Federal Register / Vol. 72, No. 66 / Friday, April 6, 2007 / Notices

Agency decision

Ask Donna

What actually matters in this document.

Text

Federal Register / Vol. 72, No. 66 / Friday, April 6, 2007 / Notices

pwalker on PROD1PC71 with NOTICES

• Mail your comments so that they

will be received in Washington, DC on

or before May 4, 2007.

Please note that we are continuing to

experience delays in mail deliveries

from the U.S. Postal Service. As a result,

we will include all comments that we

receive within a reasonable time frame

in our environmental analysis of this

project. The Commission strongly

encourages electronic filing of any

comments in response to this Notice of

Intent. For information on electronically

filing comments, please see the

instructions on the Commission’s Web

site at http://www.ferc.gov.

The public scoping meetings are

designed to provide another opportunity

to offer comments on the proposed

project. Interested groups and

individuals are encouraged to attend the

meetings and to present comments on

the environmental issues they believe

should be addressed in the EIS. A

transcript of each meeting will be

generated so that your comments will be

accurately recorded.

Once Broadwater formally files its

application with the Commission, you

may want to become an official party to

the proceeding known as an

‘‘intervenor.’’ Intervenors play a more

formal role in the process and are able

to file briefs, appear at hearings, and be

heard by the courts if they choose to

appeal the Commission’s final ruling.

An intervenor formally participates in a

Commission proceeding by filing a

request to intervene. Instructions for

becoming an intervenor are included in

the User’s Guide under the ‘‘e-filing’’

link on the Commission’s Web site.

Please note that you may not request

intervenor status at this time. You must

wait until a formal application is filed

with the Commission.

Environmental Mailing List

An effort is being made to send this

notice to all individuals, organizations,

and government entities interested in

and/or potentially affected by the

proposed project. This includes all

landowners who are potential right-ofway grantors, whose property may be

used temporarily for project purposes,

or who own homes within distances

defined in the Commission’s regulations

of certain aboveground facilities.

If you received this notice, you are on

the environmental mailing list for this

project. If you do not want to send

comments at this time, but still want to

remain on our mailing list, please return

the Information Request (Appendix 3). If

you do not return the Information

Request, you will be removed from the

Commission’s environmental mailing

list.

VerDate Aug<31>2005

18:39 Apr 05, 2007

Jkt 211001

Availability of Additional Information

DEPARTMENT OF ENERGY

Additional information about the

project is available from the

Commission’s Office of External Affairs,

at 1–866–208–FERC (3372). Additional

information can also be found on the

Internet at http://www.ferc.gov. The

‘‘eLibrary link’’ on the FERC Web site

provides access to documents submitted

to and issued by the Commission, such

as comments, orders, notices and

rulemakings. Once on the FERC Web

site, click on the ‘‘eLibrary link,’’ select

‘‘General Search’’ and in the ‘‘Docket

Number’’ field enter the project docket

number excluding the last three digits

(PF07–1). When researching information

be sure to select an appropriate date

range. In addition, the FERC now offers

a free e-mail service called

eSubscription that allows you to keep

track of all formal issuances and

submittals in specific dockets. This can

reduce the amount of time you spend

researching proceedings by

automatically providing you with

notification of these filings, document

summaries and direct links to the

documents. To register for this service,

go to http://www.ferc.gov/

esubscribenow.htm.

Public meetings or site visits will be

posted on the Commission’s calendar

located at http://www.ferc.gov/

EventCalendar/EventsList.aspx along

with other related information.

For assistance with the FERC Web site

or with eSubscription, please contact

FERC Online Support at

FERCOnlineSupport@ferc.gov or toll

free at 1–866–208–3676, or TTY, contact

1–202–502–8659.

Finally, Boardwalk has established an

Internet Web site for this project at

http://www.gulfcrossing.com. The

website includes a description of the

project, a map of the proposed pipeline

route, and answers to frequently asked

questions. You can also request

additional information or provide

comments directly to Boardwalk at 1–

713–544–5420.

Federal Energy Regulatory

Commission

Philis J. Posey,

Acting Secretary.

[FR Doc. E7–6443 Filed 4–5–07; 8:45 am]

BILLING CODE 6717–01–P

PO 00000

Frm 00065

Fmt 4703

Sfmt 4703

17155

Notice of Request for Extension of

Time To Commence and Complete

Project Construction and Soliciting

Comments, Motions To Intervene, and

Protests

April 2, 2007.

Take notice that the following

hydroelectric application has been filed

with the Commission and is available

for public inspection:

a. Application Type: Request for

Extension of Time.

b. Project No: 11480–004.

c. Date Filed: March 19, 2007.

d. Applicant: Haida Corporation.

e. Name of Project: Upper Reynolds

Creek Hydroelectric Project.

f. Location: On Reynolds Creek, near

the town of Hydaburg, Copper River

Meridian, Prince of Wales, in the

Ketchikan County recording district,

Alaska.

g. Pursuant to: Pub. L. 109–297, 120

STAT. 1471.

h. Applicant Contact: Donald H.

Clarke, Law Offices of GKRSE, 1500 K

Street, NW., Suite 330, Washington, DC

20005; (202) 408–5400.

i. FERC Contact: Diane M. Murray,

Telephone: (202) 502–8838 and e-mail:

diane.murray@ferc.gov.

j. Deadline for filing comments,

motions to intervene, and protests: May

10, 2007.

All documents (original and eight

copies) should be filed with: Secretary,

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426. Please include the project

number (P–11480–004) on any

comments.

The Commission’s Rules of Practice

and Procedure require all intervenors

filing documents with the Commission

to serve a copy of that document on

each person whose name appears on the

official service list for the project.

Further, if an intervenor files comments

or documents with the Commission

relating to the merits of an issue that

may affect the responsibilities of a

particular resource agency, they must

also serve a copy of the document on

that resource agency. A copy of any

motion to intervene must also be served

upon each representative of the

Applicant specified in the particular

application.

k. Description of Request: The

licensee requests that the Commission

grant two, two-year extensions of time

from the existing deadlines to

commence and complete project

E:\FR\FM\06APN1.SGM

06APN1

pwalker on PROD1PC71 with NOTICES

17156

Federal Register / Vol. 72, No. 66 / Friday, April 6, 2007 / Notices

construction of the Jordan Dam

Hydroelectric Project. This will be the

first and second 2-year extensions of

three authorized by Public Law 109–

297. The requested new deadlines

would be October 24, 2008, and October

24, 2010, to commence and complete

construction, respectively.

l. Locations of the Application: A

copy of the application is available for

inspection and reproduction at the

Commission’s Public Reference Room,

located at 888 First Street, NE., Room

2A, Washington, DC 20426, or by calling

(202) 502–8371. This filing may also be

viewed on the Commission’s Web site at

http://www.ferc.gov using the

‘‘eLibrary’’ link. Enter the docket

number excluding the last three digits in

the docket number field to access the

document. You may also register online

at http://www.ferc.gov/docs-filing/

esubscription.asp to be notified via email of new filings and issuances

related to this or other pending projects.

For assistance, call toll-free 1–866–208–

3676 or e-mail

FERCOnlineSupport@ferc.gov. For TTY,

call (202) 502–8659. A copy is also

available for inspection and

reproduction at the address in item h.

above.

m. Individuals desiring to be included

on the Commission’s mailing list should

so indicate by writing to the Secretary

of the Commission.

n. Comments, Protests, or Motions to

Intervene—Anyone may submit

comments, a protest, or a motion to

intervene in accordance with the

requirements of Rules of Practice and

Procedure, 18 CFR 385.210, .211, .214.

In determining the appropriate action to

take, the Commission will consider all

protests or other comments filed, but

only those who file a motion to

intervene in accordance with the

Commission’s Rules may become a

party to the proceeding. Any comments,

protests, or motions to intervene must

be received on or before the specified

comment date for the particular

application.

o. Any filings must bear in all capital

letters the title ‘‘COMMENTS’’,

‘‘PROTEST’’, or ‘‘MOTION TO

INTERVENE’’, as applicable, and the

Project Number of the particular

application to which the filing refers.

p. Agency Comments—Federal, state,

and local agencies are invited to file

comments on the described application.

A copy of the application may be

obtained by agencies directly from the

Applicant. If an agency does not file

comments within the time specified for

filing comments, it will be presumed to

have no comments. One copy of an

VerDate Aug<31>2005

18:39 Apr 05, 2007

Jkt 211001

agency’s comments must also be sent to

the Applicant’s representatives.

q. Comments, protests, and

interventions may be filed electronically

via the Internet in lieu of paper. See, 18

CFR 385.2001(a)(1)(iii) and the

instructions on the Commission’s Web

site at http://www.ferc.gov under the ‘‘eFiling’’ link.

Philis J. Posey,

Acting Secretary.

[FR Doc. E7–6441 Filed 4–5–07; 8:45 am]

BILLING CODE 6717–01–P

Federal Energy Regulatory

Commission

[Docket No. CP07–52–000]

Downeast LNG, Inc.; Notice of

Technical Conference

April 2, 2007.

On Wednesday, April 25, 2007, at 9

a.m. (EDT), staff of the Office of Energy

Projects will convene a cryogenic design

and technical conference regarding the

proposed Downeast LNG import

terminal. The cryogenic conference will

be held at the Calais Motor Inn at 663

Main Street, Calais, Maine 04619. For

Calais Motor Inn details call 1–800–

439–5531.

The conference will review the design

of the LNG storage tanks and facility,

instrumentation and controls, hazard

detection and controls, spill

containment, geotechnical topics, and

other issues related to the operation of

the proposed facility. Issues related to

environmental impacts and LNG vessel

transit are outside the scope of the

conference.

In view of the nature of critical energy

infrastructure information and security

issues to be explored, the cryogenic

conference will not be open to the

public. Attendance at this conference

will be limited to existing parties to the

proceeding (anyone who has

specifically requested to intervene as a

party) and to representatives of

interested federal, state, and local

agencies. Any person planning to attend

the April 25th cryogenic conference

must register by close of business on

Thursday, April 19, 2007. Registrations

may be submitted either online at

http://www.ferc.gov/whats-new/

registration/cryo-conf-form.asp or by

faxing a copy of the form (found at the

referenced online link) to 202–208–

0353. All attendees must sign a nondisclosure statement prior to entering

the conference. For additional

information regarding the cryogenic

Frm 00066

Fmt 4703

Sfmt 4703

Philis J. Posey,

Acting Secretary.

[FR Doc. E7–6437 Filed 4–5–07; 8:45 am]

BILLING CODE 6717–01–P

ENVIRONMENTAL PROTECTION

AGENCY

[ER–FRL–6685–7]

Environmental Impact Statements and

Regulations; Availability of EPA

Comments

DEPARTMENT OF ENERGY

PO 00000

conference, please contact Tejal Patel at

202–502–6037.

Availability of EPA comments

prepared pursuant to the Environmental

Review Process (ERP), under section

309 of the Clean Air Act and Section

102(2)(c) of the National Environmental

Policy Act as amended. Requests for

copies of EPA comments can be directed

to the Office of Federal Activities at

202–564–7167.

Summary of Rating Definitions

Environmental Impact of the Action

LO—Lack of Objections

The EPA review has not identified

any potential environmental impacts

requiring substantive changes to the

proposal. The review may have

disclosed opportunities for application

of mitigation measures that could be

accomplished with no more than minor

changes to the proposal.

EC—Environmental Concerns

The EPA review has identified

environmental impacts that should be

avoided in order to fully protect the

environment. Corrective measures may

require changes to the preferred

alternative or application of mitigation

measures that can reduce the

environmental impact. EPA would like

to work with the lead agency to reduce

these impacts.

EO—Environmental Objections

The EPA review has identified

significant environmental impacts that

must be avoided in order to provide

adequate protection for the

environment. Corrective measures may

require substantial changes to the

preferred alternative or consideration of

some other project alternative

(including the no action alternative or a

new alternative). EPA intends to work

with the lead agency to reduce these

impacts.

EU—Environmentally Unsatisfactory

The EPA review has identified

adverse environmental impacts that are

E:\FR\FM\06APN1.SGM

06APN1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.