jlentini on PROD1PC65 with NOTICES

74512

Federal Register / Vol. 71, No. 238 / Tuesday, December 12, 2006 / Notices

revision to the Interconnection and

Local Delivery Service Agreement 1262

with Wabash Valley Power Association.

Filed Date: 12/01/2006.

Accession Number: 20061205–0023.

Comment Date: 5 p.m. Eastern Time

on Friday, December 22, 2006.

Docket Numbers: ER07–279–000.

Applicants: Kentucky Utilities

Company.

Description: Kentucky Utilities

Company submits amendment to their

contract with City of Falmouth,

Kentucky Rate Schedule 310.

Filed Date: 12/01/2006.

Accession Number: 20061205–0018.

Comment Date: 5 p.m. Eastern Time

on Friday, December 22, 2006.

Docket Numbers: ER07–280–000.

Applicants: Kentucky Utilities

Company.

Description: Kentucky Utilities Co

submits amendments to their contract

with City of Corbin, Kentucky Rate

Schedule 309.

Filed Date: 12/01/2006.

Accession Number: 20061205–0019.

Comment Date: 5 p.m. Eastern Time

on Friday, December 22, 2006.

Docket Numbers: ER07–282–000.

Applicants: Southwest Power Pool,

Inc.

Description: Southwest Power Pool,

Inc submits an executed service

agreement for firm point-to-point

transmission service with Kansas Power

Pool.

Filed Date: 12/01/2006.

Accession Number: 20061205–0003.

Comment Date: 5 p.m. Eastern Time

on Friday, December 22, 2006.

Docket Numbers: ER07–283–000.

Applicants: Southwest Power Pool,

Inc.

Description: Southwest Power Pool,

Inc submits an executed service

agreement for Network Integration

Transmission Service with Kansas

Power Pool.

Filed Date: 12/01/2006.

Accession Number: 20061205–0021.

Comment Date: 5 p.m. Eastern Time

on Friday, December 22, 2006.

Docket Numbers: ER07–285–000.

Applicants: New York Independent

System Operator, Inc.

Description: New York Independent

System Operator Inc submits revisions

to its Market Administration and

Control Area Service Tariff.

Filed Date: 12/01/2006.

Accession Number: 20061205–0020.

Comment Date: 5 p.m. Eastern Time

on Friday, December 22, 2006.

Docket Numbers: ER07–287–000.

Applicants: Klondike Wind Power III

LLC.

VerDate Aug<31>2005

18:00 Dec 11, 2006

Jkt 211001

Description: MidAmerican Energy

Company submits an amended Network

Integration Transmission Service

Agreement and an amended

Interconnection and Network Operating

Agreement w/Indianola Municipal

Utilities.

Filed Date: 12/01/2006.

Accession Number: 20061205–0022.

Comment Date: 5 p.m. Eastern Time

on Friday, December 22, 2006.

Docket Numbers: ER97–2846–011;

ER99–2311–008; ER01–2928–010;

ER01–1418–007; ER99–2324–004;

ER01–1310–008; ER03–398–008.

Applicants: Florida Power

Corporation; Carolina Power & Light

Company; Progress Ventures, Inc.;

Efffingham County Power, LLC; MPC

Generating, LLC; Walton County Power,

LLC; Washington County Power, LLC.

Description: Progress Energy, Inc on

behalf of Florida Power Corp submits

notice of change in status re the

terminating agreement with Shady Hills

Power Co, LLC etc pursuant to Order

652.

Filed Date: 12/01/2006.

Accession Number: 20061205–0026.

Comment Date: 5 p.m. Eastern Time

on Friday, December 22, 2006.

Any person desiring to intervene or to

protest in any of the above proceedings

must file in accordance with Rules 211

and 214 of the Commission’s Rules of

Practice and Procedure (18 CFR 385.211

and 385.214) on or before 5 p.m. Eastern

time on the specified comment date. It

is not necessary to separately intervene

again in a subdocket related to a

compliance filing if you have previously

intervened in the same docket. Protests

will be considered by the Commission

in determining the appropriate action to

be taken, but will not serve to make

protestants parties to the proceeding.

Anyone filing a motion to intervene or

protest must serve a copy of that

document on the Applicant. In reference

to filings initiating a new proceeding,

interventions or protests submitted on

or before the comment deadline need

not be served on persons other than the

Applicant.

The Commission encourages

electronic submission of protests and

interventions in lieu of paper, using the

FERC Online links at http://

www.ferc.gov. To facilitate electronic

service, persons with Internet access

who will eFile a document and/or be

listed as a contact for an intervenor

must create and validate an

eRegistration account using the

eRegistration link. Select the eFiling

link to log on and submit the

intervention or protests.

Persons unable to file electronically

should submit an original and 14 copies

PO 00000

Frm 00028

Fmt 4703

Sfmt 4703

of the intervention or protest to the

Federal Energy Regulatory Commission,

888 First St. NE., Washington, DC

20426.

The filings in the above proceedings

are accessible in the Commission’s

eLibrary system by clicking on the

appropriate link in the above list. They

are also available for review in the

Commission’s Public Reference Room in

Washington, DC. There is an

eSubscription link on the Web site that

enables subscribers to receive e-mail

notification when a document is added

to a subscribed dockets(s). For

assistance with any FERC Online

service, please e-mail

FERCOnlineSupport@ferc.gov or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Magalie R. Salas,

Secretary.

[FR Doc. E6–21100 Filed 12–11–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. PF06–34–000]

Ozark Gas Transmission, LLC; Notice

of Intent To Prepare an Environmental

Impact Statement for the Proposed

East End Expansion Project, and

Request for Comments on

Environmental Issues

December 4, 2006.

The staff of the Federal Energy

Regulatory Commission (FERC or

Commission) will prepare an

environmental impact statement (EIS)

that will identify and address the

environmental impacts that could result

from the construction and operation of

the East End Expansion Project

proposed by Ozark Gas Transmission,

LLC (OGT).

In order to assist staff with the

identification of environmental issues

and to comply with the requirements of

the National Environmental Policy Act

of 1969 (NEPA), a scoping period has

been opened to receive comments on

the proposed project. Please note that

the scoping period for this project will

close on January 31, 2007.

Comments may be submitted in

written form or verbally. Further details

on how to submit written comments are

provided in the Public Participation

section of this notice. In lieu of sending

written comments, we invite you to

attend the public scoping meetings that

will be scheduled in mid January across

the project region. A second notice will

E:\FR\FM\12DEN1.SGM

12DEN1

Federal Register / Vol. 71, No. 238 / Tuesday, December 12, 2006 / Notices

be issued in December to provide the

meeting date, time, and locations.

This notice is being sent to affected

landowners; federal, state, and local

government agencies; elected officials;

environmental and public interest

groups; Native American tribes; other

interested parties; and local libraries

and newspapers. We encourage

government representatives to notify

their constituents of this planned

project and encourage them to comment

on their areas of concern. Details on

how to submit comments are provided

in the Public Participation section of

this notice.

If you are a landowner receiving this

notice, you may be contacted by an OGT

representative about the acquisition of

an easement to construct, operate, and

maintain the proposed project facilities.

The pipeline company would seek to

negotiate a mutually acceptable

agreement. However, if the project is

approved by the FERC, that approval

conveys with it the right of eminent

domain. Therefore, if easement

negotiations fail to produce an

agreement, the pipeline company could

initiate condemnation proceedings in

accordance with state law.

A fact sheet prepared by the FERC

entitled ‘‘An Interstate Natural Gas

Facility on My Land? What Do I Need

To Know?’’ is available for viewing on

the FERC Internet Web site (http://

www.ferc.gov). This fact sheet addresses

a number of typically asked questions,

including the use of eminent domain

and how to participate in the FERC’s

proceedings.

jlentini on PROD1PC65 with NOTICES

Summary of the Proposed Project

OGT proposes to construct, own,

operate, and maintain a natural gas

pipeline to provide incremental

multiyear shipper requirements due to

expected regional supply and market

growth. OGT indicates that the

proposed facilities form the basis of an

incremental project that is designed to

optimize the placement of facilities to

meeting short term volume growth

requirements while taking into

consideration a long term design to meet

future anticipated transporter volume

growth to 2026. The proposed pipeline

would originate at the proposed

Wonderview Compressor Station near

Wonderview in Conway County,

Arkansas along OGT existing pipeline

right-of-way to Searcy, Arkansas and

extend to a terminus at the

interconnection with an existing

interstate pipeline located near Banner

in Calhoun County, Mississippi.

VerDate Aug<31>2005

18:00 Dec 11, 2006

Jkt 211001

The general location of the proposed

pipeline is shown in the figure included

as Appendix 1.1

The East End Expansion Project

facilities under FERC jurisdiction would

include:

• Approximately 225 miles of 36inch-diameter pipeline extension (East

End Expansion) and looping beginning

in Conway County, Arkansas and

ending in Calhoun County, Mississippi;

• Approximately 8 miles of 24-inchdiameter pipeline extension (Noark

Extension) from the existing Noark to

the proposed Wonderview Compressor

Station all within Conway County,

Arkansas;

• Three compressor stations—

Wonderview, Searcy, and Helena

Compressor Stations in Conway, White,

and Phillips County, Arkansas,

respectively each with two 10,000horsepower (hp) electric drive

compressors;

• Five new gas meter stations at

interconnects with existing interstate

pipelines, including:

—Texas Gas Meter Station in Coahoma

County, Mississippi;

—ANR Meter Station in Panola County,

Mississippi;

—Trunkline Meter Station in Panola

County, Mississippi;

—Tennessee Gas Meter Station in

Panola County, Mississippi;

—Columbia Gulf Meter Station in

Calhoun County, Mississippi;

• Interconnections between the OGT

existing 16-inch-diameter pipeline

(Noark) and the OGT existing 20-inchdiameter pipeline; and

• Four pig launching and receiving

facilities (one on the 24-inch-diameter

line and three on the 36-inch diameter

line), 24-inch side valve on the 36-inch

diameter line, and 14 mainline valves.

The project would be designed and

constructed to receive and transport

about 1.0 billion cubic feet of natural

gas per day. OGT proposes to have the

project constructed and operational by

December 2008.

Land Requirements for Construction

As proposed, the typical construction

right-of-way for the project pipeline

would be 115-feet-wide for the 36-inchdiameter pipeline and 115-feet-wide for

the 24-inch-diameter pipeline.

Following construction, OGT would

retain a 75-foot-wide permanent rightof-way for operation of the project.

Additional, temporary extra workspaces

beyond the typical construction right-ofway limits would be required at certain

feature crossings (e.g., roads, railroads,

1 The appendices referenced in this notice are not

being printed in the Federal Register.

PO 00000

Frm 00029

Fmt 4703

Sfmt 4703

74513

wetlands, or waterbodies), in areas with

steep side slopes, or in association with

special construction techniques.

Based on preliminary information,

construction of the proposed project

facilities would affect a total of about

3,414 acres of land. Following

construction, about 2,118 acres would

be maintained as permanent right-ofway, and about 126 acres of land would

be maintained as new aboveground

facility sites. The remaining 1,170 acres

of temporary workspace (including all

temporary construction rights-of-way,

extra workspaces, and pipe storage and

contractor yards) would be restored and

allowed to revert to its former use.

The EIS Process

NEPA requires the Commission to

take into account the environmental

impacts that could result from an action

when it considers whether or not an

interstate natural gas pipeline should be

approved. The FERC will use the EIS to

consider the environmental impact that

could result if the OGT project is

authorized under section 7 of the

Natural Gas Act. NEPA also requires us

to discover and address concerns the

public may have about proposals to be

considered by the Commission. This

process is referred to as ‘‘scoping.’’ The

main goal of the scoping process is to

focus the analysis in the EIS on the

important environmental issues. With

this Notice of Intent, the Commission

staff is requesting public comments on

the scope of the issues to be addressed

in the EIS. All comments received will

be considered during preparation of the

EIS.

In the EIS we will discuss impacts

that could occur as a result of the

construction and operation of the

proposed project under these general

headings:

• Geology and soils;

• Water resources;

• Wetlands and vegetation;

• Fish and wildlife;

• Threatened and endangered

species;

• Land use, recreation, and visual

resources;

• Air quality and noise;

• Cultural resources;

• Socioeconomics;

• Reliability and safety; and

• Cumulative impacts.

In the EIS, we will also evaluate

possible alternatives to the proposed

project or portions of the project, and

make recommendations on how to

lessen or avoid impacts on affected

resources.

Our independent analysis of the

issues will be included in a draft EIS.

The draft EIS will be mailed to federal,

E:\FR\FM\12DEN1.SGM

12DEN1

74514

Federal Register / Vol. 71, No. 238 / Tuesday, December 12, 2006 / Notices

state, and local government agencies;

elected officials; environmental and

public interest groups; Native American

tribes; affected landowners;

commentors; other interested parties;

local libraries and newspapers; and the

FERC’s official service list for this

proceeding. A 45-day comment period

will be allotted for review of the draft

EIS. We will consider all comments on

the draft EIS and revise the document,

as necessary, before issuing a final EIS.

We will consider all comments on the

final EIS before we make our

recommendations to the Commission.

To ensure that your comments are

considered, please follow the

instructions in the Public Participation

section of this notice.

Although no formal application has

been filed, the FERC staff has already

initiated its NEPA review under the

Commission’s Pre-filing Process. The

purpose of the Pre-filing Process is to

encourage the early involvement of

interested stakeholders and to identify

and resolve issues before an application

is filed with the FERC.

With this notice, we are asking

federal, state, and local governmental

agencies with jurisdiction and/or

special expertise with respect to

environmental issues, especially those

identified in Appendix 2, to express

their interest in becoming cooperating

agencies for the preparation of the EIS.

These agencies may choose to

participate once they have evaluated the

proposal relative to their

responsibilities. Agencies that would

like to request cooperating status should

follow the instructions for filing

comments provided in Appendix 2.

jlentini on PROD1PC65 with NOTICES

Currently Identified Environmental

Issues

The EIS will discuss impacts that

could occur as a result of the

construction and operation of the

proposed project. We have already

identified several issues that we think

deserve attention based on a

preliminary review of the project site

and the facility information provided by

OGT. This preliminary list of issues may

be changed based on your comments

and our analysis.

• Potential effects on prime farmland

and erodable soils.

• Potential impacts to perennial and

intermittent waterbodies, including

waterbodies with federal and/or state

designations/protections.

• Evaluation of temporary and

permanent impacts on wetlands and

development of appropriate mitigation.

• Potential impacts to fish and

wildlife habitat, including potential

VerDate Aug<31>2005

18:00 Dec 11, 2006

Jkt 211001

impacts to federally and state-listed

threatened and endangered species.

• Potential visual effects of the

aboveground facilities on surrounding

areas.

• Potential impacts and potential

benefits of construction workforce on

local housing, infrastructure, public

services, and economy.

• Potential impacts to local air and

noise quality associated with

construction and operation.

• Public safety and potential hazards

associated with the transport of natural

gas.

• Alternative alignments for the

pipeline route and alternative sites for

the compressor stations.

Public Participation

You can make a difference by

providing us with your specific

comments or concerns about the

proposed project. By becoming a

commentor, your concerns will be

addressed in the EIS and considered by

the Commission. Your comments

should focus on the potential

environmental effects, reasonable

alternatives (including alternative

facility sites and pipeline routes), and

measures to avoid or lessen

environmental impact. The more

specific your comments, the more useful

they will be. To ensure that your

comments are timely and properly

recorded, please carefully follow these

instructions:

• Send an original and two copies of

your letter to: Magalie R. Salas,

Secretary, Federal Energy Regulatory

Commission, 888 First St., NE., Room

1A, Washington, DC 20426.

• Label one copy of your comments

for the attention of Gas Branch 2, DG2E.

• Reference Docket No. PF06–34–000

on the original and both copies.

• Mail your comments so that they

will be received in Washington, DC on

or before January 31, 2007.

Please note that we are continuing to

experience delays in mail deliveries

from the U.S. Postal Service. As a result,

we will include all comments that we

receive within a reasonable time frame

in our environmental analysis of this

project. The Commission strongly

encourages electronic filing of any

comments in response to this Notice of

Intent. For information on electronically

filing comments, please see the

instructions on the Commission’s Web

site at http://www.ferc.gov.

The public scoping meetings (dates,

times, and locations) will be provided at

a later date in a separate notice. Scoping

meetings are designed to provide

another opportunity to offer comments

on the proposed project. Interested

PO 00000

Frm 00030

Fmt 4703

Sfmt 4703

groups and individuals are encouraged

to attend the meetings and to present

comments on the environmental issues

they believe should be addressed in the

EIS. A transcript of each meeting will be

generated so that your comments will be

accurately recorded.

Once OGT formally files its

application with the Commission, you

may want to become an official party to

the proceeding known as an

‘‘intervenor.’’ Intervenors play a more

formal role in the process and are able

to file briefs, appear at hearings, and be

heard by the courts if they choose to

appeal the Commission’s final ruling.

An intervenor formally participates in a

Commission proceeding by filing a

request to intervene. Instructions for

becoming an intervenor are included in

the User’s Guide under the ‘‘e-filing’’

link on the Commission’s Web site.

Please note that you may not request

intervenor status at this time. You must

wait until a formal application is filed

with the Commission.

Environmental Mailing List

An effort is being made to send this

notice to all individuals, organizations,

and government entities interested in

and/or potentially affected by the

proposed project. This includes all

landowners who are potential right-ofway grantors, whose property may be

used temporarily for project purposes,

or who own homes within distances

defined in the Commission’s regulations

of certain aboveground facilities.

If you received this notice, you are on

the environmental mailing list for this

project. If you do not want to send

comments at this time, but still want to

remain on our mailing list, please return

the Information Request (Appendix 3). If

you do not return the Information

Request, you will be removed from the

Commission’s environmental mailing

list.

Availability of Additional Information

Additional information about the

project is available from the

Commission’s Office of External Affairs,

at 1–866–208–FERC (3372) or on the

FERC Internet Web site http://

www.ferc.gov. The ‘‘eLibrary link’’ on

the FERC Web site provides access to

documents submitted to and issued by

the Commission, such as comments,

orders, notices and rulemakings. Once

on the FERC Web site, click on the

‘‘eLibrary link,’’ select ‘‘General Search’’

and in the ‘‘Docket Number’’ field enter

the project docket number excluding the

last three digits (PF06–34). When

researching information be sure to select

an appropriate date range. In addition,

the FERC now offers a free e-mail

E:\FR\FM\12DEN1.SGM

12DEN1

Federal Register / Vol. 71, No. 238 / Tuesday, December 12, 2006 / Notices

service called eSubscription that allows

you to keep track of all formal issuances

and submittals in specific dockets. This

can reduce the amount of time you

spend researching proceedings by

automatically providing you with

notification of these filings, document

summaries and direct links to the

documents. To register for this service,

go to http://www.ferc.gov/

esubscribenow.htm.

Public meetings or site visits will be

posted on the Commission’s calendar

located at http://www.ferc.gov/

EventCalendar/EventsList.aspx along

with other related information.

For assistance with the FERC Web site

or with eSubscription, please contact

FERC Online Support at

FERCOnlineSupport@ferc.gov or toll

free at 1–866–208–3676, or TTY, contact

(202) 502–8659.

Finally, OGT has established an

Internet Web site for this project at

http://www.eastendexpansion@

ozarkgastransmission.com. The Web

site includes a description of the

project, a map of the proposed pipeline

route, and answers to frequently asked

questions. You can also request

additional information or provide

comments directly to OGT thorough

their Operations Communication Center

at 1–888–593–8207.

Magalie R. Salas,

Secretary.

[FR Doc. E6–21052 Filed 12–11–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Project No. 2085]

Southern California Edison Company;

Notice of Application and ApplicantPrepared EA Accepted for Filing,

Soliciting Motions To Intervene and

Protests, and Soliciting Comments,

and Final Recommendations, Terms

and Conditions, and Prescriptions

jlentini on PROD1PC65 with NOTICES

December 5, 2006.

Take notice that the following

hydroelectric application and applicantprepared environmental assessment has

been filed with the Commission and is

available for public inspection.

a. Type of Application: New—Major

License.

b. Project No.: 2085–014.

c. Date Filed: November 29, 2005.

d. Applicant: Southern California

Edison Company.

e. Name of Project: Mammoth Pool

Hydroelectric Power Project.

VerDate Aug<31>2005

18:00 Dec 11, 2006

Jkt 211001

f. Location: On the San Joaquin River,

near North Fork, California. The project

affects 2,036 cres of Federal land

administered by the Sierra National

Forest.

g. Filed Pursuant to: Federal Power

Act 16 U.S.C. 791(a)–825(r).

h. Applicant Contact: Russ W.

Krieger, Vice President Power

Production, Southern California Edison

Company, 300 N. Lone Hill Ave., San

Dimas, CA 91773. Phone: 909–394–

8667.

i. FERC Contact: Jim Fargo at (202)

502–6095, or e-mail:

james.fargo@ferc.gov.

j. Deadline for filing motions to

intervene and protests, comments, and

final recommendations, terms and

conditions, and prescriptions is 60 days

from the issuance date of this notice;

reply comments are due 105 days from

the issuance date of this notice.

All documents (original and eight

copies) should be filed with: Magalie R.

Salas, Secretary, Federal Energy

Regulatory Commission, 888 First

Street, NE., Washington, DC 20426.

The Commission’s Rules of Practice

require all intervenors filing documents

with the Commission to serve a copy of

that document on each person on the

official service list for the project.

Further, if an intervenor files comments

or documents with the Commission

relating to the merits of an issue that

may affect the responsibilities of a

particular resource agency, they must

also serve a copy of the document on

that resource agency.

Motions to intervene and protests,

comments, recommendations, terms and

conditions, and prescriptions may be

filed electronically via the Internet in

lieu of paper. The Commission strongly

encourages electronic filings. See 18

CFR 385.2001(a)(1)(iii) and the

instructions on the Commission’s Web

site http://www.ferc.gov under the ‘‘eFiling’’ link.

k. This application has been accepted

for filing.

l. Description of project: the Project is

located in the central Sierra Nevada,

within the San Joaquin River watershed,

about 50 miles northeast of the City of

Fresno. The Project is operated as a

reservoir-storage type plant with an

installed operating capacity of 190.0

MW and a dependable operating

capacity of 187.0 MW. Water for the

Project is taken from the San Joaquin

River, Ross Creek, and Rock Creek and

conveyed to the Mammoth Pool

Powerhouse through the Mammoth Pool

Tunnel.

The Project facilities include: the

Mammoth Pool Dam forming Mammoth

Pool Reservoir, with a capacity of about

PO 00000

Frm 00031

Fmt 4703

Sfmt 4703

74515

119,940 acre-feet at an elevation of

about 3,330 feet above mean sea level;

one power tunnel about 7.5 miles long,

to convey water from Mammoth Pool

Reservoir to Mammoth Pool

Powerhouse; two small diversions on

Rock Creek and Ross Creek; and one 230

kV transmission line about 6.7 miles

long that connects the Mammoth Pool

Powerhouse to the non-project Big

Creek No. 3 Switchyard. Type of

Application: New—Major Modified

License

m. A copy of the application is

available for review at the Commission

in the Public Reference Room or may be

viewed on the Commission’s Web site at

http://www.ferc.gov using the

‘‘eLibrary’’ link. Enter the docket

number excluding the last three digits in

the docket number field to access the

document. For assistance, contact FERC

Online Support at

FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,

(202) 502–8659. A copy is also available

for inspection and reproduction at the

address in item h above.

n. Anyone may submit comments, a

protest, or a motion to intervene in

accordance with the requirements of

Rules of Practice and Procedure, 18 CFR

385.210, .211, .214. In determining the

appropriate action to take, the

Commission will consider all protests or

other comments filed, but only those

who file a motion to intervene in

accordance with the Commission’s

Rules may become a party to the

proceeding. Any comments, protests, or

motions to intervene must be received

on or before the specified comment date

for the particular application.

All filings must (1) bear in all capital

letters the title ‘‘PROTEST’’, ‘‘MOTION

TO INTERVENE’’, ‘‘COMMENTS’’,

‘‘REPLY COMMENTS’’,

‘‘RECOMMENDATIONS’’, ‘‘TERMS

AND CONDITIONS’’, or

‘‘PRESCRIPTIONS’’; (2) set forth in the

heading the name of the applicant and

the project number of the application to

which the filing responds; (3) furnish

the name, address, and telephone

number of the person protesting or

intervening; and (4) otherwise comply

with the requirements of 18 CFR

385.2001 through 385.2005. All

comments, recommendations, terms and

conditions or prescriptions must set

forth their evidentiary basis and

otherwise comply with the requirements

of 18 CFR 4.34(b). Agencies may obtain

copies of the application directly from

the applicant. A copy of any protest or

motion to intervene must be served

upon each representative of the

applicant specified in the particular

application. A copy of all other filings

E:\FR\FM\12DEN1.SGM

12DEN1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.