Federal Register / Vol. 71, No. 136 / Monday, July 17, 2006 / Notices

Agency decision

Ask Donna

What actually matters in this document.

Text

40484

Federal Register / Vol. 71, No. 136 / Monday, July 17, 2006 / Notices

Practice and Procedure (18 CFR

385.211). Protests to this filing will be

considered by the Commission in

determining the appropriate action to be

taken, but will not serve to make

protestants parties to the proceeding.

Such protests must be filed on or before

the date as indicated below. Anyone

filing a protest must serve a copy of that

document on all the parties to the

proceeding.

The Commission encourages

electronic submission of protests in lieu

of paper using the ‘‘eFiling’’ link at

http://www.ferc.gov. Persons unable to

file electronically should submit an

original and 14 copies of the protest to

the Federal Energy Regulatory

Commission, 888 First Street, NE.,

Washington, DC 20426.

This filing is accessible online at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Comment Date: 5 p.m. Eastern Time

on July 18, 2006.

Magalie R. Salas,

Secretary.

[FR Doc. E6–11261 Filed 7–14–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Project No. 2145]

Public Utility District No. 1 of Chelan

County, WA; Notice of Authorization

for Continued Project Operation

rwilkins on PROD1PC63 with NOTICES

July 11, 2006.

On June 29, 2004, Public Utility

District No. 1 of Chelan County, licensee

for the Rocky Reach Hydroelectric

Project, filed an application for a new or

subsequent license pursuant to the

Federal Power Act (FPA) and the

Commission’s regulations. The Rocky

Reach Project is located on the

Columbia River in the Town of Entiat,

Chelan County, Washington.

The license for Project No. 2145 was

issued for a period ending June 30,

2006. Section 15(a)(1) of the FPA, 16

U.S.C. 808(a)(1), requires the

Commission, at the expiration of a

VerDate Aug<31>2005

17:41 Jul 14, 2006

Jkt 208001

license term, to issue from year-to-year

an annual license to the then licensee

under the terms and conditions of the

prior license until a new license is

issued, or the project is otherwise

disposed of as provided in section 15 or

any other applicable section of the FPA.

If the project’s prior license waived the

applicability of section 15 of the FPA,

then, based on section 9(b) of the

Administrative Procedure Act, 5 U.S.C.

558(c), and as set forth at 18 CFR

16.21(a), if the licensee of such project

has filed an application for a subsequent

license, the licensee may continue to

operate the project in accordance with

the terms and conditions of the license

after the minor or minor part license

expires, until the Commission acts on

its application. If the licensee of such a

project has not filed an application for

a subsequent license, then it may be

required, pursuant to 18 CFR 16.21(b),

to continue project operations until the

Commission issues someone else a

license for the project or otherwise

orders disposition of the project.

If the project is subject to section 15

of the FPA, notice is hereby given that

an annual license for Project No. 2145

is issued to Public Utility District No. 1

of Chelan County for a period effective

July 1, 2006 through June 30, 2007, or

until the issuance of a new license for

the project or other disposition under

the FPA, whichever comes first. If

issuance of a new license (or other

disposition) does not take place on or

before June 30, 2007, notice is hereby

given that, pursuant to 18 CFR 16.18(c),

an annual license under section 15(a)(1)

of the FPA is renewed automatically

without further order or notice by the

Commission, unless the Commission

orders otherwise. If the project is not

subject to section 15 of the FPA, notice

is hereby given that Public Utility

District No. 1 of Chelan County, is

authorized to continue operation of the

Rocky Reach Project until such time as

the Commission acts on its application

for a subsequent license.

Magalie R. Salas,

Secretary.

[FR Doc. E6–11262 Filed 7–14–06; 8:45 am]

BILLING CODE 6717–01–P

PO 00000

Frm 00016

Fmt 4703

Sfmt 4703

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket Nos. CP06–412–000 and CP06–416–

000]

Puget Sound Energy, Inc. and

Northwest Pipeline Corporation; Notice

of Application

July 10, 2006.

Take notice that on June 30, 2006,

Puget Sound Energy, Inc. (Puget), 10885

NE. 4th Street, Bellevue, Washington

98009, filed an application in Docket

No. CP06–412–000, pursuant to sections

7(c) and 7(b) of the Natural Gas Act

(NGA) and part 157 of the Commission’s

regulations, for a certificate of public

convenience and necessity and related

abandonment authority for Puget, as

operator of the Jackson Prairie Storage

Project in Lewis County, Washington, to

construct and operate new and

upgraded facilities necessary to increase

the Jackson Prairie maximum firm

withdrawal deliverability from 850

MMcf/day to 1,150 MMcf/day on behalf

of three owners of Jackson Prairie,

Puget, Northwest Pipeline Corporation

(Northwest), and Avista Corporation.

Also on June 30, 2006, Northwest, 295

Chipeta Way, Salt Lake City, Utah

84158, filed a companion application

under section 7(c) of the NGA and part

157 of the Commission’s regulations, for

a certificate of public convenience and

necessity authorizing it to utilize a

portion of the expanded withdrawal

deliverability from the Jackson Prairie

Storage Project for new firm storage

services. Puget’s project would consist

of up to ten new injection/withdrawal

wells with appurtenant gathering

facilities, about 0.8 miles of 24-inchdiameter pipeline looping, and various

upgrades at the Jackson Prairie

Compressor station and Jackson Prairie

Meter Station. The total cost of facilities

is estimated to be $43.8 million, all as

more fully set forth in the applications

which are on file with the Commission

and open to public inspection. The

filings may also be viewed on the Web

at http://www.ferc.gov using the

‘‘eLibrary’’ link. Enter the docket

number excluding the last three digits in

the docket number field to access the

document. For assistance, please contact

FERC Online Support at

FERCOnlineSupport@ferc.gov or toll

free at (866) 208–3676, or for TTY,

contact (202) 502–8659.

Any questions regarding these

applications may be directed to Garry

Kotter, Manager, Certificates and Tariffs,

at (801) 584–7117, Northwest Pipeline

E:\FR\FM\17JYN1.SGM

17JYN1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.