46622

Federal Register / Vol. 72, No. 161 / Tuesday, August 21, 2007 / Notices

of the intervention or protest to the

Federal Energy Regulatory Commission,

888 First St., NE., Washington, DC

20426.

The filings in the above proceedings

are accessible in the Commission’s

eLibrary system by clicking on the

appropriate link in the above list. They

are also available for review in the

Commission’s Public Reference Room in

Washington, DC. There is an

eSubscription link on the Web site that

enables subscribers to receive e-mail

notification when a document is added

to a subscribed dockets(s). For

assistance with any FERC Online

service, please e-mail

FERCOnlineSupport@ferc.gov or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Nathaniel J. Davis, Sr.,

Acting Deputy Secretary.

[FR Doc. E7–16422 Filed 8–20–07; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Project No. 2277]

AmerenUE; Notice of Availability of

Final Environmental Assessment

rmajette on PROD1PC64 with NOTICES

August 14, 2007.

In accordance with the National

Environmental Policy Act of 1969 and

the Federal Energy Regulatory

Commission (Commission or FERC)

regulations contained in the Code of

Federal Regulations (CFR) (18 CFR Part

380), the Office of Energy Projects has

prepared a Final Environmental

Assessment (FEA) regarding

AmerenUE’s request to rebuild the

upper reservoir of the Taum Sauk

Pumped Storage Project (FERC No.

2277), located on the East Fork Black

River, in Reynolds County, Missouri.

The FEA analyzes the environmental

effects of the reconstruction of the upper

reservoir and contains measures to

minimize those effects. The FEA

concludes that the proposed

reconstruction, with recommended

mitigation measures, would not

constitute a major federal action

significantly affecting the quality of the

human environment.

A copy of the FEA is available for

review at the Commission in the Public

Reference Room, or it may be viewed on

the Commission’s Web site at http://

www.ferc.gov using the e-Library link.

Enter the docket number ‘‘P–2277’’ in

the docket number field to access the

document. For assistance, call (202)

502–8222 or (202) 502–8659 (for TTY).

VerDate Aug<31>2005

16:34 Aug 20, 2007

Jkt 211001

For further information regarding this

notice, please contact Thomas LoVullo

at (202) 502–8900.

Kimberly D. Bose,

Secretary.

[FR Doc. E7–16389 Filed 8–20–07; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. PF07–4–000]

Midcontinent Express Pipeline, LLC;

Supplemental Notice of Intent To

Prepare an Environmental Impact

Statement for the Proposed

Midcontinent Express Project, Request

for Comments on Environmental

Issues, and Notice of Public Site Visit

August 14, 2007.

The staff of the Federal Energy

Regulatory Commission (FERC or

Commission) will prepare an

environmental impact statement (EIS)

that will identify and address the

environmental impacts that could result

from the construction and operation of

the Midcontinent Express Pipeline

Project (Project) proposed by

Midcontinent Express Pipeline, LLC

(MEP). On June 25, 2007, MEP filed

draft Resource Reports that identified a

modification to the Project in Richland

and Madison Parishes, Louisiana,

consisting of an approximately 4.2-milelong lateral pipeline (CenterPoint

Lateral). MEP subsequently filed

additional information clarifying the

location of the Project facilities

associated with the CenterPoint Lateral

on August 3, 2007.

On April 27, 2007, the FERC issued a

‘‘Notice of Intent To Prepare an

Environmental Impact Statement for the

Proposed Midcontinent Express

Pipeline Project, Request for Comments

on Environmental Issues and Notice of

Public Scoping Meetings’’ (NOI). The

NOI was published in the Federal

Register and was also mailed to

interested parties, including Federal,

state and local officials, agency

representatives, conservation

organizations; Native American groups;

local libraries and newspapers; and

property owners affected by the

proposed facilities. This notice is being

issued because the CenterPoint Lateral

was not identified in the NOI, and

landowners potentially affected by that

facility were therefore not included on

the environmental mailing list for that

correspondence.

In order to assist staff with the

identification of environmental issues

PO 00000

Frm 00024

Fmt 4703

Sfmt 4703

associated with the modified facilities

and to comply with the requirements of

the National Environmental Policy Act

of 1969 (NEPA), a 30-day scoping period

has been opened to receive comments

on the proposed Project, as modified by

the addition of the CenterPoint Lateral.

Please note that the scoping period for

this project will close on September 10,

2007.

Comments on the Project and the

issues that should be addressed in the

EIS may be submitted in written form.

Further details on how to submit

written comments are provided in the

Public Participation section of this

notice. Additionally, as part of the

scoping process, we will sponsor a

public site visit of the proposed

CenterPoint Lateral, as described below.

Please note that attendees at the site

visit must obtain their own

transportation for the site visit.

Date and time

Location

Tuesday, August 28,

2007, 9 am (CST).

Delhi Municipal Airport (parking lot),

Airport Road/Louisiana Highway 17,

Delhi, Louisiana

71232

This notice is being sent to

landowners affected by the CenterPoint

Lateral, as well as those that previously

requested to remain on the Project

environmental mailing list; federal,

state, and local government agencies;

elected officials; environmental and

public interest groups; Native American

tribes; other interested parties; and local

libraries and newspapers; all of which

are encouraged to submit comments on

the proposed Project. Details on how to

submit comments are provided in the

Public Participation section of this

notice.

If you are a landowner receiving this

notice, you may be contacted by an MEP

representative about the acquisition of

an easement to construct, operate, and

maintain the proposed project facilities.

The pipeline company would seek to

negotiate a mutually acceptable

agreement. However, if the project is

approved by the FERC, that approval

conveys with it the right of eminent

domain. Therefore, if easement

negotiations fail to produce an

agreement, the pipeline company could

initiate condemnation proceedings in

accordance with state law.

A fact sheet prepared by the FERC

entitled ‘‘An Interstate Natural Gas

Facility on My Land? What Do I Need

To Know?’’ is available for viewing on

E:\FR\FM\21AUN1.SGM

21AUN1

Federal Register / Vol. 72, No. 161 / Tuesday, August 21, 2007 / Notices

pipeline, which would extend from an

interconnect with the Project mainline

pipeline in Madison Parish, Louisiana,

to the Delhi Booster Station and an

interconnect with a CenterPoint Energy

Gas Transmission Company pipeline in

Richland Parish, Louisiana;

Summary of the Proposed Project

• Four new mainline and one booster,

MEP proposes to construct, own and

natural gas-fired compressor stations,

operate approximately 495 miles of new including:

30-, 36-, and 42-inch-diameter interstate —The 38,555-hp Lamar Compressor

natural gas transmission pipeline, a total

Station at Milepost (MP) TX 28.5 in

of approximately 111,720 horsepower

Lamar County, Texas;

(hp) of compression at one booster and

—The 12,270-hp Atlanta Compressor

four new mainline compressor stations,

Station at MP TX 117.4 in Cass

and related appurtenant facilities

County, Texas;

—The 32,720-hp Perryville Compressor

located in portions of Oklahoma,

Station at MP LA 109.0 in Union

northeast Texas, northern Louisiana,

Parish, Louisiana;

central Mississippi, and Alabama. The

—The 18,405-hp Vicksburg Compressor

proposed pipeline route identified by

Station at MP MS 11.8 in Warren

MEP would extend from a receipt point

County, Mississippi;

with existing pipeline infrastructure

—The 9,470-hp Delhi Booster Station,

near Bennington in Bryan County,

which would be located along the

Oklahoma, to an interconnect with the

CenterPoint Lateral in Richland

existing Transcontinental Gas Pipe Line

Parish, Louisiana;

Corporation system near Butler in

• Meter stations at up to 13

Choctaw County, Alabama. The general

interconnects with existing pipeline

location of the proposed pipeline is

infrastructure in Bryan County,

shown in the figure included as

Oklahoma; Lamar and Cass Counties,

Appendix 1.1

In addition, as part of the

Texas; Ouachita, Richland, and

Midcontinent Express Pipeline Project,

Madison Parishes, Louisiana; Hinds,

MEP proposes to construct, own, and

Smith, Jasper, and Clarke Counties,

operate the approximately 4.2-mileMississippi; and Choctaw County,

long, 16-inch-diameter CenterPoint

Alabama;

• Various pig 2 launching and

Lateral in Richland and Madison

receiving

facilities; and

Parishes, Louisiana.

• 29 mainline valves.

Specifically, the MEP Project facilities

MEP indicates that the proposed

under FERC jurisdiction would include

Project facilities would provide longthe following:

• Approximately 40 miles of 30-inch- haul takeaway capacity to facilitate the

transport of natural gas from production

diameter pipeline in Bryan County,

areas in Texas, Oklahoma, and Arkansas

Oklahoma, and Lamar County, Texas;

to markets in the Southeast, Northeast

• Approximately 262 miles of 42and Midwest regions of the United

inch-diameter pipeline in Lamar, Red

States that can be accessed through

River, Franklin, Titus, Morris, and Cass

interconnects with existing pipeline

Counties, Texas, and Caddo, Bossier,

infrastructure. The Project would

Webster, Claiborne, Lincoln, Union,

consist of two capacity zones. The

Ouachita, Morehouse, Richland, and

initial transport capacity of Zone 1,

Madison Parishes, Louisiana;

• Approximately 193 miles of 36which would include the 30- and 42inch-diameter pipeline in Madison

inch-diameter portions of the pipeline

Parish, Louisiana, and Warren, Hinds,

facilities, would be 1.4 billion cubic feet

Rankin, Simpson, Smith, Jasper, and

of natural gas per day (Bcf/d). However,

Clarke Counties, Mississippi, and

additional supporting contracts could

Choctaw County, Alabama;

provide for expansion of the Zone 1

• The newly proposed, approximately transport capacity to 1.5 Bcf/d. Zone 2,

4.2-mile-long, 16-inch-diameter lateral

which would include the balance of the

pipeline facilities, would have an initial

1 The appendices referenced in this notice are not

transport capacity of 1.0 Bcf/d, with the

being printed in the Federal Register. Copies of all

potential for expansion to 1.2 Bcf/d.

appendices, other than Appendix 1 (maps), are

MEP proposes to place the first 40

available on the Commission’s Web site at the

miles of 30-inch-diameter pipeline in

‘‘eLibrary’’ link or from the Commission’s Public

Reference Room, 888 First Street, NE., Washington,

service by October 31, 2008, with the

DC 20426, or call (202) 502–8371. For instructions

remainder of the pipeline constructed

on connecting to eLibrary refer to the Public

and operational by February 2009.

Participation section of this notice. Copies of the

rmajette on PROD1PC64 with NOTICES

the FERC Internet Web site

(www.ferc.gov). This fact sheet

addresses a number of typically asked

questions, including the use of eminent

domain and how to participate in the

FERC’s proceedings.

appendices were sent to all those receiving this

notice in the mail. Requests for detailed maps of the

proposed facilities should be made directly to MEP.

VerDate Aug<31>2005

15:08 Aug 20, 2007

Jkt 211001

2 A pig is a mechanical tool used to clean and

inspect the interior of a pipeline.

PO 00000

Frm 00025

Fmt 4703

Sfmt 4703

46623

Land Requirements for Construction

As proposed, the typical construction

right-of-way width for the 30-, 36-, and

42-inch-diameter sections of Project

pipeline would be 100, 110, and 125

feet, respectively. The typical

construction right-of-way width for the

CenterPoint Lateral would be 75 feet.

Following construction, MEP would

generally retain a 50-foot-wide

permanent right-of-way for operation of

the Project, though MEP proposes to

expand the maintained permanent rightof-way width to 60 feet in limited areas

based on site-specific conditions.

Additionally, temporary extra

workspaces beyond the typical

construction right-of-way limits would

also be required at certain feature

crossings (e.g., roads, railroads,

wetlands, or waterbodies), in areas with

steep side slopes, in association with

special construction techniques, or at

pipe storage and contractor yards. In

residential areas, wetlands, and other

sensitive areas, the construction rightof-way width would be reduced as

necessary to protect homeowners and

environmental resources. Following

construction, all temporary workspaces

(including the temporary construction

rights-of-way and extra workspaces)

would be restored and allowed to revert

to its former use.

The EIS Process

NEPA requires the Commission to

take into account the environmental

impacts that could result from the

approval of an interstate natural gas

pipeline. The FERC will use the EIS to

consider the environmental impact that

could result if the Midcontinent Express

Pipeline Project is authorized under

Section 7 of the Natural Gas Act.

NEPA also requires us to discover and

address concerns the public may have

about proposals to be considered by the

Commission. This process is referred to

as ‘‘scoping.’’ The main goal of the

scoping process is to focus the analysis

in the EIS on the important

environmental issues. With this NOI,

the Commission staff is requesting

public comments on the scope of the

issues to be addressed in the EIS. All

comments received will be considered

during preparation of the EIS.

In the EIS we will discuss impacts

that could occur as a result of the

construction and operation of the

proposed project under these general

headings:

• Geology and soils;

• Water resources;

• Wetlands and vegetation;

• Fish and wildlife;

• Threatened and endangered

species;

E:\FR\FM\21AUN1.SGM

21AUN1

46624

Federal Register / Vol. 72, No. 161 / Tuesday, August 21, 2007 / Notices

rmajette on PROD1PC64 with NOTICES

• Land use, recreation, and visual

resources;

• Air quality and noise;

• Cultural resources;

• Socioeconomics;

• Reliability and safety; and

• Cumulative environmental impacts.

In the EIS, we will also evaluate

possible alternatives to the proposed

project or portions of the project, and

make recommendations on how to

lessen or avoid impacts on affected

resources.

Our independent analysis of the

issues will be included in a draft EIS.

The draft EIS will be mailed to federal,

state, and local government agencies;

elected officials; environmental and

public interest groups; Native American

tribes; affected landowners;

commentors; other interested parties;

local libraries and newspapers; and the

FERC’s official service list for this

proceeding. A 45-day comment period

will be allotted for review of the draft

EIS. We will consider all comments on

the draft EIS and revise the document,

as necessary, before issuing a final EIS.

We will consider all comments on the

final EIS before we make our

recommendations to the Commission.

To ensure that your comments are

considered, please follow the

instructions in the Public Participation

section of this notice.

With this notice, we are asking

federal, state, and local governmental

agencies with jurisdiction and/or

special expertise with respect to

environmental issues, to express their

interest in becoming cooperating

agencies for the preparation of the EIS.

These agencies may choose to

participate once they have evaluated the

proposal relative to their

responsibilities.

Currently Identified Environmental

Issues

The EIS will discuss impacts that

could occur as a result of the

construction and operation of the

proposed project. We have already

identified several issues that we think

deserve attention based on a

preliminary review of the project site,

comments filed in response to the April

27, 2007 NOI, and the facility

information provided by MEP. This

preliminary list of issues may be

changed based on your comments and

our analysis.

• Potential impacts to water

resources, including groundwater and

ephemeral, intermittent, and perennial

waterbodies.

• Evaluation of temporary and

permanent impacts on wetlands and

development of appropriate mitigation.

VerDate Aug<31>2005

15:08 Aug 20, 2007

Jkt 211001

• Potential impacts to fish and

wildlife habitat, including potential

impacts to federal and state-listed

threatened and endangered species.

• Potential impacts to natural

vegetative communities, including

native prairie and forestland.

• Potential effects on prime farmland

soils and soils with a high potential for

compaction or erosion.

• Potential impacts to existing land

uses, including agricultural and

managed forested lands.

• Potential impacts to recreation and

special interest areas, including

Wetland Reserve Program lands and the

Natchez Trace Parkway.

• Potential impacts to residential

areas, planned developments, and

property values.

• Potential disruption to area

businesses associated with construction.

• Potential visual effects of the

pipeline easement and aboveground

facilities on surrounding areas.

• Potential impacts to local air and

noise quality associated with

construction and operation.

• Potential impacts to cultural

resources and Native American lands.

• Public safety and hazards

associated with the transport of natural

gas.

• Alternative alignments for the

pipeline route and alternative sites for

the compressor stations.

• Assessment of the effect of the

proposed Project when combined with

other past, present, or reasonably

foreseeable future actions in the Project

area, including the potential cumulative

effect of collocating multiple utility

rights-of-way.

• Use of the existing and proposed

rights-of-way to minimize the need for

additional temporary construction

workspace and/or reduce the width of

the permanent easement.

Public Participation

You can make a difference by

providing us with your specific

comments or concerns about the

proposed project. By becoming a

commenter, your concerns will be

addressed in the EIS and considered by

the Commission. Your comments

should focus on the potential

environmental effects, reasonable

alternatives (including alternative

facility sites and pipeline routes), and

measures to avoid or lessen

environmental impact. The more

specific your comments, the more useful

they will be. To ensure that your

comments are timely and properly

recorded, please carefully follow these

instructions:

• Send an original and two copies of

your letter to: Kimberly D. Bose,

PO 00000

Frm 00026

Fmt 4703

Sfmt 4703

Secretary, Federal Energy Regulatory

Commission, 888 First St., NE., Room

1A, Washington, DC 20426.

• Label one copy of your comments

for the attention of Gas Branch 3, DG2E.

• Reference Docket No. PF07–4–000

on the original and both copies.

• Mail your comments so that they

will be received in Washington, DC on

or before September 10, 2007.

Please note that we are continuing to

experience delays in mail deliveries

from the U.S. Postal Service. As a result,

we will include all comments that we

receive within a reasonable time frame

in our environmental analysis of this

project. The Commission strongly

encourages electronic filing of any

comments in response to this Notice of

Intent. For information on electronically

filing comments, please see the

instructions on the Commission’s Web

site at www.ferc.gov.

Once MEP formally files its

application with the Commission, you

may want to become an official party to

the proceeding known as an

‘‘intervenor.’’ Intervenors play a more

formal role in the process and are able

to file briefs, appear at hearings, and be

heard by the courts if they choose to

appeal the Commission’s final ruling.

An intervenor formally participates in a

Commission proceeding by filing a

request to intervene. Instructions for

becoming an intervenor are included in

the User’s Guide under the ‘‘e-filing’’

link on the Commission’s Web site.

Please note that you may not request

intervenor status at this time. You must

wait until a formal application is filed

with the Commission.

Environmental Mailing List

An effort is being made to send this

notice to all individuals, organizations,

and government entities interested in

and/or potentially affected by the

proposed Project. This includes all

landowners along the CenterPoint

Lateral who are potential right-of-way

grantors, whose property may be used

temporarily for Project purposes, or who

own property within distances defined

in the Commission’s regulations of

certain aboveground facilities. In

addition, this notice is also being sent

to potentially affected landowners along

other portions of the Project that

previously requested to remain on the

Project environmental mailing list.

If you received this notice, you are on

the environmental mailing list for this

project. If you do not want to send

comments at this time, but still want to

remain on our mailing list, please return

the Information Request (Appendix 2). If

you do not return the Information

Request, you will be removed from the

E:\FR\FM\21AUN1.SGM

21AUN1

Federal Register / Vol. 72, No. 161 / Tuesday, August 21, 2007 / Notices

Commission’s environmental mailing

list. Please note that interested

individuals who previously responded

to the April 27, 2007 NOI with a request

to stay on the environmental mailing list

need not reply again.

Availability of Additional Information

rmajette on PROD1PC64 with NOTICES

Additional information about the

project is available from the

Commission’s Office of External Affairs,

at 1–866–208–FERC (3372). Additional

information can also be found on the

Internet at www.ferc.gov. The ‘‘eLibrary

link’’ on the FERC Web site provides

access to documents submitted to and

issued by the Commission, such as

comments, orders, notices and

rulemakings. Once on the FERC Web

site, click on the ‘‘eLibrary link,’’ select

‘‘General Search’’ and in the ‘‘Docket

Number’’ field enter the project docket

number excluding the last three digits

(i.e., PF07–4). When researching

information be sure to select an

appropriate date range. In addition, the

FERC now offers a free e-mail service

called eSubscription that allows you to

keep track of all formal issuances and

submittals in specific dockets. This can

reduce the amount of time you spend

researching proceedings by

automatically providing you with

notification of these filings, document

summaries and direct links to the

documents. To register for this service,

go to www.ferc.gov/esubscribenow.htm.

For assistance, please contact FERC

Online Support at

FERCOnlineSupport@ferc.gov or toll

free at 1–866–208–3676, or TTY, contact

1–202–502–8659.

Public meetings or site visits will be

posted on the Commission’s calendar

located at www.ferc.gov/EventCalendar/

EventsList.aspx) along with other

related information.

Finally, MEP has established an

Internet Web site for this Project at

www.midcontinentexpress.com. The

Web site includes a description of the

Project, a map of the proposed pipeline

route, and answers to frequently asked

questions. You can also request

additional information or provide

comments directly to MEP at 1–877–

327–5515 or

pipelineinfo@midcontinentexpress.com.

Kimberly D. Bose,

Secretary.

[FR Doc. E7–16383 Filed 8–20–07; 8:45 am]

BILLING CODE 6717–01–P

VerDate Aug<31>2005

15:08 Aug 20, 2007

Jkt 211001

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Project No. 12769–000]

Ice House Partners, Inc.; Notice of

Application Ready for Environmental

Analysis, and Soliciting Comments,

Terms and Conditions,

Recommendations, and Prescriptions

August 14, 2007.

Take notice that the following

hydroelectric application has been filed

with the Commission and is available

for public inspection:

a. Type of Application: Exemption

from Licensing.

b. Project No.: 12769–000.

c. Date Filed: January 22, 2007.

d. Applicant: Ice House Partners, Inc.

e. Name of Project: Ice House Power

Project.

f. Location: On the Nashua River in

the Town of Ayer, Middlesex County,

Massachusetts. The project would

occupy United States land administered

by the U.S. Fish and Wildlife Service.

g. Filed Pursuant to: Public Utility

Regulatory Policies Act of 1978, 16

U.S.C. Sections 2705 and 2708.

h. Applicant Contact: Liisa Dowd, Ice

House Partners, Inc., 323 West Main

Street, Ayer, MA 01432, (978) 772–3303.

i. FERC Contact: Tom Dean, (202)

502–6041.

j. Deadline for Filing Comments,

Recommendations, Terms and

Conditions, and Prescriptions: 60 days

from the issuance date of this notice;

reply comments are due 105 days from

the issuance date of this notice.

All documents (original and eight

copies) should be filed with: Secretary,

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

The Commission’s Rules of Practice

require all intervenors filing documents

with the Commission to serve a copy of

that document on each person whose

name appears on the official service list

for the project. Further, if an intervenor

files comments or documents with the

Commission relating to the merits of an

issue that may affect the responsibilities

of a particular resource agency, they

must also serve a copy of the document

on that resource agency.

Comments, recommendations, terms

and conditions, and prescriptions may

be filed electronically via the Internet in

lieu of paper. The Commission strongly

encourages electronic filings. See 18

CFR 385.2001(a)(1)(iii) and the

instructions on the Commission’s Web

site (http://www.ferc.gov) under the

‘‘eFiling’’ link.

PO 00000

Frm 00027

Fmt 4703

Sfmt 4703

46625

k. This application has been accepted

and is now ready for environmental

analysis at this time.

l. Description of Project: The Ice

House Power Project would consist of:

(1) The existing 190-foot-long, 12-foothigh Ice House dam and spillway

topped with 24-inch-high flashboards

impounding; (2) the existing 965-acrefoot reservoir with a normal full pond

elevation of 216.45 feet National

Geodetic Vertical Datum; (3) the existing

headgate structure equipped with four

8-foot-high, 10-foot-wide gates of which

two are operational and two are

stationary leading to; (4) the existing 50foot-wide, 109-foot-long power canal

connected to; (5) a restored powerhouse

containing two generating units with a

total installed capacity of 280 kilowatts

discharging flow to; (6) the existing 50foot-wide, 365-foot-long tailrace; (7) the

existing 480-volt, 100-foot-long

underground transmission cable; and (8)

appurtenant facilities.

m. A copy of the application is

available for review at the Commission

in the Public Reference Room or may be

viewed on the Commission’s Web site at

http://www.ferc.gov using the

‘‘eLibrary’’ link. Enter the docket

number excluding the last three digits in

the docket number field to access the

document. For assistance, contact FERC

Online Support at

FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,

(202) 502–8659. A copy is also available

for inspection and reproduction at the

address in item h. above.

All filings must: (1) Bear in all capital

letters the title ‘‘COMMENTS’’, ‘‘REPLY

COMMENTS’’,

‘‘RECOMMENDATIONS’’, ‘‘TERMS

AND CONDITIONS’’, or

‘‘PRESCRIPTIONS’’; (2) set forth in the

heading the name of the applicant and

the project number of the application to

which the filing responds; (3) furnish

the name, address, and telephone

number of the person submitting the

filing; and (4) otherwise comply with

the requirements of 18 CFR 385.2001

through 385.2005. All comments,

recommendations, terms and conditions

or prescriptions must set forth their

evidentiary basis and otherwise comply

with the requirements of 18 CFR 4.34(b).

Agencies may obtain copies of the

application directly from the applicant.

Each filing must be accompanied by

proof of service on all persons listed on

the service list prepared by the

Commission in this proceeding, in

accordance with 18 CFR 4.34(b), and

385.2010.

You may also register online at

http://www.ferc.gov/docs-filing/

esubscription.asp to be notified via

E:\FR\FM\21AUN1.SGM

21AUN1