Federal Register / Vol. 72, No. 86 / Friday, May 4, 2007 / Notices

Commission, 888 First St., NE., Room

1A, Washington, DC 20426.

• Label one copy of your comments to

the attention of Gas Branch 2, DG2E;

and Reference Docket No. CP07–44–000

on the original and both copies.

• Mail your comments so that they

will be received in Washington, DC on

or before June 18, 2007.

Please note that the Commission

strongly encourages the electronic filing

(‘‘eFiling’’) of comments. Instructions on

how to ‘‘eFile’’ comments can be found

on the Commission’s Web site at

www.ferc.gov under the ‘‘Documents

and Filings’’ link. In lieu of or in

addition to sending written comments,

we invite you to attend the public

comment meetings the FERC will

conduct in the project area to receive

comments on the Draft EIS. All meetings

will begin at 6 p.m. (CDT), and are

scheduled as follows:

Date and time

Location

Monday, May 21, 6:00 p.m ......................................................................

Lucedale Rocky Creek Inn, 120 Woods Ridge Road, Lucedale, MS

39452, (601) 947–6900.

La Quinta Inn—Mississippi Ballroom, 6563 U.S. Highway 49 North,

Hattiesburg, MS 39401, (601) 268–2850.

Multipurpose Building, West Gallman Road, Gallman, MS 39077, (601)

953–9907.

Tuesday, May 22, 6:00 p.m .....................................................................

Thursday, May 24, 6:00 p.m ....................................................................

pwalker on PROD1PC71 with NOTICES

25287

The public comment meetings will be

posted on the FERC’s calendar located

at www.ferc.gov/EventCalendar/

EventsList.aspx. Interested groups and

individuals are encouraged to attend

and present oral comments on the Draft

EIS. Transcripts of the meetings will be

prepared.

After the comments received are

reviewed, any significant new issues are

investigated, and modifications are

made to the Draft EIS, a Final EIS will

be published and distributed by the

FERC staff. The Final EIS will contain

the staff’s responses to timely comments

received on the Draft EIS.

Comments will be considered by the

Commission but will not serve to make

the commentor a party to the

proceeding. Any person seeking to

become a party to the proceeding must

file a motion to intervene pursuant to

Rule 214 of the Commission’s Rules of

Practice and Procedures (18 CFR

385.214). Anyone may intervene in this

proceeding based on this Draft EIS. You

must file your request to intervene as

specified above.1 You do not need

intervenor status to have your

comments considered.

The Draft EIS has been placed in the

public files of the FERC and is available

for public inspection at: Federal Energy

Regulatory Commission, Public

Reference Room, 888 First Street, NE.,

Room 2A, Washington, DC 20426, (202)

502–8371.

A limited number of copies of the

Draft EIS are available from the Public

Reference Room identified above. In

addition, CD copies of the Draft EIS

have been mailed to affected

landowners; various federal, state, and

local government agencies; elected

officials; environmental and public

interest groups; Native American tribes;

1 Interventions may also be filed electronically via

the Internet in lieu of paper. See the previous

discussion on filing comments electronically.

VerDate Aug<31>2005

20:12 May 03, 2007

Jkt 211002

local libraries and newspapers;

intervenors; and other individuals that

expressed an interest in the proposed

Project. Hard-copies of the Draft EIS

have also been mailed to those who

requested that format during the scoping

and comment periods for the proposed

Project.

Additional information about the

proposed Project is available from the

Commission’s Office of External Affairs,

at 1–866–208–FERC or on the FERC

Internet Web site (www.ferc.gov).

To access information via the FERC

website click on the ‘‘eLibrary’’ link

then click on ‘‘General Search’’ and

enter the docket number excluding the

last three digits in the Docket Number

field. Be sure you have selected an

appropriate date range. The ‘‘eLibrary’’

link provides access to the texts of

formal documents issued by the

Commission, such as orders, notices,

and rulemakings. For assistance with

‘‘eLibrary’’, please contact FERC Online

Support at FercOnlineSupport@ferc.gov

or toll free at 1–866–208–3676, or for

TTY, contact (202) 502–8659.

In addition, the Commission now

offers a free service called eSubscription

which allows you to keep track of all

formal issuances and submittals in

specific dockets. This can reduce the

amount of time you spend researching

proceedings by automatically providing

you with notification of these filings,

document summaries and direct links to

these documents. To learn more about

eSubscription and to sign up for this

service please go to www.ferc.gov/

esubscribenow.htm.

Kimberly D. Bose,

Secretary.

[FR Doc. E7–8519 Filed 5–3–07; 8:45 am]

BILLING CODE 6717–01–P

PO 00000

Frm 00046

Fmt 4703

Sfmt 4703

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[ FERC Docket No. CP06–459–000]

Transwestern Pipeline Company, LLC;

Notice of Availability of the Draft

Environmental Impact Statement and

Draft General Conformity

Determination for the Proposed

Phoenix Expansion Project

April 27, 2007.

The environmental staffs of the

Federal Energy Regulatory Commission

(Commission or FERC); the U.S.

Department of the Interior, Bureau of

Land Management (BLM); the U.S.

Department of Agriculture, Forest

Service (FS); the U.S. Department of

Transportation, Office of Pipeline Safety

(OPS); the U.S. Department of the

Interior, Bureau of Indian Affairs (BIA);

and the Navajo Nation, collectively

referred to as the Agency Staffs, have

prepared the draft environmental

impact statement (draft EIS) to address

Transwestern Pipeline Company, LLC’s

(Transwestern) proposed expansion of

its natural gas pipeline system. A draft

General Conformity Determination was

also prepared by the FERC to assess the

potential air quality impacts associated

with construction and operation of the

proposed project and is included as

Appendix Q of the draft EIS.

The draft EIS was prepared to satisfy

the requirements of the National

Environmental Policy Act (NEPA). The

Agency Staffs have concluded that if the

project is constructed and operated in

accordance with applicable laws and

regulations, Transwestern’s proposed

mitigation, and the Agency Staffs’

additional mitigation measures, it

would have limited adverse

environmental impact.

E:\FR\FM\04MYN1.SGM

04MYN1

25288

Federal Register / Vol. 72, No. 86 / Friday, May 4, 2007 / Notices

pwalker on PROD1PC71 with NOTICES

The FERC is the lead federal agency

and will use the EIS to consider the

environmental impacts that could result

if it issues Transwestern a Certificate of

Public Convenience and Necessity

under section 7 of the Natural Gas Act.

The BLM and the FS are federal land

management agencies affected by

Transwestern’s proposal and have

elected to act as cooperating agencies in

preparing the draft EIS. The BLM will

use the document to meet its NEPA

responsibilities in considering

Transwestern’s application for a Rightof-Way Grant and obtain Temporary Use

Permits for the portion of the project on

federal lands under section 185(f) of the

Mineral Leasing Act of 1920. The BLM

would issue the Right-of-Way Grant and

Temporary Use Permits for the crossing

of BLM-managed lands and the Kaibab

and Prescott National Forests, which are

managed by the FS, and for crossing

lands managed by the U.S. Department

of the Interior, Bureau of Reclamation

(BOR). The BLM would consider the

concurrence or non-concurrence of the

FS and BOR, as well as FERC approval

or denial, in making its decision

whether to issue the Right-of-Way Grant

and Temporary Use Permits. The BLM’s

decision would be documented in a

Record of Decision.

The OPS is participating as a

cooperating agency in preparing the

draft EIS because it is responsible for

ensuring the safe, reliable, and

environmentally sound operation of the

nation’s transportation system and for

providing oversight for oil and natural

gas pipelines. The OPS’ authority is

found under the Natural Gas Pipeline

Safety Act of 1968 (49 U.S.C. 1671 et

seq.) and the Hazardous Liquids

Pipeline Safety Act of 1979 (49 U.S.C.

2001 et seq.).

The BIA and the Navajo Nation have

also elected to act as cooperating

agencies in preparing the draft EIS

because the proposed project would be

near tribal lands in Arizona and would

cross two classes of Navajo Nation lands

in New Mexico: Tribal lands and

allotted lands. Tribal lands are owned in

fee by the Navajo Nation, and access to

these lands would be acquired through

direct negotiation between

Transwestern and officials of the Navajo

Nation Tribal Headquarters in Window

Rock, Arizona. Allotted lands are held

in trust by the United States government

VerDate Aug<31>2005

20:12 May 03, 2007

Jkt 211002

and managed by the BIA for the benefit

of individual allottees.

The Phoenix Expansion Project is

designed to transport up to 500 million

cubic feet per day of natural gas to the

Phoenix area, which is one of the

fastest-growing regions in the United

States. The project would not only help

to satisfy the increasing demand for

electricity and natural gas, but would

also increase competition in the regional

energy market, thereby working to

stabilize costs to the consumer.

The draft EIS addresses the potential

environmental effects of the

construction and operation of the

following facilities proposed by

Transwestern:

• 24.6 miles of new 36-inch-diameter

pipeline loop 1 (the San Juan Lateral

Loops A and B) extending along the

existing San Juan Lateral in San Juan

and McKinley Counties, New Mexico;

• 259.3 miles of new 42- and 36-inchdiameter lateral 2 pipeline (the Phoenix

Lateral), consisting of 95.7 miles of 42inch-diameter pipeline extending from

milepost (MP) 0.0 in Yavapai County,

Arizona to MP 95.2 in Maricopa County,

Arizona, and 163.6 miles of 36-inchdiameter pipeline extending from MP

95.2 in Maricopa County, Arizona to MP

255.1 in Pinal County, Arizona;

• 1.4 miles of new 24-, 20-, 16-, and

6-inch-diameter lateral pipeline (the

customer laterals) connecting the

Phoenix Lateral to meter stations that

are not located immediately adjacent to

the Phoenix Lateral right-of-way;

• Minor piping and pressure control

modifications at the existing Bloomfield

Compressor Station in San Juan County,

New Mexico and at the existing

Seligman Compressor Station No. 1 in

Mohave County, Arizona;

• Installation of the Ash Fork Facility

at MP 0.0 of the Phoenix Lateral in

Yavapai County, Arizona including 2

filter separators, odorant injection

facilities, and telecommunications

equipment; and

• Installation of 4 taps, 31 valves, 11

meter stations, 6 pig launchers, and 3

pig receivers.

1 A loop is a segment of pipeline that is usually

installed adjacent to an existing pipeline and

connected to it at both ends. The loop allows more

gas to be moved through the system.

2 A lateral pipeline typically takes gas from the

main system to deliver it to a customer, local

distribution system, or another interstate

transmission system.

PO 00000

Frm 00047

Fmt 4703

Sfmt 4703

Transwestern would also acquire an

undivided interest in the existing East

Valley Lateral consisting of 36.7 miles of

24-inch-diameter lateral pipeline in

Pinal and Maricopa Counties, Arizona.

Comment Procedures and Public

Meetings

Any person wishing to comment on

the draft EIS and/or draft General

Conformity Determination is

encouraged to do so. To ensure

consideration prior to a Commission

decision on the proposal, it is important

that your comments be received before

the date specified below.

Please note that the Commission

strongly encourages electronic filing of

any comments, interventions, or

protests to this proceeding. See Title 18

CFR 385.2001(a)(1)(iii) and the

instructions on the FERC Internet Web

site (www.ferc.gov) under the eFiling

link and the link to the User’s Guide.

Before you can submit comments, you

will need to create a free account by

clicking on ‘‘Sign-up’’ under ‘‘New

User.’’ You will be asked to select the

type of submission you are making. This

type of submission is considered a

‘‘Comment on Filing.’’ Comments

submitted electronically must be

submitted by June 18, 2007.

If you wish to mail comments, please

mail your comments so that they will be

received in Washington, DC on or before

June 18, 2007. Please carefully follow

these instructions to ensure that your

comments are received in time and

properly recorded:

• Send an original and two copies of

your comments to: Kimberly D. Bose,

Secretary, Federal Energy Regulatory

Commission, 888 First St. NE; Room 1A,

Washington, DC 20426;

• Reference Docket No. CP06–459–

000; and

• Label one copy of your comments

for the attention of Gas 2, DG2E.

In addition to or in lieu of sending

written comments, the FERC and the

cooperating agencies invite you to

attend public meetings the Agency

Staffs will conduct in the project area to

receive comments on the draft EIS and

draft General Conformity Determination.

The dates, times, and locations of these

meetings are as follows:

E:\FR\FM\04MYN1.SGM

04MYN1

Federal Register / Vol. 72, No. 86 / Friday, May 4, 2007 / Notices

Date

Location

Monday, June 4, 2007; 7 p.m. (MST) ......................................................

Central Arizona Seniors Association, 9360 East Manzanita Circle,

Prescott Valley, AZ 86314, (928) 772–3337.

Albins Civic Center, Black Canyon Community Association,19055 East

K-Mine Road, Black Canyon City, AZ 85375, (623) 374–5553.

Buckeye Community Center, 201 East Centre Avenue, Buckeye, AZ

85326, (623) 349–6600.

Hotel Casa Grande, Cotton/Copper Room, 777 North Pinal Avenue,

Casa Grande, AZ 85222, (520) 426–3500.

Navajo Technical College, (former Crownpoint Institute of Technology),

Lower Point Road and State Highway 371, Crownpoint, NM 87313,

(505) 786–4100.

Tuesday, June 5, 2007; 7 p.m. (MST) .....................................................

Wednesday, June 6, 2007; 7 p.m. (MST) ................................................

Thursday, June 7, 2007; 7 p.m. (MST) ....................................................

Tuesday, June 12, 2007; 1 p.m. (MST) ...................................................

pwalker on PROD1PC71 with NOTICES

25289

These public meetings will be posted

on the FERC’s calendar located at

http://www.ferc.gov/EventCalendar/

EventsList.aspx. Interested groups and

individuals are encouraged to attend

and present written or oral comments

on the draft EIS and/or draft General

Conformity Determination. Transcripts

of the meetings will be prepared.

After the comments are reviewed, any

significant new issues are investigated,

and necessary modifications are made to

the draft EIS and draft General

Conformity Determination, a final EIS,

including a final General Conformity

Determination, will be published and

distributed. The final EIS will contain

the Agency Staffs’ responses to timely

comments filed on the draft EIS and

draft General Conformity Determination

that are related to environmental issues.

Comments will be considered by the

Commission and the cooperating

agencies but will not serve to make the

commentor a party to the proceeding.

Any person seeking to become a party

to the proceeding must file a motion to

intervene pursuant to Rule 214 of the

Commission’s Rules of Practice and

Procedure (Title 18 CFR Part 385.214).

Anyone may intervene in this

proceeding based on the draft EIS and

draft General Conformity Determination.

You must file your request to intervene

as specified above.3 You do not need

intervenor status to have your

comments considered.

The draft EIS, including the draft

General Conformity Determination, has

been placed in the public files of the

FERC and is available for distribution

and public inspection at:

Federal Regulatory Energy Commission,

Public Reference Room, 888 First St.

NE; Room 2A, Washington, DC 20426,

(202) 208–1371.

A limited number of copies are

available from the FERC’s Public

Reference Room identified above. These

copies may be requested in hard copy or

as .pdf files on a CD that can be read by

3 Interventions may also be filed electronically via

the Internet in lieu of paper. See the previous

discussion on filing comments electronically.

VerDate Aug<31>2005

20:12 May 03, 2007

Jkt 211002

a computer with a CD–ROM drive. The

draft EIS, including the draft General

Conformity Determination, is also

available for viewing on the FERC

Internet Web site at www.ferc.gov. In

addition, copies of the document have

been mailed to federal, state, and local

government agencies; elected officials;

Native American tribes; affected

landowners; local libraries and

newspapers; intervenors to the FERC’s

proceeding; and other interested parties.

Hard copies of the draft EIS, including

the draft General Conformity

Determination, can be viewed at the

following libraries in the project area:

Ash Fork Public Library, 518 Lewis

Avenue, Ash Fork, AZ 86320.

Avondale-Goodyear Public Library, 328

West Western Avenue, Avondale, AZ

85323.

Black Canyon City Community Library,

34701 South Old Black Canyon Hwy,

Black Canyon, AZ 85324.

Buckeye Public Library, 310 North 6th

Street, Buckeye, AZ 85032.

Casa Grande Public Library, 449 North

Dry Lake, Casa Grande, AZ 85222.

Chino Valley Public Library, 1020 West

Palomino Road, Chino Valley, AZ

86323.

Coolidge Public Library, 160 West

Central Avenue, Coolidge, AZ 85228.

Flagstaff Public Library, 300 West

Aspen, Flagstaff, AZ 86001.

Fredonia Public Library, 118 North

Main Street, Fredonia, AZ 86022.

Mayer Public Library, 10004 Wicks

Street, Mayer, AZ 86333.

Arizona State Library, 1700 West

Washington Street, Phoenix, AZ

85007.

North Central Regional Library, 17811

North 32nd Street, Phoenix, AZ

85032.

Yavapai County Library District, 172

East Merritt Street, Suite E, Prescott,

AZ 86301.

Prescott Public Library, 215 East

Goodwin, Prescott, AZ 86303.

Prescott Valley Public Library, 7501 East

Civic Circle, Prescott Valley, AZ

86314.

Williams Public Library, 113 South First

Street, Williams, AZ 86046.

PO 00000

Frm 00048

Fmt 4703

Sfmt 4703

Bloomfield Public Library, 333 South

First Street, Bloomfield, NM 87413.

Farmington Public Library, 100 West

Broadway, Farmington, NM 87401–

6420.

Octavia Fellin Public Library, 115 West

Hill, Gallup, NM 87301.

Additional information about the

project is available from the

Commission’s Office of External Affairs

at 1–866–208–FERC or on the FERC

Internet Web site (www.ferc.gov) using

the eLibrary link. Click on the eLibrary

link, click on ‘‘General Search,’’ and

enter the docket number excluding the

last three digits in the Docket Number

field. Be sure you have selected an

appropriate date range. For assistance,

please contact FERC Online Support at

FERCOnlineSupport@ferc.gov or toll

free at 1–866–208–3676, or for TTY,

contact (202) 502–8659. The eLibrary

link on the FERC Internet website also

provides access to the texts of formal

documents issued by the Commission,

such as orders, notices, and

rulemakings.

In addition, the Commission now

offers a free service called eSubscription

that allows you to keep track of all

formal issuances and submittals in

specific dockets. This can reduce the

amount of time you spend researching

proceedings by automatically providing

you with notification of these filings,

document summaries, and direct links

to the documents. To register for this

service, go to the eSubscription link on

the FERC Internet Web site.

Information concerning the

involvement of the cooperating agencies

in the EIS process may be obtained

from:

U.S. Department of the Interior, Bureau

of Land Management, Mark

Mackiewicz, (435) 636–3616.

U.S. Department of Agriculture, Forest

Service, Prescott National Forest, Ken

Simeral, (928) 443–8010.

Kaibab National Forest, Tom Mutz,

(928) 635–5661.

U.S. Department of Transportation,

Office of Pipeline Safety, John Pepper,

(713) 272–2849.

E:\FR\FM\04MYN1.SGM

04MYN1

25290

Federal Register / Vol. 72, No. 86 / Friday, May 4, 2007 / Notices

U.S. Department of the Interior, Bureau

of Indian Affairs, Navajo Area Office,

Harrilene Yazzi, (505) 863–8286.

Phoenix Area Office, Amy Heuslein,

(602) 379–6750.

Navajo Nation, Ron Maldonado, (928)

871–7139.

Kimberly D. Bose,

Secretary.

[FR Doc. E7–8524 Filed 5–3–07; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. PF07–6–000]

Colorado Interstate Gas Company;

Notice of Intent To Prepare an

Environmental Assessment for the

Proposed Totem Storage Field Project

and Request for Comments on

Environmental Issues

pwalker on PROD1PC71 with NOTICES

April 30, 2007.

The staff of the Federal Energy

Regulatory Commission (FERC or

Commission) will prepare an

environmental assessment (EA) that will

discuss the environmental impacts of

the Totem Storage Field Project

involving construction and operation of

facilities by Colorado Interstate Gas

Company (CIG) in Adams County,

Colorado.

This notice announces the opening of

the scoping process we will use to

gather input from the public and

interested agencies on the project. Your

input will help the Commission staff

determine which issues need to be

evaluated in the EA. Please note that the

scoping period will close on May 30,

2007.

This notice is being sent to affected

landowners; Federal, State, and local

government representatives and

agencies; environmental and public

interest groups; Native American tribes;

other interested parties in this

proceeding; and local libraries and

newspapers. We encourage government

representatives to notify their

constituents of this planned project and

encourage them to comment on their

areas of concern.

If you are a landowner receiving this

notice, you may be contacted by a

pipeline company representative about

the acquisition of an easement to

construct, operate, and maintain the

proposed facilities. The pipeline

company would seek to negotiate a

mutually acceptable agreement.

However, if the project is approved by

the Commission, that approval conveys

VerDate Aug<31>2005

20:12 May 03, 2007

Jkt 211002

with it the right of eminent domain.

Therefore, if easement negotiations fail

to produce an agreement, the pipeline

company could initiate condemnation

proceedings in accordance with state

law.

A fact sheet prepared by the FERC

entitled ‘‘An Interstate Natural Gas

Facility On My Land? What Do I Need

To Know?’’ was attached to the project

notice CIG provided to landowners.

This fact sheet addresses a number of

typically asked questions, including the

use of eminent domain and how to

participate in the Commission’s

proceedings. It is available for viewing

on the FERC Internet Web site (http://

www.ferc.gov).

Summary of the Proposed Project

CIG proposes to convert a depleted

natural gas production field in eastern

Adams County, Colorado located 34

miles northeast of the City of Denver

into the proposed Totem Storage Field

Project. The storage field design would

have a total gas inventory of

approximately 10.7 Bcf, comprised of

7.0 Bcf of working gas and 3.7 Bcf of

base gas. CIG seeks authority to:

• Construct and operate a 9,400

horsepower compressor station in

Adams County, Colorado;

• Reenter 16 abandoned wells and

replug 10 of the 16 wells and convert

the remaining six wells to observation

wells;

• Plug and abandon three of seven

currently operational oil and gas wells

and convert the remaining four

operational oil and gas wells to

observation wells;

• Drill eight horizontal injection

withdrawal wells from three separate

well pad locations. Horizontal wells

(Nos. 1, 2. and 3) would be drilled at

Site Pad No. 1 near the north end of the

field in the vicinity of an existing well

pad (Well No. 8–10); horizontal well

(Nos. 4, 7, and 8) would be grouped at

Site Pad No. 2 located in the center of

the field; and horizontal wells (Nos. 5

and 6) would be drilled at Site Pad No.

3 in the south central portion of the

field in the vicinity of an existing well

pad location (Well No. 48–2);

• Drill one salt water disposal well;

and

• Construct about 3 miles of 6-inchdiameter gathering pipeline and 1.5

miles of 4-inch-diameter saltwater

pipeline.

The gathering lines would be highpressure, steel line. The brine disposal

line would be high-pressure, fiberglass

line. Fiberglass pipe will also be used to

collect brine and other fluids from the

individual well head separators and

dehydrators and will conduct these

PO 00000

Frm 00049

Fmt 4703

Sfmt 4703

fluids to the dew point control plant

located at the compressor station site.

These pipes will occupy the same

trench as the main gathering lines, fuel

gas lines, electrical and communication

lines.

The location of the project facilities is

shown in Appendix 1.1

Land Requirements for Construction

Construction of the proposed facilities

would require about 442.5 acres of land.

Following construction, about 29.9 acres

would be maintained as permanent

pipeline right-of-way, well sites, or new

aboveground facility sites. The

remaining 412.6 acres of land would be

restored and allowed to revert to its

former use.

The EA Process

The National Environmental Policy

Act (NEPA) requires the Commission to

take into account the environmental

impacts that could result from an action

whenever it considers the issuance of a

Certificate of Public Convenience and

Necessity. NEPA also requires us to

discover and address concerns the

public may have about proposals. This

process is referred to as ‘‘scoping.’’ The

main goal of the scoping process is to

focus the analysis in the EA on the

important environmental issues. By this

Notice of Intent, the Commission staff

requests public comments on the scope

of the issues to address in the EA. All

comments received are considered

during the preparation of the EA. State

and local government representatives

are encouraged to notify their

constituents of this proposed action and

encourage them to comment on their

areas of concern.

In the EA we 2 will discuss impacts

that could occur as a result of the

construction and operation of the

proposed project under these general

headings:

• Geology and soils.

• Land use.

• Water resources, fisheries, and

wetlands.

• Cultural resources.

• Vegetation and wildlife.

• Air quality and noise.

• Endangered and threatened species.

• Hazardous waste.

1 The appendices referenced in this notice are not

being printed in the Federal Register. Copies of all

appendices, other than Appendix 1 (maps), are

available on the Commission’s Web site at the

‘‘eLibrary’’ link or from the Commission’s Public

Reference Room, 888 First Street, NE., Washington,

DC 20426, or call (202) 502–8371. For instructions

on connecting to eLibrary refer to the last page of

this notice. Copies of the appendices were sent to

all those receiving this notice in the mail.

2 ‘‘We’’, ‘‘us’’ ‘‘our’’ refer to the environmental

staff of the Office of Energy Projects (OEP).

E:\FR\FM\04MYN1.SGM

04MYN1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.