T.C. Memo. 2016-130

UNITED STATES TAX COURT

CHRISTINA A. ALPHONSO, Petitioner v.

COMMISSIONER OF INTERNAL REVENUE, Respondent*

Docket No. 17130-08.

Filed July 14, 2016.

Harvey R. Poe and Amy M. Van Fossen, for petitioner.

Patrick F. Gallagher and Erika B. Cormier, for respondent.

SUPPLEMENTAL MEMORANDUM FINDINGS OF FACT AND OPINION

CHIECHI, Judge: This case is before the Court on remand from the U.S.

Court of Appeals for the Second Circuit in Alphonso v. Commissioner, 708 F.3d

*This opinion supplements the Court's previously filed opinion Alphonso v.

Commissioner, 136 T.C. 247 (2011), vacated and remanded, 708 F.3d 344 (2d Cir.

2013).

SERVED Jul 14 2016

-2[*2] 344 (2d Cir. 2013), vacating and remanding 136 T.C. 247 (2011). The issues

for decision on remand are (1) whether the collapse of a certain retaining wall is a

casualty within the meaning of section 165(c)(3)¹ and (2) if the collapse of that

retaining wall is a casualty within the meaning of that section, the amount of the

deduction to which petitioner is entitled under section 165(a) and (h) and the

regulations thereunder with respect to any loss from that casualty. We hold that

the collapse of that certain retaining wall is not a casualty within the meaning of

section 165(c)(3).2

FINDINGS OF FACT

Some of the facts have been stipulated and are so found.

At the time petitioner filed the petition in this case, she resided in New

York.

During 2005, the year at issue, petitioner owned certain shares of stock in

Castle Village Owners Corp. (Castle Village), a cooperative housing corporation

as defined in section 216(b), that was incorporated in mid-December 1986. At all

¹All section references are to the Internal Revenue Code in effect for the

year at issue. All Rule references are to the Tax Court Rules of Practice and

Procedure.

2As a result of our holding on the first issue presented, we need not, and do

not, consider the second issue presented.

-3[*3] relevant times, Castle Village owned a cooperative apartment complex that

consisted of a seven-acre tract of land (seven-acre tract or grounds) overlooking

the Hudson River in New York, New York, on which there were a two-story

cottage and five apartment buildings (Castle Village apartment buildings). The

Castle Village apartment buildings ranged in height from 12 to 15 stories and

contained a total of 589 apartments.3 Before May 12, 2005, the grounds near those

five Castle Village apartment buildings were supported by a retaining wall of

stone masonry construction (retaining wall in question) that had been built

between 1921 and 1925. (We shall refer collectively to the seven-acre tract and all

of the improvements thereon that Castle Village owned at all relevant times as the

Castle Village complex.) Before May 12, 2005, the retaining wall in question ran

parallel to Riverside Drive4 for approximately 800 feet and had an average height

of 65 feet.

Before May 12, 2005, the retaining wall in question had 14 locations known

as pilasters; at each of the pilasters an approximately seven-foot-wide section of

the retaining wall in question extended beyond the face of that wall by approxi-

3One of the reports that is part of the record indicated that the Castle Village

apartment buildings had been constructed between 1939 and 1945.

4Riverside Drive is on the west side of the Castle Village complex.

-4[*4] mately one foot. Before that date, the 14 pilasters spanned the retaining wall

in question from the southern edge of the Castle Village grounds that was adjacent

to the Castle Village apartment building at 120 Cabrini Boulevard to an approximate point adjacent to the northernmost point of the Castle Village apartment

building at 160 Cabrini Boulevard.

Two semicircular turrets were constructed near the top of the retaining wall

in question. One of those turrets was adjacent to the eighth southernmost pilaster,

and the other turret was adjacent to the tenth southernmost pilaster.

At the top of the retaining wall in question was a parapet that consisted of a

thin concrete wall with concrete columns, or balusters, spaced at regular intervals

across the top of that retaining wall. There were a total of 64 balusters, each

having a diameter of 14 inches and a height of four feet nine inches. Of the 64

balusters, 33 were south of the southernmost turret (i.e., south of the eighth

southernmost pilaster).

Three tunnels were constructed through the retaining wall in question. The

respective tunnels were approximately 10 feet north of the tenth southernmost

pilaster, adjacent to the ninth southernmost pilaster, and approximately 10 feet

south of the eighth southernmost pilaster.

-5[*5] At some time before August 28, 1985, Castle Village retained John J. Flynn

(Mr. Flynn), an engineer,5 to perform an inspection of the retaining wall in

question. In a letter dated August 28, 1985 (August 28, 1985 Flynn letter), Mr.

Flynn indicated that a portion of the retaining wall in question south of the

southernmost turret (i.e., south of the eighth southernmost pilaster) showed signs

of movement and instability. In that letter, Mr. Flynn further indicated that the

following conditions existed in and around the portion of the retaining wall in

question between the eighth southernmost pilaster and the first southernmost

pilaster: (1) a vertical crack through the retaining wall in question beginning

about 20 feet from the base, (2) relief drains, referred to in the August 28, 1985

Flynn letter as drainage tiles, that appeared not to function properly, and (3) a

crack between the fifth southernmost pilaster and the fourth southernmost pilaster.

In the August 28, 1985 Flynn letter, Mr. Flynn also indicated that the dam-

age to the southern portion of the retaining wall in question "is of serious magni-

5The record does not establish whether Mr. Flynn specialized in any

particular field of engineering.

-6[*6] tude" and that a stone in the area of the fourth so-called panel6 had "dropped

inward into what may be a hollow development behind the stone wall."

Around September 1985, Castle Village retained Mueser Rutledge Consulting Engineers (MRCE), an engineering firm, to conduct a study of the retaining wall in question.7 MRCE discussed the results of that study in a report

dated November 4, 1985 (November 4, 1985 MRCE report). In the November 4,

1985 MRCE report, MRCE stated in pertinent part:

In accordance with our proposal letter dated October 1, 1985,

we have completed our study of the condition of the large stone

masonry retaining wall, tunnel, two cottages and balustrade at the

Castle Village. We report herein our findings, specific recommendations for structural repairs and a recommended allowance of

$250,000 for the repairs.

Executive Summary

In our opinion, the condition of these structures is, more or

less, unsightly and in need of repairs but is not hazardous to the present village occupants. Structural repairs can be made in an orderly

fashion followed by repairs or replacement to finishes in the cottages

and elsewhere as desired. As the next phase of this rehabilitation

program, we will provide drawings and specifications for the structural repairs and inspect the work in the field. Finally, we will

6The record does not establish the meaning of the term "panel". It appears

from our examination of various reports that are part of the record that that term

may refer to each section of the retaining wall in question between each of the 14

pilasters.

7MRCE specialized in so-called foundation engineering.

-7[*7] report back to you when these repairs have been completed to our

satisfaction.

MRCE set forth in the November 4, 1985 MRCE report its conclusions with

respect to the retaining wall in question in pertinent part as follows:

Stone Masonry Retaining Wall

*

*

*

*

*

*

*

Visual observations of the existing retaining wall reveal several

local problem areas, scattered cracking and widespread prior surface

patching with cement mortar of the joints and cracks between individual stones. The more pronounced problem areas were observed at the

southwest corner at the lower wall south of the turrets. No indications were seen that the wall is unstable or shows damage other than

that related to weathering and volume changes due to shrinkage of

mortar and temperature.

Photograph No. 1 shows south face of Pilaster No. 1 located at

the southwest corner of the wall [the first southernmost pilaster]. A

nearly vertical crack was observed, located approximately 2.5 feet

from the easterly edge of pilaster and extending vertically for several

feet. Another crack was visible between the pilaster and the recessed

wall panel extending upward to the coping stones and branching eastward into the lower coping stone above and westward through the

coping stones up to the top of the lower wall.

*

*

*

*

*

*

*

Similarly, a crack ranging from 1/8" to 1 inch was observed at

the junction of Pilaster No. 1 [the first southernmost pilaster] and the

adjacent west wall panel. Several small vertical cracks were observed

in Panel No. 1, which is north of Pilaster No. 1 [the first southernmost

pilaster]. The most southerly extends full height of the panel and

-8[*8] partially into the coping. A narrow void, approximately 2 feet into

the wall, was observed at the lower middle of the panel.

Pilasters Nos. 2 and 3 [the second and third southernmost

pilasters] and Panel No. 2 appear to be in generally good condition,

without any obvious defects.

A horizontal crack was observed at the top of Pilaster No. 4

[the fourth southemmost pilaster] near the coping stones. A second

horizontal crack was observed at the base of the pilaster. A large

recessed stone with multiple cracks around it, and local bulging in the

stones below was observed in the upper north corner of the panel

adjoining Pilaster No. 4 [the fourth southernmost pilaster]. Slight

bulging of the upper portion of Pilaster No. 4 [the fourth southernmost pilaster] was observed, as shown in Photograph No. 3. Multiple

areas of loose surface mortar and scattered narrow cracks were seen

in the middle and upper portions of Panel No. 3.

Photographs Nos. 4 and 5 show Panel No. 4 between the 4th

and 5th pilasters [fourth and fifth southernmost pilasters]. A vertical

crack extends from the bottom of panel at midbay upward to the top

of panel and partially through the coping. A dark oblong stone,

located in the lower central third of the panel is cracked vertically,

parallel to the wall face.

Photograph No. 6 shows the lower portion of Pilaster No. 5

[the fifth southernmost pilaster]. Two inclined cracks were observed

in the lower portion of this pilaster. One propagates through a dark

lower stone upward to the south edge of the pilaster and the other,

approximately 3 feet north of it, extends through the long stone

above. A wide crack, approximately 3 inches wide by 4 feet high was

observed between the two cracked stones and the panel face, extending about 6 feet into the pilaster in the northerly direction.

Photograph No. 7 shows Pilaster No. 7 [the seventh southernmost pilaster] and the upper northerly corner of the Panel No. 6. A

narrow crack was observed, beginning at the bottom of pilaster

-9[*9] at Panel No. 6 and extending upward and to the south to the underside

of a dark stone and to the ledge. Another nearly vertical crack was

noticed in Panel No. 7, north of the pilaster. This crack extends from

approximately 1/4 height of the panel upward into the ledge stone,

where it appears to be about 1 inch wide.

The wall north of Panel No. 7 appears to be in better condition,

with only scattered small voids between individual stones at several

locations. More pronounced voids were noticed at the lower portion

of Pilaster No. 9 [the ninth southernmost pilaster], between the two

turrets, and in Panels No. 9 and 10 near Pilaster No. 10 [the 10th

southernmost pilaster].

Scattered areas of loose mortar covering stone joints were observed mainly over the southern half of the west wall. These however

have no effect on the stability of the wall. For the long term they

might contribute to local deterioration of the joints by permitting

access of water and the formation of ice, which could in turn loosen

individual stones and cause more cracks to appear in the wall.

A number of relief drains, consisting of 6 inch diameter clay

pipes, slanted downward away from the face of the wall, were observed scattered over the entire wall area. Some sand was visible

inside the drain pipes but none of them contained any moisture in

spite of heavy rain that fell several days before the day of observation. There are no signs of discoloration on the stones below the

individual drains, indicating very little drainage flow, if any.

The 2-foot wide coping at top of the lower wall is covered with

cement mortar which contains many small cracks.

After setting forth its conclusions with respect to the condition of the

retaining wall in question, MRCE made the following recommendations in the

November 4, 1985 MRCE report:

- 10 [*10] Retaining Wall--Corrective Measures

As is described above, the condition of the retaining wall needs

remedial measures as part of its regular maintenance. It contains no

signs of instability and considering its age of 77 years, 81 is in good

condition. Local repairs to be performed with [sic] consist of raking

out and placing mortar in cracks of more than 1/4 inch width. At

Pilaster No. 5, the separation of the 4-foot high portion above grade,

will be repaired by drilling and grouting several rock bolts into the

wall behind the gap. The gap will then be filled with grout. Grouted

rock pins may be required at other locations in order to confine

individual stones.

*

*

*

*

*

*

*

Balustrade--Corrective Measures

Six of the balusters have deviations from vertical of more than

one inch per 24 inches (4%). We will correct this condition by either

resetting the balusters to a plumb position and grouting or, if probing

indicates they cannot be reset, by drilling and grouting vertical anchor

dowels for the inside edge. Cracks in the baluster bases will be filed

with sand-epoxy grout.

In or around 1986, eight rock anchors and three rock bolts were installed in

the retaining wall in question.°

8As discussed above, construction of the retaining wall in question was

completed in 1925. As a result, that retaining wall had been in place

approximately 60 years, not 77 years, when MRCE prepared the November 4,

1985 MRCE report.

9Although it is not altogether clear from the record, it appears that the

installation of the eight rock anchors and three rock bolts through the retaining

wall in question was in response to the recommendation by MRCE in the

(continued...)

- 11 [*11] At some time before April 14, 1994, Castle Village retained Antonucci &

Lawless, Architects & Engineers (Antonucci), an architectural and engineering

firm,¹° to evaluate the retaining wall in question. Antonucci issued a report dated

April 14, 1994 (April 14, 1994 Antonucci report) that Antonucci limited "only to

readily observable conditions." Consequently, Antonucci added in its April 14,

1994 Antonucci report the caveat that "[p]otential underground or hidden problems that may exist and would not be apparent without an extensive investigation

or unless selected excavation, opening of walls, testing, etc. were performed are

not included [in this report]."

In the April 14, 1994 Antonucci report, Antonucci indicated that the mortar

joints along the retaining wall in question were deteriorating as a result of water

penetration, freezing and thawing action, and penetrating root systems from

vegetation.

9(...continued)

November 4, 1985 MRCE report with respect to the wide crack that it had

observed in the retaining wall in question, which was approximately three inches

wide by four feet high and was between two cracked stones in the fifth southernmost pilaster and the panel. However, the record does not establish the nature of

any problems with that wall that that installation was intended to address. Nor

does the record establish where the eight rock anchors and three rock bolts were

installed in the retaining wall in question.

¹°The record does not establish whether Antonucci specialized in any

particular field of architecture or engineering.

- 12 [*12] At some time before June 22, 1998, Castle Village retained Cutsogeorge &

Tooman Architects, P.C. (Cutsogeorge), an architectural firm," to inspect the

retaining wall in question. On June 22, 1998, Cutsogeorge conducted that inspection and thereafter prepared a so-called architect's field report that it sent to Castle

Village with a cover letter dated June 24, 1998. (We shall refer collectively to the

letter dated June 24, 1998 and the architect's field report as the June 24, 1998

Cutsogeorge report.)

In the June 24, 1998 Cutsogeorge report, Cutsogeorge indicated that it had

inspected the retaining wall in question with Frank Nadal (Mr. Nadal), the property manager of Castle Village, to investigate a report of fallen masonry from the

retaining wall in question "adjacent to the public sidewalk at the entrance ramp to

the Henry Hudson Parkway."¹² As a result of its June 22, 1998 inspection of that

part of the retaining wall in question, Cutsogeorge indicated in the June 24, 1998

Cutsogeorge report that approximately six cubic feet of rock and mortar had fallen

to the sidewalk from a point that was about 20 feet up the wall.

"The record does not establish whether Cutsogeorge specialized in any

particular field of architecture.

¹²In the June 24, 1998 Cutsogeorge report, Cutsogeorge indicated that a

resident of the Castle Village apartment building adjacent to the south end of the

retaining wall in question had found the masonry that had fallen.

- 13 [*13] In the June 24, 1998 Cutsogeorge report, Cutsogeorge also indicated that, in

addition to inspecting the part of the retaining wall in question with respect to

which there had been a report of fallen masonry, it had inspected other areas of

that retaining wall on June 22, 1998. As a result of its inspection of those other

areas, Cutsogeorge indicated in the June 24, 1998 Cutsogeorge report that areas of

the retaining wall in question had severely deteriorated mortar and cement patches

and that approximately 80 percent of that retaining wall was overgrown with

vegetation. As a result of what it observed upon its inspection of the retaining

wall in question, Cutsogeorge recommended in the June 24, 1998 Cutsogeorge

report that Castle Village retain a person qualified to undertake an assessment of

the structure and the facade of that retaining wall and thereafter to indicate what

repairs were recommended as a result of those assessments.

On March 17, 1999, at the request of Castle Village, MRCE submitted a

proposal to Castle Village (March 17, 1999 MRCE proposal) "for the performance

of engineering services for the investigation of structural distress to the west

retaining wall and to determine remedial measures to stabilize the wall." In that

proposal, MRCE indicated that the "southerly portion of the stone masonry

retaining wall along the Riverside Drive on the west side of the site has experienced structural distress since that work was performed [i.e., installation of eight

- 14 [*14] rock anchors and three rock bolts in and around 1986 after MRCE submitted

the November 4, 1985 MRCE report to Castle Village and certain remedial work

was done on the retaining wall in question]."

On March 19, 1999, at the request of Castle Village, MRCE submitted to

Castle Village a second proposal dated March 19, 1999 "for the performance of

engineering services for the investigation of structural distress to the plaza 'east'

retaining wallD31 and to provide recommendations for reconstruction of the wall."

At the request of Castle Village, Gregory Pillori, P.E., P.A. (Pillori), a

geotechnical engineering firm, submitted to Castle Village a proposal dated May

19, 1999 (May 19, 1999 Pillori proposal) for inspecting the retaining wall in

question for structural integrity and the surrounding grounds as follows: (1)

inspecting all outdoor sidewalks, staircases, and retaining walls for structural

integrity; (2) photographing any items in need of repair, describing their present

condition, and making recommendations for repair; (3) inspecting lawn drain inlet

boxes to ascertain the existing drainage scheme; and (4) evaluating the site

drainage system with recommendations for repair or replacement.

¹³In addition to the retaining wall in question, there was another masonry

retaining wall in the Castle Village complex. That other retaining wall, which was

approximately 25 feet high and was at the north end of the west boundary of the

Castle Village complex, formed the exterior corner of the parking garage structure

in that complex and supported a terrace.

- 15 [*15] On September 16, 1999, Pillori sent to Castle Village an initial engineering

report dated September 16, 1999 (September 16, 1999 Pillori report). In that

report, Pillori indicated that pursuant to the May 19, 1999 Pillori proposal it had

performed an inspection and evaluation of the retaining wall in question. Pillori

set forth in the September 16, 1999 Pillori report the following conclusions and

recommendations as a result of that inspection and that evaluation: (1) thermal

expansion, freeze-thaw cycles, exposure to water, and inadequacies in design had

led to significant deterioration of the Castle Village infrastructure, most prominently in the retaining walls and stormwater control system; (2) the retaining wall

in question exhibited vertical and horizontal cracks throughout and bulged outward at the midpoint; (3) replacement of the retaining wall in question was

required but was a medium priority as opposed to a high priority; (4) the stormwater control system was not capable of handling stormwater runoff; (5) in the

areas of the Castle Village complex grounds that were west of Castle Village

apartment buildings at 120 Cabrini Boulevard and 140 Cabrini Boulevard, some

catch basins had collapsed and most drainage pipes were filled with silt; (6)

replacement of the stormwater control system was required but was a medium

priority as opposed to a high priority; and (7) designing and constructing a new

drainage system and regrading sections of the lawn area would be necessary.

- 16 [*16] On January 7, 2002, at the request of Castle Village, Langan Engineering &

Environmental Services, Inc. (Langan), an engineering firm,¹4 submitted to Castle

Village a letter dated January 7, 2002 (January 7, 2002 Langan proposal letter) in

which it made a proposal for undertaking the inspection and the evaluation of, and

making recommendations as a result of that inspection and that evaluation with

respect to, ground subsidence (i.e., the gradual sinking or downward movement of

ground surface resulting in depressions therein) in the southerly portion of the

Castle Village complex and the condition of the retaining wall in question. In that

proposal letter, Langan indicated its understanding that its inspections, evaluations, and recommendations were to be used as part of an ongoing understanding

of the conditions and long-range planning that Castle Village was undertaking.

In the January 7, 2002 Langan proposal letter, Langan indicated that before

preparing that letter it had visited the Castle Village complex and had observed

that there were extensive depressions throughout the lawn area above the retaining

wall in question as well as an existing drainage system along and in the general

vicinity of a north-south walkway which may not have functioned properly and for

¹#One of the fields of engineering in which Langan specialized was socalled soil engineering.

- 17 [*17] which the outlet was not known. Langan set forth the following proposal in

the January 7, 2002 Langan proposal letter:

1. Make a detailed inspection of the grounds and identify and understand the areas where the depressions have occurred. You have supplied us with a plan from a previous report showing the depressions.

We would use that and expand upon it to better understand the conditions. During that time, we would also investigate the existing

drainage system by lifting covers and evaluating the size of the pipe

and determine the routing of the pipes. The previous report indicates

that the pipes are typically filled with silt. We would also research

[New York] City records in hopes of finding some information with

regard to the drainage outlet from the development.

2. Prepare topographic survey of the lawn area in the key areas to

understand the conditions regarding slopes and depressions as part of

our evaluation and determining recommendations for correction of

the problems. Survey area will be limited from the edge of the

buildings towards the retaining wall and encompass approximately 2

acres of land. We would also survey the existing wall in three locations to document the geometry. This plan would be used to present

our evaluations and recommendations. A digital copy of the previous

plan would be helpful.

3. Make a physical inspection of the retaining wall along Riverside

Drive. The masonry rock wall was constructed seventy plus years

ago and the geometry and size of the wall (other than height) is not

known. You did report that within the last few years a portion of the

wall was tied back using soil or rock anchors. In the meantime, there

has [sic] been some depressions [that] have developed and [sic]

[behind] a portion of the wall that has a terrace on the Riverside Drive

side. There has also been some spalling occurring in locations. We

would document the existing wall conditions and assess the shortterm and long-term needs for maintenance and possibly monitoring of

the wall.

- 18 [*18] 4. Prepare a report indicating our findings, evaluation and

recommendation. We expect to prepare some preliminary drainage

calculations, possibly some grading and schematic design of a new

drainage system.

In early 2002, Castle Village sought additional assistance from MRCE with

respect to the retaining wall in question. In a letter dated March 27, 2002 (March

27, 2002 MRCE letter), MRCE stated in pertinent part:

Terrace Area:

*

*

*

*

*

*

*

We suggest that it would be prudent for Castle Village to engage a

landscape architect with civil capabilities to design and implement a

coordinated program of site regrading, site drainage, repair or replacement of the storm sewer system coordinated with possible

reconstruction of the lawn watering system, repair or replacement of

pavements, and the repair of retaining walls as described in the

Pillory report.

High, masonry retaining wall:

We understand that the 70 foot high, masonry retaining wall paralleling Riverside drive was originally constructed in 1906.l"1 There is

a soil filled setback at mid height that suggests the wall was constructed in two sections, with the lower half essentially a facing on

bedrock and the upper half a separate, gravity retaining wall bearing

on bedrock. However, we are not aware of any descriptions of wall

construction, plans or sections that confirm the actual configuration

of the wall, including the thickness of the masonry and the character

of the foundations.

"As discussed above, construction of the retaining wall in question was

completed in 1925.

- 19 [*19] We examined the wall in and appurtenances in 1985 and recommended remedial measures that were implemented in 1986 and 1987

and which included reinforcement of a tunnel through the wall and

repair of the wall face. At that time we found no indications of displacement or tilting of the wall that would indicate potential instability of the wall as a retaining structure. We also observed no indications of potential instability during our March 1, 2002 site visit. We

did note that soil has washed into the drainage holes in the wall, and

we observed sinkholes in the soil filling the mid-height setback that

may be related to the loss of soil into the drainage holes; but, these do

not affect the basic stability of the wall.

Recognizing that the wall has apparently remained stable for 96

years, and that observed deteriorations to date have been essentially cosmetic in nature, we suggest that a minimum program to

mitigate deteriorations and to confirm the continuing stability of the

wall should include a detailed examination of the wall by MRCE

Engineers, and the making of test pits at the location of sinkholes in

the soil filling the setback to attempt to determine the cause of the

sinkholes. We also suggest the program include a photogrammetric

survey of the face of wall from fixed points to establish the horizontal

position of the face of the wall. This technique has the ability to

determine the horizontal position of selected target points on the wall

to within 1/16 inch. Once a baseline survey is completed the photogrammetry can be repeated at selected time intervals to determine if

the wall is moving. In addition to fixing the horizontal position of the

entire face of the wall, the procedure obtains a complete photographic

record of the condition of the face each time the survey is made.

*

*

*

*

*

*

*

¹6As discussed above, construction of the retaining wall in question was

completed in 1925. As a result, that retaining wall had been in place

approximately 77 years, not 96 years, when MRCE prepared the March 27, 2002

MRCE letter. See supra note 8.

- 20 [*20] MRCE's product would be a report summarizing the field work, our

interpretation of the test pit and photogrammetric data, and including

recommendations for cosmetic repairs to the face of the wall, cleaning

of drains and mitigation of the sinkholes in the soil filling the setback

in the wall.

Note that the minimum program is intended to establish that the high,

masonry retaining wall maintains the degree of stability that has been

demonstrated by 96 years of satisfactory performance. However, we

are not aware of any available information that defines the cross

section of the wall or the character of the wall foundations. Thus, the

minimum program cannot determine the actual safety factor of the

wall against failure, either against present static loads or against

dynamic loads in the event of an earthquake during the life of the

wall.

If Castle Village desires to establish the actual safety factors of the

wall under various conditions of loading for comparison with presently accepted values, it will be necessary to define the wall cross

section, the character of the backfill and the character of the foundations by a rather extensive program of test pits and borings behind

and in front of the wall, as well as coring horizontally through the

wall at several levels to determine its actual thickness. * * *

On June 27, 2002, MRCE submitted a letter dated June 27, 2002 (June 27,

2002 MRCE proposal letter) to Castle Village with respect to proposed consulting

engineering services relating to rehabilitation of the face of the retaining wall in

question. In that proposal letter, MRCE acknowledged that Castle Village was

interested in obtaining a quantitative assessment of the long-term stability of the

retaining wall in question. In the June 27, 2002 MRCE proposal letter, MRCE

also acknowledged that there recently had been pieces of masonry and mortar that

- 21 [*21] had fallen from the face of the retaining wall in question onto Riverside

Drive, which was an indication that maintenance work on the face of the retaining

wall in question was necessary. In that proposal letter, MRCE stated that, except

for observed deteriorations to date that had essentially been cosmetic in nature, the

retaining wall in question had remained stable for 96 years."

In the June 27, 2002 MRCE proposal letter, MRCE proposed to Castle

Village that MRCE provide the following consulting services in two phases:

(1) during the first phase, MRCE would inspect the face of the retaining wall in

question in order to estimate the scope of maintenance work necessary to mitigate

the deterioration of the face of that retaining wall, and (2) during the second phase,

MRCE would arrange for subcontractors to make borings and test pits to investigate the thickness of the retaining wall in question, foundation conditions, and the

character of the wall backfill.

Castle Village did not accept MRCE's proposal in the June 27, 2002 MRCE

proposal letter.

In a letter dated July 3, 2002, Castle Village retained Langan to evaluate the

ground subsidence and structural integrity of the retaining wall in question and

authorized it to begin a topographical survey.

"See supra note 16.

- 22 [*22] In a letter dated August 9, 2002 (August 9, 2002 Langan proposal letter),

Langan noted that it had been reported that the retaining wall in question had

previously exhibited structural distress and that within the past few years several

tieback anchors were installed. Langan proposed to Castle Village in that letter

that Langan perform, inter alia, the following services: (1) review available

subsurface investigation data; (2) visually inspect the face of the retaining wall in

question to determine signs of structural distress and inspect in detail the depression behind that retaining wall at terrace level; and (3) investigate subsurface

conditions behind the retaining wall in question by means of a combination of test

borings, test probes, and test pit excavations.

With respect to the test borings and test probes that Langan proposed as part

of its investigation of subsurface conditions, Langan proposed in the August 9,

2002 Langan proposal letter drilling a series of test borings and test probes behind

the re-taining wall in question in order to better define the top of the rock contour

behind that retaining wall. With respect to the test pit excavations that Langan

proposed as part of its investigation of subsurface conditions, Langan proposed in

that proposal letter to perform two days of exploratory test pit excavations at the

inboard edge of the retaining wall in question in order to determine conditions

immediately behind that retaining wall.

- 23 [*23] In a letter dated September 13, 2002 (September 13, 2002 Langan revised

proposal letter), Langan modified the August 9, 2002 Langan proposal letter by

eliminating as services that it proposed to perform for Castle Village the investigation of subsurface conditions behind the retaining wall in question by means of a

combination of test borings, test probes, and test pit excavations.¹ª In lieu of those

services, Langan proposed in the September 13, 2002 Langan revised proposal

letter that Langan monitor the retaining wall in question using control point prisms

at six sections that would be approximately 100 feet apart, with multiple points in

each section, and with measurements taken initially, and at three, six, and 12

months in order to determine the magnitude and rate of wall movement. In that

letter, Langan reaffirmed that it would perform the following services that it had

proposed in the August 9, 2002 Langan proposal letter: (1) review available

subsurface investigation data and (2) visually inspect the face of the retaining wall

in question to determine signs of structural distress and a detailed inspection of the

depression behind that retaining wall at terrace level.

On November 4, 2002, Castle Village accepted the proposal in the

September 13, 2002 Langan revised proposal letter.

¹ªThe record does not establish why Langan modified the August 9, 2002

proposal letter about a month after it had sent that letter to Castle Village.

- 24 [*24] In a report dated January 6, 2003 (January 6, 2003 Langan report), Langan

informed Castle Village that it had performed the following services on November

25 and 26, 2002: (1) visually inspected approximately 600 feet of the retaining

wall in question; (2) used a 50-foot lift bucket and a 55-foot truck lift bucket to

inspect the upper portion of the retaining wall in question and to access the

tunnels; (3) established a series of survey control points at six sections of the

retaining wall in question; (4) permanently mounted optical survey control points

on the retaining wall in question; and (5) installed those survey control points so

that a series of five control points were distributed vertically from the top to the

base of the retaining wall in question at about 100-foot intervals along the length

of that retaining wall. Langan stated in the January 6, 2003 Langan report that it

intended 30 control points to be monitored three times during a one-year period.

In the January 6, 2003 Langan report, Langan further stated in pertinent part

as follows with respect the conditions that it had observed during its visual

inspection of the retaining wall in question:

We have established three categories of overall condition of the

structure as an indication of the subjective evaluations of the

observable conditions only. The ratings and corresponding

definitions are as follows:

-25[*25] Rating

Description

I

Little to Moderate deterioration.

Stability and safety concerns are unlikely over the

next 12 months.

II

Moderate to Heavy deterioration.

Possible stability and safety concerns over the next

12 months.

III

Heavy to Severe damage.

Probable safety and stability concern over the next

12 months.

Station 0+00 to 1+00l"1

1.

The face of retaining wall in this location is covered in

vegetation, mainly vines. The face of the stones appears

to have been weakened/eroded by the plant growth in

several locations.

2.

Loose/missing mortar was observed throughout.

3.

The weepholes all sloped downwards into the wall face,

and are typically filled with sand, vegetation, and birds

nests. Evidence of soil washing out from behind the

retaining wall was observed at several locations, mainly

beneath the setback level. Water was observed seeping

out of the wall through the mortar/joints. All of the weep

holes were dry.

4.

Minor vertical and horizontal cracking was note as [sic]

several locations along the base of the wall.

"According to certain diagrams included with the January 6, 2003 Langan

report, "Station 0+00 to 1+00" encompassed the most northerly portion of the

retaining wall in question and each subsequent station encompassed a portion of

the retaining wall in question that is south of the one immediately before it.

- 26 [*26] The retaining wall from Sta. 0+00 to 1+00 is given an overall condition rating of I.

Station 1+00 to 2+00

1.

The face of the retaining wall is covered in vegetation.

The face of the stones appears to have been

weakened/eroded by the plant growth in several

locations.

2.

The weepholes all sloped downwards into the wall face,

and are typically filled with sand, vegetation, and birds

nests. Evidence of soil washing out from behind the

retaining wall was observed at several locations, mainly

beneath the setback level. Water was observed seeping

out of the wall through the mortar/joints. All of the weep

holes were dry.

3.

Minor vertical and horizontal cracking was note as [sic]

several locations along the base of the wall.

The retaining wall from Sta. 1+00 to 2+00 is given an overall condition rating of I.

Station 2+00 to 3+00

1.

The retaining wall is covered in vegetation. The face of

the stones appears to have been weakened/eroded by the

plant growth in several locations.

2.

The overall shape of the retaining wall changes from

concave at about Station 2+00 to convex at about Station

2+70.

3.

Minor vertical and horizontal cracks, loose

mortar/stones, and soil staining were observed along the

base of the wall from about Station 2+00 to about Station

- 27 [*27]

2+60. Vertical cracks were observed extending from the

bottom of the wall to the terrace level at about Stations 2+80

and 3+10.

4.

The weepholes all sloped downwards into the wall face,

and are typically filled with sand, vegetation, and birds

nests. All of the weep holes were dry.

The retaining wall from Sta. 2+00 to 2+60 is given an overall condition rating of I. The retaining wall from Sta. 2+60 to 3+00 * * * is

given an overall condition rating of II.

Station 3+00 to 4+00

1.

Scattered portions of the retaining wall are covered in

vegetation. The face of the stones appears to have been

weakened/eroded by the plant growth in several

locations.

2.

The weepholes all sloped downwards into the wall face,

and are typically filled with sand, vegetation, and birds

nests. The base of the wall is stained with soil from

about Station 3+00 to 3+50. Water was observed seeping out of the bottom of the buttress at Station 3+50. All

of the weep holes were dry.

3.

The lower portion of the wall appears to be bulging outward from about Station 3+00 to 3+60. The portion of

the wall below the setback at about Station 3+10 appears

to have moved outward more than 2 inches.

4.

Vertical cracks were observed extending from the bottom

of the wall to the terrace level at about Station 3+10.

Large vertical cracks and offset of adjacent stones were

also observed at about Stations 3+80 to 3+90.

- 28 [*28] The retaining wall from Sta. 3+00 to 4+00 is given an overall condition rating of II.

Station 4+00 to 5+00

1.

Most of the vegetation appears to have been removed

from the retaining wall. The face of the stones appears

to have been weakened/eroded by the plant growth in

several locations.

2.

Repointing of the mortar between the stones was

observed on the upper portion of the wall (extending

from about 10-ft above the base to the top of the

retaining wall).

3.

Vertical cracks and offset adjacent stones were observed

throughout the lower portion of the wall.

4.

Five rock anchors were observed at the base of the buttress at Station 4+00. Three rock anchors were observed

at the top of the buttress at Station 4+50, and three were

observed immediately adjacent to the buttress, below the

terrace setback.

5.

The wall appears to be bulging outward immediately

below the installed anchors. The base of the buttress has

pulled away from surrounding stone more than 4 inches.

Vertical cracks were observed adjacent to the buttress in

this location from the base of the wall to a height of

about 20-ft. Additional vertical cracking was observed

between the two buttresses from the base of the wall to a

height of about 5 to 10-ft.

6.

The weepholes all sloped downwards into the wall face,

and are typically filled with sand, vegetation, and birds

nests. All of the weep holes were dry.

- 29 [*29] The retaining wall from Sta. 4+00 to 5+00 is given an overall condition

rating of II.

Station 5+00 to 6+00

1.

Minor vegetation growth was observed on the face of the

retaining wall.

2.

Loose/crumbling mortar/stones were observed

throughout. Scaffolding is in place along this portion of

the wall due to potential of falling blocks.

3.

Missing stones and were also observed.

4.

Water was observed seeping out of the wall through

joints at about Station 5+25, and mold growth was

observed throughout the base of the wall. The weep

holes all sloped downwards into the wall face, and are

typically filled with sand, vegetation, and birds nests.

All of the weep holes were dry.

The retaining wall from Sta. 5+00 to 6+00 is given an overall condition rating of I.

Southern face of the retaining wall (Station 6+00 to 7+00)

1.

A vertical crack was observed along the southern face of

the retaining wall beginning at the base of the wall and

extending diagonally eastward to the top of the wall.

2.

Loose mortar was observed throughout this section of

the wall.

3.

The weepholes all sloped downwards into the wall face,

and are typically filled with sand, vegetation, and birds

nests. All of the weep holes were dry.

- 30 [*30] The retaining wall on the south property line is given an overall rating

of I.

Top of the Retaining Wall

1.

Sidewalk slabs above the southern portion of the

retaining wall exhibit signs of differential settlement;

this [sic] could be indications of soil erosion.

After setting forth a description of the conditions Langan observed during

its visual observation of the retaining wall in question, Langan in the January 6,

2003 Langan report made the following recommendations for continuing maintenance and observation of that wall:

RECOMMENDATIONS

Our evaluation of the retaining wall is as follows:

1.

Locations identified with a conditions rating II appear to

have undergone movement since the 1980's repair.

Additional effort should be focused on these areas to

determine if [sic] the magnitude and rate of wall

deformation.

2.

Localized areas of loose mortar/stones should be cleaned

out and repointed to minimize the potential for rocks

falling from the face of the wall.

3.

All vegetation should be removed from the face of the

fall [sic] to minimize additional spalling of the rock face.

4.

The soil loss at the top of the retaining wall is likely due

to the ponding of water behind the wall, and subsequent

migration through loose mortar/joints in the retaining

- 31 [*31]

wall. Additional investigation including soil borings/test

pits behind the retaining wall is strongly encouraged to

evaluate the extent of the soil erosion. We recommend

investigating the subsurface conditions behind the

retaining wall by means of a combination of test borings,

test probes, and test pit excavations. A series of test

probes behind the training [sic] wall will better define

the top of rock contour and will identify subsurface

conditions. Test pits will help to determine conditions

immediately behind the wall.

5.

If seepage continues through the mortar, weepholes may

be required throughout the wall to relieve any hydrostatic pressure. The existing "weepholes" are not

oriented in the conventional manner for a weephole to

drain water from behind the wall; i.e., downward toward

the face of the wall, or horizontal through the wall. The

weepholes do not appear to have been compromised

other than being filled in with dirt and debris. Any

benefit from cleaning out the existing weepholes is unclear as there [sic] purpose is unknown.

6.

The wall is currently scheduled to be monitored for

potential lateral movements using optical level survey

equipment. The monitoring frequency is currently

scheduled for February, May, and December. Additional

monitoring may be required based on the results of the

measurements. Additional monitoring could consist of

crack gauges, and more frequent surveying of the optical

points to check for movements.

7.

The retaining wall should be reexamined within a year to

evaluate changes in conditions. If the monitoring shows

continual lateral movement an investigation of the backfill material, and the rock profile behind the retaining

wall should also be performed. If additional bulging

- 32 [*32]

out/lateral movement of the base of the wall is observed,

structural repair may be necessary.

In a memorandum dated February 27, 2003, Langan informed Castle Village

of the results of a three-month survey of the observation survey points on the

retaining wall in question. In that memorandum, Langan stated in pertinent part

that "the measured wall movement is neglible [sic]."

In a memorandum dated May 20, 2003, Langan informed Castle Village of

the results of a six-month survey of the observation survey points on the retaining

wall in question. In that memorandum, Langan stated in pertinent part:

The six month survey indicates wall movement near the southern

portion of the wall (survey line 5; points 21 to 25). The readings indicate greater than one inch of lateral movement outward movement

(toward the highway) at this location. Longitudinal movements up to

about 1 inch were also recorded in this section. Survey line 5 was

identified as an area of "Moderate to Heavy deterioration. Possible

stability and safety concern over the next 12 months" in our "Retaining Wall inspection and Evaluation" report dated 6 January 2003.

Vertical movements show a consistent change of about less than 3/8

inch along the entire length of the wall. A portion of this apparent

vertical movement could be attributed to the reestablishment of the

control elevation.

The lateral and longitudinal movements along survey lines 1, 2, 3, 4

and 6 indicated negligible change in movement.

The next scheduled reading is the twelve month reading, scheduled

for November 2003. We recommend an addition survey visit within

the next month. The measured movement could be a function of a

- 33 [*33] change in weather condition from the winter freeze to the spring

thaw. Additional survey readings will isolate/establish the trend in

movement independent of weather. These additional readings will

provide better insight in the degree of urgency for stabilization of this

portion of the wall.

In a memorandum dated August 8, 2003 (August 8, 2003 Langan memorandum), Langan summarized for Castle Village Langan's findings to that date

with respect to onsite storm drainage. In that memorandum, Langan indicated that

on or around June 13, 2003, it had inspected the Castle Village grounds to

evaluate the site storm drainage system. As a result of that inspection, Langan

indicated in the August 8, 2003 Langan memorandum that (1) it had observed that

the existing drainage inlets located on the east side of the pedestrian walkway that

ran in a north-south direction at the rear of the property were in very poor condition and full of sediment and debris; (2) Langan had been "informed that the

existing drainage system drains to the west to Riverside Drive" but that Langan

could not find the exact connections; (3) it would not be viable to rehabilitate the

existing drainage system and that a new drainage system should be constructed;

and (4) it recommended that the area be regraded to redirect runoff from ponding

near the retaining wall in question.

In a memorandum dated September 12, 2003, Langan provided Castle

Village with the results of a 10-month survey of the observation survey points on

- 34 [*34] the retaining wall in question. In that memorandum, Langan indicated in

pertment part:

The ten month survey indicates wall movement near the southern

portion of the wall (survey line 4; points 16 to 20, and survey line 5,

points 21 to 25). The readings indicate greater than one inch of

lateral movement outward movement (toward the highway) at survey

line 4, and up to 3.5 inches of lateral movement at survey line 5.

Long-itudinal movements up to about 1 inch, and vertical movements

greater than 3/4 inch were also recorded in this section. The lateral

and longitudinal movements along survey lines 1, 2, 3, and 6 indicated less change in movement.

Survey lines 4 and 5 were previously identified as an area of

"Moderate to Heavy deterioration. Possible stability and safety concern over the next 12 months" in our "Retaining Wall Inspection and

Evaluation" report dated 6 January 2003.

The next scheduled reading is the twelve month reading, scheduled

for November 2003. We recommend an addition [sic] survey visit

within the next month. A Langan engineer will visit the site on

Monday, 15 September 2003 to observe the condition of the retaining

wall in the vicinity of survey lines 4 and 5, and to evaluate if the wall

condition in these areas should be downgraded to Level III rating indicating "Heavy to Severe damage. Probable safety and stability

concern over the next 12 months".

In a memorandum dated September 16, 2003 (September 16, 2003 Langan

memorandum), Langan summarized for Castle Village Langan's findings to that

date with respect to the retaining wall in question. In that memorandum, Langan

indicated that (1) the water ponding near the retaining wall in question was nega-

- 35 [*35] tively impacting the performance of that retaining wall, and (2) Langan's

monitoring data collected through September 16, 2003, showed an apparent trend

of lateral movement in sections four and five of the retaining wall in question.

Langan made the following recommendations in the September 16, 2003

Langan memorandum: (1) the areas of the retaining wall in question that were

given a conditions rating of II should continue to be monitored; (2) loose mortar

should be cleaned out and repointed to minimize the potential for rocks falling

from the face of the retaining wall in question; (3) all vegetation should be

removed from the face of the retaining wall in question; and (4) soil borings and

test pits should be excavated behind the retaining wall in question in order to

evaluate the extent of the soil erosion and wall construction details.

In a memorandum dated September 29, 2003, Langan provided to Castle

Village the results of an additional survey of the retaining wall in question. In that

memorandum, Langan stated in pertinent part:

This latest survey was performed on 25 September 2003, approximately 2 weeks after the ten month survey. Attached for your reference are summary plots of the survey readings to date.

Lateral Movement (East-West)

The latest survey indicates less than 1/8 inch of additional lateral wall

movement since the previous survey along all survey lines. Total

lateral movements near the southern portion of the wall remain

- 36 [*36] greater than one inch of lateral movement outward movement (toward

the highway) at survey line 4 (points 16 to 20, greater than 1 inch)

and survey line 5 (points 21 to 25, up to 3.5 inches). Less than 1 inch

total lateral movement has been observed along survey lines 1, 2, 3,

and 6.

Longitudinal Movement (North-South)

Longitudinal movements along all sections of the wall remain unchanged since the previous reading. Total longitudinal movements

measure up to about 1 inch on the south section of the wall (survey

lines 4 and 5). Less than 1 inch total movement has been observed

along survey lines 1, 2, 3 and 6.

Vertical Movement (Elevation)

About 1/8 inch of additional vertical movement was recorded along

survey lines 4 and 5. Total vertical movement along survey lines 4, 5,

and 6 now ranges from about 1/2 inch to 1.5 inches. Less than 1/2

inch of total vertical movement has been recorded along survey lines

1, 2, and 3.

In a memorandum dated November 5, 2003 (November 5, 2003 Langan

memorandum), Langan summarized for Castle Village the observations and concerns that Langan had identified during its field investigation of the retaining wall

in question in which it initiated a subsurface investigation (Langan subsurface

investigation) in order to evaluate the causes of movement of that retaining wall.

In that memorandum, Langan indicated that it had identified the following

conditions: (1) subsurface conditions in the vicinity of the retaining wall in

question that consisted of a thin layer of topsoil over a boulder/cobble fill above

- 37 [*37] bedrock; (2) a surface sinkhole that had opened near the location of drilling

associated with the Langan subsurface investigation; (3) potentially large

underground voids that were present beneath both the sidewalk and landscaped

areas adjacent to the retaining wall in question and that may have been connected

with movement of that retaining wall; and (4) numerous depressions in the

landscaped areas adjacent to the retaining wall in question together with significant unevenness of the sidewalk path that may have been indicative of potential

loss of material behind that retaining wall.

In the November 5, 2003 Langan memorandum, Langan recommended that

Castle Village take the following steps: (1) cordon off and restrict access to the

sidewalk adjacent to the retaining wall in question and the landscaped area within

about 25 feet of that retaining wall; (2) turn off the yard irrigation until the area

becomes stabilized; (3) prohibit heavy objects within the restricted access areas;

(4) authorize the excavation of test pits; and (5) implement a remedial repair program in order to stabilize the area and minimize future problems that should

include filling in surface voids and underground cavities in the boulders and

cobble that had previously been placed as fill behind that retaining wall.

- 38 [*38] In a letter dated November 12, 2003, Langan made the following preliminary recommendations to Castle Village with respect to the stabilization of the

walkway above the retaining wall in question:

1. Remove about 190 linear ft of the concrete sidewalk adjacent to

the inboard side (east side) of the existing wall, extending south from

the southern turret. A Location Plan is attached as drawing 1 and

shows the limits of the work.

2. Excavated [sic] about 5 ft below the sidewalk elevation extending

from the inboard side of the retaining wall to about 4 ft east of the

eastern edge. The excavation should expose the limits of the existing

voids below the sidewalk and adjacent landscaping.

3. Place a layer of filter fabric in the bottom of the excavation and

extend up the sides of the excavation. The fabric will span the existing voids and help prevent future soil migration into the lower

boulder fill. Drawing 2 shows a section through the proposed excavation.

4. Install a perforated collection pipe along the western extent of the

excavation to collect surface runoff.

5. Backfill the excavation to within 1 ft of the existing ground

surface with 3/4 inch gravel and place a second layer of filter fabric

above the gravel backfill creating a continuous envelope. This will

allow for topsoil to be placed and the landscaping repaired. At this

time we recommend replacing the concrete sidewalk as part of the site

drainage work.

6. We recommend drilling 2 new rows of 2" diameter weep holes in

the existing wall to aid in the drainage of subsurface water. The first

row of weep holes should be drilled about 5 ft down from the existing

inboard sidewalk elevation. The perforated collection pipe would be

connected to the newly drilled weep holes. The second row of weep

- 39 [*39] holes would be installed about 4 ft above the outboard sidewalk to

help drain water from behind the wall. All weep holes should be

drilled at about 10 ft centers. Drawing 3 identifies the locations of

the proposed weep holes.

7. Clean out the existing clay pipe lined weep holes along entire face

of the wall to allow drainage of subsurface water and prevent hydrostatic pressures from building up behind the wall.

In a letter dated December 16, 2003 (December 16, 2003 Langan proposal

letter), Langan made a proposal to Castle Village with respect to the design of an

onsite drainage system. In that proposal letter, Langan proposed (1) surveying

services and (2) grading and drainage design. The scope of that proposal related

to site grading, drainage design for the site, and regulatory permitting for the

work. In the December 16, 2003 Langan proposal letter, Langan indicated that

during the construction phase it would provide support services relating to review

of certain drawings, requests for information, and controlled inspection of work

performed by the selected contractor.

In a memorandum dated December 16, 2003, Langan provided to Castle

Village the results of the 12-month survey of the observation survey points on the

retaining wall in question. In that memorandum, Langan stated in pertinent part:

This survey completes a one year cycle as per our initial monitoring

agreement. This latest survey was performed on 12 December 2003.

Survey readings are being compared with the data from a 27

September survey, which was summarized in our last monitoring

- 40 [*40] memorandum, dated 29 September 2003. Survey monitoring was also

performed in October and November 2003 (before and after the

subsurface investigation program). The attached summary plots contain data from all of the survey readings recorded to-date.

Lateral Movement (East-West)

The latest survey indicates additional lateral wall movement along

survey line 5. About 1/2 inch of lateral movement was recorded at

the top of the wall, and about 1/8 inch of movement near the center

terrace, and along the bottom of the wall. This is indicative of outward rotation of the top of the wall toward the west. Less than 1/8

inch movement was recorded along survey lines 4 and 6. Readings

along survey lines 1, 2, and 3 indicate that the wall is moving back

toward the initial reading, and movements recorded in these areas

may be partially due to thermal effects (i.e., stone expanding and

contracting with temperature variations).

Longitudinal Movement (North-South)

The latest survey indicates up to about 1/2 inch additional longitudinal wall movement since the September 27 survey. This movement was recorded at the top of the wall along survey line 5. Less

than 1/8 inch of additional longitudinal wall movement was recorded

at the bottom of the wall at survey line 5 and along the other survey

lines. Total longitudinal movements measure up to about 1.8 inches

on the south section of the wall (survey lines 4 and 5). Less than 1/2

inch total movement has been observed along survey lines 1, 2, 3 and

6.

Vertical Movement (Elevation)

About 3/8 inch of additional vertical movement was recorded along

the top of the wall at survey line 5. Measured vertical movement

along survey lines 1, 2, 3, 4, and 6, remained essentially unchanged

since the September 2003 readings. Total vertical movement along

survey lines 4, 5, and 6 now ranges from about 1/2 inch to 1.5 inches

- 41 [*41] from initial. Less than 1/2 inch of total vertical movement has been

recorded along survey lines 1, 2, and 3.

In a report dated December 30, 2003 (December 30, 2003 Langan report),

Langan summarized for Castle Village the results of the Langan subsurface

investigation and provided recommendations for the long-term stability of the

retaining wall in question. In that report, Langan indicated that during the latter

half of 2003 it had performed that subsurface investigation behind the retaining

wall in question and that that subsurface investigation had included three borings

and two lines of probes drilled on the east side of that retaining wall.

In the December 30, 2003 Langan report, Langan indicated that (1) it had

uncovered numerous voids; (2) during the drilling of one of the borings a sinkhole

had opened near that boring; (3) drill fluid had flowed out of a clay drainage pipe

for one of the borings; and (4) water had seeped through the mortar joints at the

base of the retaining wall in question but did not flow through the pipes during the

other borings or probes, which suggested that water either flowed into existing

voids and stopped traveling or flowed to the top of the rock and ponded behind

that retaining wall.

In January 2004, Castle Village accepted the December 16, 2003 Langan

proposal letter.

- 42 [*42] On January 7, 2004, Langan provided Castle Village with a proposal for a

walkway void repair on the Castle Village grounds. Thereafter, in January 2004,

Castle Village accepted that proposal.

On March 29, 2004, Castle Village sent an email to Langan in which it requested a status update with respect to the sidewalk sinkhole repair plans.

On April 6, 2004, Langan provided Castle Village with plans and specifications for walkway remediation, along with a list of potential contractors.

In a memorandum dated April 20, 2004, Langan addressed for Castle

Village design issues associated with the walkway remediation.

In a memorandum dated April 27, 2004, Langan summarized for Castle

Village a prebid meeting that had taken place with respect to the walkway

remediation project.

On June 11, 2004, Mr. Nadal, the Castle Village property manager, sent to

the Castle Village board of directors Langan's plans to correct sidewalk, sinkhole,

and drainage problems on the Castle Village grounds.

On August 24, 2004, Castle Village's Mr. Nadal sent to the Castle Village

board of directors Langan's proposal to remediate and abate conditions that

affected the stability of the retaining wall in question.

- 43 [*43] In a memorandum dated September 14, 2004 (September 14, 2004 Langan

memorandum), Langan addressed the stability of the parapet of the retaining wall

in question. In that memorandum, Langan indicated that on September 9, 2004, it

had (1) observed excavations by Morris Park Contracting Corp. (Morris Park)

associated with the repair of the walkway above the retaining wall in question; (2)

inspected the inboard side of the upper portion of the retaining wall in question;2°

and (3) observed at about 3.5 to 4 feet below grade on the inbound side of the

retaining wall in question relatively large cracks along the interface of the parapet

wall and the main portion of that retaining wall. As a result of those observations

and that inspection, Langan recommended in the September 14, 2004 Langan

memorandum that Castle Village take steps to reinforce the parapet of the

retaining wall in question.2¹

2°The open excavations of the grounds at the south end of the retaining wall

in question allowed Langan to inspect the inboard side of the upper portion of that

retaining wall.

2¹The parties stipulated that the September 14, 2004 Langan memorandum

indicated that between September 1 and November 5, 2004, Morris Park (1) installed new catch basins, regraded grounds, and placed a geotextile-wrapped

gravel blanket beneath a new sidewalk behind the retaining wall in question and

(2) installed a tieback-and-deadman system to the parapet of the retaining wall in

question. Those stipulations are clearly contrary to the facts that we have found

are established by the record, and we shall disregard them. See Cal-Maine Foods,

Inc. v. Commissioner, 93 T.C. 181, 195 (1989). The record establishes, and we

(continued...)

- 44 [*44] In a memorandum dated September 30, 2004 (September 30, 2004 Langan

memorandum), Langan informed Castle Village that there was an opening or

empty space (void space) discovered on or around September 23, 2004, under the

lawn area adjacent to the northwest wing of the Castle Village apartment building

at 140 Cabrini Boulevard, that opened into the tunnel below that lawn area.

According to Langan, that void space consisted of a horizontal slab of concrete

about three feet below grade that supported the soil above and formed the socalled roof of the opening which, before it extended into the tunnel, was about 18

inches high and about 24 inches wide. In the September 30, 2004 Langan memorandum, Langan recommended plugging the east end of the tunnel to prevent

further soil erosion.

At some time between September 30 and November 5, 2004, Morris Park

filled various voids and closed a tunnel opening at the Castle Village complex.

In a memorandum dated April 7, 2005 (April 7, 2005 Castle Village

memorandum), Castle Village followed up with two representatives of Langan

2¹(...continued)

have found from our review of the September 14, 2004 Langan memorandum and

a memorandum from Langan dated April 11, 2005 (discussed below) that that later

memorandum, and not the September 14, 2004 Langan memorandum, discussed

the services performed by Morris Park between September 1 and November 5,

2004.

- 45 [*45] who had been assigned to work on the Castle Village project regarding a

recent telephone call with one of those representatives with respect to the

preparation of plans for the maintenance of the retaining wall in question that had

been approved by Castle Village in August 2004. In that memorandum, Castle

Village advised those representatives that Castle Village wanted to proceed with

those plans and also suggested that measurements be taken of the retaining wall in

question in order to assess its condition. In the April 7, 2005 Castle Village

memorandum, Castle Village also informed the Langan representatives that there

were some holes that had formed around the catch basins and manholes in the

grounds and that the grounds near the retaining wall in question had settled overall

about two inches after the sidewalk repair that took place around the fall of2004,

although there was one area on the sidewalk by that retaining wall that had settled

unevenly.

In a memorandum dated April 11, 2005 (April 11, 2005 Langan memo-

randum), Langan informed Castle Village that it had inspected the conditions of

the grounds above the retaining wall in question in order to evaluate the long-term

maintenance requirements of that retaining wall and had observed the following

conditions: (1) the appearance of sinkholes adjacent to the new catch basins and

manholes; (2) vertical and lateral displacement of concrete slabs encompassing the

- 46 [*46] new sidewalk near the retaining wall in question; (3) soil tension cracks that

generally were parallel to that retaining wall, that were adjacent to the inboard side

of the retaining wall in question, and that extended up to 25 feet from that inboard

side; (4) an increase in the size of the existing sinkholes at the terrace level; and

(5) cracks along previously parged joints of the retaining wall in question, suggesting additional movement of that retaining wall. Langan did not refer to any

recent rainfall in the April 11, 2005 Langan memorandum.

In the April 11, 2005 Langan memorandum, Langan indicated that starting

on or around September 1 and continuing through November 5, 2004, Morris Park

had performed the following services for Castle Village: (1) installation of new

catch basins above the retaining wall in question; (2) regrading of the grounds

above the retaining wall in question; and (3) placement of a geotextile-wrapped

gravel blanket beneath a new sidewalk. (We shall refer collectively to the services

that Morris Park performed during the period September 1 through November 5,

2004, as the 2004 drainage modifications.)

In the April 11, 2005 Langan memorandum, Langan further indicated that at

some point between September 1 and November 5, 2004, Morris Park had

installed a tieback-and-deadman system to the parapet.

- 47 [*47] In a memorandum dated April 13, 2005 (April 13, 2005 Langan memorandum), Langan informed Castle Village that (1) cracks in the retaining wall in

question generally coincided with the locations of relatively large sinkholes at the

terrace level of that retaining wall; (2) there was probably ongoing deep-seated

global movement of an approximately 50-foot section of the retaining wall in

question adjacent to the area between Castle Village apartment buildings at 120

Cabrini Boulevard and 140 Cabrini Boulevard; and (3) that critical section of the

retaining wall in question required immediate action. Langan did not refer to any

recent rainfall in the April 13, 2005 Langan memorandum.

In a memorandum to residents of the Castle Village complex dated April 28,

2005, the board of directors of Castle Village indicated that spalling of the surface

material on the retaining wall in question had occurred during the last decade.

On May 12, 2005, at approximately 4 p.m., a portion of the retaining wall in

question collapsed onto Riverside Drive. Minutes later, a second larger portion of

that retaining wall collapsed. In total, a 150-foot section collapsed. The 150-foot

section of the retaining wall in question that collapsed was around the portion of

that wall between the second southernmost pilaster and the eighth southernmost

pilaster and was adjacent to the area between the Castle Village apartment

buildings at 120 Cabrini Boulevard and 140 Cabrini Boulevard. (For

- 48 [*48] convenience, we shall sometimes refer to the collapse on May 12, 2005, of

the 150-foot portion of the retaining wall in question as the collapse of the

retaining wall in question.) The cause of the collapse of the retaining wall in

question was progressive deterioration in and around that wall that had begun at

least 20 years before that collapse occurred on May 12, 2005.

As discussed above, the various consultants (i.e., Mr. Flynn, MRCE,

Antonucci, Cutsogeorge, Pillori, & Langan) whom Castle Village had retained

since at least as early as 1985 to inspect the retaining wall in question had observed certain problems in and around that wall, which they described in the

respective letters, reports, proposals, and/or memoranda that they had prepared

and sent to Castle Village. Most of the major problems in and around the retaining

wall in question that those consultants had observed and described in those respective documents were observed in and around the 150-foot section of that

retaining wall that collapsed on May 12, 2005. That 150-foot section included the

approximately 50-foot section of the retaining wall in question which, in Langan's

judgment, was a "critical section (i.e., cracks reopening and large sinkholes within

the terrace)" of that wall.

Petitioner filed timely Form 1040, U.S. Individual Income Tax Return, for

her taxable year 2005 (2005 return). In that return, petitioner claimed (1) a

- 49 [*49] casualty loss (2005 casualty loss) of $26,39022 and (2) a casualty loss

deduction (2005 casualty loss deduction) of $23,188.23

Respondent issued to petitioner a notice of deficiency (notice) with respect

to her taxable year 2005. In that notice, respondent, inter alia, disallowed the 2005

casualty loss deduction of $23,188 that petitioner had claimed.24 In the notice,

22Petitioner attached to the 2005 return Form 4684, Casualties and Thefts

(petitioner's 2005 Form 4684). In that form, petitioner reported a casualty loss

related to the "CO-OP RETAINING WALL". In petitioner's 2005 Form 4684,

petitioner claimed that (1) the "[c]ost or other basis of each property" was

$26,390; (2) the "[f]air market value before casualty or theft" was $26,390; and

(3) the "[f]air market value after casualty or theft" was zero. In petitioner's 2005

Form 4684, petitioner determined a casualty loss of $26,390 by first subtracting

the "[f]air market value after casualty or theft" of zero from the "[f]air market

value before casualty or theft" of $26,390, which produced a balance of $26,390.

She then calculated the amount of the casualty loss that she claimed (i.e., $26,390)

as equal to the lesser of that balance of $26,390 and the "[c]ost or other basis of

each property" of $26,390. Petitioner argues here that she incorrectly calculated

the amount of the casualty loss shown in petitioner's 2005 Form 4684 because the

entries that she made in that form were incorrect.

23In petitioner's 2005 Form 4684, petitioner reduced the amount of the 2005

casualty loss of $26,390 shown in that form, as required by sec. 165(h)(1) and (2),

in order to arrive at the amount of the 2005 casualty loss deduction of $23,188 that

she claimed in her 2005 return. Consistent with her argument that the amount of

the casualty loss claimed in petitioner's 2005 Form 4684 was erroneous, petitioner

argues here that she incorrectly calculated the amount of the casualty loss deduction shown in that form and that she claimed in her 2005 return.

24Except for certain correlative adjustments, the only other determination

that respondent made in the notice was to disallow certain employee business

expenses of $5,266 that petitioner claimed in her 2005 return. Petitioner concedes

(continued...)

- 50 [*50] respondent determined that "[t]he cause of the collapse of the Castle Village

Retainer [sic] Wall was * * * the result of a gradual weakening of the wall" and

that therefore the loss from that collapse does not constitute a casualty loss under

section 165(c)(3).

Petitioner filed an amended petition in this case in which she alleged that

the 2005 casualty loss deduction that she claimed in the 2005 return should be

increased to $149,843.25 In that amended petition, petitioner alleged that $149,843

"represent[s] the full value of the property loss due to the collapse of the Castle

Village retainer [sic] wall".

Respondent filed an answer to petitioner's amended petition. In that

answer, respondent denied the allegations in the amended petition with respect to

the increased amount of the casualty loss deduction to which petitioner alleges she

is entitled for her taxable year 2005.

24(...continued)

respondent's determination to disallow those claimed employee business

expenses.

25Petitioner refers in the amended petition to what she alleges is the correct

amount of the casualty loss to which she is entitled. We believe that she intended

to refer to what she alleges is the correct amount of the casualty loss deduction to

which she is entitled.

- 51 [*51]

OPINION

Petitioner bears the burden of establishing that the determination in the

notice that remains at issue is erroneous. See Rule 142(a); Welch v. Helvering,

290 U.S. 111, 115 (1933). She also bears the burden of establishing the allegations in the amended petition with respect to the increased casualty loss deduction that she is claiming. See Rule 142(a).

The initial dispute between the parties is over whether the collapse of the

retaining wall in question is a casualty within the meaning of section 165(c)(3).

As pertinent here, section 165(a) and (c)(3) allows an individual taxpayer to

deduct "losses of property not connected with a trade or business or a transaction

entered into for profit, if such losses arise from fire, storm, shipwreck, or other

casualty". A loss is treated as sustained during the taxable year in which the loss

occurs, as evidenced by closed and completed transactions and as fixed by identifiable events occurring in such taxable year. Sec. 1.165-1(d)(1), Income Tax

Regs.

The term "other casualty" in section 165(c)(3) refers to an event that shares

characteristics with a fire, storm, or shipwreck. See Coleman v. Commissioner, 76

T.C. 580, 589 (1981); see also Shearer v. Anderson, 16 F.2d 995, 996 (2d Cir.

1927). A casualty is an event which is due to a sudden, unexpected, or unusual

- 52 [*52] cause. See Matheson v. Commissioner, 54 F.2d 537, 539 (2d Cir. 1931),

afg 18 B.T.A. 674 (1930). The progressive deterioration of property though a

steadily operating cause is not a casualty. See Fay v. Helvering, 120 F.2d 253,

253 (2d Cir. 1941), affg 42 B.T.A. 206 (1940).

A collapse, even one that occurs suddenly, is not a casualty when the

collapse is caused by progressive deterioration. See, e.g., Carlson v. Commis-

sioner, T.C. Memo. 1981-702, 1981 Tax Ct. Memo. LEXIS 41, at *5-*6; Chipman

v. Commissioner, T.C. Memo. 1981-194, 1981 Tax Ct. Memo. LEXIS 550, at *8.

A loss that is accelerated by a contributing factor such as rain or wind is not a

casualty if the loss is caused by progressive deterioration. See, e.g., Hoppe v.

Commissioner, 42 T.C. 820, 824-825 (1964), afsì, 354 F.2d 988 (9th Cir. 1965);

Chipman v. Commissioner, 1981 Tax Ct. Memo. LEXIS 550, at *8.

It is petitioner's position that the collapse of the retaining wall in question is

a casualty within the meaning of section 165(c)(3). At the core of petitioner's

position is that "[t]he cause of the collapse of the Retaining Wall [in question] was

the excessive rainfall during the months of January through May 2005, 20 which

26There is no evidence in the record to support petitioner's contention that

the rainfall between January and May 12, 2005, the date on which the 150-foot

section of the retaining wall in question collapsed, was "excessive". However, we

shall assume arguendo that the rainfall during that period was "excessive". That is

(continued...)

- 53 [*53] overstressed the recently installed faulty drainage system [2004 drainage

modifications] and caused rapidly accelerating movement in the four weeks

immediately preceding the collapse." (We shall refer to the "excessive rainfall"

that petitioner contends caused the collapse of the retaining wall in question as the

spring 2005 rainfall.) Proceeding from that core contention, petitioner argues that

Helstoski v. Commissioner, T.C. Memo. 1990-382, 1990 Tax Ct. Memo. LEXIS

400, supports her position that the collapse of the retaining wall in question is a

casualty within the meaning of section 165(c)(3).27

According to petitioner, the event that caused the collapse of a portion of

the retaining wall in question and the loss to petitioner's property in the instant

26(...continued)

because, as discussed herein, we have found that progressive deterioration of the

retaining wall in question, not the rainfall that occurred in 2005 before May 12,

2005, caused the 150-foot portion of that wall to collapse.

27In further support of her position that the collapse of the retaining wall in

question is a casualty within the meaning of sec. 165(c)(3), petitioner relies on

Heyn v. Commissioner, 46 T.C. 302 (1996), Bailey v. Commissioner, T.C. Memo.

1983-685, and Grant v. Commissioner, 30 B.T.A. 1028 (1934). We find the facts

in each of those cases to be materially distinguishable from the facts that we have

found in this case and petitioner's reliance on each of those cases to be misplaced.

Suffice it to say that we did not find on the respective records presented to us in

Heyn, Bailey, and Grant that the respective events that were at issue in those cases

were caused by progressive deterioration. In contrast, as discussed herein, we find

on the record presented to us in the instant case that the collapse of the retaining

wall in question was caused by the progressive deterioration of that wall that

occurred over a period of at least 20 years before it collapsed.

- 54 [*54] case was the spring 2005 rainfall, and the event that caused the failure of the

dam, the draining of the pond, and the loss to the taxpayers' property in Helstoski

was "a violent storm" with extraordinary amounts of rainfall. As a result, petitioner maintains, the holding in Helstoski that the event that caused the loss there was

a casualty within the meaning of section 165(c)(3) applies with equal force in the

instant case. We disagree. For reasons explained below, we find the facts in

Helstoski with respect to the cause of the failure of the dam, the draining of the

pond, and the loss to the taxpayers' property to be materially distinguishable from

the facts that we have found in this case with respect to the cause of the collapse of

the retaining wall in question and the loss to petitioner's property. As a result, we

find petitioner's reliance on Helstoski to be misplaced.

In Helstoski v. Commissioner, 1990 Tax Ct. Memo. LEXIS 400, the

taxpayers purchased property (taxpayers' property) around the center of which the

previous owners had constructed a concrete dam supported by footings on a

stream that was a tributary of a river and that flowed through that property. The

construction of that dam resulted in the formation of a pond on the upstream side

of the dam. There was an access road on one side of the pond. In the center of the

dam, there was a cutout, or indentation, which was six inches lower than the rest

of the dam. The prior owners also had a roadway built near the dam and installed

- 55 [*55] a culvert over part of the stream. In addition, they added wingwalls to the

dam in order to prevent water from running around the dam. During a 10-year

period before and after the taxpayers acquired the taxpayers' property, water from

the stream flowed over the cutout or indented part of the dam (except during times

of drought). After they acquired that property, the taxpayers occasionally had

problems with the dam. For example, after a heavy rainfall, water flowed over the

entire length of the dam and not just over the cutout or indentation in the dam.

Moreover, the stream occasionally flowed around one or both ends of the dam, and

the soil washed away. When that problem occurred, the taxpayers had the pond

drained and the soil around the ends of the dam replaced. Storms occasionally

washed away the roadway near the dam. However, no one storm caused more than

a few hundred dollars of damage. See 4 at *15-*16.

During the year at issue in Helstoski, violent thunderstorms (storm)

occurred that caused the following damage to the taxpayers' property: (1) the

dam's footings were undermined, which permitted the stream to pass under the

dam and thereby caused the pond to drain; and (2) the access road to the taxpayers' pond was washed away. The damage to the taxpayers' property from the

storm significantly decreased the fair market value of that property. See 4 at

*16-*17.

- 56 [*56] The taxpayers claimed in Helstoski that the damage to the taxpayers'

property was caused by the storm and that consequently the loss attributable to

that damage was a casualty loss within the meaning of section 165(c)(3). See id.

at *32. The position of the Commissioner of Internal Revenue (Commissioner)

regarding the cause of the damage to the taxpayers' property, which relied on the

opinion of the Commissioner's expert, was that "the failure of the dam was due to

gradual erosion of the earth around the dam's footings, which occurred 'over a

period of years', and thus was not a casualty within the meaning of section

165(c)(3)". Id. We were unwilling to rely in Helstoski on the opinion of the

Commissioner's expert as to the cause of the damage to the taxpayers' property.

That was because although the expert on whom the Commissioner relied

"attributed the dam's failure to the possibility that the dam did not conform to

acceptable design standards * * * and to erosion over time", that expert nonetheless "admitted that he was not certain why the dam failed, and that several

factors were probably involved." Helstoski v. Commissioner, 1990 Tax Ct.

Memo. LEXIS 400, at *34-*35. Having been unwilling to rely on the opinion of

the Commissioner's expert that the cause of the damage to the taxpayers' property

was "erosion over time", we rejected the Commissioner's position that the cause

of that damage was "gradual erosion of the earth around the dam's footings, which

- 57 [*57] occurred 'over a period of years'". Id. at *32. We found on the record

presented to us in Helstoski that the storm caused the damage to the taxpayers'

property and that the loss from the damage to the taxpayers' property that was

caused by the storm was a casualty loss within the meaning of section 165(c)(3).

See id. at *35.

In support of her contention (quoted above) that the cause of the collapse of

a portion of the retaining wall in question was the spring 2005 rainfall, petitioner

relies on her purported expert, David Thompson (Mr. Thompson), who prepared a

purported expert report (Mr. Thompson's report). After voir dire examination of

Mr. Thompson, we found him to be qualified as an expert in the field of geotechnical engineering (qualified field of expertise). However, because Mr. Thompson

opined in Mr. Thompson's report on matters outside of the field in which we

found him to be qualified as an expert, we admitted that report only to the extent

that it pertained to his qualified field of expertise.

We were not impressed or persuaded by Mr. Thompson or by his various

conclusions and his ultimate opinion in Mr. Thompson's report that were within

his qualified field of expertise. Initially, we note that we were not impressed with

Mr. Thompson because he was not fully prepared to answer questions on crossexamination. That is because Mr. Thompson had prepared Mr. Thompson's report

- 58 [*58] approximately five years before the trial in this case and had not reviewed

the entirety of that report in order to prepare himself to testify at trial. Moreover,

we were not persuaded by, and are unwilling to accept, Mr. Thompson's various

conclusions and his ultimate opinion in Mr. Thompson's report that the cause of

the collapse of the retaining wall in question was the spring 2005 rainfall. That is

because, inter alia, he admitted during cross-examination by respondent's counsel

that he had erroneously used an engineering guideline that applied to retaining

walls constructed from materials that were different from the materials used to

construct the retaining wall in question. We are unwilling to rely on the views of a

purported expert who is at best careless and at worst not competent.

It is also significant and affects our evaluation of Mr. Thompson's various

conclusions and his ultimate opinion in Mr. Thompson's report as to the cause of

the collapse of the retaining wall in question that during cross-examination, after

respondent's counsel asked Mr. Thompson to review certain other reports and

proposals that are in the record, Mr. Thompson made certain acknowledgments

that raise serious questions about those conclusions and that ultimate opinion.

With respect to the November 4, 1985 MRCE report, respondent's counsel

asked Mr. Thompson to review a paragraph of that report in which MRCE

indicated that it had inspected the retaining wall in question, including the

- 59 [*59] drainage pipes in that wall, and had observed certain indicia that led MRCE

to conclude that there was "very little drainage flow, if any." After Mr. Thompson

reviewed that paragraph, the following exchange occurred between respondent's

counsel and Mr. Thompson:

Q:

Does what's described in that paragraph indicate a functioning

drainage system behind the wall?

A:

No.

Q:

Would a less-than-fully-functional drainage system affect the

stability of the wall?

A:

Yes.

With respect to the April 14, 1994 Antonucci report, respondent's counsel

asked Mr. Thompson to review a paragraph of that report in which Antonucci

indicated that it had inspected the retaining wall in question and had observed that

the mortar joints of that wall were "deteriorating" and had been "subjected to

water penetration, freezing/thawing action, and penetrating root systems from the

vegetation." After Mr. Thompson reviewed that paragraph, the following

exchange occurred between respondent's counsel and Mr. Thompson:

Q:

Are the deterioration of mortar joints proper behavior for a

retaining wall?

A:

No.

- 60 -

[*60] *

*

*

*

*

*

*

Q:

Now, is the presence of penetrating root systems, is that

indicative of proper wall maintenance?

A:

No.

Q:

So Castle Village should have had the plants removed from the

wall?

A:

Yes.

With respect to the March 17, 1999 MRCE proposal, respondent's counsel

asked Mr. Thompson to review that proposal. After Mr. Thompson reviewed that

proposal, the following exchange occurred between respondent's counsel and Mr.

Thompson with respect to a certain paragraph of that proposal:

Q:

In the first paragraph of this report, Mueser Rutledge [MRCE]

states that there is structural distress to the retaining wall. Does

structural distress sound like normal behavior for a retaining

wall?

A:

No.

With respect to the January 7, 2002 Langan proposal letter, respondent's

counsel directed Mr. Thompson to the following statement in that proposal:

The area of interest with regard to this proposal is approximately 2

acres located between the buildings and Riverside Drive, where there

is open lawn area with paths and walks. Along the retaining wall,

there is also an existing walkway that is presently sloping down away

from the retaining wall. There are extensive amounts of depressions

throughout the lawn area. Also, there is an existing drainage system

- 61 [*61] located along and in the general vicinity of a north-south walkway

that may not function properly and for which the outlet is not known.

After Mr. Thompson reviewed the above-quoted statement, the following

exchange occurred between respondent's counsel and Mr. Thompson:

Q:

*

A:

Now, in this report, starting on page 192, Langan reported

extensive depressions in the grounds above the retaining wall.

Are extensive depressions a sign of a properly-functioning

retaining wall?

*

*

*

*

*

*

The answer to the question is no.

With respect to the January 6, 2003 Langan report, respondent's counsel

asked Mr. Thompson to review several pages in that report with respect to, inter

alia, numerous cracks in, vegetation on, missing masonry stones within, and

ponding of water behind the retaining wall in question. After Mr. Thompson

reviewed those pages, the following exchange occurred between respondent's

counsel and Mr. Thompson:

Q:

In those pages, Langan stated that he observed numerous

cracks in the retaining wall. And you believe those cracks are

actually signs of proper maintenance?

A:

I'm not sure if the cracks have anything to do with maintenance. They have to do with the performance of the wall,

though.

Q:

Do they indicate good performance of the wall?

- 62 [*62] A:

No.

Q:

I believe Langan also observed vegetation growing on the wall.

Does the growth, continued growth of vegetation indicate good

maintenance of the wall?

A:

No.

Q:

Langan also observed missing masonry stones within the wall;

does that indicate good maintenance of the wall?

A:

No.

Q:

Langan noticed that there was ponding behind the wall; is that

indicative of a properly-behaving retaining wall?

A:

No.

We shall not rely on Mr. Thompson's conclusions and his ultimate opinion

in Mr. Thompson's report that, as petitioner contends, the cause of the collapse of

the retaining wall in question was the "excessive rainfall during the months of

January through May 2005, which overstressed the recently installed faulty drainage system [2004 drainage modifications] and caused rapidly accelerating

movement in the four weeks immediately preceding the collapse."

Our serious concerns about, and thus our unwillingness to rely on, Mr.

Thompson and his various conclusions and his ultimate opinion in Mr. Thompson's report with respect to the cause of the collapse of the retaining wall in

question are reinforced and confirmed by Thomas G. Thomann (Mr. Thomann),

- 63 [*63] respondent's expert, whom, after voir dire, we found to be qualified as an

expert in the field of geotechnical engineering. As an expert in his qualified field

of expertise, Mr. Thomann prepared a report (Mr. Thomann's report) and a rebuttal report with respect to Mr. Thompson's report (Mr. Thomann's rebuttal

report). (We shall sometimes refer collectively to Mr. Thomann's report and Mr.

Thomann's rebuttal report as Mr. Thomann's reports.) We found Mr. Thomann

and Mr. Thomann's reports, as well as the materials on which he relied in preparing those reports, to be impressive and persuasive.

After setting forth a description of the analyses and the investigations that

he and his company, URS Group, Inc., made into the cause of the collapse of the

retaining wall in question, Mr. Thomann opined in Mr. Thomann's report as

follows with respect to that cause:

Based on the results of these analyses and supporting investigations,[281 the following opinion is made regarding the likely cause of

the retaining wall collapse:

The retaining wall in the collapse zone [150-foot portion of the

retaining wall in question that collapsed] likely developed tension

cracks at the back of the wall and at the face of the lower portion of

the wall during and after construction. As groundwater developed

28Attached as an appendix is an excerpt from Mr. Thomann's report that is

titled "Executive Summary". That excerpt includes a description of the analyses

and the supporting investigations that he used in reaching his ultimate opinion

about the cause of the collapse of the retaining wall in question.

- 64 [*64] behind the wall over time, this caused unintended pressure against the

wall and also possibly resulted in a reduction in the mortar and/or

rock strength over time due to weathering. This caused further

cracking and deformations to occur and therefore continued weakening of the wall. As the wall continued to deform over time, the

factors of safety decreased until the wall became unstable and collapsed. In addition, the deformations caused large tensile strains to

occur near the face of the lower retaining wall thereby leading to the

observed delamination of the front face of the lower wall. Following

the loss of this resisting material, the remaining portion of the wall

collapsed.

The adverse conditions on which Mr. Thomann relied in reaching his

ultimate opinion about the cause of the collapse of the retaining wall in question

are the same adverse conditions that the various consultants (i.e., Mr. Flynn,

MRCE, Antonucci, Cutsogeorge, Pillori, & Langan) had observed and pointed out

in the respective letters, reports, proposals, and/or memoranda that they had prepared and sent to Castle Village over a period of at least 20 years before the

collapse of that wall.

On cross-examination, petitioner's counsel attempted to undermine Mr.

Thomann's ultimate opinion about the cause of the collapse of the retaining wall

in question by asking him about the effect of the spring 2005 rainfall on the 2004

drainage modifications and thus on that retaining wall. Petitioner's counsel did

not succeed in that attempt. Instead, as shown below, petitioner's counsel's crossexamination of Mr. Thomann reaffirmed our evaluation of Mr. Thomann and Mr.

- 65 [*65] Thomann's reports and our confidence in his opinion regarding the cause of

the collapse of the retaining wall in question.

Petitioner's counsel read to Mr. Thomann a passage from Mr. Thomann's

report in which Mr. Thomann opined as follows with respect to the effect of the

spring 2005 rainfall on the 2004 drainage modifications and thus on the retaining

wall in question: "Based on the trends shown in the stability and deformation

analysis [sic], the estimated ground water pressure increase resulted in a small

reduction in the factor of safety (approximately 4%)". After petitioner's counsel

read that passage to Mr. Thomann, the following exchange occurred between

petitioner's counsel and Mr. Thomann:

Q:

What does that mean?

A:

What that means is, if you read before that, it says seepage

analysis results indicate that the 2004 drainage modifications

may have increased the ground water pressure behind the

retaining wall. The settlements in portions of the drainage

modification system occurred. So what it's saying is that we

looked at how much water may have been infiltrated into the

ground and what impact that water had on the stability of the

wall.

Q:

Okay. And what does the 4 percent represent?

A:

The 4 percent, what you have is the factor--let me explain a

little bit about what the factor of safety is. If I have a retaining

wall, I have forces on the back of that--the soil on the back of

the retaining wall is acting to try to tilt the wall over, the

- 66 [*66]

weight of the wall itself is what's resisting that. The ratio of

that weight to the force is the factor of safety. As this force

gets higher, the factor of safety goes down. So what we're

saying is that that increase in water pressure resulted in a 4

percent decrease in the factor of safety.

Q:

So what caused the wall to fall down?

A:

The wall, there was movement of the wall. And as the wall

continues to move, that wall is going to reduce in the factor of

safety. Based on our analysis, what we found was that when

the wall was originally constructed, and they backfilled, there

was some tension that developed behind the wall. This type of

wall, an unmortared masonry wall, cannot handle any tension.

Tension is when I have something, I have two--and in this case,

two rocks holding on to each other, and if they have some tension, they're going to come apart. Well, there's nothing to hold

it from coming apart. There is that tension that developed.

And there was also some tension that developed in the front of

the wall. And as the wall tilted, and there was water pressure

up against the back of the wall, that continued to reduce the

factor of safety and the wall continued to move.

*

*

*

*

*

*

*

Q:

So this 4 percent, according to your report, did not have a

significant adverse impact on the stability of the wall, is that

what you're saying?

A:

Yes, that's what it says.

Q:

So when you say stability of the wall, what does that mean?

A:

The stability of the wall is related to the factor of safety that I

was talking about.

- 67 [*67] Q:

So it still had a 96 percent safety, right?

A:

No.

Q:

No? Okay.

A:

No.

Q:

Please explain again?

A:

It's s [sic] a reduction--it says a small reduction in the factor of

safety.

Q:

Small. I'm saying, so the wall itself could have a 96 percent--

*

*

*

*

*

*

*

A:

A factor of safety of 1 means failure, 1.0 means failure.

Q:

Failure?

A:

Yes.

Q:

Okay. So the drainage work that was done by Castle Village in

2004 decreased the safety factor by only 4 percent?

A:

That's correct.

Mr. Thomann's above-quoted testimony is consistent with Mr. Thomann's

opinion in Mr. Thomann's report that a four percent decrease in the factor of

safety "did not likely have a significant adverse impact on the stability of the

retaining wall." Indeed, Mr. Thomann opined at trial that, absent taking appropriate steps to remedy the structural and other deficiencies in and around the

- 68 [*68] retaining wall in question, the conditions in and around that wall, which

existed for at least 20 years before the spring 2005 rainfall, would have caused,

and did cause, the collapse of the retaining wall in question.

Based upon an examination of the entire record before us, we find that

petitioner has failed to carry her burden of showing that "[t]he cause of the

collapse of the Retaining Wall [in question] was the excessive rainfall during the

months of January through May 2005, which overstressed the recently installed

faulty drainage system [2004 drainage modifications] and caused rapidly accelerating movement in the four weeks immediately preceding the collapse." On that

record, we further find that although the spring 2005 rainfall and the 2004 drain-

age modifications may have been contributing factors to the particular time at

which the retaining wall in question collapsed, they did not cause that collapse.

On the record before us, we further find that the cause of the collapse of the retaining wall in question was progressive deterioration in and around that wall that

had begun at least 20 years before that collapse occurred on May 12, 2005.

Based upon our examination of the entire record before us, we find that the

collapse of the retaining wall in question was not a casualty within the meaning of

section 165(c)(3). On that record, we hold that petitioner is not entitled to any

- 69 [*69] deduction under section 165(a) with respect to any loss that she is claiming

for her taxable year 2005 with respect to that collapse.2°

We have considered all of the contentions and arguments of the parties that

are not discussed herein, and we find them to be without merit, irrelevant, and/or

moot.

To reflect the foregoing,

Decision will be entered for

respondent.

2°See supra note 2.

- 70 [*70]

APPENDIX

The following is an excerpt from Mr. Thomann's report that is titled

"Executive Summary":

On May 12, 2005, a 250 ft long section of the Castle Village retaining

wall, located near West 181" Street and Riverside Drive in Manhattan, collapsed onto the Riverside Drive ramp and the Henry Hudson Parkway northbound lanes. URS Group Inc. (URS) has been

retained by the IRS to provide an expert opinion regarding the likely

reason(s) for the collapsed portion of the retaining wall.

The retaining wall is of stone masonry construction and was probably

completed between 1921 and 1925. The wall generally consists of

slightly to moderately fractured and weathered mica schist boulders

with occasional grout seams located between the boulders and with

occasional voids and potential zones of soft material. The front face

of the wall appears to have had more mortar than the remaining parts

of the wall. The pre-collapse length of the retaining wall was approximately 800 ft with a height of 65 to 70 ft. Numerous inspections and

investigations of the retaining wall since 1985 show evidence of

cracking and wall movements, weepholes not functioning, the drainage system at the top of wall not functioning, observations of settlement of the ground surface behind the top of the wall, observations of

bulging of the wall, observations of stones falling from the wall, and

evidence of voids/sinkholes developing behind the top of the wall. In

the retaining wall collapse zone, it is estimated that the wall may have

experienced at least 4 ft of lateral movement at the top of the wall

prior to collapse.

The top of the bedrock slopes towards the west with the bedrock

appearing to be lowest in the area of the collapse zone. Since the

bedrock generally has a very low permeability, most of the groundwater that reaches the bedrock will flow along the top of the bedrock

towards the back of the retaining wall. The retaining wall also did

not have any drainage behind the wall, it was observed that the

- 71 [*71] weepholes were not working, and the drainage system at the top of

the wall was not functioning between at least 1985 and 2004. Considering all of these conditions, it is likely that groundwater accu-

mulated behind the wall.

Seepage, limit equilibrium (i.e., stability), and deformation analyses

were performed by URS to better understand the factors that may

have contributed to the collapse of the retaining wall. Steady state

seepage analyses were performed to estimate the pre-collapse

groundwater conditions prior to November 2004. Based on observations and the results of the seepage analyses, there was groundwater present behind and within the retaining wall. Since precipitation is transient, the groundwater, or phreatic, surface will increase

and decrease over time. The results of three seepage analysis cases

show that the phreatic surface will vary by approximately 7 to 15 ft,

depending on the permeability of the materials. Therefore, the seepage appears to be very sensitive to the permeability of the materials.

The stability analyses indicate that the factor of safety against overturning for the original geometry and the May 2005 geometry under

no groundwater pressure conditions is approximately 1.40 and 1.14

respectively. However, if groundwater conditions from the seepage

analyses are included, the factor of safety against overturning varies

from 1.29 to 1.05 for the original geometry and is approximately 1.0

or less than 1.0, for the May 2005 geometry. As the factor of safety

approaches 1.0 (i.e., failure condition), the probability that the wall

will move increases; therefore, it is possible that as the groundwater

level increased behind the wall this resulted in movement of the wall.

Deformation analyses were performed for six different cases that

consider the deformations and stresses that are developed after

construction, after cracking of the wall takes place, and if groundwater pressures are developed within and behind the wall. The

stresses within the wall indicate that tension developed behind the

face of the wall and at the lower back portion of the wall during and

after construction of the wall. Since the wall has limited tension

- 72 [*72] capacity, cracks may develop, which result in increased deformations

of the wall.

The tension developed behind the face of the wall also indicates that a

vertical crack may have developed behind the face of the wall, which

is consistent with the initial collapse which showed a separation of

the wall face from the rest of the wall. The results for a vertical crack

show large deformations and bulging of the lower retaining wall,

which was observed prior to the collapse. For some of the cases that

include groundwater pressures, the deformations are very large and

failure of the wall occurs. The results of sensitivity analyses indicate

that the deformation of the wall is very sensitive to the tensile

strength of the wall and the groundwater conditions within and be-

hind the wall.

Based on the results of these analyses and supporting investigations,

the following opinion is made regarding the likely cause of the retaining wall collapse:

The retaining wall in the collapse zone likely developed tension

cracks at the back of the wall and at the face of the lower portion of

the wall during and after construction. As groundwater developed

behind the wall over time, this caused unintended pressure against the

wall and also possibly resulted in a reduction in the mortar and/or

rock strength over time due to weathering. This caused further

cracking and deformations to occur and therefore continued weakening of the wall. As the wall continued to deform over time, the

factors of safety decreased until the wall became unstable and collapsed. In addition, the deformations caused large tensile strains to

occur near the face of the lower retaining wall thereby leading to the

observed delamination of the front face of the lower wall. Following

the loss of this resisting material, the remaining portion of the wall

collapsed.

Typical maintenance for a wall of this type, that is not deforming,

might consist of repointing the mortar joints, removing vegetation

from the wall face, clearing the weepholes, and ensuring that the

- 73 [*73] storm water drainage system behind the top of the wall was functioning properly. Routine maintenance of this wall appeared to

generally consist of repointing the mortar joints at the face of the wall

and occasionally removing vegetation from the wall face. Since the

weepholes only extend a few feet beyond the face of the wall, clearing the weepholes may not have a significant effect on the overall

drainage of the wall. Maintenance of the storm water system behind

the top of the wall prior to 2004 would have reduced the infiltration

of precipitation in the area behind the top of the wall and would have

reduced the water behind the wall.

There have been two documented times when work has been performed either directly on the wall or close to the wall. This primarily

included the installation of rock anchors/bolts in 1986 and drainage

modifications beyond the top of the wall in 2004. Based on the observations and testing of the retrieved rock anchors/bolts and seepage

analyses, the following opinions/conclusions are made regarding the

rock anchors/bolts and the drainage modifications:

1.

The rock anchors do not appear to have been installed in the

bedrock, as specified on the design drawings. The design intention of the rock anchors is not clear. If the three rock anchors located at approximately the mid-height of the wall had

been installed in the rock, analyses indicate that they would not

have had a significant effect on the overall stability of the wall.

2.

Seepage analysis results indicate that the 2004 drainage modifications may have increased the groundwater pressure behind

the retaining wall if settlements of portions of the drainage

modification system occurred. Based on the trends shown in

the stability and deformation analyses, the estimated groundwater pressure increase will result in a small reduction in the

factor of safety (approximately 4%) and a small increase in the

deformations. Therefore, the analyses indicate that the drainage modifications did not likely have a significant adverse

impact on the stability of the retaining wall.