Federal Register / Vol. 72, No. 8 / Friday, January 12, 2007 / Notices

888 First Street, NE., Washington, DC

20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Comment Date: 5 p.m. Eastern Time

on January 11, 2007.

Magalie R. Salas,

Secretary.

[FR Doc. E7–271 Filed 1–11–07; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

Magalie R. Salas,

Secretary.

[FR Doc. E7–273 Filed 1–11–07; 8:45 am]

[Docket No. RP07–122–000]

Florida Gas Transmission Company,

LLC; Notice of Proposed Changes in

FERC Gas Tariff

BILLING CODE 6717–01–P

rmajette on PROD1PC67 with NOTICES

January 4, 2007.

Take notice that on December 29,

2006, Florida Gas Transmission

Company, LLC (FGT) submitted for

filing pursuant to section 19.1 of the

General Terms and Conditions of its

FERC Gas Tariff, Fourth Revised

Volume No. 1, schedules detailing

certain information related to its CashOut Mechanism, Fuel Resolution

Mechanism and Balancing Tools

charges for the accounting months

October 2005 through September 2006.

No tariff changes are proposed.

Any person desiring to intervene or to

protest this filing must file in

accordance with Rules 211 and 214 of

the Commission’s Rules of Practice and

Procedure (18 CFR 385.211 and

385.214). Protests will be considered by

the Commission in determining the

appropriate action to be taken, but will

not serve to make protestants parties to

the proceeding. Any person wishing to

become a party must file a notice of

intervention or motion to intervene, as

appropriate. Such notices, motions, or

protests must be filed in accordance

with the provisions of Section 154.210

of the Commission’s regulations (18 CFR

154.210). Anyone filing an intervention

or protest must serve a copy of that

document on the Applicant. Anyone

filing an intervention or protest on or

VerDate Aug<31>2005

15:41 Jan 11, 2007

Jkt 211001

before the intervention or protest date

need not serve motions to intervene or

protests on persons other than the

Applicant.

The Commission encourages

electronic submission of protests and

interventions in lieu of paper using the

‘‘eFiling’’ link at http://www.ferc.gov.

Persons unable to file electronically

should submit an original and 14 copies

of the protest or intervention to the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

DEPARTMENT OF ENERGY

1499

protests must be filed in accordance

with the provisions of Section 154.210

of the Commission’s regulations (18 CFR

154.210). Anyone filing an intervention

or protest must serve a copy of that

document on the Applicant. Anyone

filing an intervention or protest on or

before the intervention or protest date

need not serve motions to intervene or

protests on persons other than the

Applicant.

The Commission encourages

electronic submission of protests and

interventions in lieu of paper using the

‘‘eFiling’’ link at http://www.ferc.gov.

Persons unable to file electronically

should submit an original and 14 copies

of the protest or intervention to the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

This filing is accessible online at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Federal Energy Regulatory

Commission

Magalie R. Salas,

Secretary.

[FR Doc. E7–280 Filed 1–11–07; 8:45 am]

[Docket No. RP99–518–098]

BILLING CODE 6717–01–P

Gas Transmission Northwest

Corporation; Notice of Negotiated Rate

DEPARTMENT OF ENERGY

January 5, 2007.

Take notice that on December 29,

2006, Gas Transmission Northwest

Corporation (GTN) tendered for filing as

part of its FERC Gas Tariff, Third

Revised Volume No. 1–A, Forty-First

Revised Sheet No. 15, to become

effective January 1, 2007.

GTN states that this sheet is being

filed to update GTN’s reporting of

negotiated rate transactions that it has

entered into.

Any person desiring to intervene or to

protest this filing must file in

accordance with Rules 211 and 214 of

the Commission’s Rules of Practice and

Procedure (18 CFR 385.211 and

385.214). Protests will be considered by

the Commission in determining the

appropriate action to be taken, but will

not serve to make protestants parties to

the proceeding. Any person wishing to

become a party must file a notice of

intervention or motion to intervene, as

appropriate. Such notices, motions, or

PO 00000

Frm 00014

Fmt 4703

Sfmt 4703

Federal Energy Regulatory

Commission

[Docket No. RP06–407–003]

Gas Transmission Northwest

Corporation; Notice of Motion to Place

Suspended Rates and Tariff Sheets

into Effect

January 5, 2007.

Take notice that on December 29,

2006, Gas Transmission Northwest

Corporation (GTN) moved to place the

rates and tariff sheets suspended in the

Commission’s July 31, 2006 ‘‘Order

Accepting and Suspending Tariff Sheets

Subject to Refund and Conditions,

Establishing Hearing Procedures, and

Establishing a Technical Conference’’

into effect on January 1, 2007. In

addition, GTN submitted for filing as

part of its FERC Gas Tariff, Third

Revised Volume No. 1–A, the following

tariff sheets to become effective January

1, 2007:

E:\FR\FM\12JAN1.SGM

12JAN1

1500

Federal Register / Vol. 72, No. 8 / Friday, January 12, 2007 / Notices

rmajette on PROD1PC67 with NOTICES

Third Substitute Ninth Revised Sheet No. 4

Substitute Fourth Revised Sheet No. 5

Substitute Fourth Revised Sheet No. 12

GTN states that these substitute tariff

sheets reflect (1) Tariff modifications

which were made subsequent to GTN’s

original filing and (2) the removal of the

costs of facilities that will not be in

service by the end of the test period, as

required by the July 31, 2006 Order.

Suspended sheets that were modified

subsequent to GTN’s original filing are

referenced in Appendix A of GTN’s

motion filing. Sheets that will become

effective without change are referenced

in Appendix C of GTN’s motion filing.

GTN moved to place the sheets in both

Appendix A and C into effect on

January 1, 2007.

GTN further states that a copy of this

filing has been served on GTN’s

jurisdictional customers and interested

state regulatory agencies.

Any person desiring to protest this

filing must file in accordance with Rule

211 of the Commission’s Rules of

Practice and Procedure (18 CFR

385.211). Protests to this filing will be

considered by the Commission in

determining the appropriate action to be

taken, but will not serve to make

protestants parties to the proceeding.

Such protests must be filed in

accordance with the provisions of

Section 154.210 of the Commission’s

regulations (18 CFR 154.210). Anyone

filing a protest must serve a copy of that

document on all the parties to the

proceeding.

The Commission encourages

electronic submission of protests in lieu

of paper using the ‘‘eFiling’’ link at

http://www.ferc.gov. Persons unable to

file electronically should submit an

original and 14 copies of the protest to

the Federal Energy Regulatory

Commission, 888 First Street, NE.,

Washington, DC 20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Magalie R. Salas,

Secretary.

[FR Doc. E7–287 Filed 1–11–07; 8:45 am]

15:41 Jan 11, 2007

Federal Energy Regulatory

Commission

[Project No. 2306–098]

Great Bay Hydro Corporation; Notice

Dismissing Rehearing Requests as

Moot

January 5, 2007.

On August 29, 2006, the license for

the Great Bay Hydro Corporation’s

(Great Bay) 4.80-megawatt Clyde River

Hydroelectric Project No. 2306 was

amended to authorize the licensee to

remove from the project boundary

certain impoundments, structures, and

lands and to convey in fee a portion of

the lands to the Vermont Agency of

Natural Resources (ANR), as well as to

convey to the Vermont ANR a

conservation easement on certain lands

remaining within the project boundary.1

On September 28, 2006, Great Bay

and Vermont ANR filed timely requests

for rehearing and or clarification of the

August 29 order. However, upon

consideration of the record in the

proceeding, the August 29 order was

rescinded and the proceeding was

remanded to Commission staff for

further action.2 Accordingly, the

requests for rehearing filed on

September 28, 2006, by Great Bay Hydro

Corporation and by Vermont Agency of

Natural Resources are dismissed as

moot.

Magalie R. Salas,

Secretary.

[FR Doc. E7–286 Filed 1–11–07; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. CP07–51–000]

Gulfstream Natural Gas System, L.L.C.;

Notice of Application

January 5, 2007.

On December 22, 2006, in Docket No.

CP07–51–000, Gulfstream Natural Gas

System, L.L.C. (Gulfstream), pursuant to

section 7(c) of the Natural Gas Act, as

amended, and section 157 Subpart A of

the Federal Energy Regulatory

Commission’s (Commission)

regulations, filed for authorization to

install, construct, own, operate and

maintain certain pipeline facilities,

consisting primarily of the installation

1 See 116 FERC ¶ 62,169 (2006).

2 See 117 FERC ¶ 61,329 (2006).

BILLING CODE 6717–01–P

VerDate Aug<31>2005

DEPARTMENT OF ENERGY

Jkt 211001

PO 00000

Frm 00015

Fmt 4703

Sfmt 4703

of approximately 17.74 miles of 20-inch

diameter pipeline and additional

compression totaling 45,000 horsepower

to be installed at Stations 410 and 420,

as more fully described in the

application ( Phase IV Project).

Gulfstream further requests that the

Commission grant a preliminary

determination on the nonenvironmental aspects of this

Application by May 31, 2007, with a

final order granting the requested

authorizations and related approvals by

September 1, 2007. Gulfstream states

that issuing orders by these dates will

help to ensure that the Phase IV

facilities are available to meet the timing

needs of the Phase IV shipper and to

give the Phase IV shipper and

Gulfstream the economic assurance

needed to go forward with their

respective projects.

Questions concerning the application

should be directed to: P. Martin Teague,

Associate General Counsel at Gulfstream

Natural Gas System, L.L.C., 5400

Westheimer Court, P.O. Box 1642,

Houston, Texas 77251–1642, or by

calling (713) 627–5242.

On November 21, 2006, the

Commission staff granted Gulfstreams’

request to utilize the Pre-Filing process

and assigned Docket No. PF06–29–000

to staff activities involving the Phase IV

Project. As of the filing of this

application on December 29, 2006, the

Pre-Filing Process for this project has

ended. From this time forward,

Gulfstreams’ proceedings will be

conducted in Docket No. CP07–51–000.

Pursuant to Section 157.9 of the

Commission rules, 18 CFR 157.9 and to

ensure compliance with the Energy

Policy Act of 2005, upon completion of

the Commission staff’s environmental

review for Gulfstreams’ proposal, the

environmental document will be placed

into the record on the Commission’s

eLibrary system. The action of the

document’s placement in the record

alerts the other agencies of the

requirement to complete necessary

reviews and authorizations within 90

days of the date of the Commission

staff’s environmental document.

There are two ways to become

involved in the Commission’s review of

this project. First, any person wishing to

obtain legal status by becoming a party

to the proceedings for this project

should, on or before the comment date,

file with the Federal Energy Regulatory

Commission, 888 First Street, NE.,

Washington, DC 20426, a motion to

intervene in accordance with the

requirements of the Commission’s Rules

of Practice and Procedure (18 CFR

385.214 or 385.211) and the Regulations

under the NGA (18 CFR 157.10). A

E:\FR\FM\12JAN1.SGM

12JAN1