HSRObinson on PROD1PC61 with NOTICES (2006)

Agency decision

Ask Donna

What actually matters in this document.

Text

HSRObinson on PROD1PC61 with NOTICES

Federal Register / Vol. 71, No. 71 / Thursday, April 13, 2006 / Notices

(Northern) tendered for filing to become

part its FERC Gas Tariff, Fifth Revised

Volume No. 1, 38 Revised Sheet No. 66

and 31 Revised Sheet No. 66A,

proposed to be effective on April 1,

2006.

Northern further states that copies of

the filing have been mailed to each of

its customers and interested State

Commissions.

Any person desiring to intervene or to

protest this filing must file in

accordance with Rules 211 and 214 of

the Commission’s Rules of Practice and

Procedure (18 CFR 385.211 and

385.214). Protests will be considered by

the Commission in determining the

appropriate action to be taken, but will

not serve to make protestants parties to

the proceeding. Any person wishing to

become a party must file a notice of

intervention or motion to intervene, as

appropriate. Such notices, motions, or

protests must be filed in accordance

with the provisions of Section 154.210

of the Commission’s regulations (18 CFR

154.210). Anyone filing an intervention

or protest must serve a copy of that

document on the Applicant. Anyone

filing an intervention or protest on or

before the intervention or protest date

need not serve motions to intervene or

protests on persons other than the

Applicant.

The Commission encourages

electronic submission of protests and

interventions in lieu of paper using the

‘‘eFiling’’ link at http://www.ferc.gov.

Persons unable to file electronically

should submit an original and 14 copies

of the protest or intervention to the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Magalie R. Salas,

Secretary.

[FR Doc. E6–5452 Filed 4–12–06; 8:45 am]

BILLING CODE 6717–01–P

VerDate Aug<31>2005

14:20 Apr 12, 2006

Jkt 208001

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. ER06–634–000]

Spruance Genco, LLC; Notice of

Issuance of Order

April 6, 2006.

Spruance Genco, LLC (Spruance

Genco) filed an application for marketbased rate authority, with an

accompanying tariff. The proposed

market-based rate tariff provides for the

sale of energy, capacity and ancillary

services at market-based rates. Spruance

Genco also requested waiver of various

Commission regulations. In particular,

Spruance Genco requested that the

Commission grant blanket approval

under 18 CFR part 34 of all future

issuances of securities and assumptions

of liability by Spruance Genco.

On April 5, 2006, pursuant to

delegated authority, the Director,

Division of Tariffs and Market

Development—West, granted the

request for blanket approval under part

34. The Director’s order also stated that

the Commission would publish a

separate notice in the Federal Register

establishing a period of time for the

filing of protests. Accordingly, any

person desiring to be heard or to protest

the blanket approval of issuances of

securities or assumptions of liability by

Spruance Genco should file a motion to

intervene or protest with the Federal

Energy Regulatory Commission, 888

First Street, NE., Washington, DC 20426,

in accordance with Rules 211 and 214

of the Commission’s Rules of Practice

and Procedure. 18 CFR 385.211, 385.214

(2004).

Notice is hereby given that the

deadline for filing motions to intervene

or protest is May 5, 2006.

Absent a request to be heard in

opposition by the deadline above,

Spruance Genco is authorized to issue

securities and assume obligations or

liabilities as a guarantor, indorser,

surety, or otherwise in respect of any

security of another person; provided

that such issuance or assumption is for

some lawful object within the corporate

purposes of Spruance Genco,

compatible with the public interest, and

is reasonably necessary or appropriate

for such purposes.

The Commission reserves the right to

require a further showing that neither

public nor private interests will be

adversely affected by continued

approval of Spruance Genco’s issuances

of securities or assumptions of liability.

Copies of the full text of the Director’s

Order are available from the

PO 00000

Frm 00024

Fmt 4703

Sfmt 4703

19183

Commission’s Public Reference Room,

888 First Street, NE., Washington, DC

20426. The Order may also be viewed

on the Commission’s Web site at

http://www.ferc.gov, using the eLibrary

link. Enter the docket number excluding

the last three digits in the docket

number filed to access the document.

Comments, protests, and interventions

may be filed electronically via the

Internet in lieu of paper. See, 18 CFR

385.2001(a)(1)(iii) and the instructions

on the Commission’s Web site under the

‘‘e-Filing’’ link. The Commission

strongly encourages electronic filings.

Magalie R. Salas,

Secretary.

[FR Doc. E6–5443 Filed 4–12–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. CP06–94–000]

Southern Star Central Gas Pipeline,

Inc.; Notice of Intent to Prepare an

Environmental Assessment for the

Proposed Ozark Trails Expansion

Project and Request for Comments on

Environmental Issues

April 6, 2006.

The staff of the Federal Energy

Regulatory Commission (FERC or

Commission) will prepare an

environmental assessment (EA) that will

discuss the environmental impacts of

the Ozark Trails Expansion Project

involving construction and operation of

facilities by Southern Star Central Gas

Pipeline, Inc. (Southern Star) in (Labette

and Montgomery counties, Kansas and

Christian, Greene, Jasper, and Newton

counties, Missouri).1 The project would

include about 2 miles of various

diameter pipelines, uprating 13.5 mile

of pipeline from a maximum allowable

operating pressure (MAOP) of 720

pounds per square inch gauge (psig) to

877 psig, and modifications at two

existing compressor stations. No

additional horsepower of compression

is proposed. This EA will be used by the

Commission in its decision-making

process to determine whether the

project is in the public convenience and

necessity.

If you are a landowner receiving this

notice, you may be contacted by a

pipeline company representative about

the acquisition of an easement to

construct, operate, and maintain the

1 Southern Star’s application was filed with the

Commission under section 7 of the Natural Gas Act

and part 157 of the Commission’s regulations.

E:\FR\FM\13APN1.SGM

13APN1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.