Federal Register / Vol. 73, No. 5 / Tuesday, January 8, 2008 / Notices
Agency decision
Ask Donna
What actually matters in this document.
Text
Federal Register / Vol. 73, No. 5 / Tuesday, January 8, 2008 / Notices
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
http://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on January 3, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–70 Filed 1–7–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP08–39–000]
Saltville Gas Storage Company L.L.C.;
Notice of Request Under Blanket
Authorization
pwalker on PROD1PC71 with NOTICES
January 2, 2008.
Take notice that on December 18,
2007, Saltville Gas Storage Company
L.L.C. (Saltville), P.O. Box 1642,
Houston, Texas 77251–1642, filed in
Docket No. CP08–39–000 a prior notice
request pursuant to sections 157.205
and 157.210 of the Commission’s
regulations under the Natural Gas Act
(NGA) and Saltville’s blanket certificate
issued in Docket Nos. CP04–13, et al.,
for authorization to acquire, operate and
maintain storage facilities owned by
Spectra Energy Early Grove Company
and Spectra Energy Virginia Pipeline
Company, all as more fully set forth in
the application, which is on file with
the Commission and open to public
inspection. The filing may also be
viewed on the Web at http://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding the
application should be directed to Garth
VerDate Aug<31>2005
17:32 Jan 07, 2008
Jkt 214001
Johnson, General Manager, Certificates
& Reporting, East Tennessee Natural
Gas, L.L.C., P.O. Box 1642, Houston,
Texas 77251–1642 at (713) 627–5415.
Any person or the Commission’s Staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
157.205 of the Commission’s
Regulations under the Natural Gas Act
(NGA) (18 CFR 157.205) a protest to the
request. If no protest is filed within the
time allowed therefor, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at http://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
This filing is accessible on-line at
http://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: January 23, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–96 Filed 1–7–08; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
1337
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER03–768–000; ER03–768–
001]
Susquehanna Energy Products LLC;
Notice of Issuance of Order
January 2, 2008.
Susquehanna Energy Products LLLP
(now Susquehanna Energy Products
LLC) (Susquehanna Energy) filed an
application for market-based rate
authority, with an accompanying tariff.
The proposed market-based rate tariff
provides for the sales of capacity and
energy at market-based rates.
Susquehanna Energy also requested
waivers of various Commission
regulations. In particular, Susquehanna
Energy requested that the Commission
grant blanket approval under 18 CFR
Part 34 of all future issuances of
securities and assumptions of liability
by Susquehanna Energy.
On June 16, 2003, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development-South, granted the
requests for blanket approval under Part
34 (Director’s Order). The Director’s
Order also stated that the Commission
would publish a separate notice in the
Federal Register establishing a period of
time for the filing of protests.
Accordingly, any person desiring to be
heard concerning the blanket approvals
of issuances of securities or assumptions
of liability by Susquehanna Energy,
should file a protest with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing protests is January 9,
2008.
Absent a request to be heard in
opposition to such blanket approvals by
the deadline above, Susquehanna
Energy is authorized to issue securities
and assume obligations or liabilities as
a guarantor, indorser, surety, or
otherwise in respect of any security of
another person; provided that such
issuance or assumption is for some
lawful object within the corporate
purposes of Susquehanna Energy,
compatible with the public interest, and
is reasonably necessary or appropriate
for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
E:\FR\FM\08JAN1.SGM
08JAN1
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.