Joint Appendix — PennEast Pipeline Company, LLC, Petitioner v. New Jersey, et al.

Supreme Court briefMar 1, 2021

Ask Donna

What actually matters in this document.

Text

NO. 19-1039

In the

Supreme Court of the United States

________________

PENNEAST PIPELINE COMPANY, LLC,

Petitioner,

v.

STATE OF NEW JERSEY, et al.,

Respondents.

________________

On Writ of Certiorari to the

United States Court of Appeals

for the Third Circuit

________________

JOINT APPENDIX

Volume I of II

________________

JEREMY M. FEIGENBAUM

PAUL D. CLEMENT

Counsel of Record

Counsel of Record

OFFICE OF THE NEW

KIRKLAND & ELLIS LLP

JERSEY ATTORNEY

1301 Pennsylvania Ave., NW

GENERAL

Washington, DC 20004

25 Market Street

(202) 389-5000

Trenton, NJ 08611

paul.clement@kirkland.com

(609) 376-2690

jeremy.feigenbaum@njoag.gov

Counsel for Respondents

State of New Jersey, et al.

Counsel for Petitioner

(Additional Counsel Listed on Inside Cover)

March 1, 2021

Petition for Writ of Certiorari Filed Feb. 18, 2020

Petition for Writ of Certiorari Granted Feb. 3, 2021

MATTHEW LITTLETON

Counsel of Record

DONAHUE, GOLDBERG,

WEAVER & LITTLETON

1008 Pennsylvania Avenue, SE

Washington, DC 20003

(202) 683-6895

matt@donahuegoldberg.com

JENNIFER L. DANIS

EDWARD LLOYD

MORNINGSIDE HEIGHTS

LEGAL SERVICES

435 W. 116th Street

New York, NY 10027

(201) 306-3382

jld2228@columbia.edu

elloyd@law.columbia.edu

Counsel for Respondent New Jersey

Conservation Foundation

JA i

TABLE OF CONTENTS

Volume I

Relevant Docket Entries, United States Court of

Appeals for the Third Circuit, In re: PennEast

Pipeline Co., LLC, No. 19-1191 ..................... JA-1

Relevant Docket Entries, United States

District Court for the District of New Jersey,

In re: PennEast Pipeline Co., LLC,

No. 3:18-cv-01597 ........................................ JA-26

Order Issuing Certificates, PennEast Pipeline Co.,

LLC, 162 FERC ¶ 61,053 (Jan. 19, 2018) ... JA-35

Order Granting Rehearings for Further

Consideration, PennEast Pipeline Co., LLC,

No. CP15-558-001 (Feb. 22, 2018) ............ JA-212

Order on Rehearing, PennEast Pipeline Co., LLC,

164 FERC ¶ 61,098 (Aug. 10, 2018) .......... JA-213

Volume II

Declaratory Order, PennEast Pipeline Co., LLC,

170 FERC ¶ 61,064 (Jan. 30, 2020) .......... JA-363

Order Denying Rehearing, PennEast Pipeline Co.,

LLC, 171 FERC ¶ 61,135 (May 22, 2020) . JA-460

The following opinions, decisions, judgments, and

orders have been omitted in printing this joint

appendix because they appear on the following page in

the appendix to the Petition for Certiorari:

Appendix A

Opinion, United States Court of Appeals for

the Third Circuit, In re: PennEast Pipeline

Company, LLC, Nos. 19-1191-19-1232

(Sept. 10, 2019) ...................................... Pet.App-1

JA ii

Appendix B

Order, United States Court of Appeals for the

Third Circuit, In re: PennEast Pipeline

Company, LLC, Nos. 19-1191-19-1232

(Nov. 5, 2019) ....................................... Pet.App-32

Appendix C

Opinion, United States District Court for the

District of New Jersey, In re: PennEast

Pipeline

Company,

LLC,

No. 18-1585

(Dec. 14, 2018) ..................................... Pet.App-34

Appendix D

Relevant Statutory Provisions .......... Pet.App-103

15 U.S.C. § 717 ............................ Pet.App-103

15 U.S.C. § 717a .......................... Pet.App-105

15 U.S.C. § 717b .......................... Pet.App-106

15 U.S.C. § 717b-1 ....................... Pet.App-111

15 U.S.C. § 717c .......................... Pet.App-114

15 U.S.C. § 717c-1 ....................... Pet.App-118

15 U.S.C. § 717d .......................... Pet.App-118

15 U.S.C. § 717e .......................... Pet.App-119

15 U.S.C. § 717f ........................... Pet.App-120

15 U.S.C. § 717g .......................... Pet.App-125

15 U.S.C. § 717h .......................... Pet.App-127

15 U.S.C. § 717i ........................... Pet.App-128

15 U.S.C. § 717j ........................... Pet.App-129

15 U.S.C. § 717k .......................... Pet.App-130

15 U.S.C. § 717l ........................... Pet.App-131

15 U.S.C. § 717m ......................... Pet.App-131

JA iii

15 U.S.C. § 717n .......................... Pet.App-135

15 U.S.C. § 717o .......................... Pet.App-138

15 U.S.C. § 717p .......................... Pet.App-138

15 U.S.C. § 717q .......................... Pet.App-140

15 U.S.C. § 717r .......................... Pet.App-141

15 U.S.C. § 717s .......................... Pet.App-145

15 U.S.C. § 717t .......................... Pet.App-147

15 U.S.C. § 717t-1 ....................... Pet.App-147

15 U.S.C. § 717t-2 ....................... Pet.App-148

15 U.S.C. § 717u .......................... Pet.App-151

15 U.S.C. § 717v .......................... Pet.App-151

15 U.S.C. § 717w ......................... Pet.App-152

15 U.S.C. § 717x .......................... Pet.App-152

15 U.S.C. § 717y .......................... Pet.App-153

15 U.S.C. § 717z .......................... Pet.App-162

JA 1

UNITED STATES COURT OF APPEALS

FOR THE THIRD CIRCUIT

________________

No. 19-1191

________________

IN RE: PENNEAST PIPELINE COMPANY, LLC

STATE OF NEW JERSEY; NEW JERSEY DEPARTMENT OF

ENVIRONMENTAL PROTECTION; NEW JERSEY STATE

AGRICULTURE DEVELOPMENT COMMITTEE; DELAWARE

& RARITAN CANAL COMMISSION; NEW JERSEY WATER

SUPPLY AUTHORITY; NEW JERSEY DEPARTMENT OF

TRANSPORTATION; NEW JERSEY DEPARTMENT OF THE

TREASURY; NEW JERSEY MOTOR VEHICLE COMMISSION,

Appellants.

________________

RELEVANT DOCKET ENTRIES

Date Filed

Docket Text

01/25/2019 CIVIL CASE DOCKETED.

Notice filed by Appellants

Delaware & Raritan Canal

Commission,

New

Jersey

Department of Environmental

Protection,

New

Jersey

Department of Transportation,

New Jersey Department of the

Treasury, New Jersey Motor

Vehicle

Commission,

New

Jersey

State

Agriculture

Development Committee, New

Jersey Water Supply Authority

JA 2

Date Filed

Docket Text

and State of New Jersey in

District Court No. 3-18-cv01597.

(KR)

[Entered:

01/25/2019 03:42 PM]

01/30/2019 CLERK ORDER consolidating

the Appeals at Nos. 19-1191

through

19-1232

for

all

purposes. The parties are

advised that all case opening

forms, motions and briefs must

be electronically filed in all

cases on the Court’s electronic

case filing (ECF) system. All

required case opening forms

should be filed within 14 days of

the date of this Order. For ease

of

docketing,

the

State

Defendants have been added to

the case by department as listed

on the notice of appeal rather

than by how the State

Defendants were listed on each

individual docket, filed. [191191, 19-1192, 19-1193, 191194, 19-1195, 19-1196, 191197, 19-1198, 19-1199, 191200, 19-1201, 19-1202, 191203, 19-1204, 19-1205, 191206, 19-1207, 19-1208, 191209, 19-1210, 19-1211, 191212, 19-1213, 19-1214, 191215, 19-1216, 19-1217, 19-

JA 3

Date Filed

Docket Text

1218, 19-1219, 19-1220, 191221, 19-1222, 19-1223, 191224, 19-1225, 19-1226, 191227, 19-1228, 19-1229, 191230, 19-1231, 19-1232] (LML)

[Entered: 01/30/2019 11:39 AM]

*

*

*

03/05/2019 ECF FILER: Motion filed by

Appellants Delaware & Raritan

Canal Commission, New Jersey

Department of Environmental

Protection,

New

Jersey

Department of Transportation,

New Jersey Department of

Treasury, New Jersey Motor

Vehicle

Commission,

New

Jersey

State

Agriculture

Development Committee, New

Jersey Water Supply Authority

and State of New Jersey to stay

District Court Order Pending

Resolution of the Appeal, to

Expedite the motion and the

appeals with proposed briefing

schedule. Certificate of Service

dated 03/05/2019. Service made

by ECF. [19-1191, 19-1192, 191193, 19-1194, 19-1195, 191196, 19-1197, 19-1198, 191199, 19-1200, 19-1201, 191202, 19-1203, 19-1204, 191205, 19-1206, 19-1207, 19-

JA 4

Date Filed

Docket Text

1208, 19-1209, 19-1210, 191211, 19-1212, 19-1213, 191214, 19-1215, 19-1216, 191217, 19-1218, 19-1219, 191220, 19-1221, 19-1222, 191223, 19-1224, 19-1225, 191226, 19-1227, 19-1228, 191229, 19-1230, 19-1231, 191232]--[Edited 03/05/2019 by

KR]

(MAC)

[Entered:

03/05/2019 03:18 PM]

*

*

*

03/08/2019 ECF FILER: Response filed by

Appellee County of Mercer to

motion for stay, motion to

Expedite

the

appeals.

Certificate of Service dated

03/08/2019. [19-1191, 19-1192,

19-1227]--[Edited 03/08/2019 by

KR] (PRA) [Entered: 03/08/2019

10:35 AM]

*

*

*

03/15/2019 ECF

FILER:

Reply

by

Appellants Delaware & Raritan

Canal Commission, New Jersey

Department of Environmental

Protection,

New

Jersey

Department of Transportation,

New Jersey Department of

Treasury, New Jersey Motor

Vehicle

Commission,

New

Jersey

State

Agriculture

JA 5

Date Filed

Docket Text

Development Committee, New

Jersey Water Supply Authority

and State of New Jersey to

Response to motion for stay,

motion to Expedite, filed.

Certificate of Service dated

03/15/2019. Service made by

ECF, US mail [19-1191, 191192, 19-1193, 19-1194, 191195, 19-1196, 19-1197, 191198, 19-1199, 19-1200, 191201, 19-1202, 19-1203, 191204, 19-1205, 19-1206, 191207, 19-1208, 19-1209, 191210, 19-1211, 19-1212, 191213, 19-1214, 19-1215, 191216, 19-1217, 19-1218, 191219, 19-1220, 19-1221, 191222, 19-1223, 19-1224, 191225, 19-1226, 19-1227, 191228, 19-1229, 19-1230, 191231,

19-1232]--[Edited

03/15/2019 by KR] (MAC)

[Entered: 03/15/2019 03:26 PM]

03/19/2019 ORDER

(CHAGARES

and

JORDAN,

Circuit

Judges)

granting in part motion for stay

filed by Appellants New Jersey

Department of Environmental

Protection,

New

Jersey

Department of Transportation,

State of New Jersey, New

JA 6

Date Filed

Docket Text

Jersey Department of Treasury,

New Jersey Motor Vehicle

Commission, New Jersey State

Agriculture

Development

Committee, New Jersey Water

Supply Authority and Delaware

& Raritan Canal Commission.

In

the

event

Appellee

transitions from the surveying

and testing phase to the

construction phase of the

pipeline

project,

physical

construction of the pipeline

shall be stayed pending this

appeal. Additionally, the just

compensation portion of the

litigation is stayed pending this

appeal. Appellants’ Motion to

Expedite is granted. Appellants’

Opening Brief of no more than

14,000 words must be filed and

served within thirty (30) days

from the date of this order.

Appellee’s Brief must be filed

and served within twenty (20)

days of service of Appellants’

Brief. A reply brief, if any, must

be filed and served within ten

(10) days of service of the

Appellee’s Brief. The matter will

be assigned to the first merits

panel

available

at

the

conclusion of briefing, filed.

JA 7

Date Filed

Docket Text

Panel

No.:

ECO-026E.

Chagares, Authoring Judge.

[19-1191, 19-1192, 19-1193, 191194, 19-1195, 19-1196, 191197, 19-1198, 19-1199, 191200, 19-1201, 19-1202, 191203, 19-1204, 19-1205, 191206, 19-1207, 19-1208, 191209, 19-1210, 19-1211, 191212, 19-1213, 19-1214, 191215, 19-1216, 19-1217, 191218, 19-1219, 19-1220, 191221, 19-1222, 19-1223, 191224, 19-1225, 19-1226, 191227, 19-1228, 19-1229, 191230, 19-1231, 19-1232] (KR)

[Entered: 03/19/201911:38 AM]

*

*

*

04/18/2019 ECF FILER: ELECTRONIC

BRIEF on behalf of Appellants

Delaware & Raritan Canal

Commission,

New

Jersey

Department of Environmental

Protection,

New

Jersey

Department of Transportation,

New Jersey Department of

Treasury, New Jersey Motor

Vehicle

Commission,

New

Jersey

State

Agriculture

Development Committee, New

Jersey Water Supply Authority

and State of New Jersey in 19-

JA 8

Date Filed

Docket Text

1191, 19-1192, 19-1193, 191194, 19-1195, 19-1196, 191197, 19-1198, 19-1199, 191200, 19-1201, 19-1202, 191203, 19-1204, 19-1205, 191206, 19-1207, 19-1208, 191209, 19-1210, 19-1211, 191212, 19-1213, 19-1214, 191215, 19-1216, 19-1217, 191218, 19-1219, 19-1220, 191221, 19-1222, 19-1223, 191224, 19-1225, 19-1226, 191227, 19-1228, 19-1229, 191230, 19-1231, 19-1232, filed.

Certificate of Service dated

04/18/2019 by ECF, US mail.

[19-1191, 19-1192, 19-1193, 191194, 19-1195, 19-1196, 191197, 19-1198, 19-1199, 191200, 19-1201, 19-1202, 191203, 19-1204, 19-1205, 191206, 19-1207, 19-1208, 191209, 19-1210, 19-1211, 191212, 19-1213, 19-1214, 191215, 19-1216, 19-1217, 191218, 19-1219, 19-1220, 191221, 19-1222, 19-1223, 191224, 19-1225, 19-1226, 191227, 19-1228, 19-1229, 191230,

19-1231,19-1232]

[Appendix has been removed

from this entry by the Clerk as

it was filed separately]--[Edited

JA 9

Date Filed

Docket Text

04/24/2019 by MS] (MAC)

[Entered: 04/18/2019 08:56 PM]

*

*

*

04/24/2019 ECF FILER: ELECTRONIC

JOINT APPENDIX on behalf of

Appellants Delaware & Raritan

Canal Commission, New Jersey

Department of Environmental

Protection,

New

Jersey

Department of Transportation,

New Jersey Department of

Treasury, New Jersey Motor

Vehicle

Commission,

New

Jersey

State

Agriculture

Development Committee, New

Jersey Water Supply Authority

and State of New Jersey in 191191, 19-1192, 19-1193, 191194, 19-1195, 19-1196, 191197, 19-1198, 19-1199, 191200, 19-1201, 19-1202, 191203, 19-1204, 19-1205, 191206, 19-1207, 19-1208, 191209, 19-1210, 19-1211, 191212, 19-1213, 19-1214, 191215, 19-1216, 19-1217, 191218, 19-1219, 19-1220, 191221, 19-1222, 19-1223, 191224, 19-1225, 19-1226, 191227, 19-1228, 19-1229, 191230, 19-1231, 19-1232, filed.

Certificate of service dated

JA 10

Date Filed

Docket Text

04/24/2019 by ECF. [19-1191,

19-1192, 19-1193, 19-1194, 191195, 19-1196, 19-1197, 191198, 19-1199, 19-1200, 191201, 19-1202, 19-1203, 191204, 19-1205, 19-1206, 191207, 19-1208, 19-1209, 191210, 19-1211, 19-1212, 191213, 19-1214, 19-1215, 191216, 19-1217, 19-1218, 191219, 19-1220, 19-1221, 191222, 19-1223, 19-1224, 191225, 19-1226, 19-1227, 191228, 19-1229, 19-1230, 191231, 19-1232] (MAC) [Entered:

04/24/2019 11:20 AM]

*

*

*

04/25/2019 ECF FILER: ELECTRONIC

AMICUS BRIEF on behalf of

Niskanen Center in support of

Appellant/Petitioner,

filed.

Certificate of Service dated

04/25/2019 by ECF. F.R.A.P.

29(a) Permission: YES.[191191, 19-1192, 19-1193, 191194, 19-1195, 19-1196, 191197, 19-1198, 19-1199, 191200, 19-1201, 19-1202, 191203, 19-1204, 19-1205, 191206, 19-1207, 19-1208, 191209, 19-1210, 19-1211, 191212, 19-1213, 19-1214, 19-

JA 11

Date Filed

Docket Text

1215, 19-1216, 19-1217, 191218, 19-1219, 19-1220, 191221, 19-1222, 19-1223, 191224, 19-1225, 19-1226, 191227, 19-1228, 19-1229, 191230, 19-1231, 19-1232] (JS)

[Entered: 04/25/2019 10:14 PM]

*

*

*

05/08/2019 ECF FILER: ELECTRONIC

BRIEF on behalf of Appellee

PennEast Pipeline Co LLC in

19-1191, 19-1192,19-1193, 191194, 19-1195, 19-1196, 191197, 19-1198, 19-1199, 191200, 19-1201, 19-1202, 191203, 19-1204, 19-1205, 191206, 19-1207, 19-1208, 191209, 19-1210, 19-1211, 191212, 19-1213, 19-1214, 191215, 19-1216, 19-1217, 191218, 19-1219, 19-1220, 191221, 19-1222, 19-1223, 191224, 19-1225, 19-1226, 191227, 19-1228, 19-1229, 191230, 19-1231, 19-1232, filed.

Certificate of Service dated

05/08/2019 by 3rd party, ECF.

[19-1191, 19-1192, 19-1193, 191194, 19-1195, 19-1196, 191197, 19-1198, 19-1199, 191200, 19-1201, 19-1202, 191203, 19-1204, 19-1205, 19-

JA 12

Date Filed

Docket Text

1206, 19-1207, 19-1208, 191209, 19-1210, 19-1211, 191212, 19-1213, 19-1214, 191215, 19-1216, 19-1217, 191218, 19-1219, 19-1220, 191221, 19-1222, 19-1223, 191224, 19-1225, 19-1226, 191227, 19-1228, 19-1229, 191230, 19-1231, 19-1232] (JMG)

[Entered: 05/08/2019 04:57 PM]

*

*

*

05/15/2019 Amended

Oral

Argument

Notification

for

Monday,

06/10/2019. Courtroom & Time:

Maris

Courtroom/2:00p.m..

Location: Philadelphia, PA. [191191, 19-1192, 19-1193, 191194, 19-1195, 19-1196, 191197, 19-1198, 19-1199, 191200, 19-1201, 19-1202, 191203, 19-1204, 19-1205, 191206, 19-1207, 19-1208, 191209, 19-1210, 19-1211, 191212, 19-1213, 19-1214, 191215, 19-1216, 19-1217, 191218, 19-1219, 19-1220, 191221, 19-1222, 19-1223, 191224, 19-1225, 19-1226, 191227, 19-1228, 19-1229, 191230, 19-1231, 19-1232] (TLG)

[Entered: 05/15/2019 03:06 PM]

JA 13

Date Filed

Docket Text

05/15/2019 ECF FILER: ELECTRONIC

AMICUS

BRIEF

with

Supplemental

Appendix

attached on behalf of Interstate

Natural Gas Association of

America,

American

Gas

Association,

American

Petroleum Institute, Chamber

of Commerce of the United

States of America, and National

Association of Manufacturers in

support of Appellee/Respondent,

filed. Certificate of Service

dated 05/15/2019 by ECF.

F.R.A.P. 29(a) Permission: YES.

[19-1191, 19-1192, 19-1193, 191194, 19-1195, 19-1196, 191197, 19-1198, 19-1199, 191200, 19-1201, 19-1202, 191203, 19-1204, 19-1205, 191206, 19-1207, 19-1208, 191209, 19-1210, 19-1211, 191212, 19-1213, 19-1214, 191215, 19-1216, 19-1217, 191218, 19-1219, 19-1220, 191221, 19-1222, 19-1223, 191224, 19-1225, 19-1226, 191227, 19-1228, 19-1229, 191230, 19-1231, 19-1232] - [Entry

edited by the Clerk to reflect

that

Supp.

Appendix

is

attached]--[Edited 05/16/2019

JA 14

Date Filed

Docket Text

by MS] (AMM) [Entered:

05/15/2019 05:33 PM]

*

*

*

05/16/2019 ECF FILER: Motion filed by

Amicus Appellees American

Gas Association, American

Petroleum Institute, Chamber

of Commerce of the United

States of America, Interstate

Natural Gas Association of

America

and

National

Association of Manufacturers in

19-1191, 19-1192, 19-1193, 191194, 19-1195, 19-1196, 191197, 19-1198, 19-1199, 191200, 19-1201, 19-1202, 191203, 19-1204, 19-1205, 191206, 19-1207, 19-1208, 191209, 19-1210, 19-1211, 191212, 19-1213, 19-1214, 191215, 19-1216, 19-1217, 191218, 19-1219, 19-1220, 191221, 19-1222, 19-1223, 191224, 19-1225, 19-1226, 191227, 19-1228, 19-1229, 191230, 19-1231, 19-1232 to

Extend the Record and File

Supplemental Appendix With

Amicus Brief. Certificate of

Service

dated

05/16/2019.

Service made by ECF. [19-1191,

19-1192, 19-1193, 19-1194, 19-

JA 15

Date Filed

Docket Text

1195, 19-1196, 19-1197, 191198, 19-1199, 19-1200, 191201, 19-1202, 19-1203, 191204, 19-1205, 19-1206, 191207, 19-1208, 19-1209, 191210, 19-1211, 19-1212, 191213, 19-1214, 19-1215, 191216, 19-1217, 19-1218, 191219, 19-1220, 19-1221, 191222, 19-1223, 19-1224, 191225, 19-1226, 19-1227, 191228, 19-1229, 19-1230, 191231, 19-1232] (AMM) [Entered:

05/16/2019 06:36 PM]

05/20/2019 ECF FILER: ELECTRONIC

REPLY BRIEF on behalf of

Appellants Delaware & Raritan

Canal Commission, New Jersey

Department of Environmental

Protection,

New

Jersey

Department of Transportation,

New Jersey Department of

Treasury, New Jersey Motor

Vehicle

Commission,

New

Jersey

State

Agriculture

Development Committee, New

Jersey Water Supply Authority

and State of New Jersey in 191191, 19-1192, 19-1193, 191194, 19-1195, 19-1196, 191197, 19-1198, 19-1199, 191200, 19-1201, 19-1202, 19-

JA 16

Date Filed

Docket Text

1203, 19-1204, 19-1205, 191206, 19-1207, 19-1208, 191209, 19-1210, 19-1211, 191212, 19-1213, 19-1214, 191215, 19-1216, 19-1217, 191218, 19-1219, 19-1220, 191221, 19-1222, 19-1223, 191224, 19-1225, 19-1226, 191227, 19-1228, 19-1229, 191230, 19-1231, 19-1232, filed.

Certificate of Service dated

05/20/2019 by ECF, US mail.

[19-1191, 19-1192, 19-1193, 191194, 19-1195, 19-1196, 191197, 19-1198, 19-1199, 191200, 19-1201, 19-1202, 191203, 19-1204, 19-1205, 191206, 19-1207, 19-1208, 191209, 19-1210, 19-1211, 191212, 19-1213, 19-1214, 191215, 19-1216, 19-1217, 191218, 19-1219, 19-1220, 191221, 19-1222, 19-1223, 191224, 19-1225, 19-1226, 191227, 19-1228, 19-1229, 191230, 19-1231, 19-1232] (MAC)

[Entered: 05/20/2019 06:07 PM]

05/21/2019 ORDER (JORDAN, BIBAS and

NYGAARD, Circuit Judges)

granting Motion by Amicus

Appellees

Natural

Gas

Association of America, et al. for

JA 17

Date Filed

Docket Text

Leave to Extend the Record and

File Supplemental Appendix

with Amicus Brief, filed. Kent A.

Jordan, Authoring Judge. [191191, 19-1192, 19-1193, 191194, 19-1195, 19-1196, 191197, 19-1198, 19-1199, 191200, 19-1201, 19-1202, 191203, 19-1204, 19-1205, 191206, 19-1207, 19-1208, 191209, 19-1210, 19-1211, 191212, 19-1213, 19-1214, 191215, 19-1216, 19-1217, 191218, 19-1219, 19-1220, 191221, 19-1222, 19-1223, 191224, 19-1225, 19-1226, 191227, 19-1228, 19-1229, 191230, 19-1231, 19-1232] (MS)

[Entered: 05/21/2019 04:41 PM]

*

*

*

06/10/2019 ARGUED on Monday, June 10,

2019. Panel: JORDAN, BIBAS

and

*NYGAARD,

Circuit

Judges. Jeremy Feigenbaum

arguing for Appellant New

Jersey

Department

of

Environmental

Protection;

James M. Graziano arguing for

Appellee PennEast Pipeline Co

LLC. *(Participated in Video

Conference). [19-1191, 19-1192,

19-1193, 19-1194, 19-1195, 19-

JA 18

Date Filed

Docket Text

1196, 19-1197, 19-1198, 191199, 19-1200, 19-1201, 191202, 19-1203, 19-1204, 191205, 19-1206, 19-1207, 191208, 19-1209, 19-1210, 191211, 19-1212, 19-1213, 191214, 19-1215, 19-1216, 191217, 19-1218, 19-1219, 191220, 19-1221, 19-1222, 191223, 19-1224, 19-1225, 191226, 19-1227, 19-1228, 191229, 19-1230, 19-1231, 191232]

(PM)

[Entered:

06/10/2019 03:32 PM]

*

*

*

09/10/2019 PRECEDENTIAL

OPINION

Coram: JORDAN, BIBAS and

NYGAARD, Circuit Judges.

Total

Pages:

35.Judge:

JORDAN Authoring. [19-1191,

19-1192, 19-1193, 19-1194, 191195, 19-1196, 19-1197, 191198, 19-1199, 19-1200, 191201, 19-1202, 19-1203, 191204, 19-1205, 19-1206, 191207, 19-1208, 19-1209, 191210, 19-1211, 19-1212, 191213, 19-1214, 19-1215, 191216, 19-1217, 19-1218, 191219, 19-1220, 19-1221, 191222, 19-1223, 19-1224, 191225, 19-1226, 19-1227, 19-

JA 19

Date Filed

Docket Text

1228, 19-1229, 19-1230, 191231,19-1232] (KR) [Entered:

09/10/2019 08:33 AM]

09/10/2019 JUDGMENT, Vacated and

Remanded. Parties to bear their

own costs. [19-1191, 19-1192,

19-1193, 19-1194, 19-1195, 191196, 19-1197, 19-1198, 191199, 19-1200, 19-1201, 191202, 19-1203, 19-1204, 191205, 19-1206, 19-1207, 191208, 19-1209, 19-1210, 191211, 19-1212, 19-1213, 191214, 19-1215, 19-1216, 191217, 19-1218, 19-1219, 191220, 19-1221, 19-1222, 191223, 19-1224, 19-1225, 191226, 19-1227, 19-1228, 191229, 19-1230, 19-1231, 191232] (KR) [Entered: 09/10/2019

08:36 AM]

09/11/2019 ORDER

AMENDING

OPINION (Clerk) It has come to

the attention of the Clerk that

Lela Hollabaugh counsel for

amicus appellees Interstate

Natural Gas Association of

America, et al, was not listed as

counsel on the opinion of this

Court in addition American Gas

Association was not listed as an

amicus appellee. Accordingly, it

JA 20

Date Filed

Docket Text

is hereby ORDERED that the

listing of counsel on the opinion

is amended as follows, filed.

(See Order for Corrections) Nda

regenerated to show American

Gas Association was also added

to the order with counsel. [191191, 19-1192, 19-1193, 191194, 19-1195, 19-1196, 191197, 19-1198, 19-1199, 191200, 19-1201, 19-1202, 191203, 19-1204, 19-1205, 191206, 19-1207, 19-1208, 191209, 19-1210, 19-1211, 191212, 19-1213, 19-1214, 191215, 19-1216, 19-1217, 191218, 19-1219, 19-1220, 191221, 19-1222, 19-1223, 191224, 19-1225, 19-1226, 191227, 19-1228, 19-1229, 191230,

19-1231,

19-1232]-[Edited 09/11/2019 by PDB]

(PDB) [Entered: 09/11/2019

11:40 AM]

*

*

*

09/19/2019 ORDER

AMENDING

OPINION (Clerk) It has come to

the attention of the Clerk that

Mark A. Collier and Jeremy

Feigenbaum are employed by

the Office of the Attorney

General of New Jersey, Division

JA 21

Date Filed

Docket Text

of Law, not the Division of

Criminal Justice, filed. [191191, 19-1192, 19-1193, 191194, 19-1195, 19-1196, 191197, 19-1198, 19-1199, 191200, 19-1201, 19-1202, 191203, 19-1204, 19-1205, 191206, 19-1207, 19-1208, 191209, 19-1210, 19-1211, 191212, 19-1213, 19-1214, 191215, 19-1216, 19-1217, 191218, 19-1219, 19-1220, 191221, 19-1222, 19-1223, 191224, 19-1225, 19-1226, 191227, 19-1228, 19-1229, 191230,19-1231, 19-1232] (KR)

[Entered: 09/19/2019 02:42 PM]

*

*

*

10/22/2019 ECF FILER: Petition filed by

Appellee PennEast Pipeline Co

LLC for Rehearing before

original panel and the court en

banc. Certificate of Service

dated 10/22/2019. Service made

by ECF, US mail. [19-1191, 191192, 19-1193, 19-1194, 191195, 19-1196, 19-1197, 191198, 19-1199, 19-1200, 191201, 19-1202, 19-1203, 191204, 19-1205, 19-1206, 191207, 19-1208, 19-1209, 191210, 19-1211, 19-1212, 19-

JA 22

Date Filed

Docket Text

1213, 19-1214, 19-1215, 191216, 19-1217, 19-1218, 191219, 19-1220, 19-1221, 191222, 19-1223, 19-1224, 191225, 19-1226, 19-1227, 191228, 19-1229, 19-1230, 191231,

19-1232]--[Edited

10/23/2019 by KR] (JCM)

[Entered: 10/22/2019 01:33 PM]

*

*

*

10/29/2019 ECF FILER: ELECTRONIC

AMICUS BRIEF on behalf of

Amicus Appellees American

Gas Association, American

Petroleum Institute, Interstate

Natural Gas Association of

America

and

National

Association of Manufacturers in

support of Appellee’s Pettion for

Rehearing.

Certificate

of

Service dated 10/29/2019 by

ECF. [19-1191, 19-1192, 191193, 19-1194, 19-1195, 191196, 19-1197, 19-1198, 191199, 19-1200, 19-1201, 191202, 19-1203, 19-1204, 191205, 19-1206, 19-1207, 191208, 19-1209, 19-1210, 191211, 19-1212, 19-1213, 191214, 19-1215, 19-1216, 191217, 19-1218, 19-1219, 191220, 19-1221, 19-1222, 19-

JA 23

Date Filed

Docket Text

1223, 19-1224, 19-1225, 191226, 19-1227, 19-1228, 191229, 19-1230, 19-1231, 191232]--[Edited 10/30/2019 by

KR]

(AMM)

[Entered:

10/29/2019 04:12 PM]

*

*

*

10/29/2019 ECF FILER: ELECTRONIC

AMICUS BRIEF on behalf of TC

Energy Corporation in support

of Appellee’s petition for

rehearing. Certificate of Service

dated 10/29/2019 by ECF.

F.R.A.P. 29(a) Permission: NO.

[19-1191, 19-1192, 19-1193, 191194, 19-1195, 19-1196, 191197, 19-1198, 19-1199, 191200, 19-1201, 19-1202, 191203, 19-1204, 19-1205, 191206, 19-1207, 19-1208, 191209, 19-1210, 19-1211, 191212, 19-1213, 19-1214, 191215, 19-1216, 19-1217, 191218, 19-1219, 19-1220, 191221, 19-1222, 19-1223, 191224, 19-1225, 19-1226, 191227, 19-1228, 19-1229, 191230,

19-1231,

19-1232]-[Edited 10/30/2019 by KR]

(CES) [Entered: 10/29/2019

04:38 PM]

*

*

*

JA 24

Date Filed

Docket Text

11/05/2019 ORDER (SMITH, Chief Judge,

CHAGARES,

JORDAN,

KRAUSE, RESTREPO, BIBAS,

PORTER, MATEY, PHIPPS

and

NYGAARD*,

Circuit

Judges) denying Petition En

Banc and Panel Rehearing filed

by Appellee PennEast Pipeline

Co LLC. Jordan, Authoring

Judge. *Judge Nygaard’s vote is

limited to panel rehearing only.

[19-1191, 19-1192, 19-1193, 191194, 19-1195, 19-1196, 191197, 19-1198, 19-1199, 191200, 19-1201, 19-1202, 191203, 19-1204, 19-1205, 191206, 19-1207, 19-1208, 191209, 19-1210, 19-1211, 191212, 19-1213, 19-1214, 191215, 19-1216, 19-1217, 191218, 19-1219, 19-1220, 191221, 19-1222, 19-1223, 191224, 19-1225, 19-1226, 191227, 19-1228, 19-1229, 191230,

19-1231,

19-1232]-[Edited 11/05/2019 by LML to

attach corrected order] (LMR)

[Entered: 11/05/2019 08:04 AM]

11/13/2019 MANDATE ISSUED, filed. [191191, 19-1192, 19-1193, 191194, 19-1195, 19-1196, 191197, 19-1198, 19-1199, 19-

JA 25

Date Filed

Docket Text

1200, 19-1201, 19-1202, 191203, 19-1204, 19-1205, 191206, 19-1207, 19-1208, 191209, 19-1210, 19-1211, 191212, 19-1213, 19-1214, 191215, 19-1216, 19-1217, 191218, 19-1219, 19-1220, 191221, 19-1222, 19-1223, 191224, 19-1225, 19-1226, 191227, 19-1228, 19-1229, 191230,

19-1231,

19-1232]-[Edited 11/13/2019 by TMK]

(TMM) [Entered: 11/13/2019

09:30 AM]

*

*

*

JA 26

UNITED STATES DISTRICT COURT FOR THE

DISTRICT OF NEW JERSEY

________________

No. 3:18-cv-01597

________________

IN RE: PENNEAST PIPELINE COMPANY, LLC,

V.

Plaintiff,

A PERMANENT EASEMENT FOR 1.92 ACRES AND

TEMPORARY EASEMENT FOR 2.05 ACRES IN HOPEWELL

TOWNSHIP, MERCER COUNTY, NEW JERSEY, TAX

PARCEL NO. 1106-59-13.01, et al.,

Defendants.

________________

RELEVANT DOCKET ENTRIES

Date Filed

#

Docket Text

02/06/2018

1

COMPLAINT

against

A

PERMANENT

EASEMENT

FOR

1.92

ACRES

AND

TEMPORARY

EASEMENT

FOR

2.05

ACRES

IN

HOPEWELL

TOWNSHIP,

MERCER COUNTY, NEW

JERSEY, TAX PARCEL NO.

1106-59-13.01, COUNTY OF

MERCER, JERSEY CENTRAL

POWER

AND

LIGHT

COMPANY, STATE OF NEW

JERSEY,

BY

THE

JA 27

Date Filed

#

Docket Text

SECRETARY OF THE NEW

JERSEY DEPARTMENT OF

ENVIRONMENTAL

PROTECTION,

TOWNSHIP

OF HOPEWELL, VERIZON

NEW JERSEY, INC. ( Filing

and Admin fee $ 400 receipt

number 0312-8457293), filed by

PENNEAST

PIPELINE

COMPANY,

LLC.

(Attachments: # 1 Civil Cover

Sheet, # 2 NOTICE OF

CONDEMNATION,

#

3

PROPOSED ORDER TO SHOW

CAUSE, # 4 Brief, # 5

DECLARATION OF DANIEL

MURPHY, # 6 DECLARATION

OF JEFFREY ENGLAND AND

EXHIBITS, # 7 Text of Proposed

Order)(GRAZIANO,

JAMES)

(Entered: 02/06/2018)

03/22/2018

04/02/2018

21

36

*

*

*

ANSWER to Complaint with

JURY

DEMAND

by

TOWNSHIP OF HOPEWELL.

(DUGGAN,

TIMOTHY)

(Entered: 03/22/2018)

*

*

*

ANSWER to Complaint with

JURY DEMAND (with Cert of

Service) by VERIZON NEW

JERSEY, INC..(DALCORTIVO,

JA 28

Date Filed

#

Docket Text

KATHLEEN)

04/02/2018)

04/03/2018

05/17/2018

38

44

(Entered:

*

*

*

ANSWER to Complaint with

JURY DEMAND by COUNTY

OF MERCER. (Attachments: #

1 Supplement Cover Letter)

(ADEZIO, PAUL) (Entered:

04/03/2018)

*

*

*

BRIEF

Final

Summation

(Attachments: # 1 Brief, # 2

Certification Appleget, # 3

Certification DeChristie, # 4

Certification

Gates,

#

5

Certification

Payne,

#

6

Certification

Yeany,

#

7

Certificate

of

Service)

(COLLIER, MARK) (Entered:

05/17/2018)

*

*

*

BRIEF

Plaintiff

PennEast

Pipeline Company, LLC Final

Written

Summation

(Attachments: # 1 Certificate of

Service)(GRAZIANO, JAMES)

(Entered: 05/18/2018)

05/18/2018

46

05/21/2018

47

BRIEF (DUGGAN, TIMOTHY)

(Entered: 05/21/2018)

06/04/2018

48

BRIEF

Pipeline

Plaintiff

PennEast

Company,

LLC

JA 29

Date Filed

#

Docket Text

Response to Closing Argument

of the State of New Jersey

(Attachments: # 1 Certificate of

Service) (GRAZIANO, JAMES)

(Entered: 06/04/2018)

*

*

*

BRIEF (DUGGAN, TIMOTHY)

(Entered: 12/10/2018)

12/10/2018

59

12/10/2018

60

BRIEF (DUGGAN, TIMOTHY)

(Entered: 12/10/2018)

12/14/2018

61

OPINION filed. Signed by

Judge Brian R. Martinotti on

12/14/2018. (Attachments: # 1

Exhibit A) (mps) (Entered:

12/14/2018)

12/14/2018

62

VACATED - ORDER Denying

the State Defendants’ request

for

dismissal;

PennEast’s

application

for

orders

of

condemnation

and

for

preliminary injunctive relief

allowing immediate possession

of the respective Rights of Way

in advance of any award of just

compensation

is

Granted;

PennEast shall post security in

the form of a surety bond into

the Courts Registry pursuant to

Local Civil Rule 67.1(a); upon

PennEast’s post of appropriate

security,

PennEast

is

JA 30

Date Filed

#

Docket Text

authorized to immediately enter

and take possession of the

Rights of Way for all purposes

allowed under the FERC Order;

The

Court

appoints

the

individuals listed herein as

Special Masters/Condemnation

Commissioners to adjudicate

and determine compensation;

CASE

MANAGEMENT

CONFERENCE

set

for

2/14/2019, at 10:00AM in

courtroom 1; PennEast shall

submit a revised, case-specific

forms of orders by 1/4/2019..

Signed by Judge Brian R.

Martinotti

on

12/14/2018.

(Attachments: # 1 Exhibit

A)(mps) (Entered: 12/14/2018)

12/28/2018

64

12/28/2018

65

*

*

*

MOTION for Reconsideration

by STATE OF NEW JERSEY,

BY THE SECRETARY OF THE

NEW JERSEY DEPARTMENT

OF

ENVIRONMENTAL

PROTECTION. (Attachments:

# 1 Brief, # 2 Certificate of

Service, # 3 Text of Proposed

Order) (COLLIER, MARK)

(Entered: 12/28/2018)

MOTION to Stay by STATE

OF NEW JERSEY, BY THE

JA 31

Date Filed

#

Docket Text

SECRETARY OF THE NEW

JERSEY

DEPARTMENT

OF

ENVIRONMENTAL

PROTECTION. (Attachments:

# 1 Brief, # 2 Certificate of

Service, # 3 Text of Proposed

Order) (COLLIER, MARK)

(Entered: 12/28/2018)

01/08/2019

70

01/08/2019

71

01/11/2019

73

*

*

*

BRIEF in Opposition filed by

PENNEAST

PIPELINE

COMPANY,

LLC

re

64

MOTION for Reconsideration

(Attachments: # 1 Certificate of

Service)(GRAZIANO, JAMES)

(Entered: 01/08/2019)

BRIEF in Opposition filed by

PENNEAST

PIPELINE

COMPANY,

LLC

re

65

MOTION to Stay (Attachments:

#

1

Certificate

of

Service)(GRAZIANO, JAMES)

(Entered: 01/08/2019)

*

*

*

NOTICE OF APPEAL as to 62

Order,,, 61 Opinion by STATE

OF NEW JERSEY, BY THE

SECRETARY OF THE NEW

JERSEY DEPARTMENT OF

ENVIRONMENTAL

PROTECTION. Filing fee $ 505,

receipt number 0312-9301226.

JA 32

Date Filed

#

Docket Text

The Clerk’s Office hereby

certifies the record and the

docket sheet available through

ECF to be the certified list in

lieu of the record and/or the

certified copy of the docket

entries. (Attachments: # 1

Certificate of Service)(MILES,

KRISTINA)

(Entered:

01/11/2019)

01/15/2019

01/23/2019

75

82

*

*

*

REPLY BRIEF to Opposition to

Motion filed by STATE OF

NEW JERSEY, BY THE

SECRETARY OF THE NEW

JERSEY DEPARTMENT OF

ENVIRONMENTAL

PROTECTION re 65 MOTION

to Stay (Attachments: # 1

Certificate

of

Service)

(COLLIER, MARK) (Entered:

01/15/2019)

*

*

*

ORDER

that

the

State

Defendants’

Motion

for

Reconsideration is denied. The

State Defendants’ Motion to

Stay is denied as moot. Signed

by Judge Brian R. Martinotti on

1/23/2019. (Attachments: # 1

Exhibit A, # 2 Exhibit B) (mps)

(Entered: 01/23/2019)

JA 33

Date Filed

#

Docket Text

01/25/2019

83

VACATED - ORDER that

PennEast has substantive right

to condemn a permanent Right

of Way and temporary easement

to be taken on the subject

property within this Order.

PennEast shall post security in

the form of a surety bond into

the Court’s Registry in the

amount of $112,200.00. The

Court, along with the Special

Master/Condemnation

Commissioners, shall hold a

case management conference on

2/14/2019, at 10:00 AM in

Courtroom 1, regarding the

protocol for determining just

compensation, Signed by Judge

Brian

R.

Martinotti

on

1/25/2019. (mmh) (Entered:

01/25/2019)

01/25/2019

84

USCA Case Number 19-1191 for

73 Notice of Appeal (USCA)

filed by STATE OF NEW

JERSEY,

BY

THE

SECRETARY OF THE NEW

JERSEY DEPARTMENT OF

ENVIRONMENTAL

PROTECTION. USCA Case

Manager

Kirsi

(Document

Restricted - Court Only) (ca3kr)

(Entered: 01/25/2019)

JA 34

Date Filed

#

Docket Text

*

*

*

JA 35

Order Issuing Certificates, PennEast Pipeline

Co., LLC, 162 FERC ¶ 61,053 (Jan. 19, 2018)

1. On September 24, 2015, PennEast Pipeline

Company, LLC (PennEast) filed an application

pursuant to section 7(c) of the Natural Gas Act (NGA) 1

and Parts 157 and 284 of the Commission’s

regulations, 2 requesting authorization to construct

and operate a new 116-mile natural gas pipeline from

Luzerne County, Pennsylvania, to Mercer County,

New Jersey, along with three laterals extending off

the mainline, a compression station, and appurtenant

above ground facilities (PennEast Project). The project

is designed to provide up to 1,107,000 dekatherms per

day (Dth/d) of firm transportation service. PennEast

also requests a blanket certificate under Part 284,

Subpart G of the Commission’s regulations to provide

open-access transportation services, and a blanket

certificate under Part 157, Subpart F of the

Commission’s regulations to perform certain routine

construction activities and operations.

2. As explained herein, we find that the benefits that

the PennEast Project will provide to the market

outweigh any adverse effects on existing shippers,

other pipelines and their captive customers, and on

landowners and surrounding communities. Further,

as set forth in the environmental discussion below, we

agree with Commission staff’s conclusion in the

Environmental Impact Statement (EIS) that the

project will result in some adverse environmental

impacts, but that these impacts will be reduced to

1 15 U.S.C. § 717f(c) (2012).

2 18 C.F.R. pt. 157 (2017).

JA 36

acceptable levels with the implementation of the

applicant’s

proposed

mitigation

and

staff’s

recommendations, as modified herein, and adopted as

conditions in the attached Appendix A of this order.

Therefore, for the reasons stated below, we grant the

requested authorizations, subject to the conditions

discussed herein.

I.

Background and Proposal

3. PennEast 3 is a Delaware limited liability

company organized and existing under the laws of the

State of Delaware, managed by UGI Energy Services,

LLC, pursuant to a Project Management Agreement.

Upon the commencement of operations proposed in its

application, PennEast will become a natural gas

company within the meaning of section 2(6) of the

NGA, 4 and will be subject to the Commission’s

jurisdiction.

A. Facilities and Services

4. PennEast proposes to construct a new greenfield

pipeline system to provide up to 1,107,000 Dth/d of

firm natural gas transportation service to markets in

New Jersey, New York, Pennsylvania, and

surrounding states. The project extends from various

receipt point interconnections with the interstate

PennEast is a joint venture owned by Red Oak Enterprise

Holdings, Inc., a subsidiary of AGL Resources Inc. (20 percent

interest); NJR Pipeline Company, a subsidiary of New Jersey

Resources (20 percent interest); SJI Midstream, LLC, a

subsidiary of South Jersey Industries (20 percent interest); UGI

PennEast, LLC, a subsidiary of UGI Energy Services, LLC (20

percent interest); and Spectra Energy Partners, LP (20 percent

interest).

3

4 15 U.S.C. § 717a(6) (2012).

JA 37

natural gas pipeline system of Transcontinental Gas

Pipe Line Company, LLC (Transco) and with

gathering systems in the eastern Marcellus Shale

region operated by UGI Energy Services, LLC,

Williams Partners, L.P., and Energy Transfer

Partners, L.P., to multiple delivery point

interconnections in natural gas-consuming markets in

New Jersey and Pennsylvania, terminating at a

delivery point with Transco in Mercer County, New

Jersey. 5 PennEast states that the project is designed

to bring lower cost natural gas to markets in New

Jersey, Pennsylvania, and New York and to provide

shippers with additional supply flexibility, diversity,

and reliability. 6

5. PennEast proposes to construct the following

facilities:

•

•

approximately 116 miles of 36-inch-diameter

mainline transmission pipeline originating in

Luzerne County, Pennsylvania, and extending

to Mercer County, New Jersey, traversing

Luzerne, Carbon, Northampton, and Bucks

Counties, Pennsylvania, and Hunterdon and

Mercer Counties, New Jersey;

three lateral pipelines extending off of the

mainline consisting of:

• the approximately 2.1-mile, 24-inchdiameter

Hellertown

Lateral

in

Northampton County, Pennsylvania to

connect with Columbia Gas Transmission,

LLC, and UGI Utilities, Inc.;

5 See PennEast’s Application at 3.

6 Id. at 4, 8-10.

JA 38

the approximately 0.6-mile, 12-inchdiameter Gilbert Lateral in Hunterdon

County, New Jersey to connect with NRG

REMA, LLC, and Elizabethtown Gas at the

Gilbert Electric Generating Station; and

• the approximately 1.54-mile, 36-inchdiameter

Lambertville

Lateral

in

Hunterdon County, New Jersey to connect

with Algonquin Gas Transmission, LLC,

and Texas Eastern Transmission, LP;

• one new compressor station in Carbon County,

Pennsylvania; and

• various associated aboveground facilities,

including interconnects, launchers, receivers,

and mainline block valves.

PennEast estimates that the proposed facilities will

cost approximately $1.13 billion.

6. PennEast states that it conducted an open season

for the project from August 11 to August 29, 2014. As

a result of the open season, PennEast states that it has

executed long-term precedent agreements with the

following 12 shippers for 990,000 Dth/d of firm

transportation service, or approximately 90 percent of

the project’s capacity:

•

Shipper (* indicates PennEast Contracted

Affiliate)

Volumes (Dth/d)

New Jersey

Company*

Natural

Gas

180,000

PSEG Power, LLC*

125,000

Texas Eastern Transmission,

LP*

125,000

South Jersey Gas Company*

105,000

JA 39

ConEd of New York

100,000

Elizabethtown Gas*

100,000

UGI Energy Services, Inc.*

100,000

Cabot Oil & Gas Corp.

50,000

Talen Energy Marketing, LLC

50,000

Enerplus Resources Corp.

30,000

Warren Resources, Inc.

15,000

NRG Rema LLC

10,000

PennEast proposes to provide service to the project

shippers at negotiated rates.

7. PennEast also requests approval of its pro forma

tariff. PennEast proposes to offer open-access

transportation services under Rate Schedules FTS

(Firm Transportation Service), ITS (Interruptible

Transportation Service), and PALS (Parking and

Lending Service).

B. Blanket Certificates

8. PennEast requests a blanket certificate of public

convenience and necessity pursuant to Part 284,

Subpart G of the Commission’s regulations

authorizing PennEast to provide transportation

service to customers requesting and qualifying for

transportation service under its proposed FERC Gas

Tariff, with pre-granted abandonment authorization. 7

9. PennEast requests a blanket certificate of public

convenience and necessity pursuant to Part 157,

Subpart F of the Commission’s regulations

7 18 C.F.R. § 284.221 (2017).

JA 40

authorizing certain future facility

operation, and abandonment. 8

construction,

II. Procedural Issues

A. Notice, Interventions,

Comments

Protests,

and

10. Notice of PennEast’s application was published in

the Federal Register on October 15, 2015. 9 Timely,

unopposed motions to intervene are granted by

operation of Rule 214 of the Commission’s Rules of

Practice and Procedure. 10 Late interventions were

granted by notice issued on March 23, 2017, and May

18, 2017.

11. Numerous entities, landowners, individuals, and

New Jersey State representatives filed protests and

adverse comments raising the following issues: (1) the

need for an evidentiary hearing; (2) the need for the

project; and (3) whether the use of eminent domain is

appropriate for this project. On November 13, 2015,

PennEast filed a Motion for Leave to Answer and

Answer to the protests, as well as to various comments

filed on the project. Although the Commission’s Rules

of Practice and Procedure generally do not permit

answers to protests, 11 we will accept PennEast’s

answer because it clarifies the concerns raised and

provides information that has assisted in our decision

making. These concerns are addressed below.

8 Id. § 157.204 (2017).

9 80 Fed. Reg. 62,068 (2015).

10 18 C.F.R. § 385.214 (2017).

11 Id. § 385.214(c) (2017).

JA 41

12. In addition, numerous comments were filed

raising concerns over the environmental impacts of

the project. These comments are addressed in the

Final Environmental Impact Statement (EIS) and, as

appropriate, below.

B. Request for Evidentiary Hearing

13. New Jersey Senator Shirley K. Turner, New

Jersey Assemblyman Reed Gusciora, and New Jersey

Assemblywoman Elizabeth Muoio requested an

evidentiary hearing to determine the need for the

project, and explore whether less disruptive, more

cost-effective alternatives exist to meet demand.

Similarly, the New Jersey Conservation Foundation

(NJCF) and Stony Brook-Millstone Watershed

Association (Stony Brook) assert that a hearing is

necessary in order to develop a record to determine the

public benefits of the project and whether the project

is viable without subsidies.

14. An evidentiary, trial-type hearing is necessary

only where there are material issues of fact in dispute

that cannot be resolved on the basis of the written

record. 12 No party has raised a material issue of fact

that the Commission cannot resolve on the basis of the

written record. As demonstrated by the discussion

below, the existing written record provides a sufficient

basis to resolve the issues relevant to this proceeding.

The Commission has satisfied the hearing

requirement by giving all interested parties a full and

complete opportunity to participate through

12 See, e.g., Southern Union Gas Co. v. FERC, 840 F.2d 964, 970

(D.C. Cir. 1988); Dominion Transmission, Inc., 141 FERC

¶ 61,183, at P 15 (2012).

JA 42

evidentiary submission in written form. 13 Therefore,

we will deny the request for a trial-type evidentiary

hearing.

III. Discussion

15. As PennEast’s proposed pipeline system would be

used to transport natural gas in interstate commerce

subject to the Commission’s jurisdiction, the

construction and operation of the facilities are subject

to the requirements of subsections (c) and (e) of section

7 of the NGA. 14

A. Application of the Certificate Policy

Statement

16. The Certificate Policy Statement provides

guidance for evaluating proposals to certificate new

construction. 15 The Certificate Policy Statement

establishes criteria for determining whether there is a

need for a proposed project and whether the proposed

project will serve the public interest. The Certificate

Policy Statement explains that in deciding whether to

authorize the construction of major new pipeline

facilities, the Commission balances the public benefits

against the potential adverse consequences. The

Commission’s goal is to give appropriate consideration

to the enhancement of competitive transportation

alternatives, the possibility of overbuilding,

subsidization by existing customers, the applicant’s

13 Moreau v. FERC, 982 F.2d 556, 568 (D.C. Cir. 1993).

14 15 U.S.C. §§ 717f(c), (e) (2012).

15 Certification of New Interstate Natural Gas Pipeline Facilities,

88 FERC ¶ 61,227 (1999), clarified, 90 FERC ¶ 61,128 (2000),

further clarified, 92 FERC ¶ 61,094 (2000) (Certificate Policy

Statement).

JA 43

responsibility for unsubscribed capacity, the

avoidance of unnecessary disruptions of the

environment, and the unneeded exercise of eminent

domain in evaluating new pipeline facilities

construction.

17. Under this policy, the threshold requirement for

pipelines proposing new projects is that the pipeline

must be prepared to financially support the project

without relying on subsidization from its existing

customers. The next step is to determine whether the

applicant has made efforts to eliminate or minimize

any adverse effects the project might have on the

applicant’s existing customers, existing pipelines in

the market and their captive customers, or

landowners and communities affected by the

construction. If residual adverse effects on these

interest groups are identified after efforts have been

made to minimize them, we will evaluate the project

by balancing the evidence of public benefits to be

achieved against the residual adverse effects. This is

essentially an economic test. Only when the benefits

outweigh the adverse effects on economic interests

will we proceed to consider the environmental analysis

where other interests are addressed.

1.

Subsidization

and

Existing Customers

Impact

on

18. As discussed above, the threshold requirement for

pipelines proposing new projects is that the pipeline

must be prepared to financially support the project

without relying on subsidization from existing

customers. As PennEast is a new company, it has no

existing customers. As such, there is no potential for

JA 44

subsidization on PennEast’s system or degradation of

service to existing customers.

2.

Need for the Project

19. Numerous parties and commenters challenge the

need for the project. 16 They raise a variety of

arguments including: (1) insufficient demand for

natural gas in New Jersey and Pennsylvania; (2) the

need for a regional analysis to determine if the project

is needed; (3) the availability of alternatives, including

renewable energy and capacity on existing and

proposed interstate pipelines, to meet future demand;

(4) the public benefits of the project, including cost

savings, supply flexibility and reliability, and local

employment impacts are unfounded or are overstated;

(5) the use of precedent agreements with affiliated

entities to demonstrate project need; and (6) that a

portion of the gas transported on the project may be

exported.

20. A number of commenters claim that the project is

not needed because there is little or no forecasted load

growth in New Jersey and Pennsylvania. 17 In

16 Many of the commenters conflate the balancing of economic

benefits (market need) and effects under the Certificate Policy

Statement with the distinct description of purpose and need in

the final EIS. The purpose and need statement in the final EIS

complied with Council on Environmental Quality (CEQ)

regulations that provide that this statement “shall briefly specify

the underlying purpose and need to which the agency is

responding in proposing the alternatives including the proposed

actions” for purposes of its environmental analysis. 40 C.F.R.

§ 1502.13 (2017).

17 See, e.g., October 29, 2015 Comments of NJCF at 9; February

11, 2016 Comments of Delaware Riverkeeper (citing attached

affidavit of David Berman, Labyrinth Consulting Services);

JA 45

addition, the New Jersey Division of Rate Counsel

(NJRC) cites to filings made by local distribution

companies (LDCs) before state regulatory agencies in

Pennsylvania and New Jersey which show that the

peak day requirements of the LDCs will be largely

stable through 2020, and can be met through existing

supply arrangements. 18

21. Numerous commenters suggest that increased

use of renewable resources to generate electricity and

energy conservation could eliminate the need for the

project. Several other commenters claim that there is

no need to construct a new pipeline, as PennEast’s

shippers could source gas on existing pipelines or on

other to be constructed, but already-authorized

pipeline capacity. 19 NJRC states that the fact that

utilization rates of several long-haul pipelines

declined from 2007 to 2013 suggests that there is

available firm capacity on these existing pipelines. 20

October 27, 2015 Comments of the West Amwell Citizens Against

the Pipeline.

18 See September 12, 2016 Comments of NJCF (citing attached

Affidavit of David E. Dismukes). On October 17, 2016, PennEast

filed an answer to NJRC. On November 14, 2016, the New Jersey

Division of Rate Council (NJRC) filed a Motion for Leave to

Answer and Answer to PennEast. Although the Commission’s

Rules of Practice and Procedure generally do not permit answers

to answers, we will accept NJRC’s answers because it clarifies

the concerns raised and provides information that has assisted in

our decision making.

19 See, e.g., October 29, 2015 Comments of NJCF at 10.

20 September 12, 2016 Comments of NJCF at 6-8 (citing Denny

Young, Black & Veatch, Has Emerging Natural Gas Shale

Production Affected Financial Performances of Interstate

pipelines? (2013).

JA 46

22. Multiple commenters assert that PennEast’s

claims that the project will provide cost-savings for

end users, and provide increased reliability and

supply diversity are unfounded or overstated. 21 The

NJCF filed a report prepared by Skipping Stone, LLC,

(Skipping Stone Report) which challenges the findings

in the Concentric study filed by PennEast 22 that the

PennEast Project would lower costs to consumers. 23

Among other things, the Skipping Stone Report

concludes that local gas distribution companies

already have more than enough capacity to meet peak

winter demand, suggesting that increased demand by

providers of gas-fired electric generation could be

more cost effectively met by dual fuel switching or by

purchasing gas from LNG facilities, and that the

PennEast Project could increase, rather than decrease

costs to consumers. Commenters also claim that the

employment and economic benefits of the project

See, e.g., November 14 Answer of NJRC, October 27, 2015

Comments of the West Amwell Citizens Against the Pipeline.

21

22 In Exhibit F-1, Resource Report 5, PennEast submitted a study

by Concentric Energy Advisors, Estimated Energy Market

Savings from Additional Pipeline Infrastructure Serving Eastern

Pennsylvania and New Jersey) (Concentric Study) that finds that

the project would provide increased access to low-cost natural gas

in New Jersey and Pennsylvania that could save consumers

nearly $900 million. Resource Report 5 also includes a study by

Econsult Solutions & Drexel University, Economic Impact Report

and Analysis: PennEast Pipeline Project Economic Impact

Analysis (2015) (Econsult Study) that estimates the total (direct,

indirect, and induced) jobs that would be supported during

construction and operation of the project.

See Report of Skipping Stone, LLC, attached to NJCF’s

December 1, 2016 Comments (Skipping Stone Report).

23

JA 47

contained in the Econsult study cited by PennEast

have been overstated, possibly significantly so. 24

23. Several commenters allege that because a large

portion of the project’s capacity has been subscribed by

affiliates of the pipeline, additional evidence of need

must be presented as precedent agreements with

pipeline affiliates may not be the result of an “armslength negotiation,” or reflect the competitive

market. 25 Commenters further claim that the project

is being cross-subsidized by the captive customers of

the affiliated shippers, and may not be financially

viable without these subsidies. 26

24. The NJCF and Stony Brook claim that the NGA

requires the Commission to evaluate the need for new

pipeline infrastructure on a regional basis. 27 They

state that the public interest cannot be effectively

safeguarded through the approval of individual

pipelines without coordinated planning to ensure that

pipeline proposal fits within long-term, regional plans.

Therefore, they assert that the Commission should

implement a planning process for natural gas

infrastructure development that is similar to the

planning process for electric transmission.

See November 7, 2015 Comments of NJCF (citing attached

Report of the Goodman Group, ltd.), September 8, 2016

Comments of the NJCF; September 8, 2016 Comments of Jeffrey

R. Shafer.

24

25 Id. at 9-10.

26 See October 20, 2016 Comments of the Eastern Environmental

Law Center, citing attached Report of Dr. Steve Isser, “Natural

Gas Pipeline Certification and Ratemaking.

27 NJCF Comments at 24-27.

JA 48

25. Finally, a few commenters contend that the

PennEast Project is not being proposed to benefit

United States markets but to support the growing

LNG export market. 28

PennEast’s Answers

26. PennEast filed several answers disputing

commenters’ claims that the project was not needed.

PennEast maintains that that substantial need for the

project has been demonstrated by precedent

agreements for long-term firm service for

approximately 90 percent of the project’s capacity. 29

PennEast filed a study that responds to NJRC’s

assessment of the need for the project that explains

that shippers contract for pipeline capacity for a

variety of reasons beyond simply the need to be able to

meet peak demands, including costs savings, supply

security, and price stability. 30 PennEast asserts that

the various studies by market experts that it filed in

the proceeding provide ample market data and

analysis supporting the market need for the project.

Commission Determination

27. The Certificate Policy Statement established a

policy under which the Commission will allow an

applicant to rely on a variety of relevant factors to

demonstrate need, rather than continuing to require

28 See, e.g., October 27, 2015 Comments of West Amwell Citizens

Against the Pipeline at 15-17; February 11, 2016 Comments of

Delaware Riverkeeper (attaching opinion of Labyrinth

Consulting Services, Inc.).

29 See PennEast’s October 17, and December 1, 2016 Answers.

30 PennEast’s October 17 Answer (attaching report of Concentric

Energy Advisors, Inc).

JA 49

that a percentage of the proposed capacity be

subscribed under long-term precedent or service

agreements. 31 These factors might include, but are not

limited to, precedent agreements, demand projections,

potential cost savings to consumers, or a comparison

of projected demand with the amount of capacity

currently serving the market. 32 The Commission

stated that it will consider all such evidence submitted

by the applicant regarding need. Nonetheless, the

Certificate Policy Statement made clear that,

although precedent agreements are no longer required

to be submitted, they are still significant evidence of

demand for the project. 33 As the court stated in

Minisink Residents for Environmental Preservation &

Safety v. FERC, and again in Myersville Citizens for a

Rural Community, Inc., v. FERC, nothing in the

Certificate Policy Statement or in any precedent

construing it suggest that the policy statement

requires, rather than permits, the Commission to

assess a project’s benefits by looking beyond the

market need reflected by the applicant’s precedent

agreements with shippers. 34 Moreover, it is current

Certificate Policy Statement, 88 FERC ¶ 61,227 at 61,747.

Prior to the Certificate Policy Statement, the Commission

required a new pipeline project to have contractual commitments

for at least 25 percent of the proposed project’s capacity. See

Certificate Policy Statement, 88 FERC ¶ 61,227 at 61,743.

PennEast, at 90 percent subscribed, would have satisfied this

prior, more stringent, requirement.

31

32 Id. at 61,747.

33 Id. at 61,748.

34 Minisink Residents for Envtl. Pres. & Safety v. FERC, 762 F.3d

97, 110 n.10 (D.C. Cir. 2014); see also Myersville Citizens for a

Rural Cmty., Inc., v. FERC, 183 F.3d 1301, 1311 (D.C. Cir. 2015).

JA 50

Commission policy to not look beyond precedent or

service agreements to make judgments about the

needs of individual shippers. 35

28. We find that PennEast has sufficiently

demonstrated that there is market demand for the

project. PennEast has entered into long-term, firm

precedent agreements with 12 shippers for 990,000

Dth/d of firm transportation service, approximately 90

percent of the project’s capacity. 36 Further, Ordering

Paragraph (C) of this order requires that PennEast file

a written statement affirming that it has executed

contracts for service at the levels provided for in their

precedent

agreements

prior

to

commencing

construction. PennEast has entered into precedent

agreements for long-term, firm service with 12

shippers. Those shippers will provide gas to a variety

of end users, including local distribution customers,

electric generators, producers, and marketers and

those shippers have determined, based on their

assessment of the long-term needs of their particular

customers and markets, that there is a market for the

natural gas to be transported and the PennEast

Project is the preferred means for delivering or

receiving that gas. Given the substantial financial

commitment required under these contracts by project

35 Id. at 61,744 (citing Transcontinental Gas Pipe Line Corp., 82

FERC ¶ 61,084, at 61,316 (1998)).

36 Constitution Pipeline Company, LLC, 154 FERC ¶ 61,046, at P

21 (2016) (“Although the Certificate Policy Statement broadened

the types of evidence certificate applicants may present to show

the public benefits of a project, it did not compel an additional

showing … [and] [n]o market study or other additional evidence

is necessary where … market need is demonstrated by contracts

for 100 percent of the project’s capacity.”).

JA 51

shippers, we find that these contracts are the best

evidence that the service to be provided by the project

is needed in the markets to be served. We also find

that end users will generally benefit from the project

because it would develop gas infrastructure that will

serve to ensure future domestic energy supplies and

enhance the pipeline grid by providing additional

transportation capacity connecting sources of natural

gas to markets in Pennsylvania and New Jersey.

29. We are unpersuaded by the studies submitted by

commenters in their attempt to show that there is

insufficient demand for the project and by their

assertions that the Commission is required to examine

the need for pipeline infrastructure on a regional

basis. Commission policy is to examine the merits of

individual projects and assess whether each project

meets the specific need demonstrated. While the

Certificate Policy Statement permits the applicant to

show need in a variety of ways, it does not suggest that

the Commission should examine a group of projects

together and pick which project(s) best serve an

estimated future regional demand. In support of their

arguments regarding demand, commenters cite

general forecasts for load growth in Pennsylvania and

New Jersey or certain LDC supply forecast projections

through 2020 made to state commissions. 37 However,

projections regarding future demand often change and

are influenced by a variety of factors, including

economic growth, the cost of natural gas,

environmental regulations, and legislative and

regulatory decisions by the federal government and

individual states. Given this uncertainty associated

37 NJRC Comments at 5.

JA 52

with long-term demand projections, including those

presented in the studies noted by commenters above,

where an applicant has precedent agreements for

long-term firm service, the Commission deems the

precedent agreements to be the better evidence of

demand. The Commission evaluates individual

projects based on the evidence of need presented in

each proceeding. Under section 7(c) of the NGA, the

Commission shall issue a certificate for any proposal

found to be required by the public convenience and

necessity. 38 Where, as here, it is demonstrated that

specific shippers have entered into precedent

agreements for project service, the Commission places

substantial reliance on those agreements to find that

the project is needed.

30. Commenters also overlook the fact that shippers

on PennEast’s system have noted several reasons

other than load growth for entering into precedent

agreements with PennEast to source gas from the

Marcellus Shale region. 39 Project shippers state they

believe that the project will provide a reliable, flexible,

and diverse supply of natural gas that will lead to

increased price stability, and the opportunity to

expand natural gas service in the future. 40 Based on

38 15 U.S.C. § 717(f) (2012).

39 See Exhibit F-1 of PennEast’s application, Resource Report 1 -

General Project Description, section 1.1 - Purpose and Need.

40 See Motion to Intervene and Comments in Support of New

Jersey Natural Gas Co. (filed October 28, 2015); Pivotal Utility

Holdings, Inc., d/b/a Elizabethtown Gas (filed October 28, 2015);

Consolidated Edison Company of New York, Inc. (filed October

29, 2015); Texas Eastern Transmission, LP (filed October 29,

JA 53

the record before us, we find no reason to second guess

the business decisions of these shippers that they need

the service to which they have subscribed.

31. With respect to the ability of alternatives to meet

the project’s need, our environmental review

considered the potential for renewable energy and

energy conservation, and the availability of capacity

on existing or proposed natural gas systems, to serve

as alternatives to the project and concluded that they

do not presently serve as practical alternatives to the

project. 41 Specifically, the final EIS stated that

renewable energy and energy efficiency measures to

reduce the dependence on natural gas is not a

comparable replacement for the transportation of

natural gas to be provided by the project. 42 Moreover,

the final EIS found that there is not sufficient

available capacity on existing pipeline systems to

transport all of the volumes contemplated to be

transported by the PennEast Project to the range of

delivery points proposed by PennEast, and that

expansion of existing pipeline systems was not a

feasible alternative. 43 The EIS also found that the

proposed Atlantic Sunrise Project could not serve as a

practical system alternative because there is customer

demand for both projects (noting that approximately

100 percent of capacity of the Atlantic Sunrise Project,

and 90 percent of the capacity of the PennEast Project

2015); PSEG Energy Resources & Trade LLC (filed October 29,

2015); and South Jersey Gas (filed October 29, 2015).

41 Final EIS at 3-1 - 3-8.

42 Id. at 3-3.

43 Id. at ES-16; 3-4 - 3-7.

JA 54

has been contracted for), as well as the fact that the

Atlantic Sunrise Project would not provide for the

same delivery points for customers that have been

identified for the PennEast Project. 44

32. We also find that NJRC’s assertion that the

PennEast Project is not needed based on the fact that

pipeline utilization on long-haul pipelines from the

Gulf Coast to markets in the Northeast has declined

in recent years is unavailing. Pipeline utilization rates

reflect actual gas flows over the facilities but do not

indicate whether there is available firm capacity on

the pipelines. As indicated above, the EIS found that

there was insufficient firm capacity available on

existing pipeline systems to provide the service

proposed by PennEast.

33. Moreover, the fact that 6 of the 12 shippers on the

PennEast Project are affiliated with the project’s

sponsors does not require the Commission to look

behind the precedent agreements to evaluate project

need. 45 There is no evidence in the record of any

44 Id. at 3-7 - 3-8. The Atlantic Sunrise Project was authorized by

Commission order issued February 3, 2017 (see Transcontinental

Gas Pipe Line Company, LLC, 158 FERC ¶ 61,125 (2017)) and is

currently under construction.

45 Millennium Pipeline Co., L.P., 100

FERC ¶ 61,277, at P 57

(2002) (“as long as the precedent agreements are long-term and

binding, we do not distinguish between pipelines’ precedent

agreements with affiliates or independent marketers in

establishing the market need for a proposed project”); Eastern

Shore Natural Gas Co., 132 FERC ¶ 61,204, at P 31 (2010) (“the

Commission gives equal weight to contacts with affiliates and

non-affiliates.” See also Certificate Policy Statement, 88 FERC at

61,748 (explaining that the Commission’s policy is less focused on

whether the contracts are with affiliated or unaffiliated shippers

and more focused on whether existing ratepayers would subsidize

JA 55

impropriety or abuse in connection with any of the

affiliate agreements. The mere fact that six of the

shippers are affiliates of PennEast does not call into

question their need for the new capacity or otherwise

diminish the showing of market support. Indeed, three

of the six affiliates, subscribing to 38 percent of the

total project design capacity, are LDCs with service

obligations toward their retail customers. The

Commission has found it reasonable for LDCs seek

additional sources of supply, and has emphasized its

disinclination to second-guess reasoned business

decisions by pipelines’ customers evidenced by

precedent agreements, as well as binding contracts. 46

Further, when considering applications for new

certificates, the Commission’s primary concern

regarding affiliates of the pipeline as shippers is

whether there may have been undue discrimination

against a non-affiliate shipper. 47 Here, no such

allegations have been made, nor have we found that

the project sponsors have engaged in any

the project); see also id. at 61,744 (the Commission does not look

behind precedent agreements to question the individual shippers’

business decisions to enter into contracts) (citing

Transcontinental Gas Pipe Line Corp., 82 FERC ¶ 61,084, at

61,316 (1998)).

See Millennium Pipeline Co., L.P., 100 FERC ¶ 61,277, at P

201 (2002). See also, Midwestern Gas Transmission Co., 116

FERC ¶ 61,182, at P 42 (2006); Southern Natural Gas Co., 76

FERC ¶ 61,122, at 61,635 (1996), order issuing certificate and

denying reh’g, 79 FERC ¶ 61,280 (1997), order amending

certificate and denying stay and reh’g, 85 FERC ¶ 61,134 (1998),

aff’d Midcoast Interstate Transmission, Inc. v. FERC, 198 F.3d

960 (D.C. Cir. 2000).

47 See 18 C.F.R. § 284.7(b) (2017) (requiring transportation

service to be provided on a non-discriminatory basis).

46

JA 56

anticompetitive behavior. As discussed above,

PennEast held an open season for capacity on the

project and all potential shippers had the opportunity

to contract for service. Moreover, PennEast’s tariff, as

discussed below, ensures that any future shipper will

not be unduly discriminated against.

34. We also do not find merit in the commenters’

assertion that the proposed project will be subsidized

by the affiliated LDC shippers’ captive customers.

First, to the extent a ratepayer receives a beneficial

service, paying for that service does not constitute a

“subsidy.” 48 Further, state regulatory commissions are

responsible for approving any expenditures by stateregulated utilities. Moreover, PennEast is required to

calculate its recourse rates based on the design

capacity of the pipeline, thereby placing PennEast at

risk for costs associated with any unsubscribed

capacity.

35. Finally, allegations that the project is not needed

because gas that is transported by it may be exported

through an LNG terminal are not persuasive. There is

no evidence in the record that indicates that the

expansion capacity will be used to transport natural

gas for export. A number of the project shippers are

LDCs, which will locally distribute gas or use it to

generate electricity. Further, even if there was

evidence that some of the gas would be exported, the

Commission does not have jurisdiction over the

exportation or importation of natural gas. Such

jurisdiction resides with the Secretary of Energy, who

48 See Certificate Policy Statement, 88 FERC ¶61,227 at 61,746.

JA 57

must act on any applications for natural gas export or

import authority. 49

36. In conclusion, we find that the PennEast Project

will provide reliable natural gas service to end use

customers and the market. Precedent agreements

signed by customers for approximately 90 percent of

the project’s capacity adequately demonstrate that the

project is needed.

49 Section 3(a) of the NGA provides, in part, that “no person shall

export any natural gas from the United States to a foreign

country or import any natural gas from a foreign country without

first having secured an order of the Commission authorizing it to

do so.” 15 U.S.C. § 717b(a) (2012). In 1977, the Department of

Energy Organization Act transferred the regulatory functions of

section 3 of the NGA to the Secretary of Energy. 42 U.S.C.

§ 7151(b) (2012). Subsequently, the Secretary of Energy

delegated to the Commission authority to “[a]pprove or

disapprove the construction and operation of particular facilities,

the site at which such facilities shall be located, and with respect

to natural gas that involves the construction of new domestic

facilities, the place of entry for imports or exit for exports.” DOE

Delegation Order No. 00-004.00A (effective May 16, 2006). The

proposed facilities are not located at a potential site of exit for

natural gas exports. Moreover, the Secretary of Energy has not

delegated to the Commission any authority to approve or

disapprove the import or export of the commodity itself, or to

consider whether the exportation or importation of natural gas is

consistent with the public interest. See Corpus Christi

Liquefaction, LLC, 149 FERC ¶ 61,283, at P 20 (2014) (Corpus

Christi). See also National Steel Corp., 45 FERC ¶ 61,100, at

61,332-61,333 (1988) (observing that DOE, “pursuant to its

exclusive jurisdiction, has approved the importation with respect

to every aspect of it except the point of importation” and that the

“Commission’s authority in this matter is limited to consideration

of the place of importation, which necessarily includes the

technical and environmental aspects of any related facilities”).

JA 58

3.

Existing

Pipelines

Customers

and

their

37. PennEast’s project is not intended to replace

service on other pipelines, and no pipelines or their

customers have filed adverse comments regarding

PennEast’s proposal. Thus, we find that PennEast’s

project will not adversely affect other pipelines or their

captive customers.

4.

Landowners and Communities

38. Regarding the project’s impacts on landowners

and communities, the project would impact

approximately 1,588 acres of land during construction,

and approximately 788.3 acres of land during

operation. Approximately 44.5 miles, or 37 percent of

the 120.2 mile-long pipeline route, will be located

alongside existing rights-of-way.

39. While we are mindful that PennEast has been

unable to reach easement agreements with a number

of landowners, for purposes of our consideration under

the Certificate Policy Statement, we find that

PennEast has generally taken sufficient steps to

minimize adverse impacts on landowners and

surrounding

communities.

The

Commission

encourages pipeline companies to engage with project

stakeholders throughout the life of the project, and

provide all stakeholders and potential impacted

residents with informational materials, and hold

community meeting to enable stakeholders to learn

about the project, and educate project developers

about local concerns. 50 PennEast participated in the

50 Commission, Suggested Best Practices for Industry Outreach

Programs to Stakeholders at 11-17 (2015).

JA 59

pre-filing process, and held over 200 meetings with

public officials, as well as 15 “informational sessions”

for impacted landowners. 51 PennEast incorporated 70

of 101 identified route variations into its final

proposed pipeline route for various reasons, including

landowner requests, community impacts, and the

avoidance of sensitive resources. 52 Accordingly, we

find that PennEast’s proposal has taken appropriate

steps to minimize impacts on landowners and the

surrounding communities.

5.

Conclusion

40. Based on the benefits the project will provide to

the shippers, the lack of adverse effects on existing

customers, other pipelines and their captive

customers, and effects on landowners and

surrounding communities, we find, consistent with the

Certificate Policy Statement and section 7 of the NGA,

that the public convenience and necessity requires

approval of PennEast’s proposal, subject to the

conditions discussed below.

B. Eminent Domain Authority

41. Several

commenters

assert

that

it

is

inappropriate for PennEast to obtain property for the

project through eminent domain, as PennEast is a forprofit company, and has not shown that there is a

genuine need for the project, or that the public it is

intended to serve will benefit from it. 53

51 PennEast Application at 5.

52 Final EIS at 3-27 - 3-32.

53 See, e.g., Homeowners Against Land Taking-PennEast.

JA 60

42. Under section 7 of the NGA, the Commission has

jurisdiction to determine if the construction and

operation of proposed interstate pipeline facilities are

in the public convenience and necessity. Once the

Commission makes that determination, it is section

7(h) of the NGA that authorizes a certificate holder to

acquire the necessary land or property to construct the

approved facilities by exercising the right of eminent

domain if it cannot acquire the easement by an

agreement with the landowner. 54 In constructing this

provision, Congress made no distinction between forprofit and non-profit companies. Further, as discussed

above, need for the project has been demonstrated by

the existence of long-term precedent agreements for

approximately 90 percent of the project’s capacity.

Just as the precedent agreements provide evidence of

market demand/need, they are also evidence of the

public benefits of the project. 55

C. Blanket Certificates

43. PennEast requests a Part 284, Subpart G blanket

transportation certificate to provide open-access

transportation services to its shippers. Since a Part

284 blanket certificate is required for PennEast to

offer these services, we will grant PennEast a Part

284, Subpart G blanket certificate, subject to the

conditions imposed herein.

54 15 U.S.C. § 717f(h) (2012).

55 See Sierra Club v. FERC, 867 F.3d 1357, 1379 (D.C. Cir. 2017);

see also Florida Southeast Connection, LLC, 156 FERC ¶ 61,160,

at P 5 (2016); see also Minisink Residents for Environmental

Preservation and Safety v. FERC, 762 F.3d 97, 111, at n.10 (D.C.

Cir. 2014).

JA 61

44. PennEast has also applied for a Part 157, Subpart

F blanket construction certificate to automatically, or

after prior notice, perform certain activities related to

the construction, acquisition, abandonment, and

replacement and operation of pipeline facilities. This

blanket certificate includes requirements for

landowner notification before construction may begin.

45. The Trustees of the Joseph D. Ceader Family

Memorial Fund (Ceader Family) express concern over

issuing PennEast a Part 157, Subpart F blanket

certificate, alleging that doing so would grant

PennEast “carte blanche” (emphasis included)

authority to condemn land via eminent domain, and

construct significant facilities that could have

negative impacts on the environment and their

property value, without “extensive environmental

review” or findings of need. In addition, Hopewell

Township Citizens Against the PennEast Pipeline,

LLC, (Hopewell Township) oppose the issuance of a

blanket certificate to PennEast as it would be a “‘one

size fits all solution’” that is inappropriate for such a

project.

46. Neither the Ceader Family nor Hopewell

Township) present any arguments why PennEast’s

specific request for a blanket certificate should be

denied; rather they seem to take general issue with

the Commission’s blanket certificate program. Part

157, Subpart F of the Commission’s regulations

authorizes a certificate holder to engage in a limited

number of routine activities under a blanket

certificate, subject to certain reporting, notice, and

JA 62

protest requirements. 56 The blanket certificate

procedures are intended to increase flexibility and

reduce regulatory and administrative burdens.

Because the eligible activities permitted under a

blanket certificate regulations can satisfy our

environmental requirements and meet the blanket

certificate cost limits, they will have minimal impacts,

such that the close scrutiny involved in considering

applications for case-specific certificate authorization

is not necessary to ensure compatibility with the

public convenience and necessity. For almost all

eligible activities, a certificate holder seeking to

engage in such activities must notify landowners prior

to commencing the activity. 57 For activities that

require prior notice, an opportunity to protest is

afforded once notice of the certificate holder’s request

is issued to the public. 58 If a protest cannot be

resolved, then the certificate holder may not perform

the requested activity under a blanket certificate. 59

47. Receipt of a Part 157 blanket certificate does

confer the right of eminent domain authority under

section 7(h) of the NGA. 60 However, Commission

regulations require companies to include information

56 See 18 C.F.R. § 157.203 (2017).

57 See id. § 157.203(d).

58 See id. § 157.205.

59 See id. § 157.205(f).

15 U.S.C. § 717f(h) (2012); also Columbia Gas

Transmission, LLC v. 1.01 Acres, 768 F.3d 300, 314 (3rd Cir.

2014) (finding that the plain meaning of the Commission’s Part

157 blanket certificate regulations grants the holder of a blanket

certificate the right of eminent domain to obtain easements from

landowners.).

60 See

JA 63

on relevant eminent domain rules in notices to

potentially affected landowners. 61 The compensation

landowners receive for property rights is a matter of

negotiation between the pipeline company and

landowner, or is determined by a court in an eminent

domain proceeding. In view of the above-noted blanket

program procedures and protections, we expect the

Ceader Family and Hopewell Township will have the

opportunity to raise specific concerns and seek specific

relief regarding PennEast’s reliance on blanket

authority in undertaking a future activity.

48. Because PennEast will become an interstate

pipeline with the issuance of a certificate to construct

and operate the proposed facilities, we will issue

PennEast the requested blanket certificate authority

under Parts 157 and 284 of the Commission’s

regulations.

D. Rates

1.

Initial Rates

49. PennEast proposes an initial maximum

reservation recourse charge of $16.0799 per Dth per

month, and an initial usage charge of $0.0024 per Dth

for firm transportation service under Rate Schedule

FTS. 62 PennEast developed its proposed initial rates

based on a total first-year cost of service of

$224,270,492. The proposed cost-based rates reflect a

Straight-Fixed Variable rate methodology. The FTS

reservation rate is designed using the fixed costs of the

61 18 C.F.R. § 157.203(d)(2)(v) (2017).

62 Exhibit P, Schedule 2, of PennEast’s Application.

JA 64

project 63 and annual reservation design determinants

of 13,905,896 Dth. 64 The FTS usage rate is derived

using the variable costs of the project and billing

determinants of 282,838,500 Dth, based on a 70

percent load factor of the project’s annual design

throughput. 65

50. The proposed cost of service is based on a

depreciation rate of 2.5 percent for pipeline facilities

and 4 percent for compression and metering

facilities. 66 PennEast proposes a capital structure of

40 percent debt and 60 percent equity. PennEast’s

proposed rates include a return on equity of 14 percent

and a cost of debt of 6 percent. PennEast states that

the overall rate of return of 10.8 percent is consistent

with the range the Commission has found acceptable

for new greenfield pipelines. 67 PennEast’s proposed

cost of service also includes a federal corporate income

tax rate of 35 percent. 68

51. PennEast proposes an initial charge of $0.5310

per Dth for interruptible service under Rate Schedule

IT and for interruptible parking and lending service

63 Id. PennEast estimates the first year fixed costs of the project

to be $223,604,821.

64 Id. The annual reservation design determinants are based on

the project’s daily design capacity of 1,107,000 Dth plus 51,825

Dth of imputed IT billing determinants, as described further,

times 12.

65 The project’s daily design capacity of 1,107,000 Dth, times 365,

times 70 percent.

66 Exhibits L, O and P of PennEast’s Application.

67 PennEast’s Application at 32.

68 Id.

JA 65

under Rate Schedule PAL, based on a 100 percent load

factor equivalent of its Rate Schedule FTS rates. 69

52. Commission policy requires new pipelines to

allocate costs to all services (including interruptible

and short-term firm transportation) or credit revenues

generated by these services to maximum rate

shippers. 70 To comply with this policy, PennEast

proposes to assign $10 million of costs to interruptible

services, reflected as 51,825 Dth/d of imputed billing

determinants for interruptible service. PennEast

included the additional imputed billing determinants

for interruptible service in the calculation of the FT

reservation charge, which results in a lower FT

reservation charge for firm shippers.

53. The Commission has reviewed PennEast’s

proposed initial rates, cost of service, use of the

Straight Fixed-Variable method of cost classification,

billing determinants, and the treatment of

interruptible services and interruptible rate

calculations, and finds they reasonably reflect current

Commission policy, with the modifications and

conditions imposed below.

Return on Equity, Capital Structure, Debt Costs,

and Federal Corporate Tax Issues

54. In comments on the draft environmental impact

statement, the NJRC argues that PennEast’s

requested 60 percent equity capitalization, 14 percent

69 Exhibit P, Schedule 2, of PennEast’s Application.

70 Transcontinental Gas Pipe Line Corp., 78 FERC ¶ 61,057, at

61,209-61,210 (1997).

JA 66

return on equity, and 6 percent debt costs are

excessive.

Return on Equity and Capital Structure

55. NJRC asserts that a 14 percent return on equity

is too high because PennEast faces little risk as a new

market entrant constructing a new greenfield

pipeline. In support, NJRC notes that PennEast’s

system capacity is 90 percent subscribed, and that the

majority of that capacity is subscribed by local

distribution companies that are “all but guaranteed to

pay their bills.” 71 In addition, NJRC claims that

markets have changed significantly since the

Commission began granting 14 percent returns nearly

20 years ago due to the increase in hydraulic

fracturing and liquefied natural gas exports, and that

current capital markets lack the risk to necessitate

such high equity returns. 72

56. NJRC also asserts that returns on equity have

been trending down over the last few years as reflected

in both pipeline rate cases and a number of Federal

Power Act complaints regarding electric utilities, and

points out that average approved rates of return over

the last 5 years for LDCs has been less than 10

percent. 73 NJRC further points to a recent

Commission order in which it claims the Commission

“ordered a new pipeline” to use a 10.55 percent return

71 NJRC Comments at 11.

72 Id. at 11-12 (citing Alliance Pipeline L.P., 80 FERC ¶ 61,149,

at 61,552 (1997)).

73 Id. at 9-13.

JA 67

on equity, 74 and asserts that the Commission should

not “reflexively” award PennEast a 14 percent return

on equity “simply because earlier pipelines have

received that return on equity.” 75

57. Alternatively, if the Commission approves a 14

percent return on equity, NJRC contends that recent

Commission orders require the Commission to limit

PennEast’s capital structure to no more than 50

percent equity. 76

Commission Determination

58. For new pipelines, the Commission has approved

equity returns of up to 14 percent as long as the equity

component of the capitalization is no more than 50

percent. 77 As pointed out by NJRC, PennEast has

74 Id. at 13 (citing First ECA Midstream LLC, 155 FERC ¶ 61,222,

at P 23 (2016) (First ECA Midstream)).

75 Id.

Id. at 14 (citing Ingleside Energy Center, LLC, 112 FERC

¶ 61,101, at PP 32-33 (2005), vacated on other grounds, 136

FERC ¶ 61,114 (2011) (reducing a proposed 70% equity structure

to 50%).

76

See, e.g., Florida Southeast Connection, LLC, 154 FERC

¶ 61,080 (2016) (approving a 14 percent return on equity after

requiring the capital structure be modified to include at least 50

percent debt), MarkWest Pioneer, L.L.C., 125 FERC ¶ 61,165, at

P 27 (2008) (approving 14 percent return on equity based on 50

percent debt and 50 percent equity ratios); Corpus Christi LNG,

L.P., 111 FERC ¶ 61,081, at P 33 (2005) approving a 14 percent

return on equity based on 50 percent debt and 50 percent equity

ratios); Gulfstream Natural Gas System, L.L.C., 105 FERC

¶ 61,052, at n.26 (2003) and 91 FERC ¶ 61,119, at 61,463 (2000)

(approving 14 percent return on equity based on 70 percent debt

and 30 percent equity ratios); Georgia Strait Crossing Pipeline

LP, 98 FERC ¶ 61,271, at 62,054 (2002) (approving 14 percent

77

JA 68

proposed to establish its rates based only on a 40

percent debt capitalization. With such a debt ratio,

everything else being equal, PennEast will not face the

same level of financial risks as any of the new

pipelines that have been previously granted a 14

percent return on equity. Imputing a capitalization

containing a 60 percent equity ratio is more costly to

ratepayers, since equity financing is typically more

costly than debt financing, and also because the

interest on indebtedness is tax deductible. 78

Accordingly, the Commission will approve PennEast’s

proposed 14 percent return on equity, but will require

that it design its cost-based rates on a capital

structure that includes at least 50 percent debt. As a

result of the change to the capital structure required

here, we will require PennEast to recalculate its rates

in its compliance filing.

59. However, we reject NJRC’s request that we

reduce the proposed return of 14 percent, in addition

to requiring a lower equity capitalization. In

modifying PennEast’s proposed capital structure, we

are ensuring that consumers are protected and that

PennEast’s rates are on a level playing field with other

new pipelines. The Commission’s policy of approving

equity returns of up to 14 percent with an equity

capitalization of no more than 50 percent for new

pipeline companies reflects the fact that greenfield

pipelines undertaken by a new entrant in the market

face higher business risks than existing pipelines

proposing incremental expansion projects. For

return on equity based on 70 percent debt and 30 percent equity

ratios).

78 MarkWest Pioneer, L.L.C., 125 FERC ¶ 61,165, at P 27 (2008).

JA 69

example, in contrast to an existing pipeline company,

a new pipeline entrant does not have historical cost

data on which to base its cost-of-service estimates. In

addition, a new pipeline entrant is likely to face higher

risks in securing financing than an existing pipeline. 79

Thus, approving PennEast’s requested 14 percent

return on equity in this instance is not merely

“reflexive;” it is in response to the risk PennEast faces

as a new market entrant, constructing a new

greenfield pipeline system.

60. NJRC’s reliance on the Commission’s decision in

First ECA Midstream is misplaced. That proceeding

did not involve a greenfield project undertaken by a

new entrant in the market. Rather, the applicant was

an existing company proposing to operate its existing

non-jurisdictional gathering system as an interstate

pipeline. In approving a 10.55 percent return on

equity, the Commission specifically found that the

applicant had “more in common with existing

pipelines than with the greenfield pipeline projects

that have received returns of 14 percent.” 80

61. In addition, we find no support for NJRC’s

assertion that PennEast faces less risk than other new

pipelines that have received returns of 14 percent due

to its 90 percent subscription level. We have

consistently approved equity returns of 14 percent for

See, e.g., Rate Regulation of Certain Natural Gas Storage

Facilities, Order No. 678, 115 FERC ¶ 61,343, at P 127 (2006)

(“As a going concern with existing customers and financial

relationships, the risk associated with acquiring financing is

lower for incremental expansions than the risk associated with a

greenfield project undertaken by a new entrant in the market.”).

79

80 First ECA Midstream at P 23.

JA 70

new pipelines that have firm contracts subscriptions

equivalent or higher than PennEast’s 90 percent

subscription level. 81 Moreover, the returns approved

for electric utilities and LDCs are not relevant because

there is no showing that these companies face the

same level of risk as faced by greenfield projects

proposed by a new natural gas pipeline company. 82

62. Further, as explained below, we are requiring

PennEast to file a cost and revenue study at the end

of its first three years of actual operation to justify its

existing cost-based rates. The three-year study will

provide an opportunity for the Commission and the

public to review PennEast’s original estimates, upon

which its initial rates are based, to determine whether

PennEast is over-recovering its cost of service with its

approved initial rates, and whether the Commission

should exercise its authority under section 5 of the

NGA to establish just and reasonable rates.

Alternatively, PennEast may elect to make a NGA

section 4 filing to revise its initial rates. Should

PennEast elect to make such a filing, the public would

have an opportunity to review PennEast’s proposed

return on equity and other cost of service components

See, e.g. Florida Southeast Connection, LLC. 154 FERC

¶ 61,080 (2016). (approving a 14 percent return on equity where

project was 94 percent subscribed); Sierrita Gas Pipeline, LLC,

147 FERC ¶ 61,192 (2014), clarified 149 FERC ¶ 61,101 (2014)

(approving a 14 percent return on equity where project was fully

subscribed).

81

The Commission has previously concluded that distribution

companies are less risky than a pipeline company. See, e.g.

Trailblazer Pipeline Co., 106 FERC ¶ 63,005, at P 94 (2004)

(rejecting inclusion of LDCs in a proxy group because they face

less risk than a pipeline company.).

82

JA 71

at that time and would have an opportunity to raise

issues relating to the rate of return, as well as all other

cost components.

63. In section 7 certificate proceedings, the

Commission reviews initial rates for service using

proposed new pipeline capacity under the public

convenience and necessity standard, which is a less

rigorous standard than the just and reasonable

standard under NGA sections 4 and 5. 83 As

83 Atlantic Refining Co. v. Public Serv. Comm’n of New York, 360

U.S. 378, 390-391 (1959) (Atlantic Refining). In Atlantic Refining,

the Court contrasted the Commission’s authority under sections

4 and 5 of the NGA to approve changes to existing rates using

existing facilities and its authority under section 7 to approve

initial rates for new services and services using new facilities.

The court recognized “the inordinate delay” can be associated

with a full-evidentiary rate proceeding and concluded that was

the reason why, unlike sections 4 and 5, section 7 does not require

the Commission to make a determination that an applicant’s

proposed initial rates are or will be just and reasonable before the

Commission certificates new facilities, expansion capacity,

and/or services. Id. at 390. The Court stressed that in deciding

under section 7(c) whether proposed new facilities or services are

required by the public convenience and necessity, the

Commission is required to “evaluate all factors bearing on the

public interest,” and an applicant’s proposed initial rates are not

“the only factor bearing on the public convenience and necessity.”

Id. at 391. Thus, as explained by the Court, “[t]he Congress, in

§7(e), has authorized the Commission to condition certificates in

such manner as the public convenience and necessity may

require when the Commission exercises authority under section

7,” id., and the Commission therefore has the discretion in section

7 certificate proceedings to approve initial rates that will “hold

the line” and “ensure that the consuming public may be

protected” while awaiting adjudication of just and reasonable

rates under the more time-consuming ratemaking sections of the

NGA. Id. at 392.

JA 72

conditioned herein, we find that the approved initial

rates will “hold the line” and “ensure that the

consuming public may be protected,” until just and

reasonable rates can determined through the more

thorough and time-consuming ratemaking sections of

the NGA. 84

Debt Costs

64. NJRC argues that PennEast has not supported its

request for a 6 percent cost of debt. Referencing a

Moody’s report for Long-term Bond Yields in 2016,

NJRC states that long-term utility bond rates have

declined from January 2016 to July. 85 Thus, NJRC

asserts that the Commission should impute a debt cost

consistent with “actual debt market rates” and

consistent with the Commission’s approval of a debt

cost of 3 percent. 86

65. We find that PennEast’s proposed 6 percent cost

of debt is consistent with the cost of debt the

Commission has approved for recent greenfield

pipeline projects. The Commission has approved cost

of debt percentages ranging from 4.8 to 9.3. 87

Moreover, as explained above, the initial rates

established in First ECA Midstream, including

84 Id. at 392.

85 NJRC Comments at 15.

86 First ECA Midstream LLC, 115 FERC ¶ 61,222 at PP 22-23.

87 UGI Sunbury, LLC, 155 FERC ¶ 61,115, at 20 (2016) (7 percent

cost of debt); Florida Southeast Connection, LLC, 154 FERC

¶ 61,080 at n.141 (7 percent cost of debt); Ruby Pipeline, L.L.C.,

128 FERC ¶ 61,224, at P 43 (2009) (9.3 percent cost of debt);

Sierrita Gas Pipeline, LLC, 147 FERC ¶ 61,192, at P 40 (2014)

(4.8 percent cost of debt).

JA 73

approval of the applicant’s proposed 3 percent cost of

debt, are inapplicable to this proceeding. Therefore,

we will approve PennEast’s proposal to utilize a 6

percent cost of debt.

Federal Corporate Tax Issues

66. As noted above, PennEast used a federal

corporate income tax rate of 35 percent in calculating

its proposed cost of service. However, effective

January 2018, the Tax Cuts and Jobs Act of 2017

changed several provisions of the federal tax code,

including a reduction in the federal corporate income

tax rate to 21 percent and allowing certain

investments to receive bonus depreciation treatment.

Because these changes impact PennEast’s proposed

cost of service and the resulting initial recourse rates,

we direct PennEast to recalculate its initial recourse

rates consistent with the new 2018 federal corporate

tax law when it files actual tariff records. In order to

ensure compliance with this directive, we also require

PennEast to provide supporting work papers in

electronic spreadsheet format, including formulas.

2.

Negotiated Rates

67. PennEast states that it will provide service to the

project’s shippers under negotiated rate agreements

pursuant to its negotiated rate authority in section 24

of its pro forma General Terms and Conditions

(GT&C). PennEast must file either its negotiated rate

agreements or tariff records setting forth the essential

terms of the agreements in accordance with the

Alternative Rate Policy Statement 88 and the

88 Alternatives to Traditional Cost-of-Service Ratemaking for

Natural Gas Pipelines; Regulation of Negotiated Transportation

JA 74

Commission’s negotiated rate policies. 89 PennEast

must file the negotiated rate agreements or tariff

records at least 30 days, but not more than 60 days,

before the proposed effective date for such rates. 90

3.

Fuel

68. PennEast states it will use an in-kind fuel

tracking mechanism to recover fuel and lost and

unaccounted for gas (L&U) through a fuel retainage

percentage (FRP). PennEast has proposed an initial

FRP of 0.81 percent, calculated using engineering

principles and manufacturer’s specifications for the

proposed compressor engines, and an L&U percentage

of 0.00 percent. We will approve PennEast’s proposed

initial FRP rate of 0.81 percent, and its proposed

initial L&U rate of 0.00 percent.

69. In addition, PennEast proposes a fuel tracker as

part of its pro forma tariff. Section 20.3(a) of the GT&C

of PennEast’s pro forma tariff states:

With each filing hereunder for a specified

calendar period Pipeline shall calculate a

FRP as the quotient obtained by dividing (a)

Services of Natural Gas Pipelines, 74 FERC ¶ 61,076 (1996);

clarification granted, 74 FERC ¶ 61,194 (1996), order on reh’g, 75

FERC ¶ 61,024 (1996).

89 Natural Gas Pipelines Negotiated Rate Policies and Practices;

Modification of Negotiated Rate Policy, 104 FERC ¶ 61,134

(2003), order on reh’g and clarification, 114 FERC ¶ 61,042

(2006), reh’g dismissed and clarification denied, 114 FERC

¶ 61,304 (2006).

90 Pipelines are required to file any service agreement containing

non-conforming provisions and to disclose and identify any

transportation term or agreement in a precedent agreement that

survives the execution of the service agreement.

JA 75

the projected annual quantities of Fuel for the

upcoming calendar period, plus the amount of

any under-collection of Gas in-kind pursuant

to the prior period FRP or less the amount of

any over-collection of Gas in-kind pursuant to

the prior period FRP and (b) the projected

annual throughput for the upcoming calendar

period.

70. Section 154.403(c)(10) of the Commission’s

regulations 91 states that “[a] step-by step explanation

of the methodology used to reflect changes in the fuel

reimbursement percentage including the allocation

and classification of the fuel use and unaccounted-for

natural gas” must be included in the GT&C. PennEast

is directed to revise section 20 of the GT&C to include

an explanation of how the projected annual quantities

of fuel and projected annual throughput are

determined.

71. In addition, PennEast’s proposed language in

section 20.3(b) of the GT&C explains that it will

estimate the L&U quantities, but does not explain the

methodology PennEast will use to calculate those

estimates. Therefore, when PennEast files actual

tariff records in accordance with the ordering

paragraphs herein, it is directed to revise section 20 of

the GT&C to include an explanation of how PennEast

will calculate the estimates for the L&U quantities

required for the upcoming calendar period.

4.

Three-Year Filing Requirement

72. Consistent

with

Commission

precedent,

PennEast is required to file a cost and revenue study

91 18 C.F.R. § 154.403(c)(10) (2017).

JA 76

no later than three months after the end of its first

three years of actual operation to justify its existing

cost-based firm and interruptible recourse rates. 92 In

its filing, the projected units of service should be no

lower than those upon which PennEast’s approved

initial rates are based. The filing must include a cost

and revenue study in the form specified in section

154.313 of the Commission’s regulations to update

cost of service data. 93 PennEast’s cost and revenue

study should be filed through the eTariff portal using

a Type of Filing Code 580. In addition, PennEast is

advised to include as part of the eFiling description, a

reference to Docket No. CP15-558-000 and the cost

and revenue study. 94 After reviewing the data, the

Commission will determine whether to exercise its

authority under NGA section 5 to investigate whether

the rates remain just and reasonable. In the

alternative, in lieu of this filing, PennEast may make

a NGA general section 4 rate filing to propose

alternative rates to be effective no later than three

years after the in-service date for its proposed

facilities.

5.

Tariff

73. As part of its application, PennEast filed a pro

forma open-access tariff for the Commission’s

approval. PennEast proposed tariff generally

92 Bison Pipeline, LLC, 131 FERC ¶ 61,013, at P 29 (2010); Ruby

Pipeline, LLC, 128 FERC ¶ 61,224, at P 57 (2009) (Bison);

MarkWest Pioneer, L.L.C., 125 FERC ¶ 61,165, at P 34 (2008).

93 18 C.F.R. § 154.313 (2017).

94 Electronic Tariff Filings, 130 FERC ¶ 61,047, at P 17 (2010).

JA 77

conforms to the Commission’s requirements. We will

approve the tariff, as conditioned below.

Rate Schedule ITS

74. Section 2.5 of Rate Schedule ITS provides that the

pipeline shall not be required to provide

transportation service if the quantities tendered are so

small as to cause operational difficulties, such as with

measurement. Under sections 284.7(b) and 284.9(b) of

the Commission’s regulations, a transporter may not

discriminate as to the level of volumes transported. 95

In previous determinations, however, the Commission

has allowed a pipeline to include a minimum volume

restriction in its tariff when the pipeline was able to

show that the transportation of quantities below the

threshold were too small to be metered, and where the

company has provided operational and cost

justification for the restriction. 96 For example, the

Commission accepted a proposal for a 100 Dth/d

threshold for connections of new receipt and delivery

points, where the applicant demonstrated that serving

Section 284.7(b)(1) provides “[a]n interstate pipeline or

intrastate pipeline that offers transportation service on a firm

basis under Subpart B, C, or G must provide such service without

undue discrimination, or preference, including undue

discrimination or preference in the quality of service provided,

the duration of service, the categories, prices, or volumes of

natural gas to be transported, customer classification, or undue

discrimination or preference of any kind.” (emphasis added).

Section 284.9(b) applies these provisions regarding nondiscriminatory access to interruptible service.

95

96 See, e.g., Gulf South Pipeline Co., LP, 103 FERC ¶ 61,105, at P

13, n.7 (2003) (Gulf South); Trailblazer Pipeline Co., 39 FERC

¶ 61,103, at 61,336 (1987); Texas Eastern Transmission Corp., 37

FERC ¶ 61,260, at 61,680-61,681 (1986).

JA 78

small volume points presented operational challenges

because these receipt points were difficult to measure,

increasing the potential for lost system gas, and that

the cost of operating these delivery points was greater

than the maximum rate for service. In addition, the

applicant demonstrated that the costs associated with

operating small points would be greater than the

maximum rate would cover. 97

75. Here, PennEast has neither provided justification

nor has it provided a proposed threshold for minimum

volumes to be transported. Therefore, the Commission

requires PennEast to eliminate the proposed

minimum volume condition or, in the alternative,

state what that minimum volume is and provide the

justification to support it.

Rate Schedule PAL

76. Section 8.6 of Rate Schedule PAL provides that

parked quantities of gas shall become the property of

PennEast when: 1) a customer fails to comply with

notifications that receipts of parked quantities are to

be suspended or reduced; 2) a customer fails to comply

with notifications that customer’s parked quantities

must be removed; or 3) a PAL account reflects a

balance at the termination date of a PAL Service

Agreement. The Commission has found that a

pipeline’s confiscation of gas is an operationally

justified deterrent to shipper behavior that could

threaten the system or degrade service to firm

shippers. However, the Commission requires that the

value of such confiscated gas be credited to existing

97 Gulf South, 103 FERC ¶ 61,105, at PP 9-13.

JA 79

customers. 98 PennEast has not proposed a crediting

mechanism in its tariff. Therefore, we direct PennEast

to revise its tariff to include a mechanism to credit the

value of any confiscated gas, net of costs, to nonoffending shippers.

GT&C Section 5: Service Nomination

Procedures

77. PennEast proposes at section 5.1(c) of the GT&C:

Pipeline shall have the right to refuse to

receive or deliver any Gas not timely and

properly nominated. Pipeline shall not be

liable to Customer or any other person as a

direct or indirect consequence of such refusal

and Customer shall indemnify Pipeline from

and against any and all losses, damages,

expenses, claims, suits, actions and

proceedings whatsoever threatened, incurred

or initiated as a result of such refusal unless

such refusal was due to Pipeline’s gross

negligence, undue discrimination or willful

misconduct.

78. The Commission has found that a simple

negligence standard is appropriate for the liability and

indemnification provisions of open-access tariffs, as

this standard prohibits pipelines from limiting their

liability in a way that would immunize them from

direct damages resulting from simple negligence and

“gives service providers a powerful incentive to

operate their systems in a reasonable and prudent

98 AES Sparrows Point LNG, LLC and Mid-Atlantic Express,

LLC, 126 FERC ¶ 61,019, at P 42 (2009), (citing Colorado

Interstate Gas Co., 122 FERC ¶ 61,256, at P 102 (2008)).

JA 80

manner.” 99 The Commission, however, has allowed

pipelines to limit their liability for simple negligence

to direct damages, so that they are only liable for

indirect, consequential, incidental or punitive

damages where there is gross negligence, willful

misconduct, or bad faith. 100

79. PennEast’s proposed liability standard is

inconsistent with Commission policy because it

immunizes the pipeline from direct damages resulting

from simple negligence. Therefore, when it submits its

actual tariff filing, the Commission will require

PennEast to revise its liability standard proposed in

section 5.1(c) of the GT&C so as to not exclude it from

liability for direct damages arising from its own simple

negligence. Similarly, PennEast must revise sections

8.6 (Curtailment), 12.5 (Quality of Gas), and 37

(Nonrecourse Obligation of Pipeline’s Members and

Operator) of the GT&C, which also immunize the

pipeline from direct damages resulting from simple

negligence.

GT&C Section 6: Service Scheduling

80. Section 6.1 of PennEast’s GT&C lists the priority

order

in

which

quantities

nominated

for

transportation will be scheduled. Section 6.1(c) states:

99 See, e.g., Trailblazer Pipeline Co. LLC, 142 FERC ¶ 61,007, at

P 8 (2012); CenterPoint Energy Gas Transmission Co., LLC, 139

FERC ¶ 61,064, at P 19 (2012); Orbit Gas Storage, Inc., 126

FERC ¶ 61,095, at P 58 (2009)).

100 See, e.g., Bison, 131 FERC ¶ 61,013, at P 37; El Paso, 130

FERC ¶ 61,096, at P 4-5; ANR Pipeline Co., 100 FERC ¶ 61,132,

at 61,505 (2002).

JA 81

Pro rata among firm service Customers

utilizing a Secondary Point or Points with at

least one of such points being outside the

Contract Path or the nominated quantity

being in excess of the firm contractual

entitlement(s) for any pipeline segment as

described in subsection (g) below. (emphasis

added) 101

The emphasized language above appears to address

authorized overrun quantities. However, section

6.1(d) of the GT&C provides that authorized overrun

quantities will have the same scheduling priority as

interruptible services (“All interruptible service

Customers, excluding park and loan service

Customers, and Customers nominating authorized

overrun quantities in sequence starting with the

Customer paying the highest rate.”). 102 Commission

policy requires that nominations for authorized

overrun and interruptible services should have the

same scheduling priority. 103 Thus, we find that the

101 Section 6.1(g) of the GT&C provides, in part, “[i]n addition, for

any movement of Gas that traverses a segment(s) in which the

total nominated quantity for that contract exceeds the firm

contractual entitlement, the quantity in excess of the contractual

entitlement shall be deemed to be outside of the Customer’s

Contract Path.”

102 Section 6 of Rate Schedule FTS also provides that authorized

daily overrun quantities will be transported on an interruptible

basis.

103 Sierrita Gas Pipeline, LLC, 147 FERC ¶ 61,192, at P 66 (2014);

Central New York Oil and Gas Co., LLC, 114 FERC ¶ 61,105, at

P 9 (2006) (citing CNG Transmission Corp., 81 FERC ¶ 61,346,

at 62,592 (1997) and Tennessee Gas Pipeline Co., 62 FERC

¶ 61,250, at 62,676 (1993)).

JA 82

emphasized language in section 6.1 (c) of the GT&C

that applies to authorized overrun quantities is

inconsistent with Commission policy, as well as other

provisions of PennEast’s tariff. We direct PennEast to

delete this provision.

GT&C Section 8: Curtailment

81. PennEast proposes at section 8.1 of the GT&C:

Pipeline shall have the right to curtail or

discontinue transportation services, in whole

or in part, on all or a portion of its system at

any time for reasons of Force Majeure or

when, in Pipeline’s sole judgment, capacity or

operating conditions so require or it is

desirable or necessary to make modifications,

repairs or operating changes to its system.

(emphasis added.)

82. The Commission has held that pipelines should

plan routine repair, maintenance, and improvements

through the scheduling process, and should not curtail

confirmed scheduling nominations in order to perform

such work. 104 The Commission has found that

pipelines may only “curtail” service in an emergency

situation or when an unexpected capacity loss occurs

after the pipeline has scheduled service, and the

pipeline is therefore unable to perform the service

which it has scheduled. 105 The term “modifications,

repairs or operating changes” is not limited to an

104 CenterPoint Energy Gas Transmission Co., LLC, 144 FERC

¶ 61,195, at P 75 (CenterPoint).

105 Id.; Ryckman Creek Resources, LLC, 136 FERC ¶ 61,061, at P

68 (2011); MarkWest Pioneer, L.L.C., 125 FERC ¶ 61,165, at P 52

(2008).

JA 83

emergency situation or an unexpected loss of capacity,

and the pipeline should take outages required for

routine repair, maintenance, and operating changes

into account when it is scheduling service, rather than

curtailing service after it is scheduled. Therefore,

PennEast is required to revise the emphasized phrase

to comply with Commission policy.

83. In sections 8.2 (a) through (e) of the GT&C,

PennEast provides the order in which it would curtail

service. Sections 8.2 (d) and (e) of the GT&C set forth

the priorities for curtailing firm service and provide:

(d) Fourth, Pipeline shall curtail scheduled

service to those Customers receiving service

under the firm rate schedule at a Secondary

Point or Points, with at least one of such

points being outside the Contract Path, if the

operating condition that necessitates the

curtailment affects a location outside of the

Customers’ Contract Path, on a pro rata basis

among affected Customers;

(e) Fifth, Pipeline shall curtail scheduled

service to those Customers receiving service

under the firm rate schedule at Primary

Points of Receipt and Primary Points of

Delivery and at a Secondary Point or Points,

which points are wholly within the Contract

Path pro rata on the basis of scheduled

quantities.

84. The Commission rejects PennEast’s proposal as it

relates to curtailing firm transportation services.

Commission policy requires that once firm service is

scheduled, all scheduled firm transactions, whether

primary or secondary, must be curtailed on a pro rata

JA 84

basis. 106 PennEast’s proposed tariff is inconsistent

with this policy because it would curtail certain types

of scheduled firm transportation before other

scheduled firm transportation. PennEast is required,

in its tariff compliance filing, to revise sections 8.2 (d)

and (e) to provide that scheduled firm volumes may

only be curtailed on a pro rata basis.

85. Section 8.4 of PennEast’s GT&C states:

All volumes received and/or taken in violation

of Pipeline’s curtailment or interruption

orders shall constitute unauthorized receipts

or deliveries of Gas for which a penalty charge

equal to the higher of $50.00 per Dth and

150% times the Platts Gas Daily “Daily Price

Survey” High Common price for “Transco,

zone 6 non- N.Y. North” per Dth shall be

assessed, in addition to any other applicable

rate, charge or penalty. (emphasis added).

86. In addition to the above penalty, PennEast’s tariff

contains a “Usage Rate outside Tolerances” 107 penalty

provision that may result in penalizing the same

infraction twice. Commission policy prohibits multiple

106 Algonquin Gas Transmission Co., 104 FERC ¶ 61,118, at P 34

(2003); Order No. 636-B, 61 FERC ¶ 61,272, at 62,013 (1992).

107 Sections 3.2.B(2) of Rate Schedule FTS and 3.2A(2) of Rate

Schedule ITS provide, in part: “The Usage Charge outside

Tolerances as set forth on the Statement of Rates for Rate

Schedule FTS or the Statement(s) of Negotiated Rates, as

applicable, multiplied by that portion of the total quantity of Gas

deliveries on any Day pursuant to the effective Service

Agreement, except for authorized overrun quantities, which is in

excess of the lesser of 110% of scheduled service levels for such

Day or 102% of MDQ.”

JA 85

penalties for the same infraction. 108 Therefore,

PennEast is directed to revise its tariff to be consistent

with Commission policy. 109

GT&C Section 26: Force Majeure

87. PennEast’s proposed definition of force majeure

events in section 26.1 of the GT&C includes

“compliance with any court order, law, regulation or

ordinance promulgated by any governmental

authority having jurisdiction, whether federal, Indian,

state or local, civil or military, the necessity for testing

(as required by governmental authority or as deemed

necessary for safe operation by the testing party).”

PennEast’s proposed tariff language conflicts with

Commission policy because it can be interpreted to

include regular, periodic maintenance activities

required to comply with government actions as force

majeure events. The Commission has clarified the

basic distinction as to whether outages resulting from

governmental actions are force majeure or non-force

majeure events. 110 The Commission found that

outages necessitated by compliance with government

standards

concerning

the

regular,

periodic

108 Columbia Gas Transmission Corp., 100 FERC ¶ 61,084, at P

201 (2002).

109 E.g. MoGas Pipeline LLC, 151 FERC ¶ 61,201, at PP 22-23

(2015) (approving tariff language that permitted the imposition

of the greater penalty).

110 Kinder Morgan Louisiana Pipeline LLC, 154 FERC ¶ 61,145,

at P 30 (2016); DBM Pipeline, LLC, 152 FERC ¶ 62,056, at 64,159

(2015); TransColorado Gas Transmission Co., LLC, 144 FERC

¶ 61,175, at PP 35-43 (2013); Gulf South Pipeline Co., LP, 141

FERC ¶ 61,224, at PP 28-47 (2012), order on reh’g, 144 FERC

¶ 61,215, at PP 31-34 (2013).

JA 86

maintenance activities a pipeline must perform in the

ordinary course of business to ensure the safe

operation of the pipeline, including the Pipeline and

Hazardous

Materials

Safety

Administration’s

(PHMSA) integrity management regulations, are nonforce majeure events requiring full reservation charge

credits. Outages resulting from one-time, nonrecurring government requirements, including

special, one-time testing requirements after a pipeline

failure, are force majeure events requiring only partial

crediting. 111

88. In addition, PennEast’s proposed definition of

force majeure events in section 26.1 includes “any

other cause, whether of the kind herein enumerated,

or otherwise, not within the control of the party

claiming suspension and which by the exercise of due

diligence such party is unable to prevent or overcome.”

(emphasis added). The Commission has defined force

majeure outages as events that are both “unexpected

and uncontrollable.” 112 The Commission directs

PennEast to revise section 26.1 of the GT&C to comply

with Commission Policy, as discussed above.

111 See Algonquin Gas Transmission LLC, 153 FERC ¶ 61,038, at

P 104 (2015).

112 North Baja Pipeline, LLC v. FERC, 483 F.3d 819, 823 (D.C.

Cir. 2007), aff’g, North Baja Pipeline, LLC, 109 FERC ¶ 61,159

(2004), order on reh’g, 111 FERC ¶ 61,101 (2005). See also Kinder

Morgan Louisiana Pipeline LLC, 154 FERC ¶ 61,145, at P 29

(2016); Algonquin Gas Transmission LLC, 153 FERC ¶ 61,038 at

P 103.

JA 87

GT&C Section 32: North American

Energy Standards Board (NAESB)

89. PennEast adopted the Business Practices and

Electronic Communications Standards of NAESB

Wholesale Gas Quadrant’s (WGQ) Version 2.0.

PennEast has identified those standards incorporated

by reference in GT&C Section 32. Those standards not

incorporated by reference by PennEast have also been

identified, along with the tariff record in which they

are located. In the event an updated version of the

NAESB WGQ standards is adopted by the

Commission prior to PennEast’s in-service date, the

Commission directs PennEast to file revised tariff

records, 30 to 60 days prior to its in-service date,

consistent with the then current version.

GT&C Section 39:

Charge Crediting

Reservation

90. Sections 39.1 and 39.2 of the GT&C provide that

the pipeline will provide full reservation charge

credits to shippers during non-force majeure events

and partial reservation credits during force majeure

events, respectively, except as provided for in section

39.3.

91. Section 39.3 exempts PennEast from providing

reservation charge credits in a number of

circumstances including:

(xi) if Customer is provided service pursuant

to a negotiated rate agreement executed after

November 1, 2017, or any successor

negotiated rate agreement thereto, and such

agreement does not explicitly require

reservation charge credits.”

JA 88

92. The Commission has found that it is unreasonable

for a pipeline to apply a proposed new contractual

prerequisite for negotiated rate contracts to qualify for

reservation charge credits to agreements entered into

before the effective date of the proposed tariff

language. 113 Although section 39.3 (xi) of the GT&C

provides such protection to the agreements prior to the

filing of PennEast’s application, this provision does

not address any agreements that may be reached with

shippers before the effective date of the tariff.

Acceptance of PennEast’s proposal with respect to

existing

negotiated

rate

agreements

would

unreasonably deny reservation charge credits to

shippers which may have been unaware of PennEast’s

future contracting requirement. Therefore, the

Commission directs PennEast to revise this language

to apply only to negotiated rate contracts entered into

after the effective date of that tariff provision.

E. Environmental Analysis

1.

Pre-filing and Application Review

93. Commission

staff

began

a

pre-filing

environmental review of the project on October 10,

2014. On January 13, 2015, Commission staff issued a

Notice of Intent to Prepare an Environmental Impact

Statement for the Planned PennEast Pipeline Project,

Request for Comments on Environmental Issues, and

Notice of Public Scoping Meetings (NOI). This notice

was published in the Federal Register on February 3,

113 Florida Southeast Connection, LLC, et al., 154 FERC ¶ 61,080,

at P 176 (2016); Iroquois Gas Transmission Sys., LP, 145 FERC

¶ 61,233, at PP 67-71 (2013).

JA 89

2015, 114 and sent to more than 4,300 interested

entities, including representatives of federal, state,

and local agencies; elected officials; environmental

and public interest groups; Native American tribes;

potentially affected landowners as defined in the

Commission’s regulations (i.e., landowners crossed or

adjacent to pipeline facilities or within 0.5 mile of a

compressor station); concerned citizens; and local

libraries and newspapers. The NOI briefly described

the project and the environmental impact statement

(EIS) process, provided a preliminary list of issues

identified by staff, invited written comments on the

environmental issues that should be addressed in the

EIS, and listed the date and location of five public

scoping meetings. 115 On January 28, 2015,

Commission staff issued a Notice of Extension of

Comment Period and Clarification of Location of

Public Comment Meetings for the PennEast Pipeline

Project, which extended the comment period until

February 27, 2015. 116 At the public scoping meetings,

a total of 250 speakers provided verbal comments

about the project. In addition, more than 6,000 letters

were filed providing comments about the project. 117

94. To satisfy the requirements of the National

Environmental Policy Act (NEPA), Commission staff

114 80 Fed. Reg. 5744 (2015).

115 Commission staff held the public scoping meetings between

February 10 and 12, 2015 and February 25 and 26, 2015 in

Bethlehem, Jim Thorpe, and Wilkes-Barre, Pennsylvania; and

Trenton and Hampton, New Jersey.

116 80 Fed Reg. 4557 (2015).

117 Table 1.4-1 of the final EIS provides a detailed and

comprehensive list of issues raised during scoping.

JA 90

prepared a draft EIS for the project. The U.S. Army

Corps of Engineers (USACE), U.S. Environmental

Protection Agency (EPA), and the U.S. Department of

Agriculture’s Natural Resources Conservation Service

participated in the NEPA review as cooperating

agencies. Commission staff issued the draft EIS for

the project on July 22, 2016, which addressed the

issues raised during the scoping period and included

staff’s independent analysis of the environmental

impacts of the project.

95. Notice of the draft EIS was published in the

Federal Register on July 29, 2016, establishing a 45day public comment period that ended on September

12, 2016. 118 The draft EIS was mailed to over 4,280

stakeholders, which included the entities that were

mailed the NOI and additional interested entities.

Commission staff held six public comment sessions

between August 15 and 17, 2016, to receive comments

on the draft EIS. 119 Approximately 670 individuals

attended these public sessions, including 420 who

provided verbal comments. A total of 4,169 comment

letters were filed in response to the draft EIS before

the comment period closed on September 12, 2016.

The transcript of the public comment sessions and all

written comments on the draft EIS are part of the

public record for the project.

96. On September 23, 2016, PennEast filed 33 route

modifications, totaling 21.3 miles in length, to address

118 82 Fed. Reg. 49,971 (2017).

Commission staff held draft EIS comment sessions in

Bethlehem, Pennsylvania; Jim Thorpe, Pennsylvania; Clinton,

New

Jersey;

Lahaska,

Pennsylvania;

Wilkes-Barre,

Pennsylvania; and Trenton, New Jersey.

119

JA 91

environmental and engineering concerns. On

November 4, 2016, Commission staff issued a letter to

newly affected landowners describing the route

modifications and inviting comments on the route

modifications, and opening an additional 30-day

comment period, which concluded on December 5,

2016. Comments received after the close of the

comment periods (between September 12 and

November 4, 2016, and after December 5, 2016)

continued to be posted to the Commission’s eLibrary

website and were reviewed by staff for substantive

concerns.

97. The final EIS for the project was issued on April

7, 2017, and a public notice of the availability of the

final EIS was published in the Federal Register on

April 14, 2017. 120 The final EIS addresses all

substantive comments received on the draft EIS, the

November 4, 2016 letter, and comments received prior

to December 31, 2016. 121 The final EIS was mailed to

the same parties as the draft EIS, as well as additional

parties. 122 The final EIS addresses geology; soils;

water resources; wetlands; aquatic resources;

vegetation and wildlife; threatened, endangered, and

special status species; land use, recreation, and visual

resources; socioeconomics; cultural resources; air

120 82 Fed. Reg. 17,988 (2017).

121 All comments received prior to the end of the comment period

and in response to the November 4, 2016 letter that included

additional substantive concerns are included in the comment

responses contained in Appendix M of the final EIS (Volume II).

Any new issues raised after December 31, 2016, which were not

previously identified, are addressed in this order.

122 The distribution list is provided in Appendix A of the final EIS.

JA 92

quality and noise; reliability and safety; cumulative

impacts; and alternatives. The major environmental

issues raised during this proceeding, and comments

from stakeholders not addressed in the final EIS, as

well as substantive comments on the final EIS, are

discussed below.

98. The final EIS concludes that while the project will

result in some adverse environmental impacts, these

impacts will be reduced to less than significant levels

with the implementation of PennEast’s proposed

impact avoidance, minimization, and mitigation

measures, together with staff’s recommended

environmental conditions, now adopted, as modified,

as conditions in the attached Appendix A of this order.

While, the Commission recognizes that there are

incomplete surveys due to lack of access to landowner

property, the conclusions in the final EIS, and

affirmed by the Commission here, were based on the

information contained in the record, including

PennEast’s application and supplements, as well as

information developed through Commission staff’s

data requests, field investigations, the scoping

process, literature research, alternatives analysis, and

contacts with federal, state, and local agencies, as well

as with individual members of the public. As part of

its environmental review, staff developed specific

mitigation measures that we find will adequately and

reasonably reduce the environmental impacts

resulting from the construction and operation of the

PennEast Project. We believe that the substantial

environmental record and mitigation measures

sufficiently support reaching a decision on this project.

JA 93

99. Once a certificate is issued, the Commission’s

environmental staff is charged with ensuring that the

project will be constructed in compliance with the

Commission’s order, including the conclusions

regarding the project’s expected impacts upon the

environment. Recognizing that there are necessary

field surveys that are outstanding on sections of the

proposed route where survey access was denied, we

are imposing several environmental conditions that

require filing of additional environmental information

for review and approval once survey access is

obtained. This includes items such as site-specific

plans, survey results, documentation of consultations

with agencies, and additional mitigation measures.

The additional information ensures the EIS’s analyses

and conclusions are verified based on the best

available data, enabling us to improve and finalize

certain mitigation plans and ensure stakeholder

concerns are addressed. The information will also

provide Commission staff with the site-specific details

necessary to appropriately evaluate compliance

during the construction process. In addition,

Environmental Condition 10 requires that before

construction can commence, PennEast must file

documentation that it has received all applicable

authorizations required under federal law (or evidence

of waiver thereof).

100. Further, the final EIS has adequately

identified, as required by section 1502.22 of the

Council on Environmental Quality (CEQ) regulations,

where information is lacking. 123 CEQ regulations

recognize that some information simply may not be

123 40 C.F.R. § 1502.22 (2017).

JA 94

available. 124 Moreover, the final EIS contains

mitigation plans that provide for using the correct

mitigation measures, sediment control measures, and

restoration requirements based on the actual site

conditions experienced during construction. The

conditions in the order will ensure that all

environmental resources will be adequately protected.

101. The Commission needs to consider and study

environmental issues before approving a project, but

it does not require all environmental concerns to be

definitively resolved before a project’s approval is

issued. NEPA does not require every study or aspect

of an analysis to be completed before an agency can

issue a final EIS, and the courts have held that

agencies do not need perfect information before it

takes any action. 125 In U.S. Department of the Interior

v. FERC, the court held that “[v]irtually every decision

must be made under some uncertainty; the question is

whether

the

Commission’s

response,

given

uncertainty, is supported by substantial evidence and

is not arbitrary and capricious.” 126 Similarly, in State

of Alaska v. Andrus, the court stated that “[i]f we were

to impose a requirement that an impact statement can

never be prepared until all relevant environmental

124 Id.

125 U.S. Dep’t of the Interior v. FERC, 952 F.2d 538, 546 (D.C. Cir.

1992); State of Alaska v. Andrus, 580 F.2d 465, 473 (D.C. Cir.

1978), vacated in part sub nom. W. Oil & Gas Ass’n v. Alaska, 439

U.S. 922, 99 S. Ct. 303, 58 L. Ed. 2d 315 (1978) (“NEPA cannot

be ‘read as a requirement that complete information concerning

the environmental impact of a project must be obtained before

action may be taken’”).

126 U.S. Dep’t of the Interior v. FERC, 952 F.2d 538, 546.

JA 95

effects were known, it is doubtful that any project

could ever be initiated.” 127 There must, however, be

sufficient information in the record to enable the

Commission to take the requisite “hard look” required

by NEPA. As indicated above, we believe the record in

this proceeding meets that requirement. 128

2.

The EIS Process and Procedural

Concerns

102. Commenters requested public meetings be held

in areas affected by PennEast’s minor route

modifications, as identified in PennEast’s September

23,

2016

Supplemental

Information

filing.

Commission staff mailed notice on November 4, 2016,

to all landowners potentially affected by the

modifications, government officials, and other

stakeholders. The notice described the proposed route

changes, invited participation, and opened a special

30-day limited scoping period. Over 400 comments

were filed in response to the notice, which are

addressed in the final EIS. Commission staff

determined that additional public meetings were not

required and that written comments received from the

public were sufficient to identify potential concerns

associated with the minor route changes.

127 State of Alaska v. Andrus, 580 F.2d 465, 473.

See also Independence Pipeline Co., 91 FERC ¶ 61,102, at

61,352 (2000) (finding that despite landowners denying survey

access, the final EIS was sufficiently detailed to inform the

Commission and the public for purposes of NEPA); Southern

Natural Gas Co., 85 FERC ¶ 61,134, at 61,512 (1998) (finding

paper record sufficient even though landowners denied pipeline

survey access).

128

JA 96

103. In addition, several commenters asserted that

the comment period for the draft EIS was not

sufficient, and should have been extended in order to

allow parties additional time to study the draft EIS

and provide comment. Commission staff continued to

accept and review comments after the close of the

comment period for the draft EIS. All filings are

available on the docket for public review and

inspection. For these reasons, we concur that an

extended comment period was not needed.

3.

Major Environmental Issues and

Comments on the Final EIS

a.

Geology

104. Several commenters express concern regarding

construction near active quarries and in karst terrain.

Comments were also filed regarding the potential for

naturally occurring arsenic to mobilize and

contaminate groundwater, drinking water wells, and

surface waters. Commenters also express concerns for

landslide risks, as well as the potential for soil

compaction.

105. After the close of the draft EIS comment period,

United States Representative Matt Cartwright of

Pennsylvania forwarded a letter from his constituent,

Phyllis Jacewicz, particularly for residences on East

Saylor Avenue in Plains Township, Luzerne County,

Pennsylvania, citing concerns about construction of

the project near an active quarry. As stated in the final

EIS, PennEast has adjusted the pipeline route

through Luzerne County to avoid future expansion of

the quarry, PennEast also evaluated average quarry

blasting vibration, concluding there would be no effect

JA 97

from these activities on the pipeline. 129 Additionally,

PennEast provided documentation regarding the

expansion of the Trap Rock Quarry located at milepost

(MP) 99 in Delaware Township, New Jersey, and

provided a blasting assessment based on site-specific

data (geology, distance and wave propagation) and a

scaling relationship to solve for blast-induced effects

(peak particle velocity) on the pipeline. Based on the

blasting analysis, the EIS concludes that no impacts

on the pipeline from quarry blasting are

anticipated. 130 In response to comments received

regarding the accuracy of the explosive weights for the

blasting analysis, Environmental Condition 14

requires PennEast to file an updated report verifying

the explosive weights used by the quarry operator;

incorporate this information this into the final design

of the project; and to seek concurrence from Trap Rock

Quarry regarding the input parameters to the blasting

analysis. The updated report will be reviewed by

Commission staff prior to construction to confirm the

conclusions in the EIS remain valid.

106. In comments on the final EIS, Susan D.

Meacham discusses the potential risks of construction

in karst areas and the potential risk for scouring

where the pipeline will cross the floodplain along the

New Jersey side of the proposed horizontal directional

drill (HDD) crossing of the Delaware River. The final

EIS determines that there are approximately 13.8

miles of the project, in Carbon, Northampton, and

Bucks Counties, Pennsylvania, and Hunterdon

129 See final EIS at 4-5.

130 Id. at 4-5.

JA 98

County, New Jersey, where a karst hazard may be

present; approximately 50 percent of the karst survey

has been completed. 131 As discussed in the EIS,

PennEast developed a project-specific Karst

Mitigation Plan, as well as a specific HDD plan for

drilling through karst terrain. The project-specific

Karst Mitigation Plan, which provides guidance to

mitigate karst-related concerns during construction,

was developed using maps of known or suspected

karst areas, and field investigations completed todate. The HDD Drilling Plan for Karst Terrain

establishes

operational

procedures

and

responsibilities for the prevention, containment, and

clean-up of inadvertent returns of drilling muds and

losses associated with HDD through karst areas.

Further, we note that PennEast continues to complete

additional geophysical investigations as landowner

access becomes available, and will incorporate the

findings into an updated Karst Mitigation Plan. The

final updated plan will enable PennEast to finalize its

HDD design based on a detailed understanding of the

subsurface conditions, and more precisely identify

locations where the approved mitigation procedures

will be implemented. Accordingly, Environmental

Condition 16 requires PennEast to file for approval a

final Karst Mitigation Plan prior to construction,

which includes the results of all outstanding field

investigations, as well as requirements of the

Pennsylvania

Department

of

Environmental

Protection (PADEP), New Jersey Department of

Environmental Protection (NJDEP) and local

planning commissions. Based on staff’s review of the

131 Id. at 4-10.

JA 99

Karst Mitigation Plan, the HDD Drilling Plan for

Karst Terrain, and compliance with Environmental

Condition 16, we agree with the final EIS’s conclusion

that PennEast will adequately minimize impacts in

geologically sensitive areas. 132 Regarding the risk of

scour, PennEast’s HDD of the Delaware River will

drill underneath the river’s flood plain, with the HDD

entry/exit point on the New Jersey side of the river

approximately 1,100 feet east of the river’s edge,

outside of the flood zone and below the potential scour

depth. The segment of pipeline installed by HDD will

be considerably deeper than sections of pipeline

installed by standard trenching and will be below the

potential scour depths. Thus, scour from flooding on

the Delaware River will not affect the pipeline.

107. Several commenters expressed concern that the

final EIS contains an inadequate analysis of the

potential for construction and operation of the project

to contribute to arsenic contamination of groundwater

and the release of radioactivity. Comments were filed

from stakeholders, including a letter from

Congressman Brian Fitzpatrick on behalf of Bucks

County, Pennsylvania, from Dr. Tullis Onstott from

the Princeton University Department of Geosciences,

Dr. Julia Barringer, a retired U.S. Geologic Survey

research geochemist, and from the Township of

Kingwood, New Jersey, regarding the potential risk of

arsenic contamination of groundwater. Drs. Onstott

and Barringer contend that the final EIS fails to

address the potential for the project to increase

arsenic mobility, as well as the release of radioactivity.

Drs. Onstott and Barringer also comment that the

132 See final EIS at ES-5.

JA 100

pipeline has the potential to cause boron

contamination of the Lambertville, New Jersey

drinking water supply reservoir, and further state

that cathodic protection on the pipeline has the

potential to “promote the growth of microbes that

stimulate arsenic” while a potential methane leak

would input carbon into the soil, which could serve to

stimulate microbial activity, which in turn could

stimulate arsenic. 133 Further, Drs. Barringer and

Onstott state that the final EIS fails to fully analyze

the potential release of arsenic to local streams from

HDDs. In addition, several comments were filed

stating that the final EIS does not sufficiently address

the risk of uranium and uranium decay product

radionuclides potentially being released by blasting of

Newark Basin sedimentary bedrock.

108. PennEast conducted a laboratory arsenic

mobilization study, leaching experiments, and

dilution modeling to determine if trench excavation

and the use of HDDs will oxidize, release, and mobilize

naturally occurring arsenic and potentially increase

arsenic exposure to nearby groundwater users and/or

ecological receptors within waterbodies. The results of

the laboratory study demonstrate that broken

fragments of naturally occurring arsenic-enriched

rock generated during trenching activities and

subsequently returned as backfill, would not result in

an increased risk of arsenic mobilization in

groundwater; that drilling mud would not become

contaminated with particles of naturally occurring

arsenic enriched rock; and that concentrations of

133 See Comments of Drs. Julia Barringer and Tullis Onstott, filed

May 5, 2017 in Docket No. CP15-558-000.

JA 101

arsenic in groundwater will be below the EPA

maximum contaminant level (MCL) of 10 micrograms

per liter (ug/L) for public water supplies and the New

Jersey MCL of 5 micrograms per liter (μg/L) for both

public and private water supplies. Regarding

comments on the project’s ability to contaminate

Lambertville’s water supply from boron, the EIS found

that the pipeline alignment does not cross any stream

that provides water to Lambertville’s water supply

and the Lambertville reservoir is located up-gradient

of the planned PennEast pipeline.

109. As discussed in the final EIS, Drs. Onstott and

Barringers’ comments regarding the chemical

mechanisms that could mobilize arsenic and other

analytes during construction and operation were

found to be speculative, based upon misapplication of

physical principles, containing misinformation about

pipeline corrosion and corrosion prevention systems,

and not supported by empirical data for construction

and operation of natural gas pipelines. Further, the

final EIS found that radionuclides present in

groundwater and household air are “absolutely not

specific” to Newark Basin sedimentary bedrock

(Stockton, Lockatong, and Passaic formations), and

that human exposure issues related to radionuclides

are not likely to play a role in the construction and

operation of natural gas pipelines. Regarding the

potential for methane leaks to increase arsenic

mobility, PennEast has committed to several specific

measures to reduce the risk of methane leaks, which

JA 102

would in turn further reduce the risk of increased

arsenic mobility. 134

110. PennEast has prepared a Well Monitoring Plan

and proposes to conduct groundwater quality testing

of potentially affected wells prior to construction. This

will provide a baseline to determine whether any

arsenic increases in groundwater occur after the

pipeline is installed. In the unlikely event that

construction results in any arsenic impacts on a watersupply well, PennEast will provide a treatment

system to remove arsenic from the drinking water at

individual properties or find an alternative water

source.

111. In its September 20, 2016 comments on the

DEIS, the United States Department of the Interior

(DOI) expressed concern regarding the potential for

arsenic mobilization, and the potential for arsenic

contamination of individual wells, drinking water, and

groundwater. To address these concerns, we require in

Environmental Condition 23 that PennEast revise

and file for review and approval its above-described

Well Monitoring Plan to incorporate the well sampling

quality assurance/quality control elements suggested

by the DOI into its well sampling protocol and to

include provisions for treatment for groundwater

users impacted by increased arsenic levels, as well as

provisions for monitoring and maintaining such

treatment systems.

112. In comments on the final EIS, Lorraine Crown

of Holland Township expressed concern regarding

Route Deviation 1710, which she claims would lead to

134 Id. at 4-250.

JA 103

an increased risk of landslides on Gravel Hill. The

final EIS’ conclusion that that landslide incidences are

low in New Jersey is based on PennEast’s Phase I

Terrain Mapping and Geohazard Risk Evaluation,

which included the review of federal, state and local

geographic information system data, published maps,

available print and digitized terrain data, and sitespecific data collected by PennEast. The final EIS

notes that while generalized data from the United

States Geological Survey indicates that there is a low

risk of landslide potential for the New Jersey portion

of the project, several locations in New Jersey have

recorded landslides in close proximity to the proposed

pipeline. 135 This includes the area near steep slopes 75

and 76 near route deviation 1710 as identified in

Phase 1 of PennEast’s Terrain Mapping and

Geohazard Risk Evaluation Report. PennEast

identified these as areas where it will conduct further

field investigation and analysis. We require in

Environmental Condition 15 that, prior to

construction, PennEast shall file results of the

outstanding site-specific Phase 2 and 3 portions of the

Geohazard Risk Evaluation Report, which will include

a final landslide hazard inventory. The finalized

report will also include any specific measures and

locations where PennEast will implement specialized

pipeline design to mitigate for potential soil stability

or landslide hazards; and include a post-construction

monitoring plan.

113. In comments on the final EIS, the NJDEP

submitted a letter referencing previous comments by

the New Jersey Geological and Water Survey

135 Id. at 4-7.

JA 104

(NJGWS) which indicate that there are important

paleontological sites that are significantly closer than

0.25 mile to the proposed route. The NJDEP requests

that PennEast consult with Dr. William Gallagher

and provide him with the proposed project route

alignment shape files as over 90 percent of the route

crosses rock formations within the Newark Basin.

114. PennEast provided the NJGWS with updated

mapping of the proposed pipeline route in relation to

sites identified as significant paleontological locations

containing trace Triassic-age fossils and various casts,

including footprints. After analyzing the NJDEP

comments on the final EIS, we determined there is

potential for fossilized vertebrate footprints to be

affected by construction of the project through Newark

Basin sedimentary bedrock. Therefore, we have

included a new condition to address potential

discovery of paleontological resources during project

construction. Environmental Condition 20 requires

that PennEast prepare an unanticipated discovery

plan for paleontological resources in coordination with

the NJGWS and Dr. William Gallagher. The plan shall

be focused on areas where bedrock would have allowed

preservation of any significant paleontological

resource. We believe that Environmental Condition 20

sufficiently addresses NJDEP’s concerns and that any

adverse impacts on significant paleontological

resources will be appropriately mitigated.

b.

Soils

115. The project will cross numerous soil types,

which may be affected by pipeline construction

activities, such as clearing, grading, trench

JA 105

excavation, backfilling, and the movement

construction equipment along the right-of-way.

of

116. In comments on the final EIS, Emma A.

Switzler discusses the potential for soil compaction

from an HDD work space proposed on her property.

PennEast identified certain measures which will be

implemented to reduce the potential for soil

compaction, including regular testing of topsoil and

subsoil for compaction. PennEast indicated that it

would avoid construction during periods of high soil

saturation in order to minimize the risk of soil

compaction. Severely compacted topsoil will be plowed

or a green manure such as alfalfa will be planted and

plowed to decrease bulk density and improve soil

structure. 136 Given these measures and PennEast’s

adherence to the Commission’s Upland Erosion

Control, Revegetation, and Maintenance Plan (Plan),

which includes specific measures designed to mitigate

for soil compaction, the final EIS finds that the project

activities will not result in significant adverse soil

structural damage or compaction. 137

117. As stated in the final EIS, implementation of

PennEast’s Erosion and Sediment Control Plan

(E&SCP), FERC’s Plan and FERC’s Wetland and

Waterbody Construction and Mitigation Procedures

(Procedures), and other project-specific plans, will

adequately avoid, minimize, or mitigate construction

impacts on soil resources. Permanent impacts on soils

will mainly occur at the aboveground facilities where

the sites will be converted to industrial use. Based on

136 Id. at 4-28.

137 Id. at 4-21 to 4-22.

JA 106

the final EIS, we conclude that potential impacts on

soils will be avoided or effectively minimized or

mitigated.

c.

Water Resources

118. The project will cross 269 waterbodies. 138

Approximately 74 percent of these waterbodies are

classified as minor, 22 percent as intermediate, and 3

percent classified as major. Numerous commenters

expressed concern regarding the potential effects of

the construction and operation of the project on state

designated streams, with a particular emphasis on

locations where HDD crossing would occur. The final

EIS states that while minor impacts on waterbodies

may

occur

during

construction,

with

the

implementation of PennEast’s planned, and the

Commission’s required mitigation plans, no long-term

effects on surface waters are anticipated. In addition,

PennEast will comply with state regulations

regarding riparian buffers. Finally, PennEast will

comply with regulatory permit conditions that address

scour and sedimentation, flooding, or the introduction

of foreign or toxic substances into the aquatic system.

Accidental spills and leaks during construction and

operations will be prevented or adequately minimized

through implementation of PennEast’s Spill

Prevention Control and Countermeasure Plan.

119. Several comments addressed potential impacts

on state-designated waterbodies. Appendices G-7

through G-9 of the final EIS provide state

classifications for individual waterbody crossings in

Pennsylvania and New Jersey by milepost. The final

138 Id. at 4-45 (table 4.3.2-1).

JA 107

EIS analyzes construction impacts on waterbodies,

and determines that the mitigation measures

identified in our Procedures will adequately minimize

impacts on Pennsylvania and New Jersey statedesignated

waters,

including

High

Quality,

Exceptional Value and Category 1 waters. 139

Generally, PennEast will minimize impacts on statedesignated waterbodies and associated riparian zones

by locating temporary workspace in actively disturbed

areas with a vegetation buffer between the workspace

and the riparian zone. Where the riparian zone cannot

be avoided entirely, PennEast will reduce the

workspace to 75 feet in width and relocate additional

temporary workspaces upslope, or into actively

disturbed areas, to the extent practicable. For drycrossings, the workspace through the waterbody will

be reduced to 60 feet in width and the workspace

outside the waterbody will have a total width of 75 feet

on both sides of the waterbody until actively disturbed

areas are encountered. Where site constraints are

favorable, PennEast will use the HDD method, which

will not require tree clearing or workspace adjacent to

the waterbody, to directly avoid impacts within the

waterbody. PennEast has committed to preparing

sitespecific plans prior to construction for each

waterbody to be crossed via HDD. These site-specific

HDD Plans would include a description of the HDD

work site, justification of the work space required,

cleanup plans in the event of the inadvertent release

139 See final EIS at 4-49.

JA 108

of drilling mud, as well as a contingency plan in the

event the HDD is unsuccessful. 140

120. In comments on the final EIS, West Amwell

Township, New Jersey, expresses concern regarding

the crossing of Alexauken Creek, including the

feasibility of and dangers associated with using the

HDD crossing method; potential temperature and

sedimentation impacts; and PennEast’s plans for

hydrostatic testing. The majority of the HDD crossings

have had some geotechnical work performed, and staff

reviewed this data along with PennEast’s HDD

Inadvertent Returns and Contingency Plan and HDD

profiles. We require in Environmental Condition 19

that PennEast file the final design plans for each HDD

crossing for review and approval. The final design plan

will include the results for all geotechnical borings

conducted at each HDD crossing (lithology, standard

penetration testing and bedrock quality designation),

and a HDD feasibility assessment based on the soil

boring results, including an assessment of the risk for

hydrofracturing and inadvertent return of drilling

fluids at each crossing. Completion of all geotechnical

borings for each specific crossing will allow for a

comprehensive HDD feasibility and hydrofracture/

inadvertent return analysis that staff will review to

ensure PennEast has adequately minimized

environmental risks in the final design of the HDD.

121. Further, as indicated above and in the final

EIS, PennEast will prepare a detailed plan for each

waterbody that will be crossed via HDD that includes

site-specific construction diagrams of work areas;

140 Id. at 4-62.

JA 109

identification of any aboveground disturbance or

clearing between the HDD entry and exit; and a

contingency plan for crossing the waterbody or

wetland in the event the HDD is unsuccessful.

PennEast’s HDD crossing of the Alexauken Creek will

avoid any in-stream disturbance and any direct

impact to the riparian areas between the drilling entry

and exit sites, thus minimizing any potential for

sedimentation or temperature changes. In the

unlikely event that PennEast is required to cross this

waterbody using an alternative crossing method,

Commission staff must review and approve the plans

to verify appropriate mitigation measures will be

implemented

to

minimize

sedimentation.

Furthermore, PennEast’s Erosion and Sedimentation

Control Plan requires site-specific plans to mitigate

sedimentation.

122. We reviewed the hydrostatic test water source

and discharge locations provided by PennEast.

However, during exceptional dry periods when low

flow conditions may be encountered, PennEast will

assess if alternative sources would be necessary. Thus,

Environmental Condition 28 requires that PennEast

file its final hydrostatic test plan identifying the final

hydrostatic test water sources and discharge locations

and provide documentation that it has obtained all

necessary permits and approvals for withdrawal from

each source prior to construction. PennEast has

indicated that its hydrostatic testing program will

comply with state- and Delaware River Basin

Commission-issued water withdrawal and National

Pollutant Discharge Elimination System permits.

JA 110

123. Several comments were received regarding

potential impacts on groundwater supplies,

specifically supplies from private wells and

community aquifers. The final EIS evaluates potential

impacts on groundwater resources, and because

PennEast has not yet completed surveys for water

supply wells along the entire project, includes a

recommendation that PennEast complete all

necessary surveys for water supply wells and

groundwater seeps and springs, identify public and

private water supply wells within the construction

workspace, and file a revised list of wells, seeps, and

springs within 150 feet of any construction workspace

(500 feet in areas characterized by karst terrain). 141

We incorporate this requirement as Environmental

Condition 21 in Appendix A.

124. Although the precise locations of all water

supply wells have not yet been determined, the

avoidance and mitigation measures that will be

implemented are evaluated in the EIS. The final EIS

determines that no significant impacts to

groundwater resources are anticipated from the

construction or operation of the project. Installation of

the pipeline would include digging a trench

approximately 7-10 feet deep, which would have minor

impacts on surficial aquifers, and not impact deeper

bedrock or sole-source aquifers, including their

discharge and recharge patterns. 142 In addition

PennEast reviewed publicly available information

regarding wellhead protection areas to formulate

141 Id. at 4-38.

142 Id. at 4-42 - 4-43.

JA 111

alternatives and has committed to several mitigation

measures in order to further reduce the potential for

impacts to wellhead protection areas, including

prohibition of certain activities and material storage

in proximity to these areas, and consultation with the

appropriate wellhead protection authorities. 143

125. Several comments were received regarding

PennEast’s Well Monitoring Plan. The final EIS

concludes that the current Well Monitoring Plan

contains acceptable measures. As part of its initial

Well Monitoring Plan, PennEast commits to conduct

pre- and post-construction monitoring for water

quality and yield for private and public wells within

150 feet of the proposed construction workspace (500

feet in areas of karst terrain), with the well owner’s

permission. 144 However, the final EIS recommends

additional information regarding DOI’s comments on

PennEast’s initial Well Monitoring Plan, and

landowner comments on the draft EIS. Therefore, as

is discussed above, we require in Environmental

Condition 23 that PennEast file a revised Well

Monitoring Plan. The revised plan will provide

responses to address the DOI’s comments on the draft

plan; include an analysis and mitigation for radon,

radium 226, and radium 228; and provide more

information regarding the types of treatment systems

used, including provisions for monitoring and

maintenance of any treatment systems PennEast

provides.

143 See final EIS at 4-37.

144 See final EIS at 4-38.

JA 112

126. Several commenters raised concerns regarding

impacts to the Swan Creek Upper Reservoir, which is

the primary source of drinking water for the City of

Lambertville. As discussed in the final EIS, the Swan

Creek Upper Reservoir is located approximately 400

feet east of the proposed pipeline route, with the water

supply intake structure located upstream of the

pipeline. Due to the downstream location of the

proposed pipeline crossing, water quality of the active

reservoir will not be adversely affected. Blasting is not

anticipated near the Swan Creek Reservoir; however,

geotechnical evaluations are ongoing. 145 Therefore, we

require in Environmental Condition 25 that PennEast

provide the results of investigations regarding any

anticipated blasting near the Swan Creek Reservoir

prior to construction.

127. In comments on the final EIS, the EPA

recommends that PennEast consult with state

drinking water authorities to ensure state-defined

source water protection areas are not crossed by the

project. PennEast and Commission staff consulted

with federal, state and regional entities to identify

source water protection areas to be crossed by the

project. As noted above, PennEast has proposed

several mitigation measures to prevent impacts to

wellhead protection areas that staff determined will

adequately address potential impacts. In addition, the

final EIS responds to concerns about blasting impacts

on an existing water transmission tunnel managed by

the Bethlehem Authority. The pipeline will be

installed substantially above the location of the

tunnel, with about 480 feet of clearance at the point

145 See final EIS at 4-52.

JA 113

where it first crosses the tunnel, and about 75 feet of

clearance at the second crossing. Environmental

Condition 44 requires that PennEast file additional

information on the crossing, including a site-specific

crossing plan and details regarding potential blasting

within 2,000 feet of the water tunnel, and

documentation of working meetings with water

authority to ensure its concerns are adequately

addressed, prior to construction.

128. Several commenters, including the USACE,

PADEP, and the New Jersey Highlands Water

Protection and Planning Council, commented on the

final EIS and PennEast’s PADEP/USACE Joint

Permit Application, stating that more surveys needed

to be completed before the applications could be

processed, and the true environmental impacts could

be assessed. On April 25, 2017, the PADEP filed a

letter concerning the same application. The PADEP

and USACE state that the application was incomplete

due to lack of survey access. On April 26 and 28, 2017,

the NJDEP commented on the final EIS and

PennEast’s freshwater wetlands individual permit

application, stating that PennEast’s application was

determined administratively deficient, and that until

an application is determined by the NJDEP to be

complete, it is not possible to issue the permit or to

determine a proposed permit issuance date.

129. As previously noted, we are aware that

remaining field surveys need to be completed prior to

construction. For areas where PennEast was unable to

complete field surveys, remote-sensing resources were

used to approximate the locations and boundaries of

wetlands and waterbodies within the project area.

JA 114

Remote-sensing delineations were conducted using a

combination of high-resolution aerial photographic

imagery, National Wetland Inventory data, National

Hydrography Dataset data, hydric soil data

maintained by the Natural Resources Conservation

Service, floodplain and flood elevations maintained by

the Federal Emergency Management Agency,

watershed data from the USGS, and field survey

results on adjacent land parcels where access could be

obtained. Once surveys are completed following

issuance of this order, PennEast will submit any

outstanding survey information to the USACE,

PADEP, and NJDEP to enable the final processing of

its permit applications. Further, we require in

Environmental Condition 10 th

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.