Federal Register / Vol. 71, No. 91 / Thursday, May 11, 2006 / Notices
Agency decision
Ask Donna
What actually matters in this document.
Text
Federal Register / Vol. 71, No. 91 / Thursday, May 11, 2006 / Notices
to the documents. Go to http://
www.ferc.gov/esubscribenow.htm.
information, contact Patrick Murphy at
(202) 502–8755.
Magalie R. Salas,
Secretary.
[FR Doc. E6–7199 Filed 5–10–06; 8:45 am]
Magalie R. Salas,
Secretary.
[FR Doc. E6–7191 Filed 5–10–06; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. CP05–396–000]
cchase on PROD1PC60 with NOTICES
[Project No. 9185–009-WI]
Flambeau Hydro, LLC; Notice of
Availability of Environmental
Assessment
Sabine Pass LNG, LP; Notice of
Availability of the Environmental
Assessment for the Proposed Sabine
Pass LNG Terminal Phase II Project
May 5, 2006.
May 5, 2006.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s regulations, 18 CFR part
380 (Order No. 486, 52 FR 47879), the
Office of Energy Projects has reviewed
the application for a subsequent license
for the Clam River Hydroelectric Project,
located on the Clam River, 9.5 miles
northwest of Webster, Wisconsin in
Burnett County, and has prepared an
Environmental Assessment (EA). In the
EA, Commission staff analyze the
potential environmental effects of
relicensing the project and conclude
that issuing a subsequent license for the
project, with appropriate environmental
measures, would not constitute a major
Federal action significantly affecting the
quality of the human environment.
A copy of the EA is on file with the
Commission and is available for public
inspection. The EA may also be viewed
on the Commission’s Web site at
http://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
Any comments should be filed within
30 days from the issuance date of this
notice, and should be addressed to the
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Room 1–A, Washington, DC 20426.
Please affix ‘‘Clam River Project No.
9185–009’’ to all comments. Comments
may be filed electronically via Internet
in lieu of paper. The Commission
strongly encourages electronic filings.
See 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘eFiling’’ link. For further
The staff of the Federal Energy
Regulatory Commission (Commission or
FERC) has prepared an environmental
assessment (EA) on the liquefied natural
gas (LNG) facilities proposed by Sabine
Pass LNG, L.P. (SPLNG) in the abovereferenced docket. The Sabine Pass LNG
Terminal Phase II Project (Project)
would be located in Cameron Parish,
Louisiana.
The EA was prepared to satisfy the
requirements of the National
Environmental Policy Act. The staff
concludes that approval of the proposed
Project, with appropriate mitigating
measures, would not constitute a major
Federal action significantly affecting the
quality of the human environment. This
EA evaluates alternatives to the
proposal, including system alternatives
and site layout alternatives for the LNG
import terminal, impact of Ambient Air
Vaporizers, and air emissions.
The U.S. Army Corps of Engineers
(COE), U.S. Coast Guard (Coast Guard),
and U.S. Fish and Wildlife Service
(FWS) have all participated as
cooperating agencies in the preparation
of the EA.
The EA assesses the potential
environmental effects of the
construction and operation of the
following facilities:
• Sixteen (16) ambient air
vaporization trains (AAV Trains), one of
which would be installed significantly
before the others as a pilot AAV Train
for testing purposes;
• Eight (8) SCV Trains;
• One (1) pilot AAV Train;
• Three (3) LNG storage tanks;
• Two (2) LNG transfer lines;
• Two (2) BOG compressors;
• Two (2) BOG condensing systems;
• Four (4) shell and tube heat
exchangers;
• Two (2) vapor return blowers;
• One (1) simple cycle gas turbine
generator; and
VerDate Aug<31>2005
16:29 May 10, 2006
Jkt 208001
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
27493
• Two (2) 30-inch natural gas
pipelines from the Project process area
to new main meters.
The EA has been placed in the public
files of the FERC and is available for
public inspection at: Federal Energy
Regulatory Commission, Public
Reference Room, 888 First Street, NE.,
Room 2A, Washington, DC 20426, (202)
502–8371.
A limited number of copies are
available from the FERC’s Public
Reference Room identified above. In
addition, copies of the EA have been
mailed to Federal, state, and local
government agencies; elected officials;
Native American tribes; local libraries
and newspapers; intervenors in the
FERC’s proceeding; individuals who
provided scoping comments; and
affected landowners and individuals.
Any person wishing to comment on
the EA may do so. To ensure
consideration prior to a Commission
decision on the proposal, it is important
that we receive your comments before
the date specified below. Please
carefully follow these instructions to
ensure that your comments are received
in time and properly recorded:
• Send an original and two copies of
your comments to: Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Room 1A, Washington,
DC 20426;
• Label one copy of the comments for
the attention of the Gas Branch 2,
PJ11.2;
• Reference Docket No. CP05–396–
000; and
• Mail your comments so that they
will be received in Washington, DC on
or before June 5, 2006.
The Commission strongly encourages
electronic filing of any comments or
interventions or protests to this
proceeding. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site at http://
www.ferc.gov under the ‘‘e-Filing’’ link
and the link to the User’s Guide. Before
you can file comments, you will need to
create a free account, which can be
created by clicking on ‘‘Sign-up.’’
Additional information about the
Project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC (3372) or on the
FERC Internet Web site using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number excluding the last three
digits in the Docket Number field. Be
sure you have selected an appropriate
date range. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
contact (202) 502–8659. The eLibrary
E:\FR\FM\11MYN1.SGM
11MYN1
27494
Federal Register / Vol. 71, No. 91 / Thursday, May 11, 2006 / Notices
link also provides access to the texts of
the formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service call eSubscription,
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries, and direct links
to the documents. Go to http://
www.ferc.gov/esubscribenow.htm.
Magalie R. Salas,
Secretary.
[FR Doc. E6–7192 Filed 5–10–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2111]
PacifiCorp; Notice of Authorization for
Continued Project Operation
cchase on PROD1PC60 with NOTICES
May 4, 2006.
On April 28, 2004, PacifiCorp,
licensee for the Swift No. 1
Hydroelectric Project, filed an
application for a new or subsequent
license pursuant to the Federal Power
Act (FPA) and the Commission’s
regulations thereunder. The Swift No. 1
Project is located on the Lewis River in
Skamania County, Washington.
The license for Project No. 2111 was
issued for a period ending April 30,
2006. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
VerDate Aug<31>2005
16:29 May 10, 2006
Jkt 208001
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2111
is issued to PacifiCorp for a period
effective May 1, 2006 through April 30,
2007, or until the issuance of a new
license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before April 30, 2007, notice
is hereby given that, pursuant to 18 CFR
16.18(c), an annual license under
section 15(a)(1) of the FPA is renewed
automatically without further order or
notice by the Commission, unless the
Commission orders otherwise. If the
project is not subject to section 15 of the
FPA, notice is hereby given that
PacifiCorp, is authorized to continue
operation of the Swift No. 1 Project until
such time as the Commission acts on its
application for a subsequent license.
Magalie R. Salas,
Secretary.
[FR Doc. E6–7167 Filed 5–10–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 935]
PacifiCorp; Notice of Authorization for
Continued Project Operation
May 4, 2006.
On April 28, 2004, PacifiCorp,
licensee for the Merwin Hydroelectric
Project, filed an application for a new or
subsequent license pursuant to the
Federal Power Act (FPA) and the
Commission’s regulations thereunder.
The Merwin Project is located on the
Lewis River in Clark and Cowlitz
County, Washington.
The license for Project No. 935 was
initially issued for a period ending
December 11, 2009. On April 8, 1999,
the Commission amended the license
and accelerated the Merwin project
expiration date to April 30, 2006.
Section 15(a)(1) of the FPA, 16 U.S.C.
808(a)(1), requires the Commission, at
the expiration of a license term, to issue
from year-to-year an annual license to
the then licensee under the terms and
conditions of the prior license until a
new license is issued, or the project is
otherwise disposed of as provided in
section 15 or any other applicable
section of the FPA. If the project’s prior
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
license waived the applicability of
section 15 of the FPA, then, based on
section 9(b) of the Administrative
Procedure Act, 5 U.S.C. 558(c), and as
set forth at 18 CFR 16.21(a), if the
licensee of such project has filed an
application for a subsequent license, the
licensee may continue to operate the
project in accordance with the terms
and conditions of the license after the
minor or minor part license expires,
until the Commission acts on its
application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 935 is
issued to PacifiCorp for a period
effective May 1, 2006 through April 30,
2007, or until the issuance of a new
license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before April 30, 2007, notice
is hereby given that, pursuant to 18 CFR
16.18(c), an annual license under
section 15(a)(1) of the FPA is renewed
automatically without further order or
notice by the Commission, unless the
Commission orders otherwise. If the
project is not subject to section 15 of the
FPA, notice is hereby given that
PacifiCorp, is authorized to continue
operation of the Merwin Project until
such time as the Commission acts on its
application for a subsequent license.
Magalie R. Salas,
Secretary.
[FR Doc. E6–7169 Filed 5–10–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Comments,
Protests, and Motions To Intervene
May 3, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12660–000.
c. Date Filed: March 13, 2006.
d. Applicant: TDX Power, Inc.
E:\FR\FM\11MYN1.SGM
11MYN1
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.