Federal Register / Vol. 72, No. 162 / Wednesday, August 22, 2007 / Notices

Agency decision

Ask Donna

What actually matters in this document.

Text

46990

Federal Register / Vol. 72, No. 162 / Wednesday, August 22, 2007 / Notices

on the Commission’s Web site at

http://www.ferc.gov under the ‘‘eFiling’’ link and the link to the User’s

Guide. Before you can file comments

you will need to create a free account

which can be created on-line.

We may mail the EA for comment. If

you are interested in receiving it, please

return the Information Request

(Appendix 2). If you do not return the

Information Request, you will be taken

off the mailing list.

Becoming an Intervenor

In addition to involvement in the EA

scoping process, you may want to

become an official party to the

proceeding, or ‘‘intervenor’’. To become

an intervenor you must file a motion to

intervene according to Rule 214 of the

Commission’s Rules of Practice and

Procedure (18 CFR 385.214). Intervenors

have the right to seek rehearing of the

Commission’s decision. Motions to

Intervene should be electronically

submitted using the Commission’s

eFiling system at http://www.ferc.gov.

Persons without Internet access should

send an original and 14 copies of their

motion to the Secretary of the

Commission at the address indicated

previously. Persons filing Motions to

Intervene on or before the comment

deadline indicated above must send a

copy of the motion to the Applicant. All

filings, including late interventions,

submitted after the comment deadline

must be served on the Applicant and all

other intervenors identified on the

Commission’s service list for this

proceeding. Persons on the service list

with e-mail addresses may be served

electronically; others must be served a

hard copy of the filing.

Affected landowners and parties with

environmental concerns may be granted

intervenor status upon showing good

cause by stating that they have a clear

and direct interest in this proceeding

which would not be adequately

represented by any other parties. You do

not need intervenor status to have your

environmental comments considered.

jlentini on PROD1PC65 with NOTICES

Environmental Mailing List

An effort is being made to send this

notice to all individuals, organizations,

and government entities interested in

and/or potentially affected by the

proposed project. This includes all

landowners who are potential right-ofway grantors, whose property may be

used temporarily for project purposes,

or who own homes within distances

defined in the Commission’s regulations

of certain aboveground facilities.

VerDate Aug<31>2005

16:26 Aug 21, 2007

Jkt 211001

Additional Information

Additional information about the

project is available from the

Commission’s Office of External Affairs,

at 1–866–208–FERC or on the FERC

Internet Web site (http://www.ferc.gov)

using the eLibrary link. Click on the

eLibrary link, click on ‘‘General Search’’

and enter the docket number excluding

the last three digits in the Docket

Number field. Be sure you have selected

an appropriate date range. For

assistance, please contact FERC Online

Support at FercOnlineSupport@ferc.gov

or toll free at 1–866–208–3676, or for

TTY, contact (202) 502–8659. The

eLibrary link also provides access to the

texts of formal documents issued by the

Commission, such as orders, notices,

and rulemakings.

In addition, the Commission now

offers a free service called

eSubscription, which allows you to

keep track of all formal issuances and

submittals in specific dockets. This can

reduce the amount of time you spend

researching proceedings by

automatically providing you with

notification of these filings, document

summaries and direct links to the

documents. Go to http://www.ferc.gov/

esubscribenow.htm.

Finally, public meetings or site visits

will be posted on the Commission’s

calendar located at http://www.ferc.gov/

EventCalendar/EventsList.aspx along

with other related information.

Kimberly D. Bose,

Secretary.

[FR Doc. E7–16523 Filed 8–21–07; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Project No. 1864–079]

Upper Peninsula Power Company;

Notice of Application for Amendment

of License and Soliciting Comments,

Motions To Intervene, and Protests

August 15, 2007.

Take notice that the following

hydroelectric application has been filed

with the Commission and is available

for public inspection:

a. Application Type: Amendment of

License to Permanent Modifications to

Articles 401 and 402.

b. Project No: 1864–079.

c. Date Filed: July 3, 2007.

d. Applicant: Upper Peninsula Power

Company.

e. Name of Project: Bond Falls

Hydroelectric Project.

PO 00000

Frm 00039

Fmt 4703

Sfmt 4703

f. Location: On the Ontonagon River,

in Ontonagon and Gogebic Counties,

Michigan, and Vilas County, Wisconsin.

One of the project’s four developments,

Bond Falls, occupies 73.5 acres of land

within the Ottawa National Forest.

g. Filed Pursuant to: Federal Power

Act, 16 U.S.C. 791a–825r.

h. Applicant Contact: Terry P. Jensky,

Vice President, Energy Supply

Operations, Upper Peninsula Power

Company, 700 North Adams Street, P.O.

Box 19001, Green Bay, WI 54307–9001;

(715) 355–2047.

i. FERC Contact: Jake Tung,

Telephone (202) 502–8757, and e-mail:

hong.tung@ferc.gov.

j. Deadline for filing comments,

motions to intervene, and protest:

September 17, 2007. All documents

(original and eight copies) should be

filed with: Secretary, Federal Energy

Regulatory Commission, 888 First

Street, NE., Washington, DC 20426. The

Commission’s Rules of Practice and

Procedure require all intervenors filing

documents with the Commission to

serve a copy of that document on each

person whose name appears on the

official service list for the project.

Further, if an intervenor files comments

or documents with the Commission

relating to the merits of an issue that

may affect the responsibilities of a

particular resource agency, they must

also serve a copy of the document on

that resource agency. A copy of any

motion to intervene must also be served

upon each representative of the

Applicant specified in the particular

application.

k. Description of Request: The

applicant proposes to amend the license

for the Bond Falls Hydroelectric Project

at the Bergland Development (Lake

Gogebic), as follows: (1) change end of

month target elevations from 1295.7 to

1295.9 ft msl in June and from 1295.7

to 1295.5 ft msl in August and

September; (2) change minimum flow

trigger-elevations to match the proposed

target elevations from 1295.4 to 1295.9

ft msl in June, from 1295.4 to 1295.7 ft

msl in July, and from 1295.4 to 1295.5

ft msl for the period August 1 through

September 14.

l. Locations of the Application: A

copy of the application is available for

inspection and reproduction at the

Commission’s Public Reference Room,

located at 888 First Street, NE., Room

2A, Washington, DC 20426, or by calling

(202) 502–8371. This filing may also be

viewed on the Commission’s Web site at

http://www.ferc.gov using the

‘‘eLibrary’’ link. Enter the docket

number excluding the last three digits in

the docket number field to access the

document. You may also register online

E:\FR\FM\22AUN1.SGM

22AUN1

Federal Register / Vol. 72, No. 162 / Wednesday, August 22, 2007 / Notices

at http://www.ferc.gov/docs-filing/

esubscription.asp to be notified via email of new filings and issuances

related to this or other pending projects.

For assistance, call 1–866–208–3676 or

e-mail FERCOnlineSupport@ferc.gov,

for TTY, call (202) 502–8659. A copy is

also available for inspection and

reproduction at the address in item (h)

above.

m. Individuals desiring to be included

on the Commission’s mailing list should

so indicate by writing to the Secretary

of the Commission.

n. Comments, Protests, or Motions to

Intervene: Anyone may submit

comments, a protest, or a motion to

intervene in accordance with the

requirements of Rules of Practice and

Procedure, 18 CFR 385.210, .211, .214.

In determining the appropriate action to

take, the Commission will consider all

protests or other comments filed, but

only those who file a motion to

intervene in accordance with the

Commission’s Rules may become a

party to the proceeding. Any comments,

protests, or motions to intervene must

be received on or before the specified

comment date for the particular

application.

o. Any filings must bear in all capital

letters the title ‘‘COMMENTS’’,

‘‘PROTEST’’, or ‘‘MOTION TO

INTERVENE’’, as applicable, and the

Project Number of the particular

application to which the filing refers.

p. Agency Comments: Federal, state,

and local agencies are invited to file

comments on the described application.

A copy of the application may be

obtained by agencies directly from the

Applicant. If an agency does not file

comments within the time specified for

filing comments, it will be presumed to

have no comments. One copy of an

agency’s comments must also be sent to

the Applicant’s representatives.

q. Comments, protests and

interventions may be filed electronically

via the Internet in lieu of paper. See, 18

CFR 385.2001(a)(1)(iii) and the

instructions on the Commission’s Web

site at http://www.ferc.gov under the ‘‘eFiling’’ link.

jlentini on PROD1PC65 with NOTICES

Kimberly D. Bose,

Secretary.

[FR Doc. E7–16506 Filed 8–21–07; 8:45 am]

BILLING CODE 6717–01–P

VerDate Aug<31>2005

16:26 Aug 21, 2007

Jkt 211001

ADDRESSES: Submit your comments,

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. ER07–521–000]

New York Independent System

Operator, Inc.; Notice of Change in

Technical Conference

August 15, 2007.

On August 7, 2007, the Commission

issued a ‘‘Notice of Technical

Conference’’ in the above-referenced

proceeding. The date has been changed

from Tuesday, September 11, 2007, and

will now be held on Monday,

September 10, 2007, at 10 a.m. (EDT), in

conference room 3M–2A/B at the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426. A further notice will provide a

detailed agenda.

For more information about this

conference, please contact: Morris

Margolis, Office of Energy Markets and

Reliability, Federal Energy Regulatory

Commission, 888 First Street, NE.,

Washington, DC 20426, (202) 502–8611,

morris.margolis@ferc.gov.

Kimberly D. Bose

Secretary.

[FR Doc. E7–16502 Filed 8–21–07; 8:45 am]

BILLING CODE 6717–01–P

ENVIRONMENTAL PROTECTION

AGENCY

[EPA–HQ–SFUND–2007–0707; FRL–8458–3]

Agency Information Collection

Activities; Proposed Collection;

Comment Request; National Oil and

Hazardous Substance Pollution

Contingency Plan (NCP) (Renewal);

EPA ICR Number 1463.07, OMB

Control Number 2050–0096

AGENCY: Environmental Protection

Agency (EPA).

ACTION: Notice.

SUMMARY: In compliance with the

Paperwork Reduction Act (PRA) (44

U.S.C. 3501 et seq.), this document

announces that EPA is planning to

submit a request to renew an existing

approved Information Collection

Request (ICR) to the Office of

Management and Budget (OMB). This

ICR is scheduled to expire on January

31, 2008. Before submitting the ICR to

OMB for review and approval, EPA is

soliciting comments on specific aspects

of the proposed information collection

as described below.

DATES: Comments must be submitted on

or before October 22, 2007.

PO 00000

Frm 00040

Fmt 4703

Sfmt 4703

46991

identified by Docket ID No. EPA–HQ–

SFUND–2007–0707, by one of the

following methods:

• http://www.regulations.gov: Follow

the on-line instructions for submitting

comments.

• E-mail: superfund.docket@epa.gov.

• Mail: EPA Docket Center,

Environmental Protection Agency,

Superfund Docket, Mail Code 2822T,

1200 Pennsylvania Ave., NW.,

Washington, DC 20460.

• Hand Delivery: Superfund Docket,

EPA West 3334, 1301 Constitution Ave.,

NW., Washington, DC 20004. Such

deliveries are only accepted during the

Docket’s normal hours of operation, and

special arrangements should be made

for deliveries of boxed information.

Instructions: Direct your comments to

Docket ID No. EPA–HQ–SFUND–2007–

0707. EPA’s policy is that all comments

received will be included in the public

docket without change and may be

made available online at http://

www.regulations.gov, including any

personal information provided, unless

the comment includes information

claimed to be Confidential Business

Information (CBI) or other information

whose disclosure is restricted by statute.

Do not submit information that you

consider to be CBI or otherwise

protected through http://

www.regulations.gov or e-mail. The

http://www.regulations.gov Web site is

an ‘‘anonymous access’’ system, which

means EPA will not know your identity

or contact information unless you

provide it in the body of your comment.

If you send an e-mail comment directly

to EPA without going through http://

www.regulations.gov your e-mail

address will be automatically captured

and included as part of the comment

that is placed in the public docket and

made available on the Internet. If you

submit an electronic comment, EPA

recommends that you include your

name and other contact information in

the body of your comment and with any

disk or CD–ROM you submit. If EPA

cannot read your comment due to

technical difficulties and cannot contact

you for clarification, EPA may not be

able to consider your comment.

Electronic files should avoid the use of

special characters, any form of

encryption, and be free of any defects or

viruses. For additional information

about EPA’s public docket visit the EPA

Docket Center homepage at http://

www.epa.gov/epahome/dockets.htm.

FOR FURTHER INFORMATION CONTACT: S.

Steven Chang, Assessment and

Remediation Division, Office of

Superfund Remediation and Technology

E:\FR\FM\22AUN1.SGM

22AUN1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.