Federal Register / Vol. 71, No. 16 / Wednesday, January 25, 2006 / Notices

Agency decision

Ask Donna

What actually matters in this document.

Text

4126

Federal Register / Vol. 71, No. 16 / Wednesday, January 25, 2006 / Notices

protests must be filed on or before the

comment date. Anyone filing a motion

to intervene or protest must serve a copy

of that document on the Applicant and

all the parties in this proceeding.

The Commission encourages

electronic submission of protests and

interventions in lieu of paper using the

‘‘eFiling’’ link at http://www.ferc.gov.

Persons unable to file electronically

should submit an original and 14 copies

of the protest or intervention to the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive email notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please email

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Comment Date: 5 p.m. Eastern Time

on February 1, 2006.

Magalie R. Salas,

Secretary.

[FR Doc. E6–833 Filed 1–24–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No.CP96–339–002]

Total Peaking Services, LLC; Notice of

Application To Amend Certificate

wwhite on PROD1PC61 with NOTICES

January 18, 2006.

Take notice that Total Peaking

Services, LLC (TPS) filed in DocketNo.

CP96–399–002 on January 6, 2006,

pursuant to sections 7 (c) of the Natural

Gas Act (NGA) and Part 157 of the

Commission’s Regulations, an

application to amend its certificate of

public convenience and necessity

issued by the Commission on November

25, 1997.1 TPS has increased the

efficiency of its operations at the

liquefied natural gas peak-shaving

facility located in Milford, Connecticut

and requests the Commission’s

authorization to increase the sendout

capacity from 72 MMcf/d to 90 MMcf/

d, all as more fully set forth in the

application which is on file with the

Commission and open to public

1 81 FERC ¶ 61,246 (1997).

VerDate Aug<31>2005

18:26 Jan 24, 2006

Jkt 208001

inspection. This filing may be also

viewed on the web at http://www.

ferc.gov using the ‘‘eLibrary’’ link. Enter

the docket number excluding the last

three digits in the docket number field

to access the document. For assistance,

call (202) 502–8659 or TTY, (202) 208–

3676.

Any questions regarding this

application should be directed to Tim D.

Kelly, Vice President, Energy Services &

Regulatory Affairs, c/o Connecticut

Natural Gas and The Southern

Connecticut Gas Company, P.O. Box

1500, Hartford, CT 06144–1500, at (860)

727–3344 or fax (860) 727–3387.

There are two ways to become

involved in the Commission’s review of

this project. First, any person wishing to

obtain legal status by becoming a party

to the proceedings for this project

should, on or before the comment date

stated below, file with the Federal

Energy Regulatory Commission, 888

First Street, NE., Washington, DC 20426,

a motion to intervene in accordance

with the requirements of the

Commission’s Rules of Practice and

Procedure (18 CFR 385.214 or 385.211)

and the Regulations under the NGA (18

CFR 157.10). A person obtaining party

status will be placed on the service list

maintained by the Secretary of the

Commission and will receive copies of

all documents filed by the applicant and

by all other parties. A party must submit

14 copies of filings made with the

Commission and must mail a copy to

the applicant and to every other party in

the proceeding. Only parties to the

proceeding can ask for court review of

Commission orders in the proceeding.

However, a person does not have to

intervene in order to have comments

considered. The second way to

participate is by filing with the

Secretary of the Commission, as soon as

possible, an original and two copies of

comments in support of or in opposition

to this project. The Commission will

consider these comments in

determining the appropriate action to be

taken, but the filing of a comment alone

will not serve to make the filer a party

to the proceeding. The Commission’s

rules require that persons filing

comments in opposition to the project

provide copies of their protests only to

the party or parties directly involved in

the protest.

Persons who wish to comment only

on the environmental review of this

project should submit an original and

two copies of their comments to the

Secretary of the Commission.

Environmental commenters will be

placed on the Commission’s

environmental mailing list, will receive

copies of the environmental documents,

PO 00000

Frm 00028

Fmt 4703

Sfmt 4703

and will be notified of meetings

associated with the Commission’s

environmental review process.

Environmental commenters will not be

required to serve copies of filed

documents on all other parties.

However, the non-party commenters

will not receive copies of all documents

filed by other parties or issued by the

Commission (except for the mailing of

environmental documents issued by the

Commission) and will not have the right

to seek court review of the

Commission’s final order.

Comments, protests and interventions

may be filed electronically via the

Internet in lieu of paper. See, 18 CFR

385.2001(a)(1)(iii) and the instructions

on the Commission’s Web site under the

‘‘e-Filing’’ link.

Comment Date: February 8, 2006.

Magalie R. Salas,

Secretary.

[FR Doc. E6–843 Filed 1–24–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. ER06–230–000]

Wolverine Creek Energy LLC; Notice of

Issuance of Order

January 18, 2006.

Wolverine Creek Energy LLC filed an

application for market-based rate

authority, with an accompanying rate

tariff. The proposed market-based rate

schedule provides for the sales of

capacity, energy and ancillary at marketbased rates. Wolverine also requested

waiver of various Commission

regulations. In particular, Wolverine

requested that the Commission grant

blanket approval under 18 CFR Part 34

of all future issuances of securities and

assumptions of liability by Wolverine.

On January 13, 2006, pursuant to

delegated authority, the Director,

Division of Tariffs and Market

Development—West, granted the

request for blanket approval under Part

34. The Director’s order also stated that

the Commission would publish a

separate notice in the Federal Register

establishing a period of time for the

filing of protests. Accordingly, any

person desiring to be heard or to protest

the blanket approval of issuances of

securities or assumptions of liability by

Wolverine should file a motion to

intervene or protest with the Federal

Energy Regulatory Commission, 888

First Street, NE., Washington, DC 20426,

in accordance with Rules 211 and 214

E:\FR\FM\25JAN1.SGM

25JAN1

Federal Register / Vol. 71, No. 16 / Wednesday, January 25, 2006 / Notices

of the Commission’s Rules of Practice

and Procedure. 18 CFR 385.211, 385.214

(2004).

Notice is hereby given that the

deadline for filing motions to intervene

or protest is February 13, 2006.

Absent a request to be heard in

opposition by the deadline above,

Wolverine is authorized to issue

securities and assume obligations or

liabilities as a guarantor, indorser,

surety, or otherwise in respect of any

security of another person; provided

that such issuance or assumption is for

some lawful object within the corporate

purposes of Wolverine, compatible with

the public interest, and is reasonably

necessary or appropriate for such

purposes.

The Commission reserves the right to

require a further showing that neither

public nor private interests will be

adversely affected by continued

approval of Wolverine’s issuances of

securities or assumptions of liability.

Copies of the full text of the Director’s

Order are available from the

Commission’s Public Reference Room,

888 First Street, NE., Washington, DC

20426. The Order may also be viewed

on the Commission’s Web site at http://

www.ferc.gov, using the eLibrary link.

Enter the docket number excluding the

last three digits in the docket number

filed to access the document.

Comments, protests, and interventions

may be filed electronically via the

internet in lieu of paper. See, 18 CFR

385.2001(a)(1)(iii) and the instructions

on the Commission’s Web site under the

‘‘e-Filing’’ link. The Commission

strongly encourages electronic filings.

Magalie R. Salas,

Secretary.

[FR Doc. E6–837 Filed 1–24–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Magalie R. Salas,

Secretary.

[FR Doc. E6–832 Filed 1–24–06; 8:45 am]

Federal Energy Regulatory

Commission

[Docket No. EL06–47–000]

wwhite on PROD1PC61 with NOTICES

LLC’s Requested Billing Adjustment

submitted on November 9, 2005.

Devon Power LLC certifies that copies

of the complaint were served on the

contacts for ISO New England, Inc.

Any person desiring to intervene or to

protest this filing must file in

accordance with Rules 211 and 214 of

the Commission’s Rules of Practice and

Procedure (18 CFR 385.211 and

385.214). Protests will be considered by

the Commission in determining the

appropriate action to be taken, but will

not serve to make protestants parties to

the proceeding. Any person wishing to

become a party must file a notice of

intervention or motion to intervene, as

appropriate. The Respondent’s answer

and all interventions, or protests must

be filed on or before the comment date.

The Respondent’s answer, motions to

intervene, and protests must be served

on the Complainants.

The Commission encourages

electronic submission of protests and

interventions in lieu of paper using the

‘‘eFiling’’ link at http://www.ferc.gov.

Persons unable to file electronically

should submit an original and 14 copies

of the protest or intervention to the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Comment Date: 5 p.m. eastern time on

February 1, 2006.

BILLING CODE 6717–01–P

Devon Power LLC, Complainant v. ISO

New England, Inc., Respondent; Notice

of Complaint

DEPARTMENT OF ENERGY

January 18, 2006.

Federal Energy Regulatory

Commission

Take notice that on January 12, 2006,

Devon Power LLC filed a formal

complaint against ISO New England,

Inc. pursuant to 18 CFR 385.206 , and

Rule 206 of the Commission’s Rule of

Practice and Procedures, seeking appeal,

pursuant to section 6.3.6 of the ISO New

England Billing Policy, of ISO–NE

England Inc.’s denial of Devon Power

VerDate Aug<31>2005

18:26 Jan 24, 2006

Jkt 208001

Combined Notice of Filings #1

January 18, 2006.

Take notice that the Commission

received the following electric rate

filings:

Docket Numbers: ER01–48–004.

Applicants: Powerex Corporation.

PO 00000

Frm 00029

Fmt 4703

Sfmt 4703

4127

Description: Powerex Corp submits an

errata to Exhibits A and B of its 4/20/

05 change in status filing.

Filed Date: 01/11/2006.

Accession Number: 20060113–0089.

Comment Date: 5 p.m. eastern time on

Wednesday, February 1, 2006.

Docket Numbers: ER02–73–007.

Applicants: Llano Estacado Wind, LP.

Description: Llano Estacado Wind, LP

submits revised tariffs designated as

Original Sheet Nos. 1–4, FERC Electric

Tariff, First revised Volume No. 1.

Filed Date: 01/11/2006.

Accession Number: 20060113–0143.

Comment Date: 5 p.m. eastern time on

Wednesday, February 1, 2006.

Docket Numbers: ER02–580–005.

Applicants: Pawtucket Power

Associates Limited Partnership.

Description: Pawtucket Power

Associates L.P. submits an errata to its

6/16/05 filing of FERC Electric Tariff,

Second Revised Volume No. 1.

Filed Date: 01/11/2006.

Accession Number: 20060113–0137.

Comment Date: 5 p.m. eastern time on

Wednesday, February 1, 2006.

Docket Numbers: ER06–15–001.

Applicants: Southwest Power Pool,

Inc.

Description: Southwest Power Pool,

Inc and Midwest ISO submit a

compliance filing in response to FERC’s

12/05/05 deficiency letter.

Filed Date: 01/11/2006.

Accession Number: 20060113–0144.

Comment Date: 5 p.m. eastern time on

Wednesday, February 1, 2006.

Docket Numbers: ER06–39–001.

Applicants: California Independent

System Operator Corporation.

Description: The California

Independent System Operator Corp

submits its filing in compliance with

FERC’s 12/9/05 Order.

Filed Date: 01/09/2006.

Accession Number: 20060112–0354.

Comment Date: 5 p.m. eastern time on

Monday, January 30, 2006.

Docket Numbers: ER06–140–001.

Applicants: American Electric Power

Service Corporation.

Description: American Electric Power

Service Corp as agent for Indiana

Michigan Power Co’s response to FERC’s

12/22/05 letter re Cost-Based Formula

Rate Agreement.

Filed Date: 01/11/2006.

Accession Number: 20060113–0141.

Comment Date: 5 p.m. eastern time on

Wednesday, February 1, 2006.

Docket Numbers: ER06–147–000;

ER06–462–000.

Applicants: Kentucky Utilities

Company.

Description: Letter Requesting that the

Commission Delay the Effective Date of

E:\FR\FM\25JAN1.SGM

25JAN1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.