Federal Register / Vol. 71, No. 45 / Wednesday, March 8, 2006 / Notices

Commission relating to the merits of an

issue that may affect the responsibilities

of a particular resource agency, they

must also serve a copy of the document

on that resource agency.

k. Competing Application: Project No.

12602–000, Date Filed: July 1, 2005,

Notice Issued: November 1, 2005, Due

Date: December 31, 2005.

l. Description of Project: The proposed

project using the U.S. Bureau of

Reclamation’s Bull Lake Dam would

consist of: (1) A proposed 260-foot-long,

8.5-foot-diameter, steel penstock, (2) a

proposed powerhouse containing a

generating unit with an installed

capacity of 4 megawatts, (3) a proposed

2-mile-long 25 kilovolt transmission

line, and (4) appurtenant facilities. The

project would have an annual

generation of 26 gigawatt hours which

would be sold to a local utility.

m. Locations of Applications: A copy

of the application is available for

inspection and reproduction at the

Commission in the Public Reference

Room, located at 888 First Street NE.,

Room 2A, Washington, DC 20426, or by

calling (202) 502–8371. This filing may

also be viewed on the Commission’s

Web site at http://www.ferc.gov using

the ‘‘eLibrary’’ link. Enter the docket

number excluding the last three digits in

the docket number field to access the

document. For assistance, call toll-free

1–866–208–3676 or e-mail

FERCOnlineSupport@ferc.gov. For TTY,

call (202) 502–8659. A copy is also

available for inspection and

reproduction at the address in item h

above.

n. Individuals desiring to be included

on the Commission’s mailing list should

so indicate by writing to the Secretary

of the Commission.

o. Proposed Scope of Studies under

Permit: A preliminary permit, if issued,

does not authorize construction. The

term of the proposed preliminary permit

would be 36 months. The work

proposed under the preliminary permit

would include economic analysis,

preparation of preliminary engineering

plans, and a study of environmental

impacts. Based on the results of these

studies, the Applicant would decide

whether to proceed with the preparation

of a development application to

construct and operate the project.

p. Comments, Protests, or Motions to

Intervene: Anyone may submit

comments, a protest, or a motion to

intervene in accordance with the

requirements of Rules of Practice and

Procedure, 18 CFR 385.210, 385.211,

385.214. In determining the appropriate

action to take, the Commission will

consider all protests or other comments

filed, but only those who file a motion

VerDate Aug<31>2005

15:53 Mar 07, 2006

Jkt 208001

to intervene in accordance with the

Commission’s Rules may become a

party to the proceeding. Any comments,

protests, or motions to intervene must

be received on or before the specified

comment date for the particular

application.

q. Filing and Service of Responsive

Documents: Any filings must bear in all

capital letters the title ‘‘COMMENTS’’,

‘‘NOTICE OF INTENT TO FILE

COMPETING APPLICATION’’,

‘‘COMPETING APPLICATION’’,

‘‘PROTEST’’, or ‘‘MOTION TO

INTERVENE’’, as applicable, and the

Project Number of the particular

application to which the filing refers.

Any of the above-named documents

must be filed by providing the original

and the number of copies provided by

the Commission’s regulations to: The

Secretary, Federal Energy Regulatory

Commission, 888 First Street, NE.,

Washington, DC 20426. An additional

copy must be sent to Director, Division

of Hydropower Administration and

Compliance, Federal Energy Regulatory

Commission, at the above-mentioned

address. A copy of any notice of intent,

competing application or motion to

intervene must also be served upon each

representative of the Applicant

specified in the particular application.

Comments, protests and interventions

may be filed electronically via the

Internet in lieu of paper; see 18 CFR

385.2001(a)(1)(iii) and the instructions

on the Commission’s Web site under the

‘‘e-Filing’’ link. The Commission

strongly encourages electronic filings.

r. Agency Comments: Federal, state,

and local agencies are invited to file

comments on the described application.

A copy of the application may be

obtained by agencies directly from the

Applicant. If an agency does not file

comments within the time specified for

filing comments, it will be presumed to

have no comments. One copy of an

agency’s comments must also be sent to

the Applicant’s representatives.

Magalie R. Salas,

Secretary.

[FR Doc. E6–3199 Filed 3–7–06; 8:45 am]

BILLING CODE 6717–01–P

PO 00000

Frm 00039

Fmt 4703

Sfmt 4703

11611

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

Notice of Application Accepted for

Filing; Ready for Environmental

Analysis; and Soliciting Motions To

Intervene, Protests, Comments on

Application and Settlement

Agreement; and Recommendations,

Terms and Conditons and

Prescriptions

February 28, 2006.

Take notice that the following

hydroelectric application has been filed

with the Commission and is available

for public inspection.

a. Type of Application: New Major

License and approval of Settlement

Agreement.

b. Project No.: 2170–029.

c. Date Filed: Application—April 22,

2005; Settlement Agreement August 31,

2005.

d. Applicant: Chugach Electric

Association.

e. Name of Project Cooper Lake

Hydroelectric Project.

f. Location: On Cooper Lake,

approximately 4.8 river miles from the

mouth of Cooper Creek in south central

Alaska, 55 air miles south of Anchorage.

g. Filed Pursuant to: Federal Power

Act 16 U.S.C. 791(a)–825(r) and Rule

602 of the Commission’s Rules of

Practice and Procedure, 18 CFR 385.602.

h. Applicant Contact: Burke Wick,

Chugach Electric Association, 5601

Minnesota Drive, Anchorage, Alaska

99519. (907) 762–4779.

i. FERC Contact: David Turner (202)

502–6091 or david.turner@ferc.gov.

j. Deadline for filing motions to

intervene, protests, comments on

application and settlement agreement,

recommendations, terms and conditions

and prescriptions: 60 days from the

issuance date of this notice; Applicant

reply comments are due 105 days from

issuance date of this notice.

All documents (original and eight

copies) should be filed with: Magalie R.

Salas, Secretary, Federal Energy

Regulatory Commission, 888 First

Street, NE., Washington, DC 20426.

The Commission’s Rules of Practice

require all intervenors filing documents

with the Commission to serve a copy of

that document on each person on the

official service list for the project.

Further, if an intervenor files comments

or documents with the Commission

relating to the merits of an issue that

may affect the responsibilities of a

particular resource agency, they must

also serve a copy of the document on

that resource agency.

E:\FR\FM\08MRN1.SGM

08MRN1

erjones on PROD1PC68 with NOTICES

11612

Federal Register / Vol. 71, No. 45 / Wednesday, March 8, 2006 / Notices

Motions to intervene and protests may

be filed electronically via the Internet in

lieu of paper. The Commission strongly

encourages electronic filings. See 18

CFR 385.2001(a)(1)(iii) and the

instructions on the Commission’s Web

site (http://www.ferc.gov) under the ‘‘eFiling’’ link.

k. This application has been accepted,

and is ready for environmental analysis.

l. The existing project consists of: (1)

The Cooper Lake Dam, a 52-foot-high

earth-and-rockfilled structure; (2) the

2,620-acre, 5-mile-long Cooper Lake

Reservoir; (3) two vertical-shaft Francis

turbines with a total capacity of 19.38

megawatts; (4) an intake structure

located on Cooper Lake; (5) a tunnel and

penstock extending 10,686 feet east

from the intake to the powerhouse; a (6)

6.3-mile-long, 69-kV transmission line

from the powerhouse to Quartz Creek

Substation; and 90.4-mile-long, 115-kV

transmission line from the Quartz Creek

Substation to Anchorage.

A new dam is proposed to be

constructed on Stetson Creek to divert

water into Cooper Lake to provide flow

releases for fish habitat improvements

in Cooper Creek.

m. Chugach Electric filed on August

31, 2005, a Settlement Agreement on

behalf of itself, and the U.S. Forest

Service, U.S. Fish and Wildlife Service,

National Park Service, National Marine

Fisheries Service, Kenaitze Indian Tribe,

Alaska Department of Fish and Game,

Alaska Department of Natural

Resources, The Fish for Cooper Creek

Coalition, Alaska Flyfishers Association,

and the Alaska Center for the

Environment. The purpose of the

Settlement Agreement is to resolve

among the signatories all issues

associated with issuance of a new

license for the project regarding

economic and power considerations,

water quality and temperature, instream

flows, fish habitat, visual resources,

recreation and cultural resources. The

Parties to the Settlement jointly request

the Commission accept and incorporate

into any new license for the project, the

protection, mitigation, and

enhancement measures and proposed

license articles stated in the Settlement

Agreement.

n. A copy of the application and

settlement agreement is on file with the

Commission and is available for public

inspection. This filing is available for

review at the Commission in the Public

Reference Room or may be viewed on

the Commission’s Web site at http://

www.ferc.gov using the ‘‘eLibrary’’ link.

Enter the docket number excluding the

last three digits in the docket number

field to access the document. For

assistance, contact FERC online support

VerDate Aug<31>2005

15:53 Mar 07, 2006

Jkt 208001

at ferconlinesupport@ferc.gov or tollfree at 1–866–208–3676, or for Text

Telephone (TTY) call (202) 502–8659. A

copy is also available for inspection and

reproduction at the address in item h

above.

o. Anyone may submit a protest or a

motion to intervene in accordance with

the requirements of Rules of Practice

and Procedure, 18 CFR 385.210,

385.211, and 385.214. In determining

the appropriate action to take, the

Commission will consider all protests

filed, but only those who file a motion

to intervene in accordance with the

Commission’s Rules may become a

party to the proceeding. Any protests or

motions to intervene must be received

on or before the specified deadline date

for the particular application.

All filings must (1) bear in all capital

letters the title ‘‘PROTEST’’ or

‘‘MOTION TO INTERVENE;’’ (2) set

forth in the heading the name of the

applicant and the project number of the

application to which the filing

responds; (3) furnish the name, address,

and telephone number of the person

protesting or intervening; and (4)

otherwise comply with the requirements

of 18 CFR 385.2001 through 385.2005.

All comments, recommendations, terms

and conditions or prescriptions must set

forth their evidentiary basis and

otherwise comply with the requiremens

of 18 CFR 4.34(b). Agencies may obtain

copies of the application directly from

the applicant. A copy of any protest or

motion to intervene must be served

upon each representative of the

applicant specified in the particular

application. A copy of all other filings

in reference to this application must be

accompanied by proof of service on all

persons listed in the service list

prepared by the Commission in this

proceeding, in accordance with 18 CFR

4.34(b) and 385.2010.

You may also register online at

http://www.ferc.gov/docs-filing/

esubscription.asp to be notified via email of new filings and issuances

related to this or other pending projects.

For assistance, contact FERC Online

Support.

Magalie R. Salas,

Secretary.

[FR Doc. E6–3201 Filed 3–7–06; 8:45 am]

BILLING CODE 6717–01–P

PO 00000

Frm 00040

Fmt 4703

Sfmt 4703

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

Notice of Application for Transfer of

License, and Soliciting Comments,

Motions To Intervene, and Protests

February 28, 2006.

Take notice that the following

hydroelectric application has been filed

with the Commission and is available

for public inspection:

a. Application Type: Transfer of

License.

b. Project No.: 2935–018.

c. Date Filed: February 1, 2006.

d. Applicants: Enterprise Mill, LLC

(transferor), Melaver/Enterprise Mill,

LLC (transferee).

e. Name and Location of Project: The

Enterprise Mill Project is located on the

Augusta Canal and Savannah River in

Richmond County, Georgia.

f. Filed Pursuant to: Federal Power

Act, 16 U.S.C. 791a–825r.

g. Applicant Contacts: For the

transferor: Clayton B. Boardman, III,

Enterprise Mill, LLC, 1450 Greene

Street, Suite 500, Augusta, GA 30901,

(706) 262–4005.

For the transferee: Denis Blackburn,

CFO, Melaver/Enterprise Mill, LLC, 114

Barnard Street, Suite 2B, Savannah, GA

31401, (912) 236–0781.

h. FERC Contact: Robert Bell at (202)

502–6062.

i. Deadline for Filing Comments,

Protests, and Motions to Intervene: 30

days from issuance date.

All documents (original and eight

copies) should be filed with: Magalie R.

Salas, Secretary, Federal Energy

Regulatory Commission, 888 First

Street, NE., Washington, DC 20426.

Comments, protests, and interventions

may be filed electronically via the

Internet in lieu of paper. See 18 CFR

385.2001(a)(1)(iii) and the instructions

on the Commission’s Web site under the

‘‘e-Filing’’ link. The Commission

strongly encourages electronic filings.

Please include the Project Number on

any comments or motions filed.

The Commission’s Rules of Practice

and Procedure require all intervenors

filing a document with the Commission

to serve a copy of that document on

each person on the official service list

for the project. Further, if an intervenor

files comments or documents with the

Commission relating to the merits of an

issue that may affect the responsibilities

of a particular resource agency, they

must also serve a copy of the documents

on that resource agency.

j. Description of Application: The

Applicants seek Commission approval

E:\FR\FM\08MRN1.SGM

08MRN1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.