Dear Mr,
I
/
Chairman:
We are pleased to submit our annual report of s-d ‘1~aw!!5~~,“~i~~“*,*
significant ~~.2,,ssmN
audit findings
relating
to
activiti.~s.,,o~~~he.,,~~D~e~~ar~rn~~~
of
D,efen,se.
5
‘,~,~~~jc,~“.,.~,.u”,~-“,~,l-,*~~..
I ,./I,
1.7~
Gmilar
report relating to the civil departments
and agencies of the
Government was submitted separately.
In this report we have included items which we believe should be
of interest and use to the Committee
during the appropriations
hearings
for fiscal year 1973. These findings and recommendations
have previously been brought to the attention of responsible
departmental
officials
by means of audit reports.
Some matters commented on in this report
are those on which the Department
has indicated that corrective
action
either has been or will be taken. The items have been included, however, in view of their significance
and of the fact that we have not had
an opportunity
to evaluate the adequacy of corrective
actions taken.
We shall be pleased
may desire.
to furnish
any additional
information
that you
We are sending copies of this report to the Department
of Defense
and to the military
departments
so that they may be in a position to answer any inquiries
that may be made during the appropriations
hearings
with respect to these findings and recommendations.
Sincerely
yours,
Comptroller
General
of the United States
a
The Honorable George H. Mahon
1 Chairman,
Committee
on Appropriations
House of Representatives
r( ?d
Contents
PROCUREMENTPRACTICES AND CONTRACTADMINISTRATION
Continuing
problems in implementation
of the
Truth-in-Negotiations
Act
Department of Defense
Problems in settlement
of contractors'
claims
based on Government-caused
delays
Department of the Navy
Feasibility
of application
of "should cost"
concepts in reviews of contractorss
operations
Department of Defense
Feasibility
of obtaining
more competition
in
emergency procurements
Department of Defense
Need for more expeditious
processing
of contractors'
engineering
change proposals
Department of Defense
Need for clarification
of circumstances
under
which contractors
may acquire equipment for
account of the Government
Department of Defense
1
1
1
4
4
7
7
9
9
11
11
13
13
DEF'ENSEINDUSTRY PROFIT STUDY
Problems in determining
equitable
profit
objectives
for negotiated
contracts
Department of Defense
15
PROBLEMSIN ACQUISITION OF PIAJQRWEAPONSYSTEMS
Summary appraisal
of the acquisition
process
Department of Defense
Deep submergence rescue vehicle
Department of the Navy
Drone antisubmarine
helicopters
Department of the Navy
Antisubmarine
warfare directional
low-frequency
analysis
and recording
system
Department of the Navy
Surface ship sonar system
Department of the Navy
Tactical
vehicles
Department of the Army
18
18
18
21
21
24
24
15
15
25
25
27
27
28
28
RESEARCHAND DZVEL0PMEN-T
Duplication
in tactical
reconnaissance
development programs
Department of Defense
Need for closer surveillance
over authorizations
for production
of munitions under development
Department of the Army
Need for closer surveillance
over selection
and
management of basic research projects
Department of the Air Force
30
SUPPLY MANAGEMENT
Inaccuracy
of inventory
records
Department of the Army
Need to eliminate
low-cost,
low-use items in
supply systems
Department of Defense
Potential
for more effective
use
and redistribution of excess materiel
in Europe
Department of Defense
Retention
of excess inventories
of industrial
materials
at naval shipyards
Department of the Navy
Uneconomical use of air parcel post for
shipment of supplies
Department of Defense
35
35
35
42
42
PHASEDOWNOF UNITED STATES MILITARY ACTIVITIES
VIETNAM
Problems encountered
in the phasedown
Department of Defense
44
44
44
MAINTENANCE, REPAIR, AND OVERHAUL
Need to expedite repair of helicopters
Department of the Army
Need to monitor tire-rebuilding
programs
Europe
Department of Defense
ADMINISTRATION OF MANPOWER
MATTERS
Adverse effects
of ceilings
on employment
of civilian
personnel
30
30
31
31
33
33
36
36
38
38
40
40
IN
49
49
49
in
51
51
52
52
Page
Department of Defense
Misassignment
of enlisted
personnel
Department of the Army
Need for clarification
of guidance on assignment
of crews to ships under construction
Department of the Navy
Need for a comprehensive alcoholism
control
program for military
personnel
Department of Defense
Inaccuracy
of military
leave records
Department of the Army
Problems in conversion
of National Guard
technician
positions
to Federal positions
Department of Defense
Need for improvement in management of support
forces of the 8th U.S. Army
Department of the Army
52
54
54
56
56
58
58
61
61
6%
6%
65
65
MILITARY CONSTRUCTION
Measures needed to ensure compliance with contract specifications
in construction
of military facilities
Department of the Army and Department of
the Navy
Need for improved space criteria
for building
general classrooms
Department of Defense
66
ACCOUNTING
AND INFOWTIQN SYSTEMS
70
Inaccuracy
of data for projecting
future requirements for major items of military
equipment
Department of the Army
Lack of uniformity
in cost accsunting
systems
for maintenance
Department of Defense
Better cost accounting needed for operation
and
maintenance of family housing
Department of Defense
Need for improvement in cost accounting
for
training
under the Government Employees
Training
Act
Department of Defense
66
66
68
68
70
70
73
73
75
75
77
77
PotentiaI
savings through transfer
of inventory
accounting
from stock funds to industrial
funds
Department of the Army
DEFENSEINTERNATIONAL
ACTIVITIES
Problems in administration
of the military
assistance
training
program
Department of Defense and Department of
State
OTHERAREASOF' OPERATIONS
Inadequate charges to Communications Satellite
Corporation
for launch services
Department of the Air Force and National.
Aeronautics
and Space Administration
Need for a reevaluation
of the civil
defense
program
Department of the Army
79
79
81
81
81
83
83
83
85
85
' PROCUREMENT
PRACTICESAND CONTRACT
ADMINISTRATION
CONTINUING
PROBLEMS
IN IMPLEMENTATION
OF
THE TRUTH-IN-NEGOTIATIONS
ACT
Department of Defense
Under the Truth-in-Negotiations
Act of 1962, contractors
are required to submit cost or pricing data in support of
their price proposals and to certify the correctness of
these data, Cost or pricing data are required, generally,
on negotiated contracts not based on adequate price competition, when prices exceed $100,000. The act, together with
the regulations implementing its provisions, has been criticized by industry spokesmen as being inequitable and unduly
GAOreviewed the reasonableness
burdensome on contractors,
of prices negotiated under the act and the problems experienced by contractors and agency officials
in applying the
The review included
act and the implementing regulations.
awarded to 21 contrac35 contracts, valued at $135 million,
tors.
For 18 contracts, valued at $47 million,
negotiated
prices were $1.5 million higher than warranted by the cost
data available to contractors at the time of negotiation.
The overpricing stemmed basically from the same circumstances
which the Truth-in-Negotiations
Act was designed to remedy-contractors'
submissions of incomplete, inaccurate, and
noncurrent data. Little or no overpricing was found in the
GAObrought the
other 17 contracts valued at $88 million.
findings of overpricing to the attention of agency officials
and they took action to obtain price adjustments where appropriate.
GAOfound no serious problems experienced by contractors
and agency officials
in applying the act and the implementing
regulations.
There were two areas, however, which warranted
the attention of the Secretary of Defense. They involved (1)
differences among Government and contractor officials
in their
understanding of the extent of cost data to be submitted and
(2) the reluctance of some subcontractors to furnish cost
data to prime contractors with whom they may be in competition.
(B-39995, Dec. 29, 1970,)
issued to the Congress in October
3.971,
A later
report,
summarized 23 reports
that GAO had issued to agency officials and to contractors
during fiscal
year 1971 on the
pricing
of selected noncompetitive
contracts.
The 23 reports were based on GAO’s review of selected cost elements
included in the prices of 33 contracts,
totaling
$217 million,
negotiated
with 19 contractors
by 13 procurement activities
of the Department of Defense (DOD).
The selection
of contracts
for review was based on indications
that some pricing
Therefore
GAO’s
or contracting
deficiencies
were present.
findings
were not to be construed as applying to all noncompetitive
contracts.
The negotiated
prices for 28 of the 33 contracts
were
about $8.7 million
higher than indicated
by cost or pricing
data available
to the contractors
at the time of negotiations.
No overestimated
costs were found for the five other
contracts
examined.
Factors
contributing
to the overpricing
included:
--Failure
of contractors
to submit to the Government
significant
cost data which became available
after
they had submitted their proposals.
--Failure
of contracting
officers
nificant
data or to have these
Government auditors.
to obtain all sigdata reviewed by
--Inadequacies
in the Government’s
nical evaluations
of contractors’
audits and techproposals.
In view of the relatively
small number and value of
contracts
examined and the selection
of them on the basis of
potential
findings,
general conclusions
could not be drawn as
to the overall
effectiveness
of DOD management of its responsibility
to negotiate
reasonable prices.,
GAO’s findings
inby DOD to
dicated,
however, a need for continued attention
the performance of its personnel involved
in this function.
In its individual
reports
to agency officials,
GAO recommended that they determine the extent to which the Government was legally
entitled
to price adjustmentsunder
the
.
terms of the contracts.
The responses received
that the officials
have initiated
such action,
Oct. 14, 1971.)
indicate
(E-39995,
- .
Department _of the Navy
GADhad issued to the Congress several reports,
in
prior years, on the Navy's prodecures in contracting
with
private
industry
for ship construction.
A December 1958 report pointed smt that contractors
had submitted claims for
costs) sustained because of Government-caused
delays, which
were vague and lacked adequate support; that evaluations
of
the claims by the Navy had been inconclusive;
and that the
claims had been settled without
sufficient
data to show the
damage sustained by the contractors.
Two other reports,
in June and October 1964, pointed
out that a lack of effective
price evaluation
procedures had
resulted
in the negotiation
of unnecessarily
high prices for
work which had been added to the original
contracts
by change
orders.
GAO made a follow-up
review to determine whether
improvements had been made by the Navy.
Claims submitted
in the period April 1965 through
January 1969 by three contractors
(referred
to as contractors
A, B, and C) in the amounts af $114,300,000,
$486,000, and
$1,342,000 were settled
in the amounts of $96,500,000,
$354,000, an $760,000, respectively.
Although the amounts
of the claims were purported
to represent
the additional
costs incurred
by the contractors
because of Governmentcaused interruptions
and delays, the contractors
provided
no
tangible
evidence of the additional
costs incurred.
In
the absence of such evidence, the Navy9 in GAO's opinion,
could not adequately evaluate the validity
of the claims.
Following are examples of the rationale
on which the
contractors
based their
eterminations
of additional.costs
attributable
to Government-caused
interruptions
and delays.
--Contractor
A compared the estimated
labor-hours
in
its origina% price proposal. with the labor-hours
actually
expended and estimated to be expended to
complete the contract.
The contractor
then attributed the increase over the original
estimate,
after an allowance for the increase it judged to
4
be caused by its
caused delays.
own inefficiencies,
to Government-
--Contractor
B based its claims on judgment factors.,
The contractor's
chief estimator
stated that disruption
claims were based on highly intangible
judgment factors
and, in his opinion,
were impossible
to accurately
detail.
--Contractor
C compared the labor-hours
expended in
earlier
construction
of ships of the same class
with the labor-hours
expended in the follow-on
construction
and, after taking into account the
physical
differences
in the ships, attributed
the
increase to Government-caused
delays.
GAO believes
that, without
information
linking
the
additionalcosts
to actions of the Government, the Government
had insufficient
assurance that the settlements
made were
fair and reasonable,
Therefore
GAO recommended,that
supervisors of shipbuilding
require
contractors
to furnish
evidence relating
the delay and disruptions
to actions
of the
Government and to provide specific
data in support of additional
costs claimed.
GAO found that certain
contractors
used historical
data
and standards in preparing
proposals
for the pricing
of contract
changes other than those arising
from claims,but
the
Navy generally
did not obtain that data.
It relied
on the
personal judgment of its negotiators
and analysts.
GAO
believes
that the Navy would have been in a better position
to evaluate the proposals
and would have had greater assurance as to the reasonableness
of the prices negotiated
had
it obtained the data used by the contractors,
GAO has recommended that the newly implemented !'change
order accounting!'
contract
clause be clarified
to clearly
require
contractors
to segregate their direct
costs on constructive
changes as well as formally
written
changes.
To
facilitate
the negotiation
of reasonable prices for change
orders, GAO has recommended also that:
--Contractors lacking adequate systems for providing ad
factual basis for proposed prices be encouraged to
improve their systems.
--Historical
cost data and standards be obtained, whenever appropriate, for evaluation and audit.
--The Navy ensure that supervisors of shipbuilding
obtain current evaluations by the Defense Contract
Audit Agency of the estimating systems of contractors
located in their respective geographic areas and
that the evaluations include the bases upon which
proposed prices are developed.
The Navvygenerally concurred in GAO's recommendations
but pointed out that some of thecited problem areas were
susceptible to improvement but not to total and preeise
solution.
It was the Navy's opinion that this was particularly true of any attempt to achieve total, explicit,
and
auditable justification
of all delay and disruption costs.
(B-171096, Apr. 28, 1971.)
6
FEASIBILITY OF APP'ICATION OF "SHOULD COST"
CONCEPTS
--IN REYIEWS OF CONTRACTORS"OPERATIONS
Department
of Defense
At the request of the Joint Economic Committee, through
its Subcommittee on Economy in Government, GAO made a study
of the feasibility
of applying "should cost" analyses in its
audits and reviews of Government procurement.
The Committee
defined the "should cost" approach as an attempt to determine
the amount that a weapon system or a product ought to cost
given attainable
efficiency
and economy of operation.
In a
report to the Congress on the study (B-159896, May 20, 19701,
GAO concluded that it was feasible,
in auditing
and reviewing contractors'
performance,
to utilize
"should cost" analSubsequently GAO made a trial
application
of the
yses.
"should cost" concepts at plants of four contractors.
At each of the plants,
GAO found areas where the contractors"
operations
could have been improved and cost could
have been reduced through such things as better production
planning and control,
more competition
in subcontracting,
and
greater care to avoid assigning
engineers of higher competence than that required
by the nature of the work to be performed.
Although "should cost" review techniques
are intended
to find out how contractors'
operations
can be improved,
they also lead to disclosure
of areas where Government contracting
or administration
practices
affect
contract
costs
adversely.
GAO noted areas where the Government could have
improved its practices
and reduce costs through consolidation of procurements
and through elimination
of unnecessary
requirements
for packaging and for testing.
GAO brought its findings
and suggestions
for improvements to the attention
of officials
of the contractors
and
the Department of Defense.
Although the potential
for total.
savings which could accrue from the findings
and suggestions
was not readily
measurable in all cases, in those instances
where they were measurable,
GAO estimated
the potential
savings to be almost $6 million
annually.
The Department of
Defense advised GAO that the agencies concerned would look
into the specific
matters noted by GAO at the contractors'
plants.
7
-a--w...
.'
Because "should COStI" reviews require examinations
into many facets of contractors'
operations
and management
not covered in GAOes statutory
authority
to examine contractors'
records,
GAO suggested that the Congress may wish
to consider expanding GAO's statutory
authority
to enable it
to make effective
"should cast" reviews on an independent
basis.
(B-159896, Feb. 26, 1971.)
FEASI'BILITY OF OBTAININGNORECOMPETITION
IN EMERGENCY
PROCUREMENTS
Department of Defense
During fiscal year 1968 the Department of Defense negotiated about $5.4 billion
of emergency procurement; about
72 percent was negotiated without obtaining competition,
Emergency procurement declined to about $2.5 billion
in fiscal year 1970,but the percentage of noncompetitive procurement remained at about the fiscal year 1968 level.
GAOfound
that many of the noncompetitive procurements might have been
made competitively--at
lower costs and with acceptable time
for delivery.
A report issued to the Congress in March 1971 pointed
out that GAO's review of 54 noncompetitive procurements,
amounting to $33 million,
showed that, for 36, amounting to
$31.5 million,
information was available at the time of the
awards that other suppliers could have delivered items at
lower prices and within the desired periods.
GAOestimated
that,
had competition been obtained, about $3.1 million could
have been saved on 14 of the 36 procurements and that an
amount not readily determinable could have been saved on the
remaining 22 procurements.
itively
GAOhas recommendedthat decisions
in emergencies be based on:
to procure noncompet-
--A determination that the selected supplier can make
delivery a specified number of days, weeks, or months
earlier than other suppliers.
--An estimate of the additional unit cost to result
the proposed noncompetitive procurement.
from
--A statement, from the commander of the activity
needing the item, that the additional cost is justified
by the time saved.
The Deputy Assistant Secretary of Defense (Installations
and Logistics)
stated that there was no need to implement
GAO's recommendations because procurement officials
were already giving great weight to the urgency of need cited by the
9
requesting activity
and were considering availability
of*
other sources of supply, price factors, and other relevant
matters in decisions to procure without competition.
.
GAOpointed out that the degree of urgency for emergency
procurements was generally indicated only by reference to a
high-priority
number on the procurement request without support as to urgency of mission, date material was required,
or effect of delay. Little attempt was made to determine
whether the earlier projected delivery date was worth the
additional cost. GAOstated that its findings showed a need
for the recommendedimprovements in awarding emergency procurements. (~-171561, Mr. 25, 1971.)
NEEDE'ORMOREEXPEDITIOUS
PROCESSIbJG
--__
m--s---------_I_ OF
CONTRACTORS'
ENGI1'dEERING
CHANGE
PROPOSALS
-I_--Denartment of Defense
During the course of production of military aircraft,
many engineering changes are made to make the aircraft
safer,
The need for such
more reliable,
or easier to maintain.
changes is usually brought to light.through
test and operaThe
changes
may origition of the units already produced.
nate with either the military service responsible for the
aircraft
or the contractor, but the plans for the changes,
in the form of engineering change proposals, must be approved by the military service before the contractor is authorized to make the changes. A delay in processing a
change proposal can increase the number of aircraft
delivered
are delivered, the
without the change. Once the aircraft
change could be delayed for months or years or never made at
Furthermore it is generally more expensive to make
changes after production.
au-
GAOexamined 547 engineering change proposals, implemented on 11 types of aircraft
in the fiscal years 1967 and
1968, to determine whether extensive delays had occurred in
processing them.
The average time for processing the 547 proposals was
131 days compared with 45 days for routine proposals, 15
days for urgent proposals, and 24 hours for emergency proposals-- time standards established by the Department of Defense. GAOestimated that the additional costs caused by
delays in processing 42 of the proposals could amount to as
much as $3.7 million if all the planned changes were made.
Following are some of the causes of delay.
--Ineffective
monitoring by project
tions by reviewing staffs.
offices
of evalua-
--Insufficient
direction for contractors from the military services as to the kind and extent of data to be
submitted.
--Reliance on a single, overall time standard in lieu
of time standards for each individual organization
concerned in the evaluation.
--Sequential
ganizations
--Duplicate
rather
than conc,urrent reviews by the or-
concerned in an evaluation.
reviews.
--Lengthy processing by groups not under the control
of the group managing the project.
GAOsuggested that the Secretary of Defense designate
a group to establish procedures for effective control of the
processing of engineering change proposals and to monitor
the implementation of the procedures by the military services.
GAOsuggested also specific steps that it believed
would reduce processing time. The Department of Defense
(B-152600, Jan. 20, 1971.)
agreed with the suggestions.
12
'
'NEED FOR CLARIFICATION OF CIRCUMSTANCESUNDER WICH
--CONTRACTORSMAY ACQUIRE EQUIPMENT FOR ACCOUNTOF THE
GOVERNMENT
Department
of Defense
Department of Defense regulations
provide that, with
some exceptions,
contractors
furnish
all plant equipment
Equipment so specialized
needed for contract
performance.
that its use is limited
to testing
in the development or
or
performance
of particular
production
of particular
items,
Such equipservices,
is not considered plant equipment.
ment--known as special test equipment--is
generally
acquired
by contractors
for the account of the Government and ownerGAO's prior work had
ship is retained
by the Government.
indicated
that some plant equipment had been inappropriately
classified
as special test equipment and acquired for the
account of the Government.
GAO's review at plants of five contractors
showed that,
of the equipment acquired for the account of the Government
at a cost of $62 million,
about $12 million
worth should have
been classified
as plant equipment and acquired for the
account of the contractors.
The problem of classification
stems from the Armed
Services Procurement Regulation
which defines special test
equipment as including
"all components of any assemblies of
such equipment."
This definition
permits the acquisition
of plant equipment as special test equipment when it is to
be included in a group of test equipment items assembled for
a specific
use.
GAO has recommended that the Secretary
of
Defense:
--Revise
the definition
of special test equipment in
the Armed Services Procurement Regulation
and other
pertinent
Department of Defense regulations
to exclude items that are really
plant equipment.
--Require
contracting
officers
to review proposals
for
special test equipment to ensure that plant equipment is not included.
13
The Department of DeZense concurred in the findings and
advised GAQ that the Armed Services Procurement Regulation
was being revised to limit the conditions whereby the Government would take title to special tooling and test equipment
and to distinguish this type of equipment from plant equipment in the initial
procurement phase. With respect to the
second recomrslendation, these revisions will also require
that qualified Government industrial
specialists
review
contractors'
listings
of special tooling and test equipment
proposed for acquisition to ensure that plant equipment is
not included.
(B-140389, Apr. 9, 1971.)
14
.
DEFENSE INDUSTRY-- PRQFIT ._-I_
STUDY
__
PROBLEMS
IN DETE-RMINING
EQUITABLEPROFIT
OBJECTIVESFORNEGOTIATED
CONTRACTS
DeparZm~t
of
Defense
The Armed Forces Appropriation Authorization Act for
fiscal year 1970 directed GAOto study profits earned on
negotiated contracts and subcontracts entered into by the
Department of Defense, the National Aeronautics and Space
Administration,
and the Coast Guard. Contracts of the Atomic
Energy Commission to meet requirements of the Department of
Defense were also included.
Profit before Federal income taxes9 measured as a perlower on defense work
centage of sales, was significantly
than on comparable commercial work for 74 large defense contractors included in GAO's study. The profits of these 74
contractors for the 4-year period of 1966 through 1969 averaged4.3percent of sales on defense work and 9.9 percent of
sales on comparable commercial work. When profit was considered as a percentage of the total capital investment-total liabilities
and equity but exclusive of Government capital--used
in generating the sales, the difference narrowed
to 11.2 percent for defense sales and 14 percent for commercial sales. Further, when profit was considered as a percentage of equity capital investment of stockholders, there
was little
difference between the rates of return.
The major factor causing comparability of the rates of
return on contractors'
capital investment for defense and
commercial work was the substantial amount of capital provided by the Government in the form of progress payments,
cost reimbursements, equipment, and facilities.
This reduced the contractors" capital investment required for defense work.
GAO,also reviewed 146 negotiated defense contracts to
see whether it was practical to develop investment data on
individual
contracts and to see whether any wide range in
profits existed.
The review showed that data on cost,
profit,
and invested capital could be developed on individual contracts and that profit rates ranged widely in defense
15
The average rates of return for individual con- '
contracts.
tracts were substantially
higher than the average annual
profit rates developed from the questionnaires GAOsubmitted
to the 74 large defense contractors.
The 146 contracts
reviewed0 however, cannot be considered as a representative
sample.
Under current procedures for negotiation of profit for
defense contracts, little
consideration is given to the
amount of capital investment required from the contractor
to perform the work. Frofit objectives are developed as a
percentage of the anticipated costs. As a result, inequities can and do arise between contractors when differing
proportions of their capital are required to perform the
work. Further, by relating profits to costs, contractors
in noncompetitive situations are not provided with positive
incentives to make investments in equipment that would increase efficiency and result in reduced costs, especially
Under the current
where follow-on contracts are involved.
system of negotiating contract prices, such investments tend
to lower, rather than increase, profits in the long run.
Other factors, however, such as whether the program will be
continued, could be overriding considerations affecting contractors" decisions concerning investments in equipment.
GAObelieves that, in determining profit objectives
for negotiated contracts where effective competition is
lacking, consideration should be given to capital requirements as well as to such factors as risk, complexity of the
work, and other management and performance factors.
Where
capital requirements of contractors are insignificant,
such
as in many service-type contracts or contracts for the operation of Government-owned plants, profit objectives would
continue to be developed primarily through consideration of
the other factors.
The system adopted should be used, if
applicable, by all Government agencies to simplify industry
participation.
GAOdid not consider that legislation
was required to
establish uniform guidelines.
GAOrecommendedthat the Office of Management and Budget take the lead in the development of uniform, Government-wide guidelines for determining
profit objectives in negotiation of Government contracts
and that the guidelines emphasize consideration of the total
14
amount pf capital
required by a contractor
when appropriate,
where effective
price competition
is lacking.
On June 11, 1971, the Industry
Advisory Council Subcommittee on Contract Financing issued a report recommending
that the Department of Defense adopt a profit
policy which
is, in part, based on contractor
capital
investment.
On
July 17, 1971, the Deputy Secretary
of Defense issued a memorandum to the Assistant
Secretaries
of Defense (Comptroller
and Installations
and Logistics)
indicating
his support of
the profit
based on capital
investment
concept and requested
the submission of a comprehensive profit
policy proposal by
(B-159896,
Mar.
17,
1971.)
December 1, 1971.
17
FRQHEEMS
IN AAUXSITIBN
OF MAJORWEAPON
SYSTEMS
I--.--.._-__----------..----_----ZUMMARY
AH??UXL OF
PWQCESS
v THE
."I ACQJ.JISITION
-p--v-
of I!efense
-w~rtment
---The acquisition of major weapons has required a Large
investment in recent years and has involved substantial
long-term c0mmitments of future expenditures.
This has impacted heavily on the resources available for other national
Because of deep concern in the Congoals and priorities.
gress and because of evidence of serious weaknesses in the
weapon systems acquisition process9 GAOundertook to provide the Congress and the Department of Defense with a continuing series of appraisals of those factors most closely
related to effective performance in procuring major weapons,
The first such appraisal covered 67 major weapons in
the current acquisition programs of the Army, the Navy, and
the Air Force. A report on the appraisal, issued to the
Congress in March 1971, included a classified
supplement
containing summaries of G.A08sevaluations of the individual
weapons. In transmitting the report GAOadvised the recipients that more detailed studies of each of the weapons had
been prepared and would be provided upon request,
GAOdrew the following
conclusions from its appraisal.
--Over the last several months, the Office of the Secretary of Defense and the military services have been
engaged in a substantial effort to identify and solve
problems that have adversely affected the acquisition
of major weapon systems in terms of compromised perf ormance$ delayed availability,
and increased costs.
Generally the newer weapon procurements are following
a slower development pace9 and procurement practices
are more conservative than those of earlier periods,
Because many of the current programs are in early
stages of acquisition,
evidence of the results of
changed concepts is not yet available to adequately
assess them, but the outlook is brighter.
--The identification
of need for a weapon system and
the relative priority
ts be assigned to its
development are fundamental problems in acquisition
of weapon systems. Initial
decisions as to which
weapon system will be developed and the priority
of
its development is made by any one of the military
services but the Department of Defense has no organized method by which such proposals can be measured
against the Department's total needs. Such a method
is now under development, but it is in its infancy.
--In recent months the Office of the Secretary of Defense and the military
services have paid extensive
attention to the persistent problems of defining
performance characteristics
of weapon systems and of
determining the technical feasibility
of achieving
that performance, There are many encouraging signs
that these problems are being abated. Extensive efforts are being applied-- early in the weapon development process-- to identifying
areas with high design
risks and to constructing and testing the hardware
itself to demonstrate the feasibility
of high-risk
components before proceeding with further development,
--In the preparation of and attention given to costeffectiveness determinations, there was a wide range
of quality.
This variation has lessened the value of
these studies to the entire acquisition process.
--One of the most important unresolved problems in the
management of major acquisitions
is the problem
of organization,
The essence of the problem appears
to be attempts ts combine the specialized roles of
major weapon systems acquisition management into more
or less traditional
military commandstructures,
Because of this, there usually are a large number of
organizations not directly involved which can only
negatively influence the project.
There should be a
direct relationship
between the missions for which
weapon systems requirements are determined, eegcp
strategic deterrent, land warfare, ocean control,
structure needed to acetc., and the organizational
quire them. Such an arrangement would facilitate
grouping related weapon systems in packages of common mission and would permit putting together an acquisition organization of appropriate size and stature to handle these matters.
19
,
On 61 weapon systems where complete cost data were.
available, estimates on amounts needed to develop and produce these systems had increased some $33.4 billion,
About
represented
one third of this increase, or $9,5 billion,
the difference between the estimates prepared when the systems were first approved for development (the planning estimates) and the updated estimates prepared when the systems
were about to be placed under development contracts,
The
or
$23.9
billion,
was
due
to
remainder of the increase,
changes in quantities to be acquired and to a combination of
such things as engineering changes, revisions to estimates,
and provisions for increased cost due to economic inflation.
GAOhas recommendedthat the Secretary of Defense:
--Make every effort to develop and perfect a
Department-wide method--now in its early stages of
development-- to be followed by all military services
for determining two things:
first,
what weapon systems are needed in relation to the Department's misof each should be
sions; second, what the priority
in relation to other systems and their missions.
--Establish guidelines and standards for the preparation and utilization
of cost-effectiveness
studies.
These guidelines should require that studies be updated and reviewed as part of the decision process
when major changes in cost and/or performance require
revised schedules for funding commitments.
--Place greater decisionmaking authority for each major
acquisition
in a single organization within the service concerned, with more direct control over the operations of weapon systems programs and with sufficient status to overcome organizational
conflict between weapon system managers and the traditional
functional. organization.
--Ensure that each selected acquisition report (1) contain a summary statement regarding the overall acceptability
of the weapon for its mission, (2) recognize the relationships
of other weapon systems complementary to the subject systems, and (3) reflect the
current status of program accomplishment.
The Director, Defense Research and Engineering, expressed general concurrence in these recommendations E
(B-163058, Mar. 18, 1971.)
20
DEEPSUBMERGENCE
RESCUEVEHICLE
Department
of the Navy
The deep submergence rescue vehicle
is a small submersible craft designed to rescue personnel from a disabled submarine.
The development cost and time for the rescue vehicle
far exceeded original
estimates.
GAO made a review to determine the causes.
The estimated cost for the rescue vehicle program increased by more than 1,100 percent between 1964 and 1969-from $36.5 million
for a E-vehicle
system and 1 year of
operation
to $463 million
for a six-vehicle
system.
The
estimated
development and introduction
period increased from
4 to 10 years.
In addition,
costs of support equipment increased because of changes made in the design of the vehicle
which necessitated
a redesign of support craft
and some of
the supporting
equipment,
The Navy advised that it had initiated
a costeffectiveness
study in response to an earlier
report to the
Congress (B-167325, Feb. 20, 1970) in which GAO pointed out
that the increased effectiveness
to be obtained from producing four more vehicles,
in addition
to the two already on
order, would be small in relation
to their cost.
In December 1970, following
the 'study, the Navy reduced the program
to the two rescue vehicles
already ordered at an estimated
cost of $199.4 million.
GAO believes that a substantial
portion
of the cost
growth and program stretch-out
occurred because
--the original
estimates,
made by a Deep Submergence
Systems Review Group established
by the Secretary
of
the Navy, were low and were made without
sufficient
design, preliminary
development,
and testing
and
--changes were made in the vehicle
design to increase
its capabilities
beyond those stated in the formal
requirement
document for the vehicle.
The design changes in the vehicle
included an increase in"the
operating
depth to almost three times the depth at which
21
rescue of submarine personnel was possible
in rescue capacity
from 14 to 24 survivers.
and an increase
The Navy management system includes many controls.
It
require
formal
approval
by
top-level
mandoes not, however,
agement of major changes increasing
the capabilities
of a
developmental
system beyond those called for in the formal
requirement
document.
GAO found no thorough and welldocumented analysis of consideration
given in the decisionmaking process to the effects
the changes would have on detime-velopment cost and
which were considerable--or
to the
measurement of the benefits
obtainable
from the increased
capabilities
against the increased program costs.
To provide more effective
control
over development projects and over significant
increases in development cost and
time, GAO has recommended to the Secretary
of the Navy that
he require
that:
--
A sufficient
body of design, experimental
development
work, and subsystem testing
be done before promulgation of an end-item system requirement
document and
thus establish
a sound factual
basis for authorizing
full-scale
development.
--Analyses
be made of the impact on program cost and
time schedules of proposed changes designed to increase the capabilities
of equipment beyond the required level.
--Advance approval of top-level
management be obtained
for all changes which are designed to increase the
capabilities
of the equipment beyond requirements
and
which significantly
affect
program cost and time
schedules.
The Navy considered
the management objectives
implicit
in the recommendations to be generally
s'ound but did not cite
any actions to be taken.
The Navy pointed out that, after
initiation
of the rescue vehicle program, the Department of
Defense established
new methods to improve the management of
major acquisition
programs which would correct
the problems
that we reported.
22
'The new methods should help to ensure more participation
by top management in the acquisition
process,
GA8 believes,
that
it
is
still
necessary
to
revise
Navy
regulahowever,
(B-167325, June 3, 1971.)
tions.
23
gepartment --.-.-..'
of the Navy
Through June 36, 1969, the Navy spent over a quarter
of a billion dollars for the development and acquisition of
the drone antisubmarine helicopter weapon system. This
system, designed for the delivery of torpedoes by drone
helicopters,
operates from surface ships for the purpose of
attacking and destroying enemy submarines. The system provided the Navy with a capability it did not have previously;
however, the system suffered from a high rate of loss of
the drone helicopters-- of the 750 purchased, 362 had been
lost through April 1969.
In a report issued to the Congress in December 1970,
GAOconcluded that the difficulties
experienced with the
systa resulted, in large part, from producing the hekicopters before they were fully developed and tested.
Modifications of some of the ships from which the helicopters were
to operate were completed while the helicopters were still
under development. This, together with the capability that
the helicopter was expected to provide, created strong pressure on the Navy and the contractor to expedite development
and delivery.
The concurrent development and production of major
weapon systems by the Navy were discussed in an earlier report to the Congress. (&163058, Nov. 19, 1970.) In that
report CA0 recommendedthat the Navy revise its instruction
relating to concurrent development and production to provide for the submission of meaningful data to the Assistant
Secretaries who make concurrency decisions.
GAOrecommended
also that the Naval Audit Service give consideration to making regularly scheduled audits of the practice of concurrent
development and production.
The Navy agreed, in general.
(B-3160877, Bet, 31, 1970.1
‘4
ANTISUBMARINE
WARFARE
DIRECTIONALLOW-FREQUENCY
&LYSIS ANDRECORDING
SYSTEM
Department of the Navy
The directional
low-frequency analysis and recording
system (DIFAR) is regarded as critical
to the proper operation of the Navy's latest land- and carrier-based means of
detecting, classifying,
localizing,
and attacking enemy submarines. It is intended as the principal antisubmarine
sensing means in the P-3C, the latest version of the landbased P-3 patrol aircraft.
Older versions of the P-3 and
other aircraft
are to be retrofitted
with DIFAR. The expected costs of procuring P-3C aircraft,
which will depend
upon DIFAR for achievement of the antisubmarine warfare role,
will be about $2.6 billion.
A total of about $50.2 million
had been expended in the development, test, and evaluation
of DIFAR, and it was estimated by the Navy that the total
program costs would be in the hundreds of millions.
In a report issued to the Congress in June 1971, GAO
stated that the Navyawardedcontracts in April 1968 for the
production of DIFAR for deployment before satisfactory
testing to determine its suitability
for use in an operational environment and despite available evidence which
indicated that its performance would not acceptably meet
requirements.
A production contract was awarded for a more complex
system (DIFAR II) which had not been successfully tested
prior to award even though a less complex system (DIFAR I>
had failed testing.
GAObelieves that neither system was
ready for large-scale production at the time the production
contracts were awarded.
To preclude the production of developmental equipment
which has not yet demonstrated its ability
to meet prescribed objectives, GAOrecommendedthat Navy instructions
be revised to require that:
--The approval for production prior to completion of
development and testing be contingent, as a minimum,
on the equipment satisfactorily
passing a suitable
technical evaluation test by the responsible testing
agency.
25
--The
equipment
design
tested be the same as the de-
sign to be produced.
GAOrecommendedalso to the Secretary of the Navy that:
--DIFAR be thoroughly proven in the P-3C aircraft
to installation
in other aircraft.
prior
--The Chief of Naval Operations have adequate information on which to base his decision for producing
an unproven item for deployment by requiring that the
request for authority to produce include a comparison
of the design performance requirements with the performance actually achieved as the result of testing.
The Assistant Secretary of the Navy (Financial Management) stated that the Navy agreed with the intent of the
recommendations but did not state that specific actions
would be taken with regard to the recommendations.
(~-160877, June 4, 1971.)
26
'
SURFACE SHIP SONAR SYSTEM
Department
of the Navy
In a report
issued to the Congress in March 1971, GAO
stated that the Navy began procurement of the m/s@-26
surface ship sonar system before completion of initial
development and testing.
.As a result,
the system underwent continued redesign and modification
to correct
numerous equipment deficiencies
and to incorporate
features
to improve
The cost to develop the system, which was estiperformance.
mated in May 1960 to be about $12 million,
increased to an
estimated
$101 million
by 1970; costs of production
units
increased;
and delivery
of production
units was often later
With the possible exception
of
than originally
scheduled.
the most current models of the system, performance was below
expectations.
In an earlier
report to the Congress of the Navy's
large-scale
production
of major weapons before completion
of development and testing
(B-163058, Nov. 19, 19701, GAO
had recommended that the Navy revise its instruction
relating
to concurrent
development and production
to provide for the
submission of meaningful
data to the Assistant
Secretaries
who make concurrency
decisions
and that the Naval Audit Service give consideration
to making regularly
scheduled audits
of the practice
of concurrent
development and production.
The Navy agreed, in general,
with these recommendations.
(B-160877, Mar, 9, 1971.)
27
--TACTICAL VEHICLES
Department
of the Army
The Army Tank-Automotive
Command is responsible
to the
Army Materiel
Command for the development and procurement of
tactical
wheeled and tracked vehicles.
During fi seal year
1970 a total
of $35.5 million
was programmed by the Army
Tank-Automotive
Command for functions
relating
to research
and development of vehicles,
and the Command awarded contracts
valued at $545.7 million
for tactical
vehicle production.
Previous studies by GAO and by the Army Audit Agency
revealed management weaknesses.
Recommendations for improvement had been made as a result
of the studies.
GAO made a follow-up
review and found that problems
tinued despite organizational
and procedural
changes.
con-
To improve the management of the tactical
vehicles
development program, GAO has recommended that the Army ensure
that
--requirements
documents specifying,
in accordance with
existing
regulations,
the desired characteristics
of
the vehicles
to be developed are prepared,
thoroughly
analyzed,
and approved at the Department level before
any full-scale
development efforts
are initiated;
--approved
requirements
documents clearly
set forth
valid and realistically
attainable
requirements,
based
upon prior exploratory
and experimental
work, to permit full-scale
development and production
within
the
designated
time frame;
--coordination
and communication between the developing
and using agencies are improved to preclude the need
for significant
deviations
from, or later
waiver or relaxation
of, design or performan’ce characteristics
deemed essential
by the user;
--mass production
of vehicles
is authorized
only after
the vehicles
have demonstrated
the capabilities
to
meet the essential
characteristics
established
and
after
the prospective
user has pronounced them
28
suitable,
production;
thereby
and
minimizing
costly
changes during
--management places greater
emphasis on the timely dissemination of complete and current
data to decisionmaking agencies and, to the extent possible,
maintains
continuity
of participants
from one meeting to the
next throughout
the development project
to promote
stability.
The Assistant
Secretary
of the Army (Research and Development) agreed, in general,
with these recommendations
and
cited the actions
taken.
These actions
included:
--Army regulations
were changed to require
an in-process
review that will
show proof that advanced development
is progressing
satisfactorily,
or that the degree of
risk is known and is acceptable
to the Army, prior
to
continuing
development.
--Army regulations
were changed to require
information
to obtain authorization
for
tion.
more detailed
mass produc-
--Continuity
was being maintained
at the review meetings
by project
managers’ deputies,
and other high-level
project
management members, and the in-process
reviews
were strengthened
by requiring
voting members to comment on the minutes of meetings within
30 days.
GAO believes
that adequate implementation
of these actions and continuing
management attention
should improve the
Army’s management of its tactical
vehicles
development program.
(B-133256, Jan. 27, 1971.)
29
RESEARCH
AND DEVELQPMENT
DUPLICATIONIN TACTICAL~ECONNAISSANCE
DEVELCPMENT
PROGRAMS
Department of Defense
The report issued on this subject is classified
ttSecret.tt (B-171801, Mar. 29, 1971.)
30
s NEEDFORCLOSERSURVEILLANCE
OVER
*/_IIp
&JTHORIZATIQNS
FOR PRODUCTION
OF
MUNITIQNSUNDERDEVELOPMENT
Department of the Army
GAOreviewed the procedures and practices of the Army
in authorizing production, purchase, and field use of developmental munitions.
The review was limited to a specific
round of howitzer ammunition because GAOwas informed that
the procedures followed were representative of the procedures in managing other developmental munitions.
Production and operational use of materiel prior to
completing development and testing is referred to as concurrent development and production or concurrency.
The concurrency of Army munitions is authorized by a "Limited ProductionBV (LP) classification,
Items so classified
are to be
used only for the urgent requirement they are intended to
fulfill.
The howitzer ammunition had been authorized as LP for
1 year, to fill an urgent requirement for close-range,
direct-fire
capability
in Southeast Asia. The item was
still
in limited production 3-l/2 years later, although authorization
from higher echelons had not been obtained.
The rate of use in Southeast Asia was far lower than had
been anticipated but production was continued and resulted
in an excess stock position.
GAOproposed that the Army improve its overall
ment of munitions development by
manage-
--reviewing all 'Umited Production" munitions to determine whether similar problems warranting correction existed;
--enforcing its regulation requiring that "Limited
Production" items be used only for the specific,
urgent requirement for which purchases were approved;
--complying with its requirements for periodic justification by the developing agency, and approval by the
31
Army General Staff, of the need to renew a "Limited
Production" authorization;
and
--monitoring the use of developmental items purchased
for the other services.
The Assistant Secretary of Defense agreed with the
first three proposals and stated that action had been
taken to (1) issue revised regulations strengthening and
clarifying
procedures for managing "Limited Production"
items and (2) restrict
the amounts budgeted for procurement of such items. Also the Army reduced funding for procurement of "Limited Production" items from $220 million in
fiscal year 1969 to $10 million in fiscal year 1971.
The Assistant Secretary did not agree with GAQ's proposal that the Army monitor the use of developmental items
purchased for the other services.
He stated that the Army
had a monitoring responsibility
only when a safety risk
The new Army Regulation 71-6, dated Januwas involved.
ary 1, 1970, however, does not mention this responsibility.
Therefore GAOrecommendedthat the Secretary of the Army
revise Army Regulation 71-6 to reflect the responsibility
of the Army to maintain cognizance of the use of developmental items in instances involving potential safety risk.
(B-169675, Dec. 7, 1970.)
32
NEEDFORCLOSERSVRVEILLANCE
OVEJ?
SELECTION
ANDMANAGEMENT
OF BASIC RESEARCH
PROJECTS
Department of the Air Force
GAO sought to evaluate the practices
followed
by the
Air Force Office of Scientific
Research (OSR) in selecting,
managing, and using the results
of research projects,
At
the time of the review, OSR was supporting
about 1,200 projects, costing about $285 million,
most of which had been
proposed and were being performed by university
researchers,
Federal policy
is that the National
Science Foundation
will provide support for general-purpose
research.
Other
Federal agencies should support basic research only in areas
closely related
to their missions.
This policy is set forth
in an Executive order as well as a Department of Defense
directive.
Guidelines
for applying this policy were not
provided,
however,
OSR interpreted
this policy broadly when selecting
projects to be funded,
Also it did not prepare written
justification showing the basis for supporting
the projects.
Although
many of the projects
appeared to be closely
related
to the
Air Force mission,
some did not,
Support of research not
closely
related
to the Air Force mission reduces the effectiveness
of its basic research program since fewer dollars
are available
for closely
related
research.
Immediately
after GAO's evaluation
the Air Force reviewed all current
projects
in OSR as part of a Defense-wide
study following
enactment of the 1970 Defense Procurement
Authorization
Act.
This act contained a provision
forbidding
the use of 1970 funds for research projects
which did not
have a direct
and apparent relationship
to a specific
military function
or operation.
On the basis of its review,
the
Air Force disqualified
115 OSR projects--lo
percent of the
active projects --because of insufficient
relevance.
GAO found that OSR was not obtaining
maximum benefit
from its basic research program because certain
procedures
were not consistently
followed,
9
33
--Surveillance
over ongoing research projects
was not
adequate to ensure that researchers
did not deviate
from negotiated
budgets or from negotiated
budgets
or from the agreed-upon time that the principal
investigator
would devote to the project.
--Procedures
for ensuring that all required
scientific
reports were being received were not consistently
followed;
some reports were not obtained at all and
others were obtained only after long delays.
--Procedures
not fully
for disseminating
effective,
research
results
were
GAO suggested that the Department of Defense issue
guidelines
limiting
defense funding to projects
which were
clearly
relevant
to assigned missions,
Consideration
should
be given to the most appropriate
agency to support the research in view of the missions and research performed by
other organizations
--military
and civilian,
Government and
private.
Instructions
should be issued requiring
the need
for each contract
to be clearly
established
in writing.
GAO
also made a number of suggestions
for improving management
The
Air
Force
took
actions
which were responsive
procedures.
to GAO's suggestions.
(~-170801, Jan. 29, 1971.)
34
SUPPLY MANAGEMENT
INACCURACY OF INVENTCRY
-_- RECORDS
Department
of the Army
After a GAO report on inventory
controls
in the Department of Defense, issued to the Congress in 1967, the Department prescribed
new procedures to improve the accuracy of
GAO reviewed the Army inventory
procerecorded inventories.
dures in the continental
United States and in Europe to
determine the effectiveness
of the new procedures,
Although the Army was attempting
to schedule and take
physical
inventories
on a regular basis and its depots appeared to be doing a good job, significant
improvement in
the accuracy of inventory
records had not been achieved.
The Army's inventories
of about $3 billion
in the continental
United States required
adjustments
amounting to $830 million
in 1969 to reflect
quantities
based on physical
counts-downward adjustments
of $439 million
for inventory
that did
not exist and upward adjustments
of $391 million
for inventory
the Army did not know it had,
The $830 million
represented
an adjustment
ratio
of 27.7 percent compared with the ratio
of 23.5 percent GAO had found in 1966.
The Army's inventories
of about $1.1 billion
in Europe
required
even greater adjustments
in 1969: downward adjustments of $648 million
and upward adjustments
of $768 million
for a total
of $1.4 billion.
These adjustments
exceeded the
average inventory
value by about $300 million.
Accuracy of records was not improved because the Army
had underestimated
the magnitude of the task.
The manpower
and automatic data processing
equipment provided for the
task had been inadequate and had not been effectively
applied.
GAO made a series of recommendations designed to
strengthen
procedures
and to improve accuracy of the Army's
inventory
records.
The Army generally
agreed with GAO's
findings
and conclusions
and initiated
action on each of
the recommendations.
The Army"s actions,
if effectively
implemented and pursued on a continuing
basis, should bring
about substantial
improvement in accuracy of the inventory
records,
(B-146828, Feb. 26, 1971.)
35
NEED TO ELIMINATE LOW-COST, LOW-USE
ITEMS IN SUPPLY SYSTEMS
.Department
of Defense
In a report issued to the Congress in October 1967, GAO
pointed out that substantial
savings could be achieved by
eliminating
some 1.2 million
low-cost,
low-use items from
The Department of
the Department of Defense supply system.
Defense agreed and cited a program undertaken
for that purpose.
GAO's follow-up
to evaluate the effectiveness
of the
program showed that there were still
as many as 900,000 lowcost items in the supply system that were seldom, if ever,
needed.
It has been estimated
that the annual carrying
cost
of inventories
is from 20 to 25 percent of the value of the
inventories.
GAO has proposed that
its program for elimination
by ensuring that:
the Department of Defense improve
of items from the supply system
--Stock retention
policies
of inventory
management
organizations
do not restrict
the systematic
identification
and elimination
of low-cost
inactive
items.
--inactive
items are promptly eliminated
unless there
are valid future needs that cannot be met readily
and economically
by purchase or fabrication
of
stocks as needed.
--Provision
is made for periodic
identification
and elimination
of low-cost,
slow-moving items
that can be obtained readily
and economically
by purchase or fabrication
as needed.
--All
inventory
management organizations
program a high priority.
give
the
The Acting Assistant
Secretary
of Defense (Installations and Logistics)
agreed, in general, with the findings
He reported a number of corrective
actions,
and proposals.
36
,
unneeded
taken or planned, which GAO believes will eliminate
stocks in the supply system if carried
out effectively.
(~-133118, Mar. 31, 1971.)
37
POTENTIALFORMOREEFFECTIVEUSEAND REDISTRIBUTION
OF EXCESSMATERIELIN EUROPE'
.
Department of Defense
To obtain maximumuse of the materiel in the European
theater, the Department of Defense established a special
program, conducted by the Materiel Asset Redistribution
of excess materiel
Center, Europe, to promote redistribution
GAO
reviewed the
among the military services in Europe.
program to evaluate its adequacy and effectiveness.
From inception of the program in July 1967 through
October 1969, about $199 million worth of excess materiel
was reported to the Center and about $20 million worth was
Not all the Navy organizations, however,
redistributed.
and none of the Air Force contractors in Europe had reported their excesses to the Center, nor had they used the
Center as a possible source of supply for their requireby Navy orments. GAOestimated that full participation
ganizations and Air Force contractors in Europe could have
resulted in additional redistribution
of $684,000 worth of
excess materiel in the 12-month period ended December 1,
1969, and comparable amounts in subsequent years.
CA0 has found that:
--Excesses were released by the Center for disposal
after the period of screening against requirements-generally 90 days from the time the excesses were
first reported-- even though some of the items had a
potential for redistribution
and were in fact needed
shortly after they were released for disposal.
--Substitute
and interchangeable excesses were not
considered for redistribution
even though computer
equipment capacity had been provided to include information on such items and an audit in 1968 by the
Office of the Secretary of Defense indicated that
use of substitute and interchangeable excesses would
have increased redistribution
by about $1.5 million
in the 15-month period covered in the audit.
38
--Excesses redistributed
to Army requisitioners
to meet permissive overstockage may have deprived
organizations with a more urgent need and resulted,
in some instances, in the subsequent reporting of
the same stocks as excess.
GAOhas recommendedthat the Secretary of Defense:
--Require full participation
in this program by the
military
services and contractors.
--Reevaluate the screening cycle to prevent premature
disposal of needed items.
--Require the resolicitation
of organizations, whose
excesses were recently released and are subsequently
needed, to determine whether the excesses are still
available for redistribution.
--Ensure that the program for considering substitute
and interchangeable items is carried out as previously recommendedby the Department of Defense audit.
--Establish procedures to hold requisitions
for permissive overstockage in abeyance so, if requisitions
for current operating stockage are received during
the screening period, they can be filled first.
The Department of Defense generally concurred in GAO's
conclusions and recommendations. (B-140389, Feb. 3, 1971.)
39
RETENTIONOF EXCESSINVENTCX?IES
OF
INDUSTRIALl!+fATE'i~S -_u-...."
AT NAG SHIR~DS
Department of the Navy
GAO's review at four of the 10 naval. shipyards showed
that about 30 percent of the inventories of industrial
materials at the four yards were excess to their needs, The
excess material--valued
at about $17 million--had
not been
reported to the naval supply system for redistribution
or
for disposal; the shipyards did not have an adequate program
for identifying
excess material,
GAOestimated that disposal
of the excesses at the four yards would eliminate holding
costs of about $3,4 million annually.
Much of the accumulation of the excess material resulted from the ordering of material far in advance of actual need and from the establishent
of stock levels on the
basis of inaccurate demand and use data.
GAOnoted also that the yards were not making maximum
use of Navy procedures to reduce the cost of requisitioning
high-use, low-value items, These procedures provide for
re&isitioning
of such items in bulk, and placing them in
bins in the work areas9 rather than requisitioning
them in
small quantities as needed. Elimination of unnecessary
requisitioning
at the four yards could reduce costs by about
$1.3 million annually,
Internal audits and studies at shipyards had identified
similar
conditions but the recommendedcorrective measures
had not been fully implemented,
In response to GAOQssuggestions for improvement, the
Navy stated that inventories at the 10 naval shipyards had
been reduced by about $28 million in the period January
through Septaber 1970--the trend was continuing--and cited
a number of related actions taken or planned to
--improve requisitioning
--develop
--establish
tory,
of material,
revised stocking criteria,
guidelines
for placing material
40
in inven-
--dispose of excess material and set up annual inventory and reporting requirements, and
--increase to $10 the unit value of material
be bulk issued.
which may
The Navy stated also that the Inspector General would provide surveillance of the implementation of audit report recommendations. (B-125057, May 28, 1971.)
41
UNECONCMICAL
USE OF'AIR PARCFL'POST
FORSHIPMENTOF SUPPLIESDepartment of Defense
r-Supply depots of the military services were using air
parcel post more than necessary because local controls had
not been established, in all cases, to ensure selection of
the most economical, yet timely; methods of shipment, Use
of alternative
methods could save about $520,000 annually
at three of the seven installations
included in GAO's review. About $450,000 is being saved annually at two other
installations
as a result of adoption of controls that GAO
recommended.
Alternatives
to air parcel post include Navy and Air
Force, contractor-operated,
domestic cargo airlift
systems;
special types of lower cost airlift
postal services to overseas areas; and surface transportation.
The Army monitors
official
mail addressed to overseas activities
to select the
least costly mode of transportation
by which the mail will
reach its destinations within delivery requirements.
In
fiscal year 1969 this program reduced mailing costs by over
$5.4 million.
GAObelieves that the savings could have been
much larger if the monitoring program had covered all parcels
being sent overseas through the military postal system.
GAOhas recommendedthat:
--The Secretary of Defense see that procedures at military supply installations
are revised to ensure consideration of all acceptable means of delivery and
selection of the least costly means that will permit
delivery in the required time.
--The Navy adopt a mail-monitoring program at the Navy
fleet post offices to select the least costly means
of sending official
mail overseas.
--The Department of Defense issue policy guidance, similar to that of the Army, requiring all military services and other Government activities
using the military postal system to indicate delivery dates or
“42
similar
cilitate
ways.
information on supply parcels so as to fathe screening process at the postal gate-
The Department of Defense agreed with the first two
recommendations and stated that the third recommendation-requirement that delivery dates be indicated on supply parcels--would be considered in connection with its special review of the military mail concepts, operations, and procedures. (B-157476, May 6, 1971.)
43
PHASEDOWN
OF UNITED STATES
MILITARY ACTIVITIES IN VIETNAM
PROBLEMS
IQKOUNTERED
IN THE PHASEDOWN
Department of Defense
Between June 8, 1969, and April 15, 1970, the U.S.
forces
in Vietnam
were reduced from 538,000 to 425,500
troops as a part of the phasedown of U.S. military activities in Vietnam. These reductions were made in three
steps-- over periods of 3 to 4 months for each step--by redeploying military units or placing them in an inactive status, by reassigning individuals,
and by curtailing
replacements scheduled to be sent to Vietnam. The military services met each of the directed troop reduction schedules despite the relatively
short time provided.
The phasedown of
the large quantities of supplies and equipment was, and continues to be, a more formidable task.
GAOreviewed the policies and procedures being applied
in the phasedown to identify problems being encountered-particularly
in the logistics area--and to bring the problems promptly to the attention of the responsible military
commandersand the Secretary of Defense while the phasedown
was contfnuing.
The review was directed primarily to matters connected with the third,step--a
reduction of 50,000
troops completed April 15, 1970.
The circumstances made it difficult
for organizations
in Vietnam, subordtnate to the commandheadquarters of the
services, to prepare for efficient
reductions of military
activities.
They could not be provided with specific information as to size and time of force reductions until announced by the President.
Further, they were placed in the
position of having to continue their assigned missions until
a few days prior to reassignment of personnel and turn-in of
equipment. In many cases detailed procedures for withdrawal
had to be improvised even as the withdrawal was taking
place. Notwithstanding these constraints,
the Department of
Defense and the military services were making a concerted
effort to account for and control the arms, equipment, and
materiel which became excess as the phasedown proceeded,
44
The constraints contributed to a variety sf problems
requiring attention of military commandsin Vietnam and
Washington, including the Office of the Secretary of Defense,
--There was a need for greater coordination among the
three military
services in supplying the needs of the
Vietnamese Armed Forces, Lack of uniform procedures
resulted in some cases in equipment needed by the
Vietnamese being shipped back to the United States.
--There were problems in returning Army equipment to
the United States because of a backllog of equipment
which required cleaning (to meet standards of the
U.S. Public Health Service and the Department of Agriculture
for treatment and processing of materiel
being returned to the United States) and a shortage
of facilities
for cleaning.
--There were problems in returning Air Force materiel
to the United States because of a lack of people
qualified to pack and crate the materiel.
GAOalso observed the following
provement might be possible,
situations
where im-
--Because of ineffective
screening, Army repair parts
and components were issued to the Vietnamese Army,
although needed by U.S. military services in Vietnam,
or shipped out of Vietnam,
although needed by the
Vietnamese Army.
--The logistical
reporting and accounting system did
not provide accurate, complete, or timely data.
--The procedures for cancellation of requisitions
for
supplies, not needed because of force reductions,
were not adequate.
--The Army had a significant
backlog of unserviceable
equipment in Vietnam because of limited maintenance
capabilities.
There may also be a need to strengthen control over
transfers to the Vietnamese of such facilities
as buildings,
45
airfields,
and water purification
plants,
they are capable of using and maintaining
to ensure that*
them,
GAOhas suggested that the Secretary of Defense:
--Review existing plans of the military services for
anticipated withdrawals to ensure that the plans provide for withdrawals on a unit-by-unit
basis.
--Establish uniform procedures and criteria
(1) for the
transfer of excess materiel to the Vietnamese Armed
Forces and (2) to ensure that all excess materiel in
Vietnam is considered in fulfilling
requirements of
the Vietnamese.
--Reduce the backlog of equipment awaiting
for return to the United States.
preparation
The Assistant Secretary of Defense (Installations
and
Logistics) stated that the military departments concurred
generally in the conclusions and suggestions and cited the
GAObelieves
recent actions to implement the suggestions,
that the actions, if consistently applied, will improve the
conditions which existed in the early stages of the phasedown. (B-171579, Mar. 15, 1971.)
GAO's follow-up review of phasedown actions through
December 1970 showed that considerable progress had been
made to ensure an orderly phasedown and effective redistribution of equipment and materiel and to cope with problems
Following is a swnmary
identified
in GAO's earlier report.
of. GAO's observations in the follow-up review.
Disposition of departing units' equipment--In the
earlier phasedown segments, there was a lack of coordination
among the services in transferring
equipment from one United
States service to other than its counterpart service in the
Vietnamese Armed Forces, e.g., from the United States Air
Force to the Vietnamese Marines. Procedures were established to correct this.
As one result, about $2.9 million
worth of materiel was transferred -from the United States
Harines to various Vietnamese services.
Also procedures for
controlling
transfer of equipment among Army units had been
46
* strengthened and resulted in cancellation of requisitions
for equipment valued at about $5.1 million,
Other actions taken to cope with the problems of disposing of equipment included:
--Revision of unnecessarily restrictive
criteria
as to
the condition of equipment eligible
for transfer to
the Vietnamese and a resultant reduction in need to
ship equipment from the United States.
--Substantial
completion of programs for a more accurate identification
of Vietnamese requirements for
turned-in equipment,
--Implementation of mechanized procedures by the Air
Force for screening available equipment against Vietnamese requirements.
--Emphasis by the Air Force that, consistent with the
deployment priorities
of units returning to the
United States, the units not take along their equipment, parts, and supplies without first considering
the in-country requirements for the materiel.
--Action by the Army to avoid undue backlogs of
turned-in equipment awaiting maintenance and to permit its timely disposal.
Redistribution
of excess equipment and materiel--Improvements have been made in the system for redistributing
excess equipment and materiel in Vietnam to organizations
with requirements for them. Redistribution
to meet the requirements-- especially those of the Vietnamese--had not been
as effective as possible.
The following problems were identified by GAOand by other audit organizations.
--Until July 1970 there were no procedures for submission of Vietnamese Army requisitions
through United
States Army supply channels for screening against incountry materiel, although this screening was technically feasible.
47
----
.
--Even after these July 1970 procedures were estab- *
lished, requisitions
for equipment for the Vietnamese, originated in the United States by the International Logistics Center, Army Materiel Cormnand,under
the approved military assistance program, were still
not being screened against excess materiel available
at depots in Vietnam. The Army has since issued new
guidance which provides for the use of the depot excesses to meet the requirements of the Vietnamese.
--Until November 1970 the Vietnamese were not allowed
to requisition
their funded requirements from the
large volume of excess materiel reported to the Pacific CommandUtilization
and Redistribution
Agency.
Adiustment of supply flow--Many effective actions were
taken to adjust stock levels in response to decreasing redecrease
quirements. This was reflected in a significant
GAO
noted,
however,
that
further imin the stockage level.
provements could be made and brought problem areas to the
As a result:
attention of management for correction.
--The Army and Marines canceled a greater number of
requisitions
of departing units and thus further reduced the quantities of unneeded materiel being
shipped to Vietnam,
--The Army is blocking more effectively
the processing
of requisitions
of units scheduled for phaseout.
Property disposal operations--GAO limited its review
efforts in the area of property disposal to avoid duplicating the work being performed by the Army Audit Agency. The
Agency concluded in its report on this work that the Army
had exerted a strong effort to develop means of disposing
of excess personal property.
All the problem areas presented in GAO's report were
brought to the attention of local managementand were discussed with appropriate officials
in the Department of Defense and the military services.
In each instance prompt
corrective action was taken or promised. Therefore GAOincluded no specific recommendations in its report.
(B-171579, Aug. 9, 1971.)
48
MAINTENANCE, REPAIR,_AND OVERKAUL
---NEED TO EXPEDITE REPAIR OF HELICOPTERS
Department
of the Army
Because of large quantities of helicopters,
engines,
and components awaiting repair at the Army Aeronautical Bepot Maintenance Center and the unusual military need for the
equipment, GAOreviewed the Army's helicopter maintenance
program.
The backlog of equipment awaiting repair had increased
substantially
during the 18-month period preceding January 31, 1970, because of increased military operations and
insufficient
use of maintenance capabilities,
At that date
200 helicopters,
valued at about $63 million,
and large
quantities of engines and components with an original cost
of about $88 million, were awaiting repair and overhaul.
At the same time the Army had on order,, or was planning to
buy, about 1,700 helicopters and large quantities of engines
and components.
In a report issued to the Congress in December 1970,
GAOconcluded that the Army could attain the same or increased availability
of helicopters at less cost by expanding its maintenance program and by reducing or stretching
out its procurement program. The Army had sufficient
physical plant and equipment available to expand its maintenance
program. Additional funding was needed, however, for personnel costs involved in establishing a second work shift
and, if necessary, a third shift.
GAOproposed that the Army:
--Reappraise its maintenance program to take full advantage of both in-house and contractor maintenance
capabilities
to reduce the backlogs of aircraft,
engines, and components awaiting averhaul.
--Review the supply status of aircraft,
engines, and
major components to reevaluate both the need for
those on order and their delivery schedules.
49
The Army agreed with these recommendations and stated
that overhaul programs had been or would be increased and
that procurement requirements
for some of the new items had
Subsequently
the
Army reduced its planned
been reduced.
procurement of helicopter
engines and components by about
(B-146888, Dec. 7, 1970.)
$113 million.
50
.
NEEDTO MONITORTIRE-REBUILDINGPROGRAMS
IN EUROPE
Department
of Defense
In a report issued to the Congress in January 1971,
GAO estimated
that about $1 million
could have been saved
in Europe during fiscal
year 1969 if the motor vehicle
tirerebuilding
programs of the Army and Air Force had been more
effective.
Significant
quantities
of used tires
that could
have been rebuilt
were sold to scrap dealers at nominal
prices.
Neither the Army nor the Air Force had surveillance
systems to monitor the programs,
GAO has suggested to the Secretary
programs could be improved by:
of Defense that
the
--Inspection
of tires
on vehicles
during vehicle maintenance to ensure removal at the required
time for
rebuilding.
--Inspection,
periodically,
of condemned tires
in disposal yards to ensure that tires which can be rebuilt
and used are not scrapped.
--Initiation
of operational
standards and a reporting
system that would measure the performance sf the
tire-rebuilding
program at each base.
The Department of Defense concurred in these suggestions,
The Department stated that a program similar
to one instituted
for aircraft
tires would be initiated,
(B-159200, Jan. 8,
1971.)
51
ADMINISTRATION OF MANPOWER
MATTERS
ADVERSEEFFECTS OF CEILINGS ON
EMPLOYMENTOF CIVILIAN PERSONNEL
Department
of Defense
Before fiscal
year 1969 civilian
personnel ceilings
for the executive
departments and agencies generally
were
established
on the basis of annual budgets and were administered by the Bureau of the Budget (now the Office of ManageOn June 28, 1968, the Congress enacted
ment and Budget).
the Revenue and Expenditure
Control Act of 1968 which imposed restrictions
on hiring
of civilian
employees,
These
restrictions
superseded the ceiling
system previously
imposed by the Bureau of the Budget.
On July 22, 1969, the
restrictions
on hiring
imposed by the act were repealed and
the earlier
ceiling
system imposed by the Bureau of the Budget was reinstated.
GAO reviewed the effect
of the personnel
ceilings
and hiring
restrictions
on management of civilian
personnel,
In GAO's opinion,
personnel ceilings
or hiring
restrictions,
whether imposed by statute
or by the Office of Management and Budget, do not provide the most effective
management control
over civilian
personnel.
They tend to be
--arbitrarily
applied because of the difficulty
making them fit program requirements;
--inflexible
because they do not allow for
skills
as needed in changed programs;
--uneconomical
when they permit
grams through use of overtime
and
of
changes in
accomplishment
of prolabor at premium pay;
--ineffective
in controlling
expenditures
since, as an
alternative,programs
may be accomplished through contracting
with firms or institutions
for personal services.
GAO believes
that personnel levels can be better
through budget and program planning procedures,
52
controlled
GAO proposed that the Director
of the Office of Management and Budget permit departments and agencies to accomplish their programs without
restrictions
on numbers of
personnel-- being limited
only by the availability
of funds.
In December 1970 the Director
agreed to eliminate
employment
ceilings
in the Department of Defense for a l-year
trial
GAO recommended that the Secretary
of Defense esperiod.
tablish
a centralized
group of officials
to assess the effectiveness
of fiscal
and program constraints
on employment
levels during the test period.
GAO suggested also to the Secretary
of Defense that
substantial
improvements in the management of total personnel resources could be achieved through continuous
evaluation by officials
independent of the component organizations
of the Department of Defense.
GAO proposed that he establish
a group of high-level
officials,
responsible
to him, for
continuing
and objective
evaluation
of missions,
programs,
and activities
of the component organizations
within
the
Department.
The Department of Defense did not consider that
establishment
of such a group would significantly
improve
its existing
review process and pointed out that virtually
every level of management was making maximum effort
to
achieve savings necessary to meet budget reductions.
(B-165959, Apr. 30, 1971,)
53
HISASSIGNMENT
OF ENLISTEDPERSONNEL
DeDartment of the Armv
At the time of GAO@sreview of the use of Army enlisted
personnel, there were about a million trained enlisted personnel assigned to Army units-- divided about equally between
continental U.S. installations
and overseas installations.
GAOfound that about 10 percent of the personnel at the four
continental U.S. installations
included in the review were
assigned to duties for which they had not been trained.
Information obtained in other reviews at overseas installations
showed that the rate overseas was even higher,
GAOrecognized that personnel turbulence--the
number of
men entering and leaving the Army and the number being assigned and reassigned-- has increased significantly
in recent
years and has added to the problems of personnel management.
The Army needs a personnel management system capable of
coping with the varying degrees of turbulence.
The existing
system, with some revisions and adequate enforcement, may
afford the Army the potentialfor
effective personnel management* But the adequacy of the system could not be evaluated because the Army failed to strengthen and enforce it
and continued to circumvent it.
Some of the problems in personnel management stemmed
from inaccuracies in the data accumulated under the Army's
personnel statistical
and accounting system. Others resulted from practices which circumvented the normal operation of the personnel management system. These practices
included ""bulk filling"
of requisitions
for personnel (assignment of personnel in groups rather than on the basis of
the requisitioned
skills and skill levels of the individuals) and mandatory levies (a practice, outside the normal
requisitioning
procedures, which directs installations
to
transfer personnel to fill vacancies at ,other installations).
GAOhas recommendedthat the Army:
--Enforce existing personnel management policies and
procedures at all levels of commandand refrain from
54
initiating
at headquarters
level such actions
and mandatory levies.
"bulk filling"
as
--Strengthen
existing
personnel management policies
and procedures rather than introduce
new programs or
changes which add to reporting
requirements
and complicate
the operation
of the system.
--Give priority
attention
to the manpower requirements
for the personnel. management career field
and stabilize the tours of such personnel as soon as practicable.
The Department of the Army agreed with the general
thrust of GAO's report and stated that increased attention
to the personnel management area had been programmed by the
Army Audit Agency. ~(~-146890, Nay 6, 1971.~
NEEDFORCLARIFLCATIQN
--- OF GUIDANCEON
ASSIGNrvfENT
OF CREWS
-----TO SHIPS UNDER
CONSTRUCTION
Department
of the Navy
The Navy assigns nucleus or skeleton crews, for temporary duty periods up to 6 months, to ships uilder construction to ensure delivery
of ships with trained,
wellorganized crews.
Over 2,800 enlisted
men, representing
more than 980 man-years and casting about $6.2 million,
had
been assigned to temporary duty as nucleus crews for 43
ships during the P2-month period ended July 31, 1970.
GAO's review of crew assignments
ships showed that:
for
five
of these
--The number of personnel assigned was based on personal
judgment and precedent rather than on actual need.
--Grew members were sent to construction
sites before
they were needed and were assigned to perform tasks
that already were the responsibility
of other Navy
organizations.
--The Navy had not evaluated work requirements
to determine the type of personnel that should be included in a nucleus crew,
--The system for obtaining
information
nucleus crews was inadequate.
on the use of
In January 1978 the Navy approved a pilot
program to
place a fleet
introduction
team on permanent shore duty at
ship-construction
sites to perform many of the tasks being
performed by nucleus crews.
This program represents
a
significant
departure
from traditional
manning practices
for newly constructed
ships.
GAO has recommended that
the Secretary
of the Navy:
--Determine
the essential
should perform,
functions
nucleus
56
that
crews
' --Evaluate the composition and duration
needed to perform the functions.
of manpower
---Assign to nucleus crews only the rates and ratings
for the man-months needed.
--Establish procedures which will provide for a continual evaluation of nucleus crew needs, including the
requirement that prospective commanding officers recommend needed changes to nucleus crew authorizations
in their monthly ships' progress reports.
--Monitor the actions taken by the Navy to make certain
that valuable manpower resources are used efficiently.
The Navy concurred in these recommendations and initiated actions to implement them. (~-172632, Aug. 9, 1971. >
57
.,.
NEED FOR A COMPREHENSIVEALCOHOLISM
CONTROLPROGRAMFOR MILITARY PERSONNEL
Department
of Defense
GAO made a review of alcoholism
among military
personnel at the request of the Chairman, Subcommittee on Alcoholism and Narcotics,
Senate Committee on Labor and Public WelIn a report on an earlier
study concerning Federal
fare.
civilian
employees (B-164031, Sept. 28, 19701, also made at
the request of the Chairman, GAO pointed out that the Government could realize
estimated annual savings of $135 million
to $280 million
from an alcoholism
program for civilian
employees,
assuming prevalence rates of alcoholism
ranging
from 4 percent to 8 percent.
The Department of Defense (DOD) has no complete, reliable data that show the extent of alcoholism
in the Armed
Forces.
Although the incidence of alcoholism
in the military population
may be no greater than that of the civilian
population,
it could be a more serious problem because of
the frequently
dangerous and critical
duties involved.
Substantial
savings, as well as humanitarian
benefits,
can be realized
from the establishment
of a comprehensive
alcoholism
control
program for military
personnel.
For each
l-percent
reduction
in the incidence of alcoholism,
the
potential
gross savings could be about $24 million
annually.
If the incidence
is comparable to the estimated average
5 percent in the civilian
work force,
then the potential
annual gross savings could amount to about $120 million.
Factors which could encourage the incidence of alcoholism among military
personnel include social climate,
family
separations,
low cost and ready availability
of alcoholic
beverages, and boredom.
Factors which could discourage the
development of alcoholism
include military
discipline
and
standards and the lower average age of the military
personnel.
Negative attitudes
and punitive
statutes
and regulations have hidden the problem.
The military
alcoholic
has
little
incentive
to come forward to seek help.
0 No DOD-wide alcoholism
prevention
and rehabilitation
program ekisted for military
personnel,
nor were there any
guidelines
specifying
procedures to be followed
in treating
the'treatment
given to the military
althem. As a result
Alcoholism rehabilitacoholic at many bases was limited.
established
at
tion programs, however, had been formally
some military
installations
and DOD recently
established
a
task force to study all aspects of alcohol abuse among military personnel.
GAO has recommended that the Secretary
tablish
a comprehensive alcoholism
control
personnel
which
would
provide
that:
tary
of Defense esprogram for mili- -
--Alcoholism
be recognized
as a disease which is treatable rather than-as misconduct which is punishable.
--Educational
programs be established
to inform personnel of the dangers of the abusive use of alcohol.
--Rehabilitative
nel having
measures be made available
alcoholism
problems.
--A study be made to determine more precisely
dence of alcoholism
and problem drinking,
to personthe inci-
DOD agreed with the last three of these four points.
With respect to the first
point-- that alcoholism
be recognized
as a disease rather than misconduct--DOD
pointed out that
disease is equated with physical
disability
which is comIt would prefer to recognize alcoholism
as a conpensable.
dition,
rather than a disease, which is preventable
and
treatable
through the application
of enlightened
attitudes
and techniques.
GAO recognized
that certain
statutes
and regulations
affecting
military
compensation hold alcoholism
to be misconduct.
But as GAO stated earlier,
these statutes
and regulations
have resulted
in hiding the alcoholism
problem.
If they are not modified,
there is little
assurance that this
condition
will be corrected.
Title V, section 501, of Public
Law 9.2-129, amending the Military
Selective
Service Act, requires the Secretary
of Defense to make such recommendations
for additional
legislation
as are necessary to deal with the
59
problem of drug and alcohol*dependence.
GAO believes
that
.
the Secretary's
recommendations properly
should include
proposals to deal with the problems of recognizing
alcoholThese
problems
include
those
involving
ism as a disease,
and related benefits.
pay, retirement,
(Report to the Chairman, Subcommittee on Alcoholism
and Narcotics,
Senate Committee on Labor and Public Welfare,
B-164031, Nov. 2, 1971.)
INACCURACY__-OF MILITARY
TEAVE RECORDS
---“.-.A--*.“-..
1-Qefir tment ---of the--.--Army
Inaccurate
accounting
for military
leave in the Army has
been a continuing
problem and has been the subject of a number of GAO’s earlier
reports.
The weaknesses in accounting
for leave have persi.sted
despite
the adoption of additional
procedures
and controls
by the Army.
Military
personnel are
paid for the unused leave at the time they are separated from
military
service I Inaccurate
balances of unused leave have
been a major factor
contributing
to improper payments by the
Army to its military
personnel.
In April
1971 GA0 issued a
report
to the Congress on its current
review of the problem.
On the basis of the incidence
of the errors
GAQ found
in the follow-up
review,
estimated
annual overpayments of
about $23 million
and underpayments of about $3 million
could
result.
This was a conservative
estimate.
The ultimate
improper payments could be at considerably
higher rates of pay
because of subsequent longevity
and statutory
pay increases
and promotions m GAO estimated
that,
should the military
personnel choose to use their erroneous leave balances rather
than receive payment at the time of separation,
a net loss
of about 4,600 man-years of manpower availability
could result*
The following
dence of errors.
conditions
contributed
to the high
inci-
--Prescribed
records were not used to establish
servicemen arrived
at installations
and leave
while in travel
status was not charged.
dates
taken
--Leave taken in connection
with intrapost
transfers
(leave taken between completion
of training
and reassignment to another unit at the same installation)
was
incorrectly
treated
as routine
delay en route.
--Attendance
recording
records
leave.
were not used as the source
--Inadequate
supervision
of
61
the work
of
pay clerks.
for
--Little
or no internal
internal
review staffs
GAO recommended that
audit of leave either
or by the Army Audit
the Secretary
by local
Agen.cy.
of the Army:
--Direct
that local internal
review staffs
be increased
and that they and the Army Audit Agency regularly
conduct reviews of pay and allowances with emphasis on
military
leave.
--Order
a study of the Army’s leave practices
to ensure
that the leave data input to the military
pay system
will be more accurate.
--Direct
that travel
orders be endorsed by appropriate
officials
to show dates of arrival
and departure
at
all military
locations
to which the individuals
traveled, including
intermediate
points,
and that these
endorsements be used with the travel
voucher to compute the chargeable leave.
The Army generally
concurred in the findings
and conWith
clusions
and accepted the first
two recommendations.
respect
to the third recommendation,
the Army expressed doubt
that endorsement of travel
orders would reduce the error rate
significantly.
<B-125037, Apr. 2, 1971.)
PROf3LEMS
IN CONVERSION
OF NATION& GUARD
TECHNICIANPOSITIONSTO FEDERALPOSITIONS
Department of Defense
The National Guard Technicians Act of 1968 converted
Army and Air National Guard technicians from State to Federal
employee status, effective January 1, 1969. One of the
principal purposes of the legislation
was to provide an adequate and uniform retirement and fringe benefit program.
National Guard technicians are civilian
employees whose
employment generally requires them to be members of the
*Guard also. Prior to the conversion they were considered
employees of the States although their salaries were paid
out of Federal funds.
As stated in its report issued to the Congress in April
1971, GAO's review of the records of over 1,QOQtechnicians
selected at random in 12 States showed that, in general, the
conversion had been carried out in accordance with the act
and implementing regulations and instructions.
With few
exceptions the grades, rates of compensation, leave balances,
and annual leave accrual categories recorded at the time of
conversion were proper. There were many discrepancies, however, in data pertaining to service prior to conversion,
attributable
primarily to clerical errors, omission of data,
and misinterpretation
of instructions.
The erroneous data
had no significant
effect on the status of the technicians
at the time of conversion and generally will not have any
significant
effect as long as they are employed by the Federal Government. But the errors could have an effect on the
technicians' retirement rights and benefits and the related
cost to the Government.
GAOrecommended that the Secretary of Defense require
the National. Guard Bureau, in cooperation with the States,
to review the personnel records of al.1 technicians converted
to Federal employee status to ensure the accuracy of the data
recorded. The Assistant Secretary of Defense agreed, in
general.
Three of the 12 St at es had separate personnel offices
for the Army National Guard and the Air National Guard.
63
(The other nine had, or were planning to have, consolidated
Consolidation
offers the advantages of
personnel offices,)
uniformity
of
operations,
and possible
centralized
authority,
GAO was subsequently
informed
savings in personnel costs,
by the Department of Defense that the personnel offices
in
all the States had been consolidated
by the end of calendar
year 1970.
Under the act of 1968, many of the technicians
elected
to be covered by the Federal civil
service retirement
system. There is a question as to the status of those Federal
contributions
remaining in the State systems which are not
committed to pay retirement
benefits
to such technicians.
The Senate Committee on Armed Services requested the DeparL
ment of Defense to resolve this matter with the States.
The Department assigned this responsibility
to the National
Guard Bureau,
(B-20748, Apr. 29, 1971.)
NEED FOR IMPROVEMENT
IN MANAGEMENTOF
-UPPORT FORCESOF THE 8th U.S. ARM?Ikgartment
of the Army
GAO reviewed manpower procedures and practices
concerning support forces of the 8th U.S. Army in Korea and found
that decisions
resulting
in changed manpower needs of individual units were controlled
by a ceiling
for military
personnel rather
than justification
of the need for specific
positions.
GAO also found a need for Army headquarters
and
the 8th Army to improve their practices
for requesting
and
assigning military
personnel.
With better management there could be a reduction
in the
number of military
personnel assigned to the 8th Army and an
increase in the readiness of individual
units.
The Army has advised GAO that manpower accounting
and
requisitioning
procedures in the 8th Army have been revised
and that the Army will continue to emphasize the correction
of deficiencies
noted.
(Report to the Chairman, House Committee on Appropriations,
B-132990, Apr. 12, 1971.)
65
MILITARY CONSTRUCTION
MFASURES
NEEDED TO ENSURECOMPLIANCE
-WITH CONTRACTSPEC_I_FICATIONSIN C~flSTRUCTIQN OF MILITARY FACILITIES
Department
Department
of the Army and
of GNavy
The Army Corps of Engineers and the Naval Facilities
Engineering
Command, agents for the Department of Defense for
construction
of military
facilities,
need to strengthen
their
procedures and practices
for inspecting
construction
so that
military
projects
will be constructed
as contracts
specify.
A number of military
facilities
accepted by the Government as completed were not built
in compliance with contract
specifications.
As a result,
the facilities
were not fully
satisfactory
for their intended use and/or the Government had
to spend additional
time and effort
having deficiencies
corrected.
GAO recommended that the Secretaries
Navy have the two construction
agencies:
--Systematically
monitor their
ment of contractors!
quality
of the Army and the
field offices'
enforcecontrol
programs.
--Review their field offices'
inspection
reporting
correct
those not in compliance with
practices,
agency regulations,
and implement a system for prompt
communication of inspection
findings
from the field
offices
to the construction
management levels.
--Improve
the Army's training
and establish
such programs
programs for
in the Navy.
inspectors
--Perform
more comprehensive reviews of field offices'
implementation
of agency procedures for inspection
and supervision
of military
construction.
GAO recommended also that the Secretary
of Defense take
action to ensure that the two construction
agencies exchange
information
and coordinate
activities
in areas of mutual interest regarding
construction
quality
assurance.
66
The Department of Defense agreed with these recommendations and in June 1971 advised GAG of the Eolllowing corrective actions
taken or planned by the two construction
agencies .
--Regulations
regarding
the implementation
of contractor
quality
control
systems have been revised and headquarters
personnel are conducting
systematic
reviews
and visits
to monitor field
office
implementation.
--Regulations
have been issued setting
forth
requirements for inspection
reporting
and for the monitoring
of such reporting
by management levels.
--Improved
training
programs are to be initiated.
For
the
Army
is
expanding
and
adapting
fiscal
year 1972,
its courses and procedures
to also accommodate Navy
inspection
personnel.
--Significant
time is now devoted by Army personnel
to
field
visits
to review the implementation
of agency
procedures
for inspection
and supervision
of military
construction.
Periodic
on-site
reviews of such procedure s are to be made by Navy personnel.
GAO was advised that the two agencies had been coordinating their operations
and that the Office
of the Secretary
of Defense would stimulate
and expand, if possible,
such mutual beneficial
cooperation.
(B-171496, Apr. 16, 1971.)
67
NEED FOR IMPROVED SPACE CRITERIA
ZR
-F--w-EXJILDING~NERAL CLASSROOMS
Department
--
of Defense
The use of criteria
established
by the military
departments for planning space requirements
for genera.1 academic
classrooms can result
in the construction
of excessive classroom space,
Space allowances of 15 to 18 square feet for each student were used widely in planning and constructing
general
emit classrooms in civilian
colleges and universities.
Army regulations,
however, allow up to 35 square feet and
Navy regulations
allow 30 square feet for each student for
such classrooms.
Neither department has issued instructions
for applying information
on planned student load and training curriculums
to these criteria
in determining
the number
and sizes of classrooms to be built,
At several Army and Navy installations,
classrooms
which provided about 18 square feet of space for each student had been constructed.
These classrooms were considered
adequate by local officials.
Air Force instructions
allow 12 square feet of general
academic classroom space for each student included in the
total
student load.
In determining
the number and sizes of
individual
classrooms,
however, there is no requirement
that
consideration
be given to the number of students to be seated
in class at any one time or to the expected number of hours
of
classroom instruction,
Thus unless aI students attend
classes simultaneously,
the criterion
will result
in providing more than 12 square feet of space for each student.
This criterion
had been followed
in constructing
classrooms at Lackland Air Force Base, Texas:
Excessive classroom space costing about $300,000 had been constructed
but
has since been converted to other uses.
GAO recommended that the Secretary
of Defense see that
improved space-planning
criteria
be developed for general
academic classrooms.
Such criteria
should (1) provide reasonably uniform spac:e allowances for each student and (2)
' rec&ire that the number of classrooms constructed
be based
on efficient
scheduling
and classroom'use.
GAO recomsnended
also that the mil.itary
departments review their classroom
construction
projects
to determine if it would be feasible
to reduce or eliminate
proposed construction.
The Department of Defense agreed with these recommendations and in October 1971 advised GAO that it had developed
the recommended uniform criteria
for use by the military
departments for planning general academic classrooms.
The new
criteria
require
(1) consideration
of curriculums,
class
sizes, and class schedules in determining
the number and
sizes of classrooms and (2) use of standard square feet
allowances for each student in the classrooms.
GAO was also advised that the military
departments were
continuing
reviews of general academic projects
to ensure
(Report to the
compliance with the new uniform criteria.
Secretary
of Defense, B-133316, Sept. 13, 1971.1
69
AWXINTING II-AND INFORMATION SYSTEMS
.._a
INACCURACY QF DATA FOR PROJECTING FUTURE-IREWMENTS
. ..-FOR MAJOR ITEMS OF MILITARY EQUIPMENT
Department
of the Army
The Army relies
on twd computerized
management information systems for information
as to (1) its major equipment
needs for aircraft,
combat vehicles,
tactical
and support
vehicles , communications
and electronic
equipment, missiles,
and weapons and (2) equipment of these types already on hand.
GAO tested the accuracy of these two systems since information derived from them must be dependable for the Army to
make accurate and timely decisions
for budget preparation
and procurement requests.
,".
GAO found significant
weaknesses in both information
systems.
As a result
of inadequate data, the validity
of
fiscal
year 1970 budget and procurement actions was highly
Unless there is significant
improvement,
questionable.
equipment imbalances may affect
seriously
the Army's ability
to perform its mission effectively.
Inaccuracy
in data on equipment needs resulted
from
lack of adequate controls
to ensure that all pertinent
data
were considered.
For example:
--Some valid equipment requirements
for entire
Army units were excluded from the system's
computations.
--Requirements
were included
not need the equipment.
for
units
that
--Requirements
were included
for deactivation.
for
units
scheduled
--Some requirements
were considered
more than once.
--Some activities
were not revising
their
requirements
to reflect
current needs.
70
did
equipment
--Changes to requirements
of time to process for
Army commands.
took an inordinate
length
approval through the various
.Inaccuracy
in data on equipment on hand resulted
For example:
weaknesses in reporting.
--Army units did not report
in their possession,
--Quantities
of equipment
system and not reported
--Acceptable
substitute
as available
assets.
accurately
were "lost"
at all.
equipment
from
the equipment
in the Army
was not reported
At one depot GAO faund that 100 cargo trucks,
valued at $1.5
million,
had been in storage for almost a year b,ut had not
been included in the Army's computations
of available
equipBecause of questionable
validity
of the data, some
ment,
inventory
managers refused to use the equipment data derived
Instead,
the inventory
managers
from the information
system,
,used data, also of questionable
validity,
that they had developed through estimates
or personal knowledge,
GAO has recommended that
the Army:
--Establish
a procedure to ensure that all appropriate
data are considered
in determining
equipment needs,
--See that processing
of changes to equipment
zations is accelerated.
authori-
--Require
internal
auditors
to validate
equipment
requirements
periodically
and to review the accuracy
of units'
reports of equipment on hand.
--Continue
with the plan to revise the asset information system through the reporting
of major items
of equipment by serial
numbers.
--Direct
that procedures
equipment on hand will
be revised so that all major
be included in asset reports.
71
The Army concurred in the recommeIIdations and stated
that it had taken, and would continue to take, corrective
action against the problems cited in our report.
GAO
believes that the Army's actions--completed,
begun, or
(B-163074,
June 8, 1971.1
planned-- should bring improvements.
72
&ACK OF UNIFORMITYIN
COSTACCOUNTING
SYSTEBGFOEMAINTENANCE
-.-1
Department
of Defense
The Department of Defense spends about $7 billion a year
for depot-level maintenance operations--the
major overhaulGAO
reviewed the
ing or reb,uilding of military equipment,
cost accounting systems for depot-level maintenance of aircraft engines.
The cost accounting systems differed amoplgthe three
services, and among installations
within each service, making impossible any meaningful comparisons between facilities
performing similar work. For example:
--The Army and Navy used job order systems but in
different ways; the Air Force ,used an entirely
different
system-- me based on hours of work.
--All three services had a procedure for determining
cost of "gexchangematerial"--a
charge for rebuilt
parts taken from stock less an allowance for the
unserviceable parts returned to stock in exchange;
however, the Army ,used a substantially
different
formula from that of the Navy and Air Force for
determining the allowance for the unserviceable
parts returned.
--Fuel, used in considerable quantities for testing
overhauled engines, was treated as a direct material
cost by the Navy and an indirect cost by the Army
and Air Force,
--Fringe benefits, such as annual and sick leave and
Government contributions
to Life and health insurance and to retirement, were treated as indirect
cost by the Air Force and an integral part of labor
cost by the Army and Navy.
GAOproposed that the Secretary of Defense issue instructions that would ensure that the cost accounting systems
provide complete, comparable , and accurate information on
the operations and accomplishments of depot-level maintenance.
73
The Department of Defense agreed that there were inconsis-,
tencies in cost reporting
and that there were some areas requiring more explicit
instructions;
however, the Department
believed that a more strict
compliance with existing
directives and instructions
would generally
ensure the desired
,uniformity
in cost information.
(B-159797, Feb. 2, 1971.)
'
.BETTERCOSTACCQUNTING
NEEDEDFOR
OPERATION
ANDMAINTENANCE
OF
FAMILY HOUSING
Department
of Defense
Operation and maintenance of military
family housing
cost about $400 million
in fiscal
year 1970, The accounting
system for accumulating
these costs provides
information
on
the annual cost of operating
and maintaining
different
types
of housing units,'
The cost figures
are distorted,
however,
because widely dissimilar
units varying
in age, size, type
of construction,
and condition
are grouped and the differences
in cost are thereby averaged out.
The usefulness
of the cost data is further
eroded by
doubt as to the reliability
of the data.
Costs recorded at
14 installations
were found to be inaccurate
and incomplete
in a number of cases.
Further,
little
or no use was made
of the collected
costs at most installtitions
reviewed.
Despite inadequacies
in the cost data, it
apparent that many housing units are no longer
to operate and maintain and should be replaced.
GAOhas recommended that
the Secretary
is readily
economical
of Defense:
--Consider
reclassifying
housing into new categories
for cost accounting purposes--taking
into account
age, size, typ e of construction,
and condition
of
units --to provide cost data that are more nearly comparable and more useful for cost management and for
reference
in setting
standards for the future.
--Issue
more comprehensive directions
to ensure greater
uniformi-&y
in recording
and reporting
costs of operation and maintenance throughout
the armed services.
--Provide
the Congress, in the annual construction
authorization
requests,
with a plan for the phased,
orderly
replacement
of family housing units no longer
economical to operate and maintain.
75
DOD agreed that reclassifying
housing for more meaningful comparison of cost data would be useful but said that
establishing
a larger number of categories
would increase
the work load and would not offer benefits
commensurate with
the added cost.
GAO pointed out that DOD had not determined
the cost of operating
the existing
cost accounting
system
nor the additional
cost of an expanded system and recommended
that DOD make such a determination.
DOD agreed
stated that its
a request would
tion to replace
priorities
were
with the second and third proposals and
instructions
were being clarified
and that
be presented to the Congress for authorizauneconomical housing as soon as more urgent
met.
In view of the indefinite
nature of DOD's intent
to
present a plan for replacement of uneconomical housing, GAO
suggested that the Congress may wish to consider:
--Requesting
housing.
DOD to present
an inventory
of uneconomical
--The merits of authorizing
current expenditures
replacement of uneconomical housing to achieve
savings in operation
and maintenance costs.
(B-159797,
July
2, 1971.)
76
for
future
N&D FOR IWROVEMXNT IN COST ACCOUNTING
FOR TRAINING UNDER THE GOVERNMENT
EMPLOYEESTRAINING ACT
Department
of Defense
The Government Employees Training
Act provides for
Government-sponsored
programs to supplement and extend selfeducation,
self-improvement,
and self-training
by employees.
House Report 329, issued June 1, 1967, identified
problems
in employee training
in the Government and recommended certain improvements,
GAO reviewed the employee training
program at 14 installations
of the Department of Defense to
see what had been done in response to the recommendations,
The weaknesses identified
in 1967 regarding
training
costs continued to exist within
the Department of Defense
during fiscal
year 1970. The military
departments and agencies of the Department of Defense did not have adequate accounting systems for determining
and reporting
accvrate
costs of training
and not all of the training
costs were
being identified
in the cost accounting
systems.
Tnformation reported
to the Congress in the annual training
reports
tended to give a distorted
picture
of the training
programs
that were being operated under the act because cost of internal training,
which represents
more than 75 percent of the
total. costs, was not reported,
Also trainee
salaries
were
not reported as a training
cost.
GAO believes
that training
cost is the most significant
cost element in the Federal
training
program and that it should be reported.
The costs shown in the annual training
reports were not
obtained from the accounting
system but from various source
documents.
In most cases the source documents either were
not available
fsr GAO's review or could not be reconciled
with the reports.
Instructions
issued by the military
services and the
Defense Supply Agency for determfning
training
needs and
developing
training
plans generally
appeared adequate but
had not been effectively
implemented at most of the installations GAO visited,
Training
selection
procedures were generally
fairly
applied but there was Ifttle
indication
of a
systematic
method of selection
at some of the installations.
77
To correct these and other weaknesses observed in the
training program, GAOhas recommendedthat the Secretary of
Defense:
--Consider identifying
training costs in the accounting system to make these data available to managers
at all levels,
--Ensure that the Department of Defense Instruction
1430.5, prescribing policies and standards for conis properly implemented.
ducting training,
--Ensure that adequate procedures and management controls are established for recording completed training in the personnel files.
--Promote increased emphasis on surveillance of training activities
by the use of management review
groups, including internal auditors.
GAOhas recommendedalso that the Civil
Service Commis-
sion:
--Provide leadership in recommending or establishing
a uniform costing system for triining
items to ensure that costs are comparable.
--Provide more frequent inspections of the training
activities
at military departments and agencies of
the Department of Defense.
The Department of Defense and the Civil Service Commission agreed, in general, with the findings and cited corrective actions which appeared to be responsive to the conditions
(B-70896, May 25, 1971.)
cited in GAO"s report.
78
POTENTIALSAVINGSTHROUGH
TRANSFER
OF
INVElNTORY
ACCOU~,TING
FROMSTOCKFUNDS
TO INDUSTRIALFUNDS
Department af the Army
The Army's Aberdeen Proving Ground was maintaining an
industrial
fund accounting system and a stock fund accounting
system which resulted in duplication of certain accounting
functions and records. GAOconcluded that the industrial
fund could be used as the principal accounting means to
finance and account for inventories being controlled by the
Elimination
stock fund and to process related transactions,
of the stock fund accounting system would simplify accounting procedures and would result in:
--Annual savings of almost $100,000 in personnel costs.
--
A reduction of about 45 hours a month in computer
processing time.
--A potential
effort.
reduction
in keypunch and verification
Aberdeen officials
concurred in GAO's conclusion and stated
that the changeover would not involve any significant
costs
or problems.
GAOrecommended that the Secretary of Defense direct
the Secretary of the Army to eliminate the stock fund accounting system at Aberdeen and to place the inventories owned
by the stock fund under the control of the industrial
fund.
Because the industrial
fund-stock fund arrangement at Aberdeen was typical of installation
organization at many military installations,
GAOrecommended also that the Secretary
of Defense determine the installations
at which it would be
practicable for industrial
funds to finance and control
inventories and take action to eliminate unneeded stock fund
accounting systems,
The Department of Defense agreed with the objectives of
these recommendations but believed that the recommended financial procedure was not in accordance with the provisions
of 10 U.S.C. 2208 which authorized working capital funds.
79
G&Is review of the legislative
history
of these provisions
indicated
that the recommendations were not contrary
to the
intent of 10 U.S.C. 2208. Therefore GAO suggested that the
Department of Defense reconsider
its position
and implement
the recommendations.
(B-159797, July 30, 1971.)
_
. .
‘,
,.
‘,
80
.-
DEFENSEIKERNATIONhL ACTIVITIES
PROBLEMIN ADMINISTRATION
OF THE
MILITARY ASSISTAl%%TRAININGPROGRAM
Department of Defense and
Department of State
At the request of the Chairman, Senate Cmrnittee on
Foreign Relations, GAQperformed a detailed review of the
military
assistance training program in 10 recipient countries.
In recent years the total fmds provided for training foreign military
personnel under the military assistance
and service-funded programs have averaged about $74 million
a year.
In assessing the training against
the military
requirements and resources of recipient countries, GAOobserved
that some of the training was unnecessary or not of high
priority.
For example, in Iran nearly one fourth of the
$155,000 for 1970 Navy training was spent for postgraduate
courses for four men. In two other countries training was
given at a cost of about $525,000 that was unrelated to
equipment on hand.
GAOalso noted that inadequate consideration was given
by the U.S. military
advisors of the recipient countries'
capabilities
to provide training from their own resources
and that no formal effort was made by the advisors to correlate the military
assistance or service-faded
training programs with other U.S. Government training programs.
Finally, in the selection of foreign students being
trained, GAOfound that the U.S. advisors did not take the
necessary steps to ensure that a sufficient
number of qualified candidates were nominated, screened, and tested in time
so that they would be available to attend scheduled training
courses e As a result, some courses had to be canceled or
deferred and, in other cases, marginally qualified and unlified personnel entered the training program.
GAOconcluded that it was difficult
degree U.S. military assistance training
effectiveness of forces in the recipient
to assess to what
had increased the
countries included
in its review. The difficulty
arose frcxn the Pack of established measure~lent criteria
and a system for periodically
evaluating the training program.
GAOsuggested that a reexamination of the overall program, for which substantial costs were being incurred for
training, was warranted and recommendedthe following alternatives for consid,eratiow : (1) concentrating more effort
by U.S. advisors on planning, programming, administering,
and
supervising the training programs to achieve effective managfzlnerlt Or (2) reducing the size of the training program so
that it could be effectively
managed with presently authorized staffs.
also that the Committees of the Congress
might wish to consider the desirability
of enacting legislaticm requiring the Secretary of Defense to establish a measurement system to assist in determining the effectiveness
of expenditures for tltae military assistance training program.
GAO suggeste
ant of State commented on the report by
letter dated April et B 71, and generally agreed with the
information contained in the report.
The Department of Defense commented on the report by
letter dated &YLy 13, 1971, and, in general9 took a negative
view of the info ation in the report.
For example, the
Department stated that:
'The valid but limited criticisms
that resulted
from this review of military
assistance training
will be only of limited assistance in the manen% of the training programs" QH63582,
Peb. 16, 1971G.>
82
OTHER AREAS OF OPERATIONS
INADEQUATE CHARGESTO COMMUNICATIONS
SATELLITE CORPORATIONFOR LAUNCH SERVICES
Department ofathe Air Force and
National
Aeronautics
and Space Administration_
The Communications Satellite
Corporation
(Cornsat) and
the National
Aeronautics
and Space Administration
(NASA)
entered into agreements whereby NASA would supply launch services to place commercial communications
satellites
in orbit.
These satellites
are sponsored by the International
Telecommunications
Satellite
Consortium (Intelsat),
a consortium of 80 nations dedicated to improving global communications.
Comsat, as the largest
investor
in the consortium,
acts as its manager,
Some of the services that NASA agreed to furnish
actually
are provided by the Air Force and are billed
to Comsat
through NASA, At the request of Senator Mike Gravel, GAO
evaluated the Air Force charges to Comsat. GAO did not evaluate the NASA charges to Comsat.
On the basis of GAO's computation
of the charges, the
Air Force did not charge Comsat for about $6.1 million
of
launch services costs through fiscal
year 1969. About
$3.1 million
of this amount was not attributed
to Comsat
launches by the Air Force mainly because of deficiencies
in
accounting procedures of the Air Force.
Another $3 million
was attributed
to Comsat launches by the Air Force but was
not charged because of an agreement between NASA and the
Department of Defense to exclude certain
costs.
Because the parties
have agreed upon the method used
to determine costs chargeable to Comsat for the Intelsat
I,
II, and III series of launches, no legal basis existed for
changing the method.
For the Intelsat
IV series of launches,
a new agreement was reached.
Although this agreement is
essentially
the same as before,
it does provide
that the*
method used to determine costs-may be changed through negotiation.
83
GAObelieves that, since Comsat is now a going concern
and a profitmaking enterprise, charges to Comsat for theIntelsat IV series of launches and for future launches should
be determined on a full-user-charges
basis. This would be
in accord with the following
statement made by the President
on this situation in May 1966.
"When the Federal Government provides special services for special groups, it is both good economics
and good government to charge fees for these services --good economics because user charges make
possible an efficient
allocation of resources
among alternative programs; good government because user charges ensure equitable treatment of
the general taxpayer."
The Air Force was in general agreement with GAO's views.
The Department of State believes, however, that it would be
detrimental to the foreign policy interests of the United
States to change the basis of billing
to Comsat for the
Intelsat IV launches.
GAOrecommendedthat the Air Force determine costs of
Intelsat IV and future launches on a full-user-charges
basis,
including depreciation, and that NASAnegotiate with Comsat
to use such costs in its billings.
The Air Force and NASA
stated that a review was in progress to reexamine the entire
billing process.
GAOrecommendedalso that the Secretary of Defense require the Air Force to determine the actual costs incurred
for Intelsat III launches in accordance with the method that
had been agreed upon and that the Administrator of NASAbill
Comsat on this basis, including the unbilled costs of approximately $31,000 GAOidentified
as being chargeable to
Comsat under the agreed-upon method. (~-168707, Oct. 8,
1971.)
!:EEti FORA REEVAILJAI'ION
OF THE
CIVIL DEFENSEPROGRAM
Department of the Ihrrnx
In 1961 the civil defense program of the United States
was revitalized
and was directed toward providing protection
for millions of people against radioactive fallout in the
event of a nuclear attack.
A long-range program was recommended by the President to identify existing fallout shelters
and to provide new ones and the Office of Civil Defense was
created in the Office of the Scretary of Defense, In 1964.
responsibility
for civil defense, together with the Office
of Civil Defense, was transferred to the Department of the
Army a
The principal goal of the current civil defense program-the development of a nationwide fallout shelter system--is
complemented by related program elements, such as warning
and detection,
There are, however, no programs (other than
research) aimed at protecting people against chemical or biological weapons or the direct effects of nuclear explosions,
such as blast, heat, and shock.
According to the Department of Defense, present fallout shelters would save 18 millian to 30 million lives which
otherwise would be lost in the event of a nuclear attack.
Alternative
combinations of additional fallout and blast
protection,
ranging in costs from $4QOmillion to $8 billion
for fiscal years 1970 to 1975, could save additional millions
of lives.
Appropriations for civil defense, howeverp have
decreased.
Office of Civil Defense data indicate that, if current
programs continue at present levels, up to one half of the
population still will lack standard fallout protection in
1975. Futhermore available protection is dispersed unevenly.
In major cities 2.5 fall.out shelter spaces are available for
each person, compared with less than 0.4 of a space for each
person in areas outside major cities,
The Office of Civil Defense has not used information
regarding likely targets of an enemy (targeting assumptions)
in setting priorities
for developing fallout shelters.
It
85
has followed a policy which generally treats all locations
'as being equally vulnerable.
In the light of the limited
funding of this program, this is not a realistic
approach,
The Office of Civil Defense lacks the authority and
funds to finance or subsidize the construction of shelter
spaces. The Office can only identify,
license, mark, and
stock available spaces, The Office has established a minimum level of protection which must be met if the shelter is
to be licensed, marked, and stocked by the Office.
Where
shelters of this level are not available, however, many
lives could be saved and injuries could be reduced by use of
the best protection available even though it is below the
standard. The Community Shelter Planning program encourages
the use of protected space under the minimum standards, but
these shelters rasrmally are not licensed, marked9 or stocked
by the Office of Civil Defense.
GAOhas recommended that:
--The Secretary of Defense set priorities,
in developing additional fallout shelter protection,
on the basis of targeting assumptions and the best available
predictions of risk, to help ensure that the Limited
financial resources are applied to areas most likely
to need additional protection,
--The Office of Civil Defense stock the best available
shelters regardless of protection rating, pending an
overall assessment af area priorities,
in undertaking
protective measures,
--The Secretary of Defense (1) provide additional. justification to the Congress concerning the part which
civil. defense plays in the overall national security
posture and (2) give consideration to whether higher
priority
should be given to marking and stocking good
shelter spaces already identified,
in view of the
relatively
low per capita cost of the protection which
these shelters provide,
The Department of Defense stated that it was aware of
the need to reevaluate the civil defense program and that
broad policy decisions were expected to be made on the basis
of current administration
studies.
The Office of Civil Defense stated that it hoped to extend its efforts for seeking the cooperation of Government departments involved in
providing financial assistance in construction programs for
facilities,
such as urban renewal and housing agency projects, which have the potential of providing vast quantities
of fallout shelter space. It defended the use of the current fallout protection standard as a future planning objective
but stated that the best available concept of shelter
use was being applied in its current operational planning.
In view of (1) the imbalance of fallout protection,
(2) the potential for expanding the protection by using best
available space, and (3) the limited progress of the civil
defense program in meeting its objectives and in view of two
special studies recently made by the administration
pertainGAO
suggested
that
appropriate
commiting to civil defense,
tees of the Congress may wish to review the reports on these
studies for use in any consideration of civil defense requirements.
(B-133209, Oct. 26, 197L>