Petition for Writ of Certiorari — Simon V. Kinsella, Petitioner v. Bureau of Ocean Energy Management, et al.
Supreme Court briefJun 1, 2023
Ask Donna
What actually matters in this document.
Text
2-1251
file
JUN 01 2023
No.
3n ttje Supreme Court of tlje Unitcii
SIMON V. KINSELLA,
v.
Petitioner,
U.S. BUREAU OF OCEAN ENERGY
MANAGEMENT, ET AL.,
and
SOUTH FORK WIND, LLC,
Respondents.
On Petition for a Writ of Certiorari
To The United States Court of Appeals
For The District of Columbia Circuit
PETITION FOR A WRIT OF CERTIORARI
Simon V. Kinsella
P.O. Box 792
Wainscott, NY 11975
Tel: (631) 903-9154
Si@oswSouthFork.Info
Legal Printers LLC • Washington, DC • 202-747-2400 • legalprinters.com
QUESTIONS PRESENTED
The U.S. Bureau of Ocean Energy Management
(BOEM) knowingly falsified its review of an offshore
wind farm, concealing contamination harmful to
human health, the project’s cost ($2 billion),
procurement manipulation, and other material facts.
It approved the project based on its own deceit. BOEM
has neither answered the complaint (7/20/2022) or the
amended complaint (11/2/2022) nor responded to
allegations of fraud. The court of appeals admitted the
district court did not consider or allow argument on
fraud claims (or parties named under those claims)
before transferring the case. The transferee court did
not recognize claims of fraud (or parties) before,
without power, denying injunctive relief. Petitioner
pro se first learned of that denial three weeks later.
1. Whether the Fifth Amendment requires that
defendants answer allegations against them?
2. Whether fraud by a federal regulatory agency
sends the wrong message to developers, regulators,
and the public, and is the harm that flows from that
message irreparable?
3. Whether construction, the plans for which the
developer secured approval via fraudulent means, is
a valid contributing economic injury when weighing
the equities in contemplation of injunctive relief
seeking to prevent that construction?
3. Whether 28 U.S.C. § 1404 requires consideration
of the convenience of parties and witnesses before
transferring a case three hundred miles from three
federal agency defendants’ offices, nine officials
(defendants in fraud claims), potential witnesses, and
seventeen causes of action to an inconvenient forum
prejudicial to claims filed in a permissible venue?
(i)
PARTIES TO PROCEEDINGS
Petitioner who was the plaintiff-petitioner is
Simon V. Kinsella, pro se.
Respondents that were defendants-respondents
are U.S. Bureau of Ocean Energy Management
(BOEM); and in their official capacities working for
BOEM: Director Elizabeth Klein; Chief Michelle
Morin, Environment Branch for Renewable Energy;
Program Manager James F. Bennett, Office of
Renewable Energy Programs; Environmental
Studies Chief Mary Boatman, Office of Renewable
Energy Programs; Economist Emma Chaiken;
Economist Mark Jensen; Biologist Brian Hooker;
and Jennifer Draher; and Secretary of the Interior
Deb Haaland, U.S. Department of the Interior
(DOI); Principal Deputy Assistant Secretary Laura
Daniels-Davis, Land and Mineral Management;
and Administrator Michael S. Regan, U.S. Environ
mental Protection Agency (EPA).
Respondent that was intervenor-defendantrespondent is South Fork Wind LLC (SFW)
(formerly Deepwater Wind South Fork LLC).
Note: BOEM Director was Amanda Lefton when
filing the complaint on July 20, 2022, but Ms. Lefton
resigned effective January 19, 2023.
(ii)
RELATED CASES
The Supreme Court of the United States:
Simon Kinsella, Applicant v. Bureau of Ocean
Energy Management, et al., (22A1097), Application
for injunctive relief and a stay, submitted to The
Chief Justice (dated June 12, 2023), Supplemental
Brief (filed June 16, 2023).
United States Court of Appeals (D.C. Cir.):
In re: Simon V. Kinsella, No. 22-5317. Petition for
a writ of mandamus seeking review of the district
court’s order granting defendants’ motion to transfer
the case to the Eastern District of New York
(E.D.N.Y.). Judgment entered upon petition for writ
of mandamus affecting the transfer and an
emergency motion for a temporary restraining order
and preliminary injunction entered May 17, 2023
(idenied) (App 4a-5a). Judgment upon petitioner’s
motion to stay the mandate, treated as a motion to
stay the effectiveness, entered June 9, 2023 (denied)
(App 3a).
Simon V. Kinsella v. Bureau of Ocean Energy
Management, et al, No. 22-5316. Judgment upon
appellees-respondants’ motion to dismiss entered
February 23, 2023 (granted).
United States District Court (D.D.C.):
Simon V. Kinsella v. Bureau of Ocean Energy
Management, et al., No. l:22-cv-02147 (JMC).
Judgment upon federal defendants’ motion to
transfer entered November 10, 2022 (granted). See
Order (App 8a) and Opinion (App 9-19a).
(iii)
United States District Court (E.D.N.Y.):
Simon V. Kinsella v. Bureau of Ocean Energy
Management, et ah, No. 2:23-cv-02915 (FB).
Judgment upon plaintiff-petitioner’s motion for
preliminary injunction (D.D.C., No. l:22-cv-02147,
ECF 35) entered without power before the ruling to
transfer (entered May 17, 2023) became effective
contrary to D.C. Circuit order issued April 24, 2023
(“the case was transferred prematurely and in error
... The case in the Eastern District of New York, No.
2:23-cv-02915, has been administratively closed”)
See E.D.N.Y. Docket entry 04/19/2023 (App 20a) and
Docket entry 05/18/2023 “preliminary injunction is
denied” (App 21a-22a). Petitioner was not notified.
See MEMO and ORDER (App 28a-36a).
(iv)
TABLE OF CONTENTS
Questions Presented.............................................
Parties to Proceedings..........................................
Related Cases.........................................................
Table of Content.....................................................
Table of Authorities..............................................
Constitution, Statutes, and Regulations..........
Petition for a Writ of Certiorari....................
Opinions below.......................................................
Jurisdiction.............................................................
Statutory and Regulatory Provisions Involved
Preserving the Record..........................................
Statement
PROCEDURAL ABUSE:
District Court for the District of Columbia._
District Court Order to Transfer...................
Court of Appeals for the D.C. Circuit...........
Background...........................................................
Project: South Fork Wind (SFW)....................
Bureau of Ocean Energy Management........
Fraud: PFAS Contamination.......................
Fraud: Project Cost ($2 billion)......................
Fraud: South Fork RFP...................................
(i)
(h)
(iii)
(v)
(vi)
(ix)
1
1
1
1
1
2
2
6
7
10
10
10
12
14
15
16
18
Reasons for granting the petition..............
1. Petitioner will likely succeed on the merits .
2. Petitioner will likely suffer irreparable harm ... 23
3. The balance of equities favors Petitioner..
31
4. Injunctive relief favors the public interest
36
Conclusion
37
(v)
TABLE OF AUTHORITIES
Page
Cases:
Agency for Inti Development v. Alliance for Open
Society, 140 S. Ct. 2082 (2020)........................... 23
American Civil Lib. U. v. City of St. Charles,
794 F.2d 265 (7th Cir. 1986)............................... 29
Amoco Production Co. v. Gambell,
480 U.S. 531 (1987).............................................. 31
Archdiocese of Wash. v. Wash. Metro.
Area Transit Auth., 897 F.3d 314
(D.C. Cir. 2018)...................................................... 37
Armstrong v. Manzo,
380 U.S. 545 (1965).............................................. 22
Baltimore Gas & Electric Co. v. Natural Res.
Defense Council, Inc., 462 U.S. 87 (1983) 19, 20
Chaplaincy of Full Gospel Churches v. England,
454 F.3d 290 (D.C. Cir. 2006)
24, 29
Citizens Against Burlington, Inc. v. Busey,
938 F.2d 190 (D.C. Cir. 1991)................
19
Davis v. Pension Benefit Guar. Corp.,
571 F.3d 1288 (D.C. Cir. 2009)..............
17-18
Elrod v. Burns,
427 U.S. 347 (1976)..................................
23
Feltman v. Sarbov,
366 A.2d 137 (D.C. 1976)........................
34
Fine v. McGuire,
433 F.2d 499 (D.C. Cir. 1970)................
22
Gordon v. Holder,
721 F.3d 638 (D.C. Cir. 2013)................
36, 37
(vi)
Grannis v. Ordean,
234 U.S. 385 (1914)..................................
22
Jacob v. Roberts,
223 U.S. 261(1912).................................
22
Kleppe v. Sierra Club,
427 U.S. 390 (1976).................................
19
Kelley v. Everglades District,
319 U.S. 415 (1943).................................
17
League of Women Voters of U.S. v. Newby,
838 F.3d 1 (D.C. Cir. 2016)....................
36-37
Lynch v. Donnelly,
465 U.S. 668 (1984).................................
24
Mathews v. Eldridge,
424 U.S. 319 (1976).................................
22
Michigan y. Envtl. Prot. Agency,
135 S. Ct. 2699 (2015).............................
19
Percoco v. United States,
No. 21-1158, 598 U.S. —, — S. Ct. —, 2023 WL
37-38
3356527 (May 11, 2023)
Pursuing Am.’ Greatness v. Fed. Election Comm’n,
17-18, 31, 36
831 F.3d 500 (D.C. Cir. 2016).
Pyne v. Jamaica Nutrition Holdings Ltd.,
497 A.2d 118 (D.C. 1985)
20, 21, 34-35
Railroad Comm’n of Tex. v. Pullman Co.,
312 U.S. 496, 500, 61 S.Ct. 643, 85 L.Ed.
971 (1941)......................................................
31
Sage v. Broadcasting Publications, Inc.,
997 F. Supp. 49 (DDC 1998)......................
34-35
(vii)
Simon Schuster v. Crime Victims Bd.,
502 U.S. 105 (1991)...........................
36
Starnes v. McGuire,
512 F.2d 918 (D.C. Cir. 1974).........
8
Tripati v. Henman,
No. 85-170 (D.Ariz. May 13, 1987).
8
Tripati v. Henman,
No. 86-231 (D.Ariz. April 14, 1987)
8
United States v. Williams,
836 F.3d 1 (D.C. Cir. 2016).............
. 20, 35
Van Dusen v. Barrack,
376 U.S. 612 (1964)..........................
16-17
Washington v. Reno,
35 F.3d 1093 (6th Cir. 1994)...........
36-37
Weinberger v. Romero-Barcelo,
456 U.S. 305 (1982)..........................
31
Winter v. Nat. Res. Def. Council, Inc.,
555 U.S. 7 (2008)...............................
17, 31
(viii)
CONSTITUTION, STATUTES,
AND REGULATIONS
U.S. Constitution...... 2, 3, 6, 21, 24, 29, 30, 36, 37
Fifth Amendment...... ........ 2, 4, 10, 16, 17, 32, 37
Due Process Clause.... ..............................6, 23, 25
24, 25, 29
Establishment Clause
6
Freedom of Information Act
5 U.S.C. § 552(a)(4)(B)........
6
1
28U.S.C. § 1254(1)
7, 16, 17
28 U.S.C. § 1404 ..................
National Environmental Policy Act (NEPA),
42 U.S.C. 4321 et seq.
6, 10, 19, 21, 26-27, 35
21
42 U.S.C. 4331(a)......
19
42 U.S.C. 4332..........
NEPA Regulations, 40 C.F.R.:
§ 1502.14.....................................................
§ 1506.5.......................................................
19
18
Outer Continental Shelf Lands Act (OCSLA)
.6, 10, 11
43 U.S.C. § 1331 et seq..................
....10, 18
43 U.S.C. § 1332.............................
OCSLA Regulations, 30 C.F.R.:
§ 585.626................................
§ 585.627................................
§ 585.628................................
§ 585.628(f)............................
11
11, 14, 34, 35
11
10
Federal Rules of Civil Procedure:
Rule 9(b)................................
2,9
(ix)
PETITION FOR A WRIT OF CERTIORARI
OPINIONS BELOW
The orders of the court of appeals (App. 3a, 4a-5a,
6a, 7a) are unreported. The order and opinion of the
district court for D.C. (App. 8a, 9a-19a) are un
reported. The orders and opinion of the district court
for E.D.N.Y. (App. 20a-27a, 28a-35a) are unreported.
JURISDICTION
The judgment of the court of appeals ordered
Petitioner’s emergency motion for a temporary
restraining order and preliminary injunction be
denied, and the petition for a writ of mandamus
seeking review of the district court order to transfer
be denied, entered May 17, 2023. (App 4a-5a) The
judgment of the court of appeals ordered Petitioner’s
motion to stay the mandate (treated as a motion to
stay the effectiveness) be denied, entered June 9,
2023. (App 3a). The Jurisdiction of this Court is
invoked under 28 U.S.C. § 1254(1).
STATUTORY AND REGULATORY
PROVISIONS INVOLVED
Pertinent provisions are set out in the appendix
to the petition (App 36a-38a).
PRESERVING THE RECORD
On July 20, 2022, Petitioner submitted to the
district court (on USB thumb drive) 207 exhibits
(provided to Defendant Bureau of Ocean Energy
Management on February 22, 2021). The court
accepted the files (D.D.C., No. l:22-cv-02147, ECF 3).
1
On November 29, 2022, Petitioner included “a USB
Flash Drive containing the files submitted in the
district court (docket l:22-cv-02147)” (D.C. Cir., No.
22-5317, 1976909, at vii). The documents form part of
the record.
STATEMENT
The Fifth Amendment to the United States
Constitution guarantees that “[n]o person shall ... be
deprived of life, liberty, or property, without due
process of law
If our Constitution is to have
meaning, its guaranteed rights must be dependable.
Petitioner invokes those guarantees now.
Three federal courts denied Petitioner the
fundamental right to a fair hearing. The judgments of
the district courts (for the District of Columbia and the
Eastern District of New York (E.D.N.Y.)), and the
Court of Appeals for the D.C. Circuit, have so far
departed from the accepted and usual course of
judicial proceedings, sanctioned (unconstitutional)
procedure in aid of perpetuating fraud by a federal
regulatory agency as to call for an exercise of this
Court’s supervisory power.
PROCEDURAL ABUSE:
District Court for the District of Columbia
Seven months ago (November 2, 2022), Petitioner
filed as of right First Amended Complaint that
“state[s] with particularity the circumstances
constituting fraud” (Fed. R. Civ. P. 9(b)) involving nine
Bureau of Ocean Energy Management (BOEM)
officials, named defendants (parties and potential
witnesses) who participated in a fraudulent
environmental review. BOEM has not answered the
amended complaint. BOEM did not answer the
2
complaint filed ten months ago (July 20, 2022).
BOEM did not respond to a summary judgment
motion, including eighty-nine material facts where
there is no genuine dispute (D.C. Cir., No. 22-5317,
Doc. 1999552-21), filed eight months ago (September
26, 2022). Each time, BOEM had an opportunity to
deny the allegations but did not. The district court
repeatedly turned to procedural abuse in aid of
protecting federal agency officials who knowingly
made materially false statements concerning an
offshore
wind project,
violating Petitioner’s
constitutional right to due process.
The evidence of fraud is disturbing.
It
conclusively shows that BOEM deliberately falsified
the review of an offshore wind project promoted by
South Fork Wind LLC (SFW),1 concealing extensive
environmental contamination harmful to human
health (see Kinsella Affidavit, D.C. Cir., No. 22-5317,
Doc. 1999552-02,
9-67)(App 39a-49a), the project
cost ($2 billion) and its adverse socioeconomic impact
(id.,
68-91)(App 49a-56a), procurement manipul
ation that stifled competition (id.,
92-106)(App
56a-62a), and other material facts such as adverse
population-level effects on an essential fish habitat for
Atlantic Cod (Cox Ledge), and a viable alternative
offering the same energy at half the price.
Seven instances of BOEM’s fraudulent review are
prominently upfront in Petitioner’s First Amended
Complaint.2 The district court accepted the amended
complaint but refused to recognize substantive
allegations of fraud or named defendants under the
1 Formerly Deepwater Wind South Fork LLC
2 See First Amended Complaint, excerpts, D.C. Cir., No. 22-5317,
Doc. 1999552-22 (at 1-7)
3
five fraud claims introduced into the complaint.
BOEM’s only defense is for the courts to deprive
Petitioner of a hearing on his fraud claims in violation
of the Fifth Amendment. On November 29, 2022,
Petitioner filed a Petition for a Writ of Mandamus
seeking review of the district court’s practice of
denying Petitioner’s rights to respond to defendants’
motions and a fair hearing five times in two months,3
as follows—
(1)
September 13, 2022— the district court
granted defendants’ motion to extend time “for The
Government to file its responsive pleading to the
Complaint” that defendants filed the day before,
thereby denying Petitioner the opportunity to
respond. See No. 22-5317, Doc. 1999552-03, (“D.D.C.
DOCKET”) (at 4, MINUTE ORDER 09/13/2022).
Frustrated, Petitioner filed (September 26, 2022)
a cross-motion for partial summary judgment and
statement of material facts with eighty-nine facts
where there is no genuine dispute (see No. 22-5317,
1999552-21). In response, BOEM filed a motion to
strike or stay the briefing (October 6, 2022) (D.D.C.
Docket, at 4, ECF 24).
(2)
October 9 (Sunday)— the district court
granted defendants’ motion to strike or stay the
briefing (filed three days earlier) on Petitioner’s
summary judgment motion (stayed), denying
Petitioner the opportunity to respond (D.D.C. Docket,
at 5, MINUTE ORDER 10/09/2022).
(3)
November 9— A month later, the court
ruled to strike Petitioner’s summary judgment motion,
“[i]t is premature given that the defendants haven’t
3 See Reply to Federal Defendants’ Opposition to Mandamus
Petition, No. 22-5317, Doc. 1994449, corrected)
4
formally responded” (see Hearing Tr., November 9,
2022, No. 22-5317, Doc. 1994062-11, at 3:8-9), “just so
that the docket is cleaned up and that defendants
don’t have this outstanding obligation” (id., 3:21-22).
Petitioner did not have an opportunity to respond
before the court ruled to strike (D.D.C. Docket, at 7,
MINUTE ORDER 11/10/2022).
On November 2, 2022, Petitioner filed First
Amended Complaint (as of right) concurrently with a
motion for a temporary restraining order and
preliminary injunction (D.D.C. DOCKET, at 5-6, ECF
34 and 35). The district court accepted the amended
complaint (during the November 9 hearing) — “I will
grant ... Mr. Kinsella’s motion to amend the
complaint, which he was free to do as a matter of
course at this stage of the proceedings ... when we are
referring ... to any allegations, we are all talking
about the same operative complaint.”4
However, the district court did not address or allow
comment on the amended complaint’s five claims of
fraud (and nine BOEM officials named defendants
under' those claims) or seven instances of fraud
prominently upfront.5 The D.C. Circuit admitted the
district court did not “consider or allow argument on
[Petitioner’s five] claims of fraud” (or nine defendants,
potential witnesses, named under the claims)(App 5a).
During the November 9 hearing, the court did not
grant Petitioner the opportunity to address issues
regarding allegations of fraud (or BOEM’s review).
November 9— The district court ruled to
(4)
transfer the case absent a hearing on claims of fraud
4 See November 9, 2022, Hearing Tr. (at 2:20-25 and21:l-2)(D.C.
Cir., No. 22-5317, Doc. 1994062-11).
5 See First Amended Complaint, excerpts, No. 22-5317, Doc.
1999552-22, at 3-10)
5
or contemplation of parties and potential witnesses. It
was the fourth time the district court denied
Petitioner the right to respond or speak to fraud issues
at a fair hearing.
(5)
November 9— “[T]he Court DENIES
[Petitioner’s] Motion for a Temporary Restraining
Order 35 for the reasons stated on the record at the
hearing.”6 However, for the same reasons the hearing
on the transfer order was deficient, the hearing on the
TRO was also defective because it failed to address
critical fraud arguments. Without considering critical
elements of fraud (by BEOM and SFW), the court had
no reason to question whether SFW’s economic injury
resulted from wrongdoing or fraud when weighing the
equities in consideration of injunctive relief. It was
the fifth time the district court had denied Petitioner
his fundamental constitutional right to a fair hearing
on fraud claims and due process of law.
District Court Order to Transfer
On July 20, 2022, Petitioner filed his complaint in
Washington, D.C., a permissible venue easily
commutable between the courthouse and three federal
agency defendants’ offices where the causes of action
occurred giving rise to the claims under federal law—
the National Environmental Policy Act (NEPA), Outer
Shelf Continental Lands Act (OCSLA), Due Process
Clause, and the Freedom of Information Act (FOIA).
The District of Columbia is a forum with recognized
expertise in FOIA complaints.7
The district court ordered the case be transferred
from Washington, D.C., a convenient location for all
e See D.D.C. DOCKET, MINUTE ORDER 11/10/2022 (D.C. Cir.,
No. 22-5317, Doc. 1999552-03, at 7)
7 5 U.S.C. § 552(a)(4)(B)
6
parties and potential witnesses chosen by Petitioner,
to the district court in the E.D.N.Y., three hundred
miles from three federal agency defendants’ offices,
nine BOEM officials (defendants and potential
witnesses named in five fraud claims) and the
seventeen causes of action. The courthouse in Central
Islip is convenient for no parties or potential witnesses.
Court of Appeals for the D.C. Circuit
On November 29, 2022, Petitioner filed a Petition
for a Writ of Mandamus seeking review of the district
court’s order transferring the case without a hearing
or considering the convenience of parties and potential
witnesses according to 28 U.S.C. § 1404.
On February 23, 2023, the assigned panel, Circuit
Judges Wilkins, Rao, and Walker, ordered “the United
States and South Fork Wind LLC [SFW] enter
appearances and file responses to the mandamus
petition” (App 7a), which they did (on March 27, 2023).
Petitioner filed a timely reply (see No. 22-5317, Doc.
1994449, corrected).
On April 19, 2023, in what appeared to be an
attempt to evade appellate scrutiny, the district court
transferred the case to the E.D.N.Y. without power
before the court of appeals had ruled on the
mandamus petition. An emergency motion filed that
day sought return of the files {id., Doc. 1995489).
On April 24, 2023, a D.C. Circuit order confirmed
that “the case was transferred prematurely and in
error ... [and] [t]he case in the Eastern District of New
York, No. 2:23-cv-02915, has been administratively
closed” {id., Doc. 1996148) (ORDER App 6a)(E.D.N.Y
Docket, App 20a).
However, the next day, the E.D.N.Y. case was
“reassigned to Judge Frederic Block and Magistrate
7
Judge Steven Tiscione (as related to 22-cv-1305) for all
further proceedings.” (E.D.N.Y. Docket, App 20a-21a),
and on May 1, reopened—“[o]rderQ by Judge Frederic
Block” (see E.D.N.Y. Docket, 05/01/2023, App 21a).
Petitioner had not been notified that his case had been
reassigned and reopened.
Concerned about agency malfeasance by BOEM
and continuing (unlawful) construction it approved
based on fraud, Petitioner filed a motion for a
temporary restraining order and preliminary
injunction enjoining construction activities of
respondent SFW on May 16, 2023 (at 9:02 p.m.).
On May 17, 2023 (12:10 p.m.), only hours after the
motion had been filed, a new panel (Circuit Judges
Millet, Pillard, and Rao) decided the case (initially
assigned to Circuit Judges Wilkins, Rao, and Walker).
The new panel denied the mandamus petition, thus
affecting transfer, and denied injunctive relief (App
4a-5a). Such a swift decision left little time for
consideration on the merits.
The court of appeals’ order denying the mandamus
petition (App 4a-5a) relies on a case concerning a
prisoner in Arizona who sought to overturn a transfer
order based on an alleged denial of access to legal
materials, where he had filed the same claims in
another U.S. District Court (in Arizona). “[T]he
Arizona district court has found, on two previous
occasions, that the law library at FCI-Tucson is
constitutionally adequate. See Tripati v. Henman, No.
86-231
(D.Ariz. April 14,
1987); Tripati v.
Henman, No. 85-170 (D.Ariz. May 13, 1987).” Id. In
that case, the court concluded transfer was warranted
“due to its familiarity with the related civil suits filed
there [in Arizona in federal court] by Tripati[,]” citing
“Starnes v. McGuire, 512 F.2d at 932” (id.), another
8
case concerning a prisoner and habeas issues. This
case is not a habeas action, and Petitioner Kinsella is
not a prisoner. Petitioner has commenced only one
action in any court (federal or state), where he
“state[s] with particularity the circumstances
constituting fraud” (Fed. R. Civ. P. 9(b)) concerning
nine named BOEM officials (defendants and potential
witnesses) and a fraudulent environmental review by
a federal agency.
The court of appeals’ order denying injunctive relief
gave no reason for its denial in conflict with this Court
precedent (seep. 17).
The next day (May 18), the E.D.N.Y. court ordered
“[pjlaintiffs motion [in D.D.C., No. l:22-cv-02147,
ECF] 35 for a preliminary injunction is DENIED.
Ordered by Judge Frederic Block on 5/18/2023” (App
21a)(App 28a-35a). The order was without power.
D.C. Circuit Rule 41(3) states that—
No mandate will issue in connection
with an order granting or denying a
writ of mandamus ... but the order or
judgment ... will become effective
automatically 21 days after issuance
Twenty-one days after issuance of that order is
June 7, 2023. However, the E.D.N.Y. court denied
Petitioner’s preliminary injunction on May 18, 2023
(App 28a-35a), twenty days before the transfer had
The (unlawful) order denying
become effective.
Petitioner a preliminary injunction was not without
prejudice. Petitioner had not been notified and was
unaware of the proceedings. There was no hearing.
The caption on the E.D.N.Y. court order (App 28a)
erecludes eight defendants (BOEM officials) named in
9
Petitioner’s five fraud claims. The E.D.N.Y. court
ignored Petitioner’s amended complaint as if it, the
defendants, and the fraud claims do not exist.
The E.D.N.Y. court order denying injunctive relief
violates Petitioner’s Fifth Amendment right to a
hearing on fraud claims that had also been denied him
in the D.C. district court and the D.C. Circuit.
BACKGROUND
Project: South Fork Wind (SFW)
The Project BOEM approved is an offshore wind
farm (130 megawatts) approximately 19 miles
southeast of Block Island, Rhode Island, and 35 miles
east of Montauk Point, New York, in the Atlantic
Ocean. The project includes high-voltage (138 kV)
transmission and related infrastructure installed
underneath local laneways and streets through a
residential neighborhood in Wainscott, N.Y. (for
approximately two-and-a-half miles).
SFW commenced construction in February 2022.
Bureau of Ocean Energy Management
Under Outer Continental Shelf Lands Act (OCSLA)
regulations, BOEM has authority to “approve,
disapprove, or approve with modifications” (30 C.F.R.
§ 585.628(f)) construction and operations plans for
multi-billion-dollar offshore development in marine
environments on the “[Ojuter Continental Shelf [that]
is a vital national resource reserve held by the Federal
Government for the public” (43 U.S.C. § 1332(3)).
BOEM is the lead federal agency responsible for
SFW’s environmental review pursuant to the NEPA
and the OCSLA.
It developed the Final
Environmental Impact Statement (FEIS) (August 16,
2021) for SFW’s Construction and Operations Plan
10
(COP) (May 2021) and issued a Record of Decision
(ROD) approving the FEIS (on November 24, 2021).
According to the ROD,
[OCSLA] regulations at 30 C.F.R §
585.628 require BOEM to review the COP
and all information provided therein
pursuant to 30 C.F.R. §§ 585.626 and
585.627, to determine whether the COP
contains all the information necessary to
be considered complete and sufficient for
BOEM to conduct technical and
environmental reviews [see 22-cv-02147,
ECF No. 45.2, at D-5, PDF 97, second
paragraph].8
The ROD confirms that—
Throughout the review process, BOEM
evaluated the information [that] ... South
Fork Wind submitted, and determined
that the information provided was
sufficient in accordance with the
regulations [id., at D-6, PDF 98, second
paragraph].
OREP has determined that the COP
includes all the information required in
30 C.F.R. §§ 585.626 and 585.627 for the
Proposed Project [id., third paragraph].
On January 18, 2022, BOEM “approved the
Construction and Operations Plan (COP) that South
8 See Record of Decision (ROD), issued by BOEM on November
24, 2022. Available at boem.gov— www.boem.gov/renewableenergy/state-activities/south-fork
11
Fork Wind, LLC initially submitted on June 29, 2018,
and last updated on May 7, 2021
9
Fraud: PFAS10 Contamination
onshore
acknowledges
that
SFW’s
COP
construction “activities [] could impact water quality
and water resources ... including] the installation of
the underground transition vault at 0 Beach Lane ...
[and] installation of the underground SFEC [South
Fork Export Cable] Q [o]nshore route ...” 11 BOEM’s
FEIS contradicts SFW’s COP. BOEM asserts that
“[t]here are no onshore construction activities under
the Proposed Action that would require ground
disturbance at depths at or near groundwater
resources, and all activities would meet permit and
regulatory requirements to continue protecting
groundwater as drinking water resources ... Onshore
subsurface ground-disturbing activities would not be
placed at a depth that could encounter groundwater,
and would therefore not result in impacts on water
quality.”12 BOEM states that “groundwater quality in
the analysis area appears to be good” (No 22-5317,
Doc. 1999552-16, at l).13 BOEM knew its statements
9 See SFW COP (May 2021) (at 4-67, PDF 235,1 6)—
www.boem.gov/sites/default/files/documents/renewableenergy/South-Fork-Construction-Operations-Plan.pdf
10 PFAS: Per/- and Polyfluoroalkyl Substance contamination.
11 BOEM SFW COP Approval Letter, January 18, 2022 (at 1)—
www.boem.gov/sites/default/files/documents/renewableenergy/state-activities/SFWF-COP-Approval-Letter.pdf
12 See FEIS (at H-28, PDF 660, t 3). Available at boem.gov—
www.boem.gov/sites/default/files/documents/renewableenergy/state-activities/SFWF%20FEIS.pdf
13 See Final Environmental Impact Statement (FEIS), August 16,
2021 (at H-23, PDF 655). Available at boem.gov (see link)—
www.boem.gov/renewable-energy/state-activities/south-fork
12
on the project’s impact on groundwater and existing
groundwater quality were false.
In February 2021, nine months before BOEM
approved the FEIS (November 24, 2021), BOEM
received and uploaded (to regulations.gov) Petitioner’s
comments and 207 exhibits. Petitioner’s letter asked
BOEM “that the documents be incorporated by
reference and form part of my comments ... and that
BOEM, as lead agency, conduct [s] a broad review of
the whole Project.... ”14
documents
included
multiple
site
The
characterization reports for two adjacent properties
on either side of SFW’s proposed construction corridor
through Wainscott (two prepared for New York State
Department of Environmental Conservation and
another for the Town of East Hampton), hundreds of
laboratory test results for PFAS contamination of
private drinking water wells from Suffolk County
Department of Health Services (SCDHS), testimony,
and maps. The evidence shows beyond doubt that
groundwater in the area where SFW proposed
constructing concrete infrastructure for high-voltage
transmission cables encroaching into and at the
capillary fringe of a sole-source aquifer contains high
levels of PFAS contamination exceeding regulatory
limits. One document, an EPA “FACT SHEET’ (2016)
on “PFOA & PFOSI15] Drinking Water Health
Advisories,” reads— “[E]xposure to PFOA and PFOS
over certain levels may result in adverse health
effects, including developmental effects to fetuses
during pregnancy or to breastfed infants (e.g., low
birth
weight,
accelerated
puberty,
skeletal
14 See D.C. Cir., No. 22-5317, Doc. 1999552-12, at 2, 5th 1)
15 Perfluorooctanoic Add (PFOA); Perfluorooctane Sulfonate (PFOS).
13
variations), cancer (e.g., testicular, kidney), liver
effects (e.g., tissue damage), immune effects (e.g.,
antibody production and immunity), thyroid effects
and other effects (e.g., cholesterol changes).”16
In Suffolk County, thirty-two percent (32%) of all
wells with PFOA or PFOS contamination exceeding
regulatory limits are in the exact same area where
South Fork Wind proposed installing its underground
concrete infrastructure.17 Neither BOEM’s FEIS nor
SFW’s COP mentions either chemical compound. See
Kinsella Affidavit (D.C. Cir., No. 22-5317, Doc.
1999552-02, IfH 9-53)(App 39a-46a).
Fraud: Project Cost ($2 billion)
In 2018, Petitioner informed BOEM of SFW’s
“fail[ure] to comply with 30 CFR 585.627(a)(7) with
specific regard to its potential negative impact upon
employment” and of the Project cost, “$1,624,738,893.”
Now that cost is $2,013,198,056. BOEM knew that
SFW came at a price but failed to acknowledge or
consider the project cost in its socioeconomic impact
BOEM’s one-sided economic analysis
analysis.
accounts for beneficial Project-related spending in the
local economy but ignores the cost burden to
ratepayers ($2 billion), which would adversely impact
the local economy. The Project cost outweighs SFW’s
claimed beneficial spending many times over. For
every dollar SFW puts into the economy, it takes out
is See EPA FACT SHEET PFOA & PFOS (2016) at link—
https://downloads.regulations.gov/BOEM-2020-00660386/attachment_13.pdf
17 See Newsday, published April 4, 2022, ’Forever chemicals'
found in Suffolk’s private water wells since 2016 (D.C. Cir., No.
22-5317, Doc. 1999552-17, at 3-6) (www.newsday.com/longisland/environment/private-wells-testing-contaminantsdrinking-water-pfas-v49xdvtl)
14
a multiple of that amount. See Kinsella Affidavit
(D.C. Cir., No. 22-5317, Doc. 1999552-02, ff 6891)(App 49a-56a).
Fraud: South Fork RFP
On November 8, 2021, NYSPSC General Counsel
Robert Rosenthal admitted that “[i]n January 2017,
LIPA ... awarded SFWQ a PPA [power purchase
agreement] for the supply of energy at an average
price of 22 cents per kWh” and that “LIPA plans to
purchase the same offshore wind renewable energy
from another wind farm, Sunrise Wind, for 8 cents per
kWh ... The two offshore wind farms - SFWF and
Sunrise Wind Farm - are only two miles apart and are
owned and controlled indirectly by the same joint and
equal partners, Orsted and Eversource.”18 At the
prices admitted by Mr. Rosenthal, SFW is overpriced
by $1,025,415,962 (see Kinsella Affidavit, Iff 105106)(App 61a-62a)
BOEM asserts that the “power purchase agreement
executed in 2017 resulted] from LIPA’s technologyneutral competitive bidding process[,]” referring to the
South Fork RFP (id, f 102)(App 60a). SFW makes the
same false claim in its COP {id, f 103)(App 60a). Nine
months before BOEM approved the Project, Petitioner
provided BOEM with substantiating evidence
The
contradicting BOEM’s and SFW’s claim,
documents show the South Fork RFP advanced
proposals based on technology {not technology-neutral),
was a manipulated procurement that stifled
competition, permitted favoritism, and was not
is See Verified Petition (D.C. Cir., No. 22-5317, 1999552-09, ff
62-64) and Verified Answer {id., 1999552-10, ff 62-64) in Simon
V. Kinsella v. NYSPSC (index 2021-06572, N.Y. App. Div., 2d
Dept.).
15
competitive (id.,
92-106)(App 56a-62a).
approved SFWs project regardless.
BOEM
REASON FOR GRANTING THE PETITION
The district court for D.C. repeatedly denied
Petitioner answers to his complaint, amended
complaint, and a response to his summary judgment
motion and statement of material facts, violating his
Fifth Amendment rights to due process of law.
The courts consistently deny Petitioner a hearing
on his five fraud claims and consideration of named
defendants under those claims, violating his Fifth
Amendment right to a hearing on his claims.
The D.C. Circuit admitted “the district court did
not explicitly consider or allow argument on
[Petitioner’s] independent claims of fraud [and nine
named defendants under those claims], which were
first raised in his amended complaint” (App 5a). Still,
acknowledging the district court did not consider
(explicitly or otherwise) Petitioner’s fraud claims, thus
denying Petitioner a fair hearing; the D.C. Circuit
affirmed the district court’s transfer order.
The D.C. Circuit and the district court rulings to
transfer the case conflict with the plain language of
the statute (28 U.S.C. § 1404)—
(a)
For the convenience of parties and
witnesses, in the interest of justice, a
district court may transfer any civil
action to any other district or division
where it might have been brought...
The courts’ rulings conflict with this Court
precedent. In Van Dusen v. Barrack, this Court held
that the purpose of section 1404(a) “is to prevent the
16
waste of time, energy and money’ and to protect
litigants, witnesses and the public against
unnecessary inconvenience and expense” (376 U.S.
612, 616 (1964)). “[T]he most convenient forum is
frequently the place where the cause of action arose”
(id., at 628). “Section 1404(a) provides for transfer to
a more convenient forum, not to a forum likely to
prove equally convenient or inconvenient” (id., at 646).
On May 17, 2023, the court of appeal for the D.C.
Circuit denied Petitioner injunctive relief without a
hearing (No. 22-5317, Doc. 1999552-0)(see p. 9). The
appeals court gave no reason for denying preliminary
injunction, contrary to this Court precedent in Kelley
v. Everglades District, 319 U.S. 415, 416 (1943)
(“[T]here must be findings, in such detail and
exactness as the nature of the case permits, of
subsidiary facts on which the ultimate conclusion [on
the relevant issue] can rationally be predicated ... it is
not the function of this Court to analyze the evidence
in order to supply findings ... sufficient to indicate the
factual basis for its ultimate conclusion.”)
The courts’ orders denying answers to allegations of
fraud, a hearing on fraud claims, and injunctive relief
compromise proper judicial review of fraud claims and
violate Petitioner’s Fifth Amendment right to due
process of law.
Petitioner’s motion for injunctive relief makes a
clear showing that “four factors, [when] taken together,
warrant relief: likely success on the merits, likely
irreparable harm in the absence of preliminary relief, a
balance of the equities in its favor, and accord with the
public interest. Winter v. Nat. Res. Def. Council, Inc., 555
U.S. 7, 20, 22, 129 S.Ct. 365, 172 L.Ed.2d 249 (2008); see
also Davis v. Pension Benefit Guar. Corp., 571 F.3d 1288,
17
1291-92 (D.C. Cir. 2009).” Pursuing Am/Greatness v.
Fed. Election Comm % 831 F.3d 500, 505 (D.C. Cir. 2016).
Please see Emergency Motion for a Temporary
Restraining Order and Preliminary Injunction (No.
22-5317, Doc. 1999552-01, and Kinsella Affidavit (id.,
Doc. 1999552-02).
i. Petitioner will likely succeed on the merits.
Nine months before BOEM approved the FEIS for
SFW, BOEM acknowledged receiving conclusive
evidence of PFAS contamination in soil and
groundwater in the exact same area where SFW
concrete
installing
underground
proposed
infrastructure for high-voltage transmission cables
(see Kinsella Affidavit, If 9-53)(App 39a-46a). Still,
BOEM’s FEIS contains no discussion, analysis, test
results, or mitigation plans to minimize the project’s
impact on PFAS contamination. It does not consider
the adverse health effects of chemicals the EPA links
to cancer (id,
54-67)(App 46a-49a). In 2018,
Petitioner notified BOEM that it had not considered
the socioeconomic impact of the project’s cost and that
it was substantially more expensive than other nearby
wind farms (id, It 68-76) (App 49a-53a). BOEM failed
to “independently evaluate the information” submitted
by SFW, even after receiving information disproving
SFW’s claim. BOEM “shall be responsible for [the
FEIS’] accuracy.” (40 C.F.R. § 1506.5). BOEM did not
ensure that SFWs development was “subject to
environmental safeguards” (43 U.S.C. § 1332 (3))
concerning onshore PFAS contamination or “consistent
with the maintenance of competition” (id.) regarding a
non-competitive procurement process, where proposals
were advanced based on technology (id., H 104). BOEM
did not discuss alternatives to avoid a contaminated
18
area or obtain the same renewable energy at half the
price from an offshore wind farm two miles away
owned by the same joint and equal partners. “An EIS
must discuss, among other things, ‘alternatives to the
proposed action/ NEPA § 102(2)(C)(iii), 42 U.S.C. §
4332(2)(C)(iii), and the discussion of alternatives
forms ‘the heart of the environmental impact
statement/ 40 C.F.R. § 1502.14” Citizens Against
Burlington, Inc. v. Busey, 938 F.2d 190, 194 (D.C. Cir.
BOEM is required to “consider every
1991).
significant aspect of the environmental impact of [the]
proposed action” Baltimore Gas & Electric Co. v.
Natural Resources Defense Council, Inc., 462 U.S. 87,
97 (1983), and “to disclose the significant health,
socioeconomic, and cumulative consequences of the
environmental impact” (id., at 106-07). It had to “take
a ‘hard look’ at the environmental consequences before
taking a major action” Kleppe v. Sierra Club, 427 U.S.
390, 410, n. 21 (1976).
BOEM did not consider the ($2 billion) project cost.
In 2015, this Court made its position clear in a case
concerning an EPA decision to reduce power plants’
emissions of hazardous air pollutants, analogous to
offshore wind’s efforts to reduce the same emissions.
There, “[t]he Agency gave cost no thought at all,
because it considered cost irrelevant” Michigan v.
Envtl. Prot. Agency, 135 S. Ct. 2699, 2706 (2015).
Justice KAGAN, with whom Justice GINSBURG,
Justice BREYER, and Justice SOTOMAYOR joined,
dissenting, agreed with Justice SCALIA and the
majority— “I agree with the majority—let there be no
doubt about this—that EPA’s power plant regulation
would be unreasonable if ‘[t]he Agency gave cost no
thought at all/ ” Id., (at 2714). Here, BOEM gave the
cost ($2 billion) no thought at all.
19
Instead, BOEM not only neglected its duty to
“inform the public that it has indeed considered
environmental concerns in its decisionmaking
process” (Baltimore Gas, supra, at 97), it went one step
further— it falsified and concealed environmental
contamination by asserting “existing groundwater
quality in the analysis area appears to be good” (No.
22-5317, Doc. 1999552-16), and falsely stated the
project’s socioeconomic impact by omitting the project
cost and the nature of the procurement process,
contradicting evidence it acknowledged receiving nine
months before approving the project.
BOEM’s act satisfies the requisite elements of
fraud. Petitioner can “show by clear and convincing
evidence” (Pyne v. Jamaica Nutrition Holdings Ltd.,
497 A.2d 118, 131 (D.C. 1985)) that BOEM made a
“false representation of material fact which is
knowingly made” (id.) by falsely stating groundwater
quality, the project’s socioeconomic impact, and the
nature of the procurement process, contrary to
evidence it acknowledged receiving with the probable
consequence of approving the project based on its own
false representations. One “may infer ... that a person
intends the natural and probable consequences of acts
knowingly done or knowingly omitted” United States
v. Williams, 836 F.3d 1, 30 (D.C. Cir. 2016). Knowing
the “probable consequences” of its acts would be to
approve the project with false statements absent
accurate information, BOEM issued its ROD
approving the FEIS on November 24, 2021. BOEM’s
false representations would naturally deceive the
reader into believing the water quality in Wainscott is
good, the price of renewable energy is reasonable, and
the procurement was technology-neutral and
20
competitive, but it was not. BOEM deceived the
public.
The final element to prove fraud is an “action [that]
is taken in reliance upon the misrepresentation.”
Pyne v. Jamaica Nutrition Holdings Ltd., (supra). On
October 19, 2018, BOEM published a Notice of Intent
to Prepare an Environmental Impact Statement for
SFW “[c]onsistent with the regulations implementing
the National Environmental Policy Act (NEPA)” (83
Fed. Reg. 53,104).19 On January 8, 2021, BOEM
published a Notice of Availability of a Draft
Environmental Impact Statement “[i]n accordance
with regulations issued under the National
Environmental Policy Act” (86 Fed. Reg. 1520).20 In
response to both notices, Petitioner submitted
comments (on November 18, 2018, and February 22,
2021, respectively).21 Petitioner’s February 2021
comments letter specifically requested “that BOEM,
as lead agency, conduct a broad review of the whole
Project including in all respects the onshore and
offshore components and ‘use all practicable means
and measures’ ” (quoting NEPA 42 U.S.C. § 4331(a)).22
Petitioner relied on BOEM to perform a legally
sufficient review. However, BOEM deceived the
public and Petitioner by failing to perform that
review.
In addition, Petitioner can establish that the
district courts (in D.C. and the E.D.N.Y.) and the D.C.
Circuit deprived him of his Constitutional rights to
due process of law.
19 See https://www.federalregister.gOv/d/2018-22880/p-3. South
Fork Wind LLC (formerly Deepwater Wind South Fork LLC)
20 See https://www.federalregister.gOv/d/2021-00100/p-3
21 See No. 22-5317, Doc. 1999552-10 and Doc. 1999552-11.
22 Id., Doc. 1999552-11 (at 2, fifth paragraph).
21
[A]s a matter of fundamental fairness
the judge must accord an opportunity to
be heard at least whenever there is a
possibility that the hearing may develop
facts bearing on the decision ... See Fine
v. McGuire, 433 F.2d 499, 501 (D.C. Cir.
1970).
The courts repeatedly denied Petitioner his right to
a fair hearing on fraud claims and the contemplation
of the convenience of nine BOEM officials and named
defendants under those claims (parties and witnesses)
before transferring the case and denying injunctive
relief.
The fundamental requirement of due
process is the opportunity to be heard ‘at
a meaningful time and in a meaningful
manner/ Armstrong v. Manzo, 380 U.S.
545, 552 (1965). See Grannis v. Ordean,
234 U.S. 385, 394 (1914). See Mathews v.
Eldridge, 424 U.S. 319, 333 (1976).
The D.C. Circuit admitted that the district court did
not “consider or allow argument on [Petitioner’s]
independent claims of fraud” and named defendants
under those claims (parties and witnesses) but still
concluded “transfer was warranted.” (App 4a-5a)
Petitioner did not have an opportunity to be heard on
his claims of fraud.
Due process of law ... implies the
administration of law ... by a competent
tribunal having jurisdiction of the case
and proceeding upon notice and hearing
[internal quotes removed]. See Jacob v.
Roberts, 223 U.S. 261, 262 (1912)
22
The district court in the E.D.N.Y. ordered that
petition’s preliminary injunction motion be denied
(entered May 17, 2023) twenty days before the D.C.
Circuit’s order denying Petitioner’s mandamus
petition affecting transfer had become effective (June
The E.D.N.Y. district court lacked
7, 2023).23
jurisdiction to deny preliminary injunction. The court
deleted from the order’s case caption the BOEM
officials named as defendants under the fraud
claims(App 28a), and the order itself ignored the fraud
claims (App 28a-35a). The E.D.N.Y. court denied
Petitioner’s preliminary injunction motion without his
knowledge, without a hearing absent contemplation of
fraud claims.
2. The Petitioner and the public will likely suffer
irreparable harm.
The loss of First Amendment freedoms,
for even minimal periods of time,
unquestionably constitutes irreparable
injury. See Elrod v. Burns, 427 U.S. 347,
373 (1976)
Although Elrod v. Burns refers to First Amendment
freedoms, the same applies to Plaintiffs rights to due
process free of bias, but with a distinction. “The First
Amendment does not mandate a viewpoint-neutral
government” (internal quotes removed). Agency for
Int’l Development v. Alliance for Open Society, 140 S.
Ct. 2082, 2090 (2020) (Justice THOMAS concurring
with Justice KAVANAUGH and the majority). The
Due Process Clause requires a court to receive, in the
first instance, substantive claims with a neutral
23 See D.C. Circuit Rules 41(3)
23
viewpoint without pre-judging some claims to be set
aside and to be wholly ignored, as in the case here
regarding Petitioner’s fraud claims. Both district
courts (in D.C. and the E.D.N.Y.) deprived Petitioner
of the right to hear his claims free from prejudice.
Petitioner’s claims were cherry-picked by the courts to
suit a desired outcome.
Harm from the forbidden message
Mien considering Establishment Clause violations
in Chaplaincy of Full Gospel Churches, the D.C.
Circuit recognized that—
[Ojfficial preference of one religion over
such
governmental
another,
endorsement ‘sends a message to
nonadherents
[of
the
favored
denomination] that they are outsiders,
not full members of the political
community, and an accompanying
message to adherents that they are
insiders, favored members of the political
community.’ Lynch v. Donnelly,465 U.S.
668, 688, 104 S.Ct. 1355, 79 L.Ed.2d 604
(1984) (O’Connor, J., concurring).”
(square brackets included in original
text) [supra, at 302]. This harm ... occurs
merely by virtue of the government’s
purportedly unconstitutional policy or
practice [id.] [Specifically, the harm
that flows from the ‘forbidden message’
[supra, at 299].
The D.C. Circuit recognized “harm that flows from
the ‘forbidden message’ ” when government acts send
an adverse message endorsing one religion over
24
another. Whether it be Establishment Clause or Due
Process Clause violations, harm flows from the
message unlawful government acts send. In this case,
BOEM disregarded its statutorily mandated
obligations and engaged in common law fraud against
the public interest. The courts’ violated Petitioner’s
Due Process Clause rights in aid of perpetuating
BOEM’s fraud. Such actions send the wrong message.
Fraud against the public interest by BOEM officials
who have a duty to serve the public sends the wrong
message to the offshore wind industry it regulates.
Marine Construction
The United States has embarked on one of the
largest construction programs in its history. Private
developers have submitted building plans for 3,031
offshore wind turbines24 up to 1,171 feet tall,25 double
the height of the Washington Monument. Each wind
turbine could have up to four foundation piles (12,124
piles), each with a diameter of up to 14.8 feet (half the
width of the Washington Monument’s top section).26
Each foundation pile might penetrate the seabed
down 197 feet.27 To understand the construction
program’s scale, look at the Washington Monument
and imagine more than three thousand monuments
twice the height (half the width) with blades up to 935
feet in diameter28 and streaks of oil and grease
24 See D.C. Cir., No. 22-5317, Doc. 1994062-07 (at 3)
25 Id. (at 1)
26 See SouthCoast Wind (formerly Mayflower Wind), COP, Vol.
II, Rev-E (at 9-16, PDF 498, Table 9-10). At boem.gov (under the
tap “Construction and Operation Plan”)—
https://www.boem.gov/renewable-energy/stateactivities/southcoast-wind-formerly-mayflower-wind
v Id.
m See D.C. Cir., No. 22-5317, Doc. 1994062-07 (at 3)
25
running down the sides from the mechanical turbines
and rotating hubs. The (3,031) offshore wind turbines
require repairs and maintenance and (in total)
4,089,015 gallons of coolant fluids, 8,849,066 gallons
of oils and lubricants, and 2,212,425 gallons of diesel
fuel,29 which must be refilled and changed by boat in
sometimes rough seas. The industrial-scale offshore
development program has inherent risks to life,
property, and the marine environment.
As of March 2023, BOEM had auctioned leases to
private companies to develop 2.8 million acres of lease
area off the U.S. coastline to offshore wind
developers.30 By 2024, BOEM plans to auction an
additional 7.1 million acres (id.). Including areas for
which BOEM has issued a Call for Information and
Nominations (Oregon and the Gulf of Mexico), BOEM
could potentially lease up to 45.3 million acres (id.),
about the same size as the twelve largest U.S.
National Parks combined.31
Any departure from the high standards of
excellence that the nation expects of the federal
agency overseeing such an ambitious build-out of our
coastline could be disastrous. For example, the BP
Deepwater Horizon Disaster, Report to the President
(2011) reads— “With regard to NEPA specifically,
some MMS [BOEM’s predecessor] managers
29 See South Coast Wind (formerly Mayflower Wind), Draft
Environmental Impact Statement, February 2023, Vol. II:
Appendix D, Table D2-3. Offshore wind development activities
on the U.S. East Coast (at D-79, PDF 83). See boem.gov at—
https://www.boem.gov/renewable-energy/stateactivities/southcoast-wind-draft-enviromnental-impactstatement
so See D.C. Cir., No. 22-5317, Doc. 1994062-06 (at 4)
31 Approximately 45.8 million acres (id., Doc. 1994062-08, at 1)
26
reportedly ‘changed or minimized the ... scientists’
potential environmental impact findings in [NEPA]
documents to expedite plan approvals.’ According to
several MMS environmental scientists, ‘their
managers believed the result of NEPA evaluations
should always be a ‘green light’ to proceed.’ ” See No.
22-5317, Doc. 1994062-09 (at 14). “It should be no
surprise under such circumstances that a culture of
complacency with regard to NEPA developed” (id.).
Conflicted oversight
The three people overseeing the development of up
to 45.3 million acres off the U.S. coastline all worked
for a major law firm advising the offshore wind
industry, Latham & Watkins LLP. The current U.S.
Deputy Secretary of the Interior, Tommy Beaudreau,
was a partner in the Washington, D.C. office of
Latham & Watkins (2017-2021).
The Nominee
Report for Mr. Beaudreau lists “DE Shaw Renewable
Investments” as a source of compensation. DE Shaw
Renewable Investments owned South Fork Wind LLC
(formerly Deepwater Wind South Fork LLC) before
selling it to 0rsted A/S, another offshore wind
developer from which Mr. Beaudreau received
compensation. Mr. Beaudreau’s Nominee Report lists
a Latham & Watkins income of $2.4 million. It
identifies the following offshore wind companies—
0rsted A/S, Avangrid Renewables, Vineyard Wind
LLC, Beacon Offshore Energy, TOTAL, innogy
Renewables US, Dominion Resources, Inc., DE Shaw
Renewable Investments, and Anbaric Development
Partners. See Beaudreau 2020 OGE Nominee Report
(id., 1994062-10). The Principal Deputy Assistant
Secretary for Land and Minerals Management
(L&MM), Ms. Laura Daniel-Davis, who signed
27
BOEM’s Record of Decision for SFW, was a Senior
Manager at Latham & Watkins (2001-2007). The
Director of BOEM, Elizabeth (Liz) Klein, was an
Associate at Latham & Watkins (2006-2010).
Counsel representing SFW, Ms. Janice Schneider of
Latham & Watkins, served as Assistant Secretary for
L&MM (2014-2017).
Officials in charge of our nation’s marine resources
at the DOI and BOEM are conflicted. This case leaves
no room for doubt that public officials blurred the lines
between serving the public and private interests and,
with the aid of the courts, attempted to conceal their
choice to further SFWs interests to the public
detriment.
The wrong message
By engaging in acts contrary to law constituting
fraud, BOEM implicitly condones unlawful conduct in
others, including developers operating offshore where
few people can see what they are doing. BOEM’s
reckless neglect and fraudulent conduct send a clear
message that developers need not comply with
regulations and safety standards because BOEM, the
regulator, does not. If a developer plans to build on a
contaminated site, the message is that BOEM will
help you cover it up and approve your project
regardless; after all, it did it for SFW. The message is
loud and clear: SFW does not have to comply with
federal environmental law, so why should we? If
federal regulators turn a blind eye to non-compliance
and fraudulent representations, and if the courts turn
to (unlawful) procedure to thwart proper judicial
review, developers and the public will likewise act
contrary to law.
28
Sending the wrong message regarding compliance
to developers operating in unforgiving, sensitive, and
critical ocean environments and onshore residential
communities is harmful (see BP Deepwater Horizon
Disaster on pp. 26-27).
Harm flows to the public from the message that
government acts in violation of statutory, equity,
common law, and constitutional law send. The public
will lose confidence in the regulatory and judicial
It demoralizes hardworking staff and
process.
scientists at government agencies and judges and
It implicitly condones
officials at courthouses,
unlawful acts by developers, regulators, and the
public. If government regulators violate the law and
judges ignore the people’s constitutional rights, the
Such acts erode our
public will do the same,
constitutional protections.
The harm is irreparable.
In Chaplaincy of Full Gospel Churches, the D.C.
Circuit finds the harm that flows from the ‘forbidden
message’ is irremediable—
[T]he inchoate, one-way nature of
Establishment Clause violations, which
inflict an ‘erosion of religious liberties
[that] cannot be deterred by awarding
damages to the victims of such erosion,’
City of St. Charles,19A F.2d at 275, we
are able to conclude that where a movant
alleges a violation of the Establishment
Clause, this is sufficient, without more,
to satisfy the irreparable harm prong for
purposes of the preliminary injunction
determination. [454 F.3d 290, 303 (D.C.
Cir. 2006)]
29
In this case, the harm resulting from the message
BOEM’s and the courts’ violations send also are of an
“inchoate, one-way nature ...” It includes the fishing
industry struggling to defend the livelihood of its
members, who rightly question the integrity of
BOEM’s decisions. It includes the petitioner, who
doubts the integrity of BOEM and the federal courts.
While Petitioner’s heart still holds hope, experience
tells him that a federal environmental review, like a
federal court, is a charade and the Constitution is like
an elusive mythical creature spoken about but never
experienced. This Court can make the constitutional
experience real.
Petitioner sends email updates to a list of over one
thousand people who forward his emails to others. He
posts information on his websites32 that are accessible
Petitioner communicates his
to the public,
experiences to countless others in an inchoate, one
way nature. Such a disparate group cannot receive
damages. An award of damages cannot remediate the
harm.
The FEIS states that other “[c]ooperating agencies
may rely on this final EIS to support their decision
making.” (FEIS, at ii, PDF 6, 3rd If). The U.S.
Environmental Protection Agency is a listed
cooperating federal agency (ROD, at 1, PDF 3, 2nd If).
Should the EPA rely on BOEM’s false representations
that “[o]verall, existing groundwater quality in the
analysis area appears to be good” (FEIS, at H-23, PDF
655), Wainscott will likely have problems securing
federal assistance from the EPA regarding the
remediation
of harmful
groundwater PFAS
contamination. This is another example of the harm
32 www.Wainscott.Life and www.oswSouthFork.info
30
from BOEM’s unlawful act of fraudulently stating
groundwater quality, sending the wrong message that
ripples through agencies by word of mouth. Wainscott
may not get the support it needs. Such harm is
irremediable.
3. The balance of equities favors Petitioner.
In each case, courts ‘must balance the
competing claims of injury and must
consider the effect on each party of the
granting or withholding of the requested
relief/ Amoco Production Co.,480 U.S., at
542, 107 S.Ct. 1396. ‘In exercising their
sound discretion, courts of equity should
pay particular regard for the public
in
employing
the
consequences
extraordinary remedy of injunction/
Romero-Barcelo,456 U.S., at 312, 102
S.Ct. 1798; see also Railroad Comm’n of
Tex. v. Pullman Co., 312 U.S. 496, 500,
61 S.Ct. 643, 85 L.Ed. 971 (1941). See
Winter v. Natural Res. Def. Council, Inc.,
555 U.S. 7, 24 (2008)
The balance of equities weighs the harm to
Petitioner without injunctive relief against the harm
to SFW with injunctive relief. Petitioner considers the
harm to Defendant Federal Agencies and the public
interest together. See Pursuing Am/ Greatness v. Fed.
Election Comm’n, 831 F.3d 500, 511 (D.C. Cir. 2016)
(“assessing the harm to the opposing party and
weighing the public interest ‘merge when the
Government is the opposing party’ ”).
Petitioner without injunctive relief
31
Petitioner jogs regularly along Beach Lane, where
SFW has installed underground infrastructure for
high-voltage transmission cables. The permanent
concrete duct banks and vaults encroach into
groundwater and are installed at the capillary fringe
of a contaminated sole-source aquifer. BOEM did not
perform the requisite ‘hard look’ environmental
review of the likely chemical interaction between
concrete and PFAS compound contaminants. Plaintiff
has cause to suspect SFW’s infrastructure will become
a secondary source of contamination and prolong its
harmful effects on the environment near his home.
Plaintiff swims and sails in the waters surrounding
the onshore construction corridor that is connected via
groundwater to SFW’s concrete duct banks and vaults.
Plaintiff has cause to suspect that SFW’s overpriced
renewable energy will increase the cost of electricity
and adversely impact the local economy more than
would have occurred had BOEM considered the
project’s cost and procurement manipulation. BOEM
engaged in fraud, denying Petitioner and the public
the right to a legally sufficient environmental review.
The federal courts repeatedly deny Petitioner his Fifth
Amendment right to a hair hearing on his claims.
Without immediate injunctive relief, the harm from
the uncertainty due to the lack of an environmental
review and the message unlawful government actions
send will continue inflicting harm.
SFW with injunctive relief (denying fruits of fraud)
SFW will argue (as it did in the district court) that
it “has already mobilized and begun its prep work ...
that includes bringing highly specialized equipment
that was reserved in advance of construction to the
site at great expense, approximately $40 million.”
32
(November 9, 2022, Hearing Tr., at 5:20-25). SFW
claims it will suffer potential economic injury should
the district court grant Petitioner an injunction.
However, the hearing occurred in November 2022,
after SFW had begun construction. SFW does not
explain why it failed to consider PFAS contamination
when it was widely known in 2017. Suffolk County
Department of Health Services issued a Water
Quality Advisory on October 11, 2017. See Kinsella
Affidavit, No. 22-5317, Doc. 1999552-02, 1 12)(App
41a). PFAS contamination in Wainscott was widely
publicized three years before SFW submitted its final
COP (May 7, 2021). On January 2, 2020, Petitioner
provided SFW with conclusive evidence of extensive
PFAS contamination (also provided to BOEM in
February 2021). See link (last accessed June 17,
2023)—
https://downloads.regulations.gov/BOEM-20200066-0386/attachment_13.pdf.
Despite knowing the extent of contamination for at
least a year before submitting its final COP, SFW did
not alter its plans.
In December 2022 and January 2021, SFW tested
its onshore construction corridor for PFAS
contamination for the first time. The test results
showed groundwater PFOA contamination (50 ppt),
exceeding regulatory limits five times (see No. 225317, Doc. 1999552-20, at 1, 5th column). Groundwater PFOS contamination (14.7 ppt) exceeds
regulatory limits (id., at 2, 8th column). SFWs testing
pre-dates its final COP (submitted on May 7, 2021) by
four months. SFW did not disclose its test results
showing PFAS contamination exceeding regulatory
limits that the EPA links to cancer and other severe
health problems (EPA FACT SHEET, on pp. 13-14)
33
but included other less harmful contaminants, such as
“median groundwater nitrogen levels ... [that] have
risen 40 percent to 3.58 mg/L”,33
SFW (falsely) claimed that its COP “provides a
description of water quality and water resource
conditions in the ... [onshore] SFEC [South Fork
Export Cable] as defined by several parameters
including: ... contaminants in water ...” 34 Despite a
clear duty to “[d]escribe the existing water quality
conditions and your project activities that could affect
water quality” (30 CFR 585.627(a)(2)), and to
“[djescribe the general state of water quality in the
area proposed for your project by reporting typical
metrics for quality including the ... presence or
absence of contaminants in water” (id.) and any
“environmental hazards and/or accidental events
causing accidental releases of... hazardous materials
and wastes” (id.), SFW remained silent on known
onsite PFAS contamination. See Kinsella Affidavit
(No. 22-5317, Doc. 1999552-02, 1)1 146-157)(App 63a67a).
SFW’s false representations of water quality satisfy
the requisite elements of fraud. The Petitioner can
“show by clear and convincing evidence” (Pyne v.
Jamaica Nutrition Holdings Ltd., supra) that SFW
made a “false representation of material fact which is
knowingly made” (id.) “The concealment of a fact that
should
have
been
disclosed
is
also
a
misrepresentation. Feltman v. Sarbov, 366 A.2d 137,
140-41 (D.C. 1976). Where a court finds that a party
had the duty to disclose material information and
33 See COP May 2021 (at 4-61, PDF 229, 1st t). See SFW COP at
boem.gov (under tab “Construction and Operations Plan”)—
www.boem.gov/renewable-energy/state-activities/south-fork
34 Id., (at 4-56, PDF 224, 1st f)
34
failed to do so, there is an even greater likelihood that
the nondisclosure will constitute fraud. Pyne v.
Jamaica Nutrition Holdings, Ltd.,497 A.2d 118,
131 (D.C. 1985)” Sage v. Broadcasting Publications,
Inc., 997 F. Supp. 49, 52 (DDC 1998). According to
BOEM, SFW had a duty to disclose—
Pursuant to 30 C.F.R. § 585.627, the
Lessee [SFW] must submit information
and certifications necessary for BOEM to
comply with the National Environmental
Policy Act of 1969 (NEPA)8 and other
relevant laws, [n.8 “42 U.S.C. § 4321 et
seq.] See ROD (at D-5, PDF 97, third
paragraph)
Contrary to its obligations, SFW did not submit to
BOEM its own test results showing onsite
groundwater PFAS contamination (but disclosed
SFW falsely
other less harmful contaminants),
represented groundwater quality by omission,
knowing it was contaminated, and sought project
approval. One “may infer ... that a person intends the
natural and probable consequences of acts knowingly
done or knowingly omitted” United States v. Williams
(supra).
The “probable consequence” of SFW
knowingly omitting environmental contamination
would likely lead to BOEM‘s approval of its Project.
The final element of fraud is an “action [that] is
taken in reliance upon the misrepresentation.” Pyne v.
Jamaica Nutrition Holdings Ltd., (supra). Petitioner
relied on the accuracy of SFW’s COP and has read it
several times out of concern that SFW would cause
harm to him, his family, his community, and his
35
environment. His concerns have proved to be wellfounded. SFW’s actions constitute (civil) fraud.35
In Simon Schuster v. Crime Victims Bd., this Court
“recognized the ‘fundamental equitable principle,’ ...
that ‘[n]o one shall be permitted to profit by his own
fraud, or to take advantage of his own wrong, or to
found any claim upon his own iniquity ...’ ” (502 U.S.
105, 119 (1991)). It is inconsistent with fundamental
equitable principles for SFW “to profit by his own
fraud” (id.), that is, the fraud when it knowingly
omitted PFAS contamination from its COP that
materially misrepresented groundwater quality and
seeking “to take advantage of [its] own wrong” (id.) by
using its construction (obtained by fraudulent
representations) to defeat injunctive relief, SFW
wants to keep what it gained through fraud despite
the ongoing risks to public health and the
environment absent a legally sufficient review.
4. Injunctive relief favors the public interest.
The case cries out for this Court to defend the
public interest in having agencies comply with their
statutorily mandated obligations and for courts to
uphold the Constitution by granting Petitioner a
fair hearing on his fraud claims.
There is generally no public interest in
the perpetuation of unlawful agency
action. PAG, 831 F.3d at 511-12, 2016
WL 4087943, at *8; Gordon v. Holder,
721 F.3d 638, 653 (D.C. Cir. 2013). To
the contrary, there is a substantial
public interest “in having govern[-]
35 SFW’s COP may have violated 18 U.S.C. § 1001.
36
mental agencies abide by the federal
laws that govern their existence and
operations.” Washington v. Reno, 35
F.3d 1093, 1103 (6th Cir. 1994). See
League of Women Voters of U.S. v.
Newby, 838 F.3d 1, 12 (D.C. Cir. 2016).
There is a public interest in courts guaranteeing
Fifth Amendment rights to due process of law,
including a fair hearing. “The public interest favors
the protection of constitutional rights, see, e.g., Gordon
v. Holder, 721 F.3d 638, 653 (D.C. Cir. 2013)”
Archdiocese of Wash. v. Wash. Metro. Area Transit
Auth., 897 F.3d 314, 335 (D.C. Cir. 2018).
Federal Defendants may argue that “the Project
materially furthers federal renewable energy goals”36
as they did in the D.C. Circuit. However, SFW’s wind
farm (130 MW) represents only one-third of one
percent of U.S. approved offshore wind generating
capacity (39,021 MW);37 thus, it is not material. On
the contrary, granting injunctive relief at this early
stage of offshore wind development would send the
industry and regulators a message that the nation
expects higher standards. This Court could send that
message without materially affecting offshore wind
resources’ overall generating capacity.
CONCLUSION
This Court recognized in Percoco v. United States
that “an agent of the government has a fiduciary duty
to the government and thus to the public it serves”
36 See D.C. Cir., No 22-5316, Doc. 1982686 (at 23)
37 Mayflower Wind’s DEIS (February 2023), Volume II: Appendix
D (D.C. Cir., No. 22-5317, Doc. 1994062-07, at 3). Table D2-1:
OCS Total Generating Capacity (MW) is “39,021”
37
— S. Ct. —, 2023 WL
(No. 21-1158, 598 U.S. 3356527 (May 11, 2023)). It follows that if such agent
has a fiduciary duty, then actual public officials
employed by the government have a fiduciary duty to
the public they serve. Here, clear and convincing
evidence shows that public officials violated their
fiduciary duty and engaged in common law fraud.
Simply put, it cannot be that fraud by a federal
regulatory agency is acceptable.
Petitioner has no alternative remedy.
For the reasons stated herein, Petitioner
respectfully requests that this Court grant his
Petition for a Writ of Certiorari.
Respectfully submitted this 22nd day of June 2023,
’a
SimonlV. Kinsella,
Petitioner pro se
P.O. Box 792,
Wainscott, NY 11975
Tel: (631) 903-915
Si@oswSouthFork.info
38