This is our annual report

in the Department of Defense.

civil

departments

and agencies

of significant

audit findings

A similar

report

on Federal

was submitted

separately.

We have included

items which we believe

should be of interest

and use to the Committee during the appropriations

hearhave previously

ings for fiscal

year 1975. Audit reports

brought these findings

and recommendations

to the attention

of

departmental

officials.

Some matters

commented on in this report are those on which the Department has indicated

that corrective

action either

has been or will

be taken.

The items

have been included,

however 2 in view of their

significance

and

of the fact that we have not had an opportunity

to evaluate the

adequacy of corrective

actions

taken,,

We shall be pleased

you may desire,

to furnish

any additional

information

We are sending copies of this report

to the Department of

Defense and to the military

departments

so that they may be in

a position

to answer any inquiries

that may be made during the

appropriations

hearings with respect

to these findings

and

recommendations 0

Sincerely

yours,

Comptroller

General

of the United States

(

Contents

Page

PROCUREMENTPRACTICES AND CONTRACTADMINISTRATION

Need to keep the Congress informed and to apply

appropriate

criteria

in decisions

on long-term

leasing

Department of the Navy

Improvement needed in use of formal

procedures

for procurement

Department of Defense and civil

1

1

1

advertising

agencies

5

5

Potential

cost reductions

through improvement

in contractors

t industrial

operations

Department of Defense

7

7

Potential

savings through procurement

on life

cycle costing

Department of Defense

8

8

based

Improvement needed in management of contracting

for studies and disseminating

results

of

studies

Department of the Army

Need for a policy

requiring

contracts

foreign

firms to be priced in local

Department of Defense

with

currency

Validity

of payments to the contractor

production

of the C-5A aircraft

Department of Defense

for

10

10

12

12

14

14

Need for contracting

officers

reports

more effectively

Department of Defense

to act on audit

Ways to reduce administrative

ing negotiated

contracts

Department of Defense

costs

15

15

of award-

ACQUISITION OF MAJOR WEAPONSAND OTHER SYSTEMS

Problems in naval ship construction

programs

Department of the Navy

17

17

19

19

19

Page

Problems in controlling

cost

weapon sys terns

Department of Defense

growth

of major

21

21

Need to clarify

policy

on inflation

as a factor

in cost estimates

of proposed Programs

Department of Defense and civil

agencies

RESEARCHAND DEVELOPMENT

Coordination

needed among Government agencies

to insure maximum sharing of technology

Department of Defense and civil

agencies

Development and use of flight

simulators

reduce cost of military

flight

training

Department of Defense

24

24

26

26

26

could

28

28

Problems in development of the SAM-D surfaceto-air

missile

Department of the Army

30

30

Development of in-flight

escape systems for

helicopters

could reduce fatalities

and severe

injuries

Department of Defense

32

32

Improvement needed in development

computer models

Department of Defense

35

35

and use of

SUPPLY MANAGEMENT

Economies available

through improved

of Navy shipboard inventories

Department of the Navy

Savings, attainable

by revising

criteria

Department of Defense

d

38

management

38

38

packaging

Requirements for modular electronic

for aircraft

could be reduced

Department of the Air Force

40

40

equipment

41

41

Page

MAINTENANCE, REPAIR, AND OVERHAUL

Little

progress in acting on opportunities

for

significant

savings by consolidating

real

property

maintenance organizations

Department of Defense

Potential

for greater consolidation

maintenance workloads

Department of Defense

43

43

43

of

45

45

!

Need for improvement in industrial

management

Departments of the Army and Navy

46

46

Ih

Need for more realistic

projections

of funding

requirements

for ship overhaul programs

Department of the Navy

48

48

ADMINISTRATION OF MANPOWERMATTERS

Problems in meeting military

manpower needs in

the all-volunteer

force

Department of Defense

51

51

Improvements needed to increase effectiveness

of the Government Employee.9 Incentive

Awards Program

Department of Defense

54

54

Inconsistent

policies

in administering

bility

retirements

Department of Defense

57

57

Enlisted

aide programs require

Department of Defense

disa-

modification

Need for centralized

management control

closed-circuit

television

for training

education

Department of Defense

Improvements needed in administration

management of technical

training

Department of the Navy

51

58

58

of

and

59

59

and

60

60

Page

Administration

of the Reserve Officers

Corps program should be coordinated

Department of Defense

Training

61

61

Further

improvement needed in assisting

military personnel

in finding

adequate housing

near bases

Department of Defense

62

62

Construction

of lodging facilities

quate consideration

of availability

cial motels

Department of Defense

64

64

without

adeof commer-

DEFENSE INTERNATIONAL ACTIVITIES

Need for tighter

control

over U.S. commitments

to other nations

Department of Defense and Department of

State

Desirability

of improved reporting

on U.S. contributions

to NATO

Department of Defense and Department of

State

Payments for phantom troops in the Cambodian

military

forces

Department of Defense and Department of

State

OTHER AREAS OF OPERATION

Potential

for reduction

of communication

costs

through centralized

management of multiplex

sys terns

Department of Defense and civil

agencies

66

66

66

67

67

68

68

70

70

70

Government not equitably

compensated by telephone companies for use of its equipment to

serve public pay telephones

Department of Defense and civil

agencies

73

73

Opportunities

for reducing the cost

ing and operating

health facilities

Department of Defense and civil

75

75

of constructagencies

’

Page

Not all costs of public affairs

are considered

in application

tion on such costs

Department of Defense

activities

of the limita-

Need for Federal agencies to improve solid-waste

management practices

Department of Defense and civil

agencies

,

MILITARY READINESS

I

Need for improvement in readiness

Force in Europe

Department of the Air Force

78

78

80

80

82

of the Air

82

82

.

‘.

PROCUREMENTPRACTICES AND CONTRACTADMINISTRATION

NEED TO KEEP THE CONGRESSINFORMED AND TO APPLY

APPROPRIATE CRITERIA IN DECISIONS ON LONG-TERM

LEASING

Department

of the fiavy

The Navy uses tankers to transport

fuel for itself

and

for the other military

services.

Part of the tanker fleet

consists

of 14 Government--owned T-2 tankers built

during the

costs

1940s m Navy studies concluded that transportation

would be reduced by replacing

the 14 old tankers with 9 new

ones.

The Navy entered into a long-term

(ZO-year)

leasing

arrangement on June 20, 1972, by having private

interests

obtain the funds to finance the construction

of

the tankers

with Navy’s guarantee that it would lease them.

GAO made a review to determine

(1) whether the Navy’s

action was the more economical method to meet its needs,

(2) whether or not the Congress had an opportunity

to consider the wisdom of the transaction

before the formal commitment to spend future

funds, and (3) whether review and

approval by the Congress should be required

for future

transactions

of this type.

A March 23, 1972, decision

of the Comptroller

General

on the legality

of this leasing arrangement

stated that GAO

could no,t say the transaction

resulted

in purchase of an

asset, for which funds are required

to be authorized

and

appropriated

by the Congress, because the Navy never obtains

actual title

to the tankers,

GAO said it had no leg?1 objection

to the transaction

but that,

in view of the program9s

magn i tude 9 it would seem appropriate

to inform the House and

Senate Committees on Armed Services and Appropriations

of

Navy plans before going forward.

Navy officials

advised

GAO that they gave informal

rather

than formal notification

to selected

committee staff

members.

If the tankers were purchased,

total

Government payments would be made during a 3-year construction

period.

By leasing,

total

payments are spread over a 20-year period

with no payments due until

the tankers

are ready for use.

Determining

whether leasing

is more economical than purchasing

depends on the discount

into today’s value.

rate

used to co.zvert

future

dollars

The Navy’s lease-versus-purchase

analysis

used the

criteria

established

in Department of Defense (DOD) Instruction 7041.3.

This inst&ction

requires

a lo-percent

discount rate which represents

an estimate

of the average return on private

investment

before taxes and after

inflation.

The source cited in this instruction

is the Office

of Management and Budget (OMBJ Circular

A-94.

Circular

A-94 prescribes

the discount

rate for evaluating Government decisions

concerning

the initiation,

renewal,

or expansion of programs or projects.

However, A-94 states

that its provisions

do not apply to the evaluation

of

Government decisions

concerning

the acquisition

of commercialtype services

and that guidance for making such decisions

is contained

in Circular

A-76.

OMB Circular

A-76 criteria

for valuing money is the yieid on long-term

Department of

the Treasury borrowing rate.

This rate,

at the time the

transaction

was entered into, was about 6 percent.

A comparison of the effects

on Government costs if

(1) no present-value

discount

is used, (2) a lo-percent

discount is used (A-94 criteria),

and (3) a 6-percent

discount

is used (A-76 criteria)

shows the following:

little

$178.1 million

more to lease

ent value discount;

with

$10.4 million

less

discount;

to lease

at lo-percent

$29.6 million

more to lease

discount.

at 6-percent

At a discount

difference

no pres-

rate of about 8-3/4 percent,

there

between leasing and purchasing.

is

By leasing

instead of purchasing,

the Navy was not required to obtain specific

congressional

authorization

and

The Navy told GAO that it preferred

to purchase

approval.

new tankers but that it had been unsuccessful

in obtaining

procurement

funds in prior

yea.rs and, therefore,

considered

leasing as its only viable

alternative.

However, future

2

Government payments under this lease transaction

will

more

than double the amount that would have been paid if direct

congressional

approval had been received and the tankers

had been purchased.

Although leasing

is recognized

as a proper means of

the magnitude of the funds involved

in

acquiring

asseti,

this transaction

clearly

warranted

congressional

input to

the decis ionmaking process.

GAO’recommended that the Secretary

of Defense revise

DOD instructions

to provide for application

of the guidelines set ,forth

in Circular

A-76 in evaluating

long-term

leasing of assets,

such as ships e GAO also recommended that,

to improve congressional

awareness of future

build and

the

Secretary

of

Defense

should

assist

the

charter

programs p

Congress by

‘,

--providing

it

of acquisition

with information

on the proposed method

(long-term

leasgng or purchasing);

congressional

committees

- -providing

B to appropriate

a detail.ed

cost analysis

showing full

impact on

future

budgets when long-term

leasing

is proposed;

and

o

--requiring

analyses of long-term

leasing arrangements

to be made on a total-cost-to-the-Government

basis,

“including

direct

effects

of delayed payments of income taxes.

DOD and the Navy generally

accepted GAOPs recommendations for improving congressional

review of future

buildand-character

programs 0 DOD assured GAO that formal presentations

would be given to key congressional

oversight

committees D

The Navy did not concur, however9 in GAO’s treatment

of deferred

taxes because it believes

that the value of deferred payment of income taxes should not be recognized

as

Q cost.

DOD did not concur with GAO’s recommendation

that

DOD instructions

be revised

to provide for application

of

3

the guidelines

set forth

in OMB Circular

A-76

long-term

leasing of assets such as ships.

in evaluating

Since the Navy’s program is similar

to Government prothe

Congress

should evaluate

grams for leasing buildings,

the need for legislation

similar

to Public Law 92-313 of

June 16, 1972.

That law amended the Public Buildings

Act

of 1959 to require

congressional

approval of all leases

It also requires

that a

greater

than $500,000 a year.

prospectus

containing

details

of the transaction

be provided

Similar

legislation

may be appropriate

to the Congress.

for long-term

leasing of’such assets as ships.

Because the

Navy’s program can be considered as setting

a precedent

(the Navy is considering

acquiring

other types of vessels,

such as dry-cargo

ships, in this manner), legislation

could

be an effective

tool to insure congressional

oversight

of

(B-174839, Aug. 15, 1973.)

future

long-term-leasing

programs.

4

t

IMPROVEMENTNEEDED IN USE OF FORMAL

ADVERTISING PROCEDURESFOR PROCUREMENT

Department

of Defense

and civil,

agencies

GAO reviewed procedures

and practices

of DOD, the General

Services Administration

(GSA), and the Tennessee Valley

Authority

(TVA) in using formal advertising

for bids in order

to (1) identify

problems that limit

competition

and increase

costs to the Government and (2) offer

suggestions

to the

agencies for more effective

and less costly use of this

method of procurement.

GAO examined 138 contracts,

awarded under formal advertising

procedures

by 8 procurement

offices

of these agencies,

and found that 8,956 suppliers

had been solicited

but that

only 8 percent of them had submitted

bids.

Fifty-three

contracts

were awarded on the basis of three or fewer bids.

Causes of the low response follow.

--Bidders

lists

were based on broad

and did not reveal the relatively

o,f bidding for a specific

item.

--Previous

bidders

categories

of items

few sources capable

were not regularly

solicited.

--Advertising

in the Commerce Business

timely,

and the published

description

or services

required

was insufficient

Daily was not

of supplies

to elicit

bids.

--The causes for the low number of bids were not evaluated to increase competition

for future

procurements.

--Restrictive

specifications

were used repeatedly.

--The complexity

from bidding.

--Bidders

--Bids

or purchase

of invitations

were given

were rejected

discouraged

insufficient

because

descriptions

time

of minor

suppliers

to bid.

discrepancies.

Administrative

costs of formal advertising

include costs

of maintaining

lists

of bidders;

preparing

and mailing

invitations;

and receiving,

recording,

and analyzing

bids.

5

Opportunities

because:

for

reducing

these

costs

--41 percent more invitations

pared for distribution

than

were evident

for bid (IFBs)

were used.

were pre-

--About 50 percent of the pages in the IFBs were standard contract

provisions

which were repeated from one

solicitation

to another.

these

could

--Furnishing

more than two copies

firms solicited

was unnecessary.

of the

IFB to the

--92 percent

not result

mailed

to firms

of the solicitations

in bids.

GAO believes

that,

if its suggestions

for

conditions

are adopted, DOD and the civil

save several million

dollars

annually.

did

correcting

agencies

GAO recommended that DOD and GSA, the major agencies

responsible

for procurement policy,

instruct

procurement

offices

and agencies to:

--Establish

a program in each procurement

office

to

selectively

review the extent of competition

achieved

under formal advertising

and take aggressive

action

to stimulate

competition

where it appears to be restricted.

--Establish

a work simplification

program in each procurement agency to (1) solicit

only previous

bidders

or suppliers

and firms that request IFBs, (2) simplify

and shorten IFBs, and (3) reevaluate

the requirements

for distributing

IFBs.

After

the report was issued to the Congress, the Office

of Management and Budget asked GSA to immediately

undertake

a review of the unresolved

issues and determine

how best to

proceed with appropriate

implementation

of the suggestions

and recommendations.

GSA advised GAO that it was initiating

action

in cooperation with DOD to insure that formal advertising

policy

of

executive

agencies provides

for maximum effective

use of the

technique.

(B-176418, Aug. 14, 1973.)

6

6

’

POTENTIAL COST REDUCTIONS THROUGHIMPROVEMENT

IN CONTRACTORS?INDUSTRIAL OPERATIONS

Denartment

of Defense

GAO reviewed industrial

operations

at the plants of

three aircraft

engine manufacturers

performing

a substantial

amount of work for DOD. Industrial

engineering

and financial

management principles

were applied

in these reviews to identify

conditions

which were increasing

the cost of contract

performance(and

to bring those conditions

to the attention

of the contractor

or Government officials

for appropriate

action.

There were areas at plants

of each of the contractors

where the contractors

V operations

could be improved and costs

could be reduced through such things as (1) more effective

programs for establishing,

maintaining,

and using labor

standards

for measuring labor efficiency,

(2) strengthened

production

control

systems for scheduling,

coordinating,

and

controlling

manufacturing

operations,

(3) elimination

of excessive inspection

and testing

of material,

parts,

and assembled products,

(4) greater

efficiency

in plant layout and

plant use, (5) improved programs for maintenance,

modernization,

and replacement

of equipment,

and (6) relaxation

of

the military

services 1 stringent

packaging requirements

for

spare parts and assembled products

destined

for domestic

rather

than overseas delivery

and use,

Suggestions

for improving these conditions

were brought

to the IFattention

of the contractors

and of the cognizant

procurement and contract

administration

organizations

of DOD.

The results

of GAO’s efforts

will be especially

useful to

the Government’s procurement

and contract

administration

personnel

who will

be dealing with these contractors

in the

future o

Some of the suggested improvements will require

time to

implement and some will

require

further

study by the contractors

to determine

the most feasible

approach.

Consequently,

GAO was unable to quantify

the savings which could

result

from the suggestions.

GAO believes,

however, that

the savings would significantly

exceed the cost to implement

the improvements.

(B-159896, June 26, 1973.)

POTENTIAL SAVINGS THROUGH

PROCUREMENT

BASED ON LIFE CYCLE COSTING

Denartment

of Defense

Life cycle costing

is a procurement

technique which

takes into account not only the price of an item but also

its useful life

and the cost of maintaining

it during the

When

competitive

prices

are

being

evaluated,

useful life.

this technique often reveals

that a lower price is not nece’sarily

more advant%geous in terms of overall

cost,

In

1965 DOD began a program to test this concept and in 1970

issued implementing

guidelines.

Although the concept has

been widely accepted by DOD’s engineering

and procurement

at only five or six procuremanagers, it has been successful

ment activities

which have used it aggressively.

GAO evaluated the life

cycle costing

technique

to determine

its potential

in DOD for broader application

in awarding procurement

contracts

for subsystems and components.

From inception

of the test program in 1965 to the time

of GAO’s review,

contracts

had been awarded on the basis of

life

cycle costing for only 64 procurements--43

of which had

The Air Force reported

that

been awarded by the Air Force.

the 43 procurements

at a cost of about $20 million

resulted

in overall

savings of about $25 million.

The limited

application

of the concept was attributable

the Armed Services

to insufficient

emphasis by DOD. Neither

Procurement Regulation

nor the Defense Procurement Circulars-the primary means of disseminating

policy and direction

to

procurement personnel

and to contractors--had

provided

It is unlikely

guidance on the life

cycle costing

technique.

that the benefits

and lessons learned from the test program

can be widely used in DOD unless high-level

interest

is expressed and coordination,

communication,

and training

are

improved.

GAO recommended that

the Secretary

of Defense:

--Emphasize more vigorously

the importance

of an effective test program for the life

cycle costing

technique

and provide coverage in the Armed’ Services Procurement

Regulation.

8

--Expand the test program to provide

that,

where appropriate I the competition

for prime contracts

include

consideration

of contractors9

plans to use life

cycle

costing

in awarding subcontracts

I)

--Expand the test program to include,

where appropriate,

noncompetitive

procurements

by requiring

the submission

of proposals

offering

different

levels of reliability

and maintainability

and providing

for evaluations

on a

life

cycle costing basis.

--Place the prime responsibility

for life

cycle

on the engineering

and requirements

personnel

provide for coordination

with the procurement

--Establish

scheduled

dates for

costing

and

personnel.

goals for systematically

reviewing

items

for procurement

to identify

potential

candiapplication

of life

cycle costing.

The Office

of the Secretary

of Defense agreed generally

with these findings,

conclusions,

and recommendations

and

informed GAO of the specific

steps it was taking to implement

the recommendations.

(B-178214, May. 21, 1973.)

9

IMPROVEMENTNEEDED IN MANAGEMENT

OF

CONTRACTING FOR STUDIES AND DISSEMINATING

RESULTS OF STUDIES

Department

of the Army

DOD and the military

services

contract

with public and

private

organizations

to make studies

that will

assist

them

GAO selected

in reaching decisions

or solving problems.

17 Army contract

studies

for review to determine

adequacy of

the Army’s control

over its contract

study program.

costing

about $1.4 million,

Eight of the 17 studies,

It was

either

were of limited

usefulness

or were not used.

not determinable

from available

records whether the remaining

costing

about $4.1 million,

met their

objecnine studies)

tives satisfactorily

or were used as intended.

The Army evaluated

each contractor’s

performance

after

completion

or termination

of a contract;

however, it did not

make a similar

evaluation

of its own performance

in planning

Because of the intangible

nature

and monitoring

the studies.

of the subject matter of the studies,

high turnover

of personnel involved in contract

administration,

and lack of evaluation by the Army of its own performance,

GAO was unable to

determine the effectiveness

of the Army’s control

over the

studies

or to positively

determine causes of unsatisfactory

study results.

Some factors

contributing

to unsuccessful

study efforts

were the Army’s failure

to (1) review the lessons learned on

the subject

through previous

studies,

(2) state the study

.assumptions used to guide the contractual

effort,

(3) prescribe clearly

the duties and responsibilities

of the study

advisory

group assigned to provide technikal

advice and

assistance,

and (4) provide the technical

expertise

to plan

In

addition,

there

was

some

conflict

and monitor the study.

between directives

and regulations

relating

to distribution

of study results

and related

information,

GAO recommended to the Secretary

of the Army that existing regulations

be revised and new procedures

be established

to require:

--An evaluation

of management’s performance

after

the

completion

or termination

of each study contract.

10

--The advisory

group to meet early enough to (1) assist

in meeting all prescribed

requirements

for planning

a

contract

study and (2) determine whether it is capable

of monitoring

the contractorss

performance

in accordance with the plan.

--The distribution

of contract

studies to the Defense

Documentation

Center regardless

of their

outcome or

funding e For unsatisfactory

or incomplete

studies,

a

summary of lessons learned should be prepared and disseminated with the results

of, the study.

GAO also recommended to the Secretary

of Defense that he

consider ) in conjunction

with the Secretary

of the Army,

phasing out the Army’s data bank of studies and analyses as

the Defense Documentation

Center obtains the data needed to

function

as the central

repository

for such information.

DOD generally

concurred in these recommendations

and

reported

that the Army was considering

revising

its regulations along the lines recommended.

(B-177372, Dec. 11,

1972.)

11

NEED FOR A POLICY REQUIRING CONTRACTSWITH

FOREIGN FIRMS TO BE PRICED IN LOCAL CURRENCY

Department

of Defense

The kind of currency used in pricing

contracts

with

foreign

firms (the dollar,

the currency

of the contractor’s

country,

or a combination

of the two currencies)

is of little

importance when the rate of exchange is stable.

It becomes

important

when the exchange rate has a history

of significant fluctutation

or is expected to change during the contract

period.

Foreign contractors)

when paid in dollars,

generally

convert them to local currency

to pay local obligations.

In a period of exchange-rate

fluctuation,

the dollars they receive may be worth more or less in local currency

than was anticipated

when the contractors

were priced.

When

bidding

for dollar-priced

contracts,

foreign

contracts

may

increase or decrease their prices depending on the anticipated gain or loss from exchange-rate

fluctuations

during

the contract

period.

GAO examined contracts

at DOD procurement

offices

overseas and in the United States to find out whether existing

DOD policies

and practices

adequately

protect

the U.S. Government and foreign

contractors

when currency

fluctuations

occur.

Contracts

in countries

where the Department of the

Treasury held excess currency or near excess currency were

not examined because the Armed Services Procurement Regulation adequately

implements the Government’s policy

that

U.S.-owned foreign

currency be used when feasible.

DOD has not formulated

a uniform policy

for determining

whether contracts

with foreign

firms should be priced in

local currency or dollars.

The determination

is left

to the

discretion

of the contracting

officers.

Because of this,

a

number of different

practices

exist,

sometimes within

the

same country.

Pricing

contracts

in dollars

has resulted

to both the United States and the contractors.

in inequities

For example:

--In Korea, contractors

have benefited

or will benefit

by about c5.2 million,

on the contracts

GAO reviewed,

because Korean currency

(won) depreciated

in value

relative

to the dollar.

12

--In Japan, contractors

could lose as much as $4 million

on open, dollar-priced

contracts

as a result

of the

August 1971 devaluation

of the dollar.

--In Europe, contractors

could lose about $1.6 million

und.er dollar-priced

contracts

for fiscal

year 1972

milk requirements.

The contracts

were awarded only

days before the value of the dollar

dropped in Europe.

I

GAO believes

that the need for DOD policy

guidance is

I critical

because of uncertainty

in the internaltional

monetary

market m GAO recommended that the Secretary

of Defense establish a policy

requiring

that foreign

contracts

be priced in

local currency unless there is a compelling

reason to use

dollars 9 such as a requirement

in the contract

for signifiJustification

for

cant purchases in the United States.

pricing

in dollars

should be approved at a level above the

A less preferable

alternative

would be

contracting

officer.

to price the contracts

in dollars

subject

to provisions

for

appropriate

price adjustment

if the exchange rate fluctuates

significantly

during the contract

period,

DOD said that,

as a result

of the interest

generated by

a

study

of

the

matter

has

been

initiated

at a

the report,

number of foreign

procurement

offices,

and at the conclusion

of this study,

it will be determined whether a change in

policy

is warranted.

(B-14.6749, July 6> 1973.)

13

VALIDITY OF PAYMENTSTO THE CONTRACTOR

FOR PRODUCTI'ONOF THE C-SA .AIRCRAFT

Denartment

of Defense

Each of the Public Laws 91-441, 92-156, and 92-436,

which authorized

funding for the C-5A aircraft

program for

provided

fiscal

years 1971, 1972, and 1973, respectively,

that payments be made to the contractor--Lockheed

Aircraft

The laws

Corporation-throughout

a special bank account.

also placed restrictions

on the costs for which payments

could be made from the special bank account and required

GAO

to audit the payments and submit quarterly

reports

to the

Congress.

$565.6 million,

made

GAO audited payments, totaling

since the special bank account was set up in June 1971

through June 30, 1973, and submitted

nine quarterly

reports

to the Congress.

No payments were found to be contrary

to

the applicable

laws.

GAO questioned,

however, the propriety

of payments to the contractor

for contributions

to employees’

retirement

funds, which had been made well before the contractor

made payments to the retirement

fund trustees.

Although costs incurred

but not yet paid are reimbursable if otherwise

valid,

the payments received

from the Government were held by the contractor

for an average of about

14 months before payment to the retirement

fund trustees.

In response to our recommendation,

the Department of Defense

took action to avoid making such payments significantly

in

advance of need,

Defense Procurement Circular

114, issued in

July 1973, provides

that,

unless contractors’

contributions

to retirement

funds are made within

30 days of the end of a

quarter,

they are not eligible

for reimbursement

until

actually paid,

(B-162578, Nov. 29, 1372, Mar. 9, 1973, May 17,

1973, and Aug. 10, 1973.)

14

,I

NEED FOR CONTRACTING OFFICERS TO ACT

ON AUDIT ‘REPORTSMORE EFFECTIVELY

Denartment

of Defense

GAO reviewed the actions taken by the contracting

officials

on the Defense Contract Audit Agency (DCAA) reports

which recommended price reductions

under the Truth-InNegotiations

Act because contractors

had submitted

defective

data at the time of negotiations.

The objective

of the

review was to find out (1) whether DCAA reports were providing contracting

officers

the information

needed to reduce

contract

prices,

(2) why the contracting

officers

had determined in some instances

that they did not have a basis to

reduce contract

prices in the amounts recommended by DCAA,

and (3) whether prompt action was being taken on DCAA

reports,

A report on the review,

submitted

to the Secretary

Defense, stated that of 177 reports reviewed:

of

--DCAA had recommended reductions

of $46 million

but

contracting

officials

had concluded there was defective pricing

of only $21 million,

--For $19 million

of the remaining $25 million,

tracting

officials

disagreed with DCAA that

tors had submitted

defective

data.

concontrac-

--For 66 million

of the remaining $25 million,

contracting officials

agreed that defective

data had been submitted. but the Government did not have a right

to

reduce contract

prices,

--As of June 30, 1972, DCAA reports

on 893 contracts,

or 68 percent of those reported,

had not been settled.

GAO recommended the following

Defense:

to the Secretary

of

--Insure

that contracting

officers

provide adequate

documentation

of the cost or pricing

data submitted

by and certified

to by contractors.

--Require

officer

higher level approval when the contracting

does not accept DCAA recommendations

on either

1

the grounds that pertinent

cost or pricing

data had

been disclosed

to him during contract

negotiations

or

the grounds that he was aware of the correct

cost or

pricing

data at that time.

--Establish

time standards

for procurment

offices

to

review DCAA reports,

evaluate

the recommendations,

and

take the action appropriate

in the circumstances.

--Require

closely

officers.

DCAA to review its proposed reports

more

before they are issued to contracting

In reply,

DOD stated that the regulations

are adequate

and that settlements

have been orderly.

GAO will

continue to

monitor these settlements.

(B-159724, Mar. 22, 1973.)

16

.

.

WAYS TO REDUCEADMINISTRATIVE COSTS

OF AWARDINGNEGOTIATED CONTRACTS

Department

of Defense

DOD can reduce the administrative

costs of its

negotiated

procurements

of parts and components without

sacrificing

adequate competition,

reasonable prices,

or other

goals of the Congress.

These other goals are reflected

in

such laws and programs as the small business programs;

the

labor surplus area program; the Buy American Act; the equal

employment opportunity

programs;

and the procurement-related

labor laws) such as the Walsh-Healey Public Contracts

Act

and the Service Contract

Act,

Millions

of dollars

in administrative

saved annual ly + For example :

costs

could

be

--DOD can save about $900,000 annually by shortening

its solicitation

documents and by requiring

the Navy

and the Defense Supply Agency to use only two copies

of the solicitation

document in each solicitation

package e

--DOD can realize

substantial

annual

ing fewer solicitation

packages m

savings

by prepar-

--DODvs ceiling

for simplified

procurment

procedures

is

limited

to procurements

under $2 9SflO, If the ceiling

were raised to $10,000 for negotiated

and formally

advertised

procurements,

administrative

costs up to

$30 million

annually might be avoided at procurement

centers e

--DOD could save about $150,000 annually

if the

requirement

for preparing

certain

determinations

findings

were repealed.

and

Some of the needed improvements to effect

these savings

can be made administratively

by DOD; others will

require

congressional

action,

GAO recommended that DOD:

--Encourage

throughout

greater

use of master solicitations

DOD and, where it is not feasible,

17

give

centers ,greater

latitude

to incorporate

reference

when this action would benefit

merit.

--Require

procurement

of the solicitation

package.

clauses by

the Govern-

centers to include only two copies

document in each solicitation

In response, DOD pointed out that it had already granted

the services permission

to use master solicitations

on a

trial

basis and to incorporate

many clauses in contracts

by

DOD said that it was considering

changes permitreference.

ting incorporation,

by reference,

of additional

clauses,

DOD also said that it

solicitation

provisions,

and notices.

was considering

whether procurement

centers should include

only two copies of the solicitation

document in each solicitation

package.

Because DOD’s procurement system is tied to legislation,

certain

administrative

costs cannot be reduced without

conThe Commission on Government Procurement

gressional

action.

has recognized that changes are needed and has recommended

Since GAO’s study

appropriate

legislation

to the Congress.

also indicated

a need for the changes recommended by the Commission,

GAO recommended that the Congress enact legislation:

--Authorizing

petitive,

agencies to solicit

proposals

from a comrather than a maximum, number of sources.

--Raising

the ceiling

price of procurements

simplified

procurement procedures,

subject

to

--Repealing

the requirement

that contracting

officers

prepare determinations

and findings

for certain

procurements.

(B-168450, Sept. 17, 1973.)

18

ACQUISITION OF MAJOR WEAPONSAND OTHER SYSTEMS

PROBLEMSIN NAVAL SHIP CONSTRUCTIONPROGRAMS

Department

of the Navy

GAO reviewed the status of two of the Navy’s largest

shipbuilding

programs,

the general-purpose

amphibious assault ship (LHA) and the DD-963 antisubmarine

destroyer

(both

under contracts

with the same shipbuilder)

9 because production problems had been encountered

in the shipyard where the

construction

work was being performed.

The shipyard was new. There is little

doubt that both

the shipbuilder

and the Navy grossly underestimated

the problems the shipbuilder

faced in (1) starting

a new shipyard,

(2) assembling an adequate work force,

(3) introducing

new,

untried

ship construction

techniques,

and (4) locating

the

ship design organizational

unit 2,000 miles away from the

construction

site.

The LHA was the first

and the DD-963 was the second Navy

shipbuilding

program undertaken by the shipbuilder

in the

yard.

These programs were intended to be carried

out nearly

consecutively.

However, slippages

in the LHA construction

schedule resulted

in unintended

concurrent

construction.

This further

aggravated

the problems.

Other aggravating

factors were the high turnover

of executives

and key personnel

of the shipbuilder

and the unusual provisions

in the contracts.

The Navy, for the first

time in its award of ship construction

contracts,

contractually

assigned to the shipbuilder

almost

complete responsibility

for decisions

in program execution

and complete responsibility

for ship design.

At the time of GAO’s review,

the shipbuilder’s

cost estimates for the LHAs were more than the ceiling

price allowed

under the contract,

and delivery

had been delayed more than

2 years.

The cost and construction

schedule of the DD-963s

had not changed significantly

since June 1970, when the contract was awarded.

Congressional

concern was expressed,

however, in deliberations

on the fiscal

year 1973 budget when the

Congress denied authorization

and funding of another block of

7 DD-963s--17

through 23 of the 30-ship program.

19

i

In fiscal

year 1974, the Congress authorized

and funded

these 7 ships and long-lead&time

items for the remaining

The Congress also provided $165 mil7 ships-- 24 through 30.

lion to cover cost growth on the LHA program.

(B-163058,

July 26, 1973.)

20

PROBLEMSIN CONTROLLING COST GROWTH

OF MAJOR WEAPONSYSTEMS

Desartment

of Defense

At the request of the House Committee on Armed’ Services,

GAO made a special

review of the cost growth of major weapon

A

report

on

the review noted that most new weapon

systems.

systems are intended to replace obsolete systems performing

The military

services,

however,

the same type of missions.

constantly

‘demand that the performance

and capabilities

of

the new systems exceed those of the systems to be replaced.

their

cost.

Comparing the latest

This, of course, increases

generation

of eight major weapons showed that the cost of a

successor system was between two and six times greater

than

Other

significant

factors

contribthat of its predecessor.

uting to cost growth were (1) optimistically

low initial

estimates

of costs on the part of competing contractors

and of

the military

services,

(2) revisions

in contract

specifications as to quantities,

scope, time schedules,

and engineering, and (3) inflation.

Various actions have been proposed or are being tried

to

develop new policies

and management techniques

to bring about

They are aimed at three key objectives:

improvements.

(11

making the right

decision

at the outset on what to develop

(2) learning

the lessons offered

by

and for w’hat purpose,

past schedule slippages,

cost overruns,

and disappointing

performances of the weapons in the field,

and (3) strengthening

the overall

management of the systems acquisition

process.

GAO recommended that action

strengthened

in these 13 areas:

be taken,

continued,

or

1.

Obtain Office

of the Secretary

of Defense, service,

and congressional

agreement on the basic operational

need, the fundamental

weapon system characteristics,

and the expected level of resources

to

be allocated

to that need.

2.

Strengthen

the staff

tary of Defense with

analyses of missions

support to provide

the Secrecomprehensive

and objective

and weapons requirements.

21

3.

Extend the span of congressional

authorizations

least 1 year in advance of the upcoming budget

at

year.

4.

Strengthen

congressional

reviews of weapons budgets

by first

considering

and approving budget totals

for major missions.

This review will

be based on

consideration

of the overall

needs of the various

military

missions.

5.

Avoid concurrent

adhere to orderly

evaluation.

6.

Stress austerity

in development,

small design teams,

freedom to innovate,

and maximum competition

in the

design phase with clear separation

of development

and production,

Encourage continuous

development

of subsystems.

7.

Adopt contracting

practices

and Governmentcontractor

relationships

which will

encourage

most effective

team performance.

development and production

and

and sequential

design, test,

and

the

8.

Continue to improve the Government’s

capability

to

develop cost estimates

covering

the development

phase, as well as the production

phase, of new systerns,

9.

Emphasize life

cycle costing

to gain better

perspectives on proposed new systems and to strengthen

cost-effectiveness

analysis.

f

10.

Continue the current,

strong emphasis on upgrading

the competence, stature,

and tenure of program

managers and procurement

specialists.

11.

Continue to emphasize operational

test and evaluation by establishing

in each military

department

an organization

independent

of the developer and

the user,

The senior DOD official

in these activities

should report

to the Secretary

of Defense or

to his deputy.

22

.

.

12.

One of the deputy secretaries

assume the responsibility

for

system acquisition.

13.

Improve the planning

for maintaining

ment and production

base.

(B-163058,

1973.)

23

of Defense should

mission analysis

and

the developMar. 26,

t

NEED TO CLARIFY POLICY ON INFLATION AS

A FACTOR IN COST ESTIMATES OF PROPOSED

PROGRAMS

Department

of Defense and civil

agencies

Inflation

is defined as a persistent

and appreciable

rise in the general level or average of prices for labor and

material e When an agency requests the Congress to authorize

and appropriate

funds for a program, realistic

cost estimates,

including

inflation,

are needed to be considered

in deliberThe Office

of Management

ations on the merits of the program.

and Budget (OMB) has a long-established

policy

that excludes

allowances

for future

price increases from budget requests

presented

to the Congress.

Inflation

has little

effect

on

programs for which funds are budgeted and obligated

for a

programs, however, OMB’s policy

single year D For long-term

may result

in approval of programs by the Congress on the basis of incomplete

information.

GAO examined the methods by which

consider

inflation

in estimating

costs

and disclose

them to the Congress.

Government agencies

of long-term

programs

Some agencies included allowances for inflation

in their

budget requests

despite the OMB policy.

The allowances were

and

the

Congress

did not receive

not so identified,

however,

budget estimates

prepared on a consistent

basis.

Also, agencies frequently

prepared cost estimates

for internal

use-in contrast

to the cost estimates

submitted

to the Congresswhich included allowances for inflation.

In 1969, DOD requested authority

from OMB to provide for

inflation

in its cost estimates

for major weapon systems and

other large projects.

The request was denied.

DOD then instructed

the military

services

to prepare two estimates--one

excluding

inflation

for OMB use and one including

inflation

for DOD use.

In response to DOD’s later

request,

OMB modified its policy with respect to 1972 and 1973 fiscal

year

budget estimates

for major weapon systems and major construction.

GAO suggested to the Director,

OMB, that cost estimates

for long-term

programs include an estimate

for inflation

and

that the estimate

be presented

to the Congress as supplemental

24

,

data.

OMB did not agree.

OMB believes

that including

inflaeven on the suggested supplementary

bation in cost estimates,

sis, would tend to increase Government procurement

costs o

OMB has sound reasons for not desiring

to include inflation in the formal Federal budget.

However, to assess and

the Congress should have inauthorize

long- term programs,

as

realistically

as possible,

the total

formation

showing,

Agencies should have estimates

for

expected program costs.

inflation

available

to submit to appropriate

congressional

committees for their

use when the programs are under consideration.

(B-176873, Dec. 14, 1972.)

25

RESEARCHAND DEVELOPMENT

COORDINATION NEEDEDAMONGGOVERNMENT

AGENCIES TO INSURE MAXIMUM SHARING

OF TECHNOLOGY

Department

of Defense

and civil

agencies

GAO sought to identify

ways by which DOD and Federal

civil

agencies can share and put to greater

use the Government’s technological

resources

to solve sociological

problems in such areas as transportation,

law enforcement,

environmental

protection,

education,

housing,

and urban develThe contribution

which DOD can make becomes clear

opment.

upon realizing

that DOD spends about $8 billion

a year in

research and development-- nearly half the Federal research

and development budget- - involving

virtually

every scientific

and technical

field.

This sharing process is called technology

transfer.

It

means that technology

developed for a particular

purpose may

be adapted and applied to fill

a different

need.

Transfer

methods may be:

1.

Passive-- collecting,

technical

documents

tial users.

processing,

and distributing

and data on request of poten-

2.

Active-- personal liaison

between developers

of

technology and its potential

users, frequently

aided by a third-party

transfer

agent.

The transfer

process is complex, particularly

where the developer and potential

user do not have similar

technical

backgrounds and where the commonality of problems is not obvious,

In a report

submitted

to the Congress in December 1972,

CA0 pointed out that DOD’s efforts

are primarily

passive.

Active participation

has been inhibited

by the lack of policy

guidance and the question

of whether DOD funds may be expended for other than mission-related

research.

In the absence of a national

policy and of guidelines

which clearly

define the responsibility

of all agencies to encourage technology transfer,

civil

agencies differ

widely in the extent

that they seek and use DOD technology.

26

GAO recommended that the Secretary

of Defense establish

policy and procedures

to encourage active

transfer

of DOD

technology

to civil

agencies.

GAO also recommended that the

Director,

Office

of Management and Budget:

--Establish

a Government-wide

policy

for technology

transfer

and issue guidelines

for formal active transfer efforts.

--Provide

for a small technology

transfer

team as a

pilot

effort

to assist

Federal agencies in matching

technological

resources

with their

needs in solving

pressing

national

problems.

The Secretary

of Defense has issued a policy

statement

endorsing nondefense work in DOD laboratories,

subject

to

certain

specified

considerations.

The policy

statement

is

an essential

first

step; guidelines

to put the policy

into

effect

still

are needed.

The Office

of Management and Budget said that it had

long been the Government’s policy

to encourage technology

transfer

and cited steps being taken in this regard but did

not agree to provide written

guidelines

for active transfer

efforts

by Federal agencies.

(B-175132, Dec. 29, 1972.)

27

DEVELOPMENT

AND USE OF FLIGHT SIMULATORS

COULDREDUCECOST

OF MILITARY FLIGHT TRAINING

Department

of Defense

GAO reviewed commercial atid military

uses of simulators

for flight

training

to find out if greater

use of simulators

in DOD would reduce costs of flight

training

without

weakPilot

training

programs of the Air

ening pilot

proficiency.

Force and the Navy were reviewed because these services

fly

the most fixed-wing

aircraft.

The Air Force and the Navy fly about 8.4 million

hours

Hourly operating

costs

a year, much of which is for training.

for fuel,

maintenance,

and spare parts range from less than

$50 for light

trainers

and utility

aircraft

to more than

$1,500 for combat aircraft.

Advancements in technology

are continually

improving

flight

simulators’

ability

to duplicate

the operating

characteristics

of flying

and flight

environment.

Commercial

airlines

have taken advantage of breakthroughs

in simulator

technology

and have replaced various phases of flight

training with training

in improved simulators.

The military

services have not always availed themselves of the advanced technology partly

because of the operational

requirements

and

priorities

of the Southeast Asia conflict.

Air Force and Navy studies

completed in 1972 projected

that, with better

simulators

and improved training

techniques, flight

time at basic pilot

training

schools could be

reduced in the mid-1980s by about 46 to 49 percent,

depending on the type of aircraft

involved.

The extent that simulator

training

can replace flight

training

in combat aircraft

used in intermediate

training

and operational

squadrons

is not known. However, substantial

savings are likely.

A

’

25-percent

reduction

of flight

training

in such aircraft

would save about $455 million

annually;

a 50-percent

reduction would save about $910 million

annually.

The range of potential

savings is necessarily

broad because under the current

state of the art in simulator

technology there is no basis for accurately

estimating

the amount

of flight

training

future

simulator

use can replace.

However) with the development of more sophisticated

visual

28

simulators p the range of actual flight

characteristics

and maneuvering which can be accurately

duplicated

by simulators

should increase and should permit more replacement

of flight

training

in aircraft.

The military

services

have recently

taken several steps

to increase simulator

development and use for pilot

training

which GAO believes

are constructive.

However, continuing

emphasis will

be necessary for several years.

This will

require current

research and development funds to be spent to

achieve future

long-term

benefits.

Accordingly,

GAO recommended that the Secretary

of Defense require

the Navy and

the Air Force to:

’

2

/

--Put a higher priority

on developing

improved simulatoss which can replace maximum amounts of flight

training.

--Insure

that development and use of adequate simulators

are integral

parts of acquisition

or modification

programs for sophisticated

aircraft.

I

--Use simulators

as much as possible

to reach and maintain desired proficiency,

including

the establishment

of simulator

grading methods which will

provide a more

accurate

evaluation

of pilot

proficiency.

The Assistant

Secretary

of Defense (Manpower and Reserve

Affairs)

agreed fully

with the recommendations

and stated

that:

--DOD understands

the need to explore alternatives

traditional

flight

training

programs.

to

--Advance simulators

have been delivered,

have been

placed on order,

or are under development for the

latest

weapon systems in the inventory.

--Indepth

studies will

be made to objectively

individual

performance,

learning

transfer,

related

to this training

approach,

determine

and costs

GAO plans to evaluate the effectiveness

of these

in future

reviews.

(B-157905, Aug. 9, 1973.)

29

actions

1

1

YROBLEMSIN DEVELOPMENTOF THE SAM-D

SURFACE-TO-AIR MISSILE

Department

of the Army

The Chairman, Research and Development Subcommittee,

Senate Committee on Armed Services,

asked GAO to review the

SAM-D surface-to-air

missile

system which was in the developA report on the review, submitted

to the Congress

ment stage.

t'SECRET"tl The following

is an unin May 1973, is classified

classified

summary of the report.

/

The Army is developing

the SAM-D to replace the Improved

HAWKand Nike Hercules systems.

The Department of Defense

justifies

the replacement

on the basis that the SAM-D will be

more cost effective.

Comparing the SAM-D with the Improved

HAWK shows that:

--A single Improved HAWK radar can scan a greater area

than a single SAM-D radar.

The Army is studying ways

to ,increase the SAM-D radar coverage and ways to increase radar survivability

against enemy antiradiation

missiles.

--Reloading

times for the SAM-D are significantly

longer

than for the Improved HAWK. However, an Improved HAWK

battery

is easier to overwhelm than a single SAM-D

fire section,

since the Improved HAWK can engage fewer

targets concurrently

than can the SAM-D.

--The SAM-D can track a significantly

greater

targets

than can the Improved HAWK.

number of

--The SAM-D has a longer range, a higher altitude

capability,

and a faster

firing

rate than the Improved

HAWK.

--The Army expects to use fewer personnel to deploy the .

SAM-D than are needed for deployment of the Improved

HAWK.

On the basis of these findings

Congress may want to consider:

GAO suggested

--What assumptions were made justifying

that

greater engagement capability

would offset

reloading

time,

30

that

the

the SAM-D's

its slower

--Why the Army used its own assessment of enemy threat

rather

than that of the Defense Intelligence

Agency

and whether a new analysis

should be made that would

include consideration

of all support and systems that

would be available,

including

ground and air,

to

counter the threat

beyond 1980.

--Whether the Army has left

its forces and the assets

it is to protect

vulnerable

to attack by developing

a

system, the SAM-D, that has a limited

radar coverage.

--Whether

the SAM-D, or any other air defense system for

that matter,

can survive

or be effective

in an environment where antiradiation

missiles

are used.

--Whether

the Army is still

assured.about

the prospects

of being able to operate the SAM-D with fewer personnel and attain

simplified

maintenance

in view of

changes in quantities

to be acquired and changes in

performance

characteristics.

--Whether

the decisions

to defer testing

of critical

and guidance

components, such as the warhead-fuzing

subsystems,

until

a considerable

expenditure

of funds

has been made is justified

in view of past experience.

--Whether the current

trend of rising

costs on the SAM-D

program can be curtailed

and whether continued

rising

costs would impact on the capabilities

and quantities

of fire

sections

acquired.

--Whether a new cost-effectiveness

study is warranted

in view of the changes made to the SAM-D performance

characteristics,

quantities,

and additional

changes

contemplated,

as well as the product improvement program on the Improved HAWK.

Another matter that the Congress may wish to examine

relates

to the Mutual and Balanced Force Reduction Program

presently

under negotiation.

Since the need for the SAM-D

is partly

predicated

on the army’s assumption that its forces

reduction

in the size of these

in Europe will

be increased,

forces and the Warsaw Pact Forces could impact significantly

on the quantities

of SAM-D fire

sections

needed in that area.

(B-163058, May 7, 1973.)

31

DEVELOPMENTOF IN-FLIGHT ESCAPE SYSTEMS

FOR HELICOPTERS COULD REDUCE

FATALITIES AND SEVERE INJURIES

Department

of Defense

Navy-sponsored

studies

show that most helicopter

fatalities

result

from uncontrolled

descents which, in turn,

result in crashes -causing structural

failures

and fires.

The

studies

show also that in-flight

escape systems could prevent over 40 percent of these fatalities.

Other proposed

survivability

features

could further

reduce fatalities.

The Navy has studied such escape systems since 1962.

the most, has conHowever, the Army, which uses helicopters

centrated

on reducing injuries

and fatalities

by developing

and installing

energy-absorbing

seats to reduce impact forces

and crashworthy

fuel tanks to prevent fires.

Although the

Army’s system is important,

it offers

protection

to crew

members and passengers only when impact forces are low.

From September 1967 to September 1972, 210 Army and 10

Marine Corps Cobra pilots

were killed

in Vietnam.

A Navy

anaiysis

indicated

that in-flight

escape systems could have

prevented 6 out of every 10 Cobra pilot

deaths.

In March 1972 the Navy obtained $500,000 to begin developing individual-type

escape systems for Cobra helicopters.

The Army is helping to fund this development effort.

Although the Army agrees that an in-flight

escape system is desirable

for its new advanced attack helicopter,

its current

design requirements

do not provide for such a system.

GAO

believes

that the development of an in-flight

escape system

should be emphasized to insure its availability

for this

helicopter.

The Navy has deemphasized developing

and testing

a

capsule-type

in-flight

escape system for larger

troop transport helicopters

primarily

because of additional

weight involved.

GAO recognizes

that

tems for cargo-passenger

and constraints

regarding

available

technology

for

development of in-flight

escape syshelicopters

may pose severe problems

weight and complexity.

However,

capsule-type

in-flight

escape systems

32

Therefore

has been demonstrated.

sible system for the troop-carrying

continued.

GAO recommended that

effort

to develop a feahelicopters

should be

the Army:

--Emphasize and give priority

to developing

an in-flight

escape system for the advanced attack helicopter.

--Monitor

the current

development of the escape system

for the Cobra helicopter

to determine whether the concept could be applied to the design of the advanced attack helicopter.

--Reevaluate

the design requirements

for the advanced

attack helicopter

to insure that it will

be capable

of accepting

an in-flight

escape system when it becomes available.

GAO further

recommended that effort

to develop a feasible solution

to provide an in-flight

escape capability

for

the larger

cargo-passenger

helicopters

be continued.

DOD said it would continue

efforts

to increase

the effectiveness

of escape systems but disagreed

that emergency

in-flight

escape systems should be included in helicopters

now being developed or planned for development.

DOD contended that an in-flight

escape system had not been ‘vdemonstrated

to be the most effective

method of improving

flight

safety,

considering

both human life

values and dollar

costs.“’

GAO believes

that DOD is not adequately

considering

costs of not having emergency in-flight

escape systems:

the

--Trained

and experienced

aviators

and other trained

military

personnel

are killed.

Army and Navy estimates of the initial

cost of training

each helicopter

pilot

range from $20;000 to $100,000.

--Death

benefits

must be paid.

--New pilots

must be trained.

--Helicopter

readiness

pilot

and crew morale

is adversely

affected.

33

as well

as military

GAO recognizes

that it may be expensive to develop,

install,

and maintain

an in-flight

escape system but believes

that the potential

decrease in the number of fatalities

and

severe injuries

warrants

further

consideration.

(B-177166,

June 12, 1973.)

34

IMPROVEMENTNEEDED IN DEVELOPMENT

e AND USE OF COMPUTERMODELS

Department

of Defense

A substantial

part of the. cost of conducting

computer

and

analytical

studies

was

represimulations,

war games,

sented by the development and operation

of models used in

these activities

e A model is a documented set of rules,

methodologies,

techniques,

procedures,

mathematical

formulas,

and logic designed to simulate

or approximate

selected

elements and/or functions

of reality

that are deemed essential

to the particular

situation

or system being studied.

Modeling is one of the principal

tools the operations

research and systems analysis

community uses to simulate,

“game, I1 or study complex problems or situations

involving

(1) technical

performance

of equipment or systems,

(2) polities,

strategies,

and tactics,

and (3) force structures,

including the determination

of optimum size and appropriate

mixes of personnel and weapons.

Its purpose is to provide

decisionmakers

with results

that should present objective

and statistically

reliable

bases for decisions

in these areas.

GAO reviewed

in DOD.

the development

and use of computer

models

Numerous models have been developed in DOD over the past

10 years to cover a broad spectrum of simulated war, defense,

and military

problems.

GAO obtained data on 132 models

which represented

a fairly

complete picture

of the modeling

activity

throughout

DOD. Some observations

derived from

analyzing

the data were:

--Development

of models was about equally

tween contractor

and in-house activities.

divided

be-

--Reported

costs of building

104 models totaled

$28,805,500,

and the average model cost was about

$276,900.

The cost of individual

models ranged from

about $1,200 to $3 million,

--Building

a model is generally

a lengthy undertaking.

The average reported

development time was 18 months;

some models were under development for as long as

7 years.

35

--Many models were related

and formed the basis for

to previously

developed

follow-on

models.

ones

--Independent

checks were not made to insure the accuracy, timeliness,

consistency,

and overall

quality

of

the data used in about one-third

of the models.

--Technical,

doctrinal,

and force-structure

evaluations

were the principal

stated purposes for building

models; models were then used to answer specific

questions and to study operational

problems in five major

areas : logistics

operations,

ground combat, nuclear

and naval warfare.

exchange, air warfare,

There were indications

that uncertainties

may not be

adequately

considered

in the studies

employing a computer

model and that DOD decisionmakers

frequently

may not be made

aware of the uncertainties

inherent

in the study results.

The proper.use

of study results

requires

that the relevant

qualifications

reflecting

the inherent

uncertainty

be presented to the decisionmaker

along with the results.

If a

decisionmaker

is to be enlightened

and is to receive full

benefit

from a study, he should be fully

informed of the limitations

and uncertainties

and how they were treated,

the

range of assumptions that were made, as well as other qualifying factors

that influenced

the study results

and conclusions.

GAO recognized

the efforts

within

DOD to improve the

use of computer modeling and simulation

techniques

in studies

and analyses programs.

The review indicated,

however, that

additional

emphasis was needed in this area.

Accordingly,

GAO recommended that the Secretary

of Defense:

--Formally

adopt, as DOD policy,

guidelines

for reporting study results

similar

to those of the Operations

Research Society of America.

--Establish

a requirement

for periodic,

independent

technical

reviews of computer models to insure continued improvement in their development and employment

as well as in the studies

in which they are used.

36

DOD endorsed the general concepts indicated

in the recomputer modeling

port; namely, that the.use of large-scale

to assist

decisionmaking

must be accompanied by continued

review of these models, and that principles,

such as those

outlined

by thd Operations

Research Society of America,

As for establishing

more formal guideshould be followed.

lines,

DOD was of the opinion that adequate guidelines

are

present in existing

directives

and manuals and that extend(B-163074,

ing reporting

requirements

was unnecessary.

May 3, 1973.)

37

SUPPLY MANAGEMENT

ECONOMIESAVAILABLE THROUGHIMPROVED

MANAGEMENTOF NAVY SHIPBOARD INVENTORIES

Department

of the Navy

During fiscal

year 1970 budget hearings,

the Defense

Subcommittee,

House Committee on Appropriations,

expressed

concern over the Navy’s request for $740 million

to buy repair parts and supplies needed to fill

the operating

requirements of its ships in view of the estimated

$1 billion

inventory of such items already on board the ships,

GAO made

this review to determine if the Navy was making maximum use

of available

repair parts and supplies

and to evaluate the

adequacy of its system for managing shipboard inventories.

GAO found (1) an estimated

$5.8 million

worth of excess

inventories

were loaded on 57 new ships because of delays in

applying an improved supply support concept to these ships,

(2) excess repair parts valued at $2.3 million

were accumulated at two private

shipyards because outfitting

inventories

for 14 ships were purchased before firm requirements

were

established,

(3) millions

of dollars

worth of excess outfitting

inventories

were held at private

shipyards

for periods of up to 5 years, and (4) at one Navy shipyard over

1,000 usable items were removed from ships being modernized

and were unnecessarily

disposed of and replaced with new

items,

GAO also found that the Navy does not have an adequate

system for promptly identifying

and redistributing

excess

repair parts and supplies, aboard ships in the .operating

fleet

which are needed by other ships.

As a result,

an estimated

$59 million

worth of excess inventories

are accumulated

aboard Navy ships during the 3nyear period between supply

overhauls.

GAO estimated that between $11 million

worth and

$29 million

worth could be used to support other ships.

GAO further

found an estimated

$100 million

worth of

idle inventories

on inactive

ships and at inactive

ship

maintenance facilities.

Although the Navy is using some of

38

these inventories

to support active ships,

as $20 million

worth could be used without

mobilizatitin

readiness

of inactive

ships.

GAO recommended that

that:

the Secretary

possibly

impairing

as much

the

of the Navy insure

--Eleven

ships scheduled for delivery

after

September 1,

1973, be outfitted

with revised,

rather

than conventional , allowances of hull a mechanical,

and electrical

repair parts.

--Inventories

taken off ships undergoing shipyard work

be used where possible

to resupply

the same ships

undergoing

concurrent

work at the same shipyard.

--A system is established

to provide for prompt identification

and redistribution

of inventory

excesses

on board active ships.

’

--The need for strict

compliance with prescribed

shipboard procedures

for recordkeeping

and requisitioning

material

is emphasized.

--The Navy’s

on inactive

policy

concerning

ships’ is furt,her

the use of inventories

revised,

The Navy agreed with the intent

of GAOfs recommendations

but did not, in some case, agree with the method of implemenThe Navy cited a number of actions which had been

tation.

taken or which were being taken, that should,

if properly

carried

out, bring about many of the needed improvements.,

The navy disagreed with GAO’s estimate

of the amount of excesses, particularly

aboard ships in the operating

fleet.

They estimated

actual excesses to be about one-fourth

as large

as GAO projected.

After discussing

this matter with Navy officials,

GAO concluded that its estimate

of $59 million,

while imprecise,

was reasonable and represented

a fair

indication

of the significance

of this problem,

(B-125057,

Apr. 9, 1973.)

39

SAVINGS ATTAINABLE BY REVISING

PACKAGING CRITERIA

Department

of Defense

At the outset of the U.S. buildup in Vietnais, fast

logistical

response was strained

severely

because facilities

there were too meager to handle vast quantities

of supplies.

Many supplies

could not survive

the rigors

of transportation,

outdoor storage in a hostile

environment,

and multiple

and

rough handling.

Great material

losses were sustained,

To correct

this

situation,

stringent

and costly packaging criteria

were

specified

across the board, regardless

of destination.

Many of those stringent

criteria

continue in effect

although conditions

giving rise to them have changed significantly,

As a result,

DOD is spending millions

of dollars

a year for packaging it doesn’t need,

In addition,

bidders

and contractors

are required

to wade through voluminous

standards , specifications,

and guidelines

which are repetitious,

redundant,

or not applicable.

Contractors

whose own commercial packaging often

that specified

are further

confronted

by inconsistent

of packaging required by different

DOD buyers.

equals

methods

GAO recommended that the Secretary

of Defense discontinue blanket assignment of packaging levels for “protection

against the most severe conditions

known or anticipated;”

determine the suitability

of commercial packaging and make

greater

use of it where it meets minimum Government requirements ; and closely monitor the progress

of the U.S. Army

Materiel

Command Packaging,

Storage, and Containerization

Center--DOD’s

focal point for developing

and monitoring

the

packaging program- -and reaffirm

its authority

to carry out

its intended objectives,

DOD, concurring

in the report’s

objective,

considers

that actions have been taken or are part of an ongoing program to carry out the intent

of the recommendations.

Its

guidance to various DOD elements has been revised and expanded to incorporate

some of GAO’s recommendations.

(B-157476, May 21, 1973.)

40

REQUIREMENTSFOR MODULARELECTRONIC

EQUIPMENT FOR AIRCRAFT COULD BE REDUCED

Department

of the Air. Force

The Air Force has invested billions

of dollars

in

electronic

equipment used in aircraft

(avionics).

For exthe

avionics

and

spare

parts

for

its

F-111D

aircraft

ample)

alone have cost more than $900 million.

A significant

development in the field of electronics

has been the introduction

of modular design; under this

concept many expensive “black boxes” making up an avionics

system contain plug-in-type

components known as modules.

The principal

advantages

of modular

design

are:

--Avionics

units or black boxes can be rapidly

replaced

in aircraft

on the flight

line,

so the time aircraft

are out of service is minimized.

--Most black boxes can be repaired rapidly

time can be taken to repair modules.

and more

Because avionics are becoming more and more costly,

investment in less expensive spare modules, rather than in more

expensive spare black boxes, means substantial

savings,

GAO found that the Air Force could have substantially

reduced its requirements

for avionics

spares for the A-7D

and the F/FB-111 if its management personnel had used more

realistic

estimates

in determining

the requirements.

The

estimates

used did not recognize all the advantages of modular design.

For example, estimates were based on the premise that:

--Repairing

actually

black boxes would

being experienced.

take more time

--More black boxes modules were being

repair

facilities.

sent

than was

to depot

The second premise was the result

of a management reporting

system which did not routinely

show actual repair cycle time.

As a result,

expensive black boxes rather than less expensive

41

modules continued

to be bought; many black boxes were

awaiting repair

because of the lack of subcomponents and

maintenance capabilities

to repair

them,

The Air Force is considering

modular design for other

types of equipment in its inventory,

In view of-the

significance of the problem, GAO made several suggestions

to the

Secretary

of the Air Force to insure that the maximum benefits

were achieved from the modular concept,

DOD generally

agreed with GAO’s suggestions,

and said

GAO’s information,

provided during the review,

had proven

useful to Air Force logistics

planning and had resulted

in

improved management.

The Air Force reduced requirements

for

items for F/FB-111 and A-7D aircraft

by $79 million.

More

importantly,

the Air Force has begun preventing

a recurrence

of the matters discussed in the report,

(B-133396, July 3,

1973.)

42

MAINTENANCEp REPAIR, AND OVERHAUL

LITTLE PROGRESSIN ACTING ON OPPORTUNITIES

FOR SIGNIFICANT SAVINGS BY CONSOLIDATING

REAL PROPERTYMAINTENANCEORGANIZATIONS

Department

of Defense

In 1968 GAO reported potential

annual savings of

$3.4 million

by consolidating

real property

maintenance

organizations

on Oahu, Hawaii, and in the Norfolk,

Virginia,

area.

DOD,

which

spends

$3

billion

yearly

on

real

property

.

maintenance,

p romised to consider consolidation

at those

locations

and elsewhere.

GAO reviewed DOD progress in

carrying

out the 1968 recommendations

because of the increasing costs, concern with high Federal budgets, and need

for managing the military

establishment

more efficiently.

In the 4 years since GAO’s last review, almost no

consolidation

had taken place m DOD made studies at 25

locations,

including

Oahu and Norfolk.

Most of these did

not seriously

consider consolidation.

Instead of considering the feasibility

of consolidation,

.the Interdepartmental

Committees making the studies emphasized the joint

use of

equipment and increased use of and/or consolidation

of

contracts.

-.,Some savings have been reported.

The effectiveness of the committees was reduced because:

--Many members represented

maintenance organizations

that would be affected

by consolidation.

--Informal

guidance from committee members in Washington, in conflict

with the original

intent

of the

“studies,

advised the Interdepartmental

Committees not

to be concerned with the feasibility

of consolidation.

Although efforts

to date have merit,

potential

savings

from consolidation

seem far larger than those attained.

Some of the above studies and other studies have identified

various locations

where consolidation

would be economical,

Benefits

of consolidation

are demonstrated

by Navy experience

For

example,

three

locations

with Public Works Centers.

where centers have been serving installations

in their

vicinity

for 6 years report annual savings of $1 million.

Some Navy Public Works Centers, however, are underused

43

because individual

installations

are not required

to use them

but, instead,

maintain

their

own duplicative

maintenance force.

GAO recommended that the Secretary

of Defense should have

maintenance organizations

consolidated

where studies

indicate

consolidation

would be economical.

GAO also recommended that

the Secretary

of the Navy should require,

where feasible,

that all naval activities

within

a reasonable distance

of a

Public Wor,ks Center use it fully.

DOD said that interservice

support agreements have been

most effective

in consolidating

real property

maintenance

The

use

of

such

agreements

has

resulted

in savings

activities.

by avoiding unnecessary duplication

of functions

and by increasing

the use of consolidated

contracts.

Although stressing

limitations

that must be overcome in complete organizational

consolidation,

DOD said that such consolidation

was its ulti;

mate goal.

DOD also said the Navy is improving use of Public

Works Centers.

Revised guidance issued by DOD in March 1972

is an initial

step toward consolidating

maintenance organizations wherever practical.

GAO plans to look into the implementation

of this guidance and the effectiveness

of DOD’s

continuing

efforts

in this area.

(B-164217, Dec. 12, 1972.)

44

.

*POTENTIAL FOR GREATERCONSOLIDATION

OF MAINTENANCEWORKLOADS

Department

of Defense

In a report

issued to the Congress, we disclosed

problems

concerning

the effectiveness

of interservice

maintenance programs of the military

services.

We found that each of the

military

services

has overemphasized

developing

its own inhouse depot maintenance capability

instead of trying

to

Although existing

policy

use other services’

existing

ones.

encourages interservicing,

the services

have circumvented

the spirit

and intent

of this policy.

Consequently,

they have

extensively

duplicated,

and thus, underused maintenance capacities.

The Secretary

of Defense has not been able to effeccontinued use of their

own maintively

control

the services’

tenance capabilities

because they have claimed a need to

maintain

mission-essential

equipment in their

own facilities.

GAO recommended that the Secretary

of Defense form a

plan to realign

the management of depot-level

maintenance.

This plan should consider the following

alternatives:

(1)

establishing

an independent

agency, similar

to the Defense

for the depot-level

SUPPlY Agency 3 to assume responsibility

maintenances

of all commonly used equipment items or (2)

assigning

a single manager to be responsible

for maintenance

of specific

classes of items.

DOD agreed to consider

implementing our recommendation

for a single manager responsible

for maintenance of specific

classes of items.

(B-178736,

July 6, 1973.)

45

NEED FOR IMPROVEMENT

IN INDUSTRIAL MANAGEMENT

Denartments

of the Army and Navy

In 1971, GAO advised the Congress that industrial

management reviews can effectively

identify

ways a Government

contractorfs

costs can be reduced and that it would be practicable

for GAO to undertake

such reviews.

GAO conducted reviews at the Naval Air Rework Facility,

Alameda, California,

and the Army Aeronautical

Depot Maintenance Center, Corpus Christi,

Texas, and identified

opportunities

for improving overall

industrial

operations

with

related

savings which could amount to several million

dollars

a year.

Some areas identified

were common to both installations :

--Converting

idle time of the production

allow each depot to absorb substantially

without

increasing

the workforce.

workforce

would

more work

--Improving

the work measurement systems and labor

standards programs would improve workload scheduling

and production

control,

thus enhancing total

productivity

of both installations.

--Recording

machine usage would assist management in

decisions

regarding

retention,

redistribution,

and

acquisition

of equipment,

as well as form a realistic

basis for preventive

maintenance programs e

--Repair

costs could be reduced through more systematic

decisionmaking

regarding

repair

parts which could be

purchased more economically

than the present practice

of making or repairing

the parts.

--Inventory

quantities

economies

of parts

can be achieved by reducing large

accumulated in maintenance shops.

In addition

to the potential

savings these areas indicate) improvements in DOD industrial

activities

play an

important

role in the level of operational

readiness

of

For

example,

the

Alameda

respective

military

forces.

report

states that average repair

time for critically

needed

aircraft

components during fiscal

year 1971 was 57.8 calendar

46

the stalradard time by 35.8 days.

that 26 additional

aircraft

would have been fully

if the repair

standard had been met.

days 9 exceeding

GAO estimated

operational

Each facility

began implementing

suggested corrective

actions during the reviews,

GAO recommended that DOD plan

periodic

industrial

management reviews of its industrial

facilities.

DOD told GAO that it was exploring

the feasibility

of

making such reviews but believed the types of, studies

GAO

performed were already being done through internal

audit,

management reviews.

Inspector

General, and other functional

(B-133014, July 3, 1973.)

47

NEED FOR MORE REALISTIC PROJECTIONS OF

FUNDING REQUIREMENTSFOR SHIP OVERHAULPROGRAMS

Department

of the Navy

Fiscal years 1972 and 1973 were characterized

by substantial

changes in the Navy’s ship overhaul program.

Although the Navy received all the funds they requested in

these years, fewer ships were overhauled than originally

planned.

Because of this, your Committee directed

that

GAO review the Navy’s ship overhaul and repair programs for

1972 and 1973.

GAO found that the Navy did not anticipate,

and therefore did not budget for, the substantial

increase in the

cost of overhaul work in Navy shipyards.

Actual ship overhaul costs were 27 percent higher in 1972 than original

As of March, the 1973 ship overhaul costs were

estimates.

about 20 percent higher than original

estimates.

Because overhaul costs were higher than available

funds, the Navy had to defer planned overhaul work.

The

original

1972 overhaul schedule of 139 ships was reduced

to 102 ships, and the 1973 overhaul schedule of 95 ships

was reduced to 84.

Budget requests were based on overhaul-experience

in

fiscal

years 1969 and 1970.

Cost estimates

were developed

from (1) forecasts

of the amount of repair that ships would

need when they entered overhaul in 1972 and 1973, expressed

as direct

labor man-days

and (2) projections

of man-day

rates and material

costs in those years.

The procedures

needed for overhaul

used to forecast

the number of man-days

t

were not accurate because:

the man-days

--Generally,

were understated.

--Some planned

--Labor

required

work was not’ included

and material

costs

for

overhaul

in the estimates.

were allocated

arbitrarily.

--Prior

overhaul costs, which were incomplete,

used to estimate future work.

48

work

were

.

\

Also, projections

Qf man- ay rates in Navy

shipyards

were substantially

understat

Shipyard repair

costs)

expressed as a cost per man- ays increased

from $69 in 1969

to $109 in 1973--an increase of almost 60 percent,

Most of

the $40 increase,

about $28 a man-day, is attributable

to

wage and salary increases

for direct

and indirect

employees,

The remainder)

about $12 a man-day, is attributable

to increased overhead costs.

,

Various factors

contributed

to the overhead cost increase, but the most significant

factor

was reduced employment at the shipyards.

Employment dropped from about 90,000

in 1969 to an estimated

67,000 at the end of 1973--a decrease

of about 25 percent.

The increased

cost for overhauls

in 1972 and 1973 revised the outlook for ship maintenance.

Although the Navy

originally

anticipated

that only one ship’s overhaul would

be overdue at the end of 1972, 21 ships with overhaul costs

of $87 million

were overdue by June 30, 1972.

Because this

backlog carried

over into 1973 and because overhaul costs

increased,

the number of ships overdue for overhaul has

further

increased.

The Navy projects

that 33 ships, with

an estimated

overhaul cost of $233.4 million,

will

be overdue at the end of 1973.

This undoubtedly

will

affect

the

plans for ship overhauls

in 1974 and future

years.

Furthermore, the full

impact of the Vietnam operation

on overhaul

costs may not have been totally

realized

or provided

for

in the 1974 overhaul program.

The Navy has changed its procedures

for estimating

thk

work needed when ships are overhauled.

These new procedures)

which appear to be improvements,

were used to prepare the

1974 overhaul program.

The Navy continues

to be faced with high costs for

repair work in its shipyards.

Additional

pay raises can be

expected in the future

as well as increased material

costs.

The most significant

cost influence

is the low use of

If shipyard

the Navy shipyards

in terms of their

capacity.

capacity

is expressed as a function

of shipyard employment

the 10 existing

shipyards

are operating

at about

levels,

75 percent

of their

1969 levels.

Since overhead costs have

not dropped proportionately

to the use, the overhead cost

per unit of production

has increased.

49

The Navy has several

--Close selected

ing yards.

options

shipyards

--Emphasize improving

of its shipyards.

to control

and increase

efficiency

costs.

use of remain-

and cost

effectiveness

--Reduce fleet

size by inactivating

older ships

less reliability

and high maintenance costs.

with

The closures of two shipyards,

recently

announced,

Although we did not specifically

should help this situation.

review the effect

of these closures,

ship overhaul and repair workloads at those yards can eventually

be redistrib(B-133170,

uted to increase the use of other shipyards.

June 7, 1973.)

50

ADMINISTFUTIQNOF MANPOWER

MATTERS

PROBLEMS

IN MEETINGMILITARY MANPOWER

NEEDSIN THE ALL-VOLUNTEER

FORCE

Department

of Defense

As July 1, 1973, drew near, the Congress was faced

essentially

with three choices in legislating

the future

method of obtaining

men and women to serve in the Armed

Forces : (1) let the existing

draft

authority

expire and rely

entirely

on volunteers,

(2) extend the existing

draft

system, or (3) rely on an all-volunteer

force but enact some

form of standby draft

authority.

GAO’s report

to the Congress sought answers to some of the major issues associated

with putting

the volunteer

system into operation.

The report

stated that obtaining

and retaining

sufficient officers,

except those in health professions,

did not

appear to be a problem.

there

appeared

to

be

less

However,

optimism about the services’

ability

to obtain a sufficient

number of qualified

enlisted

personnel.

On the basis of the

experience with true volunteers

and quality

services I prior

goals,

it appeared that there would be a shortfall

of between

11,000 and 83,000 new enlistments

in fiscal

year 1974, compared with a total

requirement

of 354,000.

The shortfall

would occur primarily

in the Army and the Marine Corps and

to a small degree in the Navy.

To avoid these shortfalls,

the services

could accept

more men with below average mental qualifications

(Category IV) and more enlistees

who had not graduated from high

school.

According

to DOD officials,

service quality

goals

had been set at levels difficult

to attain

and were unrealis tically

high.

The Army and the Navy had achieved their

high school graduate goals with true volunteers

in only

1 month since January 1970; the Marine Corps’ goal had not

been achieved at all during that period.

The Air Force, on

the other hand, had no difficulty

in maintaining

quality,

In its report,

GAO illustrated

the importance of obtaining the desired quality

of enlistees

by stating

that the

services

had imbalances in skills

resulting

from a combination of (1) insufficient

men of required

aptitude

and school

preference

and (2) inadequate retention

of men in desired

51

that over one=-half of the skill

skills I GAO reported

categories

in the Army and Marine Corps were either

overmanned or undermanned by more than 20 percent at June 30,

1972, and that filling

school seats for technical

occupations

would be difficult

because true volunteers

tended to have

less education and lower test scores than draft-motivated

volunteers 0 The report

also stated that a 20-percent

shortfall would occur in the Army’s combat arms enlistments

in

fiscal

year 1974 and that the Office

of the Secretary

of Defense had forecast

that, without

special

incentive

pay, there

would be physician

shortages beginning

in fiscal

year 1975

and perhaps sooner.

The report

identified

several alternatives

to using

male volunteers

to fill

military

requirements.

These included increasing

the use of military

women and converting

military

positions

to civilian

positions.

With respect to the Reserve and National

Guard, which

would be the initial

and primary sources for increasing

the

Active Forces in any future

emergency, GAO pointed out that

DOD was predicting

that,

at June 30, 1974, these forces

would be 97,000 below their mobilization

objective

level of

971,000.

GAO reported

that DOD programs for the all-volunteer

force contributed

about 23 percent of the increased manpower

costs occurring

since 1968.

The Office

of the Secretary

of

Defense’s Project Volunteer

costs budgeted for fiscal

year

1974 were about $3.192 billion.

GAO estimated

that as much

as $1 billion

of additional

costs related

to the allvolunteer

force were incurred

annually but were not specifically identified

for all-volunteer

purposes.

GAO expressed

the view that,

if force levels need to be increased

in the

future,

the cost of volunteers

may increase sharply.

The report raised several questions

the Congress and/or its committees might

with DOD:

that

wish

minimum quality

GAO believed

to explore

1.

What are realistic

each service?

2.

What is the probable force level of minimum quality

that could be supported without

using the draft?

52

standards

for

3.

Should some form of standby

enacted?

induction

4.

Should some type of draft be required

cians after fiscal

year 1974?

for

physi-

5.

Should some type of draft

serve components?

for

the Re-

6.

Will the Uniformed

come the foregoing

1973.)

be required

authority

Services Special Pay Act overproblems?

(B-177952, May 2,

53

be

IMPROVEMENTSNEEDED TO INCREASE

EFFECTIVENESS OF THE GOVERNMENT

EMPLOYEES’ INCENTIVE AWARDSPROGRAM

Department

of Defense

GAO reviewed the Government Employees t Incentive

Awards

Program to determine whether cash performance

awards (lumpsum special achievement awards and quality

increases)

and

cash suggestion

awards had been effectively

encouraging

employees to help improve Government operations.

Of the more

than 1,900 randomly selected

employees responding

to a GAO

questionnaire,

56 percent indicated

that the program had not

motivated

them to do a better

job.

During fiscal

year 1972,

Government agencies granted over $16 million

for 91,161 special achievement awards, $4.6 million

for 56,606 employee

and 42,570 quality

increases

having an estisuggestions,

mated first-year

cost of $17 million.

Since these increases

are reflected

in subsequent years’ pay, these awards will

eventually

cost the Government much more.

The Civil

Service Commission reported

measurable benefits

of $315 million

related

to special achievements

and

adopted suggestions.

Related benefits

were not determined

for quality

increases.

GAO’s review was made in 10 civilian

partments

and agencies,

which represented

the Federal Government, and in the Civil

GAO found that:

--Cash

performance

and Defense dea cross section

of

Service Commission.

awards had been used inconsistently.

--There was no clear distinction

between the criteria

for granting

a special achievement award and a quality

increase,

although the latter

is much more expensive.

--Many employees were not

granted.

told

why specific

awards were

--About one-fourth

of Federal civilian

employees are not

eligible

for the quality

increase award because of restrictions

in Commission regulations.

54

--The Commission does not officially

creases in the program although

tacted treated

them as incentive

include quality

the agencies conawards.

in-

GAO found that employee participation

in the suggestion

award portion

of the program could be increased by actively

promoting

and publicizing

this portion

and by processing

sugFurther,

GAO found that the Commission’s

gestions

promptly.

annual report

on the incentive

awards program did not present

a complete picture

because it did not include the substantial

costs of quality

increases

and program administration

and may

have significantly

overstated

measurable benefits e Also,

neither

the Commission,nor

the agencies had made reviews of

sufficient

frequency

or depth to identify

problems in the

program.

GAO recommended that

mission:

the Chairman,

Civil

Service

Com-

--Establish

criteria

limiting

cash performance

awards

to employees whose performance

has clearly

improved

Government operations.

--Revise

standards to clearly

distinguish

between

level of performance

needed to receive a special

achievement award or a quality

increase

so that

ity increases

will be relatively

more difficult

obtain.

--Emphasize the importance

informed of the specific

of keeping employees

reasons for awards.

the

qualto

well

--Include

quality

increases

as part of the Incentive

Awards Program and consider creating

a comparable

value award for employees who are now ineligible

for

quality

increases.

--Insure

that agencies promote and publicize

the program and that suggestions

are processed promptly.

--Increase

the usefulness

of the Commission’s

annual report by including

quality

increase and administration

costs and by improving

the accuracy of reported

benefits

and costs.

55

--Make reviews and evaluations

necessary’to

program strengths

and weaknesses,

identify

The Commission said that GAO’s report

presented a clear

and accurate

perspective

on the Incentive

Awards Program and

that it believed

GAO’s conclusions

and recommendations were

As a result,

the Commission said it had taken,

constructive.

corrective

actions

and will

fully

or planned to take, certain

discuss with agencies the approaches to be taken to deal with

the problems GAO identified.

(B-166802, Nov. 1, 1973.)

56

INCONSISTENT POLICIES IN ADMINISTERING

DISABILITY RETIREMENTS

Deuar tment

of Defense

After

reviewing

military

disability

retirements,

GAO

reported

to the Secretary

of Defense that inconsistent

policies and practices

of the military

departments

might be resulting

in undue costs to the Government as well as inequitable treatment

of disabled service members.

During the review it was noted that excessive time was elapsing

between

the date Army and Air Force members were declared medically

unfit

for active service

and the effective

date of their

retirements.

For the Z-month period sampled, GAO estimated

that the Army and Air Force could have saved between

$825,000 and $1,845,000 by processing

disability

retirements

as expeditiously

as the Navy and Marine Corps.

The report

included recommendations

directed

at overcoming this problem.

GAO also noted significant

variances

among the services

in the ratios

of permanent to temporary disability

retirements, and it appeared that consolidating

the disability

processing

functions

of the four military

departments

would

eliminate

some of the inconsistencies

discussed above.

GAO

suggested that DOD consider

these two matters

in a study of

military

disability

retirement

that was then underway.

DOD generally

agreed with GAO’s findings

and indicated

that its recommendations

were being implemented.

The actions

taken on the recommendations

to expedite

the processing

of

disability

retirements

should result

in annual savings to the

Government of about $8 million.

(B-168308, Mar. 19, 1973.)

57

ENLISTED AIDE PROGRAMSREQUIRE MODIFICATION

Department

of Defense

GAO reported

to the Congress the results

of a review of

the enlisted

aide program of the military

services.

The review was made at the request of Senator William Proxmire.

as of December 1972, 1,722 enlisted

men

GAO reported

that,

were assigned as aides to 860 admirals

and generals and 110

Navy captains.

The remaining 457 admirals

and generals were

not assigned enlisted

aides.

Tasks performed by enlisted

aides were generally

those associated

with domestic servants.

Personnel costs of the enlisted

aide program for fiscal

year

1973 were about $21.3 million;

training

costs were about

In requesting

that the review be made, Senator

$360,000.

Proxmire asked GAO to clarify

the statutory

and budgetary

justification

for the programs and to determine

the nature

and propriety

of tasks assigned to enlisted

aides, which the

report

provided.

The Secretary

of Defense informed GAO that the report

resulted

in several changes in the program.

Major changes

included a 28-percent

reduction

in the number of enlisted

aides and the closing

of training

schools for aides.

These

changes should result

in annual savings of more than

$6.2 million.

(B-177516, Apr. 18, 1973.)

58

NEED FOR CENTRALIZED MANAGEMENT

CONTROL OF CLOSED-CIRCUIT TELEVISION

FOR TRAINING AND EDUCATION

Department

of Defense

At the end of the fiscal

year 1972, the Army, Navy, and

Air Force were using closed-circuit

television

equipment,

costing about $27.3 million,

for education

and training

purposes.

The personnel costs associated

with operating

and

maintaining

the equipment were estimated

to be about

$8.1 million.

GAO’s report

to the Secretary

of Defense highlighted

the importance

of effective

coordinated

or centralized management control

over those highly

specialized,

costly

resources.

The report

stated

that:

1.

Most studios

GAO visited

did not have catalogs

of

television

video tapes produced by other services,

and tapes usable by several services

generally

were produced independently

by each service.

2.

The services

were individually

testing

different

types of new audiovisual

equipment for similar

education

and training

applications

although it

would appear likely

that the services’

joint

testing of new equipment would result

in reduced costs.

3.

Each military

service had incurred

significant

investment and costs in operating

its own closedcircuit

television

studios,

although

(1) some

studios were in close proximity

to one another and

were not being fully

used and (2) the specializedskilled

operating

personnel were in short supply.

GAO made several recommendations

to have DOD provide

more aggressive

centralized

direction

over the services’

use

of television

equipment in meeting training

needs.

DOD officials

generally

agreed with the facts and recommendations

presented

in the report.

(B-177350, Nov. 29, 1972.)

59

IMPROVEMENTSNEEDED IN ADMINISTRATION AND

MANAGEMENTOF TECHNICAL TRAINING

Denartment

of the Navy

GAO’s report

to the Secretary

of the Navy discussed the

findings

of a review made at selected

naval facilities

to

assess the Navy’s administration

and management of technical

About $550 million

was spent during fiscal

year

training.

1973 in the Navy technical

training

activities.

GAO reported that differences

in the interpretation

of instructions

governing determination

of instructor

requirements,

as well

as the lack of management review at the training

locations

resulted

in both overstatements

and understatements

visited,

in Navy training

instructor

requirement

submissions.

GAO

also,found

that the Navy had not established

a formal system

which would provide for collecting,

assessing,

and disseminating information

needed to insure the adequacy of technical

training.

In addition,

the report

stated that,

in the absence of a standardized

instructor

training

policy,

instructors could spend as much as 30 percent of their

tours of duty

observing

classroom presentations

of experienced

teachers,

thereby increasing

the overall

stated requirements

for instructors.

After being apprised of these findings,

Navy officials

initiated

action to deal with most of the problem

areas discussed in GAO’s report.

(B-175773, June 14, 1973.)

60

‘ADMINISTRATION OF THE

RESERVEOFFICERS TRAINING CORPS PROGRAM

SHOULD BE COORDINATED

Deuartment

of Defense

GAO reported

to the Secretary

of Defense the results

of

its review of the management of the ROTC program administered

by each military

service.

The senior ROTC program, in which

72,500 students were enrolled

during the 1972-73 school year

and which prepares selected

college students

for commissions

in the military

services,

cost an estimated

$155 million

during fiscal

year 1973.

The junior

ROTC program, in which

140,000 high school students

were enrolled

during the school

year and which fosters

national

pride and provides

these

students with a knowledge of military

subjects,

cost about

$16 million

during the fiscal

year.

The report

stated that increased

services

was needed because:

coordination

among the

--Some senior ROTC units do not meet DOD’s prescribed

officer

production

requirements.

--Services

fail

to uniformly

apply statutory

restrictions for establishing

and maintaining

junior

ROTC

units.

--Enrollments

in the senior

ROTC program

are declining.

--Ratios

of staff

to enrolled

students

in the senior

program vary because the services

have separate staffing criteria.

--Some applicants

for ROTC scholarships

examinations

by more than one service.

--Program

dents,

dropouts

--Services

porting.

lack

cause a loss

complete

Agency officials

generally

vised that remedial

action

Feb. 28, 1973.)

receive

of

investment

and uniform

program

physical

in stu-

cost

re-

agreed with GAO’s findings

and adwould be taken.

(B-146947,

61

/

FURTHER IMPROVEMENTNEEDED IN

ASSISTING MILITARY PERSONNELIN

FINDING ADEQUATEHOUSING NEAR BASES

Department

of Defense

1967 DOD established

Housing Referral

Offices

(HROs) at military

bases to promote its policy of relying

on

nearby communities as a primary source of family housing for

military

personnel 0 HROs were to assist military

personnel,

as well as DOD civilian

employees, in locating

adequate,

suitable,

economical)

and nondiscriminatory

offbase housing

near their

duty stations * In this initial

review of the

program, GAO sought to learn how effectively

HROs were

achieving

their purposes 0

In July

GAO found that,

although required

to do so, many incoming military

personnel were not reporting

to base HROs.

This precluded HROs from providing

valuable

centralized

information

on availability

of onbase housing and the type and

cost of available

private

housing.

GAO also found that at some bases, reports’prepared

from

HRO records were not prompt, accurate,

reliable,

or complete.

Therefore,

it was not feasible

for GAO or agency officials

to

evaluate HROs’ effectiveness.

Although reported

cases of racial

discrimination

in offbase housing were few, GAO found several

instances

where

house hunters felt

they had been rejected

because of race but

did not lodge a formal complaint

for a variety

of reasons.

One reason given to GAO by persons involved was that they

were not aware of procedures

to follow.

Another was that,

since the discrimination

was subtle,

it would be difficult

to

prove,

The problem, therefore,

may not be as minor as the

few reported

cases seem to suggest,

DOD requires

landlords

to give written

assurances that

they will

rent to all military

personnel regardless

of race,

creed, color,

or national

origin.

Of 17 installations

checked, GAO found that only 6 had current

and adequate landlord assurances on file.

Some military

personnel have entered into rental

or sales agreements for units which are supposed to be officially

restricted

because of landlords’

failure

to furnish

assurances.

62

GAO suggested that

steps to insure that:

the Secretary

--Nondiscrimination

and landlords.

--Maximum coordination

is attained.

assurances

of Defense

are obtained

should

take

from owners

among HROs in metropolitan

areas

DOD agreed that HRO operations

could be improved and cited

action taken or planned to accomplish objectives

in GAO’s

GAO met with agency officials

and learned

recommendations.

such as revising

reporting-in

prothat subsequent actions,

cedures and giving more attention

to intensive

management,

should alleviate

the problem of personnel

failing

to process

for recording

and rethrough the HRO. DOD said procedures

porting

HRO operations

had been strengthened

since GAO’s reA directive

is being revised which addresses the recview.

ommendations.

DOD said its instruction

on equal opportunity

in housing

emphasized GAO’s suggestion

that HROs provide greater

assurance that alleged cases of discrimination

will

be promptly

GAO

believes

proper

implementaand thoroughly

investigated.

tion of the instruction

should correct

delays in investigating

However, GAO feels that some cases of apparent

complaints.

discrimination

may continue

to be unreported

for one reason

or another , and increased attention

should be given to interviewing minority

personnel

to identify

such problems.

DOD said military

departments

were notified

of deficiencies GAO found in DOD’s policy

requiring

signed nondiscrimiDOD plans to

nation assurances from owners and landlords.

review

revise

Instruction

4165 51 to provide for a periodic

of written

assurances toi” insure they are current

and correct.

(B-133102, June 12, 1973.)

63

CONSTRUCTIONOF LODGING FACILITIES

WITHOUT ADEQUATECONSIDERATION

OF AVAILABILITY OF COMMERCIALMOTELS

Denar tment of Defense

In 1970 and 1971 the Army, Navy, and Air Force began to

construct

temporary lodging facilities

(TLFs) to provide

temporary accommodations at modest prices for military

personnel and their

families

attempting

to find permanent quarters at .new duty stations,

The services

said TLFs were

needed because of a lack of adequate commercial motels at

reasonable

rates e Construction

was financed

from the services v welfare

funds, which are largely

profits

generated from

post exchange sales q

At the request of the Subcommittee on Small Business

Problems in Smaller Towns and Urban Areas, Select Committee

on Small Business, House of Representatives,

GAO examined

actions

taken by DOD and the military

services

in connection

with their

TLF program.

The review was based on the Subcommittee’s

concern that DOD’s promise to curtail

construction

of unneeded TLFs was not materializing.

The Subcommittee

had conducted several hearings wherein private

industry

had

voiced complaints

that local motels near many bases where

TLFs were planned could meet the need for such facilities.

Complainants

felt

that such projects,

if constructed,

would

constitute

unfair

competition

since their modest prices

(about $8 a night for a family

of five)

were possible

only

because of Government subsidy.

The Subcommittee requested

that GAO examine the validity

of justifications

for TLPs at

six specific

Air Force installations.

In a report

to the Subcommittee issued in September

1973, GAO concluded that surveys the Air Force used to support the requests

to build TLFs at six installations

did not

meaningfully

explore the capabilities

of nearby communities

to provide suitable

facilities

through leasing arrangements.

GAO informally

advised DOD and Air Force officials

of its

findings

on two projects,

still

to be built

at the time of

our review,

and requested

that they reconsider

plans to

build.

The officials

continued

to feel the projects

were

needed, and construction

was undertaken.

64

In December 1972 DOD issued a directive

on TLFs to

The directive

provided for informaguide military

services.

tion on the capabilities

of the local communities

to meet

TLF needs and for close liaison

on the subject with those

Although sufficient

time has not elapsed to

communities.

permit a valid evaluation

of the effectiveness

of the TLF

directive,

GAO believes

that it could be improved.

Because of the Subcommittees’

desire to obtain the results of the review as soon as possible,

GAO didn’t

follow

its customary practice

of obtaining

agency comments.

(B-169926, Sept. 27, 1973.)

65

DEFENSE INTERNATIONAL ACTIVITIES

NEED FOR TIGHTER CONTROLOVER

U,S, COMMITMENTSTO OTHER NATIONS

Department

of Defense

and Department

of State

In recent years the Congress has been concerned over the

number and scope of agreements by the executive

branch committing

the United States to provide substantial

assistance

to foreign

countries.

DOD reported

that,

as of September 30, 1972, approximately $12.6 billion

of defense funds had been used to support the military

forces of Vietnam, Korea, Thailand,

Laos,

and the Philippines

0

GAO found that the U.S. Government, through its military

and diplomatic

officials,

enters into numerous types of agreements and arrangements with foreign

governments,

not all of

which require

coordination

with or approval of the Department

of State.

The agreements committed the United States to substantial

cash payments directly

to the concerned governments

and to material

support of their military

forces--commitments

ultimately

resulting

in the expenditure

of many millions

of

dollars.

GAO found no evidence that the Congress, which is responsible

for establishing

levels of Federal spending, was

notified

or advised by the executive

branch before entering

into these agreements s

GAO believes

there is a need for the executive

branch

to exercise more coordinated

control

and management, especially

by the Departments of State and Defense, over our commitments

to foreign

governments B GAO recommended that the Secretary

of State:

(1) establish

procedures

to require

that all agreeincluding

those

subordinate

ments be subject

to his approval,

to or designed to implement basic government-to-government

agreements which commit the United States to specific

performance requiring

the expenditure

of substantial

amounts of

a central

repository

to be established

money, (21 require

within

the Department for all such international

agreements,

arrangements,

and commitments similar

to the one now existing

for treaties,

and (3) provide annually

to the appropriate

66

committees of the Congress a list

and description

together

with

estimates

of the future

agreements,

that each agreement involves.

of all

years’

such

costs

State said that GAO recommendations

concerning

a documentation procedure and a central

repository

for international

agreements warranted

careful

study and would be seriously

considered.

The Congress in late 1972 passed Public Law 92-403,

requiring

the Secretary

of State to transmit

to the Congress

the text of all international

agreements other than treaties.

The Secretary,

however, may not consider most of the subordinate

and implementing

agreements,

such as those covered

in the GAO review,

to be subject

to Public Law 92-403 because

GAO therereporting

of the parent agreement would suffice.

fore suggested that the Congress consider legislation

requiring the Secretary

to submit annually to the Congress a list

and description

of all such subordinate

and implementing

agreements involving

substantial

amounts of U.S. assistance.

(B-159451, Apr. 24, 1973,)

67

DESIRABILITY OF IMPROVED REPORTING

ON U.S. CONTRIBUTIONS TO NATO

Department

of Defense

and Department

of State

The cost to the United States for participating

in the

North Atlantic

Treaty Organization

(NATO) is not readily

determinable,

because funds come from several different

appropriations,

In 1972, the U,S. contribution

to the NATO

budgets was about $85 million.

GAO found however, that the

U,S. spent ,at least an additional

$40 million

as a result

of

its NATO membership, primarily

for personnel

assigned to

and other costs are paid from

NATOo U-S. contributions

several different

appropriations

and authorizations,

including DOD, the Department of State,

and the Foreign Assistance

Act.

Other costs were incurred

in paying for U.S. forces committed

to NATO, unrecovered

costs for prefinanced

construcThe total

tion in Europe, and the cost of moving from France.

U.S. cost for participating

in NATO amounts to as much as

GAO believed

that this diffused

fund$16 billion

annually.

ing of U.S. NATO activities

makes congressional

overview and

control

difficult.

In GAO’s view, the costs incurred

by the agencies involved are for international

security

assistance,

even though

Theresome of the costs may also be for national

programs.

fore,

GAO believes

that all of these costs should be taken

into consideration

along with the requests for direct

funding

of international

security

programs.

DOD stated that U.S. participation

in NATO represents

funding for the defense of the United States and did not

agree with GAO’s view that the cost of NATO to the United

States is international

security

assistance.

DOD felt,

however) that NATO support is but one of many DOD responsibilities

that are subject

to changing requirements.

Establishing

a separate appropriation

would eliminate

the flexibility

required

to s meet these changing needs,

/

GAO therefore

recommended to the Congress that it consider either

placing

all direct

costs of NATO financing

under

the Foreign Assistance

Act and requiring

the executive

branch

to report

on other costs incurred

or requiring

the executive

(B-156489, Feb. 23,

branch to report

all costs incurred.

1973,)

68

,

‘PAYMENTS FOR PHANTOMTROOPS IN THE

CAMBODIAN MILITARY FORCES

Department

of Defense and Department

of State

At the request of a member of the Congress, GAO investigated allegations

that Cambodian Army unit commanders inflate

their payrolls

and pocket the pay of phantom (nonexistent)

troops.

American officials

acknowledged that corrupt payroll

practices

have existed for some time and that, despite corrective

efforts,

the problem of phantom troops had not been

eliminated.

However, neither

the American officials

nor the

Cambodian Government knew the extent of the corrupt practices.

Using estimated percentages

of padded troop strengths

provided

by U.S. officials

in Cambodia, GAO estimated

that Cambodian

military

commanders may have drawn the local currency equivalent of $750,000 to $1.1 million

in January 1973 for phantomtroop pay.

In 1971 and 1972, the United States provided the local

currency equivalent

of about $56 million

to support military

pay and allowances.

These funds were commingled with Cambodian

Government resources

and could not be attributed

to payments

to specific

troops or units.

However, the availability

of

such large amounts undoubtedly

facilitated

corrupt pay practices.

(B-169832, July 3, 1973.)

I

69

OTHER AREAS OF OPERATION

POTENTIAL FOR REDUCTION OF COMMUNICATION COSTS

THROUGHCENTRALIZED MANAGEMENT

OF MULTIPLEX SYSTEMS

Department

of Defense

and civil

agencies

In 1960, the Defense Communications

System (DCS) was

established

and the Defense Communications Agency (DCA) was

organized to manage DOD’s single integrated

long-distance

communications

system.

The objective

was to obtain maximum

economy and efficiency

in allocating

and managing DOD communiIn 1961, the General Services Administration

(GSA)

cat ions.

was authorized

to establish

the Federal Telecommunications

Systems (FTS) to integrate,

with certain

exceptions,

all

In

1963,

the

National

Government civil

communications

systems.

Communications System (NCS) was established

to strengthen

the

communications

support of all major Government functions.

The

NCS includes the DCS and the FTS, as well as other telecommunication

networks.

GAO has previously

reported

problems

caused by the diffused

management of Government communications

and the unique relationships

between DCA and the military

departments

and between DOD and civil

agencies.

GAO made this review to demonstrate

possible

cost savings

through centralized

management in a specific

application-increased use of multiplex

systems for both military

and civil

Multiplexing

is a technique

Federal agency communications.

in which electronic

devices at each end of a single circuit

simultaneously

transmit

a number of messages, thereby eliminating the need for numerous individual

long-distance

circuits

between terminal

points.

l

Although multiplexing

has been available

since June 1968,

when the Federal Communications Commission removed restrictions on the use of inter-connecting

devices not furnished

Federal agencies have made little

use of

by common carrier,

the technique

in the continental

United States.

GAO’s study, which included 200 circuits,

showed that new

multiplex

systems could be established

and communications

For example,

costs could be reduced by about $400,000 a year.

by installing

multiplex

equipment at Homestead Air Force Base,

Florida;

Andrews Air Force Base, Maryland;

and Norfolk,

Virginia,

and connecting

them by a single multiplexed

circuit,

70

t

54 individual

circuits

leased for 8 agencies (including

2 civil

agencies)

could be eliminated.

The multiplex

system

costing about $72,000 would result

in savings of over

$50,000 a year compared with current

circuit

costs.

The savings

potential

is significant

because:

annually,

--DOD leases, at about $15 million

cuits of the type included in GAO’s review,

which appeared susceptible

to multiplexing.

--Only a token number of circuits

were included in GAO’s review.

--The lease

cantly.

costs

of circuits

civil

3,200 cirmany of

agencies

had increased

leased

signifi-

--Systems GAO proposed included only low-speed data and

teletype

circuits,

whereas multiplex

equipment capable

of handling higher speed DOD and civil

agency requirements is available.

GAO believes

that the benefits

of multiplexing

can best

be obtained by a single organization

with authority

and responsibility

to develop and manage systems meeting requirements of all Government users.

Without additional

policy

and procedural

guidance in the framework of the NCS, the

present fragmented

and parochial

arrangements

would continue

and would result

in unnecessary costs as well as in duplicate sys terns.

GAO recommended that:

--The Director,

Office

of Telecommunications

Policy

a Policy that departments

and agenWW 9 establish

cies identify

their

communications

requirements

which

are susceptible

to multiplexing

and that the requirements be satisfied

by multiplexed

facilities

when

economically

and operationally

feasible e In forming

such a policy,

he should consider

establishing

a

single entity

to be responsible

for developing

and

managing multiplex

systems for the entire

Government.

--The Secretary

of Defense, in accordance with his

sponsibilities

as Executive

Agent, NCS, develop

specific

procedures

for coordinating

civil

and

71

re-

’

nontactical

military

communications

ceptible

to multiplexing.

which are

sus-

DOD advised.GAO that it plans to make DCA the central

organization

in DOD with authority

and responsibility

for

OTP

and

DOD

questioned

all nontactical

multiplex

systems.

the desirability

or necessity

of centralized

management or

rather

than

suitable

and approhigh-level

policy direction,

priate

interagency

coordination,

although OTP agreed that

the Government should take advantage of the benefits

of

multiplexing

and is proceeding

with the establishment

of a

GSA said that it is responGovernment policy

in this area.

sible for telecommunications

for the civil

activities

of

On

the

basis

of

responses

executive

departments

and agencies.

to the matters discussed in this report

and on its experience

on communications

matters discussed in previous reports,

GAO

believes

that coordination

may only continue

separate multiplex systems within

and between military

and civil

agencies

and that therefore

more definitive

management arrangements

are needed.

(B-169857, Jan. 18, 1973.)

72

‘GOVERNMENTNOT EOUITABLY COMPENSATEDBY

TELEPHONECOMPANIES FOR USE OF ITS EQUIPMENT

TO SERVE PUBLIC PAY TELEPHONES

Department

of Defense

and civil

arrencies

DOD provides

telephone service by means of Governmentowned systems at about 160 military

installations.

Some

commercial telephone

companies use these system facilities

(cables)

in conjunction

with their public pay telephones

installed

on military

installations.

Revocable licenses

permitting

telephone

companies to

install

public pay telephones

on military

installations

provide that the telephone

companies may use those Governmentowned cables,

wires,

poles, etc. which are required

to

provide service.

The companies must pay the standard commissions that would apply to all other public pay telephones

Commissions range from 9 to

under similar

circumstances.

20 percent on revenues collected

from public pay telephones.

At six military

installations

reviewed,

GAO found that

the companies paid standard commissions although the installations

furnished

some of the cable facilities

used to psovide public pay telephone

service,

whereas commercial concerns

and other Government organizations

normally

do not furnish

such facilities.

GAO estimated

compensation due the Government to be about $52,000 annually

at the six locations

on

the basis of the prevailing

area rate for leasing such cables.

Other methods of computing the compensation for using facilities may also be equitable

and appropriate.

Even after

deducting the above compensation,

the average revenue per telephone still

exceeded that of public pay telephones

installed

in General Services Administration

buildings

in the San

Francisco,

California,

area.

I

GAO recommended that DOD establish,

as policy,

that

standard commissions are applicable

when no cable facilities

are furnished

but that adjustments

be made when circumstances

differ

from other public pay telephones.

/GAO also recommended

that DOD direct

the renegotiation

of existing

agreements or

licenses

which conflict

with this policy.

The Office

of Telecommunications

Policy stated

compensating

the Government for use of its facilities

reasonable

and that there appeared to be no obstacle

73

that

appears

to doing

Subsequently,

GAO

so. The DOD response was inconclusive..

was advised that the Army (the action agency) had attempted

to work out mutual agreements with the telephone companies

Results

and the companies had agreed to review this matter.

of those studies are expected in the spring of 1974.

(B-133201, Mar. 15, 1973.)

74

’

OPPORTUNITIES FOR REDUCING THE COST OF

CONSTRUCTINGAND OPERATING HEALTH FACILITIES

Department

of Defense

and civil

agencies

Pursuant to a law enacted by the Congress, GAO undertook a comprehensive

study of the costs of constructing

and

operating

health facilities

and reported

to the Congress on

ways to reduce these costs for facilities

built

with assistance provided

under the Public Health Service Act.

GAO

also examined into ways in which the demand for facilities

1

could be reduced or 1eliminated.

Constructing

and operating

health facilities

In a November 1972 report

to the Congress, GAO identified many opportunities

for improving the planning,

construction,

and operation

of health facilities,

including

advance

analysis

of specific

health care needs, identification

of

alternative

sources of funds, reuse of building

designs,

and different

construction

techniques.

Hospital

planners

generally

do not evaluate on a lifecycle basis alternative

construction

techniques,

material,

designs,

and operating

sys terns.

Many hospital

administrators and architects,

to curb the rising

cost of hospital

construction,

search for obvious savings in initial

construction.

These initial

savings often preclude

later

savings in

operations

and maintenance that exceed the initial

cost

savings.

To demonstrate

the impact that certain

alternatives

would have on initial

construction

and life-cycle

costs,

GAO selected

a recently

opened hospital

for detailed

study.

The demonstration

showed that

--initial

construction

costs of the redesigned

would have been as much as 8.6 percent lower

those of the facility

that was built

and

facility

than

--life-cycle

costs of as much as $10.4 million

could

have been saved by incorporating

the alternate

improvements

into the redesigned

hospital.

75

GAO recommended that the Department of Health,

Educaand Welfare (HEW) (I) compile and publish

information

tion,

on the essential

factors

to be considered

in project

planning, (2) explore the feasibility

of reusing hospital

designs,

(3) adopt a common set of construction

requirements

for HEW-administered

programs,

(4) develop and disseminate

a scientific

base of knowledge on construction

requirements,

and (5) require

that the fast-tract

and total-concept

approaches be considered

for health facility

projects

assisted

under the Public Health Service Act.

GAO also recommended that HEW establish

the capacity

to provide life-cycle

cost data to health facility

planners

and require

that applicants

for Federal funding justify

the

use of construction

techniques,

materials,

designs,

and

operating

systems which differ

from those HEW recommended.

GAO recommended further

that,

until

HEW establishes

the

capacity

to provide life-cycle

cost data to health facility

planners,

HEW should encourage planners

to consider

the information

presented

in this report,

along with local’operating conditions

and costs,

in identifying

the alternatives

for life-cycle

analyses that are likely

to be the most appropriate

for inclusion

in the facility.

Demand for health

facility

construction

GAO also identified

and studied ways in which health

facility

construction

could’be avoided by either

reducing

the demand for such facilities

or increasing

the productjvity

of existing

facilities.

The study showed that the demand

for hospitals

and, to a lesser extent,

other health care

facilities

could be reduced and that,

by more efficiently

using existing

facilities,

millions

of dollars

in construction costs would not need to be spent.

These results ,are

attainable

by (1) placing

greater

emphasis on preventive

medicine practices,

(2) making more appropriate

use of

various types of health care facilities,

(3) increasing

the

use of more efficient

and economical medical care delivery

systems,

(4) using more effective

utilization

review techniques,

(5) changing health insurance

incentives

that emphasize inpatient

care,

(6) sharing more hospital

services,

(7) organizing

more efficient

and. economical health care

systems, and (8) strengthening

the role and increasing

the

capabilities

of areawide health planning agencies.

’

GAO made a number of recommendations

to the Secretary

of HEW calling

for the changes cited above.

In implementing

the cooperathese changes, GAO recommended that HEW solicit

tion of other Government agencies, private

health organizations,

and medical professionals

and assume leadership

in

these areas,

Some health care providers

have changed traditional

health care demand and utilization

patterns,

decreasing

the

need to construct

acute care and other types of health facilities.

The economic benefits

emanating from these changes

and the means by which such changes have been effected,

as

discussed in GAO’s report,

should be of particular

interest

to the Congress.

Accordingly,

GAO recommended that the

Congress consider these matters in relation

to legislative

such as those providing

for the rehealth care proposals,

organization

of the existing

health care delivery

system

and for programs on national

health insurance.

HEW, 5 other Federal agencies,

and 17 private

organizations were requested to review and comment on all or parts

The agencies and organizations

agreed with

of the study,

the report.

(B-164031(3),

Nov. 20, 1972.)

77

NOT ALL COSTS OF PUBLIC AFFAIRS ACTIVITIES

ARE CONSIDERED IN APPLICATION OF THE LIMITATION

ON SUCH COSTS

Department

of Defense

GAO reviewed selected

activities

(aerial

teams, military ceremonial

bands, civilian

tours,

museum programs,

exhibit

groups9 and educational

activities)

which are, at least

in part,

promotional

in nature and found that costs amounting

to $24 million

for these activities

are not included in the

$28 million

limitation

on annual obligations

for public affairs

activities

imposed by the Senate Appropriations

Committee.

GAO has not concluded that all of these activities

public affairs

activities.

are, in fact,

Operating

costs for activities,

which fall

within

DOD’s

interpretation

of its definition

of public affairs,

and

salaries

of employees who spend more than 50 percent of their

time in these defined public affairs

activities

are included

in the public affairs

expenditures

reported

to the Congress,

For fiscal

year 1972 DOD estimated

that expenditures

for

public affairs

were approximately

$22 million.

GAO recommended that DOD reexamine its position

on what

it includes as public affairs

costs,

since many of the activities

mentioned in GAO’s report meet, at least in part,

DOD’s

definition

of public affairs

o The Office

of Management and

Budget considered

some of these promotional

activities

as

public relations

activities

in OMB Bulletin

70-10.

GAO also recommended that procedures

be established

to

account for and report

costs of all employees who work in

public affairs

activities

0 In addition,

GAO suggested that

the Senate Committee on Appropriations

may wish to clarify

what types of DOD activities

it expects to be reported

under

the $28 million

limitation,

In commenting on GAO’s conclusions

and recommendations,

DOD stated that it had reexamined its definition

of public

affairs

and found it valid and viable.

While DOD agreed that

the activities

selected

by GAO contributed,

in part,

to the

accomplishment

of the public affairs

mission,

DOD stated

that only civilian

tours have this as their primary mission.

DOD also stated that only the costs of activities

which have

78

’ public affairs

as their primary mission are included

in the

$28 million

limitation,

DOD has directed

the military

departments

to charge against

the limitation

any incremental

costs incurred

in operating

civilian

tours.

(B-161939,

July 20, 1973.)

79

NEED FOR FEDERAL AGENCIES TO IMPROVE

SOLID-WASTE MANAGEMENTPRACTICES

Department

of Defense

and civil

agencies

Federal legislation

and Executive orders have stressed

the importance of proper solid waste disposal,

resource reI covery, waste reduction,

and the Federal agencies’

responsibilities

for providing

leadership

in the nationwide

effort

to protect

and enhance the quality

of the environment.

To

determine how well Federal agencies were fulfilling

their

GAO reviewed disposal

policies

and pracresponsibilities,

tices of those agencies --Bureau of Land Mtinagement, Forest

Service,

National

Park Service,

and the Department of the

managed the bulk of the Federal land having disAmY --that

posal sites,

Federal regulations

generally

prohibit

Federal agencies

from burning wastes in open fires

and using open dumps.

GAO

reported

open burning and open dumping on Federal lands administered

by the Bureau of Land Management, the Forest Service, and the National

Park Service to be widespread.

The

Army generally

was disposing

of its unsalvageable

wastes in

a satisfactory

manner.

The agencies generally

lacked a systematic

approach to

identifying

and solving waste disposal

problems.

GAO recommended that the Secretaries

of Agriculture

and the Interior

direct

the Forest Service,

Bureau of Land Management, and

National

Park Service to:

--Establish,

sponsibility

at the various

centers

for

organizational

levels,

solid waste matters.

re-

--Establish

procedures

so that (1) solid-waste

management policies

are communicated effectively

to all officials,

(2) headquarters

provides

adequate policy

guidance to regional

personnel,

and (3) regional

officials carry out agency policies

effectively.

--Require

periodic

inspections

and reporting

of inspection results

of (1) agency-operated

and lessee- and

permittee-operated

disposal

sites on Federal land and

(2) disposal

sites used by the agencies on private

land.

80

.

.

GAO reviewed

also the procurement,

resource recovery,

and recycling

policies

and practices

of the General Services

Administration

(GSA) and the Department of the Army and reported that although both agencies had been recovering

some

wastes for reuse or recycling,

much more could be recovered.

Generally

the Army was recovering

wastes only when it was

economically

advantageous;

little

consideration

was given

to salvaging

and recycling

primarily

for environmental

benefits.

GAO recommended that GSA and the Army, in their

procurement activities,

should be aware of and should emphasize to

their

suppliers

the environmental

benefits

that could be obtained through using more reusable or recyclable

materials,

containers,

and packaging.

agencies generally

agreed with GAO’s findings

and

recommendations

and specified

steps they were taking to implement GAO’s recommendations.

(B-166506, Oct. 26, 1972.)

The

81

MILITARY READINESS

NEED FOR IMPROVEMENTIN READINESS

OF THE AIR FORCE IN EUROPE

Department

of the,Air

Force

Aircraft

squadrons of the United States Air Forces in

Europe (USAFE) were not fully

combat-ready

generally

because

such

as

funding

limitations,

of factors

beyond their

control,

Air Force-wide

combat crew shortages,

priorities

of the war

in Southeast Asia, and the forced relocation

of U.S. Forces

from France.

Also the readiness

status of USAFE’s aircraft

units was

lower than reported

because the criteria

used to measure

readiness

of the units did not consider

all pertinent

factors

and because some measurable areas, such as manpower and

equipment, were not always properly

reported.

Readiness reports

should fully

disclose

to higher commands all factors

which could limit

a combat unit’s

ability

Complete, accurate,

and uniform

to perform its missions.

readiness

reporting

would permit

the Air Force to more realistically

assess immediate needs and would provide a sound

basis for obtaining

additional

resources

or relocating

those

available.

GAO proposed that the Air Force revise its

Consequently,

instructions

for measuring readiness

to disclose

all significant factors.

GAO also proposed that action be taken to

provide uniform interpretation

of the criteria

and that the

Air Force Inspector

General emphasize the accuracy of reporting operational

readiness

in his instructions.

The Air Force has taken steps to improve criteria

has also developed a readiness measurement system that

corporates

many of the guidelines

we suggested.

and

in-

The Air Force agreed that many factors

limited

the

readiness

of forces assigned in Europe and stated that,

within

budgetary constraints,

every possibility

was being

explored to remedy the situation.

82

GAO also suggested that,

in view of the combat readiness

level of the USAFE squadrons,

the Secretary

of Defense consider the following

alternatives

:

--Increase

the funding support so that

tions and fuel can be prepositioned.

sufficient

muni-

--Reduce the number of squadrons maintained

in Europe

to a level that could be effectively

supported with

available

funds, personnel,

and materiel.

--Accept the risks associated

rons in Europe at a reduced

(B-146896,

Apr.

25, 1973.)

a3

with having combat squadreadiness

level.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.