24286
Federal Register / Vol. 72, No. 84 / Wednesday, May 2, 2007 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Public Comment Meetings for
the Elba III Project Draft Environmental
Impact Statement
April 25, 2007.
Southern LNG Inc. (Docket No. CP06–
470–000); Elba Express Company, L.L.C.
(Docket Nos. CP06–471–000, CP06–472–
000, and CP06–473–000); Southern
Natural Gas Company (Docket No.
CP06–474–000)
On March 30, 2007, the staff of the
Federal Energy Regulatory Commission
(FERC or Commission) issued a draft
Environmental Impact Statement (EIS)
for the Elba III Project, proposed by
Southern LNG Inc., Elba Express
Company, LLC, and their parent
company Southern Natural Gas
Company, a subsidiary of El Paso
Corporation. Issuance of the draft EIS
began a 45-day public comment period
which will end on May 21, 2007. In
addition to accepting written comments
on the draft EIS, the Commission staff
will be hosting public comment
meetings in the project area to accept
oral comments as listed in the following
table.
Public meeting
date and time
Location
Monday, May
7, 2007 at 7
p.m.
Washington-Wilkes High
School Cafeteria, 304 Gordon Street, Washington,
GA 30673, Phone: (706)
678–2426.
Thomson High School Cafeteria, 1160 White Oak
Road, Thomson, GA
30824, Phone: (706) 986–
4200.
Sylvania Recreation Building, 605 Millen Highway,
Sylvania, GA 30467,
Phone: (912) 863–2388.
Quality Inn Conference Center, (Southburg Chateau
Room), 301 Governor
Truetlen Drive, Pooler, GA
31322, Phone: (912) 748–
6464.
Tuesday, May
8, 2007 at 7
p.m.
Wednesday,
May 9, 2007
at 7 p.m.
Thursday, May
10, 2007 at
7 p.m.
ycherry on PROD1PC64 with NOTICES
Comment Procedure
Instructions for submitting written
comments are included in the draft EIS
and the Notice of Availability that were
issued on March 30, 2007. These
documents can be found on the FERC
Internet website as discussed below.
Oral comments presented at the public
comment meetings will be given the
same consideration as written
comments received by mail before the
VerDate Aug<31>2005
18:42 May 01, 2007
Jkt 211001
close of the public comment period on
May 21, 2007.
As with previous public meetings on
the Elba III Project, attendees will be
asked to provide their name and address
so that any project-related
environmental information issued by
the Commission may be mailed to all
attendees. Additionally, those wishing
to provide oral comments will be asked
to put their name on a Speakers List.
Depending on the number of
individuals wishing to provide oral
comments, speakers may be asked to
limit their presentations to 5 minutes in
order that all speakers may be
accommodated. Transcripts of the
public comment meetings will be
prepared and placed into the FERC’s
public record.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (http://www.ferc.gov)
using the eLibrary link. Click on the
eLibrary link, click on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
contact (202) 502–8659. The eLibrary
link on the FERC Internet Web site also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–8338 Filed 5–1–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP07–128–000]
Cheyenne Plains Gas Pipeline
Company; Notice of Intent To Prepare
an Environmental Assessment for the
Proposed Kirk Compressor Station
Project and Request for Comments on
Environmental Issues
April 25, 2007.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Kirk Compressor Station Project
(Project), involving construction and
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
operation of a compressor station and
appurtenances by Cheyenne Plains Gas
Pipeline Company (CPG).
This notice announces the opening of
the scoping process we will use to
gather input from the public and
interested agencies on the project. Your
input will help the Commission staff
determine which issues need to be
evaluated in the EA. Please note that the
scoping period will close on May 25,
2007.
This notice is being sent to affected
landowners within half mile of the
proposed compressor station; Federal,
State, and local government
representatives and agencies;
environmental and public interest
groups; Native American tribes; other
interested parties in this proceeding;
and local libraries and newspapers. We
encourage government representatives
to notify their constituents of this
planned project and encourage them to
comment on their areas of concern.
Project Description
CPG proposes to construct a new
natural gas-fired compressor station
referred to as the Kirk Compressor
Station which would consist of a single
10,310 horsepower gas fired compressor
unit and appurtenances near Kirk in
Yuma County, Colorado. The proposed
Project would permit the firm
transportation of an additional 70,000
dekatherms per day of natural gas to a
delivery point near Greensburg, Kansas.
The general location of the project is
shown on the map attached as
Appendix 1.1
The Kirk Compressor Station would
be constructed on a 40 acre tract of land
which is owned by CPG. Approximately
3.69 acres would be permanently
disturbed for placement of the
compressor station and access road. The
current land use is fallow agricultural
land. The closest residence is located
more than one mile away from the
proposed compressor station site
(approximately 5,500 feet north
northwest of the site).
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us to
1 The appendix referenced in this notice is not
being printed in the Federal Register. Copies of the
appendix (map) are available from the
Commission’s Public Reference Room, 888 First
Street, NE., Washington, DC 20426, call (202) 502–
8371. Copies of the appendix will be sent to all
those receiving this notice in the mail.
E:\FR\FM\02MYN1.SGM
02MYN1
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.