Federal Register / Vol. 72, No. 66 / Friday, April 6, 2007 / Notices
Agency decision
Ask Donna
What actually matters in this document.
Text
Federal Register / Vol. 72, No. 66 / Friday, April 6, 2007 / Notices
pwalker on PROD1PC71 with NOTICES
• Mail your comments so that they
will be received in Washington, DC on
or before May 4, 2007.
Please note that we are continuing to
experience delays in mail deliveries
from the U.S. Postal Service. As a result,
we will include all comments that we
receive within a reasonable time frame
in our environmental analysis of this
project. The Commission strongly
encourages electronic filing of any
comments in response to this Notice of
Intent. For information on electronically
filing comments, please see the
instructions on the Commission’s Web
site at http://www.ferc.gov.
The public scoping meetings are
designed to provide another opportunity
to offer comments on the proposed
project. Interested groups and
individuals are encouraged to attend the
meetings and to present comments on
the environmental issues they believe
should be addressed in the EIS. A
transcript of each meeting will be
generated so that your comments will be
accurately recorded.
Once Broadwater formally files its
application with the Commission, you
may want to become an official party to
the proceeding known as an
‘‘intervenor.’’ Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in a
Commission proceeding by filing a
request to intervene. Instructions for
becoming an intervenor are included in
the User’s Guide under the ‘‘e-filing’’
link on the Commission’s Web site.
Please note that you may not request
intervenor status at this time. You must
wait until a formal application is filed
with the Commission.
Environmental Mailing List
An effort is being made to send this
notice to all individuals, organizations,
and government entities interested in
and/or potentially affected by the
proposed project. This includes all
landowners who are potential right-ofway grantors, whose property may be
used temporarily for project purposes,
or who own homes within distances
defined in the Commission’s regulations
of certain aboveground facilities.
If you received this notice, you are on
the environmental mailing list for this
project. If you do not want to send
comments at this time, but still want to
remain on our mailing list, please return
the Information Request (Appendix 3). If
you do not return the Information
Request, you will be removed from the
Commission’s environmental mailing
list.
VerDate Aug<31>2005
18:39 Apr 05, 2007
Jkt 211001
Availability of Additional Information
DEPARTMENT OF ENERGY
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC (3372). Additional
information can also be found on the
Internet at http://www.ferc.gov. The
‘‘eLibrary link’’ on the FERC Web site
provides access to documents submitted
to and issued by the Commission, such
as comments, orders, notices and
rulemakings. Once on the FERC Web
site, click on the ‘‘eLibrary link,’’ select
‘‘General Search’’ and in the ‘‘Docket
Number’’ field enter the project docket
number excluding the last three digits
(PF07–1). When researching information
be sure to select an appropriate date
range. In addition, the FERC now offers
a free e-mail service called
eSubscription that allows you to keep
track of all formal issuances and
submittals in specific dockets. This can
reduce the amount of time you spend
researching proceedings by
automatically providing you with
notification of these filings, document
summaries and direct links to the
documents. To register for this service,
go to http://www.ferc.gov/
esubscribenow.htm.
Public meetings or site visits will be
posted on the Commission’s calendar
located at http://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
For assistance with the FERC Web site
or with eSubscription, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or TTY, contact
1–202–502–8659.
Finally, Boardwalk has established an
Internet Web site for this project at
http://www.gulfcrossing.com. The
website includes a description of the
project, a map of the proposed pipeline
route, and answers to frequently asked
questions. You can also request
additional information or provide
comments directly to Boardwalk at 1–
713–544–5420.
Federal Energy Regulatory
Commission
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–6443 Filed 4–5–07; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00065
Fmt 4703
Sfmt 4703
17155
Notice of Request for Extension of
Time To Commence and Complete
Project Construction and Soliciting
Comments, Motions To Intervene, and
Protests
April 2, 2007.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Request for
Extension of Time.
b. Project No: 11480–004.
c. Date Filed: March 19, 2007.
d. Applicant: Haida Corporation.
e. Name of Project: Upper Reynolds
Creek Hydroelectric Project.
f. Location: On Reynolds Creek, near
the town of Hydaburg, Copper River
Meridian, Prince of Wales, in the
Ketchikan County recording district,
Alaska.
g. Pursuant to: Pub. L. 109–297, 120
STAT. 1471.
h. Applicant Contact: Donald H.
Clarke, Law Offices of GKRSE, 1500 K
Street, NW., Suite 330, Washington, DC
20005; (202) 408–5400.
i. FERC Contact: Diane M. Murray,
Telephone: (202) 502–8838 and e-mail:
diane.murray@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: May
10, 2007.
All documents (original and eight
copies) should be filed with: Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. Please include the project
number (P–11480–004) on any
comments.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Request: The
licensee requests that the Commission
grant two, two-year extensions of time
from the existing deadlines to
commence and complete project
E:\FR\FM\06APN1.SGM
06APN1
pwalker on PROD1PC71 with NOTICES
17156
Federal Register / Vol. 72, No. 66 / Friday, April 6, 2007 / Notices
construction of the Jordan Dam
Hydroelectric Project. This will be the
first and second 2-year extensions of
three authorized by Public Law 109–
297. The requested new deadlines
would be October 24, 2008, and October
24, 2010, to commence and complete
construction, respectively.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
http://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at http://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, call toll-free 1–866–208–
3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h.
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Any filings must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
VerDate Aug<31>2005
18:39 Apr 05, 2007
Jkt 211001
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at http://www.ferc.gov under the ‘‘eFiling’’ link.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–6441 Filed 4–5–07; 8:45 am]
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
[Docket No. CP07–52–000]
Downeast LNG, Inc.; Notice of
Technical Conference
April 2, 2007.
On Wednesday, April 25, 2007, at 9
a.m. (EDT), staff of the Office of Energy
Projects will convene a cryogenic design
and technical conference regarding the
proposed Downeast LNG import
terminal. The cryogenic conference will
be held at the Calais Motor Inn at 663
Main Street, Calais, Maine 04619. For
Calais Motor Inn details call 1–800–
439–5531.
The conference will review the design
of the LNG storage tanks and facility,
instrumentation and controls, hazard
detection and controls, spill
containment, geotechnical topics, and
other issues related to the operation of
the proposed facility. Issues related to
environmental impacts and LNG vessel
transit are outside the scope of the
conference.
In view of the nature of critical energy
infrastructure information and security
issues to be explored, the cryogenic
conference will not be open to the
public. Attendance at this conference
will be limited to existing parties to the
proceeding (anyone who has
specifically requested to intervene as a
party) and to representatives of
interested federal, state, and local
agencies. Any person planning to attend
the April 25th cryogenic conference
must register by close of business on
Thursday, April 19, 2007. Registrations
may be submitted either online at
http://www.ferc.gov/whats-new/
registration/cryo-conf-form.asp or by
faxing a copy of the form (found at the
referenced online link) to 202–208–
0353. All attendees must sign a nondisclosure statement prior to entering
the conference. For additional
information regarding the cryogenic
Frm 00066
Fmt 4703
Sfmt 4703
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–6437 Filed 4–5–07; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6685–7]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
DEPARTMENT OF ENERGY
PO 00000
conference, please contact Tejal Patel at
202–502–6037.
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167.
Summary of Rating Definitions
Environmental Impact of the Action
LO—Lack of Objections
The EPA review has not identified
any potential environmental impacts
requiring substantive changes to the
proposal. The review may have
disclosed opportunities for application
of mitigation measures that could be
accomplished with no more than minor
changes to the proposal.
EC—Environmental Concerns
The EPA review has identified
environmental impacts that should be
avoided in order to fully protect the
environment. Corrective measures may
require changes to the preferred
alternative or application of mitigation
measures that can reduce the
environmental impact. EPA would like
to work with the lead agency to reduce
these impacts.
EO—Environmental Objections
The EPA review has identified
significant environmental impacts that
must be avoided in order to provide
adequate protection for the
environment. Corrective measures may
require substantial changes to the
preferred alternative or consideration of
some other project alternative
(including the no action alternative or a
new alternative). EPA intends to work
with the lead agency to reduce these
impacts.
EU—Environmentally Unsatisfactory
The EPA review has identified
adverse environmental impacts that are
E:\FR\FM\06APN1.SGM
06APN1
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.