Federal Register / Vol. 71, No. 196 / Wednesday, October 11, 2006 / Notices

FRQ Deferred Account at the end of the

previous accumulation period.

Maritimes states that for the period

August 1, 2005 through July 31, 2006,

the FRQ Deferred Account resulted in a

net credit balance of $1,641,748.73,

inclusive of carrying charges, that will

be refunded to Maritimes’ customers.

Maritimes states that copies of this

filing were mailed to all affected

customers of Maritimes and interested

state commissions.

Any person desiring to intervene or to

protest this filing must file in

accordance with Rules 211 and 214 of

the Commission’s Rules of Practice and

Procedure (18 CFR 385.211 and

385.214). Protests will be considered by

the Commission in determining the

appropriate action to be taken, but will

not serve to make protestants parties to

the proceeding. Any person wishing to

become a party must file a notice of

intervention or motion to intervene, as

appropriate. Such notices, motions, or

protests must be filed in accordance

with the provisions of Section 154.210

of the Commission’s regulations (18 CFR

154.210). Anyone filing an intervention

or protest must serve a copy of that

document on the Applicant. Anyone

filing an intervention or protest on or

before the intervention or protest date

need not serve motions to intervene or

protests on persons other than the

Applicant.

The Commission encourages

electronic submission of protests and

interventions in lieu of paper using the

‘‘eFiling’’ link at http://www.ferc.gov.

Persons unable to file electronically

should submit an original and 14 copies

of the protest or intervention to the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Magalie R. Salas,

Secretary.

[FR Doc. E6–16800 Filed 10–10–06; 8:45 am]

BILLING CODE 6717–01–P

VerDate Aug<31>2005

16:53 Oct 10, 2006

Jkt 211001

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. RP99–176–118]

Natural Gas Pipeline Company of

America; Notice of Negotiated Rates

Magalie R. Salas,

Secretary.

[FR Doc. E6–16784 Filed 10–10–06; 8:45 am]

October 3, 2006.

BILLING CODE 6717–01–P

Take notice that on September 29,

2006, Natural Gas Pipeline Company of

America (Natural) tendered for filing as

part of its FERC Gas Tariff, Sixth

Revised Volume No. 1, the following

tariff sheets, to become effective

November 1, 2006, and a Rate Schedule

FTS Service Agreement with a

Negotiated Rate Agreement.

Second Revised Sheet No. 26D.02

First Revised Sheet No. 26D.03

Second Revised Sheet No. 414A.01

Natural states that copies of the filing

are being mailed to all parties set out on

the Commission’s official service list.

Any person desiring to intervene or to

protest this filing must file in

accordance with Rules 211 and 214 of

the Commission’s Rules of Practice and

Procedure (18 CFR 385.211 and

385.214). Protests will be considered by

the Commission in determining the

appropriate action to be taken, but will

not serve to make protestants parties to

the proceeding. Any person wishing to

become a party must file a notice of

intervention or motion to intervene, as

appropriate. Such notices, motions, or

protests must be filed in accordance

with the provisions of section 154.210

of the Commission’s regulations (18 CFR

154.210). Anyone filing an intervention

or protest must serve a copy of that

document on the Applicant. Anyone

filing an intervention or protest on or

before the intervention or protest date

need not serve motions to intervene or

protests on persons other than the

Applicant.

The Commission encourages

electronic submission of protests and

interventions in lieu of paper using the

‘‘eFiling’’ link at http://www.ferc.gov.

Persons unable to file electronically

should submit an original and 14 copies

of the protest or intervention to the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

PO 00000

Frm 00046

Fmt 4703

Sfmt 4703

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Project Number 11858–002]

Nevada Hydro Company, Inc. and

Elsinore Valley Municipal Water

District; Notice of Modified

Transmission Alignment Proposal and

Staff NEPA Alternatives for the Lake

Elsinore Advanced Pumped Storage

Project

October 3, 2006.

On February 2, 2004, the Elsinore

Valley Municipal Water District and

Nevada Hydro Company, Inc. (coapplicants) filed an application for the

Lake Elsinore Advanced Pumped

Storage Project (LEAPS Project).

The proposed LEAPS project would

consist of: (1) A new upper reservoir

(Morrell Canyon) having a 180-foot-high

main dam and a gross storage volume of

5,750 feet, at a normal reservoir surface

elevation of 2,880 feet above mean sea

level; (2) a powerhouse with two

reversible pump-turbine units with a

total installed capacity of 500

megawatts; (3) the existing Lake

Elsinore as a lower reservoir; (4) about

30 miles of 500-kV transmission line

connecting the project to an existing

transmission line owned by Southern

California Edison, located north of the

proposed project, and to an existing San

Diego Gas & Electric Company

transmission line located to the south.

This notice is being sent to

landowners of property crossed by or

near either the proposed or alternative

routes for the transmission line and

other interested parties to the

proceeding. The maps attached to this

notice show two transmission

alignments: (1) The applicant’s current

proposal, modified in response to staff’s

draft EIS and filed with the Commission

on June 12, 2006; and (2) the staff

alternative alignment being considered

for the final EIS.

The February 17, 2006, draft EIS for

the proposed LEAPS Project shows both

the co-applicant’s proposed

transmission line (figure 2 of the draft

EIS) and the Commission and U.S.

E:\FR\FM\11OCN1.SGM

11OCN1

59761

Federal Register / Vol. 71, No. 196 / Wednesday, October 11, 2006 / Notices

Forest Service staff alternative

alignment (figure 5 of the draft EIS). In

response to public comments on the

draft EIS, the co-applicants’ revised

their original transmission alignment

and now propose to place part of the

line underground (see the attached coapplicant’s modified alignment). After

considering the co-applicants’ modified

proposal, as well as the comments filed

on the draft EIS, Commission and U.S.

Forest Service staff are proposing to

revise their draft EIS alternative

transmission alignment and consider a

revised alignment in the final EIS. The

staff alternative alignment also includes

documents (original and eight copies)

should be filed with: Magalie R. Salas,

Secretary, Federal Energy Regulatory

Commission, 888 First Street, NE.,

Washington, DC 20426, and should have

the docket number P–11858–002 in the

reference heading. Comments may be

filed electronically via the Internet in

lieu of paper. The Commission strongly

encourages electronic filings. See 18

CFR 385.2001(a)(1)(iii) and the

instructions on the Commission’s Web

site at http://www.ferc.gov under the

eLibrary link.

The licensing schedule for the project

will be revised as follows:

Milestone

Tentative date

Notice of the availability of the final EIS ..........................................................................................................................................

Ready for Commission’s decision on the application ......................................................................................................................

December 2006.

May 2007.

For further information, contact Jim

Fargo at (202) 502–6095,

james.fargo@ferc.gov.

Magalie R. Salas,

Secretary.

[FR Doc. E6–16764 Filed 10–10–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. CP06–461–000]

Northern Natural Gas Company; Notice

of Application

October 3, 2006.

pwalker on PRODPC60 with NOTICES

an underground segment along South

Main Divide Road as shown by the blue

dotted line on the staff alternative

alignment and the same underground

segment from the transmission line to

the powerhouse as shown by the red

dotted line on the co-applicants’

modified transmission alignment. The

final EIS will include a response to the

comments received on the draft EIS and

those on this notice and will be used by

the Commission in making a decision

on the proposal.

Please provide any comments in

response to this public notice within 30

days of the date of this notice. All

Take notice that on September 20,

2006, Northern Natural Gas Company

(Northern), 1111 South 103rd Street,

Omaha, Nebraska 68124, filed in Docket

No. CP06–461–000, an application

pursuant to section 7 of the Natural Gas

Act (NGA) to increase the certificated

storage capacity of the Redfield Storage

Field located in Dallas County, Iowa by

2.102 Bcf to 124.102 Bcf, all as more

fully set forth in the application which

is on file with the Commission and open

to public inspection. This filing may be

also viewed on the Web at http://

www.ferc.gov using the ‘‘eLibrary’’ link.

Enter the docket number excluding the

last three digits in the docket number

field to access the document. For

assistance, call (866) 208–3676 or TTY,

(202) 502–8659.

Any questions regarding this

application may be directed to Michael

T. Loeffler, Director of Certificates for

Northern, 1111 South 103rd Street,

Omaha, Nebraska 68124, (402) 398–

VerDate Aug<31>2005

16:53 Oct 10, 2006

Jkt 211001

7103 or Bret Fritch, Senior Regulatory

Analyst, at (402) 398–7140.

There are two ways to become

involved in the Commission’s review of

this project. First, any person wishing to

obtain legal status by becoming a party

to the proceedings for this project

should, before the comment date of this

notice, file with the Federal Energy

Regulatory Commission, 888 First

Street, NE., Washington, DC 20426, a

motion to intervene in accordance with

the requirements of the Commission’s

Rules of Practice and Procedure (18 CFR

385.214 or 385.211) and the Regulations

under the NGA (18 CFR 157.10). A

person obtaining party status will be

placed on the service list maintained by

the Secretary of the Commission and

will receive copies of all documents

filed by the applicant and by all other

parties. A party must submit 14 copies

of filings made with the Commission

and must mail a copy to the applicant

and to every other party in the

proceeding. Only parties to the

proceeding can ask for court review of

Commission orders in the proceeding.

However, a person does not have to

intervene in order to have comments

considered. The second way to

participate is by filing with the

Secretary of the Commission, as soon as

possible, an original and two copies of

comments in support of or in opposition

to this project. The Commission will

consider these comments in

determining the appropriate action to be

taken, but the filing of a comment alone

will not serve to make the filer a party

to the proceeding. The Commission’s

rules require that persons filing

comments in opposition to the project

provide copies of their protests only to

PO 00000

Frm 00047

Fmt 4703

Sfmt 4703

the party or parties directly involved in

the protest.

Comments, protests and interventions

may be filed electronically via the

Internet in lieu of paper. See, 18 CFR

385.2001(a)(1)(iii) and the instructions

on the Commission’s Web site under the

‘‘e-Filing’’ link.

Comment Date: October 24, 2006.

Magalie R. Salas,

Secretary.

[FR Doc. E6–16760 Filed 10–10–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. RP06–456–001]

Northern Natural Gas Company; Notice

of Compliance Filing

October 3, 2006.

Take notice that on September 28,

2006, Northern Natural Gas Company

(Northern) tendered for filing its

information filing in compliance with

the Commission’s August 31, 2006

Order in the above referenced docket.

Northern further states that copies of

the filing have been provided to each of

its customers and interested state

commissions.

Any person desiring to protest this

filing must file in accordance with Rule

211 of the Commission’s Rules of

Practice and Procedure (18 CFR

385.211). Protests to this filing will be

considered by the Commission in

determining the appropriate action to be

taken, but will not serve to make

protestants parties to the proceeding.

Such protests must be filed in

E:\FR\FM\11OCN1.SGM

11OCN1