Federal Register / Vol. 72, No. 234 / Thursday, December 6, 2007 / Notices

Agency decision

Ask Donna

What actually matters in this document.

Text

68872

Federal Register / Vol. 72, No. 234 / Thursday, December 6, 2007 / Notices

on or before the intervention or protest

date need not serve motions to intervene

or protests on persons other than the

Applicant.

The Commission encourages

electronic submission of protests and

interventions in lieu of paper using the

‘‘eFiling’’ link at http://www.ferc.gov.

Persons unable to file electronically

should submit an original and 14 copies

of the protest or intervention to the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Comment Date: 5 p.m. Eastern Time

December 10, 2007.

Kimberly D. Bose,

Secretary.

[FR Doc. E7–23624 Filed 12–5–07; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. CP08–22–000]

DCP Midstream, LP; Notice of Petition

for Declaratory Order

mstockstill on PROD1PC66 with NOTICES

November 28, 2007.

Take notice that on November 13,

2007, DCP Midstream, LP (DCP

Midstream) 370 17th Street, Suite 2500,

Denver, Colorado 80202 filed in Docket

No. CP08–22–000, under Rule 207(a)(2)

of the Commission’s Rules of Practice

and Procedure, 18 CFR

385.207(a)(2)(2007), a petition for a

declaratory order requesting that the

Commission disclaim jurisdiction over

certain natural gas facilities DCP

Midstream would purchase from

Transcontinental Gas Pipe Line

Corporation (Transco),1 because such

facilities perform a gathering function

and would be exempt from the

1 Transco filed an application with the

Commission in Docket No. CP08–25–000 on

November 13, 2007, requesting permission and

approval to abandon the subject facilities by sale to

DCP Midstream.

VerDate Aug<31>2005

18:57 Dec 05, 2007

Jkt 214001

Commission’s jurisdiction under section

1(b) of the Natural Gas Act.

DCP Midstream states that it would

purchase Transco’s South Texas

facilities, consisting of approximately

135.6 miles of natural gas pipelines and

related meter stations, valves,

miscellaneous field and tie-in piping,

other appurtenances along the pipeline

segments, and related realty and

easement rights. These facilities would

handle unprocessed natural gas in

Hidalgo, Willacy, Starr, Brooks, and Jim

Wells Counties, Texas, and would be

incorporated into DCP Midstream’s

existing south Texas gathering facilities

for processing at DCP Midstream’s

LaGloria Processing Plant.

Any person desiring to intervene or to

protest this filing must file in

accordance with Rules 211 and 214 of

the Commission’s Rules of Practice and

Procedure (18 CFR 385.211 and

385.214). Protests will be considered by

the Commission in determining the

appropriate action to be taken, but will

not serve to make protestants parties to

the proceeding. Any person wishing to

become a party must file a notice of

intervention or motion to intervene, as

appropriate. Such notices, motions, or

protests must be filed on or before the

date as indicated below. Anyone filing

an intervention or protest must serve a

copy of that document on the Applicant.

Anyone filing an intervention or protest

on or before the intervention or protest

date need not serve motions to intervene

or protests on persons other than the

Applicant.

The Commission encourages

electronic submission of protests and

interventions in lieu of paper using the

‘‘eFiling’’ link at http://www.ferc.gov.

Persons unable to file electronically

should submit an original and 14 copies

of the protest or intervention to the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

PO 00000

Frm 00016

Fmt 4703

Sfmt 4703

Comment Date: December 19, 2007.

Kimberly D. Bose,

Secretary.

[FR Doc. E7–23618 Filed 12–5–07; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket Nos. ER07–1247–000; ER07–1247–

001; ER07–1247–002]

FC Energy Services Company, LLC;

Notice of Issuance of Order

November 28, 2007.

FC Energy Services Company, LLC

(FC Energy) filed an application for

market-based rate authority, with an

accompanying rate schedule. The

proposed market-based rate schedule

provides for the sale of energy, capacity

and ancillary services at market-based

rates. FC Energy also requested waivers

of various Commission regulations. In

particular, FC Energy requested that the

Commission grant blanket approval

under 18 CFR part 34 of all future

issuances of securities and assumptions

of liability by FC Energy.

On November 28, 2007, pursuant to

delegated authority, the Director,

Division of Tariffs and Market

Development-West, granted the requests

for blanket approval under part 34

(Director’s Order). The Director’s Order

also stated that the Commission would

publish a separate notice in the Federal

Register establishing a period of time for

the filing of protests. Accordingly, any

person desiring to be heard concerning

the blanket approvals of issuances of

securities or assumptions of liability by

FC Energy, should file a protest with the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426, in accordance with Rules 211

and 214 of the Commission’s Rules of

Practice and Procedure. 18 CFR 385.211,

385.214 (2004).

Notice is hereby given that the

deadline for filing protests is December

28, 2007.

Absent a request to be heard in

opposition to such blanket approvals by

the deadline above, FC Energy is

authorized to issue securities and

assume obligations or liabilities as a

guarantor, indorser, surety, or otherwise

in respect of any security of another

person; provided that such issuance or

assumption is for some lawful object

within the corporate purposes of FC

Energy, compatible with the public

interest, and is reasonably necessary or

appropriate for such purposes.

E:\FR\FM\06DEN1.SGM

06DEN1