Federal Register / Vol. 71, No. 45 / Wednesday, March 8, 2006 / Notices

Agency decision

Ask Donna

What actually matters in this document.

Text

11616

Federal Register / Vol. 71, No. 45 / Wednesday, March 8, 2006 / Notices

Rodney Snedecker, United States Forest

Service, P.O. Box 2750, Asheville, NC

28802.

Any person on the official service list

for the above-captioned proceeding may

request inclusion on the restricted

service list, or may request that a

restricted service list not be established,

by filing a motion to that effect within

15 days of this notice date. In a request

for inclusion, please identify the

reason(s) why there is an interest to be

included. Also please identify any

concerns about historic properties,

including Traditional Cultural

Properties. If historic properties are to

be identified within the motion, please

use a separate page, and label it NonPublic Information.

An original and 8 copies of any such

motion must be filed with Magalie R.

Salas, the Secretary of the Commission

(888 First Street, NE, Washington, DC

20426, and must be served on each

person whose name appears on the

official service list. Please put the

project name ‘‘Nantahala Project’’ and

number ‘‘P–2692–032’’ on the front

cover of any motion. If no such motions

are filed, the restricted service list will

be effective at the end of the 15 day

period. Otherwise, a further notice will

be issued ruling on any motion or

motions filed within the 15 day period.

Magalie R. Salas,

Secretary.

[FR Doc. E6–3203 Filed 3–7–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

Notice of Combined Notice of Filings

for ‘‘ES’’ Dockets

erjones on PROD1PC68 with NOTICES

March 1, 2006.

Take notice that, effective March 15,

2006, the Commission will include

‘‘Applications for Authorization of the

Issuance of Securities or the

Assumption of Liabilities’’ under 18

CFR 34 in Combined Notices of Filings

for publication in the Federal Register.

Due to the anticipated increase in the

number of ‘‘ES’’ filings, the Commission

will no longer issue individual notices

for these filings, except in the case of

Errata notices pertaining to these filings.

A Combined Notice of Filings may

include both ‘‘ER’’ (electric rate) and

‘‘ES’’ dockets.

The Secretary of the Commission is

making the following changes to the

filing procedures for ‘‘Applications for

Authorization of the Issuance of

Securities or the Assumption of

VerDate Aug<31>2005

15:53 Mar 07, 2006

Jkt 208001

Liabilities’’ received on or after March

15, 2006:

1. A draft form of notice and diskette

are no longer required for ‘‘ES’’ filings.

2. Filers requesting a comment period

shorter than the standard 21 days after

the filed date must clearly state such

request in the ‘‘Re:’’ section of the filing.

For example:

DEPARTMENT OF ENERGY

Re: Hot Spring Power Company, Docket

No. ES05__, Request for shortened

comment period.

February 28, 2006.

The notices issued under the

combined notice method will be added

to eLibrary and published in the Federal

Register under the name ‘‘Combined

Notice of Filings.’’ The notices will list

up to 20 ‘‘ER’’ and ‘‘ES’’ docketed filings

that are already in eLibrary. The listing

for each filing will include:

Docket Number: This docket number

is a hyperlink to the eLibrary docket

sheet.

Applicant(s): The applicant name(s)

as it appears on the filing.

Description: A basic description of the

filing that is a hyperlink to the

document in eLibrary.

Filed Date: The date the document

was filed with the Secretary of the

Commission.

Accession Number: The eLibrary

accession number is a hyperlink to the

‘‘Info’’ area of eLibrary for the

document. If the accession number for

the filing changes after issuance of the

combined notice, the user will have to

search eLibrary to access the document.

Comment Date: This is the date/time

for the filing of comments on the

particular filing.

The Combined Notice of Filings will

be indexed in eLibrary as: ‘‘Combined

Notice of Filings, (date)’’ under each

docket included in the notice. If the

Commission issues more than one

combined notice on any given day, the

second notice will be indexed as:

‘‘Combined Notice of Filings, (date) #2’’

and so forth.

For general information about the

Combined Notice of Filings method,

contact Mary Lynch or Capria Johnson

at 202–502–8400.

Magalie R. Salas,

Secretary.

[FR Doc. E6–3210 Filed 3–7–06; 8:45 am]

BILLING CODE 6717–01–P

PO 00000

Frm 00044

Fmt 4703

Sfmt 4703

Federal Energy Regulatory

Commission

[Docket No. AD06–5–000]

Office of Energy Projects (OEP); Notice

of Intent to Prepare an Effectiveness

Assessment of the Natural Gas Facility

Interagency Agreement

In May 2002, the Federal Energy

Regulatory Commission (FERC or

Commission), the Bureau of Land

Management, the Fish and Wildlife

Service, the Environmental Protection

Agency, the Forest Service, the

Department of Transportation, the Army

Corps of Engineers, the National Marine

Fisheries Service, the Advisory Council

on Historic Preservation, and the

Department of Energy signed an

agreement entitled ‘‘Interagency

Agreement on Early Coordination of

Required Environmental and Historic

Preservation Reviews Conducted in

Conjunction with the Issuance of

Authorizations to Construct and Operate

Interstate Natural Gas Pipelines

Certificated by the Federal Energy

Regulatory Commission’’ (IA).

As a result of the IA, the signatory

agencies formed a working group to

coordinate each agency’s

implementation of the IA (Working

Group). Among its tasks, the Working

Group committed to the periodic

evaluation of the effectiveness of the IA.

On behalf of the Working Group, FERC

is leading the effort to initiate this

assessment. To achieve the maximum

benefit, including evaluation of the

Commission’s Pre-Filing Process, a

series of telephone conferences and

interactive public workshops are

planned. The participants will include

individuals who have participated in

the Commission’s National

Environmental Policy Act (NEPA)

process since the enactment of the IA,

and will cover both pipeline and

liquefied natural gas (LNG) projects in

various regions of the United States.

These include individuals from Federal,

state and local agencies, regulated

natural industry, Native American

tribes, affected property owners,

citizens, non-government organizations

and other stakeholders.

Since many of the signatory federal

agencies have prepared internal

guidelines to more effectively

implement the IA, the assessment will

also collect feedback on each agency’s

implementation, to determine whether

they are effective or need revision to

improve the review of future natural gas

projects.

E:\FR\FM\08MRN1.SGM

08MRN1

Federal Register / Vol. 71, No. 45 / Wednesday, March 8, 2006 / Notices

erjones on PROD1PC68 with NOTICES

The FERC or its contractor will be

contacting individuals to collect specific

information about experiences working

with the IA and/or agency guidance. We

are looking for a broad cross-section of

responses—large and small projects;

involving multiple agencies or a single

agency; and projects involving the

Commission’s Pre-Filing Process. The

information gathered from this

assessment will be compiled and

presented to the Working Group to

assist in determining whether the IA

and the signatory agencies’ current

internal guidelines are furthering the

intended goals. The information will

also be used to gage whether agencies

are fulfilling the expeditious completion

of proceedings by issuing the necessary

permits or authorizations for natural gas

projects.

At this time, we are considering the

following projects for our assessment

(note this project list may change and is

not final):

• ANR Pipeline Company: West Leg

Project, (CP02–434–000);

• Columbia Gas Transmission

Corporation: Line 1278 Replacement

Project, (CP04–34–000);

• Transwestern Pipeline Company:

San Juan 2005 Expansion, (CP04–104–

000);

• Golden Pass LNG: Golden Pass LNG

Project, (CP04–386–000);

• Vista del Sol LNG: Vista del Sol

LNG Project, (CP04–395–000);

• Northwest Pipeline Corporation:

Northwest Capacity Replacement

Project, (CP05–32–000); and

• Entrega Gas Pipeline, LLC: Entrega

Pipeline Project, (CP04–413–000).

Public Participation

You are encouraged to participate and

provide comments about the

Commission’s NEPA process as it relates

to the IA and/or the Commission’s PreFiling Process. To expedite the receipt

and consideration of your comments,

electronic submission of comments is

strongly encouraged. See Title 18 CFR

385.2001(a)(1)(iii) and the instructions

on the FERC Internet Web site (http://

www.ferc.gov) under the eFiling link

and the link to the User’s Guide. Before

you can submit comments you will need

to create a free account by clicking on

‘‘Sign-up’’ under ‘‘New user.’’ You will

be asked to select a type of submission

you are making. This type of submission

is considered a ‘‘Comment on Filing.’’

Comments submitted electronically

must be submitted by March 31, 2006.

If you wish to mail comments, please

mail your comments so that they will be

received in Washington, DC on or before

March 31, 2006 and carefully follow

these instructions:

VerDate Aug<31>2005

15:53 Mar 07, 2006

Jkt 208001

Send an original and two copies of

your letter to:

• Magalie R. Salas, Secretary, Federal

Energy Regulatory Commission, 888

First Street, NE., Room 1A, Washington,

DC 20426.

• Label one copy of your comments

for the attention of Gas 1, DG2E; and

• Reference Docket No. AD06–5–000

on the original and both copies.

Everyone who responds to this notice

or provides comments will be retained

on our Gas Outreach mailing list.

We will issue a separate notice

announcing the workshops’ planned

dates, locations and times. If you have

any questions regarding the IA

Effectiveness Assessment, the

upcoming/planned public workshops,

or would like to be placed on our Gas

Outreach mailing list for this task,

please call Alisa Lykens, Gas Outreach

Manager, at (202) 502–8766.

Magalie R. Salas,

Secretary.

[FR Doc. E6–3207 Filed 3–7–06; 8:45 am]

BILLING CODE 6717–01–P

ENVIRONMENTAL PROTECTION

AGENCY

[EPA–HQ–RCRA–2005–0014; FRL–8042–7]

Agency Information Collection

Activities; Submission to OMB for

Review and Approval; Comment

Request; General Hazardous Waste

Facility Standards; EPA ICR Number

1571.08, OMB Control Number 2050–

0120

AGENCY: Environmental Protection

Agency.

ACTION: Notice.

SUMMARY: In compliance with the

Paperwork Reduction Act (44 U.S.C.

3501 et seq.), this document announces

that an Information Collection Request

(ICR) has been forwarded to the Office

of Management and Budget (OMB) for

review and approval. This is a request

to renew an existing approved

collection. This ICR is scheduled to

expire on February 28, 2006. Under

OMB regulations, the Agency may

continue to conduct or sponsor the

collection of information while this

submission is pending at OMB. This ICR

describes the nature of the information

collection and its estimated burden and

cost.

DATES: Additional comments may be

submitted on or before April 7, 2006.

ADDRESSES: Submit your comments,

referencing docket ID number EPA–HQ–

RCRA–2005–0014, to (1) EPA online

PO 00000

Frm 00045

Fmt 4703

Sfmt 4703

11617

using www.regulations.gov (our

preferred method), or by mail to: RCRA

Docket (5305T), U.S. Environmental

Protection Agency, 1200 Pennsylvania

Avenue, NW., Washington, DC 20460;

and (2) OMB by mail to: Office of

Information and Regulatory Affairs,

Office of Management and Budget

(OMB), Attention: Desk Officer for EPA,

725 17th Street, NW., Washington, DC

20503.

FOR FURTHER INFORMATION CONTACT:

Norma Abdul-Malik, Environmental

Protection Agency, 1200 Pennsylvania

Ave., NW., Washington, DC 20460;

telephone number: (703) 308–8753; fax

number: (703) 308–8617; e-mail address:

abdul-malik.norma@epamail.epa.gov.

SUPPLEMENTARY INFORMATION: EPA has

submitted the following ICR to OMB for

review and approval according to the

procedures prescribed in 5 CFR 1320.12.

On September 8, 2005 (70 FR 53356),

EPA sought comments on this ICR

pursuant to 5 CFR 1320.8(d). EPA

received no comments. Any additional

comments on this ICR should be

submitted to EPA and OMB within 30

days of this notice.

EPA has established a public docket

for this ICR under Docket ID No. EPA–

HQ–RCRA–2005–0014, which is

available for online viewing at

www.regulations.gov, or in person

viewing at the RCRA Docket in the EPA

Docket Center (EPA/DC), EPA West,

Room B102, 1301 Constitution Ave.,

NW., Washington, DC. The EPA/DC

Public Reading Room is open from 8

a.m. to 4:30 p.m., Monday through

Friday, excluding legal holidays. The

telephone number for the Reading Room

is (202) 566–1744, and the telephone

number for RCRA Docket is (202) 566–

0270.

Use EPA’s electronic docket and

comment system at

www.regulations.gov, to submit or view

public comments, access the index

listing of the contents of the docket, and

to access those documents in the docket

that are available electronically. Once in

the system, select ‘‘docket search,’’ then

key in the docket ID number identified

above. Please note that EPA’s policy is

that public comments, whether

submitted electronically or in paper,

will be made available for public

viewing at www.regulations.gov as EPA

receives them and without change,

unless the comment contains

copyrighted material, CBI, or other

information whose public disclosure is

restricted by statute. For further

information about the electronic docket,

go to www.regulations.gov.

Title: General Hazardous Waste

Facility Standards (Renewal).

E:\FR\FM\08MRN1.SGM

08MRN1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.