cprice-sewell on PROD1PC66 with NOTICES (2006)
Agency decision
Ask Donna
What actually matters in this document.
Text
cprice-sewell on PROD1PC66 with NOTICES
Federal Register / Vol. 71, No. 130 / Friday, July 7, 2006 / Notices
Filed Date: 6/23/2006.
Accession Number: 20060627–0057.
Comment Date: 5 p.m. eastern time on
Friday, July 14, 2006.
Docket Numbers: ER06–1123–001.
Applicants: American Electric Power
Service Corporation.
Description: American Electric Power
Service Corp on behalf of Ohio Power
Co submits a revised Notice of
Termination of Interconnection and
Operating Agreement with Lawrence
Energy Center, LLC.
Filed Date: 6/23/2006.
Accession Number: 20060627–0055.
Comment Date: 5 p.m. eastern time on
Friday, July 14, 2006.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at http://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
VerDate Aug<31>2005
15:46 Jul 06, 2006
Jkt 208001
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–10608 Filed 7–6–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF06–29–000]
Gulfstream Natural Gas System, L.L.C.;
Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Gulfstream Phase IV
Expansion Project and Request for
Comments on Environmental Issues
June 28, 2006.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
Gulfstream Natural Gas System, L.L.C.’s
(Gulfstream) planned Phase IV
Expansion Project located in Florida
and Alabama. This notice announces
the opening of the scoping process we
will use to gather input from the public
and interested agencies on the projects.
Your input will help the Commission
staff determine which issues need to be
evaluated in the EA. Please note that the
scoping period will close on July 31,
2006.
This notice is being sent to affected
landowners; Federal, State, and local
government representatives and
agencies; environmental and public
interest groups; Native American tribes;
other interested parties in this
proceeding; and local libraries and
newspapers. We encourage government
representatives to notify their
constituents of this planned project and
encourage them to comment on their
areas of concern.
At this time we request that
comments be submitted in written form.
Further details on how to submit
written comments are provided in the
public participation section of this
notice. For further information and an
opportunity to provide comments, you
are invited to attend Gulfstream’s public
open house meetings that are scheduled
as follows:
Tuesday, July 11, 2006, 6–8 p.m.:
Hillsborough County Commission
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
38635
Building, 601 East Kennedy Blvd.,
18th Floor, Tampa, FL 33602.
Wednesday, July 12, 2006, 6–8 p.m.:
Weedon Island Preserve, Cultural and
Natural History Center, 1800 Weedon
Drive, St. Petersburg, FL 33702.
Thursday, July 13, 2006, 6–8 p.m.:
Manatee Civic Center, Palma Sola
Room, One Haben Blvd., Palmetto, FL
34221.
The primary purpose for the open
house sessions is to identify potential
siting issues so that they could be
appropriately addressed. At the open
houses, Gulfstream representatives will
be available to discuss the various
aspects of the project (e.g., land,
construction, environmental, design/
engineering, and operations) and will
meet individually with attendees to
outline how pipelines and related
facilities are sited, approved, built, and
operated. Aerial photography and
offshore survey maps showing route
alternatives will be made available to
encourage comments on the proposed
project. Information on the FERC
process will also be available.
In addition to the open houses,
Gulfstream has established a toll-free
phone number (888–GAS–4–FLA), an email address
(gulfstream@williams.com), and has
developed a project Web site (http://
www.gulfstreamgas.com/phase4.htm).
Information included on the project
Web site includes: The route selection
process; the regulatory overview, with
links to the FERC Web site; construction
procedures; pipeline safety; and contact
information.
Summary of the Proposed Project
Progress Energy Florida, Inc. (Progress
Energy) is scheduled to re-power its
Bartow Power Plant. The 472-megawatt
(MW) oil-fired plant is scheduled to be
re-powered with three combined cycle
gas turbines that will generate 1,100
MW of power. Progress Energy has
requested, and Gulfstream has agreed to
provide 0.155 billion cubic feet per day
of firm natural gas transportation service
to the Bartow Plant. In order to provide
the requested transportation service, it
is necessary for Gulfstream to expand its
current system, as described below.
Gulfstream is proposing to construct
approximately 17.74 miles of 20-inchdiameter offshore pipeline from a
proposed underwater hot tap with the
existing 36-inch-diameter Gulfstream
Pipeline (Line 200) in Hillsborough
County waters of Tampa Bay and
connecting to the existing Progress
Energy Bartow Power Plant (Bartow
Plant) on the east shore of St. Petersburg
in Pinellas County, Florida. The project
would also require the installation of
E:\FR\FM\07JYN1.SGM
07JYN1
38636
Federal Register / Vol. 71, No. 130 / Friday, July 7, 2006 / Notices
45,000 horsepower (hp) of new
compression. One 15,000 hp compressor
unit would be added at Gulfstream’s
existing compressor station in Coden,
Alabama and a new compressor station
with two 15,000-hp units would be
constructed at an existing pressure
reduction station site in Manatee
County, Florida.
The proposed offshore pipeline would
head north-northeast from the proposed
hot tap location and would cross Port
Manatee channel, cross Cut ‘‘C’’ of
Tampa Bay channel, turn in a northnorthwest direction, cross Cut ‘‘G’’ of
Tampa Bay channel and Cut ‘‘K’’ of
Tampa Bay channel, enter Pinellas
County waters, turn almost due west,
cross the Bartow Channel and enter the
south side of the Bartow Plant. The
pipeline would be buried to maintain a
minimum of 3 feet of cover between the
top of the pipeline and the natural bay
bottom, in accordance with U.S.
Department of Transportation
regulations. The four channel crossings
would be installed by horizontal
directional drills (HDD) under each
channel and would be buried with a
cover of 10 or more feet below the
design bottom of each channel. The
shore approach to the Bartow Plant
would also be installed by HDD and
would start at the Bartow Channel,
thereby avoiding sensitive nearshore
habitats.
In order to meet the in-service dates
requested by Progress Energy,
Gulfstream intends to place the
proposed pipeline in service by
September 1, 2008, and the compression
in service by January 1, 2009.
Location maps depicting Gulfstream’s
proposed facilities are provided in
Appendix 1.1
Currently Identified Environmental
Issues
cprice-sewell on PROD1PC66 with NOTICES
At this time no formal application has
been filed with the FERC. For this
project, the FERC staff has initiated its
NEPA review prior to receiving the
application. The purpose of our PreFiling Process is to involve interested
stakeholders early in project planning
and to identify and resolve issues before
an application is filed with the FERC.
We have already identified several
issues that we think deserve attention
based on a preliminary review of the
1 The appendices referenced in this notice are not
being printed in the Federal Register. Copies are
available on the Commission’s Web site (excluding
maps) at the ‘‘eLibrary’’ link or from the
Commission’s Public Reference Room or call (202)
502–8371. For instructions on connecting to
eLibrary refer to the end of this notice. Copies of
the appendices were sent to all those receiving this
notice in the mail.
VerDate Aug<31>2005
15:46 Jul 06, 2006
Jkt 208001
proposed facilities, environmental
information provided by Gulfstream,
and comments provided by other
agencies. This preliminary list of issues
may be changed based on your
comments and our analysis.;
• Potential indirect impacts (e.g.,
turbidity and sedimentation) to
submerged aquatic vegetation;
• Safety and noise concerns for the
new compressor station facilities;
• Potential conflicts with future ship
channel improvements;
• Potential impacts to aquatic
preserves;
• Net benefits to air quality;
• Potential impacts to manatees, sea
turtles, and sawfish.
The EA Process
The FERC will use the EA to consider
the environmental impact that could
result if it issues Gulfstream a Certificate
of Public Convenience and Necessity.
This notice formally announces our
preparation of the EA and the beginning
of the process referred to as ‘‘scoping.’’
We 2 are soliciting input from the public
and interested agencies to help us focus
the analysis in the EA on the potentially
significant environmental issues related
to the proposed action.
Our independent analysis of the
issues will be included in an EA that
will be prepared for the project. Our
evaluation will also include possible
alternatives to the proposed project or
portions of the project, and we will
make recommendations on how to
lessen or avoid impacts on the various
resource areas of concern.
The EA will be mailed to Federal,
State, and local government agencies;
elected officials; environmental and
public interest groups; Native American
tribes; affected landowners; other
interested parties; local libraries and
newspapers; and the FERC’s official
service list for this proceeding. A 30-day
comment period will be allotted for
review of the EA. We will consider all
comments submitted on the EA in any
Commission Order that is issued for the
project.
We are currently involved in
discussions with other jurisdictional
agencies to identify their issues and
concerns. These agencies include the
U.S. Army Corps of Engineers, National
Oceanic and Atmospheric
Administration, U.S. Fish and Wildlife
Service, Florida Department of
Environmental Protection, and the U.S.
Department of Transportation. By this
notice, we are asking these and other
Federal, State, and local agencies with
2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the Office of Energy Projects.
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
jurisdiction and/or special expertise
with respect to environmental issues to
formally cooperate with us in the
preparation of the EA. Agencies that
would like to request cooperating status
should follow the instructions for filing
comments provided below.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the
proposals. Your comments should focus
on the potential environmental effects,
reasonable alternatives and measures to
avoid or lessen environmental impact.
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please mail your comments so
that they will be received in
Washington, DC on or before July 31,
2006 and carefully follow these
instructions:
• Send an original and two copies of
your letter to: Magalie R. Salas,
Secretary, Federal Energy Regulatory
Commission, 888 First St., NE., Room
1A, Washington, DC 20426;
• Label one copy of the comments for
the attention of Gas Branch 3, DG2E;
and
• Reference Docket No. PF06–29–000
on the original and both copies.
Please note that the Commission
encourages electronic filing of
comments. See 18 Code of Federal
Regulations 385.2001(a)(1)(iii) and the
instructions on the Commission’s
Internet Web site at http://www.ferc.gov
under the ‘‘eFiling’’ link and the link to
the User’s Guide. Prepare your
submission in the same manner as you
would if filing on paper and save it to
a file on your hard drive. Before you can
file comments you will need to create an
account by clicking on ‘‘Login to File’’
and then ‘‘New User Account.’’ You will
be asked to select the type of filing you
are making. This filing is considered a
‘‘Comment on Filing.’’
When Gulfstream submits its
application for authorization to
construct and operate the Phase IV
Expansion Project, the Commission will
publish a Notice of Application in the
Federal Register and will establish a
deadline for interested persons to
intervene in the proceeding. Because the
Commission’s Pre-filing Process occurs
before an application to begin a
proceeding is officially filed, petitions
to intervene during this process are
premature and will not be accepted by
the Commission.
Environmental Mailing List
If you wish to remain on the
environmental mailing list, please
E:\FR\FM\07JYN1.SGM
07JYN1
Federal Register / Vol. 71, No. 130 / Friday, July 7, 2006 / Notices
return the Mailing List Retention Form
included in Appendix 2. If you do not
return this form, you will be taken off
our mailing list.
Availability of Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs
at 1–866–208 FERC (3372) or on the
FERC Internet Web site (http://
www.ferc.gov). Using the ‘‘eLibrary’’
link, select ‘‘General Search’’ from the
eLibrary menu, enter the selected date
range and ‘‘Docket Number’’ (i.e., PF06–
29–000), and follow the instructions.
Searches may also be done using the
phrase ‘‘Gulfstream Phase IV
Expansion’’ in the ‘‘Text Search’’ field.
For assistance with access to eLibrary,
the helpline can be reached at 1–866–
208–3676, TTY (202) 502–8659, or at
FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC Internet Web
site also provides access to the texts of
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the FERC now offers a
free service called eSubscription that
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. To register for this service,
go to http://www.ferc.gov/
esubscribenow.htm.
Public meetings or site visits will be
posted on the Commission’s calendar
located at http://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information. As
indicated previously, Gulfstream has
established an Internet Web site for its
project at http://
www.gulfstreamgas.com/phase4.htm.
The Web site includes a project
overview, contact information,
regulatory overview, and construction
procedures.
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. RP06–365–000; Docket No.
RP06–231–002]
Columbia Gas Transmission
Corporation; Norstar Operating, LLC v.
Columbia Gas Transmission
Corporation; Notice of Technical
Conference
June 29, 2006.
Take notice that the Commission will
convene a technical conference in
reference to the above-captioned
proceeding on Tuesday, July 25, 2006, at
9 a.m. (EDT), in a room to be designated
at the offices of the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s June 21, 2006
order in this proceeding directed that a
technical conference be held to address
the technical, engineering and
operational issues raised by Columbia
Gas Transmission Corporation’s
(Columbia) proposed gas quality
specifications filed in Docket No. RP06–
365–000.1 The order also found that
Columbia’s filing in Docket No. RP06–
231–002 revising section 25.5(e) of its
General Terms and Conditions should
be addressed at the technical
conference.
FERC conferences are accessible
under section 508 of the Rehabilitation
Act of 1973. For accessibility
accommodations please send an e-mail
to accessibility@ferc.gov or call toll free
(866) 208–3372 (voice) or 202–502–8659
(TTY), or send a fax to 202–208–2106
with the required accommodations.
All interested persons are permitted
to attend. For further information please
contact David Faerberg at (202) 502–
8275 or e-mail david.faerberg@ferc.gov.
Magalie R. Salas,
Secretary.
[FR Doc. E6–10614 Filed 7–6–06; 8:45 am]
BILLING CODE 6717–01–P
Magalie R. Salas,
Secretary.
[FR Doc. E6–10618 Filed 7–6–06; 8:45 am]
cprice-sewell on PROD1PC66 with NOTICES
BILLING CODE 6717–01–P
1 Columbia Gas Transmission Corporation, 115
FERC ¶ 61,351 (2006).
VerDate Aug<31>2005
15:46 Jul 06, 2006
Jkt 208001
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
38637
Notice of Comment Meeting
June 28, 2006.
Millennium Pipeline L.L.C. (Docket
Nos. CP98–150–006, CP98–150–007, and
CP98–150–008); Columbia Gas
Transmission Corporation (Docket Nos.
CP98–151–003, CP98–151–004, and
CP05–19–000); Empire State Pipeline
and Empire Pipeline, Inc. ( Docket Nos.
CP06–5–000, CP06–6–000, and CP06–7–
000); Algonquin Gas Transmission
System ( Docket No. CP06–76–000); and
Iroquois Gas Transmission System
(Docket No. CP02–31–002)
On July 18, 2006, the Federal Energy
Regulatory Commission staff will
conduct comment meeting for the
purpose of hearing comments on the
draft supplemental environmental
impact statement (DSEIS) for the
Northeast (NE)–07 Project which was
issued on June 15, 2006 and which you
should have received. The NE–07
Project would involve the construction
and operation of natural gas facilities as
proposed and described in the abovereferenced dockets in the states of New
York, New Jersey, and Connecticut and
would include:
• The Millennium Pipeline Project—
Phase I proposed by Millennium
Pipeline L.L.C. and Columbia Gas
Transmission Corporation (Columbia);
• The Line A–5 Replacement Project
proposed by Columbia;
• The Empire Connector Project
proposed by Empire State Pipeline and
Empire Pipeline, Inc.;
• The Ramapo Expansion Project
proposed by Algonquin Gas
Transmission System; and
• The MarketAccess Project proposed
by Iroquois Gas Transmission System.
The SDEIS comment meeting will be
on July 18, 2006, and will begin at 6
p.m. and will end no later than 9 p.m.
(EST). The meeting will be held at:
Brookfield High School Auditorium, 45
Longmeadow Hill Road, Brookfield,
Connecticut.
Additional information about the
project and the comment meeting is
available from the Commission’s Office
of External Affairs, at 1–866–208–FERC.
Magalie R. Salas,
Secretary.
[FR Doc. E6–10619 Filed 7–6–06; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\07JYN1.SGM
07JYN1
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.