Federal Register / Vol. 72, No. 194 / Tuesday, October 9, 2007 / Notices

available for inspection and

reproduction at the address in item h

above.

m. Individuals desiring to be included

on the Commission’s mailing list should

so indicate by writing to the Secretary

of the Commission.

n. Competing Preliminary Permit—

Anyone desiring to file a competing

application for preliminary permit for a

proposed project must submit the

competing application itself, or a notice

of intent to file such an application, to

the Commission on or before the

specified comment date for the

particular application (see 18 CFR 4.36).

Submission of a timely notice of intent

allows an interested person to file the

competing preliminary permit

application no later than 30 days after

the specified comment date for the

particular application. A competing

preliminary permit application must

conform with 18 CFR 4.30 and 4.36.

o. Competing Development

Application—Any qualified

development applicant desiring to file a

competing development application

must submit to the Commission, on or

before a specified comment date for the

particular application, either a

competing development application or a

notice of intent to file such an

application. Submission of a timely

notice of intent to file a development

application allows an interested person

to file the competing application no

later than 120 days after the specified

comment date for the particular

application. A competing license

application must conform with 18 CFR

4.30 and 4.36.

p. Notice of Intent—A notice of intent

must specify the exact name, business

address, and telephone number of the

prospective applicant, and must include

an unequivocal statement of intent to

submit, if such an application may be

filed, either a preliminary permit

application or a development

application (specify which type of

application). A notice of intent must be

served on the applicant(s) named in this

public notice.

q. Proposed Scope of Studies Under

Permit—A preliminary permit, if issued,

does not authorize construction. The

term of the proposed preliminary permit

would be 36 months. The work

proposed under the preliminary permit

would include economic analysis,

preparation of preliminary engineering

plans, and a study of environmental

impacts. Based on the results of these

studies, the Applicant would decide

whether to proceed with the preparation

of a development application to

construct and operate the project.

VerDate Aug<31>2005

17:07 Oct 05, 2007

Jkt 214001

r. Comments, Protests, or Motions to

Intervene—Anyone may submit

comments, a protest, or a motion to

intervene in accordance with the

requirements of Rules of Practice and

Procedure, 18 CFR 385.210, .211, .214.

In determining the appropriate action to

take, the Commission will consider all

protests or other comments filed, but

only those who file a motion to

intervene in accordance with the

Commission’s Rules may become a

party to the proceeding. Any comments,

protests, or motions to intervene must

be received on or before the specified

comment date for the particular

application.

Comments, protests and interventions

may be filed electronically via the

Internet in lieu of paper. See 18 CFR

385.2001(a)(1)(iii) and the instructions

on the Commission’s Web site at http://

www.ferc.gov under the ‘‘e-Filing’’ link.

s. Filing and Service of Responsive

Documents—Any filings must bear in

all capital letters the title

‘‘COMMENTS’’, ‘‘NOTICE OF INTENT

TO FILE COMPETING APPLICATION’’,

‘‘COMPETING APPLICATION’’,

‘‘PROTEST’’, and ‘‘MOTION TO

INTERVENE’’, as applicable, and the

Project Number of the particular

application to which the filing refers.

Any of the above-named documents

must be filed by providing the original

and the number of copies provided by

the Commission’s regulations to: The

Secretary, Federal Energy Regulatory

Commission, 888 First Street, NE.,

Washington, DC 20426. An additional

copy must be sent to Director, Division

of Hydropower Administration and

Compliance, Federal Energy Regulatory

Commission, at the above-mentioned

address. A copy of any notice of intent,

competing application or motion to

intervene must also be served upon each

representative of the Applicant

specified in the particular application.

t. Agency Comments—Federal, state,

and local agencies are invited to file

comments on the described application.

A copy of the application may be

obtained by agencies directly from the

Applicant. If an agency does not file

comments within the time specified for

filing comments, it will be presumed to

have no comments. One copy of an

agency’s comments must also be sent to

the Applicant’s representatives.

Kimberly D. Bose,

Secretary.

[FR Doc. E7–19779 Filed 10–5–07; 8:45 am]

BILLING CODE 6717–01–P

PO 00000

Frm 00046

Fmt 4703

Sfmt 4703

57329

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Project No. 4656–020]

Boise-Kuna Irrigation District, Nampa

& Meridian Irrigation District, New York

Irrigation District, Wilder Irrigation

District, and Big Bend Irrigation

District; Notice of Application for

Amendment of License and Soliciting

Comments, Motions To Intervene, and

Protests

September 26, 2007.

Take notice that the following

hydroelectric application has been filed

with the Commission and is available

for public inspection:

a. Application Type: Amendment of

License.

b. Project No.: 4656–020.

c. Date Filed: August 1, 2007.

d. Applicant: Boise-Kuna Irrigation

District, Nampa & Meridian Irrigation

District, New York Irrigation District,

Wilder Irrigation District, and Big Bend

Irrigation District (Districts).

e. Name of Project: Arrowrock Dam

Hydroelectric Project.

f. Location: The project will be

located at the U.S. Bureau of

Reclamation’s (Reclamation) existing

Arrowrock Dam and Reservoir on the

South Fork of the Boise River, in Elmore

and Ada Counties, Idaho. Parts of the

project would occupy lands managed by

Reclamation and the U.S. Corps of

Engineers and lands managed by the

U.S. Forest Service within the Boise

National Forest.

g. Filed Pursuant to: Federal Power

Act, 16 U.S.C. 791a–825r.

h. Applicant Contact: Albert P.

Barker, Barker Rosholt & Simpson LLP,

1010 West Jefferson Street, Suite 102,

Boise, Idaho 83701; telephone (208)

336–0700.

i. FERC Contact: Linda Stewart,

telephone (202) 502–6680, and e-mail:

linda.stewart@ferc.gov.

j. Deadline for filing comments,

motions to intervene, and protest:

October 29, 2007.

All documents (original and eight

copies) should be filed with: Secretary,

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

The Commission’s Rules of Practice

and Procedure require all interveners

filing documents with the Commission

to serve a copy of that document on

each person whose name appears on the

official service list for the project.

Further, if an intervener files comments

or documents with the Commission

relating to the merits of an issue that

E:\FR\FM\09OCN1.SGM

09OCN1

mstockstill on PROD1PC66 with NOTICES

57330

Federal Register / Vol. 72, No. 194 / Tuesday, October 9, 2007 / Notices

may affect the responsibilities of a

particular resource agency, they must

also serve a copy of the document on

that resource agency. A copy of any

motion to intervene must also be served

upon each representative of the

Applicant specified in the particular

application.

k. Description of Request: (1)

Extension of Time: The Districts request

an extension of time for the

commencement of project construction

to December 13, 2009, pursuant to

Public Law 109–383. The Districts also

propose changes, where necessary, to

dates or time periods specified in

various license articles such that the

dates or time periods for taking action

would be tied to an order amending the

project license; (2) Amendment to

Project Design: The Districts propose to

install two 7.5-megawatt (MW)

generating units with a total installed

capacity of 15 MW instead of installing

two 30–MW generating units with a

total installed capacity of 60 MW, as

authorized in the March 27, 1989 Order

Issuing License. The Districts also

propose to change the project’s

transmission line, which would

decrease in length by approximately 10

miles and would eliminate the need to

use any lands managed by the Bureau of

Land Management. The Districts request

the deletion and/or revision of certain

license articles that are directly related

to the above proposed design changes.

l. Locations of the Application: A

copy of the application is available for

inspection and reproduction at the

Commission’s Public Reference Room,

located at 888 First Street, NE., Room

2A, Washington, DC 20426, or by calling

(202) 502–8371. This filing may also be

viewed on the Commission’s Web site at

http://www.ferc.gov using the

‘‘eLibrary’’ link. Enter the docket

number excluding the last three digits in

the docket number field to access the

document. You may also register online

at http://www.ferc.gov/docs-filing/

esubscription.asp to be notified via

email of new filings and issuances

related to this or other pending projects.

For assistance, call 1–866–208–3676 or

e-mail FERCOnlineSupport@ferc.gov,

for TTY, call (202) 502–8659. A copy is

also available for inspection and

reproduction at the address in item (h)

above.

m. Individuals desiring to be included

on the Commission’s mailing list should

so indicate by writing to the Secretary

of the Commission.

n. Comments, Protests, or Motions to

Intervene: Anyone may submit

comments, a protest, or a motion to

intervene in accordance with the

requirements of Rules of Practice and

VerDate Aug<31>2005

17:07 Oct 05, 2007

Jkt 214001

Procedure, 18 CFR 385.210, .211, .214.

In determining the appropriate action to

take, the Commission will consider all

protests or other comments filed, but

only those who file a motion to

intervene in accordance with the

Commission’s Rules may become a

party to the proceeding. Any comments,

protests, or motions to intervene must

be received on or before the specified

comment date for the particular

application.

o. Any filings must bear in all capital

letters the title ‘‘COMMENTS’’,

‘‘PROTEST’’, or ‘‘MOTION TO

INTERVENE’’, as applicable, and the

Project Number of the particular

application to which the filing refers.

p. Agency Comments: Federal, State,

and local agencies are invited to file

comments on the described application.

A copy of the application may be

obtained by agencies directly from the

Applicant. If an agency does not file

comments within the time specified for

filing comments, it will be presumed to

have no comments. One copy of an

agency’s comments must also be sent to

the Applicant’s representatives.

q. Comments, protests and

interventions may be filed electronically

via the Internet in lieu of paper. See, 18

CFR 385.2001(a)(1)(iii) and the

instructions on the Commission’s Web

site at http://www.ferc.gov under the ‘‘eFiling’’ link.

Kimberly D. Bose,

Secretary.

[FR Doc. E7–19780 Filed 10–5–07; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Project No. 12788–000]

Mountain Property Resources, LLC;

Notice of Application Accepted for

Filing and Soliciting Motions To

Intervene, Protests, and Comments

October 1, 2007.

Take notice that the following

hydroelectric application has been filed

with the Commission and is available

for public inspection:

a. Type of Application: Preliminary

Permit.

b. Project No.: 12788–000.

c. Date filed: March 22, 2007.

d. Applicant: Mountain Property

Resources, LLC.

e. Name of Project: Grace Project.

f. Location: The project would be

located on Fall Creek in Eagle County,

Colorado. The project will occupy

PO 00000

Frm 00047

Fmt 4703

Sfmt 4703

approximately 3.8 acres of federal land

within the White River National Forest.

g. Filed Pursuant to: Federal Power

Act, 16 U.S.C. 791(a)–825(r).

h. Applicant Contacts: Steven R.

Coley, Mountain Property Resources,

LLC, 1857 County Road 109, Glenwood

Springs, CO 81601, phone: (970) 230–

0579.

i. FERC Contact: Henry Woo, (202)

502–8872.

j. Deadline for filing comments,

protests, and motions to intervene: 60

days from the issuance date of this

notice.

The Commission’s Rules of Practice

and Procedure require all intervenors

filing documents with the Commission

to serve a copy of that document on

each person in the official service list

for the project. Further, if an intervenor

files comments or documents with the

Commission relating to the merits of an

issue that may affect the responsibilities

of a particular resource agency, they

must also serve a copy of the document

on that resource agency.

k. Description of Project: The

proposed project would consist of: (1)

An existing water diversion structure,

(2) a proposed 3,000-foot-long steel

penstock, (3) an existing powerhouse

containing a proposed generating unit

with an installed capacity of 140

kilowatts, (4) a proposed 25 kilovolt

transmission line; and (5) appurtenant

facilities. The applicant estimates the

average annual generation would be

1.209 gigawatt-hours and would be sold

to a local utility.

l. Locations of Applications: A copy of

the application is available for

inspection and reproduction at the

Commission in the Public Reference

Room, located at 888 First Street, NE.,

Room 2A, Washington, DC 20426, or by

calling (202) 502–8371. This filing may

also be viewed on the Commission’s

Web site at http://www.ferc.gov using

the ‘‘eLibrary’’ link. Enter the docket

number excluding the last three digits in

the docket number field to access the

document. For assistance, call toll-free

1–866–208–3676 or e-mail

FERCOnlineSupport@ferc.gov. For TTY,

call (202) 502–8659. A copy is also

available for inspection and

reproduction at the address in item h

above.

m. Individuals desiring to be included

on the Commission’s mailing list should

so indicate by writing to the Secretary

of the Commission.

n. Competing Preliminary Permit—

Anyone desiring to file a competing

application for preliminary permit for a

proposed project must submit the

competing application itself, or a notice

of intent to file such an application, to

E:\FR\FM\09OCN1.SGM

09OCN1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.