REPORT TO THE COMMITTEE
Agency decision
Ask Donna
What actually matters in this document.
Text
REPORT TO THE COMMITTEE
ON APPR 0PRIATIONS
HOUSE OF REPRESENTATIVES
i~lilillillilililllillilill~lllllll
1
li
087463
Selected Significant Audit Findings
In The Department Of Defense
B
- 706190
BY THE COMPTROLLER GENERAL
OF THE UNITED STATES
COMPTROLLER GENERAL OF T H E UNITED STATES
WASHINGTON. D.C. 20548
B-106190
Dear Mr. Chairman:
W e a r e pleased to submit our annual report of selected significant audit findings relating to activities of the Department of Defense.
A similar report relating to the civil departments and agencies of the
Government was submitted separately.
In this report we have included items, selected from audit r e ports previously submitted t o the Congress, which we believe should
be of interest and use to the Committee during the appropriations
hearings for fiscal year 1970. Some of the matters commented on in
this report a r e matters on which the Department has indicated that
corrective action either has been or will be taken. The items have
been included, however, in view of their significance and of the fact
that we have not had a n opportunity to evaluate the adequacy of corrective actions taken.
We shall be pleased t o furnish any additional information that
you may desire.
These findings and recommendations have previously been brought
t o the attention of responsible departmental officials by means of audit
reports. We a r e sending copies of this report to the Department of Defense and to the military departments so that they may be in a position
t o answer any inquiries that may be made during the appropriations
hearings with respect to these findings and recommendations.
z
Sincerely yours,
Comptroller Gene Pal
of the United States
The Honorable George H. Mahon
Chairman, Committee on Appropriations
House of Representatives
C o n t e n t s
Page
DETERMINATION OF REQUIREMENTS FOR SUPPLIES, EQUIPMENT, AND FACILITIES
Need f o r improvement i n exchange of i n f o r m a t i o n
a f f e c t i n g planned u s a g e of weapon systems
Department of the Army
Need f o r u p d a t i n g of o r i g i n a l p l a n s f o r a c q u i s i t i o n of f a c i l i t i e s p r i o r t o actual a c q u i s i t i o n s
Department of t h e A i r Force
Need f o r improvement i n computation of r e q u i r e ments f o r missile r e p a i r p a r t s
Department of: t h e ArTny
PROCUREMENT PRACTICES AND CONTRACT ADMINISTRATION
Need f o r improvement i n c o n t r o l o v e r Governmentowned p r o p e r t y i n p o s s e s s i o n of c o n t r a c t o r s
Department of Defense
I n c r e a s e d c o s t s t o t h e Government t h r o u g h lease
rather t h a n p u r c h a s e of land and b u i l d i n g s by
contractors
Department of Defense
Need t o i n c r e a s e c o m p e t i t i o n i n procurement of
aeronautical spare parts
Department of Defense
Need t o i n c r e a s e c o m p e t i t i o n i n procurement of
coal f o r use i n Europe
Department o m m y
P o t e n t i a l s a v i n g s i n procurement of petroleum
p r o d u c t s f o r use by c o n t r a c t o r s
Department of t h e N a v y
Need f o r improvement i n a d m i n i s t r a t i o n of contracts f o r research studies
Department of t h e Army
+
c
STOCK RECORDS AND CONTROLS
Need f o r improvement i n Tnanagement of s u p p l i e s i n
Vietnam
Department of t h e Army
Need f o r improvement i n r e p o r t i n g i n v e n t o r i e s o f
nonexpendable equipment
Department of t h e A i r Force
Keed f o r iinprovernent i n t h e supply management
d a t a system of t h e Army Tank-Autonotive Command
1
1
1
2
2
3
3
4
4
4
5
5
6
6
7
7
9
9
10
10
11
11
11
12
12
13
Page
Department of the Army
Need for improvement in the records used in
matching requirements against availability of
stock and effecting redistribution
Department of Defense
Need for improvement in control over repairable
spare parts
Department of the Army
Need for improvement in control of stock levels
of nonstandard aeronautical repair parts
Department of the Navy
13
SUPPLY MANAGEMENT, GENERAL
Need for improvement in the processing of stock
requisitions
Department of Defense
Need for improvement in supply management of magnetic computer tape
Department of Defense
Need for improvement in funding practices affecting procurement of spare parts
Department of Defense
Potential savings through increased recapping of
aircraft tires
Department of Defense
Potential savings through elimination of duplicate inventories
Department of the Navy
Potential savings through elimination of uneconomical shipments of stock
Department of the Air Force
Potential savings through repairing rather than
scrapping unserviceable spare parts
Department of the Air Force
Potential savings through reuse of shipping containers
Department of the Army
18
EQUIPMENT MANAGEMENT , GENERAL
Need for improvement in management of inactive
industrial equipment
Department of the Army
15
15
16
16
16
16
18
18
19
19
21
21
22
22
24
24
25
25
26
26
27
27
28
28
28
Page
Need for improvement in rllanagernent of missionsupport aircraft
Department of the Army
Need for improvement in management of tractortrailer fleet in Europe
Department of the Army
ADMINISTRATION OF MANPOWER MATTERS
Potential savings through conversion of manually
operated furnaces to automatic-type heating
units
Department of Defense
Need for improvement in administration of military pay and allowances
Department of Defense
Need for improvement in management of detailing
of civilian employees
Department of Defense
Potential savings through use of civil service
personnel in lieu of contract personnel
Department of the Air Force
MILITARY ASSISTANCE PROGRAM
Need for screening excess property for feasibility of recovery from recipient countries prior
to release to them for disposal
Department of Defense
Need for improvement in management of equipment
held in storage for the military assistance
program
Department of Defense
AUTOMATIC DATA PROCESSING EQUIPMENT
Need for greater consideration to use of in-house
maintenance of Government-owned automatic data
processing equipment
Department of Defense (and other departments
and agencies)
Potential savings through direct purchase of components and spare parts for automatic data
processing equipment
Department of Defense (and other departments
and agencies)
28
28
29
29
31
31
31
32
32
33
33
34
34
36
36
36
37
37
39
39
39
41
41
Page
MANAGEMENT CONTROL SYSTEMS
Need for a study of the coordination of the management review efforts of groups outside the
internal audit organizations
Department of Defense
Favorable opinion on the accounting system for
operations proposed for implementation July 1,
1968
Department of Defense
Need for improvement in reliability of the Air
Force personnel data system
Department of the Air Force
MOVEMENT OF AMERICAN FORCES FROM FRANCE (OPERATION
FRELOC)
Problems incident to relocation of supplies and
equipment
Department of Defense
OTHER AREAS OF OPERATIONS
Potential savings through consolidation of real
property maintenance functions in areas of
highly concentrated military installations
Department of Defense
Need for improvement in control over ammunition
development
Department of the Army
Need for improvement in airlift of cargo to
Southeast Asia
Department of the Air Force
Potential savings through use of available space
on military aircraft to transport baggage between the United States and Europe
Department of Defense
Need for improvement in control over charges for
services provided nonappropriated fund activities and private interests
Department of befens e
Potential savings through use of certified mail
rather than registered mail to transmit confidential material
~
43
43
43
44
44
45
45
47
47
47
49
49
49
50
50
52
52
53
53
54
54
55
Page
Department of Defense
Observations on the United States balance-ofpayments position
Department of Defense (and other departments
and agencies)
55
55
55
DETERMINATION OF REQUIREMENTS
FOR SUPPLIES, EQUIPMENT, AND FACILITIES
NEED FOR IMPROVEMENT IN EXCHANGE
OF INFORMATION AFFECTING PLANNED
USAGE OF WEAPON SYSTmS
Department of the Army
In a report issued to the Congress in April 1968, we
stated that Army procedures did not, in OUT opinion, provide a systematic method for the communication and consideration of recommended changes in plans that affect equipment requirements. We found that, had Army officials given
timely consideration to recommendations that usage of the
M-132 flamethrowers be more limited than had been originally planned, the flamethrowers might not have been purchased in excess quantities.
The contracts €or the excess quantities were subsequently terminated at an estimated loss to the Government
of about $2.7 million. (Termination and related costs of
about $4 million less value of usable components of
$1.3 million.)
We advised the Secretary of Defense that there was a
need for systematic procedures to accomplish two things:
First, to ensure formal consideration of recommendations
affecting procurement by top levels of command; secondp to
ensure timely follow-up action by subordinate commands to
determine whether their recommendations had been accepted
or rejected. Accordingly, we suggested that the Army establish appropriate procedures to accomplish this.
The Army concurred in our suggestions and advised us
of procedural changes that had been recently completed or
were nearing completion which, if properly carried out,
should correct the situation disclosed by our review.
(B-146802, Apr. 2 4 , 1968.1
1
Department of the Air Force
In July 1968 we issued a report to the Congress on our
review of the acquisition by the Air Force of certain test,
launch, and tracking facilities for the TITAN I11 booster
program and a classified satellite program. We found that
these facilities had been acquired in accordance with the
original plans which had not been reevaluated and updated
despite indications that requirements, because of changing
circumstances, were substantially less than originally estimated. Had the plans been reevaluated and updated, we
believe that a substantial portion of the estimated costs
of about $26.3 million, incurred for the following facilities, could have been saved.
Rapid-launch, mobile features of the TITAN I11 launch
complex, Cape Kennedy, Florida--estimated construction
cost of about $23.8 million.
Basic data recording instrumentation and four storage
buildings, Edwards Air Force Base, Californiaestimated procurement and construction cost of about
$820,000.
Tracking and readout equipment installed prematurely
in Alaska--estimated cost of about $1.7 million to
maintain equipment in a caretaker status until needed.
In response to our findings and proposals for strengthening the planning procedures for facilities acquisition,
the Air Force advised us that it had recognized the problem
and was developing criteria specifications €or application
within its existing review system. The Director of Defense
Research and Engineering advised us that the Army and Navy
had reviewed their regulations and that the Navy would modify its existing procedures to provide additional safeguards.
2
We recommended that the Secretary of Defense take action to ensure that the procedures of the military departments limit the acquisition of facilities to those actually
needed to fulfill firm program requirements. On September 4 , 1968, the Director of Defense Research and Engineering replied to this recommendation on behalf of the Secretary of Defense. The Director stated that the Department
of Defense believed that existing procedures of the Army,
Navy, and Air Force were adequate if fully adhered to. He
stated also that the Air Force and the Navy were taking
steps to strengthen their existing procedures. (B-164027,
July 3, 1968.)
NEED FOR IMPROVEMENT IN COMPUTATION OF
REQUIREMENTS FOR MISSILE REPAIR PARTS
Department of the Army
Our review of requirements computations for expensive
missile repair parts by the Army Missile Command showed a
number of problem areas. In a report issued to the Congress in May 1968, we pointed out that these areas related
primarily to (1) inadequacy of asset and demand data received from user activities, ( 2 ) failure of inventory managers to accurately compile, review, and use historical
supply data, and ( 3 ) inconsistency in the implementation of
supply management procedures and guidelines. These problem
areas contributed to imbalances in the supply system. In
some instances underprocurements were made which could lead
to supply shortages. In other instances overprocurements
were made which could lead to excess material.
The Army agreed, in general, with our findings and
conclusions and initiated several corrective actions which,
we believe, should improve requirements computations.
(3-163706, May 27, 1968.)
3
PROCUREMENT PRACTICES AND
CONTRACT ADMINISTRATION
NEED FOR IMPROVEMENT IN CONTROL
Department of Defense
We found a need for the Department of Defense (DOD) to
improve its system of controls over Government-owned facilities, special tooling, and material in the possession of
contractors. Our review revealed weaknesses, in general,
with regard to effective use of industrial plant equipment;
rental arrangements; and accounting for, and control of,
special tooling and material. Certain aspects of the work
of Government property administrators and internal auditors
were also in need of improvement. Our report on these
findings was issued to the Congress in November 1967.
We made a number of proposals to improve the administration over Government-owned property. Actions taken or
planned in response to most of our proposals, if properly
implemented, should result in significant improvements in
the control and utilization of such property.
DOD did not fully agree with, or indicate any specific
corrective action on, our proposals to (1) require contractors to furnish machine-by-machine utilization data and to
obtain prior Office of Emergency Planning approval on an
item-by-item basis for the commercial use of industrial
plant equipment and (2) strengthen the controls over special tooling and special test equipment by use of financial
accounting controls. We recommended to the Secretary of
Defense that he reconsider DOD's position on these matters.
We also recommended to the Director, Office of Emergency
Planning, that prior approvals for planned commercial use
of industrial plant equipment be administered on a machineby-machine basis.
4
Subsequent to t h e i s s u a n c e of our r e p o r t , DOD a d v i s e d
us t h a t it had reconsidered i t s p o s i t i o n . DOD s t a t e d t h a t
a 3-month t e s t , s t a r t i n g on J u l y 1, 1968, would be made a t
20 c o n t r a c t o r l o c a t i o n s t o determine t h e f e a s i b i l i t y and
c o s t of maintaining machine-by-machine u t i l i z a t i o n r e c o r d s
and t h a t t h e Armed S e r v i c e s Procurement Regulation Committee would review t h e m a t t e r of f i n a n c i a l accounting cont r o l s over s p e c i a l t o o l i n g and s p e c i a l t e s t equipment. DOD
s t a t e d a l s o t h a t t h e O f f i c e of Emergency Planning was rev i s i n g t h e a p p l i c a b l e Defense M o b i l i z a t i o n Order i n o r d e r
t o t i g h t e n c o n t r o l s over commercial u s e of Government-owned
equipment and t o e n s u r e e q u i t a b l e r e n t a l s f o r such use.
(B-140389, Nov. 24, 1 9 6 7 . )
INCREASED COSTS TO THE GOVERNMENT
THROUGH LEASE RATHER THAN PURCHASE
OF LAND AND BUILDINGS BY CONTRACTORSDepartment of Defense
W e found t h a t t h s l e a s i n g by c o n t r a c t o r s of land and
b u i l d i n g s t o be used almost e x c l u s i v e l y i n t h e performance
of Government c o n t r a c t s r e s u l t e d i n g r e a t e r c o s t s t o t h e
Governnent than would have been t h e c a s e i f t h e f a c i l i t i e s
had been purchased by t h e c o n t r a c t o r s . Had t h e f a c i l i t i e s
been purchased, a c q u i s i t i o n c o s t s r e c o v e r a b l e by t h e cont r a c t o r s would have been l i m i t e d t o t h e amount of d e p r e c i a tion.
W
e reviewed t h i s m a t t e r a s i t r e l a t e d t o t h e land and
b u i l d i n g s a t 20 l o c a t i o n s of 1 7 major c o n t r a c t o r s . A s
pointed o u t i n our r e p o r t i s s u e d t o t h e Congress i n Octob e r 1968, t h e a d d i t i o n a l c o s t s t o t h e Government a r e s i g n i f i c a n t . The a d d i t i o n a l c o s t s could amount t o about
$55.8 m i l l i o n by t h e end of t h e i n i t i a l p e r i o d s of t h e
l e a s e s a t t h e l o c a t i o n s we reviewed. They could amount t o
a s much a s $99.3 m i l l i o n i f a l l renewal o p t i o n s of t h e
leases a r e exercised.
The d e c i s i o n t o lease o r purchase r e s t s w i t h t h e cont r a c t o r . However, because c o n t r a c t o r s stand t o g a i n by
l e a s i n g o r , i n some c a s e s , a t l e a s t avoid t h e r i s k a t t e n d a n t on ownership, we b e l i e v e t h a t c o n t r a c t o r s may be swayed
5
toward a course of action more costly to the Government
since equal treatment is accorded costs associated with
either course of action in negotiating profits and fees.
The weighted guidelines of the .Armed Services Procurement Regulation for the negotiation of contractors' profits
or fees do not make appropriate distinctLon between owned
and leased facilities and therefore do not offer any motivation to contractors to select the method of acquisition
most economical to the Government. We suggested to the Department of Defense that, in negotiating profits and fees,
consideration be given to the methods used by the contractor in acquiring real property for use under Government
contracts.
The Department of Defense is considering new guidelines
for negotiating profits and fees that will give consideration
'to the contractor's investment in facilities. (B-156818,
Oct. 23, 1968.)
NEED TO INCREASE CONPETITION
IN PROCUREMENT OF AERONAUTICAL
SPARE PARTS
Department of Defense
In response to the expressed interest of the Subcommittee on Economy in Government of the Joint Economic Committee, Congress of the United States, we made a Defensewide survey of the procurement of aeronautical spare parts.
Our report on this review was issued to the Congress in
June 1968. We found that problems which we had previously
identified as restricting competition in procurement continued to require management attention and correction. In
addition, many of the procurements reported by procuring
activities as having been made competitively had not, in
our opinion, been made under competitive conditions.
The Department of Defense advised us of the following
corrective measures.
1. Procedures were being revised to provide for earlier
reviews of items to determine whether they could be
procured competitively.
6
2. A management reporting system would be established
to document reasons for procurement without competition.
3. A means for coordinating interservice spare parts
procurement was under study.
4 . Rules for reporting procurement actions had been
revised.
5. Aggressive action would be taken to correct the
technical data deficiencies revealed by our survey.
On September 12, 1968, the Department of Defense advised us that it expected to be able to provide us with its
evaluation of the effectiveness of the corrective measures
by April 30, 1969. (B-133396, June 25, 1968.)
NEED TO INCREASE COMPETITION
IN PROCUREMENT OF COAL FOR
USE IN EUROPE
Department of the Army
We reviewed the procurement of anthracite coal by the
Army in fiscal years 1962 through 1967. The coal involved
was mined in the United States and was procured by the Army
from European importers under negotiated fixed-price contracts awarded on a competitive basis. Our report on this
review was issued to the Congress in June 1968.
We concluded that the competition was not sufficiently
effective to ensure the lowest price. The contractual
practices permitted the sources of supply to be limited almost entirely to one American exporter. The exporter, in
turn, procured the coal from only a limited number of prohave limited
ducers. Restrictive specifications may &a
competition.
The major anthracite suppliers have, under the provisions of the Webb-Pomerene Act, entered into agreements
among themselves to set prices and to allocate quantities
of coal for export and ultimate sale to the Army. The
7
general policy of most of the larger American anthracite
suppliers is to offer their coal only to a certain coal export company. This company advised us that it had purchased coal for the Army procurements only from members of
the Anthracite Export Association--an association representing the larger anthracite producers--although there were
other producers, not members of the association, that were
qualified to meet specifications of the Army.
Because of these arrangements, the company was the only
exporter in position to furnish enough coal to meet total
needs of the Army. Furthermore, the exporter's quotations
to European importers were conditioned on their purchasing
from the exporter all of their requirements for the Army
procurements. Members of the Anthracite Export Association,
when participating in these procurements, furnished statements that, under the provisions of the Webb-Pomerene Act,
they were not required to submit unqualified certifications
of independent price determination. Therefore, what little
competition existed was limited to the importer functions
where the costs generated--principally transportation costs-represented only a small fraction of the total cost of the
coal to the Army.
Also, we found considerable evidence that the Army's
specifications for ash content and ash-softening temperature might have been more restrictive than necessary and
might have limited competition.
In response to our findings, the Army stated that, for
the fiscal year 1969 procurement, offerors would not be
permitted to claim exemption under the Webb-Pomerene Act
from certifying that prices proposed were arrived at independently. The Army stated also that t e s t s were being conducted by the Bureau of Mines to determine the minimum
quality of coal which could be used economically in Europe
and that the results of the tests would be considered in
the specifications for the fiscal year 1970 procurement.
On August 7, 1968, the Army advised us of certain additional steps it had taken to increase competition in the
procurement of anthracite coal €or use in Europe. These
steps included strengthening the language in the certificate of independent price determination to be signed by
8
o f f e r o r s and r e l a x i n g t h e a s h c o n t e n t s p e c i f i c a t i o n s ,
(B-159868, June 4 , 1968.)
POTENTIAL SAViNGS I N PROCUREMENT OF
PETROLEUM PRODUCTS FOR USE BY CONTRACTORS
Department of t h e Navy
Our review showed t h a t s u b s t a n t i a l annual savings
could b e r e a l i z e d i f t h e Navy would f u r n i s h t o i t s contract o r s t h e petroleum products used by them i n t h e t e s t i n g of
a i r c r a f t and a i r c r a f t engines i n s t e a d of p e r m i t t i n g t h e
c o n t r a c t o r s t o supply these products a s a p a r t of t h e i r
contracts.
Our review was made a t three p l a n t s where estimated
requirements represented about 86 percent of t h e t o t a l petroleum needs of Navy a i r c r a f t and a i r c r a f t engine contract o r s . As s t a t e d i n our r e p o r t issued t o t h e Congress i n
February 1968, we estimated t h a t during 1964 t h e Navy paid
two of t h e c o n t r a c t o r s about $229,000 more f o r such produ c t s than i t would have paid i f t h e products had been f u r nished t o t h e c o n t r a c t o r s . We estimated t h a t about $250,000
and about $400,000 could have been saved i n 1965 and 1966,
respectively.
With regard to t h e t h i r d c o n t r a c t o r , our review showed
t h a t t h e c o n t r a c t u a l arrangements i n e f f e c t were d i f f e r e n t
and t h e c o s t d i f f e r e n t i a l was considerably less.
The Navy advised us t h a t , i n t h e c a s e of one of t h e
c o n t r a c t o r s , s u b s t a n t i a l savings might be r e a l i z e d and t h a t
n e g o t i a t i o n s were t a k i n g p l a c e t o change t h e c o n t r a c t u a l
treatment of t h e s e products.
The Navy s t a t e d t h a t , with regard t o t h e second cont r a c t o r , t h e savings would b e small and t h a t i t was t o t h e
o v e r a l l advantage of t h e Government f o r t h e c o n t r a c t o r t o
continue t o f u r n i s h the’petroleum products. Although t h e
p o t e n t i a l savings were not s u b s t a n t i a l , t h e Navy should
consider n e g o t i a t i n g new arrangements with t h e c o n t r a c t o r .
9
We therefore recommended that, in the case of the second contractor and other contractors under similar conditions, the Navy consider negotiating new contractual arrangements. The Navy concurred. (B-160334, Feb. 6, 1968.)
NEED FOR IMPROVEMENT IN
ADMINISTRATION OF CONTRACTS
FOR RESEARCH STUDIES
Department of the Army
We found that, of the 11 study reports submitted by a
contractor under three research study contracts, seven were
considered by the Office of Civil Defense, Department of
the Army, t o be less useful than had been expected or t o
require major revision. Our report on these findings was
issued t o the Congress in March 1968.
We recognized that contracting for studies of this
type was relatively new and involved uncommon questions.
However, it was our belief that the Office of Civil Defense
could improve its administration of such contracts and
thereby obtain study reports that would furnish the information sought.
The improvements which we considered to be needed involved more specific statements of the scope of work t o be
performed; more effective monitoring of studies; more frequent, timely, and complete progress reports from the contractor; and written records of agreements with contractor
personnel. The Office of Civil Defense has taken steps t o
improve its procedures in these areas. (B-133209, Mar,25,
1968.
10
STOCK RECORDS AND CONTROLS
NEED FOR IMPROVEMENT IN MANAGEMENT
OF SUPPLIES IN VIETNAM
Department of the Army
We reviewed certain aspects of the Army's management
of supplies in the Republic of Vietnam, Our report on the
review was issued to the Congress in June 1968. In our
opinion, the Army supply system had been responsive to the
combat needs of the military units in Vietnam despite adverse conditions, The high level of support had been
achieved, however, through costly and inefficient supply
procedures.
The Army had recognized many of its supply management
problems and had initiated certain corrective actions prior
to the time of our review. We noted, however, areas which,
in our opinion, warranted additional management attention
as follows:
1. The development of accurate data relating to stocks
on hand and consumed in order to facilitate determinations of supply requirements and preclude imbalances of stock.
2. The identification and redistribution of the large
quantities of excess material now in Vietnam.
3 . The development of programs which will ensure the
prompt return of repairable components to the supply system.
4 . The institution of procedures designed to increase
both intraservice and interservice utilization of
available supplies.
5. The enforcement of greater supply discipline in
order to reduce to a minimum the costly shipment
of supplies under high-priority requisitions.
Although the Army agreed with our findings, it did not
agree with certain of our proposals f o r improved procedures.
We recognized that the management emphasis being applied by
the Army would tend to improve supply discipline and help
to correct the problems. We believed, however, that such
emphasis by itself was not sufficient. Therefore, we recommended to the Secretary of the Army-that certain of our
proposals for improved procedures be reconsidered. On October 8 , 1968, the Office of the Assistant Secretary of the
Army (Installations and Logistics) advised us that the Army
was taking steps to implement our proposals. (B-160763,
June 21, 1968.)
NEED FOR IMPROVEMENT IN REPORTING
INVENTORIES OF NONEXPENDABLE EQUIPMENT
Department of the Air Force
Our follow-up review showed that, although the Air
Force had, since our earlier review (report issued to the
Congress in June 1961), significantly improved its procedures for the management of nonexpendable equipment, there
was a need for further improvement in management controls
over the two major elements of the equipment management
system--the validity of authorizations and the accuracy of
reported inventories of in-use equipment.
As stated in our report issued to the Congress in December 1967, we found that incomplete inventory information
was reported and used in the fiscal year 1966 requirements
computations. Our review showed that equipment valued at
about $44 million was neither reported for use in computing
requirements nor otherwise accounted for. We found also
that the practices followed at the base level in taking
physical inventories did not provide the necessary controls
to ensure that all assets would be counted and that the
same assets would not be counted twice,
Our review of the data used in computing fiscal year
1966 procurement requirements showed that, of the $65 mil-
lion worth of computed requirements, over $8 million worth
was not needed and, of the remaining $57 million worth about
$20 million worth was questionable. Me discussed this with
Air Force officials and, as a result, the requirements for
several high cost items were recomputed and about $3 million
worth of planned procurement was canceled.
12
The Air Force generally concurred in our findings and
proposals for improvements in the equipment management system. We were advised of actions either taken or planned to
ensure closer adherence to prescribed procedures for forecasting and controlling equipment authorizations. We were
advised also that the Air Force intended to study the feasibility of incorporating additional data into its computer
programs for managing nonexpendable equipment to provide a
basis for periodic verification and reconciliation of reported inventories of in-use equipment. (B-133361, Dec. 5,
1967.)
NEED FOR IMPROVEMENT IN THE
SUPPLY MANAGEMENT DATA SYSTEM OF
THE ARMY TANK-AUTOMOTIVE COMMAND
Department of the Army
The Army Tank-Automotive Command (TACOM) has the mission of providing tank and automotive vehicles and repair
parts for all the military services in the United States and
overseas. As a part of our continuing program of review of
management activities at TACOM, we examined into supply management, giving particular attention to problems in its computerized supply management data system. Our report on the
examination was issued to the Congress in September 1 9 6 8 .
For several years, TACOM has been unable to achieve
the desired levels of supply support. During the period
February 1965 to November 1 9 6 7 , for example, stock requisitions filled on time ranged between 33 and 7 8 percent compared with the objective of 85 percent established by the
Army Materiel Command. In November 1 9 6 7 , only about 46 percent of the requisitions were filled on time.
The situation stemmed primarily from the presence of
inaccurate data in the computerized supply management records. Although TACOM and higher command officials had recognized the seriousnesq of this problem and had taken action
to improve the accuracy of the data, these efforts generally
had been unsuccessful. A 1967 study showed, for example,
that about $94 million worth of material recorded as duein had, in fact, been received and that about $83 million
worth of material had been received but had never been
13
recorded as due-in. These conditions can cause inventory
managers to either procure unneeded supplies or fail to procure needed supplies.
In our opinion, the prime factor retarding improvement
of supply support effectiveness has been the lack of coordination, evaluation, and follow-up efforts to clear up the
computerized supply management records. Other factors--imposition of additional workloads, major reorganizations,
and saturation of computer capacity--also have had an adverse
effect
.
We proposed that the Secretary of Defense establish a
coordinated supply management program at TACOM to
--Improve supply records.
--Prevent additional invalid data from entering the
records.
--Review additional workloads or special programs to be
imposed on TACOM to prevent unnecessary interference
with the current management improvement program.
--Establish measures to maintain organizational stability at TACOM and to prevent the constant movement of
experienced supply personne1.
--Review the use being made of the existing automatic
data processing equipment with the objective of eliminating or reducing lower priority projects so that
the equipment can be used f o r matters vitally in need
of correction.
The Army, in its reply on behalf of the Secretary of
Defense, agreed with these proposals and stated that actions
in keeping with the proposals either had been already taken
or were planned. (B-146772, Sept. 23, 1968.)
14
NEED FOR IMPROVEMENT IN THE RECORDS
USED IN MATCHING REQUIREMENTS AGAINST
AVAILABILITY OF STOCK AND EFFECTING
REDISTRIBUTION
DeDartment of Defense
We examined into the effectiveness of the automated
centralized screening system, maintained by the Department
of Defense (DOD), for matching material available at various
of its locations with the material needs of other locations.
The system includes a master screening file of information
on the needs and the availability of material maintained by
the Defense Logistics Services Center on the basis of periodic reports submitted by inventory control points. Our report on the examination was issued to the Congress in May
1968.
Although this system has greatly benefited DOD, we
found that certain improvements could make the system more
effective.
As operated at the time of our examination, the system
depended on the voluntary cooperation of the organizations
involved. We found many instances where inventory control
points had not reported the necessary information or had
reported information which was not accurate or current. It
appeared to us that there was a need for an organization
vested with the responsibility for ensuring that DOD organizations followed prescribed operating policies and procedures.
We recommended that, since the responsibility for establishing basic policies related to the centralized screening system is vested in the Office of the Assistant Secretary of Defense (Installations and Logistics), the Secretary
of Defense assign to that organization the responsibility
for surveillance of the system.
On August 6 , 1968, DOD advised us that it considered
our recommendation to be an excellent one but, in view of
certain actions already taken, had decided that adoption of
the recommendation was not necessary. DOD cited the actions
which, in its opinion, would achieve the objectives of our
recommendation. (B-163478, May 14, 1968.)
15
NEED FOR IMPROVEMENT IN CONTROL
OVER REPAIRABLE SPARE PARTS
Department of the Army
Our review of about 12,000 issues o f spare parts at
seven Army installations that should have resulted in the
return of a like quantity of unserviceable parts showed
that some 70 percent of these parts were not returned to
maintenance activities for repair and reissue. The principal reasons, as stated in our report issued to the Congress
in January 1968, were (1) incorrect and inconsistent recoverability codings in publications issued by the National Inventory Control Points and (2) inaction by supply activities to
obtain the return of repairable items.
The Department of the Army concurred in our findings
and took action to improve its management of repairable
spare parts. These actions, if properly carried out, should
improve substantially the recovery of repairable items.
(B-146874, Jan, 23, 1968.)
NEED FOR IMPROVEMENT IN CONTROL
OF STOCK LEVELS OF NONSTANDARD
AERONAUTICAL REPAIR PARTS
Department of the Navy
In May 1968 we issued a report to the Congress on our
review of the Navy's management of the manufacture of nonstandard aeronautical repair parts at four naval air stations, We found that as much as 80 percent of the dollar
value of these items on hand at the four stations were excess. The excess stock on hand amounted to about $3.7 million. In addition, we found that these four stations had
disposed of about $2.2 million worth of excess quantities
of such stock during the period July 1, 1963, to March 31,
1966.
We proposed that the Navy review its management o f nonstandard aeronautical repair parts and develop realistic
criteria to govern manufacturing and stocking and that per i o d i c follow-up reviews be made to ensure adherence to these
14
criteria. The Navy agreed and advised us of specific actions
which, we believe, should prevent the future accumulation of
excess nonstandard aeronautical repair parts. (B-133396,
May 21, 1968.)
17
SUPPLY MANAGEMENT, GENERAL
NEED FOR IMPROVEMENT IN THE
PROCESSING OF STOCK REQUISITIONS
Department of Defense
In a prior review of the ability of the military supply systems to respond to increased demands, we observed
that the manner in which supply requisitions were processed
under the Military Standard Requisitioning and Issue Procedures (MILSTRIP) system precluded realization of the maximum benefits of the system. Therefore we undertook a limited examination, at selected installations of the Army,
Navy, and Air Force, of the processing of requisitions under the MILSTRIP system. Our report on the examination was
issued to the Congress in September 1968.
The MILSTRIP system is designed to
--Provide uni€ormity of procedures for all requisitioners and suppliers of stock,
--Meet essential requirements of all the military services.
--Provide for interservice supply transactions and intraservice supply-support operations.
--Accommodate the requisitioning on stocks of the General Services Administration.
We found that MILSTRIP had improved the processing of
requisitions. Maximum benefits of MILSTRIP had not been
realized, however, because large numbers of requisitions
contained erroneous or incompatible data and could not be
processed routinely. A s a result, many of the requisitions
were returned to the originators for additional information
or revision and resubmission. Resubmission of requisitions
is time consuming, causes significant delays, and reduces
supply-support effectiveness
.
The primary causes of erroneous or noncurrent information on requisitions, in our opinion, were
--Preparation of requisitions by untrained and inadequately supervised individuals.
--Inadequate review of requisitions before forwarding
them to the next higher supply level.
--Absence of current and compatible catalog data at
various supply levels.
We also found that the Defense Supply Agency (DSA) had
not fully carried out its responsibility for surveillance
of MILSTRIP. Surveillance by the DSA on a systematic basis
could have identified the problems so that appropriate corrective actions could have been taken.
The Department of Defense agreed generally with our
findings and proposals for corrective measures. The Department stated that its directive on MILSTRIP had been revised to define responsibilities more explicitly and that a
study was being made of the requirement for, and the frequency o f , catalog changes. The Department stated further
that, pending completion of the study, a moratorium had
been declared on unit-of-issue changes. (B-164500
Sept. 17, 1968.)
NEED FOR IMPROVEMF,NT IN SUPPLY MANAGEMENT
OF MAGNETIC COMPUTER TAPE
Department of Defense
At June 30, 1967, the Federal Government operated
about 3,700 computers at various locations throughout the
world. The Government has accumulated over 10 million reels
of magnetic tape, valued at about $200 million, to serve
these computers. The magnetic tape inventory of the Department of Defense--about 6 million reels valued at about
$125 million--is about 60 percent of the Government-wide
total.
We reviewed the practices of the Department of Defense
in the procurement, use, and disposition of its magnetic
computer tape. Our report on the review was issued to the
Congress in September 1968.
There is a need for the Department of Defense to centralize its management of magnetic tape. Although the Department has generally established centralized controls
over its automatic data processing operations, it has, in
our opinion, given inadequate attention to similar controls
over its magnetic tape activities. At the time of our review, the Air Force was the only service that had centralized its management of magnetic tape activities.
We found that, in the absence of centralized management, local military commands had
--Computed tape requirements without adequate knowledge of the quantity or condition of the tape on
hand.
--Procured tape with little regard to quantity discounts and other advantages of centralized procurement.
--Accumulated large quantities of used tape without
testing or attempting to rehabilitate it for further use.
We found also that in some cases no specific instructions had been established for determining when tape was
unserviceable, for disposing of unserviceable tape, or for
reporting and screening serviceable excess tape for possible
use by others.
The Department of Defense was in general agreement with
our proposals for corrective action. The Department advised us that
--Action had been taken to screen tape for reuse.
--Consideration would be given to the feasibility of
consolidating tape procurements throughout the Department.
20
--Studies would be made on the need for a uniform
method of computing requirements for tape and the
need for guidance in the control and use of tape.
(B-164392, Sept. 18, 1968.)
NEED FOR I M P R O ~ N TIN FUNDING PRACTICES
AFFECTING PROCUREMENT OF SPARE PARTS
Department of Defense
In a prior review of the ability of the military supply
systems to respond to increased demands, we observed that
some supply-support problems were apparently the result of
the practice of releasing procurement funds on a piecemeal
basis. Therefore we undertook a.lirnited examination into
the effects of such funding practices on the procurement of
aeronautical spare parts by the Air Force. Our report on
the examination was issued to the Congress in August 1968.
We found that in fiscal years 1966 and 1967 the Department of Defense released funds to the military departments on a piecemeal basis. The Air Force, in turn, released funds to its procurement centers on a piecemeal bas i s and without advance notice as to the amounts that would
be made available or when they would be made available.
The funds made available to the procurement centers
were less than the funds needed to cover computed requirements. The incremental funding created additional difficulties for the procurement centers in their management of
the limited funds in that
--Spare parts could not be purchased in larger, more
economical quantities.
--Prices were increased by contractors because of delays in placing orders.
--Administrative costs of procurement were increased
because of additional paperwork.
--Procurement on a piecemeal basis increased the likelihood of shortages of spare parts which could ad=
versely affect the operational readiness of aircraft.
The Assistant Secretary of Defense (Comptroller) stated
that the numerous fund releases in fiscal years 1966 and
1967 were neither desirable nor economical but were necessary under the then-existing circumstances. Further, we
were informed that the Air Force attempted in fiscal year
1968 to reduce the number of separate fund allocations to
the Air Materiel. Areas, We were informed also that the
other military departments pursued the same objective and
that the Office of the Secretary of Defense was cooperating
in every way possible.
We pointed out that similar conditions could recur and
could again necessitate close fund control and incremental
releases of funds, We recommended that, in that event,
consideration be given by the Department of Defense and the
military departments to the additional costs and other adverse effects of incremental fund releases and that efforts
be made to reduce the practice to a minimum. We recommended
a l s o that as much information as possible be furnished to
inventory management activities as to amounts of funds that
will be available and the probable release dates to facilitate the planning of their procurement programs. (B-164301,
Aug. 27, 1968.)
POTENTIAL SAVINGS THROUGH INCREASED
E W P I N G O F A I R C W T TIWS
Department of Defense
We found that the Air Force and Navy do not recap aircraft tires as extensively as commercial airlines do because of arbitrary restrictions on the number of times a
tire may be recapped and, in the case of the Navy, because
of ineffective administration of the tire recapping program. The Army has not established a program for recapping
aircraft tires,
In our report issued to the Congress in February 1968,
we pointed out that the use of recapped aircraft tires often saves as much as 50 percent of the cost of new tires
and--as shown by the practices of the commercial airlinesis consi.dered consistent with safety requirements.
22
We found that all three services could realize significant savings by recapping aircraft tires more extensively.
These savings could be as much as $1,650,000 annually for
the Air Force and the Navy. If it were found to be practicable to increase the recapping of tires for high-speed and
jet aircraft, substantial additional savings could be realized.
The Air Force and Navy advised us of actions taken or
planned to increase the effectiveness of their respective
aircraft tire recapping programs.
We recommended that the Secretary of Defense issue
policy guidance to the military departments relative to the
recapping of aircraft tires. We recommended further that
the Department of Defense periodically review the recapping
policies and procedures established by the military department s.
The Department of Defense advised us in April 1968
that it had established a study group which comprised representatives from the military departments to develop criteria and policies for uniform application. (B-146753,
Feb. 1, 1968.)
23
POTENTIAL SAVINGS THROUGH ELIMINATION
OF DUPLICATE INVENTORIES
Department of the Navy
We reviewed the Navy's practice of stocking, for further distribution, material which is normally procured,
stocked, and distributed to Government organizations by the
General Services Administration (GSA). Our .report on this
review was issued to the Congress in May 1968. On the basis of our review, we concluded that Navy wholesale inventories, and similar GSA inventories held for Navy use, unnecessarily duplicated each other and resulted in duplicate
management and warehousing functions in the Government supply system as a whole.
We concluded that inventories valued at about $8.5 million, and related management and warehousing functions,
could be eliminated from the wholesale stocks of either the
Navy or GSA. T o the extent that duplication of stock could
be eliminated, the Government would realize not only increased efficiency in stock management, but also annual
savings of up to $940,000. We suggested that, for those
items stocked by GSA, the Navy overseas stock points, supply ships, and fleet activities within the continental
United States waters requisition their requirements directly from GSA.
The Navy did not believe that this would be feasible
with respect to overseas stock points and supply ships but
did agree to review the existing arrangements for supply
support. GSA expressed the opinion that the procedure of
direct requisitioning from GSA was the most economical
method of supply support except in those cases where the
volume of issues warrants the shipment of wholesale quantities direct from the manufacturers to the Navy.
We recommended that the Secretary of Defense and the
Administrator of the General Services Administration
jointly establish a working group to formulate the necessary policies and procedures for a supply-support system
which will eliminate the duplications cited in our report.
On May 22, 1968, the General Services Administration adv i s e d us that it had informed the Department of Defense of
its readiness to establish -sucha group. On July 23, 1968,
the Department of Defense advised us tha-tit concurred in
this approach to the problem. (B-146828, May 16, 1968.)
POTENTIAL SAVINGS THROUGH ELIMINATION
OF UNECONOMICAL SHIPMENTS OF STOCK
Department of the Air Force
Our review of the Air Force system f o r redistributing
excess parts and other material from Air Force bases to
supply depots showed that, during the last 3 months of
1966, three Air Force supply depots received over 370,000
such shipments. In our report issued to the Congress in
January 1968, we pointed out that over 125,000, or about 34
percent, of these shipments were uneconomical for two reasons. They involved material with which the Air Force was
already well supplied or was in an excess position or material with a value less than the costs incurred for its return.
We estimated that the packaging, handling, and other
administrative costs incurred in connection with the uneconomical shipments totaled about $1.3 million for the
3 months.
In general, the uneconomical shipments were made because (1) the Air Force screening of items reported as excess did not include a determination of stock-level status
of all the items before authorization of their return,
( 2 ) unserviceable items were returned without a determination as to whether there was sufficient serviceable material in Air Force stocks, and (3) the Air Force redistribution system did not provide for the identification of items
valued at less than shipping costs.
After we brought these matters to its attention, the
Air Force took certain actions to effect improvements.
These actions included establishment of retention levels
for excess stocks at Air Force bases, revision of criteria
for shipment of low-value items, and initiation of surveys
by the Air Force Auditor General. The Air Force expressed
the belief that these actions would effectively eliminate
the problem. (B-133019, Jan. 22, 1968.)
2%
POTENTIAL SAVINGS THROUGH REPAIRING
RATHER THAN SCRAPPING UNSERVICEABLE
SPARE PARTS
Department of the Air Force
Air Force regulations provide for the return of certain unserviceable items to designated depots for repair if
they cannot be repaired at the Air Force base level. However, the regulations permit the bases to condemn the items
as scrap if (1) they are beyond repair, (2) repair costs
exceed 65 percent of replacement cost, or ( 3 ) their condemnation is specified by applicable technical orders. During
6 months of 1967, Air Force bases condemned about $6.7 million worth of the type of items designated for repair at
the depots managed by the three Air Materiel Areas included
in our review. The condemnation of a substantial portion
of these items was based on determinations that repair costs
were excessive in relation to replacement cost.
We tested 78 items that had been condemned at five
bases and found that 51 of them could have been repaired
for amounts significantly less than replacement cost. Many
of the condemned items were in short supply and, in some
cases, action had been taken to procure additional items.
These findings were presented in a report issued to the
Congress in October 1968.
The primary reason for improper condemnation was that
maintenance personnel at the bases had made their determinations without adequate knowledge of depot repair costs,
procedures, and capabilities. We proposed that the Air
Force regulations be revised to require the bases to return
the items to the depots unless the bases have been advised
that the items are (1) not needed in Air Force stocks,
( 2 ) obviously beyond repair, or ( 3 ) authorized for disposition under Air Force technical orders.
The Air Force advised us that its analyses indicated
that the magnitude of improper condemnations did not warrant instructing the bases to return such items to the depots. The Air Force stated, however, that certain revisions were being made in existing regulations to require
(1) the reporting of cost data to, and approval of the cost
26
d a t a by, t h e i t e m managers p r i o r t o condemnation of i t e m s
by t h e b a s e s and ( 2 ) e s t a b l i s h m e n t of a review board a t
each base t o m a i n t a i n s u r v e i l l a n c e over condemnations based
on c o s t c r i t e r i a .
W e were of t h e o p i n i o n t h a t t h e s p e c i a l i z e d r e p a i r act i v i t i e s a t t h e d e p o t s were t h e only o r g a n i z a t i o n s q u a l i f i e d t o e s t i m a t e t h e c o s t s t o r e p a i r i t e m s f o r which they
were r e s p o n s i b l e , and f o r t h a t reason the a c t i o n taken by
t h e A i r Force would only s e r v e t o reduce b u t would n o t p r e v e n t improper condemnation of r e p a i r a b l e i t e m s . We t h e r e f o r e recommended t h a t t h e A i r Force r e c o n s i d e r our proposal.
The A i r Force s t a t e d t h a t a program was being i n i t i a t e d t o
s h i p s e l e c t e d i t e m s , s e l e c t e d on t h e b a s i s of d o l l a r v a l u e ,
t o t h e s p e c i a l i z e d r e p a i r a c t i v i t i e s f o r t h e purpose of de( B - 1 4 6 8 7 4 , Oct. 2 3 , 1968.)
termining t h e i r r e p a i r a b i l i t y .
POTENTIAL SAVINGS THROUGH REUSE
OF SHIPPING CONTAINERS
Department of t h e A r m y
A s s t a t e d i n our r e p o r t i s s u e d t o t h e Congress i n Febr u a r y 1968, w e found a need f o r improvement i n t h e Army's
procedures f o r making shipping c o n t a i n e r s a v a i l a b l e t o manu f a c t u r e r s of e l e c t r o n i c equipment f o r shipment of newly
prodrzced e l e c t r o n i c equipment. U s e of Government-furnished
shipping c o n t a i n e r s would reduce procurement c o s t s . Reusa b l e c o n t a i n e r s were n o t being f u r n i s h e d t o t h e c o n t r a c t o r s
because Army procedures d i d n o t r e q u i r e procurement and
supply personnel t o c o o r d i n a t e t h e i r e f f o r t s and i d e n t i f y
c o n t a i n e r s a v a i l a b l e i n t h e supply system.
The Army concurred, i n g e n e r a l , w i t h our f i n d i n g s and
p r o p o s a l s and r e v i s e d i t s a p p l i c a b l e r e g u l a t i o n t o r e q u i r e
a l l n a t i o n a l inventory c o n t r o l p o i n t s t o e s t a b l i s h proced u r e s and c o n t r o l s t o e n s u r e maximum use of r e u s a b l e cont a i n e r s for a l l t y p e s of equipment.
The Department of Defense informed u s t h a t t h e m i l i t a r y departments and t h e Defense Supply Agency had been d i r e c t e d t o review t h e i r procedures f o r management of r e u s a b l e
c o n t a l n e r s and t o c o r r e c t any d e f i c i e n c i e s . (B-146917,.
Feb. 1 5 , 1968.)
27
EQUIPMENT MANAGEMENT, GENERAL
NEED FOR IMPROVEMENT IN MANAGEMENT
OF INACTIVE INDUSTRIAL EQUIPMENT
Department of the Army
In May 1968 we issued to the Congress a report on our
review of inactive industrial plant equipment--such as woodworking and metalworking machines, crane and crane shovel
attachments, compressors, power and hand pumps, and electric
motors-in Army arsenals. We found that millions o r dollars
worth of equipment had been permitted to lie idle in Army
arsenals for periods up to 10 years while similar equipment
had been purchased for use elsewhere in the Department of
Defense.
The Department of Defense agreed that there had been
instances of Army retention of inactive industrial plant
equipment €or considerable lengths of time and stated that
Army regulations relating to authorization for retention of
such equipment for current and mobilization needs were being
revised. We believe that the actions of the Departments of
Defense and of the Army should substantially reduce the
quantities of unused and unneeded equipment at the arsenals.
(5-163691, May 23, 1968.)
HEED FOR IMPROVEMENT IN MANAGEMENT
OF MISSION-SUPPORT AIRCRAFT
Department of the Army
We evaluated the management of the aircraft used by the
Army to maintain readiness proficiency for combat flying and
for administrative purposes. Our report on the evaluation
was issued to the Congress in May 1968. We found that,
based on recent flying experience and the utilization criteria established by the Departments of Defense and of the
Army, the number of aircraft authorized at the locations we
reviewed was about 25 percent more than the justifiable requirements. We believe that the overauthorizations resulted
from the incomplete criteria and procedures prescribed and
used for determining aircraft requirements and from
28
insufficient evaluation o f the justifications for aircraft
submitted by the user organizations.
We found also that the utilization of some military
aircraft was uneconomical and incorisistent with the transportation and traffic management policies of the Department
of Defense. Furthermore, at most of the locations we reviewed, effective management and control over the use of
aircraft for mission-support purposes was, in our opinion,
lacking. The procedures in effect at the time of our review
generally did not provide for a determination, although required by Department of Defense policy, of whether use of
commercial or other means of transportation would be practicable and more economical.
We recommended that the Army establish an effective
integrated system for managing aircraft for mission-support
purposes and outlined the elements which we believe should
be included in such a system. The Army agreed, in general,
with our recommendations and cited actions already taken and
being developed toward that end. (B-163453, May 10, 1968.)
NEED FOR IMPROVEMENT IN MANAGEMENT
OF TRACTOR-TRAILER FLEET IN EUROPE
Department of the Army
In January 1968 we reported to the Congress our findings in a review of the Army's management and utilization
of highway transportation equipment in Europe. We pointed
out that management procedures of the 37th Transportation
Group were inadequate. We found that (1) daily inventory
reports were insufficient to monitor the status and location
of its trailers at all times, (2) control units were not
making the required analyses of equipment use, and (3) full
use of available equipment would have avoided the hiring of
commercial carriers at substantial increase in costs.
There were also indications that costs were increased
unnecessarily because Army European commands failed to
promptly unload trailers and report them as available for
further use.
29
The Army took corrective action in accordance with all
but one of our proposals. We believed that action should
have been taken on that proposal and, accordingly, we recommended that available refrigerated equipment be transferred and utilized to the maximum extent possible f o r the
transportation of frozen food products. Subsequent to the
issuance of our report, the Army advised us that it concurred in this recommendation. (B-162771, Jan. 3 0 , 1968.)
30
ADMINISTRATION OF MANPOWER MATTERS
POTENTIAL SAVINGS THROUGH CONVERSION
OF W A L L Y OPERATED FURNACES
TO AUTO-WTIC-TYPE HMTING UNITS
Department of Defense
We reviewed costs of operating heating units of the
types generally used at military bases to heat single buildings. We found that costs could be reduced several million
dollars annually at Army and Air Force installations if
manually operated furnaces were converted to automatic-type
heating units, Such conversions at the 12 military installations covered in our review could reduce costs about
$3.5 million each year, primarily by releasing military personnel for other duties. These findings were stated in our
report issued to the Congress in December 1967.
Department of Defense officials expressed the opinion
th2t (1) there could be no actual reduction of military personnel requirements if the function were eliminated since
no personnel spaces had been authorized for this function,
(2) the Congress was reluctant to support requests for fuel
conversion, ( 3 ) military labor should not be considered an
economic factor in fuel conversions except where such labor
was permanently assigned to the installation engineer and a
reduction in strength could be made, and ( 4 ) these duties
were usually performed as an additional duty or by transient
personnel. We found, however, that the majority of the military personnel used to fire furnaces were on the job full
time for 30 days or longer.
However, the Department of Defense requested the Army
and Air Force to make a study of this matter, including a
comprehensive review of all small hand-fired heating systems
using either military or civilian firemen. On September 8,
1968, the Department reported to us on the progress of the
study. The Department stated that the study showed that
there were 8,053 heating systems in the Army and Air Force
which were hand fired by military or civilian firemen, that
4,059 of them had thus far been tentatively selected for inclusion in a conversion program, and that the study was
continuing.
In view of the need to achieve the most efficient and
effective utilization of military manpower in assignments
requiring military skills and to realize the economies possible through conversion of manually operated, coal-heating
units to automatic gas- or oil-heating units, we suggested
in our report that the Congress may wish to inquire into the
practice of using military labor to perform the function of
tending furnaces. (B-160931, Dec. 27, 1967.)
NEED FOR IMPROVEMENT IN ADMINISTRATION
OF MILITARY PAY AND ALLOWANCES
Department of Defense
Our report on an earlier review, issued to the Congress
in April 1963, presented our findings of significant overpayments and underpayments of military pay and allowances
and our recommendations for improving the administration of
military pay and allowances. Our report on a follow-up review, issued to the Congress in April 1968, presented our
findings that serious deficiencies in administration still
exist. The main cause continues to be the use of inexperienced and untrained clerks and supervisors in the local disbursing and personnel offices.
The Department of Defense and the military services had
taken a number of actions which had improved the administration of military pay and allowances in some areas. A l s o ,
the Department of Defense is implementing its Joint Uniform
Military Pay System (JUMPS), a system for maintaining military pay and leave accounts by electronic data processing
equipment and techniques at one central site for each military service. However, most of the input data in this s y s tem will originate at the local office level where we found
inexperienced and untrained clerks and supervisors. Further
efforts in correcting existing weaknesses in training and
staffing at local levels should therefore be made to ensure
the most accurate input possible and the effective operation
of the new system.
Errors in basic allowance for subsistence for enlisted
men accounted for about 30 percent, or the largest category,
of errors we found. We believe that there is a need for a
change in legislation to place basic allowance for
32
subsistence for enlisted men on a monthly rate basis rather
than the present daily rate basis. In our opinion, this
would reduce the administrative burden and the administrative costs of handling the large volume of transactions and
could substantially reduce the number of errors in making
payments. The Department of Defense stated that it is considering a proposal for a legislative change. (B-125037,
Apr. 2, 1968.)
NEED FOR IMPROVEMENT IN MANAGEMENT
OF DETAILING OF CIVILIAN EMPLOYEES
Department of Defense
In April 1968 we issued a report to Congressman John E.
Moss on an investigation, made at his request, of the practices at McClellan Air Force Base in detailing (assigning)
civilian employees to work on other than their regular jobs.
Our findings at McClellan led us to an expanded review at
10 industrial-type military installations in the Department
of Defense (DOD). A report on this review was issued to the
Congress in November 1968.
The basic law provides that the head of an executive
department or a military department may detail employees
among the bureaus and offices of his department, except
those employees required by law to be exclusively engaged
on some specific work. Records of details in excess of 30
days are required to be maintained permanently in the official personnel records. We found many instances where large
numbers of employees were being "loaned" or "borrowed" between shops for extended periods in excess of 30 days without appropriate personnel action to credit the individuals
€or the time involved and instances where details either
were not recorded or were improperly recorded.
Details in excess of 6 months (now 120 days) are required to be approved by the local office of the Civil Service Commission. We found many instances where the required
approvals were not being obtained. We found instances also
of employees' being detailed to higher and lower grade positions and instances of temporary promotions to fill vacancies.
33
We found little evidence that internal audit and review
staffs of the military departments or the Civil Service Commission inspection teams had found these types of deficiencies or that, if they did, they had identified the causes
and made appropriate recommendations.
The Secretary of Defense and the Chairman, Civil Service Commission, agreed, in general, with our suggestions
for corrective measures. DOD outlined to us the actions
that would be taken in each of the military departments and
the Defense Supply Agency, advised us that DOD would provide
surveillance over the actions, and stated that we would be
kept advised of the progress. The Civil Service Commission
advised us that it would issue further guidelines to its inspectors to ensure more specific coverage of detailing in
their inspections. We requested that we be furnished a copy
of the guidelines when issued. (B-160879, Nov. 15, 1968.)
POTENTIAL SAVINGS TJBOUGH USE OF
CIVIL SERVICE PERSONKEL IN LIEU OF
CONTRACT PERSONNEL
Department of the Air Force
Our review confirmed Air Force studies--undertaken
after we issued a report to the Congress in January 1966 on
our survey of research management functions at the Air Force
Cambridge Research Laboratories--which showed that savings
would be realized if some of the research functions performed by contractors were performed by civil service personnel. The savings would result primarily from reduction,
or elimination, of overhead costs and of profits paid to the
contractors. Our report on the review was issued to the
Congress in November 1967.
The Air Force study of contracts for services at the
Laboratories--costing about $3 million annually--showed a
savings potential of $750,000 a year. The amount of the
savings, however, would be less than estimated if considerationweregiven to Federal income taxes forfeited, to the
possibility that the contractors' other Government business
might absorb part of the overhead being applied to these
contracts, and to other factors.
34
We believe that (1) administrative ceilings on the
availability of civil service personnel for these jobs and
(2) excessive delays in approving or disapproving amendments
to the manpower ceilings have, in the past, been major factors in the continued use of contractor services.
We therefore proposed to the Secretary of Defense that
--Manpower ceilings made available to the Laboratories
be sufficiently flexible to enable the Laboratories
to acquire civil service employees to assume the
long-term research work being performed within its
facilities by contractor-furnished personnel.
--The personnel ceilings of the Laboratories be related
to the facilities and research project approval processes and that appropriate adjustments be made consistent with such approvals.
--A more expeditious manner of processing manpower re-
quirements be established within the Department of
Defense
.
The Department of Defense concurred, in general, in our
finding and advised us that the civil service personnel authorization at the Laboratories had been increased to permit
conversion of 25 service contracts to Government operation.
The Department did not agree, however, with our conclusion
that manpower ceiling practices prevent economical management of programs and resources. (B-146981, Nov. 28, 1967.)
35
MILITARY ASSISTANCE PROGRAM
NEED FOR SCREENING EXCESS PROPERTY
FOR FEASIBILITY_ OF RECOVERY FROM
RECIPIENT COUNTRIES PRIOR TO m L W E
TO 'THF,M FOR DISPOSAL
Department of Defense
I n J u l y 1967 w e issued t o t h e Congress a r e p o r t , class i f i e d "Secret," on our review of t h e m i l i t a r y a s s i s t a n c e
program (MAP) property which had become excess t o t h e needs
of r e c i p i e n t c o u n t r i e s . The d i s c u s s i o n which follows w a s
s e l e c t e d from t h e u n c l a s s i f i e d material i n t h a t r e p o r t .
We found t h a t a s i g n i f i c a n t p o r t i o n of t h e property
was r e l e a s e d t o t h o s e c o u n t r i e s by t h e Department of Defense
without f i r s t determining, on a case-by-case basis, whether
it would be economically b e n e f i c i a l t o recover t h e property
f o r e i t h e r r e d i s t r i b u t i o n o r d i s p o s a l purposes by t h e United
States. W e found a l s o t h a t t h e r e w e r e b i l l i o n s of d o l l a r s
worth of KW property s t i l l i n possession of r e c i p i e n t
c o u n t r i e s , which would e v e n t u a l l y become excess.
The proceeds from t h e s a l e of such property by t h e
r e c i p i e n t c o u n t r i e s have t h e e f f e c t of adding m i l l i o n s of
d o l l a r s of a d d i t i o n a l U.S. a i d t o t h o s e c o u n t r i e s , and,
s i n c e t h i s i s not a p a r t of t h e u s u a l a i d program, it is n o t
r e a d i l y apparent. W e expressed t h e opinion t h a t t h e proceeds could have been r e a l i z e d by t h e United S t a t e s had
case-by-case econornic r e c o v e r a b i l i t y determinations been
made and t h a t t h e s e proceeds would havs had a f a v o r a b l e e f f e c t on t h e U . S . balance-of-payments p o s i t i o n .
The U.S. p r a c t i c e of d i s p o s i n g of excess MAP property
d i f f e r e d i n many r e c i p i e n t c o u n t r i e s . W e expressed t h e
opinion t h a t t h e Department of Defense could i n c r e a s e U.S.
revenues from t h e d i s p o s a l of excess MAP property i n f o r e i g n
c o u n t r i e s by recovering, f o r d i s p o s a l by U.S. d i s p o s a l agencies, a g r e a t e r p o r t i o n . o f t h e property which is declared by
r e c i p i e n t c o u n t r i e s t o be excess t o t h e i r needs. We expressed t h e opinion a l s o t h a t t h e release of property which
might have been determined t o b e economically r e c o v e r a b l e
36
had deprived the United S t a t e s of f o r e i g n currency which
could o t h e r w i s e have been r e a l i z e d by the United S t a t e s and
used t o r e d u c e d o l l a r expenditures.
I n c l a s s i f i e d comments, the Departments of S t a t e and
Defense pointed o u t some of t h e f o r e i g n p o l i c y and o t h e r
c o n s i d e r a t i o n s involved i n t h e matters d i s c u s s e d i n t h i s report. Since we w e r e not i n a p o s i t i o n t o d e a l d i r e c t l y with
such issues, w e brought t h e matter t o the a t t e n t i o n of t h e
Congress t o a d v i s e it of how t h e excess p r o p e r t y w a s handled
and t h e a g e n c i e s ' reasons f o r t h e i r a c t i o n s . (B-161049,
J u l y 1 2 , 1967, S e c r e t . )
NEED FOR IMPROVEMENT I N MANAGEMENT OF
EQUIPMENT HELD I N STORAGE FOR THE
MILITAXY ASSISTANCE PROGRAM
Department of Defense
I n a r e p o r t issued t o t h e Congress i n November 1967, w e
pointed o u t t h a t improvement w a s needed i n the management of
equipment h e l d i n s t o r a g e f o r t h e m i l i t a r y a s s i s t a n c e program (MAP). W e found t h a t
--Certain unassigned MAP-owned equipment i n Army s t o r age w a s n o t being used t o s a t i s f y requirements.
- - S i g n i f i c a n t amounts of MAP funds had been r e q u i r e d t o
o b t a i n equipment t o f i l l g r a n t - a i d and sales r e q u i r e ments which could o t h e r w i s e have been f i l l e d from
s t o c k s of i d e n t i c a l i t e m s of unassigned MAP-owned
equipment i n Army s t o r a g e .
--Because such equipment w a s n o t u s e d , a d d i t i o n a l MAP
funds w e r e expended f o r s t o r i n g and maintaining the
unassigned equipment.
We a t t r i b u t e d t h e f a i l u r e t o use a v a i l a b l e MAP-owned
equipment t o (1) t h e absence Df a c c u r a t e inventory d a t a and
of d e f i n i t i v e procedures f o r s y s t e m a t i c a l l y s c r e e n i n g and
u s i n g unassigned MAP-owned equipment, (2) t h e l a c k of necess a r y c o n t r o l s t o assure h i g h e r echelons of command t h a t exi s t i n g p o l i c i e s w e r e being implemented by o p e r a t i n g u n i t s ,
37
and (3) t h e u s e of verbal hold orders t o r e s e r v e equipment,
unassigned because of c a n c e l l a t i o n of c e r t a i n grant-aid
r e c i p i e n t country programs, €or p o t e n t i a l but unconfirmed
s a l e s , b a r t e r , o r coproduction agreements.
We also pointed out t h a t t h e r e was a need f o r improvement i n management of Army-owned equipment reserved f o r MAP,
t o ensure t h a t , upon termination o r reduction of t h e MAP requirement f o r which the equipment was reserved, it would be
promptly released f o r general-issue purposes. Our review a t
t h r e e Army locations showed t h a t only one had l o c a l w r i t t e n
procedures i n e f f e c t t o cover t h i s management area.
A t t h e conclusion of our review, Defense and Army o f f i c i a l s agreed generally with t h e findings, conclusions, and
proposals f o r c o r r e c t i v e a c t i o n s contained i n our r e p o r t and
informed us t h a t measures had been taken o r were i n process
t o improve management procedures and controls over MAP inventor i e s
.
We believe t h a t t h e Department's plans, i f properly
carried o u t , should r e s u l t i n more e f f e c t i v e u t i l i z a t i o n of
MAP-owned equipment and equipment reserved f o r MAP and should
reduce c o s t s t o t h e United S t a t e s . W e intend t o review t h e
Department's actions a s p a r t of our continuing review of
MAP.
(B-162479, NOV. 14, 1967.)
AUTOMATIC DATA PROCESSING EQUIPMENT
Department of Defense (and o t h e r departments and agencies)
The Federal Government i s a l a r g e user o f automatic
d a t a processing (ADP) equipment i n i t s o p e r a t i o n s . I n most
c a s e s , maintenance services f o r Government-owned computers
are being obtained from computer equipment manufacturers.
Only a r e l a t i v e l y small number of Government computer ins t a l l a t i o n s have adopted a policy of in-house maintenance
f o r t h e i r equipment. Because af t h e i n c r e a s i n g investment
o f t h e F e d e r a l Government i n computer f a c i l i t i e s and t h e
r e l a t e d i n c r e a s e i n d i r e c t maintenance c o s t s , w e made a
study o f t h e many f a c t o r s involved i n d e c i s i o n s on o b t a i n i n g adequate maintenance s e r v i c e a t reasonable c o s t .
On t h e b a s i s of o u r study, we concluded t h a t g r e a t e r
c o n s i d e r a t i o n should be given t o in-house maintenance of
Government-owned ADP equipment because o f t h e p o t e n t i a l f o r
c o s t r e d u c t i o n i n o b t a i n i n g t h i s necessary s e r v i c e and o t h e r
p o s s i b l e advantages, including g r e a t e r management c o n t r o l
o v e r maintenance work, increased acceptance of computer ope r a t i o n s by o t h e r employees, and a h i g h e r level o f computer
e f f i c i e n c y ( i . e . , l i t t l e downtime).
Although in-house maintenance of ADP equipment i n t h e
F e d e r a l Government is n o t a common p r a c t i c e , w e d i d v i s i t
several Government i n s t a l l a t i o n s t h a t have followed t h i s
p r a c t i c e successfully. W e a l s o v i s i t e d s e v e r a l non-Federal
and p r i v a t e o r g a n i z a t i o n s t h a t do t h e i r own maintenance
work.
No simple, p r e c i s e c r i t e r i a f o r determining t h e f e a s i b i l i t y o f in-house maintenance can be s e t f o r t h which
w i l l apply uniformly t o a l l Government i n s t a l l a t i o n s . During our i n q u i r i e s a t Government and p r i v a t e i n d u s t r y ins t a l l a t i o n s which had adopted in-house maintenance p o l i c i e s ,
we noted t h a t t h e following o p e r a t i o n a l and c o s t f a c t o r s
were considered before making in-house naintenance d e c i s i o n s .
39
--Operational character of systems.
--Location of equipment.
--Split maintenance responsibility.
--Quality of maintenance.
--Modification by equipment manufacturers.
--Size of computer installation.
We pointed out in our report issued to the Congress in
April 1968 that the investment of the Federal Government in
computer facilities and related direct maintenance costs,
currently about $50 million annually, could be expected to
continue to increase. We concluded that there was need for
more management attention toward ascertaining the most efficient, effective, and economical methods of maintaining
Government-owned ADP equipment. For these reasons, we recommended that
--the Bureau or' the Budget require the executive agencies to consider in-house maintenance in reaching
procurement and maintenance decisions and that the
General Services Administration accelerate its studies now under way on this subject with an objective
of promulgating more specific policies for the guidance of Federal agencies in obtaining adequate maintenance service at the least cost to the Government.
--the head of each Federal agency arrange for the establishment of procedures for arriving at the most
advantageous decisions for maintenance of ADP equipment.
We also suggested that, pending issuance of more specific policy guidance in the executive branch, the Federal
agencies use the detailed operational and cost factors we
included in the report in arriving at maintenance decisions
for their ADP equipment.
40
The Bureau of the Budget has advised us that it is
taking steps to amend its Circular No. A-54 which relates
specifically to acquisition and use of ADP equipment to ensure that agencies give appropriate consideration to the use
of in-house maintenance.
The General Services Administration accelerated its
study by awarding a contract for consulting services to conduct -a survey "to identify the optimum least cost alternative means for maintenance of ADP within appropriate parameters such as make, size and type of equipment; type and
priority of applications; and geographical considerations. I 1
The General Services Administration advised us that it would
issue a Federal Property Management Regulation containing
some interim guidelines to assist agencies in their evaluation of alternative means of maintenance. These guidelines
will cover the factors brought out in our report.
(B-115369, Apr. 3, 1968.)
POTENTIAL SAVINGS THROUGH DIRECT PURCHASE
OF COMPONENTS AND SPARE PARTS FOR
AUTOMATIC DATA PROCESSING EQUIPMENT
Department o f Defense (and other departments and agencies)
During our study of maintenance practices of ADP equipment users in the Federal Government and several non-Federal
and private organizations, we noted instances where aggressive managers saved their activities significant sums of
money by not purchasing ADP system components and repair
parts from the computer manufacturer but by purchasing the
items direct from the actual manufacturers of the components
or from other sources of supply. For instance:
--The United States Fleet Numerical Weather Facility
performed its maintenance on an in-house basis. As
a result, it was in a position to determine the best
method of procurement. The Facility, for example,
made two procurements of drum-storage devices and
related controllers for $900,300 from the actual
manufacturers of the items. Equivalent equipment
procured from the computer manufacturer could have
cost an additional $475,200.
41
--Repair parts for the large-scale computer system at
the Data Processing Center, United States Army Deputy
Chief of Staff for Logistics (DCSLOG), were not
usually purchased from the manufacturer. Some of the
repair parts were obtained by the purchase of a complete computer system, deemed obsolete, at salvage
or scrap price on the open market. This contributed
to the relatively l o w cost of maintenance at this installation.
--A private computer service bureau followed the same
practice as DCSLOG (above). The modest price that
this company paid for spare parts contributed to
the relatively low overall cost of maintenance of the
company.
In our report issued to the Congress in April 1968, we
expressed the view that the cost savings from direct procurement, illustrated by the cases we encountered, suggested
that this method of procurement should be more extensively
explored in procuring ADP components and parts needed in
maintaining Government-owned ADP equipment. We are conducting further studies of this question as a preliminary to
making specific recommendations. (B-115369, Apr. 3 , 1968.)
42
MANAGEMENT CONTROL SYSTEMS
NEED FOR A STUDY OF THE COORDINATION OF THE
MANAGMENT REVIEW EFFORTS OF GROUPS OUTSIDE
THE INTERNAL AUDIT ORGANIZATIONS
Department of Defense
In a report issued to the Congress in March 1968, we
stated that the organization, audit policies, directives,
plans, and operations of the internal audit organizations
in the Department of Defense complied substantially with
requirements for an effective internal audit system. We
stated also that the Department's internal audit policies,
directives, and plans were being implemented in a generally
satisfactory manner. Our review was directed primarily to
obtaining current information on the adequacy of the auditing activities of the Department's five formally designated
internal audit organizations.
In view of the existence in the Department of numerous
separate internal review and surveillance organizations
performing management reviews, we also gave consideration
to the need for coordination of review work in order to
avoid omissions and duplications and to direct the total
effort s o a s to maximize results. Because of our lack of
knowledge of the management review activities of the Inspectors General of the military departments, which stems
from constraints on making the related records available
for our review, we indicated that we were unable to ascertain whether the activities of the designated audit organizations and the Inspectors General are effectively coordinated so as to avoid duplication and obtain the best results from the total review effort.
We made a number of proposals for consideration in the
performance of future internal audit activities. The Department of Defense concurred except with repsect to our
proposal that a study be made of the work of the numerous
organizations and activities conducting management reviews,
with a view to strengthening overall control, direction,
and coordination of such efforts. The D,epartment doubted
whether such a study would be productivk but proposed to
consider the matter further. (B-132900, Mar. 8, 1968.)
43
FAVORABLE OPINION ON THE ACCOUNTING
SYSTEM FOR OPERATIONS PROPOSED FOR
IMPLEMENTATION JULY 1, 1968
Department of Defense
Section 640(b) of the Department of Defense Appropriation Act, 1968, provided that none of the funds were available to the Department of Defense (DOD) to install o r utilize any new ''cost based" or "expense-based" system or systems f o r accounting until 45 days after the Comptroller
General of the United States, after consultation with the
Director of the Bureau of the Budget, had reported to the
Congress that the design of the system or systems had met
certain criteria. The section specified that the design
should (1) meet the requirements of all applicable laws
governing budgeting, accounting, and the administration of
public funds and the standards and procedures established
pursuant thereto, (2) provide for uniform application to
the extent practicable throughout DOD, and (3) prevent violations of the antideficiency statute (Rev. Stat. 3679;
31 U. S.C. 665).
In April 1968 we reported to the Congress that, in our
opinion, the DOD accounting system for operations, as outlined in a system design description dated March 19, 1968,
prepared by DOD and proposed for implementation July 1,
1968, met the criteria specified in section 640(b),
Our
opinion was based on analysis and evaluation of the system
design description, supporting directives and instructions,
and other documentation of DOD, and on limited tests of operational feasibility of certain of the features of the proposed system. Our opinion was reached in consultation with
the Director of the Bureau of the Budget. A copy of his
favorable opinion and a copy of the system design description dated March 19, 1968, were enclosed in our report.
Implementation of the DOD accounting system for operations is in progress. We are cooperating actively with DOD
to facilitate the implementation. (B-159797, Apr. 12,
1968
.
44
NEED FOR IMPROVEMEKC IN RELIABILITY OF
THE AIR FORCE PERSONNEL DATA SYSTEM
Department of the Air Force
The Air Force maintains a computerized personnel data
system to provide the information needed for management of
its military personnel. The information provided by the
system is used as the basis for management decisions affecting overall planning and budgeting and decisions affecting individual officers and enlisted men in such personnel actions as assignments, promotions, separations, and
retirements. We examined the operation of the system for
the period April through October 1967. Our examination was
directed primarily toward the evaluation of the data recorded in the system and did not include an overall evaluation of the operation, Our report on the examination was
issued to the Congress in July 1968.
We found that the data in the system was not sufficiently reliable to serve management purposes effectively.
Our examination of the recorded personnel data for 378
officers--an average of about 85 items of information for
each officer--showed that 366 of the 378 records had one or
more errors. The errors averaged five for the record of
each officer. A similar examination of the recorded personnel data for 480 enlisted men--an average of about 52
items of information for each enlisted man--showed that 457
of the 480 records had one or more errors. The errors averaged three for the record of each enlisted man.
In our opinion the errors stemmed from
--Lack of adequate review procedures to ensure the accuracy of personnel information.
--Absence of standards for evaluating the reliability
of the data in the system.
--Ineffective guidance and instruction to personnel at
base level by higher levels of command.
--Inadequate staffing and training of personnel at
base level.
45
The Air Force agreed generally with our findings and
proposals f o r corrective action and informed us of s t e p s
taken to strengthen its management of the personnel data
system. These actions, if properly implemented and monitored, should improve the reliability of the data in the
system. (B-164471, July 25, 1968.)
MOVEMENT OF AMERICAN FORCES
FROM FRPNCE (OPERATION FFSLOC)
PROBLEMS INCIDENT TO RELOCATION
OF SUPFEIES AND EQUIPMENT
Department of Defense
In response to strong congressional interest concerning the movement of American Forces from France (Operation
FTIELOC) , we undertook a broad survey covering military supply matters, disposition of surplus material, disposition
of real property and related personal property, and construction requirements arising from the movement of supplies
and personnel by the Army and Air Force. In May 1967 we
issued to the House Appropriations Committee and to certain
other committees of the Congress a report which presented
our observations to that date. In August 1968 we issued to
the Congress a report which supplemented the earlier report
and summarized our overall findings.
Despite the magnitude of the move from France and the
relatively short period of time available (March 1966 to
April 1, 19671, the Army and the Air Force were able to relocate their personnel, supplies, and equipment on time and
in a generally effective manner. However, as could be expected in an operation of this nature, many difficulties
arose, some of which were directly related to problems existing prior to the move.
The most significant problems noted by us were the
following:
--Control was lost over large quantities of supplies
and equipment, including weapons, ammunition, and
medical supplies. Inaccurate inventory records contributed to this situation.
--Supplies were shipped to locations with inadequate
storage facilities although available facilities
were not being used.
47
--Requirements for constmction of additional ammunition storage facilities were overstated.
-=.Some of the fixtures and personal property removed
f r o m former French bases were used ineffectively.
--Some usable personal property was not removed from
French bases.
Some of these problems were complicated by the fact
that the Secretary of Defense did not approve new locations
until relatively late dates. Officials of the Department
of Defense stated that the delays were caused by problems
associated with gold flow, relations with foreign governments, and the need to formulate acceptable lines of communications to support American Forces.
We made no recommendations in the reporto We intend
to issue detailed reports on specific aspects of Operation
FRELOC and to make appropriate recommendations at that
time, (B-161507, Aug, 7, 1968.)
48
OTHER AREAS OF OPEMTIONS
POTENTIAL SAVINGS THROUGH CONSOLIDATION OF
REAL PROPERTY MAINTENANCE FUNCTIONS IN AREAS
OF HIGHLY CONCENTRATED MILITARY INSTALLATIONS
Department of Defense
We examined into the feasibility of consolidating the
eight separate real property maintenance activities operated
by the military services on the island of Oahu, Hawaii, and
the 16 in the area of Norfolk, Virginia. These locations
were selected for examination because the relatively limited
geographical areas involved contained a large concentration
of military installations and facilities. Our findings were
presented to the Congress in a report issued in August 1968.
On the basis of our examination, we concluded that consolidation of the maintenance activities at each of the two
locations was feasible and would result in economies. We
estimated that the consolidations would result in:
--Annual savings of about $ 3 . 4 million in operating
costs ( $ 2 . 4 million on Oahu; $960,000 at Norfolk),
--Annual savings in an indeterminate amount in replacement c o s t s f o r equipment.
--Release of equipment valued at about $ 2 . 2 million
for possible use elsewhere ($1 million on Oahu;
$1.2 million at Norfolk).
We proposed that the Secretary of Defense consider
consolidating real property maintenance organizations on
Oahu and in the Norfolk area, each under a single manager,
with supporting subactivities as appropriate. We proposed
also that the Secretary conduct studies at other locations
having large concentrations of military installations, to
ascertain the feasibility of consolidation. We cited New
Orleans, Los Angeles, San Francisco, New York, and Washington, D.C., as examples of such concentrations.
49
In response, the Assistant Secretary of Defense (Installations and Logistics) advised us that his office had
established an interdepartmental committee, under the Department of the Navy, to develop measures for effecting
maximum consolidations on Oahu, at Norfolk, and at other
locations of highly concentrated military installations.
We were further advised that the committee was establishing
local interdepartmental committees on Oahu and at Norfolk.
The guidelines provided to the local committees indicated that the installation commanding officers involved
would decide the extent of consolidation, In our report we
recommended that decisions as to the extent of consolidation of real property maintenance activities be made on the
basis of independent studies and that such decisions be made
binding on the installations involved.
On October 4, 1968, the Assistant Secretary of Defense
(Installations and Logistics) advised us that the recommendations of the local interdepartmental committees would be
made binding on the installations involved after review and
approval by the military departments, by the Washington Interdepartmental Committee and by his office. (B-164217,
Aug. 5, 1968.)
NEED FOR IMPROVEMENT IN CONTROL
OVER AMMUNITION DEVELOPMENT
Department of the A m y
The Army Materiel Command is responsible €or developing conventional ammunition required by the Army, Air Force,
and Marine Corps, In September 1968 we issued to the Congress a report on our review of the management controls
over these operations.
The Army has established procedures reasonably adequate
to enable management to identify and to correct deficiencies
in ammunition prior to completion of development. The procedures include five distinct in-process reviews, or periodic evaluations, at specified points in the development
process.
50
In our opinion, Headquarters, Army Materiel Command,
was not adequately monitoring the development programs or
requiring project managers to perform the necessary reviews.
Insufficient management control had been in large part responsible for the development and production of unacceptable
ammunition in the past.
In our review of 11 items of conventional ammunition
that were in the developmental stage, we found that the
following items had been approved for production although
none of the required reviews and evaluations had been performed during the course of their development:
--73,000
rounds of howitzer cartridges at a cost of
$21 million.
--115,000 rounds of recoilless rifle cartridges at a
cost of $31 million.
In the remaining 9 of the 11 items we reviewed, we
found that, on the basis of their respective stages of development, a total of 30 reviews and evaluations should
have been made. However, only 6 had been made.
In bringing our findings to the attention of the Department of Defense we proposed that
--The Army clarify existing reporting instructions to
ensure that proposed and completed actions in development programs are recorded and reported through
command channels.
--The Army maintain closer supervision over research
and development activities to ensure that in-process
reviews actually are made.
--The Army Audit Agency include in-process reviews in
its audit programs.
The Army, in its reply on behalf of the Department of
Defense, stated its agreement with these proposals and cited
corrective measures that had already been taken.
(B-157535, Sept. 27, 1968.)
51
NEED FOR IMPROVE3%NT IN AIRZIFT
OF CARGO TO SOUTHEAST ASIA
Department of the Air Force
The Military Airlift Command has responsibility for
providing overseas airlift services for all military departments, Most of the flights to Southeast Asia originate at
Travis Air Force Base, California.
We estimated that the aircraft dispatched from Travis
Air Force Base during July 1, 1965, through October 31,
1966, had unused airlift capacity of about 21 million pounds
although ample and critically needed cargo was on hand
awaiting shipment. The unused space was valued at about
$15 million based on the contract rates then in effect.
We believe the situation at Travis stemmed from (1) a
scarcity of personnel having the experience necessary to
supervise adequately and carry out efficiently air cargo
shipping operations and (2) a weakness in procedures f o r
communicating and coordinating information on availability
of cargo space on special military flights to the Far East
not originating at Travis. We brought our findings to the
attention of the Air Force and proposed certain corrective
measures which the Air Force accepted.
A follow-up review showed improvement in the use of
available cargo space on flights out of Travis, with the
exception of flights not originating there. In our report
issued to the Congress in May 1968, we recommended that the
Air Force require the Military Airlift Command to take the
necessary steps to ensure that accurate load information is
properly prepared and forwarded to appropriate air bases,
We recommended also that the Secretary of Defense require
the internal audit staff to review the matters covered in
our report to provide additional assurance that the necessary corrective actions are taken and effectively implemented. The Department of Defense and the Air Force agreed
with these recommendatiohs, (B-157476, May 14, 1968.)
52
POTENTIAL SAVINGS THROUGH USE OF AVAILABLE SPACE
ON MILITARY AIRCRAFT TO TRANSPORT BAGGAGE
BETWEEN THE UNITED STATES AND EUROPE
Department of Defense
In a report issued to the Congress in January 1962 we
pointed out that unaccompanied personal baggage of military
personnel, transported by commercial air carriers, could
have been transported in unused space on aircraft of the
Military Airlift Command (MAC) at less cost. The Department
of Defense stated at that time that steps had been, or
would be, taken to ship as much of this baggage as possible
on MAC flights.
In our follow-up review we found, as stated in our report issued to the Congress in September 1968, that the
problem reported on in 1962 was continuing. We estimated
that, of the 13.2 million pounds of unaccompanied baggage
moved by commercial air carriers between selected points,
6.8 million pounds could have been moved in unused space
on MAC flights at savings of about $1 million. The space
was unused because of a Department of Defense policy which
impeded the flow of unaccompanied baggage into MAC air terminals.
The Department of Defense concurred in our findings
and conclusions but stated that priority military cargo,
rather than baggage, would be used in the future to achieve
fuller use of space on MAC aircraft. In our opinion unaccompanied baggage should be reintroduced into the MAC system to achieve maximum use of available space, because the
Department of Defense has experienced difficulty in supplying sufficient quantities of high-priority military cargo
to make full use of space on MAC aircraft. (B-133025,
Sept. 26, 1968.)
53
NEED FOR IMPROVEMENT IN CONTROL OVER
Department of Defense
We found that the military departments did not m i fsmly or consistently implement Department of Defense p o l icy with respect to charges for services provided to nonappropriated fund activities and private interests. The
practices varied among military installations. The military
installations did not recover fully the costs of services
provided, and they used military personnel in lieu of civilian employees for nonmilitary activities without first
attempting to employ civilians.
We pointed out, in a report issued to the Congress in
February 1968, that the Office of the Secretary of Defense
had not required military departments to issue uniform instructions and to comply fully with Department of Defense
instructions relating to such charges. Also, the military
departments had not in all cases provided adequate surveillance at the installation level to ensure that charges f o r
services, sufficient in amount for the recovery of applicable c o s t s , were properly developed and consistently applied. Moreover, surveillance was not adequate to ensure
that assignments of military personnel to nonmilitary and
quasi-military activities were limited to positions of command supervision or were made only when qualified civilians
were not available.
The Department of Defense concurred, in general, with
our findings and acknowledged the need for added measures
to improve the controls over user charges and military personnel assignments. The Department stated that it was reevaluating its directive governing the funding of morale,
welfare, and recreational activities with a goal of establishing uniform and consistent practices. (B-163136,
Feb. 26, 1968.)
54
POTENTIAL SAVINGS THROUGH USE OF
CERTIFIED MAIL RATHER THAN REGISTERED MAIL
TO TRANSMIT CONFIDENTIAL MATERIAL
Department of Defense
Executive orders, a Department of Defense directive,
and service regulations permit the use of certified mail
for transmitting confidential material within the continental United States. A s stated in a report issued to the
Congress in April 1968, we found that certified mail was
not being used for this purpose to the fullest extent practicable because regulations do not require its use and because opinions differ regarding the adequacy and suitability of certified mail.
In our opinion considerable savings could be realized
and adequate security could be maintained if certified mail
rather than registered mail were used in the Department of
Defense f o r transmitting confidential material. The Department of Defense agreed and took steps to revise its d i rective to require that, as a general policy, certified
mail be used to the maximum extent practicable.
We recommended that the Director, Bureau of the Budget, in consonance with his responsibilities under the
President's cost reduction program, inquire into the practices of other Government agencies with a view toward the
use of the least costly and most suitable method of mailing
classified material. The Bureau of the Budget concurred.
(B-146979, Apr. 8, 1968.)
OBSERVATIONS ON THE UNITED STATES
BALANCE-OF-PAYMENTS POSITION
Department of Defense (and other departments and agencies)
Over the past several years, we have issued a number
of reports to the Congress on the subject of the United
States balance-of-payments position. Many of these reports
have been cited in our annual reports on selected significant audit findings that are made to the House Committee on
Appropriations
55
The problem of balance-of-payments is one of
Government-wide importance and is one which is identified
with several departments and agencies. It has been an area
of increasing interest to both the Congress and to the Executive branch. Because of this interest we felt that a
compilation-type report of all our prior reports was in order.
This report was issued to the Congress in October 1967
and pointed out that over the years we had sought ways and
means of benefiting the United States balance-of-payments
position. The report, and a separate classified supplement,
summarized the results of our efforts since 1961.
A wide range of Government programs has been developed
to deal with continuing balance-of-payments deficits. Some
of these programs depend for their success on the voluntary
cooperation of a broad segment of the American business
community and public; others involve largely matters of
domestic or foreign policies.
We have directed our efforts toward identifying specific situations which lend themselves to achieving additional balance-of-payments benefits. We have examined into
the management of Govesnment-owned foreign assets and
claims; the negotiation and enforcement of bilateral agreements that result or should result in the accrual of proceeds to the Government; efforts made to encourage multinational participation in foreign aid programs; and areas
where operations could be carried out abroad with more efficiency o r at less cost.
As we discovered situations having beneficial balanceof-payments implications, we brought them to the attention
of the Congress and of the appropriate officials of the
agencies involved. In many cases remedial action was taken.
While it is not possible to estimate precisely how
much the United States balance-of-payments situation was
benefited because of th& actions later taken by agency officials, we believe that such actions with respect to the
matters included in the report and in the separate classified supplement have resulted in benefits of many millions
of dollars. In a number of cases, little or nothing was
56
done about the matters we identified because agency officials maintained that the adoption of our proposals would
not be in the interest of the foreign policy of the United
States. It appears that significant balance-of-payments
advantages in these areas are not likely until and unless
basic policies change.
We issued our report to the Congress because the problem of coping with chronic balance-of-payments deficits is
prominent among the contemporary economic issues confronting the United States. The report outlined areas of Government operations where balance-of-payments advantages may
be possible, the status of agencies' efforts in these areas,
and reasons why in some cases the potential advantages have
not been pursued to date. (B-162222, Oct. 31, 1967.)
U.S. GAO Wash., D.C.
57