indirect effects,” which “may include

growth inducing effects and other effects related to

induced changes in the pattern of land use, population

density, or growth rate, and related effects on air and

water and other natural systems, including

ecosystems.” 40 C.F.R. § 1508.8(b) (2019). While

express reference to “indirect effects” is not included

in CEQ’s 2020 NEPA regulations, CEQ has noted that

the elimination of this phrase was merely intended to

JA 83

simplify

analysis

by

avoiding

unnecessary

categorizations, in order to focus on effects “that are

reasonably foreseeable and have a reasonably close

causal relationship to the proposed action.” 85 Fed.

Reg. 43,343. This may include effects both direct and

indirect—notably, the CEQ declined in its 2020

changes to affirmatively state that consideration of

indirect effects is not required. 85 Fed. Reg. at 43,344.

Here, the growth inducing effects leading to

reasonably foreseeable impacts are clear from the

Project description. The Project will result in the

establishment of common carriage service, which is by

law required to serve all shippers upon reasonable

request, 49 U.S.C. § 11101(a), and is generally open to

all commodities and products, Union Pacific R.R.

Co.—Petition for Declaratory Order, STB Finance

Docket No. 35219, slip op. at 3 (Service Date June 11,

2009), including those such as crude oil, coal, natural

gas.

The Uinta Basin is home to significant crude oil

fields, oil shale deposits, and natural gas fields, as well

as some coal deposits in the area. See Vanden Berg,

supra, 16, 22, 29, 34. While various factors, such as

specific commodity characteristics, infrastructure

needs, and market fluctuations may affect the

likelihood of transport of these commodities on rail

over the proposed rail line (as is the case with crude

oil as well as coal, natural gas, and other

commodities), it would be unreasonable to conclude

that construction of durable long-term transportation

infrastructure such as a rail line would not induce

additional exploitation of natural resources in the

Uinta Basin.

JA 84

The Project’s proponents are clearly looking to

proactively expand access to markets for resources

sourced from within their jurisdictions, a consequence

of which would inevitably accelerate resource

extraction. This is reflected in the Project proposal

itself as well as in other potentially unrelated

activities by Coalition members. For instance,

members of the Seven County Coalition (including

Carbon, Emery and Sevier Counties) appear to have

sought to support development of a rail-marine

intermodal terminal in Oakland, California, to export

coal to China using the same state funding vehicle

that is now supporting development of the Uinta

Basin Railway. See Robin Kaizer-Schatzlein, Lawsuit

over proposed fossil fuel railway in Utah moves

forward, High Country News, Dec. 15, 2020,

https://www.hcn.org/articles/energy-industrylawsuitover-proposed-fossil-fuel-railway-in-utah-movesforward; Brian Maffly, Utah coal: California, here it

comes—and not everyone is happy, The Salt Lake

Tribune,

Apr.

27,

2015,

https://archive.sltrib.com/article.php?id=2425141&ity

pe=CMSID. While not strictly connected to the

Project, such activity clearly indicates the foreseeable

inducement of increased extraction in the Uinta Basin

beyond the current levels that serve as the basis for

analysis under the DEIS. This reasonably foreseeable

consequence of the Project must be considered in the

DEIS.

Given that the Uinta Basin has coal deposits and

large natural gas fields, and that the Coalition notes

that these commodities may be another commodity

that is shipped (DEIS at 2-1), OEA should consider the

additional natural gas and coal-related impacts that

JA 85

construction of the rail line could induce. This requires

reassessment of the downline study area.

G. The Project’s DEIS Failed To Contain

Adequate Mitigation for Anticipated

Greenhouse Gas Emissions

Although some federal case law originally

questioned the need to evaluate climate impacts under

NEPA, jurisprudence has become increasingly settled

that such impacts must be included in NEPA

analyses. NEPA also requires an agency to “include

appropriate mitigation measures not already included

in the proposed action or alternatives.” 40 C.F.R.

§§ 1502.14(e).

While NEPA requires consideration and

discussion of mitigation measures, it does not have a

“substantive requirement that a complete mitigation

plan be actually formulated and adopted.” Robertson

v. Methow Valley Citizens Council, 490 U.S. 332, 35153 (1989). Nonetheless, the Tenth Circuit has held

that a discussion of mitigation measures “must be

reasonably complete in order to properly evaluate the

severity of the adverse effects of a proposed project

prior to making a final decision.” Colorado Envtl. Coal.

v. Dombeck, 185 F.3d 1162, 1173 (10th Cir. 1999)

(internal quotation marks and citations omitted). The

CEQ has made clear in a guidance document that even

where an impact is not considered “significant,”

mitigation measures must still be identified:

“The mitigation measures discussed in an

EIS must cover the range of impacts of the

proposal. ... Mitigation measures must be

considered even for impacts that by

themselves would not be considered

JA 86

‘significant.’ Once the proposal itself is

considered as a whole to have significant

effects, all of its specific effects on the

environment (whether or not “significant”)

must be considered, and mitigation measures

must be developed where it is feasible to do

so.”18

In the DEIS, OEA estimates the reasonably

foreseeable greenhouse gas (“GHG”) emissions that

would result from implementation of the Project, both

during the construction phase and the operations

phase.

Anticipated

GHG

emissions

during

constructions range from 208,697 metric tons of total

CO2 equivalent for the Indian Canyon alternative to

289,737 CO2e for the Wells Draw Alternative. DEIS

at 3.7-19. GHG emissions during rail operations for

the preferred alternative, Whitmore Park, are

estimated to range from 44,476 CO2e at the low-rail

traffic scenario to 131,169 CO2e at the high-rail traffic

scenario. Id. at 3.7-21. The DEIS seeks to explain

away the significance of these emissions by stating

that they represent a small percentage of existing

emissions. It notes that the Wells Draw alternative

could result in up to 211,621 metric tons of CO2e per

year under the high rail traffic scenario, “which

represents approximately 5 percent of GHG emissions

in the regional study area, 1 percent of statewide GHG

emissions, and 0.0004 percent of global GHG

emissions.” Id.

Forty Most Asked Questions Concerning CEQ’s National

Environmental Policy Act Regulations, 46 Fed. Reg. 18,026,

18,031 (Mar. 23, 1981).

18

JA 87

To address these GHG emissions, OEA is

“recommending mitigation measures requiring the

Coalition consider actions that would reduce GHG

emissions during rail construction and operations,”

id., including:

AQ-MM-4. The Coalition shall require its

contractors to use diesel fuel that contains a

minimum biodiesel content of 5 percent (BS

blend). If B5 is not available from local fuel

suppliers, the Coalition shall use fuel with

the highest biodiesel content that is available

to reduce greenhouse gas emissions.

AQ-MM-5. The Coalition shall consider

procuring alternative engine and fuel

technologies, e.g., hybrid-electric diesel

equipment, for construction and operation of

the rail line to reduce greenhouse gas

emissions.

AQ-MM-6. The Coalition shall evaluate the

feasibility of installing solar and wind

microgeneration technologies on site offices,

lodgings, and other project-related facilities

to reduce the use of grid or privately

generated electricity to reduce greenhouse

gas emissions. As part of its evaluation, the

Coalition shall consider the suitability of site

conditions and location of solar and wind

generation and the technical and economic

feasibility of supplementing site electricity

demands with renewable power.

DEIS at 4-14. These mitigation measures are

inadequate to address the GHG emissions anticipated

because they are largely optional and procedural and

JA 88

are therefore unlikely to reduce GHG emissions.

While AQ-MM-4 appears reasonably fashioned to

reduce GHG emissions by directing the Coalition to

require its contractors to use diesel fuel containing a

minimum biodiesel content of 5%, that direction is

excused if such fuel is not available from local

suppliers. AQ-MM-5 is even less likely to result in

GHG-emissions reductions, inasmuch as it only

directs the Coalition to “consider” using hybridelectric diesel equipment for construction and

operation activities. Similarly, AQ-MM-6 directs the

Coalition only to “evaluate” the use of solar and wind

microgeneration technologies at project facilities, and

to “consider” site conditions in its evaluation.

The DEIS should be revised to require the

Coalition to take concrete steps to mitigate the

foreseeable GHG emissions of the Uinta Basin

Railway; directing the Coalition to evaluate and

consider actions is inadequate. NEPA requires a

“reasonably complete discussion of possible mitigation

measures,” such that fair evaluation of the

environmental consequences of the alternatives is

possible. Robertson v. Methow Valley Citizens Council,

490 U.S. 332, 352 (1989).

Here, an analysis of the effectiveness of the

mitigation measures is not only missing—it’s

impossible. One cannot reasonably say what actions

the Coalitions’ “consideration” of alternative fuel or

engine technologies or “evaluation” of installing solar

or wind technologies might yield, let alone what the

mitigative effect of such technologies on GHG

emissions or climate impacts might be. Such general

and vague mitigation measures do not satisfy NEPA’s

JA 89

“hard look” requirement. See Neighbors of Cuddy

Mountain v. U.S. Forest Service, 137 F.3d 1372, 1381

(9th Cir. 1998) (NEPA violated where the mitigation

measures were “so general that it would be impossible

to determine where, how, and when they would be

used and how effective they would be”).

H. The DEIS Fails To Adequately Consider

Reasonable Alternatives Such as a

Pipeline

Federal agencies must “study, develop, and

describe appropriate alternatives to recommended

courses of action.” 42 U.S.C. § 4332(2)(E). CEQ

Regulations require that an EIS shall “[e]valuate

reasonable alternatives to the proposed action, and,

for alternatives that the agency eliminated from

detailed study, briefly discuss the reasons for their

elimination.” 40 C.F.R. § 1502.14(a). Reasonable

alternatives are those that constitute “a reasonable

range of alternatives that are technically and

economically feasible, meet the purpose and need for

the proposed action, and, where applicable, meet the

goals of the applicant.” 40 C.F.R. § 1508.1(z). Each

reasonable alternative discussed must be “considered

in detail, including the proposed action, so that

reviewers may evaluate their comparative merits.” 40

C.F.R. § 1502.14(b). “[A]n EIS need not include every

available alternative where the consideration of a

spectrum of alternatives allows for the selection of any

alternative within that spectrum.” 85 Fed. Reg. at

43,330.

As discussed supra at Section III.D.1, there is no

adequate basis provided in support of the purpose and

need of the Project beyond the stated desire of the

JA 90

Coalition. To the extent a purpose and need is

demonstrated in the DEIS, it reflects providing oil

extraction companies located in “an isolated

geographical region” with an alternative to trucking

oil to outside markets. DEIS at 1-3. Although the

DEIS discusses other shippers besides oil producers,

the Coalition’s assertions reflect that the

overwhelming majority of shipments would be for

crude oil and oil extraction-related materials, and the

proposed alternatives are only evaluated in terms of

the shipment of crude oil. DEIS at 1-3 to 1-4.

To address this purpose and need, the DEIS

considered three action alternatives involving the

construction of rail lines—the Indian Canyon

Alternative, the Wells Draw Alternative, and the

Whitmore Park Alternative—which the DEIS states

were developed over the course of several years of

analysis by the Utah Department of Transportation

(UDOT), the Coalition, and OEA. DEIS, at S-5. All

other alternatives explored similarly involved the

construction of rail lines. DEIS at 2-2.

The DEIS fails to demonstrate consideration of

the full spectrum of potentially reasonable

alternatives. Most glaringly, and perhaps reflecting

the failure to include other key federal agencies with

jurisdiction such as PHMSA, the DEIS does not even

mention, let alone consider, a pipeline alternative to

transporting crude oil by rail. DEIS at 2-2. This is so

even though elsewhere in the DEIS’s impact analysis

there are references to crude oil and natural gas

pipelines that run through the area. DEIS at 3.5-18.

There is nothing in the DEIS’s stated purpose and

need for the Project that suggests that a pipeline

JA 91

alternative would not be a reasonable alternative to

consider even at a preliminary stage. While the

proposed rail line is expected to ship other products

and commodities besides oil, the overwhelming

majority of shipments will be crude oil. The

statements of the Coalition, if taken at face value,

make clear that the economic feasibility is centered on

transporting oil alone. Accordingly, it is reasonable to

consider a pipeline as a transportation alternative.

Indeed, it appears that the Coalition and others

have in fact considered a pipeline alternative in the

past, making its absence in the DEIS alternatives

analysis even more curious. For instance, in 2017 the

Coalition published an oil pipeline study analyzing the

prospects for such a pipeline. See Seven County

Infrastructure Coalition, Uinta Basin Oil Pipeline

Study,

Final

Report

(2017),

available

at:

https://scicutah.org/storage/app/uploads/public/5d0/27

e/9ad/5d027e9adl453049115378.pdf. In addition, in

2014 a company with an oil refinery in Salt Lake City

initiated a study regarding connecting the Uinta

Basin to Salt Lake City via a pipeline specially

designed to accommodate the waxy character of crude

produced from the Uinta Basin. See Uinta-WasatchCache National Forest; Utah; Uinta fapress Pipeline

Project, 79 Fed. Reg. 4657 (Jan. 29, 2014) (US Forest

Service notice of intent to prepare an environmental

impact statement). The prospects identified in these

evaluations and their comparison with rail

alternatives are unknown because the DEIS does not

make the comparison, even though a pipeline appears

to meet the purpose and need of the Project.

JA 92

CONCLUSION

For the reasons set forth above, Eagle County and

its allied jurisdictions respectfully request that OEA

issue a Supplemental DEIS to include FRA and

PHMSA as cooperating agencies, analyze the

potential impacts of the Project on the Tennessee Pass

Line, and rectify areas of insufficient analysis.

Respectfully submitted,

[signature]

Allison I. Fultz

Stephen H. Kaplan

Robert W. Randall

Christian L. Alexander

Kaplan Kirsch & Rockwell LLC

1634 I St., N.W.

Suite 300

Washington, DC 20006

(202) 955-5600

afultz@kaplankirsch.com

skaplan@kaplankirsch.com

brandall@kaplankirsch.com

calexander@kaplankirsch.com

Counsel for Eagle County

February 12, 2021

JA 93

EPA Map of Counties Designated

“Nonattainment” for Clean Air Act’s National

Ambient Air Qualty Standards (NAAQS)

February 12, 2021

(see foldout on next page)

GU

HI

AK

Document #1989949

Filed: 03/13/2023

PR

10/31/2020

Page 189 of 606

** Included in the counts are counties designated for NAAQS and revised NAAQS pollutants.

Revoked 1-hour (1979) and 8-hour Ozone (1997) are excluded. Partial counties, those with part

of the county designated nonattainment and part attainment, are shown as full counties on the map.

* The National Ambient Air Quality Standards (NAAQS) are health standards for Carbon Monoxide,

Lead (1978 and 2008), Nitrogen Dioxide, 8-hour Ozone (2008), Particulate Matter (PM-10

and PM-2.5 (1997, 2006 and 2012), and Sulfur Dioxide.(1971 and 2010)

Legend **

County Designated Nonattainment for 6 NAAQS Pollutants

County Designated Nonattainment for 5 NAAQS Pollutants

County Designated Nonattainment for 4 NAAQS Pollutants

County Designated Nonattainment for 3 NAAQS Pollutants

County Designated Nonattainment for 2 NAAQS Pollutants

County Designated Nonattainment for 1 NAAQS Pollutant

for Clean Air Act's National Ambient Air Quality Standards (NAAQS) *

Counties Designated "Nonattainment"

USCA Case #22-1019

JA93-a

JA 94

Table of Contents Excerpts, Unita Basin

Railway, Final Environmental Impact

Statement, STB Docket No. FD 36284

(Aug. 2021)

List of Tables .................................................... viii

List of Figures.................................................... xv

List of Acronyms and Abbreviations ............. xviii

Summary ............................................................... S-1

S.1 Introduction ............................................... S-1

S.1.1 Purpose and Need ................................... S-1

S.1.2 Proposed Action ................................ S-2

S.1.3 Cooperating Agency Actions ............ S-3

S.2 Draft EIS and Final EIS Process ............... S-4

S.2.1 Scoping and Consultation ................ S-4

S.3 Alternatives ................................................ S-6

S.4 Conclusions on Environmental Impacts ... S-8

S.4.1 Major Impacts .................................. S-8

S.4.2 Minor Impacts ................................ S-10

S.4.3 Downline Impacts .......................... S-13

S.4.4 Cumulative Impacts ....................... S-13

S.4.5 Environmentally Preferred

Alternative ............................................... S-13

S.5 Summary of Impacts ................................ S-14

S.6 Mitigation ................................................. S-25

S.7 Public Involvement .................................. S-25

S.7.1 Online Public Meetings .................. S-25

S.7.2 Public Comment Period for the

Draft EIS .......................................... S-25

JA 95

Chapter 1 Purpose and Need............................. 1-1

1.1 Introduction ................................................ 1-1

1.2 Purpose and Need....................................... 1-3

1.3 National Environmental Policy Act

Process ......................................................... 1-4

1.3.1 Lead Agency...................................... 1-4

1.3.2 Cooperating Agencies ....................... 1-4

1.3.3 Scoping Process ................................ 1-6

1.3.4 Public Comment Period for the

Draft EIS ........................................... .1-7

1.3.5 Public Meetings ................................ 1-8

Chapter 2 Proposed Action and

Alternatives .......................................................... 2-1

2.1 Proposed Action .......................................... 2-1

2.2 Alternatives ................................................ 2-2

2.2.1 Alternatives Development ............... 2-2

2.2.2 Routes Considered but Not

Analyzed in the EIS ............................. 2-5

2.2.3 Alternatives Analyzed in the EIS .. 2-20

2.3 Construction and Design Features .......... 2-27

2.3.1 Rail Line, Temporary, and Project

Footprints ......................................... 2-28

2.3.2 Railbed and Track Construction .... 2-30

2.3.3 Rail Line Construction Equipment

and Methods .................................... 2-30

2.3.4 Materials for Rail Line

Construction ..................................... 2-30

2.3.5 Construction Staging Areas ........... 2-31

JA 96

2.3.6 Staffing and Worker Housing ........ 2-31

2.3.7 Bridges, Culverts, and Stream

Realignments .................................... 2-31

2.3.8 Tunnels ........................................... 2-32

2.3.9 Grade Crossings ............................. 2-32

2.3.10 Road Relocations .......................... 2-33

2.3.11 Associated Facilities ..................... 2-33

2.3.12 Construction Schedule ................. 2-34

2.4 Operations ................................................ 2-35

2.4.1 Rail Traffic ...................................... 2-35

2.4.2 Maintenance ................................... 2-36

2.4.3 Staffing ........................................... 2-36

2.5 Summary of Impacts ................................ 2-37

2.6 Environmentally Preferred Alternative .. 2-48

Chapter 3 Affected Environment

and Environmental Consequences .................. 3-1

3.1 Vehicle Safety and Delay ........................ 3.1-1

3.1.1 Analysis Methods .......................... 3.1-1

3.1.2 Affected Environment ................... 3.1-4

3.1.3 Environmental Consequences ....... 3.1-7

3.1.4 Mitigation and Unavoidable

Environmental Effects .................. 3.1-20

3.2 Rail Operations Safety ............................ 3.2-1

3.2.1 Analysis Methods .......................... 3.2-1

3.2.2 Affected Environment ................... 3.2-3

3.2.3 Environmental Consequences ....... 3.2-4

3.2.4 Mitigation and Unavoidable

Environmental Effects .................... 3.2-8

JA 97

3.3 Water Resources ...................................... 3.3-1

3.3.1 Analysis Methods .......................... 3.3-1

3.3.2 Affected Environment ................. 3.3-10

3.3.3 Environmental Consequences ..... 3.3-24

3.3.4 Mitigation and Unavoidable

Environmental Impacts ................ 3.3-47

3.4 Biological Resources ................................ 3.4-1

3.4.1 Analysis Methods .......................... 3.4-1

3.4.2 Affected Environment ................... 3.4-4

3.4.3 Environmental Consequences ..... 3.4-28

3.4.4 Mitigation and Unavoidable

Environmental Effects .................. 3.4-62

3.5 Geology, Soils, Seismic Hazards, and

Hazardous Waste Sites .......................... 3.5-1

3.5.1 Analysis Methods .......................... 3.5-1

3.5.2 Affected Environment ................... 3.5-4

3.5.3 Environmental Consequences ..... 3.5-20

3.5.4 Mitigation and Unavoidable

Environmental Effects .................. 3.5-28

3.6 Noise and Vibration................................. 3.6-1

3.6.1 Analysis Methods .......................... 3.6-1

3.6.2 Affected Environment ................... 3.6-4

3.6.3 Environmental Consequences ....... 3.6-7

3.6.4 Mitigation and Unavoidable

Environmental Effects .................. 3.6-16

3.7 Air Quality and Greenhouse Gases ........ 3.7-1

3.7.1 Analysis Methods .......................... 3.7-1

3.7.2 Affected Environment ................... 3.7-4

JA 98

3.7.3 Environmental Consequences ..... 3.7-11

3.7.4 Mitigation and Unavoidable

Environmental Effects .................. 3.7-38

3.8 Energy ...................................................... 3.8-1

3.8.1 Analysis Methods .......................... 3.8-1

3.8.2 Affected Environment ................... 3.8-3

3.8.3 Environmental Consequences ....... 3.8-6

3.8.4 Mitigation and Unavoidable

Environmental Impacts ................ 3.8-13

3.9 Cultural Resources .................................. 3.9-1

3.9.1 Analysis Methods .......................... 3.9-1

3.9.2 Affected Environment ................... 3.9-7

3.9.3 Environmental Consequences ..... 3.9-11

3.9.4 Mitigation and Unavoidable

Environmental Effects .................. 3.9-16

3.10 Paleontological Resources ................... 3.10-1

3.10.1 Analysis Methods ...................... 3.10-1

3.10.2 Affected Environment ............... 3.10-2

3.10.3 Environmental Consequences ... 3.10-8

3.10.5 Mitigation and Unavoidable

Environmental Effects ................ 3.10-13

3.11 Land Use and Recreation .................... 3.11-1

3.11.1 Analysis Methods ...................... 3.11-1

3.11.2 Affected Environment ............... 3.11-3

3.11.3 Environmental Consequences . 3.11-12

3.11.4 Mitigation and Unavoidable

Environmental Effects ................ 3.11-28

3.12 Visual Resources.................................. 3.12-1

JA 99

3.12.1 Analysis Methods ...................... 3.12-1

3.12.2 Affected Environment ............... 3.12-5

3.12.3 Environmental Consequences ... 3.12-6

3.12.4 Mitigation and Unavoidable

Environmental Effects ................ 3.12-35

3.13 Socioeconomics..................................... 3.13-1

3.13.1 Analysis Methods ...................... 3.13-1

3.13.2 Affected Environment ............... 3.13-2

3.13.3 Environmental Consequences ... 3.13-9

3.13.4 Mitigation and Unavoidable

Environmental Effects ................ 3.13-31

3.14 Environmental Justice ........................ 3.14-1

3.14.1 Analysis Methods ...................... 3.14-1

3.14.2 Affected Environment ............... 3.14-2

3.14.3 Environmental

Consequences .............................. 3.14-11

3.14.4 Mitigation and Unavoidable

Environmental Effects ................ 3.14-19

3.15 Cumulative Impacts ............................ 3.15-1

3.15.1 Analysis Methods ...................... 3.15-1

3.15.2 Cumulative Impacts Study

Area ................................................ 3.15-1

3.15.3 Affected Environment ............... 3.15-1

3.15.4 Other Past, Present, and

Reasonably Foreseeable Future

Actions ........................................... 3.15-3

3.15.5 Cumulative Impacts by

Resource ....................................... 3.15-10

JA 100

Chapter 4 Mitigation ........................................... 4-1

4.1 Introduction and Approach ........................ 4-1

4.2 Limits of the Surface Transportation

Board’s Conditioning Power...................... 4-1

4.2.1 Cooperating Agency Mitigation

Matters ............................................... 4-1

4.2.2 Voluntary Mitigation and Negotiated

Agreements ......................................... 4-2

4.2.3 The Mitigation Process..................... 4-2

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Joint Appendix — Seven County Infrastructure Coalition, et al., Petitioners v. Eagle County, Colorado, et al. | Frix